WHAT IS SEDIMENT?
Definition: “Sediment is any solid matter eroded, transported or deposited by flowing water”
‘Silt’ denotes a size range of material 0.004 to 0.062mm
![Page 3: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/3.jpg)
Sedimentation Processes
Erosion: The wearing away of the earth’s surface by surface water runoff
Transportation: Movement of eroded particles through stream channels to the point of deposition
Deposition: Deposition of eroded particles in stream channels, flood plains, reservoirs, harbours, canals etc
![Page 4: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/4.jpg)
Why is Sediment a Problem? Reservoirs:• Loss of potential water storage due to sediment
accumulation• Further reduction by evaporation due to change in lake
surface area from sediment accumulationIrrigation Canals:• Generally constructed in erodable material, so scour
and sediment deposition can occur
Degradation Below Dams:• Potential dam failure due to undermining causing
lowering of bed level downstream of wall
Power Station Turbines:• Sediment can damage blades and bearings
![Page 5: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/5.jpg)
Why Sediment Samples are Required?
Quantity and particle size of sediment is required
Particle Size:• As sediments of different size act differently, data
for particle size is important
Quantity:• Determines necessity for and type of
sediment removal devices
Samples should be taken regularly and at different gauge heights (full range)
![Page 6: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/6.jpg)
Theory of Sediment Transport
Suspended Load:Material that moves along the stream in suspension
Contact Load: Material that rolls or slides along bed of stream
Bed Load = Coarse material moving near the bed (i.e. Contact Load and Saltation Load and other particles that cannot be sampled by a
suspended load sampler)
Saltation Load:Material ‘bounding’ along the stream bed, in contact with bouncing particles which may force other particles upwards for a short period of time
![Page 7: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/7.jpg)
Effects of Sedimentation
![Page 8: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/8.jpg)
Sampling Equipment Depth Integrating Type:• By traversing the stream at a uniform speed the sampler is
moved through each vertical to receive a sample proportional to stream velocity
• Sampler is designed to fill at a rate proportional to the velocity of the approaching flow
• One sample per vertical is taken by lowering and raising the sampler to and from the stream bed to achieve a representation of mean concentration and particle size in each vertical
• Attached to a gauging rod or handline
DH-59 DH-48
![Page 9: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/9.jpg)
Depth Integrated Sampling
![Page 10: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/10.jpg)
Sampling Equipment Point Integrating Type:• Sampler remains stationary at each point on the
vertical with electrical activation of sampler at specific point on vertical
• Samples are integrated or ‘added-up’ on each vertical over a period of time
• Allows mean concentration of sediment to be determined
• Usually suspended from a gauging winch
P 61
![Page 11: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/11.jpg)
Sampling Equipment Bed Load Samplers:
• Designed to sample sand, silt, gravel or rock in close proximity to stream bed
• Samples collected in a polyester/monofilament bag or scoop
• Suspended from either a gauging rod or winch
BLS30 / BLS48BLSHVan Veen Grab
![Page 12: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/12.jpg)
Bed Load Sampling
![Page 13: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/13.jpg)
Sampling Equipment Static Samplers:
• Free standing or mounted on trees, bridge piers, gauge posts to obtain discreet samples at set gauge heights
• Sample bottles are replaced after flood events
Rising Stage Sampler
![Page 14: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/14.jpg)
Sampling Equipment
Grab Sample:
• Water scooped up in bottle manually
• Water ‘pumped’ into plastic bladders
• Sample preservation and chain of custody
![Page 15: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/15.jpg)
Sampling Equipment
Automatic Sampler:
• Water pumped from stream and bottles filled
• Available as refrigerative or non-refrigerative
• Configured to sample at critical gauge heights or flow proportional
![Page 16: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/16.jpg)
References
• Snowy Mountains Hydro-Electric Authority – Hydrographic Course (September 1966), Volume 3
• United States Geological Survey ‘ Field Methods for Measurement of Fluvial Sediment’, Book 3, 1982.
![Page 17: STREAM SEDIMENT SAMPLING Hydrography Skills Set Training Course No. 27743 June 2012](https://reader037.vdocuments.us/reader037/viewer/2022110206/56649cdf5503460f949a947e/html5/thumbnails/17.jpg)