structuretone capability document - oct 2015
DESCRIPTION
StructureTone is one of the UK’s leading construction companies, with vast experience in the commercial office fit-out, refurbishment and data centre sectors.TRANSCRIPT
StructureTone Introduction
“
We wanted to create a space that would leave a lasting impact on visitors and provide staff with a space they wanted to work in.
The team have worked hard to achieve this and we believe the refurbishment has completely lifted the building and blown new life into it. John Robinson | EMEA Head of Design and Construction | J.P. Morgan
““
INTRODUCTIONS
DEAN MANNINGMANAGING
DIRECTOR
TEL: +44 (0)20 7204 7048
EMAIL: richard.brandon@ structureTone.co.uk
TEL: +44 (0)20 7204 7017
EMAIL: dean.manning@ structureTone.co.uk
RICHARD BRANDONMISSION CRITICAL
DIRECTOR
TEL: +44 (0)20 7204 7062
EMAIL: kevin.mulligan@ structureTone.co.uk
KEVIN MULLIGANMAJOR
PROJECTS DIRECTOR
TEL: +44 (0)20 7204 7030
EMAIL: michael.burke@ structureTone.co.uk
MIKE BURKEPRECONSTRUCTION
& DESIGN DIRECTOR
ALAN FORDOPERATIONS
DIRECTOR
TEL: +44 (0)20 7204 7064
EMAIL: russell.white@ structureTone.co.uk
TEL: +44 (0)20 7204 7051
EMAIL: alan.ford@ structureTone.co.uk
RUSSELL WHITECOMMERCIAL
DIRECTOR
TEL: +44 (0)20 7204 7056
EMAIL: gary.dackombe@ structureTone.co.uk
GARY DACKOMBESPECIAL
PROJECTS DIRECTOR
TEL: +44 (0)20 7204 7029+44 (0)7595 106 124
EMAIL: jonathan.ross@ structureTone.co.uk
JONATHAN ROSSBUSINESS
DEVELOPMENT DIRECTOR
ABOUT USOVERVIEW
DUBLIN
Warrington House, 1st Fl. Mount Street Crescent
Dublin 2, Ireland
LONDON
77 Gracechurch Street
London EC3V 0AS United Kingdom
SHANGHAI
23F/ Chinachem Johnston Plaza,
178-186 Johnston Rd, Wanchai,
Hong Kong
HONGKONG
23F/ Chinachem Johnston Plaza,
178-186 Johnston Rd, Wanchai,
Hong Kong
NEWYORK
StructureTone Inc. 770 Broadway,
9th Floor, New York, NY 10003, USA
BOSTON711 Atlantic Avenue, Boston, MA 02111 USA
DALLAS3333 Welborn Street, Suite 200 Dallas, TX 75219 USA
HOUSTON4550 Post Oak Place Drive, Suite 335 Houston, TX 77027 USA
PHILADELPHIA1500 Walnut Street, Suite 1410, Philadelphia, PA 19102 USA
SAN ANTONIO
10100 Reunion Place, Suite 333, San Antonio, TX 78216 USA
WASHINGTON DC2300 Clarendon Boulevard, Suite 900, Arlington, VA 22201 USA
WOODBRIDGE10 Woodbridge Center, Drive, Woodbridge, NJ 07095 USA
OTHER OFFICES
UK MANAGEMENTSTRUCTURE
OPERATIONS
AlanFord
MISSION CRITICAL
RichardBrandon
IRELAND OPERATIONS
JamesReidy
STRUCTURETONEInternational Limited
London
STRUCTURETONEORGANISATION
Dean ManningManaging Director
ASIA OPERATIONS
MikeKavanagh
StructureTone is a Global Organisation, with offices across the United States, United Kingdom, Ireland and Asia.
With a global turnover of over $3.5 billion, we consistently look after our clients to the highest standard across any office.
StructureTone employ 1,400 people worldwide and work across multiple sectors offering full construction services.
STRUCTURETONE ORGANISATION
INTRODUCTION
STRUCTURETONE IS ONE OF THE UK’S LEADING CONSTRUCTION COMPANIES, WITH VAST EXPERIENCE IN THE COMMERCIAL OFFICE FIT-OUT, REFURBISHMENT AND DATA CENTRE SECTORS.
We have a long impressive history of delivering high quality work and included in this brochure are examples of some of our recent projects.
To consistently achieve the demands of Quality, Time and Budget, it is a requirement that we understand our clients market and therefore how they work. We have made it our business to understand these as part of a vision not only to meet client expectations, but also to exceed them.
