structu re access report - marinet2 · 2019. 5. 2. · nisations th re‐wind. th 2015. the...

22
Sta Ver DaIn Fibr WireCo tus: rsion: te: nfrastruc re Rop o WorldG Mari Draft 01 15Dec20 Infra cture: U pes for E Group (La Tecno ine Rene 014 EC astructu NEXE So UserPro r Taut Energy ankhorst ológico d ewables C FP7 “Capa Research ure Acc outh W oject: Fib t Moo y Conv tEuronet de Comp s Infra cities” Spec h Infrastruccess Re est Moo breTaut 1 ring Li verter te Portug onentes structu cific Program ture Action eport oring Te 1 ines fo rs gal) & Fu (CTC) ure Net mme est Facili or Ma undación twork ity rine Centro

Upload: others

Post on 25-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

 

 

 

StaVerDat

Inf

Fibr

WireCo

tus: rsion: te:   

nfrastruc

re Rop

o WorldG

Mari

Draft 01 15‐Dec‐20

 

Infra

cture: U

pes forE

Group (LaTecno

ine Rene

014 

EC

astructu

NEXE So

User‐Pro

r TautEnergy

ankhorstológico d

ewables

C FP7 “CapaResearch

 

ure Acc

outh W

 oject: Fib

t Mooy Conv

t‐Euronetde Comp

 

s Infra

cities” Spech Infrastruct

cess Re

est Moo

breTaut 1

ring Liverter

te Portugonentes 

structu

cific Programture Action

eport 

oring Te

ines fors 

gal) & Fu(CTC)  

 

ure Net

mme 

est Facili

or Ma

undación

twork

ity 

rine 

Centro 

Page 2: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

ABMARof reenerand acro MARComas wareaavai4‐ye MARdevevarioin or The acce 

Par 

 

 

 

 

 

BOUTMRINET (Marinesearch centrgy ‐ wave, truns for fou

oss 11 EU cou

RINET  offersmpanies and wave energyas such as polable to an eear initiative.

RINET  partnelopment prous facilitiesrder to facilit

aim of the ielerate the co

tners

MARINEne Renewabtres and orgatidal & offshour years untiluntries and 1

s  periods  ofresearch groy,  tidal energower take‐ofestimated 30. 

ers  are  alsorocess, conds in the netwtate partner

nitiative is toommercialis

Univ

Sustainable 

Institut Fran

Nationa

Euro

Tec

ETbles  Infrastruanisations thore‐wind.  Thl 2015.  The 1 Internation

f  free‐of‐chaoups can avagy, offshore‐ff systems, g00 projects a

o  working  tucting reseawork in orderships and kn

o streamlineation of mar

versity College Co

Energy Authority

Aa

Danmarks Tekn

Ecole C

nçais de Recherch

al Renewable Ene

The Univ

opean Marine En

University of St

The Universi

Queen’s 

P

Ente V

cnalia Research &

Rev.

ucture Netwohat are workihe initiative inetwork of 2nal Cooperat

arge  access ail of this Tra‐wind  energgrid integratind 800 exter

to  implemenrch to  impror to enhancenowledge exc

e the capabilrine renewab

ork, HMRC (UCC_Coor

y of Ireland (SEAI_

Dealborg Universite

niske Universitet 

Centrale de Nante

he Pour l'Exploitala Mer (IFR

United Kiergy Centre Ltd. (

versity of Exeter (

nergy Centre Ltd. 

rathclyde (UNI_S

ity of Edinburgh (

University Belfas

Plymouth Univers

Vasco de la Energí

& Innovation Foun(TEC

B1‐Tech (1

 01, 15‐Dec‐Page 2 of 22

ork for emeing togetheris funded th29 partners tion Partner C

to  test  facansnational Agy  and enviroion, materiarnal users, w

nt  common ove testing ce personnel change.   

ities of test ble energy.  S

Ireland _HMRC) rdinator 

 

_OEDU)  

enmark et (AAU) 

 

(RISOE)  

France es (ECN) 

 

ation de REMER) 

 

ingdom NAREC) 

 

UNEXE)  

(EMEC)  

STRATH)  

(UEDIN)  

st (QUB)  

sity(PU)  

Spain gía (EVE) 

 

ndation CNALIA) 

Belgium 1_TECH) 

 

 

NeSti 

Sti(EC 

GeFraAn 

Go 

Un 

PoW(W 

ItaUn 

Un 

Un 

Co 

BrInsPa 

NoSin 

No(N 

Infras

‐2014 2 

rging Energy to acceleratrough the ECwith 42 specCountry (Bra

cilities  at  a Access (TA) tonmental dals or moorinwith at least f

standards capabilities aexpertise an

infrastructuSee www.fp7

etherlandsichting Tidal Test

ichting EnergieonCNeth) 

ermany aunhofer‐Gesellsngewandten Fors

ottfried Wilhelm 

niversitaet Stuttg

ortugal ave Energy Centr

WavEC) 

aly niversità degli Stu

niversità degli Stu

niversità degli Stu

onsiglio Nazionale

razil stituto de Pesquiaulo S.A. (IPT) 

orway ntef Energi AS (SI

orges Teknisk‐NatTNU) 

tructure Acc

y Technologite the develoC's Seventh Fcialist marineazil). 

range  of  wto test devicata or  to  cogs.  In total,four calls for

for  testing across the nend organising

res in order 7‐marinet.eu

ing Centre (TTC) 

nderzoek Centrum

schaft Zur Foerdechung E.V (Fh_IW

Leibniz Universitä

art (USTUTT) 

re – Centro de En

udi di Firenze (UN

udi di Firenze (UN

udi della Tuscia (U

e delle Ricerche (

sas Tecnológicas 

NTEF)  

turvitenskapelige

cess Report: 

ies)  is an ECopment of mFramework Pe research fa

world‐class  rces at any sconduct  tests , over 700 wr access appl

in  order  toetwork, provg industry ne

to enhance u for more d

m Nederland 

erung Der WES) 

ät Hannover (LUH

nergia das Ondas 

NIFI‐CRIACIV) 

NIFI‐PIN) 

UNI_TUS) 

CNR‐INSEAN) 

 do Estado de São

e Universitet 

FibreTau

‐funded netwmarine renewProgramme (acilities is sp

esearch  cencale in areas on  cross‐cu

weeks of acceications ove

o  streamlineviding traininetworking ev

their impactetails. 

