PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
SARAKI ROAD (AGRIC ROUND ABOUT M.O.H ROUND ABOUT)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
A. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
7 NO. 3,500.00 24,500.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '
1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts
% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand
% +ater et".
7
ets ),000 47),000.00
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
250 250.00 737,500.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
100 15,000.00 1,500,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting#ios#A-%panel plint!
2 ets 225,000.00 450,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
2 ets 1,500,000.00 3,000,000.00
CIVIL WORKS SUBTOTAL % % % !"#$$"%%%.%%
MOE/ST. REH/ SARAKI ROAD /PG.#
-
8/10/2019 Street Light Rehabilitation-general
2/47
-
8/10/2019 Street Light Rehabilitation-general
3/47
SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoort*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
2 ets 1,5,0003,70,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
of 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
2 ets 550,000 1,100,000.00
MOE/ST.REH/SARAKI ROAD /PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
-
8/10/2019 Street Light Rehabilitation-general
4/47
SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 55,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
,"*,"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % %350,000.00
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 2,500,000.00
&4. Allo for testing and
"ommissioning
=ot um % 500,000.00
#%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%
MOE/ST. REH/SARAKI ROAD /PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)
-
8/10/2019 Street Light Rehabilitation-general
5/47
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!lessre(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$
% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be orderedit! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$
% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
2 Nos. 3,75,000 7,50,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
6/47
% )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* of
s!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er
=O- 6 25,000.00 25,000.00
). Complete too# #it for t!e maintenan"e
of poer plants as des"ribed in t!e
te"!ni"al spe"ifi"ations and as
re"ommended b* t!e manufa"turers
2 ets 500,000 1,000,000.00
7. abri"ate and install an insulated metal
!ood to du"t t!e generator radiator !ot
air e'!aust to t!e outside t!roug! t!e
metal in t!e all to super(ising&ngineerFs detail
2 ets 225,000 450,000.00
. uppl* and install plate mounted a'ial
fan e'tra"tor "omplete it! industrial
fan "ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor
to >55.
2 ets 55,000 110,000.00
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe
or#, su"! as gate (al(es anda""essories et"
2 ets )00,000 1,200,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
4 Nos. 55,000 220,000.00
11. >nstallation a""essories s!all in"lude
"able tra*s, unistru"t et". and ot!er
ne"essar* materials
=ot um 100,000.00
12. Allo for t!e operation and
maintenan"e it!in t!e first )%mont!s of
defe"t liabilit* period after t!e"ommissioning of t!e proIe"t
% % 3,500,000.00
%KVA C-0 G10 S12
SUB TOTAL
#!"%*%"!%%.%%
MOE/ST. REH/ SARAKI ROAD /PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
-
8/10/2019 Street Light Rehabilitation-general
7/47
A. C>>= +O? % % % ),1,000.00
;. O=&,
>-->N&
% % % 27,025,000.00
C. CA;=& % % % 12,1,000.00D. D>-?>;6->ON, CON-?O=
/ &A?-=>N&&=ON % % % 74,10,50.00
MOE/ST. REH/ SARAKI ROAD /PG.
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU
GAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
A. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
4 NO. 3,500.00 14,000.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '1200mm for all t*pes of soil
-
8/10/2019 Street Light Rehabilitation-general
8/47
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand
% +ater et".
4 ets ),000 272,000.00
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
3200 250.00 00,000.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ingof 6C pipes under t!e road
a*
100 15,000.00 1,500,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting
#ios#A-%panel plint!
2 ets 225,000.00 450,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
2 ets 1,500,000.00 3,000,000.00
CIVIL WORKS SUBTOTAL % % % !"%+!"%%%.%%
MOE/ST. REH/ AHMADU BELLO /PG.#
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULUGAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
4 No. 125,000 75,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
2 No. 115,000 230,000.00
-
8/10/2019 Street Light Rehabilitation-general
9/47
installation materials
9&D:
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel
=&D 9= @ ): lig!ting fitting
"omplete it! installationa""essories
175 No. 175,000.00 30,)25,000.00
;4. )0100A C "onne"tor 45 #t 4,500.00 202,500.00
;5. 3 t*pe C insulation tape 30 ?oll 3,500.00 105,000.00
;). 5A C; industrial brea#er 9A;;: 175 No. 1,500.00 2)2,500.00
;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 100,000.00
;. ainting of poles and repairs of
arms
No. ),500.00 57,500.00
FITTINGS & ACCESSORIES SUB
TOTAL
+'"!%+"%%.%%
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
200 tr. 4,500.00 00,000.00
C2. 4 ' 1).0mm C+AC
underground armoured "able
3500 tr. 3,750.00 13,125,000.00
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
25 Coils 1,500.00 4)2,500.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 15,000.00
CABLE SUM TOTAL #,"%'"%%.%%MOE/ST. REH/ AHMADU BELLO /PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU
GAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoor
t*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:%etering(oltage meter rela*
%OffAuto sele"tors sit"!
