studio kplans.shshotelus.net/home 2 south san francisco/ssf... · rev"d arch. plans. executive...

24
MANAGERS OFFICE STAFF BOARDROOM STORAGE LOBBY OASIS FRONT DESK & MARKET EXTENDED LOBBY BREAKFAST GAMES ROOM 3.01 11 8 9 10 9'-7" 9'-0 1/2" 1'-6 15/64" 3'-10" 30" x 48" 30" x 48" 48" x 60" 30" x 48" 30" x 48" 60"DIA STORAGE GUEST LAUNDRY FITNESS ROOM 3.02 4 1 3 PANTRY STORAGE ELECTRICAL / MECHANICAL KING STUDIO 1 KING STUDIO 2 KING STUDIO 1 1-BR KING ACC 1 KING STUDIO ACC 1 BOARDROOM BUSINESS LOUNGE 4'-0" 4" 2'-0" 1'-8" 2'-0" 1'-8" 6 1/2" 6 1/2" VESTIBULE OFFICE 1 OFFICE 2 EMPLOYEE BREAK RM LAUNDRY MEETING RM STORAGE SERVERY KING STUDIO 2 KING STUDIO 2 2 OUTDOOR LOUNGE OUTDOOR PATIO SPA 3.01 7 4 5 6 STORAGE STORAGE STORAGE STORAGE STORAGE STAIR 1 STAIR 2 STAFF RESTROOM 1 3.00 1 3.00 1 3.00 2 3.00 2 3.00 3 3.00 3 3.00 4 3.00 4 3.00 1 3.01 2 3.01 3 3.01 3.02 8 5 7 6 3.02 12 11 9 10 1 3.03 1 3.04 2 3.04 CORRIDOR CORRIDOR CORRIDOR CORRIDOR STORAGE LADIES RESTROOM MENS RESTROOM 2 5.00 PROJECT: HOME2 SUITES BY HILTON DRAWING: FIRST FLOOR PLAN SCALE: 1/8" = 1'-0" DATE: JAN. 12, 2017 DRAWN BY: DRAWING NUMBER: REVISIONS: REV # DATE NOTES GENERAL: 1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS. 2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY DISCREPANCY OR OMISSION. 3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT DOCUMENTS, PERFORMANCE REQUIREMENTS, AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 4. ALL MATERIALS SHALL MEET CODE. 5. THIS DRAWING, AND THE INFORMATION SHOWN OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF STUDIO K DESIGN COMPANY, AND MAY NOT BE USED OR DISCLOSED WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K DESIGN COMPANY. 6. DO NO SCALE DRAWINGS. 0 APR 28, 2017 RELEASE K SUTHERLAND ID1.00 550 GATEWAY BLVD. SOUTH SAN FRANCISCO, CA SRI KRISHNA ENTERPRISE 300 GATEWAY BOULEVARD SOUTH SAN FRANCISCO, CA 94080 8853 213 Street Langley, BC V1M 1Z3 [email protected] STUDIO K DESIGN COMPANY 604-619-4119 1 MAY 08, 2017 PATIO REV. 2 MAY 15, 2017 COMM. TBL.. UD. FIRST FLOOR FURNITURE PLAN 1/8" = 1'-0" 1 1.00 HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) 3 JUN 05, 2017 K STUDIO CONV. 4 JUN 08, 2017 GENERAL REV'S PER OWNER REVIEW NOTES 5 AUG 01, 2017 REALIGN TO REV"D ARCH. PLANS

Upload: others

Post on 21-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

MANAGERSOFFICE

STAFFBOARDROOM

STORAGE LOBBYOASIS

FRONT DESK& MARKET

EXTENDEDLOBBY

BREAKFAST

GAMESROOM

3.0111

8

9

10

9'-7" 9'-0 1/2"

1'-6 15/64"

3'-10

"

30" x 48"

30" x 48"

48" x 60"

30" x 48"

30" x 48"

60"DIA

STORAGE

GUESTLAUNDRY

FITNESSROOM3.024

1

3

PANTRY

STORAGE

ELECTRICAL /MECHANICAL

KING STUDIO 1

KING STUDIO 2

KING STUDIO 1

1-BR KINGACC 1

KING STUDIOACC 1

BOARDROOM

BUSINESSLOUNGE

4'-0"

4"

2'-0"1'-

8"

2'-0" 1'-

8"

6 1/2"

6 1/2"

VESTIBULE

OFFICE 1OFFICE 2EMPLOYEEBREAK RMLAUNDRY

MEETINGRM

STORAGE

SERVERY

KING STUDIO 2

KING STUDIO 2

2

OUTDOORLOUNGE

OUTDOORPATIO

SPA

3.017

4

5

6

STORAGE

STORAGESTORAGE

STORAGE

STORAGE

STAIR1

STAIR2

STAFFRESTROOM

13.00

13.00

13.00

23.00

23.00

33.00

33.00

43.00

43.00

13.01

23.01

33.01

3.028

5

7

6

3.0212

11

9

10

13.03

13.04

23.04

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

STORAGE

LADIESRESTROOM

MENS RESTROOM

25.00

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

FIRST FLOOR PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID1.00

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1 MAY 08, 2017 PATIO REV.

2 MAY 15, 2017 COMM. TBL..UD.

FIRST FLOOR FURNITURE PLAN

1/8" = 1'-0"1

1.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

3 JUN 05, 2017 K STUDIOCONV.

4 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

5 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
Page 2: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

1-BR KINGKING

STUDIO 3KING

STUDIO 3KING

STUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KING STUDIO 6

KING STUDIOACC 2 CONN

DOUBLE QUEENSTUDIO CONN

KING STUDIOACC 3 CONN

DOUBLE QUEENSTUDIO CONN

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

1-BR KING

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 4

KINGSTUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

KINGSTUDIO 3

ELEVATORLOBBY

ELEVATORSTORAGE

HOUSEKEEPING

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

CO

RRID

OR

STAIR2

STAIR1

STORAGE

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

SECOND TO FIFTHFLOOR PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID1.01

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1 MAY 05, 2017 GBATHDOORS

2

SECOND TO FIFTH FLOOR FURNITURE PLAN

1/8" = 1'-0"1

1.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

3 JUN 05, 2017 K STUDIOCONV.

MAY 08, 2017 PATIO REV.

4 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

Page 3: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

EXECUTIVERESTROOM

RECEPTIONLOBBY

OFFICE 1CONTROLLER

FLEXIBLEWORK SPACE

TEMPLEFOYER

TEMPLE

FILEROOM

BISTROKITCHEN

EXECUTIVEOFFICE 3

(BJ)

EXECUTIVEOFFICE 2(VIJAY)

EXECUTIVEANTECHAMBER 3

EXECUTIVEANTECHAMBER 2

CORRIDOR

ELEVATORSTORAGE

CUSTOM MOSAICTILE WALL ART

MODELNUMBERTRADENAMEPRODUCTMATERIAL MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

ELEVATORLOBBY

LOBBYVESTIBULE

37"TELEVISION

96.6

25

96.25 41.125

21.1

25

137.375

5.75

3654

.875

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

SIXTH FLOOR PLAN(DETAIL)

SCALE:

1/4" = 1'-0"

DATE:

JULY 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 JUL 12, 2017 RELEASE

K SUTHERLAND

ID1.02

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119SIXTH FLOOR PLAN (DETAIL)