H) 

ut 1 

work wable (FP7) pread 

ntres.  such 

utting ess is r the 

e  the ng at vents 

t and 

Page 3: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

DOTitle

Dist

Doc

UseAuth

UseCon

Infra

Infra(or M

 

RERev

01 

02 

 

OCUMEe 

ribution 

ument Refer

r‐Group Leadhor 

r‐Group Memtributing Au

astructure A

astructure MMain Contac

VISIONH.  Date 

15/12/20

18/12/20

ENTINF

rence 

der, Lead 

mbers, uthors 

Accessed: 

Manager ct) 

HISTORY

014 

014 

FORMAFibre Ropes 

Public 

MARINET‐TA 

Jeroen DoreJeroenDoren

Jose CanedoAlberto LeaoRaúl RodríguÁlvaro RodríVerónica GleLars JohanniPhilipp ThiesDavid ParishSam Weller 

UNEXE Sout

Lars Johanin

Description 

First Draft 

Final Report

Rev.

ATIONfor Taut Mo

A1‐FibreTaut

enbusch nbusch@wir

o o uez Arias   Cíguez Ruiz  Cez. De LenaCing  Us  Uh  U

U

h West Moo

ng 

Ro

 Ro

 01, 15‐Dec‐Page 3 of 22

ooring Lines f

t 1 

WireCo Wrecoworldgro

Lankhorst‐EuLankhorst‐EuCentro TecnoCentro TecnoCentro TecnoUniversity ofUniversity ofUniversity ofUniversity of

oring Test Fac

Prepared

Raúl Rodríodríguez and

De 

Raúl Rodríodríguez and

De 

Infras

‐2014 2 

for Marine E

WorldGroupoup.com 

uronete Porturonete Portológico de Coológico de Coológico de Cof Exeter (UoEf Exeter (UoEf Exeter (UoEf Exeter (UoE

cility

by (Name)

guez, Álvarod Verónica GLena 

guez, Álvarod Verónica GLena 

tructure Acc

nergy Conve

  

tugaltugalomponentesomponentesomponentesE) E) E) E) 

 

ApInf

 lez. 

 lez. 

La

cess Report: 

erters 

        

s (CTC) s (CTC) s (CTC) 

pproved By frastructure Manager 

 

rs Johaning 

FibreTau

Statu(Draft/F

Draft

Fina

ut 1 

us inal)

Page 4: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

ABOneis  thgenestateconf The thro

In  ssendat 

ACThe Infra 

LEGThe Comdatafor lthis purpmem

BOUTTHIe of the requhat  the  usererated undee  that  dissfidentiality o

aim of this rough this MA

progres

publicis

provide

provide

share le

avoid p

provide

etc. some  cases,sitive, and soa – this is acc

KNOWLEwork  descrastructure Ac

GALDISCviews expre

mmission is na from sourcloss or damadocument ispose.    The  umber  of  th

ISREPORirements of r  group musr the projectemination  aobligations an

report is theARINET infras

ss the state‐o

se resulting p

e evidence of

e due diligenc

essons learne

otential futu

e opportuniti

  the  user  go may choosceptable and

DGEMENTribed  in  this ction under t

CLAIMERessed, and renot liable forces external tage suffered s provided “user  thereofhe  MARINET

RTthe EC in enst  be  entitlet in order to activities  shnd the legitim

erefore to mestructure acc

of‐the‐art 

progress mad

f progress m

ce material f

ed 

ure replicatio

ies for future

group may  wse to presentd allowed fo

Tpublicationthe FP7 “Cap

esponsibility r any use thato the MARIby any thirdas is” and nof  uses  the  inT  Consortiu

Rev.

abling a userd  to  dissemprogress thehall  be  commate interes

eet the first cess project i

de for the te

ade along th

for potential 

on by others

e collaboratio

wish  to  prott results in a r in the seco

  has  receivepacities” Spe

for the contat may be mNET project d party as a o guarantee nformation  aum  is  liabl

 01, 15‐Dec‐Page 4 of 22

r group to beminate  the  foe state‐of‐thmpatible  witsts of the ow

requiremenin an accessi

chnology/ind

he Structured

 future inves

on 

tect  some  o normalised nd requirem

ed  support  fecific Program

ent of this pade of the inConsortiumresult of error warrantyat  its  sole  rle  for  any 

Infras

‐2014 2 

enefit from foreground  (ie‐art of the sth  the  protwner(s) of the

t of publicly ble format in

dustry 

d Developme

stment and f

of  this  infor(non‐dimen

ment outlined

from MARINmme. 

publication, linformation c.  Members rors or inaccy is given tharisk  and  neituse  that 

tructure Acc

free‐of‐chargnformation sector.  Notwtection  of  ie foreground

disseminatin order to: 

ent Plan 

financing 

mation  whicsional) formd above. 

NET,  a  Europ

ie solely withcontained heof the Consouracies in suat the informther  the  Eurmay  be  m

cess Report: 

ge access to and  resultswithstandingintellectual d. 

ng the know

ch  they  deeat or withho

pean  Comm

h the authorerein.  This wortium do nouch data.  Thmation is fit fropean  Commade  of  t

FibreTau

an infrastruc)  that  they g this, the ECproperty  ri

wledge gener

em  commercold certain de

unity  ‐  Rese

rs.  The Eurowork may reot accept liahe informatiofor any partimmission  norhe  informa

ut 1 

cture have C also ghts, 

rated 

cially esign 

earch 

pean ly on bility on in cular r  any ation.

