strategic planning implementation - naspd park managers forum 2002 1 strategic planning...
TRANSCRIPT
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 11
Strategic Planning• Implementation
Strategic Planning• Implementation
Daniel D. McLean, Ph.D., Daniel D. McLean, Ph.D., CPRPCPRP
Indiana State UniversityIndiana State UniversityCenter for State Park Center for State Park
ResearchResearch
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 22
Strategic planning is
above all else about creating and facilitating
change!
Strategic planning is
above all else about creating and facilitating
change!
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 33
A Strategic Planning ModelA Strategic Planning Model
Phase 5
• Responsibilities & Time-lines
• Implementation
Phase 4
•Strategic Issues•Operational Planning•Capability & Contradiction•Vision Validation
Phase 3
• Influence Scanning•Stakeholder Analysis•Evaluation & Monitoring
Phase 2
•Values Clarification•Stakeholder Identification•Vision Creation•Mission Statement
Phase I
Need and Readiness to Engage in Strategic
Planning.
Community NeedsAssessment
Management Strategies
Measurement Processes
Focus on “DoingFocus on “Doingthe Right Things.”the Right Things.”
Focus on “Doing things Right “ Focus on “Doing things Right “ through Strategic Issues through Strategic Issues
resulting resulting In goals and output andIn goals and output and
outcome objectivesoutcome objectives
Management Strategies
3
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 44
Conflicts in PlanningConflicts in Planning
Strategic IssuesStrategic Issues
EnvironmentEnvironment
MandatesMandates PolicyPolicyObjectivesObjectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 55
Conflicts in PlanningConflicts in Planning
Significant programSignificant programgrowth predictedgrowth predicted
Existing servicesExisting servicesscattered in communityscattered in community
Overcrowding ofOvercrowding ofexisting facilitiesexisting facilities
Strategic IssuesStrategic Issues
EnvironmentEnvironment
MandatesMandates PolicyPolicyObjectivesObjectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 66
Conflicts in PlanningConflicts in Planning
Significant programSignificant programgrowth predictedgrowth predicted
Existing servicesExisting servicesscattered in communityscattered in community
Overcrowding ofOvercrowding ofexisting facilitiesexisting facilities
Provision ofProvision ofSport/Recreation ProgramsSport/Recreation Programs
Provision ofProvision ofRecreation ServicesRecreation Services
Impact on PositiveImpact on PositiveQuality of LifeQuality of Life
Strategic IssuesStrategic Issues
EnvironmentEnvironment
MandatesMandates PolicyPolicyObjectivesObjectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 77
Conflicts in PlanningConflicts in Planning
Resource DevelopmentResource Development
Significant programSignificant programgrowth predictedgrowth predicted
Existing servicesExisting servicesscattered in communityscattered in community
Overcrowding ofOvercrowding ofexisting facilitiesexisting facilities
Provision ofProvision ofSport/Recreation ProgramsSport/Recreation Programs
Provision ofProvision ofRecreation ServicesRecreation Services Impact on PositiveImpact on Positive
Quality of LifeQuality of Life
Convenience &Convenience &Quality of ServicesQuality of Services
Facility CostFacility CostContainmentContainment
Efficiency ofEfficiency ofOperationsOperations
EnvironmentEnvironment
MandatesMandates PolicyPolicyObjectivesObjectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 88
Strategic Planning…Strategic Planning…The focus of strategic planning is
to cause individuals and the organization to:
1) Think strategically,
2) Learn to deal with change, and
3) Become innovative in individual approaches to focusing on the future.
The focus of strategic planning is to cause individuals and the organization to:
1) Think strategically,
2) Learn to deal with change, and
3) Become innovative in individual approaches to focusing on the future.
