Steven Letendre Certified Master Inspector. Home & Commercial Inspection. Thermal Inspection. Air Quality Testing. EIFS Consulting Inspector: Steven Letendre, Admirable Inspection Services Ltd. Cover Page Inspection prepared for: Canadian Company Date of Inspection: 6/28/2018 Inspector: Steven Letendre

Upload: others

Post on 05-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Steven Letendre Certified Master Inspector.

Home & Commercial Inspection. Thermal Inspection. Air Quality Testing. EIFS Consulting

Steven Letendre Certified Master Inspector.

Home & Commercial Inspection. Thermal Inspection. Air Quality Testing. EIFS Consulting

Inspector: Steven Letendre, Admirable Inspection Services Ltd.

Cover Page

Inspection prepared for: Canadian Company Date of Inspection: 6/28/2018

Inspector: Steven Letendre

Page 2: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Admirable Inspection Services Ltd.

Page 1 of 104

Admirable Inspection Services Ltd.

Page 1 of 104

Admirable Inspection Services Ltd.

Page 1 of 104

AREAS OF INTERESTAREAS OF INTEREST

The summary below consists of potentially significant findings or items that may require repairsooner then later. These findings can be a safety hazard, a deficiency requiring a qualifiedcontractor to quote in order to correct or items I would like to draw extra attention to.Throughout the entire report, including the summary and pages that follow, are my findingsand opinions, including, but not limited to, items that require repair, safety hazards anddeficiencies.  All repairs should be completed by a licensed and bonded tradesman or qualifiedprofessional.  I recommend obtaining a copy of all receipts, warranties and permits for thework done.ExteriorPage 15 Item:10

Fence Condition • The chain link fence is in need of repairs throughout theproperty. No major damages where located. Wire hangersare broken, ties are broken and sections are leaning.

Page 17 Item:11

Wall and TrimConditions

• Caulking trim seams and penetrations as necessary toprevent water intrusion. This is normal maintenancearound windows / doors, sealant joints are failingthroughout the exterior.• Damages are present throughout the building on theyard / operations side.

Page 29 Item:15

VegetationComments

• With mature growth in the area trimming andmaintenance will be required to protect the structure fromdamages. Vegetation contact also provides a pathway forwater and pests.

RoofPage 31 Item: 2 Roof Condition • Racking is present in the roof covering at the parapet on

the west side and should be further inspected by theroofing contractor as needed, these can be signs ofbuilding movement, This condition can result inmembrane damage leading to leaking.• Bubbling is present throughout the roof covering, this isa sign of trapped moisture in the roofing system.• Surface sealant is present throughout a large area of theoffice roof top. Secondary or face sealants may be a signof problematic areas.

Page 44 Item: 5 Gutter andDownspoutcondition

• Gutters have debris, Leaking is present. Cleaning isrequired and slope should be inspected and adjusted asrequired for effectiveness. (throughout)

Page 46 Item: 6 Roof Comments • Service lines strung across the roof covering is poorpractice, damages are present as a result, stands withcable tray should be installed to prevent further damages.

Office AreasPage 52 Item: 3 Ceiling Conditions • Thermal anomaly was present in the ceiling. This can be

caused by a larger ongoing roofing element at that willrequire further investigation.

Page 55 Item: 6 ElectricalConditions

• Not all emergency lights are operational. All should beinspected and repaired as needed.

Page 3: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Admirable Inspection Services Ltd.

Page 2 of 104

Admirable Inspection Services Ltd.

Page 2 of 104

Admirable Inspection Services Ltd.

Page 2 of 104

Page 55 Item: 7 Other InteriorArea Comments

• Pest stations are present throughout

Heating Cooling and Air HandlingPage 73 Item: 5 Heating

Comments• The inspector had the opportunity to speak with theHVAC representative performing service today. Severalunit heaters, radiant heaters and roof top equipment areongoing for service. To the best of his knowledge mostother equipment is operating normally. Suggest obtainingservice records for this building to determine pastrecommendations and repair needs. Multiple Unit heaters,a boiler, entry heaters were not operational.• A wall mount units are located in shop walls, these are inpoor conditions and should be replaced if intended foruse.

ShopPage 87 Item: 4 Wall Condition • Moderate cracking in the load bearing wall between the

shop and wash bay. These may be structural issues thatshould be further inspected.

Page 89 Item: 6 Window andFrame Condition

• Damaged: The window(s) are damaged and requirerepair or replacement. See images.

Page 90 Item: 7 ElectricalConditions

• Shop lighting projects a orange / yellow lighting into thespace which was noted to be darker then expected in theilluminated areas. Lighting improvements may bebeneficial.

Page 92 Item: 8 Shop DoorCondition

• Damage: The shop doors are damaged. Repair is desired.

Page 95 Item:13

Shop Comments • The bridge cranes appear to be due for annualinspections.

Cold StoragePage 98 Item: 3 Wall and Trim

Conditions• Damage: Area(s) of damage are present. Recommendrepairs as desired.

Page 101 Item:6

ElectricalConditions

• Not all lights are working, multiple ballasts are veryloud, replacement can be expected at some point.

Page 4: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Admirable Inspection Services Ltd.

Page 3 of 104

Admirable Inspection Services Ltd.

Page 3 of 104

Admirable Inspection Services Ltd.

Page 3 of 104

General Information

Thank you for choosing Admirable Inspection Services as your preferredinspection service provider. It is important to understand that this report is theopinion of the "Inspector" and it is based on the limited visual inspection of theaccessible aspects of the building. The "Inspector" will provide ratings on itemsin a simple "Good", "Fair" Or "Poor" condition and may providerecommendations for repair or further evaluation based on observations madethe day of the inspection. ] This report is the opinion of the "Inspector" and it isbased on the limited visual inspection of the accessible aspects viewed the day ofthe inspection. It is important to remember properly operating itemsmanufactured and installed 50 years ago that function as intended will receive arating of "Good" even if they do not meet todays construction standards. Ainspection is not a warranty or guarantee of a buildings future performance orlack thereof. Admirable Inspection Services will follow the NACHI, IAC2 or AHSStandards of Practice and protocols as closely as possible with services that willexceed these mentioned standards. Admirable is here to support building ownersafter the inspection is over and the report is delivered. Inspection reports can bereviewed in person, over the phone or with a return visit to the inspectionlocation. (Fees may apply)We appreciate the opportunity to conduct this inspection for you!   Pleasecarefully read your entire Inspection Report.  Email us after you have reviewedyour report, so we can go over any questions you may have.  Remember, whenthe inspection is completed and the report is delivered, we are still available toyou for any questions you may have, throughout the entire process.Properties being inspected do not "Pass" or "Fail.” -  The following report isbased on an inspection of the visible portion of the structure all inspection maybe limited by vegetation and possessions. For your safety and liability purposes, we recommend that licensed contractorsevaluate and repair any critical concerns and defects.  Note that this report is asnapshot in time as seen on the day of inspection

1. Persons in AttendanceInspector(s) • Tenant(s)

2. Current state of occupancyThis Property is occupied.

3. Property InformationCommercial Building

4. Number of levelsSingle Level

5. Estimated AgeUnable to determine. Information not avaliable or provided.

6. Weather conditions day of inspectionSunny • Overcast / Cloudy

Page 5: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

General Information ContinuedGeneral Information ContinuedGeneral Information Continued

Admirable Inspection Services Ltd.

Page 4 of 104

Admirable Inspection Services Ltd.

Page 4 of 104

Admirable Inspection Services Ltd.