-
8/10/2019 Street Light Rehabilitation-general
10/47
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
2 ets 1,5,000 3,70,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# madeof 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer
% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
2 ets 550,000 1,100,000.00
MOE/ST.REH/AHMADU BELLO /PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU
GAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 55,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
,"*,"%%%.%%
-
8/10/2019 Street Light Rehabilitation-general
11/47
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % % 350,000.00
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 2,500,000.00
&4. Allo for testing and
"ommissioning
=ot um % 500,000.00
#%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%
MOE/ST. REH/AHMADU BELLO /PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU
GAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
. % KVA" ,#V DIESEL GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!less
re(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$
% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
-
8/10/2019 Street Light Rehabilitation-general
12/47
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$
% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
2 Nos. 3,75,0007,50,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
13/47
!ood to du"t t!e generator radiator !ot air
e'!aust to t!e outside t!roug! t!e metal
in t!e all to super(ising &ngineerFs detail
. uppl* and install plate mounted a'ial fan
e'tra"tor "omplete it! industrial fan
"ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor to>55.
2 ets 55,000 110,000.00
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe or#,
su"! as gate (al(es and a""essories et"
2 ets )00,000 1,200,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
4 Nos. 55,000 220,000.00
11. >nstallation a""essories s!all in"lude "abletra*s, unistru"t et". and ot!er ne"essar*
materials
=ot um 100,000.00
12. Allo for t!e operation and maintenan"e
it!in t!e first )%mont!s of defe"t liabilit*
period after t!e "ommissioning of t!e
proIe"t
% % 3,500,000.00
%KVA C-0 G10 S12
SUB TOTAL
#!"#%%"%%.%%
MOE/ST. REH/ AHMADU BELLO /PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU
GAMBARI)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
A. C>>= +O? % % % ),03),000.00
;. O=&,
>-->N&
% % % 32,)03,500.00
C. CA;=& % % % 14,502,500.00
D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=
-
8/10/2019 Street Light Rehabilitation-general
14/47
6;%-O-A= 9A%: % % % 77,537,500.00
A- 95J: % % % 3,7),75.00
-O-A= -O CO==&C->ON % % % 1,414,375.00
MOE/ST. REH/ AHMADU BELLO /PG.
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
A. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
4 NO. 3,500.00 14,000.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '
1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts
% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand
% +ater et".
4
ets ),000 272,000.00
A3. Digging and ba"# filling oftren"! 300mm ' )00mm to
allo for la*ing of "able
150 250.00 4)2,500.00
-
8/10/2019 Street Light Rehabilitation-general
15/47
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
100 15,000.00 1,500,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting
#ios#A-%panel plint!