1/4" = 1'-0"1

1.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

1 JUL 13, 2017ADD DIM'S /MODIFYDOORS

2 JUL 13, 2017DOORS ATELEV. LOBBY

3 JUL 21, 2017GENERALREVISIONS

4 JUL 24, 2017GENERALREVISIONS

5 AUG 21, 2017ID INPROGRESS

Page 4: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

OFFICE

STAFFBOARDROOM

STORAGE

42" TELEVISION

LOBBYOASIS

FRONT DESK& MARKET

EXTENDEDLOBBY

BREAKFASTREFER TO ID4.56 ENLARGED PLAN - BREAKFAST SERVERYFOR DETAILS ON APPLIANCES AND LOCATIONS

STORAGE

STORAGE

BOARDROOM

BUSINESSLOUNGE

VESTIBULE

BREAK RM

MEETINGROOM

SERVERY

IF-502

IF-512

IF-118

IF-807

IF-207

IF-304

IF-301

IF-303

IF-402

IF-602IF-601

IF-500

IF-102

IF-308

IF-501

IF-102

IF-602IF-601

IF-402

IF-117IF-801

IF-115IF-200

IF-402

IF-117

IF-801

IF-115

IF-200

IF-806

IF-111

IF-801

IF-108

IF-108

IF-801

IF-800

IF-113

IF-113

IF-105

IF-103

IF-806

IF-106

IF-100

IF-107

IF-107

IF-804IF-202

IF-800

IF-108

IF-108

IF-202

IF-114IF-109

IF-805

IF-601

IF-602

IF-600 IF-602

IF-601

IF-802

IF-112 IF-112

IF-112 IF-112

IF-802

IF-112 IF-112

IF-112 IF-112

IF-802

IF-112 IF-112

IF-112 IF-112

IF-600

IF-602IF-601

IF-107IF-107

IF-804

IF-403 IF-403

IF-407 IF-300

IF-123IF-124

IF-125

IF-824 IF-824

IF-124IF-125 IF-125

IF-124IF-125

IF-123IF-125

IF-124 IF-123

IF-526IF-525IF-524

IF-306IF-1001

IF-827

IF-143 IF-826

IF-144

IF-804

IF-144

IF-827

IF-143IF-826

IF-144

IF-804

IF-144

IF-829 IF-829

IF-601

IF-212

IF-828

IF-527

IF-212

IF-601

IF-302 IF-505

IF-601IF-602

IF-209

IF-126

IF-126

IF-126

IF-126

IF-126

IF-126

IF-126

IF-126

IF-209

IF-310

IF-402

IF-402

IF-318 IF-318

IF-316 IF-317 IF-509

IF-523

IF-510

IF-102TYPICAL

IF-825

IF-529IF-529

IF-528

IF-530

IF-309

IF-314

IF-134

IF-134

IF-142TYPICAL IF-817

IF-135

IF-135

IF-814

IF-134

IF-409

IF-815

IF-135 IF-135

IF-815

IF-134IF-134IF-409IF-409

IF-135 IF-135

IF-141IF-820

TYPICALIF-133

IF-813

IF-313

36" TELEVISION

50" TELEVISION

42" TELEVISION

IF-612

OF-719

OF-720

IF-612

OF-715OF-709

OF-715OF-709

OF-715

OF-712

OF-712

OF-721

OF-715OF-709

OF-715 OF-715OF-709

OF-715

OUTDOORPATIO

IF-822

IF-821

IF-142TYPICAL

IF-203TYPICAL

IF-311 IF-513TYPICAL

IF-203TYPICAL

IF-311 IF-513TYPICAL

OF-712

OF-710

STAFFRESTROOM

MENS RESTROOM

LADIESRESTROOM

IF-808

IF-527

IF-506

IF-521

IF-816

IF-211 IF-211

IF-201TYPICAL

IF-211

IF-211

IF-211

IF-211

TYPICALIF-211

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

ENLARGED FURNITURE PLANLOBBY

SCALE:

1/4" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID2.00

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1 MAY 05, 2017 GBATHDOORS

2

3 JUN 05, 2017 K STUDIOCONV.

MAY 08, 2017 PATIO REV.

ENLARGED FURNITURE PLAN - LOBBY

1/4" = 1'-0"1

2.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

4 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

5 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
Page 5: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

IF-612

OF-719

OF-720

IF-612

OF-715OF-709

OF-715OF-709

OF-715

OF-712

OF-712

OF-712

OF-712

OF-706

OF-704 OF-704

BBQ BBQ

OF-704

OF-704

OF-704

OF-701

IF-717

OF-703

OF-705

OF-703

OF-705

OF-711OF-711

OF-713

OF-713

OF-700

OF-700

OF-700

OF-700 OF-700

OF-700

OF-700

OF-701

OF-700

OF-702

OF-702

OF-706OF-707

OF-700

OF-721

OF-721

OF-715OF-709

OF-715 OF-715OF-709

OF-715

IF-612

OF-705

OUTDOORLOUNGE

OUTDOORPATIO

SPA

OF-712

OF-712

OF-712

OF-710

OF-710

ELEVATORLOBBY

ELEVATOR

IF-210IF-818

IF-131IF-504

IF-210IF-818

IF-520

IF-531

IF-520

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

ENLARGED PUBLIC AREAPLANS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID2.01

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1 MAY 05, 2017 GBATHDOORS

2

ENLARGED FURNITURE PLAN - OUTDOOR PATIO

3/8" = 1'-0"1

2.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

3 JUN 27, 2017 ADD PLANDETAIL 4

MAY 08, 2017 PATIO REV.

ENLARGED FURNITURE PLAN - UPPER LEVEL ELEV. LOBBY

3/8" = 1'-0"2

2.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

4 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

Page 6: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

GAMESROOM

IF-315 IF-136 IF-136A

IF-146

IF-146

IF-315

IF-516

IF-136IF-136A

IF-516

IF-518IF-318

IF-518IF-318

IF-111

IF-145

IF-518IF-318

IF-519IF-408 IF-145

IF-803IF-107

TYPICALIF-211

TV

TV

IF-211 IF-211 IF-211 IF-211

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

ENLARGED GAMES ROOMPLAN DETAILS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID2.02

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1 JUN 10, 2017REDESIGN PERBRANDREVIEW

ENLARGED FURNITURE PLAN - GAMES ROOM

3/4" = 1'-0"1

2.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

ENLARGED POWER & CABLE PLAN - GAMES ROOM

3/4" = 1'-0"1

2.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

Page 7: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

GUESTLAUNDRY

FITNESSROOM

3.0112

9

11

10

IF-400

2

1

1

11

3

11

IF-400

5

6

IF-613

16

8

7

9

12

IF-1000

20

IF-810

19

IF-122

22

IF-122

22

IF-809

23

IF-205

10

10

13

15

17

21

18

25

25

24

24IF-823

28

10

29

IF-809

23

26

12

4

14

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

ENLARGED FITNESS ROOMPLAN DETAILS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID2.03

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

1

ENLARGED FURNITURE PLAN - FITNESS ROOM

3/8" = 1'-0"1

2.03

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

AUG 01, 2017ALIGN TOARCH. PLANS

Page 8: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

WC 04 WC 04 WC 04 WC 04

OPEN TOCORRIDOR BEYOND

WC 04SF 06G 01 WC 04 WC 09 WC 04 CT 031M3.02

VB 02 VB 02 VB 02 VB 02 VB 02 VB 02

HOME2GUARANTEESIGN LOCATION

CT03

CT 04CT 03 CT 04CT 03IF 402 IF 402 CT 04CT 03

VB 02 VB 02

WC 09ACCESSIBLE POWER AND DATA INSTALLEDAT EACH BUSINESS CENTER WORK STATION

CT 04CT 03 IF 402IF 402

IF 402CT 04CT 03 CT 04CT 03 CT 04CT 03 WC 04

VB 02

OPEN TOCORRIDOR BEYOND

ACCENTCUBBY A

ACCENTCUBBY B

ACCENTCUBBY A

ACCENTCUBBY A

ACCENTCUBBY A

ACCENTCUBBY B

ACCENTCUBBY B

WC 04 WC 09 IF 403IF 403ALL SELF SERVICE DISPENSERS AND OTHER AMENITIES MUST BE LOCATEDWITHIN 48" AFF REACH HEIGHT. IF ITEMS ARE DEEPER THAN 10" FROM THEFRONT OF THE BASE CABINET, PROVIDE DISPENSERS AT 46" MAX AFF.