ABOUT USFORWARD
CAPABILITIES
CONSTRUCTION MANAGEMENT
COST MANAGEMENT
DESIGN MANAGEMENT
& BIM
SUPPLY CHAIN MANAGEMENT
HEALTH SAFETY MANAGEMENT
ENVIRONMENTAL MANAGEMENT
RISK MANAGEMENT
OURFINANCIALS
FINANCIAL STRENGTH
Worldwide StructureTone now employs in excess of 1400 construction professionals and has put in place projects worth over $3.5bn annually with net assets exceeding $100m including, significant cash and investment balances.
Our investment in the European marketplace began over 21 years ago and has the financial strength and commitment to support projects of any size.
Since incorporation we have:
• Completed projects valued over £1Bn• Maintained cash reserves with no external
borrowing• Maintained a comprehensive local insurance
programme
We have a 2A1 rating with Dunn & Brad Street and maintain average cash of £2m.
MAINTAININGQUALITY
TOTAL QUALITY
StructureTone is committed to the philosophy and application of Total Quality in all of our activities to achieve business excellence.
These principles are adopted for managing an organisation in a way which enables it to meet stakeholder needs and expectations efficiently and effectively, without compromising ethical values.
In an effort to reduce costs, some organisations have forgotten that it is the quality of the complete services delivered that counts. Providing a low cost services whist ignoring quality management will not lead to satisfied customers.
At StructureTone we deliver a ‘business excellence’ culture in our projects by the application of hands-on management by high calibre technically qualified people and the implementation of a Project Management strategy. Client interviews have shown us to have an industry leading 85% satisfaction.
VALUE FOR MONEY
80% 80%
QUALITY OF PRODUCT
80% 84%
PRODUCT DELIVERY TIME
80% 87%
PRODUCT
0%
100%
50%
75%
25%
SERV
ICE
DESIG
N
COM
MER
CIAL
VALUE
HEALT
H & S
AFETY
ENVIR
ONM
ENT
FEED
BACK
DELIV
ERY
TIM
E
BEHAVIO
UR
DISRU
PTIO
N
HANDOVER
OVERALL
85%
EXCELLENT
GOOD
POOR
CLIENT SATISFACTION
HEALTH AND SAFETY
At StructureTone, we take health and safety very seriously and work to the highest standards at all times.
We strive for improvements in our health and safety standards and take only effective measures by conducting monthly reviews which is completed by the senior management team.
StructureTone’s Health & Safety Management System runs in line with ISO 18001 accreditation which is externally audited by CHAS
We strive for improvements in our health and safety standards and take effective measures, which add value in sustaining these improvements.
ENVIRONMENTALSUSTAINABILITY
IN OUR OFFICES
CARBON NEUTRALOur operational CO2 is offset through the Carbon Neutral company
PAPER RECYCLINGTwice weekly pick-up by London Recycling
PRINTER TONER CARTRIDGESAll recycled after use
FSC Accredited or recycled paperNo other paper used in the office
WASTE RECYCLINGOur contractor, City Cleaning have achieved Safe Contractor certification
LOWER ENERGYWhere possible, low energy lighting has been installed
PCsEnergy saving features are enforced on every computer
ITVirtualization to reduce number of servers used
ON OUR SITES
RECYCLING2015 target of 94% (audited)
FSCFirst UK accredited FSC fit-out project at WIllis HQ, 51 Lime Street, by StructureTone
BREEAMProactively adopt (with Client support)
CARBON OFFSETProactively promote (with Client support)
CONSIDERATE CONTRACTOR INITIATIVEProactively promote (with Client support)
SUPPLY CHAINSubject to environmental assessment
CARBON FOOTPRINT REDUCTION
eg. Consolidation centre to reduce haulage related CO2 emissions
MATERIAL SELECTIONPromote building product/material evaluation to actively reduce CO2 footprint and recycle/reuse Green Travel Plans
AMAZON ABERCROMBIE & FITCH ABN AMRO ABOVENET
ADOBE SOFTWARE SYSTEMS ANDAZ HOTEL AON BENFIELD ARCADIAGROUP
AT&T BACHEFINANCIAL BACS BAINCAPITAL BANKOFCHINA BANKOFENGLAND
BILL & MELINDA GATES FOUNDATION BLOOMBERG BPP HOLDINGS
CABLE & WIRELESS CANCER RESEARCH UK CISCO SYSTEMS CITY UNIVERSITY
