Studebaker Elementary School
Additions and Renovations
Final Plans
February 21, 2012
![Page 2: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/2.jpg)
![Page 3: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/3.jpg)
Site Plan Site Plan
![Page 4: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/4.jpg)
Proposed classroom addition
![Page 5: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/5.jpg)
Area ‘A’ – Floor Plan
![Page 6: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/6.jpg)
Area ‘B’ – Floor Plan Sketch of
existing “open
plan” layout
![Page 7: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/7.jpg)
Temporary partitions between classrooms. Considerable noise transfer between classrooms which can cause disruptions or distractions.
![Page 8: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/8.jpg)
ADMIN / FRONT
ENTRY ADDITION
CLASSROOM
ADDITION
Perspective Views
![Page 9: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/9.jpg)
Temporary classrooms on the north side of the school. Safety/security concern as well as comfort of students during inclement weather.
![Page 10: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/10.jpg)
SOUTH ELEVATION
CLASSROOM ADDITION
EAST ELEVATION
ADMIN/FRONT ENTRY ADDITION
Exterior Elevations
![Page 11: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/11.jpg)
Project Features “Students First”
• Vastly improved classroom layout and finishes
• Security and classroom environment improvements – Students would not have to leave the school for classes
• Technology upgrades – Faster internet
– Improved wireless connections
• Acoustic improvements – Reduced classroom disruptions “walls”
– Sound enhancement systems for classrooms
• Energy efficiency
• Miscellaneous : new clock and P.A. systems
![Page 12: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/12.jpg)
$5,108,926
Five-year plan….Ten-year vision
Studebaker Elementary Project Budget
![Page 13: Studebaker Elementary School](https://reader031.vdocuments.us/reader031/viewer/2022030319/58668aa91a28abfd408b6dbb/html5/thumbnails/13.jpg)
Timeline
January 10, 2012 – Preliminary plans
February 21, 2012 – Board approval of plans
April 3, 2012 – Award of bids
April 2012 – Construction start
Fall 2012 - Completion