Federal Transit Administration • Federal Highway Administration City of Vancouver • City of Portland • SW Washington Regional Transportation Council • Metro • C-TRAN • TriMet Current Bridge Criteria and Constraints Update to Project Sponsors Council December 10, 2010 Frank Green Structural Engineering Manager Rob Turton Principal Bridge Engineer

Upload: others

Post on 05-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Structural Engineering Manager

Federal Transit Administration • Federal Highway AdministrationCity of Vancouver • City of Portland • SW Washington Regional Transportation Council • Metro • C-TRAN • TriMet

Current Bridge Criteria and ConstraintsUpdate to Project Sponsors Council

December 10, 2010Frank GreenStructural Engineering Manager

Rob TurtonPrincipal Bridge Engineer

Page 2: Structural Engineering Manager

• River crossing constraints• 2008 Bridge type screening process• Bridge type study• River crossing type timeline

2

Presentation topics

Page 3: Structural Engineering Manager

CRC project area

3

Victory Blvd.

Marine Drive

Hayden Island

SR14

Mill Plain

Fourth Plain

SR500

Interstate Bridge

Washington

Oregon

Expo Station

Page 4: Structural Engineering Manager

• Aviation• River navigation• Cultural and historic resources• Environmental

4

River crossing constraints

Page 5: Structural Engineering Manager

Aviation

5

Page 6: Structural Engineering Manager

Navigation and aviation constraints

6

Page 7: Structural Engineering Manager

Existing navigation channels

7

Page 8: Structural Engineering Manager

Existing navigation channels

8

Page 9: Structural Engineering Manager

Physical constraints

9

Pearson Field

Vancouver National Historic Reserve

BNSF Railroad

Downtown Vancouver

Old Apple Tree

Land Bridge

Page 10: Structural Engineering Manager

Cultural and historical constraints

Vancouver National Historic Reserve

Downtown Vancouver

10

Page 11: Structural Engineering Manager

Cultural and historical constraints

11

- Vancouver National Historic Reserve Impacts- City of Vancouver Impacts

Vancouver National Historic Reserve

Downstream Alignment Footprint

Downtown Vancouver

Page 12: Structural Engineering Manager

Cultural and historical constraints

12

Upstream Alignment Footprint

5+ acres additional 4F impacts compared to downstream alignment

- Vancouver National Historic Reserve Impacts- City of Vancouver Impacts

Vancouver National Historic Reserve

Downtown Vancouver

Page 13: Structural Engineering Manager

Columbia RiverEnvironmental constraints

• 16 ESA-listed fish species

• 1 ESA-listed marine mammal

13

Page 14: Structural Engineering Manager

Environmental constraints

14

2-Bridge Footprint / In Water Piers

Page 15: Structural Engineering Manager

Environmental constraints

15

3-Bridge Footprint / In Water Piers

Page 16: Structural Engineering Manager

• Determine bridge types that should be screened / analyzed

• Tier 1 Screening– Determined which bridge types have the technical merit to

warrant further consideration. Bridge types either passed or failed the performance requirements (project constraints and technical suitability)

• Tier 2 Screening– Bridge types that passed tier 1 were measured and analyzed

against 6 performance attributes and 2 cost attributes.

Bridge type screening process

16

Page 17: Structural Engineering Manager

• Jugesh Kapur (WSDOT)• Tim Moore (WSDOT)• Bruce Johnson (ODOT)• Craig Shike (ODOT)• Shoukry Elnahal (FWHA)• Barry Brecto (FHWA)• John Buchheit (FTA PMOC)• Rod Miller (FTA PMOC)• Steve Thoman (Independent Consultant)• John Clark (Independent Consultant)• Rob Turton (CRC, HDR)• Matt Deml (CRC, HDR)