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 99
Setting the StageSetting the Stage Establishing working timelines Contradiction analysis Determining resource requirements Prioritizing and aligning goals and
objectives Assigning responsibilities Negotiating timelines Determining outputs & outcomes
Establishing working timelines Contradiction analysis Determining resource requirements Prioritizing and aligning goals and
objectives Assigning responsibilities Negotiating timelines Determining outputs & outcomes
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1010
PrinciplePrinciple
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1111
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1212
Working TimelinesWorking Timelines Establish working timeline for
each goal Identify expectation problems
Establish working timeline for each goal
Identify expectation problems
Strategic IssueGoal 1Goal 2Goal 3Goal 4Goal 5
0 1 2 3 4 50 1 2 3 4 5
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1616
Implementation…Implementation…It involves rethinking… Governing Body use of
strategic plan Staff perceptions & realities Organizational structure Individual accountability Budgeting processes
It involves rethinking… Governing Body use of
strategic plan Staff perceptions & realities Organizational structure Individual accountability Budgeting processes
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1818
Staff Perceptions & Realities
Staff Perceptions & Realities
Individual Concerns about implementation• Anticipated increased workloads
• Fear of unknown
• Fear of change
• Lack of skills
• Too little time to adjust
Individual Concerns about implementation• Anticipated increased workloads
• Fear of unknown
• Fear of change
• Lack of skills
• Too little time to adjust
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 1919
Realities of implementation•Shifting (and maybe increased)
workloads•Change in duties and requisite
skills and knowledge base• Individual and group
frustration• Increased organizational
awareness of future
Realities of implementation•Shifting (and maybe increased)
workloads•Change in duties and requisite
skills and knowledge base• Individual and group
frustration• Increased organizational
awareness of future
Staff Perceptions & Realities
Staff Perceptions & Realities
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2020
Organizational Structure
Organizational Structure
Strategic planning assumes that the old structure may not work in the new realities
It demands the organization think in terms of new approaches to solving existing and potential issues
Business as usual is not acceptable
Strategic planning assumes that the old structure may not work in the new realities
It demands the organization think in terms of new approaches to solving existing and potential issues
Business as usual is not acceptable
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2222
Individual Accountability
Individual Accountability
Performance appraisal systems may need to change
Outputs and outcomes tied to strategic plans
Accountability reviews frequent• At least once a quarter
Establish new reporting methods for accountability
Performance appraisal systems may need to change
Outputs and outcomes tied to strategic plans
Accountability reviews frequent• At least once a quarter
Establish new reporting methods for accountability
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2424
Implementation Responsibility Matrix
Implementation Responsibility Matrix
Strategic Planning Team
Governing Body
Administration
Staff
Strategic Planning Team
Governing Body
Administration
Staff
Presentation to BoardMonitor implementation and progressAdopt strategic planReceive progress reportsInterpret & Implement PlanAssign responsibilities Administer planMonitor & prepare progress reportsEstablish work-plansFunctionalize operational plan
Presentation to BoardMonitor implementation and progressAdopt strategic planReceive progress reportsInterpret & Implement PlanAssign responsibilities Administer planMonitor & prepare progress reportsEstablish work-plansFunctionalize operational plan
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2525
Implementation…Implementation…At the stage of implementation 3
things must occur Target dates established for
objectives (and some goals) Responsibilities assigned for
completion of goals and objectives
Budget allocated for achievement of goals and objectives
At the stage of implementation 3 things must occur
Target dates established for objectives (and some goals)
Responsibilities assigned for completion of goals and objectives
Budget allocated for achievement of goals and objectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2626
Relationships of Goals & Objectives
Relationships of Goals & Objectives
Strategic Planning Strategic Planning GoalsGoals and and objectivesobjectives are are translated as goals at the translated as goals at the DivisionDivision and and IndividualIndividual levellevel
Action PlanAction Plan
Strategic IssuesStrategic Issues
GoalsGoals
ObjectivesObjectivesStrategic Plan GoalStrategic Plan Goal
Division GoalsDivision Goals
Division ObjectivesDivision Objectives
Detail increases asDetail increases asthe process moves the process moves through the through the organizationorganization
Division Plan GoalDivision Plan Goal
Individual GoalsIndividual Goals
Individual ObjectivesIndividual Objectives
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2727
Establishing Target Dates
Establishing Target Dates
Set target dates for each task Establish a matrix depicting when
all tasks are:
• In process
• Due to be completed
Resolve conflicts Return to after responsibilities
assigned
Set target dates for each task Establish a matrix depicting when
all tasks are:
• In process
• Due to be completed
Resolve conflicts Return to after responsibilities
assigned
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 2828
Establishing ResponsibilityEstablishing
Responsibility Assign responsibility for each task
to an individual or to a team (group)
Identify what outcomes should look like (not processes)
Identify specific parameters Identify target dates Negotiate existing responsibilities
Assign responsibility for each task to an individual or to a team (group)
Identify what outcomes should look like (not processes)
Identify specific parameters Identify target dates Negotiate existing responsibilities
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3030
Performance Measures
Performance Measures
Involves… Relating organizational roles to
performance Fixing time frames for
accomplishment Identifying performance
measures
Involves… Relating organizational roles to
performance Fixing time frames for
accomplishment Identifying performance
measures
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3131
Performance Measures
Performance Measures
Operational measures•Focus on operations outputs
(e.g., budgeting, personnel administration, maintenance, etc.)
