strategic plan – department of posts - india post linkage between strategic plan and rfd annex. ii...
TRANSCRIPT
2
Table of Contents
Section Content Page Number
Preamble 3
1 India Post’s Vision, Mission, Objectives and Functions 5
1A Vision
1B Mission
1C Objectives
1D Functions
2. Assessment of the Situation 7
2A Potential forces impacting on India Post.
2B Stakeholders and their potential roles
2C What are our strengths and Weaknesses
2D Strengths and Weakness
3 Outline of Strategy 11
3A How will we engage our stakeholders
3B How will we build our knowledge and capabilities
3C Priorities
4 Implementation Schedule Annex. I
5 Linkage between Strategic Plan and RFD Annex. II
6 Cross departmental and cross functional issues 15
6A Linkage with potential challenges likely to be addressed in the 12th Plan
6B Identification and management of cross departmental issues including resource allocation and capacity building
6C Cross functional linkages within departments / offices
6D Organisational review and role of agencies and wider public service
7 Monitoring and Reviewing arrangements 17
8 Strategic Planning process Annex.III
3
Preamble
• The Department of Posts - India Post has touched the lives of every citizen for more than 150 years, be it through mails, banking, insurance money transfer or retail services. Ever since its existence it has enjoyed the trust and support of its customers and stakeholders.
• With the spread of telephony, internet and modernised banking services, citizens are used to new level of speed, transparency and quality. This has also been the experience of other postal administrations in the world. In India, customers of the postal service expect Department of Posts to provide a service level similar to industry standards maintained by banks, insurance, express industry, etc.
• External consultations with stakeholders as a part of this Strategic Plan exercise has brought out the expectations of the customers from the Department of Posts to expand the range of its existing services with the use of IT. Some of the responses are cited below:
• During external consultations, customers expressed expectation of higher quality of services in the post offices.
• Improved quality of services
“ courteous and helpful staff” “neat, clean, spacious ...post office”, High and
standardized quality of service”, “Dynamic Queue management” , “ Total
computerisation of postal operations”
• Customers today have a number of alternatives to most of the products and service offered through the postal services. A number of e substitutes are also available. Focus on meeting the needs and expectations of the customers will be the key for the future success of the Department.
Post Forums in Project Arrow Post Offices
India Post website
“CBS to be introduced”, “on-line collection of premium to be started”, “e-Commerce tie ups” “tie up with employment exchange job portals etc to make information on employment opportunities available through Post Office”
“PLI premium and RD Deposit to be made online through net banking, debit card or ECS” “ online shopping sites for home delivery products” “ track and trace for all articles” “should issue a Digital Postal ID”.
4
• India post provides last mile delivery to important government schemes such as Mahatma Gandhi National Rural Employment Guarantee Scheme, UIDAI related services, old age pensions, scholarships to weaker sections. These programs directly impact the common citizen of the country. Improvement of quality of services and greater transparency through IT services will contribute to inclusive growth.
• As in the case of India, postal administrations the world over are also obliged to provide countrywide services and enjoy trust and loyalty of the customers. Many of the advanced postal administrations such as Duetche Posts, Poste Italiane, SwissPost, etc have inducted IT to modernise their network and thereby improve the quality of services of their core businesses as the first step. These administrations are now successfully innovating and diversifying their products and services and are further leveraging the trust of the customers by entering into new areas such as telephony, financial services, etc.
• The Universal Postal Union (a specialised agency of the United Nations) has 191 member countries including India. In the last UPU Congress in 2008 the following vision for 2008-2014 was adopted : “The Postal Sector – an essential component of the global economy.” It also stressed on three dimensional networks for postal services in the modern context – i.e., Physical, Electronic and Financial.
• This strategy document attempts to spell out how India Post will meet the needs and the expectations of the customers so that it can retain their trust and support, as well as regain lost ground due to poor quality of services.
5
Section 1: India Post’s Vision, Mission, Objectives and Functions
Section 1A: Vision
India Post’s products and services will be the customer’s first choice.
Section 1B: Mission
● To sustain its position as the largest postal network in the world touching the lives of every citizen in the country.
● To provide mail parcel, money transfer, banking, insurance and retail services
with speed and reliability. ● To provide services to the customers on value-for-money basis. ● To ensure that the employees are proud to be its main strength and serve its
customers with a human touch. ● To continue to deliver social security services and to enable last mile connectivity
as a Government of India platform.
Section 1 C: Objectives
Modernise and consolidate the network
Provide best in class customer service
Develop financial Services
Grow in existing businesses
Develop professional workforce.
2
1
3
4
5
6
1D : Functions
Functions as defined for Department of Posts in Allocation of Business Rules
1 Provision of Mail and Parcel services including premium postal products, printing of
public postage stamps/commemorative stamps and all types of postal stationery.
2 Discharge of any other agency function on behalf of the Government as well as provision of fee based third party services.
3 Matters relating to introduction, development and maintenance of all services by
the Post Office.
4 Promotion of feasibility survey, research and development in the field of activities allotted to the Department.
5 Execution of works, including purchase of land debit able to the Capital Budget
pertaining to the Department of Posts.
6 Planning, operation and maintenance of the postal and mail services network and infrastructure in the country.
7 Administration of the Postal and Rural Postal Life Insurance services.
8 Administration of the Post Office Savings Banks and Post Office Certificate Services. 9 International cooperation in matters connected with postal
communications, including matters relating to all international bodies dealing with postal communications such as Universal Postal Union, Asia Pacific Postal Union (APU), Commonwealth Postal Union.
