sts-126/ulf2 - nasanov 16, 2008 · sts-126/ulf2 fd 03 execute package msg page(s) title 011a 1 -...
TRANSCRIPT
STS-126/ULF2 FD 03 Execute Package
MSG Page(s) Title 011A 1 - 14 FD03 Flight Plan Revision (pdf) 012 15 - 16 FD03 Mission Summary (pdf) 004 17 - 19 SSC 16 SETUP (pdf) 010 20 - 23 Stowage Locations for FD03 (GMT 321) (pdf) 013 --- FD03 Transfer Message (pdf - Electronic Only) 014 24 - 28 SSRMS DOUG Setup Notes for ULF2 (pdf) 015A 29 - 30 FD3 EVA Deltas (pdf) 016 31 FD2 MMT Summary (pdf) 017 32 - 34 HD Digital Camcorder Dnlk Procedure (pdf) 018 35 - 37 Exp 18 / STS-126 Joint Emergency Agreement (pdf) 019 38 - 42 FD03 RNDZ PACKAGE (pdf)
Approved by FAO: J. Clevenger
Last Updated: Nov 16 2008 1:19PM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003
MSG 011A - FD03 FLIGHT PLAN REVISION
END OF PAGE 1 OF 12, MSG 011A
MSG INDEX 1 2 MSG NO. TITLE 3 004 SSC 16 SETUP (18-0213) 4
010 STOWAGE LOCATIONS FOR FD03 (18-0218) 5 011 FD03 FLIGHT PLAN REVISION 6 012 FD03 MISSION SUMMARY 7 013 FD03 TRANSFER MESSAGE 8
014 SSRMS DOUG SETUP NOTES FOR ULF2 (18-0212) 9
015 FD3 EVA DELTAS 10 016 FD2 MMT SUMMARY 11
017 HD DIGITAL CC DNLK PROCEDURE 12
018 EXP 18 / STS-126 JOINT EMERGENCY AGREEMENT (18-0221) 13 019 FD03 RNDZ PACKAGE 14 15 1. For today's cryo config, O2 tanks 1 and 2 will be active with dual heaters and H2 tanks 2 16
and 4 will be active with dual heaters. 17 18
R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) 19 O2 TK1 HTRS A,B (two) - AUTO 20 21 A11 CRYO TK4 HTRS O2 A,B (two) – OFF 22 23
2. For your simo dump today, use SUPPLY/WASTE WATER DUMP (ORB OPS, ECLS) p. 24 5-2. MCC will TMBU FDA in steps B and K. Waste dump valve open time will be ~ 30 25 minutes and will dump the waste tank to 5%. Supply dump valve open time will be 20 26 minutes. 27
28 3. The Y-Y Condensate Hose and CWC for the Shuttle Condensate Collection are located 29
in MF57C. Report CWC serial number to MCC. 30 31 4. In an effort to categorize the brake line heaters' effect on the landing gear tire temps, we 32
are asking for a couple actions from you. First, we would like to improve the 33 thermal model of the nose landing gear. In order to do so, we will need to swap to TFL 34 129 every day for 3 minutes to gather temperature data not available in standard orbit 35 TFLs. You will see the two item entries required for this in your Flight Plan from FD3 36 through undocking. 37
38 Second, we would like you to activate two brake line heaters during the docked phase in 39 order to evaluate their effect on the tire temps. These heater actions will be added to 40 your Flight Plan on FD9 and then again post undocking. 41
42 5. MSG 017 should replace the HD Digital CC Dnlk procedure on pages 2-14 and 2-15 in 43
the Photo/TV Flight Supplement C/L. The updates include steps to configure color bars 44 and a black screen on the camcorder, which is used for pixel correction by the ground. 45
46 47 48 49 50
1
MSG 011A - FD03 FLIGHT PLAN REVISION
END OF PAGE 2 OF 12, MSG 011A
1 6. DOUG targets for all of the operations on ULF2 are on board ISS and Msg 014 (ISS 18-2
0212) SSRMS DOUG Setup Notes for ULF2 is available to assist in DOUG setup if 3 desired for each of the Ops days. 4
5 7. The Elbow camera iris control sequence is exhibiting a failure, latching the first 6
Automatic Light Control "ALC" command. This failure is only in automatic iris settings. If 7 no image appears after nominal camera command sequence, push the pnl A7 "ALC" 8 button a second time. 9
10 8. Welcome to Station! This is just a friendly reminder that for the docked portion of the 11
mission, a message including stowage locations for all ISS activities will be uplinked and 12 printed on the Shuttle side at crew wake. The stowage locations include unstow and 13 restow information for all activities requiring ISS assets. Please feel free to call if you 14 have any questions. 15
16 9. REPLACE PAGES 3-20 THROUGH 3-29. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
2
FLT PLN/126/FLIGHT
D O C K I N G *
FD03
MNVR
NHNC4
TiΔ
ΔΔ
Δ
*1/21:09
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
PETTIT
R1
R2/E
V3
R3/M
1
EV2
EV1
M2
MAGNUS
CHAMITOFF
FINCKE
LONCHAKOV
Δ RPM
REPL
ANNE
D
2-6
S T S - 1 2 6 U P I S S D N
13
1415
1617
1819
2021
2223
11/17
GMT 11/16/08 (321)
12
1314
1516
1718
1920
2122
23002/00
MET
Day 001
CDR
POST SLEEP
P T V 0 5
S E T U P
SLEEP
SIMO
INIT
ISS RNDZ OPS
APPROACH W/RPM
POST
RNDZ
PGSC
CONFG
SFTY
BRIEF
S S V - 2
! ! ! !
S S P T SO P C U @
P O S T
S L E E P
G R P B
P W R D N
G R P B
P W R U P
I M U
E X E R
F E S #H / O
R C S *
PLT
SLEEP
POST SLEEP
M C I U *
ISS RNDZ OPS
APPROACH W/RPM
M N V R
T E ASFTY
BRIEF
! ! !
G R P B
P W R U P
O B S S *
G R P B
P W R D N
PTV06
D O C K
A U D I O
MS1
OBSS
GRPL
SLEEP
APPROACH W/RPM
SFTY
BRIEF
ISS RNDZ OPS
W L E S
! ! ! !
POST SLEEP
EXERCISE
D S L V
D S L V
POST
SLEEP
MS2
EXERCISE
SLEEP
SIMO
TERM
APPROACH W/RPM
SFTY
BRIEF
EMU
RMVL
COND
CWC
S/U
S S V - 3
P T V O 4
S E T U P
PTVO4
OPS
INGR/EGR
! ! ! !
POST SLEEP
C N F G #
POST
SLEEP
D S L V
D S L V
POST
SLEEP
DIDB
R N D ZISS RNDZ OPS
MS3
SLEEP
APPROACH W/RPM
HATCH
LEAK CK
ODS
PREP
FOR
INGR
HATCH
OPEN
SFTY
BRIEF
EMU
RMVL
A H O Y
POST SLEEP
XFER
UPDATE
D S L V
D S L V
POST
SLEEP
DIDB
O 2 - I
O 2 - TEXERCISE
ISS
RNDZ
OPS
ISS
RNDZ
OPS
ISS RNDZ
OPS
MS4
POST SLEEP
ISS RNDZ OPS
APPROACH W/RPM
HATCH
LEAK CK
ODS
PREP
FOR
INGR
SFTY
BRIEF
HATCH
OPEN
! M A T
SLEEP
PTV06
L O GEXERCISE
A P C U #
A P C U *
P O S T
S L E E P
O B S S *
O I U - A
M D D K #
FE-2 EXP18
SLEEP
POST SLEEP
EXERCISE
P/TV02
DOCK
S/U
P/TV02 DOCK OPS
APPROACH W/RPM
SSC
SETUP
E Y ! !
SFTY
BRIEF
IELK
ISS CDR
SLEEP
POST SLEEP
PW
S H U T TDPC
P/TV
RPM
VRFY
S/U
EXERCISE
CEVIS
EXERCISE RED
MIDDAY-MEAL
P R E P
8 0 0 M M
F I L M
R P M D L
P M A 2
C F G
HATCH
LEAK
CK ISS
HATCH
OPEN
! ! ! !
SFTY
BRIEF
R T R
OBSS
GRPL
FE-1
SLEEP
POST SLEEP
PWDPCC N F G
VELO
EXERCISE TVIS
MIDDAY-MEAL
T I M E R
T I M E R
P/TV
DOC
HATCH
LEAK
CK ISS
СОЖ
MNT
С О Г С
S M P L
! ! ! !
SFTY
BRIEF
IELK
FE-2
SLEEP
URN
CLCT
I N SPOST SLEEP
PWDPC
P/TV
RPM
VRFY
S/U
EXERCISE RED
EXERCISE CEVIS
MIDDAY-MEAL
P R E P
4 0 0 M M
F I L M
P M A 2
C F G
D E A C T
NUTR
STOW
D O C K
A U D I O
HATCH
OPEN
! ! !
SFTY
BRIEF
VCA
DAY/NIGHT
ORBIT
2526
2728
2930
3132
33
TDRS
W -171.0
E -46.0
Z -275.0
-ZLV -XVV
-ZLV +YVV
RNDZ
DKBIAS -XLV -ZVV
ORB ATT
@ACT
#OFF
*HEATER RCNFG
*FILTER CHK
*H/O
#GALLEY
O/N
#ACT
*DEACT
#STATUS CHECK
NOTES
2-6
D O C K I N G *
FD03
MNVR
NHNC4
TiΔ
ΔΔ
Δ
*1/21:09
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
PETTIT
R1
R2/E
V3
R3/M
1
EV2
EV1
M2
MAGNUS
CHAMITOFF
FINCKE
LONCHAKOV
Δ RPM
REPL
ANNE
D
S T S - 1 2 6 U P I S S D N
13
1415
1617
1819
2021
2223
11/17
GMT 11/16/08 (321)
12
1314
1516
1718
1920
2122
23002/00
MET
Day 001
CDR
POST SLEEP
P T V 0 5
S E T U P
SLEEP
SIMO
INIT
ISS RNDZ OPS
APPROACH W/RPM
POST
RNDZ
PGSC
CONFG
SFTY
BRIEF
S S V - 2
! ! ! !
S S P T SO P C U @
P O S T
S L E E P
G R P B
P W R D N
G R P B
P W R U P
I M U
E X E R
F E S #H / O
R C S *
PLT
SLEEP
POST SLEEP
M C I U *
ISS RNDZ OPS
APPROACH W/RPM
M N V R
T E ASFTY
BRIEF
! ! !
G R P B
P W R U P
O B S S *
G R P B
P W R D N
PTV06
D O C K
A U D I O
MS1
OBSS
GRPL
SLEEP
APPROACH W/RPM
SFTY
BRIEF
ISS RNDZ OPS
W L E S
! ! ! !
POST SLEEP
EXERCISE
D S L V
D S L V
POST
SLEEP
MS2
EXERCISE
SLEEP
SIMO
TERM
APPROACH W/RPM
SFTY
BRIEF
EMU
RMVL
COND
CWC
S/U
S S V - 3
P T V O 4
S E T U P
PTVO4
OPS
INGR/EGR
! ! ! !