Page 5: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

 

EX Oneweigprob(see

 Alsomatreqube b 

As  wperf The extepros

XECUTI

e  immediate ght problemblems of usine Figure 1). 

o,  compared erial  properuirements. Sbuilt into rop

with  any  neformance req

testing infraensive testingspective  inno

VESUM

challenge  fs of mooringng steel lines

to  steel,  thrties.  A  synteveral matepes using a nu

ew  applicatioquirements. 

astructures ag of mooringovative  fibre

MMARY

for  the Marig lines in dees in deep wa

here are a  lathetic  rope rials have poumber of co

on,  research

at the Univeg lines in seae  rope moo

Rev.

Y

ne Renewabep water (>7ater offshore

Figure 1: Tau

arge numbercan  therefootential for mnstructions, 

Figure 2: Diff

h must  be  c

rsity of Exet water. Its tering  line  is 

 01, 15‐Dec‐Page 5 of 22

ble  Energy C75m). Synthee oil and gas 

ut mooring co

r of  synthetiore  be  desimooring linesome of wh

ferent yarn co

conducted  t

er (UoE) areesting infrastbest  suited 

Infras

‐2014 2 

Converters  (etic fibre ropinstallations

onfiguration.

ic  fibre mategned  to  have applicationich are suite

onfigurations

to  determine

e unique in ttructure will for  deep w

tructure Acc

MRECs)  indupes already os as they hav

erial  composve  propertie. Yarns of thd to particul

e  how  well 

he MARINEThelp the con

water MECs. 

cess Report: 

ustry  is  solvoffer a solutive a very low

sitions with es  that  mathese synthetar fibres (see

the  fibre  r

T consortiumnsortium to Also,  the  te

FibreTau

ing  the  coston to the we

w weight in w

a wide  rangtch  the  mootic materials e Figure 2).

ropes  satisfy

m, as it allowdetermine wechnological

ut 1 

t  and eight water 

ge of oring may 

y  the 

ws for which   and 

Page 6: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

sciefacil The Tecnobtasea    

ntific  suppoities. 

present stunológico  de aining knowlconditions. 

rt  offered  b

dy of  internComponentledge of the

by  the well  e

ational parttes  ‐  CTC  (S applicability

Rev.

experienced

ners, WireCopain),  and Uy of fibre ro

 01, 15‐Dec‐Page 6 of 22

  staff  is  ano

o WorldGrouUniversity  ofopes  in Marin

Infras

‐2014 2 

other  reason

up  (Lankhorsf  Exeter  ‐ Une Energy Co

tructure Acc

n  to  propose

st‐Euronete oE  (UK)  as onverters  (M

cess Report: 

e  the  acces

Portugal), Ffacility  provMEC), both  i

FibreTau

s  to  this  kin

undación Cevider,  focusen  laboratory

ut 1 

nd  of 

entro es  on y and 

Page 7: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

CO 

 

ONTENT

INTRODUCT

1.1  INTRO1.2  DEVEL1.2.1  Sta1.2.2  Pla

OUTLINE O

2.1  SETUP2.1.1  Pre2.1.2  Pre2.2  TESTS2.2.1  Tes2.3  RESUL2.4  ANALY

MAIN LEAR

3.1  PROG3.1.1  Pro3.1.2  Pro3.2  KEY LE

FURTHER IN

4.1  SCIEN4.2  WEBS

APPENDICE

5.1  STAGE

TS

TION & BAC

ODUCTION ......LOPMENT SO Fage Gate Proan For This A

F WORK CAR

P ...................eliminary woeparation of S ...................st Plan .........LTS ................YSIS & CONCLU

RNING OUTC

RESS MADE ...ogress Madeogress MadeESSONS LEARN

NFORMATIO

TIFIC PUBLICATSITE & SOCIAL 

ES ................

E DEVELOPMEN

KGROUND .

....................FAR ...............ogress ..........ccess ...........

RRIED OUT .

....................ork to deployf the test sam............................................................USIONS ..........

COMES ........

....................e: For This Use: For MarineNED ...............

ON ...............

TIONS ...........MEDIA ..........

..................

NT SUMMARY T

Rev.

...................

....................

....................

....................

....................

...................

....................yment ...........mples (fabrica................................................................................

...................

....................ser‐Group or e Renewable....................

...................

....................

....................

...................

TABLE ...........

 01, 15‐Dec‐Page 7 of 22

...................

....................

....................

....................

....................

...................

....................

....................ation) and te................................................................................

...................

....................r Technologye Energy Indu....................

...................

....................

....................

...................

....................

Infras

‐2014 2 

...................

....................

....................

....................

....................

...................

....................

....................ests set‐up ...................................................................................

...................

....................

....................ustry .................................

...................

....................

....................

...................

....................

tructure Acc

...................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

...................

....................

....................

...................

....................

cess Report: 

...................

....................

............................................................

...................

............................................................................................................................................

...................

................................................................................

...................

....................

....................

...................

....................

FibreTau

...................

....................

....................

....................

....................

...................

....................

....................

....................

....................

....................

....................

....................

...................

....................

....................

....................

....................

...................

....................

....................

...................

....................

ut 1 

..... 8 

...... 8 

...... 8 

..... 8 

... 10 

... 11 

.... 11 

... 11 

... 13 

.... 16 

... 16 

.... 16 

.... 17 

... 18 

.... 18 

... 19 

... 19 

.... 19 

... 19 

.... 19 

.... 20 

... 20 

.... 20 

Page 8: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

1

1.1The and the projwas labo PropProp The of th To a 

 ThisSWM

1.2

1.2

STA

Stag

LinFinHuRePrtuni

Inv

INTRO

1 INTRODcompany WdistributionFundación  Cect FIBRETAto obtain kn

oratory and s

posal #182 (Fposal #219 (F

overall ideahe buoy of th

achieve this, 

- Performcontrol e

- Determiloads. 

