studio 6225: stage ii - poster
DESCRIPTION
Pohutukawa Developments: Stage II: Area C - PosterTRANSCRIPT
POTENTIALDEVELOPMENT
GATEWAY INDUSTRY PARKGATEWAY INDUSTRIAL PARK+ +
SLOPE 15+
INDIGENOUS FOREST
ESTURINE ECOLOGY
MANUKA KANUKA
RIPARIAN BUFFERNATURAL FOREST
POST 1989 FOREST
EXOTIC FOREST
R E T I R E D L A N DPLAN VIEW
GATEWAYINDUSTRIALPARK
LOTSBUILDINGSROADINGWALKWAYSVEGETATIONOPENSPACE
N 1:10000
GATEWAY INDUSTRIAL PARK IS A NEW SUSTAINABLE LANDUSE DEVELOPMENT.
NEW AND EXISTING VEGETATION AND ENGINEERED STORMWATER SYSTEMS CONTAIN AND CONTROL ALL HYDROLOGICAL ASPECTS ACROSS THE SITE.
WITH A FRAGILE ESTURINE ECOSYSTEM ON THE EDGE OF THIS PROPOSED INDUSTRIAL SITE, IT IS OF MAIN IMPORTANCE TO MAINTAIN AND IMPROVE THE WATER QUALITY THAT FLOWS OUT THROUGH THIS ECOLOGICALLY IMPORTANT ECOSYSTEM THEN OUT INTO THE TAMAKI STRAIT.
TOTAL DEVELOPMENT AREA: 101HASEMI-PERMEABLE/IMPERVIOUS AREAS: 33HATOTAL VEGETATIVE AREA: 39HA
133 LOTS RANGING IN SIZE FROM 600M2-5150M2.
ALISTAIR McCULLOUGH 1293647