straw tracker na62 workshop jinr 29/11-4/12 2009
DESCRIPTION
Straw tracker NA62 Workshop JINR 29/11-4/12 2009. Goals. Present an overview of the results from the test beam 2009, simulation and 64-straw prototype activities Review status of straw material and straw production Converge on important design issues - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Straw tracker NA62 Workshop JINR 29/11-4/12 2009](https://reader036.vdocuments.us/reader036/viewer/2022083007/56814056550346895dabc79d/html5/thumbnails/1.jpg)
Straw tracker NA62 Workshop JINR 29/11-4/12 2009
![Page 2: Straw tracker NA62 Workshop JINR 29/11-4/12 2009](https://reader036.vdocuments.us/reader036/viewer/2022083007/56814056550346895dabc79d/html5/thumbnails/2.jpg)
GoalsPresent an overview of the results from the test beam 2009,
simulation and 64-straw prototype activities Review status of straw material and straw productionConverge on important design issuesObtain a plan for the chambers design, test and simulation
programIdentify and list the issues and questions where more work is
neededAgree on sharing of the work packages in particular in the light
of the first chamber in 2010!Plan for the week:
Today: Results from beam test, simulations and prototype work
Tomorrow: Detector design and visit to the labLast day: WP list and plans – closeout