stonehenge world heritage site management plan 2009
TRANSCRIPT
StonehengeWorld Heritage SiteManagement Plan 2009
Stonehenge is the focus of a complex of prehistoric monuments and sites
Cover
Stonehenge and its surroundingsSky Eye aerial photography 2004 © English Heritage Photo Library K040312
The Vision for Stonehenge
The Stonehenge World Heritage Site is globally important not just for
Stonehenge, but for its unique and dense concentration of outstanding
prehistoric monuments and sites, which together form a landscape
without parallel. We will care for and safeguard this special area and
its archaeology and will provide a more tranquil, biodiverse and rural
setting for it, allowing present and future generations to enjoy it and the
landscape more fully. We will also ensure that its special qualities are
presented, interpreted and enhanced where necessary, so that visitors
can better understand the extraordinary achievements of the prehistoric
peoples who left us this rich legacy.
Rac
hel Fost
er
2003 ©
Engl
ish H
eri
tage
StonehengeWorld Heritage SiteManagement Plan 2009Written and compiled byChristopher Young, Amanda Chadburn and Isabelle Bedu
Published in January 2009 by English Heritage on behalf of the Stonehenge World Heritage Site Committee
© English Heritage 2009
English Heritage, 1 Waterhouse Square, 138–142 Holborn, London EC1N 2ST
ISBN: 978-1-84802-041-2
CONTENTS
Page
FOREWORD 6
PREFACE 7
ACKNOWLEDGEMENTS 8
PART 1: THE MANAGEMENT PLAN AND THE SIGNIFICANCE OF THE STONEHENGE WORLD HERITAGE SITE 9
1.0 Function of the World Heritage Site Management Plan 11
1.1 The need for the Plan 111.2 The status of the Plan 121.3 The purpose of the Plan 121.4 The structure of the Plan 131.5 The process of developing the Plan 131.6 Data Sources 15
2.0 Assessment of the 2000 World Heritage Site Management Plan 15
2.1 Evaluation of the 2000 Management Plan 152.2 Public Inquiries and Government decisions affecting the 2000 Vision for the WHS 182.3 Changes in knowledge since 2000 192.4 The “core zone” of the 2000 Management Plan 20
3.0 Description and significance of the World Heritage Site 20
3.1 Location and boundary of the Stonehenge part of the WHS 20Location 20The Stonehenge WHS and its boundary 20
3.2 Description of the World Heritage Site 21Brief description 21The cultural heritage of the World Heritage Site 21The character of the WHS and its regional context 23
3.3 Significance of the World Heritage Site 25The Outstanding Universal Value of the WHS 25Statement of Significance 25Attributes of Outstanding Universal Value for the Stonehenge part of the WHS 28Authenticity and Integrity 32Other cultural heritage and historic environment values 34Landscape and nature conservation values 34Educational and research values 36Social, artistic and spiritual values 36Tourism and economic values 37
2 Stonehenge World Heritage Site Management Plan 2009Contents
Page
4.0 Current policy context 37
4.1 Planning and policy framework 374.2 Relationship to other statutory and management plans 384.3 Historic environment designations 394.4 Landscape and nature conservation designations 404.5 Government position on road and visitor centre 40
5.0 Current management context 41
5.1 The Stonehenge WHS executive and consultative groups 415.2 The Stonehenge WHS team 415.3 Working groups and liaison with key partners 415.4 Funding arrangements for the WHS team 415.5 Relationship to the Avebury part of the WHS 425.6 Ownership and management roles 435.7 The role of English Heritage 435.8 The role of the National Trust 445.9 The local community 445.10 Agriculture 445.11 Agri-environmental schemes 455.12 The military 465.13 Woodland and forestry management 475.14 Royal Society for the Protection of Birds 475.15 Museums 475.16 The Geographic Information System database 47
PART 2: KEY MANAGEMENT ISSUES 49
6.0 Introduction to key issues 50
7.0 Planning and policy 52
7.1 UNESCO Policies and Guidance 527.2 Changes to the English planning system 547.3 Heritage Protection Reform 557.4 English Heritage’s Conservation Principles 577.5 Government statements affecting Stonehenge 577.6 The WHS boundary and buffer zone 577.7 Development control 59
8.0 Conservation 60
8.1 The condition of archaeological monuments and sites in the WHS 608.2 The settings of the WHS and its attributes of OUV 628.3 Monument management 648.4 Agricultural practices 658.5 Conservation of other parts of the historic environment 668.6 Nature conservation 668.7 Climate change 708.8 Risk management and counter-disaster preparedness 70
Stonehenge World Heritage Site Management Plan 2009 3Contents
Page
9.0 Visitor, tourism and education issues 71
9.1 Sustainable tourism 719.2 Public access 749.3 Visitor management 759.4 Solstice management 779.5 Physical impacts on the Site 789.6 Existing visitor facilities 789.7 The need for improved visitor facilities 799.8 Interpretation, education and museums 79
10.0 Roads and traffic 81
10.1 Highways network and usage 8110.2 Road safety 8310.3 Public transport provision and sustainable access 8310.4 Car parking facilities and usage 84
11.0 Research 85
11.1 The importance of research in the WHS 8511.2 The archaeological research framework 8511.3 Archaeological research priorities 8511.4 Sustainable archaeological research 8611.5 The archiving of archaeological finds, paper archives and data 8711.6 Research links with Avebury and beyond 87
12.0 Maintaining the long-term objectives of the Management Plan 88
13.0 Management, liaison and monitoring arrangements for the World Heritage Site 88
13.1 Management and liaison within the WHS 8813.2 Revision of WHS governance 9013.3 Funding and Resources 9013.4 Relationship to the Avebury WHS 9113.5 Monitoring and reviewing the Plan 9213.6 Monitoring indicators 92
PART 3: AIMS AND POLICIES 97
14.0 Vision, aims and policies 99
14.1 Vision 9914.2 Statutory and Policy Framework 10014.3 The designation and boundaries of the World Heritage Siten 10114.4 Conservation of the World Heritage Site 10214.5 Sustainable Tourism and Visitor Management 10714.6 Sustainable Traffic Management and Transportation 11114.7 Research 11314.8 Long-term objectives for the World Heritage Site 11414.9 Management, Liaison and Monitoring 114
4 Stonehenge World Heritage Site Management Plan 2009Contents
Page
PART 4: IMPLEMENTING THE PLAN 117
15.0 Action Plan 118
BIBLIOGRAPHY 133
APPENDICES 137
A. Membership and terms of reference of the Stonehenge WHS Committee 139B. Membership and terms of reference of the Stonehenge WHS Advisory Forum 141C. The WHS Management Plan public consultation process 142D. Statement of principles governing archaeological work in the Stonehenge WHS 145E. The role of the WHS Coordinator 148F. Reports and Decisions from the World Heritage Committee and Bureau referring to Stonehenge 149G. Detailed archaeological description of the Stonehenge World Heritage Site 155H. Stonehenge Regulations 1997 158I. Key publications, surveys and education resources 160J. MOD and MPBW Concordat on Future Building Work at Larkhill 164K. ICOMOS International Cultural Tourism Charter 166L. Bodies with an interest in the WHS 167M. The English Heritage Stonehenge GIS 168N. Article 4 Direction in relation to land around Stonehenge 169O. Regional, sub-regional and local planning policies of relevance to Stonehenge 170P. The “Vision for the Future” extract from the Stonehenge WHS Management Plan 2000 172
MAPS 173
1. The Stonehenge World Heritage Site 1752. Archaeology and Land Use 1763. Grass Restoration since 2000 1774. Access 1785. Land Ownership 1796. Heritage Designations 1807. Landscape and Nature Conservation Designations 1818. Regional Landscape Context 1829. Landscape Character 18310. Visual Sensitivity 184
FACTS AND FIGURES 187DEFINITIONS 188ABBREVIATIONS 193INDEX 194
ILLUSTRATIONS AND TABLES
1. The Aims which should be prioritised during the lifetime of the Plan according to theConsultation exercise 15
2. Location of the Stonehenge and Avebury WHS in the UK 203. Location of the Stonehenge and Avebury WHS in southern England 204. Number of collisions and casualties in the WHS between March 2005 and April 2008 835. Key monitoring indicators for the Stonehenge WHS 946. The Stonehenge WHS Action Plan 1197. Larkhill Concordat map 165
Stonehenge World Heritage Site Management Plan 2009 5Contents
I am pleased to present this revised Management Plan for theStonehenge World Heritage Site.
Management Plans are the frameworks in which our WorldHeritage Sites work to ensure their continued sustainable useand the maintenance of their Outstanding Universal Value forgenerations to come.They are fundamental to meeting ourinternational obligations under the World HeritageConvention.
Stonehenge, Avebury and Associated Sites is one of Britain’sbest known World Heritage Sites. It is internationallyrecognised for its outstanding prehistoric monuments.Stonehenge was one of the first sites to have a WorldHeritage Site Management Plan.This set out a vision for itsfuture protection and presentation; and has enabledsubstantial improvements to be made to the Site, mostnotably the creation of large areas of permanent grassland.
This new Management Plan is being introduced at a keypoint in the development of Stonehenge. It provides thestrategic framework for environmental improvements,including the closure of the junction of the A303 and A344and the re-location and upgrading of the current visitorfacilities. It also provides the overall policy framework for theintegrated management of the whole World Heritage Siteand will guide those with a particular interest in its care.
The Plan demonstrates the Government’s commitment toprotect and enhance this unique and important Site.We arecommitted to its implementation and will continue to workclosely with our many partners to achieve this goal.TheGovernment is determined to make the necessary roadchanges, improve the visitor facilities and interpretation by2012 and strengthen the partnerships in place to helpmanage the Stonehenge World Heritage Site.
I am extremely grateful to all those who have worked sohard in the last decade to bring about positive change atStonehenge, in particular English Heritage, the National Trust,the Highways Agency, Natural England, the RSPB, the Ministryof Defence,Wiltshire County Council, Salisbury DistrictCouncil, the World Heritage Site landowners and all themembers of the Stonehenge World Heritage Site Committeeand Advisory Forum. I am sure that this document will proveinvaluable for the conservation, preservation and protectionof this iconic site.
6 Stonehenge World Heritage Site Management Plan 2009
FOREWORD
by Barbara Follet, Minister for Culture, Creative Industries and Tourism
PREFACE
The Stonehenge World Heritage Site Management Plan setsout the strategy for the protection of the site for present andfuture generations. It is about Stonehenge but also about themany outstanding prehistoric monuments which are withinthe 2,600 hectare World Heritage Site (WHS). Its primaryaim is the protection of the archaeological landscape but italso addresses other issues such as access, interpretation,farming, nature conservation, research, education and thelocal community.The Management Plan explains theinternational significance of the site, outlines the keymanagement issues, and provides long-term aims anddetailed policies. It also includes a detailed action planidentifying the organisations responsible for delivery and atimescale for each action.
The Management Plan was prepared on behalf of theStonehenge WHS Committee by English Heritage, withextensive involvement of stakeholders and a publicconsultation. During 2008, several workshops were held withthe WHS Advisory Forum before the Committee discussedeach new development of the text. As the chairman of thesegroups, I can confirm that there was a healthy level of debateand that many amendments were made to the Plan toreflect the comments received. There was also a very goodlevel of response from the three-month public consultationheld between July and September, which included anexhibition, a questionnaire, a website and a mailing to localresidents. As a result, the new Management Plan is asinclusive as it can be. I hope that it will be endorsed as soonas possible by all those with responsibilities within the WorldHeritage Site.
Any work of this kind involves a large number of people andorganisations.We are grateful to all those consulted for theirhelp and support. I should like particularly to thank themembers of the Committee and of the Advisory Forum fortheir great commitment of time and effort over the veryshort time available to develop this Plan. On behalf of themall, I would like to express our gratitude to the writers of thePlan for their outstanding achievement.
Elizabeth GassChairmanStonehenge World Heritage Site Committee
Stonehenge World Heritage Site Management Plan 2009 7
ACKNOWLEDGEMENTS
In December 2007, Margaret Hodge, the Culture Minister,asked for the rapid revision of the Stonehenge WorldHeritage Site Management Plan.That task is the responsibilityof the Stonehenge World Heritage Site Committee, made upof bodies and individuals with management or statutoryresponsibilities in the World Heritage Site (WHS). EnglishHeritage was asked to facilitate the Committee’s work toproduce the Plan.
As the principal authors of the Plan, we would like to thankall those who have helped and supported us in what isessentially a team effort to develop a consensus on thefuture direction of the World Heritage Site. Our firstthanks must go to the Committee itself and also to membersof the Advisory Forum, the wider stakeholder body for theWorld Heritage Site. In particular, we thank most warmlyLady Gass who chaired all eight meetings of the Committeeand Advisory Forum as well as leading us on a site visit andtaking part in the launch of the public consultation.Wewould also like to thank Hilary Barnett of Blue Onion whowas a very efficient facilitator for the meetings of theAdvisory Forum.
The members of the WHS Committee and Advisory Forumwho have assisted over 2008 are Roger Fisher (AmesburyTown Council), Philip Miles (Country Land and BusinessAssociation), Nigel de Foubert (Ministry of Defence), PeterMarsden and Caity Marsh (DCMS), Dave Healing(Durrington Parish Council), Peter Carson (English Heritage),Stephanie Payne (Natural England), Chris Jones (HighwaysAgency), Susan Denyer (ICOMOS UK), Richard Crook(NFU), Chris Gingell, Lucy Evershed, Mike Keen and NickKendall-Carpenter (National Trust),Tracé Williams and TonyRichardson (RSPB), Dave Milton (Salisbury District Council),Peter Bailey (Wilsford-cum-lake Parish Council/Landowner),Helena Cave-Penney, Melanie Pomeroy-Kellinger and TimJones (Wiltshire County Council), Sarah Simmonds (AveburyWHS Officer), Max Hosier (Boreland Farm), Francis Taylorand Julian Richards (CBA - Wessex), Kate Fielden (CPREWiltshire), Peter Goodhugh (Countess Road ResidentsAssociation), Richard Osgood (Defence Estates), IanBriscoe(Forestry Commission), Robert Turner (Manor Farm),Adrian Green (Salisbury and South Wiltshire Museum),Alistair Millington and Adrian Roper (Sustrans), Sue Daviesand Andrew Fitzpatrick (Wessex Archaeology), Brian Davison(WANHS), Bill Haley and Steve Colwill (WiltshireConstabulary).We are grateful to all of them for their helpand comments.
We were also helped by many colleagues in English Heritage,particularly Gillian Cochrane, who dealt with pictureresearch, editing and proof-reading; Rachel Foster, whohelped with the production of the maps, projectmanagement, GIS issues and editing; and Matthew Reynolds,who assisted with GIS issues and who produced most of themaps. Nick Hanks helped with NMR searches. Othercolleagues commented on various drafts, particularly RohanTorkilsden, Isla Macneal, Martin Harvey, Emma Carver, andSue Cole, and the English Heritage Advisory Committee alsosaw drafts and made some comments. Robin Taylor, NeilCollins and Tanya Reid helped with publication, print anddesign issues.
Other comments and advice were received from LucyBradley, Penny Needham, Stuart Maughan, Renee Fok , MikeHarlow and Dave Batchelor (English Heritage), Phil Sheldrakeand Peter Exley (RSPB),Tim Darvill (University ofBournemouth), David Thackray (National Trust), AmandaRiddle (Graylings), Mike Parker-Pearson (University ofSheffield) and David Dawson (WANHS).There were 304written responses to the Management Plan consultation, andfurther details are set out in Appendix C of the Plan.Graylings Global were commissioned to run the consultationprocess and some of their report has been included in thisPlan.We were in the fortunate position that a Plan alreadyexisted, and some of the information and text from the 2000Plan, written by Chris Blandford Associates (which itself drewon the 1998 Avebury WHS Management Plan), has found itsway into this one.We would also like to thank RowanWhimster of Whimster Associates, who edited the draft Planduring the Autumn, Alan Rutter, who prepared the index, andall the team at FONDA and Colourhouse, who have workedso hard to meet our very tight deadlines.
We are extremely grateful to all these people who haveassisted in the production of this Plan.
Christopher YoungAmanda ChadburnIsabelle Bedu
English Heritage
8 Stonehenge World Heritage Site Management Plan 2009
Part 1The Management Plan and the significance of the Stonehenge World Heritage Site
Stonehenge at dawnJames O Davies 2007 © English Heritage Photo Library N071271
Part 1The Management Plan and the significance of the Stonehenge World Heritage Site
Stonehenge at dawnJames O Davies 2007 © English Heritage Photo Library N071271
10 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
The Stonehenge, Avebury and Associated Sites WorldHeritage Site was inscribed in 1986. It is in two parts, some27 km apart, focused respectively on the great stone circlesof Stonehenge and Avebury.
Stonehenge is among the most iconic and best knowninternationally of archaeological sites. The Stonehenge part ofthe World Heritage Site (WHS) covers 2,600 hectaresaround Stonehenge itself, and comprises one of the richestconcentrations of early prehistoric monuments in the world.Stonehenge monument itself attracts around 900,000 visitorseach year, but the WHS is also a place where people liveand work and much of it is farmed. Managing the variousinterests and concerns affecting the Site to protect andenhance its Outstanding Universal Value (OUV) is complexand challenging.
This Management Plan sets the overarching strategy forachieving the correct balance between conservation, access,the interests of the local community and the sustainable useof the site, whether for recreation and tourism, or foragriculture. The strategy aims to protect the Site for its OUVas agreed by UNESCO, provide access worthy of the site forvisitors, and allow its continued use for sustainable agriculture.Central to it is the Vision established for the 2000 Plan, theessence of which is still valid today (see Appendix P for thefull text of 2000 Vision for reference purposes).
The Vision for the StonehengeWorld Heritage Site
The Stonehenge WHS is globally important not just forStonehenge, but for its unique and dense concentrationof outstanding prehistoric monuments and sites, whichtogether form a landscape without parallel. We will carefor and safeguard this special area and its archaeologyand will provide a more tranquil, biodiverse and ruralsetting for it, allowing present and future generations toenjoy it and the landscape more fully. We will alsoensure that its special qualities are presented, interpretedand enhanced where necessary, so that visitors canbetter understand the extraordinary achievements of theprehistoric peoples who left us this rich legacy.
Priorities for 2009-2015
The primary purpose of this Management Plan is toguide all interested parties on the care of this WorldHeritage Site by sustaining its Outstanding UniversalValue. This will ensure the effective protection,conservation, and presentation of the World HeritageSite for present and future generations. It will also ensurethat all decisions affecting the World Heritage Site movetowards the achievement of the Vision.
The priorities of this Management Plan are to:■ maintain and extend permanent grassland to protect
buried archaeology from ploughing and to provide anappropriate setting for upstanding monuments;
■ remove the woodland and scrub cover from keymonuments;
■ remove or screen inappropriate structures or roads,in particular the A344, and keep the A303improvements under review;
■ enhance the visitor experience by 2012 by providingimproved interim facilities;
■ improve the interpretation of the WHS and increaseaccess to selected monuments;
■ continue to encourage sustainable archaeologicalresearch and education to improve and transmit ourunderstanding of the WHS;
■ encourage the sustainable management of the WHS,balancing its needs with those of farming, natureconservation, access, landowners and the localcommunity.
Traffic on the A303
Part 1The Management Plan and the significance of theStonehenge World Heritage Site
Introduction
Jam
es
OD
avis
2008 ©
Engl
ish H
eri
tage
DSC
8181
Stonehenge World Heritage Site Management Plan 2009 11Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
1.0 FUNCTION OF THE WORLDHERITAGE SITE MANAGEMENTPLAN
1.1 The need for the Plan
1.1.1 World Heritage Sites are recognised as places ofOUV under the terms of the 1972 UNESCOConvention concerning the Protection of the WorldCultural and Natural Heritage (the World HeritageConvention). By joining the Convention, the UnitedKingdom Government has undertaken to identify,protect, conserve, present and transmit such Sites tofuture generations (UNESCO 1972, Article 4). It is foreach Government to decide how to fulfil thesecommitments. In England, this is done through thestatutory spatial planning system, designation ofspecific assets, and the development of WHSManagement Plans.
1.1.2 The Operational Guidelines for the Implementation ofthe World Heritage Convention (2008) say:
“each nominated property should have an appropriatemanagement plan or other management systemwhich should specify how the OUV of a World HeritageSite should be preserved, preferably throughparticipatory mean.
The purpose of such a management system is to ensurethe effective protection of the site for present and futuregenerations (paras 108-109).”
Since 1994 it has been UK Government policy thatall UK World Heritage Sites should haveManagement Plans.
1.1.3 The recently published draft planning circular onWorld Heritage together with its supporting guidance(May 2008) emphasise the need for comprehensivemanagement plans based on a proper understandingof the OUV of the site. Such plans need to bedeveloped in a consensual way, fully involving allinterested parties including those responsible formanaging, owning or administering the particularWorld Heritage Site.
1.1.4 All effective conservation is concerned with thesuccessful management of change. Conserving the Siteis fundamental but some change is inevitable if theSite is to respond to the needs of present-day society.Effective management of a WHS is thereforeconcerned with identification and promotion ofchange that will respect, conserve and enhance theSite and its OUV, and with the avoidance,modification or mitigation of changes that mightdamage them. It is also necessary to develop policiesfor the sustainable use of the site for the benefit ofthe local population and economy.
The first phase of Stonehenge is the circular earthwork (c. 3000 BC) which is clearly visible on this early morning shot
Adam
Sta
nfo
rd 2
007 ©
Aeri
al C
am 2
007
12 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
1.1.5 It is essential that all change is carefully planned andthat competing uses are reconciled withoutcompromising the overriding commitment toconserve the Site. WHS Management Plans areintended to resolve such potential conflicts and toachieve the appropriate balance between conservation,access and interpretation, the interests of the localcommunity, and sustainable economic use of the Site.They must also be capable of being implementedwithin the means available to achieve this.
1.1.6 The first Stonehenge WHS Management Plan wascompleted in 2000 (English Heritage, 2000a). Itprovided the opportunity to develop policies to dealwith the various problems affecting Stonehenge.Those identified in the Plan included the impact oflarge numbers of visitors, and also the impacts oftraffic on the A303, and on the A344 which seversStonehenge from its Avenue a few metres from theHeel Stone. The visual and noise pollution of theroads had long been recognised as significantdetractors from the setting of the Stones. Post-waragricultural intensification, changes in military use ofthe areas around the WHS and at Larkhill, andincreasing demands for leisure and recreational use ofthe countryside, have all contributed to changes in thecharacter and quality of the WHS landscape.
1.1.7 Much has been achieved to fulfil the objectives of the2000 Plan (see 2.1 below). Equally, some majorobjectives have not been achieved. Periodic review ofWHS Management Plans is recommended as bestpractice and was delayed in this case until keydecisions on the roads and visitor facilities had beentaken. Now that this has happened, the Governmenthas asked for a revision of the Plan to be carried outas soon as possible to provide the policy frameworkfor future management of the WHS.
1.2 The status of the Plan
1.2.1 Within the UK, WHS Management Plans arerecommended in Government planning guidance andso are a material consideration in planning decisions.The 2000 Management Plan has been adopted asSupplementary Planning Guidance (SPG) by SalisburyDistrict Council. Management Plans provide anadvisory policy framework for guiding and influencingplanned or potential management initiatives at avariety of scales and for different purposes. Theydepend for their effectiveness on consensus amongthe key stakeholders involved in the WHS andwillingness on their part to work in partnershiptowards the achievement of the agreed objectives in
these Plans. Once endorsed by the Department forCulture, Media and Sport, Management Plans arereferred to UNESCO who forward them to theInternational Council on Monuments and Sites(ICOMOS) for review.
1.2.2 The Management Plan brings together the policiesand aspirations of a number of different bodiesinvolved with the WHS. At the same time, it sets outa management framework for the WHS. Individualstakeholders should use the Plan to influence theirown strategic and action plans as these are reviewedand implemented over the life of this ManagementPlan. The Government has confirmed that theManagement Plan will remain the overarching strategicdocument for the WHS.
1.3 The purpose of the Plan
1.3.1 The primary purpose of the Management Plan is tosustain the Outstanding Universal Value of the WHSto ensure the effective protection, conservation,presentation and transmission of the WHS to presentand future generations. The significance and value ofthe WHS is discussed further in section 3, but it is theOUV of the Site which makes it important in globalterms for all humanity, and which is therefore themain focus of and reason for the Plan. To sustain theOUV, it is necessary to manage all the attributes ofOUV. Additionally, there are also a number of otheraspects and values of the Site (such as ecologicalvalue) which need managing and/or improving: theseare discussed in sections 3.3.24-3.3.45 below.‘Conservation’ in the context of this Plan includes notonly ensuring the physical survival of thearchaeological sites and monuments and/or theimprovement of their condition, but also enhancingthe visual character of their landscape setting,increasing biodiversity and improving theinterpretation and understanding of the WHS as alandscape without parallel. Continued research into allaspects of the WHS will be fundamental to informingits appropriate future management.
1.3.2 In order to achieve the primary aim of protecting theWHS through the conservation of its OUV, this Planprovides an integrated approach to managing theWHS, where the needs of various stakeholders andof conserving elements of the WHS that havedifferent values are recognised. Aims and policies forfinding an appropriate balance are set out in Part 3.
Stonehenge World Heritage Site Management Plan 2009 13Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
1.3.3 In summary, the Management Plan has fiveoverarching objectives. These are:
■ to manage the WHS so that it and the attributesthat carry its OUV are conserved and enhanced;
■ to identify the current other values, needs andinterests of the WHS;
■ to outline a sustainable approach to the futuremanagement of the whole WHS which aims tobalance all values and needs, such asarchaeological and nature conservation (includingresearch), visitor access and farming, and to setout ways whereby stakeholders can optimise thebenefits of these values, without compromising theOUV of the Site;
Stonehenge at Sunrise
■ to increase public awareness of, and interest in theWHS, and to promote the educational andcultural value of the entire Site, not just thefamous Stones;
■ to identify a prioritised programme of action thatis achievable and will contribute to theconservation of the WHS; the understanding of itsOUV, and the improvement of the WHS for allthose who visit Stonehenge and live or work inthe area.
1.4 The structure of the Plan
1.4.1 The structure of the Plan comprises:
■ a description of the WHS and an assessment of itsOUV, other values and character; its currentmanagement; the planning and policy context forthe Site; and an assessment of the 2000 Plan(Part 1);
■ the identification of the main issues affecting theWHS and of monitoring indicators for the WHS(Part 2);
■ the Vision, aims (long-term), and policies (short tomedium-term), addressing the management issues(Part 3);
■ a detailed action plan for 2009-2015 (Part 4).
1.4.2 Supporting information is provided at the end ofthe Plan as appendices, maps, facts and figures,definitions, etc.
1.5 The Process of developing the Plan
1.5.1 In December 2007, the Government’s Departmentfor Culture, Media and Sport (DCMS) asked for therevision of the Management Plan to be carried out asa matter of urgency, following decisions taken on theA303 improvement scheme and the other elementsof the 1998 Stonehenge Project. The Governmentasked English Heritage to facilitate the revision of theManagement Plan by the Stonehenge WHSCommittee, and also set a timetable for its revisionwhich allowed six months for the preparation of aconsultation draft, and a further six months for publicconsultation, finalisation of the Plan and its publicationin January 2009.
1.5.2 The Minister for Culture set out some parameters forthe revision of the Plan in a debate in WestminsterHall on 18th December 2007, when she stated thatthe overall vision of the 2000 Plan still had long-termvalidity and that many objectives would not need tochange, including the following:
■ Objective 1, which is now Aim 1 of the 2009 Plan
■ Objective 2, now Policy 1b
■ Objective 3, now Aim 4
■ Objective 11, now Policy 3i
■ Objective 18, now Aim 7 and Policy 4j
She was therefore seeking a review of theManagement Plan that focused on the parts thatneeded to be changed as a result of the decision thatwas announced to Parliament on 6 December 2007.She also indicated that there would be no significantchanges to the boundary of the WHS as this wouldrequire a re-nomination of the WHS, which theGovernment will not undertake at this time.
Jam
es
OD
avie
s2007 ©
Engl
ish H
eri
tage
Photo
Lib
rary
N071262
14 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
1.5.3 The Stonehenge WHS Committee represents the keystakeholders who own or manage parts of the Site, orwho have statutory responsibilities within it (seemembership and terms of reference at Appendix A).The Committee agreed the programme for revisionthrough an iterative process. They also agreed thatthe wider stakeholder group represented by theWHS Advisory Forum should be fully involved (seemembership and terms of reference at Appendix B).
1.5.4 A partial first draft of the Plan was prepared byEnglish Heritage before the consultation draft wasdeveloped. This stimulated further exploration of theissues to be covered by the Plan, which led to theproduction of this consultation draft. Once agreed bythe Stonehenge WHS Committee, this was issued forpublic consultation on 15 July 2008 for a full threemonths. After the completion of the publicconsultation, the Plan was revised in the light of theresponses and then agreed by the Committee forsubmission to the Department for Culture, Media andSport at the end of 2008. Once endorsed by theSecretary of State, the Plan was forwarded toUNESCO for consideration by its World HeritageCommittee.
The Consultation Booklet was
mailed to 14,500 local residents
1.5.5 The Advisory Forum have commented at each stagethrough a series of facilitated workshops. It met fourtimes in all during the development of the revisedManagement Plan, beginning with an initial workshopto brainstorm issues. For each draft, an AdvisoryForum workshop preceded discussion by theStonehenge WHS Committee so that the Forum’sviews could be fully considered by the Committee.
1.5.6 The Plan blends the views and knowledge of theStonehenge WHS Committee and StonehengeAdvisory Forum with the considerable body ofexisting management information prepared for the
WHS over the last 25 years or so. A full list ofreferences consulted in the preparation of the Plan isincluded in the bibliography, and further referencescan be found in Appendix I.
1.5.7 A three month public consultation on the future ofStonehenge took place between July 15th andOctober 17th 2008. It sought views and feedbackfrom members of the public and stakeholders on twoseparate issues - the proposed EnvironmentalImprovements in the Stonehenge WHS and the draftStonehenge WHS Management Plan.
Exhibition on the Management Plan and the Stonehenge
Environmental Improvements in July 2008, Amesbury
1.5.8 A range of consultation materials were produced, abooklet was mailed to 14,500 households in thevicinity, a consultation hotline was set up, publicexhibitions were held in Amesbury, London andSalisbury and a website was developed. Another smallexhibition was taken to an international conference ofEuropean archaeologists. There was a very highresponse rate to the consultation – in total 886written responses were received, of which 304related to the draft Management Plan, and 635people visited the exhibitions in England. This was afar higher response level than for the previous Plan,when 57 written responses were received and around100 people visited the exhibition. Some respondentssimply answered the questions set in the consultationbooklet, but more detailed responses were receivedfrom a number of organisations and interestedindividuals, including:
■ local town and parish councils;
■ local and national archaeology and heritageorganisations;
Am
anda
Chad
burn
2008 ©
Engl
ish H
eri
tage
Stonehenge World Heritage Site Management Plan 2009 15Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
■ conservation and environmental groups;
■ local and national tourism bodies;
■ local and national transport interest groups;
■ landowners and tenants affected by the visitorcentre options.
1.5.9 A summary of results relating to the WHSManagement Plan is set out below, and is furtherdetailed in Appendix C. Overall, there was strongsupport for the revised WHS Management Plan:
■ 86% of respondents agreed with the Vision forthe WHS;
■ 84% supported the five Strategic Objectives of theManagement Plan;
■ 81% supported the eight long-term aims;
■ 88% agreed that the contents of the ManagementPlan are broadly acceptable;
■ Aim 5 (to reduce the impacts of roads and trafficon the OUV of the WHS and to improvesustainable access to it) and Aim 7 (the long-termobjectives for reducing the impact of the A303in the WHS, and the creation of a permanentworld class visitor centre should be kept underreview) were clearly thought to be the mostimportant of the eight aims and it was felt theseshould be prioritised during the lifetime of theManagement Plan.
Q4. Which, if any, of the eight aims should beprioritised during the lifetime of theManagement Plan?
Illustration 1: The Aims which should be prioritised during the
lifetime of the Plan according to the Consultation exercise
1.6 Data sources
1.6.1 The revision of the Management Plan has drawn onthe data collected for the first Management Plan,which itself drew very heavily on the 1998 AveburyWHS Management Plan. It has also been able to usethe large amount of data collected since 2000. Thisincludes the records in the Wiltshire County CouncilSites and Monuments Record (SMR) and theStonehenge Geographical Information System (GIS)curated by English Heritage. The GIS incorporateslicensed data which are kept up-to-date by otherbodies – for example the ownership map withinthis Plan ultimately derives from data held by theLand Registry.
1.6.2 The Plan has also drawn on other key documentswhich have been published since 2000 including theStonehenge WHS Research Framework (Darvill 2005),the Stonehenge WHS Condition Survey carried out in2002, the interim results of the Stonehenge RiversideProject and SPACES Project, and the extensivesurvey work carried out in the evaluation phase ofthe 1998 Stonehenge Project on both road andvisitor centre proposals.
2.0 ASSESSMENT OF THE 2000WORLD HERITAGE SITEMANAGEMENT PLAN
2.1 Evaluation of the 2000Management Plan
2.1.1 The importance of the Management Plan has beenevident since its publication. It has been used in anumber of fields including planning, fund raising andfunding prioritisation, education and interpretation. Itwas adopted by Salisbury District Council asSupplementary Planning Guidance in 2000, and hassubsequently influenced many planning decisions, andwas referred to at length in the A303 StonehengeImprovement Scheme and Visitor Centre ProjectPublic Inquiries. It has influenced the production ofvarious guidance notes which have subsequently beenproduced for the WHS, including Principles forUndertaking Archaeological Work (2002, see AppendixD) and for Sustainable Access and Interpretation(English Heritage 2002). It has been used as astrategic framework by the National Trust in its LandUse Plan (National Trust 2001). Its objectives arequoted in all project briefs and funding bids. It hasbeen widely disseminated and requests for theManagement Plan still come from all corners of the world.
0
10
20
30
40
50
60
70
80
90
Aim 1 Aim 2 Aim 3 Aim 4 Aim 5 Aim 6 Aim 7 Aim 8
16 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
The first Management Plan
for the Stonehenge World Heritage
Site was produced in 2000
2.1.2 However, it is fair to say that a significant part of theVision for the Future (English Heritage 2000b, point 5)which was a key element of the 2000 Plan, has notbeen achieved. The Vision included the building of anew high quality visitor centre, the removal of theroads from the vicinity of Stonehenge, and ensuringthat all farmland in the core would be restored topermanent grassland. Of these three main objectives,there has only been significant progress with thegrassland restoration. Great efforts were made toprogress the other two main aims (see 2.2 below),but with the Government’s cancellation in December2007 of the scheme to upgrade the A303, EnglishHeritage’s planning permission for a new visitor centreat Countess East could not be taken forward, leavingtwo key aims of the 2000 Plan unfulfilled.
2.1.3 On other fronts, there has been good progress withthe implementation of the objectives of theManagement Plan. Since 2000, there has been amarked improvement in the management andcondition of archaeological sites. In 2002, EnglishHeritage funded a condition survey of 650archaeological sites in the WHS, identifying as keythreats ploughing, burrowing animals and scrubencroachment (Wessex Archaeology, 2003). TheCountryside Stewardship arable reversion specialproject and the successor Environmental Stewardshipscheme, both funded by Defra since 2002, have beenvery successful: in total, 520 hectares of land havebeen signed up for conversion from arable land topasture, thus protecting and improving 105 prehistoricmonuments and their settings. In addition, thecondition of the Normanton Down Barrows, the LakeBarrows and Durrington Walls was further improvedby scrub removal undertaken by the National Trust,
the RSPB, and a Council for British Archaeologyvolunteer group, the Friends of Ancient Monuments(FOAM). As for burrowing animals, a joint workinggroup between English Heritage and Natural Englandwas set up to address this issue, and work is inprogress for a revised guidance note for landowners.A woodland management strategy is still beingdeveloped.
2.1.4 Despite the lack of success in constructing a newvisitor centre with interpretation facilities, reasonableprogress was achieved in interpretation, educationand awareness of the wider landscape and inproviding access to the WHS.
2.1.5 The interpretation of the WHS was examined ingreat detail as part of the proposals for the EnglishHeritage Visitor Centre. This included undertakingmarket research on various audiences. Based on theresults of this research, an Interpretation and LearningGroup comprising staff from the National Trust andEnglish Heritage drafted an Interpretation and LearningStrategy (English Heritage forthcoming). Additionally,an expert group of academics was brought togetherto advise on the contents of the Interpretation andLearning Strategy.
Local craftsman making new Stonehenge World Heritage Site
signposts in 2004
2.1.6 Improvements on the ground include new rights ofway signs featuring the World Heritage logo, whichwere put in place throughout the WHS in 2004 withfunding from WCC and the DCMS, and newinterpretation panels at various points in thelandscape, funded by WCC and the National Trust,with more panels in preparation. Guided tours of thelandscape are now available throughout the year,organised by the National Trust and its volunteers.The RSPB also leads accompanied tours of its reserveat Normanton Down at various times of the year. At
Nic
k C
ow
en 2
004 ©
Nic
k C
ow
en
Stonehenge World Heritage Site Management Plan 2009 17Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
Stonehenge itself, English Heritage introduced a newrefundable car park fee in 2004 for the busiestmonths to alleviate the car park congestion and freeup spaces for Stonehenge patrons. A DisabilityDiscrimination Act audit by English Heritage led tothe construction in 2005 of a new ramp leading tothe Stonehenge ticket office.
2.1.7 Virtual access to the key monuments in the landscapeis now possible through an interactive map of theWHS, which was launched on the English Heritagewebsite in 2004 and was partly funded by the NewOpportunities Fund. In addition, there have beenmany new popular publications which have raisedawareness of the whole Site, not just the Stones; forexample the new English Heritage guidebook toStonehenge (Richards 2005) has a section specificallyon the WHS. Appendix I details the key publicationson Stonehenge since 2000. Following feedback fromthe Advisory Forum, the WHS Coordinator has givenpriority to raising awareness of the whole WHS to avariety of audiences.
2.1.8 Since 2005, open access and guided tours of theStonehenge Riverside Project excavations have beenprovided every summer, together with special opendays featuring flint-knapping, archery, prehistoriccooking, etc. This operation involving the EnglishHeritage outreach officer, National Trust staff andvolunteers, and Riverside Project archaeologists andstudents has been extremely successful, attracting anestimated 2000 people in August 2005, 5000 in 2007and over 10,000 in 2008. A major outreach operationalso accompanied the SPACES (Bluestone)excavations at Stonehenge during Easter 2008,including an exhibition, marquee, live webcams andregularly updated website.
2.1.9 A WHS education project aimed at local schools wasset up by the WHS Coordinator, the English HeritageEducation Manager and Wessex Archaeology in 2004.New educational material was produced and is nowavailable on English Heritage and WessexArchaeology websites. The English Heritage educationdepartment in partnership with the National Trustalso set up new educational workshops for schoolswhich link visits to Stonehenge with the widerprehistoric landscape. An Outreach and LearningGroup meets regularly with all the partners involvedat Stonehenge and Avebury. Since 2005, the NationalTrust has developed tailor-made education projectswith a series of schools, youth groups, clubs andcolleges each year, most of them in the local area. In2007, the National Trust established a Guardianshipeducation scheme with a local school, delivering six
lessons each year on themes relating to cultural andnatural heritage.
2.1.10 Much progress has been made in understanding theWHS, with several major archaeological researchinvestigations having been undertaken since 2000, anda peer-reviewed archaeological research frameworkhaving been written (Darvill 2005). Theseimprovements are further detailed in 2.3 below. Thiswas a major achievement of the last Plan, whichemphasised the importance of a thoroughunderstanding of the WHS and encouragedsustainable research.
Activities during the Stonehenge Riverside Project 2007
2.1.11 The ecological value of the WHS has been enhancedowing to the Countryside Stewardship special projectgrass restoration and Environmental Stewardshipschemes; some arable areas have been sown with richwildflower seed mix. The RSPB is now involved atNormanton Down, under a management agreementwith the landowner. A new reserve of 46 hectareshas been created in 2004 to establish chalk grasslandflora and to protect the breeding stone-curlews. Highnumbers of otherwise declining farmland birds such asskylark, lapwing and corn bunting have increased andthe reserve is also proving important for rareinvertebrates with eleven rare species recorded in2006. The RSPB conducts annual monitoring of floraand fauna in this area and undertook a Breeding BirdSurvey of the whole WHS in spring 2005. The surveyfound that the WHS contains many of the UK’sdeclining farmland bird species due to the mix ofhabitats. The most abundant was skylark with 147territories. Two to three pairs of stone-curlew breedwithin the WHS, and following this survey the RSPBhas produced a management plan for the species(RSPB 2007a). Since 2000, the National Trust hasconducted an ecological survey (2007), a woodlandsurvey (2008) and, since 2005, annual grassland
Adam
Sta
nfo
rd 2
007 ©
Aeri
al-C
am S
RP2007/A
CS1
983
18 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
surveys of its land. Overall, our knowledge of theecological value of the WHS has been greatlyincreased since 2000.
2.1.12 There has been good overall progress with themanagement and protection of the WHS. TheNational Trust has acquired 70 hectares of land withinthe WHS since 2000, which include parts ofDurrington Walls and all of the Lesser Cursus. It hasalso been implementing a Land Use Plan for its estate(National Trust 2001) and put in place a propertymanager, project officer and warden strengthened bya volunteers team set up in 2004.
2.1.13 The WHS administrative and implementationstructure is in place, with a full-time coordinator andpart-time assistant (mostly funded by English Heritage)and an executive Committee and consultativeAdvisory Forum. In addition to their meetings, a WHSnewsletter is sent to the stakeholders and a widergroup of people to keep them informed of newdevelopments. The WHS coordinators forStonehenge and Avebury produced the firstUNESCO periodic report for the whole WHS in2004-5, and there are now monitoring indicators forthe whole Site (see Part 4). The English HeritageStonehenge GIS is a very valuable tool for managingthe site.
2.1.14 Since 2000, English Heritage, the Highways Agencyand the National Trust have also employed new staffand contractors to take forward the roads and visitorfacilities projects.
2.2 Public Inquiries and Governmentdecisions affecting the 2000 Vision forthe WHS
2.2.1 Since the early 1980s, there has been concern about,and actions to improve, the visitor facilities andsetting of Stonehenge. Much of the activity in pursuitof the 2000 Management Plan and its Vision dealtwith proposals to upgrade the A303 and place in atunnel around two kilometres of road visible fromStonehenge; to close the A344 as agreed at thetime of the World Heritage inscription; to develop anew Visitor Centre at Countess East on the easternedge of the WHS; and finally to secure thesubstantial reversion from arable to grassland in thecore of the World Heritage Site, all designed toprovide an appropriate setting for Stonehenge itself(see above section 2.1). Detailed proposals weredeveloped for both the road improvements and theVisitor Centre and taken through the necessarystatutory procedures.
2.2.2 The A303 improvements scheme was the subject of athree-month Public Inquiry in early 2004.
2.2.3 The Inspector’s Report on the Inquiry, published inJuly 2005 (Ref HA61/4/3, Report to the FirstSecretary of State and the Secretary of State forTransport dated 31 Jan 05), recommended in favourof the scheme promoted by the Highways Agency.However, in the light of a significant increase in thecost of tunnelling the Minister of State for Transportannounced a review to determine whether theproposed scheme still represented value for moneyand the best option for delivering improvements tothe A303 and to the setting of Stonehenge.
2.2.4 Parallel to this process, English Heritage developedproposals for a new Visitor Centre at Countess Eastwith a transit system into the WHS. Following aPublic Inquiry at the end of 2006, planning consentfor the proposals was granted in March 2007,conditional on Government approval of the A303published scheme.
2.2.5 Following the review into options for improving theA303, the Parliamentary Under-Secretary of State forTransport announced on 6 December 2007 that aftercareful consideration the Government had nowconcluded that, due to significant environmentalconstraints across the whole of the WHS andbeyond, there are no acceptable alternatives to the2.1km bored tunnel scheme promoted by theHighways Agency. However, when set against widerobjectives and priorities, the Government hadconcluded that allocating more than £500m for theimplementation of this scheme could not be justifiedand would not represent best use of taxpayers’money (Department for Transport, 2007).
2.2.6 The Minister also said that his Department wouldwork with the Department for Culture, Media andSport and English Heritage on their plans to takeforward, in consultation with other stakeholders, areview of the WHS Management Plan, and toconsider alternative options for the development ofnew visitor facilities at Stonehenge in the light of theGovernment’s decision on the A303 improvement.This further work will include examination of the casefor closing the junction of the A344 with the A303 aspart of the investigation of options for improving thesetting of Stonehenge, taking into account the widerheritage and environmental needs, to which theGovernment remains committed, of this iconic WHS(see also 1.5.2).
Stonehenge World Heritage Site Management Plan 2009 19Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
A303/A344 junction – an accident black spot
2.3 Changes in knowledge since 2000
2.3.1 Since the last Plan in 2000, the WHS has seen asignificant amount of archaeological research, bothdesk-based and fieldwork-based. The publication ofthe Stonehenge Research Framework in 2005 (Darvill2005) provided an analysis of what we already know,set out the gaps in our knowledge and suggestedstrategies for filling these gaps. It has influenced anumber of ongoing research projects within theWHS and the curatorial decisions taken in respect ofthose proposals.
2.3.2 There have been three main fieldwork-based researchprojects over the last few years relating toStonehenge. The first (Exon, Gaffney et al, 2000)examined the spatial patterning of monuments withinthe WHS, using fieldwork and computing techniques.It is the largest digital analysis of the archaeologicallandscape and monuments of the Stonehenge areayet attempted, with 1,200 monuments beingexamined. Additionally, it collated the contents of allthe excavated Stonehenge barrows for the first time.
2.3.3 The second research project is the StonehengeRiverside Project, which is still running (Parker-Pearson et al 2007). A group of British Universitiesled by the University of Sheffield has beenundertaking excavations since 2003; the project isscheduled to finish in 2010. A number of extremelyimportant discoveries have been made, perhaps mostcritically, the first discovery of Neolithic houses withinthe WHS. Such houses are extremely rare in Britain;perhaps the best-known parallels are from theNeolithic village of Skara Brae in the Orkneys, anotherWHS. The Scottish examples were stone-built, butthe houses from Durrington Walls were built fromless-durable materials – with beaten chalk floors andstake-built and cobb walls. However, in plan, thehouses bear a remarkable resemblance. A total of ten
houses have been excavated, but the excavatorsconsider that there may have been as many as 300houses in the Neolithic settlement, which would makeit the largest known of its time in north-west Europe.
2.3.4 An Avenue with a cobbled surface was revealedrunning through the eastern entrance of DurringtonWalls henge to the River Avon, thus providing a linkfrom that monument to Stonehenge itself which isalso linked to the river via its Avenue. The Avenueterminated at the Southern Circle within the henge; itnow appears that both were earlier than the massivebanks and ditches of the Durrington Walls henge.Further extensive fieldwork took place during 2008within the WHS by the research team, includingexcavations at the Cursus, Stonehenge Avenue, andthe Cursus long barrow. The results are currentlybeing analysed.
2.3.5 The final fieldwork-based project is the SPACESproject, led by the University of Bournemouth. It hasbeen examining the Neolithic remains in the PreseliHills of Wales, the source of the Stonehengebluestones. In April 2008, the team dug a small trenchat Stonehenge to examine the remains of the firststone monument at Stonehenge, the double-bluestone circle. Post-excavation work is stillunderway, but the team have discovered that themonument was altered and dug into during theRoman period.
Several Neolithic houses and an avenue linked to the River Avon
were discovered at Durrington Walls in 2005 during the
Riverside Project excavations led by Sheffield University
2.3.6 Many important archaeological books aboutStonehenge and the World Heritage Site have alsobeen published since 2000, which are detailed in thebibliography and appendix I.
Chri
s N
ew
ton 2
001 ©
Engl
ish H
eri
tage
Adam
Sta
nfo
rd 2
006 ©
Aeri
al-C
am/S
RP 2
006
Stonehenge World Heritage Site Management Plan 2009 21Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
Barrows, New King and Old King Barrows, LakeBarrows and Winterbourne Stoke Barrows);Woodhenge and the henge enclosure of DurringtonWalls; and the Stonehenge Avenue and Cursusearthworks. Much of the area surrounding the WHSis also of archaeological importance. The boundariesof the WHS also include the National Trust’s 827hectare property, managed to protect a landscaperich with interrelated monuments.
Winterbourne Stoke barrow group with Neolithic long barrow
top right
3.1.3 The boundary of the WHS as depicted in the 2000Plan was slightly incorrect and this Plan depicts thecorrect boundary throughout, and accords with theWHS boundary details held by UNESCO in Paris.
3.2 Description of theWorld Heritage Site
Brief description
The official UNESCO brief description of the WorldHeritage Site, agreed by the World HeritageCommittee in July 2008, is:
The cultural heritage of the World Heritage Site
See Map 2 – Archaeology and Land Use
3.2.1 Stonehenge occupies a unique position in our nationalheritage. Its archaeological importance isunquestionable. It also figures strongly in art, literatureand the public consciousness. The landscape that wesee today is the culmination of millennia of humanactivity. The remains unearthed within the WHS pointboth to a degree of status and to the substantial tradethat existed during the Neolithic and Bronze Age,indicating a highly developed society. The WHScontains much more than the Stones alone.Stonehenge lies at the heart of a very densearchaeological landscape comprising a significant groupof long barrows, ridge-top cemeteries mainly of roundbarrows, other major monuments such as henges,earthworks such as the Cursus, and evidence of earlysettlements and field patterns, as well as remains oflater ages. The nature of the recorded archaeologicalevidence is varied and includes built, buried, surfaceand encapsulated forms of evidence occurring atdifferent densities within the WHS. It is recognisedthat visibility of features does not always equate withimportance. Some built monuments may be highlyvisible in the landscape, but other less-well preservedand buried sites may also be important. The WHSwas inscribed on the World Heritage List as a Siteand not as a World Heritage Cultural Landscape (adetailed discussion on this point in relation to theAvebury part of the WHS can be found in Pomeroy-Kellinger 2005, 2.1.3).
The Stonehenge, Avebury, and AssociatedSites World Heritage Site is internationallyimportant for its complexes of outstandingprehistoric monuments. Stonehenge is themost architecturally sophisticatedprehistoric stone circle in the world, whileAvebury is the largest in the world.Together with inter-related monumentsand their associated landscapes, they helpus to understand Neolithic and BronzeAge ceremonial and mortuary practices.They demonstrate around 2000 years ofcontinuous use and monument buildingbetween c. 3700 and 1600 BC. As suchthey represent a unique embodiment ofour collective heritage.
Roge
r Feat
hers
tone 1
993 ©
Engl
ish H
eri
tage
Photo
Lib
rary
N930001
22 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
3.2.2 There are more than 700 known archaeologicalfeatures (including find spots) recorded within theStonehenge WHS, and 180 scheduled areas whichare afforded statutory protection because of theirnational importance. These 180 scheduledmonuments include 415 individual archaeologicalitems or features. Given the density of knownarchaeology, there is considered to be great potentialfor new discoveries within the WHS, and theprotection of the archaeology and the landscape isgiven a high priority in development control decisionswithin the WHS.
3.2.3 The archaeological sites throughout the WHS areevidence of the different cultures which occupiedthe area at different times. A complex sequence ofevents and human activities is represented, whichhas influenced the development and character ofthe landscape.
3.2.4 An appreciation of the key phases of this historiclandscape change, particularly those of prehistorictimes, is important for a full understanding of thesignificance and integrity of the WHS, the currentlandscape and its future management needs. This canbe found in Appendix G.
Perceptions of Stonehenge and the Landscape
3.2.5 Stonehenge in its landscape setting has long beenconsidered to be impressive and important. Literatureand art give a further indication of how it has beenperceived through time. Henry of Huntingdon (1080-1160) in his Historia Anglorum – ‘Stanenges…stones ofwonderful size’ – and Geoffrey of Monmouth (1100-1155) both questioned how the monument wasconstructed. Visitors appeared in larger numbers fromthe seventeenth century, after the survey by InigoJones in 1620. Antiquarians such as John Aubrey(1626-97), William Stukeley (1687-1765) and SirRichard Colt-Hoare (1758-1838) continued therecognition of, and interest in, Stonehenge as asignificant monument. Antiquarians also made detailedstudies of aspects of the landscape, mapping out suchmonuments as the Cursus and the Avenue. Images ofthose times reflect the developing architecturalcontribution made by the monument. Inigo Jones’plans of Stonehenge, for example, were a majorinfluence on the form of part of another WHS – theCircus in Bath – and talks given by Sir John Soane inthe early nineteenth century led to a further revival ofinterest. By the 1830’s it had become a favouriteRomantic site. Artists, including Turner, Constable,and James Barry, were inspired by the ‘romanticmagnificence’ of the monument in its landscape.
Others were drawn by the Stones themselves, suchas the artist Henry Moore in the twentieth century. Amemorable scene from Thomas Hardy’s novel ‘Tess ofthe d'Urbervilles’ (published in 1891) is set within theStone Circle.
‘The North West Prospect of Stone Henge’ by Inigo Jones 1725
Summary of historic environment values
3.2.6 Today the topography and landscape character ofmuch of the WHS can, at first glance, appearunexceptional. The gentle and expansive rollingdownland and small valleys are similar to many otherchalk landscapes in Southern England. However, thelandscape of the WHS provides a remarkable amountof evidence of changing human activities and land usesince the Palaeolithic period, although not all thesearchaeological remains are attributes of OUV. Inparticular, the unusually extensive survival of thedensest and most varied complex of Neolithic andBronze Age monuments in England, are a visible partof the present day landscape. Many individualmonuments are typical of their period while othertypes are extremely rare. Other less well-known, lessvisible, or buried sites all contribute to ourunderstanding of former peoples and the way inwhich they used the landscape. The potential forfurther research and knowledge to be gained fromsites yet-to-be discovered, is also considered to begreat. As a whole, the combination of differentmonument types and their concentration in arelatively small area is unparalleled. A more detaileddescription of archaeological remains within theboundary of the WHS is found at Appendix G.
Mik
e S
eaf
ort
h 2
005 ©
Engl
ish H
eri
tage
Photo
Lib
rary
J0500111
Stonehenge World Heritage Site Management Plan 2009 23Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
The character of the WHS and its regional context
Regional Landscape Context
See Map 8 – Regional Landscape Context
3.2.7 The Regional Character Areas, defined on thenational Character of England map and shown onMap 8, provide a useful context within which toconsider the existing character of the StonehengeWHS landscape. Stonehenge lies within Salisbury Plainat the heart of the extensive chalklands that givestructure to the landscape of much of southernEngland. To the east, the North and South Downsextend through Sussex, Surrey and Kent to thechannel coasts, enclosing the clays of the Low andHigh Weald. To the north and north-east, theBerkshire and Marlborough Downs and the Chilternsmark the northern edge of the Thames Basin Heaths,while to the south, the Dorset Downs and CranborneChase stretch to the coast below Dorchester. Thesegreat bands of chalk come together in Hampshire andWiltshire, where a vast area of downland extendsfor some eighty kilometres. Avebury is situated onthe western edge of the Marlborough Downs withinthe North Wessex Downs Area of OutstandingNatural Beauty.
3.2.8 Though each of these areas of chalk has a distinctiveregional character, they have a number of commonfeatures. These include the characteristic convex,smoothly rounded landform, steep escarpmentswhere the beds of chalk are exposed, dry valleys andlarger river valleys which often provide a focus formodern settlement and communication routes.Historically, the high downland provided a dry andsecure route for travellers, and many ofthe escarpments are crowned with ancientridgeway tracks.
3.2.9 The landscape around Stonehenge exhibits many ofthe classic features associated with chalk. To thenorth, many decades of military training activity haveled to the survival of very extensive areas ofunimproved downland where there is an absence ofsettlement. To the south, east and west lie chalk rivervalleys, characterised by a high density of historicvillages and designed landscapes clustered along thesides of lush floodplains.
Landscape Character Classification of the WHS and itsEnvirons
See Map 9 – Landscape Character
3.2.10 Landscape types have been identified within a broadstudy area around the WHS by the Stonehenge WHSLandscape and Planning Study (Land Use Consultants,1995). These are tracts of countryside with a unity ofcharacter due to broadly similar combinations ofgeology, landform and land cover, and a consistentand distinct pattern of constituent elements.Differences in landscape character reflect bothphysical and historical influences including drainage,land use and field patterns.
3.2.11 Within the study area, seven landscape types havebeen identified (Land Use Consultants, 1995)reflecting two main principal physiographic variationsin the structure of the landscape. Their broaddistribution is shown on Map 9, which presents thelandscape types in relation to the occurrence ofrecorded archaeology within the WHS and thesurrounding area. They include:
(A) Downland Landscapes(A1) Dry River Valleys(A2) Upper Stonehenge Dry Valley(A3) Agricultural Downland(A4) Downland Ridgelines(A5) Unimproved Downland/Military Training Areas(B) Avon Valley Landscapes(B1) River Valley: Water Meadows and Floodplain(B2) River Valley: Slopes
3.2.12 The landscape types are relatively coherent units interms of the management issues that they raise.Landscape management guidelines for each type wereidentified in the same study. These aim to conserveand enhance the area’s landscape character, bymaintaining the differences in land cover andvegetation which distinguish the river valley watermeadows and floodplain landscape from the opendownland, for example. This broad guidance has beenincorporated into the objectives of the WHSManagement Plan.
Key Characteristics of the Landscape
3.2.13 Typically, much of the WHS is an open landscape inwhich the sky dominates. The undulating landform,with large fields bounded by fences and long distantviews of plantations, clumps of trees, roads andupstanding archaeological features are the mostdistinctive characteristics of the downland plateaulandscapes within the WHS (see Map 9). The general
24 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
absence of hedgerows and buildings is also a notablefeature. In contrast to the expansive downlandplateau areas, the enclosed and small-scale characterof the Avon Valley is a significant variation in thecharacter of the WHS. Here, the River Avonmeanders through cattle-grazed water meadows,bordered by thick woodland which extends up thevalley sides in places. Small riverside settlements withdistinctive historic buildings follow the valley floor,complemented by the designed landscapes of oldparkland. The sense of tranquillity and remoteness isenhanced by the visual containment of the woodedvalley slopes.
Stonehenge from Byway 11 with Larkhill in the background
Landform
See Map 10 – Visual Sensitivity
3.2.14 The topography of the WHS landscape is rolling witha series of ridges and dry valleys. These include theKing Barrow Ridge which extends southwards toSpringbottom, the Cursus/Stonehenge Down, theNormanton Down ridgelines; and WinterbourneStoke, and the Lesser Cursus ridgelines. Prominentdry valleys, such as the one running northwards fromSpringbottom to Larkhill Plantation are also distinctivefeatures. The valley of the River Avon along theeastern boundary forms a marked transition to thedownland east of the WHS. To the west, thewatershed between the Avon and the Till catchmentsmarks the boundary of the Site.
Modern features of the landscape
3.2.15 The current character of the Stonehenge landscape isgreatly influenced by relatively recent agricultural andforestry land use practice. Much of the WHSlandscape was laid out in the twentieth century, andwithin these modern land parcels are many individual
monuments and much surviving archaeology. Parts oftoday’s landscape are dominated by the intensivemilitary use of the WHS during the early twentiethcentury, further documented in a study by WessexArchaeology in 1998 (Stonehenge military installations:a desk-based assessment). The landscape has beensubject to continuous change, with varying intensitiesor speed of change over different periods, and it willcontinue to change into the future.
3.2.16 Today several major intrusive elements are obviouswithin the rich archaeological landscape. The A303 (aformer 18th Century toll road) and the A344 andA360 roads, and their associated traffic, run straightacross the landscape and are particularly visible andaudible features. They are most noticeable aroundStonehenge in the triangle between the two roads, atKing Barrow Ridge and at Longbarrow Crossroads.The existing Stonehenge car park adjacent to theA344 is also a visually intrusive modern developmentin the landscape. To the north, the large modernbuildings of Larkhill Garrison dominate the risingslopes on the edge of Salisbury Plain while to the east,the buildings at Boscombe Down are prominent onthe skyline. In an open landscape such as Stonehenge,fence lines, silos and pylon lines are also potentiallyintrusive features, particularly where they crossridgelines, although these are largely screened by treesfor much of the year.
Trees and Woodlands in the Landscape
3.2.17 The woodlands within the WHS are typically of twomain types. Firstly, ridgeline clumps of mixeddeciduous trees planted in the 18th and 19thcenturies include a high proportion of beech, such ason King Barrow Ridge and Winterbourne StokeClump. Many of these developed originally fromsimpler coppices of hazel and ash. Secondly, there areplantations of pine, mainly Scots and Corsican, mostof which were planted at the end of the SecondWorld War, such as the west and east LarkhillPlantations. The largest block of woodland is FargoPlantation which is a complex area of woodland ofdeciduous and coniferous species. This woodland,because of its size and location, is also a visuallydominant feature and can be seen from most of thearea as far east as the King Barrow Ridge. Many of theridgeline clumps have suffered greatly from windblow,particularly the New King Barrow Plantation andWinterbourne Stoke Clump in 1987 and 1990.
Dav
id B
atch
elo
r 2003 ©
Engl
ish H
eri
tage
Stonehenge World Heritage Site Management Plan 2009 25Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
Agricultural Character
3.2.18 Changes in agricultural techniques and, in particular,the drive to increase agricultural production duringthe twentieth century, has meant that most of thedownland has been ploughed up to allow moreintensive agricultural production. As a result, much ofthe WHS, along with the surrounding downland (withthe exception of the military training area) is arable incharacter. Extensive arable fields occur across a largeproportion of the WHS. In recent years, the areanorth of the A303 around Stonehenge itself and theCursus Barrows have been converted from arable topasture, and large parts of the WHS below the A303have now been converted with the aid of Defragrants. Some small isolated fragments of chalkgrassland have survived on the steeper slopes and onsome protected archaeological sites.
3.3 Significance of theWorld Heritage Site
The Outstanding Universal Value of the WHS
3.3.1 The UK Government is accountable according to theWorld Heritage Convention for the protection,conservation, presentation and transmission to futuregenerations of its sites on the World Heritage List inorder to sustain their Outstanding Universal Value(OUV). According to the UNESCO OperationalGuidelines, OUV is ‘cultural and/or natural significancewhich is so exceptional as to transcend nationalboundaries and to be of common importance forpresent and future generations of all humanity’. TheOperational Guidelines sets out ten criteria forassessing whether or not a place has OUV.
3.3.2 Nowadays, the UNESCO World Heritage Committeeadopts a Statement of Outstanding Universal Valuefor each site when it is inscribed. These Statements:
■ Contain a summary of the Committee’sdetermination that the property has OUV,
■ identify the criteria under which the property wasinscribed,
■ assess the conditions of integrity or authenticity,and
■ assess the requirements for protection andmanagement in force.
The Statement of Outstanding Universal Value is thebasis for the future protection and management ofthe property (UNESCO 2008).
3.3.3 Past inscriptions, including that of Stonehenge andAvebury, do not have such statements. In many cases,the Committee’s definition of why a site has OUVhas to be deduced from the documentation(particularly the Advisory Body evaluation) submittedto the Committee at the time of inscription plus anycomments made in their decision. Therefore, one ofthe Committee’s follow-up actions to the PeriodicReport on Europe, completed in 2005, has been toask each Government to prepare a short Statementof Significance for each site inscribed before 1998.These Statements have to be based on the originalCommittee decision and documentation and do notallow for any changes from the Committee’s views atthe time of inscription. They do not coverauthenticity and integrity since these were notformally assessed in the early decades of theConvention and there is therefore no evidence inCommittee documentation of these aspects of theWHS. These shortened statements are known asStatements of Significance and help to guide thefuture management of each WHS. The Committeeintends in the future to develop a methodology forinclusion of assessments of authenticity and integrityin these retrospective Statements.
Avebury Stone Circle, the largest in the world
Statement of Significance
3.3.4 The World Heritage Committee agreed a Statementof Significance for the whole Stonehenge, Aveburyand Associated Sites World Heritage Site at itsmeeting in July 2008 (decision 32 COM 8B.93). ThisStatement was proposed by the UK Governmentfollowing its agreement by the Avebury WHS SteeringGroup and the Stonehenge WHS Committee. ThisStatement sets out why the Site was placed on theWorld Heritage List and should guide themanagement of the Site for the foreseeable future.