COLT CRAVATH SWAINE & MOORE DDB DENTON WILDE SAPTE DEPARTMENT
OF HEALTH DIGITAL ISLAND DIGITAL REALTY DLA PIPER DLJ/PERSHING
DONALDSON LUFKIN & JENRETTE DONOVAN DATA SYSTEMS EDELMAN EDEXCEL
ERNST & YOUNG EXODUS F&C PROPERTY ASSET MANAGEMENT FACEBOOK
FIDELITY GALILEO CONNECT GEFICA INDUSTRIES AG GLOBAL CENTRE GLOBAL
CROSSING HARRODS HBOS PLC HEIDRICK & STRUGGLES HOWREY HRO UK LTD
HSBC BANK PLC INFLOW TECHNOLOGIES INTERXION ISIS JP MORGAN CHASE
KBC FINANCIAL PRODUCTS UK KEMPINSKI HOTEL KENNEDYS KNIGHT SECURITIES
OURCLIENTS
80%REPEAT BUSINESS CLIENTS
85%AVERAGE CLIENT SATISFACTIONRATING 2014
LATHAM & WATKINS LAZARD BROTHERS & CO LTD LE MÉRIDIEN HOTEL
LEN HART REAL ESTATE LEVEL 3 COMMUNICATIONS LITTLE GYM MACQUARIE
CAPITAL HOLDINGS MATTHEW S DONTZIN MCGRAW-HILL METLIFE MFS
MILLENNIUM PARTNERS NEW ZEALAND MINISTRY NOMURA NORWICH UNION
OLIVER WYMAN PARLIAMENTARY ESTATES PERELLA WEINBERG OMNICOM
RABOBANK INT RBS SEMPRA COMMODITIES REGUS ROYAL COLLEGE OF
ANAESTHETISTS ROYAL COURTS OF JUSTICE SCOTIABANK SCOTTISH WIDOWS
SIDLEY AUSTIN SELL AR SIMPSON THACHER & BARTLETT ST GEORGE
STARWOOD CAPITAL STATE STREET BANK SUMITOMO CORPOR ATION
T.ROWE PRICE CARLYLE GROUP THE ROYAL COLLEGE OF GENERAL PRACTITIONERS
THOMASWEISEL THOMSONREUTERS TISHMANSPEYER TRAFELET DELTA FUNDS
TRIPADVISOR UNIVERSITY OF LONDON VERNE GLOBAL WEIL GOTSHAL
WILLIS WOOLWORTH WORKPLACE MANAGEMENT LTD XL SERVICES
0REPORTABLEACCIDENTS SINCE 2013
84%OF PROJECTS DELIVERED IN LIVE ENVIRONMENTS
OUREXPERIENCE
AMAZON FASHION EU PHOTOGRAPHY STUDIO
Size: 40,000 sq ftForm of Contract: JCT Design & BuildProcurement Route: Fixed price lump sumContract Period: 23 weeksScope: Full refurbishment of
fashion studio
Works include:
Full refurbishment & infrastructure upgrade
OUREXPERIENCE
OMNICOM
Value / Size: £8.3m / 350,000 sq ftForm of Contract: JCT Standard ContractProcurement Route: Two stage negotiatedContract Period: 21 weeksScope: CAT A to CAT B fitout
Works include:
Full refurbishment & fit out of 18 floor UK HQ
OUREXPERIENCE
MCGRAW HILL
Value / Size: £2.85m / 42,000 sq ftForm of Contract: JCT Standard Building
ContractProcurement Route: Fixed Stage Lump SumContract Period: 12 weeksScope: CAT A to CAT B fitout
Works include:
Full fit out to Cat B from a dormant Cat A for 10 years. Specialist ceilings, specialist lighting (LED) cellular offices and meeting rooms, large video conference meeting rooms, copy / water hubs and collaborative multi - function coffee hub area with full A.V presentation
OUREXPERIENCE
SEA CONTAINERS HOUSE
Size: 226,000 sq ftForm of Contract: JCT Design & Build Procurement Route: Fixed Stage Lump SumContract Period: 43 weeksScope: Full Refurbishment to CAT B
Works include:
Full fit-out from shell to levels 1, 2 12 and 13 including catering and AV installations. Full fit-out from Cat A finish to levels 6-11 including new elevated roof terrace to level 14 including lift access from level 13 below and associated structural works. Introduction of staircases, balustrades and finishes to large openings on levels 2-13 and associated structural works
OUREXPERIENCE
60 VICTORIA EMBANKMENT
Size: 400,000 sq ftForm of Contract: JCT Design & Build Procurement Route: 2 Stage Lump SumContract Period: 86 weeksScope: Full Refurbishment to CAT B
Works include:
Full Refurbishment to CAT B with elements of major structural works for Atrium & Reception along with full infrastructure plant replacement whilst in occupation
OUREXPERIENCE
SHARD CAT A
Size: 300,000 sq ftForm of Contract: JCT 2011 with CDPProcurement Route: Fixed price lump sumContract Period: 32 weeksScope: Shell and core to
CAT A fit out
OUREXPERIENCE
LATHAM & WATKINS LLP
Value / Size: £18m / 112,000 sq ftForm of Contract: Bespoke Client ContractProcurement Route: Fixed Price Lump SumContract Period: 36 weeksScope: CAT B Fit-out
Works include:
• Levels Grd
Shell & Core to CAT B Reception
• Levels 7 & 8
Conference space and fee earner office
• Levels 13 & 21
CAT A to CAT B office fit out to form fee earner space
