STRETCH FRAME PROCEDURE
![Page 2: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e739923e1ce573abb523c68/html5/thumbnails/2.jpg)
STEP # 1 :Unit is completely disassembled, all electrical air and hydraulic systems,
suspensions and braking systems are removed.
STEP # 2: Chassis is cut at 45 degree angle in one single location. New channels are
designed specifically to fit current chassis design. New channel extension is welded at 45
degree angle for higher rigidity and structural strength.
![Page 3: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e739923e1ce573abb523c68/html5/thumbnails/3.jpg)
STEP # 3: Chassis extensions are bolted and welded. Glove channels are inserted for
additional structural strength
STEP # 4: Suspension is reinstalled. Drive lines stretched and modified for unit, if needed
new brake cams will be installed or added when a single brake cam is present
![Page 4: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e739923e1ce573abb523c68/html5/thumbnails/4.jpg)
STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical
systems are reinstalled and extended as needed.
STEP # 6: Units is prepared for installation of fish plates, and accessories such as oil
tank, tool boxes. When necessary fuel tanks, oil tanks and tool boxes are relocated for
installation of hoist cylinders.
![Page 5: STRETCH FRAME PROCEDURE - Spartan Truck Stretch.pdf · STEP # 5: If needed yokes and universal joints are completely rebuild, air and electrical systems are reinstalled and extended](https://reader030.vdocuments.us/reader030/viewer/2022040902/5e739923e1ce573abb523c68/html5/thumbnails/5.jpg)
STEP # 7: Fish plates are bolted, lower shaft is welded to fish plate to ensure additional
structural strength for hoisting systems. Chassis rear is modified to accommodate hinges
and shaft. Frame is mounted and connected to all operational systems.
STEP # 8 : Unit is complete and ready for paint.