POST SLEEP
C N F G #
POST
SLEEP
D S L V
D S L V
POST
SLEEP
DIDB
R N D ZISS RNDZ OPS
MS3
SLEEP
APPROACH W/RPM
HATCH
LEAK CK
ODS
PREP
FOR
INGR
HATCH
OPEN
SFTY
BRIEF
EMU
RMVL
A H O Y
POST SLEEP
XFER
UPDATE
D S L V
D S L V
POST
SLEEP
DIDB
O 2 - I
O 2 - TEXERCISE
ISS
RNDZ
OPS
ISS
RNDZ
OPS
ISS RNDZ
OPS
MS4
POST SLEEP
ISS RNDZ OPS
APPROACH W/RPM
HATCH
LEAK CK
ODS
PREP
FOR
INGR
SFTY
BRIEF
HATCH
OPEN
! M A T
SLEEP
PTV06
L O GEXERCISE
A P C U #
A P C U *
P O S T
S L E E P
O B S S *
O I U - A
M D D K #
FE-2 EXP18
SLEEP
POST SLEEP
EXERCISE
P/TV02
DOCK
S/U
P/TV02 DOCK OPS
APPROACH W/RPM
SSC
SETUP
E Y ! !
SFTY
BRIEF
IELK
ISS CDR
SLEEP
POST SLEEP
PW
S H U T TDPC
P/TV
RPM
VRFY
S/U
EXERCISE
CEVIS
EXERCISE RED
MIDDAY-MEAL
P R E P
8 0 0 M M
F I L M
R P M D L
P M A 2
C F G
HATCH
LEAK
CK ISS
HATCH
OPEN
! ! ! !
SFTY
BRIEF
R T R
OBSS
GRPL
FE-1
SLEEP
POST SLEEP
PWDPCC N F G
VELO
EXERCISE TVIS
MIDDAY-MEAL
T I M E R
T I M E R
P/TV
DOC
HATCH
LEAK
CK ISS
СОЖ
MNT
С О Г С
S M P L
! ! ! !
SFTY
BRIEF
IELK
FE-2
SLEEP
URN
CLCT
I N SPOST SLEEP
PWDPC
P/TV
RPM
VRFY
S/U
EXERCISE RED
EXERCISE CEVIS
MIDDAY-MEAL
P R E P
4 0 0 M M
F I L M
P M A 2
C F G
D E A C T
NUTR
STOW
D O C K
A U D I O
HATCH
OPEN
! ! !
SFTY
BRIEF
VCA
DAY/NIGHT
ORBIT
2526
2728
2930
3132
33
TDRS
W -171.0
E -46.0
Z -275.0
ORB ATT
-ZLV -XVV
-ZLV +YVV
RNDZ
DKBIAS -XLV -ZVV
NOTES
@ACT
#OFF
*HEATER RCNFG
*FILTER CHK
*H/O
#GALLEY
O/N
#ACT
*DEACT
#STATUS CHECK
3
FLT PLN/126/FLIGHT
FD03
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
R1
R2/E
V3
R3/M
1
EV2
EV1
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
R1
R2/E
V3
EV2
EV1
MAGNUS
CHAMITOFF
FINCKE
M2
LONCHAKOV
PETTIT
NO EXERCISE
(WHILE OBSS GRAPPLED BY SRMS & SSRMS)
REPL
ANNE
D
2-8
S T S - 1 2 6 U P I S S D N
01
0203
0405
0607
0809
1011
12GMT 11/17/08 (322)
002/00
0102
0304
0506
0708
0910
1112
MET
Day 002
CDR
PRE SLEEP
SLEEP
PMC
A/G
PRE
SLEEP
MDDK XFER
X F E R
T A GM U S
EXER
T F L ^
PLT
SLEEP
OBSS
H/O
OBSS
H/O
FROM
SSRMS
O B S S *
PRE SLEEP
M U SEXERCISE
MS1
♣OBSS UNBRTH
U N G R P
H / OPRE SLEEP
SLEEP
X F E R
B R I E F
X F E R
T A G
D S L V
M U SMDDK XFER
PRE
SLEEP
MS2
SLEEP
PRE SLEEP
MDDK XFER
C N F G *
D S L V
DIDB
M O P
MS3
SLEEP
PRE SLEEP
P L Y B K
O P S
D S L V
MDDK XFER
EMU@
MS4
PRE SLEEP
SLEEP
OBSS
H/O
OBSS
H/O
FROM
SSRMS
O B S S *
M D D K #M U S
M O P
FE-2 EXP18
IELK
MDDK XFER
PWPW
SOKOL
LK CKDPCPMC
PRE SLEEP-ISS
SLEEP
ISS CDR
♣OBSS UNBRTH
U N G R P
H / O
J R N L
E N T R Y
PWPW
DPC
PRE SLEEP-ISS
SLEEP
FE-1
IELK
PWPW
SOKOL
LK CKDPC
PRE SLEEP-ISS
SLEEP
FE-2
V C AV D SIELK
SODF XFERDPC
PWPRE SLEEP-ISS
SLEEP
DAY/NIGHT
ORBIT
3334
3536
3738
3940
41
TDRS
W -171.0
E -46.0
Z -275.0
BIAS -XLV -ZVV
ORB ATT
♣OBSS GRPL
^129
*H/O
*GALLEY
MORNING
@XFER
#STATUS CHECK
NOTES
2-8
FD03
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
R1
R2/E
V3
R3/M
1
EV2
EV1
FERGUSON
BOE
BOWEN
PIPER
KIMBROUGH
R1
R2/E
V3
EV2
EV1
MAGNUS
CHAMITOFF
FINCKE
M2
LONCHAKOV
PETTIT
NO EXERCISE
(WHILE OBSS GRAPPLED BY SRMS & SSRMS)
REPL
ANNE
D
S T S - 1 2 6 U P I S S D N
01
0203
0405
0607
0809
1011
12GMT 11/17/08 (322)
002/00
0102
0304
0506
0708
0910
1112
MET
Day 002
CDR
PRE SLEEP
SLEEP
PMC
A/G
PRE
SLEEP
MDDK XFER
X F E R
T A GM U S
EXER
T F L ^
PLT
SLEEP
OBSS
H/O
OBSS
H/O
FROM
SSRMS
O B S S *
PRE SLEEP
M U SEXERCISE
MS1
♣OBSS UNBRTH
U N G R P
H / OPRE SLEEP
SLEEP
X F E R
B R I E F
X F E R
T A G
D S L V
M U SMDDK XFER
PRE
SLEEP
MS2
SLEEP
PRE SLEEP
MDDK XFER
C N F G *
D S L V
DIDB
M O P
MS3
SLEEP
PRE SLEEP
P L Y B K
O P S
D S L V
MDDK XFER
EMU@
MS4
PRE SLEEP
SLEEP
OBSS
H/O
OBSS
H/O
FROM
SSRMS
O B S S *
M D D K #M U S
M O P
FE-2 EXP18
IELK
MDDK XFER
PWPW
SOKOL
LK CKDPCPMC
PRE SLEEP-ISS
SLEEP
ISS CDR
♣OBSS UNBRTH
U N G R P
H / O
J R N L
E N T R Y
PWPW
DPC
PRE SLEEP-ISS
SLEEP
FE-1
IELK
PWPW
SOKOL
LK CKDPC
PRE SLEEP-ISS
SLEEP
FE-2
V C AV D SIELK
SODF XFERDPC
PWPRE SLEEP-ISS
SLEEP
DAY/NIGHT
ORBIT
3334
3536
3738
3940
41
TDRS
W -171.0
E -46.0
Z -275.0
ORB ATT
BIAS -XLV -ZVV
NOTES
♣OBSS GRPL
^129
*H/O
*GALLEY
MORNING
@XFER
#STATUS CHECK
4
FLT PLN/126/FLIGHT
03
FERGUSON
BOE
PETTIT
TRANSITION TO RNDZ C/L
at MET 01/15:35:00
< MNVR 1/14:20:00
FD03 EZ ACTIVITIES:
TEPC (ORB OPS, CREW SYS)
CHECK STATUS
√OCAC FILTER & MDDK DUCT SCREEN
HARD REBOOT ALL PGSCs EXCEPT:
STS-6(WLES),STS-3(KFX),
& OCA ROUTER.
REPL
ANNE
D
AA14 RCS/OMS HTR L POD B - OFF
A - AUTO
R POD B - OFF
A - AUTO
3-20
STS-
126
FD (
)
13:00
14:00
15:00
16:00
GMT
Date
11/16
(321)
12:00
13:00
14:00
15:00
16:00
MET
Day 001
WE
Z
T D R S
~
~~
D / N
D O R B 1 4 1 5 1 6
O R B 2 5 2 6 2 7
~ - Z L V - X V V - Z L V + Y V V ~S T S A T T
CDR
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)SL
EEP
~
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Initiate Supply/Waste Dump
Ref. MSG 011 Item 2
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIORITY PWRUP GRP B
(ORB PKT, PRIOR PWRDN)
Steps 12 (IMU 1),10,9,6 (Triple G2),5
IMU STAR OF OPPTY ALIGN (ORB OPS,GNC)
RCS/OMS HEATER RECONFIG A
PLT
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
L17 Check MCIU filter screen
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
PRIORITY PWRUP GRP B
(ORB PKT, PRIOR PWRDN)
Steps 12 (IMU 1),10,9,6 (Triple G2),5
MS1
SLEEP
~
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DRY SALIVA CLCT(ORB OPS,SDBI)
DRY SALIVA CLCT(ORB OPS,SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
UPDATE
H2O WASTE
DUMP QTY
NOTES
3-20
03
FERGUSON
BOE
PETTIT
TRANSITION TO RNDZ C/L
at MET 01/15:35:00
< MNVR 1/14:20:00
FD03 EZ ACTIVITIES:
TEPC (ORB OPS, CREW SYS)
CHECK STATUS
√OCAC FILTER & MDDK DUCT SCREEN
HARD REBOOT ALL PGSCs EXCEPT:
STS-6(WLES),STS-3(KFX),
& OCA ROUTER.