- Developcharacte

- Validate- Verify th- In  the  l

applicathelp adv

- Contribuenvironm

- Promoti

  report  sumMTF.  

2 DEVELO

2.1 Stage

GE GATE CR

ge 1 – Conce

near monoch

nite monoch

ull(s) sea wor

estricted deg

ovide the emng) 

vestigate  ph

ODUCTI

DUCTIONWireCo Worldn of steel cabCentro  TecnAUT (Fibre Ronowledge ofsea condition

FibreTaut1): FibreTaut2): 

a was to acquhe SWMTF a

several proje

m  tests of  thenvironmentine strength 

p  a  base  lineristics. e the model whe applicabilong‐term,  itions for the vance the Mution to the ment test. on of comm

mmarises  the

OPMENT

GatePro

ITERIA 

pt Validatio

hromatic wav

romatic wav

rthiness in re

grees of freed

mpirical hydr

hysical  proce

ION&B

dGroup (Lankbles, synthetnológico  de opes for Tauf the applicans. For this re

UNEXE SoutUNEXE Dyna

uire real loand replicate 

ect developm

e  fibre  ropet at the labolimits and t

e  numerica

with real datity of fibre rot  is  expecteemerging MREC industryimprovemen

unication an

e  research  a

SOFAR

ogress

ves to valida

ves to include

eal seas (scal

dom (DofF) i

rodynamic co

ess  governin

Rev.

BACKGR

khorst‐Eurontic  rope cabComponentet Mooring Libility of fibreeason, the fo

th West Mooamic Marine

d time seriesimilar load

ment objecti

es  in  two  enratory. the stiffness 

l  model  of 

ta: meta‐oceopes for mared  to  develoMREC industry further intont of the cor

nd dissemina

activities  dev

ate or calibra

e higher ord

led duration

f required by

o‐efficient as

ng  device  r

 01, 15‐Dec‐Page 8 of 22

ROUND

nete Portugables, cable ases  (CTC)  havines for Mare ropes in Mollowing two

oring Test Fae Component

s measured s at differen

ves are desc

nvironments,

and dampin

the  moorin

ean conditionrine energy cop  cost‐effery. This woulo the deeperrrelation bet

ation of findi

veloped with

ate numerica

er effects (2

 at 3 hours)

y the early m

ssociated wi

esponse.  M

Infras

‐2014 2 

D

al), a world lssemblies, ave  received rine Energy CMarine Renewo different pr

cility (SWMTt Test Facility

from load ct rates at DM

cribed below

, one  in  rea

ng propertie

ng  system  a

ns and measuconverter apctive  fibre  rd provide a r and more etween accele

ngs among E

hin  the  prop

al models of t

5 –100 wave

mathematica

th the devic

ay  not  be 

tructure Acc

eader in thend electromsupport  froConverters). wable Energyroposals wer

TF). y (DMaC). 

ells implemeMaC to comp

l open wate

s of fibre ro

nd  rope  be

ured loads atpplications. rope  taut mnew marketnergetic waverated labor

European cen

posal  #182  (

the system (

es) 

l models 

e (for mathe

well  defined

cess Report: 

e manufactumechanical caom MARINETThe objectivy Convertersre presented

ented in thepare the fatig

er  condition

opes with cy

haviour  bas

t sea. 

mooring  linest for rope mave environmratory tests a

ntres and co

(FibreTaut1)

PreviouslPlanned f

25 – 100 wa

ematical mod

d  theoretica

FibreTau

ring, engineeables, along T  to  developve of this prs (MREC), bod:   

 mooring sysgue damage.

s  and other 

cling at diffe

sed  on  the 

s  in  deep  wanufacturers

ments. and real offs

mpanies.  

,  concerning

y completedor this proje

Sta

ves) 

delling 

ally  or 

ut 1 

ering with p  the oject oth in 

stem . 

in  a 

erent 

rope 

water s and 

shore 

g  the 

d:   ect:  

tus 

Page 9: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

STA

num

ReIniShsign

EvIni 

Stag

AcPeSuAcDeMo

DaEnSitOv 

Stag

ToToTocorr

ToToMa

Pr 

Stag

HuMo

PTCoEleApPrSeAc 

Stag

EcMDePoEn

GE GATE CR

merically solv

eal seaway p

itially 2‐D (flu

ort crested ificantly affe

vidence of th

itial indicatio

ge 2 – Design

ccurately sim

erformance in

rvival loadin

ctive dampin

evice design 

ooring arran

ata for propo

ngineering De

te Review fo

ver topping r

ge 3 – Sub‐Sy

o investigate 

o employ a re

o qualify envrosion, winda

o validate ele

o quantify su

anufacturing

oject plannin

ge 4 – Solo D

ull seaworthi

ooring and c

TO performan

omponent an

ectricity supp

pplication in 

oject manag

rvice, mainte

ccepted EIA 

ge 5 – Multi‐

onomic Feas

ultiple units 

evice array in

ower supply i

nvironmenta

ITERIA 

vable 

roductivity (

ume) test pr

seas need oected by them

e device sea

on of the full

n Validation 

mulated PTO 

n real seawa

ng and extrem

g control (m

changes and

ngements an

osed PTO des

esign (Protot

r Stage 3 and

rates 

ystems Valid

physical pro

ealistic/actua

ironmental fage and curr

ectrical suppl

rvival condit

g, deploymen

ng and mana

Device Valida

iness and sur

cable connec

nce and relia

nd assembly 

ply quality (a

local wave c

gement, man

enance and 

Device Dem

sibility/Profit

performanc

nteractions 

interaction &

l impact issu

scaled durat

ogramme 

nly be run am 

worthiness 

 system load

characteristi

ays (long and

me motion b

may be deferr

d modificatio

d effects on 

sign and ben

type), feasib

d Stage 4 de

dation 

operties not w

al PTO and g

factors (i.e. tent drag 

ly quality and

tions, moorin

nt, recovery 

agement, inc

ation 

rvival strateg

ction issues, 

ability 

longevity 

absorbed/pn

climate cond

nufacturing, d

operational 

monstration 

tability 

& quality 

es 

Rev.

