straw tracker na62 workshop jinr 29/11-4/12 2009

2
Straw tracker NA62 Workshop JINR 29/11-4/12 2009

Upload: jennis

Post on 09-Jan-2016

43 views

Category:

Documents


2 download

DESCRIPTION

Straw tracker NA62 Workshop JINR 29/11-4/12 2009. Goals. Present an overview of the results from the test beam 2009, simulation and 64-straw prototype activities Review status of straw material and straw production Converge on important design issues - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Straw tracker NA62  Workshop JINR  29/11-4/12 2009

Straw tracker NA62 Workshop JINR 29/11-4/12 2009

Page 2: Straw tracker NA62  Workshop JINR  29/11-4/12 2009

GoalsPresent an overview of the results from the test beam 2009,

simulation and 64-straw prototype activities Review status of straw material and straw productionConverge on important design issuesObtain a plan for the chambers design, test and simulation

programIdentify and list the issues and questions where more work is

neededAgree on sharing of the work packages in particular in the light

of the first chamber in 2010!Plan for the week:

Today: Results from beam test, simulations and prototype work

Tomorrow: Detector design and visit to the labLast day: WP list and plans – closeout