Programmatic measures•Focus on program outcomes
(e.g., program offerings, special events, site usage, etc.)
Operational measures•Focus on operations outputs
(e.g., budgeting, personnel administration, maintenance, etc.)
Programmatic measures•Focus on program outcomes
(e.g., program offerings, special events, site usage, etc.)
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3232
Performance Measures
Performance Measures
Performance measures may be the most
misunderstood aspect of Strategic Planning
— and the most dramatically changing
Performance measures may be the most
misunderstood aspect of Strategic Planning
— and the most dramatically changing
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3333
Program Outcome Model
Program Outcome Model
InputsInputs ActivitiesActivities OutputsOutputs
Services / Services / ProgramsPrograms
AquaticsAquaticsInterpretive Interpretive
ServicesServicesParksParksLodge Lodge
OperationsOperationsMaintenanceMaintenance
ProductsProductsPrograms Programs
offeredofferedNumber of Number of
ParticipantsParticipantsMedia Media
ExposureExposureHours of Hours of
serviceserviceMaintenance Maintenance
hourshours
Outcomes
Outcomes
ResourcesResources MoneyMoney StaffStaff VolunteersVolunteers Equipment & Equipment &
suppliessupplies ConstraintsConstraints LawsLaws RegulationsRegulations Funders’ Funders’
requirementsrequirements
ResourcesResourcesQuality of Quality of
experiencesexperiencesDesire to Desire to
returnreturnNew New
KnowledgeKnowledgeChanged Changed
AttitudesAttitudesModified Modified
BehaviorBehaviorImproved Improved
ConditionCondition
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3434
General categories of information to be collected on individual and program performance
• Establishes baseline data
• Allows for trend analysis
• Allows for comparative analysis
General categories of information to be collected on individual and program performance
• Establishes baseline data
• Allows for trend analysis
• Allows for comparative analysis
Performance Measures
Performance Measures
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3535
Output Measures - immediate
results of activity (quantitative)
(efficiency)
• Number of participants
• Contacts at Visitors Center
• Programs offered
• Complaints received
Output Measures - immediate
results of activity (quantitative)
(efficiency)
• Number of participants
• Contacts at Visitors Center
• Programs offered
• Complaints received
Performance Measures
Performance Measures
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3636
California ExampleCalifornia Example Interpretive Walks
•Output focused on number of participants
•Number of participants per walk rose from 15 to 45 to 60
•Number of people returning (retention) declined
Interpretive Walks•Output focused on number of
participants•Number of participants per
walk rose from 15 to 45 to 60•Number of people returning
(retention) declined
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3737
Outcome Measures - ultimate benefits from organization’s activities & participant involvement (quantitative & qualitative)(effectiveness)
• Participant perceptions of experience
• Quality of maintenance operations• Performance of Programmers
Outcome Measures - ultimate benefits from organization’s activities & participant involvement (quantitative & qualitative)(effectiveness)
• Participant perceptions of experience
• Quality of maintenance operations• Performance of Programmers
Performance Measures
Performance Measures
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3838
California ExampleCalifornia Example Interpretive Walks - Decision Mode
•Assessment showed that MOST participants did not enjoy the experience
•Determination that experience more important than numbers
•Experience measures Learn something? Enjoy the
experience? Do it again? Family activity?