tion at 20‐30

t this early s

d regimes 

ics 

d short creste

behaviour. 

red to Stage 

ons 

motion 

nch testing (S

ility and cost

ployments 

well scaled &

enerating sy

the device on

d power elec

ng behaviour

and O&M (c

cluding licens

gies 

including fai

eumatic pow

itions 

deployment,

experience [

 01, 15‐Dec‐Page 9 of 22

0 minutes) 

stage if the d

ed) 

3) 

Stage 3) 

ting 

& validate pe

ystem & deve

n the enviro

ctronic requi

r and hull sea

component r

sing, certifica

lure modes

wer‐converte

, recovery, e

[O&M] 

Infras

‐2014 2 

devices antic

erformance f

elop control 

nment and v

irements. 

aworthiness

reliability) 

ation, insura

ed/electrical

tc 

tructure Acc

cipated perfo

figures 

strategies 

vice versa) e

nce etc. 

 power) 

cess Report: 

ormance wo

.g. marine g

FibreTau

Sta

uld be 

rowth, 

ut 1 

tus 

Page 10: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

STA

FuCo  

1.2The The for tropedeveThe finaFinadisse Acco 

For been‐ KP

 ‐ KP

GE GATE CR

ll technical a

ompliance of

2.2 PlanFcomplete prPhase 1  is dthe South We  propertieselopment of Phase 2 willly testing at lly,  during emination ac

ording to the

the developn considered1: Definition

2: Tests at th

ITERIA 

and econom

f all operatio

ForThisAroject was pldevoted to tWest Moorings  in  terms  othe numericl be devoted sea in the SWfour  monthctivities are o

e above, the 

PHASE 1. 

Task 1 

Task 2 

Task 3 

PHASE 2. 

Task 4 

Task 5 

Task 6 

PHASE 3. 

Task 7 

Task 8 

pment of thed: n of the base 

Figur

he SWMTF a

ic due diligen

ns with exist

Accesslanned to behe specificatg Test Facilitof  breaking cal model ford to the preWMTF.  hs,  the  corongoing.  

tasks for thi

Specificatio

T1. Specifica

T2. Definitio

T3. Modellin

Developme

T4. Preparat

T5. Tests at 

T6. Accelera

Analysis, co

T7. Analysis 

T8. Dissemin

e tests plans 

line load cas

re 3: Example 

nd collection

Rev.P

nce 

ting legal req

e developed otion of the mty (SWMTF) load,  stiffn

r the base linparation and

responding 

s project are

ns and mode

ation of the m

on of the rop

ng activities (

nt of the tes

tion of the te

SWMTF 

ted test at D

nclusions an

of the tests,

nation activit

Table 1:

within the p

ses and the n

of a numeric

n of the data

 01, 15‐Dec‐Page 10 of 2

quirements

over eleven mooring systat the Univeness  and  dane loads cased fabrication

analysis,  co

e: 

elling activit

mooring syst

e properties

(base line loa

sts 

est samples (

DMaC (real lo

nd dissemina

, conclusions

ties 

: Phases of th

project and 

numerical m

cal model of th

a for the real

Infras

‐2014 2 

months, divitem and theersity of Exeamping  is  ades. n of the test

orrelations 

ties 

tem and Test

ad cases) 

(fabrication) 

oad cases) 

ation 

s and further

e project 

further activ

odel based o

he buoy and i

 sea conditio

tructure Acc

ided into thr detailed deeter facilitiesddressed  in 

 samples at 

and  conclus

t Plans (SWM

and tests se

r work 

vities, the fo

on the rope p

 

its mooring sy

ons with the 

cess Report: 

ree consecutevelopment os (UoE). The   this  Phase

the Lankho

sions  were 

MTF) 

et‐up 

ollowing Key 

properties (s

ystem 

ADCP (see F

FibreTau

Sta

tive phases:of the Test Pdefinition o  as  well  as

rst premises

addressed. 

Points (KP) 

see Figure 3)

Figure 4) 

ut 1 

tus 

Plans f the s  the 

s and 

The 

have 

). 

Page 11: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

‐ KP

‐  KP(SW NOT

2

2.1

2.1Durithe tAccofibrethe  All  tcondcons

3: Accelerate

P4:  Validate MTF). 

TE: Task 6 is o

OUTLI

1 SETUP

1.1 Preliming the Phastest at SWMording  to  thee rope  informSWMTF wer

the  proposeditions,  up struct/acquir

ed test at DM

the  numeri

out of the sc

INEOF

minarywe 1 of the p

MTF. e design conmation provre proposed a

ed mooring to  reach  tre any comp

Fig

MaC based o

cal model  a

cope of the p

WORK

worktodroject, the m

nstraints andvided by Lanand simulate

lines  configthe  final  monent.

Rev.P

gure 4: SWMT

n the real lo

F

and  correlate

roposal #182

KCARRI

eploymemain objectiv

d environmekhorst‐Euroned, up to rea

gurations  wemooring  des

 01, 15‐Dec‐Page 11 of 2

TF buoy & Tel

oad cases obt

Figure 5: DMa

e  the  accele

2 (FibreTaut1

IEDOU

entve was the d

ent charactenete Portugaach the final 

ere modelledsign.  The  fi

Infras

‐2014 2 

edyne RDI AD

tained in the

aC 

erated  test  i

1). 