OUREXPERIENCE
CONFIDENTIAL FINANCIAL CLIENT PETERBOROUGH
Value / Size: £2.4m / 40,000 sq ftForm of Contract: JCT Design & Build 2011 Procurement Route: 2 Stage Lump SumContract Period: 12 weeksScope: CAT B Fit-out
Works include:
Taking a new building from Cat A space to Cat B over 3 floors. This included:
• General open plan desking
• Meeting and Training suites
• Print and copy zones
• IDF/MER rooms
• Reception and client waiting areaW
OUREXPERIENCE
THOMSON REUTERS
Value: ConfidentialForm of Contract: JCT 2011 w/o quantsProcurement Route: Fixed Price Lump SumContract Period: 73 weeksScope: Construction of new
data centre.
Works include:
This project comprises the construction of a new External Utilities Building (EUB) to house the installation of a new UKPN 132kV substation and 11kV generator and mains distribution system to provide Thomson Reuters with additional system capacity at their existing DTC facility in Poplar, London
The first phase of the project consists of the construction of the new concrete frame to its full height of 27m, the installation of cladding to the ground floor and acoustic louvres to a height of approximately 20m.
Phases 2 and 3 of the project include; the installation of the steel frame up to the full height, completion of the external façade, installation of the remaining generator sets and chillers and the completion of the external hard and soft landscaping.
OUREXPERIENCE
TRIP ADVISOR
Value / Size: £5.5m / 75,000 sq ftForm of Contract: Lump SumProcurement Route: 2 Stage Lump SumContract Period: 20 weeksScope: CAT B Fit-out
Works include:
Floors 4 & 5 ready for occupation. Partial Fit-out of the 3rd floor with conference rooms. Construction of a staircase interconnecting all three levels.
OUREXPERIENCE
VOLTA DATA CENTERS
Value / Size: £24m / 87,000 sq ftForm of Contract: JCT 2011Procurement Route: Design & BuildContract Period: 35 weeksScope: Delivery of an Uptime Tier
3 co-location data centre facility
Works include:
The project comprises the delivery of an Uptime Tier 3 co-location data centre facility within the iconic former Reuters building in central London, formerly operated by BT. This is the largest central London data centre project to be delivered in London in 2012/13. The building is located on an island site in a densely populated mixed-use geographic location.
Phase 1 consists of the full demolition and strip-out of the existing construction and building services elements back to shell and core, construction of new internal and external structural and building elements and installation of new building services to support the fit-out of the fourth floor data hall, comprising 10,000 sqft of technical space.
Due to the age and nature of the existing building substantial structural alterations and construction works will be undertaken to enable the installation of new plant and equipment at; roof, ground floor and basement levels.
The client has aspirations for the data centre facility to achieve a high operational efficiency rating. However, the constraints of the city centre site have limited some of the technologies available for operation of the facility, which has limited the maximum efficiency achievable, therefore, the data centre equipment has been designed and installed to provide a Category 3 annual average PUE of 1.5 or less.
OUREXPERIENCE
FIDELITY
Value / Size: £5.2m / 40,000 sq ftForm of Contract: Lump SumProcurement Route: 2 Stage Lump SumContract Period: 22 weeksScope: CAT B Fit-out
Works include:
• Bespoke Reception
• 35 Offices
• 2 Comms Rooms
• 1 Pantry
• 1 Tea point
• Trading Area
• 19 Client Meeting Rooms
• Open Plan Office Area
• 3 Showers
• Copy point
OUREXPERIENCE
BLOOMBERG
Value / Size: £5.5m / 75,000 sq ftForm of Contract: Lump SumProcurement Route: 2 Stage Lump SumContract Period: 20 weeksScope: CAT B Fit-out
Works include:
Floors 4 & 5 ready for occupation. Partial Fit-out of the 3rd floor with conference rooms. Construction of a staircase interconnecting all three levels.