Dam
ian G
rady
2007 ©
Engl
ish H
eri
tage
Photo
Lib
rary
N071125
26 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
UNESCO CRITERIA FOR INSCRIPTION ON THE
WORLD HERITAGE LIST
Criterion (i): The monuments of the Stonehenge,
Avebury, and Associated Sites World Heritage Site
demonstrate outstanding creative and
technological achievements in prehistoric times.
Stonehenge is the most architecturally sophisticatedprehistoric stone circle in the world. It is unrivalled in itsdesign and unique engineering, featuring huge horizontalstone lintels capping the outer circle and the trilithons,locked together by carefully shaped joints. It is distinguishedby the unique use of two different kinds of stones(Bluestones and Sarsens), their size (the largest weighingover 40t), and the distance they were transported (up to240km).The sheer scale of some of the surroundingmonuments is also remarkable: the Stonehenge Cursusand the Avenue are both about 3km long, while DurringtonWalls is the largest known henge in Britain, around 500min diameter, demonstrating the ability of prehistoric peoplesto conceive, design and construct features of great sizeand complexity.
Avebury prehistoric stone circle is the largest in the world.The encircling henge consists of a huge bank and ditch1.3km in circumference, within which 180 local, unshapedstanding stones formed the large outer and two smallerinner circles. Leading from two of its four entrances, theWest Kennet and Beckhampton Avenues of parallelstanding stones still connect it with other monuments in thelandscape. Another outstanding monument, Silbury Hill, isthe largest prehistoric mound in Europe. Built around 2400BC, it stands 39.5m high and comprises half a milliontonnes of chalk.The purpose of this imposing, skilfullyengineered monument remains obscure.
Criterion (ii): The World Heritage Site provides an
outstanding illustration of the evolution of
monument construction and of the continual use
and shaping of the landscape over more than 2000
years, from the early Neolithic to the Bronze Age.
The monuments and landscape have had an
unwavering influence on architects, artists,
historians, and archaeologists, and still retain a
huge potential for future research.
The megalithic and earthen monuments of the WorldHeritage Site demonstrate the shaping of the landscapethrough monument building for around 2000 years fromc 3700 BC, reflecting the importance and wide influence ofboth areas.
Statement of Significance
SUMMARY
The Stonehenge, Avebury, and Associated SitesWorld Heritage property is internationallyimportant for its complexes of outstandingprehistoric monuments.
It comprises two areas of chalkland in Southern Britain withinwhich complexes of Neolithic and Bronze Age ceremonial andfunerary monuments and associated sites were built. Eacharea contains a focal stone circle and henge and many othermajor monuments. At Stonehenge these include the Avenue,the Cursuses, Durrington Walls,Woodhenge, and the densestconcentration of burial mounds in Britain. At Avebury, theyinclude Windmill Hill, the West Kennet Long Barrow, theSanctuary, Silbury Hill, the West Kennet and BeckhamptonAvenues, the West Kennet Palisaded Enclosures, andimportant barrows.
The World Heritage property is of Outstanding UniversalValue for the following qualities:
■ Stonehenge is one of the most impressive prehistoricmegalithic monuments in the world on account of thesheer size of its megaliths, the sophistication of itsconcentric plan and architectural design, the shaping ofthe stones, uniquely using both Wiltshire Sarsensandstone and Pembroke Bluestone, and the precisionwith which it was built.
■ At Avebury, the massive Henge, containing the largestprehistoric stone circle in the world, and Silbury Hill, thelargest prehistoric mound in Europe, demonstrate theoutstanding engineering skills which were used to createmasterpieces of earthen and megalithic architecture.
■ There is an exceptional survival of prehistoricmonuments and sites within the World Heritage siteincluding settlements, burial grounds, and largeconstructions of earth and stone.Today, together withtheir settings, they form landscapes without parallel.These complexes would have been of major significanceto those who created them, as is apparent by the hugeinvestment of time and effort they represent.Theyprovide an insight into the mortuary and ceremonialpractices of the period, and are evidence of prehistorictechnology, architecture, and astronomy.The carefulsiting of monuments in relation to the landscape helpsus to further understand the Neolithic and Bronze Age.
Stonehenge World Heritage Site Management Plan 2009 27Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
3.3.5 As well as endorsing the above Statement ofSignificance, the Stonehenge World HeritageCommittee and the Avebury World Heritage SteeringGroup also agreed the following text, in January 2008,which accompanies the Statement of Significance:
3.3.6 As well as endorsing the above Statement ofSignificance, the Stonehenge World HeritageCommittee and the Avebury World Heritage SteeringGroup also agreed the following text, in January 2008,which accompanies the Statement of Significance:
Key
These are the definitions used in this Statement andin Article 1 of the World Heritage Convention formonuments, groups of buildings, and sites:
Article 1 – For the purpose of this Convention, thefollowing shall be considered as “cultural heritage”:
Monuments: architectural works, works of monumentalsculpture and painting, elements or structures of anarchaeological nature, inscriptions, cave dwellings andcombinations of features, which are of OutstandingUniversal Value from the point of view of history, artand science;
Groups of buildings: groups of separate or connectedbuildings which, because of their architecture, theirhomogeneity or their place in the landscape, are ofOutstanding Universal Value from the point of view ofhistory, art or science;
Sites: works of man or the combined works of natureand man, and areas including archaeological siteswhich are of Outstanding Universal Value from thehistorical, aesthetic, ethnological or anthropologicalpoint of view.
These are the original definitions for Criteria i, ii and iiiwhich were current and in use in 1985/6:
*Criterion i – represent a unique artistic achievement,a masterpiece of creative genius.
**Criterion ii – have exerted great influence, over aspan of time or within a cultural area of the world, ondevelopments in architecture, monumental arts ortown planning and landscaping.
***Criterion iii – bear a unique or at least exceptionaltestimony to a civilisation which has disappeared.
Since the 12th century when Stonehenge was consideredone of the wonders of the world by the chroniclers Henry ofHuntington and Geoffrey of Monmouth, the Stonehengeand Avebury sites have excited curiosity and been thesubject of study and speculation. Since early investigationsby John Aubrey, Inigo Jones, and William Stukeley, they havehad an unwavering influence on architects, archaeologists,artists, and historians.The two parts of the World HeritageSite provide an excellent opportunity for further research.
Today, the Site has spiritual associations for some.
Criterion (iii): The complexes of monuments at
Stonehenge and Avebury provide an exceptional
insight into the funerary and ceremonial practices
in Britain in the Neolithic and Bronze Age.
Together with their settings and associated sites,
they form landscapes without parallel.
The design, position, and inter-relationship of themonuments and sites are evidence of a wealthy and highlyorganised prehistoric society able to impose its concepts onthe environment. An outstanding example is the alignmentof the Stonehenge Avenue (probably a processional route)and Stonehenge stone circle on the axis of the midsummersunrise and midwinter sunset, indicating their ceremonialand astronomical character. At Avebury the length and sizeof some of the features such as the West Kennet Avenue,which connects the Henge to the Sanctuary over 2kmaway, are further evidence of this.
A profound insight into the changing mortuary culture of theperiods is provided by the use of Stonehenge as acremation cemetery, by the West Kennet Long Barrow, thelargest known Neolithic stone-chambered collective tomb insouthern England, and by the hundreds of other burial sitesillustrating evolving funerary rites.
28 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
The other values of the WHS are further discussedbelow at 3.3.24 - 3.3.45.
The Attributes of Outstanding Universal Value for theStonehenge part of the WHS
3.3.7 The Statement of Significance above sets out asummary of the World Heritage Committee’sdetermination that the Site has OUV. From thisStatement, a number of attributes expressing theOUV have been identified. It is helpful to set theseout in more detail to assist in the management of theSite. The attributes are not themselves individually ofOUV but together they express the OUV of the Site.
The attributes set out below only relate to theStonehenge part of the WHS. As they clearly arederived from the Statement of Significance, theseattributes ultimately derive from the nominationdocumentation and the ICOMOS evaluation datingto 1985/6.
The Attributes of OutstandingUniversal Value of the StonehengeWorld Heritage Site
1. Stonehenge itself as a globally famous andiconic monument.
2. The physical remains of the Neolithic andBronze Age funerary and ceremonialmonuments and associated sites.
3. The siting of Neolithic and Bronze Agefunerary and ceremonial sites andmonuments in relation to the landscape.
4. The design of Neolithic and Bronze Agefunerary and ceremonial sites andmonuments in relation to the skiesand astronomy.
5. The siting of Neolithic and Bronze Agefunerary and ceremonial sites andmonuments in relation to each other.
6. The disposition, physical remains and settingsof the key Neolithic and Bronze Agefunerary, ceremonial and other monumentsand sites of the period, which together forma landscape without parallel.
7. The influence of the remains of Neolithic andBronze Age funerary and ceremonialmonuments and their landscape settings onarchitects, artists, historians, archaeologistsand others.
Other values
In addition to the Outstanding Universal Valueoutlined above, which give the Site its internationalsignificance, there are other national and localvalues which have to be taken into account inmanagement decisions.
These are set out in the two management plansfor Stonehenge and Avebury. They include: thearchaeological and historical significance of otherperiods from the Mesolithic onwards, continuallyaugmented by new discoveries, social value andlocal needs, educational resource, ecological value,tourism, agriculture and other economic activities.The movable artefacts from the World HeritageSite are important in developing our understandingof this prehistoric culture. Many of them are heldat the nearby Wiltshire Heritage Museum inDevizes, the Salisbury and South WiltshireMuseum, Salisbury and the Alexander KeillerMuseum at Avebury itself. At Avebury, it isimportant to take into consideration the needs ofthe local community living within and adjacent tothe Henge, which creates particular issues.
Stonehenge (c. 3000 - 1600 BC) is the most architecturally sophisticated prehistoric stone circle in the world, unrivalled in its design
and unique engineering
Nic
k C
ow
en 2
004 ©
Nic
k C
ow
en
Stonehenge World Heritage Site Management Plan 2009 29Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
3.3.8 Stonehenge itself as a globally famous and
iconic monument is an attribute of OUV. Thismonument is both an important and enduring symbolof man’s prehistoric past, and an internationallyrecognized symbol of Britain. It is difficult to overstateits importance as one of the best-known and best-loved monuments in the world.
The tallest Sarsen, with its fallen lintel in front
3.3.9 At the Stonehenge WHS, the physical remains of
the Neolithic and Bronze Age ceremonial and
funerary monuments and associated sites are anattribute of OUV. In particular, it is considered thatStonehenge, the most architecturally sophisticatedstone circle in the world, is a masterpiece of humancreative genius. This monument, a focal point withinthe WHS, survives well and is unrivalled in its designand unique engineering.
3.3.10 In a similar way, the physical remains of some othermonuments within the WHS are also considered tobe masterpieces of human creative genius. Theseinclude Durrington Walls henge, the largest in Britain,which demonstrates the masterly ability of prehistoricpeoples to organise and construct massive structures.Other such massive monuments include theStonehenge Cursus and the Stonehenge Avenue. Allof these sites are relatively well-preserved, haveupstanding remains, and are attributes of the Sitewhich express its OUV.
3.3.11 The physical remains of other Neolithic and BronzeAge ceremonial and funerary monuments are alsoconsidered to be attributes of OUV, and bear anexceptional testimony to a now-disappearedcivilization. As well as the sites described in sections3.3.9 and 3.3.10 above, they include Woodhenge, theLesser Cursus and the densest concentration ofBronze Age burial mounds in Britain. They provide aninsight into the mortuary and ceremonial practices ofthe period. Some of these sites and monuments haveupstanding, visible remains. Others such as the LesserCursus are now ploughed flat and survive only below-ground; however, they retain some of their integritythrough the survival of buried archaeological remains.
3.3.12 The siting of Neolithic and Bronze Age funerary
and ceremonial sites and monuments in relation
to the landscape including rivers and water is alsoan attribute of OUV. For example, it is now knownthat the monuments of Durrington Walls andStonehenge were linked via their Avenues to theRiver Avon and possibly thence to each other, andsome barrow cemeteries were clearly built onprominent ridge-lines for their visual impact and in linewith earlier burials. Whatever its original function, theStonehenge Cursus seems to have been laid out insuch a way as to link outward views over the Till andAvon valleys.
3.3.13 The design of Neolithic and Bronze Age funerary
and ceremonial sites and monuments in relation
to the skies and astronomy is an attribute of OUV.A number of sites within the WHS are aligned on themidsummer sunrise and midwinter sunset axis, forexample, Stonehenge, Woodhenge and parts of theStonehenge Avenue. At Stonehenge, this factorappears to be an extremely important one from theearliest stages of the monument and continued assuch throughout its subsequent development. Themidwinter sunrise – midsummer sunset solsticial axismay also be of importance.
Sunrise through the Stones looking North East along the
summer solstice alignment
1987 ©
Engl
ish H
eri
tage
Photo
Lib
rary
J870392
Nig
el C
orr
ie 2
005 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K050085
30 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
The Stonehenge Avenue (c. 2,500-1,700 BC), a
processional route partly aligned on the midsummer
sunrise – midwinter sunset solsticial axis
The King Barrows, a ridge-top Bronze Age barrow cemetery
overlooking Stonehenge
Woodhenge (c. 2,300 BC), a timber circle set
within a small earthwork henge, also aligned on
the solstice axis as at Stonehenge
The Winterbourne Stoke Barrow Cemetery,
with later round barrows aligned on its earlier
long barrow
The Cursus (c. 3,600-3,400 BC), a huge
earthwork enclosure, 2.7km long
The Normanton Down Barrow
Cemetery, one of the finest in Britain,
which includes the Bush Barrow with its
famous grave goods. This area has now
been improved by arable reversion
Durrington Walls (c. 2,500 BC) the largest henge in Europe,
some 500m in diameter
The Lesser Cursus
1994 ©
Cro
wn c
opyr
ight
NM
R 1
504_26
Lucy
Eve
rshed 2
008 ©
Nat
ional
Tru
st
Dam
ian G
rady
2003 ©
Engl
ish H
eri
tage
NM
R 2
1959_18
Dam
ian G
rady
2000 ©
Engl
ish H
eri
tage
Photo
Lib
rary
N000001
2000 ©
Engl
ish H
eri
tage
NM
R 1
8663_19
1989 ©
Cro
wn c
opyr
ight
NM
R 4
482_16
Dam
ian G
rady
2003 ©
Engl
ish H
eri
tage
NM
R 2
1959_24
Sky
eye
Aeri
al P
hoto
grap
hy
2004 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K040326
Stonehenge World Heritage Site Management Plan 2009 31Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
3.3.14 The siting of Neolithic and Bronze Age funerary
and ceremonial sites and monuments in relation
to each other is an attribute of OUV. For example,from Stonehenge itself, a number of importantbarrow groups are visible, such as those on KingBarrow Ridge and Normanton Down. These barrowcemeteries were deliberately built on prominent ridgelines and are clearly visible from Stonehenge, andindeed from each other, as well as from othermonuments such as the Cursus. Other barrow groupsfurther away, such as the Lake Barrows, would alsohave been visible from Stonehenge.
Panoramic view with the Stones in the distance and a barrow in
the foreground
3.3.15 It is not only barrow groups which are attributes ofOUV in this way. There are clusters of othermonuments which are not visible from Stonehenge,and never would have been. For example, thecomplex of sites in the Durrington Walls area includesits avenue leading from the river to the henge, itsassociated settlement, Woodhenge, and otherNeolithic and Bronze Age barrows and sites along theridge south of Woodhenge. All these monumentswere clearly sited in relation to each other and to thetopography of the landscape. A similar pattern occursaround the Stonehenge Cursus, which attracted laterBronze Age barrow groups.
3.3.16 The disposition, physical remains and settings of
the Neolithic and Bronze Age funerary,
ceremonial and other monuments and sites of
the period, which together form a landscape
without parallel, are an attribute of OUV. Thedesign, position and inter-relationship of themonuments are evidence of a wealthy and highlyorganised prehistoric society able to impose itsconcepts on the environment. In some parts of theWHS, monuments or groups of monuments, such asthe King Barrow Ridge barrow cemetery, Stonehenge,and the Normanton Down barrow cemetery, are sowell-preserved and prominent that they, their settings,and their inter-relationships form immediatelyrecognisable parts of an archaeological landscape. Inother parts of the WHS, however, the monumentsand sites have become degraded or hidden and theirsignificance and physical interrelationships to one
another and the landscape are no longer visible to thenaked eye but are nevertheless equally attributes ofthe Site’s OUV as may be areas which appear to havebeen deliberately left empty of monuments.
Reconstruction drawing of the Stonehenge Landscape in c1600
BC by Peter Dunn
3.3.17 The influence of the remains of Neolithic and
Bronze Age funerary and ceremonial monuments
and their landscape settings on architects,
artists, historians, archaeologists and others is anattribute of OUV. For example, Stonehenge has beendepicted in a number of key views by a number ofartists of the British Romantic Movement of theeighteenth and nineteenth centuries.
Stonehenge, a watercolour by J M W Turner (1775-1851)
painted between 1825 and 1828
3.3.18 There are also some Neolithic and Bronze Agefunerary, ceremonial and communal monuments,close to but outside the current boundary of theWHS, the remains of which along with their settings,could be considered to be related to its OUV. Theobvious candidates include the causewayed enclosureof Robin Hood’s Ball and the long barrows in thisgeneral area to the north and west of the WHS, oneof which is only a few metres north of the current
© E
ngl
ish H
eri
tage
Photo
Lib
rary
J050045
With k
ind p
erm
issi
on o
f Sa
lisbury
and S
outh
Wilt
shir
e M
use
um
©
Pau
l H
ighnam
1994 ©
Engl
ish
Heri
tage
Photo
Lib
rary
J940229
32 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
boundary. These early Neolithic monuments were infact named in the UK Government’s nominationdocumentation of 1985, and are part of thedevelopment of the Stonehenge area into a locality ofexceptional significance in the later Neolithic andBronze Ages. These monuments help us tounderstand the Site and without them, the WHS as awhole may lack some elements of integrity. It isnoteworthy that Avebury’s causewayed enclosure –Windmill Hill – is within the boundary of the Aveburypart of the WHS. The importance of the widerStonehenge area has been demonstrated by therecent finds of rich early Bronze Age graves such asthe “Amesbury Archer” and the “BoscombeBowmen”, both of which are outside the currentWHS boundary.
Robin Hood’s Ball causewayed enclosure and its
two circuits of ditch
Authenticity and Integrity
3.3.19 For the reasons discussed above, authenticity andintegrity were not considered by the World HeritageCommittee. It is nonetheless important to make somestatement on these issues since they are fundamentalto the future management of the site. Authenticity, asdefined in the Operational Guidelines is about thetruthfulness and credibility of the evidence for thesite’s OUV while integrity is about the wholeness ofthe WHS. This is very much a first attempt not justfor Stonehenge but for all early inscriptions on theWorld Heritage List and will need to be developedfurther over the lifetime of this Plan.
Authenticity
3.3.20 The Operational Guidelines suggest that authenticityshould be assessed through use of general attributessuch as ‘form and design’ or ‘materials and substance’.Since more precise attributes of OUV have beendefined for Stonehenge, it is appropriate to use thesefor the assessment of authenticity. For each of
Attributes 1 – 7, a brief assessment of the currentposition is made together with an estimate of howthings have changed since the WHS was inscribed in1986. Assessment of authenticity has been greatlyaided by the results of the centuries of researchcarried out around Stonehenge and in particular bythe amount of work carried out since 1986.
1. Stonehenge itself as a globally famous and iconic
monument.
Stonehenge itself is recognized throughout the worldas a symbol of Britain as well as a masterpiece ofgreat antiquity. This recognition has probablyincreased over the last two decades.
2. The physical remains of the Neolithic and Bronze
Age funerary and ceremonial monuments and
associated sites.
All such archaeological monuments and associatedsites are protected by scheduling while many of thekey sites are in the care of either English Heritage orthe National Trust. Apart from Stonehenge itself,which underwent considerable works in the earlierpart of the twentieth century to stabilize the stonesand re-erect those which had fallen from knownpositions, most sites have been untouched, apart fromexcavation within many of the burial mounds in thenineteenth century and work carried out toDurrington Walls during the re-alignment of the A338in the 1960’s. Since the WHS was inscribed in 1986, alarge number of sites have been taken out ofcultivation, thereby protecting their archaeologicalvalue from further damage by ploughing. Once underpermanent grass, sites need to be protected from thegrowth of scrub and trees, and from burrowinganimals, all of which can damage archaeologicaldeposits. A number of sites within the WHS needattention in this respect but overall the condition ofthe physical archaeology is far better than it wasin 1986.
3. The siting of Neolithic and Bronze Age funerary and
ceremonial sites and monuments in relation to
the landscape.
Relationships between the surviving Neolithic andBronze Age funerary and ceremonial sites andmonuments and the landscape remain at least as clearas they were in 1986. Recent archaeological work byExon et al and the Stonehenge Riverside Project hasincreased our understanding of these relationships.Some visual and physical links are still impeded by themajor roads in the landscape, by woodland and bymodern development around Larkhill, as they werein 1986.
1995 ©
Cro
wn c
opyr
ight
NM
R 1
5258/3
6
Stonehenge World Heritage Site Management Plan 2009 33Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
4. The design of Neolithic and Bronze Age funerary and
ceremonial sites and monuments in relation to the skies
and astronomy.
There is much debate about the way in which thedesign and siting of Neolithic and Bronze Agefunerary and ceremonial sites and monumentsrelates to the skies and astronomy. It is generallyagreed that the solsticial alignments of Stonehengeitself are a key element of its design. These havenot been impaired by intrusive structures since thesite was inscribed in 1986.
5. The siting of Neolithic and Bronze Age funerary
and ceremonial sites and monuments in relation to
each other.
Relationships between the Neolithic and Bronze Agefunerary and ceremonial sites and monuments remainas clear as they were in 1986 and can in most casesbe easily appreciated. In some cases, visual andphysical links are interrupted by woodland. The majorroads (A303 and A344) in the landscape intrude onsome relationships, for example between Stonehengeitself and its Avenue and between Normanton DownBarrow group and Stonehenge.
6. The disposition, physical remains and settings of the
Neolithic and Bronze Age funerary, ceremonial and
other monuments and sites of the period, which together
form a landscape without parallel.
The largely open nature of the landscape means thatthe disposition, physical remains and settings of theNeolithic and Bronze Age funerary, ceremonial andother monuments and sites of the period, whichtogether form a landscape without parallel, remainsclear over much of the WHS. Relationships are lessclear in the northern part of the WHS around thesettlement of Larkhill where there is a considerableamount of modern development within the WHS.Elsewhere the major roads intrude on appreciation ofthe landscape without parallel. Modern woodland alsoobscures some aspects of the landscape though it alsohas an important screening role. The reversion of 20%of the WHS to grassland has strengthened the settingof a number of attributes of OUV since 1986.
7. The influence of the remains of Neolithic and Bronze
Age funerary and ceremonial monuments and their
landscape settings on architects, artists, historians,
archaeologists and others.
This attribute is expressed most clearly in artworkswithin the WHS, mainly centred on Stonehenge itself,and also in literature. Many such views remain largelyunaffected by modern development apart from themajor roads which can of course be an aspect ofthe artist’s or writer’s response to the WHS(cf VS Naipaul). This position has not altered since1986 apart from the increased volume and noise ofroad traffic.
This attribute is also expressed by the fact thatStonehenge has been one of the key areas in theapproach to the development of landscapearchaeology since the work of Stukeley and others inthe 18th century.
Integrity
3.3.21 Assessments of integrity are asked to examine theextent to which the WHS:
(i) includes all elements necessary to express itsOUV
(ii) is of adequate size to ensure the completerepresentation of the features and processeswhich convey the property’s significance
(iii) suffers from adverse effects of developmentand/or neglect
3.3.22 As noted above, some elements which might help usto understand the significance of the WHS areoutside its boundaries. It therefore follows that it maynot be of adequate size to ensure completerepresentation of the features which convey its OUV.However, the boundary is that which was acceptableto ICOMOS and the World Heritage Committeewhen the site was inscribed in 1986. Possible re-assessment of the boundary is further discussed inSection 14, Aim 2.
3.3.23 The major adverse impacts of development – the twomajor roads (A303 and A344) and the current visitorfacilities – were present in 1986. At that time, theGovernment gave an undertaking to remove theA344 which has not yet been achieved. Theseimpacts have not changed in form though there isnow more intensive use of them. More intensive useof the roads and of car parking at the current visitorfacilities has had an impact on the visual integrity ofthe Site. The extent of other modern developmentwithin the WHS has not increased since 1986although there is now increased light pollution. The
34 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
integrity of the WHS has improved thanks to thereversion of 20% of the Site to permanent grassland.As well as markedly changing the character of parts ofthe WHS, this has also stopped further damage byploughing to buried archaeology.
Other cultural heritage and historicenvironment values
Historic Environment values
3.3.24 The WHS contains many later archaeological andhistoric remains many of which are important in theirown right, although not attributes of its OUV. Someare of national importance – such as the Iron Agehillfort of Vespasian’s Camp; Amesbury Abbey Parkand Garden; and the Larkhill Aircraft Hangars – andare protected through scheduling, listing and beingplaced on the register of parks and gardens. Stillothers have no legal protection, but have local orregional importance.
3.3.25 It is important, when making decisions about themanagement of the WHS, that all aspects of thehistoric environment are taken into account in anappropriate way.
Museum and Archive Collections
3.3.26 Although by definition moveable objects cannot formpart of a WHS, there are a number of nationallyimportant museum and documentary archivecollections which help illuminate our understanding ofthe Stonehenge WHS and its archaeological context.Many artefacts, historical documents and archives ofresearch from the 18th century onwards are held atthe Wiltshire Heritage Museum (WHM) in Devizes,including the famous gold objects from Bush Barrow.Other finds and records are held in the Salisbury andSouth Wiltshire Museum (SSWM), which is now themuseum which receives archaeological material fromthe Stonehenge WHS. There are also very importantcollections of data in the Wiltshire and SwindonHistory Centre (including the Wiltshire Sites andMonuments Record), the National MonumentsRecord and The National Archives. These uniquecollections are vital for research and education, and itis essential that they continue to be excellentlymaintained and curated.
A gold breast plate and belt hook from Bush Barrow and two
bronze daggers and a bronze axe with the reconstructed
sceptre, from Bush Barrow
Detail of the gold breast plate found in the Bush Barrow
Landscape and nature conservation values
3.3.27 The WHS lies within the South Wessex DownsNatural Area identified by Natural England. The mostnotable habitats within the WHS are small areas ofremnant unimproved species-rich chalk grassland,chalk rivers and associated wet grassland, woodlandand arable. Due to the widespread effects of intensivearable cultivation in this general area, the grasslands ofhigher ecological value are largely confined to verges,steeper slopes and barrows. Large areas of formerarable land within the WHS have been reverted tograssland by both the National Trust and private
© W
iltsh
ire H
eri
tage
Muse
um
D
avid
Bukac
h, as
par
t of a
Univ
ers
ity
of B
irm
ingh
am r
ese
arch
pro
ject
,
funded b
y th
e L
eve
rhulm
e T
rust
© W
iltsh
ire H
eri
tage
Muse
um
Stonehenge World Heritage Site Management Plan 2009 35Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
landowners, and special Natural England grants havecontributed to parts of the WHS reverting fromarable to pasture. Arable land is also important in theWHS for farmland birds such as stone-curlew andcorn bunting, mammals such as hares and uncommonarable plants.
3.3.28 To the west of the WHS lies the Parsonage DownNational Nature Reserve, considered to be one ofthe most outstanding chalk downland sites in Britain.Most of the site has escaped ploughing and otheragricultural improvements during the last 100 years.Grazing over the last 60 years has maintained plantand animal diversity. The site is also of somearchaeological significance.
3.3.29 Much of Salisbury Plain, including land directly adjacentto the northern WHS boundary, is designated as aSite of Special Scientific Interest (SSSI). The areacomprises the largest expanse of unimproved chalkdownland in north west Europe and represents 41%of Britain’s remaining area of this habitat. The survivalof this unimproved downland is largely a consequenceof Ministry of Defence ownership and use of the areafor army training, which has limited intensive farmingactivity. The SSSI of just under 13,000 hectares ofchalk downland supports 13 species of nationally rareand scarce plants, 67 species of rare and scarceinvertebrates, and includes a site of internationalimportance for birds. The importance of this area fornature conservation is further recognised at theEuropean level by its designation as a SpecialProtection Area for birds, and as a Special Area ofConservation under the Habitats Directive
3.3.30 Within the WHS, the Avon Valley has beendesignated as an Environmentally Sensitive Area tomaintain its acknowledged landscape and ecologicalvalue through appropriate land management practices.In addition, the Rivers Till (just outside the WHS) andAvon (forming the boundary of the WHS) have beendesignated as SSSIs and each is a Special Area ofConservation in recognition of the national andEuropean importance of their ecological interest.
3.3.31 The stream and water meadow habitats of the AvonValley are of international ecological value. On theagricultural downland of the chalk plateau, theunimproved grassland of ecological interest is largelylimited to surviving fragments of unimproved chalkgrassland on barrows and steeper slopes. Theseremaining areas offer potential for targeting downlandre-creation which buffers, links and extends theseremaining fragments.
3.3.32 In the general absence of hedgerows on the chalkplateau, arable field margins provide important‘corridors’ through the landscape and are of value forinvertebrates, mammals and birds. The requirementfor some land to be ‘set aside’ and left fallowproduced a habitat well suited to the stone-curlewand other ground nesting birds, and allow bareground for arable weed species.
Stone-curlew
3.3.33 Since the publication of the 2000 Plan, the ecologicalvalue of the WHS has been better appreciated andhas improved significantly, in particular through thereversion of extensive areas of arable land onStonehenge Down, around Countess Farm andelsewhere. Surveys of the National Trust’s property in1982 and 2007 showed that unimproved chalkgrassland increased from 7 hectares to 85 hectares,while arable declined from 322 hectares to 178hectares. Remaining cultivated fields, however, insome cases contain Red Data Book or NationallyScarce arable plants. Additionally, a new RSPB reservehas been created on private land at NormantonDown, which is protecting the successfully breedingstone-curlew, enhancing numbers of otherwisedeclining farmland birds and is also proving importantfor invertebrates and chalk flora. Generally, theamount of species-rich chalk grassland and associatedspecies within the WHS has increased.
3.3.34 The limited, but widespread, isolated areas ofwoodland in the WHS are of comparatively recentorigin, and are not generally considered to be of highecological value. However, some are considered to beof historic importance such as Vespasian’s Campplanting and the Nile Clumps, which were part of theAmesbury Abbey parkland. Overall, woodlandscontribute to the diversity and connectivity of habitatsin the WHS and require positive management asfeatures of the landscape. They are also of value asshelter for the deer population in the WHS, andimportantly, as screens to hide modern structuresfrom Stonehenge.
Andre
w H
ay 2
008 ©
rsp
b-im
ages.
com
36 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
Educational and research values
3.3.35 Access to the WHS for recreation and amenityprovides opportunities for public understanding andappreciation of prehistory in Britain through theinterpretation of Stonehenge within its local, regional,national and world context.
3.3.36 It is, however, recognised that our current knowledgeabout the prehistory of Stonehenge requirescontinuing research to improve understanding and toinform management initiatives. Together withAvebury, the Stonehenge part of the WHS offerssignificant opportunities for pioneering research, theimportance of which for archaeology is acknowledgedinternationally. Both parts of the WHS now have theirown published research frameworks, and thepublication of the Stonehenge Research Frameworkhas stimulated some important new researchprogrammes. Two significant programmes of researchare underway at present – the Stonehenge RiversideProject co-ordinated by the University of Sheffield,and the SPACES Project co-ordinated by theUniversity of Bournemouth.
3.3.37 The educational value of the WHS for all ages isrecognised. The WHS is important for children atprimary level (particularly local schools), at secondarylevel, and is an essential component of undergraduatecourses on British archaeology. It is also important formuch post-graduate research, as well as various life-long learning courses. The WHS is regularly used asan exemplar for understanding the 4th-2nd millenniaBC in southern Britain, and so has a universal value asa microcosm of wider archaeological issues for thisperiod. Much teaching and research focuses on theWHS and this should be encouraged.
Excavation at Woodhenge – Summer 2006
Stonehenge Discovery Visit organised by EH. School children
dressed in costume with musical instruments
Social, artistic and spiritual values
3.3.38 At the centre of the rich archaeological landscapecaptured by the WHS boundary stands the mostfamous prehistoric stone circle in the world. TheStones, together with the other principal prehistoricmonuments, have exerted considerable cultural andvisual influence over the landscape for the past5,000 years.
3.3.39 The Wiltshire Downs and Salisbury Plain have been afocus of attention since the late 17th century forantiquarians, historians, authors and artists, drawn tothe area by the unique atmosphere created by thecombination of open downland and visiblearchaeological monuments.
3.3.40 Stonehenge is enigmatic. The original builders left amonument that continues to puzzle and intrigue, andwhile theories about the reasons for its construction,the manner of its use and its role as a sacred placeabound, these can be but speculation. Many havepointed to the astronomical significance of the design.The principal axis (marked by the Avenue and themain entrance to the monument) is aligned withsunrise on the Summer Solstice and sunset on theWinter Solstice. This may suggest that Stonehengewas the focus of sun worship, a feature of manyancient religions. The interpretation of Stonehengewhich has most general acceptance is that of a templewhere appropriate ceremonies would have attemptedto ensure good crops, fertility and the general well-being of the population. Newer theories havesuggested the role of Stonehenge as a centre forancestor worship (Parker-Pearson et al 2007) or as acult place of healing (Darvill 2006).
Jam
es
O D
avie
s 2007 ©
Engl
ish H
eri
tage
NM
R D
P055682
Adam
Sta
mfo
rd ©
2006 A
eri
al –
Cam
Stonehenge World Heritage Site Management Plan 2009 37Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
3.3.41 People down the ages have found spiritual inspirationfrom the Stonehenge landscape. Today, the Stonescontinue to have a role as a sacred place of specialreligious and cultural significance in the minds andfaiths of some visitors. The spiritual dimension of theStones and its surroundings is valued by many as animportant opportunity for reflection and renewal, andnot just for groups with strong religious values andbeliefs. Despite the proximity of roads and the largenumbers of visitors, Stonehenge inspires a strongsense of awe and humility in many people: it is amystical ancient place where it is still possiblemomentarily to ‘escape’ the concerns of modern lifeand gain an insight into the lives of our ancestors.
Stonehenge has a strong spiritual value for many people
including the Druid groups, who have claimed it as a place of
worship since they were revived in the 18th century
3.3.42 The strong sense of history, the continuing interestand speculation, and the astronomical and mysticalsignificance of the Stones for many people, all point tothe spiritual value of the WHS in today’s society.Maintaining and improving Stonehenge and itslandscape for future generations as a place that cancontinue to offer sanctuary and spiritual sustenance isof great importance.
Tourism and economic values
3.3.43 Stonehenge enjoys a particular place in modernculture. The monument is the principal archaeologicaltourist attraction in the UK, drawing large numbers ofvisitors both from Britain and abroad. Visitor numbershave grown rapidly, from around 500,000 visitors perannum in the late 1970s to in excess of 900,000 in
2007. Stonehenge is perceived internationally as a‘must see’ attraction and around half of its visitorscome from abroad.
Visitors using the Stonehenge audio tour
3.3.44 While the nature of the visitor experience is thesubject of some criticism, Stonehenge remains one ofthe most popular sites in Britain for visitors; indeed itis the most visited archaeological site in Britain.
3.3.45 Also lying wholly or partly within the WHS are anumber of large farms which have significanteconomic values and provide a source of income tomany people. Additionally, the northern parts of theWHS are owned and used by the Ministry ofDefence as part of the Army Training Estate (SalisburyPlain), the most important and largest training estatein the UK, and includes a garrison which is hometo many.
4.0 CURRENT POLICY CONTEXT
4.1 Planning and policy framework
4.1.1 The United Kingdom has a well-established system ofspatial planning and of designation of historic sitesbased firmly on statute. Guidance on the use of thissystem is given at national, regional and local level byPolicy Guidance and by statutory development plans.There has been considerable change to the system ofplan making and policy advice in recent years andmore changes are in progress. This section describesthe current position. The potential effects of plannedchanges are discussed in Section 7.2 – 7.4 below.More detail on planning policies can be found inAppendix O.
4.1.2 The Planning and Compulsory Purchase Act 2004requires the maximum use to be made of statementsof national and regional policy and the minimumamount of duplication at local level. At the national
© E
ngl
ish H
eri
tage
NM
R p
50246
2003 ©
Engl
ish H
eri
tage
38 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
level, the Government’s Planning Policy GuidanceNotes and Statements set out the broad policyframework for the planning process. RegionalAssemblies (and shortly Regional DevelopmentAgencies) and local planning authorities are requiredto take these into account in the preparation of theirspatial strategies and development plans.
National Policies
4.1.3 PPS1, Delivering Sustainable Development, can beregarded as the corner stone of Government planningpolicy. It states that the Government is committed toprotecting and enhancing the quality of the naturaland historic environment, in both rural and urbanareas. Planning policies should seek to protect andenhance the quality, character and amenity value ofthe countryside and urban areas as a whole. A highlevel of protection should be given to most valuedtownscapes and landscapes, wildlife habitats andnatural resources. Those with national andinternational designations should receive the highestlevel of protection (PPS1 ODPM 2003).
4.1.4 Government policies on sustainable development inrural areas (PPS 7, 2004), on biodiversity andgeological conservation (PPS9, 2005), protection ofhistoric buildings and the historic environment,(PPG15, 1994), archaeology (PPG16, 1990), transport(PPG13, 1995), tourism (PPG21, 1992) andrenewable energy (PPS22, 2004) are particularlyrelevant to this WHS.
4.1.5 PPG15 (Planning and the Historic Environment, 1994)highlights the outstanding international importance ofa WHS as a key material consideration in the planningprocess, and the need to have rigorous policies toprotect them as well as to have WHS managementplans, even though WHS do not currently havestatutory recognition. The relevant parts of PPG15are likely to be replaced shortly by a new PlanningCircular on World Heritage, currently out topublic consultation.
4.1.6 There are a number of other references to WorldHeritage Sites in national planning guidance includingthe requirement in some circumstances forEnvironmental Impact Assessments both for normaldevelopment proposals and also for afforestation ordeforestation, and Design and Access Statements fordevelopment proposals in such sites. All English WorldHeritage Sites are now included in Article 1(5) of theGeneral Permitted Development Order which limitsthe range of permitted development within them.
New King Barrows on a frosty morning
Regional, sub-regional and local policies
4.1.7 Regional, sub-regional and local plans all containpolicies to protect the historic environment includingWorld Heritage Sites. Further details of these policiescan be found in Appendix O.
4.1.8 The 2000 Stonehenge WHS Management Plan hasbeen adopted by Salisbury District Council asSupplementary Planning Guidance. It is anticipatedthat the relevant parts of this Management Plan maybe similarly adopted by the local authority as aSupplementary Planning Document.
4.2 Relationship to other statutory andmanagement plans
4.2.1 There is a number of other plans which relate eitherwholly or in part to the Stonehenge WHS. Theseinclude the Amesbury Community Plan, theIntegrated Land Management Plan for the ArmyTraining Estate Salisbury Plain (MOD/DE); theNational Trust’s Land Use Plan (National Trust 2001);the National Trust’s Property Management Plan; theRSPB Normanton Down Management Plan (RSPB,2009); Stonehenge World Heritage Site ManagementStrategy for Stone-curlew, (RSPB 2008); as well asvarious private farm management plans and others.There is a separate WHS management plan for theAvebury part of the WHS, discussed further atsection 5.5.
4.2.2 It is important that these plans take account of eachother as far as practicable, and that major policies inall these plans do not act against one another.
Lucy
Eve
rshed
2007 ©
Nat
ional
Tru
st
Stonehenge World Heritage Site Management Plan 2009 39Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
4.3 Historic environment designations
See Map 6 – Heritage Designations
4.3.1 The Stonehenge, Avebury and AssociatedSites World Heritage Site was placed on theWorld Heritage List in 1986 (see section 3.1).
4.3.2 The current Stonehenge Article 4 DirectionArea places height restrictions on permitteddevelopment rights for buildings related to agriculturaland forestry operations within an area of seven and ahalf square miles around the Stonehenge monument.The Direction has been in place since 1962, originallymade under Article 3 of the Town and CountryPlanning (General Permitted Development) Order1950 (now Article 4 of the 1995 Order).
4.3.3 Scheduled Monuments are ancient monumentsand sites included on a Schedule in accordance withthe Ancient Monuments and Archaeological AreasAct 1979 by the Secretary of State for Culture, Mediaand Sport (DCMS) which recognises the nationalimportance of such monuments. Scheduledmonuments are afforded statutory protection andrequire Scheduled Monument Consent for worksaffecting them. There are 180 scheduled monumentswithin the Stonehenge WHS.
4.3.4 Guardianship Sites. The 1979 Act allows fornationally important monuments and adjoining land tobe taken into the care and/or ownership of the State(or nation), when they become known as sites in“Guardianship“. Stonehenge, Woodhenge and partsof Durrington Walls are in Guardianship. EnglishHeritage manages these sites on behalf of the State.
4.3.5 Conservation Areas are areas of special local orregional architectural or historic interest and character.The designation, preservation and enhancement ofconservation areas is the responsibility of the localplanning authority. Conservation Area statusrecognises the importance of collections of historicbuildings and their settings as critical assets of ourcultural heritage which should be conserved for futuregenerations. The following Conservation Areas lieeither partly or wholly within the WHS: Amesbury,West Amesbury, Wilsford, and Lake.
4.3.6 Listed Buildings are buildings of special architecturalor historic interest designated by the Secretary ofState for Culture, Media and Sport. Listed buildingsare afforded statutory protection, and are classified ingrades (Grades I, II* and II) according to their relativeimportance. Many buildings within Conservation Areas
along the Woodford Valley in the WHS are listed, asare some milestones nearer to Stonehenge.
4.3.7 Areas of Special Archaeological Significance(ASASs) are identified within the Salisbury Local Plan.Due to the richness of the WHS’s historicenvironment, the designation covers the entire area.The purpose of the ASAS designation is to preservethe local archaeological interest of the landscape,using existing legislation and the voluntary co-operation of landowners and farmers.
4.3.8 Parks and Gardens of Special HistoricInterest are included on a Register compiled byEnglish Heritage to draw attention to the importanceof these as an essential part of the nation’s heritage.Two such parks lie within the WHS; AmesburyAbbey, a Grade II* historic park and garden, and LakeHouse at Wilsford-cum-Lake, a Grade II historic parkand garden. This status does not currently provide anyform of statutory protection though this isrecommended to change in the Heritage ProtectionWhite Paper; however, the local planning authoritywill encourage the conservation, restoration andmaintenance of historic parks and gardens within thePlan area, and ‘registered status’ is a materialconsideration within the planning process.
The Chinese summerhouse is part of Amesbury Abbey’s park
and garden created in the 18th century
4.3.9 The Stonehenge Regulations 1997. Under the1979 Ancient Monuments and Archaeological AreasAct, these regulations set out prohibited acts, such asclimbing on the Stones and accessing the monument
Pete
r G
oodhugh
2008 ©
Pete
r G
oodhugh
40 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
without the permission of English Heritage. The fullregulations are set out in Appendix H.
4.4 Landscape and nature conservationdesignations
See Map 7 – Landscape and Nature
Conservation Designations
4.4.1 A Special Protection Area (SPA) is aninternationally important site for birds, designated bythe Secretary of State for the Environment under theterms of the European Community Directive79/409/EEC on the Conservation of Wild Birds. Oncedesignated, the Government is obliged to take stepsto avoid any significant pollution, disturbance, or thedeterioration of the habitats on the site. SalisburyPlain SSSI is also a SPA which reflects its internationalimportance as a habitat for rare birds.
4.4.2 A Special Area of Conservation (SAC) isdesignated under the European Habitats Directive.These are areas of land comprising habitats, andsupporting species, which are rare in a Europeancontext and are subject to special protection from thetime they are first identified as candidate sites. Theyare also designated as SSSIs under national legislation.The River Avon SSSI within the WHS and parts ofSalisbury Plain to the north and the River Till to thewest have been identified as SACs.
4.4.3 Sites of Special Scientific Interest (SSSI) aredesignated by Natural England (formerly EnglishNature) under the provisions of the Wildlife andCountryside Act 1981 to protect the nationallyimportant nature conservation interest of a site. TheRiver Avon within the WHS is a SSSI; to the north ofthe WHS boundary much of Salisbury Plain TrainingArea is also a SSSI, as is Parsonage Down to the west(which is also an NNR and SAC).
Dark Green Fritillary butterfly
The River Avon is a fine example of a chalk river
4.4.4 The Salisbury District Local Plan identifies the RiverAvon and Salisbury Plain as Areas of HighEcological Value (AHEV) due to their highconcentrations of sites of nature conservationimportance within the District. This is a non-statutorynature conservation designation. It has been suggestedthat AHEVs may be replaced in the Local Plan by‘Areas of Prime Biodiversity’ in the future.
4.4.5 As part of the Wiltshire Wildlife Sites Survey andNature Conservation Strategy, a database of sites ofpotential county nature conservation interest hasbeen compiled by English Nature (now NaturalEngland) and the Wiltshire Wildlife Trust. These siteswere also referred to within the District CouncilLocal Plan, and it is anticipated that this protectionwill be included in the new Local Area Agreementswithin the revised planning system. There are threeCounty Wildlife Sites within the WHS which areunder active management.
4.4.6 A Special Landscape Area (SLA) is identified bythe Structure Plan as being of high landscape qualitysufficiently attractive to justify the adoption ofparticular development control policies or othersafeguarding measures. The entire WHS (excludingMOD land) is within a SLA.
4.5 Government position on road andvisitor centre
4.5.1 One of the foci of the 2000 Management Plan wasremoval of roads from the central part of the WorldHeritage Site and the development of a new VisitorCentre outside the World Heritage Site.
4.5.2 The Government’s decision not to proceed with theA303 scheme (see section 2.2) means that other
Mar
tin Jam
es
2005 ©
Nat
ura
l Engl
and
Tra
cé W
illia
ms
© R
SPB
Stonehenge World Heritage Site Management Plan 2009 41Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
ways must be sought to deliver on these objectives asset out in the 2000 Management Plan. Part of thepurpose of this revised Plan is to develop the policyframework for doing this.
4.5.3 Ministers have confirmed that the Governmentcontinues to attach high importance to theStonehenge World Heritage Site. In the absence ofproposals to deliver the long-term vision for theWHS, which the Government has endorsed, they areseeking immediate environmental improvements,including new visitor facilities and, possibly, closure ofthe A344. The Government wishes theseimprovements to be in place by early 2012.
4.5.4 The Government has recognized that theManagement Plan will need to set the overall policieswithin which environmental improvements can bedeveloped. The Minister for Culture has said that therevision of the Plan should focus on what needs to bechanged as a result of the Government’s decision notto proceed with the A303 Published Scheme, whilealso asking for work to begin on a StonehengeEnvironmental Improvements Project. She has alsostated that the overall vision of the 2000 Plan haslong-term validity and that many of its objectives needno change including (in reply to a specific question)numbers 1 to 3, 11 and 18 though how someobjectives can be achieved will need to be reviewed.
5.0 CURRENT MANAGEMENTCONTEXT
5.1 The Stonehenge WHS executive andconsultative groups
5.1.1 In its mechanisms for implementation, the 2000 WHSManagement Plan recommended a small executivegroup, a larger consultative group and a full timeimplementation officer supported by a smallcoordination unit (the WHS team).
5.1.2 The Stonehenge WHS Management PlanImplementation Group, now known as theStonehenge WHS Committee, was formed inDecember 2000 as the executive. It meets every4 months to oversee the implementation of theManagement Plan and to take decisions on priorities,strategies and funding. It is composed of keystakeholders with responsibilities for planning and landmanagement in the WHS, including key landowners,local authorities and statutory agencies (seeAppendix A).
5.1.3 The Stonehenge WHS Advisory Forum was createdin 2001 as the wider consultative group. It is
composed of all the bodies and individuals who tookpart in the preparation of the original ManagementPlan along with various others. Its role is to provideadvice on the management of the WHS, including theperiodic revision of the Management Plan, and to actas a channel of communication between thosecarrying out work in the WHS and the widerstakeholder group. The Forum generally meets once ayear, and more often when needed (see Appendix B).
5.2 The Stonehenge WHS team
5.2.1 The Stonehenge WHS Coordinator was recruited in2001 and a part-time administrative assistant in 2003.Both are employed by English Heritage and based inthe English Heritage office in Salisbury.
5.2.2 The coordinator’s role is to facilitate the delivery ofthe objectives of the WHS Management Plan, workingclosely with the many stakeholders involved inStonehenge. This is set out in Appendix E.
5.3 Working groups and liaison with keypartners
5.3.1 A number of small and informal working groups havebeen set up to progress specific projects and fosterpartnership between the stakeholders. The remit ofthese working groups is to oversee and contribute tothe development of a project. They are wound upwhen each project is finalised. They meet whenrelevant for the project. They report through theWHS Coordinator or another member of the groupto the WHS Committee. Further consultation onprojects is carried out when relevant through informalindividual meetings, circulation of drafts for comments,presentations to other groups, etc.
5.3.2 In addition, the WHS Coordinator maintains a closeworking relationship with key partners through regularlinks with English Heritage curatorial team (theStonehenge Curatorial Unit), the English HeritageStonehenge Director, the National Trust, the AveburyWHS Coordinator, Natural England, the WHSlandowners, Salisbury District Council, WiltshireCounty Council, Wiltshire Archaeological and NaturalHistory Society, etc.
5.4 Funding arrangements for the WHSteam
5.4.1 Funding for the WHS team has been mostly providedby English Heritage since its creation in 2001, withsmaller contributions from the National Trust,Salisbury District Council and initially from AmesburyTown Council. This funding covers the salary costs of
42 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
a full-time coordinator and a part-time assistant, and asmall additional amount for projects. English Heritagenow funds the vast majority of the WHS team ascontributions from other sources have greatly reduced.
5.4.2 Funding has also been obtained by the WHS team forspecific projects from a variety of sources, includingDefra (grassland restoration), English Heritage (forexample grants for condition surveys, archaeologicalsurveys and aerial photography), Wessex Archaeology(WHS education project), the New OpportunitiesFund (interactive map), DCMS and Wiltshire CountyCouncil (WHS sign posts). In addition, many projectsare carried out directly by the various WHS partners.
Stonehenge World Heritage Site Committee inaugurating the
new signposts
5.5 Relationship to the Avebury part ofthe WHS
5.5.1 Stonehenge was inscribed on the World Heritage Listin 1986 as part of the Stonehenge, Avebury andAssociated Sites World Heritage Site. A ManagementPlan for the Avebury WHS was initially written in1998 and a revised version published in 2005.Implementation arrangements are in place and aWHS Coordinator exists for Avebury. Due to theclose relationship of the two sites in archaeological,landscape and administrative terms, the format of theAvebury Plan was adopted wherever possible for theStonehenge WHS Plan of 2000, and there are clearlinks between the revised Avebury Plan of 2005 andthis one.
5.5.2 For some issues there is merit in actively promotingcommon standards and integrating approachesbetween the two Management Plans for Stonehengeand Avebury. The principle of sharing, and building onexperience to develop models of best practice andinnovative solutions, should apply to common issueswhere appropriate. These include for example:
■ alignment of research themes and priorities;
■ methodologies for developing limits of acceptablechange models and monument condition surveys;
■ approaches to finding appropriate solutions to theconflict between permanent grassland expansionand arable farming;
■ approaches to the concept of landscape settingand visual ambience;
■ formal and informal educational initiatives.
In general, there should be a dynamic interrelationshipbetween the two parts of the Site, developed overthe medium to long-term as an iterative process.This is promoted at appropriate points in theManagement Plan.
The revised Avebury WHS
Management Plan was
published in 2005
5.5.3 There has been close co-operation between theAvebury and Stonehenge Coordinators over recentyears. This has resulted in a number of joint initiatives,such as the production of the SW WHS leaflet (alsoworking with the other SW WHS Coordinators); thecreation of a special agri-environmental project forAvebury and Stonehenge and funded by Defra; andthe writing of the agreed Statement of Significance.There are a number of joint meetings which bothcoordinators attend such as the Natural EnglandWHS working group, and the English Heritage/National Trust WHS Education Group, as well asother national forums such as LAWHF and the All-Party Parliamentary Group on World Heritage. TheStonehenge Coordinator has covered the role ofAvebury Officer for several months, allowing a deeperunderstanding of the links between the two parts ofthe WHS. Both the Government and UNESCO have
© E
ngl
ish H
eri
tage
2004 ©
Engl
ish H
eri
tage
Stonehenge World Heritage Site Management Plan 2009 43Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
indicated that close working is needed, particularly asthe Site is monitored as a single site by UNESCO.The creation of a single unitary authority, WiltshireCouncil, is planned and may allow opportunities forcloser working in future.
5.6 Ownership and management roles
See Map 5 – Land Ownership
5.6.1 Much of the Stonehenge World Heritage Site is nowowned or managed by conservation bodies althoughno single body has responsibility for the whole Sitethrough ownership or management. The majority ofthe land is used for farming, including areaspredominantly cultivated regularly for arable crops,and is therefore subject to the macro-economicinfluences of the European Union’s CommonAgricultural Policy. Smaller parts are in additionmanaged for conservation and public access whilethe northern part of the site is part of the Larkhillmilitary base.
5.6.2 Stonehenge and 15 hectares of land around it weregiven to the nation in 1918 by the last private owner,Cecil Chubb and are now in the freehold ownershipof the Secretary of State for Culture, Media andSport. They are managed on the Secretary ofState’s behalf by English Heritage. English Heritagealso has in care Woodhenge and a very small partof the Durrington henge; these are sites instate guardianship.
5.6.3 In 1927, 587 hectares of the surrounding land (abouta fifth of the Stonehenge WHS) was purchased bypublic subscription through the WiltshireArchaeological and Natural History Society andvested in the National Trust following a nationalpublic appeal. More recently, the National Trust hasmade a series of sizeable acquisitions within the WHS;172 hectares at Countess farm in 1999, a large part ofDurrington Walls in 2001 and in 2003, land atGreenland Farm including the Lesser Cursus. TheNational Trust now owns a total of 827 hectares.
5.6.4 Apart from the land in the care of English Heritage,that owned by the National Trust, and that ownedby the Ministry of Defence which owns Larkhill andthe surrounding farmland, the majority of the WHSis owned by six private owners and is used forfarming. At Amesbury, Durrington and along theWoodford Valley, there are a number of privatehouses within the WHS boundaries. A furtherdevelopment since 2000 has been the ManagementAgreement between a private landowner and theRSPB of land adjoining, and including some of, the
Normanton Down Barrow Group in order toestablish a chalk grassland nature reserve to protectbreeding and roosting stone-curlews.
5.6.5 The existing visitor facilities at Stonehenge areoperated by English Heritage on land to the north-west of Stonehenge leased from the National Trust.These include a car park, small shop and light cateringfacilities.
5.6.6 Several Government departments, agencies and otherpublic bodies have statutory or managementresponsibilities in the WHS. These are set out inAppendix L, List A. There will inevitably be changes tothis range of bodies during the new Plan period.Wiltshire County Council and Salisbury DistrictCouncil will be replaced by a new unitary authorityfor Wiltshire in 2009.
5.6.7 There is a wide range of other bodies and individualswith an interest in the management of the WHS.These are listed in Appendix L, List B.
5.7 The role of English Heritage
5.7.1 English Heritage came into being in 1984 under theterms of the 1983 National Heritage Act. Formallyknown as the Historic Buildings and MonumentsCommission for England, it is the main advisory bodyto the Government on all matters concerning theconservation of England’s historic environmentincluding WHS. Through a range of identificationwork, grant programmes and advice, English Heritageseeks to ensure the protection and enjoyment of theman-made heritage. It is directly responsible for theconservation of 409 historic properties, and has beeninstrumental in developing management plans for allcultural WHS in England.
English Heritage is the government’s adviser on the
historic environment and the National Trust is a charity
looking after historic buildings and landscapes
5.7.2 Within the Stonehenge part of the WHS, EnglishHeritage has five areas of responsibility. These are:
1. Curatorial: advising Government and localauthorities on applications for scheduled monumentconsent, planning consent, listed building andconservation area consent and other planning anddevelopment proposals including those affectingWHSs, registered historic parks and gardens and
44 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
battlefields, and also providing pre-application adviceto owners and developers; support to owners ofheritage assets. The Stonehenge Curatorial Unit isbased in the EH Bristol Office.
2. World Heritage: acting as the Government’sofficial advisor on matters relating to the WorldHeritage Convention.
3. World Heritage Site Management Plan:coordinating the implementation and periodic revisionof the World Heritage Site Management Plan throughthe work of the Stonehenge World Heritage SiteCoordinator and other stakeholders. The WH Teamis based in Salisbury.
4. Operational: managing on behalf of Governmentthe guardianship sites of Stonehenge and Woodhenge(together with a small part of Durrington Walls). Theteam is based on site and in Salisbury.
5. Development: in partnership with Government,public bodies and the National Trust, developingproposals for the environmental improvement of theStonehenge World Heritage Site, including new visitorfacilities and the possible closure of the A344/A303junction. The team is based in Bristol and Salisbury.
English Heritage has established robust proceduresto ensure transparency and objectivity in fulfillingthese roles.
5.8 The role of the National Trust
5.8.1 As one of the largest landowners within the WHS,the National Trust is an important organisation fordelivering and influencing improvements to the Sitethrough its estate management activities. The NationalTrust was founded in 1895, and was incorporated byan Act of Parliament in 1907 (the National Trust Act1907) to promote “the permanent preservation forthe benefit of the nation of lands and tenements(including buildings) of beauty or historic interest andas regards lands for the preservation (so far aspracticable) of their natural aspect features and animaland plant life”. At Stonehenge, the National Trust’smain areas of responsibility are:
■ Cultural Heritage: the National Trust cares for awide range of prehistoric monuments and sites aswell as more recent archaeology;
■ Natural Heritage: around 112 hectares of arableland have been reverted to species-rich grassland.
■ Landscape: the National Trust manages its land atStonehenge to conserve a landscape in which awide range of monuments and sites can beinterpreted and appreciated.
5.8.2 A key aspect of the 1907 Act is that land placedunder the National Trust’s ownership can be declared‘inalienable’. This is the case for virtually all of theTrust’s recently expanded 827 hectare estate atStonehenge, which cannot be disposed of by theNational Trust except through special parliamentaryprocedure. It therefore presents a very long term andunique contribution to the preservation and integrityof the monuments and their landscape setting.
5.9 The local community
5.9.1 A number of villages and settlements are locatedwithin and around the WHS, which togethercomprise the homes of several hundred people. Thefive main settlements are parts of the LarkhillGarrison, parts of Amesbury, West Amesbury,Wilsford and Lake. Amesbury is identified in the LocalPlan as a growth area, while the AmesburyCommunity Plan stresses the important role whichStonehenge could play in the local economy.
5.9.2 Although these settlements are not at the heart ofthe Stonehenge WHS, as Avebury village is atAvebury WHS, the existence of the WHS is animportant factor for these residents. On the negativeside, it can impose additional planning restrictions, andon the positive, can bring in additional funding andother improvements. Similarly, the large number ofvisitors to the WHS can be positive in supporting thelocal economy, but can also have adverse effects, forexample, by excessive parking in local settlements.
5.9.3 Generally, the existence of Stonehenge is a source oflocal pride and the site is used for example, by thelocal schools for educational purposes. However, thereare opportunities for further community engagement.
5.10 Agriculture
See Map 2 – Archaeology and Land Use
5.10.1 Farming has been a constant, albeit changing, featurein the landscape of the WHS over the last six millenia.The chalk downland is productive arable farmland,and it is agriculture, as much as the visiblearchaeology, that gives the WHS landscape itsparticular characteristics. Equally importantly, it isagriculture which manages and maintains the structureof this landscape, and it is farmers who are the
Stonehenge World Heritage Site Management Plan 2009 45Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
primary ‘managers’ of the majority of the WHS. Theyin turn are subject to the wider influences of nationaland European agricultural policies and economics aswell as the global market. Almost all of the land withinthe WHS is under agricultural management. Theirfarms are also their homes, and also the homes oftheir workers, some of which have been occupiedover several generations. Thus the motivation of thelandowners and tenant farmers towards themanagement of the WHS, and the implications of thismanagement for farm incomes, and for a place ofdomicile, is of fundamental importance.
The World Heritage Site, rich in prehistoric monuments, is also
a farmed and living landscape
Land Tenure
5.10.2 There is generally no constraint over the way inwhich farming is carried out on the vast majority ofthe Site, although an increasing number of farmshave entered into agri-environmental schemes whichare conditioned so the land is managed in a certainway. Most farms include both land within and outsidethe WHS.
Size of Farms
5.10.3 Farm sizes vary from 650 to 2,300 hectares.
Farming Systems
5.10.4 All farms are predominantly mixed arable, growingmainly cereals in rotation with temporary grassland,typically a 3-year ley followed by five or six years in
combinable crops. There is very little land which doesnot have arable potential. There are few steep slopesand only the water meadows in the Avon valley atthe eastern edge of the WHS are restricted to non-arable use, although some of the water meadowshave some arable potential.
5.10.5 There are a few areas of relict permanent grasslandwhere there are protected monuments or on steepslopes, but these are relatively insignificant ingeographical terms. Arable farming is the dominantland use, with cereal crops rotated with temporarygrassland or ‘leys’. The rotational grassland is utilisedvariously by beef cattle, dairy cows and sheep. Cattlebuildings are generally located on the fringes of theWHS. With large fields and easy-working soils, labourutilisation is efficient, using large machinery.
Agricultural Land Quality Constraints
5.10.6 Land quality is typically classified as Grade 3 by Defrawith generally shallow topsoils, often with a high stonecontent. The soils are inherently suitable for large-scale production of combinable crops, though fallingorganic matter contents under continuous arablesystems predispose to the inclusion of grass in therotation. However, grass yields are not high with apronounced mid-season reduction in yield as a resultof moisture deficits. This places an added reliance onconserved grass for feeding at times of shortage, andcareful management of grass by control of grazing ishighly desirable. The free-draining nature of most soilsallows outwintering of livestock, though the exposednature of the land does not allow full advantage to betaken of this property. Thus the type of farming isconfined to the major agricultural commodities, withlittle scope for diversification into higher valueproducts such as fruit or vegetable production.
5.11 Agri-environmental schemes
See Map 3 – Grass restoration since 2000
5.11.1 Special grants for grass restoration in the Stonehengeand Avebury World Heritage Site were put in placeby Defra in 2002 under the Countryside StewardshipScheme (CSS), as part of an exemplary partnershipwith English Heritage and the National Trust.Although the entry to this scheme and its successor(see below) were and are completely voluntary,farmers were encouraged to return arable fields tograss in the priority archaeological areas. A rate 50%higher than the norm was negotiated for the WorldHeritage Site. The aims were to stop plough damageto prehistoric monuments, improve their setting and
Lucy
Eve
rshed 2
008 ©
Nat
ional
Tru
st
46 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
improve the ecological value of the area. Advisersfrom the Rural Development Service worked closelywith WHS Coordinators to promote and implementthe special project on the ground. It proved verysuccessful, and over 340 hectares were signed up tobe reverted from former arable land to pasture atStonehenge, protecting and enhancing the landscapesetting of 75 ancient monuments. Most of thepriorities for grass restoration identified in 2002 havebeen covered by the agreements signed to date, andfurther fields have been identified for future reversion.
First year reversion grassland
5.11.2 In addition to the grass restoration, farmers were alsoencouraged to undertake management to benefitwildlife and the wider landscape. This includedmeasures such as grass margins around arable fields(10 km), 50 hectares of over wintered stubbles, 8hectares of over wintered stubble followed by fallow,and 4 new stone-curlew plots. These will benefitspecies such as stone-curlew, corn bunting, lapwingand grey partridge as well as a range of other morecommon species. Special chalk grassland wildflowerseed from local sources was used on the reversionareas within the core of the WHS.