UT

definition of 

ristics providal, several comooring des

d  in  OrcaFlenal  design 

tructure Acc

DCP 

e test site in o

 

n  the  Lab  (

the mooring

ded by  the Uonfigurationsign. 

ex  and  subjwas  approv

cess Report: 

 

open waters

DMaC) with

g system to t

University ofns of the mo

ected  to  thved  by  Uo

FibreTau

s (see Figure 

h  the  test  at

the test plan

f Exeter, andooring system

e  real  sea  sE  previousl

ut 1 

5). 

t  sea 

ns for 

d the m  for 

state y  to 

Page 12: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

The and capa The  

1

 The  and 

 Tabl 

         1 From

tension loadthe  anchor

acity of the a

final moorin

m length cha

final moorind Table 2 resp

le 2 and Figu

                      

m the top to bott

d in each linring  point.  Tanchor. 

ng configurat

ain + 22m le

ng design is spectively: 

ure 7 show th

Type of ro

Polyami

                     

om 

e was measuThese  values

tion was: 

ngth of polya

shown in Figu

Figu

he properties

ope Diame

ide 

         

3 x 1.1 t

Rev.P

ured at two s were  comp

amide rope 

ure 6: 

re 6: Final Mo

s of the rope

eter (mm)

30 

Table 2

tonne embedme

 01, 15‐Dec‐Page 12 of 2

points: end pared with 

D30 + 36m le

ooring Config

e used: 

Weight (g/m

585 

2: Pre‐selecte

ent anchors 

3 lin5 m36m22m1m 

Infras

‐2014 2 

the point ofthe  admissi

ength stud le

uration at SW

m) MBL (kN

231

ed ropes 

nes ofm x D36mm stud m x D24mm stud m x D30mm polyx D32mm stud l

tructure Acc

f the polyamble  ones  of 

ess chain + 5

WMTF 

N) Design c

MBL >

link chain less chain amide rope ess chain

cess Report: 

mide rope (clthe  fibre  ro

5m length stu

 

constraint 

> 207 kN 

FibreTau

ose to the bope  and  ho

ud less chain

ut 1 

buoy) lding 

. 1 

Page 13: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

2.1Duri 

  Basecom 

1.2 Prepaing the Phase

ed on  the  finmposed by th

‐ SWMTF‐ Load Ce‐ D shack‐ D shack‐ 30 mm‐ D shack‐ D shack‐ Axial sw‐ D shack‐ DN 24 o‐ D shack‐ Anchor

arationoe 2 of the pr

nal mooring e following e

F Buoy padeells and swivkle 9.5 tonnekle 25 tonne Polyamide Rkle 25 tonnekle 9.5 tonnewivel 10 tonnkle 9.5 tonneopen link gakle 9.5 tonner 

1

1

2

2

Load

 (KN)

Figure 7: Str

fthetestroject, the fa

F

configuratioelements (fro

ye vels es s Rope spliceds es nes es lvanized chaes (connecte

0,00

50,00

100,00

150,00

200,00

250,00

0

Rop

Rev.P

ress‐strain cur

tsamplesbrication of 

igure 8: 30 m

on, a detaileom the top t

d over galvan

in (36 m lenged to the 5 m

5

pe ø 30m

 01, 15‐Dec‐Page 13 of 2

rve of 30mm

s(fabricathe ropes w

m diameter p

ed design wato bottom):

nized eyes (2

gth) m ground cha

10

Elongat

mm (MB

Infras

‐2014 2 

diameter pol

ation)anas carried ou

polyamide rop

as performed

1 m length e

in) 

15

tion (%)

BL=231 

tructure Acc

yamide rope 

ndtestsseut.  

pe 

d  to be  insta

eye to eye) 

20

kN)

cess Report: 

 

et‐up

alled at SWM

25

FibreTau

MTF. Each  li

ut 1 

 

ne  is 

Page 14: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

 

 Notefurth  

ed  that  at  ther protectio

the  end  of  eon. 

each  line  thi

Rev.P

Figu

imbles  and 

 01, 15‐Dec‐Page 14 of 2

ure 9: D Shac

encapsulatio

Infras

‐2014 2 

kles 

on with  an  e

tructure Acc

elastomer  co

cess Report: 

 

ompound w

FibreTau

were  installed

ut 1 

d  for 

Page 15: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

Reev. 01, 15‐Dec‐20Page 15 of 22

 

FibreTaut1

014 

  Inffrastructure Accesss Report: FibreeTaut 1 

Page 16: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

 

2.2

2.2The  

2.3The  

The instachecfive 

2 TESTS

2.1 TestPtests were c

3 RESULTSWMTF was

data was coalled  at  SWcked again, bdays. 

Plancarried out at

Task  Tes

Task 5  SW

TSs deployed o

ollected  in  tMTF.  The  lobut after som

t the SWMT

st at 

WMTF Meas

on 12th June 

the planned oad  cells weme days, one

Rev.P

F. In the nex

Obje

sure environ

Ta

2014 with th

Figure 10: D

time, 30 daere  calibratee load cell fa

 01, 15‐Dec‐Page 16 of 2

xt table, the m

ective 

ment inform

ble 3: Test Pla

he intention 

    

Deployment of

ays after. Preed  at  DMaCiled. Therefo

Infras

‐2014 2 

main charact

Dura

mation 30 

ans 

of recording

f the SWMTF

evious  to  th  previously ore, the tens

tructure Acc

teristics of th

ation Num

days 

g line tension

 

e deploymeand  during sion data we

cess Report: 

he test plan

mber of rope

ns for at leas

nt,  two newthe  deploy

ere collected 

FibreTau

are shown:

st 30 days.  