Interpretive Walks - Decision Mode•Assessment showed that MOST
participants did not enjoy the experience
•Determination that experience more important than numbers
•Experience measures Learn something? Enjoy the
experience? Do it again? Family activity?
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 3939
California ExampleCalifornia Example
Interpretive Walks - Results• Interpreters felt connected
with participants
•Participant satisfaction raised to an acceptable level
•Users reported stronger feelings towards environment
Interpretive Walks - Results• Interpreters felt connected
with participants
•Participant satisfaction raised to an acceptable level
•Users reported stronger feelings towards environment
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4040
Program Outcome Model
Program Outcome Model
InputsInputs Activities
Activities
Outputs
Outputs
Services / Services / ProgramsPrograms
AquaticsAquaticsYouth Youth
ActivitiesActivitiesParksParksSeniorsSeniorsMarketingMarketing
ProductsProductsClasses Classes
taughttaughtNumber of Number of
ParticipanParticipantsts
Media Media ExposureExposure
Hours of Hours of serviceservice
Number of Number of advisory advisory meetingsmeetings
Outcomes
Outcomes
ResourcesResources MoneyMoney StaffStaff VolunteersVolunteers Equipment Equipment
& supplies& supplies ConstraintsConstraints LawsLaws RegulationsRegulations Funders’ Funders’
requiremenrequirementsts
ResourcesResourcesFeelings of Feelings of
LeisureLeisureSocial Social
BelongingBelongingNew New
KnowledgKnowledgee
Changed Changed AttitudesAttitudes
Modified Modified BehaviorBehavior
Improved Improved ConditionCondition
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4141
In Ohio…In Ohio… Vehicles parked in boat trailer areas:
•Designed a database to track (outputs)Citations Warnings
•Worked the area for educating the public (output)
•Track number of repeat offenders (output)
•Ranger time spend (output)
and…
Vehicles parked in boat trailer areas:•Designed a database to track (outputs)
Citations Warnings
•Worked the area for educating the public (output)
•Track number of repeat offenders (output)
•Ranger time spend (output)
and…
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4242
In Ohio…In Ohio… Number of warnings and
citations down 62% (outcome)
Enforcement time spent at site down 36% (outcome)
Number of warnings and citations down 62% (outcome)
Enforcement time spent at site down 36% (outcome)
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4343
Example Goal & Objectives
Example Goal & Objectives
GOAL Provide support to enhance
visitor experiences•OUTPUT OBJECTIVE
• Increase the number of visitors park staff come into contact with to provide service
Target: 15% increase
GOAL Provide support to enhance
visitor experiences•OUTPUT OBJECTIVE
• Increase the number of visitors park staff come into contact with to provide service
Target: 15% increase
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4444
Example Goal & Objectives
Example Goal & Objectives
GOAL Provide support to enhance
visitor experiences•OUTCOME OBJECTIVE
• Increase exposure of visitors to opportunities for individual and family recreation
GOAL Provide support to enhance
visitor experiences•OUTCOME OBJECTIVE
• Increase exposure of visitors to opportunities for individual and family recreation
Strategic Planning Implementation - NASPD Park Managers Forum 2002Strategic Planning Implementation - NASPD Park Managers Forum 2002 4545
Example Goal & Objectives
Example Goal & Objectives
OUTPUT• Number of
contacts
MEASURE• Count contacts
OUTPUT• Number of
contacts
MEASURE• Count contacts
OUTCOME• Quality of
contacts from visitor view
• Enhanced experiences in park
MEASURE• Questionnaires • Exit interviews
OUTCOME• Quality of
contacts from visitor view
• Enhanced experiences in park
MEASURE• Questionnaires • Exit interviews
End…End…Questions…Comments…
Experiences…
Questions…Comments…
Experiences…
Center for Center for
State Park State Park
ResearchResearch
http:naspd.indstate.edu/research/forum2002/