1 ets 225,000.00 225,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
1 ets 1,500,000.00 1,500,000.00
CIVIL WORKS SUBTOTAL % % % +"*+"%%.%%
MOE/ST. REH/ WAHAB FOLAWIYO /PG.#
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
4 No. 125,000 500,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
installation materials
9&D:
3 No. 115,000 345,000.00
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel=&D 9= @ ): lig!ting fitting
"omplete it! installation
a""essories
52 No. 175,000.00 ,100,000.00
;4. )0100A C "onne"tor 2 #t 4,500.00 12),000.00
;5. 3 t*pe C insulation tape 1 ?oll 3,500.00 )),500.00
;). 5A C; industrial brea#er 9A;;: 52 No. 1,500.00 7,000.00
;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 50,000.00
;. ainting of poles and repairs ofarms
30 No. ),500.00 15,000.00
FITTINGS & ACCESSORIES SUB #%",!%"%%.%%
-
8/10/2019 Street Light Rehabilitation-general
16/47
TOTAL
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
250 tr. 4,500.00 1,125,000.00
C2. 4 ' 1).0mm C+AC
underground armoured "able
175 tr. 3,750.00 ),731,250.00
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
1 Coils 1,500.00 333,000.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 15,000.00
CABLE SUM TOTAL $"'%,"'%.%%
MOE/ST. REH/ WAHAB FOLAWIYO/PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoor
t*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
1 ets 1,5,000 1,5,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
-
8/10/2019 Street Light Rehabilitation-general
17/47
of 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer
% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
1 ets 550,000550,000.00
MOE/ST.REH/ WAHAB FOLAWIYO/PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 55,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
'"%%"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oilimmersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % % 175,000.00
-
8/10/2019 Street Light Rehabilitation-general
18/47
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 1,250,000.00
&4. Allo for testing and
"ommissioning
=ot um % 250,000.00
#%%KVA" ##/%.,# SUBTOTAL #"!"%%%.%%
MOE/ST. REH/WAHAB FOLAWIYO/PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!less
re(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$
% &ngine and alternator full prote"tion% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$
% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
1 Nos. 3,75,000 3,75,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
19/47
it! 100A main "ir"uit brea#er for
"omplete monitoring of all t!e sets
t!res!old arning indi"ators
4. 4 ' 1 ' 35sB.mm CC non
armoured "able for suppl* from
generator set to Auto mati" transfer
sit"! 9A-: and main panel
1 5,50.00 107,100.00
MOE/ST. REH./ WAHAB FOLAWIYO/PG
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT5. &art!ling s*stem s!all in"lude$% )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er
=O- 6 25,000.00 25,000.00
). Complete too# #it for t!e maintenan"e
of poer plants as des"ribed in t!e
te"!ni"al spe"ifi"ations and as
re"ommended b* t!e manufa"turers
1 ets 500,000 500,000.00
7. abri"ate and install an insulated metal
!ood to du"t t!e generator radiator !ot
air e'!aust to t!e outside t!roug! t!e
metal in t!e all to super(ising
&ngineerFs detail
1 ets 225,000 225,000.00
. uppl* and install plate mounted a'ial
fan e'tra"tor "omplete it! industrial
fan "ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor
to >55.
1 ets 55,000 55,000.00
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe
or#, su"! as gate (al(es and
a""essories et"
1 ets )00,000 )00,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*sele"t sit"! and fuel pipe
or#a""essories
2 Nos. 55,000 110,000.00
-
8/10/2019 Street Light Rehabilitation-general
20/47
11. >nstallation a""essories s!all in"lude
"able tra*s, unistru"t et". and ot!er
ne"essar* materials
=ot um 100,000.00
12. Allo for t!e operation and
maintenan"e it!in t!e first )%mont!s of
defe"t liabilit* period after t!e
"ommissioning of t!e proIe"t
% % 1,750,000.00
%KVA C-0 G10 S12
SUB TOTAL
$"%'"#%%.%%
MOE/ST. REH/ WAHAB FOLAWIYO/PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTSUMMARY
A. C>>= +O? % % % 3,73,500.00
;. O=&,
>-->N&
% % % 10,4)0,500.00
C. CA;=& % % % ,204,250.00
D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 3),)2,)17.50
MOE/ST. REH/ WAHAB FOLAWIYO/PG.
-
8/10/2019 Street Light Rehabilitation-general
21/47
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTA. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
25 NO. 3,500.00 7,500.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '
1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts
% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand% +ater et".
25 ets ),000 1,700,000.00
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
375 250.00 3,750.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
200 15,000.00 3,000,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting
#ios#A-%panel plint!
