FLORENTIA TOWNHOMES #3025808 STREAMLINE DESIGN REVIEW APPLICATION SDCI # 3025808 126 W. Florentia Street Seale, WA 98119 Applicant: Click Architects 609 W. Dickson Street Suite 105 Fayeeville, AR 72701 Contact: Cheryl Click Owner: Okom Homes LLC 822 27th Ave Seale, WA 98122 Contact: Carlos Roldan SDCI Contact: Colin R. Vasquez [email protected] 206.684.5639

Upload: others

Post on 09-Feb-2021

11 views

Category:

Documents


0 download

TRANSCRIPT

  • FLORENTIA TOWNHOMES #3025808

    STREAMLINE DESIGN REVIEW APPLICATION

    SDCI # 3025808126 W. Florentia Street

    Seattle, WA 98119

    Applicant:Click Architects

    609 W. Dickson StreetSuite 105

    Fayetteville, AR 72701Contact: Cheryl Click

    Owner:Okom Homes LLC

    822 27th Ave Seattle, WA 98122

    Contact: Carlos Roldan

    SDCI Contact:Colin R. Vasquez

    [email protected]

  • FLORENTIA TOWNHOMES #3025808

    2

    PROJECT SITE

    TABLE OF CONTENTS

    Site Location and Zoning 3Urban Analysis 4Neighborhood Character 5Street Views 6Existing Site Conditions 7

    Priority Design Guidelines 8-10Requested Adjustment 11Neighbor Alignment 12Site Planning + Landscape Approach 13Landscaping Plants 14Lighting Approach 15

    Floor Plans 16-19Elevations + Materials 20-21Color Renderings 22-26

    Click Architects Work Examples 27

    CONTEXT

    APPROACH

    DESIGN

    TABLE OF CONTENTS

  • FLORENTIA TOWNHOMES #3025808

    3

    PROJECT INFORMATION

    SITE LOCATION126 W. FlorentiaSeattle, WA 98119

    PROGRAMSite Area: 5,400 SFSite Zone: LR2Number of Residential Units: 4Number of Parking Stalls: 4Approx. FAR (Overall) = 6,480 SFApprox. FAR Per Unit = 1,620 SF

    ADJUSTMENTS REQUESTEDNone

    DEVELOPMENT OBJECTIVEThe project proposes construction of (2) new multi-family residential building containing (4) total townhouse units with (4) parking stalls off the alley. The existing single-famiy residence on the project parcel will be demolished. The proposed townhomes promote thoughtful density in Seattle and help to create desirable housing for the urban lifestyle. These townhouses are ideal for Seattle’s proposed density planning due to their proximity to principal arterial and commercial zoning.

    SITE

    ZONING MAP VICINITY MAP

    NEIGHBORHOOD OUTLOOKThe residences along the north side of West Florentia Street and to the north of the site consist of multi-family and single family homes. Across the street is a multi-level retirement home and David Rodgers Park. Seattle Pacific University is located just north of the site and within walking distance. Public transportation is a block away along 3rd Avenue West. There is easy access to Fremont core and the Burke Gilman trail by way of biking, walking, or using public transportation.

    SITE LOCATION AND ZONING

    SHEET TITLE

    01

    08/24/2016DATE:

    PASV

    Oko

    m H

    omes

    Dev

    elop

    men

    t at:

    126

    W. F

    LORE

    NTI

    A S

    TREE

    TSe

    attle

    , WA

    981

    1945'-0"

    7'-0

    "32

    '-0"

    16'-0

    "32

    '-0"

    33'-0

    "

    119'

    -11

    3/4"

    5'-0"17'-6"17'-6"5'-0"PRIMARY ENTRANCE PATH

    TO UNIT #1

    PRIMARY ENTRANCE PATHTO UNIT #3-4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    ENTRY UNIT 3

    WALKWAY

    PRIMARY ENTRANCE PATHTO UNIT 4

    EXISTING CURB CUT TO BEREMOVED - EXISTINGSIDEWALKS, PLANTINGSTRIP, AND STREET TREESTO REMAIN

    ENTRY TO UNIT 4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    13'-11" WIDE EXISTINGCONCRETE ALLEY

    PROPERTY LINE

    SETBACK (DASHED)

    PROPOSEDTOWNHOUSE

    (UNIT 1)1,600 SF +/-

    WEST FLORENTIA STREET

    EXISTINGSIDEWALK

    FRON

    TSE

    TBAC

    K

    COURTYARDAMENTIY AREA

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    WALKWAY

    PROPOSEDTOWNHOUSE

    (UNIT 2)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 3)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 4)1,600 SF +/-

    ENTRYENTRY

    ENTRY ENTRY

    LOT

    DEPT

    H

    LOT WIDTH

    SEPA

    RATI

    ONUN

    ITUN

    IT

    UNIT UNITSIDE SIDE

    N

    SCALE: 1/16" = 1'-0"1 Site Plan

    PROJECT ADDRESS:126 W. Florentia StreetSeattle, WA 98119

    PROJECT DESCRIPTION:Demo existing SFR and construct (4) Townhomes with surfaceparking.

    LEGAL DESCRIPTION:Lot 11 and the West half of Lot 12, Block 62, Denny and Hoytsaddition to the City of Seattle, According to the plat thereof,recorded in Volume 2 of Plats, Page 136, records of KingCounty, Washington.