10 Matters relating to administration of the Indian Post Office Act, 1898 and rules made there under as well as other laws or enactments having a bearing on postal activities, not specifically allotted to any other Department
7
Section 2: Assessment of the Situation
2A. Potential Forces Impacting on India Post
2.1 Need for change is driven by the following external forces : 2.1.1 Globalization impacts in India Post in two different ways:
• A high rate of economic growth opens up opportunities for expansion and
participation in the new economic activity. With growth of business transactions into and from India, the role of multinational firms as competitors to India Post poses a major challenge.
• It also opens up India Post’s formerly protected internal market to competition from multi-national providers with international brand images, deep pockets and experience in modern and technologically driven methods of doing business.
2.1.2 Entry of the private sector – with the entry of private sector in the traditional
monopoly business of India Post a level playing field needs to be established by legislative action. While the multi-national providers are providing high priced and speedy service in mail delivery, the low priced services offered by domestic couriers are under cutting India post’s business. In this context legislative process will have to carefully ensure that its interests are not adversely affected while ensuring a fair set of rules and regulations for all providers.
2.1.3 Growth of telephony - The growth and popularity of telephone – especially
mobile telephone – services has affected the traditional letter mail business. On the other hand it has opened up opportunities for hybrid services and also provides infrastructure for modernising postal products services.
2.1.4 Focus on Inclusive growth. The financial inclusion policy of the Government is pushing banks to devise new and cost effective ways of penetrating the hitherto excluded and rural population. Unless India Post moves fast to occupy this space and offer its platform to the banking system at large, it may lose the opportunity of being the best agency for providing the platform.
2.1.5 Higher level of delivery standards - The economy is now almost entirely
commercialized and the need for cash, bank and insurance transactions is clearly manifest. The mobility of the Indian population both within and without the country has led to new and exacting demands on communication and financial services. The speed with which communications and other transactions need to be executed with high degree of reliability is now measured in real time. The requirement for such services and products with improved features of accessibility, transparency, reliability and speed are clearly apparent in the market place. In this context, India Post has to enhance the quality – in speed and reliability - and offer the best value for its products and services.
2.1.6 Developments in other Postal Administrations - A number of postal
administrations have successfully modernized themselves. There is a risk of losing
8
customers of the advanced countries to other service providers in the country, if expected levels of service are not maintained by India post.
2B Stakeholders and their potential roles 2.2 India Post’s primary stakeholders are its customers, employees and the
Government of India.
2.2.1 Customers can exercise their choice as there are alternatives. Therefore retention of the existing customers is crucial as also attracting new customers.
2.2.2 The employees are India Posts main strength. The employees have supported IT
induction and the new initiatives. However, they could be a threat if change is not effectively managed.
2.2.3 Government of India as owner has been continuously supporting India Post. It
has also supported India Post in its plans to modernise, expand and enrich its product and services mix. It needs to give both legislative and financial support as well as approvals for undertaking financial services such as setting up of Post Bank and a full fledged insurance business. Government of India could also leverage India Post network to extend its services to its target population for delivery of various social security schemes. It could on the other hand opt to use or support other organizations.
2C What are our strengths and weakness?
2.3.1 Strengths
● It is the only network of post offices spread throughout the country which has the responsibility to provide communication, banking and insurance services and products to every resident.
● It has an extraordinary goodwill among the people who have no problem in gaining easy access to its network.
● It is one of the oldest institutions of the Government of India which is well known to the customers and has well established and time tested procedures.
● In the rural areas where 85% of the post offices are located the workforce is mainly local and is therefore known to the community served by the Post Office.
● It has a large and skilled manpower.
● Many of the products and services have features which are suitable for the average citizen, daily delivery on doorstep, delivery in cash at doorstep for money orders, small transactions in Post Office Savings Bank.
● Its operations are funded by the Public Exchequer.
9
2.3.2 Weaknesses
● There are legacy issues in converting a 150 year old government department to deliver quality of services and products in competition with the private sector.
● There are varying levels of infrastructure. The infrastructure is inadequate in newly developed urban pockets and in rural areas.
● Customers are unable to get full benefits of IT induction such as track and trace etc, due to limited use of technology.
● Customers have a perception of poor service.
● A number of players and substitutes operate in the market where once only India Post operated. There is no mechanism for gathering market intelligence to enable response to the changed situation.
● Partial modernisation and automation lead to lack of standardisation. Slow processing and poor reliability of services is due to lack of mechanization, interconnectivity and computerization.
● Workforce - Due to ban on recruitment in the last five years direct recruitments has been limited. Therefore workforce is ageing. The attendant problem is disparate levels of skill in using IT.
● There is a lack of performance based culture along with poor monitoring systems and ineffectual internal marketing.
● Lack of scientific costing has resulted in lack of awareness of cost of products and services.
2.3.3 Opportunities
● Given its already extensive network, it is also possible and necessary for India Post to incrementally expand its network and reach by exploring the franchisee and outsourcing models in a cost effective manner. This will enhance the overall viability and efficiency of India Post and enable the inclusion of many residents currently not being served or ill served - mainly in rural areas
● Focus on inclusive growth by the Government provides an opportunity to leverage the network for last mile delivery. Already payments are being made for MNREGS, old age and a number of other pensions. Data for Cost Price Index for rural areas is collected through the Branch Post Offices and recently the same has been brought out for the first time.