5.11.3 In March 2005, the CSS grant was replaced by Defra’snew Environmental Stewardship scheme, which offershigher payments for grass reversion and newopportunities to protect archaeological features. TheStonehenge & Avebury WHS is one of the targetareas for the Higher Level Stewardship (HLS). TheNatural England Adviser continues to work closelywith the WHS Coordinators, English Heritage,landowners including the National Trust, and otherpartners, focusing on the remaining priorities for grassrestoration, scrub removal, protection of monumentsfrom burrowing animals, chalk grassland restorationand recreation and conservation of farmlandbirds/other wildlife.
5.11.4 A new major agreement was signed with Lake Farmin November 2006, the first HLS agreement withinthe World Heritage Site. With another 176 hectaresof arable land taken out of cultivation, it increased by50% the areas to be reverted to grassland in theWorld Heritage Site. The land will be managed toprotect significant archaeological features on the farm,enhance the setting of the Normanton, Lake DownBarrow groups and other surviving linear features andcreate chalk grassland and rough grassland habitat forwildlife. In addition, 108 hectares of land withremnants of prehistoric field systems are nowmanaged under the reduced cultivation depth option.The agreement also includes management to enhancethe landscape, benefit farmland birds such as stone-curlews, corn buntings and lapwing, maintain andrestore species rich chalk and wet grassland, restorehedges and manage scrub.
5.12 The military
5.12.1 The north of the WHS includes a large part of LarkhillGarrison and is part of the Army Training Estate,Salisbury Plain. The Army was originally drawn to theSalisbury Plain over 100 years ago by the expanse oflightly settled chalk downland and one of the largestun-populated areas in the country, thereby providinga suitable expanse of land for military training. TheLarkhill Garrison has seen significant and sustainedinvestment by the army over a considerable period.The Government’s Strategic Defence Review (July1998) indicated that the use of the Salisbury PlainArmy Training Estate is expected to continue andintensify, with the continued draw-down of troopsfrom Germany. There are no current plans for theArmy to leave the area. The residents of Larkhill formthe largest population group within the WHS andsome former Army houses are now privately owned.Larkhill and its associated military infrastructure aretherefore likely to remain as features in the landscapefor the foreseeable future. However, due torepresentations by English Heritage in response to theStrategic Defence Review, Larkhill has not beendeveloped as much as was originally planned in thelate 1990s, with significant new military developmentsbeing built at Tidworth and elsewhere instead.Recently, major elements of the Royal Artillery havebeen moved to Larkhill from Woolwich. Many of thelocal communities depend economically on thepresence of the military sites in the area.
Pat
Cas
hm
an 2
007 ©
rsp
b-im
ages.
com
Stonehenge World Heritage Site Management Plan 2009 47Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
5.13 Woodland and forestry management
5.13.1 Woodlands of several types are to be found in theWHS: impressive broadleaf plantations such as thebeech copses at the Lake Barrow Group; formerhazel/ ash coppices at Fargo, Normanton Gorse andSeven Barrows; game copses such as at Luxenborough;and mixed or coniferous plantations associated withLarkhill and the military training area and also presentat parts of Fargo Plantation. Mature woodland is alsofound on Vespasian’s Camp (part of an historic parkand garden) and along the Avon Valley.
5.13.2 Little or none of the woodland on the light chalksoils is managed or harvested for its timber value.The existing woodland performs a variety offunctions, including:
■ providing shelter for game, deer and wildlife;
■ providing shelter from prevailing winds for farmbuildings and livestock;
■ providing screening for development such as theRollestone grain store or, more significantly, thegarrison settlement of Larkhill;
In addition, woodlands contribute to the biodiversityof the landscape as a whole.
5.14 Royal Society for the Protectionof Birds
5.14.1 In 2004, the RSPB established a nature reserve forchalk grassland at Normanton Down to enhance andprotect the population of breeding and roostingstone-curlews. The RSPB have a managementagreement with the landowner over 46 hectares ofland south of, and including part of, the NormantonDown Barrow Group. They have established twobreeding plots for stone-curlews, which are also usedas roost sites in the autumn by large numbers ofthese birds. They have also greatly improved theconservation of the barrows in their care by removingscrub and old fencing from them and introducingsheep. Although (as before) there is no public accessto this privately owned site, the RSPB have promotedaccess through a controlled number of escortedgroup visits each year.
5.15 Museums
5.15.1 The Wiltshire Heritage Museum (WHM) and theSalisbury and South Wiltshire Museum (SSWM)contain important collections of archaeologicalartefacts from the WHS designated by the Museums,Libraries and Archives Council as pre-eminentcollections of national and international importance,and also contain interpretative displays of the same.They are repositories for archaeological archives fromthe WHS and the SSWM is the museum where newmaterial from the WHS is archived.
Gold artefacts from Amesbury Archer burial
5.16 The Geographic InformationSystem database
5.16.1 Wiltshire County Council and English Heritage havedeveloped a spatial mapped database (GeographicInformation System, GIS) for the WHS, curated byEnglish Heritage. Further details can be found inAppendix M.
Ela
ine W
akefield
2002 ©
Wess
ex A
rchae
olo
gy
48 Stonehenge World Heritage Site Management Plan 2009Part 1 – The Management Plan and the significance of the Stonehenge World Heritage Site
Part 2Key Management IssuesPart 2Key Management Issues
Stonehenge and its Avenue1994 © Crown Copyright NMR 15041/26
Stonehenge and its Avenue1994 © Crown Copyright NMR 15041/26
Part 2Key Management Issues
6.0 INTRODUCTION TO KEY ISSUES
6.1 The key purpose of the Management Plan is to setout a framework for the management of the WHS toensure its conservation and continued sustainable useand the maintenance of its OUV. To achieve this, theManagement Plan also needs to address sustainabilityissues relating to visitor access, experience and use ofthe Site, the retention of a sustainable workingagricultural economy and the long-term social,economic and amenity needs of the local community.
6.2 The Plan does this by identification and considerationof key issues and by the development of policies andactions to deal with them. Part 2 of the ManagementPlan sets out and discusses the key issues. Part 3 thensets out objectives and actions for dealing with thekey issues.
6.3 Part 2 draws extensively on the 2000 Plan whichconsidered the key issues in some detail. This Partalso draws on the various surveys and other workcarried out in the WHS since 2000. As with otherParts of the Plan, it has benefited greatly from theinput of members of the WHS Committee andAdvisory Forum.
6.4 Considerable progress has been made on some issuessince 2000. Others can now be resolved in new waysin the light of changing circumstances. In addition,some new issues are discussed for the first timebecause their significance has grown over the last nineyears or because we have been asked to addressthem specifically either by the UNESCO WorldHeritage Committee or by the government (forexample, consideration of climate change and riskpreparedness has been asked for by the WorldHeritage Committee). There have also beenconsiderable changes in both international andnational policy which will affect the futuremanagement and conservation of the site.
6.5 47 key issues have been identified. These areconsidered sequentially, and are grouped together inPart 3 as Aims under the following headings:
■ Planning and policy framework
■ Boundaries of the WHS
■ Conservation of the WHS
■ Visitors, Tourism and education
■ Transport and traffic
■ Research
■ Long-term Objectives for the WHS
■ Management, liaison and monitoring
6.6 The key issues are listed here, and discussed in detailbelow in the rest of Part 2:
Issue 1: UNESCO guidance and requirements
Issue 2: The effect of the introduction of Regional SpatialStrategies and Local Development Frameworks
Issue 3: Sustainable Community Strategies
Issue 4: Reform of the Heritage Protection Systemin England
Issue 5: Changes to the legal protection of WorldHeritage Sites
Issue 6: The application of English Heritage’sConservation Principles to the Stonehenge WHS
Issue 7: Government statements affecting theStonehenge WHS
Issue 8: The need to keep the boundary of the WHSand the case for a buffer zone under review
Issue 9: The WHS designation does not – at present –afford any additional statutory protection for the WHS
Issue 10: The need to manage potentially damagingactivities within the WHS which are not normally subjectto planning control
Issue 11: Improving the condition of archaeologicalremains within the WHS
Issue 12: The damage caused to archaeological siteswithin the WHS by burrowing animals
50 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Issue 13: There should be suitable settings for the WHSand its attributes of OUV
Issue 14: Woodland within and around the WHS andits impact
Issue 15: Enhancing management arrangements formonuments and sites in the WHS
Issue 16: Agricultural practices within the WHS –balancing the needs of farmers with those of thehistoric environment
Issue 17: The conservation of designated elements ofthe historic environment
Issue 18: The enhancement of the nature conservationvalues of the WHS
Issue 19: The effects of climate change on the WHS
Issue 20: Counter-disaster preparedness in the WHS
Issue 21: Sustainable tourism
Issue 22: Stonehenge,Tourism and the Local Community
Issue 23: Public access to, and awareness of, thewhole WHS
Issue 24: The management of visitors in the wider WHS
Issue 25: The management of visitors at Stonehenge
Issue 26: The need to manage carefully the summersolstice and other pagan festivals to allow a reasonablelevel of access whilst ensuring that the conservationneeds of the Stones and other monuments are met.
Issue 27: Visitors can cause erosion and other problems
Issue 28: The current visitor facilities are inadequate
Issue 29: The need for improved visitor facilities
Issue 30: There is a strong need to improve theinterpretation of Stonehenge and the WHS
Issue 31: The Stonehenge WHS is used for educationand life-long learning
Issue 32: Museum and archive arrangements forthe WHS
Issue 33: The presentation, interpretation and visibility ofkey archaeological monuments and sites
Issue 34: Roads and traffic have an adverse effect onthe WHS
Issue 35: Road Safety
Issue 36: Access to the WHS
Issue 37: Car parking facilities for visitors
Issue 38: The importance of research in the WHS
Issue 39: Research within the WHS should be of thehighest quality and sustainable
Issue 40: The storage of archaeological finds, paperarchives and data from the WHS
Issue 41: Formal links should be made with researchersin the Avebury WHS
Issue 42: The long-term objectives of theManagement Plan
Issue 43: The role of stakeholders in implementing theManagement Plan
Issue 44: The governance of the WHS
Issue 45: Funding and resources for the implementationof the Management Plan
Issue 46: Relationships between the Avebury andStonehenge parts of the WHS
Issue 47: Monitoring arrangements for the WHS
The visitor facilities at Stonehenge are no longer adequate
Stonehenge World Heritage Site Management Plan 2009 51Part 2 – Key Management Issues
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8231
7.0. PLANNING AND POLICY
The nine years since the publication of the first StonehengeManagement Plan have seen considerable changes in theplanning systems and policy framework at international,national and local levels. Further changes are now underwayin policy and in legislation and the structures of localgovernment. This section identifies and reviews the changesthat have an impact on the World Heritage Site, beginningwith international considerations and finishing with changesthat will affect only the Site.
7.1 UNESCO Policies and Guidance
Issue 1: UNESCO guidance and requirements
7.1.1 The World Heritage Convention is one of a family ofUNESCO Conventions dealing with heritage. As such,it figures strongly in UNESCO’s overall objectives andpolicies. UNESCO’s mission is:
“As a specialized agency of the United Nations,UNESCO contributes to the building of peace, theeradication of poverty, sustainable development andintercultural dialogue through education, the sciences,culture, communication and information”
The UNESCO World Heritage Convention has been signed by
many countries
7.1.2 UNESCO’s current Medium Term Strategy (2008 to2013) is structured around five overarching objectives:
■ Attaining quality education for all and lifelonglearning
■ Mobilizing scientific knowledge and policy forsustainable development
■ Addressing emerging social and ethical challenges
■ Promoting cultural diversity, intercultural dialogueand a culture of peace, and
■ Building inclusive knowledge societies throughinformation and communication.
7.1.3 These overarching objectives are translated intoStrategic Programme Objectives (SPO). SPO11 is:
■ Strategic Programme Objective 11: Sustainablyprotecting and enhancing cultural heritage
■ The preservation of cultural heritage and its effectson development, social cohesion and peaceintegrated into national and local policies
■ National conservation policies and processesrevised to take account of global trends such asclimate change, urbanization and migration
■ New forms of international co-operationdeveloped to strengthen the application of the1970 Convention
■ Role of museums recognized by decision-makersas part of formal and non-formal educationprogrammes.
7.1.4 These internationally-agreed overarching and strategicobjectives should be reflected in Member States’policy, procedural and management approaches toWHS, down to the level of individual sites wherepracticable. This accords with the UK Government’saims for UNESCO.
7.1.5 World Heritage Sites provide opportunities for theUK to
■ maintain UK standards in management andpromotion,
■ promote capacity building in developing countries,
■ promote tourism,
■ gain economics benefits for the UK,
■ support cultural diversity and community identity,and citizenship,
■ meet UK Government’s commitments to thedeveloping world – especially Africa,
■ deal with climate change and sustainability.
7.1.6 The UK National Commission for UNESCO (UKNC)was set up by Government to advise on all mattersconcerning UNESCO and to act as a focal pointbetween the Government, civil society and UNESCO.The UKNC views WHSs as key focal points andcatalysts for change on a truly global scale focusing on
WORLD
HERITAGE PATRIM
OI
NEMONDIA
L
PATR
IMONIO MUNDIAL
Stonehenge, Avebury and Associated sitesinscribed on the World Heritage List in 1986
United Nations
Cultural Organization
52 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
©U
NESC
O
people and their environments. Such globally-recognized sites:
■ provide opportunities for international co-operation, developing and sharing good practice,and for capacity-building
■ act as drivers for managing sustainable change,including community participation in managingchange and developing public support forconservation
■ act as focal points for standard-setting, includinginformed, consistent and balanced decision-making
■ act as focal points for developing sustainablecommunities, promoting diversity and enhancingcultural understanding
■ provide opportunities for education, access andlearning
■ provide a platform for improving public awarenessand understanding of UNESCO’s goals andobjectives
■ should act as exemplars in management policy,practice and procedures.
7.1.7 The basic definition of UK responsibilities for itsWorld Heritage Sites is set out in Article 4 of theWorld Heritage Convention. This says:
Each State Party to this Convention recognizes thatthe duty of ensuring the identification, protection,conservation, presentation and transmission to futuregenerations of the cultural and natural heritagereferred to in Articles 1 and 2 [i.e World HeritageSites] and situated on its territory, belongs primarilyto that State. It will do all it can to this end, to theutmost of its own resources and, where appropriate,with any international assistance and co-operation, inparticular, financial, artistic, scientific and technical,which it may be able to obtain.
7.1.8 The World Heritage Committee has adoptedOperational Guidelines for the Implementation of theWorld Heritage Convention. These are periodicallyrevised, most recently in February 2008 when minorchanges were made to the 2005 edition. The 2005Operational Guidelines for the first time spelled outwhat was meant by a management system and how itshould work:
7.1.9 This gives much greater clarity to the requirements ofthe World Heritage Convention and the WorldHeritage Committee. In particular, it makes clear thatthe primary purpose of the management of a WHS isto conserve the Site so as to preserve its OUV. Thisties in well with developing UK practice on values-ledmanagement of the historic environment.
108. Each nominated property should have anappropriate management plan or otherdocumented management system whichshould specify how the outstanding universalvalue of a property should be preserved,preferably through participatory means.
109. The purpose of a management system is toensure the effective protection of thenominated property for present and futuregenerations.
110. An effective management system depends onthe type, characteristics and needs of thenominated property and its cultural andnatural context. Management systems mayvary according to different culturalperspectives, the resources available and otherfactors. They may incorporate traditionalpractices, existing urban or regional planninginstruments, and other planning controlmechanisms, both formal and informal.
111. In recognizing the diversity mentioned above,common elements of an effective managementsystem could include:
a) a thorough shared understanding of theproperty by all stakeholders;
b) a cycle of planning, implementation,monitoring, evaluation and feedback;
c) the involvement of partners andstakeholders;
d) the allocation of necessary resources;
e) capacity-building; and
f) an accountable, transparent description ofhow the management system functions.
112. Effective management involves a cycle of long-term and day-to-day actions to protect,conserve and present the nominated property.
Stonehenge World Heritage Site Management Plan 2009 53Part 2 – Key Management Issues
7.1.10 The 2008 Operational Guidelines also contains furtherguidance on the ways in which the World HeritageCommittee monitors the state of conservationof individual World Heritage Sites. There aretwo processes.
7.1.11 Reactive Monitoring is the process by whichgovernments are asked to report significant changesor proposed developments to the World HeritageCommittee. On the basis of these reports and ofadvice from the relevant Advisory Body to theConvention (ICOMOS International for a cultural site)and from the UNESCO World Heritage Centre, theCommittee can offer advice to the relevantgovernment. In very serious cases, the Committee canplace a site on the World Heritage in Danger List, orif it is considered that its outstanding universal valuehas been lost, can remove it from the World HeritageList altogether (see Operational Guidelines paras169 – 198).
7.1.12 The World Heritage Committee reviews all WorldHeritage Sites on a cyclical basis. This process, knownas Periodic Reporting, was carried out for Europe in2004 and 2005. The Periodic Report for Stonehenge,Avebury and Associated Sites provided a most usefulopportunity to review the overall state of both partsof the World Heritage Site. As a consequence of theEuropean Periodic Report, governments were askedto provide brief statements of significance for all sitesinscribed before 1997. The draft statement forStonehenge and Avebury is quoted at 3.3.4 above.
7.1.13 The Operational Guidelines also contain guidance onthe management of serial sites such as Stonehengeand Avebury. This states that ‘in the case of serialproperties, a management system or mechanisms forensuring the coordinated management of the separatecomponents are essential’ (Operational Guidelines, para114). How this might be achieved for Stonehenge andAvebury is discussed further below.
7.1.14 Apart from the Operational Guidelines, the Committeedevelops further guidance at its annual meetings. Thisis noted in Committee decisions and can cover bothgeneral and site-specific matters. Of particularsignificance for this Management Plan are theCommittee’s requests that future management plansshould address the issues of climate change and alsoof risk preparedness to cope with disasters. Boththese issues are dealt with in Section 8.
7.1.15 This brief survey demonstrates the degree ofinternational involvement and guidance in theStonehenge WHS. It will be important to take this
into account in developing policies in thisManagement Plan.
7.2 Changes to the English planningsystem
Issue 2: The effect of the introduction of Regional Spatial
Strategies and Local Development Frameworks
7.2.1 The WHS as a whole is protected primarily throughthe planning system. This is plan-led and in 2008depends on a hierarchy of national and regionalguidance, county structure plans and district localplans setting out policies according to which localauthorities determine planning applications. Individualscheduled monuments within the Site are alsoprotected under the Ancient Monuments andArchaeological Areas Act 1979 through the scheduledmonument consent system.
7.2.2 The Planning and Compulsory Purchase Act 2004 hasintroduced a new system of spatial planning. PPS12explains how this new system operates. In the futurethe development plan for each local authority areawill consist of the Regional Spatial Strategy,Development Plan Documents and LocalDevelopment Frameworks. The key element of thelatter will be the Core Strategy. This will becomplemented by a variety of other subsidiarydocuments including Area Action Plans andSupplementary Planning Documents (SPDs). Thesemay cover a range of issues, both thematic and sitespecific, which may expand policy or provide furtherdetails to policies in a development plan document. Itis essential that SPDs are directly related to a policy inthe development plan.
7.2.3 The immediate effect of the implementation of thenew system is that both the current Regional PlanningGuidance (RPG10) and the Wiltshire Structure Planwill lapse when the new Regional Spatial Strategycomes into effect during 2009. It will be important toensure that future revisions of the Regional SpatialStrategy maintain adequate coverage of heritage ingeneral and World Heritage in particular.
7.2.4 Salisbury District Council has embarked on thepreparation of their Local Development Framework(Local Development Scheme: a timetable for theproduction of the local development framework SalisburyDistrict Council, January 2007). The 2000Management Plan was adopted as SupplementaryPlanning Guidance to the Local Plan and is recognisedby SDC as one of the guidance documents which thenew Local Development Framework will need to takeinto account.
54 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
7.2.5 SDC published their Core Strategy (PreferredOptions) for public consultation at the end ofFebruary 2008 and is due to re-issue it. It will beimportant to ensure that the final submission versioncontains adequate policies for the protection andsustainable management of the WHS. It will also beimportant to establish whether relevant parts of thisnew WHS Management Plan could be adopted as aSupplementary Planning Document to the new LocalDevelopment Framework.
7.2.6 A further factor which needs to be taken into accountis the forthcoming creation of a unitary authority forWiltshire. This will come into being in April 2009 andwill take over responsibility for spatial planning for thewhole county, so the new authority will determineplanning applications. It will be important to ensurethat unitary authority policies are robust and effectivein relation to the WHS and are consistent for bothAvebury and Stonehenge.
Issue 3: Sustainable Community Strategies
7.2.7 The Local Government Act 2000 places a duty onlocal authorities to prepare community strategies forpromoting or improving the economic, social andenvironmental well-being of their areas, andcontributing to the achievement of sustainabledevelopment in the UK. It gave them broad newpowers to improve and promote local well-being as ameans of helping them to promote those strategies(see Preparing community strategies: government adviceto local authorities, Department for Communities andLocal Government 2006).
7.2.8 There are clearly methodological links betweenCommunity Strategies and the way in which WHSManagement Plans should be developed by keystakeholders with the involvement of local and otherinterested communities. There will also be areas ofcommon interest. Some policies in WHSManagement Plans may well need to reflect policies inCommunity Strategies or to influence thedevelopment of such strategies. How close therelationship should be will depend on the character,ownership and size of the WHS and also on the areacovered by the relevant Community Strategy.
7.2.9 There are Community Strategies for Wiltshire as awhole and for South Wiltshire, the latter prepared bythe South Wiltshire Strategic Partnership and runningfrom 2004 to 2009. Within Salisbury District thereare also local Community Plans, one of which coversthe Amesbury Area including Stonehenge for theperiod 2006 to 2016 (Amesbury CommunityStrategic Plan, 2007). The Plan was prepared by the
Amesbury Market Town Partnership and contains anumber of references to Stonehenge, for examplerelating to roads, the former Visitor Centre proposals,and the need for Amesbury to share in the benefits ofthe tourism created by Stonehenge. At the least itwould be helpful to develop links between the WHSManagement Plan and the Community Strategic Plan.
7.3 Heritage Protection Reform
Issue 4: Reform of the Heritage Protection System in England
7.3.1 The Department for Culture, Media and Sportpublished a White Paper on Heritage Protection in the21st Century in March 2007. This proposed wideranging changes to the current system of heritageprotection, some of which will require primarylegislation and some of which can be achieved byother means. A draft Heritage Protection Bill waspublished for pre-legislative scrutiny in April 2008. TheBill itself will be considered by Parliament at theearliest legislative opportunity.
The circle before sunrise with the moon in the background
7.3.2 The particular provisions for the better protection ofWHS are dealt with below. Stonehenge will also beaffected by the general provisions of the proposals.The Bill will introduce a unified statutory HeritageRegister which will merge the categories of listedbuilding and scheduled monument and make themsubject to a single process of Heritage Asset Consent.For the first time, historic battlefields, historic parksand gardens and WHSs will be given statutoryrecognition though they will continue to be protectedprimarily through the spatial planning system as now.The listed buildings, scheduled monuments andregistered historic parks and gardens in the WHSs willbe automatically transferred to the new register whenit comes into effect.
Stonehenge World Heritage Site Management Plan 2009 55Part 2 – Key Management Issues
Nig
el C
orr
ie 2
004 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K040506
7.3.3 Heritage asset control will be operated by therelevant local authority. This is already the case forlisted buildings but will be new for scheduled ancientmonuments. Once the Bill is enacted, consent forworks to heritage assets which were previouslysubject to Scheduled Monuments Consent (SMC) willno longer be a matter for the Secretary of State butfor the new unitary Wiltshire Council. This will includeworks proposed by English Heritage and others underthe existing Class Consents. Additionally all localauthorities will be required to take into account allentries on the Register, including World HeritageSites, when determining planning applications.
7.3.4 The Bill also introduces the concept of HeritagePartnership Agreements. These will be agreementsbetween a landowner or site manager and the localauthority. They should enable routine and repetitivetasks to be carried out without the need to seekspecific consent on each occasion. Agreements willneed to be tailored to the specific circumstances ofeach designated asset and owner and will probably bemost suitable for major landowners with largenumbers of designated sites. There could be potentialfor the use of Heritage Partnership Agreements withinthe Stonehenge World Heritage Site.
Issue 5: Changes to the legal protection of World Heritage Sites
7.3.5 The White Paper also included specific provisions forthe improved protection of WHSs. Their statutoryrecognition by inclusion in the new Register ofHistoric Assets is covered above (7.3.2). The Whitepaper also announced three changes to planningpolicy advice. These were a change to call-inregulations, the inclusion of WHSs in Article 1(5)Land in the Town and Country Planning (GeneralPermitted Development) Order 1995 (GPDO) andthe development of a new planning circular which willfurther recognise in national policy the need toprotect WHSs as sites of outstanding universal value,and will make more prominent the need to create amanagement plan for each WHS, including, whereneeded, the delineation of a buffer zone around it.
7.3.6 The new Call-In Regulations were published for publicconsultation in January 2008 and, once in force, wouldintroduce a requirement for local authorities to referto the Secretary of State for Communitiesdevelopment proposals where English Heritage hasobjected on the grounds that a proposeddevelopment could have an adverse impact on theoutstanding universal value and significance of a WHSor its setting, and has been unable to withdraw thatobjection after discussions with the local planning
authority and the applicant. The Secretary of State willtake into account the views of English Heritage indeciding whether or not to call in any applicationsreferred for this reason. Publication of the newregulations is expected in 2009.
7.3.7 Article 1(5) of the GPDO restricts certain permitteddevelopment rights within areas it covers. Areascurrently covered include National Parks, Areas ofOutstanding Natural Beauty and conservation areas.Article 1(5) restricts the size of extensions to housesand industrial buildings which can be built withoutspecific planning consent. It also covers matters suchas cladding of buildings. Parts of the Stonehenge WHSalready fell within Article 1(5) land because they arewithin conservation areas. From 1 October, 2008, thewhole WHS is Article 1(5) land. This complementsthe restrictions on height which are already in forceunder the Article 4 Direction placed on theStonehenge area by Salisbury District Council manyyears ago.
7.3.8 The draft Planning Circular referred to above (7.3.5) issupported by an English Heritage Guidance Note. It isexpected that the final versions of both the planningcircular and the Guidance Note will be published inthe early part of 2009.
7.3.9 It is appropriate to note at this point two otherplanning requirements for WHSs.
7.3.10 WHSs have a specific status with regard toEnvironmental Impact Assessments (EIA) since theyare included within Schedule 2 of the EIA regulations.This means that Environmental Impact Assessmentsfor development proposals within WHSs shouldconsider the impact of the proposal on the WHS andits OUV. Location within the WHS should also be amatter taken into account by local authorities whenscreening development proposals for the need forEIA. The Forestry Commission operates a separatesystem of EIA for all proposals for afforestation anddeforestation within WHSs if they might have asignificant environmental impact.
7.3.11 Development proposals within WHS will also requireDesign and Access Statements.
7.3.12 Taken as a whole the changes in national planningpolicy and advice relating to WHSs should have asignificant impact on the procedures for theprotection of the Stonehenge WHS.
56 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
7.4 English Heritage’s ConservationPrinciples
Issue 6: The application of English Heritage’s Conservation
Principles to the Stonehenge WHS
7.4.1 The main purpose of English Heritage’s recentlypublished Conservation Principles: Policies and Guidancefor the Sustainable Management of the HistoricEnvironment (English Heritage 2008) is to strengthenthe credibility and consistency of decisions taken andadvice given by English Heritage staff. Since EnglishHeritage is the Government’s principal advisor on theconservation of the historic environment including theapplication of the World Heritage Convention, thePrinciples will be of importance in shaping EnglishHeritage’s future involvement in the management ofthe Stonehenge WHS.
7.4.2 The Principles define ‘Conservation’ as the process ofmanaging change to a ‘significant place’ and its settingin ways that will best sustain its heritage values, whilerecognising opportunities to reveal or reinforce thosevalues for present and future generations. At thehighest level they are defined in the following sixstatements:
1. The historic environment is a shared resource.
2. Everyone should be able to participate insustaining the historic environment.
3. Understanding the significance of places is vital.
4. Significant places should be managed to sustaintheir values.
5. Decisions about change must be reasonable,transparent and consistent.
6. Documenting and learning from decisions isessential.
7.5 Government statements affectingStonehenge
Issue 7: Government statements affecting the Stonehenge WHS
7.5.1 Sections 2.2 (particularly 2.2.5 – 2.2.7) and 4.5summarise recent government statements onStonehenge. The Government has confirmed that therevised Management Plan will continue to be theoverarching strategic document for the WHS. TheGovernment has also confirmed that the long-termvision for Stonehenge contained in the 2000 Plan is
still valid even though it is not wholly achievable in theshort to medium time-scale. The Government hastherefore decided that interim improvements to theenvironment of Stonehenge are essential and that aStonehenge Environmental Improvements Projectshould be developed. Its principal elements are likelyto be the building of new visitor facilities and someminor changes to the road network, includingexamination of the case for closure of the A303/A344 junction and at least part of the A344. It ishoped to have changes in place by early 2012.
7.5.2 These government statements shape much of thisPlan and need to be taken into account throughoutits implementation.
7.6 The WHS Boundary and buffer zone
Issue 8: The need to keep the boundary of the WHS and the
case for a buffer zone under review
The Boundary
7.6.1 The case for revision of the boundary was discussedat length in the 2000 Plan. The Plan recognised thatthe existing boundary was to some extent arbitraryand excluded features which, if included, mightcontribute to the Site’s OUV. It noted too thatprevious studies had been divided on whether or notthe Site should be extended and concluded that theboundaries of both the Avebury and Stonehengeparts of the WHS should be addressed using thesame criteria. The Plan included an Objective (no. 14)that the ‘WHS Boundary should capture all significantarchaeological features and landscapes related toStonehenge and its environs.’
7.6.2 There are a number of minor discrepanciesconcerning the boundary requiring resolution as wellas some more major issues to be considered. Minorchanges can be dealt with relatively easily – the StateParty has to make a proposal for them to theUNESCO World Heritage Committee and theCommittee then takes a decision after evaluation ofthe proposal by ICOMOS. Significant changes affectingthe definition of the OUV of the site would atpresent require a full re-nomination. The Governmenthave specifically excluded a re-nomination of the siteduring the lifetime of this Plan.
7.6.3 As noted in 2000, similar approaches on boundaryissues should be used for both parts of the WorldHeritage Site. At Avebury, a detailed study wascarried out in 2004 and proposals for minor changeswere agreed by the UNESCO World Heritage
Stonehenge World Heritage Site Management Plan 2009 57Part 2 – Key Management Issues
Committee in July 2008. A similar approach to minorchanges could be adopted for the Stonehenge part ofthe site. The principles used in the Avebury study todevelop recommendations were that:
The WHS boundary should as far as possible:
■ remain true to the spirit of the original inscriptionof the Site on the World Heritage List, with itsemphasis on the Neolithic and Bronze Age,megalithic and sarsen stone elements in thelandscape;
■ not be changed unless it is perceived that theextent of the Site’s “outstanding universal values”is not protected adequately within the existingboundary;
■ reflect current knowledge and understanding ofAvebury and its surrounding landscape as a WHSin the 21st-century as defined in the WorldHeritage nomination in 1986;
■ include physically-related archaeological featuresand the whole of a group of archaeologicalfeatures such as burial mounds, including inparticular all Scheduled Ancient Monuments;
■ have regard for the setting of individualmonuments and groups of monuments and fortheir overall context in archaeological andlandscape terms;
■ avoid changes which include inhabited villages,notably those along the Kennet Valley.
7.6.4 To these might be added the need to rectify thediscrepancies between the mapped boundaries andwritten description in the original nomination dossier.A good first step would be to carry out a similarstudy to that carried out for Avebury in 2004. Areview of the boundary would also provide theopportunity to review the significance of the Site, itsauthenticity and integrity, to establish whether moreemphasis should be placed on its landscape.
Buffer Zones
7.6.5 The World Heritage Committee OperationalGuidelines recommend (para 103) that ‘wherevernecessary for the proper conservation of theproperty, an adequate buffer zone should beprovided’. It does leave open the option that thesetting of the World Heritage Site can be protectedin other ways. Proposals for a buffer zone or forchanges to an existing one have to be approved by
the World Heritage Committee following on fromproposals by the State Party. This does not require afull re-nomination. Whether or not there should bebuffer zones for each part of the Stonehenge,Avebury and Associated Sites World Heritage Site isan issue for the whole site since the World HeritageCommittee are likely to seek a consistent approach ifproposals are put to them.
View of trilithon in the snow
7.6.6 In 2000, the Stonehenge Management Plan concludedthat there was no compelling justification for theprovision of a formal buffer zone around theStonehenge part of the Site. There has been noreview of the issue since then. This followed the linetaken in the 1998 Avebury Management Plan.However, the 2005 Avebury Management Plan hasnow concluded that ‘A buffer zone needs to bedefined effectively protecting the WHS, itsmonuments and their landscape settings from visualintrusion and other adverse impacts’. The justificationfor this would be to protect the landscape setting ofthe WHS and to provide stronger protection againstinappropriate development.
7.6.7 This discrepancy in approach would need to beresolved or justified before any proposals for bufferzones were proposed to the UNESCO WorldHeritage Committee for part or all of the Site. Oneway forward would be a joint study of the WorldHeritage Site as a whole.
58 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Jam
es
O D
avie
s 2005 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K040907
7.7 Development control
Issue 9: The WHS designation does not – at present – afford
any additional statutory protection for the WHS
7.7.1 The development control system is a key tool in thelong-term protection of the WHS values. Localplanning authorities are required to accept WHSs as amaterial consideration when making decisions onplanning applications, as is the Secretary of State indetermining cases on appeal or following call-in. (seesection 4.1 for further details; see also para 7.3.7 onrestriction of permitted development rights). WHSManagement Plans may also be adopted in whole orin part as local planning guidance.
7.7.2 In the nine years since the publication of theStonehenge WHS Management Plan, there have beenmany planning applications within the WHS, some ofwhich were for substantial developments. Otherplanning applications outside the WHS also have hadthe potential to affect its setting. The majority werefor small-scale householder developments such asextensions which, unless they are sited directly onarchaeologically sensitive land, have little impact onthe values or significance of the Site. The number ofapplications is higher at Stonehenge than it wouldnormally be, because of the current StonehengeArticle 4 Direction Area which withdraws somepermitted development rights relating to agriculturaland forestry operations (see 4.3.2).
7.7.3 It is common practice for English Heritage and theArchaeology Service of Wiltshire County Council tobe consulted by the local planning authority aboutplanning applications within or around the WHSwhich may impact on the values and managementobjectives as set out in the WHS Management Plan.New legislation may affect this situation, although thedetail of future arrangements are not yet known,while the move to unitary status will affect the way inwhich cases are handled.
Issue 10: The need to manage potentially damaging
activities within the WHS which are not normally subject to
planning control
7.7.4 Despite the Stonehenge Article 4 Direction, there arecurrently a number of activities which are potentiallydamaging to archaeological remains and the setting ofthe WHS and do not require planning permission orother forms of consent. They include:
■ new planting not funded by the ForestryCommission, and not requiring consent by themas afforestation in a WHS
■ hedge removal not covered by the HedgerowsAct
■ increased ploughing depth on land which is notscheduled
■ utility installations on land which is not scheduled
■ treasure hunting on land which is not scheduled,not in the ownership of the National Trust or theMinistry of Defence, and not on knownarchaeological sites within areas covered byStewardship agreements.
■ swimming pools below a certain size
7.7.5 There is particular concern that measures should betaken to avoid or mitigate potential damage caused bythe installation of essential services (gas, water,electricity, sewage, telecommunications).Telecommunication masts and overhead transmissionlines may not require planning permission. The diggingof holes and trenches for underground pipes andcables has affected parts of the WHS in the past, andhas the potential to cause archaeological damage. Thisissue has been less of a problem recently atStonehenge than it has at Avebury, but is still an issue.
7.7.6 Potential damage from the irresponsible use of metaldetectors is also a cause for concern. In recent yearsthis has been more of a problem in the Avebury partof the WHS, but still has the potential to causedamage at Stonehenge. Metal detectorists and casualfieldwalkers have made a number of important findsin the area in the past. However, these are oftenmade without the full and reliable recording of theirarchaeological context. When this is the case, itdiminishes our understanding of the artefact and itscontext, and can also lead to the damage ordestruction of archaeological features. Although metaldetecting can be a useful technique when used as partof a properly conducted archaeological project, itsuncontrolled use within the WHS should bediscouraged. The use of metal detectors within aWHS is not illegal, although it is the subject ofcriminal law under certain circumstances. For example,under the 1979 Ancient Monuments andArchaeological Areas Act, it is illegal to use a metaldetector on a scheduled monument without a“Section 42” licence from English Heritage. Moreover,artefacts must not be removed from land without thelandowner’s permission, and all finds of Treasure (asdetailed by the 1996 Treasure Act) must be reportedto a coroner within 14 days. The National Council forMetal Detecting has its own Code of Conduct toguide the responsible use of metal detectors. The
Stonehenge World Heritage Site Management Plan 2009 59Part 2 – Key Management Issues
National Trust does not permit the use of metaldetectors on its land unless as part of an approvedarchaeological project. Permission is also required byDefra for metal detecting on a known archaeologicalsite included within a Countryside or EnvironmentalStewardship Scheme. The use of metal detectors isprohibited on MOD land. A Finds Liaison Officer forWiltshire, employed by the Salisbury and SouthWiltshire Museum, is building better lines ofcommunication between archaeologists anddetectorists, which has helped to increased thereporting of archaeological finds. It may be that afurther Article 4 direction could be considered tocontrol these activities. It is suggested that this couldbe explored for both parts of the WHS with the newWiltshire Council.
8.0 CONSERVATION
8.1 The condition of archaeologicalmonuments and sites in the WHS
Issue 11: Improving the condition of archaeological remains
within the WHS
8.1.1 The Stonehenge Environs: A Preservation andManagement Policy report was produced in 1984 tohelp English Heritage consider the statutoryprotection of the area’s archaeological sites. In the1990’s, English Heritage’s Monument ProtectionProgramme identified all known sites contemporarywith Stonehenge (i.e. Neolithic or Bronze Age) atwhich archaeological remains survived substantiallyintact, whether visible or below ground. These werethen recommended for scheduling in recognition ofthe importance of the area as a whole and to reflectthe Government’s commitment to the protection ofthe WHS. There is, however, a very limited numberof sites in and around the WHS, however, whichcould still benefit from revisions to their schedulingdocumentation, or from being included on theSchedule.
8.1.2 Despite statutory protection, a number ofmanagement problems remain and raise the followingissues:
■ whether there is justification for revoking thecurrent Class Consents for continuing ploughing ofcertain sites;
■ the limitations of statutory powers for certaintypes of site, such as surface artefact scatters.
■ what the condition of sub-surface archaeologicalremains might be after ploughing;
The first two of these bullet points may be addressedduring the lifetime of this Plan by the revision of therelevant statutory protection via the new Heritage Bill.
8.1.3 During and subsequent to the process of scheduling,details of the condition and land use on everyindividual monument within the WHS were recordedby the Monuments Protection ProgrammeArchaeologists and the Field Monument Wardens(now Historic Environment Field Advisers) of EnglishHeritage, so that measurable changes through timecan be demonstrated. A comprehensive monumentcondition survey of sites within the WHS was alsoundertaken by Wessex Archaeology on behalf of EHin 2002. Its results were compared with the similarsurvey undertaken in the Avebury part of the WHS,and both surveys have been used to target sites forfunding bids and to assist in the Periodic Reportingexercise to UNESCO. The National Trust made acondition survey of the monuments on its land in2007. Condition surveys to a consistent and uniformstandard need to be undertaken on a regular basis –say every 5-6 years –to demonstrate to UNESCOthat the overall condition of archaeological sites withinthe WHS is stable or improving, and to assist inmaking up-to-date and informed managementdecisions. Advantage should be taken of newapproaches such as airborne light detecting andranging survey (lidar) which has been able to showthe survival of visible surface remains of monumentsin the WHS where none had been detected fromground-based survey.
Normanton Down Barrows before grass reversion in 2003 . . .
the burial mounds are no longer isolated islands in a sea of crops
8.1.4 Certain agricultural practices continue to be a threatto the survival and condition of some archaeologicalremains within the WHS, including some scheduledmonuments. Although ploughing to a constant depth
60 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
2003 ©
Engl
ish H
eri
tage
NM
R 1
5401-0
6
over a site where ploughing has previously eradicatedall upstanding earthworks will usually erodearchaeological information at a relatively slow rate,archaeological information may still be lost. Ifploughing is undertaken on sites which have neverbeen ploughed, then the information loss and damageis much greater, although this is not currently aserious problem at Stonehenge. Factors which affectthe degree of archaeological loss from continuedploughing include the local topography (sites onslopes may be more vulnerable to damage thanothers on flat areas) and the nature of thearchaeological resource. Further investigations areneeded to establish exactly what damage ploughingmight do. There is a continuing need to establishdetailed data which would help prioritise whichmonuments currently in cultivation are in most urgentneed of conversion to grassland. The degree ofsurvival of remains on a specific site, and itsvulnerability, could be tested using relevant fieldtechniques, although this would be relatively time-consuming and costly given the number ofmonuments under cultivation within the WHS. Suchissues are currently being addressed through pastDefra funded research projects, such as ‘managementof archaeological sites in arable landscapes’(OxfordArchaeology, 2002) and ‘conservation of scheduledmonuments in cultivation (COSMIC)’ (OxfordArchaeology, 2006) and also through current researchinitiatives, namely the Natural England funded trials toidentify soil cultivation practices to minimise theimpact on archaeological sites being undertaken byCranfield University and Oxford Archaeology. Defraand the Stonehenge WHS Coordinator, together withlocal farmers and landowners, should continue to beinvolved in the resolution of these complex issuesat Stonehenge.
8.1.5 The encroachment of scrub onto monuments is acause for concern. Scrub can damage fragilearchaeological deposits through the action of roots,and can obscure earthwork sites. It should beremoved wherever possible from archaeological sites,which thereafter should be kept free of scrub, usuallythrough grazing with suitable numbers of stock. Someof the Normanton Down barrow group and othermonuments have been greatly improved in recentyears through scrub removal, by volunteers fromRSPB and FOAM. It must be remembered that acertain level of scrub is healthy for biodiversity andthat scrub removal programmes should consider thispoint with the relevant authorities.
Scrub clearance at Normanton Down barrows by volunteers in
March 2005
Issue 12: The damage caused to archaeological sites within the
WHS by burrowing animals
8.1.6 The impact of burrowing animals on the archaeologyof the WHS has become far more pressing within thelifetime of the former Stonehenge WHS ManagementPlan. Indeed, on the Salisbury Plain Training Area tothe north of the WHS, burrowing animals areconsidered to pose a greater threat to the survival ofarchaeological remains than that of agriculture andmilitary use of the Plain. The main species causingthese problems are rabbits and badgers. Rabbits arestill a major problem but since 2000, there have beenincreasing numbers of badgers. Badgers are protectedunder the Badgers Act 1992. Excavations have shownthe extensive damage which they can do toarchaeological remains. English Heritage, NaturalEngland and Defra have written guidelines on thissubject and specific guidance for the Stonehenge andAvebury WHS is being developed. Measures tocounter badger damage include their licenced removalafter which vulnerable monuments are either coveredwith a suitable mesh or surrounded by fencing. Thesemeasures are being further developed in a nearbypilot project between the Defence Estates and EnglishHeritage. However, none of these measures issuitable for large monuments such as hillforts, and allhave considerable cost implications for large areas ofland such as the WHS. There is a need for relevantagencies and landowners to tackle this issue in a moreproactive way. A detailed survey of the WHS isneeded as a matter of urgency to establish whichmonuments contain active primary or satellite badgersetts. Recommendations to remove badgers andbadger-proof threatened monuments within areasonable time period should follow on fromthis survey.
Stonehenge World Heritage Site Management Plan 2009 61Part 2 – Key Management Issues
2005 ©
RSP
B
8.2 The settings of the WHS and itsattributes of OUV
Issue 13: There should be suitable settings for the WHS and its
attributes of OUV
8.2.1 With the exception of the grassland areas in andaround key monuments, the rolling and openlandscape of the WHS is more or less wholly farmedwith extensive areas of very large arable fields. Thereare also limited (but visually prominent) areas ofwoodland. Principal features of the landscape includethe distinctive ridgelines with their concentrations ofvisible archaeological remains, including the Stonesthemselves, and dry valleys which cut deeply into thesurrounding downland. The strongly contrasting slopesand floodplain of the River Avon form the easternboundary of the WHS and contain distinctive historicbuildings and villages related to human settlement ofthe area. Key aspects of the relationship between thearchaeological sites and the landscape include:
■ the location of prehistoric barrow groups alongvisually prominent ridgelines;
■ gradual change in the visual relationships or‘ambience’ between Stonehenge and the otherprincipal archaeological sites as the observermoves through the WHS which may have been adeliberate intention of their builders;
■ equally strong visual relationships between each ofthe other principal archaeological sites;
■ the nature of most approaches to Stonehenge,whereby the observer first looks down on theStones but then may descend and climb a numberof times before making a final uphill approach tothe monument now visible on the horizon. Thisunderlines the importance of the sequential andunfolding nature of the visual experience, andsuggests that anticipation and expectation in theform of views and movement towards the Stonesmay have been an important element of historicceremonies and rituals;
■ spatial patterning of archaeological finds collectedfrom the surface of fields and the monumentsthemselves, suggest that the area immediatelysurrounding the Stones was regarded differentlyfrom areas beyond – and may have been reservedfor ceremonial functions. It is possible thatsettlements located outside this ceremonial zonewould have been necessary to maintain thisreserved area and to support both the builders ofStonehenge and those who participated in itsceremonies. A number of other concentrations ofprehistoric ceremonial sites are known in Britain.Like Stonehenge, each had a regional significance.However, it is probable that, as today, the uniquestone structures of Stonehenge and the scale of itsassociated monuments and sites gave it particularsignificance both within Britain and even abroad;
■ the number of early Bronze Age burials with goldand other lavish grave goods concentrated nearStonehenge. Their existence implies a socialhierarchy in which certain individuals were capableof controlling wealth and supporting non-productive and ceremonial activities. The placingof Bronze Age barrows within the landscape iscareful and deliberate and has been the subject ofrecent research (Exon et al 2000);
■ the pattern of ancient settlements and fieldsystems suggests that arable cultivation wasestablished in early prehistoric times in the WHS.The original soil was impoverished by forestclearance, prehistoric agriculture and climatechange, and consequently the downland was bestused for grazing. There has been a gradualresumption of arable agriculture since theseventeenth century;
■ archaeological evidence suggests that during theMiddle to Late Neolithic and the Bronze Age,much of the original woodland cover had beenremoved and the landscape had a sparselywooded appearance with deciduous trees.
62 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Fieldwalking survey prior to grass reversion in the North Kite
area in September 2003
8.2.2 The main pressures on the landscape nowadayscontinue to include development and changes in landuse which can alter or even destroy these oftensubtle, but important visual and thematic relationships.Such relationships contribute to, or may be attributesof, the OUV of the WHS; improved understanding oftheir relationships enhances enjoyment of a visit tothe WHS as a whole, rather than limiting experienceto only the Stones themselves and a few set-pieceviewpoints. There is currently no systematic HistoricLandscape Character Assessment of the WHS and itsenvirons; however, there is a need for such a study todeepen understanding of how the present characterof the WHS relates to its historic usage anddevelopment, in order to inform management optionsand planning policies.
8.2.3 In the last Plan, the relative sensitivity of knownarchaeological remains in the WHS to visual impactwas assessed by Wiltshire County Council and EnglishHeritage (see Appendix C of the 2000 Plan). This hasbeen further refined since then thanks toimprovements to GIS capabilities (see Map 10).Individual planning applications can be monitored
against the visual impact they will have on individualmonuments and parts of the WHS, an approachwhich will continue to develop with newarchaeological research, improved computingcapabilities, and the development of high resolutionlidar terrain models.
8.2.4 The formally inscribed area of the WHS is merely thecentral portion of a wider area which also containsprolific archaeological remains and monuments, someof which might also contribute to the attributes ofOUV if they had been included within the WHS. Abroader archaeological study area has already beendefined by Wiltshire County Council and EnglishHeritage for the GIS database, although this could beextended even further to include other monumentssuch as Yarnbury hillfort to the west. Any futureanalysis should be undertaken in this broader context,so that the way in which the WHS stands out fromthe wider area can be demonstrated. Such workwould benefit any analysis looking at minor changes tothe WHS boundaries.
8.2.5 Detailed study of the WHS suggests that the buildingof monuments (and other activity) occurred atdifferent focal points in the landscape at differenttimes. Sometimes these focal points relate to periodswhich are poorly studied (for example, the EarlyNeolithic concentration between Robin Hood’s Balland Larkhill). These areas may be priorities forevaluation in the future, but require a systematicHistoric Landscape Character Assessment to fullyinvestigate this issue.
Issue 14: Woodland within and around the WHS and its impact
8.2.6 Woodland is a relatively prominent feature in thelandscape of the WHS. Some of it is historic andrelates to the planned landscape developed aroundAmesbury Abbey in the eighteenth and nineteenthcenturies, while other woodland provided coppiceproducts. Much of the rest consists of recentplantations, often planted to screen intrusive elementsin the landscape.There would be no overall natureconservation gain from increasing woodland cover atthe expense of permanent grassland or otherpotentially ecologically valuable habitats. Enhancing thebiodiversity of existing woodland wherever possible isdesirable, but it is important to avoid creating futuremanagement problems, e.g. from trees spreading intoadjacent grassland, especially in relation toarchaeology. A proportion of scrub in a mosaic ofgrassland habitats is beneficial for birds andinvertebrates but, as with woodland, there is a needto avoid future problems for grassland management
Stonehenge World Heritage Site Management Plan 2009 63Part 2 – Key Management Issues
2003 ©
Engl
ish H
eri
tage
on archaeological sites as scrub can becomeexpensive and difficult to remove once established.
8.2.7 The positive screening role of woodland is particularlyimportant where designed to hide existing moderndevelopment in views within and towards the WHS.Such woodland is important in and around the LarkhillGarrison. Some plantations are already over-matureand will require replacement. It is important that suchscreening, for instance the Cursus plantation, does notdamage underlying archaeological remains. Much lessattention has been paid to restoring important viewsfrom the other key archaeological sites, such as theMonarch of the Plain barrow, and from the principalapproaches to Stonehenge. There is a potential todecrease woodland cover in such situations.There arealso opportunities for selective removal of trees atkey archaeological sites (as has been achieved alongthe King Barrow Ridge and in Fargo Plantation whichpreviously masked the width of the Cursus), therebyreturning barrows and earthworks to the landscape.All these issues should be considered in the WHSWoodland Strategy.
Barrow and sun through the trees at King Barrow ridge
8.2.8 The mosaic of individual trees and/or woodland isimportant for wildlife because it provides the diversityof habitat required to encourage species diversity.
8.2.9 With a few notable exceptions, existing woodlandwithin the WHS, is unmanaged and tends to beisolated, without connections between blocks or toother surrounding habitats. There are, however, waysin which its wildlife value could be enhanced withoutcompromising other landscape and archaeologicalaims:
■ woodland areas devoid of significant archaeologyand not impeding significant visual links betweenmonuments or the appreciation of their settings
could be selectively replanted as mixed orbroadleaved native woodlands, and managed topromote a less even-aged structure;
■ where possible, woodlands could be linked toother farmland habitats such as arable fieldmargins to provide ‘stepping stones’ for wildlife,rather than being left in isolated, small blocks;
■ some scrub could be allowed to develop inselected locations away from archaeological sites.
8.2.10 All works classified as afforestation or deforestationrequire consent from the Forestry Commission withina WHS if they might have a significant environmentalimpact, and should be notified to them. EnglishHeritage is the statutory adviser to the ForestryCommission on Woodland Grant Schemeapplications within the WHS. There is a clear needfor an integrated woodland management strategy tobe developed to provide a co-ordinated policy onscreen planting, tree removal and woodlandmanagement for the WHS as a whole. The NationalTrust has completed a woodland survey of its ownproperty and is drafting a woodland strategy fordiscussion in 2009 and implementation during the lifeof this Management Plan.
8.3 Monument management
Issue 15: Enhancing management arrangements for monuments
and sites in the WHS
8.3.1 At the national level, the importance of thearchaeological components of the WHS is reflected inthe generally high level of statutory protectionafforded to sites through scheduling. However, thereare a number of management issues relating to thephysical survival of archaeological remains:
■ a number of archaeological sites lie under arablecultivation. In some instances, sites have been‘ploughed out’ so they are no longer visible in thelandscape. Nevertheless, archaeological evidencewill still survive below the surface;
■ a number of sites, particularly barrows, lie withinwoodland. This may result in progressive rootdamage or catastrophic damage in the event ofwindblow, and also enhanced exposure to damageby burrowing animals;
■ a small number of sites have been damaged in thepast, or are currently at risk of being damaged bythe installation/maintenance of utilities, and some
64 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Lucy
Eve
rshed 2
005 ©
Nat
ional
Tru
st
monuments lie partly within byways and are liableto erosion damage;
■ although many archaeological sites lie in grasslandenclosures within arable fields, in some instancesthe fence lines are extremely close to the remains– or even partly clip them – with the result thatany associated remains in the area immediatelysurrounding the site may be lost to plough orfence-post damage;
■ some instances of individual monuments in acohesive group being fenced individually, therebydetracting from the appreciation of the entiregroup and leading to the exclusion of outer banksand ditches;
■ some barrows are fenced unnecessarily, oftenbecause they were previously surrounded byarable cultivation. However, the removal of fencesneeds to be balanced against the damage whichcan be caused by grazing stock;
■ damage caused by burrowing animals, such asrabbits and badgers.
■ Erosion of archaeological sites by visitors
8.3.2 Most of the former English Heritage “Section 17”Management Agreements, which provided paymentsfor the positive management of archaeological sites,have now lapsed, and have mostly been replaced withother agri-environmental funding streams. However,these discretionary grants may still be an optionwhere other funds are not available.
8.3.3 Many monuments were in the past fenced off fromthe surrounding arable fields, but with limitedprovision made for fence maintenance orreplacement. If cattle break into ill-maintainedenclosures, they can not only injure themselves but inthe process can cause further damage to the fencesand monuments.
8.4 Agricultural practices
Issue 16: Agricultural practices within the WHS – balancing the
needs of farmers with those of the historic environment
8.4.1 On some National Trust land, there are agreementswhich restrict livestock numbers, ploughing depthsand fertiliser application and sprays. Such restrictionsalso apply to some other areas which are the subjectof agri-environmental funding schemes, which farmerscan enter on a voluntary basis (see 5.11). Elsewhere,they are not required to distinguish between land
within and outside the WHS. Visible archaeologicalfeatures are generally not cultivated, but those whichare not obvious on the surface are cultivated in thesame manner as the rest of the farm.
8.4.2 Over recent years it has been recognised that thereare a number of non-agricultural benefits of increasingthe extent of permanent pasture for the character ofthe WHS. These include:
■ a consistency with archaeological evidence thatthe heart of the WHS would have been pastoralin the period contemporary with Stonehenge’s useand therefore its restoration in this area offers anappropriate land cover in historical terms;
■ a reduction in the potential damage caused toknown and unknown archaeological remains byploughing;
■ the replacement of tall arable crops which tend toobscure more subtle earthworks and barrows,thus hindering interpretation;
■ the facilitation, subject to stock control, of greaterpublic access and freedom of movement (e.g.permissive access is allowed throughout theNational Trust’s pastures);
■ the potential to enhance the WHS’s natureconservation value.
■ The potential to enhance visual understanding ofmonuments invisible on the ground by, forinstance, differential grass-cutting
8.4.3 The vast majority of permanent grassland in the WHSoccurs in and around the central area. Here theNational Trust and private owners have successfullyconverted large areas of former arable land topermanent grassland, often with the support ofagri-environmental grants.
8.4.4 Many upstanding and uncultivated monuments are nototherwise managed and are viewed as obstacles tostraightforward cultivations, resulting in added costs tofarmers. They then become vulnerable to scrubgrowth which can ultimately cause root damage andattract burrowing animals. Fences around monumentscan interfere with access for maintenance mowing.Some farmers do allow grazing stock into theenclosures for a few days under good groundconditions, in order to graze off the vegetation. Deer,rabbits and hares have relatively little impact onkeeping scrub development down, though burrowingcan cause problems on monuments.
Stonehenge World Heritage Site Management Plan 2009 65Part 2 – Key Management Issues
8.4.5 There are a number of agri-environmental schemeswithin the WHS which will expire during the lifetimeof this Plan, including the remaining CountrysideStewardship Agreements and the English HeritageManagement Agreements. Consideration needs to begiven to what will happen to these areas of land –which contain important archaeological remains –once these schemes expire. All these schemes arevoluntary, but it is hoped that farmers will beencouraged to continue to farm their land in anenvironmentally sensitive way if finances allow andwhere possible assisted by funding from newagri-environmental schemes. It needs to be recognisedthat farmers must be able to make a living and not befinancially disadvantaged by the existence of theWHS. There may be a need in the future torenegotiate special agri-environmental schemes acrossthe whole WHS if commodity prices rise.
8.4.6 The Environmental Stewardship scheme was launchednationally by Defra in 2005, replacing the earlierCountryside Stewardship Scheme. EnvironmentalStewardship is a voluntary scheme which aims totackle countrywide environmental issues. Theobjectives of the scheme are: wildlife conservation,maintenance and enhancement of landscape qualityand character, resource protection, protection of thehistoric environment and promotion of public accessand understanding of the countryside. The Entry LevelScheme is open to all, and can provide protection toarchaeological sites through, for example, minimalcultivation over plough-damaged areas. Stonehengeand Avebury are one of the target areas for HigherLevel Stewardship and there has been take-up underthis scheme. It will be necessary for statutory agenciesto continue to work closely with Defra and NaturalEngland to ensure that agri-environmental schemescontinue to be targeted effectively for theconservation of the World Heritage Site.
8.5 Conservation of other parts of thehistoric environment
Issue 17: The conservation of designated elements of the
historic environment
8.5.1 There are a number of other notable historic assetswithin the WHS which – although not attributes ofthe Site’s OUV – also require conservation. Many ofthese –including most of the listed buildings – are inprivate ownership and it is in the owner’s interest tokeep them well-maintained, although grants may beavailable from the local planning authorities andEnglish Heritage for the most urgent and important ofrepairs. Many parts of the historic environment in theWHS are in a good state of repair or under good
management. However, there are a number of assetswhich are in need of repair within the WHS. Thereare two Grade II* sites on the English HeritageBuildings at Risk Register 2008: the Baluster Bridgeand Gate Piers, and Gays Cave and Diamond, both inAmesbury Abbey. The local planning authority alsohas a register of Grade II buildings which need repair.Sometimes, the needs of various parts of the historicenvironment may be different. For example, as ageneral rule, it is not good practice to have treeswithin hillforts or on their ramparts because of thedamage this may cause. However, the planting atVespasian’s Camp is an integral part of the historicGrade II* park and garden of Amesbury Abbey, andhas a historic value in its own right. Considerationneeds to be given to identifying historic assets withinthe WHS in need of repair or change, agreeingprogrammes of work, and then setting them in hand.
Plan of Vespasian’s Camp by Sir Richard Colt Hoare
8.6 Nature conservation
Issue 18: The enhancement of the nature conservation values of
the WHS
Chalk Grassland
8.6.1 The WHS is important as a potential stepping stonebetween Salisbury Plain SAC, Parsonage DownSSSI/SAC/NNR and Porton Down SAC/SSSI, whichare all key chalk grassland sites and stone-curlewhotspots. The diversity and national importance ofsurviving areas of unimproved chalk grassland both inareas around the WHS and, at a much smaller scale,on barrows and steeper slopes within the WHS,point to the opportunity that exists for downlandre-creation. The typical chalk grassland sward isdiverse and species-rich with a mixture of grasses andherbs. The characteristic downland herb-rich flora cansupport a huge variety of fauna, especially butterfliesand other insects, and birds.
66 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
©W
iltsh
ire H
eri
tage
Muse
um
Stonehenge World Heritage Site Management Plan 2009 67Part 2 – Key Management Issues
Red Headed Cardinal
Beetle at King Barrows
Six Spot Burnet at Seven
Barrows Field
Meadow Saxifrage on
Stonehenge Down
Autumn Gentian Arable Weeds
Sainfoin at Seven Barrows Field
Wasp Spider on King Barrow Ridge
Clustered Bellflower at Coneybury
Coneybury chalk grassland flora
Lesser Stag Beetle
Star of Bethlehem
Roesel’s Bush Cricket
Corn Buntings at Seven
Barrows Field
All images are by Lucy Evershed 2007 and 2008 © National Trust
8.6.2 These areas are not only important for the highquality chalk grassland they contain but also as apossible source of seed for chalk grassland(re)creation and the enhancement of existingpermanent pasture in the future. By buffering andlinking the surviving fragments of chalk grasslandhabitat and extending the areas of recreated chalkgrassland, the nature conservation value of the WHSas a whole could be enhanced. Changes in grazingmanagement on existing grassland can also enhancethe structure and value for birds and invertebrates.Since the last Plan was published, much progress onthis has been made and there are now an additional520 hectares of the WHS under pasture than was thecase in 2000. It is however important to maintain amosaic of different habitats within the WHS, includingarable land, in order to maximise its biodiversity.
8.6.3 The objectives set out in the former English Nature’sSouth Wessex Downs Natural Area Profile, withinwhich the WHS lies, identify chalk grassland andassociated habitats, together with low fertility arableland and river corridors, as key habitats with scope forre-creation and restoration. This is in line with the UKBiodiversity Action Plan (BAP), which includes a ChalkGrassland Habitat Action Plan.
8.6.4 The local Wiltshire BAP also highlights the value ofthis habitat in Wiltshire and lists actions and targets tohelp maintain, enhance and extend this habitat.Partnerships and landscape scale restoration projectssuch as the Stonehenge WHS example are cited asobjectives. The BAP was reviewed in 2007 and thenew BAP has now been published. Other key BAPhabitats particularly relevant to the WHS are farmland( e.g. farmland birds, mammals such as brown hareand arable plants), wetland birds and rivers (RiverAvon and Till SSSI/SAC and catchment andwatermeadows).
8.6.5 Arable land is valuable as a habitat for specialistwildlife such as farmland birds, arable plants, hares etc.Therefore it should be an aim to balance the needs ofthe archaeology, habitats for rare flora, and the
opportunities for farmland birds, for example, byproviding wild bird food cover, grass margins, andfallow plots when looking at strategic locations ofreversion. It is important to retain the mosaic ofdifferent types of land use.
68 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Map of chalk grassland and RSPB nature reserves in Wiltshire
©rs
pb-im
ages.
com
8.6.6 Farmland birds are particularly important due to theirdecline nationally over the past 50 years. There is agovernment target aiming at delivery of increasingfarmland bird populations by 2013. Species includestone-curlew, corn bunting, skylarks, wintering goldenplover, etc. A survey of breeding birds was carriedout in 2005 funded by Defra and RSPB which willenable us to monitor change. The River Avon, inpart the boundary of WHS, and its adjacent watermeadows, some of which are also SSSI for theirwet grassland and diverse plant communities, arealso of value for waders/wildfowl and Europeanspecies such as Desmoulins whorl snail. This is inaddition to the historic landscape value of themeadows and importance of the river in Stonehengelandscape development.
8.6.7 Natural England acknowledge that it is impossibleto re-create rapidly habitats that have evolved overcenturies, but notes that restoration schemes forhabitats such as chalk grassland can be valuable inbuffering and linking existing habitats, and forreducing fragmentation.
Arable reversion and extending the areas ofpermanent grassland
8.6.8 The Countryside Stewardship Scheme hasencouraged farmers to protect archaeology andencourage wildlife and landscape. Some areas havebeen reseeded with a species-rich calcareous grassand wildflower seed mix where soil nutrient levelswere suitable. In others, the existing grass leys havebeen oversown with wild flowers. Overall theschemes aim to establish species-rich semi-naturalgrassland and protect historic monuments and theirlandscape setting.