    TAX ID NUMBER:197220-5555

    LAND USE:

    Zone: LR2

    Lot Area: 5,399 SF

    PROJECT TEAM:

    Owner:Okom Homes, LLCFelipe Sanchez822 27th AveSeattle, WA 98122

    Architect:Click ArchitectsCheryl Click291 S Hill AveFayetteville, AR 72701p. [email protected]

    SHEET TITLE

    01

    08/24/2016DATE:

    PASV

    Oko

    m H

    omes

    Dev

    elop

    men

    t at:

    126

    W. F

    LORE

    NTI

    A S

    TREE

    TSe

    attle

    , WA

    981

    19

    45'-0"

    7'-0

    "32

    '-0"

    16'-0

    "32

    '-0"

    33'-0

    "

    119'

    -11

    3/4"

    5'-0"17'-6"17'-6"5'-0"PRIMARY ENTRANCE PATH

    TO UNIT #1

    PRIMARY ENTRANCE PATHTO UNIT #3-4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    ENTRY UNIT 3

    WALKWAY

    PRIMARY ENTRANCE PATHTO UNIT 4

    EXISTING CURB CUT TO BEREMOVED - EXISTINGSIDEWALKS, PLANTINGSTRIP, AND STREET TREESTO REMAIN

    ENTRY TO UNIT 4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    13'-11" WIDE EXISTINGCONCRETE ALLEY

    PROPERTY LINE

    SETBACK (DASHED)

    PROPOSEDTOWNHOUSE

    (UNIT 1)1,600 SF +/-

    WEST FLORENTIA STREET

    EXISTINGSIDEWALK

    FRON

    TSE

    TBAC

    K

    COURTYARDAMENTIY AREA

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    MEDIUMPARKINGSPACE

    WALKWAY

    PROPOSEDTOWNHOUSE

    (UNIT 2)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 3)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 4)1,600 SF +/-

    ENTRYENTRY

    ENTRY ENTRY

    LOT

    DEPT

    H

    LOT WIDTH

    SEPA

    RATI

    ONUN

    ITUN

    IT

    UNIT UNITSIDE SIDE

    N

    SCALE: 1/16" = 1'-0"1 Site Plan

    PROJECT ADDRESS:126 W. Florentia StreetSeattle, WA 98119

    PROJECT DESCRIPTION:Demo existing SFR and construct (4) Townhomes with surfaceparking.

    LEGAL DESCRIPTION:Lot 11 and the West half of Lot 12, Block 62, Denny and Hoytsaddition to the City of Seattle, According to the plat thereof,recorded in Volume 2 of Plats, Page 136, records of KingCounty, Washington.

    TAX ID NUMBER:197220-5555

    LAND USE:

    Zone: LR2

    Lot Area: 5,399 SF

    PROJECT TEAM:

    Owner:Okom Homes, LLCFelipe Sanchez822 27th AveSeattle, WA 98122

    Architect:Click ArchitectsCheryl Click291 S Hill AveFayetteville, AR 72701p. [email protected]

  • FLORENTIA TOWNHOMES #3025808

    4

    2

    1

    3

    4

    5

    6

    7

    8

    10

    9

    5 MIN

    .

    10 M

    IN.

    15 MIN

    .

    URBAN ANALYSIS KEY

    PRIMARY ACCESS ROAD

    NODE

    POINT OF INTEREST

    WALKSHED

    PROJECT SITE

    #

    DAVID RODGERS PARK

    QUEENANNEBOWLPLAYFIELD

    MT. PLEASANT CEMETERY

    SEATTLE PACIFIC

    UNIVERSITY

    FREMONTCUT

    PCC NATURAL FOODS

    SHEET TITLE

    01

    08/24/2016DATE:

    PASV

    Oko

    m H

    omes

    Dev

    elop

    men

    t at:

    126

    W. F

    LORE

    NTI

    A S

    TREE

    TSe

    attle

    , WA

    981

    19

    45'-0"

    7'-0

    "32

    '-0"

    16'-0

    "32

    '-0"

    33'-0

    "

    119'

    -11

    3/4"

    5'-0"17'-6"17'-6"5'-0"PRIMARY ENTRANCE PATH

    TO UNIT #1

    PRIMARY ENTRANCE PATHTO UNIT #3-4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    ENTRY UNIT 3

    WALKWAY

    PRIMARY ENTRANCE PATHTO UNIT 4

    EXISTING CURB CUT TO BEREMOVED - EXISTINGSIDEWALKS, PLANTINGSTRIP, AND STREET TREESTO REMAIN

    ENTRY TO UNIT 4

    EXISTING STRUCTURE TOBE REMOVED - SHOWNDASHED

    13'-11" WIDE EXISTINGCONCRETE ALLEY

    PROPERTY LINE

    SETBACK (DASHED)

    PROPOSEDTOWNHOUSE

    (UNIT 1)1,600 SF +/-

    WEST FLORENTIA STREET

    EXISTINGSIDEWALK

    FRON

    TSE

    TBAC

    K

    COURTYARDAMENTIY AREA

    MEDIUMPARKING

    SPACE

    MEDIUMPARKING

    SPACE

    MEDIUMPARKING

    SPACE

    MEDIUMPARKING

    SPACE

    WALKWAY

    PROPOSEDTOWNHOUSE

    (UNIT 2)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 3)1,600 SF +/-

    PROPOSEDTOWNHOUSE

    (UNIT 4)1,600 SF +/-

    ENTRYENTRY

    ENTRY ENTRY

    LOT

    DEPT

    H

    LOT WIDTH

    SEPA

    RATI

    ONUN

    ITUN

    IT

    UNIT UNITSIDE SIDE

    N

    SCALE: 1/16" = 1'-0"1 Site Plan

    PROJECT ADDRESS:126 W. Florentia StreetSeattle, WA 98119

    PROJECT DESCRIPTION:Demo existing SFR and construct (4) Townhomes with surfaceparking.