WC 09 WC 07 WC 04 WC 04 WC 04CT 04CT 03

2'-9 1

/2"

2'-8"

VB 02VB 02 VB 02 VB 02

8 1/2"

2'-0"

6"2'-

0"

8'-0"

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID3.00

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - LOBBY

3/8" = 1'-0"1

3.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - LOBBY

3/8" = 1'-0"2

3.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - LOBBY

3/8" = 1'-0"3

3.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - LOBBY

3/8" = 1'-0"4

3.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

1 AUG 03, 2017ALIGN TOARCH.PLANS

AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
DATA
AutoCAD SHX Text
V
AutoCAD SHX Text
DATA
AutoCAD SHX Text
V
Page 9: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

WC 07 WC 09

VB 02

WC 04

ADJUSTABLE SHELVING ON HEAVY DUTYBRACKETS AND STANDARDS

OPEN TOLOBBY BEYOND

9'-0"

5'-0"

5'-0"

8'-0"5'-10"

5'-2"

11'-3 1/2" 2'-1"

5'-2"

WC 12 WC 12 WC 12 WC 12

VB 02 VB 02 VB 02 VB 02

PT 03

5'-0"

5'-0"

5'-5 1/2"

5'-0"

WC 10 WC 10 WC 06 WC 10 WC 06 WC 06

VB 02 VB 02 VB 02 VB 02 VB 02

IF 406

4'-3 1

/2"

4'-3 1

/2"

1'-9"

1'-9"

1'-9"

1'-9"

PT 03

5'-1"5'-

7"

4'-10

"

10'-3"

13'-3"

16'-3"

6"

3'-8"

EQ EQ

4"

3'-2"

EQEQ

5'-0 17/64"

5'-0 17/64"

6"

3'-8"

WC 12 WC 12 WC 12 WC 12 WC 12

VB 02 VB 02 VB 02 VB 02 VB 02

PT 03 PT 03

5'-5 1

/4"

VB 02 VB 02 VB 02

WC 04WC 04 WC 04 WC 04

3'-0" EQ EQ

2'-1 1/2" 2'-1 1/2"

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID3.01

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - BUFFET WORK SPACE

3/8" = 1'-0"1

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - MEETING ROOM

3/8" = 1'-0"6

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - GAMES ROOM

3/8" = 1'-0"8

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - LOBBY

3/8" = 1'-0"2

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - MEETING ROOM

3/8" = 1'-0"4

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - BUSINESS LOUNGE

3/8" = 1'-0"3

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - MEETING ROOM

3/8" = 1'-0"5

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - MEETING ROOM

3/8" = 1'-0"7

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INT. ELEV. - GAMES ROOM

3/8" = 1'-0"9

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)INTERIOR ELEVATION - GAMES ROOM

3/8" = 1'-0"10

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INT. ELEV. - GAMES ROOM

3/8" = 1'-0"11

3.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

1 AUG 03, 2017ALIGN TOARCH.PLANS

AutoCAD SHX Text
TV
AutoCAD SHX Text
TV
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
D
AutoCAD SHX Text
TV
AutoCAD SHX Text
TV
Page 10: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

3'-10

"

EQ EQ

PROVIDE BLOCKING,ONLY AS REQUIRED

WC 10

VB 03

WC 10PT 03

MODELNUMBERTRADENAMEPRODUCTMATERIAL MODELNUMBERTRADENAMEPRODUCTMATERIAL

1'-5"

2'-10

"

2'-0"

3'-6 1

/4"

CT 06 CT 05

4"2

2'-6"

5'-4"

CT 05MLAM 01 BABY CHANGING STATIONREFER TO IF-1006

CT 05 CT 05

3'-8"

6'-0"

WALL HOOKSREFER TO IF-902

UNDERCOUNTER TRASH RECEPTACLEREFER TO IF-1003

PAPER TOWEL DISPENSERREFER TO IF-1004

4'-0"

8'-5"TOILET TISSUE DISPENSERREFER TO IF-1009

PT 03

MODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIAL

2'-10

"

3'-6 1

/4"

CT 06CT 05

4"2

2'-6"

5'-4"

CT 05 MLAM 01CT 05

3'-8"

6'-0"

WALL HOOKSREFER TO PA-902

1'-1 1/2"3'-4"

1'-1"

3'-4"

BABY CHANGING STATIONREFER TO IF-1006

CT 05

UNDERCOUNTER TRASH RECEPTACLEREFER TO IF-1003

PAPER TOWEL DISPENSERREFER TO IF-1004

4'-0"

8'-5"NAPKIN DISPOSALREFER TO IF-1008

TOILET TISSUE DISPENSERREFER TO IF-1009

PT 03

5'-8"

4'-7"

EQ EQ EQ EQ

5'-8"

4'-7"

WC 06 WC 06 WC 06

VB 03 VB 03VB 03

IF 400 IF 400

WC 10

VB 03

9"9"

5'-6"

4'-0"

MAX

T.O.

OPE

RABL

E CO

MPON

ENT

3'-10

"

6"

WC 10 WC 10

VB 03 VB 03

PT 03

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONS

SCALE:

3/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID3.02

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - FITNESS

3/8" = 1'-0"1

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - MENS PUBLIC RESTROOM

3/8" = 1'-0"5

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - LADIES PUBLIC RESTROOM

3/8" = 1'-0"9

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - FITNESS

3/8" = 1'-0"3

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)INTERIOR ELEVATION - FITNESS

3/8" = 1'-0"2

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - FITNESS

3/8" = 1'-0"4

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

MENS RESTROOM

3/8" = 1'-0"6

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)MENS RESTROOM

3/8" = 1'-0"7

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)MENS RESTROOM

3/8" = 1'-0"8

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

LADIES RESTROOM

3/8" = 1'-0"10

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)LADIES RESTROOM

3/8" = 1'-0"11

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)LADIES RESTROOM

3/8" = 1'-0"12

3.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

1 AUG 03, 2017ALIGN TOARCH.PLANS

AutoCAD SHX Text
TV
AutoCAD SHX Text
TV
Page 11: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

4'-2"4'-2"

1F3.03

1J3.03

7F3.03

SF 06G 01

VB 02

EQ EQ

7'-0"

5"

5/8" REVEAL AROUNDPERIMETER OFSPECIAL FINISH

WALLRETURN

WALL BEHINDFRONT DESK

3'-10"

4'-0"

8"1'-

8"8"

1'-10

"

2'-10" WC 04

WC 04

VB 02

2"

5/8" REVEALAROUNDPERIMETER OFSPECIAL FINISH

4J3.03

4F3.03

3'-0"

ENLARGED ELEVATION AT WOOD WALL

SCALE: 3/4" = 1'-0"1M

3.03

FRY REGLET "Z" REVEAL MOLDINGDRMZ-100-100 -- SHIM AS REQUIRED

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDENGINEERED COMPOSITE BOARD15MM ENGINEEREDCOMPOSITE BOARD

5/8" GYPSUM BOARD

NEOPRENE GASKET

BLOCKING / GLAZING STOPS3 3/8"

4 1/2"

TOP OF SILL4'-6"

5/8" GYPSUM BOARD

G 01

BOT. OF HEAD6'-4"3/8" COLORED GLASS

MITER CORNERS AT ENGINEEREDCOMPOSITE BOARD

STUD WALL

WC 04

3/4" MAPLE TRIM / GLAZING STOPSTAINED TO MATCHWITH CLEAR MATTEPOLYURATHANE TOP COAT

3/4" MAPLE TRIM / GLAZING STOPSTAINED TO MATCHWITH CLEAR MATTEPOLYURATHANE TOP COAT PL

3 3/4"

SECTION DETAIL

DO NOT SCALE4F

3.03

SECTION DETAIL

DO NOT SCALE1F

3.03

FRY REGLET "F" REVEAL MOLDINGDRMF 625-625 -- SHIM AS REQUIRED

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDCOMPOSITE BOARD

STUD WALL

BOT. OF REVEAL3'-8" A.F.F.