8.6.9 Management involves extensive grazing with nofertiliser or herbicide use (except where necessary forweed control). Grazing times and duration aremanaged to provide a variety of sward lengths andstructure, to take account of bird species and toencourage flowering plants. This depends on thespecies present and whether the sward has beenbotanically enhanced or whether it is currently grass-dominated semi-improved or improved grassland.There are opportunities to enhance the natureconservation of the more fertile fields over time,through the introduction of suitable plants;alternatively they can be managed to providestructurally diverse grassland for insects and birds. There-created grasslands and enhanced semi-improvedgrasslands will take years to develop into diverseflower-rich grassland.
Lapwing
8.6.10 However, there are some areas which already showgreat promise: parts of the National Trust land havebeen seeded with chalk grassland seeds harvestedfrom the Salisbury Plain Training Area and now showgreatly increased biodiversity for both flora and fauna.Other areas such as the new Royal Society for theProtection of Birds (RSPB) reserve on NormantonDown are also developing highly diverse ecosystems,including insects, birds and chalk grassland species.There have been notable successes during the lastfew years in breeding the rare stone-curlew.
8.6.11 Since the last Plan, there have been significantimprovements to the funding rates available for agri-environment schemes. Unlike the situation in 2000,some farmers have now entered into such schemesfor arable reversion, as they can be offered a realisticand long-term economic alternative to arable. This isbecause Defra increased the rate of CountrysideStewardship special project funding for arablereversion within the Stonehenge and Avebury WHS,largely as a result of the recommendations of theirrespective WHS management plans.
8.6.12 With the new Environmental Stewardship scheme,there are more options for protection of historiclandscape and for higher payment rates for all areasand not just those within the WHS. However recentchanges in agricultural economics linked to widerworld issues have made these payments less financiallyattractive so that it could be potentially more difficultto attract people to join the schemes. There are alsoissues concerning increased costs and lowerprofitability of the stock needed to graze thereversion areas. In recognition of this issue and thepotential impact on measures for bird conservationand reversion targets, a review of ES arable optionpayment rates is being undertaken in preparation forthe major review of the scheme in 2010.
Stonehenge World Heritage Site Management Plan 2009 69Part 2 – Key Management Issues
Andy
Hay
©rs
pb-im
ages.
com
8.6.13 Extending permanent grassland has objectives otherthan for nature conservation, including amenity,archaeological conservation and landscape benefits.
8.7 Climate Change
Issue 19: The effects of climate change on the WHS
8.7.1 Damaging climate change, driven by greenhouse gases,is now widely recognised as a defining issue of ourtimes. The historic environment is not immune fromthe impacts of climate change. Shifts in temperature,storminess and flood risk could all take their toll ofhistoric sites and places. The United Kingdom isprojected to get warmer, our winters will continue toget milder and wetter, and some weather extremesare projected to become more common includingheavier precipitation in winter (Conservation Bulletin52, Spring 2008, passim).
8.7.2 The UNESCO World Heritage Committee has beenconsidering the likely impact of climate change onWorld Heritage Sites and has published a strategy fortackling this issue (Climate Change and WorldHeritage, World Heritage Occasional Paper 22, Paris,2007). The Committee has requested new andexisting World Heritage Sites to integrate climatechange issues into new and revised management plans(as appropriate) including risk preparedness, adaptivedesign and management planning.
8.7.3 Within the WHS, increased severe weather eventscould lead to greater wind damage to structures andto trees, thus having an effect on the character of thelandscape and possibly on buried archaeology beneathor close to trees. While Stonehenge itself should besafe following all the works carried out in the 20thcentury, proactive work could be necessary in somewoodland, as has already happened with the removalof trees from barrows on the King Barrow Ridge.Severe weather events could also increase the risk offlooding, particularly along the Avon valley.
8.7.4 Changes in rainfall patterns and increasingtemperature may already be affecting the range ofvegetation and bird and animal species found in theWHS and thus its values for nature conservation. Forexample, it is already considered that the warmerwinters have allowed larger numbers of badger cubsto survive with the consequent problems that has forthe WHS. Changing moisture levels in the groundcould affect the survival of archaeological deposits.Changing patterns of weather could also havesignificant effects on agricultural use of the WHS.
8.7.5 At first sight the likely impact of climate change onthe attributes of OUV does not appear dramatic, butthere could be significant changes to the character ofthe landscape. It will be necessary therefore over thenext Plan period to analyse the risks to theStonehenge WHS of climate change and to developappropriate adaptation strategies to minimiseits effects.
8.8 Risk Management and counter-disaster preparedness
Issue 20: Counter-disaster preparedness in the WHS
8.8.1 The UNESCO World Heritage Committee has alsoasked for Management Plans to consider the risk ofpotential disasters and how these might be countered.They have placed great emphasis on the need forpreparedness and forward planning and havepublished guidance on the matter (Herb Stovel RiskPreparedness: a Management Manual for WorldCultural Heritage, ICCROM, Rome 1998). UKGovernment policy generally is placing more emphasison the need for society as a whole to be prepared todeal with severe emergencies.
8.8.2 Within this part of the WHS, the biggest risk ofdisaster in the past has probably been damage toStonehenge itself. The work carried out to the Stonesduring the 20th century should have minimised therisk of storm damage. There is still the potential forthem, because of their iconic status, to be the targetof vandalism or malicious damage and adequatesecurity remains necessary.
8.8.3 More work needs to be done to identify potentialrisks to the WHS as a whole, although someemergency plans are already in place with regard tothe Stones. Some have been identified in the previoussection. Others could include accidents involvingtraffic or low-flying aircraft, or possible ammunitionexplosions at the ammunition compound in the northof the WHS. During the plan period, a priority shouldbe to extend this work and to develop appropriateemergency plans.
70 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Dangerously unstable stones were straightened and some
uprights were set in concrete early in the twentieth century
Stabilisation work at Stonehenge in 1919
9.0 VISITOR, TOURISM ANDEDUCATION ISSUES
9.1 Sustainable tourism
Issue 21: Sustainable tourism
9.1.1 A widely held definition of sustainability is the onepresented at the 1987 World Commission onEnvironment and Development and in a report ofthat Commission entitled “Our Common Future”.This states that sustainability can be defined as:
“development that meets the needs of thepresent without compromising the ability of futuregenerations to meet their own needs”
Additionally and of relevance to the visitor and trafficissues at Stonehenge, is the EU’s Sixth EnvironmentAction Programme. This extends the definition ofsustainability to include the need for modifyingsociety’s attitudes towards the environment, andchanging patterns of consumption and behaviourstowards the environment. It also confirms thatsustainability is only achievable through theparticipation of all stakeholders, thus implying theneed for co-operation, partnership, and interactionand involvement in decision-making.
9.1.2 Successful management of public access and tourismat Stonehenge WHS will depend on an integratedmonitoring programme, that can identify where visitorpressure may be damaging archaeology, ecology orthe landscape, and then tackling these problems witha successful programme of actions. The opportunityto provide new visitor facilities must be taken toensure that Stonehenge becomes a more sustainabletourist attraction.
Issue 22: Stonehenge, Tourism and the Local Community
9.1.3 Stonehenge, with more than 900,000 visitors in 2007,has long been one of the top 20 major paidattractions at a national level. Alongside SalisburyCathedral (over 600,000 visitors a year), the stonecircle is one of the main reasons for visiting SalisburyDistrict. The 1998 Salisbury Visitor Survey indicatedthat 27% of respondents had visited or intended tovisit Stonehenge during their visit.
Stonehenge World Heritage Site Management Plan 2009 71Part 2 – Key Management Issues
1919 ©
Engl
ish H
eri
tage
NM
R P
50461
1919 ©
Engl
ish H
eri
tage
NM
RP50325
Salisbury Cathedral attracts over 600,000 visitors per year
9.1.4 In 2003, 3,357,000 day trips and 1.3 million overnightstays were made to Salisbury and south Wiltshire(South West Tourism, 2003, Economic impact oftourism in Salisbury), generating £146 millions intourism expenditure. It is estimated that 4,300 jobsare directly and indirectly sustained by tourism inthe District.
9.1.5 Stonehenge appeals to many different groups and is apopular destination for coach tours. Approximatelyone third of paying visitors travel to Stonehenge aspart of a group.
9.1.6 A large proportion of those use the existing car parkand facilities, in their journeys. Each year, up to amillion people, particularly those travelling along theA303 to and from the South West, use Stonehengeonly as a brief refreshment and convenience break.English Heritage estimate that 250,000 view thestone circle from the verge of the A344 withoutpayment annually.
9.1.7 There is a need to balance the wider economic andemployment benefits of tourism in the WHS withadverse impacts, both on the WHS and the localcommunity. A balanced tourism strategy for the WHSshould include:
■ enhancing the quality of the historic environment;
■ enhancing the quality of the visitor experience;
■ managing the number of visitors;
■ providing a net benefit to the local communityand economy;
■ collaborating with, and complementing, rather thancompeting with, other attractions in the region;
■ ensuring maximum and coordinated use of publictransport to get to and from the WHS;
■ ensuring adequate transport infrastructure to assistthe tourist trade and tour operators in accessingthe WHS and the wider area.
9.1.8 Balancing these issues needs to be a primary objectivefor the Management Plan. The Plan should embracethe following principles of sustainable tourism:
■ conserving the WHS and its archaeology forfuture generations, and protecting the WHSagainst the effects of visitor pressure;
■ subject to the primary need of conserving theWHS, accommodating the demands of the manydifferent user groups and organisations with aninterest in Stonehenge;
■ providing access and information for visitors,enabling them to enjoy the WHS and learn fromit. However, this will need to be carefully managedin order to reduce impacts and maintain thequality of the visitor experience;
■ identifying and reducing the impacts of non-sustainable tourism activities (e.g. over-crowding,vehicular congestion, wear and tear around keymonuments and inappropriate visitor-relateddevelopment in sensitive locations);
■ recognising tourism as a positive activity with thepotential to benefit the community, the Site andthe visitor.
9.1.9 Stonehenge is a working landscape. Villages in theWoodford Valley, the Army and civilian housing atLarkhill, and settlements such as Shrewton, Bulford,Amesbury and Durrington on the edge of the WHS,and the farms in the Site are living communities andare key stakeholders in the future of the WHS. Theirneeds and concerns therefore need to be fullyreflected in the implementation of the Plan’s primary
72 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Tony
Rum
sey
©Engl
ish H
eri
tage
NM
R
objectives to sustain the OUV of the Site to ensureprotection, conservation, and presentation of theWHS for present and future generations, and toimprove its visitor management.
9.1.10 At present, the surrounding settlements do notbenefit significantly from tourism at Stonehenge.Stonehenge attracts a high percentage of day visitorsand groups who are just passing through; indeed themajority of visitors only stay at Stonehenge for anaverage of 45 minutes. Although these visitors mayspend money in the visitor centre, they do not tendto bring much benefit to the area as a whole. Animportant issue therefore, is how to maximise theopportunities and spread the economic benefits ofvisitors to Stonehenge more widely within the locality.This should involve all private sector businesses andtourist organisation partners working together in linewith the aims of initiatives such as the South WiltshireEconomic Strategy and the Amesbury Vision. Types oftourism which are inherently more sustainable shouldbe encouraged, including linking the WHS with otherattractions such as public access downland and theAvon valley.
Amesbury from South Mill
9.1.11 Visitors should be encouraged to visit other heritagesites and museums in the area and to link their tripsto the neighbouring settlements. As Britain’s mostvisited archaeological site, Stonehenge has thepotential to benefit the local community, bygenerating business and employment through touristspending on local accommodation, restaurants, shopsand amenities.
9.1.12 Settlements closest to Stonehenge tend to be heavilyreliant on defence and (to a much smaller extent)agriculture. It is for this reason that the draft LocalDevelopment Framework promotes new anddiversified employment opportunities in the vicinity
of local settlements so as to improve economicactivity and reduce the potential impacts of thiscurrent vulnerability.
9.1.13 Potential economic development impacts ofimprovements in the management of the WHS arelikely to arise in at least two key ways:
■ first, the visitor profile is likely to change and theremay be some increase in visitor numbers;
■ second, if the visitor facilities are substantiallyimproved, both the average time spent atStonehenge and expenditure at the visitor centremay well increase. The increased visit time couldalso offer opportunities to increase spending in thearea although this is much more difficultto estimate.
9.1.14 The direct and indirect effects of the WHS site andany new visitor centre operations could thereforegenerate additional employment opportunities inlocal settlements.
9.1.15 For the benefits of this to be realised, the attractionsof local settlements would have to be positivelyconveyed to visitors in a highly effective manner viathe context of new visitor centre facilities and sitemanagement arrangements. It would also benecessary to examine in some detail the physical linksbetween local settlements and a new visitor centre,since even fairly small differences in real (orperceived) distances between the core destinationand a possible extension to a trip could have asubstantial deterrent effect. Conversely, the spin-offbenefits to other businesses may be significant if thereare good links between a new visitor centre andneighbouring settlements to encourage use of localfacilities by visitors. A well-promoted cycle networkbetween locations in and around the WHS mightassist the flow of greater economic benefit tolocal communities.
9.1.16 Informed by the WHS Management Plan, theformulation of a comprehensive TourismDevelopment Plan for the WHS and surroundingarea should be undertaken to address fully thepromotion and marketing needs of the area in anintegrated manner.
Stonehenge World Heritage Site Management Plan 2009 73Part 2 – Key Management Issues
Pete
r G
oodhugh
2008 ©
Pete
r G
oodhugh
9.2 Public access
Issue 23: Public access to, and awareness of, the whole WHS
See Map 4 – Access
9.2.1 The Stonehenge WHS is recognised as being ofinternational importance for its complex ofoutstanding prehistoric monuments. The survival oflarge numbers of both visible archaeologicalmonuments and buried sites concentrated within the2,600 hectares of chalk downland has resulted in alandscape without parallel, preserving evidence of along history from prehistoric times of humaninteraction with the environment.
9.2.2 However, the landscape of the WHS is not purelyNeolithic and Bronze Age in nature, but bears theimprint of many successive centuries of humansettlement and cultural activity. The un-watered,marginal nature of the Downs means that activityhere has been less intensive than in the river valleys (afactor which is directly reflected in the survival ofprehistoric archaeological remains), but there areother traces of human activity in the WHS landscape.Although often of historic and cultural importance intheir own right, these are frequently overlooked byvisitors to the WHS (although many are notaccessible). Examples include:
■ Iron Age activity as evidenced by the remains ofthe hillfort known as “Vespasian’s Camp”
■ Roman activity on Rox Hill, towards Oatlands Hill,near Durrington Walls and around the CuckooStone;
■ Saxon activity at Amesbury and in and aroundCountess Farm;
■ medieval and post-medieval activity, currentlyknown mainly in the east of the WHS along theAvon valley, including historic villages, manor sitesand their estates, and water meadows;
■ military activity, including existing buildings andstructures within Larkhill Camp. Many formermilitary structures now only remain as below-ground deposits, such as the StonehengeAerodrome, just to the north of NormantonGorse, and the Larkhill Aerodrome on FargoRoad, which was probably the earliest militaryairfield in the world and was the site of the firstmilitary plane trials and airborne radiotransmissions;
■ monumental associations with military history suchas ‘Airman’s Corner’;
■ the remains of military railways, some of whichfollowed a circuitous route from the formerairfield north, through Fargo Plantation, easttowards the Avon Valley;
■ the 17th Century carriageway constructedbetween the A344 and the Cursus (and whichbisects the Stonehenge Avenue) and the 18thcentury origins of the current A303 route;
■ the remains of parks and gardens associated withimportant buildings, and in particular plantationsclaimed to have been established incommemoration of famous people or events suchas the ‘Nile Clumps’;
■ farm and other woodlands that have becomelandmarks and part of the modern landscape.
9.2.3 Current public awareness of and access to heritageassets in the wider WHS landscape is generally low,particularly in the south of the Site and the AvonValley (see Map 4). Attention is currently firmlyfocused on the Stones themselves, with littleappreciation of the surrounding archaeologicallandscape. This concentration is due to a number offactors. These include:
■ the direct vehicular access to Stonehengeprovided by the A303 and the A344;
■ the location of the car park and visitor facilitiesimmediately adjacent to the Stones;
■ the restraints on physical access imposed by fast-moving traffic on the A344 and especially theA303, where there are no pedestrian or cyclecrossing points;
■ the seemingly less significant and less dramaticnature of other archaeological components;
■ the constraints imposed by the current pattern ofland ownership and public access opportunities onfoot, particularly to the south of the Site;
■ there is currently no indication to road users thatthey are travelling through a WHS.
74 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
9.2.4 The need to estimate and control acceptable levels ofvisitor numbers throughout the WHS is an importantprinciple for the Plan. This would need to be basedon the carrying capacity of the areas concerned, asderived from detailed assessments of the landscape,archaeological and ecological sensitivity.
9.2.5 A more extensive hierarchy of waymarked paths tosuit different visitor needs and those of local userswould provide better access to the WHS as a whole.This should build on existing walks created by theNational Trust on its land. The overall aim ofproviding flexibility of movement within the WHScould in part be addressed by proposals for newvisitor facilities. Visitors should be given the chance toenjoy different experiences, whether it is simply abrief visit to a new visitor centre, or walking toStonehenge and around the wider area. One way ofincreasing access to and within the Site might be an‘explorebus’ service which could drop off and pick uptourists at the visitor centre, in local settlements andat various other points .
UNESCO’s Director General Koïchiro Matsuura looking at the new
National Trust information panels
Visitors walking to the Cursus barrows
9.2.6 The A344/A303 junction and the A344 from there tothe current car park should be closed. On theremainder of the A344 from Airman’s Corner, andsubject to the position of any new visitor facilities, andon the Byways, motorised traffic, other thanemergency, operational and agricultural vehicles,should be excluded, and visitors should beencouraged to walk between a drop-off point/ visitorfacilities and the Stones. The old, disabled and veryyoung may, however, require motorised assistance.
9.2.7 The objective of increased public access will, however,have to be balanced with the need to maintainworking agricultural land, to protect archaeologicalsites and to create nature conservation sites.Increased recognition of the importance of the wholeWHS will require an integrated approach that blendssound archaeological and land management with highquality visitor interpretation and access information.Improved access is only possible with the agreementof the landowners.
9.3 Visitor Management
Issue 24: The management of visitors in the wider WHS
9.3.1 As well as visiting the Stones, tourists may also visitthe National Trust “open access” land, or walk alongthe byways and bridleways within the WHS. Section9.2, above, explains why it is desirable to allow accessto other sites and monuments within the WHS.However, the needs of landowners, land managers,farmers and sensitive wildlife have also to be setagainst the access needs of visitors.
Stonehenge World Heritage Site Management Plan 2009 75Part 2 – Key Management Issues
Isab
elle
Bedu 2
004 ©
Engl
ish H
eri
tage
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8225
9.3.2 While there may often be a strong visual case forremoving fences within the WHS, this is frequentlyimpractical. For example, limiting the amount offencing on open access land can create significantproblems for livestock management and the efficientproduction of hay and silage. The National Trust has,however, removed 11 kms of fencing in recent yearsand reports few major problems in managing theexisting 40 to 55 hectare blocks. Any large-scalemove to rotational grazing could consider the use oftemporary electric fencing as used on Salisbury Plain,although this may not be desirable in areas wherethere are large numbers of visitors or vulnerablearchaeological remains.
Issue 25: The management of visitors at Stonehenge
9.3.3 Stonehenge has long been a popular visitor attractionand attracted 900,000 visitors in 2007. The triangle ofland at Stonehenge between the A303, A344 andByway 12 is managed by English Heritage, with staffbased on site and at offices in Salisbury. As long agoas the 1970s, the numbers and behaviour of visitorsto Stonehenge raised concerns. The physicalenvironment at the Stones proved unable towithstand pressure from such large numbers ofvisitors, with the result that strict visitor managementmeasures were introduced in the late 1970s, such asroping off the Stones and provision in some areas of ahardened path (on the line of formerly disturbedland). A low-level and reversible “bridge” was placedabove the fragile earthworks of the Avenue, in orderto protect them and allow a circular walk around themonument. These arrangements have made itpossible to return the centre of Stonehenge to grass.
The effects of increasing visitor numbers: a muddy track around
Stonehenge in the 80’s
9.3.4 A well-researched grass management regime is inplace in areas where there is no hard-standing.Visitors are allowed to walk within roped areas, whichare relocated by staff according to when erosionlooks to be likely to happen (Cathersides, 2001). Inthis way, the 900,000 annual visitors to the site donot have an adverse impact on the grass aroundthe Stones.
A new grass management regime was put in place in 1995
allowing 900,000 visitors a year to walk on grass around
Stonehenge without erosion
9.3.5 English Heritage now operates a Stone Circle Accessscheme, which allows a limited number of visitors toenter the stone circle before and after the monumentis open to the general public. This type of visit, whichmust be booked in advance, allows visitors to getcloser to the Stones than is possible during normalvisiting hours.
Walkway across the Avenue put in place in 1995 to reduce
wear and tear on the monument
9.3.6 Access to the Stones, and the carrying capacity of theimmediately surrounding ground, will remain keyissues as long as visitor numbers are high. The desireof visitors to get physical access to the centre of theStones has to be balanced against the conservationneeds of the monument, and additionally raises issues
76 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Ala
n C
athers
ides
1985 ©
Engl
ish H
eri
tage
Ala
n C
athers
ides
1985 ©
Engl
ish H
eri
tage
Ala
n C
athers
ides
1985 ©
Engl
ish H
eri
tage
of security and control. Climbing on the Stones, andeven touching them may have serious implications fortheir long-term preservation. This applies in particularto their ancient carvings which have not yet been fullystudied, and their important colonies of fragile lichen.Visitor access will need to continue to be carefullyand intensively managed in the immediate areaaround the Stones. Remote or virtual access to thecentre of the Stones is highly desirable if physicalaccess is not available.
9.3.7 Visitor pressure is compounded by the highly seasonalnature of tourism at Stonehenge, together with peakscreated by the influx of visitors at certain times of theyear, mainly at the summer and winter solstices andequinoxes. The growth in visitor numbers has also ledto increasing demand between different user groupswho seek access to the Stones for different purposes.
9.3.8 In particular, there is a large demand for car parkingwhich can overflow onto the adjacent Byway 12.Areas of Byway 12 and the overflow car park sufferfrom erosion caused by traffic.
When the car park is full at Stonehenge people have no other
choice but to park on Byway 12 – photo taken on 2 January
2006
9.3.9 It is essential that future visitor management do notadversely affect the special qualities of the WHS or ofStonehenge itself, including its mystical appeal, which,
for many people, lies at the root of its attraction.This is undermined by existing access arrangementsand proximity to the road network. The key issueis ensuring that in the long-term, the style, natureand quality of visitor management at the Stonesis appropriate for Stonehenge, given its status asa WHS, and its vulnerability to erosion. Acomprehensive assessment of visitor numbers,profile and behaviour needs to continue to bemade on a regular basis in order to allow forinformed management.
9.4 Solstice management
Issue 26: The need to manage carefully the summer solstice
and other pagan festivals to allow a reasonable level of access
whilst ensuring that the conservation needs of the Stones and
other monuments are met
9.4.1 Visitors to the Stones generally cause few problemsto farmers and landowners. However, this has notalways been the case. In the 1980s, mass summersolstice gatherings were banned by the authorities.Many pagan and druid groups felt their rights toworship were being violated as they were preventedfrom entering the monument at this time, andsubsequently they took the issue to the Courts.
9.4.2 Since 2000, there has been significant progress inproviding access for the summer and winter solsticesand the equinoxes. English Heritage, working inpartnership with pagan and community groups,Wiltshire Constabulary and other County emergencyservices, Wiltshire County Council HighwaysDepartment and other agencies and interestedgroups, now opens the monument free of charge atthe summer solstice to all who wish to visit. Strictrules of entry are agreed by the interested groups inadvance to ensure a safe and enjoyable environment,and to promote an attitude of respect for themonument and other attendees. Each year atemporary car park is set up in the western part ofthe WHS, 1 km from the stone circle, but attendeesare increasingly encouraged to make use of the publictransport arrangements that have been developedsince 2004. As many as 30,000 people now visit theStones to celebrate and enjoy the summer solstice.The management of the summer solstice and otherseasonal gatherings is now greatly improved and allrecent periods of access have passed off peacefully.However, the planning, organising and operating ofsuch events is a significant financial cost for EnglishHeritage and others, while development andmanagement work continues throughout the year.Visitor numbers, the traffic implications, theimplications for the spill-over to the Avebury WHS,
Stonehenge World Heritage Site Management Plan 2009 77Part 2 – Key Management Issues
Pete
r C
arso
n 2
006 ©
Engl
ish H
eri
tage
and the behaviour of visitors, will need to continue tobe closely monitored by the relevant authorities.
Sunrise by the heelstone at summer solstice
9.5 Physical impacts on the Site
Issue 27: Visitors can cause erosion and other problems
9.5.1 If not carefully managed, large numbers of visitors cancause problems to fragile archaeological remains bothabove and below ground,. Compared with Avebury,relatively few monuments at Stonehenge are atpresent suffering from visitor erosion. Visitor numbersat the Stones themselves are carefully managed (seesection 9.3 above), but if more visitors are dispersedaround the WHS, then the condition of monumentswill need to be regularly assessed to make sure thatvisitor erosion does not become a problem.
9.5.2 As well as problems caused by footfall, visitors candamage archaeological sites in other ways, such aserosion of the carvings on the Stones, damage tosigns, litter, and graffiti. These issues can pose agreater risk during the summer solstice. However, it isfair to say that, given the numbers of visitors, therehas been remarkably little damage in recent years, andmost of it very superficial, such as chalked graffitiwhich can be easily removed, or litter which is clearedaway within hours. Happily, most visitors demonstrateconsiderable respect for the monument and act in a
very responsible manner. However, there is acontinual low-level of litter, graffiti and damage at siteswithin the WHS which needs to be monitored andaddressed, as it is at present.
9.6 Existing visitor facilities
Issue 28: The current visitor facilities are inadequate
9.6.1 The rapid growth in visitor numbers has highlightedthe inadequacy of existing visitor facilities andinfrastructure at Stonehenge. The current location ofthe visitor centre, adjacent to the Stones and in ahighly sensitive area in archaeological and visual terms,has severely limited the ability of the operators,English Heritage, to expand and develop new facilitiesin line with the growth in visitor numbers. At manytimes of the year, the existing facilities are subject tosevere overcrowding and congestion. Parking for carsand coaches is both inadequate and poorly designed.The proximity of the car park to the A303 and A344,means that it is often used not by visitors to theWHS, but rather as a convenient stop for toilets andlight refreshments. To counter this there is a chargefor car parking in the summer months, which may berefunded upon purchasing a ticket to visit Stonehenge.
Visitors queuing for tickets – August Bank Holiday weekend
2008
9.6.2 Catering, retail and interpretative facilities remain basicand the toilet facilities are limited. Overall, the existingfacilities do not do justice to a WHS.
9.6.3 Access to the Stones from the existing visitor centrecar park is via an underpass, which creates a poor firstimpression even though it was built for the safety ofvisitors so they do not have to cross the A344. Most
78 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Rac
hel Fost
er
2005 ©
Engl
ish H
eri
tage
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8299
visitors do not experience the dramatic views andapproaches to Stonehenge which are possible fromthe wider landscape. Because the Stones are so closeto the A344, some visitors pull up next to themonument and view Stonehenge from the roadside,or park on Byway 12, detracting from the visitorexperience. This also leads to potential road safetyhazards, as does the current vehicular entrance andexit arrangements to the Stonehenge car park.
9.7 The need for improved visitorfacilities
Issue 29: The need for improved visitor facilities
9.7.1 For many years it has been acknowledged that thereis a need to remove the existing visitor facilities whichhave an adverse impact on the OUV of the Site, andto develop improved visitor facilities where they willnot have an adverse impact on the WHS and its OUV.The current facilities, built in 1968, were described in1993 by a Parliamentary Committee as a “nationaldisgrace” and have been a matter of concern also tothe UNESCO World Heritage Committee.
9.7.2 The location and nature of the current visitor facilitiesand the introduction that they afford to the Stonesand the wider WHS is a key issue for the Plan. Atpresent, few visitors fully appreciate that Stonehengelies at the heart of a complex archaeologicallandscape that is rich in biodiversity with a high natureconservation value. There is a need to encouragevisitors to discover less well-used areas within otherparts of the WHS through sustainable means.
9.7.3 The Stones in themselves are visually striking, yetwithout an insight into their history, origin, andcontext, visitors cannot appreciate their fullsignificance, nor that of the wider WHS.
9.7.4 There is a clear consensus that the Stonehenge WHSshould be managed to the highest standards toprovide for effective conservation with managedpublic access through appropriate interpretation,education and other visitor facilities. Any new visitorcentre should be a focal point of access andinformation for the Stones themselves, for the rest ofthe WHS and for other visitor attractions in theregion, thus spreading the benefits of tourism inthe area.
9.7.5 Identifying new ways for different types of visitor (e.g.children, overseas visitors, school groups, disabledvisitors, coach groups) to experience Stonehenge andthe wider WHS is an important principle for futurevisitor management.
9.8 Interpretation, education andmuseums
Issue 30: There is a strong need to improve the interpretation
of Stonehenge and the WHS
9.8.1 The current facilities at Stonehenge are small andcramped and do not offer opportunities for fixedinterpretation. Interpretation is provided at presentonly through the English Heritage guidebook (Richards2005), which is currently available in five languages(English, French, Japanese, German and Spanish), theEnglish Heritage Orientation leaflet which is availablein eleven languages (English, French, German, Spanish,Japanese, Swedish, Russian, Italian, Mandarin, Dutchand Polish), and the on-site audio guide which is atpresent available in ten languages (English, French,German, Spanish, Japanese, Swedish, Russian, Italian,Mandarin and Dutch). The National Trust providesinterpretation boards in the landscape. Guided toursof the stone circle and the WHS are available throughprior booking, as are English Heritage and NationalTrust education visits. Off-site interpretation includesmany books devoted to Stonehenge, many websitesincluding those of key stakeholders, and importantmuseum displays at Devizes and Salisbury. TheNational Trust and others also provide leaflets andother printed material on request. However, thereare no formal interpretation facilities of eithercultural or natural heritage within a dedicatedbuilding for visitors.
On site there is currently only the audio tour to explain the
history of Stonehenge
Stonehenge World Heritage Site Management Plan 2009 79Part 2 – Key Management Issues
Chri
stopher
Young
2008 ©
Engl
ish H
eri
tage
9.8.2 This is a grossly inadequate state of affairs for a site ofsuch undoubted importance as the Stonehenge WHS.The Stones themselves are a global icon, yet withouta greater insight into their history, origin and context,visitors cannot appreciate their full significance or theirplace in the landscape, or gain understanding of theancient people who once lived in the area.Interpretation of the WHS landscape should be of thehighest quality and enhance the visitor experience.
9.8.3 English Heritage, with the National Trust, prepared adetailed Interpretation and Learning Strategy forStonehenge over the past few years, which includes aVision for the Interpretation of the WHS agreed byboth bodies in 2004. Further cooperation willstrengthen the future development of theinterpretation of Stonehenge and the WHS.
9.8.4 There are numerous possible methods ofinterpreting Stonehenge. The key issue is to decidewhich to use and how to achieve the optimumbalance between on and off-site interpretation. Thesensitivity of the WHS (and particularly the areaaround the Stones) will limit the opportunities foron-site interpretation, and consideration must begiven to the visual and construction impacts of anynew interpretative materials.
9.8.5 It will also be important to make sure that the typeand level of interpretation caters for a wide range ofdifferent user groups with varying needs (e.g. children,overseas visitors, school groups, disabled visitors,coach groups).
Issue 31: The Stonehenge WHS is used for education and life-
long learning
9.8.6 Stonehenge fulfils an important role in formal andinformal education. Currently there is no single staffmember whose job is solely involved in educationneeds in the Stonehenge area, except as a long-termvolunteering opportunity within the National Trust.Both the National Trust and English Heritage arestrongly committed to the development of furtherlearning opportunities and for the better educationaluse of the historic environment in general, anexample of which is a joint ‘Discovery Visit’ atStonehenge (see http://www.english-heritage.org.uk/server/show/nav.19488). EnglishHeritage has a specific Learning Plan for Stonehengewhile the National Trust has a Learning Plan indevelopment. The potential for the educational use ofthe Stonehenge WHS should be further developed inorder to reinforce the conservation message. Thevalue of educational resources embodied in a sitesuch as Stonehenge should be considered
comprehensively in conjunction with similar sites suchas Avebury and the rest of prehistoric Wessex,together with the museums at Devizes and Salisbury.There is scope for widening the role of education atStonehenge , to reach new audiences and coverthemes such as recent history, wildlife, WorldHeritage itself and business tourism (this latter themeis covered by another English Heritage ‘DiscoveryVisit’). An English Heritage/Wessex ArchaeologyWHS education project was piloted at Stonehengeworking with pupils from a local school, the result ofwhich was the creation of a new QCA scheme ofwork on prehistory. In the spring term of 2005, theproject was extended to Avebury and an on-lineteachers’ resource created. It is hoped that theeducation project can be continued and extended toinclude both primary and secondary schools acrossthe county. Since 2005, the National Trust hasworked with schools, colleges and youth clubs, mostlywithin the local area, to create a series of tailor-madefree visits each year. Since 2007, the National Trusthas been in partnership with a local school on acontinuing project through the Trust’s Guardianshipscheme, which aims to encourage a sense ofcustodianship through lessons based around local,cultural and natural heritage.
Stonehenge Educational visit by Larkhill School
9.8.7 Volunteering in the WHS involves mostly Wiltshireresidents including people from the local communities.The National Trust offers a range of part-time andoccasional volunteering opportunities, most of whichare learning (e.g. landscape guiding, education groupleading, researching) or conservation roles (e.g.carrying out practical conservation, wildlife orarchaeological surveys). Working alongside NationalTrust property staff, there are also three full-timevolunteering placements, dealing with learning andinterpretation, youth and community, andconservation. Many of the Trust’s engagementprojects are planned and managed entirely byvolunteers. In 2007, 60 volunteers worked a total of
80 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Nig
el C
orr
ie 2
006 ©
Engl
ish H
eri
tage
Photo
Lib
rary
N060193
5,775 hours in the Stonehenge landscape. Potentialexists to develop many further volunteeringopportunities in the WHS.
Issue 32: Museum and archive arrangements for the WHS
9.8.8 There are two museums, the Salisbury and SouthWiltshire Museum (SSWM) at Salisbury, and theWiltshire Heritage Museum (WHM) at Devizes,which curate and display unique and importantcollections of archaeological material relating to theStonehenge WHS. The Wiltshire Heritage Museumalso curates and displays material from Avebury. Atthe moment, these museums are the only placeslocally where visitors can see permanent exhibitionsand important archaeological finds and documentsrelating to Stonehenge and other monuments andsites in the WHS. The two museums regularly hosttemporary exhibitions and events on Stonehengethemes, and are intellectual gateways to the Site. Bothare situated about 16kms from Stonehenge itself. Theother part of the WHS at Avebury has its own on-site museum and documentary archive, where thereare interpretation facilities and archaeological displays.New visitor facilities should include exhibition space.
Issue 33: The presentation, interpretation and visibility of
archaeological monuments and sites
9.8.9 There are opportunities to enhance the visibility ofburied archaeological sites in the wider WHSlandscape to improve visitor appreciation. Forexample, ‘earthwork enhancement’ through selectivemowing and/or grazing could be used to emphasisethe ceremonial route to the Stones of The Avenuewhere it exists below ground or is not clear, and todefine the location of other important sites, such asthe Lesser Cursus, for which the surviving surfaceevidence is minimal or non-existent.
10.0 ROADS AND TRAFFIC
10.1 Highways network and usage
Issue 34: Roads and traffic have an adverse effect on the WHS
10.1.1 Roads and transport have long had major influenceson the WHS which is traversed and surrounded byroads and byways, many of some antiquity. The A303and A344 are highly visible routes that cut throughthe WHS landscape and adversely impact on theStonehenge Avenue, the character of the Site as awhole, and on people’s access to enjoyment of theStones themselves and of the wider landscape. Theircurrent routes presumably reflect Stonehenge’sprominence as a landmark. The western boundary ofthe WHS is the A360 and part of the easternboundary is formed by the A345 which also cuts
through the Durrington Walls Henge. The northernboundary of the site is the Packway which is the mainaccess route to the army base at Larkhill. There is aminor road running south from Amesbury throughthe settlements in the Avon valley and also Ministry ofDefence roads in the Larkhill area. In addition, thereare historic byways running primarily north-souththrough the World Heritage Site as well as a numberof public footpaths.
10.1.2 Significant volumes of traffic pass through the WHSon the A303 trunk road as well as on the A344 andalso along the other main roads bounding the Site toeast and west. The settlements around the Site anddown the Avon valley also generate traffic.Stonehenge itself generates traffic with c900,000visitors to the Stones annually (and more who juststop at the car park but don’t visit), most of whomcome by car or by coach. In the future the volume ofboth commuter and leisure-related traffic is likely tocontinue to grow in line with national trends. TheManagement Plan should reflect the Government’sintegrated transport policy aims to reduce relianceon the private car and encourage alternative meansof travel.
Traffic at a standstill on A303 – August Bank Holiday weekend
2008
10.1.3 Concerns about roads and traffic include:
■ The impact on the WHS;
■ Traffic congestion, particularly along the A303, butwith knock-on effects on other routes in the area;
■ Concerns of local residents that changes to trafficmanagement within the WHS will cause additionaltraffic and congestion in the surroundingsettlements;
■ The need to manage visitor access to the WHS inthe most sustainable way possible;
Stonehenge World Heritage Site Management Plan 2009 81Part 2 – Key Management Issues
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8068
■ Management of traffic and access on bywayswithin the WHS;
■ Road safety, especially at the junction of the A303and A344, and also at Airman’s Corner (alsoknown as Airman’s Cross).
Queues on the A344 to get in to the Stonehenge car park
10.1.4 The impact of traffic has long been a matter ofconcern and was raised by the World HeritageCommittee in 1986 when the site was inscribed onthe World Heritage List. The Committee then ‘notedwith satisfaction the assurances provided by theauthorities of the United Kingdom that the closure ofthe road which crosses the avenue at Stonehenge(ie the A344) was receiving serious consideration aspart of the overall plans for the future management ofthe site’.
10.1.5 Proposals to improve the A303 go back over manyyears. The Amesbury bypass was built across theRiver Avon and up to King Barrow Ridge in the1960s. There was then an intention to continue thedual carriageway westwards past Stonehenge, withthe potential for a flyover at Countess Roundabout,which was not built. Around the same time thejunctions between the A303 and A344 in StonehengeBottom and the A303 and A360 at LongbarrowCrossroads were improved.
10.1.6 The most recent proposals to improve the stretch ofthe A303 past Stonehenge date back to the early1990s when the process of initial route identificationwas started. Some 50 route options were consideredas part of this exercise, including ones that sought topass to the north or south of the World Heritage Siteboundaries. A public consultation in 1993 failed toidentify an acceptable route. In 1995, a widelyattended Planning Conference explored options forimproving the A303 between Amesbury and BerwickDown and resolved that any route for the improved
A303 should avoid the archaeologically and visuallysensitive area known as the Stonehenge ‘Bowl’.
10.1.7 With support from English Heritage and the NationalTrust, the Highways Agency in 1998 began developinga scheme for putting the A303 in a tunnel under thecentral part of the World Heritage Site. Thedeveloped version of this scheme (the PublishedScheme) proposed a bored tunnel 2.1km in lengthpast Stonehenge with the remainder of the A303 inthe World Heritage Site also dualled and with abypass for Winterbourne Stoke. The scheme wouldalso have closed the A344 and enabled the relocationof the visitor facilities. The scheme was the subject ofa Public Inquiry held in 2004.
10.1.8 The Inspector’s Report, published in July 2005,recommended in favour of the scheme promoted atthe Inquiry. However, as a result of a substantialincrease in the cost of tunnelling, the Governmentdecided to review whether the scheme stillrepresented value for money and the best option fordelivering improvements to the A303 and to thesetting of Stonehenge.
10.1.9 Following the review, the Government have statedtheir view that there are no acceptable alternatives tothe 2.1km bored tunnel scheme, but that its costcannot currently be justified and would not representbest use of taxpayers’ money. In the absence of ascheme to remove the A303 from the centre of theWHS, the Government have asked that alternativeopportunities be explored for the delivery ofenvironmental improvements at Stonehenge, includingnew visitor facilities and examination of the case forclosing the A303/A344 junction.
10.1.10 Closure of the A344 adjacent to the Stones wouldmeet the concerns of the UNESCO World HeritageCommittee as stated in 1986, but it would also haveimplications for traffic movements elsewhere in andaround the WHS. Closure of the A344/ A303junction (and possibly of more of the length of theA344) would increase traffic loading on surroundingroads, particularly the A360 via LongbarrowCrossroads. There is also the risk that traffic seekingto avoid delay would use the minor roads throughsettlements such as Larkhill and Durrington. Thedistribution of traffic could depend to some extent onthe future location of the visitor facilities forStonehenge. Closure of the A303/A344 junctionwould therefore require mitigation measures tomanage traffic elsewhere in the area.
10.1.11 The future of the A303 and A344 is clearly the majortraffic issue facing the WHS.
82 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8241
10.2 Road safety
Issue 35: Road Safety
10.2.1 Road safety is a significant issue within the WHS.There are regular collisions in this area, in particular atthe A303/A344 junction, at Airman’s Corner junction,and on the A344 near the entrance to theStonehenge car park. In the last 3 years, there were72 casualties in the WHS, including 2 fatalities and 9serious injuries. Fewer than 10% of the collisions weredue to excessive speed, whilst most of the collisionswere due to poor manoeuvres or failing to lookproperly or judge the other person’s path or speed.Other factors included foreign drivers inexperiencedwith driving on the left, illegal right turns from theA344 onto the A303, and positive breath tests.Pedestrian and cycle safety on roads within the WHSshould be reviewed. Improved crossing arrangementsfor roads crossed by other rights of way should beprovided where possible.
10.2.2 All roads within the WHS are currently subject to thenational speed limit (60 miles per hour), except theA344 by the Stones and the roads within built-upareas. As such, many vehicles pass through the WHSat high speed, and there is no indication to motoriststhat they are travelling through a WHS. The volumein the passage and speed of traffic on the A303makes it very difficult for pedestrians and cyclists tocross it, for instance, when travelling on Byway 12from Stonehenge to the Normanton Down barrowsor from Bridleway 10 on King Barrow Ridge to thesouthern side of the WHS. However, it is recognisedthat it would not be practical or effective simply toreduce the speed limit on the A303 and other WHSroads. Other measures would have to be sought toallow pedestrians and cyclists to feel safe nearthese roads.
10.3 Public transport provision andsustainable access
Issue 36: Access to the WHS
10.3.1 At present the majority of visitors to Stonehengearrive by car. A key issue is to work with private andpublic transport operators to explore reliable,alternative and more sustainable methods of reachingthe WHS through better use of coaches and publictransport. Bus service provision to the Stones and thewider WHS is relatively limited, although there is anexisting commercially operated service from theSalisbury railway and bus stations, which includesSunday and Bank Holiday operation. Improvingopportunities for visitors to access the WHS by publictransport from bus stations in Salisbury, Amesburyand Devizes, and the rail station at Salisbury, shouldbe considered in the future. The potential ofpromoting Grateley Station on the Waterloo toExeter line, and Pewsey rail station with its direct linkto London Paddington, could be investigated due totheir proximity to the WHS. These stations provideimportant ‘hubs’ for connecting WHS destinationsfurther afield, such as Avebury and Bath.
Coming to Stonehenge by public transport is possible; take the
train to Salisbury and then the special Stonehenge bus
10.3.2 Access for pedestrians to the Stonehenge circle andmuch of the wider WHS has improved since 2000.The introduction by the National Trust of pedestriangates on its open access land has improved access tothe landscape, previously only possible via stiles. Anew gentler ramp for disabled visitors has beenprovided at Stonehenge. Since 2000, the NationalTrust has also created areas of open access land atDurrington Walls, the Cuckoo Stone and fields westof Stonehenge. Cyclists have access to Rights of Way,but their use is restricted by heavy traffic levels on theroads through the Site. Improved signage could directcyclists to alternative routes. Despite theseimprovements, current arrangements for pedestrian
Table 4: Number of reported collisions & casualtiesin the WHS between March 2005 and April 2008
■ 48 collisions, including 7 at the A303/A344 junction, 8at Airman’s Corner junction, and 3 on the A344 nearthe entrance to the Stonehenge car park
■ 72 casualties, including 2 fatal, 9 serious injuries and 61slight injuries
(source Wiltshire Constabulary 2008)
Stonehenge World Heritage Site Management Plan 2009 83Part 2 – Key Management Issues
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8068
and cyclist access within the WHS and to Stonehengeare considered inadequate, having regard to the largenumbers of visitors and the speed of passing vehicles.Closure of the A344 would improve this situation.
10.3.3 The current rights of motorised vehicular access onexisting byways within the WHS is a key issue. Byway12, for example, is of historic interest and importanceas a routeway, and its further realignment away fromthe Stones could be potentially damaging toarchaeological remains. The current number of off-road vehicles using this byway is already causing muchdamage, for instance, to low-lying barrows througherosion and widening of the byway. There may bescope in the future for restricting motorised vehicularuse of byways to limit access by unauthorised trafficwithin and around the WHS. This measure wouldhelp protect the character of these routes, but shouldbe considered in the context of the existing widerrights of way network to assist appropriate access.
The first aerial photograph of a British archaeological site, taken
in 1906. Byway 12 used to go through the Stonehenge
monument and was diverted twice to remove its impact
10.3.4 There may be opportunities for local ‘pedestriangateways’ to the Stonehenge WHS sited at carefullyselected points to encourage exploration of thelandscape by visitors and as a local amenity. Such‘pedestrian gateways’ could be serviced by an‘explorebus’ type service perhaps linked to visitorfacilities and local residential areas.
10.4 Car parking facilities and usage
Issue 37: Car parking facilities for visitors
10.4.1 At present, visitors to Stonehenge can use the visitorscar park, which comprises a permanent car park witha hard surface, and a fenced overflow car park whichis grassed. These two car parks cover 1.1 hectares.The surface car park contains space for eight coachesand 123 cars. The overflow contains space for arounda further 150 cars and is in use for 6 months of theyear. During the peak summer months, capacity issometimes exceeded even in this overflow car park,and the adjacent field is then used for further carparking. There are increasing numbers of visitors whopark on Byway 12.
The busy car park can overflow on peak days; it is not always
possible to park at Stonehenge – August Bank Holiday 2008
10.4.2 There is particular concern that Larkhill could comeunder pressure as an unofficial parking area shouldthere be major changes to the parking provision forvisitors to Stonehenge, for example, if new parking isa long way from the Stones. Similar concerns wereraised with the previous Visitor Centre scheme in the2000 Plan. Unless controlled, this could have seriousimplications for security within Larkhill Garrison andfor traffic control in a residential area. Similar concernshave been raised by residents of villages in theWoodford Valley.
10.4.3 There are also concerns about parking atWoodhenge by residents of Countess Road.
10.4.4 Any new parking provision will have to consider theneeds of local residents as well as the needs of thenatural and historic environment and those of visitors.
84 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
1906. Im
age c
ourt
esy
of th
e S
oci
ety
of A
ntiquar
ies
of London. Fro
m A
rchae
olo
gia,
vol60, 1907, pl LX
IX
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8397
11.0 RESEARCH
11.1 The importance of research in theWHS
Issue 38: The importance of research in the WHS
11.1.1 It is widely accepted that places are better managedwhen they are understood well (English Heritage’sConservation Principles – Principle 3). Continuedarchaeological research in and around the WHS istherefore essential. However it must be recognisedthat intrusive/destructive research within the WHSmay damage the OUV of the WHS.
11.1.2 The need for continuing research and the concept ofa research agenda were a key issue for the 2000Management Plan, and since then, progress has beenmade and the Stonehenge archaeological researchframework was published in 2005 (Darvill 2005). TheResearch Agenda should be modified as newquestions arise which test our understanding of themonuments, sites and landscape.
11.1.3 Archaeological research has been undertaken withinthe WHS since 2000 by a number of universities andalso agencies such as English Heritage, and a numberof significant new discoveries have been made,documented above in section 2.3. The WHS has alsobeen subject to programmes of non-intrusiveinvestigation, aimed at the improvement of bothstrategic decisions and day-to-day management.
Excavations at Durrington Walls: part of the Stonehenge
Riverside Project
11.1.4 A crucial factor constraining the rate at whichresearch resulting in the production of extensivearchives is carried out will be the existence ofaccredited institutions capable of receiving andcurating those archives.
11.2 The archaeological researchframework
11.2.1 The overarching aim of the Stonehenge archaeologicalresearch framework is to recognise the importance ofresearch in the WHS and actively to encourage,within a conservation ethic, well-planned, focussedresearch to the highest standards.
11.2.2 The research framework, comprises three mainelements: a resource assessment, a statement of thecurrent state of our knowledge and a descriptionof the resource; a research agenda, a statement ofthe main gaps, issues and priorities for new research;and finally a research strategy, a statement of howthe questions set out in the agenda are going to betaken forward.
11.2.3 The contents of the research framework have beenwidely disseminated. The document is published inhard-back, but a draft is also available via theBournemouth University website.
11.3 Archaeological research priorities
11.3.1 There are 25 main objectives or priorities set out inSection 4 of the research framework (Darvill 2005,126-136). These are:
1. Investigate the essential importance anddistinctiveness of Stonehenge past and present
2. Monument dating programme
3. Modelling environment and landscape change
4. Understanding occupation
(These four objectives are known as the Big Questions).
5. The Stonehenge structural sequence, phasing andinterpretation
6. The Avenue – ground checking geophysicalanomalies and mapping
7. Mapping the surfaces of the Stonehenge stones
8. Investigate the Palisade Ditch north-west ofStonehenge
9. Review of oval barrows and excavation of aselected example
10. Barrow cemetery surveys
Stonehenge World Heritage Site Management Plan 2009 85Part 2 – Key Management Issues
Mega
n P
rice
2005 ©
Engl
ish H
eri
tage
11. Create database of place names and cartographicdata for the Stonehenge landscape
12. Characterize and investigate the main field systemswithin the Stonehenge landscape
13. Extending the fieldwalking data set
14. Compiling a geophysical map of the Stonehengearea
15. Filling the data gaps
16. Validating and dating features revealed by aerialphotography
17. Understanding recent land-use change andHistoric Landscape Characterisation
18. Create SARSEN: the Stonehenge ArchaeologicalResearch, Study and Education Network
19. Establish a Stonehenge Research Centre
20. Publish outstanding investigations in theStonehenge Landscape
21. Prepare and publish a Stonehenge LandscapeResearch Handbook
22. Compile a corpus of material culture from theStonehenge Landscape
23. Compile a corpus of human skeletal remains fromthe Stonehenge Landscape
24. Develop enhanced mapping and visualizationprogrammes for archaeological data sets
25. Create a social history archive of the twentieth-century excavations at Stonehenge
11.3.2 These objectives may be pursued in a variety of ways,through national heritage agencies, local authorities,archaeological contractors and consultants,universities, amateur societies and groups. It isconsidered that success in implementing the researchstrategy will come through individuals andorganisations wanting to undertake the research,rather than feeling that they must.
11.4 Sustainable archaeological research
Issue 39: Research within the WHS should be of the highest
quality and sustainable
11.4.1 Archaeological excavation is essentially a destructiveprocess as it removes and destroys the depositsunder investigation. It is therefore essential that thegains made in understanding the WHS are made in asustainable way. A good definition of sustainableresearch can be found in the Avebury WHSManagement Plan (2005):
meeting today’s need for improved knowledge andunderstanding of the WHS without jeopardising theability of future generations to do the same
Excavation of one of the Aubrey Holes by Mike Pitts and Julian
Richards in August 2008
11.4.2 The Stonehenge archaeological research frameworkmakes it clear that the research strategy must beimplemented in a responsible way, and that allresearch carried out within the WHS should becompatible with WHS values (Darvill 2005, 3). Theresearch framework is designed to underpin curatorialwork and should aim to provide a better basis formanagement decision-making (ibid).
11.4.3 The National Trust has adopted policies aboutundertaking research on its own estate, emphasising theneed for thorough non-destructive techniques abovedestructive excavations, and emphasising sustainability.
11.4.4 Additionally, English Heritage, the National Trust andWiltshire County Council wrote a “Statement ofPrinciples Governing Archaeological Work” in January2002 (see Appendix D) which sets out the need forundertaking full and detailed non-destructivearchaeological investigations before undertakingexcavation. The Stonehenge WHS Committee hasagreed these principles. English Heritage has also setout guidelines for undertaking excavation within the”Stonehenge Triangle” (EHAC paper 2007).
86 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Adam
Sta
nfo
rd 2
008 ©
Aeri
al-C
am/S
RP 2
008 M
P-J
R-A
H-0
652
11.5 The archiving of archaeological finds,paper archives and data
Issue 40: The storage of archaeological finds, paper archives
and data from the WHS
11.5.1 Although sustainable archaeological research isencouraged, the resulting archaeological archives needto be properly curated for the future. Archaeologicalarchives from past excavations in the WHS are heldby the Wiltshire Heritage Museum and the Salisburyand South Wiltshire Museum. The WHS is nowwithin the agreed collecting area of the Salisbury andSouth Wiltshire Museum. However, neither museumhas room for any further major archives. Indeed, thereare some archaeological archives which aretemporarily held by other organisations – notablyWessex Archaeology and the Stonehenge Riversideproject – for which there is currently no room ateither museum. There is no “fall back” position asthere is no other relevant store in Wiltshire althoughSalisbury and South Wiltshire Museum are consideringrefurbishing their storage facilities as part of a broaderredevelopment programme.
Beaker pots from around 2,300 BC
11.5.2 Both Wiltshire Heritage Museum and Salisbury andSouth Wiltshire Museum are independent museums,and although both receive some public funding, thisdoes not fully cover the costs of storing and curatingthe archives.
11.5.3 Although not of OUV under UNESCO WHSguidelines (because they are not physically part of theSite), these archives are nevertheless essential to ourunderstanding of the Site. To secure the long-termfuture of these archives, consideration should be givento developing a Stonehenge resource centre/ storagefacility/research centre in conjunction with the twoexisting museums.
11.6 Research links with Avebury andbeyond
Issue 41: Formal links should be made with researchers in the
Avebury WHS.
11.6.1 There is a well-established archaeological researchgroup in the Avebury part of the WHS, the AveburyArchaeological and Historical Research Group(AAHRG). AAHRG wrote the research agenda forthe Avebury part of the WHS (AAHRG 2001), thefirst research framework for a WHS in the UK, andpossibly in the world.
11.6.2 Unfortunately, there is not a similar group atStonehenge, despite the fact that this was arecommendation of the 2000 Stonehenge WHSManagement Plan (section 4.7.3), although groups ofexpert academics have been brought together fromtime to time to advise on specific projects. Forexample, a group of key academics brought togetherby English Heritage advised on the contents of theEnglish Heritage Stonehenge Interpretation andLearning Strategy (forthcoming). The 2000 WHSManagement Plan advised that a new group should beformed, working in conjunction with AAHRG, or asan independent group with formal links.
11.6.3 More recently the Stonehenge Research Framework(Darvill 2005, Objective 18) has recommended that anew group – SARSEN (the StonehengeArchaeological Research, Study and EducationNetwork)– is set up to co-ordinate and facilitateresearch in the WHS. This group would beindependent of AAHRG but with formal links.
11.6.4 A difficulty arises concerning the amount of timerequired for academics and curators to attend twosets of meetings. Some have indicated that theywould much prefer a single new research group tocover the entire WHS at both Avebury andStonehenge (the Stonehenge and AveburyArchaeological and Historical Research Group –SSAHRG). There is some merit in this suggestion, asboth halves of the WHS contain similar monumentsof the same period, and the relationship betweenthese and other areas is critical to our understandingof them (cf Objective 1, Darvill 2005, 126). Others atAvebury are concerned that Avebury matters are notnecessarily of relevance to Stonehenge and vice versa.If it is considered that two research groups arepreferable, then perhaps they should meet on thesame day to allow people who would be in bothgroups to easily attend both meetings.
Stonehenge World Heritage Site Management Plan 2009 87Part 2 – Key Management Issues
©W
iltsh
ire H
eri
tage
Muse
um
The Amesbury Archer burial, one of the richest graves found in
the Stonehenge area, discovered in May 2002
12.0 MAINTAINING THE LONG-TERMOBJECTIVES OF THEMANAGEMENT PLAN
Issue 42: The long-term objectives of the Management Plan
12.1.1 Some aspects of the long-term Vision for the WHS(see Appendix P) are not achievable in the lifetime ofthis Management Plan. In particular, it is not possibleto remove the impact of the A303 fully from theWHS, or to create a permanent world class visitorcentre. It is important that these long-term aimsshould be kept under review during the lifetime ofthis Plan, and subsequent revisions to it.
13.0 MANAGEMENT, LIAISON ANDMONITORING ARRANGEMENTSFOR THE WHS
13.1 Management and liaison withinthe WHS
13.1.1 The implementation of the Management Plan’sobjectives requires the support and participation ofmany organisations and individuals. The Plan itself canprovide the focus for co-ordinating this effort, but itrequires a significant level of commitment andresources if it is to succeed in protecting andimproving the WHS for future generations. To ensurebest use of these resources, the mechanisms forimplementing the objectives of the Management Planshould be subject to regular review. A high level ofcommitment to the WHS is evidenced by theparticipation of many groups in the WHS Committeeand the Advisory Forum, and in the level of responseto the public consultation on the draft Plan.
Issue 43: The role of stakeholders in implementing the
Management Plan
13.1.2 The range of bodies and individuals with strongly feltinterests in the World Heritage Site is very wide.Local communities, especially landowners andoccupiers of the World Heritage Site, are obviously ofthe highest importance. Those who live within theWHS or on its boundary, in particular, have a right toexpect their interests to be taken into account. Othergroups with a strong interest in the WHS includenational agencies, local authorities, archaeologists,academics, conservationists, those concerned with itsspiritual aspects, and all visitors to the site. List B inAppendix L gives details of some such bodiesand individuals.
13.1.3 It will be important to provide local communities withmore information about the significance of historicenvironmental issues and the relevance of the WHSdesignation to their needs if local ownership of thePlan is to be built and sustained. The town and parishcouncils are well placed to represent communitiesand provide a mechanism for encouraging localinvolvement in the day-to-day management of theSite. Initiatives such as Sustainable CommunityStrategies and the Amesbury Community Plan couldhave a significant role to play in implementing parts ofthe Plan’s objectives.
88 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
2002 ©
Wess
es
Arc
hae
olo
gy
A group of volunteers cleared the Lake Barrows of scrub in 2007
13.1.4 National and local voluntary organisations and interestgroups also have an important role to play. Many canhelp undertake practical conservation actions on theground and provide significant input on local andwider issues of relevance to the WHS, such as thespiritual and astronomical aspects of Stonehenge or itslocal history, for example, or to curate and displayartefacts recovered during excavations. The role ofthe National Trust as a major landowner within theWHS is of particular importance to the successfulimplementation of many of the Plan’s objectives.
13.1.5 No single agency controls the entire WHS, andtherefore improvements must be made by multipleagencies and individuals working together. It isimportant that stakeholders agree the contents of theManagement Plan, and endorse the final Plan. It is alsoimportant that stakeholders use their best endeavoursto undertake the actions they have agreed as beingtheir responsibility.
13.1.6 Communication, information sharing anddeveloping partnerships are central to cost-effectiveworking practices. It is also essential that keystakeholders commit to supporting the Plan throughtheir own actions as well as through participationin the Stonehenge WHS groups. The cleardefinition of individual roles and responsibilities forimplementing certain actions identified by the Planis particularly important.
Key partners
13.1.7 A number of government departments haveimportant roles to play in the WHS, either directly orthrough their agencies. (These are set out in List A,Appendix L). These responsibilities can be statutory,involve funding various activities or, as in the case ofMOD, derive from owning land in the WHS. Ingeneral, government departments should:
■ ensure that the need to protect the WHS and itsOUV is recognised in the development andimplementation of national policy;
■ provide support, assistance and funding forrelevant management work within the WHS asrecommended in the Plan.
National Agencies
13.1.8 In general, national agencies should:
■ ensure that the need to protect the WHS and itsOUV is recognised in the development andimplementation of national policy;
■ continue to support the Committee as activemembers;
■ contribute specialist services or staff to specificprogrammes or initiatives as required;
■ provide support, assistance and funding forrelevant management work within the WHS asrecommended in the Plan.
Regional and Local authorities
13.1.9 Regional and local authorities should ensure that theManagement Plan is given the highest possible statusin their policies. Their development plans anddevelopment control decisions should reflect theneed to protect the WHS, and its OUV throughmanagement of its attributes. They should alsoseek to:
■ continue to participate actively in the StonehengeWHS Committee;
■ allocate resources to the management of theWHS where possible and appropriate;
■ incorporate the key objectives andrecommendations for action in all relevantdepartmental work programmes;
■ ensure the key objectives and recommendationsfor action are reflected in the Local DevelopmentFramework and Sustainable Community Strategies
■ contribute to the maintaining of environmentaland other data for monitoring purposes.
Stonehenge World Heritage Site Management Plan 2009 89Part 2 – Key Management Issues
Adam
Sta
nfo
rd 2
007 ©
Aeri
al-C
am
13.2 Revision of WHS governance
Issue 44: The governance of the WHS
13.2.1 The 2000 Management Plan was drawn up on behalfof the Stonehenge WHS Management Group. Thegroup was broadly based, drawing its membershipfrom the key stakeholders as defined above and alsofrom many other groups with an interest in the WHS.
13.2.2 Structures for the implementation of the ManagementPlan have developed over the last nine years. TheManagement Plan Implementation Group, now knownas the WHSCommittee, was set up in December2000. Convened by English Heritage it consists of thekey organisations and bodies, including representativesof local residents and landowners, with an interest inthe administration and management of the WHS. Themembership and terms of reference of theCommittee are listed at Appendix A.
13.2.3 In addition, an Advisory Forum, representing thewider stakeholder group involved in preparing the2000 Management Plan, was set up in September2001. Its role is to provide advice on the managementof the WHS, including the periodic revision of theManagement Plan and to act as a channel ofcommunication between those carrying out work inthe WHS and the wider stakeholder group. Themembership and terms of reference of the AdvisoryForum are listed at Appendix B.
13.2.4 The Committee has been supported since 2001 by alocally-based WHS Coordinator with part-timeadministrative assistance. The Coordinator isemployed and largely funded by English Heritage andis based in their Stonehenge office in Salisbury. Thisrole is a key one, and is critical in ensuring that theManagement Plan is implemented, which is the mainpurpose of the role. The role of the WHSCoordinator is further detailed in Appendix E.
A WHS education project targeting local schools was put in
place in 2004
13.2.5 These arrangements have worked reasonablysatisfactorily. However systems will need to bedeveloped to involve the Advisory Forum morefrequently and effectively than hitherto. The WHSCommittee should review both its own terms ofreference and, in consultation with Forum members,those of the Advisory Forum, to ensure that they willbe effective for the span of the revised ManagementPlan. In doing so, it will be useful to look at thegovernance of other WHSs.
13.2.6 The move to unitary status in Wiltshire in 2009 willwill bring both the Avebury and Stonehenge parts ofthe WHS under one local authority. The proposedchanges to the heritage protection system will makethat authority responsible for all planning and consentdecisions on the WHS once the Heritage Bill hasbeen enacted.
13.3 Funding and Resources
Issue 45: Funding and resources for the implementation of the
Management Plan
13.3.1 The need for effective administration and appropriatefunding for the WHS as a whole has been highlightedthroughout the Plan. In order to implement the Plan,it is important that key stakeholders find theresources for programmes of work, projects and corestaff; that progress in meeting Plan targets is regularlymonitored; and appropriate action taken to ensuretargets are met.
13.3.2 The work and activities of individual farmers andlandowners have long been one of the greatestinfluences on the WHS landscape. The Plan seeks toinfluence these actions in the long-term, butrecognises that secure and appropriate levels offinancial incentives for farming initiatives are required ifthe overall aims of the Plan are to be achieved. Theneed for long-term certainty on the part of farmersthat payments will both be secure and automaticallyadjusted to reflect changing agricultural fortunes, isfundamental to the management of the WHS underincreased and permanent grassland in the future.