2 ets 225,000.00 450,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
2 ets 1,500,000.00 3,000,000.00
CIVIL WORKS SUBTOTAL % % % *"'+#"'%.%%
MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.#
-
8/10/2019 Street Light Rehabilitation-general
22/47
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
25 No. 125,000 3,125,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
installation materials
9&D:
0 No. 0.00
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel
=&D 9= @ ): lig!ting fitting
"omplete it! installation
a""essories
200 No. 175,000.00 35,000,000.00
;4. )0100A C "onne"tor )2 #t 4,500.00 27,000.00
;5. 3 t*pe C insulation tape 42 ?oll 3,500.00 147,000.00
;). 5A C; industrial brea#er 9A;;: 200 No. 1,500.00 300,000.00
;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 100,000.00
;. ainting of poles and repairs of
arms
101 No. ),500.00 )5),500.00
FITTINGS & ACCESSORIES SUB
TOTAL
+*"!%"%%.%%
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
200 tr. 4,500.00 00,000.00
C2. 4 ' 1).0mm C+ACunderground armoured "able
4375 tr. 3,750.00 1),40),250.00
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
42 Coils 1,500.00 777,000.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 15,000.00
CABLE SUM TOTAL #$"%*$"'%.%%
MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
-
8/10/2019 Street Light Rehabilitation-general
23/47
WESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoort*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
2 ets 1,5,0003,70,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
of 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
2 ets 550,000 1,100,000.00
MOE/ST.REH/WESTERN RESERVOIR ROAD /PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONGWESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
-
8/10/2019 Street Light Rehabilitation-general
24/47
% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 25,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
,"*#"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % % 350,000.00
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 2,500,000.00
&4. Allo for testing and
"ommissioning
=ot um % 500,000.00
#%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%
MOE/ST. REH/WESTERN RESERVOIR ROAD /PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR
-
8/10/2019 Street Light Rehabilitation-general
25/47
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!less
re(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
2 Nos. 3,75,000 7,50,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
26/47
% 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"# and
"omplete it! "on"rete eart! pit "o(er
=O- 6 25,000.00 25,000.00
). Complete too# #it for t!e maintenan"e of
poer plants as des"ribed in t!e te"!ni"al
spe"ifi"ations and as re"ommended b*
t!e manufa"turers
2 ets 500,000 1,000,000.00
7. abri"ate and install an insulated metal
!ood to du"t t!e generator radiator !ot air
e'!aust to t!e outside t!roug! t!e metal
in t!e all to super(ising &ngineerFs detail
2 ets 225,000 450,000.00
. uppl* and install plate mounted a'ial fan
e'tra"tor "omplete it! industrial fan
"ontroller and air operated =ou(res!utters and 4%pole, single p!ase motor to
>55.
2 ets 55,000 110,000.00
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe or#,
su"! as gate (al(es and a""essories et"
2 ets )00,000 1,200,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
2 Nos. 55,000 110,000.00
11. >nstallation a""essories s!all in"lude "able
tra*s, unistru"t et". and ot!er ne"essar*
materials
=ot um 100,000.00
12. Allo for t!e operation and maintenan"e
it!in t!e first )%mont!s of defe"t liabilit*
period after t!e "ommissioning of t!e
proIe"t
% % 3,500,000.00
%KVA C-0 G10 S12
SUB TOTAL
#"$!#"!%%.%%
MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
WESTERN RESERVOIR ROAD
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
A. C>>= +O? % % % ,231,250.00
-
8/10/2019 Street Light Rehabilitation-general
27/47
;. O=&,
>-->N&
% % % 3,)07,500.00
C. CA;=& % % % 1,0,250.00
D. D>-?>;6->ON, CON-?O=
/ &A?-=>N&&=ON % % % 5,)1),70.00
MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTA. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
NO. 3,500.00 2,000.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '
1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard ets ),000 544,000.00
-
8/10/2019 Street Light Rehabilitation-general
28/47
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts
% 100mm diam. C pipe
"omplete it! a""essories% aggregate granite "!ippings
% !arp sand
% +ater et".
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
1200 250.00 3,000,000.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
100 15,000.00 1,500,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting
#ios#A-%panel plint!