5/8" GYPSUM BOARD

TOP OF REVEAL7'-2" A.F.F.

FRY REGLET "Z" REVEAL MOLDINGDRMZ-625-100 -- SHIM AS REQUIRED

3/8" ENGINEEREDCOMPOSITE BOARD

GYP BOARD AT CEILING

4"3 3

/4"

PLAN DETAIL

DO NOT SCALE4J

3.03

PLAN DETAIL AT WOOD WALL

DO NOT SCALE1J

3.03

3/8" COLORED GLASS3/4" MAPLE TRIM / GLAZING STOPSTAINED TO MATCHWITH CLEAR MATTEPOLYURATHANE TOP COAT

3/8" ENGINEERED COMPOSITEBOARD

MITER ENGINEERED COMPOSITEBOARD AT CORNER

BUTT JOINT AT CORNER GLAZING - NO SILICONE

G 01

SF 06WORKSTATION

REGISTRATION

PASSAGE WAY

1'-3"1'-6"

5/8" GYPSUM BOARD

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDENGINEERED COMPOSITE BOARD

3/8" ENGINEEREDCOMPOSITE BOARD

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDENGINEERED COMPOSITE BOARD

MITER COMPOSITE BOARD AT CORNER

SF 06

WORKSTATION

REGISTRATION1'-

0"

FRY REGLET "Z" REVEAL MOLDINGDRMZ-625-100 -- SHIM AS REQUIRED

3/8" ENGINEEREDCOMPOSITE BOARD

SF 06

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDENGINEERED COMPOSITE BOARD

5/8" GYP. BOARD WITH METAL CORNERBEAD

3 3/4"

SECTION DETAIL

DO NOT SCALE7F

3.03

FRY REGLET "Z" REVEAL MOLDINGDRMF 625-100 -- SHIM AS REQUIRED

Z-CLIP WITH 5/8" LIFT OFF -- SHIM TOALIGN FACE OF GYP BOARD ANDCOMPOSITE BOARD

STUD WALL

BOT. OF REVEAL3'-8" A.F.F.

5/8" GYPSUM BOARD

TOP OF REVEAL7'-2" A.F.F.

FRY REGLET "Z" REVEAL MOLDINGDRMZ-625-100 -- SHIM AS REQUIRED

3/8" ENGINEEREDCOMPOSITE BOARD SF 06

5/8" GYPSUM BOARD

3 1/2"

3 3/4"

4'-0"

8"1'-

8"8"

1'-10

"

1J3.03

2'-6"8"

SF 06

WC 08

G 01

5/8" REVEALAROUNDPERIMETER OFSPECIAL FINISH

4J3.03

WALL ATPASSAGE

4F3.03

VB 02

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSWOOD WALL DETAIL

SCALE:

3/4" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 02, 2017 RELEASE

K SUTHERLAND

ID3.03

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

1 AUG 03, 2017ALIGN TOARCH.PLANS

Page 12: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

IF-618

ACCENT CUBBY B

ACCENTCUBBY A

ACCENTCUBBY B

IF-617

IF-615

IF-619

IF-620

IF-616

IF-621

IF-505

IF-506

ACCENTCUBBY A

ACCENTCUBBY B

ACCENTCUBBY A

ACCENTCUBBY A

ACCENTCUBBY A

ACCENTCUBBY B

ACCENTCUBBY B

IF-508

IF-627IF-628

IF-627

IF-627IF-626

IF-625

IF-622IF-623

IF-624

5'-0"

4'-10

"

7'-0"

WC 12WC 12

VB 03VB 03

PT 03

7'-0"

6'-1"

7'-0"

WC 12 WC 12

VB 03 VB 03

PT 03

WC 13

NAPKIN DISPOSALREFER TO IF-1008

TOILET TISSUE DISPENSERREFER TO IF-1009

WC 13

PAPER TOWEL DISPENSERREFER TO IF-1004

MODELNUMBERTRADENAMEPRODUCTMATERIAL

IF 513.2CT 05

CT 11 CT 11

WC 13

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONS- MEDIA WALL DETAILS- BOARDROOM- STAFF RESTROOM

SCALE:

VARIES

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID3.04

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

ENLARGED DETAIL - LOBBY MEDIA WALL

3/4" = 1'-0"1

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

ENLARGED DETAIL - BUSINESS LOUNGE MEDIA WALL

3/4" = 1'-0"2

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

1 AUG 03, 2017ALIGN TOARCH.PLANS

INTERIOR ELEVATION - BOARDROOM

3/8" = 1'-0"3

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)BOARDROOM

3/8" = 1'-0"4

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATION - BOARDROOM

3/8" = 1'-0"5

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)BOARDROOM

3/8" = 1'-0"6

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

INTERIOR ELEVATIONS - STAFF RESTROOM

3/8" = 1'-0"6

3.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

2 AUG 24, 2017STAFF RRELEV.

AutoCAD SHX Text
TV
Page 13: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

SOUTHERN HOSPITALITY SERVICES, L L C

A k s h a r D e v e l o p m e n t I n c

3'-6"

OPEN TORECEPTION LOBBY

BEYOND

ELEVATORLOBBY

LOBBYVESTIBULE

2'-9"

2'-9"

1'-6"

1'-6"

ELECTRICAL AT WATER FEATURE WALLPENDING / MIDWEST TROPICAL 2017-08-1510"EQ EQ

3'-6"

7'-0"

REFER TO E5.0 FOR ELECTRICAL PLAN

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.05

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - ELEVATOR LOBBY

1/2" = 1'-0"1

3.05

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

INTERIOR ELEVATION - LOBBY VESTIBULE

1/2" = 1'-0"2

3.05

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

FURNITURE PLAN - DETAIL

1/2" = 1'-0"3

3.05

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"4

3.05

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

Page 14: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

MATERIALPRODUCTTRADENAMEMODELNUMBER

5'-6"

2'-10

"

MODELNUMBERTRADENAMEPRODUCTMATERIAL

3/8"T TEMPERED GLASS

MATERIAL

MODELNUMBERTRADENAMEPRODUCT

TRADENAME

MATERIAL

MODELNUMBERTRADENAMEPRODUCT MODELNUMBER

MODELNUMBERPRODUCTMATERIAL

TRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIALMODELNUMBERTRADENAMEPRODUCTMATERIAL

2'-2"

3'-0"11 3/4"

2'-10

"3'-4"

2'-6"

5'-6"

5'-2"

6"

3'-6"

3'-6"

3'-0"

8'-0"

3/8"T TEMPERED GLASS

MODELNUMBERTRADENAMEPRODUCTMATERIAL

5'-10

"

2'-4 3/4"

6'-6"

3'-3"