13.3.3 One of the most successful initiatives in the last nineyears has been the tailor-made WHS CountrysideStewardship Grassland Restoration Scheme. The overallcommitment by Defra to grassland restoration in theStonehenge part of the WHS is £2,256,000 over thelifetime (ten years) of the existing agreements madebetween 2002 and 2008. During the coming Planperiod, it is essential to maintain this funding atadequate rates to prevent a reversion to arable.
90 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Rac
hel Fost
er
2004 ©
Engl
ish H
eri
tage
Volunteers removing scrub and fences at Normanton Down
Barrows following the grass restoration
13.3.4 As with all World Heritage Sites, funding has been acontinuing issue. The WHS Coordinator’s post andbudget is now funded primarily by English Heritage,with a contribution from Salisbury District Counciland the National Trust. The WHS budget should befunded from a wider range of sources in order toshare the burden more equably, increase the fundingavailable for projects, and to give a greater sense ofownership of the Plan and its implementation.
13.3.5 The funding of the Coordinator post (including thesecretariat support of the Committee and theAdvisory Forum) also needs to be kept under review.This was originally envisaged as being funded by a
number of bodies. Over the years, this role hasdevolved more and more to English Heritage and itwould be good to widen the range of funding bodies.
13.4 Relationship to the Avebury WHS
Issue 46: Relationships between the Avebury and Stonehenge
parts of the WHS
13.4.1 Avebury and Stonehenge are both parts of one WHS.The UNESCO World Heritage Committee says that‘a management system or mechanics for ensuring thecoordinated management of the separatecomponents are essential’ (Operational Guidelines114). Currently, the Stonehenge, Avebury andAssociated Sites WHS have a common Statement ofSignificance (see 3.3), but have separate steeringgroups and coordinators. A degree of commonworking is assured by close working between the twocoordinators while the special agri-environmentalscheme also covers both parts of the Site. A numberof stakeholders are members of both steering groupsbut not always represented by the same person.
13.4.2 Closer cooperation was discussed in the developmentof the Avebury Management Plan, published in 2005.The Plan concluded that ‘the case for and againstgreater integration of the individual management plansand management arrangements will need to be
Stonehenge World Heritage Site Management Plan 2009 91Part 2 – Key Management Issues
Pau
l H
ighnam
1990 ©
Engl
ish H
eri
tage
Photo
Lib
rary
J900435
Avebury Stone Circle – sunrise over the stones
2005
©R
SPB
examined in the next few years in consultation withthe Steering Committees and key stakeholders.’ Themove to a single authority may open up opportunitiesfor closer joint working, for example by reviewingcoordination arrangements. There are also otherareas where common approaches or working mightbe beneficial. As noted above, this is already the casefor grassland reversion. Other possibilities mightinclude developing a common archaeological researchpolicy and possibly more common promotion of thetwo parts of the site.
13.4.3 On the other hand, some issues facing the two partsof the site are very different. There is also a crucialdifference in that an historic and living settlement lieswithin the Avebury circle.
13.5 Monitoring and reviewing the Plan
Issue 47: Monitoring arrangements for the WHS
13.5.1 Management planning is a dynamic process and doesnot stop with the production of a Management Plan.New information or changed perceptions of prioritiescan lead to changes in the implementation of the Plan,as the knowledge and practical experience of thoseresponsible for the management of the WHSdevelops. Regular monitoring is essential to providethis information and it is important to collect data onthe effectiveness of the Plan as well as on the physicalcondition of the WHS. Some monitoring should beundertaken in conjunction with the Avebury part ofthe WHS, and links should be strengthened betweenthe two parts of the WHS, including the use ofmonitoring indicators.
13.5.2 The policies and suggested actions set out in theManagement Plan should retain their relevance forfive to ten years as progress is made. A formal reviewof the issues and objectives should be undertaken atleast every six years, perhaps in the context of theUNESCO periodic report, and the Plan revised ifnecessary to reflect changed circumstances. However,as some parts of the Plan may need updating atdifferent intervals, interim reviews should beundertaken as and when required. The relevantsection of the Plan should be updated accordingly andreissued to all key partners. Where appropriate,public consultation may be helpful to inform options.Reviewing the issues and updating the Plan should bethe main role of the WHS Committee, assisted bythe WHS Coordinator. The preparation and reviewof annual action plans should be an important part ofthis process.
Stonehenge and its surroundings
13.5.3 The following mechanisms are recommended for aregular review of progress:
■ Progress report by key partners at each meetingof the Stonehenge WHS Committee (3 to 4times a year);
■ Annual progress report, including priorities for thefollowing year, produced in writing by key partnersfor the WHS Advisory Forum, and incorporatedinto WHS annual action plan;
■ Production by WHS Coordinator of an annualreport of performance against the monitoringindicators;
■ Production by the WHS Coordinator of a regularnewsletter highlighting achievements andforthcoming projects, with input from all partners;
■ Coordinator to produce a 3-year job plan to bediscussed with the Advisory Forum and agreed bythe Committee;
■ Overall review of progress with theimplementation of the Management Plan to beproduced by the WHS Coordinator every 3 years;
■ Production of the UNESCO periodic report everysix years
13.6 Monitoring indicators
13.6.1 The purpose of monitoring is to assess how thevalues of the WHS are being maintained over timeand to measure whether the objectives of the WHSManagement Plan are being achieved. Measuringprogress is essential to be able to adapt and improvethe management of the site. Identifying key threatsearly on is necessary to be able to put in place
92 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Sky
Eye
aeri
al p
hoto
grap
hy
2004
©Engl
ish H
eri
tage
Photo
Lib
rary
K040312
Stonehenge World Heritage Site Management Plan 2009 93Part 2 – Key Management Issues
Reconstruction of Durrington Walls southern circle by Time Team – 2005
Julia
n T
hom
as 2
005 ©
Julia
n T
hom
as
Stonehenge in its grassland setting
Jam
es
O D
avie
s 2004 ©
Engl
ish H
eri
tage
. Photo
Lib
rary
K040926
remedial measures before the damage gets too great.Regular monitoring is necessary to re-assess prioritiesin view of new issues and progress made. Monitoringindicators need to be firmly linked to the values andobjectives identified in the WHS Management Plan.
13.6.2 A set of 19 monitoring indicators for the Stonehengeand Avebury WHS was produced jointly by the twocoordinators, with input from a number of partners,and endorsed by the Stonehenge WHS Committee in2003. Their aim is to measure progress with theprotection, interpretation and management of the site.Although most indicators are common to Aveburyand Stonehenge, there are some minor differencesreflecting the specificity of each site. It was agreed thatthe indicators should be simple, meaningful, easy togather and constant, so that comparisons over timecould be possible. Now that attributes of OUV havebeen identified, it is essential during the lifetime of thisPlan to review the indicators to see whether theyshould be made more relevant to them.
13.6.3 Amongst the indicators listed below, some are alreadyin place while others may require additional financialand human resources to collect and analyse the data.The table identifies how the data may be collected, bywhom and how often. Collaboration from the WHSpartners is essential for the effective monitoring of thesite. They will need to agree the areas where they willsupply information and/or conduct monitoring.
13.6.4 Monitoring is something that should be an integralpart of management and performance against theindicators should be reviewed annually in order toinform annual action plans and keep track of the stateof the WHS. The WHS Coordinator should use thisinformation as the basis for the monitoring reportproduced every 6 years to inform the UNESCOperiodic report and the review of the ManagementPlan. Both annual and periodic reports should becirculated to all interested parties. The next periodicreport for Stonehenge and Avebury is due after theend of this Plan period.
94 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Objectives Key Monitoring Indicators How and Who? How Often? In place?
NoEvery yearNumber of days car park capacity isexceeded, overcrowding at Stonehengeand in the landscape, erosion – byWHS Coordinator, NT, EH
8. Sustainable tourism
YesEvery year on 22June
Report on the Solstice by EnglishHeritage
7. Sustainable managementand number of visitors atSolstice
Yes
No
Every year
Every year
Stonehenge: English Heritage
WHS landscape: NT and WCC –consider stile counters and visitorsurveys
6. Visitor numbers,including number offoreign visitors andeducational visits
Sustainable access,interpretation andeducation
Every 6 yearsPhotographic survey and reportidentifying intrusive elements, andreviewing land use changes, recentdevelopments, and progress inremoving roads and modern ‘clutter’ –use WCC aerial photos (done every10 years) and possibly satellite imaging– by Salisbury District Council (SDC)
5. Changes in thelandscape
BiannualFixed-point photographic survey andmap indicating eroded areas andcause of erosion – by trained NationalTrust volunteers
4. ErosionProtection andenhancement ofthe landscapesetting
YesAnnual UpdateMap and figures collated by WHSCoordinator, Defra, National Trust
3. Hectares of grassrestoration and number ofsites protected fromplough damage
YesAs appropriateRegular monitoring of sites byNational Trust (NT) volunteers andEH Historic Environment FieldAssistants
YesEvery 6 yearsWHS Condition Survey funded by EH
2. Condition ofarchaeological sites
YesAs appropriateStonehenge Geographical InformationSystem (GIS) maintained by EnglishHeritage (EH)
YesAs appropriateSites and Monuments Recordmaintained by the Wiltshire CountyCouncil (WCC)
1. Existence of updatedrecords for thearchaeological sites
Conservation ofArchaeologicalSites
Table 5: Key Monitoring Indicators for the Stonehenge WHS endorsed bythe Stonehenge WHS Committee in 2003
Stonehenge World Heritage Site Management Plan 2009 95Part 2 – Key Management Issues
Objectives Key Monitoring Indicators How and Who? How Often? In place?
NoEvery yearWHS Archaeology Group19. Review of fieldwork,research projects andpublications onStonehenge
PartlyEvery 6 yearsEnglish Heritage and WHSArchaeology Group
18. Research Strategy inplace with mechanisms toimplement and review it
Archaeologicalresearch andfieldwork
PartlyEvery 6 yearsBiodiversity survey – use EIA surveysas baseline – by NT, RSPB andNatural England
17.Audit of rare speciesand habitats
PartlyEvery 6 yearsGrassland survey – use EIA surveys asbaseline – by NT, RSPB and NaturalEngland
16. Extent and quality ofgrassland
NatureConservation andland management
PartlyEvery yearWHS Coordinator15. List of joint projectswith WHS partners andsummary of fundingobtained
YesEvery 6 yearsWHS Coordinator14. WHS ManagementPlan in place withmechanisms to implementand review it
NoEvery yearAnnual review by Salisbury DistrictCouncil
13. Number and impact ofplanning applicationsrelating to the WHS andits setting
PartlyAs appropriateReview of RSS, LDF and communityplans, Regional Economic Strategy, andother key local and regional policydocuments – by WHS Coordinator,SDC, WCC, EH
12. WHS objectives takeninto account in key policydocuments
Planning, policy,WHSmanagement andpartnerships
NoEvery 2 yearsAs part of visitor surveys by EnglishHeritage
11. Increased % of visitorscoming by other meansthan car
YesEvery 2 yearsVisitor surveys by English Heritage10. Quality of the visit(% of visitors satisfied)
NoEvery yearSummary of changes in provision forinterpretation and access (includingdisabled and virtual access) – by WHSCoordinator, NT, EH
9. Improved visitor facilitiesand improved access toand interpretation of theWHS landscape
Table 5: Key Monitoring Indicators for the Stonehenge WHS endorsed bythe Stonehenge WHS Committee in 2003
96 Stonehenge World Heritage Site Management Plan 2009Part 2 – Key Management Issues
Part 3Aims and Policies
Schoolchildren from the local primary school in Amesbury re-enacting a pilgrimage to StonehengeRachel Foster 2004 © English Heritage
Part 3Aims and Policies
Schoolchildren from the local primary school in Amesbury re-enacting a pilgrimage to StonehengeRachel Foster 2004 © English Heritage
98 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
Part 3Aims and Policies
Introduction
Based on the description and evaluation of the WHS, itsOUV and its key management issues, this part of theManagement Plan re-affirms the essence of the Vision for thefuture contained in the 2000 Plan and then identifies Aimsand Policies considered necessary for the effectivemanagement of the Site as a whole.The 2000 ManagementPlan contained 26 Objectives reflecting six broad categories.These have been revised as necessary to take account ofchanged circumstances since then while some new policies have been added to cover areas not covered by the previous Plan.
The objectives have been reordered into general long-termaims, which should remain valid for 30 years or more, andmore specific policies with a given time scale.The distinctionbetween the two does not imply that their importancediffers but rather that the aims are more long-term andshould form the continuing guiding principles to be reviewedand retained at successive revisions of the Management Plan.Most policies should result in specific actions during thelifespan of this Plan (6 years) although some of them have alonger time scale (10 or 30 years) and may be carriedforward from this plan to future ones. An Action Plan basedon these aims and policies is contained in Part 4. Aims andpolicies are set out after the vision, and cross-referenced tothe management issues identified in Part 2.
Early morning view of Stonehenge
Pau
l H
ighnam
1994 ©
Engl
ish H
eri
tage
Photo
lib
rary
J940296
14.0 VISION, AIMS AND POLICIES
14.1 Vision
14.1.1 The significance of the WHS has been described inPart 1 of this Plan.The long-term Vision for the futureof the WHS is based on the fundamental need toprotect, conserve, enhance, and interpret the WHSfor present and future generations. It retains theessence of the Vision in the 2000 Plan, updated totake account of changes since 2000 (for the 2000Vision see Appendix P).Whilst it is not possible toachieve all parts of the 2000 vision in relation to theroads and visitor centre in the lifetime of this Plan, it isimportant not to lose sight of these as long-termobjectives and to maintain pressure to achieve them.This is further considered in Section 14.8 below.
The current situation: Stonehenge is sandwiched between the
A303 and the A344
The plan for the future: the A344 closed and Stonehenge
reunited with the Avenue
Stonehenge World Heritage Site Management Plan 2009 99Part 3 – Aims and Policies
The Vision for the StonehengeWorld Heritage Site
The Stonehenge WHS is globally important not just forStonehenge, but for its unique and dense concentrationof outstanding prehistoric monuments and sites, whichtogether form a landscape without parallel. We will carefor and safeguard this special area and its archaeologyand will provide a more tranquil, biodiverse and ruralsetting for it, allowing present and future generations toenjoy it and the landscape more fully. We will alsoensure that its special qualities are presented,interpreted and enhanced where necessary, so thatvisitors can better understand the extraordinaryachievements of the prehistoric peoples who left us thisrich legacy.
Priorities for 2009-2015
The primary purpose of this Management Plan is toguide all interested parties on the care of this WorldHeritage Site by sustaining its Outstanding UniversalValue. This will ensure the effective protection,conservation, and presentation of the World HeritageSite for present and future generations. It will alsoensure that all decisions affecting the World HeritageSite move towards the achievement of the Vision.
The priorities of this Management Plan are to:
■ maintain and extend permanent grassland to protectburied archaeology from ploughing and to providean appropriate setting for upstanding monuments;
■ remove the woodland and scrub cover from keymonuments;
■ remove or screen inappropriate structures or roads,in particular the A344, and keep the A303improvements under review;
■ enhance the visitor experience by 2012 by providingimproved interim facilities;
■ improve the interpretation of the WHS and increaseaccess to selected monuments;
■ continue to encourage sustainable archaeologicalresearch and education to improve and transmit ourunderstanding of the WHS;
■ encourage the sustainable management of theWHS, balancing its needs with those of farming,nature conservation, access, landowners and thelocal community.
2003 ©
Hig
hw
ays
Age
ncy
2008 ©
Hig
hw
ays
Age
ncy
100 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
14.2 Statutory and Policy Framework
14.2.1 The primary aim of the Plan is the conservation ofthe WHS by sustaining the attributes of its OUV.Thecommitment and need for a partnership approach tothe long-term management and improvement of theSite is reflected in the Government’s current policiesfor World Heritage Sites.
14.2.2 It is vital that all government departments, agenciesand other statutory bodies should continue torecognise the need for special treatment where theStonehenge WHS is concerned, in respect of policyformulation and implementation, future fundingcommitments and programmes of work.
14.2.3 Incorporation of relevant Management Plan policiesinto the spatial planning system is essential. Since 2000the Government have introduced a new system forlocal planning focused on Regional Spatial Strategiesand Local Development Frameworks which togetherform the development plan.There are various ways inwhich the relevant policies dealing with spatialplanning from the Management Plan could beadopted into the Local Development Framework forthis area. Doing so will give greater weight to thosepolicies in determining planning applications.
14.2.4 Local authorities are also required to developSustainable Community Strategies which can besupported by more detailed Community Plans forsmaller areas (as is the case for Amesbury). It will beimportant to ensure read-across between theManagement Plan, the South Wiltshire CommunityStrategy and the Amesbury Community Plan. It willalso be important to ensure that all relevant policiesare carried forward by the new unitary authorityfor Wiltshire.
14.2.5 Ensuring that any new development within the WHSis compatible with its status as a WHS is a clearpriority for the Plan. Development control policiesshould seek to prevent or avoid, as appropriate, theadverse impacts of development within the WHSupon the Site and its OUV. Similarly, developmentoutside the WHS which might adversely affect it andits setting should also be controlled throughappropriate policies.
14.2.6 Issues which will need further consideration inrelation to Development Plan policies for theWHS include:
■ The development of additional advice andprocedures for considering applications outsidethe Site which could have a significant visualimpact or other potential adverse effects on theWHS. Any such advice should supplement and notreplace the policies of the development plan;
■ The adequacy of archaeological policies fordevelopment control in relation to PPG16and any guidance which replaces it as partof the implementation of the HeritageProtection Review;
Aim 1: The Management Plan should beendorsed by those bodies and individualsresponsible for its implementation as theframework for long-term detailed decision-making on the conservation and enhancementof the WHS and the maintenance of its OUV,and its aims and policies should be incorporatedinto relevant planning guidance and policies (All issues).
Policy 1a – Government departments, agencies and otherstatutory bodies responsible for making and implementingnational policies and for undertaking activities that mayimpact on the WHS and its environs should recognise theimportance of the WHS as a whole and its need for specialtreatment and a unified approach (issue 1).
Policy 1b – Set within the framework provided by theManagement Plan, key stakeholders should develop writtenand agreed policy guidance for the improved managementand conservation of the overall character and integrity of theWHS as a cultural landscape, as well as its constituentparts (issue 13).
Policy 1c – The Regional Spatial Strategy and the LocalDevelopment Framework and other statutory plans such asCommunity Strategies should contain policies to ensure thatthe importance of the protection of the WHS and its settingand the maintenance of its OUV are fully taken intoaccount in determining planning applications and RoadOrders (issue 2).
Policy 1d – The relevant policies of the Management Planshould, where appropriate, be incorporated within the LocalDevelopment Framework, and consideration be given to thepotential need to adopt the Management Plan as aSupplementary Planning Document or SupplementaryPlanning Guidance.
Policy 1e – Development which would impact adverselyon the WHS, its OUV or its setting should not be permitted.(issue 2)
Stonehenge World Heritage Site Management Plan 2009 101Part 3 – Aims and Policies
■ The appropriateness of historic landscape andWHS policies in relation to PPG15 and theforthcoming planning circular on World Heritage;any review of landscape policies should beinformed by a systematic Historic LandscapeCharacter Assessment of the WHS;
■ A review of the scope and extent of the existingArticle 4 Direction for the WHS;
■ The implications of the ratification of theEuropean Landscape Convention.
14.2.7 Future reviews of the development plan shouldensure that the requirements of PPG15, PPG16 andany guidance which replaces them, and the WorldHeritage Planning Circular for the historicenvironment, including archaeology and proposals fordevelopment, are met in full in relation to the WHS.
14.2.8 In addition, applicants should be strongly encouragedto seek the advice of Wiltshire County Council’sArchaeology Service at an early stage in theconsideration of schemes likely to affect the WHS.The voluntary guidelines for statutory undertakersdeveloped for use at Avebury should be revised asnecessary, and adopted for use at Stonehenge inconsultation with the utilities companies.
14.2.9 Planning guidance and the implementation ofdevelopment control will need to be kept underreview as the Heritage Protection Review isimplemented through the proposed HeritageProtection Bill and other new guidance.
Stonehenge at sunset
14.3 The designation and boundaries ofthe World Heritage Site
14.3.1 It is acknowledged that the existing boundary of theWHS may not encompass all the known significantarchaeological sites which, if included within it, mightbe part of the OUV of the Site. Defining the scope ofany changes could be a considerable piece of work.Significant changes to the boundary would requirea re-nomination of the Site which has beenruled out by Government for the period of thisManagement Plan.
14.3.2 There are however known discrepancies between thewritten description of the Site in the nominationdossier and the map showing its boundaries.There areother minor issues such as the exclusion of parts ofarchaeological sites from the Site and, possibly, theinclusion of modern development on the edges of theSite. Similar issues have been dealt with at Avebury byproposing a minor modification of the boundary tothe UNESCO World Heritage Committee, andcould be dealt with in the same way for this part ofthe Site.
Aim 2: The WHS boundary should ensure theintegrity of the WHS is maintained by includingall known significant archaeological features andinterrelationships related to the attributes ofthe Site’s OUV (issue 8).
Policy 2a – a minor modification of the boundary shouldbe proposed to UNESCO (issue 8).
Policy 2b – a study into the need for a buffer zone shouldbe carried out jointly with Avebury and appropriaterecommendations should be made to the State Party(issue 8).
Policy 2c – During the lifetime of this Plan, a review of thesignificance of the Site should be undertaken to establishwhether more emphasis should be placed on its landscape,and to assess its boundary in the light of any changedunderstanding of its significance. In particular, the merits ofre-nominating in the future the Stonehenge and AveburyWHS as a cultural landscape should be addressed.Thereview should also undertake an assessment of the integrityand authenticity of the Site, and will need to be carried outat both Avebury and Stonehenge (issue 8).
Adam
Sta
nfo
rd 2
008 ©
Aeri
al-c
am/S
RP2008 S
H-0
994
102 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
14.3.3 The previous Management Plan ruled out the needfor a buffer zone as did the 1998 AveburyManagement Plan. More recently, the 2005 AveburyManagement Plan has identified the need to consideragain the case for a buffer zone for that part of theWHS.This would need to be done for both parts ofthe WHS and the appropriate study and consultationwith landowners, land managers and others should becarried out during the lifetime of this Plan.
14.3.4 The WHS was inscribed on the World Heritage Listas a Cultural Site and not as a World HeritageCultural Landscape (Pomeroy-Kellinger 2005, 2.1.3).The designation “Cultural Landscape” - which is a sub-category of Cultural Site - was not recognised by theWorld Heritage Committee until 1992. Howeversome consider this would be the most suitablecategorisation for the Stonehenge WHS, and a reviewof the Site’s OUV will be undertaken during thelifetime of this Plan to consider this. It should benoted that the Government have ruled out re-nomination in the short to medium-term, should thisbe the outcome of such a review. It should also benoted that the appropriate methodology forrecognition of the WHS as a Cultural Landscapewould need to be established with the UNESCOWorld Heritage Committee.
14.4 Conservation of theWorld Heritage Site
14.4.1 The primary aim of the Management Plan is topreserve and sustain the OUV of the WHS.Theattributes of OUV were identified in section 3.3.
Policy 3e – Where appropriate, degraded and otherarchaeological features within the WHS should be conservedand/or made more visible without detracting from theirintrinsic form and character (issue 33).
Policy 3f – In the management of land in the future,existing areas of permanent grassland should bemaintained, enhanced and those areas extended whereappropriate (issues 16, 18, 23).
Policy 3g – The overall nature conservation value of theWHS should be maintained and enhanced, in particular bymaintaining and improving the biodiversity of permanentgrassland including conserving the existing limited areas offloristically rich chalk downland turf, leading to greaterdiversity not just of plants but also of other wildlife includingbirds and invertebrates (issue 18).
Policy 3h – Woodland management in the WHS should bereviewed taking into account the OUV of the Site and itsecological and landscape values (issue 14).
Policy 3i – Where opportunities arise, the visual characterof the WHS landscape should be improved by the removalor screening of existing intrusive structures (issue13).
Policy 3j – Risk management strategies should be keptunder review and updated as necessary (issue 20).
Policy 3k – A study of the possible impacts of climatechange should be carried out and appropriate adaptationstrategies identified (issue 19).
Policy 3l – Explore with the local authority the possibilityof addressing the issue of light pollution in the LocalDevelopment Framework (issue 13).
Policy 3m – Undertake a Historic Landscape CharacterAssessment of the WHS.
Aim 3: The OUV of the WHS should besustained and enhanced through theconservation of the Site and the attributes thatcarry its OUV (issues 11 – 20).
Policy 3a –The WHS should be managed to protect itsattributes of OUV, to protect their physical remains, toimprove and enhance their condition and explain theirsignificance (issue 11).
Policy 3b – Appropriate agri-environmental schemesshould be maintained and developed to maximise theprotection of archaeological sites and their settings, and alsothe setting of the WHS itself (issues 11-16).
Policy 3c – The condition and vulnerability of allarchaeological sites and monuments throughout the WHSshould be reviewed regularly to guide future managementaction and priorities (issues 11, 12).
Policy 3d – The setting of visible monuments and sites inthe landscape and their inter-relationships should bemaintained and enhanced with particular attention given toachieving an appropriate landscape setting for themonuments and also the WHS itself (issue 13)
Stonehenge World Heritage Site Management Plan 2009 103Part 3 – Aims and Policies
14.4.2 Sustaining the OUV of the Site should therefore focuson the protection, conservation and enhancement ofthe WHS, so that the landscape setting and inter-relationships of the archaeological sites of theNeolithic and Bronze Age can be fully appreciated.This should include the removal or screening ofintrusive features, as well as the preservation ofsurviving visual and contextual links and theencouragement of an appropriate setting for theWHS and the attributes of its OUV. It should alsoinclude consideration of the inspirational effect of thelandscape on artists and others. Conservation of theWHS and the attributes of its OUV will also help toprotect other attributes of the area of national orinternational value such as chalk grassland habitats orarchaeological sites and historic parks designatedunder national legislation.
14.4.3 This Plan promotes a co-ordinated and balancedapproach which carefully considers the natureconservation and archaeological potential andsensitivity of different areas within the WHS, as well asfarming needs and other uses.This will require aregular, comprehensive assessment of thearchaeological significance of particular areas and the
extent to which they are suffering damage due toploughing or other effects.
14.4.4 This approach could be achieved through two distinct,but related, land management regimes which make adistinction between farmland around the keyconcentrations of major monuments, and the wideragricultural landscape. An extensive and coherent areais already managed as permanent grassland to createa more appropriate setting for key ceremonialmonuments.This area should be extended asconsidered appropriate or feasible over time.Alongside this, a wider landscape setting of mixedfarming with a diverse mosaic of habitats, includingarable, permanent pasture and woodlands, shouldcontinue as the principal land use, in which otherarchaeological sites and monuments should remainappropriately protected and managed.
Conservation of Monuments and Sites in the
landscape
14.4.5 Most archaeological sites in the WHS are eitherearthworks or buried – relatively few contain stoneelements. Arable cultivation can cause plough damageto archaeology and restricts the potential for publicaccess. Permanent pasture is considered to have anumber of conservation benefits over arable.These include:
■ conserving archaeological remains throughnon-cultivation;
■ providing improved opportunities for openpublic access;
■ an historically appropriate land-cover settingfor monuments;
■ increasing, if grazed, the visibility of somearchaeological features;
■ opportunities to recreate species-rich grassland,which has great wildlife potential.
14.4.6 In some cases, archaeological sites under cultivationare stable and not being further damaged, whereas inothers continued deterioration is taking place. Furtherresearch should be undertaken on how farmingtechniques can be adjusted in various situations toavoid damage to buried archaeology. In all cases whenarchaeological sites are taken out of plough, it will beessential to ensure that in future they are notdamaged by burrowing animals and that they do notbecome overgrown with scrub. Currently, there aredraft proposals in the new Heritage Bill to revoke
The Attributes of Outstanding Universal Valueof the Stonehenge World Heritage Site
1. Stonehenge itself as a globally famous and iconicmonument.
2. The physical remains of the Neolithic and BronzeAge funerary and ceremonial monuments andassociated sites.
3. The siting of Neolithic and Bronze Age funerary andceremonial sites and monuments in relation to thelandscape.
4. The design of Neolithic and Bronze Age funeraryand ceremonial sites and monuments in relation tothe skies and astronomy.
5. The siting of Neolithic and Bronze Age funeraryand ceremonial sites and monuments in relation toeach other.
6. The disposition, physical remains and settings of thekey Neolithic and Bronze Age funerary, ceremonialand other monuments and sites of the period, whichtogether form a landscape without parallel.
7. The influence of the remains of Neolithic and BronzeAge funerary and ceremonial monuments and theirlandscape settings on architects, artists, historians,archaeologists and others.
104 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
class consent for ploughing of legally protectedmonuments. Any changes to the law in this area willneed to be considered and taken into account.
Cowslips with Bush Barrow in the background
14.4.7 Many significant archaeological sites and features ofthe surrounding landscape remain largelyunappreciated. Many of these are degraded siteswhich are not easily recognisable by the untrainedeye. Enhancing the visibility of key degradedarchaeological sites in the wider WHS landscapewould improve the appreciation and understanding ofthe landscape as a whole. Opportunities for sensitivelyenhancing the visibility of selected monuments shouldbe investigated. For example, ‘selective mowing and/orgrazing could be used to reinstate the ceremonialroute to the Stones of the Avenue, and to emphasiseits location on the ground to visitors.Whilst enhancingthe visibility of degraded monuments by low-keysustainable methods may be considered, care must betaken not to create an impression of an artificiallymanaged ‘park like’ appearance.
14.4.8 Although the landscape in earlier periods may havebeen extensively wooded, during the later stages ofStonehenge’s use in the Bronze Age, the area wasrelatively lightly wooded. It was predominantly afarmed landscape, including some arable, with the areaaround the Stones remaining uncultivated. However,the landscape has not remained static and extensiveareas of arable and forestry plantations are now keyfeatures of the WHS.The aim is not to recreate thelandscape as it was at a specific point in the past.Theappropriate baseline landscape character for theWHS, which the Plan should seek to achieve in thelonger-term, needs to reflect both the historiccharacter, and contemporary values and uses of thearea.This may require the removal over time ofwoodland obscuring barrow cemeteries and othermonuments, whose intended wide visibility is impliedin their topographical siting.
14.4.9 Since 2000, grassland in the WHS has beenconsiderably extended through agri-environmentalschemes funded by Defra. Most priority areas havenow been reverted to grass but it will be veryimportant to maintain such schemes in the future inorder to ensure renewal of existing agreements andthe development of new ones, targeting the remainingpriority areas. New options such as the reduction ofcultivation depth and scrub control have also beentaken up by landowners and should be furtherencouraged where appropriate.
14.4.10Outside the area of grassland, there is continuedscope for improving the setting of remaining priorityareas which contain important monuments and sites,through a combination of enhanced payments, andappropriate advice covering archaeology, natureconservation and access. Ideally entire barrow groupsshould be managed as a single entity: fences should beremoved, or set sufficiently far back to include allouter ditches or banks to ensure the group can beappreciated as a whole and effectively managed.
Nature Conservation
14.4.11During the previous Plan, English Nature (nowNatural England) considered the nature conservationissues and opportunities within the WHS, andprepared an outline strategy for the Site based on thebroad objectives set out in the South Wessex DownsNatural Area Profile.This strategy reflects the UKGovernment’s national Biodiversity Action Plan (BAP).The Government has adopted a Habitat Action Planfor chalk grassland which includes targets for therecreation of this priority habitat.The WHS is within akey area for the delivery of these targets and ishighlighted within the local Wiltshire BAP as a valuablelink between Salisbury Plain and Porton DownSAC/SSSIs.The WHS also contains or adjoins otherimportant habitats such as the River Avon SSSI/SACand associated wet grassland and wetland birds inparticular.The wider WHS is also important for itsfarmland birds. the delivery of favourable condition ofthe River Avon SSSI.
14.4.12Experience on new permanent grassland has shownthat it is possible to develop herb-rich pastures withhigh biodiversity comparatively rapidly, for example byusing seed collected from existing chalk downlandpasture. Arable farmland is, of course, important forspecialist wildlife such as arable plants and farmlandbirds.The needs of these species should beconsidered as part of the wider strategy for the areawhere this does not conflict with the protection andconservation of the archaeology of the WHS and themaintenance of the Site’s OUV. Maintenance of a
©R
SPB
Stonehenge World Heritage Site Management Plan 2009 105Part 3 – Aims and Policies
mosaic of arable and pasture will help to conservethese species.
In general, newly created grassland should:
■ be species-rich grassland (chalk/mesotrophicdepending on soil conditions);
■ be based on local soils and vegetationcommunity types;
■ maximise potential for natural regeneration anddevelopment of grassland (if seed is required, thisshould continue to be sourced from establishedlocal species-rich sites such as Salisbury Plain);
■ give consideration to the value of existingcultivated areas for rare arable flora and farmlandbirds before conversion to permanent grassland.
14.4.13Grassland management should be tailored to the Sitebut will generally include:
■ appropriate grazing by cattle, sheep or both, withconsideration given to the archaeological sensitivityand to the benefits of utilising rare or traditionalbreeds for selective grazing; it will be important toensure that suitable stock to graze such areas isavailable through, for example, the developmentof schemes to market local beef and lamb ata premium.
■ management to maintain and enhance the natureconservation value for example by providing arange of sward heights and structure with areas ofshorter grazed grass and longer and tussockygrassland and low grazing intensity or no grazingduring the spring/summer to allow plants toflower and spread. It should be recognised thatsuch management may have implications foraccess through the need for additional fencingto control grazing densities, and supportagricultural management.
14.4.14 Farmers within the WHS are currently preservingmany existing arable and woodland wildlife habitats,and are interested in doing more to enhancebiodiversity on their land through co-operation withconservation organisations, including Natural Englandand the RSPB. Existing arable areas should whereverpossible be managed to maximise their potentialcontribution to national and local BAP targets forfarmland species (e.g. hares, arable plants and farmlandbirds including overwintering flocks of seed-eatingspecies and the stone-curlew).This is currently
achieved through the following measures whichshould be supported and continued:
■ spring cereals and over-winter stubbles (withstone-curlew plots where appropriate);
■ range of crop types in relatively small-scale mosaic;
■ grassland ley within rotation if possible;
■ provision of features such as conservationheadlands, beetle banks, or grassland margins.
Stone-curlew chicks
14.4.15 In particular, farmers within the WHS are alreadymaking a significant contribution towards meetingtargets under the Stone-curlew Species Action Planthrough the creation and maintenance of suitablehabitat and the RSPB reserve. Opportunities toincrease the local stone-curlew population should beencouraged in line with the Stonehenge WHSstrategy for the Stone-curlew (RSPB 2007), but asground nesting birds they are prone to disturbancefrom increased visitor access.This will require carefulmanagement to avoid conflicts of interest. Sustainableland management for stone-curlews will be betterachieved through an increase in arable reversion,especially to species-rich chalk grassland.
14.4.16Opportunities for increasing biodiversity within theWHS as a whole should also be considered as anintegral part of the overall aim to enhance the WHSlandscape.This will require a comprehensiveassessment of the conservation interest across theWHS to enable targeting of conservation advice inkey areas of important wildlife value, to ensure thelong-term sustainability of farmland birds and otherwildlife, and should be linked to regular monitoring toensure biodiversity objectives are met. Increasedbiodiversity also presents more opportunities for
Phil
Sheld
rake 2
005 ©
RSP
B
106 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
people to learn about and value wildlife andlandscape and to see how humanity has helped shapethe countryside.
Woodland
14.4.17Woodland is a relatively prominent feature in thelandscape of the WHS.The screening role ofwoodland is particularly important where designed tohide modern development in views from and towardskey monuments. More attention should be given torestoring significant views to and from importantarchaeological sites, including the Stones, throughactions to decrease woodland cover and density incertain areas.
14.4.18A WHS Woodland Management Strategy needs to becompleted so that it can provide guidance on screenplanting, tree removal and compensatoryrequirements, and woodland management for theWHS as a whole.The key elements of such a strategymight include:
■ acknowledgement of the significance of woodlandwithin the WHS as having a contribution to maketo the present character of the landscape;
■ ensuring high quality management of existingwoodlands to maintain and improve their valuefor nature conservation, and as importantfeatures which;
■ ensuring that new planting does not damageburied archaeological sites;
■ new planting should be in accord with growingunderstanding of the historical development andcharacter of the landscape;
■ reducing risk of physical damage to archaeologicalsites from roots and/or wind blow, and enhancingthe visibility of and access to key monuments, byselective removal of trees;
■ identifying woodlands, or parts of woodlands,which might be removed to restore importantvisual links between key monuments;
■ removing woodland cover where this performs noscreening or shelter function and is of limitednature conservation value;
■ ensuring that any new screen planting is bothnecessary and appropriate;
■ ensuring that woodland screening of existingmilitary buildings and installations is both effectiveand of high quality, and is not damaging underlyingarchaeology;
■ replacing existing screen planting where it is stillrequired and nearing the end of its natural life;
■ examining whether there is a need for additionalwoodland planting (both within the WHS andbeyond it) to screen existing moderndevelopments from view from key archaeologicalsites and approaches.
Intrusive features in the landscape
14.4.19Modern development and changes in land use havesignificantly influenced the character of the WHS, andcontinue to impact on important visual and historicrelationships between the archaeological sites andtheir settings. Light pollution, much of it originatingfrom sources outside the WHS, has led to increasedconcealment of the night sky: this is inappropriate in alandscape with monuments celebrated for theirastronomical alignments. Considerable steps havebeen taken since 2000 to create an appropriatelandscape setting for the Stones and other keymonuments, but much remains to be done to removeor screen intrusive features.
14.4.20A strategy for achieving this aim should be informedby a systematic Historic Landscape CharacterAssessment of the WHS to inform evaluation of theimpacts of intrusive features on the OUV of theWHS. Possible measures include:
■ screening, removal and/or relocation of intrusivebuilt features within the WHS whereopportunities arise. For example:
■ existing visitor facilities/car park;
■ A344/A303;
■ water tower;
■ Larkhill Garrison;
■ sources of light pollution;
■ Fargo ammunition compound;
■ pylon lines;
■ sewage works;
Stonehenge World Heritage Site Management Plan 2009 107Part 3 – Aims and Policies
■ agricultural buildings.
■ ensuring that new military development orredevelopment outside the WHS is designed so asto minimise the visual impact when viewed fromkey viewpoints, as well as from the Stonesthemselves within the WHS, as is already set outin the Concordat between the MOD and theMinistry of Public Building and Works(Appendix J);
■ ensuring that new development at LarkhillGarrison does not damage the WHS and its OUV;
■ where practical, seek opportunities to re-routesome military flights clear of the WHS in future,particularly those over-flying the WHS.
Risk prevention and the effects of climate change
14.4.21The UNESCO World Heritage Committee has askedfor all WHS Management Plans to take account ofthese factors. Individual site managers within the WHScarry out risk assessments but these will need to bereviewed in the context of the proposed changes tothe management of visitors and the road networkwithin the WHS.
14.4.22The possible impacts of climate change on the WHSneed further analysis.The most likely risks at presentare increased severe weather events leading to stormdamage, changes to the water table affecting belowground archaeological deposits, and changes tovegetation patterns in the landscape.The likely impactof climate change needs to be further analysed.
14.5 Sustainable Tourism and VisitorManagement
Aim 4: To interpret the Outstanding UniversalValue of the whole WHS, to increaseunderstanding and conservation of the culturalassets, to acknowledge and take into account itsspiritual and religious significance for some, andto promote the importance of the heritageresources for public enjoyment, education andresearch (issues 21-33, 38-41).
Policy 4a – Management of visitors to the WHS should beexemplary and follow relevant national and internationalguidance on sustainable tourism (issue 21).
Policy 4b – The economic benefits of tourism toStonehenge and the WHS should be spread to the widerarea (issue 22).
Policy 4c – Appropriate arrangements for managed openaccess on foot within the WHS should be provided withattention to avoiding erosion, while maintaining andimproving existing levels of access (issue 23, 24).
Policy 4d – Access and circulation to key archaeologicalsites within the WHS landscape should be encouraged(taking into account archaeological and ecological needs) toincrease public awareness and enjoyment (issue 23, 24).
Policy 4e – Arrangements should be maintained for specialaccess at significant occasions including solstices, and forstone circle access outside opening hours for small groups(issue 25, 26).
Policy 4f – Interpretation both on and off site should beimproved to enhance enjoyment and appreciation ofStonehenge and the whole of the WHS (issue 30).
Policy 4g – Develop learning opportunities in theStonehenge WHS (issue 31).
Policy 4h – Promote community involvement in theStonehenge WHS (issues 22, 43).
Policy 4i – Explore the opportunities for utilising theStonehenge WHS to meet the wider objectives of UNESCOand the UK Government (issue 1).
Policy 4j – Construct improved interim visitor facilities inkeeping with the WHS by early 2012 (issues 28-29).
The Stonehenge trilithons
2004
©Engl
ish H
eri
tage
108 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
14.5.1 Presentation of World Heritage Sites is one of the keyduties laid upon states parties in the World HeritageConvention.This will be achieved mainly by directaccess of visitors to the WHS although remote access,for example via websites, is becoming increasinglyimportant. Sustainable tourism can also providebenefits both to the Site and to the local communitiesand local economy.While the development of tourismwill remain an important factor, it is essential that thisdoes not conflict with conservation of the WHS andmaintenance of its OUV, on which such tourismdepends. Any proposals should follow governmentguidance Good Practice on Planning for Tourism(CLG 2006), published to guide planning authoritiesand others.
Most of the National Trust land at Stonehenge is open to
the public
14.5.2 International guidance is also relevant for a site ofinternational importance.The ICOMOS InternationalCultural Tourism Charter (1999) sets out six principleslisted in Appendix K.
Wider access to the WHS
14.5.3 At present, visitors tend to focus on the Stones andpay much less attention to other parts of the WHS asa whole. Better access to the rest of the WHS cangreatly improve visitors’ understanding andappreciation of the scale of activity in the Neolithicand Bronze Ages.There is a need to raise awarenessof existing access links between the variousarchaeological sites and monuments, and to improveor create others.
14.5.4 Managed access to archaeological sites in the WHSvia existing or negotiated permissive rights of way andon open access land should be maintained andimproved. An increased choice of circular walks andcycle routes linking points of interests within the WHSshould be developed, to encourage visitors to explorefurther afield.The more remote parts of the WHS,such as the farmland to the south of the Site and theAvon Valley remain relatively undiscovered, and couldbe better linked to the more-visited northernpart, though this will be limited by the obstacle ofthe A303.
14.5.5 Since the 2000 Plan was published, the DisabilityDiscrimination Act (2005) has come into force. Allthose involved in management of access will need toexamine what reasonably can be done to improveaccess within the WHS for all disabled visitors.
14.5.6 Potential conflict between different user groups usingthe same access routes must be considered (e.g.walkers, cyclists, horse-riders, etc). However, for thefull benefits of a sustainable traffic management policyto be realised it is preferable for routes to bedesigned to cater for the needs of all non-car users,provided that there is no adverse impact on the WHSor the attributes of its OUV. It may be necessary torestrict some routes exclusively to walkers. In addition,conflicts with farming should be minimised throughclear signing of permitted rights of way andinformation about access opportunities toparticular sites.
14.5.7 Where visitor access is sought to be increased insensitive nature conservation areas, i.e. the vicinity ofstone-curlew breeding areas, careful planning isrequired to avoid potential conflict with currentlegislation for this protected species (followingguidelines in section 9.2)
Management of access to the Stones
14.5.8 The approach to Stonehenge should be integral tothe visitor experience.Visitors should approach theStones on foot although appropriate assistance willneed to be provided for the less mobile.
14.5.9 Visitors should continue to be managed in the vicinityof the Stones to avoid overcrowding and wear andtear to the monument. Effective operationsmanagement should ensure that neither the WHSitself nor the visitor experience is compromised.Comprehensive surveys of visitor numbers, profile andbehaviour could provide essential insights into what isneeded. Security and controlled visitor management at
Lucy
Eve
rshed 2
008 ©
Nat
ional
Tru
st
Stonehenge World Heritage Site Management Plan 2009 109Part 3 – Aims and Policies
the Stones, particularly at peak times, will remain animportant issue. Careful consideration should continueto be given to flexible and unobtrusive visitormanagement measures at the Stones.
14.5.10 In the future, subject to the needs of stockmanagement, conservation and security, the existingfences in the vicinity of the Stones should beremoved.The closure of the A344 is critical to theachievement of this.
14.5.11The reuse of the existing underpass beneath theA344 as an ‘on site’ base for visitor operations/securitystaff should be considered as part of plans for newvisitor facilities.
14.5.12A particular aspect of Stonehenge is its spiritual valueto a variety of groups. In recent years special accessprovisions at solstices and equinoxes have allowedsuch groups to express their spiritual values. It will beimportant to maintain such arrangements in thefuture providing that this can be continued withoutdetriment to the WHS and its OUV.
Spreading the benefits of the WHS
14.5.13A priority is to develop stronger links between theWHS and neighbouring settlements to encourageeconomic and community benefits in the immediatelocality. Existing facilities in local settlements and newlinkages to and from these areas should be promotedto visitors to the WHS.
14.5.14New visitor facilities should aim to increase awarenessof other sites and attractions within the wider region.However, care should be taken not to over-promoteother sensitive heritage sites which already experiencesignificant visitor numbers. Interpretative andmarketing material should reflect this objective.
14.5.15Collaboration with other visitor attractions in thearea, in particular Avebury and the local museums atSalisbury and Devizes, should be sought.This wouldoffer opportunities to improve marketing, increasevisitor numbers (where appropriate) and enhancevisitors’ enjoyment and appreciation of the WHS andshould be integrated, where appropriate, with thedevelopment of the interpretation and learningstrategies set out in 14.5.18-19.
14.5.16New facilities and presentation of Stonehenge wouldpresent an opportunity for the local businesscommunity, and other organisations withresponsibilities for tourism, to work in partnership andprepare marketing and development strategies to
maximise the opportunities for longer stays in thearea for the benefit of the local economy.This will beparticularly important in 2012 when the Olympicsare expected to bring large numbers of visitors tothe UK.
Interpretation, learning and outreach
14.5.17High quality and effective interpretation andeducational information on and off site is crucial inorder to highlight and promote better understandingof the significance and integrity of the WHS.Interpretation should help people to enjoy the WHSand learn from it, contributing to the quality of life forpresent and future generations.This should beachieved by:
■ explaining how people in the past inter-relatedsocially, economically and spiritually withthemselves and with their environment;
■ maximising visual and aesthetic appreciation of themonuments, buildings, landscape features andartefacts that these people made for themselves.
14.5.18A detailed and innovative Stonehenge WHSinterpretation strategy should be prepared, building onthe draft Stonehenge Interpretation and LearningStrategy already prepared by English Heritage inconjunction with the National Trust. Some of its aimsshould be delivered by the proposed new visitorfacilities. Consideration should also be given to thesuitability of further physical signage as appropriateand other forms of interpretation such as leaflets oraudio wands.The Stonehenge WHS interpretationstrategy should take account of recent discoveries,theories and advances in knowledge about the WHS.
14.5.19Linked to the Stonehenge WHS interpretationstrategy should be a Stonehenge WHS learningstrategy.This should make use of existing work such asthe EH Learning Plan for Stonehenge, and theeducational work carried out over the last few years.It should also be linked to the new visitor facilities.Consideration should also be given to therelationships with Avebury and the museums inSalisbury and Devizes.
14.5.20 Involvement by the local communities in the WHSshould be encouraged and supported through newand existing partnerships with local groups andschools, and lifelong learning opportunities which helpto build a sense of custodianship.There should beincreased opportunities to become involved with theconservation and interpretation of the WHS through
110 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
volunteering. A range of volunteer opportunitiesshould be available – eg to undertake practicalconservation tasks, lead school visits or takephotographs – to appeal to different groupsand individuals.
National Trust activity with local schoolchildren
14.5.21UNESCO, the UK Government, and the UK NationalCommission for UNESCO have all stressed theopportunities provided by WHSs for the developmentof the wider objectives of UNESCO.These includetheir use as exemplars in management and promotionof heritage, capacity development overseas andinternational cooperation to promote sustainability,cultural diversity and enhanced cultural understanding.This is an area which has been little developed so farby most UK World Heritage Sites. Opportunities forsuch wider involvement will be constrained by theimmediate priorities of the site and by the availabilityof resources.
Visitor facilities for the World Heritage Site
14.5.22Managing sustainable levels and patterns of visitoraccess within the WHS is essential.The currentarrangements for visitors in the WHS areunsatisfactory and improved visitor facilities arerequired as a priority.
14.5.23Any new visitor arrangements at Stonehenge shouldbe exemplary in terms of respecting acceptedprinciples of conservation, sustainable tourism andapproaches to traffic management.They should helpvisitors to experience and understand the significanceof the WHS and its conservation needs; they shouldrespect the OUV of the WHS and the attributes of itsOUV, its integrity and authenticity; they shouldconform with the general principles of sustainabletourism, in respecting the carrying capacity of theoverall landscape and significant destinations within it;
they should provide visitors with sufficient choices fortheir visits and promote enjoyment; they shouldrespect green transport ideals (see section 14.6) andprovide optimum access to the WHS. All constructionwork should also respect sustainable principles interms of maximum reversibility at the end of its life.
14.5.24New visitor arrangements should aim to deliverthe following:
■ A significant improvement to the setting ofStonehenge and, where possible, improvementsto the settings of other monuments and siteswithin the WHS;
■ Relatively easy access to Stonehenge;
■ A system for managing visitor numbers andpatterns of visiting so as to control movement toStonehenge;
■ Subject to conservation requirements, increasedopportunities for access to the wider WHSlandscape, and greater dispersal of visitors;
■ Focal point(s) for the provision of information toallow understanding of the significance of theWHS at various levels of interpretation;
■ Adequate parking for visitors numbers thatrespects the carrying capacity of the WHS andreflects different arrival modes and directions;
■ Development of good connections to publictransport;
In the future we are hoping to remove the existing car park and
most of the current infrastructure and return this area to grass
although a small underground facility will be retained
Lucy
Eve
rshed 2
008 ©
Nat
ional
Tru
st
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
DSC
8320
Stonehenge World Heritage Site Management Plan 2009 111Part 3 – Aims and Policies
■ Conformity with the road closure agreed at thetime of World Heritage inscription, whilstminimising the impact on existing road users;
■ Links with Avebury and with the museums atDevizes and Salisbury;
■ Education facilities.
14.5.25Whether or not grouped at a single location, newvisitor facilities building(s) should be of an appropriatelocation, scale and quality and should include:
■ Reception and orientation point for theStonehenge WHS;
■ Interpretation of the WHS;
■ Toilets, disabled toilets, baby-changing and first-aid;
■ Parking for cars (including disabled parking spaces),coaches and motorcycles, together with cycleracks, and drop-off facilities for public transportservices;
■ Retail and catering outlets.
14.5.26A full Environmental Impact Assessment will beprepared for any proposed visitor facilities scheme.The location and design of any proposed visitorfacilities (including parking areas) should ensure thatthey:
■ avoid adverse impact on the WHS, its setting andthe attributes of its OUV;
■ avoid as far as practicable adverse impacts onsignificant features of nature conservation interestand particularly avoid and ensure there is no likelysignificant adverse impact on internationally andnationally designated sites such as the River AvonSAC and Salisbury Plain SAC and SPA;
■ minimise as far as practicable adverse impacts onthe character of the landscape;
■ avoid constraining opportunities for improvementsto the setting of Stonehenge and othermonuments and sites in the WHS landscape as faras practicable;
■ avoid significant adverse impact on localcommunities as far as practicable;
■ wherever possible make use of land which hasbeen previously disturbed by development;
■ make use of existing infrastructure whereverpossible so enabling new infrastructure (includingaccess roads and transit routes) within the WHSto be kept to a practical minimum.
14.6 Sustainable Traffic Management andTransportation
Reduction of the impact of roads and traffic
on the WHS
14.6.1 A key aim is to restore the tranquillity and dignity ofthe WHS, respecting principles of sustainable tourismand approaches to traffic management. Roads andtraffic are having an adverse impact on the WHS, asacknowledged at the time of inscription. Apart fromthe impact of the major roads, there are a number ofother issues concerning traffic. Significant numbers ofvehicles pass through the WHS at high speed; inaddition there are inadequate facilities and fewdedicated routes for pedestrians and cyclists; problemsassociated with parking; road safety concerns; andlimited public transport provision to and from theWHS.These issues have reduced the quality ofexperience and tranquillity when visiting this uniqueand internationally valued landscape.
14.6.2 The long-term vision remains the removal orscreening of all inappropriate structures and roadsincluding the A303. All measures should seek to
Aim 5: To reduce the impacts of roads andtraffic on the OUV of the WHS and to improvesustainable access to the Site (issues 34-37).
Policy 5a – Measures should be identified andimplemented to reduce the impacts of roads and traffic onthe WHS and to improve road safety (issues 34-36).
Policy 5b – Proposals should be developed, assessed andimplemented, if practical, for the closure of the A303/ A344junction, of the A344 between the junction and the currentvisitor centre site, and for restricted access on some or all ofthe remainder of the A344 up to Airman’s Corner,depending on the location of new visitor facilities (issues 34and 35).
Policy 5c – Vehicular access to Byways within the WorldHeritage Site should be restricted apart from access foremergency, operational and farm vehicles (issue 36).
Policy 5d – Measures should be taken through anexemplary Green Travel Plan to encourage access to the Siteother than by car (issues 36, 39).
112 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
achieve an integrated approach, to bring benefits tothe WHS, its setting, its attributes of OUV, and itsnature conservation values, and should be sensitive tothe needs of visitors and local residents.The designand materials used should preserve and enhance thecharacter and appearance of the area. Considerationshould be given to improvements throughcomparatively minor measures such as trafficcalming and management within the WHS and to theroad network.
14.6.3 A key objective, requested at the time of inscription, isthe closure of the A344 adjacent to Stonehenge toallow the restoration of the Avenue where it iscrossed by the existing road.This would mean closureof the junction of the A344 with the A303.Theclosure of the A344 and the extent of that closure atpresent depend on the location of the proposed newvisitor facilities.
14.6.4 In developing proposals for dealing with roads andtraffic in the WHS, including possible closure of theA303/A344 junction and restriction of access to theA344, the following should apply:
■ Develop appropriate measures and trafficmanagement at road junctions, includingLongbarrow Crossroads, Airman’s Corner andCountess Roundabout, to minimise inconvenienceto local residents and users as well as longer-distance travellers and visitors to the WHS;
■ Take measures at road junctions which improvethe safety of cyclists, pedestrians and horse riders,as well as that of motorists;
■ Restrict light pollution from road lighting into andwithin the WHS wherever possible;
■ Consider use of low-noise surfaces on all roads inor near the WHS to reduce levels of traffic noise;
■ Review speed limits and consider appropriatemeasures that could be taken to improve safetywithin the boundaries of the WHS, bearing inmind the need to strike the right balance betweensafety, tranquillity, visual enjoyment and the serviceto the travelling public. Consider supporting thisapproach with a no parking or stopping policy onmain roads;
■ Review existing signing within the WHS, andconsider appropriate gateway signs at all mainentry points to the WHS, as at Avebury, to raisedriver awareness of the special nature of the Site;
■ Review access requirements and considermeasures for controlling access bymotorised/vehicular traffic on byways within theWHS, which take account of essentialmaintenance, emergency services and farm access.
Green Travel Plan for the World Heritage Site
14.6.5 As part of an exemplary sustainable tourism plan, it isessential that a Green Travel Plan manages access andvisitor levels to the WHS, to provide visitors withample choices to visit and promote their enjoyment,whilst respecting the carrying capacity of thelandscape and its heritage in tune with sustainabletransport principles.These principles should includeencouraging maximum use of sustainable means oftransport to reach the site by non-car modes, andreducing the impact of traffic within the Site.The Planwould need to be prepared in collaboration withrelevant partners and informed by transport practicefrom other WHSs and similar attractions.The Plancould include the following components:
■ investigative work into good practice from otherWHSs and similar attractions in sensitivelandscapes;
■ Measurable and monitored targets of reducedprivate car travel and increased use of non-carmodes to and from new visitor facilities;
■ Reduced or free parking for pre-booked coachesat the new visitor facilities;
■ convenient drop-off points at the new visitorfacilities for coach and bus users together withfacilities for cyclists;
■ a comprehensive assessment of the publictransport network to the WHS as a whole, thevisitor centre, Avebury and the museums atSalisbury and Devizes;
■ a design for a WHS public transport network andassociated facilities;
■ a programme of planned improvements drawn upwith all relevant partners;
■ targeted publicity of the new access arrangementsto potential visitors at home and abroad,educational tourists, agencies, transport providersand operators.This should include travel pages onthe Internet with timetable information and publictransport links to the Site as well as routeinformation for pedestrians and cyclists;
Stonehenge World Heritage Site Management Plan 2009 113Part 3 – Aims and Policies
■ Investigation of the use of environmentally-friendlyshuttle buses around the edge of the WHS and toother potential drop-off points;
■ Measures to ensure that any means oftransporting visitors within the WHS are asunobtrusive as possible, having particular regard toarchaeologically sensitive areas and to residentialamenity, and are designed to minimise adverseeffects on existing highways and byways;
■ Encouraging visitors to walk between new visitorfacilities or drop-offs and a range of monumentsand sites and other points of interest;
■ proposals for further improving the signposting ofexisting rights of way within and beyond the WHS,and publicise these routes widely;
■ Establishment of new permissive routes and rightsof way, in consultation with local landowners;
■ Making provision for cycling to and within theWHS through dedicated cycle routes leading tothe WHS, appropriate facilities and promotion;
■ Bicycle hire should be available at the visitorcentre and at bus and railway stations in the area.
14.7 Research
14.7.1 Although the importance of the principalarchaeological sites and features has been recognisedand studied, the current state of our knowledge aboutthe landscape of Stonehenge as a whole is stillincomplete. Significant areas and themes within theWHS have not yet been investigated.These areasrepresent gaps in our understanding aboutStonehenge, and are likely to have great potential forthe discovery of as yet unknown archaeological sitesand evidence.The archaeological evidence theycontain may have significant implications formanagement and visitor access.
14.7.2 The Research Framework for Stonehenge should bekept under regular review and updated as knowledgeadvances.The Research Framework should be used asthe guiding document for the development andassessment of research proposals.
14.7.3 The use of the most appropriate investigativetechniques for the successful implementation of thepriority research areas should be encouraged,including fieldwalking, geophysical prospecting, Lidarsurvey, air photograph analysis, excavation, coring, test-pitting, cartographic and documentary analysis, datingtechniques, materials analysis, earthwork survey andstudy of site distribution and relationships.
14.7.4 Research proposals will be welcome provided thatthey:
■ conform to the published Research Framework;
■ minimise destructive intervention as far aspossible, so as to maintain the OUV of the WHS;
■ include provision for publication and storage ofarchive material;
■ and are properly resourced.
The capacity of the relevant accredited institutions toreceive and curate the archives produced in this waywill also be a factor to be taken into account wheninitiating research.
14.7.5 Sustainable research into the other values of the WHS– such as its ecological value – should be encouragedand undertaken as appropriate, particularly to informecological targets.
Aim 6 – Sustainable research should beencouraged and promoted to improveunderstanding of the archaeological, historicand environmental value of the WHS necessaryfor its appropriate management (issues 41-44).
Policy 6a – Sustainable archaeological research into andwithin the Stonehenge WHS should be encouraged, andshould be of the highest quality (issue 39).
Policy 6b – A review of the current archaeological archivingfacilities should be undertaken with the aim of securing along-term storage facility for such archives (issue 32, 40).
Policy 6c – A new archaeological group should be set upto advise on archaeological research into and within theWHS.This group should have formal links with the AveburyArchaeological and Historical Research Group (issue 41).
Policy 6d – Other types of non-destructive research, suchas the assessment of biodiversity, should be undertaken asappropriate (issue 39).
114 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
The Aubrey Hole excavation team, August 2008; the excavation
was part of the Stonehenge Riverside Project
14.8 Long-term objectives for the WorldHeritage Site
14.8.1 Some aspects of the long-term aims and Vision for theWHS are not achievable in the lifetime of this revisionof the Management Plan. In particular, it is not possibleto remove the impact of the A303 fully from theWHS, or to create a permanent world class visitorcentre. However, even if no decisions can be taken onthese matters in the lifetime of this Plan, it isimportant that these long-terms aims should beaddressed well before the Plan next comes up forreview, so that firm proposals can be included in thenext revision of the Management Plan.
14.9 Management, Liaison and Monitoring
14.9.1 The key purpose of the Management Plan is to setout a framework for the management of the WHS toensure its conservation and continued sustainable use,and the continued maintenance of its OUV. Previoussections of Part 3 outline Aims and Policies to achievethis purpose, while Part 4 of the Plan contains anAction Plan which will need to be updated regularlyduring the lifetime of the Plan.
14.9.2 To achieve all these aims and policies, it is essential tohave an effective system for the implementation ofthe Management Plan. Such a system should include:
■ effective partnership among the key stakeholderswith wider involvement of other partnersincluding the local community;
■ commitment of stakeholders, as far as ispracticable to implement those policies andactions for which they are responsible;
■ an effective steering group (the Stonehenge WHSCommittee) and supporting advisory network(the Stonehenge WHS Advisory Forum) tooversee the implementation of the Plan;
■ effective coordination of the implementation ofthe Plan by the steering group and the WHSCoordinator;
■ adequate resourcing;
■ regular monitoring and review of theimplementation of the Plan and of the conditionof the WHS.
Aim 8 – Provide adequate resources for the management,conservation and monitoring of the WHS (issues 43-47).
Policy 8a – Coordinate the implementation of theManagement Plan and liaise with partners to maintain andenhance the present partnership approach (issue 43).
Policy 8b – Review the governance of the WHS, includingthe composition and terms of reference of the WHSCommittee and the Advisory Forum (issues 44, 46).
Policy 8c – Seek adequate funding for the WHS(issue 45).
Policy 8d – Ensure regular monitoring of the WHS(issue 47)
Aim 7 – The long-term objectives for reducingthe impact of the A303 within the WHS, andthe creation of a permanent world class visitorcentre should be kept under review (issue 42).
Policy 7a – The eventual achievement of the long termobjectives for reducing the impact of the A303 and thecreation of a permanent world class visitor centre should bekept under review during the lifetime of this Plan.
Adam
Sta
ndfo
rd ©
Aeri
al-C
am/S
RP 2
008 A
016461
Stonehenge World Heritage Site Management Plan 2009 115Part 3 – Aims and Policies
14.9.3 The basic building blocks of such a system have beenput in place since the first Plan was completed in2000. It is necessary to build on these blocks toimprove the effectiveness of implementation of thePlan over the next few years. In particular, it isnecessary to do more work to improve partnership,to review the effectiveness and operation of the WHSCommittee and Advisory Forum, and to maintain andincrease as far as possible the resources available tothe WHS both for management and for projects.
14.9.4 Monitoring the implementation of the ManagementPlan is also crucial since such feedback can be used toimprove the effectiveness of this Plan and also toinform the development of its successor in duecourse. Stonehenge already has a set of agreedmonitoring indicators (see section 13.6) but it wouldbe helpful to review these in light of the attributes ofOUV identified in this Plan.
Excavation of the remains of the double circle of bluestones by
the SPACES project team, April 2008
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
NM
R D
P057787
Jam
es
O D
avie
s 2008 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K021133
Silhouette of the Stones at Sunrise
116 Stonehenge World Heritage Site Management Plan 2009Part 3 – Aims and Policies
Stonehenge World Heritage Site Management Plan 2009 117Part 4 – Implementing the Plan
Part 4Implementing the Plan
Aerial view of the Neolithic cursus from the west showing Bronze Age cursus barrows on the rightDamian Grady 2000 © English Heritage Photo Library NOO0001
Part 4Implementing the Plan
Aerial view of the Neolithic cursus from the west showing Bronze Age cursus barrows on the rightDamian Grady 2000 © English Heritage Photo Library NOO0001
118 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Part 4Implementing the Plan
15.0 Action Plan
15.1 The Management Plan aims and policies set out inPart 3 above will be achieved through a wide range ofprojects, to be undertaken by a variety oforganisations involved in the WHS. Whether theseprojects are implemented by a single body or requirea partnership approach, it is of fundamentalimportance that they are conceived, designed andimplemented within the framework established by theManagement Plan.