REPL
ANNE
D
AA14 RCS/OMS HTR L POD B - OFF
A - AUTO
R POD B - OFF
A - AUTO
STS-
126
FD (
)
13:00
14:00
15:00
16:00
GMT
Date
11/16
(321)
12:00
13:00
14:00
15:00
16:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 1 4 1 5 1 6
O R B 2 5 2 6 2 7
S T S A T T ~ - Z L V - X V V - Z L V + Y V V ~
CDR
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)SL
EEP
~
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Initiate Supply/Waste Dump
Ref. MSG 011 Item 2
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRIORITY PWRUP GRP B
(ORB PKT, PRIOR PWRDN)
Steps 12 (IMU 1),10,9,6 (Triple G2),5
IMU STAR OF OPPTY ALIGN (ORB OPS,GNC)
RCS/OMS HEATER RECONFIG
A
PLT
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
L17 Check MCIU filter screen
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
PRIORITY PWRUP GRP B
(ORB PKT, PRIOR PWRDN)
Steps 12 (IMU 1),10,9,6 (Triple G2),5
MS1
SLEEP
~
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L) ~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DRY SALIVA CLCT(ORB OPS,SDBI)
DRY SALIVA CLCT (ORB OPS,SDBI)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
UPDATE
H2O WASTE
DUMP QTY
5
FLT PLN/126/FLIGHT
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
D
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Terminate Supply/Waste Dump
Ref. MSG 011 Item 2
3-21
STS-
126
FD (
)
13:00
14:00
15:00
16:00
GMT
Date
11/16
(321)
12:00
13:00
14:00
15:00
16:00
MET
Day 001
WE
Z
T D R S
~
~~
D / N
D O R B 1 4 1 5 1 6
O R B 2 5 2 6 2 7
~ - Z L V - X V V - Z L V + Y V V ~S T S A T T
MS2
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DRY SALIVA CLCT(ORB OPS,SDBI
)
DRY SALIVA CLCT(ORB OPS,SDBI
)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT (ORB OPS,SDBI
)
DRY SALIVA CLCT(ORB OPS,SDBI
)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP
~
FLIGHT SLEEP LOG
(ORB OPS, SDBI)
FE-2 (UP)
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EXERCISE
~
NOTES
3-21
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
D
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Terminate Supply/Waste Dump
Ref. MSG 011 Item 2
STS-
126
FD (
)
13:00
14:00
15:00
16:00
GMT
Date
11/16
(321)
12:00
13:00
14:00
15:00
16:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 1 4 1 5 1 6
O R B 2 5 2 6 2 7
S T S A T T ~ - Z L V - X V V - Z L V + Y V V ~
MS2
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DRY SALIVA CLCT(
ORB OPS,SDBI
)
DRY SALIVA CLCT (ORB OPS,SDBI
)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT (
ORB OPS,SDBI
)
DRY SALIVA CLCT (ORB OPS,SDBI
)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
SLEEP
~
FLIGHT SLEEP LOG
(ORB OPS, SDBI)
FE-2 (UP)
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EXERCISE
~
NOTES
6
FLT PLN/126/FLIGHT
03
< NH 1/16:08:15
< NC4 1/16:48:03
< Ti 1/18:31:09
RNDZ PET 00:00 (Ti)
at MET 01/18:31:09
FERGUSON
BOE
PETTIT
UPLINK
TFL 192
UPDATE
TFL 199
MPLM
PRESSURE
CHECk
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
REPL
ANNE
D
3-22
STS-
126
FD (
)
17:00
18:00
19:00
20:00
GMT
Date
11/16
(321)
16:00
17:00
18:00
19:00
20:00
MET
Day 001
WE
Z
T D R S
~
~~ ~
D / N
D O R B 1 2 3
O R B 2 8 2 9 3 0
~ ~R N D ZS T S A T T
CDR
~
PLT
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)~
MS1
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)~
NOTES
3-22
03
< NH 1/16:08:15
< NC4 1/16:48:03
< Ti 1/18:31:09
RNDZ PET 00:00 (Ti)
at MET 01/18:31:09
FERGUSON
BOE
PETTIT
UPLINK
TFL 192
UPDATE
TFL 199
MPLM
PRESSURE
CHECk
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
REPL
ANNE
DST
S-12
6 FD
(
)
17:00
18:00
19:00
20:00
GMT
Date
11/16
(321)
16:00
17:00
18:00
19:00
20:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 1 2 3
O R B 2 8 2 9 3 0
S T S A T T ~ ~R N D Z
CDR
~
PLT
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)~
MS1
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)~
NOTES
7
FLT PLN/126/FLIGHT
03
BOWEN
PIPER KIMBROUGH MAGNUS
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
P/TV02 DOCK
(PHOTO/TV, SCENES) Ops
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
ON MCC GO:SSPTS APCU 1 DEACT
A15 APCU 1 CONV - OFF
OUTPUT - OFF
MDDK STATUS CHECK (ASSY OPS, P/L)
EXERCISE
REPL
ANNE
D
BC5 DIRECT O2 vlv - CL
OCAC PWR - ON
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Terminate Supply/Waste Dump
Ref. MSG 011 Item 2
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
3-23
STS-
126
FD (
)
17:00
18:00
19:00
20:00
GMT
Date
11/16
(321)
16:00
17:00
18:00
19:00
20:00
MET
Day 001
WE
Z
T D R S
~
~~ ~
D / N
D O R B 1 2 3
O R B 2 8 2 9 3 0
~ ~R N D ZS T S A T T
MS2
EXERCISE
EMU REMOVAL
(EVA, AIRLOCK CONFIG)
Disconnect EMUs from AAPs
& Stow in Middeck
SHUTTLE CONDENSATE COLLECTION
(ORB OPS, ECLS)
Perform SETUP
Ref. MSG 011 Item 3
SSV OUTRATE - 3
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
MS3
EMU REMOVAL
(EVA, AIRLOCK CONFIG)
Disconnect EMUs from AAPs
& Stow in Middeck~
TRANSFER UPDATE
Ref. MSG 013
O2 REPRESS INIT
OCAC PWR - OFF
C5 DIRECT O2 vlv - OP
O2 REPRESS TERM on MCC GO B
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
MS4
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
EXERCISE
SSPTS APCU 1 ACT
A15 APCU 1 OUTPUT - ON
CONV - ON
SSP1 OIU PWR - OIU 1 ON (tb-UP)
FE-2 (UP)
EXERCISE
~
P/TV02 DOCK
(PHOTO/TV, SCENES)
Setup
NOTES
3-23
03
BOWEN
PIPER KIMBROUGH MAGNUS
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
P/TV02 DOCK
(PHOTO/TV, SCENES) Ops
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
ON MCC GO:SSPTS APCU 1 DEACT
A15 APCU 1 CONV - OFF
OUTPUT - OFF
MDDK STATUS CHECK (ASSY OPS, P/L)
EXERCISE
REPL
ANNE
D
BC5 DIRECT O2 vlv - CL
OCAC PWR - ON
SUPPLY/WASTE WATER DUMP
(ORB OPS, ECLS)
Terminate Supply/Waste Dump
Ref. MSG 011 Item 2
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
STS-
126
FD (
)
17:00
18:00
19:00
20:00
GMT
Date
11/16
(321)
16:00
17:00
18:00
19:00
20:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 1 2 3
O R B 2 8 2 9 3 0
S T S A T T ~ ~R N D Z
MS2
EXERCISE
EMU REMOVAL
(EVA, AIRLOCK CONFIG)
Disconnect EMUs from AAPs
& Stow in Middeck
SHUTTLE CONDENSATE COLLECTION
(ORB OPS, ECLS)
Perform SETUP
Ref. MSG 011 Item 3
SSV OUTRATE - 3
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
MS3
EMU REMOVAL
(EVA, AIRLOCK CONFIG)
Disconnect EMUs from AAPs
& Stow in Middeck~
TRANSFER UPDATE
Ref. MSG 013
O2 REPRESS INIT
OCAC PWR - OFF
C5 DIRECT O2 vlv - OP
O2 REPRESS TERM on MCC GO B
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
MS4
RENDEZVOUS TIMELINE
(RNDZ, RENDEZVOUS T/L)
EXERCISE
SSPTS APCU 1 ACT
A15 APCU 1 OUTPUT - ON
CONV - ON
SSP1 OIU PWR - OIU 1 ON (tb-UP)
FE-2 (UP)
EXERCISE
~
P/TV02 DOCK
(PHOTO/TV, SCENES)
Setup
NOTES
8
FLT PLN/126/FLIGHT
03
< D
OCKI
NG (
01/2
1:09
)RETURN TO FLIGHT PLAN
FERGUSON
BOE
PETTIT
D On MCC GO: A15 OPCU 1,2 CONV (two) - ON
R1 MN BUS TIE B - ON (tb-ON)
C - ON (tb-ON)
SSPTS ODS CONNECTOR VERIF
A15 ODS MATE X1,X2(two)-ON
√МCC then - OFF
C
UPLINK
β21 + MASK
Box 40,41,
60
PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)
Steps 6 (Single G2) & 12 (IMU 1)
06 STRK PWR -Z - OFF
UPLINK
β21 + MASK
Box 30,40,
41
UPLINK
TFL 184
REPL
ANNE
D
JOINT OPS: 6.103 HARDLINE AUDIO CONFIG
Steps 1,2,6,7
TOPPING FES DEACTIVATION
(ORB OPS, ECLS)
√DAP A/LVLH/VERN
MNVR (TRK) BIAS -XLV -ZVV
TG=2 BV=5 P=159 Y=355 OM=183
Init TRK, DAP:FREE >2 sec
Then: DAP:B12/AUTO/VERN
When in atttude, select DAP A
3-24
STS-
126
FD (
)
21:00
22:00
23:00
00:00
GMT
Date
11/16
(321)
20:00
21:00
22:00
23:00
00:00
MET
Day 001
WE
Z
T D R S
~
~
~ ~
D / N
D O R B 3 4 5 6
O R B 3 0 3 1 3 2 3 3
~ R N D Z D K ~B I A S - X L V - Z V VS T S A T T
CDR
P/TV05 ISS INTERNAL OPS (HC)
(PHOTO/TV, SCENES) Setup
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST RNDZ PGSC CONFIG
Configure PGSCs SAFETY BRIEFING
SSV OUTRATE - 2
AHOY !!!
SSPTS ODS CONNECTOR VERIF C
SSPTS OPCU ACT D
EXERCISE
~
JOINT OPS: 3.111 HANDOVER ATTITUDE
CONTROL ORBITER to CMGTA
PLT
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
AHOY !!!
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 1 and 2
PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)
Steps 6 (Single G2) & 12 (IMU 1)
06 STRK PWR -Z - OFF
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Setup & Ops
MS1
ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF
Steps 1-5.2
~
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLES)
AHOY !!!
EXERCISE
NOTES
3-24
03
< D
OCKI
NG (
01/2
1:09
)RETURN TO FLIGHT PLAN
FERGUSON
BOE
PETTIT
D On MCC GO: A15 OPCU 1,2 CONV (two) - ON
R1 MN BUS TIE B - ON (tb-ON)
C - ON (tb-ON)
SSPTS ODS CONNECTOR VERIF
A15 ODS MATE X1,X2(two)-ON
√МCC then - OFF
C
UPLINK
β21 + MASK
Box 40,41,
60
PRIORITY PWRDN GRP B (ORB PKT, PRIOR PWRDN)
Steps 6 (Single G2) & 12 (IMU 1)
06 STRK PWR -Z - OFF
UPLINK
β21 + MASK
Box 30,40,
41
UPLINK
TFL 184
REPL
ANNE
D
JOINT OPS: 6.103 HARDLINE AUDIO CONFIG
Steps 1,2,6,7
TOPPING FES DEACTIVATION
(ORB OPS, ECLS)
√DAP A/LVLH/VERN
MNVR (TRK) BIAS -XLV -ZVV
TG=2 BV=5 P=159 Y=355 OM=183
Init TRK, DAP:FREE >2 sec
Then: DAP:B12/AUTO/VERN
When in atttude, select DAP A
STS-
126
FD (
)
21:00
22:00
23:00
00:00
GMT
Date
11/16
(321)
20:00
21:00
22:00
23:00
00:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 3 4 5 6
O R B 3 0 3 1 3 2 3 3
S T S A T T ~ R N D Z D K ~B I A S - X L V - Z V V
CDR
P/TV05 ISS INTERNAL OPS (HC)
(PHOTO/TV, SCENES) Setup
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST RNDZ PGSC CONFIG
Configure PGSCs SAFETY BRIEFING
SSV OUTRATE - 2
AHOY !!!
SSPTS ODS CONNECTOR VERIF C
SSPTS OPCU ACT D
EXERCISE
~
JOINT OPS: 3.111 HANDOVER ATTITUDE
CONTROL ORBITER to CMGTA
PLT
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
AHOY !!!
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 1 and 2
PRIORITY PWRDN GRP B
(ORB PKT, PRIOR PWRDN)
Steps 6 (Single G2) & 12 (IMU 1)
06 STRK PWR -Z - OFF
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Setup & Ops
MS1
ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF
Steps 1-5.2
~
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
WLES DOCK/UNDOCK RECOVERY (ORB OPS, WLES)
AHOY !!!