OUREXPERIENCE
ERNST & YOUNG
Value / Size: £1.2 / 10,000 sq ftForm of Contract: JCT 2009Procurement Route: Two stage lumps sumContract Period: 16 weeksScope: Full CAT B Fit-out with
CAT A Installations
Works include:
The project was completed over four phases: Stripout to shell and core, Modifications to existing M&E services and Cat A installation, AV installation and equipment and Full Cat B fit out
OUREXPERIENCE
MFS INVESTMENT MANAGEMENT
Value / Size: £5m / 24,600 sq ftForm of Contract: JCT Design & Build 2011 Procurement Route: 2 Stage Lump SumContract Period: 12 weeksScope: CAT B Fit-out
OUREXPERIENCE
THOMSON REUTERS
Value / Size: £880k / 30,000 sq ftForm of Contract: JCT Standard with Contractors Design 2009Procurement Route: Fixed Price Lump SumContract Period: 12 weeksScope: CAT B Fit-out
Works include:
Stripout of services and Installation of Optima Glazed office fronts, new lighting, power and cafe with bespoke joinery throughout.
OUREXPERIENCE
T.ROWE PRICE
Value / Size: £11.3m / 124,310 sq ftForm of Contract: JCT Management Building ContractProcurement Route: 2 Stage Lump SumContract Period: 52 weeksScope: CAT B Fit-out from
Shell & Core
Works include:
• Occupied Building• Phase 1 - NDC Works• Phase 2 to 6 – Fit-out levels 4 to 8
OUREXPERIENCE
ALDWYCH HOUSE
Value / Size: £5.3 / 18,250 sq ftForm of Contract: JCT 2011Procurement Route: Fixed price lump sumContract Period: 26 weeksScope: Refurbishment
Works include:
The project covered several sections refurbishment of common areas in a fully occupied building, along with the strip out back to shell and core and Category A fit out of level four.
OUREXPERIENCE
BANK OF CHINA / CHINA DAILY
Value / Size: £7.1m / 70,000 sq ftForm of Contract: JCT Management Building ContractContract Period: 35 weeksScope: CAT A / CAT B Fit-out from Shell & Core
OUREXPERIENCE
METLIFE
Value / Size: £2.4m / 22,000 sq ftForm of Contract: JCT Standard Building Contract w/o QuantitiesProcurement Route: 2 StageContract Period: 19 weeksScope: CAT A to CAT B fit-out
NEWYORK
770 Broadway New York, NY 10003 USAT: +1 (212) 481.6100
BOSTON
711 Atlantic Avenue Boston, MA 02111 USAT: +1 (617) 348.2800
DALLAS
3333 Welborn Street, Suite 200 Dallas, TX 75219 USAT: +1 (214) 520.3353
HOUSTON
4550 Post Oak Place Drive, Suite 335 Houston, TX 77027 USAT: +1 (713) 650.6420
PHILADELPHIA
1500 Walnut Street, Suite 1410, Philadelphia, PA 19102 USAT: +1 (215) 563.7875
SAN ANTONIO
10100 Reunion Place, Suite 333, San Antonio, TX 78216 USAT: +1 (210) 541.0651
WASHINGTON DC
2300 Clarendon Boulevard, Suite 900, Arlington, VA 22201 USAT: +1 (703) 526.1240
WOODBRIDGE
10 Woodbridge Center Drive, Woodbridge, NJ 07095 USAT: +1 (732) 362.3500
LONDON
1a Aylesbury Street London, EC1R 0ST England
T: +44 (0)20.7204.7000
DUBLIN
Warrington House, First Floor, Mount Street Crescent, Dublin 2, Ireland
T: +353.1.775.1800
HONGKONG
23F/ Chinachem Johnston Plaza, 178-186 Johnston Road, Wanchai, Hong Kong T: +852.2838.8877
SHANGHAI
Unit #707, 7th Floor, Office Block, Shanghai Internation-al Equatorial Hotel, No. 65 West Yan’an Road, Jing’an District, Shanghai, China T: +(86).021.5298.0260
StructureTone stand out for their reliability.
Ultimately this project was a massive integration of 3 office locations into one. It was smooth and made to look very easy.
Nicolas E. Lance | Vice President | MetLife International