Page 4 of 104

Exterior

1. Walkway ConditionsGood Fair Poor NA

✔Materials: ConcreteObservations:• Common cracking is present.• Possible trip hazard. This is a safety concern. Leveling is suggested oridentify the area. ( east )

Common cracking is present. Common cracking is present.

Possible trip hazard. This is a safety concern.Leveling is suggested or identify the area. (

east )

Common cracking is present.

2. Parking ConditionsGood Fair Poor NA

✔Materials: AsphaltObservations:• The parking area is in generally good condition, an area of pooling water ispresent on the south side of the lot, drainage does not appear effective here.

Page 6: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 5 of 104

Admirable Inspection Services Ltd.

Page 5 of 104

Admirable Inspection Services Ltd.

Page 5 of 104

The parking area is in generally goodcondition, an area of pooling water is presenton the south side of the lot, drainage does not

appear effective here.

The parking area is in generally goodcondition, an area of pooling water is presenton the south side of the lot, drainage does not

appear effective here.

The parking area is in generally goodcondition, an area of pooling water is presenton the south side of the lot, drainage does not

appear effective here.

The parking area is in generally goodcondition, an area of pooling water is presenton the south side of the lot, drainage does not

appear effective here.

Page 7: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 6 of 104

Admirable Inspection Services Ltd.

Page 6 of 104

Admirable Inspection Services Ltd.

Page 6 of 104

The parking area is in generally goodcondition, an area of pooling water is presenton the south side of the lot, drainage does not

appear effective here.

Mobility access is clear and identifiable at theentry to the building

3. Lot Grade and Drainage ConditionsGood Fair Poor NA

✔Observations:• Flat Lot, minimal slope.• The lot grading is in generally good order, drainage culvert are present,some degree of standing water was noted on the north / west side of theproperty.

Flat Lot, minimal slope. Flat Lot, minimal slope.

Page 8: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 7 of 104

Admirable Inspection Services Ltd.

Page 7 of 104

Admirable Inspection Services Ltd.

Page 7 of 104

The lot grading is in generally good order,drainage culvert are present, some degree ofstanding water was noted on the north / west

side of the property.

Flat Lot, minimal slope.

The display area is well maintained. The display area is well maintained.

Page 9: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 8 of 104

Admirable Inspection Services Ltd.

Page 8 of 104

Admirable Inspection Services Ltd.

Page 8 of 104

The display area is well maintained. This section on the east end of the yard can beexpected to be soft, drainage in the area

Flat Lot, minimal slope. Flat Lot, minimal slope.

Page 10: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 9 of 104

Admirable Inspection Services Ltd.

Page 9 of 104

Admirable Inspection Services Ltd.

Page 9 of 104

The primary entry road and grounds are wellmaintained.

The primary entry road and grounds are wellmaintained.

4. Main Service ConditionGood Fair Poor NA

✔Type: Main Service is underground • Main Service is overhead

Overhead service to the outboard buildings is present, the main is underground.

5. Electric Meter ConditionGood Fair Poor NA

✔Location: Electrical Room (East)Observations:• The meter was located in the electrical room inside the building. East sideat the transformer. A ERROR message is displaying.• Power company seal does not appear tampered with. This security taghelps ensure electrical tampering has not occurred.

Page 11: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 10 of 104

Admirable Inspection Services Ltd.

Page 10 of 104

Admirable Inspection Services Ltd.

Page 10 of 104

The meter was located in the electrical room inside the building. East side at the transformer. AERROR message is displaying.

6. Electrical ConditionsGood Fair Poor NA

✔Observations:• Two damaged electrical stands are present in the parking areas.• Not all cameras have a clear line of sight due to vegetation. Trim asneeded.• Service masts and other electrical debris are laying on the ground near theshipping area.• Exterior lighting was not tested, (daytime inspection) most covers arecovered with debris and should be removed cleaned and tested.

Two damaged electrical stands are present inthe parking areas.

Not all cameras have a clear line of sight due tovegetation. Trim as needed.

Page 12: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 11 of 104

Admirable Inspection Services Ltd.

Page 11 of 104

Admirable Inspection Services Ltd.

Page 11 of 104

Two damaged electrical stands are present inthe parking areas.

Service masts and other electrical debris arelaying on the ground near the shipping area.

Exterior lighting was not tested, (daytimeinspection) most covers are covered with

debris and should be removed cleaned andtested.

Exterior lighting was not tested, (daytimeinspection) most covers are covered with

debris and should be removed cleaned andtested.

Page 13: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 12 of 104

Admirable Inspection Services Ltd.

Page 12 of 104

Admirable Inspection Services Ltd.

Page 12 of 104

Exterior lighting was not tested, (daytime inspection) most covers are covered with debris andshould be removed cleaned and tested.

7. Door Buzzer ConditionGood Fair Poor NA

✔Location: Shipping and receivingObservations:• Door buzzer tested operational.

8. Gas Inlet ConditionGood Fair Poor NA

✔Location: FrontObservations:• Main fuel shutoff was located at the inlet. South side of shipping

Main fuel shutoff was located at the inlet.South side of shipping

Main fuel shutoff was located at the inlet.South side of shipping

Page 14: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 13 of 104

Admirable Inspection Services Ltd.

Page 13 of 104

Admirable Inspection Services Ltd.

Page 13 of 104

9. Plumbing ConditionsGood Fair Poor NA

✔Observations:• Hydrants and Fire hoses are present throughout the property. Functiontesting is not within the scope of this inspection.• Sprinkler, irrigation systems or water features are not tested. Systemsoperation overview can be performed by seasonal maintenance crews.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Page 15: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 14 of 104

Admirable Inspection Services Ltd.

Page 14 of 104

Admirable Inspection Services Ltd.

Page 14 of 104

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Hydrants and Fire hoses are presentthroughout the property. Function testing is

not within the scope of this inspection.

Sprinkler, irrigation systems or water featuresare not tested. Systems operation overview canbe performed by seasonal maintenance crews.

Page 16: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 15 of 104

Admirable Inspection Services Ltd.

Page 15 of 104

Admirable Inspection Services Ltd.

Page 15 of 104

Sprinkler, irrigation systems or water featuresare not tested. Systems operation overview canbe performed by seasonal maintenance crews.

Sprinkler, irrigation systems or water featuresare not tested. Systems operation overview canbe performed by seasonal maintenance crews.

Sprinkler, irrigation systems or water features are not tested. Systems operation overview canbe performed by seasonal maintenance crews.

10. Fence ConditionGood Fair Poor NA

✔Materials: Chain LinkObservations:• The chain link fence is in need of repairs throughout the property. Nomajor damages where located. Wire hangers are broken, ties are broken andsections are leaning.

Page 17: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 16 of 104

Admirable Inspection Services Ltd.

Page 16 of 104

Admirable Inspection Services Ltd.

Page 16 of 104

An area for repair An area for repair

An area for repair An area for repair

An area for repair An area for repair

Page 18: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 17 of 104

Admirable Inspection Services Ltd.

Page 17 of 104

Admirable Inspection Services Ltd.

Page 17 of 104

An area for repair An area for repair

An area for repair An area for repair

11. Wall and Trim ConditionsGood Fair Poor NA

✔Materials: MetalObservations:• Flashings are lifting and deteriorating, repair will be needed at some pointdue to corrosion and damage.• No thermal conditions suggested further inspection unless noted.• Caulking trim seams and penetrations as necessary to prevent waterintrusion. This is normal maintenance around windows / doors, sealant jointsare failing throughout the exterior.• Damages are present throughout the building on the yard / operationsside.

