storm water strategy city of helsinki · 5 . storm water strategy 2008 list of 14 measures deal...
TRANSCRIPT
6.2.2009 Kimmo Kuisma
Storm water strategy City of Helsinki Turku, Citywater-seminar, 11.12.2014
Kimmo Kuisma, City Executive Office
2
Content of presentation
1 Storm water strategy 2008 2 Pilot project in Kuninkaantammi area 3 Planning of storm water management in Kuninkaantammi 4 Strategy implementation 2008-14 5 Future visions
Kimmo Kuisma City Executive Office 11.12.2014
3
Background
Flooding in urban areas Helsinki 22.8.2011 39 mm per hour
Photo: www.iltalehti.fi
Kimmo Kuisma City Executive Office 11.12.2014
4
Storm water strategy 2008 Eliminating or preventing
damages of flooding
Keeping the level of ground water unchanged
Regional and local dewatering
Minimizing injurious ingredients in storm water
Utilizing storm water as a resource in urban environment
Main goal is better overall management
Photo: www.iltalehti.fi Jenni Gästgivar
Kimmo Kuisma City Executive Office 11.12.2014
5
Storm water strategy 2008 Land use planning
Contracts, planning instuctions and building permit procedures
Planning and constructing of the sewage network
Co-operation within the city: integrating the sw-strategy into the processes of planning and construction (urban spaces and private plots)
List of 14 measures deal with
Kimmo Kuisma City Executive Office 11.12.2014
Photo: www.iltalehti.fi Kira Ruohonen
6
Storm water strategy 2008 Main goal is better overall management The priority order in storm water management and planning
1. Storm water is treated and utilized on original site
2. Storm water is leaded out from original site by using delaying system, which slows down the first flush of run off
3. Storm water is leaded out from original site in drainage pipes to delaying areas in public spaces, before leading to creeks/rivers/lakes/sea
4. Storm water is leaded in drainage pipes straight to creeks/rivers/lakes/sea
5. Storm water is leaded in sewers to Viikinmäki waste water treatment plant
Kimmo Kuisma City Executive Office 11.12.2014
7
The big picture in storm water management
Built urban environment …
… should function like this
Kimmo Kuisma City Executive Office 11.12.2014
KESKUSPUISTO
VANTAANJOKILAAKSO
MÄTÄJOKILAAKSO
HONKASUO
MALMINKARTANON-HUIPPU
MYYRMÄKI
KAIVOKSELA
HAKUNINMAA
KONALA
RAJA-TORPPA
KUNINKAANTAMMI
KAARENMÄKI
URHEILU-PUISTO
VANTAA
HELSINKI
Pilot project in Kuninkaantammi area
Kimmo Kuisma City Executive Office 11.12.2014
9
Storm water management in the
core of city planning
Drainage basin based plan of storm water management
Recognising and researching the needed changes in planning ja constructing processes
Recognising and learning new best practises in co-operation within city
Implementation of the strategy and learning new best practises
Photo: www.kaleva.fi Risto Rasila
Pilot project in Kuninkaantammi area
Kimmo Kuisma City Executive Office 11.12.2014
10
City planning: overall plan of storm water management
Pilot project: revision of the overall plan – implementation of the strategy
Town planning: requirements for urban space
Detailed planning for constructing in city blocks, streets, parks
Life cycle assessment and planning of maintenance
Planning of storm water management goes through the process
Kimmo Kuisma City Executive Office 11.12.2014
Pilot project in Kuninkaantammi area
Kimmo Kuisma , Suvi Tyynilä 7.1.2010
Hulevesipilotti • hulevesien viivyttäminen ja hyödyntäminen kortteleissa
Lutra lutra Unio Crassus
Vantaanjoki
Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma , Suvi Tyynilä 7.1.2010
Hulevesipilotti • hulevesien viivyttäminen ja hyödyntäminen kortteleissa
Photo: Simo Karisalo
Kimmo Kuisma City Executive Office 11.12.2014
Mätäjoki
13
Kuninkaantammi 2008
Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma , Suvi Tyynilä 7.1.2010 Kimmo Kuisma City Executive Office 11.12.2014 Kuninkaantammi 2030
15
City plan
Principles
Areas for delaying of run off
Flooding routes
Overall plan for storm water management
Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma Taske/Keto 16 17.2.2011
Storm water pilot project
Revision of overall plan – according to the startegy Drainage basin based plan Modelling different rains Measuring the overall sw-system for town planning
Kimmo Kuisma City Executive Office 11.12.2014
17
Flooding routes Preventing flooding Managing risks Solutions along ditches
Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma , Suvi Tyynilä 7.1.2010
Town planning – city blocks
Utilizing storm water in rain gardens Modelling and instructing: for delay needed 0,5 m3 per 100 m2 unpermeable surface
Green roofs
Kaupunkisuunnitteluvirasto, ”Ihana piha”-ideakilpailu
Storm water is added value and quality of life
Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma , Suvi Tyynilä 7.1.2010
Town planning - streets
Swales
Basins Rain gardens Kimmo Kuisma City Executive Office 11.12.2014
Kimmo Kuisma , Suvi Tyynilä 7.1.2010
Hulevesien viivyttäminen ja hyödyntäminen kortteleissa – sadepuutarha/kivipuutarha Kaavamääräys: 1 m3 per 100 m2 vettä läpäisemätöntä kovaa pintaa
11.2.2011
Kevyiden piharakenteiden viherkatot
hulevesien viivyttäminen ja hyödyntäminen kortteleissa
Town planning – urban spaces
21
Co-operation with
local community:
Information and
building trust
Kimmo Kuisma City Executive Office 11.12.2014
Helene Schjerfbeck park
22
Helene Schjerfbeck park
Kimmo Kuisma City Executive Office 11.12.2014
23
Planner consultant
Steering group Group of residents
PARK PLANNING
Kimmo Kuisma City Executive Office 11.12.2014
24
Storm water management is well
integrated within urban planning in different phases
best practises are recognised but not thorouhly learned in co-operation within city operators
Kuva: www.kaleva.fi Kuvaaja: Risto Rasila
Implementation of the strategy 2008-14
Kimmo Kuisma City Executive Office 11.12.2014
25
Future visions
Impact of legislation ghanges: since 1.9.2014 the cities and municipalities are responsible for storm water management
Budgeting of green infrastructure: parks and greenfield areas as part of sw-management system
Intensive co-operation is needed
New evaluation of public space and its image
More resources for maintenance
Life cycle costs?
Kimmo Kuisma City Executive Office 11.12.2014
26
Thank you!