stodex structural floors · 2018. 5. 24. · bs 5395 parts 1 and 3 and to building regulations park...

7
k www.stodec.com Stodex Structural Floors MEZZANINES RAISED STORAGE AREAS PLANT SUPPORT PLATFORMS RAISED OFFICES from the experts with more than 30 YRS experience k k REAS A ORT O T CES C s s DON’T RELOCATE - USE YOUR EXISITING PREMISES TO THE FULL INCREASE YOUR: SPACE • WORK AREA • PROPERTY VALUE

Upload: others

Post on 17-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

k

www.stodec.com

StodexStructural Floors

MEZZANINES

RAISED STORAGE AREAS

PLANT SUPPORT PLATFORMS

RAISED OFFICES

from the experts with more than

30 YRS experience

kkREASA

ORT O T

CESC

s s

DON’T RELOCATE - USE YOUR EXISITING PREMISES TO THE FULL

INCREASE YOUR: SPACE • WORK AREA • PROPERTY VALUE

Page 2: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

2 Stodec Products Ltd [email protected] www.stodec.com

Welcome ContentsContents

Over 50 years ago we were working at Dexion designing and installing all manner of structures in slotted angle including early pallet racking and mezzanine � oors with lattice girders and even with timber trusses.

In the years between great changes have been made in materials available, structural standards, Building Regulations, clear spans and a whole new range of applications.

• Our mezzanine structures are now designed to the most detailed

and exacting standards using advanced computer programmes

• We can make sure that the structural sections used and the design

layout give you the strongest and most economical mezzanine

• We have installed mezzanine � oors throughout the UK and in

many overseas countries including Nigeria, Ghana, Mauritania,

Kazakhstan, Cote d’Ivoire, Angola, Trinidad & Ethiopia

YEARS OF EXPERIENCE…

Our design programmes provide fully detailed

calculations and drawings down to the last nut and bolt.

Stodex Mezzanine Floors

We make sure that your installation will meet all Building

Regulation requirements.

ContentsOur Services 4

Site surveys, preparing a design, costing, dealing with Building Regulations, complete installation.

Raised Storage Areas 5

Increasing storage space above or below mezzanine level with or without racking and shelving.

Additional Of� ce Space 6

Options under or over mezzanine level. Consideration of � re rating and � re escape requirements, sound reduction & other partition � ttings & � nishes.

17Production & Plant Structural Supports 7

Air handling equipment, generators or production supply equipment over or under work areas.

Design, Installation & Projects 8

How to use our services to turn your plans into action.

Design, Installation & Projects 9

How we can look after your installation through every stage.

Case Studies 10

Some examples of recent installations.

Other Stodec Group Products & Catalogues 11

Dexion storage equipment, Partitioning for Of� ces & ProductionClean room installations, Overseas supply.

ContentsContents

01908 270 011 01908 270 022

Page 3: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

4 Stodec Products Ltd [email protected] www.stodec.com

ContentsRaised Storage Areas

Our services include:

• Free site surveys

• Free designs and quotations

• Fully detailed structural calculations

and drawings for Building

Regulations and Fire Of� cer

approval

• Assistance with local authority

applications

• Complete manufacture &

installation, if required, including

any associated building work,

electrics, plumbing, partitioning,

� ooring, or storage equipment

In many cases the mezzanine is just part of the requirement. We can provide any type of partition, ceilings, services (including electrics and plumbing), � ooring, racking, goods lifts, pallet gates, security mesh, in fact any item which will give you a fully operational installation.

Raised storage areas are one of the most common applications which frees up space and puts stock and raw materials into a secure location with good selectivity.

WITH A STODEX FLOOR YOU CAN HAVE YOUR STOCK STORED:

YOU de� ne the area that you want to cover, the loads and use that you intend.

WE de� ne the most economic design, the spans and options possible, the most economic cost,

and offer advice on potential building regulation or � re of� cer requirements.