Page 19: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 18 of 104

Admirable Inspection Services Ltd.

Page 18 of 104

Admirable Inspection Services Ltd.

Page 18 of 104

Flashings are lifting and deteriorating, repairwill be needed at some point due to corrosion

and damage.

Corrosion is present in the front design feature,re finish as rust continues.

Damages are present Flashings are lifting and deteriorating, repairwill be needed at some point due to corrosion

and damage.

Page 20: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 19 of 104

Admirable Inspection Services Ltd.

Page 19 of 104

Admirable Inspection Services Ltd.

Page 19 of 104

Flashings are lifting and deteriorating, repairwill be needed at some point due to corrosion

and damage.

Flashings are lifting and deteriorating, repairwill be needed at some point due to corrosion

and damage.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Cracking is present in the office wall blockgrout, touch up or seal as desired.

Page 21: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 20 of 104

Admirable Inspection Services Ltd.

Page 20 of 104

Admirable Inspection Services Ltd.

Page 20 of 104

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Damages are present

Page 22: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 21 of 104

Admirable Inspection Services Ltd.

Page 21 of 104

Admirable Inspection Services Ltd.

Page 21 of 104

Damages are present Wall holes should be filled.

Damages are present Damages are present. Areas of block work thathave holes, will not have insulation in the area

Page 23: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 22 of 104

Admirable Inspection Services Ltd.

Page 22 of 104

Admirable Inspection Services Ltd.

Page 22 of 104

Block walls can be refinished as desired. Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Page 24: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 23 of 104

Admirable Inspection Services Ltd.

Page 23 of 104

Admirable Inspection Services Ltd.

Page 23 of 104

A section of block work has been bored forservice sleaves at some point, these have been

removed.

Block walls can be refinished as desired.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Page 25: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 24 of 104

Admirable Inspection Services Ltd.

Page 24 of 104

Admirable Inspection Services Ltd.

Page 24 of 104

Damages are present Damages are present

Damages are present Damages are present

Page 26: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 25 of 104

Admirable Inspection Services Ltd.

Page 25 of 104

Admirable Inspection Services Ltd.

Page 25 of 104

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Damages are present

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Page 27: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 26 of 104

Admirable Inspection Services Ltd.

Page 26 of 104

Admirable Inspection Services Ltd.

Page 26 of 104

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

Caulking trim seams and penetrations asnecessary to prevent water intrusion. This is

normal maintenance around windows / doors,sealant joints are failing throughout the

exterior.

No thermal conditions suggested furtherinspection unless noted.

No thermal conditions suggested furtherinspection unless noted.

Page 28: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 27 of 104

Admirable Inspection Services Ltd.

Page 27 of 104

Admirable Inspection Services Ltd.

Page 27 of 104

No thermal conditions suggested furtherinspection unless noted.

No thermal conditions suggested furtherinspection unless noted.

No thermal conditions suggested furtherinspection unless noted.

No thermal conditions suggested furtherinspection unless noted.

Page 29: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 28 of 104

Admirable Inspection Services Ltd.

Page 28 of 104

Admirable Inspection Services Ltd.

Page 28 of 104

No thermal conditions suggested furtherinspection unless noted.

No thermal conditions suggested furtherinspection unless noted.

12. Window and Frame ConditionsGood Fair Poor NA

✔Materials: Steel Frame • Double Pane

Seals have failed at the entry covering windows.

13. Exterior Door ConditionGood Fair Poor NA

✔Materials: Metal Clad

14. Foundation ConditionsGood Fair Poor NA

✔Type: Slab on grade

Page 30: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 29 of 104

Admirable Inspection Services Ltd.

Page 29 of 104

Admirable Inspection Services Ltd.

Page 29 of 104

15. Vegetation CommentsGood Fair Poor NA

✔Observations:• With mature growth in the area trimming and maintenance will berequired to protect the structure from damages. Vegetation contact alsoprovides a pathway for water and pests.

With mature growth in the area trimming andmaintenance will be required to protect thestructure from damages. Vegetation contactalso provides a pathway for water and pests.

With mature growth in the area trimming andmaintenance will be required to protect thestructure from damages. Vegetation contactalso provides a pathway for water and pests.

With mature growth in the area trimming andmaintenance will be required to protect thestructure from damages. Vegetation contactalso provides a pathway for water and pests.

With mature growth in the area trimming andmaintenance will be required to protect thestructure from damages. Vegetation contactalso provides a pathway for water and pests.

16. General Exterior CommentsGood Fair Poor NA

✔Observations:• Several piles of debris are present on site.

Page 31: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 30 of 104

Admirable Inspection Services Ltd.

Page 30 of 104

Admirable Inspection Services Ltd.

Page 30 of 104

Several piles of debris are present on site. Several piles of debris are present on site.

Several piles of debris are present on site. A compressed gas storage area is present in theNE

A supply or suppression system was present at some point (NE)

Page 32: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Exterior ContinuedExterior ContinuedExterior Continued

Admirable Inspection Services Ltd.

Page 31 of 104

Admirable Inspection Services Ltd.

Page 31 of 104

Admirable Inspection Services Ltd.

Page 31 of 104

Roof

1. Method Used to Inspect RoofHow Inspected: Walked on.

2. Roof ConditionGood Fair Poor NA

✔Materials: Built up Roofing. This material is typically used in low slopedesigns or "Flat" roofs and requires annual inspections to identify ware andareas of poor drainage. • Roll Roofing (SBS). This material is typically used inlow slope designs or "Flat" roofs and requires annual inspections to identifyware and areas of poor drainage.Observations:• Build up debris throughout the roof covering; debris must be cleaned priorto winter to avoid damages related to the forces of snow and ice.• Low ballast with exposed membrane is present in the NW corner of theshop roof covering.• Sections of the SBS roofing are worn and cracking.• Racking is present in the roof covering at the parapet on the west side andshould be further inspected by the roofing contractor as needed, these canbe signs of building movement, This condition can result in membranedamage leading to leaking.• Bubbling is present throughout the roof covering, this is a sign of trappedmoisture in the roofing system.• Surface sealant is present throughout a large area of the office roof top.Secondary or face sealants may be a sign of problematic areas.

Racking is present in the roof covering at theparapet on the west side and should be furtherinspected by the roofing contractor as needed,these can be signs of building movement, This

condition can result in membrane damageleading to leaking.

General View

Page 33: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 32 of 104

Admirable Inspection Services Ltd.

Page 32 of 104

Admirable Inspection Services Ltd.

Page 32 of 104

General View Racking is present in the roof covering at theparapet on the west side and should be furtherinspected by the roofing contractor as needed,these can be signs of building movement, This

condition can result in membrane damageleading to leaking.

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Page 34: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 33 of 104

Admirable Inspection Services Ltd.

Page 33 of 104

Admirable Inspection Services Ltd.

Page 33 of 104

Racking is present in the roof covering at theparapet on the west side and should be furtherinspected by the roofing contractor as needed,these can be signs of building movement, This

condition can result in membrane damageleading to leaking.

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Page 35: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 34 of 104

Admirable Inspection Services Ltd.

Page 34 of 104

Admirable Inspection Services Ltd.

Page 34 of 104

Sections of the SBS roofing are worn andcracking.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

The SBS is failing a the scupper on the NE lowroof

Page 36: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 35 of 104

Admirable Inspection Services Ltd.

Page 35 of 104

Admirable Inspection Services Ltd.

Page 35 of 104

General View General View

General View General View

General View General View

Page 37: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 36 of 104

Admirable Inspection Services Ltd.