● Sustained growth in the economy means more business which provides opportunity for a variety of products such as Direct Mail, e-Commerce, B to C mails, parcels and logistic services etc.
● There is untapped potential in terms of money transfer for migrant population, small businesses which cater to all India market, mail services for recruitment by
10
organisations and transactional B to C mails. An average Indian receives 10 mail items per annum as compared to 200 mail items in Germany and 600 in US. Similarly 80% of rural market is not covered by insurance and 40% rural population has no access to institutional credit.
● India Post is presently implementing its three flagship projects - India Post 2012 for networking and IT induction in all post offices, Project Arrow for improving the look and feel of post offices and Mail Network Optimisation Project for optimising the network from collection to delivery and standardising the processes. These three projects will give platform for modernising, expanding the range of products and services and enhancing the quality of services.
2.9 Threats
• The main threat is of an underestimation of the value and potential of the extensive network of India Post and the extraordinary opportunities it presents for providing a platform for last mile delivery.
• The entry and expansion of private sector and other public sector operators in
communications, mail, banking and insurance sectors present another threat to India Post.
• An (internal) threat could be that India Post and its employees may be unwilling
or unable to meet the challenges it faces and to seize the opportunities presented to them.
Section 3 3.1 The
cu
Firs
Se
3.2 Thei.
iii.
3.3 Thestainit
•im
A:
e Strategy ustomers. Th
st Phase
cond Phase
e first phaseThe aimplem
These customprovidcapabfor imp
The acresearcthe Pocreatethree f
e second p
abilising thetiatives dev
Indiapos
Enterprise induction amodernisat
Out
is aimed ahis strategy
e
e will have activities omentation o
three promer servicee the fou
bility to do proved gov
ctivities of ch, custom
ost Bank of ed by IT inflagship pro
phase of thee changes bveloped in t
st 2012
wide IT and tion.
line of Strat
at making is marked b
To moderand the cDevelop icore busin
To implemphase. To achiev
initiatives aof the firsof the three
ojects are es, processndation fobusiness. T
vernance.
the secondmer satisfac
India. The oduction, q
ojects.
e strategy wbrought abthe first pha
Proj
• Posimpservcust
tegy
products oby two pha
rnise postalcore operatinitiatives fonesses to m
ment the
e best in cl
and activitiest theme
e ongoing fl
comprehses and cor IT basedThey will als
d theme wction surveyobjective w
quality and
will be domout by the
ase.
ject Arrow
st Office -prove qualitvices and tomer expe
of India Poses of deve
network, ptions. or modernis
meet custom
initiatives
ass custom
es around twwill revo
lagship pro
ensive ancore busined quality so call for s
will be to cys, obtain awill be to bu capability
minated by aprojects an
w
ty of
erience.
ost the first elopment-
post offices
sing and exmer expecta
developed
mer service.
wo themeslve arounjects:
d cover esses. The services a
some struct
conduct stuapprovals fuild on the y enhance
activities rend impleme
Mail NeOptimis
• Mail Nconsolidnetworkmail proautoma
choice of
s, mail offic
xpanding tations.
d in the f
s: d success
the netwo projects w
and enhantural chang
udies, markfor setting opportunit
ement by t
elating to enting the
etworking sation Proj
etowrk -date mail k, improve ocessing, a
ation.
11
its
ces
the
first
sful
ork, will
nce ges
ket up
ties the
and ject
and
12
3.4 The initiatives for the first and second phase as per our strengths and weakness are given in the following table:
Pursue policy initiatives that fit our strengths Leverage our strengths
● IT induction will make access easy and simplify use of postal service to customers.
● Improve and expand services in rural areas through rural ICT.
● Expand financial services to meet the needs of customers for no frills and simple banking and insurance facilities.
● Create synergy between various financial services to make it easier for customers who use banking, insurance and money transfer services.
● Opportunity for the staff to acquire new skills to operate in a modernised network. Lead to motivation and self esteem.
● Introduce modernised mail and money transfer products which so as to meet customer expectations.
● Provide payment gateways, multiple channels for customer service and 24x7 services.
● Increase market share in parcels, logistics, and e-commerce by leveraging IT induction.
● Upscale capacity to provide a wide range of last mile services for inclusive growth.
● Synergise virtual post office and suitable franchisee model to cover underserved areas.
● Create opportunities for the staff to
contribute in the improvement process in the organisation.
● Convert Post Offices to become places of choice for customers to do business. Improved ambience and quality of service.
● Post Bank of India for promoting financial inclusion
Defensive plan to prevent susceptibility to threats
Overcome weakness
● Strengthening the internal and external
communication as a part of image building.
● Multiple channels for customers to service their needs – call centres, portal, etc.
● Post Bank of India to counter threats from initiatives of banks for promoting financial inclusion
● Reduction of manual and repetitive work.
● Modernise internal processing and standardise operations.
● Visibility of data to customers and real time settlement of enquiries through IT induction.
● Acquire knowledge and business intelligence to improve understanding of the market.
● Standardise process, consolidation of network and overcome legacy issues.
● Use of IT for modern monitoring systems and KPIs of projects for ushering performance based culture.
● Scientific costing for true assessment of costs.
13
3 B: How will we engage our stakeholders?
• The three flagship projects are already under implementation. Due process of engagement has been followed while implementing the projects.