4'-6"

4"

MODELNUMBERTRADENAMEPRODUCTMATERIAL MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL MODELNUMBERTRADENAMEPRODUCTMATERIAL

MODELNUMBERTRADENAMEPRODUCTMATERIAL

2'-0" 2'-

3"2'-

3"2'-0"

1'-0"10"

REFER TO E5.0 FOR ELECTRICAL PLAN

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.06

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - EXECUTIVE RESTROOM

1/2" = 1'-0"1

3.06

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

INTERIOR ELEVATION - SHOWER DETAIL

1/2" = 1'-0"2

3.06

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

FURNITURE PLAN - DETAIL

1/2" = 1'-0"3

3.06

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"4

3.06

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

Page 15: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

3'-10

"4'-4"

2'-10

1/2"

1'-4"

OPEN TORECEPTION LOBBY

BEYOND

5'-6"

3'-10

"

2'-6"

1'-6"2'-0"

2'-6"

8'-3 11/16"

2'-6"

2'-0"

2'-0"

3'-6"1'-6"

3'-0" 6'-2 1/2"1'-7 1/4" 1'-6" 1'-6" 1'-7 1/4"

2'-0"

2'-6"

3'-6"1'-6"

3'-0" 6'-2 1/2"1'-7 1/4" 1'-6" 1'-6" 1'-7 1/4"

2'-0"

2'-6"

FLEXIBLEWORK SPACE

1'-6"

3'-6"

3'-0"

6'-2 1

/2"2'-

0"

11'-9 11/16"

8'-2"

37"TELEVISION

1

2

3

4

43.07

13.07

73.07

73.07

FLEXIBLEWORK SPACE

TV

4'-4"

8"8"

2'-6" 2'-6"

8"

REFER TO E5.0 FOR ELECTRICAL PLAN

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.07

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

ELEVATION - FLEXIBLE OFFICE

1/2" = 1'-0"1

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

INTERIOR ELEVATION - CASEWORK DETAIL

1/2" = 1'-0"7

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

FURNITURE PLAN - DETAIL

1/2" = 1'-0"5

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"6

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

ELEVATION - FLEXIBLE OFFICE

1/2" = 1'-0"2

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELEVATION - FLEXIBLE OFFICE

1/2" = 1'-0"3

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELEVATION - FLEXIBLE OFFICE

1/2" = 1'-0"4

3.07

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

AutoCAD SHX Text
TV
AutoCAD SHX Text
TV
Page 16: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

OPEN TOLOBBY VESTIBULE

BEYOND

5'-6"

3'-9"

3"7'-0"

3'-6"

OPEN TOTEMPLE FOYER

BEYOND

OPEN TOFLEXIBLE WORK SPACE

BEYOND

RECEPTIONLOBBY

RECEPTIONLOBBY

2'-6"

2'-6"

2'-6"

REFER TO E5.0 FOR ELECTRICAL PLAN

7'-0"

2'-6"

5'-4"

4"

6'-3"4" 4"

OFFICE 1CONTROLLER

OFFICE 1CONTROLLER

REFER TO E5.0 FOR ELECTRICAL PLAN

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.08

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - RECEPTION LOBBY

1/2" = 1'-0"1

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

FURNITURE PLAN - DETAIL

1/2" = 1'-0"3

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"4

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

INTERIOR ELEVATION - CONTROLLERS OFFICE

1/2" = 1'-0"2

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

FURNITURE PLAN - DETAIL

1/2" = 1'-0"5

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"6

3.08

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

Page 17: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

2'-0"

5'-1 1

/4"

FILEROOM

FILEROOM

REFER TO E5.0 FOR ELECTRICAL PLAN

4'-0"

EQ EQ1'-0" 9" 9"

5'-6"

3'-6"

10"

1'-0"

EQ EQ

9"

10" 2'-0"3'-4 1/4"

10"4'-10"

REFER TO E5.0 FOR ELECTRICAL PLAN

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.09

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - FILE ROOM

1/2" = 1'-0"1

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

FURNITURE PLAN - DETAIL

1/2" = 1'-0"3

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"4

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

INTERIOR ELEVATION - BISTRO KITCHEN

1/2" = 1'-0"2

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

FURNITURE PLAN - DETAIL

1/2" = 1'-0"5

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL & RCP - GENERAL

1/2" = 1'-0"6

3.09

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

Page 18: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

2'-6"

3'-0"

5'-6"

EXECUTIVECONFERENCE

ROOM

50" TELEVISION

TV

4'-4"

4'-10

"4'-

10"

EQ EQ

2'-0" 2'-0"

REFER TO E5.0 FOR ADDITIONAL ELECTRICAL

8'-0"

3'-6"

1'-10

"

1'-9"

1'-10

"

1'-9"

5'-6"

CENTER WALL ART ONCONFERENCE TABLE

3'-6"

10"

5'-6"

5'-6"

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

INTERIOR ELEVATIONSPENTHOUSE - 6TH FLR

SCALE:

1/2" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

0 AUG 21, 2017 WIP

K SUTHERLAND

ID3.10

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

INTERIOR ELEVATION - CONFERENCE RM

1/2" = 1'-0"1

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

7. REFER TO ELECTRICAL PLANS FOR ALL VERIFIED

OUTLET LOCATIONS.

FURNITURE PLAN - DETAIL

1/2" = 1'-0"6

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEELECTRICAL - GENERAL

1/2" = 1'-0"7

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

INTERIOR ELEVATION - CONFERENCE RM

1/2" = 1'-0"5

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

INTERIOR ELEVATION - CONFERENCE RM

1/2" = 1'-0"2

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEINTERIOR ELEVATION - CONFERENCE RM

1/2" = 1'-0"3

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSEINTERIOR ELEVATION - CONFERENCE RM

1/2" = 1'-0"4

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

RCP - GENERAL

1/2" = 1'-0"8

3.10

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY) - PENTHOUSE

Page 19: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

MANAGERSOFFICE

STAFFBOARDROOM

STORAGE LOBBYOASIS

FRONT DESK& MARKET

EXTENDEDLOBBY

BREAKFAST

GAMESROOM

STORAGE

GUESTLAUNDRY

FITNESSROOM

PANTRY

STORAGE

ELECTRICAL /MECHANICAL

KING STUDIO 1

KING STUDIO 2

KING STUDIO 1

1-BR KINGACC 1

KING STUDIOACC 1

BOARDROOM

BUSINESSLOUNGE

4'-0"

4"

2'-0"1'-

8"

2'-0" 1'-

8"

6 1/2"

6 1/2"

VESTIBULE

OFFICE 1OFFICE 2EMPLOYEEBREAK RMLAUNDRY

MEETINGRM

STORAGE

SERVERY

KING STUDIO 2

KING STUDIO 2

OUTDOORLOUNGE

OUTDOORPATIO

SPA

STORAGE

STORAGESTORAGE

STORAGE

STORAGE

STAIR1

STAIR2

STAFFRESTROOM

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

STORAGE

LADIESRESTROOM

MENS RESTROOM

DATA (6) TOTAL

VOICE (2) TOTAL

POWER (12) TOTAL

TV

TV

TV

TV

TV

TV

TV TV

TV

25.00

J

J J

J

36 WIDE CLEAR AISLE

J

APPROACH 30" X 48"

J JJ

SERVERY008

8

NOTE:ELECTRIC AND DATA OUTLETS ARE SHOWNTO PROVIDE REFERENCE LOCATIONS ANDTO SUPPORT BRAND STANDARD FF+E ANDEQUIPMENT. ADDITIONAL DEVICES MAY BEREQUIRED FOR OTHER ITEMS OR LOCALCODE COMPLIANCE.