    LEGAL DESCRIPTION:Lot 11 and the West half of Lot 12, Block 62, Denny and Hoytsaddition to the City of Seattle, According to the plat thereof,recorded in Volume 2 of Plats, Page 136, records of KingCounty, Washington.

    TAX ID NUMBER:197220-5555

    LAND USE:

    Zone: LR2

    Lot Area: 5,399 SF

    PROJECT TEAM:

    Owner:Okom Homes, LLCFelipe Sanchez822 27th AveSeattle, WA 98122

    Architect:Click ArchitectsCheryl Click291 S Hill AveFayetteville, AR 72701p. [email protected]

    3RD

    AV

    ENU

    E W

    EST

    WEST NICKERSON

    KNOLL’S TROLL

    P-PATCH

    MAYFAIR PARK

    FREMONT BRIDGE

    NICKERSON SALOON

    URBAN ANALYSIS

    BURKEGILMAN

    TRAIL

    WEST FLORENTIA

  • FLORENTIA TOWNHOMES #3025808

    5

    1

    2

    3

    5

    6

    7 10

    9

    8

    4FREMONT PCC NATURAL MARKET

    TROLL’S KNOLL P-PATCH

    FREMONT CUT SEATTLE PACIFIC UNIVERSITY

    MAYFAIR PARK

    QUEEN ANNE BOWL PLAYFIELD

    FREMONT BRIDGE

    BURKE GILMAN TRAIL

    DAVID RODGERS PARK

    NICKERSON STREET SALOON

    NEIGHBORHOOD CHARACTER

  • FLORENTIA TOWNHOMES #3025808

    6

    SITE

    STREET LOOKING NORTH (A)

    STREET LOOKING SOUTH (B)

    ACROSS FROM SITE

    AB

    STREET VIEWS

  • FLORENTIA TOWNHOMES #3025808

    7

    LEGAL DESCRIPTIONLot 11 and the west half of Lot 12, Block 62, Denny and Hoyts addition to the city of Seattle. According to the plat thereof, recorded in volume 2 of plats, page 136, records of King County, Washington.

    EXISTING SITEThe project site (APN: 197220-555) is located on West Florentia Street. Queen Anne Avenue to the East, 3rd Avenue West to the West, West Etruria Street to the North and David Rodgers Park to the South. To the east and west of the site is a mix of multi-family houses and single family homes. Opposite of the site is a multi-level retirement home and a larger building for Cascade Parent Partnership Program. The subject parcel is 5,400 SF and measures roughly 45’-0” wide by 120’-0” deep. The site slopes from south to north, with an overall grade change in this direction of approximately 10 feet. Currently, there is a single family home approximately 1,720 SF and a detached garage of 218 SF on site.

    EXISTING TREESThe current survey shows two trees on the property. CH16 is a Cherry tree approx. 16 inches in diameter and A12 is an Apple tree that is approx. 12 inches in diameter. Per Director’s Rule 16-2008, existing trees CH16 and A12 are not exceptional and will be removed for the development of the four townhomes. Flowering Cherry trees are considered exceptional at 23 inches in diameter and Apple trees at 20 inches in diameter. These two trees do not meet the exceptional tree requirements.

    EXISTING SITE CONDITIONS

  • FLORENTIA TOWNHOMES #3025808

    8

    GUIDELINE DESCRIPTION SUB-GUIDELINE NOTES EARLY RESPONSE

    CS1. Natural Systems and Site Features Use natural systems and features of the site and its surrounding as a starting point for project design.

    D. Plants and Habitat CS1.D.1. On-Site Features: Incorporate on-site natural habitats and landscape elements such as: existing trees, native plant species or other vegetation into project design and connect those features to existing networks of open spaces and natural habitats.

    When possible, the existing trees will be saved and incorporated into the landscape design. Native plant species will be planted along Florentia, along the pedestrian walkways, and in courtyard public amenity space.

    CS2. Urban Pattern and Form Strengthen the most desirable forms, characteristics, and patterns of the streets, block faces, and open spaces in the surrounding area.

