storyboard for conjoint vaac bp/6 and vasag/8 · where and when… monday tuesday wednesday...
TRANSCRIPT
Where and when… Monday Tuesday Wednesday Thursday Friday
Morning (0900 start)
Everyone at CAA NZ
VAAC BP at MetService
VASAG at CAA NZ
VAAC BP at MetService
VASAG at CAA NZ
----------------- Everyone at
CAA NZ before lunch
Everyone at CAA NZ
Everyone at CAA NZ
Afternoon (1330 start)
Everyone at CAA NZ
VAAC BP at MetService
VASAG at CAA NZ
Everyone at CAA NZ
Everyone at CAA NZ
Everyone at CAA NZ
CAA NZ: https://goo.gl/maps/gdQzEMnraao MetService: https://goo.gl/maps/gBdVC8JCAhr
What and who… MONDAY 5 NOVEMBER
JOINT SESSION TUESDAY 6 NOVEMBER
PARALLEL SESSIONS WEDNESDAY 7 NOVEMBER PARALLEL & JOINT SESSIONS
THURSDAY 8 NOVEMBER THEMATIC OPEN SESSION
FRIDAY 9 NOVEMBER THEMATIC OPEN SESSION
0830 Registration @ CAA NZ
— VAAC BP @ MetService
VASAG @ CAA NZ
— VAAC BP @ MetService
VASAG @ CAA NZ
0830 Registration for new participants @ CAA NZ
0830 Registration for new participants @ CAA NZ
0900 Welcome, opening remarks
[Ian]
Objectives, working arrangements
0900 Status of open VAAC BP outcomes
(2016 & 2017) [Ian]
Status of open VASAG actions (2015 & 2017)
[Andrew & Larry]
0900 Additional VAAC
discussions including IATA
request for review of
VAACs [Ian] (VAAC managers
only)
Publications and outreach suggestions [Andrew]
IWVA proposals
[Andrew & Larry]
0900 Welcome, opening remarks
[Ian]
Objectives, working arrangements
0900 Welcome to new participants
[Ian] Plan for the day
0930 INS and OUTS modelling tables
update [Matt & Claire]
0930 Satellite inter-
comparisons of discernible ash
[Kazuki]
ESP database for restless volcanoes
[Larry & Sam]
0930 VAAC Personnel Competency
[Ian]
0915 Volcanic Ash Impacts on Jet Engines Update
[Rory]
1030 Break 1030 Break 1030 Break 1030 Break 1030 Break
1100 VAACs strength of evidence check-lists
[Kazuki, Jarrad & Mike]
1100 Forecast verification and
VAAC KPIs [Mark]
Encounters database and severity index
[Dave]
1100 JOINT SESSION @ CAA NZ Parallel session reporting
[Ian, Andrew & Larry]
1100 VAAC Personnel Competency
[Ian]
1100 Quantitative volcanic ash forecasts –
progress [Larry & Andrew]
1200 Lunch / Group photo 1200 Lunch 1200 Lunch 1200 Lunch 1200 Lunch
1330 VONA and aviation colour codes
[Dave & Sam]
1330 VAAC collaboration
tools [Dov]
Satellite advancements
(including SCOPE-
Nowcasting) [Mike]
1330
JOINT SESSION @ CAA NZ
IWVA proposal from VASAG & feedback [Andrew & Larry]
WMO Constituent Bodies Reform and impacts on CAeM governance/structures [Ian]
1330 VAAC Personnel Competency
[Ian]
1330 Quantitative volcanic ash forecasts –
recommendations [Ian]
1530 Break 1500 Break 1530 Break 1530 Break 1530 Break
1600 Volcanic hazard monitoring and
observing capabilities [Dave & Sam]
1515 IWXXM developments
[Dov & Patrick]
Modelling advancements
(including probability & ESP) [Claire]
1600 JOINT SESSION @ CAA NZ
Wrap-up and close [Ian, Andrew & Larry]
1600 State Volcano Observatory skills, needs & capacity
development [Larry & Andrew]
1600 VA sulphur dioxide [Larry & Andrew]
Wrap-up and close [Ian]
1700 Close 1630 Close then ‘Icebreaker’ at MetService
1700 Close Close 1700 Close
Closed
VASAG/6 (2015) VAAC BP/4 (2016) VAAC BP/5 (2017) METP WG-MOG IAVW (2017) METP WG-MISD VASD (2017) VASAG/7 (2017)
4/03 - Modelling (Matt)
4/16 - Updates to METP (Greg)
6/2 - Publications (Andrew)
6/6 - ESP database (Larry)
6/7 - Outreach (Alex w/ VASAG)
6/10 - Use of radar data (Sara)
5/01 - VAAC collaboration tools (Dov)
5/02 - IWXXM versions (Patrick)
5/03 - IWXXM implementation (Dov)
5/04 - VONA and aviation colour codes (Greg/Ian)
5/10 - VONA and aviation colour codes (Don/Partick et al.)