• The second phase involves market studies, customer surveys, consultation with government as a part of the approval process for new schemes. Consultations with staff will be taken up prior to introduction of new initiatives.
3 C: How will we build our knowledge and capabilities?
• Consultants have been associated in developing the three flagship Projects. In India Post 2012 and Mail Networking Optimisation consultants are hand holding in the implementation stage also. This is also brining in new learning and exposure to best practices and project management.
• It is proposed to use external resources for customer satisfaction survey and market research. This will be done for three years.
• International exposure to officers and supervisors on how postal administrations have modernised themselves successfully as a part of development programs and other foreign training.
• It is expected some specialised cadres will need to be inducted by suitable modes for management of specific areas such as CBS, IT maintenance.
14
3. D What are our priorities?
Number Strategic Initiative Priority
Strategic Initiative 1
Enterprise wide IT induction and modernisation of mail processes through India Post 2012.
50
Strategic Initiative 2
Enhance quality of services and improve access.
15
Strategic Initiative 3
Modernise and expand financial services
10
Strategic Initiative 4
Modernisation of Postal products and services
10
Strategic Initiative 5
Enhance professionalism and specialisation
15
Total 100
Section 4: Implementation Plan Please see attached document. Section 5: Linkage between Strategic Plan and RFD Please see attached document.
15
Section 6: Cross departmental and cross functional issues 6A Linkage with potential challenges likely to be addressed in the 12th Plan
6.1 India Post will fit into the overall policy and programs of the Government of India and meet the Challenges likely to be addressed in the 12th Plan viz.;
● Enhancing capacity for growth
○ India Post will contribute to this objective by mobilising savings through its savings bank and Post Bank services.
○ By enterprise wide connectivity India Post will be contributing to the networking process currently underway in the country. It will be a significant All-India network which both individuals, corporate. and governments can use to ensure speedy and reliable services
○ India Post will undertake an expansion of its network in the rural areas by
opening post offices and franchised outlets in underserved areas.
● Assist in empowering and informing all citizens ○ By making available a system of communication at affordable costs India
Post will be assisting in the dissemination of information. It will also put within reach of customers opportunities in distant locations without they having to go there.
● Bringing technology to improve speed of service delivery and ensure reliability of operations
○ The entire strategy of India Post is to bring technology of the best kind to the rural network to be able to deliver services at the quickest pace both on its own behalf as well as that of its clients – especially Government.
● Managing urbanization by providing a secure an effective link for migrant workers to transmit information and funds to their families.
○ Migrant workers find it difficult to establish and retain a reliable communication link with their distant home and also to transfer money and goods to their families there. India Post will make a special effort to offer services to such workers
16
6. B Identification and management of cross departmental issues including resource allocation and capacity building Consultation will be required with:
• Central Government Ministries who have schemes for financial inclusion such as Ministry of Rural Development and State Governments
• Ministry of Finance
• Ministry of Statistics and Program Implementation
• Unique Identification Authority of India
• PFRDA
• RBI
These consultations are required to be taken up at various stages of the Projects. Resource allocation cannot be anticipated at this stage.
6 C Cross functional linkages within departments / offices
Department of Posts is a single entity with functional divisions. Therefore a whole of organisation approach will be adopted.
6 D Organisational review and role of agencies and wider public service
• The interface of customers and citizens with the Department is through the post offices. These units display the delivery standards in public place. Further Post Forums are active in Project Arrow post offices where representatives can discuss the improvement initiatives in the Post Offices.
• India post is an operational department and customers can lodge their complaints in the event of failure of service, at any post office or on the Departmental website. Well established customer grievance redressal mechanism is in place.
• The strategic initiatives being adopted are in consonance with the
Administrative Reforms Commission recommendations for rationalisation. • India Post needs to plan for the long term, based on a well thought out
strategy and to institutionalize this as an on-going process, based on close monitoring, market surveillance, customer feedback, evaluation and, where necessary, course correction as the strategy is implemented.
17
Section 7: Monitoring and Reviewing arrangements
• Project Management Unit for each Project.
• Regular monitoring mechanism is in place where every fortnight Secretary reviews the performance of the Circles through Video Conferencing on Project Arrow, financial review and performance of RFD targets. Monitoring tool – Data Extraction Tool creates a dashboard for monitoring performance of project arrow post offices.
• Customer Satisfaction Survey and Market Research each year will give an indication of the performance of the business.
• Regular monitoring will be done by each Division on various operations.
.....................................
18
Annexure I
Implementation Plan for Strategic Plan 2010-15 Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
1. 1 Enterprise‐wide IT induction
1 Supply of Hardware to departmental offices. Computerise the remaining Departmental Offices.
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, Technology Division
100% computerisation of the Departmental Offices
Number 11411 Departmental post offices
Remaining post offices and 916 Mail offices, TMOs, HROs and SROs
Maintenace & monitoring
Maintenace & monitoring
Maintenace & monitoring
Reports from circles
1. Steering Committee Meetings 2. Working Committee Meetings 3. PMU Coordination & Monitoring Meetings 4. Committee meeting (Business/ Functional)
DGS&D, Mail hardware vendor/ PMU, Technology Division
2 Rural ICT solutions ‐ i. IT induction in rural post offices through development of solutions for all activities of branch post offices including introduction of new services, value additions , ii. Hard ware supply , iii. Training on new systems. iv. Network connectivity.