Our Services Raised Storage Areas

OUR MEZZANINE FLOORS ARE DESIGNED TO THE FOLLOWING STANDARDS:

• British Standards structural steel code BS 5950 Parts 1 & 5 structural use of steel in buildings.

• General requirements of Building Regulations and BRE Digest 437.

• Staircases & Handrails – British Standards BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate.

• Loading design category of intended use as covered in British Standards BS 6399 – Part 1 Code of Practice for dead and imposed loads.

• Flooring complies with EN12871: 2010 and to UK National annexes to Eurocodes 1 and 5.

• We incorporate changes and upgrades to the standards applicable to mezzanine � oors as they are introduced so that your � oor will be designed to the highest standard.

• Mezzanine � oor structures need to meet the highest standards so that your staff, your products, your machinery and your company are fully protected.

Our Services

ABOVE:Flooring can be T&G 38mm chipboard, steel chequer plate, open steel grid, solid timber, or any other sheet material.

Edges are protected with steel handrail, and can be lined with solid or mesh partition panels.

Shelving or racking can be positioned above.

BELOW:Spans & loads are variable. We will design to best meet your requirement and advise on the most economical layout, whilst leaving maximum space.

BOTH:Racks above can be two tier joined to those below or independent to a separate layout.

Goods access can be with pallet safety gates, goods elevators, lifts, or incline belt conveyors.

01727 840 594 01727 843 368

Page 4: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

6 Stodec Products Ltd [email protected] www.stodec.com

Contents

This application can increase substantially the value of your building and operations.

The of� ce space can be associated with the production or warehouse area, it can be laboratory or testing area, high quality executive of� ces, or CMM and Clean Room Areas depending on the type of partitioning, � ooring and � xtures that we use.

If you have the headroom (probably 4.3m or above) then a mezzanine over an existing area can increase production space without having to move or add new buildings.

We can install goods lifts, incline conveyors, product elevators, or pallet safety gates to ensure that both raw materials and � nished goods can be moved between ground and mezzanine level.

Many of our structures are used to support air handling equipment or other machinery associated with a production or cleanroom facility.

Steel chequer plate is frequently used for plant and equipment.

Composite and chipboard or timber for Production areas.

Additional Of� ce Space

Additional Of� ce Space Production & Plant Structural Supports

OFFICE AREAS CAN BE:

PRODUCTION OR PLANT SPACE CAN BE:

Increased Production Area or Support for Plant & Machinery

UNDER A MEZZANINE: OVER A MEZZANINE:

OVER THE MEZZANINE:

OR EVEN WITH EXECUTIVE PARTITIONING

OR BOTH

Steel panel, plasterboard, sound rated, � re rated, part glazed, full height glazed, cleanroom or laboratory standard, sound absorbant, or any combination.

acoustic, � re rated, insulated, clean room standard.

vinyl wall covering, painted, taped & jointed.

PARTITIONING CAN BE...

FINISHES CAN BE...

CEILINGS CAN BE...

UNDER THE MEZZANINE:

OR BOTH OVER & UNDER

01908 270 011 01908 270 022

Page 5: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

8 Stodec Products Ltd [email protected] www.stodec.com

ContentsDesign, Installation & ProjectsDesign, Installation & Projects

Let us take the responsibility for turning your plans into action while you concentrate on YOUR BUSINESS.

Design, Installation & ProjectsOur Design and Installation Service can complete your project on time and in the most economic way.

We will supply and co-ordinate the various trades and supplies to meet your standards, budgets and timetables.

We have been carrying out project installation for more than 30 years (some of us for more that

45 years), so please use our many years of experience to consider alternative designs and achieve a

successful result for your project

We have completed projects successfully throughout the UK and in Europe, Asia, Africa and the

Middle East, for both large and small companies.

If you are considering a project, discuss it with us to see how we can help you to achieve success.