Page 36 of 104

Admirable Inspection Services Ltd.

Page 36 of 104

General View General View

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Page 38: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 37 of 104

Admirable Inspection Services Ltd.

Page 37 of 104

Admirable Inspection Services Ltd.

Page 37 of 104

Sections of the SBS roofing are worn andcracking.

Sections of the SBS roofing are worn andcracking.

General View General View

Page 39: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 38 of 104

Admirable Inspection Services Ltd.

Page 38 of 104

Admirable Inspection Services Ltd.

Page 38 of 104

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Some degree of ponding is present due toongoing rain in the region

Page 40: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 39 of 104

Admirable Inspection Services Ltd.

Page 39 of 104

Admirable Inspection Services Ltd.

Page 39 of 104

Surface sealant is present throughout a largearea of the office roof top. Secondary or facesealants may be a sign of problematic areas.

Surface sealant is present throughout a largearea of the office roof top. Secondary or facesealants may be a sign of problematic areas.

General View General View

Page 41: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 40 of 104

Admirable Inspection Services Ltd.

Page 40 of 104

Admirable Inspection Services Ltd.

Page 40 of 104

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Newer Carrier units are present on the officeroof top

Low ballast with exposed membrane is presentin the NW corner of the shop roof covering.

Low ballast with exposed membrane is presentin the NW corner of the shop roof covering.

Page 42: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 41 of 104

Admirable Inspection Services Ltd.

Page 41 of 104

Admirable Inspection Services Ltd.

Page 41 of 104

Newer Carrier units are present on the officeroof top

A previous repair is present in the shop roof.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

Page 43: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 42 of 104

Admirable Inspection Services Ltd.

Page 42 of 104

Admirable Inspection Services Ltd.

Page 42 of 104

Newer Carrier units are present on the officeroof top

Bubbling is present throughout the roofcovering, this is a sign of trapped moisture in

the roofing system.

General View General View

Page 44: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 43 of 104

Admirable Inspection Services Ltd.

Page 43 of 104

Admirable Inspection Services Ltd.

Page 43 of 104

Racking is present in the roof covering at theparapet on the west side and should be furtherinspected by the roofing contractor as needed,these can be signs of building movement, This

condition can result in membrane damageleading to leaking.

General View

Build up debris throughout the roof covering;debris must be cleaned prior to winter to avoiddamages related to the forces of snow and ice.

Surface sealant is present throughout a largearea of the office roof top. Secondary or facesealants may be a sign of problematic areas.

3. Flashing, Fascia and Penetration ConditionGood Fair Poor NA

✔Materials: Flashing and Facia are: • SeparatingObservations:• Flashing materials should be sealed at a time of sealing the exterior wallson the building.

Page 45: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 44 of 104

Admirable Inspection Services Ltd.

Page 44 of 104

Admirable Inspection Services Ltd.

Page 44 of 104

The flashings on the south side were not cutfor the scupper.

Flashing materials should be sealed at a time ofsealing the exterior walls on the building.

4. Skylight ConditionGood Fair Poor NA

✔Observations:• Skylight(s) observed were in fair order at time of the inspection.

Skylight(s) observed were in fair order at time of the inspection.

5. Gutter and Downspout conditionGood Fair Poor NA

✔Observations:• Down spouts should be extended further from the slab to ensure waterdrains away from the foundation at all times.• Gutters have debris, Leaking is present. Cleaning is required and slopeshould be inspected and adjusted as required for effectiveness. (throughout)

Page 46: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 45 of 104

Admirable Inspection Services Ltd.

Page 45 of 104

Admirable Inspection Services Ltd.

Page 45 of 104

Gutters have debris, Leaking is present.Cleaning is required and slope should beinspected and adjusted as required for

effectiveness. (throughout)

Gutters have debris, Leaking is present.Cleaning is required and slope should beinspected and adjusted as required for

effectiveness. (throughout)

Down spouts should be extended further fromthe slab to ensure water drains away from the

foundation at all times.

Down spouts should be extended further fromthe slab to ensure water drains away from the

foundation at all times.

Page 47: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 46 of 104

Admirable Inspection Services Ltd.

Page 46 of 104

Admirable Inspection Services Ltd.

Page 46 of 104

Gutters have debris, Leaking is present.Cleaning is required and slope should beinspected and adjusted as required for

effectiveness. (throughout)

Gutters have debris, Leaking is present.Cleaning is required and slope should beinspected and adjusted as required for

effectiveness. (throughout)

6. Roof CommentsGood Fair Poor NA

✔Observations:• A back scratcher should be considered for installation on the low shop roofas a safety enhancement.• Service lines strung across the roof covering is poor practice, damages arepresent as a result, stands with cable tray should be installed to preventfurther damages.

Service lines strung across the roof covering ispoor practice, damages are present as a result,

stands with cable tray should be installed toprevent further damages.

Service lines strung across the roof covering ispoor practice, damages are present as a result,

stands with cable tray should be installed toprevent further damages.

Page 48: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 47 of 104

Admirable Inspection Services Ltd.

Page 47 of 104

Admirable Inspection Services Ltd.

Page 47 of 104

Service lines strung across the roof covering ispoor practice, damages are present as a result,

stands with cable tray should be installed toprevent further damages.

Service lines strung across the roof covering ispoor practice, damages are present as a result,

stands with cable tray should be installed toprevent further damages.

Unused equipment should be removed fromthe roof covering.

Unused equipment on the roof covering shouldbe removed

Page 49: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Roof ContinuedRoof ContinuedRoof Continued

Admirable Inspection Services Ltd.

Page 48 of 104

Admirable Inspection Services Ltd.

Page 48 of 104

Admirable Inspection Services Ltd.

Page 48 of 104

Kitchen

A back scratcher should be considered for installation on the low shop roof as a safetyenhancement.

The kitchen is used for food preparation and often for entertainment. Kitchens typically include astove, dishwasher, sink and other appliances.

1. Floor ConditionGood Fair Poor NA

2. Wall ConditionGood Fair Poor NA

✔Observations:• Dry at the time of inspection. No stains or evidence of moisturepenetration observed.

3. Ceiling ConditionsGood Fair Poor NA

✔Observations:• Dry at the time of inspection. No stains or evidence of moisturepenetration observed.

4. Door ConditionsGood Fair Poor NA

5. Cabinet and Counter ConditionGood Fair Poor NA

✔Observations:• Stains observed in cabinet no leaks present today

Page 50: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Kitchen ContinuedKitchen ContinuedKitchen Continued

Admirable Inspection Services Ltd.

Page 49 of 104

Admirable Inspection Services Ltd.

Page 49 of 104

Admirable Inspection Services Ltd.

Page 49 of 104

Stains observed in cabinet no leaks present today

6. Electrical ConditionsGood Fair Poor NA

7. Kitchen Sink ConditionGood Fair Poor NA

✔Materials: Stainless Steel

8. Kitchen FaucetsGood Fair Poor NA

9. Kitchen CommentsGood Fair Poor NA

✔Observations:• Kitchens are present in the: shop area, central office and west office.

General kitchen view Pest stations are present throughout

Page 51: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Kitchen ContinuedKitchen ContinuedKitchen Continued

Admirable Inspection Services Ltd.

Page 50 of 104

Admirable Inspection Services Ltd.

Page 50 of 104

Admirable Inspection Services Ltd.

Page 50 of 104

Office Areas

General view of the shop kitchen General view of the shop kitchen

1. Floor ConditionGood Fair Poor NA

✔Observations:• Marks or wear in floor coverings. Suggest replacement as desired.