15.2 The following Action Plan outlines new projects orongoing work for the short (5 years), medium(10 years) and long-term (30 years). It identifies foreach action the lead organisation and the partnersthat need to be involved, the time scale forimplementation, and the resources needed.
15.3 The implementation of the Action Plan will requirethe support and participation of the WHS partners interms of staff time and funding. The key stakeholdersshould formally endorse the Management Plan, and inparticular the Action Plan, to ensure that the projectsfor which they are identified as leaders areincorporated in their own work programme andadequately funded. Organisations leading projectsshould report regularly on progress at the WHSCommittee meetings. The WHS Committee will alsoconfirm who is responsible for delivering particularprojects when needed, and review regularly thepriorities. The Action Plan will also provide theopportunity to monitor progress towards achievingthe Management Plan objectives. The Action Plan willbe used to develop an annual work programme eachyear for agreement by the WHS Committee.
15.4 Abbreviations
AAHRG Avebury Archaeological and HistoricalResearch Group
AWHS Avebury World Heritage Site OfficerCLA Country Land and Business AssociationDCMS Department for Culture, Media and SportDefra Department for the Environment, Food
and Rural AffairsDE Defence EstatesDfT Department for TransportEH English HeritageFC Forestry CommissionFOAM Friends of Ancient Monuments
(CBA Wessex)HA Highways Agency
The UK national committee of theInternational Council on Monuments and Sites
LO Private landownersMOD Ministry of DefenceNE Natural EnglandNFU National Farmers UnionNSAG New Stonehenge Archaeological GroupNT National TrustNWC New Wiltshire Council (merger of
Wiltshire County Council and the four District Councils includingSalisbury District Council)
PC Parish CouncilsROWU Rights of Way usersRSPB Royal Society for the Protection of BirdsSDM Salisbury and Devizes Museums Sustrans (sustainable transport charity)SWEP South Wiltshire Economic PartnershipSWHS Stonehenge World Heritage Site
CoordinatorT2KP Tourism 2000 PartnershipUKNC UK National Commission for UNESCOVW Visit WiltshireWC Wiltshire ConstabularyWHSC Stonehenge World Heritage Site
Committee
ICOMOSUK
Stonehenge World Heritage Site Management Plan 2009 119Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
ST
AT
UT
OR
Y A
ND
PO
LIC
Y F
RA
ME
WO
RK
Aim
1T
he
Man
agem
ent
Pla
n s
ho
uld
be
end
ors
ed b
y th
ose
bo
die
s an
d i
nd
ivid
ual
s re
spo
nsi
ble
fo
r it
s im
ple
men
tati
on
as
the
fram
ewo
rkfo
r lo
ng-
term
det
aile
d d
ecis
ion
-mak
ing
on
th
e co
nse
rvat
ion
an
d e
nh
ance
men
t o
f th
e W
HS
an
d t
he
mai
nte
nan
ce o
f it
s O
UV
, an
dit
s ai
ms
and
po
licie
s sh
ou
ld b
e in
corp
ora
ted
in
to r
elev
ant
pla
nn
ing
guid
ance
an
d p
olic
ies.
Ong
oing
Exist
ing
staf
fSW
HS
NW
C, E
HP
olic
y 1e
Dev
elop
men
t w
hich
wou
ld im
pact
adv
erse
ly o
n th
e W
HS,
its
OU
V o
r its
set
ting
shou
ld n
otbe
per
mitt
ed.
5 ye
ars
Exist
ing
staf
fSW
HS
EHN
WC
Po
licy
1dT
he r
elev
ant
polic
ies
of t
he M
anag
emen
t Pl
an s
houl
d, w
here
app
ropr
iate
, be
form
ally
inco
rpor
ated
with
in t
he L
ocal
Dev
elop
men
t Fr
amew
ork
(pos
sibly
as
a Su
pple
men
tary
Plan
ning
Doc
umen
t) a
nd w
ithin
oth
er s
tatu
tory
pla
ns s
uch
as C
omm
unity
Str
ateg
ies.
5 ye
ars
Exist
ing
staf
fSW
HS
EHN
WC
Po
licy
1cT
he R
egio
nal S
patia
l Str
ateg
y an
d th
e Lo
cal D
evel
opm
ent
Fram
ewor
k an
d ot
her
stat
utor
ypl
ans
such
as
Com
mun
ity S
trat
egie
s sh
ould
con
tain
pol
icie
s to
ens
ure
that
the
impo
rtan
ceof
the
pro
tect
ion
of t
he W
HS
and
its s
ettin
g an
d th
e m
aint
enan
ce o
f its
OU
V a
re fu
llyta
ken
into
acc
ount
in d
eter
min
ing
plan
ning
app
licat
ions
and
Roa
d O
rder
s.
5 ye
ars
Exist
ing
staf
fSW
HS
EH, N
TN
E, N
WC
Po
licy
1bSe
t w
ithin
the
fram
ewor
k pr
ovid
ed b
y th
e M
anag
emen
t Pl
an, k
ey s
take
hold
ers
shou
ldde
velo
p w
ritte
n an
d ag
reed
pol
icy
guid
ance
for
the
impr
oved
man
agem
ent
and
cons
erva
tion
of t
he o
vera
ll ch
arac
ter
and
inte
grity
of t
he W
HS
as a
cul
tura
l lan
dsca
pe, a
sw
ell a
s its
con
stitu
ent
part
s.
5 ye
ars
and
ongo
ing
Feb
2009
2009
Exist
ing
staf
fSW
HS
All
DC
MS
All
Po
licy
1aG
over
nmen
t de
part
men
ts, a
genc
ies
and
othe
r st
atut
ory
bodi
es r
espo
nsib
le fo
r m
akin
g an
dim
plem
entin
g na
tiona
l pol
icie
s an
d fo
r un
dert
akin
g ac
tiviti
es t
hat
may
impa
ct o
n th
e W
HS
and
its e
nviro
ns s
houl
d re
cogn
ise t
he im
port
ance
of t
he W
HS
as a
who
le a
nd it
s ne
ed fo
rsp
ecia
l tre
atm
ent
and
a un
ified
app
roac
h.
•D
CM
S to
sub
mit
Plan
to
Wor
ld H
erita
ge C
entr
e•
Key
stak
ehol
ders
form
ally
to
endo
rse
the
Man
agem
ent
Plan
Table 6: Stonehenge WHS Action Plan
120 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
TH
E D
ES
IGN
AT
ION
AN
D B
OU
ND
AR
IES
OF
TH
E W
HS
Aim
2T
he
WH
S b
ou
nd
ary
sho
uld
en
sure
th
e in
tegr
ity
of
the
WH
S i
s m
ain
tain
ed b
y in
clu
din
g al
l kn
ow
n s
ign
ific
ant
arch
aeo
logi
cal
feat
ure
s an
d i
nte
rrel
atio
nsh
ips
rela
ted
to
th
e at
trib
ute
s o
f th
e S
ite’
s O
UV
.
CO
NS
ER
VA
TIO
N O
F T
HE
WO
RL
D H
ER
ITA
GE
SIT
E
Aim
3T
he
OU
V o
f th
e W
HS
sh
ou
ld b
e su
stai
ned
an
d e
nh
ance
d t
hro
ugh
th
e co
nse
rvat
ion
of
the
Sit
e an
d t
he
attr
ibu
tes
that
car
ry
its
OU
V.
Ong
oing
Ong
oing
Ong
oing
Exist
ing
staf
f
Exist
ing
staf
f
Add
ition
alca
pita
l
LOSW
HS,
EH
NT
, RSP
B
SWH
S, N
T,
NW
C, E
H
Po
licy
3aT
he W
HS
shou
ld b
e m
anag
ed t
o pr
otec
t its
att
ribut
es o
f OU
V, t
o pr
otec
t th
eir
phys
ical
rem
ains
, to
impr
ove
and
enha
nce
thei
r co
nditi
on a
nd e
xpla
in t
heir
signi
fican
ce.
•C
ontin
ue t
o w
ork
with
land
owne
rs t
o im
prov
e th
e m
anag
emen
t of
the
pre
hist
oric
mon
umen
ts
•N
T a
nd R
SPB
to c
ontin
ue t
o m
anag
e th
eir
land
to
high
sta
ndar
ds
•C
ontin
ue t
o im
prov
e th
e pr
otec
tion,
set
ting
and
inte
rpre
tatio
n of
key
mon
umen
ts,
incl
udin
g D
urrin
gton
Wal
ls, W
oodh
enge
and
the
Cur
sus
10 y
ears
Exist
ing
staf
fD
CM
S,
EH, N
WC
,IC
OM
OS
UK
SWH
SA
WH
SP
olic
y 2c
Dur
ing
the
lifet
ime
of t
his
Plan
, a r
evie
w o
f the
sig
nific
ance
of t
he S
ite s
houl
d be
und
erta
ken
to e
stab
lish
whe
ther
mor
e em
phas
is sh
ould
be
plac
ed o
n its
land
scap
e, a
nd t
o as
sess
its
boun
dary
in t
he li
ght
of a
ny c
hang
ed u
nder
stan
ding
of i
ts s
igni
fican
ce. T
he r
evie
w s
houl
d al
soun
dert
ake
an a
sses
smen
t of
the
inte
grity
and
aut
hent
icity
of t
he S
ite, a
nd w
ill n
eed
to b
eca
rrie
d ou
t at
bot
h A
vebu
ry a
nd S
tone
heng
e.
5 ye
ars
Exist
ing
staf
fD
CM
S, E
H,
AA
HR
G.
NSA
G, N
WC
,IC
OM
OS
UK
SWH
S A
WH
SP
olic
y 2b
A s
tudy
into
the
nee
d fo
r a
buffe
r zo
ne s
houl
d be
car
ried
out
join
tly w
ith A
vebu
ry a
ndap
prop
riate
rec
omm
enda
tions
sho
uld
be m
ade
to t
he S
tate
Par
ty.
5 ye
ars
Exist
ing
staf
fD
CM
S,
EH, N
WC
,IC
OM
OS
UK
SWH
SP
olic
y 2a
A m
inor
mod
ifica
tion
of t
he b
ound
ary
shou
ld b
e pr
opos
ed t
o U
NES
CO
.
Stonehenge World Heritage Site Management Plan 2009 121Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
5 ye
ars
Ong
oing
NW
CSW
HS
AW
HS
SWH
S
EH EH, N
T, N
WC
Po
licy
3cT
he c
ondi
tion
and
vuln
erab
ility
of a
ll ar
chae
olog
ical
site
s an
d m
onum
ents
thr
ough
out
the
WH
S sh
ould
be
revi
ewed
reg
ular
ly t
o gu
ide
futu
re m
anag
emen
t ac
tion
and
prio
ritie
s.
•U
nder
take
rep
eat
cond
ition
sur
veys
of a
ll ar
chae
olog
ical
site
s in
the
Sto
nehe
nge
WH
Sjo
intly
with
Ave
bury
eve
ry s
ix y
ears
(on
e is
over
due)
•Se
t st
anda
rds
and
met
hodo
logy
for
cond
ition
sur
veys
to
ensu
re c
ompa
tibili
ty
•C
ontin
ue r
egul
ar m
onito
ring
at S
tone
heng
e an
d re
gula
r m
onito
ring
visit
s el
sew
here
5 ye
ars
5 ye
ars
5 ye
ars
Ong
oing
5 ye
ars
5 ye
ars
Exist
ing
staf
f
Add
ition
alca
pita
l
Exist
ing
staf
f
Add
ition
alca
pita
lA
dditi
onal
capi
tal
Add
ition
alca
pita
l
Def
ra, N
E, N
TSW
HS,
EH
, LO
Po
licy
3bA
ppro
pria
te a
gri-e
nviro
nmen
tal s
chem
es s
houl
d be
mai
ntai
ned
and
deve
lope
d to
max
imise
the
prot
ectio
n of
arc
haeo
logi
cal s
ites
and
thei
r se
ttin
gs, a
nd a
lso t
he s
ettin
g of
the
WH
Sits
elf.
•Ex
tend
gra
ss r
esto
ratio
n in
rem
aini
ng p
riorit
y ar
eas
•Se
ek t
o m
aint
ain
appr
opria
te p
aym
ents
for
land
owne
rs a
s pa
rt o
f Def
raag
ri-en
viro
nmen
tal s
chem
es
•M
aint
ain
exist
ing
gras
sland
and
ren
ew e
xist
ing
gras
s re
stor
atio
n ag
reem
ents
•C
ontin
ue s
crub
and
ero
sion
cont
rol
•Pr
oduc
e an
d im
plem
ent
a st
rate
gy fo
r co
ntro
lling
bur
row
ing
anim
als
in t
he S
tone
heng
ean
d A
vebu
ry W
HS
•D
eliv
er s
chem
es t
arge
ting
impr
ovem
ents
for
arch
aeol
ogy,
acc
ess
and
land
scap
e
122 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
10 y
ears
Ong
oing
In-h
ouse
In-h
ouse
FOA
M
NT
, LO
RSP
B, N
T, L
O,
Po
licy
3eW
here
app
ropr
iate
, deg
rade
d an
d ot
her
arch
aeol
ogic
al fe
atur
es w
ithin
the
WH
S sh
ould
be
cons
erve
d an
d/or
mad
e m
ore
visib
le w
ithou
t de
trac
ting
from
the
ir in
trin
sic fo
rm o
rch
arac
ter.
•En
hanc
e th
e vi
sibili
ty o
f the
Sto
nehe
nge
Ave
nue,
the
Cur
sus
and
Dur
ringt
on W
alls
Ave
nue
thro
ugh
sust
aina
ble
and
appr
opria
te m
etho
ds
•C
ontin
ue a
nd e
xten
d sc
rub
cont
rol,
rem
oval
of f
ence
s w
here
pos
sible
and
mon
itore
dgr
azin
g fo
r ba
rrow
gro
ups
on la
nd c
onve
rted
to
past
ure,
with
app
ropr
iate
con
trol
s of
burr
owin
g an
imal
s
5 ye
ars
5 ye
ars
5 ye
ars
Ong
oing
10 y
ears
5 ye
ars
5 ye
ars
Maj
or c
osts
Maj
or c
osts
Maj
or c
osts
Add
ition
alca
pita
l
Add
ition
alca
pita
l
In-h
ouse
In-h
ouse
HA
NT
NT
, NW
C
EH NT
NT
NW
C, E
H
NW
C, E
H
EH
EH, N
WC
, NT
NT
, NW
C
NW
C
NW
C
Po
licy
3dT
he s
ettin
g of
visi
ble
mon
umen
ts a
nd s
ites
in t
he la
ndsc
ape
and
thei
r in
ter-
rela
tions
hips
shou
ld b
e m
aint
aine
d an
d en
hanc
ed w
ith p
artic
ular
att
entio
n gi
ven
to a
chie
ving
an
appr
opria
te la
ndsc
ape
sett
ing
for
the
mon
umen
ts a
nd a
lso t
he W
HS
itsel
f.
•C
lose
and
rem
ove
an a
ppro
pria
te le
ngth
of t
he A
344
and
rest
ore
to a
n ap
prop
riate
fini
sh
•W
hen
clos
ed, r
esto
re t
he fo
rmer
A34
4 to
gra
ss in
the
vic
inity
of t
he A
venu
e at
Ston
ehen
ge
•R
emov
e ex
istin
g ca
r pa
rk a
nd v
isito
r fa
cilit
ies,
reta
inin
g m
inim
al fa
cilit
ies
for
oper
atio
nal
and
secu
rity
need
s, lin
ked
to p
rovi
sion
of n
ew v
isito
r fa
cilit
ies
else
whe
re.
•R
emov
e fe
nces
whe
re p
ossib
le a
nd a
ppro
pria
te, w
hen
they
are
not
nee
ded
for
secu
rity
orst
ock-
cont
rol,
and
repl
ace
wor
n-ou
t fe
nces
whi
ch a
re s
till n
eede
d
•R
eloc
ate
the
Woo
dhen
ge c
ar p
ark
furt
her
away
from
the
mon
umen
t an
d fr
omD
urrin
gton
Wal
ls to
an
appr
opria
te n
ew lo
catio
n
•U
nder
take
stu
dy in
to r
emov
ing
form
er r
oad
cros
sing
Dur
ringt
on W
alls
•R
emov
ing
the
scru
b al
ong
the
line
of t
hat
rout
e
Stonehenge World Heritage Site Management Plan 2009 123Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
In-h
ouse
LO, S
WH
S,EH
, NW
CN
T, F
CP
olic
y 3h
Woo
dlan
d m
anag
emen
t in
the
WH
S sh
ould
be
revi
ewed
tak
ing
into
acc
ount
the
OU
V o
fth
e Si
te a
nd it
s ec
olog
ical
and
land
scap
e va
lues
.
•T
he W
HS
Woo
dlan
d St
rate
gy s
houl
d be
com
plet
ed.
5 ye
ars
In-h
ouse
In-h
ouse
In-h
ouse
SWH
SN
E, R
SPB,
NT
,LO SW
HS
SWH
S
Po
licy
3gT
he o
vera
ll na
ture
con
serv
atio
n va
lue
of t
he W
HS
shou
ld b
e m
aint
aine
d an
d en
hanc
ed, i
npa
rtic
ular
by
mai
ntai
ning
and
impr
ovin
g th
e bi
odiv
ersit
y of
per
man
ent
gras
sland
incl
udin
g th
eex
istin
g lim
ited
area
s of
flor
istic
ally
ric
h ch
alk
dow
nlan
d tu
rf, l
eadi
ng t
o gr
eate
r di
vers
ity n
otju
st o
f pla
nts
but
also
of o
ther
wild
life
incl
udin
g bi
rds
and
inve
rteb
rate
s.
•M
aint
ain
the
exist
ing
area
s of
flor
istic
ally
ric
h ch
alk
gras
sland
•Im
prov
e th
e bi
odiv
ersit
y of
exi
stin
g gr
assla
nd t
hrou
gh e
xten
sive
graz
ing
and
othe
rap
prop
riate
met
hods
•En
cour
age
recr
eatio
n of
flor
istic
ally
ric
h ch
alk
gras
sland
•C
ontin
ue t
o pr
otec
t an
d en
cour
age
prot
ecte
d sp
ecie
s su
ch a
s st
one-
curle
ws
thro
ugh
appr
opria
te m
anag
emen
t an
d im
plem
ent
the
ston
e-cu
rlew
str
ateg
y
•C
ontin
ue m
onito
ring
on R
SPB
and
NT
land
and
con
sider
ext
endi
ng t
his
to o
ther
priv
atel
yow
ned
land
•C
olla
te t
he e
nviro
nmen
tal d
ata
avai
labl
e in
to a
map
of t
he e
colo
gica
l val
ue o
f the
WH
S to
be a
lso a
vaila
ble
on t
he S
tone
heng
e G
IS
•C
reat
e a
wor
king
gro
up o
n N
atur
e C
onse
rvat
ion
to p
rom
ote
a co
-ord
inat
ed a
ppro
ach
5 ye
ars
Add
ition
alco
sts
SWH
SLO
, NT
, NE
Po
licy
3fIn
the
man
agem
ent
of la
nd in
the
futu
re, e
xist
ing
area
s of
per
man
ent
gras
sland
sho
uld
bem
aint
aine
d, e
nhan
ced
and
thos
e ar
eas
exte
nded
whe
re a
ppro
pria
te.
124 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
SU
ST
AIN
AB
LE
TO
UR
ISM
AN
D V
ISIT
OR
MA
NA
GE
ME
NT
A
im 4
To
in
terp
ret
the
OU
V o
f th
e w
ho
le W
HS
, to
in
crea
se u
nd
erst
and
ing
and
co
nse
rvat
ion
of
the
cult
ura
l as
sets
, to
ack
no
wle
dge
an
dta
ke i
nto
acc
ou
nt
its
spir
itu
al a
nd
rel
igio
us
sign
ific
ance
fo
r so
me,
an
d t
o p
rom
ote
th
e im
po
rtan
ce o
f th
e h
erit
age
reso
urc
es f
or
pu
blic
en
joym
ent,
ed
uca
tio
n a
nd
res
earc
h.
5 ye
ars
and
ongo
ing
Exist
ing
staf
fEH
& N
TP
olic
y 4a
Man
agem
ent
of v
isito
rs t
o th
e W
HS
shou
ld b
e ex
empl
ary
and
follo
w r
elev
ant
natio
nal a
ndin
tern
atio
nal g
uida
nce
on s
usta
inab
le t
ouris
m.
5 ye
ars
Add
ition
alca
pita
lSW
HS
Po
licy
3mU
nder
take
a H
istor
ic L
ands
cape
Cha
ract
er A
sses
smen
t of
the
WH
S
5 ye
ars
Exist
ing
staf
fEH
, SW
HS
Po
licy
3lEx
plor
e w
ith t
he lo
cal a
utho
rity
the
poss
ibili
ty o
f add
ress
ing
the
issue
of l
ight
pol
lutio
n in
the
Loca
l Dev
elop
men
t Fr
amew
ork
5 ye
ars
Spec
ialis
tad
vice
NT
SWH
SP
olic
y 3k
A s
tudy
of t
he p
ossib
le im
pact
s of
clim
ate
chan
ge s
houl
d be
car
ried
out
and
appr
opria
tead
apta
tion
stra
tegi
es id
entif
ied.
Ong
oing
Exist
ing
staf
fSW
HS
EHP
olic
y 3j
Risk
man
agem
ent
stra
tegi
es s
houl
d be
kep
t un
der
revi
ew a
nd u
pdat
ed a
s ne
cess
ary.
5 ye
ars
10 y
ears
5 ye
ars
Ong
oing
Add
ition
alca
pita
lIn
hou
se
In-h
ouse
Add
ition
alca
pita
l
MO
D, D
E, L
O
MO
D
HA
, MO
D, D
E,N
WC
EH, N
WC
, NT
Po
licy
3iW
here
opp
ortu
nitie
s ar
ise, t
he v
isual
inte
grity
of t
he W
HS
land
scap
e sh
ould
be
impr
oved
by
the
rem
oval
or
scre
enin
g of
exi
stin
g in
appr
opria
te s
truc
ture
s
•Se
ek o
ppor
tuni
ties
to r
emov
e or
scr
een
intr
usiv
e bu
ilt fe
atur
es a
t La
rkhi
ll an
d el
sew
here
•Se
ek o
ppor
tuni
ties
to r
e-ro
ute
som
e m
ilita
ry fl
ight
s in
the
futu
re, i
n pa
rtic
ular
the
helic
opte
r ro
ute
alon
g th
e C
ursu
s
•Se
ek t
o m
inim
ise li
ght
pollu
tion
in t
he W
HS
from
sou
rces
insid
e an
d ou
tsid
e th
e W
HS
•R
emov
e fe
nces
whe
re p
ossib
le a
nd a
ppro
pria
te, w
hen
they
are
not
nee
ded
for
secu
rity
orst
ock-
cont
rol,
and
repl
ace
wor
n-ou
t fe
nces
whi
ch a
re s
till n
eede
d
Stonehenge World Heritage Site Management Plan 2009 125Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
Exist
ing
staf
fan
d so
me
addi
tiona
lca
pita
l
EHN
T, R
SPB,
LO
Po
licy
4dA
cces
s an
d ci
rcul
atio
n to
key
arc
haeo
logi
cal s
ites
with
in t
he W
HS
land
scap
e sh
ould
be
enco
urag
ed (
taki
ng in
to a
ccou
nt a
rcha
eolo
gica
l and
eco
logi
cal n
eeds
) to
incr
ease
pub
licaw
aren
ess
and
enjo
ymen
t.
•D
evel
op c
ircul
ar r
oute
s lin
king
arc
haeo
logi
cal s
ites
for
wal
kers
and
cyc
lists
•D
evel
op g
uide
d to
urs
of t
he W
HS
•C
ontin
ue N
T p
olic
y of
pro
vidi
ng o
pen
acce
ss t
o its
land
rev
erte
d to
pas
ture
•C
ontin
ue R
SPB
esco
rted
visi
ts o
n its
nat
ure
rese
rve
•Pu
t in
pla
ce W
HS
signs
at
key
sites
on
the
mod
el o
f the
Dur
ringt
on W
alls
info
rmat
ion
pane
l
•R
evie
w v
isito
r ca
r pa
rkin
g sit
uatio
n in
the
WH
S an
d de
velo
p a
new
pol
icy
5 ye
ars
and
ongo
ing
Exist
ing
staf
fSW
HS
NT
, LO
Po
licy
4cA
ppro
pria
te a
rran
gem
ents
for
man
aged
ope
n ac
cess
on
foot
with
in t
he W
HS
shou
ld b
epr
ovid
ed w
ith a
tten
tion
to a
void
ing
eros
ion,
whi
le m
aint
aini
ng a
nd im
prov
ing
exist
ing
leve
lsof
acc
ess.
5 ye
ars
Add
ition
alca
pita
lEH
, SW
HS,
AW
HS,
VW
NW
C,
SDM
, NT
, NE
Po
licy
4bT
he e
cono
mic
ben
efits
of t
ouris
m t
o St
oneh
enge
and
the
WH
S sh
ould
be
spre
ad t
o th
ew
ider
are
a.
•N
ew v
isito
r fa
cilit
ies
shou
ld li
nk u
p w
ith a
nd r
aise
aw
aren
ess
of t
he w
ider
are
a
•D
evel
op c
olla
bora
tion
with
the
Ave
bury
, Sal
isbur
y an
d D
eviz
es m
useu
ms
•Li
aise
with
the
oth
er r
egio
nal a
ttra
ctio
ns in
vie
w o
f the
Cul
tura
l Oly
mpi
ad
•Ex
plor
e op
port
uniti
es t
o us
e lo
cal p
rodu
cts
•Ex
plor
e op
port
uniti
es t
o pr
omot
e gr
een
trav
el li
nks
betw
een
Ston
ehen
ge a
nd A
vebu
ry
•Ex
plor
e op
port
uniti
es o
f pro
mot
ing
acce
ss t
o na
ture
•Ex
plor
e lin
ks w
ith V
isit
Wilt
shire
tou
rism
str
ateg
y
126 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
Exist
ing
staf
fan
d so
me
addi
tiona
lca
pita
l
SDM
, NW
C,
RSP
B, N
EEH
, NT
, SW
HS
RSP
B, N
T
Po
licy
4fIn
terp
reta
tion
both
on
and
off s
ite s
houl
d be
impr
oved
to
enha
nce
visit
or e
njoy
men
t an
dap
prec
iatio
n of
Sto
nehe
nge
and
the
who
le o
f the
WH
S.
•C
ompl
ete
the
WH
S in
terp
reta
tion
and
lear
ning
str
ateg
y
•Im
prov
e th
e St
oneh
enge
web
site
and
prov
ide
links
to
all p
artn
ers
•Im
prov
e th
e in
terp
reta
tion
of W
oodh
enge
and
Dur
ringt
on W
alls
•Pr
oduc
e a
Ston
ehen
ge W
HS
new
slett
er fo
r lo
cal h
ouse
hold
s an
d in
tere
sted
par
ties
•Pr
oduc
e an
info
rmat
ion
pack
for
all W
HS
land
owne
rs a
nd h
ouse
hold
ers
•C
ontin
ue p
rese
ntat
ions
on
the
Ston
ehen
ge W
HS
to lo
cal,
natio
nal a
nd in
tern
atio
nal
audi
ence
s
•Ex
plor
e th
e fe
asib
ility
of a
n ac
cred
ited
trai
ning
cou
rse
for
guid
es o
n th
e St
oneh
enge
WH
Sin
par
tner
ship
with
the
tou
rist/
Blu
e Ba
dge
guid
es a
ssoc
iatio
n
•Pr
oduc
e a
guid
e on
bird
s an
d ot
her
wild
life
in t
he W
HS
to e
nhan
ce t
he v
isito
rex
perie
nce.
•D
evel
op a
bra
ndin
g an
d sig
nage
str
ateg
y fo
r th
e vi
sitor
faci
litie
s an
d th
e w
hole
WH
S,in
clud
ing
road
sig
ns a
t th
e en
tran
ces
of t
he W
HS
5 ye
ars
Con
tinue
curr
ent
regi
me
NT
, WC
,N
WC
EHP
olic
y 4e
Arr
ange
men
ts s
houl
d be
mai
ntai
ned
for
spec
ial a
cces
s at
sig
nific
ant
occa
sions
incl
udin
gso
lstic
es, a
nd fo
r st
one
circ
le a
cces
s ou
tsid
e op
enin
g ho
urs
for
smal
l gro
ups.
Stonehenge World Heritage Site Management Plan 2009 127Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
and
ongo
ing
In-h
ouse
All
NT
, RSP
B,FO
AM
, SW
HS
SWH
S
All
SWH
S, A
WH
S
EH NT
NT
Po
licy
4hPr
omot
e co
mm
unity
invo
lvem
ent
in t
he S
tone
heng
e W
HS
•C
ontin
ue t
o de
velo
p vo
lunt
eerin
g op
port
uniti
es in
the
WH
S th
roug
h th
e N
T, t
he R
SPB
and
FOA
M a
nd o
ther
loca
l arc
haeo
logi
cal g
roup
s
•In
the
long
-ter
m, c
onsid
er s
ettin
g up
a t
eam
of l
ocal
vol
unte
er w
arde
ns fo
r th
e W
HS
•St
reng
then
link
s w
ith t
he lo
cal c
omm
unity
and
enc
oura
ge a
sen
se o
f cus
todi
ansh
ip
•C
onsid
er a
spe
cific
WH
S ev
ent
for
the
loca
l com
mun
ity o
rgan
ised
join
tly w
ith A
vebu
ry
•M
aint
ain
free
ent
ry t
o St
oneh
enge
for
loca
l res
iden
ts a
nd p
rom
ote
it m
ore
proa
ctiv
ely
•C
ontin
ue N
atio
nal T
rust
gua
rdia
nshi
p in
itiat
ive
•Fu
rthe
r de
velo
p vo
lunt
eer
and
com
mun
ity p
roje
cts
in t
he m
anag
emen
t of
cop
pice
woo
dlan
ds
5 ye
ars
In-h
ouse
SDM
EH, N
T, S
WH
S
EH
Po
licy
4gD
evel
op le
arni
ng o
ppor
tuni
ties
in t
he S
tone
heng
e W
HS.
•M
aint
ain
free
ent
ry t
o St
oneh
enge
to
scho
ol g
roup
s an
d fr
ee e
duca
tiona
l res
ourc
es
on t
he w
eb
•C
ondu
ct a
sur
vey
of t
he v
ario
us e
duca
tion
grou
ps u
sing
the
WH
S
•Pr
ovid
e ed
ucat
iona
l res
ourc
es a
dapt
ed t
o th
e va
rious
pub
lics
•In
crea
se t
he n
umbe
r of
edu
catio
n vi
sitor
s
•C
ontin
ue t
he S
tone
heng
e an
d A
vebu
ry W
HS
Lear
ning
and
Out
reac
h G
roup
, and
rev
iew
and
impl
emen
t th
e Le
arni
ng a
nd O
utre
ach
Plan
128 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
In-h
ouse
EH, P
ublic
Tra
nspo
rtop
erat
ors,
Net
wor
k R
ail
NW
C, W
C,
HA
Po
licy
5aM
easu
res
shou
ld b
e id
entif
ied
and
impl
emen
ted
to r
educ
e th
e im
pact
s of
roa
ds a
nd t
raffi
cw
ithin
the
WH
S an
d to
impr
ove
road
saf
ety
SU
ST
AIN
AB
LE
TR
AF
FIC
MA
NA
GE
ME
NT
AN
D T
RA
NS
PO
RT
AT
ION
A
im 5
To
red
uce
th
e im
pac
ts o
f ro
ads
and
tra
ffic
on
th
e O
UV
of
the
WH
S a
nd
to
im
pro
ve s
ust
ain
able
acc
ess
to t
he
Sit
e.
5 ye
ars
Maj
or c
osts
NW
C, H
A,
LO, N
T,
DC
MS,
NE,
DfT
EHP
olic
y 4j
Con
stru
ct im
prov
ed in
terim
visi
tor
faci
litie
s in
kee
ping
with
the
WH
S by
ear
ly 2
012
•Bu
ild n
ew v
isito
r fa
cilit
ies,
incl
udin
g ca
r pa
rkin
g, e
xhib
ition
spa
ce, i
ndoo
r ca
fé a
ndin
terp
reta
tion
faci
litie
s
•En
sure
tha
t th
e ne
w fa
cilit
ies
are
envi
ronm
enta
lly-fr
iend
ly a
nd fo
llow
the
prin
cipl
es o
fsu
stai
nabl
e to
urism
•Pr
ovid
e su
stai
nabl
e tr
ansp
ort
and/
or p
edes
tria
n ac
cess
from
the
new
visi
tor
faci
litie
s to
Ston
ehen
ge w
ith m
inim
al im
pact
on
the
WH
S
•Pr
ovid
e m
inim
um fa
cilit
ies
requ
ired
for
secu
rity
and
oper
atio
ns a
t St
oneh
enge
mon
umen
t
5 ye
ars
In-h
ouse
EHD
CM
SU
KNC
Po
licy
4iEx
plor
e th
e op
port
uniti
es fo
r ut
ilisin
g th
e St
oneh
enge
WH
S to
mee
t th
e w
ider
obj
ectiv
es o
fU
NES
CO
and
the
UK
gove
rnm
ent
Stonehenge World Heritage Site Management Plan 2009 129Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
5 ye
ars
Add
ition
alco
sts
SWH
S
EH, N
T
Sust
rans
NW
C
EH EH NW
C
NW
C
Po
licy
5dM
easu
res
shou
ld b
e ta
ken
thro
ugh
an e
xem
plar
y G
reen
Tra
vel P
lan
to e
ncou
rage
acc
ess
toth
e Si
te o
ther
tha
n by
car
.
•D
evel
op a
Gre
en T
rans
port
Pla
n fo
r th
e w
hole
WH
S
•D
ecre
ase
the
% o
f visi
tors
arr
ivin
g at
Sto
nehe
nge
by c
ar
•Pr
oduc
e a
sust
aina
ble
tran
spor
t pl
an fo
r th
e ne
w v
isito
r fa
cilit
ies
cove
ring
acce
ss t
o an
dw
ithin
the
WH
S
•In
crea
se a
nd p
rom
ote
publ
ic t
rans
port
to
Ston
ehen
ge a
nd t
he W
HS,
in p
artic
ular
bus
link
sfr
om S
alisb
ury
trai
n st
atio
n
•En
cour
age
cycl
ing
in t
he W
HS
and
long
dist
ance
cyc
ling
rout
es
5 ye
ars
In-h
ouse
EH, N
T,
RO
WU
NW
CP
olic
y 5c
Veh
icul
ar a
cces
s to
Byw
ays
with
in t
he W
HS
shou
ld b
e re
stric
ted
apar
t fr
om a
cces
s fo
rem
erge
ncy,
ope
ratio
nal a
nd fa
rm v
ehic
les
•Pu
t in
pla
ce a
Tra
ffic
Reg
ulat
ion
Ord
er o
r re
gula
te t
raffi
c by
oth
er m
eans
•In
stal
l gat
es r
estr
ictin
g m
otor
ised
traf
fic b
ut a
llow
ing
acce
ss t
o cy
clist
s, ho
rse-
rider
s an
dho
rse-
draw
n ca
rria
ges
5 ye
ars
Maj
or c
osts
EH, R
OW
UH
A, N
WC
Po
licy
5bPr
opos
als
shou
ld b
e de
velo
ped,
ass
esse
d an
d im
plem
ente
d, if
pra
ctic
able
, for
the
clo
sure
of
the
A30
3/ A
344
junc
tion,
of t
he A
344
betw
een
the
junc
tion
and
the
curr
ent
visit
or c
entr
esit
e, a
nd fo
r th
e cl
osur
e an
d/or
res
tric
ted
acce
ss o
n th
e re
mai
nder
of t
he A
344
up t
oA
irman
’s C
orne
r, de
pend
ing
on t
he lo
catio
n of
new
visi
tor
faci
litie
s..
•C
lose
the
A30
3/ A
344
junc
tion
•G
rass
ove
r th
e be
d of
the
dec
omm
issio
ned
A34
4 be
twee
n th
e A
303
junc
tion
and
the
curr
ent
visit
or c
entr
e sit
e
•R
estr
ict
mot
orise
d ve
hicu
lar
acce
ss o
n th
e re
mai
nder
of t
he A
344
•R
evie
w a
cces
s to
Sto
nehe
nge
by n
on-m
otor
ised
traf
fic u
sing
RO
Ws
(cro
ssin
g th
e A
303
isa
safe
ty is
sue)
130 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
Ong
oing
In-h
ouse
NT
, RSP
BP
olic
y 6d
Oth
er t
ypes
of n
on-d
estr
uctiv
e re
sear
ch, s
uch
as t
he a
sses
smen
t of
bio
dive
rsity
, sho
uld
beun
dert
aken
as
appr
opria
te.
5 ye
ars
Som
e ex
tra
EH s
taffi
ngne
eded
AA
HR
GEH
Po
licy
6cA
new
arc
haeo
logi
cal g
roup
sho
uld
be s
et u
p to
adv
ise o
n ar
chae
olog
ical
res
earc
h in
to a
ndw
ithin
the
WH
S. T
his
grou
p sh
ould
hav
e fo
rmal
link
s w
ith t
he A
vebu
ry A
rcha
eolo
gica
l and
Hist
oric
al R
esea
rch
Gro
up.
•T
his
new
Sto
nehe
nge
Arc
haeo
logi
cal P
anel
sho
uld
cons
ider
and
adv
ise o
n re
sear
ch in
the
WH
S, in
clud
ing
an a
sses
smen
t of
the
impl
icat
ions
of r
ecen
t re
sear
ch, a
nd t
he n
eed
for
any
revi
sed
rese
arch
obj
ectiv
es.
5 ye
ars
In-h
ouse
NW
C, E
HSD
MP
olic
y 6b
A r
evie
w o
f the
cur
rent
arc
haeo
logi
cal a
rchi
ving
faci
litie
s sh
ould
be
unde
rtak
en w
ith t
he a
imof
sec
urin
g a
long
-ter
m s
tora
ge fa
cilit
y fo
r su
ch a
rchi
ves.
5 ye
ars
Som
e ex
tra
EH s
taffi
ngne
eded
EH, N
SAG
EH, N
SAG
SWH
S
Po
licy
6aSu
stai
nabl
e ar
chae
olog
ical
res
earc
h in
to a
nd w
ithin
the
Sto
nehe
nge
WH
S sh
ould
be
enco
urag
ed, a
nd s
houl
d be
of t
he h
ighe
st q
ualit
y.
•Pr
ojec
ts s
houl
d co
nsid
er t
he p
ublis
hed
Ston
ehen
ge R
esea
rch
Fram
ewor
k
•En
cour
age
diss
emin
atio
n of
the
res
ults
of r
esea
rch
to m
anag
ers
and
the
gene
ral p
ublic
•Pu
blish
on
the
Ston
ehen
ge w
ebsit
e th
e m
ain
agre
ed p
riorit
ies
for
rese
arch
5 ye
ars
Exist
ing
staf
fU
nive
rsiti
es
and
othe
rre
sear
cher
s,SD
M,N
T,
NW
C,
AA
HR
G
EH, N
SAG
RE
SE
AR
CH
OB
JEC
TIV
ES
Aim
6S
ust
ain
able
res
earc
h s
ho
uld
be
enco
ura
ged
an
d p
rom
ote
d t
o i
mp
rove
un
der
stan
din
g o
f th
e ar
chae
olo
gica
l, h
isto
ric
and
en
viro
nm
enta
l va
lue
of
the
WH
S n
eces
sary
fo
r it
s ap
pro
pri
ate
man
agem
ent.
Stonehenge World Heritage Site Management Plan 2009 131Part 4 – Implementing the Plan
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
In-h
ouse
SWH
SP
olic
y 8a
Coo
rdin
ate
the
impl
emen
tatio
n of
the
Man
agem
ent
Plan
and
liai
se w
ith p
artn
ers
to m
aint
ain
and
enha
nce
the
pres
ent
part
ners
hip
appr
oach
•R
evie
w p
rogr
ess
& p
riorit
ies
ever
y ye
ar
•Pr
oduc
e a
repo
rt o
n pr
ogre
ss &
prio
ritie
s ev
ery
3 ye
ars
•St
reng
then
link
s w
ith A
vebu
ry t
hrou
gh fa
cilit
atin
g jo
int
proj
ects
•R
evie
w a
nd r
ewrit
e th
e M
anag
emen
t Pl
an e
very
6 y
ears
•D
evel
op li
nks
and
exch
ange
of b
est
prac
tice
with
oth
er W
HSs
in t
he U
K an
d el
sew
here
MA
NA
GE
ME
NT
, L
IAIS
ON
AN
D M
ON
ITO
RIN
GA
im 8
Pro
vid
e ad
equ
ate
reso
urc
es f
or
the
man
agem
ent,
co
nse
rvat
ion
an
dm
on
ito
rin
g o
f th
e W
HS
Ong
oing
Maj
or c
osts
for
the
new
wor
ks
NT
DC
MS,
DfT
,EH
, HA
Po
licy
7aT
he e
vent
ual a
chie
vem
ent
of t
he lo
ng t
erm
obj
ectiv
es fo
r re
duci
ng t
he im
pact
of t
he A
303
and
the
crea
tion
of a
per
man
ent
wor
ld c
lass
visi
tor
cent
re s
houl
d be
kep
t un
der
revi
ewdu
ring
the
lifet
ime
of t
his
Plan
Th
e lo
ng-
term
ob
ject
ives
fo
r re
du
cin
g th
e im
pac
t o
f th
e A
303
wit
hin
th
e A
im 7
WH
S,
and
th
e cr
eati
on
of
a p
erm
anen
t w
orl
d c
lass
vis
ito
r ce
ntr
e sh
ou
ld b
eke
pt
un
der
rev
iew
.
Aim
s, P
olic
ies
and
Act
ion
sS
take
ho
lder
(s)
Key
Res
ou
rces
Tim
e
resp
on
sib
leP
artn
ers
nee
ded
scal
e
for
del
iver
y
Ong
oing
In-h
ouse
AW
HS
SWH
SP
olic
y 8d
Ensu
re r
egul
ar m
onito
ring
of t
he W
HS
•R
evise
as
appr
opria
te t
he W
HS
mon
itorin
g in
dica
tors
in li
ne w
ith a
ttrib
utes
of O
UV
and
ensu
re t
he W
HS
part
ners
put
the
m in
pla
ce p
rogr
essiv
ely
•Pr
oduc
e th
e U
NES
CO
per
iodi
c re
port
eve
ry 6
yea
rs jo
intly
with
Ave
bury
•C
ontin
ue t
o de
velo
p th
e St
oneh
enge
GIS
Ong
oing
Add
ition
alco
sts
In-h
ouse
EH, N
T, N
WC
SWH
S
Po
licy
8cSe
ek a
dequ
ate
fund
ing
for
the
WH
S
•Ke
y st
akeh
olde
rs t
o pr
ovid
e lo
ng-t
erm
fund
ing
for
the
WH
S
•M
axim
ise fu
ndin
g fo
r th
e W
HS
from
all
sour
ces
5 ye
ars
In-h
ouse
SWH
SP
olic
y 8b
Rev
iew
the
gov
erna
nce
of t
he W
HS,
incl
udin
g th
e co
mpo
sitio
n an
d te
rms
of r
efer
ence
of
the
WH
S C
omm
ittee
and
the
Adv
isory
For
um
132 Stonehenge World Heritage Site Management Plan 2009Part 4 – Implementing the Plan
Bibliography
Aerial view of the Winterbourne Stoke Barrow group with Neolithic long barrow top rightRoger Featherstone 1993 © English Heritage Photo library N930001
Bibliography
Aerial view of the Winterbourne Stoke Barrow group with Neolithic long barrow top rightRoger Featherstone 1993 © English Heritage Photo library N930001
BIBLIOGRAPHY
Listed below are documents specifically cited in the text of thisManagement Plan. Further key publications will be found inAppendix I.
AAHRG. 2001. Archaeological Research Agenda for the AveburyWorld Heritage Site. Wessex Archaeology, for the AveburyArchaeological and Historical Research Group.
Anon. 2002. Principles for Undertaking Archaeological Work inthe Stonehenge WHS. Unpublished typescript prepared byEnglish Heritage, the Highways Agency, the National Trust andWiltshire County Council, January 2002.
Cathersides, A. 2001. ‘Stonehenge – restoration of grasslandsetting’, Conservation Bulletin, March 2001, 34. EnglishHeritage.
Chippendale, C. 2004. Stonehenge Complete (revised edn).Thames and Hudson.
Cleal, R.M.J.,Walker, K.E., and Montague, R. 1995. Stonehengeand its Landscape:Twentieth Century Excavation. EnglishHeritage Archaeological Reports, 10. English Heritage.
CLG. 2006a. Preparing Community Strategies: GovernmentAdvice to Local Authorities, Department for Communities and Local Government.
CLG. 2006b. Good Practice on Planning for Tourism.Department for Communites and Local Government.
Darvill,T. (ed). 2005. Stonehenge World Heritage Site: AnArchaeological Research Framework. English Heritage andBournemouth University.
Darvill,T. 2006. Stonehenge:The Biography of a Landscape.Tempus.
DCMS. 2007. Ministerial Statement by the Minister forCulture, Hansard, 18 December 2007, Debate onStonehenge, column 221WH.
Department for Transport. 2007.Written MinisterialStatement to Parliament on the A303 StonehengeImprovement Scheme, Hansard, 6 December 2007.
DTLR. 2001. Regional Planning Guidance for the South West(RPG 10). The Stationery Office.
English Heritage. 2000a. Stonehenge World Heritage SiteManagement Plan. English Heritage.
English Heritage. 2000b. Stonehenge World Heritage SiteManagement Plan: Summary. English Heritage.
English Heritage. 2002. Sustainable Access and InterpretationPrinciples for the Stonehenge WHS, July 2002. Unpublishedreport.
English Heritage. 2008. Conservation Principles: Policies andGuidance for the Sustainable Management of the HistoricEnvironment. English Heritage.
English Heritage (forthcoming). An Interpretation and LearningPlan for Stonehenge.
English Heritage and National Trust. 2006. StonehengeLearning Plan (Version 8). Unpublished report, 16 February2006.
Exon, S., Gaffney,V.,Woodward, A. and Yorston, R. 2000.Stonehenge Landscapes: Journeys through Real and ImaginedWorlds. Archaeopress.
ICOMOS. 1999. International Cultural Tourism Charter.ICOMOS.
National Trust. 2001. Stonehenge Land Use Plan 2001–2006.National Trust.
ODPM. 2003. Policy Planning Statement 1: DeliveringSustainable Development. ODPM.
Parker Pearson, M. et al. 2007a. ‘The age of Stonehenge’.Antiquity. 81, 617–39.
Planning Inspectorate. 2005. Inspector’s Report on the PublicInquiry into the A303 Stonehenge Improvement. PlanningInspectorate.
Pomeroy-Kellinger, M. 2005. Avebury World Heritage SiteManagement Plan 2005. English Heritage.
Richards, J. 2005. Stonehenge. English Heritage guidebooks,English Heritage.
Richards, J. 2007. Stonehenge:The Story so Far. English Heritage.
RSPB. 2005. Stonehenge World Heritage Site Breeding BirdsSurvey. Unpublished report. RSPB.
RSPB. 2008. Stonehenge World Heritage Site ManagementStrategy for Stone-curlew (Burhinus oedicnemus). Unpublishedreport. RSPB.
Stonehenge World Heritage Site Management Plan 2009 135Bibliography
RSPB. 2009. Normanton Down Management Plan. Unpublishedreport. RSPB.
South West Tourism. 2003. Economic Impact of Tourism inSalisbury. (www.salisbury.gov.uk/leisure/tourism/tourism-strategy.htm)
Stovel, H. 1998. Risk Preparedness: A Management Manual forWorld Cultural Heritage. ICCROM.
UNESCO. 1972. Convention Concerning the Protection of theWorld Cultural and Natural Heritage. UNESCO.
UNESCO. 2008. Operational Guidelines for the Implementationof the World Heritage Convention. UNESCO.
Wessex Archaeology. 2003. Condition Survey and ManagementRecommendations for Archaeological Sites within the StonehengeWHS. Unpublished report. Wessex Archaeology.
136 Stonehenge World Heritage Site Management Plan 2009Bibliography
Appendices
Stonehenge in snow showing the circular ditch and the AvenueSkyskan Balloon Photography 1985 © Skyscan Balloon Photography Source: English Heritage Photo Library K850200
Appendices
Stonehenge in snow showing the circular ditch and the AvenueSkyskan Balloon Photography 1985 © Skyscan Balloon Photography Source: English Heritage Photo Library K850200
Stonehenge World Heritage Site Management Plan 2009 139Appendices
Appendix A – Membership and Terms of Reference of the Stonehenge World Heritage Site Committee
Chairman – Lady Gass
Secretariat – Isabelle Bedu, Stonehenge World Heritage Site Coordinator
Members (updated 25 November 2008)
1. Amesbury Town Council
2. Country Land and Business Association
3. Defence Estates/ Ministry of Defence
4. Department for Culture, Media and Sport
5. Durrington Parish Council
6. English Heritage
7. Natural England
8. Highways Agency
9. International Council on Monuments and Sites UK
10. National Farmers’ Union
11. National Trust
12. Royal Society for the Protection of Birds
13. Salisbury District Council
14. University of Southampton, Department of Archaeology (rep. of academic archaeology)
15. Wilsford cum Lake Parish Council/ Representative of the WHS landowners
16. Wiltshire County Council
Terms of reference (December 2000 This refers to the Implementation Group, the former name of theStonehenge WHS Committee)
The creation of the Stonehenge World Heritage Site Management Plan Implementation Group was recommended in the WorldHeritage Site Management Plan to be the body responsible for oversight of the implementation of the Plan.
Its principal functions are to:
1. Raise awareness of the significance of the World Heritage Site and its status
2. Be consulted on all significant matters related to the current and future management of the World Heritage Site
3. Co-ordinate activities as necessary within the World Heritage Site for the implementation of the Plan
4. Review and monitor the effectiveness of the Plan
5. Have the revision of the Plan as a main role.
6. Oversee the work of the Implementation Officer and Co-Ordination Unit
7. Agree annual work programmes for the implementation of the Management Plan
8. Produce annually a report on work carried out to implement the Management Plan
140 Stonehenge World Heritage Site Management Plan 2009Appendices
In order to fulfil these functions, the Implementation Group has the following specific responsibilities:
1. Clarification of roles and responsibilities within the World Heritage Site
2. Approval and oversight of the implementation programme for the Management Plan
3. Oversight and approval of the programme of the Implementation Officer
4. Approval of Annual Action Programme
5. Monitoring progress of Annual Action Programme through half-yearly progress reports on work achieved and theidentification of priorities for following year
6. Preparation of annual progress report
7. Investigation of possibilities of creating Stonehenge World Heritage Fund
8. Implementation of projects to meet objectives of Management Plan not being met by other organisations or partnershipsworking within the framework of the Plan
9. Making best use of the Stonehenge Geographical Information System, based on information provided by Wiltshire CountySMR
10. Development of Limits of Acceptable Change monitoring process
11. Monitoring the state of the World Heritage site
12. Assessing overall effectiveness of actions to achieve Plan’s objectives, and review of overall direction of Plan’s strategy andinitiatives in response to changing perceived priorities and needs
13. Formal review of Plan
The Group will be serviced by the World Heritage Site Implementation Officer (now known as the WHS Coordinator)
Stonehenge World Heritage Site Management Plan 2009 141Appendices
Appendix B – Membership and Terms of Reference of the StonehengeWorld Heritage Site Advisory Forum
Chairman – Lady Gass
Secretariat – Isabelle Bedu, Stonehenge World Heritage Site Coordinator
Members (updated 25 November 2008)
1. Ablington Farm
2. Ancient Sacred Landscape Network
3. Avebury World Heritage Site Officer
4. Boreland Farm
5. Council for British Archaeology
6. Campaign to Protect Rural England
7. Countess Road Residents’ Association
8. Defence Estates
9. Druid’s Lodge Estate
10. Forestry Commission
11. Government Office for the South West
12. Larkhill Residents’ Association
13. Manor Farm
14. Salisbury and South Wiltshire Museum
15. Shrewton Parish Council
16. Sustrans
17. Wessex Archaeology
18. West Amesbury Farms
19. Wiltshire Archaeological and Natural History Society
20. Wiltshire Police
21. Winterbourne Stoke Parish Council
All the members of the WHS Committee are also members of the Advisory Forum.
Terms of reference (December 2000)
The Stonehenge World Heritage Site Management Plan Advisory Forum is being formed to allow those bodies interested in thefuture well-being of the World Heritage Site to be kept informed of progress towards the implementation of the ManagementPlan. It will also provide them with the opportunity to comment on progress.
The Forum will be convened by the Stonehenge World Heritage Site Management Plan Implementation Group, the body of keystakeholders which is overseeing the implementation of the Plan.The Forum will meet once or twice a year. Invitations to join itwill be sent initially to all those bodies who served on the consultative group which created the Management Plan.
The Forum will be serviced by the World Heritage Site Implementation Officer (now known as the WHS Coordinator).
142 Stonehenge World Heritage Site Management Plan 2009Appendices
1.0 INTRODUCTION
The timetable for the development of theManagement Plan demonstrates the importanceattached to public consultation on the plan. Out ofa programme of only 12 months from inception toconclusion, a full three months was devoted topublic consultation. English Heritage appointedGrayling Global in June 2008 to carry out thisConsultation covering simultaneously both the draftWorld Heritage Site Management Plan and theStonehenge Environmental Improvements Project.Feedback was handled and considered separately viatwo distinct questionnaires.
The Consultation programme, from 15 July to17 October 2008, engaged with local people and keystakeholders to obtain feedback on both initiatives.This appendix outlines the activities undertaken andprovides a summary of the feedback.
2.0 DEVELOPMENT OF MATERIAL TOSUPPORT THE CONSULTATIONPROCESS
Booklet
The future of Stonehenge, a booklet covering both thedraft WHS Management Plan and the EnvironmentalImprovements Project, was prepared. This bookletincluded questionnaires on both aspects of theConsultation and was one of the main methods forfeedback. It was circulated at the launch of theConsultation, handed out at the Exhibition venuesand mailed to 14,500 households in the area ofStonehenge (postcode areas SP3 4, SP4 6, SP4 7,SP4 8, SP4 9, BA12 0). A further 800 copies weredistributed to public venues in Andover, Amesbury,Salisbury, Marlborough, Pewsey and Durringtonincluding libraries, surgeries, council offices andleisure centres. Copies were also sent to a numberof parliamentarians.
World Heritage Site Management Plan
The WHS management plan draft and its summarywere available on request in hard copy and could alsobe downloaded from the Consultation website.
Website
A Consultation website was developed(www.stonehengeconsultation.org) to make available
all the materials prepared for the Consultation. It waspossible to respond to the Consultation on-line. 2,484people visited the website and approximately 200responses were received on-line.
Consultation Hotline
An 0845 telephone line was established as theConsultation Hotline and this was publicised in all theConsultation material.
3.0 OVERVIEW OF THECONSULTATION PROCESS
The Consultation was launched at Antrobus House inAmesbury on July 15. The event was chaired by thelate Lord Sandy Bruce-Lockhart, Chairman of EnglishHeritage, and speakers included Rt. Hon. MargaretHodge MP, Culture Minister. It was preceded by apress briefing. The launch was attended by around100 guests and the consultation generated coveragein a range of media including The Guardian, SalisburyJournal, Wiltshire Gazette, Western Daily Press, BBCSouth and ITV West, BBC Countryfile, Spire FM, BBCRadio Wiltshire, British Archaeology, Salon newsletter(publication for the Society of Antiquaries of London),Planning Magazine and BBC Online.
An important part of the public consultation was anexhibition informing visitors about both theManagement Plan and the EnvironmentalImprovements Project. It was advertised on theConsultation website and in the local press. TheExhibition was displayed in Amesbury for three days,in London for three days, and Devizes for three days.It was then available on appointment in the EnglishHeritage offices in Salisbury. It was visited by 635people in the different venues.
In addition to the public exhibition, a number ofindividual meetings and site visits were held. Theseincluded briefings to the Salisbury District CouncilNorthern Area Planning Committee, SalisburyEconomic Partners, Robert Key MP, Richard Younger-Ross MP, Visit Wiltshire DMO Board, the UKNational Commission for UNESCO, Wiltshire CountyCouncil and Salisbury District Council, as well asmembers of the Stonehenge World Heritage SiteCommittee and Advisory Forum.
A small exhibition on the Stonehenge proposals wasdisplayed at the annual European Association ofArchaeologists meeting in Valletta, Malta in
Appendix C – The WHS Management Plan public consultation process
Stonehenge World Heritage Site Management Plan 2009 143Appendices
September 2008. The exhibition received interestfrom many of the 580 visitors to the meeting. Themost frequent verbal feedback from EAA memberswas that something needs to be done to improve theimmediate setting of Stonehenge. A number of EAAmembers also sent in official responses.
4.0 QUESTIONNAIRE RESPONSES
In total, 304 responses were received on the DraftWorld Heritage Management Plan. These are furtherdiscussed in the main text in the Plan. The aims of theManagement Plan were broadly supported by mostrespondees to the questionnaire.
Yes No
Q1. Do you agree with theVision for the WorldHeritage Site? 211 34
Q2. Do you support the fiveStrategic Objectives ofthe Management Plan? 235 45
Q3. Do you support theeight long-term aims? 226 52
Q4. Which, if any, of the Aim Voteseight aims should beprioritised during thelifetime of theManagement Plan? Aim 1 28
Aim 2 29Aim 3 33Aim 4 46Aim 5 85Aim 6 24Aim 7 85Aim 8 22
Q5. Are the contents ofthe Management Planbroadly acceptable? 195 27
A noteworthy element of the consultation was theconcern expressed over the A303. Despite the factthat the future of the road was not part of theConsultation, a large number of respondents referredto it. A number of respondents also raised concernsover any proposals that would restrict the useof byways.
The following stakeholders responded to theconsultation on the World Heritage Site ManagementPlan, either filling the questionnaire or sendingdetailed tracked changes to the full DraftManagement Plan:
The 304 responses were analysed by Grayling andEnglish Heritage. Additionally, the detailed responseswere set out in a table, set against the original textfrom the draft Management Plan and the proposednew text. This table was sent to all members of theAdvisory Forum to consider at the 12 Novembermeeting. After that meeting, the Management Plantext was redrafted taking into considerationcomments from the Advisory Forum, and a final draftprepared for the Stonehenge WHS Committee on15 December 2008.
Amesbury Town Council
Ancient and Sacred
Landscape Network
Association of Land Rover
Clubs
Avebury World Heritage Site
Villagers of Berwick St James
Campaign for Better
Transport and Friends of the
Earth joint response
CBA
CLA
CPRE
Prof Tim Darvill
Durrington Parish Council
English Heritage
Friends of the Ridgeway
Highways Agency
Alan Hill
ICOMOS UK
Robert Key MP
Land Access and Recreation
Association
Local Cyclists’Touring Club
National Trust
Natural England
Diane R Pringle
RAC Foundation
RSPB
Salisbury and South Wiltshire
Museum
Society of Antiquaries
Sustrans
Lord Tebbit
Trail Riders Fellowship
UK National Commission for
UNESCO
Visit Wiltshire Tourism
Partnership
Wessex Archaeology
Wiltshire Archaeological and
Natural History Society
Wiltshire County Council
Wiltshire Police
Winterbourne Stoke Parish
Council
144 Stonehenge World Heritage Site Management Plan 2009Appendices
Phase 1: initial stages
DCMS/EH write to World Heritage Site Committee (WHSC) and Advisory Forum (AF)setting out remit 11 January 2008
EH produce issues paper and draft Statement of Significance 11 January 2008
WHSC meets and agrees issues paper and Statement of Significance 18 January 2008
AF meeting/ workshop on issues 13 February 2008
Phase 2: development of first draft of plan
First draft revised plan completed 8 March 2008
First draft circulated to WHSC/ AF for comment w/c 17 March
AF Workshop on first draft 3 April
EH staff revise plan in line with comments from AF 3 - 11 April 2008
First draft amended as necessary and circulated to WHSC 14 April 2008
WHSC meeting to comment – on first draft 22 April 2008
Phase 3: development of consultation draft
EH staff revise plan in line with comments from WHSC 28 April - 9 May 2008
Consultation draft completed and circulated to WHSC/AF 9 May 2008
AF Workshop on consultation draft 22 May 2008
EH staff revise plan in line with comments from AF 22 - 30 May 2008
Consultation draft amended as necessary and circulated to WHSC 30 May 2008
WHSC signs off on consultation draft 12 June 2008
EH staff write and produce leaflet and exhibition material, and do any final changes toconsultation draft 16 - 27 June 2008
Consultation draft, leaflet, exhibition printed and are ready for circulation 30 June - 11 July 2008
Phase 4: public consultation
Launch of public consultation (13 weeks) w/c 14 July 2008
Public consultation completed 17 October 2008
EH staff analyse responses and write report 20 - 30 October 2008
Analysis of consultation responses circulated to WHSC/AF 31 October 2008
AF workshop on consultation response 12 November 2008
EH staff revise plan in line with AF comments 17 - 28 November 2008
Final draft circulated to WHSC 1 December 2008
WHSC Meeting. Considers consultation response and agrees final draft plan 15 December
EH staff prepare final plan 16 - 19 December 2008
Phase 5: final stages
Final draft submitted to DCMS for endorsement 23 December 2008
Plan published and sent to UNESCO 31 January 2009
UNESCO response received Early July 2009
Any necessary variations agreed by WHSC September 2009
5.0 TIMETABLE FOR THE REVISION OF THE MANAGEMENT PLAN
Stonehenge World Heritage Site Management Plan 2009 145Appendices
Endorsed by the Stonehenge World HeritageSite Management Plan Implementation Group,January 2002
1.0 INTRODUCTION
1.1 Stonehenge and Avebury were inscribed as a WorldHeritage Site by the World Heritage Committeebecause the Site
i. Represents a masterpiece of human creativegenius
ii. Exhibits an important interchange of humanvalues over a span of time or within a culturalarea of the world on developments inarchitecture or technology, monumental arts,town planning or landscape design
iii. Bears a unique or at least exceptionaltestimony to a cultural tradition or to acivilisation which is living or has disappeared.
1.2 A vision for the Stonehenge World Heritage Site isset out within the Stonehenge World HeritageManagement Plan (June 2000). Its implementation isbeing overseen by an Implementation Group of thekey stakeholders within the World Heritage Site.TheManagement Plan has been adopted by SalisburyDistrict Council as Supplementary Planning Guidance.It has been lodged with UNESCO.
1.3 The World Heritage Site Management Plan seeks tobalance the primary aim of protecting and enhancingthe Site’s outstanding universal significance with otherlegitimate needs especially those of he localcommunity within an overall framework ofsustainability.The Management Plan has a number ofObjectives and an Implementation Co-ordinator hasbeen appointed (July 2001).
1.4 This statement sets out principles which theImplementation Group considers should be applied toall archaeological work carried out within theStonehenge World Heritage Site. All thosecommissioning or carrying out archaeological work oradvising or approving proposals for such work areurged to follow these principles.
1.5 These principles should apply to all archaeologicalwork carried out within the Stonehenge WorldHeritage Site and take account of its outstandinguniversal significance. Although the principlesspecifically address archaeology, it is acknowledgedthat the approach must integrate with other valuesand objectives for the overall management of theWorld Heritage Site.Where appropriate theprinciples reflect the approaches developed for theAvebury World Heritage Site.
2.0 GENERAL PRINCIPLES
2.1 Any consideration of the cultural heritage of theWorld Heritage Site should be inclusive and includearchaeology from the Palaeo-environmental up to andincluding remains of the last century, Listed buildingsand Parks and Gardens and other cultural heritageremains should be given equal weight.
2.2 These principles seek to guide actions to ensure theconservation of cultural heritage assets contributing tothe outstanding universal significance of the WorldHeritage Site.
