strategy to execution: case studies of installation ...infohouse.p2ric.org/ref/41/40567.pdf•...
TRANSCRIPT
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Strategy to Execution Case studies of installation sustainability initiatives
John WuichetJMWA/IMCOM-SE
Region 4 EPA-DoD-States Environmental Conference19 June 07
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Overview
1. Inspiration
2. Perspiration
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
INSPIRATION
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Mission IntegrationHow we won the war How we win the war
Army Posture Statement & Army Plan, 2007:“Sustainable practices …enable us to deploy faster, travel farther, and sustain deployed units as long as required.”
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Buying Power
Army 5-year Furnishings Forecast: $2.3 billion
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
ArmyNavyMarinesAir Force
Geographic Influence
Finding NEMMO…
150-mi radius
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Regional Advantage
• Diversity of missions• Diversity of markets• Proximity• Economies of scale• Volunteers
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Recognition
• 2007 White House Closing the Circle Award– Sowing the Seeds of
Change• 2002 White House Closing
the Circle Award– Pollution Prevention
• 2002 – Secretary of Defense Award
• 2002 – Secretary of the Army Award
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Businesses Pursuing Sustainability
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
JacksonWhite Sands Missile Testing Center
Fort Hood
Pine Bluff Ars
McAlester AAPRed River AD
Lone Star AAP
Camp Stanley Storage Actv
Louisiana AAP
Fort Sam Houston
Corpus Christi AD
Presidio of Monterey
Fort Irwin
Yuma Proving Ground
Riverbank AAP
Sierra Army Depot
Hawthorne AD
Fort Hunter Liggett (USAR)
Parks RFTA (USAR)
Natick R&DCtr
Devens RFTA (USAR)
Fort McPhersonFort Gordon
Fort StewartHunter Army Airfield
Fort BenningFt. Gillem
Mississippi AAP
Fort BraggMOT Sunny Point
NORTHEAST
Redstone Arsenal
Holston AAP
Milan AAP
Blue Grass AD
Detroit Ars
USAG Selfridge
Fort Leavenworth
Kansas AAP
Lake City AAP
Dugway Proving Ground
Pueblo Depot
Fort CarsonTooele AD
Deseret Chem Depot
Yakima TrainingCenter
Umatilla Chem Depot
USAG Miami
Moffett FieldRFTA (USAR)
Fort MonmouthPicatinny Arsenal
Watervliet ArsFt. Hamilton
West Point
Fort Belvoir
Fort Story
Ft. AP Hill
Radford AAP
Letterkenny AD
Carlisle Barracks
Fort McNairFt. Meade
Fort Myer
Walter Reed
Ft Detrick
Tobyhanna Army Depot
Adelphi Lab Ctr
Scranton AAP
SOUTHEAST
WESTLewis
Carson
Hood Polk
Campbell Bragg
BenningRucker Stewart / HAAF
Eustis
Knox
13 installations doing sustainability planning
FY07 Installation Sustainability Efforts
Lima Army Tank Plt
Iowa AAPRock Island Arsenal
As of May 07
PANG
Installation Sustainability Planning
Letterkenny AD
DetrickAP Hill
Anniston AD
USAG-Wiesbaden
USAG-HI USAG-AK
CA ARNG
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Goals Support Core Business Processes
• Military Training/Land Management– Optimize use of existing lands– Easements/buffers around fence lines
• Transportation/Logistics– Convenient (reduced congestion)– Reliable, clean (emission-free), renewable fuels
• Facilities– Meet LEED Gold standard– Renewable, secure energy– Reduce water use, improve quality
• Regional/Community Planning– Development/growth, compatible land use, regional education
• Procurement/Contracting– Completely cyclable non-toxic materials– Buy local– Zero waste
Triple Bottom Line
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
PERSPIRATION
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Finding NEMMOSolution• “Finding New Emerging Military
Market Opportunities,” Fall 2007• Provides mission-essential
products• Transforms waste into value• Reduces transport impacts/costs• Boosts local employment• Concept exportable
Problem• Buying local is more sustainable,
but local manufacturing jobs are down 20% since 1990
• Six DoD facilities in southeast NC buy products, generate waste
• Industries in 22 counties can use our waste to make new products we, in turn, want to buy
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Water System SealantProblem• 100+ miles of wastewater
collection pipes at Ft Bragg• Infiltration/inflow can increase
wastewater costs by 1/3rd
Potential Solution• In-situ composite system
• Made from feathers• ½ the cost of pipe
replacement• Developing pilot
study
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Wood Waste
Solution• Ft Stewart foresters evaluating
cantonment area and forest wood resources in combination,
• Product(s) can be used or sold as biomass/fuel
• Transforms waste into value
Problem• Ft Stewart landfills 220 tons/mo
of C&D, pallets, storm debris• Tons of timber harvest waste
left to rot/burn on forest floor• On-site wood fired steam plant
uses wood chips from off-site
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Furniture Life-CyclesSolution• Sustainable Interiors Showcase (SIS)
–Ft Lewis, Ft Jackson, Ft Benning• Pilot study:
–How to consider lifecycle costs at time of acquisition
–Relative cost of LEED credits from furniture vs. other credits
Problem• Army 5-year furniture forecast:
$2.3 billion• Furniture disposal costs rising,
but not considered at time of purchase
• LEED furniture credits may be the cheapest, but not considered
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Mattress Life-CyclesSolutions• Ft Bragg refurbishes, saving 50%• Ft Jackson buys 100% foam units;
maker takes back and recycles• Ft Gordon donates, buys foam• Redstone Arsenal recycles coil
units for credit toward new foam
Problem• Landfills starting to ban
mattresses (not profitable: high volume/low weight)
• Recycling options very limited• Procurement alternatives few
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
Food Waste ManagementSolutions• Zero Footprint Camp• Donate edible surplus: AR 30-22
– Ft Gordon• Buy biobased cafeteriaware
– DLA: UGRs now 50% biobased– Ft Campbell, Ft Benning
• Compost remainder– on-site or with community partner
Problem• About 12% of all solid waste is
food• For IMCOM-SE, that’s about
97,800 tons/yr• Diverting food waste is difficult• Food packaging in deployed
units is a Force Protection risk
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
High-Performance BuildingsProblem• DoD FY08-13 construction
budget: $13 billion/yr• Services can’t afford O&M tail
of conventional buildings• High-performance concept
poorly understood/documented
Solutions• ESTCP fire station at Ft Bragg
- 25% less in O&M costs- 30% less energy cost- 75% less wastewater
• Beyond Army LEED Silver policy:- Ft Bragg Golden Knights - LEED Gold at no additional cost
- Ft Campbell RCI pilot - Zero Energy Housing
Solution
SOUTHEAST REGION, INSTALLATION MANAGEMENT COMMAND
SERO
John Wuichet: IMCOM-SE, [email protected], 404-464-0708
John WuichetJMWA/IMCOM-SE
404-464-0708 [email protected]