    A. Location in the City and NeighborhoodB. Adjacent Sites, Streets, and Open SpacesC. Relationship to the BlockD. Height, Bulk, and Scale

    CS2.A.2. Architectural Presence: Evaluate the degree of visibility or architectural presence that is appropriate or desired given the context, and design accordingly...may be better suited to a simpler but quality design that contributes to the block as a whole. Encourage all building facades to incorporate design detail, articulation and quality materials.CS2.B.2. Connection to the Street: Identify opportunities for the project to make a strong connection to the street and carefully consider how the building will interact with the public realm.CS2.C.2. Mid-Block Sites: Look to the use and scale of adjacent buildings for clues about how to design a mid-block building. Where adjacent properties are undeveloped or underdeveloped, design the party walls to provide visual interest through materials, color, texture, or other means.CS2.D.1. Existing Development and Zoning: Review the height, bulk, and scale of neighboring buildings as well as the scale of development anticipated by zoning for the area to determine an appropriate complement and/or transition.

    This project proposes the use of durable, quality materials that can be seen throughout the neighborhood on homes of varying ages. The project is located mid-block where multi-family developments are slowly infilling the properties of single family dwellings. While the adjacent properties are still single family dwellings, this project focuses on the future of the street and proposes the front facade to have a presence and connection with pedestrians by building to the front yard setback.

    PL1. Open Space and Connectivity Complement and contribute to the network of open spaces around the site and the con-nections among them.

    B. Walkways and ConnectionsC. Outdoor Uses and Activities

    PL1.B.1. Pedestrian Infrastructure: Connect on-site pedestrian walkways with existing public and private pedestrian infrastructure, thereby supporting pedestrian connections within and outside the project.PL1.C.1. Selecting Activity Areas: Concentrate activity areas in places with sunny exposure, views across spaces, and in direct line with pedestrian routes.

    The project proposes parking off the alley and shared walk-ways along the east side of the property. This allows for easy access to parking, as well as, the sidewalk that connects you to transit, bike trails, and local parks. The public amenity area located between the two structures will have plenty of natu-ral light from the West and along the walkway to the East.

    PL2. Walkability Create a safe and comfortable walking environment that is easy to navigate and well-connected to existing pedestrian walkways and features.

    A. AccessibilityB. Safety and SecurityD. Wayfinding

    PL2.A.2. Access Challenges: Add features to assist pedestrians in navigating sloped sites, long blocks, or other challenges. PL2.B.2. Lighting for Safety: Provide lighting at sufficient lumen intensities and scales, including pathway illumination, pedestrian and entry lighting, and/or security lights. PL2.D.1. Design is Wayfinding: Use design features as a means of wayfinding wherever possible, and provide clear directional signage where needed.

    The project proposes walkable paths from the streetside sidewalk to all units and from the alley to all units. The walkable path will be well lit with path lighting and entry lights. Signage will be provided at each entry and as necessary to for a clear directional path to the units.

    PL3. Street Level Interaction Encourage human interaction and activity at the street-level with clear connections to building entries and edges.

    A. EntriesC. Residential Edges

    PL3.A.1.d. Individual entries to ground-related housing should be scaled and detailed appropriately to provide for a more intimate type of entry. The design should contribute to a sense of identity, opportunity for personalization, offer privacy, and emphasize personal safety and security for building occupants. PL3.C.1. Security and Privacy: Provide security and privacy for residential buildings through the use of a buffer or semi-private space between the development and the street or neighboring buildings.

    This project focuses on individuality of each unit. We are proposing a building that works compositionally as a whole, rather than, repeating the units. This allowed for two totally separate entries and a design that has a profound presence on the street. Each entry has a covered canopy or building cantilever for protection and security. There is an abundance of landscaping, hardscaping, unit numerals, and lighting to give each unit a sense of privacy and ownership.

    DESIGN GUIDELINES

  • FLORENTIA TOWNHOMES #3025808

    9

    GUIDELINE DESCRIPTION SUB-GUIDELINE NOTES EARLY RESPONSE

    PL4. Active Transportation Incorporate design features that facilitate active forms of transportation such as walking, bicycling, and use of transit.

    A. Entry Locations and RelationshipsB. Planning Ahead for BicyclistsC. Planning Ahead for Transit

    PL4.A.1. Serving all Modes of Transit: Provide safe and convenient access points for all modes of travel.PL4.B.1. Early Planning: Consider existing and future bicycle traffic to and through the site early in the process so that access and connections are integrated into the project along with other modes of travel.PL4.C.3. Transit Connections: ...Identify where the nearest transit stops and pedestrian routes are and include design features and con-nections within the project design as appropriate.

    The project has taken into account the lack of exterior storage for projects of this nature and has provided a private outdoor storage large enough for bicycles, yard tools, grills, and other outside equipment that one might need. This storage is easily accessed from the public walkway on the East through the back covered patio on each unit. The project is located within walking distance to numerous bus stops and bike paths.

    DC1. Project Uses and Activities Optimize the arrangement of uses and activities on site.

    A. Arrangement of Interior UsesB. Vehicular Access and CirculationC. Parking and Service Uses

    DC1.A.4. Views and Connections: Locate interior uses and activities to take advantage of views and physical connections to exterior spaces and uses, particularly activities along sidewalks, parks, and other public spaces.DC1.B.1. Access Location and Design: Choose locations for vehicular access, service uses, and delivery areas that minimize conflict be-tween vehicles and non-motorists whenever possible. DC1.C.3. Multiple Uses: Design parking areas to serve multiple uses such as children’s play space, outdoor gathering areas, sports courts, woonerf, or common space in multifamily projects.