1 ets 225,000.00 225,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
1 ets 1,500,000.00 1,500,000.00
CIVIL WORKS SUBTOTAL % % % !"*"%%%.%%
MOE/ST. REH/ BALOGUN FULANI /PG.#
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
No. 125,000 1,000,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
installation materials
9&D:
0 No. 0.00 %
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel
0 No. 175,000.00 14,000,000.00
-
8/10/2019 Street Light Rehabilitation-general
29/47
=&D 9= @ ): lig!ting fitting
"omplete it! installation
a""essories
;4. )0100A C "onne"tor 3 #t 4,500.00 171,000.00
;5. 3 t*pe C insulation tape 22 ?oll 3,500.00 77,000.00
;). 5A C; industrial brea#er 9A;;: 0 No. 1,500.00 120,000.00
;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 50,000.00
;. ainting of poles and repairs of
arms
40 No. ),500.00 2)0,000.00
FITTINGS & ACCESSORIES SUB
TOTAL
#"!$"%%%.%%
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
100 tr. 4,500.00 450,000.00
C2. 4 ' 1).0mm C+AC
underground armoured "able
145 tr. 3,750.00 5,)0),250.00
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
1 Coils 1,500.00 333,000.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 15,000.00
CABLE SUM TOTAL !",%,"'%.%%
MOE/ST. REH/ BALOGUN FULANI/PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoor
t*pe floor mounted free standing Apanel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses%ets of Au'iliar* "ontra"tor
%ets of pin rela*
1 ets 1,5,000 1,5,000.00
-
8/10/2019 Street Light Rehabilitation-general
30/47
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
of 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:brea#er as in"omer
% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
1 ets 550,000 550,000.00
MOE/ST.REH/ BALOGUN FULANI/PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)
NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 25,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
'",%"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
-
8/10/2019 Street Light Rehabilitation-general
31/47
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % %175,000.00
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding lossof re(enue !ere appli"able
=ot um % 1,250,000.00
&4. Allo for testing and
"ommissioning
=ot um % 250,000.00
#%%KVA" ##/%.,# SUBTOTAL #"!"%%%.%%
MOE/ST. REH/BALOGUN FULANI/PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!less
re(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$
% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilitiesin%built from t!e fa"tor*$
% ea(* dut* air filters
1 Nos. 3,75,0003,75,000.00
-
8/10/2019 Street Light Rehabilitation-general
32/47
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
33/47
fan "ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor
to >55.
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipeor#, su"! as gate (al(es and
a""essories et"
1 ets )00,000 )00,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
1 Nos. 55,000 55,000.00
11. >nstallation a""essories s!all in"lude
"able tra*s, unistru"t et". and ot!er
ne"essar* materials
=ot um 100,000.00
12. Allo for t!e operation and
maintenan"e it!in t!e first )%mont!s ofdefe"t liabilit* period after t!e
"ommissioning of t!e proIe"t
% % 1,750,000.00
%KVA C-0 G10 S12
SUB TOTAL
$"%#"#%%.%%
MOE/ST. REH/ BALOGUN FULANI/PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
A. C>>= +O? % % % ),77,000.00
;. O=&,
>-->N&
% % % 15,)7,000.00
C. CA;=& % % % ),404,250.00D. D>-?>;6->ON, CON-?O=
/ &A?-=>N&&=ON % % % 43,03,417.00
MOE/ST. REH/ BALOGUN FULANI/PG.
-
8/10/2019 Street Light Rehabilitation-general
34/47
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
A. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
2) NO. 3,500.00 1,000.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts
% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand
% +ater et".
2) ets ),000 1,7),000.00
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
2000 250.00 500,000.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
400 15,000.00 ),000,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
-
8/10/2019 Street Light Rehabilitation-general
35/47
A). Constru"tion of lig!ting
#ios#A-%panel plint!
4 ets 225,000.00 00,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(a
generator, Automati" -ransferit"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
4 ets 1,500,000.00 ),000,000.00
CIVIL WORKS SUBTOTAL % % % #"'*"%%%.%%
MOE/ST. REH/ ALIMI ROAD/PG.#
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
No. 125,000 1,125,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
installation materials
9&D:
17 No. 115,000 1,55,000.00
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel
=&D 9= @ ): lig!ting fitting
"omplete it! installation
a""essories
324 No. 175,000.00 5),700,000.00
;4. )0100A C "onne"tor 10 #t 4,500.00 10,000.00
;5. 3 t*pe C insulation tape ?oll 3,500.00 343,000.00
;). 5A C; industrial brea#er 9A;;: 324 No. 1,500.00 4),000.00;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 200,000.00
;. ainting of poles and repairs of
arms
17 No. ),500.00 1,215,500.00
FITTINGS & ACCESSORIES SUB
TOTAL
!'"$+,"%%.%%
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
400 tr. 4,500.00 1,00,000.00
C2. 4 ' 1).0mm C+AC 7500 tr. 3,750.00 2,125,000.00
-
8/10/2019 Street Light Rehabilitation-general
36/47
underground armoured "able
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
Coils 1,500.00 1,13,000.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 30,000.00
CABLE SUM TOTAL +#"!$"%%%.%%
MOE/ST. REH/ ALIMI ROAD/PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoort*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter
%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
4 ets 1,5,0007,50,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
of 4mm "orrosion resistan"e s!eet
dul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
4 ets 550,0002,200,000.00
-
8/10/2019 Street Light Rehabilitation-general
37/47
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
MOE/ST.REH/ALIMI ROAD/PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C
"able as eart! "ontinuit* "ondu"tor.