EXERCISE
NOTES
9
FLT PLN/126/FLIGHT
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
D
3-25
STS-
126
FD (
)
21:00
22:00
23:00
00:00
GMT
Date
11/16
(321)
20:00
21:00
22:00
23:00
00:00
MET
Day 001
WE
Z
T D R S
~
~
~ ~
D / N
D O R B 3 4 5 6
O R B 3 0 3 1 3 2 3 3
~ R N D Z D K ~B I A S - X L V - Z V VS T S A T T
MS2
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
P/TV04 INGRESS/EGRESS
(PHOTO/TV, SCENES)
Setup
P/TV04 INGRESS/EGRESS
(PHOTO/TV, SCENES)
Ops
AHOY!!!
GALLEY OVRNIGHT CONFIG (ORB OPS,ECLS)
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
~
MS3
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST DOCKING HATCH LEAK CHECK
(RNDZ, APDS)
A/L PREP FOR INGRESS
-AIRLOCK FAN ACTIVE
(RNDZ, APDS)
JOINT OPS: 2.104 HATCH OPENING
& SHUTTLE/ISS DUCT INSTALLATION
√MCC-H complete with step 1
Perform step 2-15
SAFETY BRIEFING
AHOY!!!
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
MS4
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST DOCKING HATCH LEAK CHECK
(RNDZ, APDS)
A/L PREP FOR INGRESS
-AIRLOCK FAN ACTIVE
(RNDZ, APDS)
SAFETY BRIEFING
JOINT OPS: 2.104 HATCH OPENING
& SHUTTLE/ISS DUCT INSTALLATION
√MCC-H complete with step 1
Perform step 2-15
AHOY!!!
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Setup & Ops
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 1 & 2
FE-2 (UP)
APPROACH TIMELINE
(RNDZ, CUE CARD)
SSC 16 SETUP
Ref. MSG 004 AH
OY!!!
SAFETY BRIEFING
IELK INSTALL & C/O
Ref. Middeck Transfer List:
Item 23,23.1
Ref. MPLM Return Transfer List:
Item 767
~
NOTES
3-25
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
DST
S-12
6 FD
(
)
21:00
22:00
23:00
00:00
GMT
Date
11/16
(321)
20:00
21:00
22:00
23:00
00:00
MET
Day 001
WE
Z
T D R SD / N
D O R B 3 4 5 6
O R B 3 0 3 1 3 2 3 3
S T S A T T ~ R N D Z D K ~B I A S - X L V - Z V V
MS2
APPROACH TIMELINE
(RNDZ, CUE CARD)
SAFETY BRIEFING
P/TV04 INGRESS/EGRESS
(PHOTO/TV, SCENES)
Setup
P/TV04 INGRESS/EGRESS
(PHOTO/TV, SCENES)
Ops
AHOY!!!
GALLEY OVRNIGHT CONFIG
(ORB OPS,ECLS)
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
~
MS3
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST DOCKING HATCH LEAK CHECK
(RNDZ, APDS)
A/L PREP FOR INGRESS
-AIRLOCK FAN ACTIVE
(RNDZ, APDS)
JOINT OPS: 2.104 HATCH OPENING
& SHUTTLE/ISS DUCT INSTALLATION
√MCC-H complete with step 1
Perform step 2-15
SAFETY BRIEFING
AHOY!!!
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
MS4
APPROACH TIMELINE
(RNDZ, CUE CARD)
POST DOCKING HATCH LEAK CHECK
(RNDZ, APDS)
A/L PREP FOR INGRESS
-AIRLOCK FAN ACTIVE
(RNDZ, APDS)
SAFETY BRIEFING
JOINT OPS: 2.104 HATCH OPENING
& SHUTTLE/ISS DUCT INSTALLATION
√MCC-H complete with step 1
Perform step 2-15
AHOY!!!
P/TV06 ROBOTICS OPERATIONS
(PHOTO/TV, SCENES)
Setup & Ops
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 1 & 2
FE-2 (UP)
APPROACH TIMELINE
(RNDZ, CUE CARD)
SSC 16 SETUP
Ref. MSG 004 AH
OY!!!
SAFETY BRIEFING
IELK INSTALL & C/O
Ref. Middeck Transfer List:
Item 23,23.1
Ref. MPLM Return Transfer List:
Item 767
~
NOTES
10
FLT PLN/126/FLIGHT
03
FERGUSON
BOE
PETTIT
NO EXERCISE
WHILE OBSS
GRAPPLED BY
SRMS & SSRMS
REPL
ANNE
D
ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF
Steps 1-5.2
SM SPEC 62
ITEM 1 -EXEC
Wait 3 MINUTES
ITEM 2 -EXEC
RESUME
E
3-26
STS-
126
FD (
)
01:00
02:00
03:00
04:00
GMT
Date
11/17
(322)
00:00
01:00
02:00
03:00
04:00
MET
Day 002
WE
Z
T D R S
~
~~ ~
D / N
D O R B 6 7 8
O R B 3 3 3 4 3 5
~ ~B I A S - X L V - Z V VS T S A T T
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PRIVATE MEDICAL CONFERENCE (A/G)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ Hum Seps for H2O Accumulation
MIDDECK XFER
Ref. Middeck Transfer List
TRANSFER TAGUP
Coordinate with xfer counterpart
MUS LOG (ASSY OPS, PAYLOADS)
EXERCISE
~
TFL 129 FOR NLG
E
PLT
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Steps 6-8
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Step 9
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 3-5
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MUS LOG
(ASSY OPS, PAYLOADS)
EXERCISE
MS1
~
ROBO: 1.110 OBSS UNBERTH & HANDOFF
Steps 5.3-9
ROBO: 1.111 OBSS RELEASE AT HANDOFF
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
TRANSFER BRIEF
Call down status to MCC
TRANSFER TAGUP
Coordinate with xfer counterpart
MUS LOG (ASSY OPS, PAYLOADS)
MIDDECK XFER
Ref. Middeck Transfer List
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
3-26
03
FERGUSON
BOE
PETTIT
NO EXERCISE
WHILE OBSS
GRAPPLED BY
SRMS & SSRMS
REPL
ANNE
D
ROBOTICS: 1.110 OBSS UNBERTH & HANDOFF
Steps 1-5.2
SM SPEC 62
ITEM 1 -EXEC
Wait 3 MINUTES
ITEM 2 -EXEC
RESUME
E
STS-
126
FD (
)
01:00
02:00
03:00
04:00
GMT
Date
11/17
(322)
00:00
01:00
02:00
03:00
04:00
MET
Day 002
WE
Z
T D R SD / N
D O R B 6 7 8
O R B 3 3 3 4 3 5
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PRIVATE MEDICAL CONFERENCE (A/G)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
√ Hum Seps for H2O Accumulation
MIDDECK XFER
Ref. Middeck Transfer List
TRANSFER TAGUP
Coordinate with xfer counterpart
MUS LOG (ASSY OPS, PAYLOADS)
EXERCISE
~
TFL 129 FOR NLG
E
PLT
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Steps 6-8
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Step 9
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 3-5
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MUS LOG
(ASSY OPS, PAYLOADS)
EXERCISE
MS1
~
ROBO: 1.110 OBSS UNBERTH & HANDOFF
Steps 5.3-9
ROBO: 1.111 OBSS RELEASE AT HANDOFF
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
TRANSFER BRIEF
Call down status to MCC
TRANSFER TAGUP
Coordinate with xfer counterpart
MUS LOG (ASSY OPS, PAYLOADS)
MIDDECK XFER
Ref. Middeck Transfer List
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
11
FLT PLN/126/FLIGHT
03
BOWEN
PIPER KIMBROUGH MAGNUS
MIDDECK XFER
Ref. Middeck Transfer List
NO EXERCISE
WHILE OBSS
GRAPPLED BY
SRMS & SSRMS
REPL
ANNE
D
MIDDECK XFER
Ref. MSG013
Ref. MIDDECK TRANSFER LIST:
Items 5,5.1,5.1.1,13,13.1-13.4,
24,25,29,46,46.1,46.2,716
3-27
STS-
126
FD (
)
01:00
02:00
03:00
04:00
GMT
Date
11/17
(322)
00:00
01:00
02:00
03:00
04:00
MET
Day 002
WE
Z
T D R S
~
~~ ~
D / N
D O R B 6 7 8
O R B 3 3 3 4 3 5
~ ~B I A S - X L V - Z V VS T S A T T
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
√ All EVA drink bags fills complete
THEN: GALLEY MORNING CONFIG
(ORB OPS, ECLS
)
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
~
MOP QUESTIONNAIRE
(ASSY OPS, PAYLOADS)
MS3
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
CANNON G1 HD DIGITAL CC DNLK
Ref. MSG 017
KU TDRW (02:15-02:51)
EMU TRANSFER TO ISS
Ref. MIDDECK TRANSFER LIST:
Items 51,52
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 6-8
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Step 9
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Steps 3-5
MDDK STATUS CHECK (ASSY OPS, P/L)
MUS LOG (ASSY OPS, PAYLOADS)
MOP QUESTIONNAIRE
(ASSY OPS, PAYLOADS)
FE-2 (UP)
IELK INSTALL & C/O
Ref. Middeck Transfer List:
Item 23,23.1
Ref. MPLM Return Transfer List:
Item 767
~
MIDDECK XFER
Ref. Middeck Transfer List
PREP WORK
PREP WORK
SOKOL LEAK CHECK
DAILY PLANNING CONFERENCE (DPC)
PRIVATE MEDICAL CONFERENCE (A/G)
PRE SLEEP-ISS
~
NOTES
3-27
03
BOWEN
PIPER KIMBROUGH MAGNUS
MIDDECK XFER
Ref. Middeck Transfer List
NO EXERCISE
WHILE OBSS
GRAPPLED BY
SRMS & SSRMS
REPL
ANNE
D
MIDDECK XFER
Ref. MSG013
Ref. MIDDECK TRANSFER LIST:
Items 5,5.1,5.1.1,13,13.1-13.4,
24,25,29,46,46.1,46.2,716
STS-
126
FD (
)
01:00
02:00
03:00
04:00
GMT
Date
11/17
(322)
00:00
01:00
02:00
03:00
04:00
MET
Day 002
WE
Z
T D R SD / N
D O R B 6 7 8
O R B 3 3 3 4 3 5
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
√ All EVA drink bags fills complete
THEN: GALLEY MORNING CONFIG
(ORB OPS, ECLS
)
DIDB FILL
FILL 8 DIDBs FROM GALLEY
REMOVE GAS
DISPOSE OF FILL TOOL IN WET TRASH
~
MOP QUESTIONNAIRE
(ASSY OPS, PAYLOADS)
MS3
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
CANNON G1 HD DIGITAL CC DNLK
Ref. MSG 017
KU TDRW (02:15-02:51)
EMU TRANSFER TO ISS
Ref. MIDDECK TRANSFER LIST:
Items 51,52
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL) Steps 6-8
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Step 9