7/3 - VONA and aviation colour codes (Dave, Sam. Sara)
5/05 - KPIs (Anton) 5/2 - KPIs (VAACs/Anton)
5/06 - No Ash (Emile) 5/6 - No Ash (VAACs)
5/07 - Discernible ash strength of evidence (Adele/Kazuki)
7/1 - Strength of evidence checklists (Mike)
5/08 - Satellite inter-comparison (Adele/Kazuki)
5/09 – Re-suspended ash (Yohko) 5/9 – Re-suspended ash (Don/Greg et al.)
5/10 - T+0 confidence (Emile) 5/3 - T+0 confidence levels trial cessation [Decision]
KEY 5/11 - Model charts VAG and SVA (Greg) 5/4 - Model charts (WMO/Greg)
OPEN 5/12 - T+24 VAG trial (Greg) 5/5 - T+24 VAG trial cessation [Decision]
CLOSED 5/13 - Supplementary products Concentration charts (Anton)
5/12 - Quantitative VA contamination info. (Patrick et al.)
7/2 - State of science review for MOG (Larry et al.)
5/14 - SO2 (Greg) 3/1 - SO2 studies/tests, threshold (Tammy et al.)
7/6 - Assistance to State of science review for MISD (VASAG/Larry)
5/15 - Next BP workshop (Paula/Greg)
5/1 - MOG Terms of Reference (Raul)
5/7 - Aircraft encounters info. (VASAG)
7/5 - Aircraft encounters database (Dave et al.)
5/8 – Re-suspended ash terminology BP [Decision]
5/11 - IAVW Roadmap and ConOps (Tammy et al.)
5/13 - IAVW Handbook backup info. (Paula et al.)
5/14 - Infrasound (Patrick with Paula)
5/15 - VAAC Management Reports (Jamie, Adele, Paula)
3/2 - MISD SO2 job card (Tammy et al.)
3/3 - MISD SO2 work plan [Decision]
7/4 - SVO responsibilities (Raul)
7/7 - IWVA/8 concept note (Andrew/Larry)
7/8 - Next VASAG meeting (Greg)
THREADS (IF APPLICABLE)
Presentation materials and other information at:
www.wmo.int/aemp/VAAC-BP-6-VASAG-8
Monday’s agenda
• Opening remarks, objectives, working arrangements
• ‘Ins and Outs’ modelling tables update
• VAAC strength of evidence checklists
• VONA and aviation colour codes
• Volcanic hazard monitoring and observing capabilities
Andrew & Larry chairing
Ian chairing
Ian & Greg lead
‘Ins and Outs’ modelling tables update
• VAAC BP/4 (2016) Outcome VW4-O-03
– Concerned investigations and reports on NWP errors/performance relevant to volcanic ash modelling (taking into account region specific issues, e.g. the tropics) and a review of VAAC ‘Ins and Outs’ modelling tables which were to be updated and shared once every 2 years
Matt & Claire to lead
DECISION REQUIRED: Keep open (recurrent), close or replace
VAAC strength of evidence checklists
• VAAC BP/5 (2017) Outcome VW5-O-07 and VASAG/7 (2017) Action Agreed 7/1
– Both concerned discernible ash strength of evidence checklists used by the VAACs
• More specifically, the VAACs were tasked to undertake further trials with checklists presented in 2017 and to seek expert input/scientific advice from the VASAG
Kazuki, Jarrad & Mike to lead
DECISION REQUIRED: Keep open, close or replace
VONA and aviation colour codes
• VAAC BP/5 (2017) Outcome VW5-O-04 and VASAG/7 (2017) Action Agreed 7/3 – Both concerned the Volcano Observatory Notice for
Aviation (VONA) and aviation colour codes
• METP WG-MOG/5 (IAVW) endorsed proposal that that: – the aviation colour code be removed from the VAA; and – the status of the VONA be elevated to a recommended
practice and (eventually) a standard
• VASAG/7 (2017) Action Agreed 7/4
– ICAO to remind States of their SVO obligations
Dave & Sam to lead
DECISION REQUIRED: Keep open, close or replace
Volcanic hazard monitoring and observing capabilities
• Latest developments to be presented/discussed
Dave & Sam to lead
Tuesday’s agenda – VAAC BP
• Status of open VAAC BP outcomes (2016 & 2017)
• Satellite inter-comparisons of discernible ash
• Forecast verification and VAAC KPIs
• VAAC collaboration tools
• IWXXM developments
Ian chairing
Status of open VAAC BP outcomes (2016 & 2017)
• VAAC BP/4 (2016): – Outcome 4/3 on ‘Ins and Outs’ modelling tables
(recurrent, every 2 years) – See Day 1 – Outcome 4/16 on updates to METP – Close?