2.3 All works should be done to an appropriately highstandard that adequately reflects the importance ofthe World Heritage Site, taking on board guidanceand standards set out by ICOMOS, UNESCO at theinternational level, the Institute of Field Archaeologists,National Trust, English Heritage at the national level,and Wiltshire County Council Archaeology Service atthe regional level. (See 4.0)
2.4 Organisations and individuals undertakingarchaeological work within the World Heritage Siteshould do so within the ethical and professionalstandards on archaeology as set out in the IFA Codeof Conduct, Bylaws, Standards and PolicyStatements.(See 4.0)
2.5 Applicable Government guidelines on planning andarchaeology include PPG15 which makes specificreference to World Heritage Sites, PPG 16, GDO andthe Highways Agency DMRB volume 10 and 11.(See 4.0)
Appendix D – Statement of principles governing archaeological work in theStonehenge World Heritage Site
146 Stonehenge World Heritage Site Management Plan 2009Appendices
3.0 DETAILED PRINCIPLES
All those undertaking archaeological work in theWorld Heritage Site must:
3.1 Observe appropriate professional codes, guidance andstandards (See 4.0)
3.2 Utilise the considerable information already availablefrom prior investigations where appropriate andrelevant before commissioning any new works. Onlyundertake further surveys when the evidence fromprevious surveys has been reviewed and found to bein need of augmentation. Archaeometry investigationsand field walking of appropriate areas should beundertaken where possible before intrusiveinvestigations and excavations
3.3 Ensure that the visual character of the setting of theWorld Heritage Site as a whole, and of its componentparts, is not significantly eroded but is enhancedwhere possible
3.4 Ensure that all results are disseminated in anappropriate format for assimilation into the SMR andStonehenge World Heritage Site GIS
3.5 Consider archaeological and cultural heritage evidencefrom all periods and its contribution to theunderstanding of the Historic Landscape
3.6 Adopt a phased approach for archaeologicalassessment and mitigation, successive phases beingcomplementary in their method and the presentationof results so that the results are integrated.Duplication should be avoided
3.7 Ensure that all results are disseminated in anappropriate format so as to develop theunderstanding by the archaeological profession andthe public at large
3.8 Only undertake the minimum necessary intrusiveexcavation where it is necessary to inform researchquestions, design process or to mitigate theunavoidable effects of construction or oftemporary works
3.9 Only undertake extensive intrusive works in areaswhere it is probable that there will be a direct impactthrough development, or where there is a need toconsider management issues
3.10 Only advocate the replacement or diminution ofhistorical assets with a record where the need for thisoutweighs the need for their preservation in situ
3.11 Utilise the contribution to archaeology fromopportunities created by other works (for example,geotechnical surveys)
3.12 Ensure that sufficient information is gathered on thepresence or absence of archaeological remains toensure that informed decisions can be made aboutits management
3.13 Observe a minimum standard of surveys across theentire World Heritage Site.The scope and intensity ofsurveys may increase in particular areas, as the needfor further information becomes apparent.Thereshould be no needless degradation of thearchaeological resource through unwarranted andintrusive impacts on the Stonehenge WorldHeritage Site
3.14 Ensure that the full range of archaeological techniquesis considered and that on every occasion the mostappropriate are selected
3.15 All works whether temporary or permanent and theirimpacts on the outstanding universal significance ofthe World Heritage Site must be assessed and furtherinvestigated where necessary
3.16 All works must take account of all statutorydesignations
3.17 All works must only proceed following appropriateconsultation with English Heritage, and WiltshireCounty Council and other relevant consultees,including landowners
Stonehenge World Heritage Site Management Plan 2009 147Appendices
4.0 GUIDANCE AND STANDARDS
Association of County Archaeological Officers, ModelBriefs and Specifications for Archaeological Assessmentsand Field Evaluations, 1993
English Heritage, Management of ArchaeologicalProjects, 2nd ed., 1991
Highways Agency, Design Manual for Roads andBridges, Vols 10 and 11
Institute of Archaeologists, Codes of Conduct:
■ Code of approved practice for the regulation ofcontractual arrangements in field archaeology
■ Regulations for the registration of archaeologicalorganisations
■ Standards and guidance for archaeological desk-based assessment, field evaluation, excavation,watching briefs, investigation and recording ofstanding buildings and structures, artefact andenvironmental study, collection, research andconservation.
International Council on Monuments and Sites(ICOMOS), International Charter for ArchaeologicalHeritage Management (Lausanne Charter)
UNESCO, Guidelines for the Management of WorldCultural Heritage Sites, 1999
Wiltshire County Council, Standards for ArchaeologicalAssessment and Field evaluation in Wiltshire 1995
Authors:English HeritageHighways AgencyNational TrustWiltshire County Council
148 Stonehenge World Heritage Site Management Plan 2009Appendices
Guided by the Stonehenge WHS Committee, the key rolesof the Stonehenge WHS Coordinator are set out below:
■ Liaison with the WHS stakeholders (organisationof the WHS Committee, Advisory Forum,establishment and facilitation of working groups,liaison with partners including Avebury WHS)
■ Coordinating the implementation of the WHSManagement Plan
■ Coordinating and facilitating the delivery ofprojects set out in the WHS Action Plan(e.g. grass restoration, condition survey, educationproject, etc)
■ Monitoring the condition of the WHS (productionof UNESCO periodic report in conjunction withthe Avebury WHS Officer, and of annual reportbased on WHS monitoring indicators)
■ Revision and updating of the WHS ManagementPlan on a 6-yearly basis
■ Seeking funding for projects to assist in theimplementation of the Plan
■ Providing advice on projects and planningapplications affecting the WHS in relation toPlan policies
■ Communication and advocacy on the WHS(production of a WHS newsletter, web pages,exhibition touring local venues, media work,presentations on the Stonehenge WHS)
■ Advising on Stonehenge information andinterpretation material prepared by bodies such asEnglish Heritage, the National Trust, and localtourism organisations, to ensure that such materialmeets the objectives of the Plan
Appendix E – The role of the WHS Coordinator
Stonehenge World Heritage Site Management Plan 2009 149Appendices
10th session of the World Heritage Bureau, June1986 Consideration of Nomination(CC-86/CONF.001/11):
Stonehenge, Avebury and associated sitesUnited Kingdom C373 C(i)(ii) (iii)
The Bureau requested the United Kingdomauthorities to study possible solutions to the problemof the A 344 main road crossing the avenue atStonehenge (detour, digging of a tunnel, etc.). It wouldbe desirable for the Committee to be informed ofthe progress of these studies at its next meeting.
By a letter of 13 October 1986, the Department ofthe Environment has informed the Secretariat thatnew plans, which would enable the A 344 road to beclosed, were under preparation
10th session of the World Heritage Committee,November 1986 Inscription (CC-86/CONF. 003/10:)
Stonehenge, Avebury and associated sitesUnited Kingdom
The Committee noted with satisfaction the assurancesprovided by the authorities of the United Kingdomthat the closure of the road which crosses the avenueat Stonehenge was receiving serious consideration aspart of the overall plans for the future managementof the site.
11th session of the World Heritage Committee,November 1987 (SC-87/CONF.005/9)
In accordance with the procedure foreseen, theCommittee should draw up the list of the first fiftycultural properties which should be monitored in1988 (1).The Director of the Division of CulturalHeritage then proceeded to present those cases inwhich the Secretariat had recently intervenedconcerning World Heritage cultural properties forwhich the Secretariat had received information onthe state of conservation.The Secretariat had receivedreplies which indicated that the States had taken thenecessary measures to respond to the problemsraised. Such was the case for Angra do Heroismo inthe Azores and the Monastery of the Hieronymitesin Lisbonne, Portugal, Giza in Egypt, Auschwitz inPoland and for Cregneash and Stonehenge in theUnited Kingdom.
16th session of the World Heritage Bureau, July1992 (WHC-92/CONF.003/2:)
59.The representative of ICOMOS reported to theBureau on the cultural sites he had monitored. Amore detailed report accompanied by slideprojections will be made during the Santa Fé sessionin December 1992 for all the cases mentioned.Theproperties in question are: Kizhi Pogost (RussianFederation), Monastery of Rila (Bulgaria), Budapest(Hungary) and Stonehenge (United Kingdom).Withregard to the site of Stonehenge, the ICOMOSRepresentative mentioned the problem of touristpressure and the deviation of the road A-344. A moredetailed report will be submitted at the next sessionof the Committee at Santa Fe.
16th session of the World Heritage Committee,November 1992 (WHC-92/CONF.002/12, Item VIII)
Concerning Stonehenge, the ICOMOS representativeprovided all the details on the management of the siteas well as on the anticipated projects forimprovement, including that of a museum site.TheICOMOS recommended to the World HeritageCentre to write to the authorities in the UnitedKingdom in order to support the measuresundertaken for the management of Stonehenge.
18th session of the World Heritage Bureau, July1994 (WHC-94/CONF.001/10:)
This site which was inscribed in 1986 is threatened bythe path of the A303 motorway through the southernpart of the site. At the request of the Observer of theUnited Kingdom, a communication prepared by theconcerned authorities was brought to the attention ofthe Bureau.Two proposals for the organization of thesite will be discussed on 8 July 1994 at a meetingorganized by The English Heritage and the NationalTrust, in which the representatives of the Ministry ofTransportation and international experts willparticipate.The first foresees the construction of atunnel which would be dug under the site.The secondforesees the creation of an access bridge for visitorsat the eastern end of the site which would be linkedto an observation station on the top of the hilldominating Stonehenge.The first option is by far themost costly.
The Bureau took note of this information andexpressed the wish that a satisfactory project couldbe undertaken as soon as possible.
Appendix F – Reports and Decisions from the World Heritage Committee andBureau referring to Stonehenge
150 Stonehenge World Heritage Site Management Plan 2009Appendices
22nd session of the World Heritage Bureau,June 1998 Reports on the state of conservation ofproperties inscribed on the World Heritage List(WHC-98/CONF.201/3B:)
In response to an enquiry by the Secretariat, theDepartment for Culture, Media and Sport of theUnited Kingdom provided information on the mostrecent planning proposals for Stonehenge. It is nowproposed that a new visitor’s centre be located at‘Fargo North’, which lies to the west of the Stones,that the A344 road, which currently passes close tothe Stones, be closed and that the A303 roadbecomes a tunnel over a length of two kilometres. Itis further announced that English Heritage isconsidering to proceed with the preparation of amanagement plan for Stonehenge.
The report was transmitted to ICOMOS, which willreport its findings to the Bureau during its session.
Decision required: The Bureau, based on thereport of ICOMOS that will be presented at itssession, may recommend appropriate actions to theconsideration of the State Party and the Committee
WHC-98/CONF.201/9: Report of the Rapporteur on the 22ndsession of the Bureau of the World Heritage Committee
V.70 The Bureau expressed its satisfaction with themanagement and presentation proposals for theStonehenge World Heritage site. It stressed, however,the need for the closure of the road passing close tothe monument, foreseen when the site was inscribedon the World Heritage List in 1986 and for thecompletion of a management plan with theminimum delay.
24th session of the World Heritage Bureau, July2000 (WHC-2000/ CONF.202/17:)
IV.76 The Secretariat informed the Bureau that it hadreceived a Management Plan for the StonehengeWorld Heritage site, prepared under the direction ofthe Stonehenge World Heritage Site ManagementPlanning Group (comprising national and localorganizations) and chaired by an English HeritageCommissioner. ICOMOS congratulated theGovernment of the United Kingdom for thismanagement plan for what is a very complex site. Itrecommended that careful evaluation and assessmentbe undertaken in each stage of the process ofimplementation.The Delegate of Hungarycommended the high quality of the plan and indicatedthat Hungary was already using this plan as a model.
The Bureau congratulated the Government of theUnited Kingdom for the preparation of this high-quality management plan and took note of theintention of the Government to follow therecommendation made by ICOMOS.
25th extraordinary session of the Bureau,December 2001 (WHC.2001/ CONF.208/04)
III.207 The Bureau noted the information receivedfrom the Department for Culture, Media and Sport ofthe United Kingdom emphasizing that in order toimprove the site’s setting, the Government proposesto remove two roads from the immediate vicinity ofthe monument. In this regard, it is proposed that theA303 road run through a 2km tunnel near the stonecircle, whilst the other road (A344) should be closedand converted to grass. It is also proposed that thepresent rather poor visitor facilities and car parkshould be removed and that a new visitor centre(with car parking and interpretative facilities) shouldbe build a short distance away, outside the site.However, the Department for Culture, Media andSport underlined in its letter that all these proposalswill be subject to examination under normal planningprocedures and that full consideration will be given tothe overall archaeological and environmentalimplications. ICOMOS informed the Secretariat that itwas in full agreement with the proposals and that thecut-and-cover tunnel is a feasible project that will notcause any damage to the archaeology and theenvironment on the site.
[III.208 and III.209 omitted because they refer only tothe Avebury part of the World Heritage Site]
III.210 The Bureau noted the information transmittedby the State Party concerning the planning andprotection of the site of Stonehenge.The Bureau alsonoted the views of the State Party and ICOMOS onSilbury Hill which is part of the World Heritage site. Itrequested the State Party to work in closeconsultation with the Centre and ICOMOS regardingthe planning and protection of the site and to presenta progress report to the Bureau at its next session inApril 2002.
26th session of the World Heritage Bureau, April2002 (WHC-02/CONF.201/15)
Stonehenge, Avebury and Associated Sites(United Kingdom)
XII.108 The report submitted by the Departmentfor Culture, Media and Sports of the United Kingdominformed that management plans are in place for both
Stonehenge World Heritage Site Management Plan 2009 151Appendices
parts of the site. Concerning Stonehenge, the reportstated that an application for planning consent for thevisitor centre will be submitted during the summer of2002 while the highways consent procedure will beinitiated in December 2002. Environmental ImpactAssessments (EIA) are foreseen for both projects.[sentences concerning Silbury Hill omitted]
XII.109 The Bureau noted the informationtransmitted by the State Party concerning theplanning and the protection of the site of Stonehengeas well as the protective works carried out at SilburyHill.The Bureau congratulated the State Party for thework done on the two management plans ofStonehenge and Avebury respectively.The Bureauexpressed its satisfaction regarding the temporaryprotective works undertaken by the State Party inview of the long-term conservation of Silbury Hill.TheBureau encouraged the State Party to continue theworks in close consultation with ICOMOS and theCentre, and requested the authorities to present aprogress report in time for its next session inApril 2003.
26th session of the World Heritage Committee,June 2002 (WHC-02/ CONF.202/25, 202/2, 202/17)
The Chairperson noted the Committee’s consensuson the draft decision and declared it adopted.
The World Heritage Committee,
Takes note of the state of conservation report andthe decision of the Bureau contained in documentWHC-02/CONF.202/2, paragraph XII, 108-109.
27th session of the World Heritage Committee,July 2003 (WHC-03/27.COM/7B.82 and 7B Corr)
The World Heritage Committee,
1. Taking note of the changes made to theconstruction technique for the tunnel;
2. Welcomes the State Party’s decision to constructa bored tunnel, which is less damaging for theStonehenge, Avebury and Associated Sites WorldHeritage property than a cut-and-cover tunnel;
3. Noting that the Environmental Impact Assessmentof the road improvements to the A303 areavailable on the web site www.highways.gsi.gov.uk;
4. Requests the State Party to provide a progressreport to the World Heritage Centre by1 February 2004 in order that the World Heritage
Committee can examine the state of conservationof the property at its 28th session in 2004.
28th Session of the World Heritage Committee,July 2004 (WHC-04/28.COM/15B)
28 COM 15B.102 The World Heritage Committee,
1. Noting that the State Party did not provide aprogress report by the deadline of 1 February2004 as requested by the World HeritageCommittee at its 27th session in 2003 (Decision27 COM 7B.82), but it was only provided on7 May and its revised version on 28 May 2004;
2. Notes the progress with the A303 StonehengeImprovement Road and the proposals for a newvisitor centre;
3. Welcomes the opportunity given to the public tomake their views known in the decision makingprocess concerning the A303 road constructionthrough a Public Inquiry;
4. Requests that the Inspector’s Report of the A303Stonehenge Improvement Inquiry and details ofthe Visitor Centre planning application be providedto the World Heritage Centre;
5. Further requests the State Party to provide anupdate report by 1 February 2005 to the WorldHeritage Centre in order that the World HeritageCommittee can examine the state of conservationof the property at its 29th session in 2005.
29th Session of the World Heritage Committee,July 2007 Extract of the Decisions
The World Heritage Committee,
1. Having examined Document WHC-
05/29.COM/7B.Rev,
2. Recalling its Decision 28 COM 15B.102,adopted at its 28th session (Suzhou, 2004),
3. Expresses its concerns on the fact that noprogress in resolving the controversy over the“A303 Stonehenge Improvement” scheme hasbeen made;
4. Takes note of the planning application for thevisitor centre;
5. Requests once again that the Inspector’s Report ofthe A303 Stonehenge Improvement Inquiry be
152 Stonehenge World Heritage Site Management Plan 2009Appendices
provided to the World Heritage Centreupon publication;
6. Requests the State Party of the UnitedKingdom to provide the World Heritage Centrewith an updated report by 1 February 2007,for examination by the Committee at its31st session (2007).
31st Session of the World Heritage Committee,July 2007 Extract from the decisions (31 COM7B.104)
The World Heritage Committee,
1. Having examined Document WHC-07/31.COM/7B,
2. Recalling Decision 29 COM 7B.88, adopted atits 29th session (Durban, 2005),
3. Commends the national authorities for havingimproved the protection of archaeological sites byreversion of arable to grassland;
4. Requests the State Party to provide the WorldHeritage Centre with the approved project for thevisitor centre, and encourages the State Party toadvance the implementation of the visitor centrein order to preserve and improve the integrity ofthe property;
5. Regrets that there has been no progress made inthe implementation of the “A303 StonehengeImprovement” scheme, and urges the State Partyto find an appropriate solution compatible withthe outstanding universal value of the property;
6. Requests the State Party to provide the WorldHeritage Centre with a detailed report by1 February 2008 on progress made in theselection process of the “A303 StonehengeImprovement” scheme, for examination by theCommittee at its 32nd session in 2008.
32nd Session of the World Heritage Committee,July 2008 Extract from the decisions (32 COM7B.114 and 32 COM 8B.93)
State of Conservation Decision (32 COM 7B.114)
The World Heritage Committee,
1. Having examined Document WHC-08/32.COM/7B,
2. Recalling Decision 31 COM 7B.104, adopted atits 31st session (Christchurch, 2007),
3. Also recalling that at the time of the inscription ofthe property in 1986 the Committee noted withsatisfaction the assurances provided by theauthorities of the United Kingdom that the closureof the road which crosses the avenue atStonehenge (A344 road) was receiving seriousconsideration as part of the overall plans for thefuture management of the property;
4. Regrets that further delays have taken place inthe long overdue improvements to visitor accessto the Stonehenge part of the property, to itspresentation to visitors, and to the setting ofthe monuments;
5. Urges the State Party to address the issues abovein priority;
6. Requests the State Party to submit to the WorldHeritage Centre, by 1 February 2009, aprogress report on the closure of the road,visitor management and access, for examination bythe World Heritage Committee at its 33rd sessionin 2009.
Decision on Statement of Significance (32 COM8B.93)
The World Heritage Committee,
1. Having examined Documents WHC-08/32.COM/8B.Add and WHC-08/32.COM/INF.8B1.Add,
2. Adopts the following Statement of Significance forStonehenge, Avebury, and AssociatedSites, United Kingdom:
The Stonehenge, Avebury, and Associated SitesWorld Heritage property is internationallyimportant for its complexes of outstandingprehistoric monuments.
Stonehenge World Heritage Site Management Plan 2009 153Appendices
It comprises two areas of chalkland in SouthernBritain within which complexes of Neolithic andBronze Age ceremonial and funerary monumentsand associated sites were built. Each area containsa focal stone circle and henge and many othermajor monuments. At Stonehenge these includethe Avenue, the Cursuses, Durrington Walls,Woodhenge, and the densest concentration ofburial mounds in Britain. At Avebury, they includeWindmill Hill, the West Kennet Long Barrow, theSanctuary, Silbury Hill, the West Kennet andBeckhampton Avenues, the West Kennet PalisadedEnclosures, and important barrows.
The World Heritage property is of OutstandingUniversal Value for the following qualities:
Stonehenge is one of the most impressiveprehistoric megalithic monuments in the world onaccount of the sheer size of its megaliths, thesophistication of its concentric plan andarchitectural design, the shaping of the stones,uniquely using both Wiltshire Sarsen sandstoneand Pembroke Bluestone, and the precision withwhich it was built.
At Avebury, the massive Henge, containing thelargest prehistoric stone circle in the world, andSilbury Hill, the largest prehistoric mound inEurope, demonstrate the outstanding engineeringskills which were used to create masterpieces ofearthen and megalithic architecture.
There is an exceptional survival of prehistoricmonuments and sites within the World Heritagesite including settlements, burial grounds, and largeconstructions of earth and stone.Today, togetherwith their settings, they form landscapes withoutparallel.These complexes would have been ofmajor significance to those who created them, asis apparent by the huge investment of time andeffort they represent.They provide an insight intothe mortuary and ceremonial practices of theperiod, and are evidence of prehistoric technology,architecture, and astronomy.The careful sitingof monuments in relation to the landscape helpsus to further understand the Neolithic andBronze Age.
Criterion (i): The monuments of theStonehenge, Avebury, and Associated SitesWorld Heritage Site demonstrate outstandingcreative and technological achievements inprehistoric times.
Stonehenge is the most architecturallysophisticated prehistoric stone circle in the world.It is unrivalled in its design and unique engineering,featuring huge horizontal stone lintels capping theouter circle and the trilithons, locked together bycarefully shaped joints. It is distinguished by theunique use of two different kinds of stones(Bluestones and Sarsens), their size (the largestweighing over 40t), and the distance they weretransported (up to 240km).The sheer scale ofsome of the surrounding monuments is alsoremarkable: the Stonehenge Cursus and theAvenue are both about 3km long, whileDurrington Walls is the largest known henge inBritain, around 500m in diameter, demonstratingthe ability of prehistoric peoples to conceive,design and construct features of great sizeand complexity.
Avebury prehistoric stone circle is the largest inthe world.The encircling henge consists of a hugebank and ditch 1.3km in circumference, withinwhich 180 local, unshaped standing stones formedthe large outer and two smaller inner circles.Leading from two of its four entrances, the WestKennet and Beckhampton Avenues of parallelstanding stones still connect it with othermonuments in the landscape. Another outstandingmonument, Silbury Hill, is the largest prehistoricmound in Europe. Built around 2400 BC, it stands39.5m high and comprises half a million tonnes ofchalk.The purpose of this imposing, skilfullyengineered monument remains obscure.
Criterion (ii): The World Heritage Site providesan outstanding illustration of the evolution ofmonument construction and of the continual useand shaping of the landscape over more than2000 years, from the early Neolithic to the BronzeAge.The monuments and landscape have had anunwavering influence on architects, artists,historians, and archaeologists, and still retain a hugepotential for future research.
The megalithic and earthen monuments of theWorld Heritage Site demonstrate the shaping ofthe landscape through monument building foraround 2000 years from c 3700 BC, reflecting theimportance and wide influence of both areas.
Since the 12th century when Stonehenge wasconsidered one of the wonders of the world bythe chroniclers Henry de Huntington and Geoffreyde Monmouth, the Stonehenge and Avebury siteshave excited curiosity and been the subject ofstudy and speculation. Since early investigations by
154 Stonehenge World Heritage Site Management Plan 2009Appendices
John Aubrey, Inigo Jones, and William Stukeley, theyhave had an unwavering influence on architects,archaeologists, artists, and historians.The two partsof the World Heritage Site provide an excellentopportunity for further research.
Today, the Site has spiritual associations for some.
Criterion (iii): The complexes of monuments atStonehenge and Avebury provide an exceptionalinsight into the funerary and ceremonial practicesin Britain in the Neolithic and Bronze Age.Together with their settings and associated sites,they form landscapes without parallel.
The design, position, and inter-relationship of themonuments and sites are evidence of a wealthyand highly organised prehistoric society able toimpose its concepts on the environment. Anoutstanding example is the alignment of theStonehenge Avenue (probably a processionalroute) and Stonehenge stone circle on the axis ofthe midsummer sunrise and midwinter sunset,indicating their ceremonial and astronomicalcharacter. At Avebury the length and size of someof the features such as the West Kennet Avenue,which connects the Henge to the Sanctuary over2km away, are further evidence of this.
A profound insight into the changing mortuaryculture of the periods is provided by the use ofStonehenge as a cremation cemetery, by the WestKennet Long Barrow, the largest known Neolithicstone-chambered collective tomb in southernEngland, and by the hundreds of other burial sitesillustrating evolving funerary rites.
The State Party also proposes the revision of thebrief description as follows:
The Stonehenge, Avebury, and Associated SitesWorld Heritage Site is internationally importantfor its complexes of outstanding prehistoricmonuments. Stonehenge is the mostarchitecturally sophisticated prehistoric stone circlein the world, while Avebury is the largest in theworld.Together with inter-related monuments andtheir associated landscapes, they help us tounderstand Neolithic and Bronze Age ceremonialand mortuary practices.They demonstrate around2000 years of continuous use and monumentbuilding between c. 3700 and 1600 BC. As suchthey represent a unique embodiment of ourcollective heritage.
3. Recommends that assessment for statements ofauthenticity and integrity / statements ofprotection and management should be postponedto the 33rd session of the World HeritageCommittee (2009) awaiting adoption of amethodology and an agreed format forStatements of Outstanding Universal Value forinscribed properties.
Stonehenge World Heritage Site Management Plan 2009 155Appendices
Mesolithic. (c.10,000-4,000 BC)
Before Stonehenge was built, other substantial monumentswere created in the area and the natural environment wasdramatically altered.The sockets for four very large Mesolithicposts (c.8,000 BC) have been found on the site of thecurrent Stonehenge car park. Such evidence for our hunter-gather ancestors is exceptionally rare in Britain, and this lineof post-holes has been described as the first monument inEngland (a detailed description can be found in Darvill2006, 62-4)
Neolithic (c.4000-2000 BC)
The earliest ceremonial and funerary monuments in andaround the WHS dating from the early and middle Neolithic(4,000-3,000 BC), include about a dozen long barrows (burialmounds) and Robin Hood’s Ball, a causewayed enclosure justoutside the WHS.These monuments were built in grassland,itself created by the earlier removal of the natural ancientwoodland.The Cursus, (a long thin enclosure bounded by aditch and bank and probably used for processional uses) wasconstructed around 3,630-3,370 BC (Parker-Pearson et al2007, 14), and the now-flattened Lesser Cursus (a smallerrectangular enclosure), was also built towards the end ofthis period.
The long history of Stonehenge itself was begun around3,000 BC (Richards 2005) when a circular ditch enclosurewas dug.The antler tools which were used to construct theenclosure, are all radiocarbon-dated to 3,000 BC to 2,920BC.This henge monument, which is still visible today, had acircular chalk bank with an external causewayed ditch some110m in diameter.The principal entrance was on the north-east side and a secondary one to the south. Fifty-six circularpits, known as the ‘Aubrey Holes’ after their originaldiscoverer John Aubrey (1626-1697), were dug inside thebank, probably around this time.These once held stouttimber posts, but when these rotted or were removed,cremated human bones were placed in the resulting holes.
In the period 2,900-2,600 BC, extensive timber structureswere erected at the centre and at the entrances to thehenge. Unfortunately, this timber period of the monument’shistory is not well-understood or dated, as the later phasesof Stonehenge destroyed much of the evidence.The ditch,which had partly in-filled naturally, was back-filled in placesand cremation burials cut into the bank and ditch.
To the east, on Coneybury Hill, stood a smaller henge knownas Coneybury Henge, while to the north-east stood themassive henge enclosure of Durrington Walls (c. 2,500 BC)with the smaller Woodhenge (built around 2,300 BC) to the
south of it. Durrington Walls and Woodhenge containedlarge concentric timber structures, and they would have beena major focus of the landscape at this time alongsideStonehenge the timber structures at Durrington Walls nowappear to be earlier than the encircling bank and ditch whichform the henge enclosure. In recent years, the remains of tenlate Neolithic houses situated inside and just outside theDurrington Walls henge have been excavated (Parker-Pearson et al 2007, 4), and the excavators have suggestedthat they may be the surviving elements of a large circularvillage of many hundreds of houses. If this were the case, thiswould make it the largest village in north-west Europe at thattime (Parker-Pearson et al 2007, 7).This settlement may havebeen occupied on a seasonal basis.
On the basis of the pattern of discarded flint tools and wasteproducts, it is suggested that different activities took place indifferent parts of the landscape. For example, the centre ofthe Stonehenge landscape, which contains relatively fewartefacts, may have been reserved for ceremonial activitiesduring the late Neolithic, Chalcolithic and early Bronze Age,while the more distant areas with prolific finds may havebeen used for living and working. A deep shaft known as theWilsford Shaft was excavated at this time, and continued inuse until the Roman period.The open nature of thecountryside was maintained by grazing animals.
Chalcolithic (c. 2,500-2,200 BC) and Bronze Age(c.2,200-800 BC)
In the early Bronze Age (c. 2,200BC-1,600 BC) new funerarymonuments such as round barrows were constructed.Stonehenge itself was significantly changed in design around2,550 BC, continuing as a focal point in the landscape,although probably becoming more so.The stone structureswhich characterise this phase of Stonehenge were erected inplace of the timber structures and were re-modelled severaltimes during the period around 2,550-2,000 BC. Initially,bluestones were imported from the Preseli Hills in WestWales and set up in pairs in the centre of the monument.The distance these megaliths travelled is unique in theEuropean megalithic tradition. Only one curving arc of thisearly stone monument has been revealed by excavation. Itwas later dismantled to make way for the unique stonestructures visible today, built around 2,500 BC, whichincorporate both the bluestones and the huge shapedsandstone blocks (sarsens) brought from the MarlboroughDowns.Very few other megalithic stone structures existwhich have the architectural and technical sophistication ofStonehenge. It was uniquely built using woodworkingtechniques which may have been used in the earlierstructures at Durrington Walls and later ones at Woodhenge.Together with Avebury, it would have been a major centre
Appendix G – Detailed archaeological description of the Stonehenge World Heritage Site
156 Stonehenge World Heritage Site Management Plan 2009Appendices
for the region and possibly north-western Europe there isnow evidence that some prehistoric people who wereburied near to Stonehenge were from continental Europe.
At all times, Stonehenge was only a single component of astructured landscape in which inter-visibility with othermonuments and spaces was likely to have been important. Inthe early Bronze Age, Stonehenge was linked physically by aceremonial approach to the Stones, now known as TheAvenue, with the valley of Stonehenge Bottom (possibly aseasonal watercourse at this time), and the valley of the RiverAvon.There was, and still is, a strong visual relationship to theextensive barrow cemeteries surrounding the henge.Theseinclude the King Barrow Ridge barrow groups, the Cursusbarrows and the Normanton Down barrow group, all builton prominent ridges within the landscape which create awell-defined area or ‘amphitheatre’ with Stonehenge atits centre.
Evidence for more diverse activities during the later part ofthe Bronze Age (c. 1,600-1,000 BC) is apparent in the areaaround Stonehenge. Although burials continued to be madein some barrows at this time cremations were placed indistinctive (Deverel-Rimbury) earthenware urns formalisedsettlements and field systems appear in some parts of theWHS. Linear banks and ditches, such as those across WilsfordDown and Lake Down, formally divided up the landscape.The traces of several domestic enclosures and individualgroups of rectangular fields are known in the area.The banksof most of these have been flattened by subsequentploughing, although the example at the north end of FargoPlantation remains visible to the discerning eye. However,field systems are not found around Stonehenge itself(see Map 2).
Iron Age (c. 800 BC-AD 43)
There is little evidence for the continued ceremonial status ofStonehenge in later prehistory.The farming activities whichwere practised within the WHS in the Iron Age (c. 800 BC-AD 43) have left little evidence, but an impressive hill fortwas constructed near Amesbury, known as Vespasian’s Camp.This tree-covered monument has not been fully investigated,so the evidence for its builders and their relationshipwith the subsequent Roman (AD 43-410) populationremains unknown.
Roman (c. AD 43-410)
The occurrence of Romano-British artefacts at Stonehengeitself shows that the monument was visited and used at thattime; recent excavations have shown that the a “shaft” wasdug into the monument during this period. However thepattern of these artefacts suggests that Stonehenge wasalready partly ruinous. Farmsteads and small un-enclosedtowns of the Roman period are known across Salisbury Plain,
but no substantial Roman remains have been investigatedwithin the WHS itself, although a small Roman buildinginterpreted as a small rural shrine has been recentlyexcavated near to the Cuckoo Stone (Parker-Pearson et al2007, 13).
Saxon (c. AD 410-1066)
Amesbury was the centre for a widespread royal estateduring the Saxon period, and the abbey was founded in AD979. It is probable that the town itself grew up around theseestablishments but little is known of the way in which thesurrounding landscape was utilised. However, the remains ofseveral Saxon sunken-featured buildings were recentlyrevealed at the Countess East site owned by EnglishHeritage, which may have been an early Saxon settlementwhich later shifted to the town of Amesbury, which hasknown Saxon remains (Darvill 2006, 224-6). Stonehenge itselfmay have become an execution site during this period; adecapitated Saxon man was buried around AD 645 at themonument (Richards 2005, p40). It is even possible that thename “Stonehenge” from the Saxon “stone” and “heng”, mayrefer to this function, or may mean that, to Saxon eyes, thegreat stone trilithons resembled a gallows. Alternatively it maysimply refer to the extraordinary “hanging” lintels of theStone Circle.
Medieval to Modern (c. AD 1066 onwards)
During the medieval period, Salisbury Plain, including most ofthe WHS, reverted to downland used for the grazing of largeflocks of sheep.This was certainly the case when antiquariansfirst ‘rediscovered’ Stonehenge in the seventeenth century.Arable agriculture progressively expanded from Amesburyduring the eighteenth century. However, it was the vastexpanses of open grassland and the low land values whichmade the Plain suitable for acquisition for military trainingfrom 1897 onwards. Since then, the expansion andreconfiguration of military installations has been the mostconspicuous use of the southern fringe of Salisbury PlainTraining Area, including the northern part of the WHS.However, the acquisition of the Plain by the military hasensured the survival of huge numbers of archaeological sitesand large areas of chalk grassland, as it was not subjected tointensive agricultural techniques.
There is evidence that, as far back as medieval times, thelandscape of Stonehenge was in general terms not verydifferent from that of today, with smaller fields around WestAmesbury giving way to the open downland aroundStonehenge and on Salisbury Plain. It is also likely that, untilthe 18th century, the extent of woodland was minimal.Theclumps of trees on ridgelines which we now associate withthis landscape, were a product of planting in the 18th and19th centuries.There are a number of listed buildings withinthe WHS and also the remains of an important park and
Stonehenge World Heritage Site Management Plan 2009 157Appendices
garden at Amesbury Abbey, which once stretched as far asKing Barrow ridge.The planting on Vespasian’s Camp and ofthe Battle of the Nile Clumps dates to this period.
The landscape of the WHS is unique in having such a greatnumber of still visible Neolithic and early Bronze Agearchaeological features. From many viewpoints, theStonehenge monument itself, as well as numerous ridge-topbarrow groups, continue to dominate the landscape.TheAvon Valley contains a number of historic buildings and parksand gardens which make a significant contribution to theWHS.The historical development of estates has influencedland-use across the WHS, whereby grazing land, arable andwater-meadows were important components of traditionalfarming systems.
158 Stonehenge World Heritage Site Management Plan 2009Appendices
Statutory Instrument 1997 No. 2038
The Stonehenge Regulations 1997
© Crown Copyright 1997
Statutory Instruments printed from this website are printedunder the superintendence and authority of the Controllerof HMSO being the Queen’s Printer of Acts of Parliament.
The legislation contained on this web site is subject toCrown Copyright protection. It may be reproduced free ofcharge provided that it is reproduced accurately and that thesource and copyright status of the material is made evidentto users.
It should be noted that the right to reproduce the text ofStatutory Instruments does not extend to the Queen’sPrinter imprints which should be removed from any copiesof the Statutory Instrument which are issued or madeavailable to the public.This includes reproduction of theStatutory Instrument on the Internet and on intranet sites.The Royal Arms may be reproduced only where they are anintegral part of the original document.
The text of this Internet version of the Statutory Instrumentwhich is published by the Queen’s Printer of Acts ofParliament has been prepared to reflect the text as it wasMade. A print version is also available and is published by TheStationery Office Limited as the The StonehengeRegulations 1997, ISBN 0 11 064841 2.The print versionmay be purchased by clicking here. Braille copies of thisStatutory Instrument can also be purchased at the sameprice as the print edition by contacting TSO CustomerServices on 0870 600 5522 or e-mail:[email protected].
Further information about the publication of legislation onthis website can be found by referring to the FrequentlyAsked Questions.
To ensure fast access over slow connections, large documentshave been segmented into “chunks”.Where you see a“continue” button at the bottom of the page of text, thisindicates that there is another chunk of text available.
STATUTORY INSTRUMENTS
1997 No. 2038
ANCIENT MONUMENTS
The Stonehenge Regulations 1997
Made 18th August 1997
Coming into force 8th September 1997
The Secretary of State, in exercise of the powers conferredon him by section 19(3) and (4) of the Ancient Monumentsand Archaeological Areas Act 1979[1] and of all otherpowers enabling him in that behalf, hereby makes thefollowing regulations:
Citation, commencement and revocation
1. – (1) These Regulations may be cited as theStonehenge Regulations 1997 and shall come intoforce on 8th September 1997.
(2) The Stonehenge Regulations 1983[2] are herebyrevoked.
Interpretation
2. In these Regulations:
“the deposited plan” means the plan entitled “Planreferred to in the Stonehenge Regulations 1997”,signed by the Head of the Buildings, Monuments andSites Division of the Department of National Heritageand deposited for inspection at the offices of theSecretary of State for National Heritage.
“English Heritage” means the Historic Buildings andMonuments Commission for England;
“monument” means the ancient monument known asStonehenge situated on Stonehenge Down nearAmesbury in the county of Wiltshire and includes anypart or parts of the monument;
“site of the monument” means the land shown on thedeposited plan edged in black and hatched.
Appendix H – The Stonehenge Regulations 1997
Stonehenge World Heritage Site Management Plan 2009 159Appendices
Acts prohibited
3. The following acts are prohibited:
(a) injuring, disfiguring, removing or otherwiseinterfering with in any manner the monument or anynotice or any other property situated on the site ofthe monument;
(b) climbing on the monument;
(c) digging up, removing or otherwise interfering withany soil, grass or plants within the site of themonument;
(d) bringing onto, parking or leaving any vehicle onthe site of the monument otherwise than inaccordance with parking authorised by EnglishHeritage;
(e) bringing any animal onto the site of themonument without the prior consent of EnglishHeritage or allowing any animal to remain after suchconsent has been withdrawn;
(f) lighting a fire or a firework on the site of themonument;
(g) throwing a stone or discharging a weapon ormissile of any kind from, over or onto the site of themonument;
(h) without reasonable excuse entering or being uponany part of the site of the monument to which accessis at any time restricted by barrier or prohibited bynotice.
Acts prohibited unless done with written consent
4. The following acts are prohibited unless the priorconsent in writing of English Heritage has beenobtained:
(a) entering or being within the site of the monumentat any time when it is not open to the public;
(b) entering the site of the monument otherwise thanby the entrance authorised by English Heritage;
(c) organising or taking part in any assembly, display,performance, representation, review, theatrical event,festival, ceremony or ritual within the site of themonument;
(d) erecting a tent or any structure of any kind withinthe site of the monument;
(e) erecting or using within the site of the monumentany apparatus for the transmission, reception,reproduction or amplification of sound, speech orimages by electrical or other means unless the soundemitted is audible to the user only.
Acts done by or on behalf of English Heritage orthe Secretary of State
5. An officer, servant or agent of English Heritage orthe Secretary of State, acting in the performance ofhis duties, shall not be in contravention of regulation 3and shall be deemed to have the prior consent inwriting of English Heritage to any of the acts specifiedin regulation 4.
Chris SmithSecretary of State for National Heritage
18th August 1997
EXPLANATORY NOTE
(This note is not part of the Regulations)
These Regulations regulate public access to the ancientmonument known as Stonehenge, near Amesbury in theCounty of Wiltshire.
Notes:[1] 1979 c.46.back [2] S.I. 1983/678.back
ISBN 0 11 064841 2
160 Stonehenge World Heritage Site Management Plan 2009Appendices
Note: published works specifically cited in the text of this planare set out in the Bibliography
STONEHENGE AND ARCHAEOLOGY
Burl, A. 1995. A Guide to the Stone Circles of Britain, Ireland andBrittany. London,Yale University Press.
Castleden, R. 1993. The making of Stonehenge.
Chippendale, C. 2004. (revised edn). Stonehenge Complete.London,Thames and Hudson.
Cleal, R.,Walker, K. and Montague, R. 1995. Stonehenge and itsLandscape:Twentieth Century Excavation. English HeritageArchaeological Reports, 10. London, English Heritage.
Cunliffe, B. and Renfrew, C. (eds). 1997. Science andStonehenge. Proceedings of the British Academy 92. London,British Academy.
Darvill,T. (ed). 2005. Stonehenge World Heritage Site: AnArchaeological Research Framework. London andBournemouth, Bournemouth University for English Heritage.
Darvill,T. 2006. Stonehenge, the Biography of a Landscape.Stroud,Tempus.
English Heritage. 2004. Stonehenge World Heritage SiteInteractive Map (www.english-heritage.org.uk/filestore/stonehengeinteractivemap/index.html)
Exon, S., Gaffney,V.,Woodward, A. and Yorston, R. 2000.Stonehenge Landscapes: Journeys through Real and ImaginedWorlds. Oxford, Archaeopress.
Gibson, A. 1998. Stonehenge and Timber Circles. Stroud,Tempus.
Larsson, M. and Parker-Pearson, M. 2007. From Stonehenge tothe Baltic. BAR International Series 1692. Oxford, BritishArchaeological Reports.
Lawson, A J. 2007. Chalkland: An Archaeology of Stonehenge andits Region. East Knoyle, Hobnob Press.
McOmish, D., Field, D., and Brown, G. 2002. The fieldarchaeology of the Salisbury Plain Training Area. London, EnglishHeritage.
Mohen, J-P. 1999. Standing Stones, Stonehenge, Carnac and theWorld of Megaliths. London,Thames & Hudson.
North, J. 1997. Stonehenge Neolithic Man and the Cosmos.London, Harper Collins.
Parker-Pearson, M. and Ramilisonina. 1998. ‘Stonehenge forthe ancestors: the stones pass on the message’. Antiquity, 72,308-26
Parker-Pearson, M. et al 2007. ‘The age of Stonehenge’,Antiquity, 81, 617-40
Parker-Pearson, M. et al 2007b.The Stonehenge RiversideProject 2007: Full Interim Report. Unpublished report(http://www.shef.ac.uk/archaeology/research/stonehenge)
Pitts, M. 2001. Hengeworld. London, Arrow Books.
Richards, J. 1991. (second edn.). Beyond Stonehenge A Guide toStonehenge and its Prehistoric Landscape. Salisbury,Trust forWessex Archaeology.
Richards, J. 1991. English Heritage Book of Stonehenge. London,B T Batsford.
Richards, J. 2004. Stonehenge: A History in Photographs. London,English Heritage.
Richards, J. 2007. Stonehenge: The Story so Far. London, EnglishHeritage.
Richards, J. 1990. The Stonehenge Environs Project. EnglishHeritage Archaeological Reports, 16. London, EnglishHeritage.
Robb, J G. 1998. ‘The “ritual landscape” concept inarchaeology: a heritage construction’, Landscape Research, 23(2), 159-75
Royal Commission on the Historical Monuments of England.1979. Stonehenge and its Environs. Edinburgh, EdinburghUniversity Press.
Ruggles, C. 1999. Astronomy in Prehistoric Britain and Ireland.London,Yale University Press.
Souden, D. 1997. Stonehenge: Mysteries of the Stones andLandscape. London, Collins & Brown.
Wessex Archaeology. 1998. Stonehenge Military Installations.Salisbury,Wessex Archaeology.
Appendix I – Key publications, surveys and education resources
Stonehenge World Heritage Site Management Plan 2009 161Appendices
CONSERVATION AND MANAGEMENT
AAHRG. 2001. Archaeological Research Agenda for the AveburyWorld Heritage Site. Trowbridge,Wessex Archaeology.
Anon. 2002. Principles for Undertaking Archaeological Work inthe Stonehenge WHS. Unpublished typescript prepared byEnglish Heritage, the Highways Agency, the National Trust andWiltshire County Council, January 2002.
Batchelor, D. 1997. “Mapping the Stonehenge World HeritageSite”: Proc British Academy, 92, 61-72
Cathersides, A. 2001. Stonehenge: restoration of grasslandsetting. Conservation Bulletin March 2001: English Heritage, 34.
Chris Blandford Associates. 2000. Stonehenge World HeritageSite Management Plan. London, English Heritage.
Chris Blandford Associates. 2000. Stonehenge World HeritageSite Management Plan: Summary. London, English Heritage.
Darvill,T C. 1997. Stonehenge Conservation and ManagementProgramme: A Summary of Archaeological Assessments and FieldEvaluations Undertaken 1990-1996. London, English Heritage.
Defence Estates. 2003. Salisbury Plain Training Area IntegratedLand Management Plan. Salisbury, Defence Estates.
Darvill,T. (ed) 2005. Archaeological Research Framework for theStonehenge World Heritage Site. Bournemouth, BournemouthUniversity, English Heritage.
DCMS. 2005. UNESCO Periodic Report. Stonehenge andAvebury World Heritage Site. November 2005. Unpublishedreport submitted by DCMS to UNESCO.
English Heritage. 2008. Conservation Principles: Policies andGuidance for the sustainable management of the HistoricEnvironment.
English Heritage. 2008. Monuments at Risk South West(www.english-heritage.org.uk/risk)
English Heritage/National Trust. 2006. Stonehenge LearningPlan. Version 8, 16th February 2006. Unpublished report.
Fielden, B. and Jokilehoto, J. 1998. Management Guidelines forWorld Cultural Heritage Sites. Rome, ICCROM/ UNESCO/ICOMOS.
Last, J. 2003-4. Assessment of badger damage at Barrow Clump:English Heritage unpublished report.
Pomeroy-Kellinger, M. 2005. Avebury World Heritage SiteManagement Plan: English Heritage.
RSPB. 2007. Normanton Down Management Plan. RSPBunpublished report.
Wessex Archaeology. 2003. Condition Survey & ManagementRecommendations for Archaeological Sites within the StonehengeWorld Heritage: Volume 1 and 2 and Executive Summary.Unpublished report .
World Heritage Centre. 2008. Operational Guidelines for theImplementation of the World Heritage Convention. UNESCO
LANDSCAPE AND NATURAL ENVIRONMENT
ADAS. 1994. Avon Valley Environmentally Sensitive AreaLandscape Assessment. London, MAFF.
Countryside Agency. 1999. Countryside Character: Volume 8:South West.The character of England’s natural and man-madelandscape (http://www.countryside.gov.uk/LAR/Landscape/CC/countryside_character.asp)
Countryside Agency. 1999. Salisbury Plain and West WiltshireDowns: Character Area 132
Defence Estates. 2003. Salisbury Plain Training Area IntegratedLand Management Plan. Salisbury, Defence Estates.
Department of the Environment. 1994. UK Biodiversity ActionPlan. London, Department of the Environment.
Forestry Commission. 1992. Lowland Landscape DesignGuidelines. London, HMSO.
Forestry Commission. 2006. The Environmental ImpactAssessment (forestry) (England and Wales) (Amendment)Regulation.
Forestry Commission. 2005. Tree Felling: Getting Permission.Edinburgh, Forestry Commission. (www.forestry.gov.uk)
Forestry Commission. 1998. England Forestry Strategy: A NewFocus for England’s Woodland Strategic Priorities andProgrammes. Cambridge, Forestry Commission.
Natural England. 2007. European Landscape Convention: AFramework for Implementation.
Land Use Consultants. 2005. Wiltshire Landscape CharacterAssessment: Final report. London,Wiltshire County Council.
RSPB. 2007. Normanton Down Management Plan. RSPBunpublished report.
Swanwick, C. and Land Use Consultants. 2002. LandscapeCharacter Assessment: Guidance for England and Scotland. TheCountryside Agency and Scottish Natural Heritage.
162 Stonehenge World Heritage Site Management Plan 2009Appendices
Wheeldon, J. 2003 The River Avon cSAC Conservation Strategy.English Nature, Peterborough.
PLANNING AND OTHER POLICIES
Council of Europe. 2000. European Landscape Convention.
DCLG. 2006. Good Practice Guide on Planning for Tourism.
DCLG. 2008. Planning Policy Statement 12: Local SpatialPlanning.
DCLG. 2007. Planning Policy Statement: Planning and ClimateChange Supplement to Planning Policy Statement 1.
DCLG. 2006. Planning Policy Statement 25: Development andFlood Risk.
DOE. 2001. Planning Policy Guidance 13:Transport.
DOE. 1994. Planning Policy Guidance 15: Planning and theHistoric Environment.
DOE. 1990. Planning Policy Guidance 16: Archaeology andPlanning.
English Heritage. 2008. Conservation Principles: Policies andGuidance for the sustainable management of the HistoricEnvironment.
ODPM. 2005. Planning Policy Statement 1. DeliveringSustainable Development.
ODPM. 2004 Planning Policy Statement 7: SustainableDevelopment in Rural Areas.
ODPM. 2005. Planning Policy Statement 9: Biodiversity andGeological Conservation.
ODPM. 2004. Planning Policy Statement 11: Regional SpatialStrategies.
ODPM. 2004. Planning Policy Statement 23: Planning andPollution Control.
Salisbury District Council. 2003. Salisbury District Local Plan(Adopted).
Wiltshire County Council. 2006. Wiltshire and SwindonStructure Plan 2016 (Adopted).
SURVEYS
English Heritage. 2003. Stonehenge Lichen Survey. Unpublishedreport.
National Trust. 2005, 2006, 2007. Grassland reversion surveys.Unpublished reports.
National Trust. 2008. Woodland survey. Unpublished report.
National Trust. 2007. Biological Survey. Unpublished report.
National Trust. 2008. Condition survey and managementrecommendations for National Trust archaeological sites withinthe Stonehenge World Heritage Site. Unpublished report .
National Trust. 2008. Nature Conservation Evaluation,Stonehenge. Unpublished report .
Payne, A. 2003. Durrington Walls Geophysical survey report107/2003. English Heritage, Unpublished report.
RSPB. 2005. Stonehenge World Heritage Site Breeding BirdsSurvey. Unpublished report.
RSPB. Annual surveys of vegetation, butterflies and breedingbirds on Normanton Down Reserve. Unpublished reports since2004.
Stonehenge Riverside Project. 2003-2008. Geophysicalsurveys at Durrington Walls, Stonehenge Avenue, Cursus.
Stonehenge Riverside Project. 2003-2008. Excavations atDurrington Walls, Stonehenge Avenue, Cursus,Woodhenge.
Wessex Archaeology. 1998. Stonehenge Military Installations.Salisbury,Wessex Archaeology.
Wessex Archaeology. 2003. Condition survey and managementrecommendations for archaeological sites within the StonehengeWorld Heritage Site: Volume 1 and 2 and Executive Summary.English Heritage, Unpublished report.
Wessex Archaeology. 2002, 2004, 2006, 2008. Field walkingsurveys in the Stonehenge World Heritage Site,commissioned by English Heritage, the National Trust andHighways Agency.
Wessex Archaeology. 2002. Laser survey of the Stonehengecarvings. British Archaeology 2003.The Stonehenge LaserShow (http://www.stonehengelaserscan.org/press.html).
Stonehenge World Heritage Site Management Plan 2009 163Appendices
EDUCATION RESOURCES
English Heritage and National Trust. 2006. StonehengeLearning Plan.Version 8, 16th February 2006. Unpublishedreport.
English Heritage. 2002. World Heritage Sites, A teacher’s guide:English Heritage.
English Heritage. 2005.What was our area like in prehistorictimes? Key Stage 2 scheme of work including downloadableactivities. Available at www.english-heritage.org.uk/stonehenge
UNESCO. 2002.Tell Me About World Heritage. UNESCOPublishing.
UNESCO. 1998. World Heritage in Young Hands: Aneducational resource kit for teachers. UNESCO Publishing.(http://whc.unesco.org)
Further education resources on Stonehenge, includinginformation on Discovery Visits for Key Stage 1-3 (Stonesand Bones: Stonehenge in its Landscape) and 4-5 (TheBusiness of Heritage and Tourism), can be found atwww.english-heritage.org.uk/stonehenge
STONEHENGE VISITOR CENTRE AND ROADSPROJECTS 1999-2007
Note: For a full list of previous projects and surveys seeStonehenge WHS Management Plan 2000
Chris Blandford Associates. 2004. Stonehenge Visitor Facilitiesand Access Scheme: Environmental Statement Volumes 1 and 2and non-technical summary. English Heritage.
Department for Communities & Local Government. 2007.Decision on new Stonehenge Visitor Centre. 28 March 2007.
Department for Transport. 2007. Decision letter on A303Stonehenge Improvement Scheme. 6 December 2007.
Ellison, M. 2005. Report to the First Secretary of State and theSecretary of State for Transport. A303 Trunk Road (StonehengeImprovement) Order 200; A303 Trunk Road (StonehengeImprovement) Slip Roads Order 200; A303 Trunk Road(Stonehenge Improvement) (Detrunking) 200; A303 Trunk Road(Stonehenge Improvement) Side Roads Order 200; A303 TrunkRoad (Stonehenge Improvement) Compulsory Purchase Order200;The A303 Trunk Road Stonehenge Improvement (CountessRoundabout to Longbarrow Crossroads) (Prohibition of CertainClasses of Traffic and Pedestrians) Order 200; and A303 TrunkRoad Stonehenge Improvement (Stonehenge Byway) (Prohibitionof Motor Vehicles) Order 200.
Highways Agency. 2003. A303 Stonehenge Improvement:Environmental Statement Volumes 1 and 2 and non-technicalsummary: Department for Transport.
Highways Agency. 2006. A303 Stonehenge Improvement:Scheme Review: Stage 1 Report.
Highways Agency. 2007. A303 Stonehenge Improvement: SchemeReview: Stage 2 Report.
164 Stonehenge World Heritage Site Management Plan 2009Appendices
MINISTRY OF DEFENCELeatherhead Road
Chessington, Surrey
Tel: 01-397 5266 ext. 2446A/119/Wilts/600/Q2g(A)
17th February 1970GCC in CSouthern Command
Sir
STONEHENGE – LARKHILL
1. I am directed to inform you that agreement has nowbeen reached between the Ministry of Public Buildingand Works and the Ministry of Defence (Army) onthe control to be exercised over the development ofthe area North of STONEHENGE.
2. The principles to be observed governing the erectionof any future buildings at LARKHILL are embodied ina Concordat. A copy of the Concordat is attached foryour information.
3. In order that there should be no breach of theundertaking given to the MPBW it is essential that theterms of the Concordat should be made known to allauthorities exercising responsibilities connected withWorks Services or with building development on-landowned by the Army at LARKHILL.
4. If there is any doubt whether any Works or Landsproposal is in conflict with the terms of theConcordat it must be referred back to theappropriate Headquarters for clearance. In particular :
a. Proposals for alienation of Army land, or forbuilding development on Army land leasedto tenants, must be referred to theMOD(A) DCDL.
b. Proposals for Part II or Part III Works Serviceswhich might conflict with the terms of theConcordat or in respect of which agreementbetween the MOD(A) and the MPBW isrequired by the terms of the Concordat(e.g. buildings to a height in excess of 9 metresNorth of the building line described atAnnexure A to the Concordat) must bereferred to the MOD(A) DC.
c. Any Works or Lands proposals for Part IWorks Services, when they are referred to thenext Headquarters or to the MOD(A) mustbear a reference to the Concordat so that itsapplication is not overlooked.
5. Finally I am directed to request that arrangementsshould be made for the terms of the Concordat tobe brought to the attention of all concerned by thereminder procedures available to Command, Districtand Garrison Headquarters.
I am, SirYour obedient servant(sgd)Director of Quartering (Army)
Appendix J – Ministry of Defence and Ministry of Public Buildings and Works Concordaton Future Building Work at Larkhill
Stonehenge World Heritage Site Management Plan 2009 165Appendices
CONCORDAT GOVERNING THE LOCATION ANDCONSTRUCTION OF BUILDING FOR MINISTRY OFDEFENCE AT LARKHILL
(As agreed with MPBW, Ancient Monuments Division)
The Ministry of Defence have a requirement for a School ofArtillery at Larkhill for as long as can be foreseen. In additionto the buildings now being erected, this Army Establishmentmay require further buildings or structures. However, it is thelong term objective of the Ministry of Public Building andWorks that no buildings or large tree plantings should bevisible from Stonehenge. In furtherance of this objective, andto permit any necessary further development of the ArmyEstablishment to be planned without further consultation onthis aspect. It is agreed:
a. On the M of D owned land south of the linedescribed in Annex A (but excludingDurrington Downs Farm where, however,MPBW shall be consulted about the siting andcharacter of any replacements or additions), nonew buildings or structures shall be erectedexcept additions to existing buildings; theseadditions not to exceed 50 sq metres in areaand 5 metres in height above ground level. Allnew building work shall be screened by trees ifvisible from Stonehenge.
b. Any proposal for a building of more than9 metres above ground level to be erectedNorth of the line as described and whichwould not be completely hidden from
Stonehenge by ground contours shall bethe subject of specific agreement betweenthe Departments.
c. The Ministry of Defence will take no actionwhich would increase the obtrusion of existingbuildings and structures on the landscape asseen from Stonehenge.
d. The Ministry of Defence will take accountwhen considering requirements for newbuilding in the Larkhill area, the effect whichsuch development might have in prolongingthe life of existing buildings which are visiblefrom Stonehenge.
ANNEXURE ‘A’ TO CONCORDAT
BUILDING LINE FOLLOWING COMPLETION OFBUILDING FOR THE MOVE OF MANORBIER
From the limit of MOD property in the WEST the buildingline follows the Packway to the junction with the pathway tothe cricket pavilion (at the Eastern end of the ShoppingCentre).Thence, NORTH along this pathway past theCricket pavilion to the junction with the School of ArtilleryOfficers’ Mess approach which it follows NORTH (to theWest of the Officers’ Mess) to the junction with GLOVERRoad.Thence, EAST along GLOVE Road to the junction withthe PACKWAY.Thence EAST along the PACKWAY to thejunction with WOOD Road.Thence SOUTH along WOODRoad to the junction with POWNALL Road to the MODBoundary.
166 Stonehenge World Heritage Site Management Plan 2009Appendices
1. Since domestic and international tourism is among theforemost vehicles for cultural exchange, conservationshould provide responsible and well managedopportunities for members of the host communityand visitors to experience and understand thatcommunity’s heritage and culture at first hand.
2. The relationship between Heritage Places and Tourismis dynamic and may involve conflicting values. It shouldbe managed in a sustainable way for present andfuture generations.
3. Conservation and Tourism Planning for HeritagePlaces should ensure that the Visitor Experience willbe worthwhile, satisfying and enjoyable.
4. Host communities and indigenous peoples should beinvolved in planning for conservation and tourism.
5. Tourism and conservation activities should benefit thehost community.
6. Tourism promotion programmes should protect andenhance Natural and Cultural Heritage characteristics.
Adopted by ICOMOS, October 1999
Appendix K – ICOMOS International Cultural Tourism Charter
Stonehenge World Heritage Site Management Plan 2009 167Appendices
List A: Public bodies with a statutory or management interest
■ Department for Culture, Media and Sport (DCMS);
■ Department of Communities and Local Government(DCLG)
■ Department of the Environment, Food and RuralAffairs (Defra);
■ Department for Transport (DfT)
■ English Heritage (EH);
■ Environment Agency (EA);
■ Forestry Commission (FC);
■ Government Regional Office for the South West(GOSW);
■ Highways Agency (HA);
■ Ministry of Defence (MOD);
■ Natural England (NE);
■ New Wiltshire Council (NWC);
■ Regional Development Agency for the South West(RDA SW);
■ Salisbury District Council (SDC);
■ United Kingdom National Commission for UNESCO;
■ Wiltshire Constabulary (WC);
■ Wiltshire County Council (WCC).
List B: Other Public and Private bodies with an interest inthe Stonehenge WHS
■ Amesbury Town Council (ATC);
■ Ancient Sacred Landscape Network (ASLaN);
■ Council for British Archaeology (CBA)
■ Council for the Protection of Rural England (CPRE);
■ Council of British Druid Orders (COBDO);
■ Country Land and Business Association (CLA);
■ Durrington Parish Council (DPC);
■ Wiltshire Archaeological and Natural History Society(WANHS);
■ International Council on Monuments and Sites UK(ICOMOS UK);
■ Landowners and Farmers;
■ Local Communities and residents associations;
■ National Farmers Union (NFU);
■ National Trust (NT);
■ Prehistoric Society (PS);
■ Public Transport and Tour Operators;
■ Regional Cultural Consortium for the South West;
■ Royal Society for the Protection of Birds (RSPB)
■ Salisbury and South Wiltshire Museum (SSWM);
■ Shrewton Parish Council (SPC);
■ Society of Antiquaries of London (SAL);
■ South West Tourism (SWT):
■ University of Bournemouth (UB);
■ Visit Wiltshire (VW);
■ Wilsford-cum-Lake Parish Council (WLPC);
■ Winterbourne Stoke Parish Council (WSPC);
■ Woodford Parish Council (WPC).
Appendix L – Bodies with an interest in the WHS
168 Stonehenge World Heritage Site Management Plan 2009Appendices
This Geographic Information System (GIS) is used forcollecting, storing, analysing and displaying geographical data.The development of the database is ongoing and it isconstantly being updated and maintained as new informationbecomes available. Originally, there were two separate GISdatabases for Avebury and Stonehenge.These have nowbeen incorporated into the English Heritage corporate GISwhich covers the whole of England.
The WHS is complex and diverse, serving many differentneeds and subject to a variety of pressures and threats.Themanagement of the WHS, therefore, needs to be supportedby a range of information from many different sources andneeds to be easily accessible to the managers, agencies andthe public.The GIS provides access to a wide range of datasets held by a range of agencies. A series of maps based onthe GIS database and mapping programme data wereincluded in the Stonehenge Research Framework (Darvill(ed) 2005).
In order to fully understand the landscape context of theWHS, data has been collected for a wide study area,incorporating 135 sq km (from co-ordinates 405138 to420147).The foundation of the database is the archaeologicaldata registered in the Wiltshire County Sites and MonumentsRecord (SMR).
Layers of information that have been incorporated into theStonehenge GIS include:
■ Ordnance Survey base mapping;
■ digital terrain data;
■ archaeological sites;
■ archaeological survey data (auger, worked flint,geophysical, test pits, field surface collection data);
■ land use including areas signed up for grassrestoration;
■ landscape character types;
■ composite visibility analysis;
■ cultural heritage and natural environmentdesignations;
■ access information (Rights of Way, permissive paths,NT open access land);
■ WHS boundary;
■ WHS land ownership.
Appendix M – The English Heritage Stonehenge GIS
Stonehenge World Heritage Site Management Plan 2009 169Appendices
WILTSHIRE COUNTY COUNCIL
Town & Country Planning Acts, 1947-59
Town & Country Planning General Development Order,1950
Direction as to land around Stonehenge
Notice is hereby given that the Wiltshire County Councilhave directed in respect of approximately 71⁄2 square miles ofland around Stonehenge near Amesbury in the County ofWilts as defined on plans deposited for public inspection atthe Area Planning Office, 50, Bedwyn Street, Salisbury and atthe offices of the Amesbury Rural District Council, RedworthHouse, Amesbury, that the permission granted by Article 3 ofthe Town & Country Planning General Development Order,1950, as amended shall not apply to the carrying out of anydevelopment on the said land consisting of the erection orplacing of structures of a height exceeding six feet describedin Classes VI(1) and VII referred to in the First Schedule tothe said Order and not being development comprised withinany other Class.