2625

27

32

32

33 TYP. 24

8" MIN.

12

1313

37 9" MIN9"

24

36 3523

38 TYP.

K E Y N O T E S:

WALL MOUNTED GRAB BARS

ACCESSIBLE LOW-FLOW TOILET

TOWEL DISPENSER / TRASH CAN

TOILET PAPER HOLDER

FLOOR DRAIN WITH TRAP PRIMER IN DISH RECESS

VANITY AND MIRROR (VANITY MUST NOT ENCROACH INTO CLEARFLOOR SPACE FOR ACCESSIBLE TOILET)

PHONE RACK

BREAKFAST COUNTER; REACH RANGES FOR OPERABLE PARTS TOMEET ACCESSIBILITY REQUIREMENTS. SEE HADG FOR FURTHERINFORMATION.

PTAC

FLOOR DRAIN WITH TRAP PRIMER -- MAINTAIN ACCESSIBLE SLOPETO DRAIN

CHANGING TABLE

8" MINIMUM FROM EDGE OF WORK SURFACE TO CENTERLINE OFRAIL

UPPER CABINETS -- PROVIDE BLOCKING AS REQUIRED AT SOFFIT

NOT USED

NOT USED

NOT USED

FIRE EXTINGUISHER

LEVER INDICATED ON THE SIDE OF TANK NEAREST THEMANEUVERABILITY CLEARANCE INDICATION, TYPICAL

MATV RACK

OnQ RACK

4' x 8' PLYWOOD SHEET

COFFEE MAKER

TOASTER OVEN

MICROWAVE - COORDINATE W/ ELECTRICAL & CASEWORK

REFRIGERATOR - COORDINATE W/ ELECTRICAL & CASEWORK

DROP IN COLD WELL - COORDINATE W/ ELECTRICAL & CASEWORK

JUICE DISPENSER - COORDINATE W/ ELECTRICAL & CASEWORK

NOT USED

PROVIDE FLOOR DRAIN FOR REFRIGERATION WALL

UTILIZE ELEVATION INDICATED FOR FINISH REFERENCE ONLY

NOT USED

MAINTAIN MIN. 9" CLEAR FOR DRAPERIES - BOTH SIDES

ELECTRICAL INTEGRATED INTO CASEWORK -REFER TO CASEWORKDRAWINGS

JUNCTION BOX AND SWITCH FOR GARBAGE DISPOSAL

DEDICATED DUPLEX OUTLET FOR TOASTER OVEN

DEDICATED DUPLEX OUTLET FOR (2) MICROWAVES

KETTLE RETHERMALIZER

ALL SELF SERVICE DISPENSERS AND OTHER AMENITIES MUST BELOCATED WITHIN 48" AFF REACH HEIGHT. IF ITEMS ARE DEEPERTHAN 10" FROM THE FRONT OF THE BASE CABINET, PROVIDEDISPENSERS AT 46" MAX AFF.

1

2

3

4

5

6

NOTE:REFER TO SEPARATESPECIFICATIONS MANUALFOR ACCESSORIESSPECIFICATIONS AND FORITEMS NOT IDENTIFIEDWITHIN THESEDRAWINGS--FUNITURESHOWN ON PLAN IS FORREFERENCE ONLY

G E N E R A L N O T E S :

1. REFER TO FF&E PACKAGE FOR FURNITURE, BUILT-INMILLWORK AND FINISH SPECIFICATIONS

2. FIRE EXTINGUISHERS, SMOKE DETECTORS AND OTHEREMERGENCY DEVICES TO BE LOCATED PER LOCAL CODE.EXTINGUISHER LOCATIONS WITHIN THE PUBLIC SPACE SHALL BECONTAINED WITHIN FULLY RECESSED CABINETS PROVIDEEMERGENCY LIGHTING PER LOCAL CODE.

3. WALL DEVICES TO BE MOUNTED AT 12" A.F.F. TYPICAL U.N.O.4. REFER TO HOME 2 SUITES BY HILTON STANDARDS MANUAL FOR

ADDITIONAL GUESTROOM, GUESTROOM BATH, GUESTROOMKITCHEN AND INDOOR POOL REQUIREMENTS.

5. REFER TO STANDARDS FOR FIXTURE AND EQUIPMENTSCHEDULES

6. WALL MOUNTED EQUIP., FIXTURES, ETC. LOCATED BETWEEN 27"AND 80" A.F.F. SHALL NOT PROTRUDE FURTHER THAN 4" FROMWALL PER ACCESSIBILITY STANDARDS. CONSULT THE HADG FORFURTHER REQUIREMENTS

7

8

9

10

11

12

13

14

15

16

17

18

20

21

19

22

23

24

25

26

27

28

29

30

31

32

33

34

35

POWER AND SIGNAL LEGEND:

POWER OUTLET

QUAD OUTLET

GFCI OUTLET

DATA OUTLET

VOICE OUTLET

TV DEVICE WITH HSIA CONNECTION

SMOKE DETECTOR

ENERGY SAVER PANEL / KEY TAG

To EMERGENCY CONTROLS/DEVICES (GANGED AT B/PANEL)

To ELEVATOR CONTROLS/DEVICES

CENTERLINE OF ACCESSIBLE FLOOR IDENTIFICATIONSIGNAGE - LOCATE (1) ON EACH LOBBY DOOR JAMB,EVERY FLOOR, EVERY ELEVATOR

To ELEVATOR JAMB SIGNAGE

FLOOR MOUNTED JUNCTION BOX

FLUSH MOUNTED FLOOR OUTLET BOX

FIRE HORN

ES

TV

E1

E2

E3

E4

PLAN:

J

36

37

38

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

FIRST FLOORREFLECTED CEILING PLAN(LIMITED DETAIL)

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID5.00

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119

FIRST FLOOR - REFLECTED CEILING PLAN (PARTIAL)

1/8" = 1'-0"1

5.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

1 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

ENLARGED PLAN - SERVERY

DO NOT SCALE2

5.00

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

2 AUG 04, 2017ALIGN TO REV.ARCH. PLANS

AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MODELNUMBER
AutoCAD SHX Text
PRODUCT
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
TRADENAME
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
SD
Page 20: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

MANAGERSOFFICE

STAFFBOARDROOM

STORAGE LOBBYOASIS

FRONT DESK& MARKET

EXTENDEDLOBBY

BREAKFAST

GAMESROOM

STORAGE

STORAGE

GUESTLAUNDRY

FITNESSROOM

PANTRY

STORAGE

ELECTRICAL /MECHANICAL

KING STUDIO 1

KING STUDIO 2

KING STUDIO 1

1-BR KINGACC 1

KING STUDIOACC 1

BOARDROOM

BUSINESSLOUNGE

VESTIBULE

OFFICE 1OFFICE 2EMPLOYEEBREAK RM

LAUNDRY

MEETINGROOM

STORAGE

SERVERY

KING STUDIO 2

KING STUDIO 2

OUTDOORLOUNGE

OUTDOORPATIO

SPA

STORAGESTORAGE

STORAGESTORAGE

STORAGE

STORAGE

STAIR1

STAIR2

STAFFRESTROOM

MENSRESTROOM

LADIESRESTROOM

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

WC-07WALLCOVERING AT GUEST CORRIDOREYKON DESIGN RESOURCESSTUDIO SOURCE, RARE MINERALS BX4622 GRANITE

WC-06ACCENT WALLCOVERING AT FITNESS, MEETING, & GAMES ROOMEYKON DESIGN RESOURCESSYMPHONY, CHIMES AZ52994 LOVE IS BLUE

WC-04WALLCOVERING AT LOBBYEYKON DESIGN RESOURCES,STUDIO SOURCE, DRAPER BX4541 COCKTAIL PARTY

WC-08ACCENT WALLCOVERING AT GUEST CORRIDOR & ELEVATOR LOBBYEYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4536 ZOU BISOU