w  load cells wment  they wonly for the

ut 1 

 

were were e first 

Page 17: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

Owithe tensAs  adisp

 ThisworThe motcorr Togeresp 

2.4Duritensverytens 

         2 The 

ng to the fai6  DoF  displsions during tan  extra  effplacements: 

Figure

  figure  showking) with thMotionPak‐

tion.  The  mrelation is ac

ether with thponse during

ADCP da

Axial loa

MotionP

4 ANALYing the post‐sion simulatey  close  to  zesion. 

                      

MotionPak syste

ilure of inlinelacements  othe deploymfort,  UoE  pe

e 11: Validatio

ws  the  comphe Orcaflex s‐based  displethod  with hievable. 

he recorded g deployment

ata from 12t

ad cell 1 data

Pak‐derived d

YSIS&CON‐processing oed data by Oero  (see  Figu

                     

em comprises acc

e load cells, of  the  buoy.ment. erformed  a 

on of mooring

parison  betwimulation reacements  (ithe  Motion

ADCP data (t (after firsts

h June 2014 

a from 12th J

displacemen

NCLUSIONof the data, OrcaFlex. Furure  12).    Th

         

celerometers and

Rev.P

the UoE proThis  data w

qualitative 

g line tensions

ween  the mesults based oin  6  DoF) wnPak  based‐

(processed ws five days). T

– 12th Augu

June 2014 –

nts from 12th

NSit was notedrther analysiis  caused  th

 gyroscopes to m

 01, 15‐Dec‐Page 17 of 2

ocessed the Mwas  importe

validation  o

s using Motio

measured  SWon displacemwere  inputte‐data  inputt

with WavesMThe following

ust 2014 

15th June 20

h June 2014 

d a 20% diffes exposed thhe  differenc

measure accelerat

Infras

‐2014 2 

MotionPak2 ed  into Orca

of  mooring 

onPak‐derived

WMTF  data  (ments derived  into  Orcated  in  Orcaf

Mon softwareg data was s

014 

– 22nd July 2

erence betwhat the dataes  between

tions and angular

tructure Acc

information,aFlex  in  orde

line  tension

d displacemen

recorded wd from Motiflex  as  a  timflex  gives  s

e) this alloweupplied by U

2014 (and he

een the tens of the displthe measur

r displacements i

cess Report: 

, thus it was er  to  estima

ns  using  Mo

nts provided b

when  load  ceionPak data.me‐history  oensible  resu

ed to assess UoE: 

eader file) 

sions measulacements hred  and  sim

n all 6 degrees‐o

FibreTau

possible to ate mooring

otionPak‐der

 

by UoE 

ell  1 was  ini of  superimpults  and  a  g

the mooring

red data andad a mean v

mulated  value

f‐freedom. 

ut 1 

have g  line 

rived 

tially 

osed good 

g line 

d the value es  of 

Page 18: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

Dueinste For JONdispreprThesimpoNewmet Finasentprop The 

3

3.1 

 to those difead of zero, 

this  purposSWAP spectplacement  (Xresentative ose mean valuose in OrcaFw  simulationhod to obtai

lly, the decot  to  Lankhorposal). 

main conclu

- Even wiphase. 

- The SWOrcaflexprocessi

- There haand avai

- The desi- Storm d- The load- Despite 

performdeploym

MAIN

1 PROGR

fferences, thand add it to

se,  there  wetrum (Hs, TpX‐Y movemeof the deployues were addFlex. s with  the in the missed

ommissioninrst‐Euronete

usions of the 

th new  load

MTF has disx,  the  line  teing. ave been deilability of veign of the moata were notds of a MRECsome drawb

med by UoE wment of the b

LEARN

RESSMAD

F

he new approo the amplitu

ere  selected , depth, currents).  These yment. ded to the M

modified  timd tension va

g of the rope  Portugal  to

tests carried

d cells being 

placement sensions can 

lays, but thisessels. ooring systet obtained dC are faster tbacks, the pwas essentiabuoy and new

NINGOU

DE

Rev.P

Figure 12: Me

oach to procudes measur

the most  rrent and diresimulations 

MotionPak dis

me  history wlues of the li

pes  is scheduo  be  subject

d out in the S

installed pr

sensors onbobe obtained

s is common

m was subjeuring deployhan an Oil&Groject objecl. The projecw strategies 

UTCOM

 01, 15‐Dec‐Page 18 of 2

ean values ver

ceed was to red by the M

relevant  valuections obtawere  selec

splacements

were  again nes. 

uled to be pted  to  furth

South West 

rior deploym

oard so  if thd with minor

n when work

ect to constrayment periodGas platformctives have bct has been awere applie

MES

Infras

‐2014 2 

ry close to zer

run simulatioMotionPack.

ues  of  Hs,  iained from Ated  among 

s (6 DoF) in o

performed  i

erformed afher  testing  a

Mooring Tes

ment of SWM

is  informatior error, altho

 at sea, due 

aints, so its dd. m, so this mubeen met  in able to overd successful

tructure Acc

ro 

ons to obtain

n  order  to ADCP data) tthe  data  pr

order to obta

in OrcaFlex, 

ter the wintand  analysis

st Facility (SW

MTF  load cel

on  is  implemough  this m

to dependen

design was ve

st be taken itheir great come the drly. 

cess Report: 

n a drift valu

perform  simto obtain therovided  by U

ain a modifie

with  super

ter season. Ts  (out  of  sco

WMTF) are: 

ll  failed occu

mented  in a smeans an ext

nce on the w

ery conserva

into accountmajority andrawbacks suf

FibreTau

 

ue more real

mulations we mean valuUoE  as  the m

ed time histo

imposed mo

The ropes wope  of MAR

urred during

software suctra effort of

weather wind

ative. 