OBSS HANDOFF FROM SSRMS TO SRMS
(PDRS, OBSS NOMINAL)Steps 3-5
MDDK STATUS CHECK (ASSY OPS, P/L)
MUS LOG
(ASSY OPS, PAYLOADS)
MOP QUESTIONNAIRE
(ASSY OPS, PAYLOADS)
FE-2 (UP)
IELK INSTALL & C/O
Ref. Middeck Transfer List:
Item 23,23.1
Ref. MPLM Return Transfer List:
Item 767
~
MIDDECK XFER
Ref. Middeck Transfer List
PREP WORK
PREP WORK
SOKOL LEAK CHECK
DAILY PLANNING CONFERENCE (DPC)
PRIVATE MEDICAL CONFERENCE (A/G)
PRE SLEEP-ISS
~
NOTES
12
FLT PLN/126/FLIGHT
03
FERGUSON
BOE
PETTIT
REPL
ANNE
D
3-28
STS-
126
FD (
)
05:00
06:00
07:00
08:00
GMT
Date
11/17
(322)
04:00
05:00
06:00
07:00
08:00
MET
Day 002
WE
Z
T D R S
~
~
~
D / N
D O R B 8 9 1 0 1 1
O R B 3 6 3 7 3 8
~ ~B I A S - X L V - Z V VS T S A T T
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
PLT
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
DRY SALIVA CLCT (ORB OPS,SDBI)
NOTES
3-28
03
FERGUSON
BOE
PETTIT
REPL
ANNE
DST
S-12
6 FD
(
)
05:00
06:00
07:00
08:00
GMT
Date
11/17
(322)
04:00
05:00
06:00
07:00
08:00
MET
Day 002
WE
Z
T D R SD / N
D O R B 8 9 1 0 1 1
O R B 3 6 3 7 3 8
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
PLT
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
DRY SALIVA CLCT (ORB OPS,SDBI)
NOTES
13
FLT PLN/126/FLIGHT
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
D
3-29
STS-
126
FD (
)
05:00
06:00
07:00
08:00
GMT
Date
11/17
(322)
04:00
05:00
06:00
07:00
08:00
MET
Day 002
WE
Z
T D R S
~
~
~
D / N
D O R B 8 9 1 0 1 1
O R B 3 6 3 7 3 8
~ ~B I A S - X L V - Z V VS T S A T T
MS2
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT(ORB OPS,SDBI
)
MS3
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT(ORB OPS,SDBI
)
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
FE-2 (UP)
PRE SLEEP-ISS
~
SLEEP
~
NOTES
3-29
03
BOWEN
PIPER KIMBROUGH MAGNUS
REPL
ANNE
DST
S-12
6 FD
(
)
05:00
06:00
07:00
08:00
GMT
Date
11/17
(322)
04:00
05:00
06:00
07:00
08:00
MET
Day 002
WE
Z
T D R SD / N
D O R B 8 9 1 0 1 1
O R B 3 6 3 7 3 8
S T S A T T ~ ~B I A S - X L V - Z V V
MS2
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT (
ORB OPS,SDBI
)
MS3
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
DRY SALIVA CLCT (
ORB OPS,SDBI
)
MS4
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
SLEEP
~
FE-2 (UP)
PRE SLEEP-ISS
~
SLEEP
~
NOTES
14
MSG 012 - FD03 MISSION SUMMARY
Good Morning Endeavour!! 1 2 3 4 5 6 7 8 9
10
All of you did an awesome job yesterday! Have a great rendezvous day! YOUR CURRENT ORBIT IS: 132 X 114 NM NOTAMS: 11
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
NOTAMS - ONE CHANGE ILM – RWY 06/24 CLOSED. EDW – EDT IN USE FOR STS-126. EDW ELS DAY / VFR ONLY. EDW – LAKEBED RUNWAY 15/33 ELS ONLY. OTHER LAKEBED RWYS RED. NOR – LAKEBED RUNWAYS GREEN. DOV – RWY 14/32 CLOSED. HAW – RWY 13 THLD DISPLACED, 9,019’ USABLE. AMB – RWY 15/33 CLOSED. YHZ – RWY 05/23 CLOSED. YYT – RWY 16/34 CLOSED. IKF – NOT USABLE. NO AGREEMENT. BEN – NOT RECOMMENDED/NOT SUPPORTED. ZZA – FIRST 600M (~2,000’) OF RWY 30L NOT AVAILABLE. 10,200’ REMAINING. NEXT 2 PLS OPPORTUNITIES: 29
30 31 32 33 34
EDT04L ORB 33 – 2/00:24 FEW250 7 040/07P9 EDT04L ORB 49 – 3/00:50 SKC 7 040/07P9 OMS TANK FAIL CAPABILITY: 35
36 37 38 39 40
L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 41
42 43 44 45 46
L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 47
48 49 50 51
L OMS OX = 33.8 R OMS OX = 34.0 FU = 33.5 FU = 33.8 Subtract interconnect counter for current OMS quantities.
END OF PAGE 1 OF 2, MSG 012 15
MSG 012 - FD03 MISSION SUMMARY
DELTA V AVAILABLE: 1 2 3 4
OMS 311 FPS ARCS (TOTAL ABOVE QTY1) 28 FPS 5
6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21
TOTAL IN THE AFT 339 FPS ARCS (TOTAL ABOVE QTY2) 57 FPS FRCS (ABOVE QTY 1) 39 FPS AFT QTY 1 86 % AFT QTY 2 48 %
SYSTEM FAILURE IMPACT WORK AROUND
EPS Fuel Cell 1 H2 flowmeter is erratic. (SPEC 69 FUEL CELLS, FC 1 FLOW H2).
Loss of insight into Fuel Cell 1 H2 flow.
None. MCC has additional insight into the health of Fuel Cell 1. Onboard FDA has been inhibited.
INST/COMM Elbow Camera Automatic Light Control (ALC) command sequence
Additional command needed to activate automatic iris control
After Elbow Camera selection and standard iris control “ALC” – “AVG”, push “ALC” a second time to activate iris.
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
END OF PAGE 2 OF 2, MSG 012 16
MSG 004 (18-0213) – SSC 16 SETUP Page 1 of 3
Page 1 of 3, MSG 004 (18-0213)
OBJECTIVE: 1 This will convert Aft Flight Deck laptop to SSC Client. 2 3 UNSTOW: 4 A31p 60 GB Hard Drive P/N: SEG33115359-301 S/N: 1326 5 A31p UltraPort Camera P/N: SEG33115371-301 6 Wireless Network Card P/N: 1F15983-1 7 8 9
SETUP AFT FLIGHT DECK PCS AS SSC16 10 1. √Aft Flight Deck PCS pwr – OFF 11
12 2. Swap hard drive with A31P 60GB hard drive (s/n 1326) (Refer to 2.405 13
A31P 60 GB HARD DRIVE CHANGEOUT, steps 4 through 14 (POC: 14 NOMINAL: THINKPAD), then: 15
16 3. Temp stow original hard drive 17
18 4. Open small cover above Interposer (Refer to Figure 1) 19
20 Figure 1 - A31p UltraPort Camera Position 21
22 5. Move and hold Release Latch towards angled side of A31p UltraPort 23
camera. Align metal legs below A31p Ultraport camera with holes inside 24 Interposer and place camera on Interposer (Refer to Figures 1 and 2) 25
26 Figure 2 - A31p UltraPort Camera 27 28
6. Release latch to properly secure A31p UltraPort camera. 29 30 7. √A31p UltraPort camera properly secured and does not disconnect. 31 8. Rotate lens so that lens is directed towards user. (Refer to Figure 2) 32
Interposer
Lens
Release Latch
Aft Flight Deck PCS
17
MSG 004 (18-0213) – SSC 16 SETUP Page 2 of 3
Page 2 of 3, MSG 004 (18-0213)
1 9. Insert Wireless Network Card into top-most PCMCIA card slot 2
3 10. Aft Deck PCS pwr – ON (Henceforth referred to as SSC16) 4
5 11. Log into SSC16 as crewmember 6
For appropriate logon information, refer to {5.202 SSC USER LOGON 7 ACCOUNTS} (POC: REFERENCE: OPS LAN) 8
9 12. Verify connectivity to ISS_AP1 or ISS_AP2 (Refer to Figure 3) 10
11 13. √Signal strength > 2 (Refer to Figure 3) 12
13
14 Figure 3: Netgear Wireless Assistant 15
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
SSC16
18
MSG 004 (18-0213) – SSC 16 SETUP Page 3 of 3
Page 3 of 3, MSG 004 (18-0213)
1 *********************************************************************** 2 If Netgear monitor does not appear or low to no connectivity 3 Eject Wireless Network Card from PCMCIA slot 4 5 RJ-45 Ethernet cable →|← SSC16 Ethernet port 6 7 sel Start > Settings > Control Panel 8 9 Double-click Network Connection 10 11 Right-click Local Area Connection (Refer to Figure 4) 12 13 sel Enable (Refer to Figure 4) 14 15
16 Figure 4: Network Connections 17 18 Open PingMaster and verify connectivity to OpsLAN 19 20 Close all windows 21 *********************************************************************** 22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
**
**
**
**
**
**
**
**
**
**
**
**
**
**
**
**
*
19
18-0
218
(MSG
010
) - S
tow
age
Loca
tions
for F
D03
(GM
T 32
1)
Pag
e 1
of 4
P
age
1 of
4, 1
8-02
18 (M
SG
010
)
Con
tent
s:
Tim
elin
e Pr
oced
ures
: N
UTR
/REP
-FE2
UR
N-C
LT
NU
TR/R
EP-F
E2 U
RN
-INS
N
UTR
/REP
-FE2
UR
N-S
TW
ISS-
HAT
CH
LEA
K C
HEC
K IS
S-H
ATC
H O
PEN
Ta
sklis
t Pro
cedu
res:
P/
TV-D
CS
D2X
-CLN
S&
M-L
AB1S
3-PR
EP
S&M
-LAB
1P4-
PREP
S&
M-L
AB1D
4-PR
EP
Tim
elin
e Pr
oced
ures
: N
UTR
/REP
-FE2
UR
N-C
LT
NU
TR/R
EP-F
E2 U
RN
-INS
NU
TR/R
EP-F
E2 U
RN
-STW
2.
003
NU
TRIT
ION
UR
INE
CO
LLEC
TIO
N W
ITH
REP
OSI
TOR
Y Ty
pe: S
tand
ard
IMS
Plan
: No
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Cre
w P
ref
Kap
ton
Tape
1"
528-
4135
3-1
- -
2
Tem
p St
ow
Zipl
ock
-
- -
Siz
e is
cre
w p
ref,
use
to
gath
er d
ry tr
ash.
3
Dew
ar A
SE
Pou
ch
0329
8 03
J M
EFD
AP0
3J
4
JPM
1D4_
B1
W
hite
Glo
ves
0329
1-1
Any
Any
Ty
pe:
Res
tow
IM
S Pl
an: N
o 5
Stag
e fo
r Tra
sh
HR
F U
rine
Con
tain
men
t Bag
S
DD
4610
7234
-306
-
- P
er C
CD
6
JPM
1D4
Dew
ar 1
, Tra
y B
, S
ectio
n 4
Sam
ples
-
- -
Bun
dled
with
Kap
ton
Tape
.
7 JP
M1F
1_D
2 1.
0 C
TB: H
RF,
S/N
10
36, B
/C 0
0292
1J
Urin
e C
olle
ctio
n K
it S
JG46
1164
35-3
03
- H
RF0
7943
J
8 JP
M1F
5_G
1 1.