    Each entry is designed for privacy and safety, however, the floor plan opens up toward the shared amenity space and added glazing on upper levels for territorial views and connection to the neighborhood. Four parking spaces are located off the existing alley and could be used for outdoor gathering or multifamily projects. Trash collection is located off the alley behind an enclosure designed to fit with the design of the building. These will be visually appealing and provide extra storage for each unit.

    DC2. Architectural Concept Develop an architectural concept that will result in a unified and functional design that fits well on the site and within its surroundings.

    A. MassingB. Architectural and Facade CompositionC. Secondary Architectural FeaturesD. Scale and TextureE. Form and Function

    DC2.A.2. Reducing Perceived Mass: Use secondary architectural elements to reduce the perceived mass of larger projects. Consider creating recesses or indentations in the building envelope; adding balconies, bay windows, porches, canopies or other elements; and/or highlighting building entries.DC2.B.1. Facade Composition: Design all building facades - including alleys and visible roofs - considering the composition and architectural expression of the building as a whole.DC2.C.1. Visual Depth and Interest: Add depth to facades where appropriate by incorporating balconies, canopies, awnings, decks, or other secondary elements into the facade design.DC2.D.1. Human Scale: Incorporate architectural features, elements, and details that are of human scale into the building facades, entries, retaining walls, courtyards, and exterior spaces in a manner that is consistent with the overall architectural concept.DC2.E.1. Legibility and Flexibility: Strive for a balance between building legibility and flexibility. Design buildings such that their primary functions and uses can be readily determined from the exterior, making the building easy to access and understand.

    This project has been approached with the human-scale and massing in mind. Starting with the composition of the building as a whole rather than individual units, we were able to create a structure that adds visual depth and interest on the front facade for a cohesive design. The massing of the building has been broken down into vertical segments highlighting the use of the materials chosen. The siding materials chosen have been designed for a tangible experience and help humanize the scale of the building. Once you arrive to the roof top deck, we propose steel guardrails to lighten the overall massing of the building.

    DESIGN GUIDELINES

  • FLORENTIA TOWNHOMES #3025808

    10

    GUIDELINE DESCRIPTION SUB-GUIDELINE NOTES EARLY RESPONSE

    DC3. Open Space Concept Integrate open space design with the design of the buildings so that each complements the other.

    A. Building-Open Space RelationshipB. Open Spaces Uses and ActivitiesC. Design

    DC3.A.1. Interior/Exterior Fit: Develop an open space concept in conjunction with the architectural concept to ensure that interior and exterior spaces relate well to each other and support the functions of the development.DC3.B.4. Multifamily Open Space: Design common and private open spaces in multifamily projects for use by all residents to encourage physical activity and social interaction. DC3.C.2. Amenities and Features: Create attractive outdoor spaces well-suited to the uses envisioned for the project. Use a combination of hardscape and plantings to shape these spaces and to screen less attractive areas as needed.

    All four units have private and shared amenity space. Each unit has a private covered patio on the ground level and roof top decks with potential views of Fremont Canal, downtown Fremont, and territorial. Shared amenity space includes; street frontage, between buildings, and the parking stalls off the alley. Hardscape and native plants will be used to enhance the natural feel of these areas.

    DC4. Exterior Elements and Materials Use appropriate and high quality elements and finishes for the building and its open spaces.

    A. Exterior Elements and FinishesC. LightingD. Trees, Landscape and Hardscape Materials

    DC4.A.1. Exterior Finish Materials: Building exteriors should be con-structed of durable and maintainable materials that are attractive even when viewed up close. DC4.C.1. Functions: Use lighting both to increase site safety in all locations used by pedestrians and to highlight architectural or land-scape details and features such as entries, signs, canopies, plantings, and art.DC4.D.2. Hardscape Materials: Use exterior courtyards, plazas, and other hard surfaced areas as an opportunity to add color, texture, and/or pattern and enliven public areas through the use of distinctive and durable paving materials.

    Materials for this project were chosen for their tangibility, durability, and quality. These include, modular brick, hardie lap siding, stained wood siding, and concrete. The materials are durable, weather appropriate, and bring a sense of place to the project. Canopies, lighting, and landscaping will be used in conjunction with hardscape to help bring warmth, color, and sense of place to the exterior. Permeable paving will be used at the parking stalls and shared amenity space, which adds an extra layer of texture and detail to the site.

    DESIGN GUIDELINES

  • FLORENTIA TOWNHOMES #3025808

    11REQUESTED ADJUSTMENT

    REQUESTED ADJUSTMENT

    STANDARD: SMC 23.45.518. TABLE A SETBACKS

    REQUIREMENT: Per Table A 23.45.518 Townhouses in LR zones are requied to have the following setbacks. FRONT: 7’-0” Average; 5’-0” Minimum REAR: 7’-0” Average; 5’-0” Minimum SIDE: 5’-0” if < 40’; 7’-0” Avg.. OR 5’-0” Min. if >40’

    ADJUSTMENT REQUEST: Side setback set to 4’-8” at accent brick locations at TH 2 and TH 3. (Accent brick length is approx. 8’-5”)

    JUSTIFICATION:Brick accent is used on the front and side facades to help bring texture, modulation, and a sense of stability. Due to the site width, squeezing the brick into the required side setbacks makes the bedrooms on the ground level too small.