• VAAC BP/5 (2017):
– Outcome 5/1 on VAAC collaboration tools – Day 2 – Outcome 5/3 on IWXXM implementation – Day 2 – Outcome 5/7 on discernible ash strength of
evidence – See Day 1 – Outcome 5/8 on satellite inter-comparison – Day 2 – Outcome 5/15 on next BP workshop – Close
VAAC BP
Satellite inter-comparisons of discernible ash
• VAAC BP/5 (2017) Outcome VW5-O-08
– Concerned satellite inter-comparisons of discernible ash
• More specifically, the VAACs were tasked (where feasible) to conduct a comparison: – between the old and new generation of satellite products
within each VAAC; and
– of the new generation of satellite products across all VAACs
VAAC BP
Kazuki to lead
DECISION REQUIRED: Keep open, close or replace
Forecast verification and VAAC KPIs
• VAAC BP/5 (2017) Outcome VW5-O-05
– Concerned VAAC key performance indicators (KPIs)
• More specifically, an initial set of KPIs was reported to the ICAO METP WG-MOG/5 (IAVW) and the VAACs were subsequently tasked to trial the KPIs
VAAC BP
Mark to lead (for Anton)
DECISION REQUIRED: Keep open, close or replace
VAAC collaboration tools
• VAAC BP/5 (2017) Outcome VW5-O-01
– Concerned a VAAC collaboration tool whereby:
• a functional needs analysis formulated at the 2017 workshop was to be finalised; and
• VAACs with capability were to collaborate in the development of a suitable, single web-based platform (with basic functionality to start as necessary)
VAAC BP
Dov to lead
DECISION REQUIRED: Keep open, close or replace
IWXXM developments
• VAAC BP/5 (2017) Outcome VW5-O-02 – sought to clarify the differences between IWXXM
versions 2.1 and 3.0 and when IWXXM 3.0 would be available
• VAAC BP/5 (2017) Outcome VW5-O-03 – proposed that IWXXM-compliant volcanic ash
advisory/volcanic ash graphic (VAA/VAG) should be made available on the respective websites of the VAAC initially and the extended AMHS eventually
VAAC BP
Dov and Patrick to lead
DECISION REQUIRED: Keep open, close or replace
CLOSED
Tuesday’s agenda – VASAG
• Status of open VASAG actions (2015 & 2017)
• ESP database for restless volcanoes
• Aircraft VA encounters database and severity index
• Satellite advancements (including SCOPE-Nowcasting)
• Modelling advancements (including probability and ESP)
Andrew & Larry chairing
Status of open VASAG actions (2015 & 2017)
VASAG/6 (2015)
• 6/2 on publications
• 6/6 on ESP database
• 6/7 on outreach
• 6/10 on use of radar data
VASAG/7 (2017)
• 7/1 on strength of evidence checklists
• 7/2 on VA state of science review – Close
• 7/3 on VONA/aviation colour codes
• 7/4 on SVO responsibilities
• 7/5 on a/c encounters database
• 7/6 on assistance to SO2 state of science review
• 7/7 on IWVA/8 concept note
• 7/8 on next VASAG meeting – Close
VASAG
The VASAG needs to decide whether to keep open or to
close or replace each of these actions
ESP database for restless volcanoes
• VASAG/6 (2015) Action Agreed 6/6 – Concerned a global volcano eruption source
parameter database for restless volcanoes and work to make a web-based version of the ESP database available for VASAG review.