=ot um % 50,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
*"$+%"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element
%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#edpol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % % 700,000.00
&2. uppl* / installation of 100A,
110.415 -ransformer 9&==O:
0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 3,500,000.00
&4. Allo for testing and"ommissioning
=ot um % 1,000,000.00
-
8/10/2019 Street Light Rehabilitation-general
38/47
#%%KVA" ##/%.,# SUBTOTAL "'%%"%%%.%%
MOE/ST. REH/ALIMI ROAD/PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL
GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins
Auto mains failure starting prime"ontinuous dut* generating sets,
brus!less re(ol(ing field t*pe, 4%
poles self%regulating A? it! t!e
folloing$
% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$
% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et
% ;atter* isolator
% uel pre%ilter+ater separatorinis!ed in Cummins traditional
unsell green "olour
4 Nos. 3,75,000 15,00,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
39/47
generator set to Auto mati" transfer
sit"! 9A-: and main panel
MOE/ST. REH./ ALIMI ROAD/PG
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT5. &art!ling s*stem s!all in"lude$
% )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal
% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"# and"omplete it! "on"rete eart! pit "o(er
=O- 6 % 50,000.00
). Complete too# #it for t!e maintenan"e of
poer plants as des"ribed in t!e te"!ni"al
spe"ifi"ations and as re"ommended b*
t!e manufa"turers
4 ets 500,000 2,000,000.00
7. abri"ate and install an insulated metal
!ood to du"t t!e generator radiator !ot air
e'!aust to t!e outside t!roug! t!e metal
in t!e all to super(ising &ngineerFs detail
4 ets 225,000 00,000.00
. uppl* and install plate mounted a'ial fan
e'tra"tor "omplete it! industrial fan
"ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor to
>55.
4 ets 55,000 220,000.00
. 1500= 9litre: diesel fuel storage da* tan#
of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe or#,
su"! as gate (al(es and a""essories et"
4 ets )00,000 2,400,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
Nos. 55,000 440,000.00
11. >nstallation a""essories s!all in"lude "able
tra*s, unistru"t et". and ot!er ne"essar*
materials
=ot um 100,000.00
12. Allo for t!e operation and maintenan"e
it!in t!e first )%mont!s of defe"t liabilit*
period after t!e "ommissioning of t!e
proIe"t
% % 7,000,000.00
%KVA C-0 G10 S12
SUB TOTAL
+#"*,"#%%.%%
-
8/10/2019 Street Light Rehabilitation-general
40/47
MOE/ST. REH/ ALIMI ROAD/PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
ALIMI ROAD (IDI APE FGC" ILORIN)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
A. C>>= +O? % % % 15,25,000.00
;. O=&,
>-->N&
% % % )2,34,500.00
C. CA;=& % % % 31,7),000.00
D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 1)),70,0.00
MOE/ST. REH/ ALIMI ROAD /PG.
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONGMICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)
-
8/10/2019 Street Light Rehabilitation-general
41/47
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
A. CIVIL WORKS
A1. Digging of foundation pit for
poles in normal areas
12 NO. 3,500.00 42,000.00
A2. Casting of poles bases !i"!
s!all in"lude t!e folloing items
of or#$
% &'"a(ation of !ole )00 ' )00 '
1200mm for all t*pes of soil
in"luding !ard ro"#
% +ooden form or# to standard
spe"ifi"ations
% 100#g of "ement
% 25mm diam. - foundation
bolt / nuts% 100mm diam. C pipe
"omplete it! a""essories
% aggregate granite "!ippings
% !arp sand
% +ater et".
12
ets ),000 1),000.00
A3. Digging and ba"# filling of
tren"! 300mm ' )00mm to
allo for la*ing of "able
3200 250.00 00,000.00
A4. -!rust boring underneat!
a"ross asp!alt road and la*ing
of 6C pipes under t!e road
a*
200 15,000.00 3,000,000.00
A5. Constru"tion of transformer
plint!
0 0 0.00 0.00
A). Constru"tion of lig!ting
#ios#A-%panel plint!
2 ets 225,000.00 450,000.00
A7. Allo for t!e "onstru"tion of
"ustomi8ed al#%in "ubi"le to
a""ommodate t!e 50#(agenerator, Automati" -ransfer
it"! 9A-: s*n"!roni8ing
panel and street lig!t #ios#.