0 C
TB, S
/N 1
246,
B
/C 0
1058
2J
Sam
ple
Tube
Dis
pens
er
SE
G46
1169
31-3
31
- H
RF0
5472
J
20
18-0
218
(MSG
010
) - S
tow
age
Loca
tions
for F
D03
(GM
T 32
1)
Pag
e 2
of 4
P
age
2 of
4, 1
8-02
18 (M
SG
010
)
ISS-
HA
TCH
LEA
K C
HEC
K
2.10
2 PO
ST D
OC
KIN
G H
ATC
H L
EAK
CH
ECK
- IS
S Ty
pe: S
tand
ard
IMS
Plan
: No
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
VA
J-78
-1 5
ft 68
3-17
111-
1 -
0000
2677
J
2 M
PE
V In
tern
al S
ampl
ing
Ada
pter
(IS
A)
97M
5583
0-1
2 00
0002
M
3
NO
D1D
0 0.
5 C
TB: I
SA/
Mul
timet
er it
ems
for
ULF
-2, S
/N 1
240,
B
/C 0
1042
1J
I
SA
Sco
pem
eter
Pre
ssur
e P
robe
15
25,7
60M
MH
GA
/ 30
PSIA
00
5023
4399
91
0000
09M
A
ttach
ed to
MP
EV
ISA
4 M
ultim
eter
Kit
1011
8-10
018-
04
1017
-
5
LAB
1P6
M
ultim
eter
87
-
0007
2526
K La
bele
d “V
’ger
” 6
Cre
w P
ref
Ear
plug
s 28
-00-
05
- -
IS
S-H
ATC
H O
PEN
2.
104
HA
TCH
OPE
NIN
G A
ND
SH
UTT
LE/IS
S D
UC
T IN
STA
LLA
TIO
N
Type
: Sta
ndar
d IM
S Pl
an: N
o #
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1
Nitr
ile G
love
s A
ssy
SE
G33
1168
07-3
01
- -
Sub
stitu
te fo
r Rub
ber
Glo
ves
if no
ne fo
und.
2
NO
D1O
4_C
1 0.
5 C
TB: R
ubbe
r G
love
s, S
/N 1
159,
B
/C 0
0660
8J
Dee
rski
n G
love
s 52
8-41
517-
2 -
-
3
Tow
el
- -
-
4
Cre
w P
ref
Flas
hlig
ht
5
DO
CKI
NG
MEC
HA
NIS
M A
CC
ESS
OR
Y KI
T 33У.
9962
.003
-
- M
esh
bag
6
Ручка
11Ф
732.Г1
021-ОА
- -
AP
AS
Hat
ch T
ool
7
C
lean
ing
Pad
s 33У.
9938
.002
-
-
8
H
atch
Cov
er
33У.
9936
.021
-
- A
PA
S H
atch
Cov
er
9
S
tand
off C
over
Bag
Ass
y S
EM
3912
5998
-301
-
- D
ocki
ng T
arge
t Sta
ndof
f C
ross
Bag
10
Tar
get B
ase
Cov
er A
ssy
SE
M39
1259
97-3
01
- -
Doc
king
Tar
get B
ase
Pla
te C
over
11
NO
D2D
0
1
1/2
Inch
Wre
nch
528-
2094
2-1
- -
1 1/
2" O
pen
End
Wre
nch
21
18-0
218
(MSG
010
) - S
tow
age
Loca
tions
for F
D03
(GM
T 32
1)
Pag
e 3
of 4
P
age
3 of
4, 1
8-02
18 (M
SG
010
)
Task
list P
roce
dure
s:
P/TV
-DC
S D
2X-C
LN
18- 0
071
3.49
9 D
2Xs
SEN
SOR
CLE
AN
ING
Ty
pe: S
tand
ard
IMS
Plan
: No
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Wat
er M
icro
biol
ogy
Kit
SE
G46
1199
90-3
03
1001
C
HC
WM
K01
J
2 LA
B1P
4 M
icro
biol
ogy
Wat
er A
naly
sis
Syr
inge
60c
c K
LSK2
7024
8-30
2 -
- N
o ne
edle
S&M
-LA
B1S
3-PR
EP
1.2
15 P
REP
AR
E LA
B F
OR
RA
CK
INST
ALL
ATI
ON
ON
ULF
2 Ty
pe: S
tand
ard
IMS
Plan
: No
# LO
CA
TIO
N
ITEM
NA
ME
P/N
S/
N
B/C
N
otes
1
Cre
w P
ref
Dig
ital C
amer
a
2
ARIS
- Pi
vot F
ittin
g Bo
ttom
Lef
t 68
3-61
711-
31
REP
OR
T R
EPO
RT
3 C
OL1
O4_
A2
1.0
CTB
: Mec
hani
cal
Um
bilic
al A
ssy,
P
ushr
od A
ssy
S/M
S
/N 1
148,
B/C
00
4142
J
ARIS
- Pi
vot F
ittin
g Bo
ttom
Rig
ht
683-
6171
1-32
R
EPO
RT
REP
OR
T R
epor
t S/N
’s to
MC
C-H
Type
: Res
tow
IM
S Pl
an: N
o 4
Rac
k U
IP C
lose
out P
anel
68
3-60
410-
1 R
EPO
RT
REP
OR
T 5
NO
D1S
4_G
R
ack
Upp
er C
lose
out S
eal
683-
6043
1-2
REP
OR
T R
EPO
RT
6 R
ack
Gro
undi
ng S
trap
Bra
cket
68
3-56
200
REP
OR
T R
EPO
RT
7 R
ack
Gro
undi
ng S
trap
Bra
cket
68
3-56
200
REP
OR
T R
EPO
RT
8 IH
I/MH
I Piv
ot F
ittin
g Bo
ttom
, Lef
t 68
3-20
100-
1 R
EPO
RT
REP
OR
T 9
CO
L1O
4_A2
1.
0 C
TB: M
echa
nica
l U
mbi
lical
Ass
y,
Pus
hrod
Ass
y S/
M
S/N
114
8, B
/C
0041
42J
IHI/M
HI P
ivot
Fitt
ing
Botto
m, R
ight
68
3-20
100-
2 R
EPO
RT
REP
OR
T
Rep
ort S
/N’s
to M
CC
-H
22
18-0
218
(MSG
010
) - S
tow
age
Loca
tions
for F
D03
(GM
T 32
1)
Pag
e 4
of 4
P
age
4 of
4, 1
8-02
18 (M
SG
010
)
S&M
-LA
B1P
4-PR
EP
1.21
5 PR
EPA
RE
LAB
FO
R R
AC
K IN
STA
LLA
TIO
N O
N U
LF2
Type
: Sta
ndar
d IM
S Pl
an: N
o #
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 C
rew
Pre
f D
igita
l Cam
era
- -
-
Type
: Res
tow
IM
S Pl
an: N
o 2
CO
L1O
4_A2
1.
0 C
TB: M
echa
nica
l U
mbi
lical
Ass
y,
Pus
hrod
Ass
y S/
M
S/N
114
8, B
/C
0041
42J
ARIS
- Pi
vot F
ittin
g Bo
ttom
Rig
ht
683-
6171
1-32
R
EPO
RT
REP
OR
T R
epor
t S/N
’s to
MC
C-H
S&M
-LA
B1D
4-PR
EP
1.21
5 PR
EPA
RE
LAB
FO
R R
AC
K IN
STA
LLA
TIO
N O
N U
LF2
Type
: Sta
ndar
d IM
S Pl
an: N
o #
LOC
ATI
ON
IT
EM N
AM
E P/
N
S/N
B
/C
Not
es
1 C
rew
Pre
f D
igita
l Cam
era
- -
-
Type
: Res
tow
IM
S Pl
an: N
o 2
CO
L1O
4_A2
1.
0 C
TB: M
echa
nica
l U
mbi
lical
Ass
y,
Pus
hrod
Ass
y S/
M
S/N
114
8, B
/C
0041
42J
ARIS
- Pi
vot F
ittin
g Bo
ttom
Rig
ht
683-
6171
1-32
R
EPO
RT
REP
OR
T R
epor
t S/N
’s to
MC
C-H
23
18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 1 of 5
DOUG Setup for FD03 (OBSS Handoff) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2
(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:
POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.
3. Configure for current ISS configuration and bring up displays.
3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.110 OBSS Unberth and Handoff”, open
4. Confirm steps 4.1-4.2 are complete with loaded state file, otherwise complete these steps as needed. 4.1 Reconfig ► SSRMS
4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_5’.
4.2 JntSystems ► RMS 4.2.1 In the RMS Dialog box enter “22.7, 57.5, -27.4, -99.3, 11.8, -97.9” 4.2.2 In the SPDM Dialog box enter:
“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.2.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"
4.3 Display ► Puddle Plot Shoulder/Wrist 4.4 For real-time support, Display ► Show SSRMS Target 4.5 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)
Notes:
Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.
Starting Target Procedure Step
Camera SSRMS RMS 1.110 OBSS GRAPPLE
2 1.110 Step 2 - Stage Park
5. For procedure “1.110 OBSS Unberth and Handoff” Step 4 configure for current ISS
configuration. 5.1 Reconfig ► Orbiter Inspection
5.1.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF2_to SSRMS’ 6. For procedure “1. 111 OBSS Release at Handoff” Step 2 configure for current ISS
configuration. 6.1 Reconfig ► Orbiter Inspection
6.1.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’.
Page 1 of 5, 18-0212 (MSG 014) 24
18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 2 of 5
DOUG Setup for FD04 (MPLM Unberth and Install) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2
(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:
POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.
3. Configure for current ISS configuration and bring up displays.
3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.210 Berthed MPLM Grapple”, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS
3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘MPLM_Unberth/Install_Config’
4. Confirm steps 4.1-4.2 are complete with loaded state file, otherwise complete these steps as
needed. 4.1 Reconfig ► SSRMS
4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS5’.
4.2 Reconfig ►Orbiter Inspection. 4.2.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,
25.0, -23.0, 0.0, -13.2, -21.9) 4.2.2 In the SPDM Dialog box enter:
“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.2.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"
4.3 Display ► Puddle Plot Shoulder/Wrist 4.4 For real-time support, Display ► Show SSRMS Target 4.5 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)
Notes:
Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.
Starting Target Procedure Step
Camera SSRMS RMS 1.210 Berthed MPLM Grapple
1 1.210 Step 1 - OBSS Back-off
5. For procedure “1.210 Berthed MPLM Grapple” Step 4 configure for current ISS configuration
5.1 Reconfig ► MPLM 5.1.1 In MPLM Reconfig Dialog box, select ‘MPLM_GF1 >SSRMS’
6. For procedure “1.220 MPLM Unberth to Install” Step 4 configure for current ISS configuration 6.1 Reconfig ► MPLM
6.1.1 In MPLM Reconfig Dialog box, select ‘MPLM >NODE2’ NOTE: If MPLM needs to be installed on Node 2 Zenith, refer to starting target ‘CONT MPLM Step 1 - Low Hover’
Page 2 of 5, 18-0212 (MSG 014) 25
18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 3 of 5
DOUG Setup for FD05 (EVA1) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2
(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:
POC: Activation and Checkout: DOUG)
2.1 Set SSC volume such that tones are audible. 3. Configure for current ISS configuration and bring up displays.
3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.310 - NTA Return and FHRC Retrieve”,
open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS
3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA1_Config’
4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as
needed. 4.1 Reconfig ► SSRMS
4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS5’.
4.2 Reconfig ►MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’
4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,
25.0, -23.0, 0.0, -13.2, -21.9) 4.3.2 In the SPDM Dialog box enter:
“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.3.3 In the JEM Dialog box enter “0, 65, 15, -65, -180, 0"
4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)
Notes:
Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.