– The status of progress was discussed at the VASAG/7 (2017) meeting, where it was noted that the ESP database was continuing to be improved by the British Geological Survey (BGS) with inputs from the VASAG and VAACs.
– It was agreed at VASAG/7 (2017) to keep Action Agreed 6/6 open
VASAG
Larry & Sam to lead
DECISION REQUIRED: Keep open, close or replace
Aircraft VA encounters database and severity index
• VASAG/7 (2017) Action Agreed 7/5
– Concerned an aircraft volcanic ash encounters database and severity index.
• More specifically, in direct response to a request emanating from the ICAO METP WG-MOG/5 (IAVW), Dave Schneider was tasked to lead efforts regarding changes to Appendix F to ICAO Doc 9691 with new data on aircraft encounters and any agreed-upon modifications to an encounter severity index
VASAG
Dave to lead
DECISION REQUIRED: Keep open, close or replace
Satellite advancements
• Latest developments to be presented/discussed
– Including outcomes of the SCOPE-Nowcasting workshop (Catania, 8 to 12 October 2018)
VASAG
Mike to lead
Wednesday’s agenda – VAAC BP
• Additional VAAC discussions (including IATA request for review of the VAACs)
Ian chairing
Additional VAAC discussions
• In-camera session
– i.e. VAAC managers/representatives only
VAAC BP
Ian to lead
Wednesday’s agenda – VASAG
• Publications and outreach suggestions
• IWVA proposals
Andrew & Larry chairing
Publications and outreach suggestions
• VASAG/6 (2015) Actions Agreed 6/2 and 6/7 – Both concerned publications and outreach.
• More specifically: – Action Agreed 6/2 pertained to the VASAG contributing to an
update to IAVCEI guidelines (available here) and the promotion of conformance with these guidelines.
– Action Agreed 6/7 concerned the further development of graphically-based information brochures and a website to underpin and complement the priorities and themes of the periodic science workshops.
– At VASAG/7 (2017) both of these actions were marked as ‘ongoing’. • In respect of Action Agreed 6/7, it was noted by VASAG/7
that there was a possible linkage of the follow-up with WMO GAW SAG-Aerosol annual bulletin articles
VASAG
Andrew to lead
DECISION REQUIRED: Keep open, close or replace
IWVA proposals
• VASAG/7 (2017) Action Agreed 7/7
– Concerned the development of a concept note for an eighth International Workshop on Volcanic Ash (IWVA/8) in the 2019 timeframe
– Recent development:
• Informal expression of interest from the Icelandic Met Office to host in 2020 – potentially coincident with the 10th anniversary of the Eyjafjallajökull eruption in April
VASAG
Andrew & Larry to lead
DECISION REQUIRED: Keep open, close or replace
Wednesday’s agenda (continued)
• Parallel session reporting
• IWVA proposal from VASAG and feedback
• WMO Constituent Bodies Reform an impacts on CAeM governance and structures
• Wrap-up and close
Ian, Andrew & Larry chairing
Parallel session reporting
• Ian to give an overview of the VAAC BP discussions over the past 24/36 hours.
• Andrew and Larry to do likewise with respect to VASAG.
IWVA proposal from VASAG and feedback
• Andrew and Larry to present the latest conceptual ideas and potential timing of an IWVA/8
WMO Constituent Bodies Reform
• Ian and Greg to outline what ‘WMO Reform’ is, the objective, expected outcome, the impact, the timeline, etc.
Wrap-up and close
• Ian, Andrew and Larry to wrap-up Days 1 to 3 and to briefly outline the plan of action for Days 4 and 5 (thematic open days)
Thursday’s agenda
• Opening remarks, objectives, working arrangements
• VAAC personnel competency
• State volcano observatory skills, needs and capacity development
Ian chairing
Friday’s agenda
• Volcanic ash impacts on jet engines – an update
• Quantitative volcanic ash forecasts – progress and recommendations
• Volcanic ash sulphur dioxide
• Wrap-up and close
Andrew & Larry chairing
Quantitative volcanic ash forecasts – progress and recommendations
• Larry and Andrew to lead the discussion on progress
• Ian to lead the discussion on recommendations