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, RB Division, CEPT Mysore
Project SLAs
Stage of implementation
Development, Testing and Pilot run in locations identified
Rural ICT solution rollout in all locations
Maintenance & Monitoring
Maintenance & Monitoring
Collection of data from Circle, Region and Divisional PMU using PMU Tool which will be used for gathering data
1. Steering Committee Meetings 2. Working Committee Meetings 3. PMU Coordination & Monitoring Meetings 4. Committee meeting (Business/ Functional)
Rural System Integrator/ PMU/ DoP Functional Team/ DoP Circle Team/ IT Consultant/Other SI's, CM, RB Division and CEPT Mysore
19
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
3 Integrated scalable software‐ i. Develop and implement Software for Mail solutions, ii. Develop and implement solutions for HR Administration, Servicing, Payroll, Finance & Accounts, Inventory Management) iii. Core systems integration ‐ Mails, Rural ICT, Postal Banking and Postal Life Insurance. iv. Setting up Call Centre v. Creation of a web portal
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, CEPT Mysore
Project SLAs
Stage of implementation
Design, Development and Testing of proposed solution
Pilot and Rollout of Software Solutions across all locations
Maintenance & Monitoring
Maintenance & Monitoring
Collection of data from Circle, Region and Divisional PMU using PMU Tool which will be used for gathering data
1. Steering Committee Meetings 2. Working Committee Meetings 3. PMU Coordination & Monitoring Meetings 4. Committee meeting (Business/ Functional)
Core System Integrator/ PMU/ DoP Functional Team/ DoP Circle Team/ IT Consultant/Other SI's, CM, CEPT Mysore
4 IT solutions for Postal Banking and Postal Life Insurance ‐ i. Postal Banking Solutions for all banking facilities and introduction of Core Banking Solutions, ii. Solutions for Postal Life Insurance for e‐enablement
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, CEPT Mysore
Project SLAs
Stage of implementation
Development, Testing and Rollout of CBS & PLI Solutions at pilot locations
Rollout of CBS & PLI Solutions across all locations
Maintenance & Monitoring
Maintenance & Monitoring
Collection of data from Circle, Region and Divisional PMU using PMU Tool which will be used for gathering data
1. Steering Committee Meetings 2. Working Committee Meetings 3. PMU Coordination & Monitoring Meetings 4. Committee meeting (Business/ Functional)
Financial Services System Integrator/ PMU/ DoP Functional Team (FS/ PLI)/ DoP Circle Team/ IT Consultant/Other SI's, CM and CEPT Mysore
20
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
5 Setting up of Data Centre and Disaster Recovery Centre for the enterprise wide IT induction.
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, Technology Division
Project SLAs
Stage of implementation
Primary Data Center to be setup
Disaster Recovery Center to be setup
Maintenance & Monitoring
Maintenance & Monitoring
Collection of data from Circle, Region and Divisional PMU using PMU Tool which will be used for gathering data
Same as Above
DC Service Provider/ PMU/ IT Consultant/ Other SI's, CEPT Mysore
6 Network Integration for connecting all offices .
Business Owners of the respective solutions, PMU personnel, committee members of Solution Deployment, CEPT Mysore
Project SLAs
Stage of implementation
Rollout of network at Pilot post offices/ Locations
Rollout ofNetwork at all remaining locations
Maintenance & Monitoring
Maintenance & Monitoring
Collection of data from Circle, Region and Divisional PMU using PMU Tool which will be used for gathering data
Same as Above
Network Integrator/ PMU, Technology Division
21
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
1.2 Modernisation of Mail processing
1 Mail Network optimisation Project ‐ i. Optimise mail network, ii. Define optimised processes, iii. Implement the new processes and measure as per KPIs, quality measurement through test letters Iv. Supply of mail handling tools and equipments, v. improve Look and Feel of Mail Offices
DOP Develop and implement comprehensive set of KPIs
monitoring KPIs
Optimise processes for Speed Post and develop KPIs for performance measurement for top 20 cities
Optimise processes for 1st class and second class mail in top 20 cities and develop KPIs for performance measurement, extend roll out of optimized processes in speed post for rest of 69 hubs, supply of tools and equipments, Quality measurement rhough electronic test letters
Roll out optimised processes for First and 2nd class mail and supply of equipments in rest of the country
Maintenance & monitoring
Maintenance & monitoring
Operational data extraction through software tools
Review of performance against KPIs
Air Lines and Railways to improve mail transport
22
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
2 Automation of Mail Sorting, Processing ‐ i. Setting up of automated Mail Processing Centre in metros.
DOP, Airport Authority of India/ Airport developers
No. of sites installed
Number Site preparation and procurement process for Delhi and Kolkata
Commissioning of AMPCs at Delhi & Kolkata, Finalisation of RFP for AMPCs at Mumbai, Chennai, Hyderabad & Bangalore
Completion of procurement process of AMPCs at 4 locations
Commissioning of AMPCs at Mumbai, Chennai, Hyderabad, Bangalore
Maintenance & monitoring
implementation reports
by Project management cell through system generated MIS reports
Internally‐ Estates Division, Civil & Electrical wings. Externally‐ AAI/Airport Developers