Marks or wear in floor coverings. Suggestreplacement as desired.

Marks or wear in floor coverings. Suggestreplacement as desired.

Page 52: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 51 of 104

Admirable Inspection Services Ltd.

Page 51 of 104

Admirable Inspection Services Ltd.

Page 51 of 104

Marks or wear in floor coverings. Suggestreplacement as desired.

Marks or wear in floor coverings. Suggestreplacement as desired.

Marks or wear in floor coverings. Suggest replacement as desired.

2. Wall ConditionGood Fair Poor NA

✔Observations:• Dry at the time of inspection. No stains or evidence of moisturepenetration observed.• No thermal conditions suggested further inspection unless noted.• Ghosting is present. These are dark stains at the thermal break. This can bepainted as desired.

Page 53: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 52 of 104

Admirable Inspection Services Ltd.

Page 52 of 104

Admirable Inspection Services Ltd.

Page 52 of 104

Ghosting is present. These are dark stains atthe thermal break. This can be painted as

desired.

Ghosting is present. These are dark stains atthe thermal break. This can be painted as

desired.

3. Ceiling ConditionsGood Fair Poor NA

✔Observations:• Ghosting is present. These are dark stains at the thermal break. This can bepainted as desired.• Stains or evidence of moisture penetration observed.• Thermal anomaly was present in the ceiling. This can be caused by a largerongoing roofing element at that will require further investigation.

Stains or evidence of moisture penetrationobserved.

Stains or evidence of moisture penetrationobserved.

Page 54: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 53 of 104

Admirable Inspection Services Ltd.

Page 53 of 104

Admirable Inspection Services Ltd.

Page 53 of 104

Stains or evidence of moisture penetrationobserved.

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

Page 55: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 54 of 104

Admirable Inspection Services Ltd.

Page 54 of 104

Admirable Inspection Services Ltd.

Page 54 of 104

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

Thermal anomaly was present in the ceiling.This can be caused by a larger ongoing roofing

element at that will require furtherinvestigation.

4. Door ConditionsGood Fair Poor NA

5. Window ConditionGood Fair Poor NA

Page 56: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 55 of 104

Admirable Inspection Services Ltd.

Page 55 of 104

Admirable Inspection Services Ltd.

Page 55 of 104

6. Electrical ConditionsGood Fair Poor NA

✔Observations:• Not all lights are working.• Not all emergency lights are operational. All should be inspected andrepaired as needed.

Not all lights are working. Not all lights are working.

Not all emergency lights are operational. All should be inspected and repaired as needed.

7. Other Interior Area CommentsGood Fair Poor NA

✔Observations:• Minor cosmetic issues are not within the scope of this inspection as itfocuses on basic structure and major systems only.• Pest stations are present throughout

Page 57: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 56 of 104

Admirable Inspection Services Ltd.

Page 56 of 104

Admirable Inspection Services Ltd.

Page 56 of 104

Maps are present and posted General office views

General office views General office views

General office views Pest stations are present throughout

Page 58: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 57 of 104

Admirable Inspection Services Ltd.

Page 57 of 104

Admirable Inspection Services Ltd.

Page 57 of 104

General office View General office View

General office View General office View

General office View General office View

Page 59: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Office Areas ContinuedOffice Areas ContinuedOffice Areas Continued

Admirable Inspection Services Ltd.

Page 58 of 104

Admirable Inspection Services Ltd.

Page 58 of 104

Admirable Inspection Services Ltd.

Page 58 of 104

Bathroom

General Shop office view General Shop office view

General Shop office view

1. Bathroom LocationLocation: Office • Shop

2. Floor ConditionGood Fair Poor NA

3. Wall ConditionGood Fair Poor NA

✔Observations:• Dry at the time of inspection. No stains or evidence of moisturepenetration observed.• No thermal conditions suggested further inspection unless noted.

Page 60: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Bathroom ContinuedBathroom ContinuedBathroom Continued

Admirable Inspection Services Ltd.

Page 59 of 104

Admirable Inspection Services Ltd.

Page 59 of 104

Admirable Inspection Services Ltd.

Page 59 of 104

4. Ceiling ConditionsGood Fair Poor NA

✔Observations:• Dry at the time of inspection. No stains or evidence of moisturepenetration observed.• No thermal conditions suggested further inspection unless noted.

5. Door ConditionsGood Fair Poor NA

6. Electrical ConditionsGood Fair Poor NA

7. Cabinet and Counter ConditionGood Fair Poor NA

8. Sink ConditionGood Fair Poor NA

✔Materials: Ceramic

9. FaucetsGood Fair Poor NA

10. Shower ConditionGood Fair Poor NA

✔Materials: FiberglassObservations:• A single fiberglass shower is present in one of the shops bathrooms.

11. Tub and Shower Faucet ConditionGood Fair Poor NA

12. Toilet ConditionGood Fair Poor NA

13. Bathroom CommentsGood Fair Poor NA

✔Observations:• The shop bathroom urinals and toilets had dry traps, the building plumbershould inspect all fixtures as needed for proper function after prolongedtime without use.• Overall ratings of the bathrooms is reduced due to condition of the shopsbathrooms.

Page 61: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Bathroom ContinuedBathroom ContinuedBathroom Continued

Admirable Inspection Services Ltd.

Page 60 of 104

Admirable Inspection Services Ltd.

Page 60 of 104

Admirable Inspection Services Ltd.

Page 60 of 104

The bathrooms were clean and well maintainedin the office areas.

The bathrooms were clean and well maintainedin the office areas.

General View of the shop bathroom General view of the shop offices.

General view of the shop bathroom

Page 62: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Bathroom ContinuedBathroom ContinuedBathroom Continued

Admirable Inspection Services Ltd.

Page 61 of 104

Admirable Inspection Services Ltd.

Page 61 of 104

Admirable Inspection Services Ltd.

Page 61 of 104

Plumbing

1. Supply Line ConditionGood Fair Poor NA

✔Materials: CopperObservations:• Primary plumbing provisions are located in the shipping area and theboiler room. A copper shut off is also located in the electrical meteringroom.

A shut off is located in the meter room Primary plumbing provisions are located in theshipping area and the boiler room. A copper

shut off is also located in the electricalmetering room.

Primary plumbing provisions are located in the shipping area and the boiler room. A coppershut off is also located in the electrical metering room.

Page 63: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Plumbing ContinuedPlumbing ContinuedPlumbing Continued

Admirable Inspection Services Ltd.

Page 62 of 104

Admirable Inspection Services Ltd.

Page 62 of 104

Admirable Inspection Services Ltd.

Page 62 of 104

2. Pressure Tank ConditionsGood Fair Poor NA

✔Observations:• No signs of leaking today. Recommend inspecting apart of regularmaintenance for corrosion or leakage.

3. Waste Line ConditionsGood Fair Poor NA

✔Materials: Public WasteObservations:• As a general rule mature lots or lots with large trees may require roddingthe sewer lines.• A vacuum truck was on site during the inspection today, there are multipleaccess on the property. Inquire as to the needs for cleaning and futuremaintenance needs.

A vacuum truck was on site during the inspection today, there are multiple access on theproperty. Inquire as to the needs for cleaning and future maintenance needs.

4. Waste Line ConditionGood Fair Poor NA

✔Materials: ABS • PVCObservations:• No leaks observed at the time of the inspection. Recommend monitoringconnections for corrosion and leaks.