2 ets 1,500,000.00 3,000,000.00
CIVIL WORKS SUBTOTAL % % % $"#%$"%%%.%%
MOE/ST. REH/ MICHEAL IBRU RD./PG.#
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
-
8/10/2019 Street Light Rehabilitation-general
42/47
;. POLES" FITTINGS ANDACCESSORIES
;1. .0 Double arm standard street
lig!t pole "omplete it!
installation materials
9&D:
12 No. 125,000 1,500,000.00
;2. .0 single arm standard street
lig!t pole "omplete it!
installation materials
9&D:
2 No. 115,000 230,000.00
;3. )0 ' 30 ' 1)0mm, 115 atts
) ' 1 Cree=umileds ?ebel
=&D 9= @ ): lig!ting fitting
"omplete it! installation
a""essories
10 No. 175,000.00 31,500,000.00
;4. )0100A C "onne"tor ) #t 4,500.00 30),000.00
;5. 3 t*pe C insulation tape 4 ?oll 3,500.00 171,500.00
;). 5A C; industrial brea#er 9A;;: 10 No. 1,500.00 270,000.00
;7. undr* items s!all in"lude bolt,
nuts and ot!er ne"essar*
materials
=O- um % 100,000.00
;. ainting of poles and repairs of
arms
0 No. ),500.00 55,000.00
FITTINGS & ACCESSORIES SUB
TOTAL
+,"!!'"%%.%%
C. CA;=& $ A== ;&
N>N O? A;&&-A=
C1. 4 ' 25.0mm C+AC
underground armoured "able
200 tr. 4,500.00 00,000.00
C2. 4 ' 1).0mm C+AC
underground armoured "able
3500 tr. 3,750.00 13,125,000.00
C3. 2.5sB.mm tin it! eart!
CC "able 9N+C:
2 Coils 1,500.00 51,000.00
C4. Cable a""essories to in"lude
"able lugs et"
=O- um % 15,000.00
CABLE SUM TOTAL #,"$"%%%.%%
MOE/ST. REH/ MICHEAL IBRU RD./PG'
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &
EARTHLING
D1 uppl* and installation of purpose
built 50#(a diesel generator indoor
-
8/10/2019 Street Light Rehabilitation-general
43/47
t*pe floor mounted free standing A
panel made of 4.0mm "orrosion
resistan"e s!eet dul* a"id treated
!a(ing t!e folloing arrangements$
% 1 No ' 100A -/N CC; 9A;;: as
in"omer
% 2 No ' 100A -/N "ontra"tor 9A;;:
%etering(oltage meter rela*
%OffAuto sele"tors sit"!
%ets of "ontrol rela*s
%ets of prote"ting fuses
%ets of Au'iliar* "ontra"tor
%ets of pin rela*
%ets of -imer
%ets of pilot lamps
%Digital ammeter
%Digital (oltmeter%Digital attmeter
&n"losed in 1200 ' 750mm, 4.0mm
t!in# metal s!eet. -!e panel s!all be
ele"tri"all* insulated it! pro(ision for
bottom and top "able entr*. All "ontrol
"able s!all be 4.0mm CC
9Niger"!in: "able
2 ets 1,5,0003,70,000.00
D2. uppl* and installation of purpose
built standard street lig!t #ios# made
of 4mm "orrosion resistan"e s!eetdul* a"id treated !a(ing t!e folloing
arrangements$
% 1 No. 100A - /N CC; 9A;;:
brea#er as in"omer
% 2 No. 100A "ontra"tor
% 2 No. ' )0A -/N CC; 9A;;:
brea#er as out goings
% anualAuto sele"tor sit"!
% ig!=o (oltage rela* sensor
2 ets 550,000 1,100,000.00
MOE/ST.REH/ MICHEAL IBRU RD./PG+
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!
% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plate
-
8/10/2019 Street Light Rehabilitation-general
44/47
it! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able
D3. &art!ling s*stem s!all in"lude
100mm !ea(* dut* t*pe gal(ani8ed
eart! rod "lamp it! 1)sB.mm C"able as eart! "ontinuit* "ondu"tor.