    The use of brick adds an additional leavel of architectural detail that pedestrains see and feel as they walk by the site, approaching from the East or West. The brick is approx. 8’-5” in width and extends from the ground to the top of the guardrail at the roof top deck.

    45'-0

    "

    7'-0" 36'-2 3/4" 13'-6 1/4" 35'-10 3/4" 27'-4 1/4"

    119'-11 3/4"

    5'-0

    "35'-0

    "5'-0

    "

    EXISTING CURB

    CUT TO BE

    REFILLED

    LINE OF EXISTING HOUSE TO

    BE DEMOLISHED

    LINE OF EXISTING

    GARAGE TO BE

    DEMOLISHED

    LINE OF RECESSED ENTRY

    LINE OF RECESSED ENTRY

    LINE OF

    NEIGHBORING

    BUILDING

    LINE OF

    NEIGHBORING

    BUILDING

    FOUR PARKING STALLS

    SCREENING OF TRASH

    ENCLOSURES PER SMC

    23.54.040

    LINE OF BUILDING OVERHANG

    LINE OF BUILDING OVERHANG

    FACADE LENGTH BUILDING SEPARATION FACADE LENGTHSETBACK

    PROPERTY LINE

    PROPERTY LINE

    PROPERTY LENGTH

    PR

    OP

    ER

    TY

    LIN

    E

    PR

    OP

    ER

    TY

    LE

    NG

    TH

    FA

    CA

    DE

    LE

    NG

    TH

    SE

    TB

    AC

    KS

    ET

    BA

    CK

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    W. F

    LO

    RE

    NT

    IA

    ALLE

    Y

    TH ONE

    1,563 SF *

    PROPOSED

    WALKWAY

    PROPOSED

    WALKWAY

    TR

    AS

    H E

    NC

    LO

    SU

    RE

    1,2

    ,3,4

    86

    SF

    SETBACK

    TH TWO

    1,529 SF *

    TH FOUR

    1,563 SF *

    TH THREE

    1,529 SF *

    * SQUARE FOOTAGES

    BASED ON FAR

    ALLOWANCES

    AD

    J.

    SE

    TB

    AC

    K

    45'-0

    "

    7'-0" 36'-2 3/4" 13'-6 1/4" 35'-10 3/4" 27'-4 1/4"

    119'-11 3/4"

    5'-0

    "35'-0

    "5'-0

    "

    4'-8

    "

    4'-8

    "

    8'-5"

    8'-5"

    EXISTING CURB

    CUT TO BE

    REFILLED

    LINE OF EXISTING HOUSE TO

    BE DEMOLISHED

    LINE OF EXISTING

    GARAGE TO BE

    DEMOLISHED

    LINE OF RECESSED ENTRY

    LINE OF RECESSED ENTRY

    LINE OF

    NEIGHBORING

    BUILDING

    LINE OF

    NEIGHBORING

    BUILDING

    FOUR PARKING STALLS

    SCREENING OF TRASH

    ENCLOSURES PER SMC

    23.54.040

    LINE OF BUILDING OVERHANG

    LINE OF BUILDING OVERHANG

    FACADE LENGTH BUILDING SEPARATION FACADE LENGTHSETBACK

    PROPERTY LINE

    PROPERTY LINE

    PROPERTY LENGTH

    PR

    OP

    ER

    TY

    LIN

    E

    PR

    OP

    ER

    TY

    LE

    NG

    TH

    FA

    CA

    DE

    LE

    NG

    TH

    SE

    TB

    AC

    KS

    ET

    BA

    CK

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    PR

    IMA

    RY

    EN

    TR

    AN

    CE

    W. F

    LO

    RE

    NT

    IA

    ALLE

    Y

    TH ONE

    1,563 SF *

    PROPOSED

    WALKWAY

    PROPOSED

    WALKWAY

    TR

    AS

    H E

    NC

    LO

    SU

    RE

    1,2

    ,3,4

    86

    SF

    SETBACK

    TH TWO

    1,529 SF *

    TH FOUR

    1,563 SF *

    TH THREE

    1,529 SF *

    * SQUARE FOOTAGES

    BASED ON FAR

    ALLOWANCES

    AD

    J.

    SE

    TB

    AC

    K

    AD

    J.

    SE

    TB

    AC

    K

    Adjustment at TH Three - West Setback

    Adjustment at TH Two - East Setback

  • FLORENTIA TOWNHOMES #3025808

    12 NEIGHBOR ALIGNMENT

    *Approx. location of neighboring windows.

    WEST ELEVATIONS (TH ONE AND THREE)

    EAST ELEVATIONS (TH TWO AND FOUR)

    *Approx. location of neighboring windows.

  • FLORENTIA TOWNHOMES #3025808

    13SITE PLANNING + LANDSCAPE APPOARCH

    SITE PLANNING AND LANDSCAPE APPROACHThe four proposed townhomes are arranged with two facing the street and two along the alley, allowing for a shared amenity space between the two buildings. Parking for all four townhomes is located off the alley with proposed shared walkways to each unit. The units can easily be accessed from the back covered patios or through the front entry. Landscaping along the shared walkways will create an enjoyable path for the homeowners. An abundance of landscaping will be installed along the street edge to help engage the pedestrians and continue the greenery along Florentia.