WC-09ACCENT WALL VINYL AT MARKET WALL & WALL BEHIND SERVERYEYKON DESIGN RESOURCESSOURCE ONE, SEQUINS 2VSQ-06 PLANETARIUM

WC-10WALL COVERING AT FITNESS ROOM, GUEST LAUNDRY, AND GAMES ROOMEYKON DESIGN RESOURCESSTUDIO SOURCE, RARE MINERALS BX4622 GRANITE

WC-11ELEVATOR LOBBY WALL COVERING (LEVELS 2 - 5)EYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4547 BOARDROOM

WC-12MEETING ROOM WALL COVERINGEYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4626 QUARRY

WC-13BACK OF HOUSE & OFFICESUS VINYLINTERCONTINENTAL - REVIVE, EMMA ROSE HVS 6620/4C

CT-06ACCENT WALL TILE AT PUBLIC RESTROOMSDALTILE, FASHION ACCENTS F017 BLACK PEBBLE

CT-05PORCELAIN WALL TILE AT PUBLIC RESTROOMSDALTILE, YORKWOOD MANOR TM01 BIRCH TREE

CT-03 & CT-04INTERIOR TO EXTERIOR WALL TILE AT LOBBY & BREAKFAST ROOMSDALTILE, MARBLE ATTACHE MA84 CRUX

SF-06SUSTAINABLE FOCAL WALL AT LOBBYTORZO SURFACES, TIIKERI NATURAL

PT-05PAINTED WALL FINISH AT BACK OF HOUSE, STAIRWELLS, & STORAGESW7666 FLEUR DE SEL

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

FIRST FLOORWALL FINISH PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID5.01

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119FIRST FLOOR - WALL FINISH PLAN

1/8" = 1'-0"1

5.01

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

WALL FINISH PLAN KEY

1 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

2 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
Page 21: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

1-BR KINGKING

STUDIO 3KING

STUDIO 3KING

STUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KING STUDIO 6

KING STUDIOACC 2 CONN

DOUBLE QUEENSTUDIO CONN

KING STUDIOACC 3 CONN

DOUBLE QUEENSTUDIO CONN

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

1-BR KING

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 4

KINGSTUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

KINGSTUDIO 3

ELEVATORLOBBY

ELEVATORSTORAGE

HOUSEKEEPING

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

CO

RRID

OR

STAIR2

STAIR1

STORAGE

ELEVATORLOBBY

WC-07WALLCOVERING AT GUEST CORRIDOREYKON DESIGN RESOURCESSTUDIO SOURCE, RARE MINERALS BX4622 GRANITE

WC-06ACCENT WALLCOVERING AT FITNESS ROOM & GAMES ROOMEYKON DESIGN RESOURCESSYMPHONY, CHIMES AZ52994 LOVE IS BLUE

WC-04WALLCOVERING AT LOBBYEYKON DESIGN RESOURCES,STUDIO SOURCE, DRAPER BX4541 COCKTAIL PARTY

WC-08ACCENT WALLCOVERING AT GUEST CORRIDOR & ELEVATOR LOBBYEYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4536 ZOU BISOU

WC-09ACCENT WALL VINYL AT MARKET WALL & WALL BEHIND SERVERYEYKON DESIGN RESOURCESSOURCE ONE, SEQUINS 2VSQ-06 PLANETARIUM

WC-10WALL COVERING AT FITNESS ROOM, GUEST LAUNDRY, AND GAMES ROOMEYKON DESIGN RESOURCESSTUDIO SOURCE, RARE MINERALS BX4622 GRANITE

WC-11ELEVATOR LOBBY WALL COVERING (LEVELS 2 - 5)EYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4547 BOARDROOM

WC-12MEETING ROOM WALL COVERINGEYKON DESIGN RESOURCESSTUDIO SOURCE, DRAPER BX4626 QUARRY

WC-13BACK OF HOUSE & OFFICESUS VINYLINTERCONTINENTAL - REVIVE, EMMA ROSE HVS 6620/4C

CT-06ACCENT WALL TILE AT PUBLIC RESTROOMSDALTILE, FASHION ACCENTS F017 BLACK PEBBLE

CT-05PORCELAIN WALL TILE AT PUBLIC RESTROOMSDALTILE, YORKWOOD MANOR TM01 BIRCH TREE

CT-03 & CT-04INTERIOR TO EXTERIOR WALL TILE AT LOBBY & BREAKFAST ROOMSDALTILE, MARBLE ATTACHE MA84 CRUX

SF-06SUSTAINABLE FOCAL WALL AT LOBBYTORZO SURFACES, TIIKERI NATURAL

PT-05PAINTED WALL FINISH AT BACK OF HOUSE, STAIRWELLS, & STORAGESW7666 FLEUR DE SEL

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

SECOND TO FIFTH FLOORWALL FINISH PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID5.02

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119SECOND TO FIFTH FLOOR - WALL FINISH PLAN

1/8" = 1'-0"1

5.02

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

WALL FINISH PLAN KEY

1 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

2 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

Page 22: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

MANAGERSOFFICE

STAFFBOARDROOM

STORAGE LOBBYOASIS

FRONT DESK& MARKET

EXTENDEDLOBBY

BREAKFAST

GAMESROOM

STORAGE

STORAGE

GUESTLAUNDRY

FITNESSROOM

PANTRY

STORAGE

ELECTRICAL /MECHANICAL

KING STUDIO 1

KING STUDIO 2

KING STUDIO 1

1-BR KINGACC 1

KING STUDIOACC 1

BOARDROOM

BUSINESSLOUNGE

VESTIBULE

OFFICE 1OFFICE 2EMPLOYEEBREAK RM

LAUNDRY

MEETINGROOM

STORAGE

SERVERY

KING STUDIO 2

KING STUDIO 2

OUTDOORLOUNGE

OUTDOORPATIO

SPA

STORAGESTORAGE

STORAGESTORAGE

STORAGE

STORAGE

STAIR1

STAIR2

STAFFRESTROOM

MENSRESTROOM

LADIESRESTROOM

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

CP-05INSET AREA RUG AT LOBBY;DURKAN, LAKIR D40593 (CUSTOM COLOR)

CP-04ELEVATOR LOBBY - UPPER LEVELS - FIELD CARPET DURKAN,LAKIR D40594 (CUSTOM COLOR)

CP-03CORRIDOR RUG RUNNER AND OUTFILLDURKAN, LAKIR D4445 (CUSTOM COLOR)

CP-06MEETING ROOM - FIELD CARPETDURKAN, LAKIR D40593 (CUSTOM COLOR)

CP-07GAMES ROOM - FIELD CARPETDURKAN, LAKIR D40606 (CUSTOM COLOR)

CP-08BACK OF HOUSE - FIELD CARPET TILEMILLIKEN, NORDIC STORIES, ISOGRAD IGD124-94 SANDPIPER

CP-09DURKAN, SOLID BLOTCH col. 3I6 GUNMETAL

CT-11PUBLIC RESTROOM(S) FLOOR TILE - FIELD & COVEDALTILE, DIAMANTE, ARDESIA P027

CT-10LOBBY PORCELAIN FLOOR TILE - ACCENTDALTILE, MARBLE ATTACHE, TRAVERTINE MA85

CT-09LOBBY PORCELAIN FLOOR TILE - FIELD & COVEELEVATOR FLOOR TILE, FIELDDALTILE, MARBLE ATTACHE, TURKISH SKYLINE MA86

VCT-01VCT AT STORAGE ROOM(S)VCT AT BACK OF HOUSEARMSTRONG, MIGRATIONS BBT WITH BIOSTRIDE, LOAM BROWN T3514

QT-01PANTRY, QUARRY FLOOR TILE - FIELD & COVEDALTILE, QUARRY TILE 0Q42, ARID GRAY

FF-01FITNESS ROOM, RUBBER FLOOR TILE (INTERLOCKING)ECORE, EVERLAST EL38A STEEL BLUE 2

GENERAL - CONCRETE

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

FIRST FLOORFLOOR FINISH PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID5.03