The effect of this direction, which has been approved by theMinister of Housing & Local Government, will be that fromthe date of first publication of this notice any persons wishingto carry out any building or engineering operations requisitefor the use of the said land for the purposes of agriculture orfor forestry consisting of the erection or placing of structuresof a height exceeding six feet on any part of the landdescribed in the direction will be obliged to apply forplanning permission under Part III of the Town and CountryPlanning Act, 1947.
Dated this 8th day of May, 1962.
R.P. HARRIESClerk of the County Council.
County Hall,Trowbridge,Wilts.
Appendix N – Article 4 Direction in relation to land around Stonehenge
170 Stonehenge World Heritage Site Management Plan 2009Appendices
1.0 REGIONAL POLICIES
1.1 Regional policies affecting the World Heritage Site arecurrently contained in RPG10 due to be replacedshortly by the Regional Spatial Strategy for the South-West. RPG10 recognises the importance of the WorldHeritage Site and the need to protect the historicenvironment generally.
Policy EN3 says:
Local authorities and other agencies in their plans,policies and proposals should:
■ afford the highest level of protection to historicand archaeological areas, sites and monumentsof international, national and regional importance;
■ indicate that new development should preserveor enhance historic buildings and conservationareas and important archaeological features andtheir settings, having regard to the advice inPPG15 and PPG16;
■ indicate that policies and programmes shouldwork towards rescuing buildings and monumentsat risk;
■ encourage the restoration and appropriate re-useof buildings of historic and architectural value andtake a particularly active role in bringing abouttheir restoration where this would help bringabout urban regeneration;
■ take account of the landscape context andsetting of buildings and settlements; of buildingmaterials; and of the patterns of fields, hedgerowsand walls that distinguish one area from another.
1.2 The Draft South West Regional Spatial Strategy policyENV5 reads Historic Environment
The historic environment of the South West will bepreserved and enhanced. Local authorities and otherpartners will identify and assess the significance of thehistoric environment and its vulnerability to change, usingcharacterisation to understand its contribution to theregional and local environment and to identify options forits sensitive management.
2.0 SUB-REGIONAL POLICIES
2.1 The Wiltshire and Swindon Structure Plan 2016(2006) provides strategic policies for the county until2016, or until it is replaced by the new RegionalSpatial Strategy. It includes policies specifically for theWHS and also policies of wider application which arealso relevant to the WHS and adjoining areas.Thesepolicies provide protection for landscape and natureconservation and seek to ensure that recreation andtourism facilities do not adversely impact on theenvironment. Of particular note is policy HE1:
The World Heritage Site of Stonehenge and Aveburytogether with its landscape setting should be affordedprotection from inappropriate development, to reflect itsoutstanding international value. No development shouldtake place which by reason of its scale, siting and designwould prejudice the World Heritage Site and its setting inthe landscape.
2.2 Features of archaeological or historic interest are alsocovered in HE 2:
Features of archaeological or historic interest and theirsettings should be protected from inappropriatedevelopment.Where nationally important archaeologicalor historic remains, whether scheduled sites or not, areaffected by proposed development, there should be apresumption in favour of their physical preservation“in situ”.
2.3 Policy HE5 provides for the enhancement of theWHS in order that it might fulfill a wider education,leisure and tourism resource:
World Heritage Sites, Scheduled Ancient Monuments,Registered Battle Fields, Registered Parks and Gardens,and other historic sites will be enhanced, as far aspracticable, through appropriate management,interpretation and public access arrangements, havingregard to the scale and location of any new developmenton the character of the area.
2.4 Policy RLT8, which applies county-wide but specificallyaddresses the problem of tourism at the WHS, states:
Proposals for new or improved tourist attractions shouldbe based on the natural or historic heritage, providedthere is no adverse impact on the environment and theyare well related to the public transport network.
Appendix O – Regional, sub-regional and local planning policies of relevance to Stonehenge
Stonehenge World Heritage Site Management Plan 2009 171Appendices
3.0 LOCAL POLICIES
3.1 Salisbury District Council’s Local Plan provides themost detailed mechanism whereby development iscontrolled within and adjoining the WHS. Policiesadopted in the Plan cover the same subject areas asthe Structure Plan but generally provide more detailand specific development guidance.The SalisburyDistrict Local Plan was adopted in 2003. Undercurrent planning legislation, it will be replaced by anew Local Development Framework. Currently allthe significant policies of the Local Plan have been‘saved’ and are still in effect whilst the LDF isunder preparation.
3.2 The key development control policy for the WHS inthe Local Plan is CN24, which states:
Development that would adversely affect thearchaeological landscape of the Stonehenge WorldHeritage Site, or the fabric or setting of its monuments,will not be permitted.
3.3 General criteria for the control of development arecovered by Local Plan Policy G1, which is intended toensure a high quality of design and developmentthroughout the District, including the WHS.This issupported by more specific policies providingprotection of the countryside, landscape conservationwithin the Special Landscape Area, landscapeconservation in general, and nature conservation,notably in the Areas of High Ecological Value.
3.4 There are a number of other relevant policiesincluding CN20, which states:
Development that would adversely affect aScheduled Ancient Monument or other nationallyimportant archaeological features, or their settings,will not be permitted.
3.5 CN 21 states:
Where the application for development may affecta known or potential site of archaeological interest,as defined on the Plan as an Area of SpecialArchaeological interest, the LPA will request anarchaeological evaluation to be carried out beforethe planning application is determined.
3.6 CN 22 states:
The LPA will also seek the preservation of archaeologicalremains that are of regional to local importance, whetherthey are currently known, or discovered during the lifetimeof the Plan and there will be a preference to preservethem “in situ” and to protect their settings. Developmentthat does not achieve acceptable mitigation of adversearchaeological effects will not be permitted.Wheredevelopment is permitted and preservation “in situ” isnot appropriate or possible, the Council will requiresuitable investigation and recording to take place; thesemeasures will be sought by means of legal agreement orthe use of conditions.
172 Stonehenge World Heritage Site Management Plan 2009Appendices
The WHS Management Plan envisages a landscape whichincludes an extended core zone of permanent grasslandsurrounded by a wider landscape of sustainable low-intensitymixed farming.
In the long term all farmland in the core zone would be restoredto permanent grassland and all inappropriate structures androads removed or screened to provide an improved landscapesetting for the core of Stonehenge, the protection of thearchaeology from ploughing, and an area carefully managed foropen access on foot for visitors.The zone would be primarilymanaged for both archaeological, landscape and natureconservation, and for the access and enjoyment of the very largenumbers of visitors who it is anticipated will continue toconcentrate, at least initially, in the core zone.
With a new high quality visitor centre outside the boundary ofthe WHS as a starting point, visitors would gain access to theStones and the heart of the WHS via primary access links, drop-
off points and ‘gateways’ on the rim of the core area (at Fargoand King Barrow Ridge for example). Pedestrian access beyondthe core to the wider, and more tranquil, and more fullypresented and interpreted landscape and archaeological sites ofthe southern WHS, would be possible using the existing publicrights of way network and new links, and pedestrian gatewaysand routes to currently inaccessible sites and areas. Researchingand improving understanding of the WHS, and the developmentof its enjoyment and educational value for future generations,would be fundamental concepts for guiding the long termmanagement of the Site.
A working, but more environmentally sustainable, mixed farmingin the wider landscape of the WHS would continue as theprincipal land use, and this would provide the landscape settingto the core zone. Outside of the core, the improved conservationand management of important archaeological monuments andecological features would be balanced with the practical needsof modern arable or mixed farming, and military activities.
Appendix P – The “Vision for the Future”, extract from the Stonehenge WHS Management Plan 2000
One of the Stonehenge trilithonsJames O Davies 2004 © English Heritage
MapsMaps
One of the Stonehenge trilithonsJames O Davies 2004 © English Heritage
Stonehenge World Heritage Site Management Plan 2009 175Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
The Avenue
STONEHENGE
The Cursus
Durrington Down Barrows
KingBarrows
TheLesser Cursus
Normanton Down Barrows
DurringtonWalls
Woodhenge
Winterbourne StokeBarrows
North KiteEnclosure
LakeBarrows Wilsford
Barrows
ConeyburyHenge
The Cursus Barrows
Lake DownBarrows
Vespasian'sCamp
AMESBURY
WESTAMESBURY
WILSFORD
LAKE
A303
A345
LARKHILL
A344
B3086
The Packway
Fargo Road
A360
GREATDURNFORD
DURRINGTON
Source: Main archaeological monuments based on scheduled monuments from English Heritage GIS. Other features drawn fromOS mapping data.
0 1
kilometres
Stonehenge World Heritage Site
Main Archaeological Monuments
Roads
River Avon
Map 1: The Stonehenge World Heritage Site
176 Stonehenge World Heritage Site Management Plan 2009Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
410000 411000 412000 413000 414000 415000
138000
139000
140000
141000
142000
143000
144000
Stonehenge World Heritage Site Boundary
Recorded Archaeology
Land UseArable
Grassland
Woodland/Trees
Built up areas
Source: Land use based on information from landowners and Stonehenge WHS Coordinator (2008) updating the Stonehengecondition survey (2003) and the land use map from the 2000 Management Plan. Recorded archaeology based on WiltshireCounty Council Sites and Monuments Record.
0 1
kilometres
Map 2: Archaeology and Land Use
Stonehenge World Heritage Site Management Plan 2009 177Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
2007
2007
2005
2007
2003
2003
2010
2011
2009
2003
2002
2003
2000
2007
2004
2003
2003
2007
2007
2003
2003
2007
410000 411000 412000 413000 414000 415000
138000
139000
140000
141000
142000
143000
144000
0 1
kilometres
Source: Grass restoration based on review of Natural England stewardship agreements by Stonehenge WHS Coordinator (2008).Land use based on information from landowners and Stonehenge WHS Coordinator (2008) updating the Stonehenge conditionsurvey (2003) and the land use map from the 2000 Management Plan. Main archaeological monuments based on scheduledmonuments from the English Heritage Stonehenge GIS.
The areas indicated in bright green have been or will be revertedto grass in the period 2000-2012, as part of the stewardshipagreements signed since 2002 and the National Trust trialcarried out in 2000.
This represents a major positive change in the landscape as theagreements signed to date will return 520 hectares of arable landto pasture (about 20% of the World Heritage Site). Altogether, 105prehistoric monuments will be protected from plough damage andbenefit from an improved setting. The extension of grassland willalso enhance the ecological value of the area.
Stonehenge World Heritage Site Boundary
Main Archaeological Monuments
Grass RestorationGrassland at 2000
Grass restoration since 2000 andstarting date of stewardship agreements
Land UseArable
Woodland/Trees
Built up areas
Map 3: Grass Restoration since 2000
178 Stonehenge World Heritage Site Management Plan 2009Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
The Avenue
STONEHENGE
The Cursus
Durrington Down Barrows
KingBarrows
TheLesser Cursus
Normanton Down Barrows
DurringtonWalls
Woodhenge
Winterbourne StokeBarrows
North KiteEnclosure
LakeBarrows Wilsford
Barrows
ConeyburyHenge
The Cursus Barrows
Lake DownBarrows
Vespasian'sCamp
AMESBURY
WESTAMESBURY
WILSFORD
LAKE
A303
A345
LARKHILL
A344
B3086
The Packway
Fargo Road
Byway
12
Byw
ay11
A360
GREATDURNFORD
DURRINGTON
LongbarrowCross Roads
Airman'sCorner
RollestoneCamp
Source: Main archaeological monuments based on scheduled monuments from English Heritage GIS. National Trust open accessland information and permissive paths supplied by National Trust Stonehenge Estate Office. Other features drawn from OS mappingdata.
0 1
kilometres
Stonehenge and Woodhenge are in the care of EnglishHeritage and there is free entry to Woodhenge. Many ofthe other prehistoric monuments are on land owned by theNational Trust and open access on foot is permitted in thearea shown on the map. The rest of the World HeritageSite is in private ownership and access is restricted to publicrights of ways and permissive paths.
Stonehenge World Heritage Site
Main Archaeological Monuments
River Avon
AccessRoads
Rights of Way
National TrustPermissive Paths
National Trust Open Access
Map 4: Access
Stonehenge World Heritage Site Management Plan 2009 179Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
410000 411000 412000 413000 414000 415000
138000
139000
140000
141000
142000
143000
144000
Source: Digital data from English Heritage Stonehenge GIS. Main archaeological monuments based on scheduled monuments fromthe English Heritage Stonehenge GIS. Land ownership from Land Registry, Ministry of Defence, National Trust and StonehengeWHS Coordinator, 2008.
0 1
kilometres
Land OwnershipAblington Farm
Antrobus Estate
Boreland Farm
Bustard Farm
Druid's Lodge Estate
DCMS/English Heritage
Lake Estate
Ministry of Defence
Manor Farm
National Trust
Mixed Private
Wessex Water
West Amesbury Farms
Wiltshire County Council
Stonehenge World Heritage Site Boundary
Main Archaeological Monuments
Map 5: Land Ownership
180 Stonehenge World Heritage Site Management Plan 2009Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
410000 411000 412000 413000 414000 415000
138000
139000
140000
141000
142000
143000
144000
Source: Digital Data from English Heritage Stonehenge GIS.Scheduled Monuments, Parks and Gardens and Listed Buildings from English Heritage.
0 1
kilometres
Stonehenge WorldHeritage Site Boundary
English Heritage Guardianship Site
Conservation Area
Article 4
Listed Building
Parks and Gardens
Scheduled Monuments
Map 6: Heritage Designations
Stonehenge World Heritage Site Management Plan 2009 181Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
409000 410000 411000 412000 413000 414000 415000 416000 417000
137000
138000
139000
140000
141000
142000
143000
144000
145000
146000
Source: Digital Data from English Heritage Stonehenge GIS. National Trust inalienable Land from the National Trust.
0 1
kilometresStonehenge WHS Boundary
River Avon SSSI
Salisbury Plain SSSISpecial Area of Conservation(SAC)
Special Protection Area for the protectionof rare and vulnerable birds (SPA)
National Trust Inalienable Land
Avon Valley Environmentally Sensitive Area
Special Landscape Area
Map 7: Landscape and Nature Conservation Designations
182 Stonehenge World Heritage Site Management Plan 2009Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
A303(T)
A33
8
A36(T)
A346
A34(
T)
A30
A4A346
A4
A360
A345
A343
A361
A338
A30
A342
A436
1
A3057
A272
A344
A3028
A3094
A310
2
A3026
A346
A3093
A30
A310
2
A338
A342 A345
A343
A342
A4
A343
A3057
Devizes
MarlboroughCalne
Andover
Salisbury
M4
AVEBURY
STONEHENGE
Amesbury
0 10
kilometres
Avebury WHS Boundary
Stonehenge WHS Boundary
Area of Outstanding Natural Beauty
Built up Areas
TransportMotorways
Primary Roads
A Roads
B Roads
Railways
Regional Character AreasAvon Vale
Berkshire and Marlborough Downs
Blackmoor Vale and the Vale of Wardour
Hampshire Downs
Midvale Ridge
Salisbury Plain and West Wiltshire Downs
Thames Basin Heaths
Upper Thames Clay Vales
Source: Countryside Commission/English Nature/English Heritage -The Character of England Landscape, Wildlife and Natural Features (1996)
Map 8: Regional Landscape Context
Stonehenge World Heritage Site Management Plan 2009 183Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
410000 411000 412000 413000 414000 415000
138000
139000
140000
141000
142000
143000
144000
0 1
kilometres
Stonehenge World Heritage Site Boundary
Woodland/Trees
Urban Areas
Ridgelines and Horizons Visually Enclosing the Stones
Other Prominent Ridgeline
'Ceremonial' Approach to Stonehenge via the Avenue
Landscape TypesDownland Landscapes
Dry River Valleys
Upper Stonehenge Dry Valley
Agricultural Downland
Downland Ridgelines
Unimproved Downland/Military Training
Avon Valley LandscapeWater Meadows & Floodplain
River Valley Slopes
Source: Landscape types provided by Stonehenge WHS Landscape and Planning Study (Land Use Consultants, 1995)Main archaeological monuments based on scheduled monuments from the English Heritage Stonehenge GISOther digital data from English Heritage Stonehenge GIS
Main Archaeological Monuments
Map 9: Landscape Character
9
8
7
6
5
4
3
21
13
12 11
10
408000 409000 410000 411000 412000 413000 414000 415000 416000 417000136000
137000
138000
139000
140000
141000
142000
143000
144000
145000
146000
0 1
kilometresVisual Sensitivity
High
Low
Stonehenge World Heritage Site Boundary
Using contour data, a Digital Elevation Model (DEM) of the landscape has been calculated. This model can tell us the height of theland at any point and can be used to calculate the area of the land which can be seen from a location. These 'viewsheds' have beencalculated for thirteen sites, chosen for their archaeological and landscape significance:
The results have been added together to create a composite visibility map. The shading gives an indication of the visual sensitivity ofthe landscape; darker patches show those areas which can be seen from many of these key locations and which are thereforeparticularly sensitive to inappropriate change.
1 Normanton Down Barrow Group2 Coneybury Hill3 Cursus Barrow Ridge4 Durrington Barrow Group5 Lake Barrow group
6 New Kings Barrow Group7 Old Kings Barrow Group8 Robin Hood's Ball9 Rollestone Camp Tumuli10 Stonehenge
11 Vespasian's Camp12 Winterbourne Stoke Group13 Woodhenge
Map 10: Visual Sensitivity
184 Stonehenge World Heritage Site Management Plan 2009Maps
Produced by M Reynolds, English Heritage GIS & Mapping Team, 2008.This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office. © Crown Copyright.Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. English Heritage. 100019088. © English Heritage.
A misty view of Sarsens and BluestonesJames O Davies 2002 © English Heritage Photo Library K021135
Facts and figuresDefinitionsAbbreviationsIndex
Facts and figuresDefinitionsAbbreviationsIndex
A misty view of Sarsens and BluestonesJames O Davies 2002 © English Heritage Photo Library K021135
Stonehenge World Heritage Site Management Plan 2009 187Facts and Figures
FACTS AND FIGURES
ARCHAEOLOGY
Stonehenge (c. 3,000-1,600 BC)
■ 1st phase – earth monument – circular bank and ditch(c. 3,000 BC).
■ 2nd phase – timber monument (c. 2,900 to 2,600 BC).
■ 3rd phase – stone monuments (c. 2,500 to 2,000 BC) –bluestones and larger sarsens re-arranged in severalphases. Abandoned after 1,600 BC.
■ The tallest stone is 7.3m high and weighs over 45 tonnes.It is one of the 5 sarsen Trilithons. The sarsen circle wasoriginally composed of 30 uprights (each weighing about25 tonnes) capped by horizontal lintels (about 7 tonnes).The bluestones, weighing up to 4 tonnes each, camefrom the Preseli Hills in Wales, some 240km away.
Neolithic and Bronze Age monuments
■ Other key monuments include the Stonehenge Avenue(c. 2,500-1,700 BC and 2.5km long), the Cursus (c. 3,600-3,400 BC and 2.7km long), Woodhenge (c. 2,300 BC),and Durrington Walls (c. 2,500 BC).
■ The Stonehenge WHS contains more than 350prehistoric burial mounds. These include 10 Neolithiclong barrows, the rest are Bronze Age round barrows.The key barrow cemeteries are Normanton Down, KingBarrows, Cursus Barrows, Winterbourne Stoke, Wilsfordand Lake Barrows.
■ Altogether, the WHS includes more than 700 knownarchaeological features (including find spots), ofwhich 415 are protected by scheduling within180 scheduled areas.
SIZE AND OWNERSHIP OF THE WHS
■ The Stonehenge WHS covers 2,665 hectares (26.6square km – 6,500 acres). Ownership and managementof the WHS is shared between English Heritage, theNational Trust, the Ministry of Defence, the RSPB,farmers and householders in Amesbury, Larkhill and theWoodford Valley.
■ Stonehenge, Woodhenge and parts of Durrington Wallsare owned by the state and managed by English Heritage.
■ A large part of the landscape surrounding Stonehenge isowned by the National Trust (827 ha, 31% of the WHS).
GRASS RESTORATION
■ In the Stonehenge part of the WHS, 520 hectares ofarable land (20% of the WHS) have been signed up forgrass restoration between 2000 and 2008, protecting andenhancing the setting of 105 prehistoric monuments.
■ This represents a financial commitment from Defra of£2,256,000 over the lifetime of the stewardshipagreements (10 years).
STONEHENGE VISITORS ANDFACILITIES
■ 887,000 visitors to Stonehenge in 2007/08 (excluding theSolstice and including free education visits and stonecircle access)
■ About 50% are from overseas, 30% are part of a groupand 5% are education visitors. More than 70% of theeducation visitors are from overseas.
■ Summer Solstice: 30,000 people in June 2008. After yearsof problems, Stonehenge reopened in 2000 for theSummer Solstice under strict conditions.
■ Existing visitor facilities built in 1968 (extended car park,new café, shop and underpass).
■ Access inside the stone circle was stopped in 1978because of vandalism and erosion due to increasingvisitor numbers.
Visitor numbers to Stonehenge (excluding the Solstice and including free education visits and stone circle access)
(source: English Heritage & Stonehenge Complete)
Facts and figures compiled by the Stonehenge WHS Coordinator, November 2008
1920s 1951 1961 1971 1980 1990 2000 2008
20,000 124,000 337,000 550,000 618,000 687,000 790,000 887,000
188 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
Ter
m o
r p
hra
seD
efin
itio
nS
ou
rce
Wor
ld H
erita
ge C
onve
ntio
nW
orld
Her
itage
Con
vent
ion,
Art
icle
4
UN
ESC
O W
orld
Her
itage
Cen
tre
web
site
Wor
ld H
erita
ge S
ite
Site
Prop
erty
Ano
ther
ter
m fo
r W
orld
Her
itage
Site
.
Out
stan
ding
Uni
vers
al V
alue
Ope
ratio
nal G
uide
lines
par
a 49
Ope
ratio
nal G
uide
lines
par
a 78
Inte
grity
Ope
ratio
nal G
uide
lines
par
a 88
Inte
grity
is a
mea
sure
of t
he w
hole
ness
and
inta
ctne
ss o
f the
nat
ural
and
/or
cultu
ral
herit
age
and
its a
ttrib
utes
. Exa
min
ing
the
cond
ition
s of
inte
grity
, the
refo
re r
equi
res
asse
ssin
g th
e ex
tent
to
whi
ch t
he p
rope
rty:
a) in
clud
es a
ll el
emen
ts n
eces
sary
to
expr
ess
its o
utst
andi
ng u
nive
rsal
val
ue;
b) is
of a
dequ
ate
size
to e
nsur
e th
e co
mpl
ete
repr
esen
tatio
n of
the
feat
ures
and
proc
esse
s w
hich
con
vey
the
prop
erty
’s sig
nific
ance
;
c) s
uffe
rs fr
om a
dver
se e
ffect
s of
dev
elop
men
t an
d/or
neg
lect
.
Out
stan
ding
Uni
vers
al V
alue
mea
ns c
ultu
ral a
nd/o
r na
tura
l sig
nific
ance
whi
ch is
so
exce
ptio
nal a
s to
tra
nsce
nd n
atio
nal b
ound
arie
s an
d to
be
of c
omm
on im
port
ance
for
pres
ent
and
futu
re g
ener
atio
ns o
f hum
anity
To
be d
eem
ed o
f Out
stan
ding
Uni
vers
al V
alue
, a p
rope
rty
mus
t al
so m
eet
the
cond
ition
s of
inte
grity
and
/or
auth
entic
ity a
nd m
ust
have
an
adeq
uate
pro
tect
ion
and
man
agem
ent
syst
em t
o en
sure
its
safe
guar
ding
Whe
re t
his
is us
ed w
ith a
cap
ital l
ette
r, th
is te
rm is
use
d as
a s
hort
hand
for
“Wor
ldH
erita
ge S
ite”.
Wor
ld H
erita
ge S
ites
are
reco
gnise
d as
pla
ces
of O
utst
andi
ng U
nive
rsal
Val
ue u
nder
the
term
s of
the
UN
ESC
O W
orld
Her
itage
Con
vent
ion.
The
197
2 U
NES
CO
Con
vent
ion
Con
cern
ing
the
Prot
ectio
n of
the
Wor
ld C
ultu
ral
and
Nat
ural
Her
itage
pro
vide
s fo
r th
e id
entif
icat
ion,
pro
tect
ion,
pre
sent
atio
n an
dtr
ansm
issio
n to
futu
re g
ener
atio
ns o
f cul
tura
l and
nat
ural
her
itage
aro
und
the
wor
ldco
nsid
ered
to
be o
f out
stan
ding
uni
vers
al v
alue
(qv
)
DEFINITIONS FOR THE STONEHENGE WHS MANAGEMENT PLAN
Stonehenge World Heritage Site Management Plan 2009 189Facts and Figures
Ter
m o
r p
hra
seD
efin
itio
nS
ou
rce
Aut
hent
icity
Ope
ratio
nal G
uide
lines
par
a 80
See
Ope
ratio
nal G
uide
lines
par
a 15
4
Ope
ratio
nal G
uide
lines
par
a 15
5
Prot
ectio
nO
pera
tiona
l Gui
delin
es p
ara
97
Ope
ratio
nal G
uide
lines
par
a 98
2008
Sta
tem
ent
of S
igni
fican
ce (
see
belo
w)
Nom
inat
ion
doss
ier
All
prop
ertie
s in
scrib
ed o
n th
e W
orld
Her
itage
List
mus
t ha
ve a
dequ
ate
long
-ter
mle
gisla
tive,
reg
ulat
ory,
inst
itutio
nal a
nd/o
r tr
aditi
onal
pro
tect
ion
and
man
agem
ent
toen
sure
the
ir sa
fegu
ardi
ng. T
his
prot
ectio
n sh
ould
incl
ude
adeq
uate
ly d
elin
eate
dbo
unda
ries.
Sim
ilarly
Sta
tes
Part
ies
shou
ld d
emon
stra
te a
dequ
ate
prot
ectio
n at
the
natio
nal,
regi
onal
, mun
icip
al, a
nd/o
r tr
aditi
onal
leve
l for
the
nom
inat
ed p
rope
rty.
Legi
slativ
e an
d re
gula
tory
mea
sure
s at
nat
iona
l and
loca
l lev
els
shou
ld a
ssur
e th
esu
rviv
al o
f the
pro
pert
y an
d its
pro
tect
ion
agai
nst
deve
lopm
ent
and
chan
ge t
hat
mig
htne
gativ
ely
impa
ct t
he o
utst
andi
ng u
nive
rsal
val
ue, o
r th
e in
tegr
ity a
nd/o
r au
then
ticity
of t
he p
rope
rty
The
Sto
nehe
nge,
Ave
bury
and
Ass
ocia
ted
Site
s W
HS
as a
who
le is
pro
tect
edth
roug
h th
e pl
anni
ng s
yste
m. T
he c
ompl
exes
of o
utst
andi
ng p
rehi
stor
ic m
onum
ents
with
in t
he la
ndsc
ape
with
out
para
llel (
see
Stat
emen
t of
Sig
nific
ance
) ar
e pr
otec
ted
byde
signa
tion
as s
ched
uled
mon
umen
ts.
Tod
ay, t
hese
Sta
tem
ents
are
ado
pted
by
the
UN
ESC
O W
orld
Her
itage
Com
mitt
eefo
r al
l new
WH
Ss a
t th
e tim
e of
insc
riptio
n
The
Sta
tem
ent
of O
utst
andi
ng U
nive
rsal
Val
ue s
houl
d in
clud
e a
sum
mar
y of
the
Com
mitt
ee's
det
erm
inat
ion
that
the
pro
pert
y ha
s ou
tsta
ndin
g un
iver
sal v
alue
,id
entif
ying
the
crit
eria
und
er w
hich
the
pro
pert
y w
as in
scrib
ed, i
nclu
ding
the
asse
ssm
ents
of t
he c
ondi
tions
of i
nteg
rity
or a
uthe
ntic
ity, a
nd o
f the
req
uire
men
ts fo
rpr
otec
tion
and
man
agem
ent
in fo
rce.
The
Sta
tem
ent
of O
utst
andi
ng U
nive
rsal
Val
uesh
all b
e th
e ba
sis fo
r th
e fu
ture
pro
tect
ion
and
man
agem
ent
of t
he p
rope
rty
At
the
time
of w
ritin
g (2
008)
the
re is
no
such
Sta
tem
ent
for
Ston
ehen
ge a
ndA
vebu
ry, a
s U
NES
CO
met
hodo
logy
for
prep
arin
g th
ese
Stat
emen
ts fo
r ol
der
Site
s is
still
und
er d
evel
opm
ent.
(see
bel
ow fo
r St
atem
ent
of S
igni
fican
ce
Stat
emen
t of
Out
stan
ding
Uni
vers
al V
alue
The
abi
lity
to u
nder
stan
d th
e va
lue
attr
ibut
ed t
o th
e he
ritag
e de
pend
s on
the
deg
ree
to w
hich
info
rmat
ion
sour
ces
abou
t th
is va
lue
may
be
unde
rsto
od a
s cr
edib
le o
rtr
uthf
ul. K
now
ledg
e an
d un
ders
tand
ing
of t
hese
sou
rces
of i
nfor
mat
ion,
in r
elat
ion
toor
igin
al a
nd s
ubse
quen
t ch
arac
teris
tics
of t
he c
ultu
ral h
erita
ge, a
nd t
heir
mea
ning
, are
the
requ
isite
bas
es fo
r as
sess
ing
all a
spec
ts o
f aut
hent
icity
.[O
p G
u 8
0]
190 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
Ter
m o
r p
hra
seD
efin
itio
nS
ou
rce
Man
agem
ent
Syst
emO
pera
tiona
l Gui
delin
es
Stat
emen
t of
Sig
nific
ance
Cf W
HC
06
30 C
OM
11A
.1
Cf O
pera
tiona
l Gui
delin
es p
ara
155
See
Man
agem
ent
Plan
par
a 3.
3.4
Cf O
pera
tiona
l Gui
delin
es p
ara
100
Att
ribut
es a
re a
dire
ct t
angi
ble
expr
essio
n of
the
Out
stan
ding
Uni
vers
al V
alue
of
the
prop
erty
At
Ston
ehen
ge, a
ll th
ese
attr
ibut
es a
re u
ltim
atel
y de
rived
from
the
200
8 St
atem
ent
ofSi
gnifi
canc
e an
d th
e no
min
atio
n an
d ev
alua
tion
docu
men
tatio
n of
198
5/6.
Tak
ento
geth
er, t
he a
ttrib
utes
def
ine
the
OU
V o
f the
Sto
nehe
nge
WH
S.
Att
ibut
e/ A
ttrib
utes
of
Out
stan
ding
Uni
vers
al V
alue
At
the
requ
est
of U
NES
CO
, the
se h
ave
been
pre
pare
d fo
r ol
der
Site
s w
here
the
rew
as n
o as
sess
men
t of
aut
hent
icity
and
inte
grity
at
the
time
of in
scrip
tion,
so
that
(as
yet)
a fu
ll St
atem
ent
of O
utst
andi
ng U
nive
rsal
Val
ue c
anno
t be
pre
pare
d. T
heSt
atem
ent
of S
igni
fican
ce s
houl
d be
con
sider
ed a
wor
king
too
l for
the
man
agem
ent
of t
he p
rope
rty.
A S
tate
men
t of
Sig
nific
ance
incl
udes
a s
umm
ary
of t
he C
omm
ittee
's d
eter
min
atio
nth
at t
he p
rope
rty
has
outs
tand
ing
univ
ersa
l val
ue, i
dent
ifyin
g th
e cr
iteria
und
er w
hich
the
prop
erty
was
insc
ribed
, but
doe
s no
t co
ver
auth
entic
ity a
nd in
tegr
ity s
ince
the
sew
ere
not
asse
ssed
at
the
time
of n
omin
atio
n.
The
re is
a S
tate
men
t of
Sig
nific
ance
for
the
Ston
ehen
ge, A
vebu
ry a
nd A
ssoc
iate
dSi
tes
Wor
ld H
erita
ge S
ite, a
gree
d by
UN
ESC
O in
200
8. It
is d
eriv
ed fr
om t
heno
min
atio
n an
d ev
alua
tion
docu
men
tatio
n of
198
5/6.
Each
nom
inat
ed p
rope
rty
shou
ld h
ave
an a
ppro
pria
te m
anag
emen
t pl
an o
r ot
her
docu
men
ted
man
agem
ent
syst
em w
hich
sho
uld
spec
ify h
ow t
he o
utst
andi
ng u
nive
rsal
valu
e of
a p
rope
rty
shou
ld b
e pr
eser
ved,
pre
fera
bly
thro
ugh
part
icip
ator
y m
eans
.
The
pur
pose
of a
man
agem
ent
syst
em is
to
ensu
re t
he e
ffect
ive
prot
ectio
n of
the
nom
inat
ed p
rope
rty
for
pres
ent
and
futu
re g
ener
atio
ns
Ston
ehen
ge h
as h
ad a
n ef
fect
ive
Man
agem
ent
Plan
sin
ce 2
000
Stonehenge World Heritage Site Management Plan 2009 191Facts and Figures
Ter
m o
r p
hra
seD
efin
itio
nS
ou
rce
WH
C 0
8 C
om32
8B
93; t
his
is th
e fir
st p
art
of t
he a
gree
d St
atem
ent
of S
igni
fican
ceT
he S
tone
heng
e, A
vebu
ry, a
nd A
ssoc
iate
d Si
tes
Wor
ld H
erita
ge p
rope
rty
isin
tern
atio
nally
impo
rtan
t fo
r its
com
plex
es o
f out
stan
ding
pre
hist
oric
mon
umen
ts.
It co
mpr
ises
two
area
s of
cha
lkla
nd in
Sou
ther
n Br
itain
with
in w
hich
com
plex
es o
fN
eolit
hic
and
Bron
ze A
ge c
erem
onia
l and
fune
rary
mon
umen
ts a
nd a
ssoc
iate
d sit
esw
ere
built
. Eac
h ar
ea c
onta
ins
a fo
cal s
tone
circ
le a
nd h
enge
and
man
y ot
her
maj
orm
onum
ents
. At
Ston
ehen
ge t
hese
incl
ude
the
Ave
nue,
the
Cur
suse
s, D
urrin
gton
Wal
ls, W
oodh
enge
, and
the
den
sest
con
cent
ratio
n of
bur
ial m
ound
s in
Brit
ain.
At
Ave
bury
, the
y in
clud
e W
indm
ill H
ill, t
he W
est
Kenn
et L
ong
Barr
ow, t
he S
anct
uary
,Si
lbur
y H
ill, t
he W
est
Kenn
et a
nd B
eckh
ampt
on A
venu
es, t
he W
est
Kenn
et P
alisa
ded
Encl
osur
es, a
nd im
port
ant
barr
ows.
The
Wor
ld H
erita
ge p
rope
rty
is of
Out
stan
ding
Uni
vers
al V
alue
for
the
follo
win
gqu
aliti
es:
Ston
ehen
ge is
one
of t
he m
ost
impr
essiv
e pr
ehist
oric
meg
alith
ic m
onum
ents
inth
e w
orld
on
acco
unt
of t
he s
heer
siz
e of
its
meg
alith
s, th
e so
phist
icat
ion
of it
sco
ncen
tric
pla
n an
d ar
chite
ctur
al d
esig
n, t
he s
hapi
ng o
f the
sto
nes,
uniq
uely
usin
gbo
th W
iltsh
ire S
arse
n sa
ndst
one
and
Pem
brok
e Bl
uest
one,
and
the
pre
cisio
n w
ithw
hich
it w
as b
uilt.
At
Ave
bury
, the
mas
sive
Hen
ge, c
onta
inin
g th
e la
rges
t pr
ehist
oric
sto
ne c
ircle
inth
e w
orld
, and
Silb
ury
Hill
, the
larg
est
preh
istor
ic m
ound
in E
urop
e, d
emon
stra
teth
e ou
tsta
ndin
g en
gine
erin
g sk
ills
whi
ch w
ere
used
to
crea
te m
aste
rpie
ces
ofea
rthe
n an
d m
egal
ithic
arc
hite
ctur
e.
The
re is
an
exce
ptio
nal s
urvi
val o
f pre
hist
oric
mon
umen
ts a
nd s
ites
with
in t
heW
orld
Her
itage
site
incl
udin
g se
ttle
men
ts, b
uria
l gro
unds
, and
larg
e co
nstr
uctio
nsof
ear
th a
nd s
tone
. Tod
ay, t
oget
her
with
the
ir se
ttin
gs, t
hey
form
land
scap
esw
ithou
t pa
ralle
l. T
hese
com
plex
es w
ould
hav
e be
en o
f maj
or s
igni
fican
ce t
o th
ose
who
cre
ated
the
m, a
s is
appa
rent
by
the
huge
inve
stm
ent
of t
ime
and
effo
rt t
hey
repr
esen
t. T
hey
prov
ide
an in
sight
into
the
mor
tuar
y an
d ce
rem
onia
l pra
ctic
es o
fth
e pe
riod,
and
are
evi
denc
e of
pre
hist
oric
tec
hnol
ogy,
arc
hite
ctur
e, a
ndas
tron
omy.
The
car
eful
siti
ng o
f mon
umen
ts in
rel
atio
n to
the
land
scap
e he
lps
usto
furt
her
unde
rsta
nd t
he N
eolit
hic
and
Bron
ze A
ge.
Ston
ehen
ge, A
vebu
ry a
ndA
ssoc
iate
d Si
tes
Wor
ldH
erita
ge S
ite
192 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
Ter
m o
r p
hra
seD
efin
itio
nS
ou
rce
Ass
ocia
ted
Site
sSe
e pr
evio
us e
ntry
for
desc
riptio
n of
Ston
ehen
ge, A
vebu
ry a
nd A
ssoc
iate
d Si
tes
Wor
ld H
erita
ge S
ite, i
nclu
ding
the
se
Rem
aini
ng s
ites
Ass
ocia
ted
sites
and
mon
umen
ts
Site
s
Mon
umen
ts
rela
ted
sites
asso
ciat
ed s
ites
Land
scap
e w
ithou
t pa
ralle
lSe
e St
atem
ent
of S
igni
fican
ce a
bove
The
Sta
tem
ent
of S
igni
fican
ce m
akes
cle
ar t
hat
ther
e ar
e tw
o la
ndsc
apes
with
out
para
llel –
one
at
Ston
ehen
ge a
nd o
ne a
t A
vebu
ry, b
oth
form
ed o
f com
plex
es o
fm
onum
ents
of t
he N
eolit
hic
and
Bron
ze A
ge, t
oget
her
with
the
ir se
ttin
gs a
ndas
soci
ated
site
s.
preh
istor
ic m
onum
ents
and
sites
with
in t
he W
HS
othe
r m
onum
ents
and
site
sof
the
per
iod
Thi
s ph
rase
is a
s se
t ou
t in
the
198
5 no
min
atio
n do
cum
enta
tion,
and
has
the
sam
ede
finiti
on a
s “A
ssoc
iate
d Si
tes”
Thi
s ph
rase
is a
s se
t ou
t in
the
198
5 no
min
atio
n do
cum
enta
tion,
and
has
the
sam
ede
finiti
on a
s “A
ssoc
iate
d Si
tes”
Thi
s ph
rase
is a
s se
t ou
t in
the
198
5 no
min
atio
n do
cum
enta
tion.
Suc
h sit
es a
reun
-nam
ed “
Ass
ocia
ted
Site
s” a
s de
fined
abo
ve.
Stonehenge World Heritage Site Management Plan 2009 193Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 193Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 193Facts and Figures
ABBREVIATIONS USED IN THE MANAGEMENT PLAN
The abbreviations used only in the Action Plan are listed in 15.4.
AHEV Area of High Environmental Value
ASAS Area of Special Archaeological Significance
BAP Biodiversity Action Plan
CLA Country Land and Business Association
CSS Countryside Stewardship Scheme
DCMS Department for Culture, Media and Sport
Defra Department for the Environment, Food and Rural Affairs
EH English Heritage
EIA Environmental Impact Assessment
FOAM Friends of Ancient Monuments
GIS Geographical Information System
HLS Higher Level Scheme
ICOMOS International Council on Monuments and Sites
ICOMOS UK UK national committee of ICOMOS
LDF Local Development Framework
MOD Ministry of Defence
MPBW Ministry of Public Building and Works
NFU National Farmers Union
NNR National Nature Reserve
NT National Trust
NWC New Wiltshire Council
OUV Outstanding Universal Value
PPG Planning Policy Guidance
PPS Planning Policy Statement
QCA Qualifications and Curriculum Authority
RPG Regional Planning Guidance
RSPB Royal Society for the Protection of Birds
RSS Regional Spatial Strategy
SAC Special Area of Conservation
SDC Salisbury District Council
SMR Sites and Monuments Record
SPA Special Protection Area
SPD Supplementary Planning Document
SPG Supplementary Planning Guidance
SSSI Site of Special Scientific Interest
SSWM Salisbury and South Wiltshire Museum
SUSTRANS (sustainable transport charity)
UKNC UK National Commission for UNESCO
UNESCO United Nations Educational, Scientific and Cultural Organization
WCC Wiltshire County Council
WHM Wiltshire Heritage Museum
WHS World Heritage Site
194 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
194 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
194 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
INDEX
Figures in bold refer to illustrations, figures in italics refer to tables.
A
access 10, 71, 74–5, 76, 108, 110,
178(map); aims 108–9; monitoring
indicators 94–95; and road safety
83–4; widening 108
Action Plan 98, 118, 119–32; boundaries
120; conservation 120–4;
management, liaison and monitoring
131–2; research 130; tourism 124–8;
traffic management 128–9; visitor
management 124–8
Advisory Forum 14, 41, 90, 92, 141
agriculture 10, 12, 24–5, 34–5, 43–5, 45,
60–1, 62, 64, 65–6, 69–70, 75, 105
agri-environmental schemes 45–6, 46,
66, 69
aims 10, 98; access 108–9; agriculture
105; boundaries 101–2; climate change
107; conservation 102–7; consultation
results 15; education 109–10;
interpretation 109–10; landscape 104;
long-term objectives 114;
management, liaison and monitoring
114–15; nature conservation 104–6;
outreach operations 109–10;
prioritisation 15; research 113; risk
prevention 107; statutory and policy
framework 100–1; tourism 107–8;
traffic management 111–13; visitor
management 107–11; woodland 106
Airman’s Corner 74, 75, 83
Alexander Keiller Museum, Avebury 28
All-Party Parliamentary Group on World
Heritage 42
Amesbury 14, 14, 39, 41, 43, 44, 73, 73,
74, 156
Amesbury Abbey Park and Garden 34,
35, 39, 39, 63, 66, 157; Amesbury
Archer burial 47, 88; Community Plan
38, 44, 55, 88, 100; Market Town
Partnership 55
Ancient Monuments and Archaeological
Areas Act (1979) 39, 39–40, 54, 59
annual report 92
archaeological importance 21–2
archaeology 38, 176(map)
archives 34, 86–7
area 10, 21, 187
Area Action Plans 54
Areas of High Ecological Value (AHEV)
40
Areas of Prime Biodiversity 40
Areas of Special Archaeological
Significance 39
Army Training Estate (Salisbury Plain) 37,
46, 61, 69
artefacts 28, 34, 34, 87, 155, 156
artistic influence 22, 31, 31, 33, 36, 47
Aubrey, John 22
Aubrey Holes, the 86, 114
audio guide 79, 79
authenticity 32, 32–3, 189
Avebury 10, 21, 23, 25, 26, 42–3, 44,
57, 91-2, 91; WHS Coordinator 41;
WHS Management Plans 15, 20, 42,
42–3, 58, 86, 91, 101–2; WHS Group
27–8
Avebury Archaeological and Historical
Research Group 87
Avenue, Durringinton Walls to the Avon
19, 19
Avenue, the 19, 29, 30, 33, 76, 104, 156
Avon, River and valley 19, 23–4, 35, 40,
40, 47, 62, 69, 104
B
Baluster Bridge 66
barrows 19, 21, 31, 32, 62, 64, 65. see
also individual sites
biodiversity 12, 38, 61, 63, 68, 104-5
Biodiversity Action Plan (BAP) 104
bird life 17-18, 35, 35, 40, 46, 69, 69,
105
boundaries 13, 20-1, 33, 57-8, 101-2,
120; buffer zones 56, 58, 101, 101-2
Breeding Bird Survey (RSPB) 17–18
Bronze Age 21, 29, 62, 155-6, 156, 187
Buildings at Risk Register 66
burials 29, 62, 88, 156, 187
Bush Barrow 34, 34, 104
C
car parking 16, 72, 74, 75, 77, 77, 78,
84, 84, 110, 110, 111
Chalcolithic, the 155–6
Chubb, Cecil 43
climate change, effects of 70, 107
Colt-Hoare, Sir Richard 22
Community Plans 100
Community Strategies 55
condition survey, 2002 16
Coneybury Henge 155
conservation 11, 57. see also nature
conservation: action plan 120–4; aims
102–7; historic environment 66;
improving condition of remains 60–1;
and the management plan 12, 13;
monitoring 54, 94
Conservation Areas 39
Conservation Principles: Policies and
Guidance for the Sustainable
Management of the Historic
Environment (English Heritage) 57
Consultation Booklet 14, 14
Convention concerning the Protection
of the World Cultural and Natural
Heritage (the World Heritage
Convention) 11
Council for British Archaeology 16
counter-disaster preparedness 70
Countryside Stewardship arable
reversion special project 16
Countryside Stewardship Grassland
Restoration Scheme 90
Countryside Stewardship Scheme 66, 69
Countryside Stewardship special project
17
County Wildlife Sites 40
cultural heritage and values 21–2, 27,
36–7
Culture, Media and Sport , Department
for (DCMS) 12, 13, 14, 18, 42, 55
curatorial team 41
Cursus, the 19, 21, 29, 30, 31, 75
Cursus/Stonehenge Down 24
cycle network 73
Stonehenge World Heritage Site Management Plan 2009 195Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 195Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 195Facts and Figures
D
damage 10, 16, 32, 60–1, 64–5, 78
data sources 15
DCMS 16
Defence, Ministry of 35, 37, 43, 164–5
Defra 16, 42, 45, 61, 66, 69, 90
degraded sites, enhancement of 104
description 21, 155–7
Design and Access Statements 56
development control 56, 59, 59–60, 100
Disability Discrimination Act (2005) 16,
108
documentation 34
draft Planning Circular 56
Durrington Walls 16, 18, 19, 31, 32, 39,
43, 74, 85
Durrington Walls henge 19, 21, 29, 30,
81, 93, 155
E
earthwork enhancement 81
ecological value 12, 17–18, 35, 113
economic development 37, 73, 109
education 13, 16, 17, 36, 36, 80, 80–1,
90, 94-5, 109–10
English Heritage 13, 16, 17, 32, 39, 41,
41–2, 43, 43–4, 46, 47, 57, 80, 90,
109
English Heritage Stonehenge Director 41
English Heritage/National Trust WHS
Education Group 42
English Nature. see Natural England
Environmental Impact Assessments (EIA)
38, 56, 111
Environmental Improvements in the
Stonehenge WHS, public consultation
14, 14
Environmental Stewardship scheme 16,
17, 66, 69
Environmentally Sensitive Area 35
European Community Directive
79/409/EEC 40
European Habitats Directive 40
European Periodic Report 54
F
Fargo Plantation 24, 47, 64
fences 65, 76, 109
Field Monument Wardens 60
Finds Liaison Officer 60
Forestry Commission 59, 64
Forestry Commission on Woodland
Grant Scheme 64
Friends of Ancient Monuments (FOAM)
16, 61, 89
funding 16, 41–2, 69, 90–1
G
General Permitted Development Order
38
Geographic Information System 15, 18,
47, 63, 168
Good Practice on Planning for Tourism
(CLG) 108
governance 90
government statements affecting
Stonehenge 57
grassland 10, 18, 176(map); biodiversity
35, 104–5; chalk 35, 66, 67, 68, 68–9,
104; management 76, 76, 105;
restoration 16, 17, 18, 25, 33, 34, 42,
45–6, 46, 61, 65, 69–70, 90, 91, 104,
177(map), 187; wet 69
Green Travel Plan 112–13
Guardianship education scheme 17
Guardianship Sites 39
guidance and standards 147
guidebook 17, 79
guided tours 16, 79
H
Habitat Action Plan 104
hedge removal 59
Herb Stovel Risk Preparedness: a
Management Manual for World
Cultural Heritage( ICCROM) 70
heritage asset control 56
heritage designations 180(map)
Heritage Partnership Agreements 56
Heritage Protection in the 21st Century
(White Paper 2007) 55–6
heritage protection reform 55–6
Heritage Protection White Paper 39,
55–6, 60, 103–4
Highways Agency 18, 20, 82
hillforts 34, 74
Historia Anglorum (Henry of Huntingdon)
22
historic buildings, protection policies 38
historic environment 22, 34, 39–40, 66;
Field Advisers 60
Historic Landscape Character
Assessment 63, 106
I
Inscription onto World Heritage List 20
Integrated Land Management Plan for
the Army Training Estate Salisbury
Plain (MOD/DE) 38
integrity 32, 33–4, 188
International Council on Monuments
and Sites (ICOMOS) 12
International Cultural Tourism Charter 166
International Cultural Tourism Charter
(ICOMOS) 108
international involvement 52–4
interpretation 10, 12, 16, 79–80, 94-5,
109–10
Interpretation and Learning Strategy 16,
87
Interpretation and Learning Strategy for
Stonehenge 80
intrusive features 106–7
Iron Age 156
J
Jones, Inigo 22, 22
K
key issues 50-1
King Barrow Ridge 20, 24, 30, 31, 64,
64, 156
L
Lake 39, 44
Lake Down Barrow Group 16, 46, 47
Land in the Town and Country Planning
(General Permitted Development)
Order 1995 (GPDO) 56
land management 18, 43, 95
land ownership 15, 41, 43, 44, 45, 74,
179(map), 187
land use 176(map)
196 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
196 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
196 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
Land Use Plan (National Trust) 16, 18,
38
landscape 10, 12, 16, 24, 33, 62, 63, 104,
106–7, 156–7, 181(map); agricultural
24–5, 45; archaeological 21–2;
authenticity 32–3; character 23,
183(map); conservation 34–6, 40;
disposition of physical remains 33; high
downland 23; historic environment
values 22; historical 74; intrusive
features 106–7; monitoring indicators
94; perceptions of 22; protection
policies 38; reconstruction drawing 31;
regional context 23, 182(map); set
aside 35; significance of monuments
within 31; wider 31–2
Larkhill 12, 24, 33, 47, 63, 84, 164–5;
Aerodrome 34, 74; Garrison 24, 44,
46, 64, 74; Plantation 24
LAWHF 42
Lesser Cursus, the 18, 24, 29, 30, 43
liaison 41, 114–15, 131–2
Listed Buildings 39, 66
Local Area Agreements 40
local Community Plans 55
Local Development Frameworks 54–5,
73, 100
Local Government Act (2000) 55
location 20, 20, 29, 31
long-term objectives 88, 114, 131
M
management: context 41–7; and liaison
10, 11–12, 88–9; system 43, 190;
UNESCO operational guidelines 53,
54
Management Plan Implementation
Group 90
Marlborough Downs 23
medieval and post-medieval activity 74,
156–7
Mesolithic, the 155
metal detectorists 59–60
military activity, historic 74
Monarch of the Plain barrow 64
monitoring arrangements 54, 92-3, 94-5,
115, 131–2
Monument Protection Programme 60
monuments 19, 22, 32–3, 54, 60–1, 63,
64–5, 103–4, 155
museum and archive collections 34, 81
N
national agencies, management and
liaison 89
National Archives 34
National Heritage Act (1983) 43–4
National Monuments Record 34
National Trust 16, 17, 18, 21, 32, 35, 38,
41, 43, 44, 46, 60, 69, 76, 79, 80,
80–1, 86, 89
National Trust Act (1907) 44
Natural England (formerly English
Nature) 40, 41, 42, 66, 69, 104
Natural England grants 35
nature conservation 34–6, 66, 104–6;
designations 181(map); grassland
reversion 66, 68–70; monitoring
indicators 95
nature reserves 68
Neolithic activity 19, 19, 21, 21, 155,
187
New King Barrows 24, 38
New Opportunities Fund 17, 42
Normanton Down 16, 17, 31, 35, 47,
69; Barrow Group 16, 30, 33, 43, 46,
47, 60, 61, 61, 91, 156; Management
Plan (RSPB) 38
Normanton Down Ridge 20, 24
North Kite 63
North Wessex Downs Area of
Outstanding Natural Beauty 23
North West Prospect of Stone Henge,The
(Jones) 22
O
objectives 13, 98
Operational Guidelines for the
Implementation of the World Heritage
Convention (UNESCO) 53–4, 58, 91
Orientation leaflet 79
Outreach and Learning Group 17
outreach operations 17, 109–10, 110
Outstanding Universal Value (OUV) 10,
11, 12, 13, 25, 28–32, 188; attributes
28, 103, 190; Statement of Significance
26
Oxford Archaeology 61
P
Parks and Gardens of Special Historic
Interest 39
Parsonage Down National Nature
Reserve 35
partnerships 89
Periodic Report for Stonehenge,
Avebury and Associated Sites 54
Periodic Report on Europe 25
physical remains, disposition 33
Planning and Compulsory Purchase Act
(2004) 37, 54
planning and policies 37–8, 52, 54–5;
Local Area Agreements 40;
monitoring indicators 95; national 38;
regional, sub-regional and local 38,
170–1; restrictions 44; Stonehenge
WHS Committee responsibilities 41;
UNESCO policies and guidance 52–4
planning applications 16, 59, 63, 100–1
Planning Circular on World Heritage 38
Planning Policy Guidance Notes and
Statements 38
Policy Guidance 37
pollution 12, 34, 40
PPG15 (Planning and the Historic
Environment, 1994) 38
Preseli Hills, Wales 19
Preservation and Management Policy
(1984) 60
Principles for Undertaking Archaeological
Work (2002) 16
priorities, 2009-2015 10, 99
Property Management Plan (National
Trust) 38
public consultation process 14, 14, 15,
18–19, 142–3
public transport 83, 83, 110
publications 17, 20, 160–3
Stonehenge World Heritage Site Management Plan 2009 197Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 197Facts and Figures
Stonehenge World Heritage Site Management Plan 2009 197Facts and Figures
R
regional, sub-regional and local planning
policies 38, 170–1
regional and local authorities,
management and liaison 89
Regional Character Areas 23
Regional Planning Guidance 54
Regional Spatial Strategies 54–5, 100
Register of Historic Assets 56
research 12, 36, 84–5, 113; action plan
130; aims 113; framework 15, 17, 19,
85, 86, 87, 113; links with Avebury
and beyond 87; monitoring indicators
95; priorities 85–6; proposals 113;
since 2000 19–20; sustainable 10, 86,
113
revision timetable 144
Richards, Julian 86
risk management 70, 107
roads 12, 18, 19; A303 10, 10, 12, 16,
18–19, 20, 24, 40–1, 81, 82, 99, 112;
A303 Stonehenge Improvement
Scheme and Visitor Centre Project
Public Inquiries 16; A344 10, 12,
18–19, 24, 81, 82, 83, 99, 112; A345
81; A360 81; Environmental Impact
Assessment 20; government policy
40–1; intrusion 10, 15, 16, 24, 33,
33–4, 81, 99, 111–12; network and
usage 81–2; safety 83, 83–4; tunnel
scheme 18, 82
Robin Hood’s Ball 32, 32, 63
Roman activity 19, 74, 156
Rox Hill 74
Royal Society for the Protection of Birds
16, 17–18, 35, 38, 47, 61, 68, 69
Rural Development Service 45–6
S
salary costs 41–2
Salisbury 34; Cathedral 71, 72; District
Local Plan 39, 40; Visitor Survey
(1998) 71
Salisbury and South Wiltshire Museum
(SSWM) 47, 60, 81, 87
Salisbury District Council 41, 43; Core
Strategy 55; Local Development
Frameworks 54–5; Supplementary
Planning Document 55;
Supplementary Planning Guidance
(SPG) 12, 15–16, 38
Salisbury Plain 23, 35, 36, 40
Saxon activity 74, 156
scheduled areas 22
Scheduled Monuments 39
Scheduled Monuments Consent (SMC)
39, 56
scrub encroachment 61, 61, 65, 89, 91
security 77
serial sites, management guidelines 54
setting 18, 20, 22, 62, 62–3, 63, 63–4,
93, 94, 110
Seven Barrows 47
signage 16, 17, 42, 42
significance 25, 25–6, 26–7, 28, 28–32
Sites of Special Scientific Interest (SSSI)
35, 40
skies, the 29, 29, 33
solstice management 37, 77–8, 187
South Wessex Downs Natural Area 34
South Wessex Downs Natural Area
Profile 68, 104
South Wiltshire Community Strategy
100
South Wiltshire Economic Strategy 73
South Wiltshire Museum, Salisbury 28,
34
South Wiltshire Strategic Partnership 55
Southern Circle, the 19
SPACES Project 15, 17, 19, 115
spatial patterning 19, 62
Special Area of Conservation (SAC) 40
Special Landscape Area (SLA) 40
Special Protection Area (SPA) 40
spiritual values 36, 37, 109
stakeholders 12, 14, 41, 88–9, 90, 167
State of Conservation Decision, World
Heritage Committee 152
Statement of Outstanding Universal
Value 25, 189
statement of principles governing
archaeological work in the Stonehenge
World Heritage Site 86, 145–6
Statement of Significance 20, 25, 25–6,
27, 28, 42, 152–4, 190
status 10, 29, 80
statutory and policy framework 100–1,
119
statutory development plans 37
statutory spatial planning system 11
Stone Circle Access scheme 76
Stone-curlew Species Action Plan 38,
105
Stonehenge 10, 11, 21, 24, 28, 29, 31,
36, 36, 55, 58, 71, 76, 78, 84, 93,
98, 101, 107, 115, 149–54, 187
Stonehenge, Avebury and Associated
Sites World Heritage Site 39, 191
“Stonehenge Bowl” (Cleal et al) 20
Stonehenge Down 35
Stonehenge Environmental
Improvements Project 41, 57
Stonehenge Project, 1998 13
Stonehenge Regulations 1997 39–40,
158–9
Stonehenge Research Framework (Darvill))
15, 19, 87, 113
Stonehenge Riverside Project 15, 17, 17,
19, 19, 32–3, 85, 87, 114
Stonehenge WHS administrative
assistant 41
Stonehenge WHS Condition Survey (2002)
15
Stonehenge WHS Landscape and
Planning Study (Land Use Consultants)
23–4
Stonehenge WHS Management Group
90
Stonehenge WHS Management
Implementation Group 41
Stonehenge WHS Management Plan
(2000) 12, 13, 15, 15–21, 38, 58, 90
Strategic Defence Review (1998) 46
Supplementary Planning Documents
(SPDs) 54, 55
198 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
198 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
198 Stonehenge World Heritage Site Management Plan 2009Facts and Figures
Supplementary Planning Guidance (SPG)
12
sustainability 13, 38, 71
Sustainable Access and Interpretation
(English Heritage) 16
Sustainable Community Strategies 55,
88, 100
T
Till, River 35, 40
Time Team reconstruction 93
topography 22, 24
tourism 37, 38, 71–3, 77, 107–8, 124–8,
166
traffic management 10, 12, 24, 74, 81,
81–2, 82, 108, 111–13, 128–9
Transport, Department of 18
transport policies 18, 38, 111–13, 128–9
treasure hunting 59
U
UK National Commission for UNESCO
(UKNC) 52–3
UNESCO 10, 11, 12, 14, 18, 42, 52,
52–4, 110
UNESCO Criteria for Insceiption on the
World Heritage List 26–7
UNESCO Operational Guidelines 25
UNESCO World Heritage Committee
25
utility installations 59
V
Vespasian’s Camp 34, 35, 47, 66, 66, 74,
156, 157
Vision for the Future (English Heritage
2000) 10, 16, 98, 99, 172
visitor facilities 15, 16, 18, 74, 110, 187;
aims 109, 110–11; Environmental
Impact Assessment 111; government
policy 41; inadequacy of current 78,
78–9; operation 43; and the Vision for
the Future 16
visitors 12, 17, 22, 37; impact 65, 78;
management 75–7, 76, 108–9, 124–8;
numbers 10, 37, 71, 75, 187
visual sensitivity 184(map)
volunteering opportunities 80–1, 89, 91,
109
W
website 17
Wessex Archaeology 17, 24, 42, 60, 87
West Amesbury 39, 44
WHS Committee 27–8, 90
WHS Coordinator 17, 18, 41, 44, 90,
91, 92, 148
wider area 63
wildlife 13, 46, 64, 104–6
Wildlife and Countryside Act 1981 40
Wilsford 39, 44
Wiltshire, unitary authority 55, 90
Wiltshire and Swindon History Centre
34
Wiltshire Archaeological and Natural
History Society 41, 43
Wiltshire BAP 68, 104
Wiltshire County Council 41, 42, 43, 47,
63; Archaeology Service 101;
Direction as to land around
Stonehenge 169; Sites and
Monuments Record (SMR) 15
Wiltshire Downs 36
Wiltshire Heritage Museum, Devizes 28,
34, 47, 81, 87
Wiltshire Sites and Monuments Record
34
Wiltshire Structure Plan 54
Wiltshire Wildlife Sites Survey and
Nature Conservation Strategy 40
Wiltshire Wildlife Trust 40
Winterbourne Stoke 21, 24, 30
Woodford Valley 39, 43
Woodhenge 21, 29, 30, 31, 36, 39, 44,
90, 155
woodland 10, 16, 18, 24, 33, 35–6, 47,
62, 63–4, 64, 64, 106, 156–7,
176(map), 177(map)
World Heritage Bureau, reports and
decisions 149–51
World Heritage Committee 13, 14, 41,
42, 53–4, 58, 70, 139–40; reports and
decisions 149–54
World Heritage Convention 11, 25, 52,
57, 188
World Heritage Cultural Landscape
21–2, 102
World Heritage draft planning circular
(May 2008) 11
World Heritage in Danger List 54
World Heritage Site 10, 175(map) ,
187, 188
World Heritage Sites 11, 52, 53, 56
Y
Yarnbury hillfort 63
Back cover (clockwise):
Schoolchildren from the local primary school in Amesbury re-enacting a pilgrimage to StonehengeElaine Wakefield 2004 © Wessex Archaeology
Aerial view of the Neolithic Cursus from the West showingBronze Age Cursus barrows on the rightDamian Grady 2000 © English Heritage Photo Library N000001
Stonehenge at early dawnJames O Davies 2007 © English Heritage Photo Library N071258
Walkers by the King BarrowsLucy Evershed 2008 © National Trust
Winterbourne Stoke barrow group with Neolithic long barrow top rightRoger Featherstone 1993 © English Heritage Photo Library
N930001
Produced by Isabelle BeduDesigned by FONDAPrinted by the colourhouse
Printed on recycled paper containing 50% recovered waste and 50% virgin fibre and manufactured at a mill accreditedwith the ISO 14001 environmentalmanagement standard. The pulp used in this product is bleached using a TotallyChlorine Free (TFC) process.
Misty view of Stonehenge
Jam
es
O D
avie
s 2002 ©
Engl
ish H
eri
tage
Photo
Lib
rary
K022290
For additional copies (product code 51482) or to get this publication in a different format, please contact English Heritage Customer Services:
tel 0870 333 1181 - fax 01793 414926 - textphone 01793 [email protected]
For further information on Stonehenge and the World Heritage Site:www.english-heritage.org.uk/stonehenge
Stonehenge World Heritage TeamEnglish Heritage, Wyndham House, 65 The Close, Salisbury SP1 [email protected]
Many of the photographs credited to English Heritage can be purchased on www.englishheritageprints.comFor enquiries about other images of Stonehenge, call 01793 414 903.
The Stonehenge World Heritage Site Management Plan provides a long-termstrategy to protect the World Heritage Site for present and future generations.The Site is globally important not just for Stonehenge, but for its unique anddense concentration of outstanding prehistoric monuments and sites, whichtogether form a landscape without parallel. The primary aim of the Plan is toprotect the Site by sustaining its Outstanding Universal Value, taking intoaccount other interests such as tourism, farming, nature conservation, research,education and the local community.