3 Mechanisation of Business Mail delivery and collection at Mail Hubs/Post Offices
DOP
Number nil Assessment of requirement and preparation of proposal
Procurement and supply of 50 vehicles
Maintenance & monitoring
Maintenance & monitoring
Reports from the Post Offices/ circles of actual supply
Centrally by MB division
Internally‐ IFW; Externally‐ Min. of Finance, DGS&D
4 Modernising monitoring of Mail Motor Vehicles through GPS.
DOP
Number Nil Set up GPS system on 100 Vehicles
Set up GPS system on 850 Vehicles
Maintenace & monitoring
Maintenace & monitoring
Number of Vehicles under monitoring on the system
Monitoring by Mail Motor Divisions in the Circles
23
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
5 Develop Address database of citizens ‐ standardise addressing and create a database improve delivery of services.
DOP, NIC, UIDAI
Number of PIN code areas for which address data is collected/PIN code maps digitised
Number All PIN code areas in Delhi and Kolkata
Digitisation of PIN maps of 200 district HQs &Collection of address data of all PIN code areas in Mumbai, Chennai, Bangalore & Hyderabad
Digitisation of PIN maps of 200 District HQs &Collection of address data in PIN code areas of next top 25 cities
Digitisation of PIN maps of remaining 180 District HQs & Rural areas of all the CirclesCollection of address data in PIN code areas of next top 75 cities
Complete collection of address data for remaining cities
Information from Database software
Through Project management cell at the Directorate level and in the Circles
Internally‐BD Directorate Externally‐ NIC, UIDAI
6 Develop integrated mail and parcel processing facilities‐ construction of building
DOP, Airport Authority of India/Airport developers
No. of sites developed
Number nil Proposal for site preparation/construction at Mumbai
Approval of proposal for site preparation/construction at Mumbai
Completion of site preparation/construction at Mumbai
Follow‐up implementation reports
by Project management cell at Directorate level
Internally‐ Estates Division, Civil & Electrical wings. Externally‐ AAI/Airport Developers
7 International Mail Network Management
International airlines, IM div
On‐line generation of bills
Date 31.3.2012 on going on going on going Reports from the system
Internally at Dte
International airlines
2.1 Enhance Quality of services
1 Expansion of Project Arrow to more post office‐ Improve post office look and feel and Core Areas
Customers, CPMsG, staff
Coverage of post offices
Number 530 Internal Review of 100 Head Post offices
1000 1000 Maintenace of 500 post offices
1000 Maintenace of 500 post offices
Through Data Extraction tool & External audit
Program office at Directorate
NIC, agency engaged for external audit
24
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
2 Improve Quality of services‐ obtain Sevottam certification under IS 15700:2005
DARPG, BIS, Post offices
Obtain Sevottam Certification under IS 15700:2005
Number of Post offices certified
20 20 20 20 Surveillance audit
Internal monitoring, annual audit by BIS auditors
BIS, DARPG, post office
3 Adoption of UPU Quality Applications Systems for International mail operations
Customers of international mail
Number of offices of exchange where systems installed
Number 4 Reports from the system
Internally at Dte
Offices of Exchange, UPU
4 Setting up of call centres for international postal services
Customers of domestic and international mail
Setting up of call center
Date 31.3.2013 Reports from the system
Internally at Dte
UPU
2.2 Improve access to services
1 Adoption of Modified Franchisee model
People and households in under served areas, and prospective franchisees
Number of Franchise outlets opened
Number 110 100 100 100 100 Reports from circles
Rigourous monitoring through periodic reports
Circles
2 Opening of post offices in underserved areas
people and households in under served areas
Number of post offices opened
Number 85 BOs and 70 SOs
70 BOs and 50 SOs
70 BOs and 50 SOs
70 BOs and 50 SOs
70 BOs and 50 SOs
Reports from circles
Reports from circles
Reports from circles
25
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
3. Modernise and expand Financial Services
1 Setting up of Postbank‐expand postal facilities.
Parliament, MoF, RBI, NABARD, Customers,
Completion of each sub‐activity in each year
completion of each sub‐activity in each year
setting up of core teams & initiating DPR & necessary clearances Initiating of Act for PBI once approvals are in place.
setting up of Post Bank Pilot
survey to explore the business opportunity with different entities;phase‐wise expansion to all HOs
further expansion
Business intereligent Unit (BIU)* under monitoring vertical
monitoring vertical
RBI,MOF, C&AG. Ministry of Law,CGA & internally with IFW,PO Divison, customers, NABARD, Rajya Sabha, Lok Sabha, PMO, Planning Commission
2 Increased coverage of insurance of rural population
DoP, MoF and other Govt Dept
Increase in coverage
Number of policies in millions
4.5 2 2 2 2 Reports from circles
Rigourous monitoring through periodic reports
Nil
3 Expansion of Coverage of Postal Life Insurance through engagement of agents
DoP, agents Number appointed
Number 3000 3000 3000 3000 3000 Reports from circles
Rigourous monitoring through periodic reports
Nil
4 Creation of a separate business unit for remittance services
DoP,RBI,MoF,customers & entities with which DoP will be collaborating private sector remittance entities
Completion of each sub‐activity
completion of each sub‐activity in each year
Review of performance
conducting customer survey w.r.t to each product
setting up of a business unit to to explore syngergy & customization
training to staff
expansion of products and customer base
Business intereligent Unit (BIU) under monitoring vertical
monitoring vertical
RBI,MOF, C&AG. Ministry of Law,CGA & internally with IFW,PO Divison
26
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
5 Implement accrual Accounting
DAP, CPMsG, consultant
Acheivement of project Timelines
Percentage of offices covered
Completion of pilot project in two post offices and acceptance of project report
Preparation of asset register of all HPOs to be completed
Preparation of Profit & Loss accounts and balance sheet of all accounting units
Deployment of accrual accounting system in all accounting units
Reports from DAP
Through Accrual accounting management committee, ERP management committee
Circles, PMU, ICAI, GASAB,
4. Modernizat
ion of products
and services
1 Market Research & Develop a range of products and services Conduct surveys for next three years to study the market and customer needs and develop suitable products and services.