5. Venting ConditionsGood Fair Poor NA

✔Observations:• Multiple vent stacks observed

6. Plumbing CommentsGood Fair Poor NA

✔Comments:• All plumbing components tested well at time of inspection unlessotherwise noted.• Suppression system inspections are not within the scope of this inspection,all documents should be reviewed to ensure systems are inspected, servicedand up to date.

Definition
Acronym for acrylonitrile butadiene styrene; rigid black plastic pipe used only for drain lines.
Definition
Polyvinyl chloride, which is used in the manufacture of white plastic pipe typically used for water supply lines.
Page 64: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Plumbing ContinuedPlumbing ContinuedPlumbing Continued

Admirable Inspection Services Ltd.

Page 63 of 104

Admirable Inspection Services Ltd.

Page 63 of 104

Admirable Inspection Services Ltd.

Page 63 of 104

Electrical

1. Electrical panel ConditionGood Fair Poor NA

✔Type / Materials: Protected by BreakersObservations:• The main service is approximately 1200 amps• The exterior panel CP1 located on the east side had an open door uponarrival. Secure all cabinets.• An electrical closet is located on the east side near the shipping area with a200AMP and 60AMP Switches. A door is missing and should be coveredfrom the elements

The main service is approximately 1200 amps The exterior panel CP1 located on the east sidehad an open door upon arrival. Secure all

cabinets.

The exterior panel CP1 located on the east sidehad an open door upon arrival. Secure all

cabinets.

An electrical closet is located on the east sidenear the shipping area with a 200AMP and

60AMP Switches.

Page 65: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Electrical ContinuedElectrical ContinuedElectrical Continued

Admirable Inspection Services Ltd.

Page 64 of 104

Admirable Inspection Services Ltd.

Page 64 of 104

Admirable Inspection Services Ltd.

Page 64 of 104

An electrical closet is located on the east side near the shipping area with a 200AMP and60AMP Switches.

2. Branch Circuits ConditionGood Fair Poor NA

3. Grounding CommentsGood Fair Poor NA

4. Sub Panel CommentsGood Fair Poor NA

✔Observations:• Sub panels are located throughout the property a mechanical map shouldbe reviewed and updated if needed.• Switches along the south shop wall have poor access.

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Page 66: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Electrical ContinuedElectrical ContinuedElectrical Continued

Admirable Inspection Services Ltd.

Page 65 of 104

Admirable Inspection Services Ltd.

Page 65 of 104

Admirable Inspection Services Ltd.

Page 65 of 104

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Page 67: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Electrical ContinuedElectrical ContinuedElectrical Continued

Admirable Inspection Services Ltd.

Page 66 of 104

Admirable Inspection Services Ltd.

Page 66 of 104

Admirable Inspection Services Ltd.

Page 66 of 104

Sub panels are located throughout theproperty a mechanical map should be reviewed

and updated if needed.

Switches along the south shop wall have pooraccess.

5. Smoke detector commentsGood Fair Poor NA

✔Location: Main FloorObservations:• Admirable Inspection Services does NOT inspect or test Smoke or CarbonDioxide Detectors. Detectors will last many years when maintained as perthe manufactures instruction.

6. Electrical CommentsGood Fair Poor NA

✔Observations:• A low voltage wiring and components such as: Alarm and intercomsystems are not apart of this inspection.• A back up generator is located in the electrical side of the furnace room.

The building transformer is located on the eastside and is well protected, trim vegetation as

needed

A back up generator is located in the electricalside of the furnace room.

Page 68: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Electrical ContinuedElectrical ContinuedElectrical Continued

Admirable Inspection Services Ltd.

Page 67 of 104

Admirable Inspection Services Ltd.

Page 67 of 104

Admirable Inspection Services Ltd.

Page 67 of 104

Water Heater and Boilers

1. Water/ Boilers HeaterGas Fired. • Electric. • The water heater(s) is approximately 10 galloncapacity. • The water heater(s) is approximately 40 gallon capacity. • Thewater heater(s) is approximately 60 gallon capacity. • The boiler(s) areapproximately 263000 BTU

2. Supply lines ConditionGood Fair Poor NA

✔Materials: Copper, brass, castObservations:• Corrosion observed, no leaks visible at time of inspection.• The lines within the furnace room are well insulated and supported.• Pumps were operating normally with no abnormal noises

The lines within the furnace room are wellinsulated and supported.

The lines within the furnace room are wellinsulated and supported.

Staining appears to be from the relief on thewall behind the unit

Corrosion observed, no leaks visible at time ofinspection.

Page 69: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Water Heater and Boilers ContinuedWater Heater and Boilers ContinuedWater Heater and Boilers Continued

Admirable Inspection Services Ltd.

Page 68 of 104

Admirable Inspection Services Ltd.

Page 68 of 104

Admirable Inspection Services Ltd.

Page 68 of 104

3. Temperature Pressure Release Valve ConditionsGood Fair Poor NA

✔Observations:• Did not operate the TPR test handle during todays inspection. Relief valvesthat have never operated before have the potential to leak after testingrequiring replacement.

4. Combustion Chamber ConditionsGood Fair Poor NA

✔Observations:• Normal surface rust/corrosion observed, no signs of flaking or excessivedeterioration noted.

Normal surface rust/corrosion observed, no signs of flaking or excessive deterioration noted.

5. Flue Venting ConditionsGood Fair Poor NA

✔Materials: MetalObservations:• Rotting: Recommend review by a licensed heating contractor for repair orreplacement if needed, this is the unit that is not operating.

Page 70: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Water Heater and Boilers ContinuedWater Heater and Boilers ContinuedWater Heater and Boilers Continued

Admirable Inspection Services Ltd.

Page 69 of 104

Admirable Inspection Services Ltd.

Page 69 of 104

Admirable Inspection Services Ltd.

Page 69 of 104

Rotting: Recommend review by a licensed heating contractor for repair or replacement ifneeded, this is the unit that is not operating.

6. Water Heater CommentsGood Fair Poor NA

✔Observations:• Four boilers are located in the furnace room, a fifth boiler is located on theshop mezzanine, the cover is off and was not operating.• The older boilers on the east side of the furnace room could not beconfirmed for size due to worn ID tags.

An electric unit is located on the area abovethe north shop bathroom

Four boilers are located in the furnace room, afifth boiler is located on the shop mezzanine,

the cover is off and was not operating.

Page 71: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Water Heater and Boilers ContinuedWater Heater and Boilers ContinuedWater Heater and Boilers Continued

Admirable Inspection Services Ltd.

Page 70 of 104

Admirable Inspection Services Ltd.

Page 70 of 104

Admirable Inspection Services Ltd.

Page 70 of 104

Four boilers are located in the furnace room, afifth boiler is located on the shop mezzanine,

the cover is off and was not operating.

Four boilers are located in the furnace room, afifth boiler is located on the shop mezzanine,

the cover is off and was not operating.

A 60 Gallon gas water heater is located in thefurnace room.

Steam injection is present in the furnace room

Page 72: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Water Heater and Boilers ContinuedWater Heater and Boilers ContinuedWater Heater and Boilers Continued

Admirable Inspection Services Ltd.

Page 71 of 104

Admirable Inspection Services Ltd.

Page 71 of 104

Admirable Inspection Services Ltd.

Page 71 of 104

Heating Cooling and Air Handling

The legable tags indicate a output of263000BTU

The older boilers on the east side of thefurnace room could not be confirmed for size

due to worn ID tags.

Four boilers are located in the furnace room, a fifth boiler is located on the shop mezzanine,the cover is off and was not operating.