=ot um % 25,000.00
DIST. CONTROL & EARTHLING
SUBTOTAL
,"*#"%%%.%%
&. #%%KVA" ##/%.,# TRANSFORMER
S/S
&1 Allo for t!e "omplete ser(i"ing of t!e
e'isting 100A, 110.415#( oil
immersed transformer !i"! s!all
in"lude t!e under listed items of or#$
% ?epla"ement of / fuse !olders
"omplete it! fuse element%C!anging of transformer oil
% >mpro(ement of eart!ling s*stem to
obtain a minimum of 5 0!ms eart!
resistan"e test
% C!anging of "ross lin#ed
pol*et!*lene "able "omplete it!
terminating #its
% ?e"onstru"tion of transformer plint!
!ere desirable
. % % 350,000.00
&2. uppl* / installation of 100A,110.415 -ransformer 9&==O: 0 0 0.00 0.00
&3. Allo pa*ments of statutor*Non%
statutor* fee to CN in"luding loss
of re(enue !ere appli"able
=ot um % 2,500,000.00
&4. Allo for testing and
"ommissioning
=ot um % 500,000.00
#%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%
MOE/ST. REH/MICHEAL IBRU RD./PG,
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND
EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR
1. uppl* and installation of 50A,
415( 1500?, 50E Cummins Auto
mains failure starting prime "ontinuous
dut* generating sets, brus!less
-
8/10/2019 Street Light Rehabilitation-general
45/47
re(ol(ing field t*pe, 4%poles self%
regulating A? it! t!e folloing$
% &ngine and alternator full prote"tion
% Current "ompounded e'"itation
support s*stem
% =arge terminal !ousing on ant
(ibration units, "omplian"e it!
;2)13, ;4, ; 5000, - 111,
>&C 34%1, &D0530 and N&A
-!e generator set s!all be ordered
it! t!e folloing additional fa"ilities
in%built from t!e fa"tor*$
% ea(* dut* air filters
% Oil sump pump for eas* e(a"uation
of aste oil
% tarting batteries it! "ables and
bra"#et% ;atter* isolator
% uel pre%ilter+ater separator
inis!ed in Cummins traditional
unsell green "olour
2 Nos. 3,75,000 7,50,000.00
2. O(erseas a"tor* >nspe"tion to
itness t!e a"tor* A""eptan"e -est
9A-: of t!e
-
8/10/2019 Street Light Rehabilitation-general
46/47
450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er
). Complete too# #it for t!e maintenan"e
of poer plants as des"ribed in t!e
te"!ni"al spe"ifi"ations and as
re"ommended b* t!e manufa"turers
2 ets 500,000 1,000,000.00
7. abri"ate and install an insulated metal
!ood to du"t t!e generator radiator !ot
air e'!aust to t!e outside t!roug! t!e
metal in t!e all to super(ising
&ngineerFs detail
2 ets 225,000 450,000.00
. uppl* and install plate mounted a'ial
fan e'tra"tor "omplete it! industrial
fan "ontroller and air operated =ou(re
s!utters and 4%pole, single p!ase motor
to >55.
2 ets 55,000 110,000.00
. 1500= 9litre: diesel fuel storage da* tan#of re"tangular ma#e it! s!eet steel of
4mm t!i"#ness on a 1000mm !ig!
pedestal "omplete it! fuel line pipe
or#, su"! as gate (al(es and
a""essories et"
2 ets )00,000 1,200,000.00
10. 2+ 92.: Gdut*standb*H diesel tuel
pump "omplete it! "ontrol panel, dut*
sele"t sit"! and fuel pipe
or#a""essories
4 Nos. 55,000 220,000.00
11. >nstallation a""essories s!all in"lude
"able tra*s, unistru"t et". and ot!erne"essar* materials
=ot um 100,000.00
12. Allo for t!e operation and
maintenan"e it!in t!e first )%mont!s of
defe"t liabilit* period after t!e
"ommissioning of t!e proIe"t
% % 3,500,000.00
%KVA C-0 G10 S12
SUB TOTAL
#!"%#*"'%%.%%
MOE/ST. REH/ MICHEAL IBRU RD./PG.!
PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG
MICHEAL IBRU ROAD (EMIRS PALACE JUNTION MARABA)
S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT
SUMMARY
A. C>>= +O? % % % ,10,000.00
;. O=&,
>-->N&
% % % 34,))2,500.00
-
8/10/2019 Street Light Rehabilitation-general
47/47
C. CA;=& % % % 14,55,000.00
D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 5,)3,335.00