Starting Target Procedure Step
Camera SSRMS RMS 1.310 - NTA Return and FHRC Retrieve
1 1.310 Step 2 - Overnight Park
NOTE: If NTA cannot be removed from ESP3 and FHRC needs to be installed on ESP3 site 6, refer to starting target ‘CONT EVA FHRC Step 1 - ESP3 Clearance’ If the NTA cannot be installed on the LMC and needs to return to ESP3 site 3, refer to starting target ‘CONT EVA NTA Step 1 - Cont 1’
Page 3 of 5, 18-0212 (MSG 014) 26
18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 4 of 5
DOUG Setup for FD07 (EVA2) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2
(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:
POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.
3. Configure for current ISS configuration and bring up displays.
3.1 File ► Load State 3.1.1 From Load State Dialog box, select “1.410 - CETA Cart Relocate”, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS
3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA2_Config’
4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as needed.
4.1 Reconfig ► SSRMS 4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_WS6’.
4.2 Reconfig ►MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’
4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5, 25, -50, -90, -13.2, 30) 6.1.2 In the SPDM Dialog box enter:
“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 6.1.3 In the JEM Dialog box enter “-7, -33.8, -45.1, -136.3, -5.8, 176"
4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)
Notes:
Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.
Starting Target Procedure Step Camera SSRMS RMS
1.410 EVA - CETA Cart Relocation
2 1.410 Step 2 - Overnight Park
Page 4 of 5, 18-0212 (MSG 014) 27
18-0212 (MSG 014) - SSRMS DOUG SETUP NOTES FOR ULF2 Page 5 of 5
DOUG Setup for FD12 (MPLM Uninstall) 1. For stand-alone procedure review, perform {1.301 DOUG Startup Procedure}, step 2
(SODF: POC: Activation and Checkout: DOUG) 2. For SSRMS real-time support, perform {1.301 DOUG Startup Procedure}, step 1 (SODF:
POC: Activation and Checkout: DOUG) 2.1 Set SSC volume such that tones are audible.
3. Configure for current ISS configuration and bring up displays.
3.1 File ► Load State 3.1.1 From Load State Dialog box, select ‘1.240 Node 2 Mated MPLM Grapple’, open -or- 3.1.2 Reconfig ► Configs_for_ROBOTICS_DAYS
3.1.2.1 In Configs_for_ROBOTICS_DAYS Dialog box, select ‘EVA3_EVA4_MPLM_Uninstall’
4. Confirm steps 4.1-4.3 are complete with loaded state file, otherwise complete these steps as
needed. 4.1 Reconfig ► SSRMS
4.1.1 In SSRMS Reconfig Dialog box, select ‘SSRMS_BASE_B’. 4.1.2 In SSRMS Reconfig Dialog box, select ‘SSRMS ->NODE2_PDGF’. 4.1.3 In SSRMS Reconfig Dialog box, select ’MT_to_WORKSITE_6’.
4.2 Reconfig ► MPLM 4.2.1 In MPLM Dialog box, select ‘MPLM>Node2’
4.3 Reconfig ► Orbiter Inspection 4.3.1 In Orbiter Inspection Dialog box, select ‘OBSS_GF1_to_SRMS’ (SRMS @ 62.5,
25.0, -23.0, 0.0, -13.2, -21.9) 4.3.2 In the SPDM Dialog box enter:
“-50, -90, -45, 80, 45, -45, -90, 0, -37.5, -45, -110, -45, 45, -70, 0.1” 4.3.3 In the JEM Dialog box enter “0, 90, -149, -31, 0, 0"
4.4 Display ► Puddle Plot Shoulder/Wrist 4.5 For real-time support, Display ► Show SSRMS Target 4.6 For Real-time support, Options ► SSRMS Proximity, set all distances to 24 (inches)
Notes:
Use the Home Key to cycle through the Camera, SSRMS and SRMS Targets. Use Page Up and Page Down keys to scroll through Target selections.
Starting Target Procedure Step
Camera SSRMS RMS 1.240 Node 2 Mated MPLM Grapple
2 1.240 Step 2 - Overnight Park
5. For procedure “1.240 Node 2 Mated MPLM Grapple” Step 5 configure for current ISS
configuration. 5.1 Reconfig ► MPLM
5.1.1 In MPLM Reconfig Dialog box, select ‘MPLM_GF1 >SSRMS’
6. For procedure “1.250 Node 2 Mated MPLM Grapple” Step 12 configure for current ISS configuration. 6.1 Reconfig ► MPLM
6.1.1 In MPLM Reconfig Dialog box, select ‘MPLM >BAY’
Page 5 of 5, 18-0212 (MSG 014) 28
MSG 015A - FD3 EVA DELTAS
END OF PAGE 1 OF 2, MSG 015A
FD3 EVA Deltas 1 2 Fergie, 3 Per Mike’s request, he will be assisting you with EVA Prep for EVA 3 and Sandy will be 4 assisting with EVA 4. This is a swap from the original plan. 5 6 Heide and Steve, 7 Great job yesterday on getting your suits checked out and ready to go for the mission. 8 We have several procedural pen and ink updates for you which are listed below. 9 10 11 EVA Timeline and Inhibit Pad Deltas 12 13 A. The Wheel Bogie PIP Pin was never found during the increment Tool Config. However, 14 the probe is an acceptable alternate tool for Wheel Bogie R&R, so you can delete 15 references to the Wheel Bogie PIP Pin in the Pre Tool Configs. Note, the probe is in the 16 staging bag. 17 18 B. Based on new analysis, the original APFR overnight stow plan will not work because the 19 SSRMS wrist roll between EVAs 1 and 2 requires 10" clearance between the ingress aid 20 and all SSRMS surfaces. We suggest stowing the APFR in CETA 1 WIF 2, in any 21 clocking that does not contact structure (i.e. brake handles). 22 23 C. We need to add clarification words in the TUS block of the Inhibit Pad for EVAs 1, 2, and 24 4. The inhibit is only required if the wire conductors are visible. 25 26 27 Please incorporate the following P&I's to address the above issues: 28 29 1) On pg 7-6, EVA 1 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 30 31 2) On pg 7-9, EVA 1 Inhibit Pad, USOS Block, TUS Block, after “TUS” add "(if wire 32 conductors visible) 33 34 3) On pg 7-17, EV1 step 3, change first line to: 35 3. Tether to APFR, “retrieve, and relocate to CETA 1 WIF 2 [ __, FF, F, 12], Report 36 Clocking.” 37 38 4) On pg 7-39, EVA 2 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 39 40 5) On pg 7-42, EVA 2 Inhibit Pad, USOS Block, TUS Block, after “TUS”, add "(if wire 41 conductors visible)” 42 43 6) On pg 7-47, EV3 step 12, change first line to: 44 12. Retrieve APFR from CETA 1 WIF 2 and install on SSRMS: [12, FF, F, 12] 45 46 7) On pg 7-73, EVA 3 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 47 48 8) On pg 7-85, EVA 4 Pre Tool Config, Staging Bag, delete "Wheel Bogie PIP Pin" 49 50 51
29
MSG 015A - FD3 EVA DELTAS
END OF PAGE 2 OF 2, MSG 015A
9) On pg 7-88, EVA 2 Inhibit Pad, USOS Block, TUS Block, after “TUS”, add "(if wire 1 conductors visible)” 2 3 10) On pg 16-3, Cribsheet, CETA Cart, Block A, step 3, add: 4 “- Use probe (Staging Bag) instead of wheel bogie PIP pin” 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
30
MSG 016 - FD02 MMT SUMMARY
END OF PAGE 1 OF 1, MSG 016
FD02 MMT Summary 1 2 The FD02 MMT met today to review mission progress with only a few items of discussion. 3 These included orbiter systems and ascent imagery. At the time of the MMT, the OBSS 4 scans were in progress. 5 6 Orbiter Systems - The MMT briefly reviewed the systems anomalies that are currently 7 being tracked. Each issue was only briefly discussed since the teams are still reviewing the 8 issues. These included: 9 10
• The Ku antenna auto handover and PSP configuration issues were briefly mentioned 11 at the MMT. The team is beginning to review the details of these problems and will 12 report back to the MMT in the coming days. 13
14
• The separate Ku antenna auto track problem was also briefly discussed. The 15 problem is believed to be at the DEA or the EA Ku electronics. A similar problem 16 occurred previously that was in the EA-1 that did not affect the rendezvous radar. If 17 required, procedures and propellant do support a failed rendezvous radar approach. 18
19
• The OMS Xfeed Heater A is still under evaluation. On FD01, the Low Point Drainline 20 Temp declined to 45 deg F prior to swapping to the B heaters. The B heater is 21 performing nominally. On the previous flight, the heater cycled on about 55 deg F; 22 however, data review shows that on the first flight of Endeavour (STS-49), the same 23 heater cycled on the first time at 40 deg F. From docking through entry, the attitude 24 is such that the affected area of the crossfeed line is expected to remain thermally 25 stable and likely above limits without the heater. This next worst failure will be 26 analyzed in the coming days. 27
28 Imagery - A quick look at the available imagery was provided. The MMT reviewed the 29 release of a small piece of debris, suspected to be FRSI blanket above the T0 LH2 umbilical 30 plate. The release occurred at MET 26 sec. The standard review process will continue for 31 this item, but it is not believed this will be a thermal concern during entry since the umbilical 32 plate itself is just painted aluminum. The black tiles on the OMS pod adjacent to the FRSI 33 blanket are there for durability and not thermal reasons. Post MMT Update: You did a great 34 job providing a great view of the suspect area. Interestingly, the area looked nominal. 35 Obviously, the team will continue to analyze the imagery and the inspection data. 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
31
FS
2-1
4 P
/TV
/126
/FLT
NO