  • FLORENTIA TOWNHOMES #3025808

    14 LANDSCAPE PLANTS

    GOLDEN VARIEGATED SWEET FLAG FRAGRANT SARCOCOCCA HEAVENLY BAMBOO HORSETAIL REED GRASS

    IVORY HALO DOGWOOD OAKLEAF HYDRANGEA SOFT RUSH

    SUN KING ARALIA VANCOUVER JADE BEARBERRY

    ORANGE SEDGE

    PRINCETON SENTRY GRINKGODAWYCK BEECH

  • FLORENTIA TOWNHOMES #3025808

    15

    1

    2

    3

    41

    2

    2

    2

    22

    1

    1

    1

    1

    3

    3

    4

    4

    3

    1 2 3 4

    LIGHTING APPOARCH

  • FLORENTIA TOWNHOMES #3025808

    16

    GROUND FLOOR PLAN - SITE PLAN

    FLOOR PLANS

    5'-5 1/4"17'-1 1/4"

    17'-4 1/2"5'-1"

    34'-5 3/4"

    26'-4 1/4"

    35'-10 3/4"

    7'-5" 24'-11 1/2"

    35'-9 1/2"

    17'-4 1/2"17'-1 1/4"

    34'-5 3/4"

    24'-11 1/2"

    35'-9 3/4" 27'-4 1/2"

    26'-4 1/4"

    35'-10 3/4" 3'-4 3/4"

    33'-3"

    BEDROOM11’-5”X9-8”

    ENTRY

    COVEREDPATIO

    11’-7”X13’-1”

    BATH

    BATH

    ENTRY

    BATH

    ENTRY

    ENTRY

    BATH

    STORAGE

    STORAGE

    PARKING

    TRASH

    ENCLOSURE

    TH O

    NE

    TH TW

    O

    TH TH

    REETH

    FOU

    R

    SETBACK

    SETBACK

    COVEREDPATIO

    11’-7”X13’-1”BEDROOM11’-5”X9-8”

    COVEREDPATIO

    11’-7”X13’-1”

    COVEREDPATIO

    11’-7”X13’-1”

    BEDROOM11’-5”X9-8”

    BEDROOM11’-5”X9-8”

    SETBACK

    SETBACK

    SHAREDAMENITY

    SPACE13’-6”X43’-8”

    STORAGE

    STORAGE

    N.T.S.

  • FLORENTIA TOWNHOMES #3025808

    17

    SECOND LEVEL FLOOR PLAN

    FLOOR PLANS

    37'-7 1/2" 37'-8 3/4"

    37'-7 3/4"

    34'-5 3/4"

    17'-1 1/4"17'-4 1/2"

    17'-4 1/2"17'-1 1/4"

    34'-5 3/4"

    37'-7 1/2"

    PWD.

    PWD.

    PWD.

    PWD.

    KITCHEN9’-0”X13’-2”

    OPEN TO BELOW

    OPEN TO BELOW

    TH O

    NE

    TH TW

    O

    TH TH

    REETH

    FOU

    R

    LIVING ROOM14’-5”X16’-2”

    COVERED BALCONY4’-6”X9’-5”

    KITCHEN9’-0”X13’-2”

    KITCHEN9’-7”X10’-1”

    KITCHEN9’-7”X10’-1”

    LIVING ROOM11’-10”X16’-6”

    LIVING ROOM11’-10”X16’-6”

    LIVING ROOM14’-5”X16’-2”

    F.P.

    F.P.

    F.P.

    F.P.

    COVERED BALCONY4’-6”X9’-5”

    N.T.S.

  • FLORENTIA TOWNHOMES #3025808

    18

    THIRD LEVEL FLOOR PLANS

    FLOOR PLANS

    594 sq ft

    604 sq ft

    W/D

    W/D W

    /D

    W/D

    17'-4 1/2"17'-1 1/4"

    34'-5 3/4"

    37'-7 3/4"

    37'-7 1/2"

    34'-5 3/4"

    17'-1 1/4"17'-4 1/2"

    37'-7 1/2"

    37'-7 3/4"

    BEDROOM 10’-8”X13’-10”

    BATH

    BATH

    BATH

    BATH

    BATH

    BATH

    BATH

    BATH

    TH O

    NE

    TH TW

    O

    TH TH

    REETH

    FOU

    R

    BEDROOM 10’-8”X13’-10”

    BEDROOM 12’-8”X10’-10”

    BEDROOM 12’-8”X10’-10”

    BEDROOM 11’-1”X14’-1”

    BEDROOM 11’-1”X14’-1”

    BEDROOM 10’-9”X12’-3”

    BEDROOM 10’-9”X12’-3”

    N.T.S.

  • FLORENTIA TOWNHOMES #3025808

    19

    ROOF TOP LEVEL FLOOR PLANS

    FLOOR PLANS

    N.T.S.

    34'-5 3/4"

    17'-4 1/2"17'-1 1/4"

    37'-7 3/4"

    34'-5 3/4"

    17'-1 1/4"17'-4 1/2"

    37'-7 1/2"37'-7 1/2"

    37'-7 1/2"

    ROOF DECK465 SF

    OUTDOOR BAR

    TH O

    NE

    TH TW

    O

    TH TH

    REETH

    FOU

    R

    OUTDOOR BAR

    OUTDOOR BAR

    OUTDOOR BAR

    ROOF DECK465 SF

    ROOF DECK465 SF

    ROOF DECK465 SF

    MECH.