Customers, staff
Result of annual survey reports
Acceptance of reports
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Acceptance of reports
Internal monitioring by BD&MD div
Agency engaged
2 Customer Satisfaction Survey ‐ Conduct surveys for next three years to study customer satisfaction
Customers, staff
Result of annual survey reports
Acceptance of reports
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Annual report of research & survey
Acceptance of reports
Internal monitioring by BD&MD div
Agency engaged
3 Upgradtion of infrastructure to support modernised products and services
CPMsG, customers, staff
Augmentation of existing infrastructure and creation of new infrastructure
Number of units technologically upgraded
50 100 100 100 carry over reports from circles
Internal monitioring by BD&MD div
Circles, CP div,IFW
27
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
4 Development & Implementation of a Corporate Branding plan
CPMsG Number of offices undergoing branding
Number 2000 2500 2500 3000 carry over reports from circles
Internal monitioring by BD&MD div
Circles, CP div,IFW
5 Scientific costing of products and services
Div heads, Consultants, Finance wing
Completion of costing exercise
Stage of implementation
RFP to be issued
Award of work
Acceptance of study report & Implementation of new costing methodology
Direct monitoring of activities at Dte level
Internal monitoring at Dte level
ICWAI
5. Enhance Professionalism and
specialisation
1 Expansion and Upgradation of Training Infrastructure
Planning Commission, Ministry of Finance ,Postal Circles and DOP HQs DOP&T
Increase in capacity ‐
Number of trainee seats increased
480 400 30% increase in training capacityavaialble at the end of XIth Plan
30% increase in training capacityavaialble at the end of XIth Plan
40% increase in training capacityavaialble at the end of XIth Plan
Compilation of information / data from: Monthly Reports Evaluation Reports Feedback
Periodical Assessment by Training Division at HQs from reports and deliverables.
Planning Commission, Ministry of Finance and Training Institutes of DOP, Postal Circles and DOP HQs, outsourced agencies, DGS&D.
28
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
2 Capacity Building i. Conduct TNA, II. Develop training programs iii. Conduct development programs for specific cadres, specialised trainings for specific jobs, softskill training for forntline staff Iv. Conduct Project related trainings.
Planning Commission, Ministry of Finance Postal Circles and DOP HQs Vendors and Change Management Consultant for Indiapost 2012 Consultant for Mail networking and Optimisation Reputed Institues Employees and Cadres DOP&T
Development and Completion of the identified training programs Development Programs Inservice Programs Specialised Programs Skill Development Programs
Percentage of workforce trained from 12th Plan. ( For 11th Plan the number of staff under each program will be used as per the EFC.)
67340 75500 Coverage of 20% of the staff for training
Coverage of 20% of the staff for training
Coverage of 20% of the staff for training
Through periodical monitoring of each program .
1. Issue a Training Calendar for each Quarter and monitor completion of training ii. Develop Training Evaluation capacity inhouse for identified programs iii. External evaluation so as to cover all major programs in Plan period.
Planning Commission, Ministry of Finance, DOP&T , Reputed Institutes in India and Abroad , Consultants for flagship Projects and Training Institutes of DOP, Postal Circles and DOP HQs , Outsourced Agencies
29
Strategic Initiative
Activities Stakeholder engagements
Performance
indicator
Measurement Index
Milestones to be achieved
Manner of collection of Achievement
data
Define the monitoring mechanism
Co‐ordination required with
Mar‐11 Mar‐12 Mar‐13 Mar‐14 Mar‐15
3 Research and Development‐ i. To continuously upgrade the training programs by research, study and Training Needs Analysis, ii. Support initiatives like design of new programs, best practices in training and new developments, iii. Conduct Staff satisfaction suvery to ascertain areas for improvement, iv. Introduce eLearning.
Planning Commission, Ministry of Finance (Consultation and approval of EFC), Postal Circles and DOP HQs (For implementation) Customer ‐ Post Forums any other interface for feedback on quality of service and frontline staff. Employees ( for consultation)
Creation of Training R&D Cell Number of new training initiatives developed Number of new programs introducedStaff Satisfaction Survey completed
New programs initiated
Ground work for creation of R&D Cell‐ Approval of EFC
Creation of the Cell
Monitoring activities of the Cell
Monitoring activities of the Cell
Monitoring activities of the Cell
Through prescribed Monthly Reports Survey Results/Reports
Prescribe Scope and deliverables for the Training R&D Cell Periodical monitoring of R&D activity i.e trainers workshops, Impact assessment studies, HelpDesk, % of new products and services, process changes covered by updation of training.
4 Change Management: i. Stakeholder management for the IT induction project, ii. Communications management, iii. Capacity building, iv. Training management
Consultants, DDG Trg, vendors, PMU personnel, committee members
Acheivement of project SLAs
Stage of implementation
RFP to be issued
Stakeholder engagements
Capacity building training as per SLA
On going On going Through Survey results/ Reports
As already defined in Indiapost 2012‐ Project Management Unit and Change Management Team.
