PACIFIC MTWY (CAPTAIN COOK BDGE) STANLEY ST MAIN ST SHAFSTON AV RIVER TCE STORY BRIDGE FULL CLOSURE 9pm Friday 27 April to 5am Monday 30 April 2018 IMAGERY AND CADASTRAL DATA DISCLAIMER "While every care is taken by Brisbane City Council (BCC) and the Department of Environment and Resource Management (DERM) to ensure the accuracy of this data supplied by BCC and NRM, BCC and NRM jointly and severally make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and disclaim all responsibility and all liability (including without limitation, liability in negligence) for all expenses, losses, damages (including indirect or consequential damage) and costs which may be incurred as a result of data being inaccurate or incomplete in any way and for any reason. Based on Data provided with permission of the Department of Environment and Resource Management (DERM): Cadastral Data ". APRIL 2018 For more information about this project, please call the Project Team on 1800 669 416. STORY BRIDGE WATERPROOFING PROJECT - TRAFFIC DETOUR PLAN SOUTHSIDE: DETOUR TO CITY VIA RIVER TERRACE OR CLEM7 TOLLS WAIVED VIA CLEM7

Upload: dinhnhi

Post on 20-May-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

PACIFIC MTW

Y (CAPTAIN COOK BDGE)

STANLEY ST

MA

IN S

T

SHAFSTON AV

RIVE

R TC

E

STORY BRIDGE FULL CLOSURE 9pm Friday 27 April to 5am Monday 30 April 2018

IMAGERY AND CADASTRAL DATA DISCLAIMER"While every care is taken by Brisbane City Council (BCC) and the Department of Environment and ResourceManagement (DERM) to ensure the accuracy of this data supplied by BCC and NRM, BCC and NRM jointly andseverally make no representations or warranties about its accuracy, reliability, completeness or suitability for anyparticular purpose and disclaim all responsibility and all liability (including without limitation, liability in negligence) forall expenses, losses, damages (including indirect or consequential damage) and costs which may be incurred as aresult of data being inaccurate or incomplete in any way and for any reason.

Based on Data provided with permission of theDepartment of Environment and ResourceManagement (DERM): Cadastral Data ".

AP

RIL

201

8

For more information about this project, please call the Project Team on 1800 669 416. STORY BRIDGE WATERPROOFING PROJECT - TRAFFIC DETOUR PLAN

SOUTHSIDE: DETOUR TO CITY VIA RIVER TERRACE OR CLEM7

TOLLS WAIVED VIA CLEM7