    MECH.

    MECH.

    MECH.

  • FLORENTIA TOWNHOMES #3025808

    20

    55

    33

    3

    4

    4

    4

    WEST ELEVATIONS (TH ONE AND THREE)

    1

    44

    3

    3

    SOUTH ELEVATION - W. FLORENTIA (TH ONE AND TWO)SAME ELEVATION TH THREE AND FOUR (MIRRORED)

    PROPOSED MATERIALSThe materials chosen for this project anchor the building to the site and enhance the sense of scale. The use of modular brick and poured-in-place concrete reinforce this concept. While keeping the horizontal siding exposure to a minimum of 4-6 inches, it makes the siding more tangible and scaled appropriately. Each material is celebrated by vertical segments separated by glazing that make up the overall composition. The material colors are natural in nature and bring a sense of warmth to the site.

    ELEVATIONS + MATERIALS

    STEEL GUARDRAILS - VERTICAL

    MODULAR BRICK CONCRETE

    LAP SIDING HORIZ. WOOD SIDING

    1 2

    3

    5

    4 HARDIE PANELS6

    6

    11

  • FLORENTIA TOWNHOMES #3025808

    21

    1 3

    4

    4

    3

    4

    45

    5

    2

    3

    3

    5

    4

    5

    NORTH ELEVATION - W. FLORENTIA (TH THREE AND FOUR)SAME ELEVATION TH ONE AND TWO (MIRRORED)

    ELEVATIONS + MATERIALS

    6

    6

    STEEL GUARDRAILS - VERTICAL

    MODULAR BRICK CONCRETE

    LAP SIDING HORIZ. WOOD SIDING

    1 2

    3

    5

    4 HARDIE PANELS6

    EAST ELEVATIONS (TH TWO AND FOUR)

    PROPOSED WINDOWS - VINYL - BRONZE EXTERIOR + WHITE

    INTERIOR

    1

  • FLORENTIA TOWNHOMES #3025808

    22

    INDIVIDUALIZATIONThe overall composition of the project

    allows for separate and completely different entries.

    MODULATIONIndention at the entry and balcony along

    the street facade add modulation and architectural interest.

    ENTRY LOCATIONTownhouse units one and two are off the

    street entries with separate walkways for privacy. Townhouse units three and four are

    located along the shared walkway seen here. Landscaping, lighting, and address numbers

    will highlight the direction to their entries.

    STREET FACING GLAZINGFront facing glazing is located strategically for natural lighting from the south, as well

    as, provide extra security and safety to the street below.

    PL2.B.2, PL3.C.1

    CS2, DC2.A.2, DC2.B.1, DC2.C.1

    PL3.A.1d

    PL3.A.1d

    COLOR RENDERINGS

  • FLORENTIA TOWNHOMES #3025808

    23

    OPEN SPACE CONNECTIONThere is a strong connection between public amenity shared space and private covered patio space. These spaces are designed for flexibility and interaction.

    MATERIAL TEXTURE AND DETAIL / PRESENCEIt is important for this project to incorporate materials that are durable and long lasting and have a strong architectural presence to the street. Modular brick and poured-in-place is used to anchor the building to the ground and give a sense of stability. The horizontal siding exposure is kept at maximum of 4-6 inches to keep the siding at a more tangible, human-like scale.

    CS2.A.2, DC2.D.1

    PL1.B.1, DC2.E.1

    COLOR RENDERINGS

  • FLORENTIA TOWNHOMES #3025808

    24

    ON-SITE CONNECTIONThe shared walkway connects

    homeowners from parking at the alley through to the streetside sidewalk.

    TOPOGRAPHYThe concept for this project takes

    advantage of the topography by stepping the units and providing

    poured-in-place concrete steps and retaining walls for easy access from

    parking off the alley.

    TRANSITAdequate storage is provided

    on covered patios for bicycles, skateboards, etc. Walking distance

    to public transit is only a block away.

    PL4.B.1

    PL1.B.1, DC3.C.2

    CS1-D.1

    COLOR RENDERINGS

  • FLORENTIA TOWNHOMES #3025808

    25

    LANDSCAPING / WAYFINDINGA well thought-through landscaping plan provides privacy and a sense of place for the homeowners. While the hardscape enhances wayfinding.

    TRANSPARENCY / MASSINGPortions of the roof top deck guardrail are transparent to break down the massing of the building. The brick extends to the top of the guradrail to tie everything together.

    CS2, DC2.A.2, DC2.B.1

    CS1.D.1, CS2.B.2, PL2.D.1, DC3.B.4, DC4.D.2

    COLOR RENDERINGS

  • FLORENTIA TOWNHOMES #3025808

    26

    SERVICESShared enclosure off the alley houses the trash bins and provides additional

    storage for each unit.

    PARKING / ACCESSParking stalls are located off the

    alley with easy access to units by shared walkway along the east

    side of property.

    DC1.C

    DC1.B, DC1.C

    COLOR RENDERINGS

  • FLORENTIA TOWNHOMES #3025808

    27 CLICK ARCHITECTS WORK EXAMPLES