Type screening workshop – Oct. 2008

17

Page 18: Structural Engineering Manager

Bridge type screening workshop

18

Genre Three-Bridge Two-Bridge

Cable Supported • Cable Stayed • Cable Stayed

• Extradosed • Extradosed

• Suspension • Suspension

• Extradosed Suspended

Arch • Deck Arch • Deck Arch

• Through Arch • Through Arch

Truss • Deck Truss • Deck Truss

• Through Truss • Through Truss

Girder • Concrete I-Girder • Concrete Segmental Girder

• Concrete Segmental Girder • Open Web Box Girder

• Steel Box Girder • Steel Box Girder

• Steel I-Girder • Suspended Frame

• Haunched Concrete Box withI-Girder Drop-In Spans

Page 19: Structural Engineering Manager

19

Table 5-2. Tier 1 screening results

Page 20: Structural Engineering Manager

20

Table 5-2. Tier 1 screening results

Page 21: Structural Engineering Manager

21

Table 5-2. Tier 1 screening results

Page 22: Structural Engineering Manager

Bridge types analyzed in Tier 2

22

Genre Three-Bridge Two-Bridge

Cable Supported • Cable Stayed • Cable Stayed

• Extradosed • Extradosed

• Suspension • Suspension

• Extradosed Suspended

Arch • Deck Arch • Deck Arch

• Through Arch • Through Arch

Truss • Deck Truss • Deck Truss

• Through Truss • Through Truss

Girder • Concrete I-Girder • Concrete Segmental Girder

• Concrete Segmental Girder • Open Web Box Girder

• Steel Box Girder • Steel Box Girder

• Steel I-Girder • Suspended Frame

• Haunched Concrete Box withI-Girder Drop-In Spans

Page 23: Structural Engineering Manager

23

Table 6-1. Performance attributes for Tier 2 screening

Table 6-2. Cost attributes for Tier 2 screening

Page 24: Structural Engineering Manager

Tier 2 results – 3 bridge configuration

• Bridge type performance and cost attribute screenings for three-bridge configurations resulted in a “value index” for each bridge type. A higher percentage indicates greater relative value.

24

Page 25: Structural Engineering Manager

• Bridge type performance and cost attribute screenings for two-bridge configurations resulted in a “value index” for each bridge type. A higher percentage indicates greater relative value.

Tier 2 results – 2 bridge configuration

25

Page 26: Structural Engineering Manager

Bridge type study

26

Genre Three-Bridge Two-Bridge

Cable Supported • Cable Stayed • Cable Stayed

• Extradosed • Extradosed

• Suspension • Suspension

• Extradosed Suspended

Arch • Deck Arch • Deck Arch

• Through Arch • Through Arch

Truss • Deck Truss • Deck Truss

• Through Truss • Through Truss

Girder • Concrete I-Girder • Concrete Segmental Girder

• Concrete Segmental Girder • Open Web Box Girder

• Steel Box Girder • Steel Box Girder

• Steel I-Girder • Suspended Frame

• Haunched Concrete Box withI-Girder Drop-In Spans

Page 27: Structural Engineering Manager

• Preliminary design for all 10 bridge types– Conceptual engineering– Conceptual plans, elevations and sections– Conceptual quantities

• Preliminary cost estimates– Contractor bid style

• Recommended bridge type for 2-bridge and 3-bridge scenarios

Bridge type study

27

Page 28: Structural Engineering Manager

• 3-Bridge Recommendation– Concrete Segmental Box Girder

Bridge type study

28

Page 29: Structural Engineering Manager

• 2-Bridge Recommendation– Open Web Box Girder

Bridge type study

29

Page 30: Structural Engineering Manager

River crossing type timeline

30

PSC recommends open-web box and endorsedPBAC recommendations forMaintenance/Security plans

UDAG recommends open-web box

PBAC recommends open-web box (contingent

upon maintenance / security plans)

PSC recommends two-bridge option

UDAG recommends two-bridge option

FHWA recommends against a shared facility

inside a closed box

VE Study developsStacked Transit Highway Bridge

Concept

FHWA concurs with open-web box bridge

type for two-bridge option

Bridge Technical Screening / Type Study

Page 31: Structural Engineering Manager

Federal Transit Administration • Federal Highway AdministrationCity of Vancouver • City of Portland • SW Washington Regional Transportation Council • Metro • C-TRAN • TriMet