Project Management Units, Vendors, Change Management consultants
30
Annexure II
Section 5: Linkages with RFD
Objective Strategic Initiative Activity Performance Indicators
Modernise and consolidate the network
Enterprise wide It induction
Implement Indiapost 2012 project. Achieving milestones of Indiapost 2012 project.
• Hardware supply to Departmental Post Offices • Rural ICT Solutions • Post Office banking and PLI • Integrated scalable software solution Setting up of Data
Centre, Disaster Recovery Centre, Network Integration
Modernisation of mail processes through Indiapost 2012
Implement Mail Network Optimisation Project. Achieving the milestones in the Mail Network Optimisation Project.
• Automation of mail processing, Setting up AMPCs
• Mechanisation of business mail delivery.
• Monitoring of Mail Motor vehicles through GPS,
• Develop address databases
• Develop integrated mail and parcel processing facilities- buildings
Provide best in class quality of services
Enhance Quality of services
Expand Project Arrow to more Post Offices. Number of Post Office covered by Project Arrow
31
Objective Strategic Initiative Activity Performance Indicators
• Quality services at the Post Offices – improve the look and feel of the post office and its core operations. Expand Project Arrow to more post offices.
Performance of the Post Offices against the KPIs set for the Project.
Sevottam
Selected post offices to be developed to achieve sevottam standards
Obtain Sevottam certification for selected post offices
• Adoptionof UPU quality applications systems for international mail systems
Number of offices
• Setting up of call center Setting up of the call center
Improve Access to services
• Adoption of Modified Franchisee model Number of outlets opened
• Opening of post offices in underserved areas Number of post offices opened
Develop Financial Services
Modernise and expand Financial Services
Post Bank of India
Setting up of Post Bank in India Obtaining of approval and completion of processes for setting up of a PostBank.
Insurance • Increased coverage of insurance of rural population Achievement in number ( of lives insured or new
policies ) • Expansion of coverage of Postal Life Insurance Rural Postal
Life Insurance through Agents. Number of agents appointed
Remittances Creation of separate business unit for remittance services Acheivement of timelines
32
Objective Strategic Initiative Activity Performance Indicators
Modernise accounting system Implement Accrual Based Accounting Percentage of offices covered
Grow in existing businesses
Modernise products and services
• Market Research & Develop a range of products and services
Annual Reports of Research
• Customer Satisfaction Survey Annual Reports of survey • Upgradtion of infrastructure to support modernised products
and services Augmentation of existing infrastructure and creation of new infrastructure
• Develop and implement a Corporate Branding Plan Number of post offices undergoing branding
• Scientific Costing of products and services Completion of costing exercise.
Develop professional workforce
Enhance professionalism and
specialisation.
Expansion and upgradation of Training Infrastructure % Increase in capacity for training,
Capacity building initiatives through following training programs Number of programs conducted/staff trained
• Development Programs • Departmental Programs • Specialised Training Programs • Softskill Training • Rural entrepreneur program for Branch Postmaster’s cadre
Research and Development activities for training- Number of new training initiatives developed
TNA, Staff satisfaction survey, development of programs and initiatives and staff satisfaction survey.
Staff Satisfaction Survey report
Change Management initiatives for timely completion of projects.
Change Readiness Survey
33
Annexure III Strategy Process
Activity Date
DoP’s initiative for Strategy Planning
1. Series of workshops held with Members of the Postal Service Board, Senior officers in HQs and Heads of Postal Circles to revamp the Vision, Mission, core values and the long term objectives of the Department.
May 2009 - Jan 2010
Process after the initiation of strategy planning by Performance Management Div
2. Strategic Planning initiative launched by PMD January, 2010 3. An Action Plan prepared and submitted to PMD February 2010 4. The new Vision and Mission was adopted by Postal Services Board 5.3.2010 5. Committee constituted to draw up the Strategic Plan 28.4.2010
i First meeting of the committee held 24.5.2010 ii Inputs collected from Plan implementation Division of the Dte. May- June
2010 iii Interim report submitted to PMD 2.7.2010 iv Second meeting the Committee held to discuss broad directions of the
modes of engaging in stakeholder consultations 12.8.2010
6. Consultations held with M/s Mckinsey & Co., India Post’s consultant for the Mail network Optimisation Flagship project on strategy process
Sept 2010
7. Workshop held in collaboration with the consultants to devise the roadmap
1.10.2010
8. Multi-pronged stakeholder engagement programme initiated i Consultations held by the Chairperson of the Committee with major
service Unions and inputs received October 2010
ii Views of members Post Forums of more than 250 Post offices from all postal circles obtained
October, 2010
iii Consultation held with FICCI, CII and Madras Chamber of Commerce October, 2010 9. Five-day workshop on Strategic Planning organized in IIM Bangalore
for 23 officers drawn Dte and field formations 24 to 30th October 2010
10. Expert opinion obtained from a team headed by Prof Gautam Pingle of Administrative Staff College Hyderabad
7-9 Jan 2011
11. Draft strategy document went through several rounds of vetting by senior officers
Dec 2010 - Jan 2011
12. Interim presentation on the strategy made to PMD 18.1.2011 13. Feedback from general public sought through Departmental website January 2011 14. New Vision, Mission and Objectives formulated as part of the
Strategy Planning process January 2011