1. HeatingType: Gas Forced Air RTU's • Radiant Heat • Unit heaters

2. Burner Chamber CommentsGood Fair Poor NA

✔Observations:• The burner chambers were not opened due to operations ongoing.

Page 73: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 72 of 104

Admirable Inspection Services Ltd.

Page 72 of 104

Admirable Inspection Services Ltd.

Page 72 of 104

3. Exhaust venting ConditionGood Fair Poor NA

✔Observations:• Venting and dampers were freely operating.• A venting unit on the NE corner of the roof has a torn coupler, this unit isoff.

Venting and dampers were freely operating. Venting and dampers were freely operating.

A venting unit on the NE corner of the roof has a torn coupler, this unit is off.

4. Thermostat ConditionGood Fair Poor NA

✔Multiple thermostats located throughout the building. Multiple zones arepresent.Observations:• Suggest using programmable functions to allow temperature changes atdesired intervals to help reduce energy costs.

Page 74: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 73 of 104

Admirable Inspection Services Ltd.

Page 73 of 104

Admirable Inspection Services Ltd.

Page 73 of 104

5. Heating CommentsGood Fair Poor NA

✔Observations:• All Natrual Gas supply lines that are not identified should be updated withyellow paint to current standards• A broken switch is present on a NW unit.• The air handlers for the shops are aging, insulation from the high shop wallto the units is deteriorating and loose. The service history on all Roof topequipment for the shops should be reviewed for expected upcoming repairs.No external ID tags are present.• The inspector had the opportunity to speak with the HVAC representativeperforming service today. Several unit heaters, radiant heaters and roof topequipment are ongoing for service. To the best of his knowledge most otherequipment is operating normally. Suggest obtaining service records for thisbuilding to determine past recommendations and repair needs. MultipleUnit heaters, a boiler, entry heaters were not operational.• A wall mount units are located in shop walls, these are in poor conditionsand should be replaced if intended for use.

A condensate traps is not installed and layingon the roof covering.

All Natrual Gas supply lines that are notidentified should be updated with yellow paint

to current standards

Page 75: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 74 of 104

Admirable Inspection Services Ltd.

Page 74 of 104

Admirable Inspection Services Ltd.

Page 74 of 104

Newer Carrier units are present on the officeroof top

The air handlers for the shops are aging,insulation from the high shop wall to the unitsis deteriorating and loose. The service history

on all Roof top equipment for the shops shouldbe reviewed for expected upcoming repairs.

No external ID tags are present.

The air handlers for the shops are aging,insulation from the high shop wall to the unitsis deteriorating and loose. The service history

on all Roof top equipment for the shops shouldbe reviewed for expected upcoming repairs.

No external ID tags are present.

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

Page 76: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 75 of 104

Admirable Inspection Services Ltd.

Page 75 of 104

Admirable Inspection Services Ltd.

Page 75 of 104

The Carrier units were clean upon inspection Carrier ID tag

Newer Carrier units are present on the officeroof top

Carrier ID tag

Page 77: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 76 of 104

Admirable Inspection Services Ltd.

Page 76 of 104

Admirable Inspection Services Ltd.

Page 76 of 104

Two smaller Lennox RTU's are also present forthe office areas.

Lennox ID TAG

Two Lennox RTU's are present for the officearea

Lennox ID tag

Page 78: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 77 of 104

Admirable Inspection Services Ltd.

Page 77 of 104

Admirable Inspection Services Ltd.

Page 77 of 104

A Lennox unit has a damage condensate trapthat should be replaced

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

Page 79: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 78 of 104

Admirable Inspection Services Ltd.

Page 78 of 104

Admirable Inspection Services Ltd.

Page 78 of 104

A broken switch is present on a NW unit. The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

All Natrual Gas supply lines that are notidentified should be updated with yellow paint

to current standards

Page 80: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 79 of 104

Admirable Inspection Services Ltd.

Page 79 of 104

Admirable Inspection Services Ltd.

Page 79 of 104

All Natrual Gas supply lines that are notidentified should be updated with yellow paint

to current standards

The inspector had the opportunity to speakwith the HVAC representative performingservice today. Several unit heaters, radiant

heaters and roof top equipment are ongoingfor service. To the best of his knowledge most

other equipment is operating normally.Suggest obtaining service records for this

building to determine past recommendationsand repair needs. Multiple Unit heaters, aboiler, entry heaters were not operational.

A newer regulator is present A newer regulator is present

Page 81: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 80 of 104

Admirable Inspection Services Ltd.

Page 80 of 104

Admirable Inspection Services Ltd.

Page 80 of 104

Electrical has been updated at some point forthe older air handlers

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Page 82: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 81 of 104

Admirable Inspection Services Ltd.

Page 81 of 104

Admirable Inspection Services Ltd.

Page 81 of 104

Not operational, middle of the north side ofthe shop

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Page 83: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 82 of 104

Admirable Inspection Services Ltd.

Page 82 of 104

Admirable Inspection Services Ltd.

Page 82 of 104

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

A unit heater in central area of the shop turnedon, but made no heat

Two unit heater along the south wall of theshop did not respond to testing

Page 84: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 83 of 104

Admirable Inspection Services Ltd.

Page 83 of 104

Admirable Inspection Services Ltd.

Page 83 of 104

Two unit heater along the south wall of theshop did not respond to testing

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Most shop unit and radiant heaters wereoperational

Page 85: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 84 of 104

Admirable Inspection Services Ltd.

Page 84 of 104

Admirable Inspection Services Ltd.

Page 84 of 104

Two unit heaters in the shipping area were nottested, thermostats for only two of the four

units could be located.

Most shop unit and radiant heaters wereoperational

The east side entry heater was running, no heatwas produced.

Office radiant heat was operational

Page 86: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 85 of 104

Admirable Inspection Services Ltd.

Page 85 of 104

Admirable Inspection Services Ltd.

Page 85 of 104

Office radiant heat was operational Office radiant heating tested operational

The office area ducting was operational The office area ducting was operational

A wall mount units are located in shop walls, these are in poor conditions and should bereplaced if intended for use.

Page 87: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Heating Cooling and Air Handling ContinuedHeating Cooling and Air Handling ContinuedHeating Cooling and Air Handling Continued

Admirable Inspection Services Ltd.

Page 86 of 104

Admirable Inspection Services Ltd.

Page 86 of 104

Admirable Inspection Services Ltd.

Page 86 of 104

Shop

1. Shop Construction TypeType: Attached.

2. Exterior Door ConditionGood Fair Poor NA

✔Materials: Metal CladObservations:• Flashing at the bottom of the door is damaged and should be replaced toprotect from water intrusion at the threshold.

Flashing at the bottom of the door is damaged and should be replaced to protect from waterintrusion at the threshold.

3. Floor ConditionGood Fair Poor NA

✔Observations:• All concrete floor slabs experience some degree of cracking, the slabs arein fair condition for the suspected use of the building.• Floor rails create high and low spots within the floor surface, consideridentifying.

Page 88: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 87 of 104

Admirable Inspection Services Ltd.

Page 87 of 104

Admirable Inspection Services Ltd.

Page 87 of 104

All concrete floor slabs experience somedegree of cracking, the slabs are in fair

condition for the suspected use of the building.

Floor rails create high and low spots within thefloor surface, consider identifying.

All concrete floor slabs experience somedegree of cracking, the slabs are in fair

condition for the suspected use of the building.

All concrete floor slabs experience somedegree of cracking, the slabs are in fair

condition for the suspected use of the building.