t carefully. d the extra wffered during

ut 1 

listic, 

ith  a es of most 

ory to 

otion 

ill be RINET 

g  test 

ch as data 

dows 

work g the 

Page 19: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

ThesfibreThe the  

3.1The fibrecan conc 

3.1.The projat thFurtWithageiobse

3.1 The moo In ththe induIn  thnewin th 

3.2 

 

4

4.1

se  tests were ropes in Mkey objectivdeployment 

1.1 Progrtests have re ropes. Combe  an  issueclusions are 

.1.1 NextSresults obtaect (FiberTahe laboratoryther data anah  limited  timng  implicatioerved in the 

1.2 Progr

developmenoring design 

he long‐termemerging Mustry further he specific cw market framhe field of M

2 KEYLE

Installatgenerati

It is imp

The desi

Photo an

30 days 

FURTH

1 SCIENT Paper EW

re  intended REC. ves for the teof the buoy

ressMaderaised some mpression fate  for  stiffer drawn on th

StepsforRained  througut2), in ordey (DMaC). alysis of thesme availableons on the mlimited testi

ressMade

nt of synthetwith reduce

m it is expecteREC industryinto the dee

case of Wiremework, andREC. 

ESSONSLE

ion windowing the test s

ortant to ext

ign of the mo

nd Video doc

of infrastruc

HERINF

TIFICPUBWTEC 2015: 

as a  first ste

esting have b and analysis

e:ForThquestions atigue shouldmaterials  suis. 

Researchogh  these  teser to analyse 

se results is r, many of  thmaterial. Theng conducte

e:ForMa

tic fibre mood weight and

ed to develoy. This wouldeper and moCo WorldGrd all the kno

EARNED

ws  provide  soschedule. 

treme the re

ooring syste

cumentation

cture access 

FORMA

BLICATIONAbstract acc

Rev.P

ep  to unders

been mostly s the data. 

hisUser‐Gbout the effdn’t be an issuch  as HMP

orStagedDsts will  feedthe potentia

required as these  tests  ce tests have ed here. 

arineRen

oring systemsd therefore r

op cost‐effectd provide a nre energeticoup  (Lankhoowledge deri

ome  uncerta

eliability of th

m was subje

n is vital whe

is not enoug

ATION

NScepted. 

 01, 15‐Dec‐Page 19 of 2

standing  the

achieved. Th

Grouporfect of marinsue for nylonPE  and  Aram

Developm directly  intal correlatio

the project man be  consiindicated ke

newable

s will be an areduced cost

tive fibre ropnew market c wave enviroorst‐Euronetved from th

ainties  to  p

he vital meas

ect to many c

en re‐viewing

gh.  

Infras

‐2014 2 

e  longer  term

he work perf

rTechnolne ageing onn, use in themids.  Further

entPlan–o  the next  sn between t

moves on to tdered a  firstey areas for 

EnergyI

asset to the ts. 

pe taut moofor rope maonments. e Portugal), is project wi

roject  time 

surement co

constraints, s

g and sharing

tructure Acc

m considerat

ormed by Uo

logy the materiaoffshore indr  analysis  of

Exit/Chansteps of devhe tests at se

the next stagt attempt atfurther test

ndustry

industry as a

ring lines foranufacturers 

this projectill be applica

line which  s

omponents. 

so its design 

g data.  

cess Report: 

tions of  the 

oE has been 

al propertiesdustry has hf  the  data  is

nge&Retevelopment  fea with the 

ge of develot understandt work to va

a whole, lead

r deep wate and help ad

t  represents able for futu

should  be  c

was very co

FibreTau

use of synt

essential, du

s of the syntighlighted ths  needed  be

est/Proceefor  the  Fiberaccelerated 

pment. ding  loadinglidate the re

ding to impr

r applicationdvance the M

an opening re developm

considered w

nservative.

ut 1 

hetic 

uring 

hetic hat it efore 

ed?rTaut tests 

g and esults 

oved 

ns for MREC 

to a ments 

when 

Page 20: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

4.2 Fundhttp Univhttp 

5

5.1The Readcom 

Paper  IJpaper.  

THETIS 2

Other jo

2 WEBSI

dación Centrp://ctcompon

versity of Exep://www.fp7

APPEN

1 STAGEtable  followdiness Level

mmitted to at

OME: An ab

2015 (planne

ournals in the

TE&SOC

ro Tecnológinentes.es/la

eter, South W‐marinet.eu/

NDICES

DEVELOPwing  offers . This is onlyt each TRL. 

bstract was a

ed). 

e field of Oce

CIALMED

co de Componzamiento‐d

West Moorin/UNEXE‐sout

S

PMENTSUan  overviewy offered as a

Rev.P

accepted  to 

ean Engineer

DIA

onentes, (CTdel‐proyecto‐

ng Test Facilitth‐west‐moo

UMMARYw  of  the  tesa guide and 

 01, 15‐Dec‐Page 20 of 2

IJOME but 

ring (under d

TC): ‐fibre‐taut/

ty (SWMTF):oring‐test‐fa

YTABLEt  programmis in no way

Infras

‐2014 2 

due  to  the d

discussion) 

: cility.html 

mes  recommy extensive o

tructure Acc

delays  it was

ended  by  IEf the full tes

cess Report: 

sn't possible

EA‐OES  for  est programm

FibreTau

e  to  fulfil  the

each  Technome that shou

ut 1 

e  full 

ology ld be 

Page 21: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

Reev. 01, 15‐Dec‐20Page 21 of 22

014 

  Inffrastructure Accesss Report: FibreeTaut 1 

Page 22: structu re Access Report - MaRINET2 · 2019. 5. 2. · nisations th re‐wind. Th 2015. The Internation free‐of‐cha ups can ava y, offshore‐ f systems, g 0 projects a working

 

Rev.P 01, 15‐Dec‐Page 22 of 2

Infras

‐2014 2 

tructure Acccess Report: FibreTauut 1