...from a few bays of racking tomulti-level distribution warehouses

...from small plant platforms to large structural steel mezzanine areas on single or multiple levels

...from one off partitions to full, multi- � oor of� ce installations or refurbishments, which can include partitions, ceilings, furnishings, � oor coverings, services and electrics, associated building work etc.

...for budgets from £1,000 to £1m

Storage & Materials Handling

Shelving & Racking

Of� ce Interiors

Partitioning

Mezzanine Floors & Structures

MezzanineWe can prepare calculations and drawings for a local authority or � re of� cer approval.

Our contracts division has many years of experience designing and installing � rst class installations.

OUR SITE WORK MEETS

CDM REQUIREMENTS

Layout advice

Our service starts before you buy...

Plan

ning

& D

esig

nIn

stal

lati

onFu

lly O

pera

tion

al

Our installation work can be small or extensive, depending on your requirements

Product Options

Detailed quotations, samples or site-visits

Call us for more information regarding our FINANCE OPTIONS FOR LARGE INSTALLATIONS

01727 840 594 01727 843 368

Page 6: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

10 Stodec Products Ltd [email protected] www.stodec.com

Contents

catalogue

for environments that work

Design & Installation Engineering

rkk

Buy online at:

www.stodec.com

Catalogue

Products &Services

2015- 2016

Other Stodec Group Products & CataloguesCase Studies

Case Studies Other Stodec Products & Catalogues

Mediplus are an Industry award winning company

focused on the research, development, manufacture and

marketing of innovative medical devices that meet the

needs of patients and clinicians worldwide.

As part of their development and expansion programme Stodec were engaged to design and install

a high quality clean room through the Clean Room Division. This included a mezzanine across the

complete area initially to provide storage but with the potential for this area to be used for of� ces or

additional clean room area in the future.

CLIENT: A major UK based shoe retailer with

shops throughout the UK

PROJECT TYPE: 5000m2 of Mezzanine � ooring

and relocation / addition of 2900 Linear metres of

Longspan shelving, second phase ordered.

PROJECT SIZE / DURATION:

5000m2 / 14 weeks

Prices for many components are on the

‘BUY ONLINE’ section of our website

www.stodec.com

FULL LIST OF BROCHURES ON OUR

WEBSITE FREQUENTLY UPDATED

Access our website stodec.com and print from downloads or contact us for a posted copy

CLIENT: Mediplus Limited

PROJECT TYPE: Cleanroom

PROJECT SIZE / DURATION:

170m² / 12 weeks

For this complex job, Stodec designed a 9.6kN/m2 heavy duty

loading � oor with joist centres at 400mm. The design also

included 6m high continuous columns to make installation

easier and avoid baseplates on intermediate levels. An

extensive part list and full documentation were essential to

allow smooth export to Africa.

The Solution

As part of a major warehouse equipment project, which

The Stodec Group were installing for an international client

in Africa, the company was required to design and supply

a large two tier mezzanine � oor serviced with a goods lift

and by fork lift to pallet safety gates.

1400m2 � oor for export to Mauritania

‘BUY ONLINE’ section of our website

Access our website stodec.com and print from

Our website download section also

includes useful data on storage design

and use as well as guidance on health

& safety in the works and warehouse

01908 270 011 01908 270 022

CLIENT: Major Gold Mining Company

Page 7: Stodex Structural Floors · 2018. 5. 24. · BS 5395 Parts 1 and 3 and to Building Regulations Park K and Part M as appropriate. • Loading design category of intended use as covered

Stodec Products is an associated company of the Stodec Group

Stodex Mezzanine Floorswww.stodec.com

Stodec Products is an associatedis

Please call:

01908 27001101727 840594

w: www.stodec.com e: [email protected]

oducts Ltd.

t: 01908 270011f: 01908 270022

ST ALBANS9 The Metro Centre

Ronsonss s

WaySt. Alban AL4 9QT

t: 01727 840594f: 01727 843368

Stodec rPMILTON KEY ESN

8 James ayW

Milton Ke ne MK1 1SUy

or

Denbigh West