Sub-area A Undeveloped = 0.8 in/hr Sub-area B Residential = 0.2 in/hr 0.0 0.5 1.0 1.5 2.0 0.0 0.5 1.0 1.5 2.0 Tim e (hr) Increm ent.Precip (in) 0 200 400 600 800 0.0 2.0 4.0 6.0 Tim e (hr) U H (cfs/in) 0 100 200 300 400 0 1 2 3 4 5 6 Tim e (hr) U H (cfs/in) Channel Muskingum: K = 0.5, X = 0.25 Reservoir Level Pool 0 200 400 600 800 1000 1200 0 250 500 750 1000 Storage (ac-ft) O utflow (cfs)

Upload: shaeleigh-cross

Post on 31-Dec-2015

28 views

Category:

Documents


1 download

DESCRIPTION

Sub-area A Undeveloped f = 0.8 in/hr. Sub-area B Residential f = 0.2 in/hr. Channel Muskingum: K = 0.5, X = 0.25. Reservoir Level Pool. Transform to Basin Outlet. Subarea A runoff. Subarea B runoff. Muskingum Routing. Level Pool Routing. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Sub-area A Undeveloped f  = 0.8 in/hr

Sub-area AUndeveloped = 0.8 in/hr Sub-area B

Residential = 0.2 in/hr

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0

Time (hr)

Incre

men

t. P

recip

(in

)

0

200

400

600

800

0.0 2.0 4.0 6.0

Time (hr)

UH

(cfs

/in)

0

100

200

300

400

0 1 2 3 4 5 6

Time (hr)

UH

(cfs

/in)

ChannelMuskingum: K = 0.5, X = 0.25 Reservoir

Level Pool

0200400600800

10001200

0 250 500 750 1000

Storage (ac-ft)

Ou

tflo

w (

cfs

)

Page 2: Sub-area A Undeveloped f  = 0.8 in/hr

Transform to Basin Outlet

• Subarea A runoff • Subarea B runoff

Page 3: Sub-area A Undeveloped f  = 0.8 in/hr

Muskingum Routing

tXK

tXKC

tXK

KXtC

tXK

KXtC

)1(2

)1(2

)1(2

2

)1(2

2

3

2

1

Page 4: Sub-area A Undeveloped f  = 0.8 in/hr

Level Pool Routing