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119FIRST FLOOR - FLOOR FINISH PLAN

1/8" = 1'-0"1

5.03

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

FLOOR FINISH PLAN KEY

1 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

2 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
K-3654
AutoCAD SHX Text
PERSUADE
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
VITREOUS CHINA
Page 23: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

1-BR KINGKING

STUDIO 3KING

STUDIO 3KING

STUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KING STUDIO 6

KING STUDIOACC 2 CONN

DOUBLE QUEENSTUDIO CONN

KING STUDIOACC 3 CONN

DOUBLE QUEENSTUDIO CONN

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

1-BR KING

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 3

KINGSTUDIO 4

KINGSTUDIO 3

KINGSTUDIO 3

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

DOUBLE QUEENSTUDIO 1

KINGSTUDIO 3

KINGSTUDIO 3

ELEVATORLOBBY

ELEVATORSTORAGE

HOUSEKEEPING

CORRIDOR

CO

RRID

OR

CO

RRID

OR

CORRIDOR

CO

RRID

OR

STAIR2

STAIR1

STORAGE

CP-05INSET AREA RUG AT LOBBY;DURKAN, LAKIR D40593 (CUSTOM COLOR)

CP-04ELEVATOR LOBBY - UPPER LEVELS - FIELD CARPET DURKAN,LAKIR D40594 (CUSTOM COLOR)

CP-03CORRIDOR RUG RUNNER AND OUTFILLDURKAN, LAKIR D4445 (CUSTOM COLOR)

CP-06MEETING ROOM - FIELD CARPETDURKAN, LAKIR D40593 (CUSTOM COLOR)

CP-07GAMES ROOM - FIELD CARPETDURKAN, LAKIR D40606 (CUSTOM COLOR)

CP-08BACK OF HOUSE - FIELD CARPET TILEMILLIKEN, NORDIC STORIES, ISOGRAD IGD124-94 SANDPIPER

CP-09DURKAN, SOLID BLOTCH col. 3I6 GUNMETAL

CT-11PUBLIC RESTROOM(S) FLOOR TILE - FIELD & COVEDALTILE, DIAMANTE, ARDESIA P027

CT-10LOBBY PORCELAIN FLOOR TILE - ACCENTDALTILE, MARBLE ATTACHE, TRAVERTINE MA85

CT-09LOBBY PORCELAIN FLOOR TILE - FIELD & COVEELEVATOR FLOOR TILE, FIELDDALTILE, MARBLE ATTACHE, TURKISH SKYLINE MA86

VCT-01VCT AT STORAGE ROOM(S)VCT AT BACK OF HOUSEARMSTRONG, MIGRATIONS BBT WITH BIOSTRIDE, LOAM BROWN T3514

QT-01PANTRY, QUARRY FLOOR TILE - FIELD & COVEDALTILE, QUARRY TILE 0Q42, ARID GRAY

FF-01FITNESS ROOM, RUBBER FLOOR TILE (INTERLOCKING)ECORE, EVERLAST EL38A STEEL BLUE 2

GENERAL - CONCRETE

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

SECOND TO FIFTH FLOORFLOOR FINISH PLAN

SCALE:

1/8" = 1'-0"

DATE:

JAN. 12, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 APR 28, 2017 RELEASE

K SUTHERLAND

ID5.04

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-4119SECOND TO FIFTH FLOOR - FLOOR FINISH PLAN

1/8" = 1'-0"1

5.04

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

FLOOR FINISH PLAN KEY

2 AUG 01, 2017REALIGN TOREV"D ARCH.PLANS

1 JUN 08, 2017GENERAL REV'SPER OWNERREVIEW NOTES

Page 24: STUDIO Kplans.shshotelus.net/Home 2 South San Francisco/SSF... · rev"d arch. plans. executive restroom reception lobby office 1 controller flexible work space temple foyer temple

EXECUTIVERESTROOM

RECEPTIONLOBBY

OFFICE 1CONTROLLER

FLEXIBLEWORK SPACE

TEMPLEFOYER

TEMPLE

FILEROOM

BISTROKITCHEN

EXECUTIVEOFFICE 3

(BJ)

EXECUTIVEOFFICE 2(VIJAY)

EXECUTIVEANTECHAMBER 3

EXECUTIVEANTECHAMBER 2

CORRIDOR

ELEVATORSTORAGE

ELEVATORLOBBY

LOBBYVESTIBULE

EXECUTIVECONFERENCE

ROOM

CP-2002CARPET TILE 3MILLIKEN CONTRACT, LAPIDUS, MANTLE MAN238 LIMESTONE

CP-2001CARPET TILE 2MILLIKEN CONTRACT, LAPIDUS, LITHO TRANSITION LTR217-235 LIMESTONE39.4" x 39.4"

CP-2000CARPET TILE 1MILLIKEN CONTRACT, LAPIDUS, LITHO LIT217 LIMESTONE39.4" x 39.4"

CT-2000PORCELAIN FLOOR TILEDALTILE, P'ZAZZ 9261 WHITE RITZ6" x 24"

PROJECT:

HOME2 SUITES BY HILTON

DRAWING:

6TH FLOOR PENTHOUSEFLOOR FINISH PLAN

SCALE:

1/8" = 1'-0"

DATE:

AUG. 25, 2017

DRAWN BY:

DRAWING NUMBER:

REVISIONS:

REV # DATE NOTES

GENERAL:

1. CONTRACTOR(S) SHALL VERIFY SITE CONDITIONS.

2. NOTIFY THE DESIGNER IMMEDIATELY OF ANY

DISCREPANCY OR OMISSION.

3. CONTRACTOR(S) SHALL COMPLY WITH CONTRACT

DOCUMENTS, PERFORMANCE REQUIREMENTS, AND

ALL APPLICABLE LOCAL, STATE, AND FEDERAL

REGULATIONS.

4. ALL MATERIALS SHALL MEET CODE.

5. THIS DRAWING, AND THE INFORMATION SHOWN

OR IMPLIED HEREIN, CONSTITUTE THE ORIGINAL

AND UNPUBLISHED WORK OF STUDIO K DESIGN

COMPANY, AND MAY NOT BE USED OR DISCLOSED

WITHOUT PRIOR WRITTEN CONSENT OF STUDIO K

DESIGN COMPANY.

6. DO NO SCALE DRAWINGS.

0 AUG 25, 2017 RELEASE

K SUTHERLAND

ID5.06

550 GATEWAY BLVD.SOUTH SAN FRANCISCO, CA

SRI KRISHNA ENTERPRISE300 GATEWAY BOULEVARDSOUTH SAN FRANCISCO, CA 94080

8853 213 StreetLangley, BC V1M 1Z3

[email protected]

STUDIO KDESIGN COMPANY

604-619-41196TH FLOOR PENTHOUSE - FLOOR FINISH PLAN

1/8" = 1'-0"1

5.06

HOME2 SUITES SOUTH SAN FRANCISCO (GATEWAY)

FLOOR FINISH PLAN KEY