TE
CA
NO
N G
1 (C
ontin
ued)
HD
DIG
ITA
L C
C D
NLK
Not
ify M
CC
, con
figur
ing
for H
D T
V d
nlk
C
onfig
H/W
per
dw
g at
righ
t
CC
Fo
r cab
le s
train
relie
f atta
ch M
PC
-to-G
1 C
able
V
elcr
o st
rap
to C
C s
trap
A
VIU
S
YN
C/V
IDE
O –
VID
EO
H
I-Z/7
5 –
75
PW
R S
ELE
CT
– LO
O19
√T
V P
WR
– O
N
C
C
√Wid
e C
onve
rsio
n Le
ns in
stal
led
Inst
all L
AV
MIC
√N
D F
ILTE
R –
OFF
√O
UTP
UT
– C
AM
√
√STA
ND
BY
/LO
CK
– S
TAN
DB
Y
PW
R d
ial –
“gre
en”
M
ount
Cam
cord
er
L1
0 (M
UX)
√M
UX
/VTR
/CC
PW
R –
off
(LE
D o
ff)
√VTR
/CC
/PW
R –
off
(LE
D o
ff)
Dis
conn
ect C
HA
NN
EL
3 IE
EE
139
4 C
able
M
UX/
VTR
/CC
PW
R –
on
(LE
D o
n)
√MU
X B
YP
AS
S –
AC
T √C
HA
NN
EL
0,1
RA
TE S
EL
– 1
CH
AN
NE
L √2
RA
TE S
EL
– 8
O
19
DC
UTI
L P
WR
MN
A –
ON
M
PC
PW
R
DC
PW
R S
PLY
PW
R S
W1
– O
N
MP
C S
PLY
MP
C
PW
R-O
N (H
DV
, TA
XI, 5
V, 3
V g
reen
LE
Ds
on)
js
c480
38_
126
_021
.cvx
VT
R/C
CM
UX
/VT
R/C
C
AC
T MU
XB
YPA
SS
IEE
E13
94C
hann
el3
TXR
XC
hann
el2
RAT
ESE
L
8
MP
C-D
TV
MU
XC
ab
le(S
T-S
TO
ptica
lCa
ble
)
HD
V/D
V
N/A
J2 VID
EO
J4 J6F
DA
VIU
J1 75 J5 LO J3 J7
FLT
DE
CK
(O19)
FD
TV
Pw
rC
able
(20
ft)
ETHE
RNET
HDV
DATA
OUT
16VD
CIN
MP
C
P2P1
J2J1
SW
1D
CP
WR
SP
LY(W
hite
Bric
k)
P1
P1
J2 S2
DC
UT
ILP
WR
MN
A
O19
P2
MP
CD
CP
wr
Cab
le(6
ft)
MP
CD
CSp
lyC
able
(10
ft)
MP
C-G
1C
able
(DTV
IEE
E13
944-
PIN
toM
ale
CIR
CC
able
(5ft)
)
P2/
P2
P1
Mul
tiuse
Arm
Wid
eC
onve
rsio
nLe
nsC
C
FOR
PAO
EVEN
TS
LAV
MIC
Pho
toflo
od
AC
UTI
LP
WR
AC
1F1
(MO
52J)
Loc–
Line
(w/C
lam
p)
FOR
PAO
EV
ENTS
MS
G 0
17 H
D D
IGIT
AL
CC
DN
LK P
RO
CE
DU
RE
32
FS
2-1
5 P
/TV
/126
/FLT
NO
TE
CA
NO
N G
1 (C
ontin
ued)
HD
DIG
ITA
L C
C D
NLK
(Con
tinue
d)
L10
(MU
X)
√CH
AN
NE
L 2
F/O
OK
,DA
TA L
ED
S o
n
F1(M
O52
J)
AC
UTI
L P
WR
AC
1 –
ON
Pho
toflo
od
ON
/OFF
– O
N
HI/L
O –
HI
C
abin
Lts
Fl
t Dec
k –
ON
Lt
s in
FO
V –
OFF
as
reqd
Lt
Sha
des
– in
stal
l as
reqd
W
indo
w S
hade
s –
inst
all a
s re
qd
C
C
√Sce
ne c
ompo
sitio
n
Adj
ust C
amr a
ngle
for b
est f
ram
ing
LA
V M
IC
PW
R –
ON
(tal
k),O
FF (l
iste
n)
√M
CC
if B
lack
vid
eo a
nd c
olor
bar
s re
qd
If re
qd:
PW
R d
ial -
Av
Ape
rture
- cl
ose
√Av
CLO
SE
dis
play
ed o
n to
p le
ft of
LC
D
AG
C -
OFF
√G
AIN
sw
- L
ñ0d
B d
ispl
ayed
on
LCD
O
UTP
UT
- BA
RS
Whe
n M
CC
say
s do
ne w
/bar
s:
OU
TPU
T - C
AM
Whe
n M
CC
say
s do
ne w
/bla
ck s
cree
n te
st:
PW
R d
ial -
“gre
en”
MS
G 0
17 H
D D
IGIT
AL
CC
DN
LK P
RO
CE
DU
RE
33
FS
2-1
6 P
/TV
/126
/FLT
NO
TE
CA
NO
N G
1 (C
ontin
ued)
HD
DIG
ITA
L C
C D
NLK
(Con
clud
ed)
Whe
n dn
lk c
ompl
ete:
C
C
P
WR
dia
l – O
FF
O
19
TV
PW
R –
OFF
as
reqd
MP
C
P
WR
– O
FF
MP
C P
WR
DC
PW
R S
PLY
PW
R S
W1
– O
FF
MP
C S
PLY
O
19
D
C U
TIL
PW
R M
NA
– O
FF
L10
(MU
X)
M
UX/
VTR
/CC
PW
R –
off
(LE
D o
ff)
Con
nect
CH
AN
NE
L 3
IEE
E 1
394
Cab
le
N
otify
MC
C, r
etur
ned
to S
D T
V d
nlk
G
o to
DE
AC
TIV
ATI
ON
(Cue
Car
d, T
V) a
s re
qd
MS
G 0
17 H
D D
IGIT
AL
CC
DN
LK P
RO
CE
DU
RE
34
18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 1 of 3
Page 1 of 3, 18-0221 (MSG 018)
Exp 18 / STS-126 Joint Emergency Agreement 1
2
General 3
• JEE cue cards will be posted in A/L and PMA2. Leave A/L cue card for ISS use. 4
Hardcopy of JEUS at RWS. 5
• If possible, ground and both CDRs should confirm JEE is in progress. Would like 6
Capcom to echo on S/G2. 7
• Preferred to make all calls on the Big Loop. 8
• Soyuz emergency requiring ISS crew to deorbit does not imply a STS 9
emergency. 10
• If ISS crew egresses to Soyuz, will be out of comm unless ground ties loops 11
together. 12
• Over-riding philosophy is to take immediate safing steps (fight fire, collect EMUs, 13
etc.) then quickly egress to shuttle. 14
• When possible, use the buddy system. 15
• ISS crew generally pushes ATM/FIRE/DpDt pushbutton unless situation is 16
obvious (i.e. Fire) 17
• STS crew encouraged to push Tox Atm if recognizable NH3 leak 18
• Treat STS messages as if ISS (“ISS Tox Atm”, etc.) 19
Pending Shuttle activities, there are time periods in which the ISS 20
alarms may NOT annunciate on STS 21
• Shuttle alarms passed via BPSMU. Otherwise no indication of shuttle alarm 22
unless passed over big loop. 23
• If SSRMS grappled to OBSS or MPLM while in MPMs (PRLAs), STS will vacate 24
ISS and let MCC perform the ungrapple. If EV crew on arm, operator will let 25
MCC know what they are doing based on the situation. 26
• If an emergency occurs when each crew is on their own vehicle, Shuttle crew will 27
come back onto the ISS to get their EMUs (if the emergency is not in their direct 28
path) while the ISS crew will deal with the emergency. 29
30
Specific Responsibilities 31
• Kimbrough, Piper, or Pettit will retrieve 22’ and 28’ hose from seat 7, 6 to close 32
hatch during Fire or Tox Atm 33
• Kimbrough is responsible for counting heads. Kimbrough (pri)/ Piper (sec) will be 34
responsible for hatch closures and reporting closures to CDR. Shuttle crew will 35
notify ISS crew and MCC when Node 2 Fwd hatch is closed. 36
• Pettit backs up Kimbrough for O2/N2 disconnect and duct stow. 37
• Boe (Pri) for putting RMS in safe config for un-docking until Kimbrough available 38
39
35
18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 2 of 3
Page 2 of 3, 18-0221 (MSG 018)
EVA 1
• If in campout with A/L depress imminent and PHA Ports don’t work, use PBA if 2
necessary for emergency. 3
If PBA donned, wear to shuttle for egress. If fighting fire in path, stay back 1 4
m due to oxygen from PBA. 5
• Piper (pri) and Bowen (sec) will retrieve EMUs using cue card in the Joint Airlock. 6
Identify EMUs for return using expedited doff cue card for ISS crew 7
awareness. 8
• EV crew always recovers in ISS A/L unless directed otherwise. 9
Can recover in STS A/L on MCC call. 10
• If Piper on SSRMS w/ FHRC or NTA continue w/ RWS vacant to complete 11
JOCAS or let the ground finish. 12
13
Depress 14
• If shuttle crew feels pressure changing in ears, confirm with ISS crew member 15
before annunciating. 16
• If dP/dt during Campout, EV crew will talk to ground on Big Loop before taking 17
action unless it’s an obvious large leak in A/L. 18
• Shuttle crew will notify ISS crew when Node 2 Fwd hatch is closed and additional 19
information about hatch pulling away or slamming shut. 20
21
Toxic Atmosphere 22
• Ammonia - 23
Shuttle crew - don masks, push ATM button on C&W panel if not already in 24
alarm, close Node 2 Fwd hatch, if contamination suspected doff clothes in 25
PMA2, close APAS hatch. 26
Shuttle crew is not expected to retrieve EMUs in this situation. 27
All crews will verify levels of ammonia in own vehicles using ammonia 28
detection kit. 29
• Other unidentified odor or spill - do not push ATM button; notify ISS crew. 30
Talk plan on Big Loop before taking additional actions. 31
32
Fire 33
• Shuttle crew can push fire button for any fire with visible smoke or flame. 34
• If only indication is burning odor, preferred to talk to ISS crew before pushing 35
button. 36
• Should annunciate alarm before attempting to extinguish fire. Should call over 37
ATU visible fire, or smoke. 38
• Shuttle crew can use fire extinguishers to fight a visible fire or smoke billowing 39
from an obvious source until ISS crew arrives, then egress to shuttle. 40
• Shuttle crew does not need to unpower rack using rack power switch for smoke 41
coming from rack. 42
36
18-0221 (MSG 018) – Exp 18 / STS-126 Joint Emergency Agreement Page 3 of 3
Page 3 of 3, 18-0221 (MSG 018)
• For Shuttle fire, if safe enough call ISS crew on Big Loop to push the button 1
before using Halon extinguishers. 2
Goal is to stop ventilation before or as soon as possible to prevent spreading 3
Halon to ISS. 4
37
FLIGHT NOTE --------------------------------------------------------------- | | | TO: FD, CAPCOM, FAO, RENDEZVOUS, PROP, GC | | FROM: FDO | | SUBJECT: MANEUVER TIGS | | | | | | COPIES: 1 | | | | MET | | NH 001:16:08:15.300 | | NC4 001:16:48:03.300 | | NCC 001:17:33:27.000 | | TI 001:18:31:09.000 PET = 0:0 ; SS - 36 MIN | | MC1 001:18:51:09.000 | | MC2 001:19:21:03.000 ET = 0:0 | | MC3 001:19:38:03.000 MC2 + 17 MIN | | MC4 001:19:48:03.000 MC2 + 27 MIN | | DOCK 001:21:09:15.000 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | --------------------------------------------------------------- 1/ 2
MSG 019 - FD3 RNDZ PACKAGE
38
MSG 019 - FD3 RNDZ PACKAGE
39
PRELIMINARY ORBIT MANEUVER PAD FOR NH (RNDZ C.L. p. 3-2)
(+)125.7
(+)000.0
(+)006.2
X X
X
X
XX
XX
N/A
N/A
N/A
N/A
N/A
N/A
13
X
X 000
(+)0.5
(-)5.7
(+)5.7
252294
01/16:08:15.3
325
270
049
125.9
01:21
(+)121.4
(+)000.0
(+)033.2
191
(+)127
X
TREAT LOSS OF GPC-3 AS SECOND GIMBAL FAIL ON THE RIGHT.
MS
G 0
19 -
FD3
RN
DZ
PA
CK
AG
E
40
PRELIMINARY ORBIT MANEUVER PAD FOR NC-4 (RNDZ C.L. p. 3-4)
(+)094.6
(+)000.0
(+)003.4
X X
X
X
XX
XX
N/A
N/A
N/A
N/A
N/A
N/A
13
X
X 000
(+)0.5
(-)5.7
(+)5.7
249168
01/16:48:03.3
049
113
326
094.7
01:00
(+)091.3
(+)000.0
(+)024.9
193
(+)180
X
TREAT LOSS OF GPC-3 AS SECOND GIMBAL FAIL ON THE RIGHT.
MS
G 0
19 -
FD3
RN
DZ
PA
CK
AG
E
41
MS
G 0
19 -
FD3
RN
DZ
PA
CK
AG
E
42