4. Wall ConditionGood Fair Poor NA

✔Observations:• Moderate cracking in the load bearing wall between the shop and washbay. These may be structural issues that should be further inspected.

Page 89: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 88 of 104

Admirable Inspection Services Ltd.

Page 88 of 104

Admirable Inspection Services Ltd.

Page 88 of 104

Moderate cracking in the load bearing wallbetween the shop and wash bay. These may be

structural issues that should be furtherinspected.

Moderate cracking in the load bearing wallbetween the shop and wash bay. These may be

structural issues that should be furtherinspected.

Moderate cracking in the load bearing wallbetween the shop and wash bay. These may be

structural issues that should be furtherinspected.

Moderate cracking in the load bearing wallbetween the shop and wash bay. These may be

structural issues that should be furtherinspected.

Page 90: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 89 of 104

Admirable Inspection Services Ltd.

Page 89 of 104

Admirable Inspection Services Ltd.

Page 89 of 104

Damaged block work is present in the washbay area

Damaged block work is present in the washbay area

Damaged block work is present on the SE corner of the shop

5. Ceiling ConditionsGood Fair Poor NA

6. Window and Frame ConditionGood Fair Poor NA

✔Observations:• Fog/condensation observed in door windows. This is an indication of afailed seal. Recommend review for repair or replacement as necessary.• Damaged: The window(s) are damaged and require repair or replacement.See images.

Page 91: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 90 of 104

Admirable Inspection Services Ltd.

Page 90 of 104

Admirable Inspection Services Ltd.

Page 90 of 104

Fog/condensation observed in door windows.This is an indication of a failed seal.

Recommend review for repair or replacementas necessary.

Fog/condensation observed in door windows.This is an indication of a failed seal.

Recommend review for repair or replacementas necessary.

Damaged: The window(s) are damaged and require repair or replacement. See images.

7. Electrical ConditionsGood Fair Poor NA

✔Observations:• Shop lighting projects a orange / yellow lighting into the space which wasnoted to be darker then expected in the illuminated areas. Lightingimprovements may be beneficial.

Page 92: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 91 of 104

Admirable Inspection Services Ltd.

Page 91 of 104

Admirable Inspection Services Ltd.

Page 91 of 104

Shop lighting projects a orange / yellowlighting into the space which was noted to bedarker then expected in the illuminated areas.

Lighting improvements may be beneficial.

Shop lighting projects a orange / yellowlighting into the space which was noted to bedarker then expected in the illuminated areas.

Lighting improvements may be beneficial.

Shop lighting projects a orange / yellowlighting into the space which was noted to bedarker then expected in the illuminated areas.

Lighting improvements may be beneficial.

Shop lighting projects a orange / yellowlighting into the space which was noted to bedarker then expected in the illuminated areas.

Lighting improvements may be beneficial.

Page 93: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 92 of 104

Admirable Inspection Services Ltd.

Page 92 of 104

Admirable Inspection Services Ltd.

Page 92 of 104

Shop lighting projects a orange / yellow lighting into the space which was noted to be darkerthen expected in the illuminated areas. Lighting improvements may be beneficial.

8. Shop Door ConditionGood Fair Poor NA

✔Materials: Insulated

Observations:• The finish of the shop door on the display area side of the building is inpoor cosmetic condition, suggest refinishing.• Seal is in poor condition and should be replaced.• Damage: The shop doors are damaged. Repair is desired.

Damage: The shop doors are damaged. Repairis desired.

Damage: The shop doors are damaged. Repairis desired.

Page 94: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 93 of 104

Admirable Inspection Services Ltd.

Page 93 of 104

Admirable Inspection Services Ltd.

Page 93 of 104

Damage: The shop doors are damaged. Repairis desired.

Damage: The shop doors are damaged. Repairis desired.

Damage: The shop doors are damaged. Repairis desired.

Page 95: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 94 of 104

Admirable Inspection Services Ltd.

Page 94 of 104

Admirable Inspection Services Ltd.

Page 94 of 104

The finish of the shop door on the display areaside of the building is in poor cosmetic

condition, suggest refinishing.

Damage: The shop doors are damaged. Repairis desired.

Seal is in poor condition and should be replaced.

9. Door Hardware ConditionGood Fair Poor NA

10. Door Opener ConditionGood Fair Poor NA

11. Fire Door ConditionsGood Fair Poor NA

✔Materials: Metal Clad

Page 96: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 95 of 104

Admirable Inspection Services Ltd.

Page 95 of 104

Admirable Inspection Services Ltd.

Page 95 of 104

12. Fire Wall ConditionGood Fair Poor NA

13. Shop CommentsGood Fair Poor NA

✔Observations:• A rain water leader appears to be leaking near the paint booth area.• Staining was present in the main shop on a support post in the east side,water entry could not be located.• The bridge cranes appear to be due for annual inspections.

The bridge cranes appear to be due for annualinspections.

The bridge cranes appear to be due for annualinspections.

The bridge cranes appear to be due for annualinspections.

General View

Page 97: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 96 of 104

Admirable Inspection Services Ltd.

Page 96 of 104

Admirable Inspection Services Ltd.

Page 96 of 104

General View General View

The paint shop was not lit today. A rain water leader appears to be leaking nearthe paint booth area.

Page 98: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 97 of 104

Admirable Inspection Services Ltd.

Page 97 of 104

Admirable Inspection Services Ltd.

Page 97 of 104

A rain water leader appears to be leaking nearthe paint booth area.

Staining was present in the main shop on asupport post in the east side, water entry could

not be located.

General view of the shop offices. General shop view

Page 99: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Shop ContinuedShop ContinuedShop Continued

Admirable Inspection Services Ltd.

Page 98 of 104

Admirable Inspection Services Ltd.

Page 98 of 104

Admirable Inspection Services Ltd.

Page 98 of 104

Cold Storage

General view of a shop office

1. Roof ConditionGood Fair Poor NA

✔Materials: Metal Roofing. This material comes in many forms and has a lifeexpectancy that is dependant on many factors including weather conditionsand installation and quality of the product.

2. Gutter and Downspout conditionGood Fair Poor NA

3. Wall and Trim ConditionsGood Fair Poor NA

✔Materials: MetalObservations:• Damage: Area(s) of damage are present. Recommend repairs as desired.

Page 100: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Cold Storage ContinuedCold Storage ContinuedCold Storage Continued

Admirable Inspection Services Ltd.

Page 99 of 104

Admirable Inspection Services Ltd.

Page 99 of 104

Admirable Inspection Services Ltd.

Page 99 of 104

Damage: Area(s) of damage are present.Recommend repairs as desired.

Damage: Area(s) of damage are present.Recommend repairs as desired.

Damage: Area(s) of damage are present.Recommend repairs as desired.

Damage: Area(s) of damage are present.Recommend repairs as desired.

Page 101: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Cold Storage ContinuedCold Storage ContinuedCold Storage Continued

Admirable Inspection Services Ltd.

Page 100 of 104

Admirable Inspection Services Ltd.

Page 100 of 104

Admirable Inspection Services Ltd.

Page 100 of 104

Damage: Area(s) of damage are present.Recommend repairs as desired.

Damage: Area(s) of damage are present.Recommend repairs as desired.

Damage: Area(s) of damage are present. Recommend repairs as desired.

4. Exterior Door ConditionGood Fair Poor NA

✔Materials: Metal Clad

5. Floor ConditionGood Fair Poor NA

✔Observations:• Expansive cracks and settling observed, suggest sealing cracks asnecessary.

Page 102: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Cold Storage ContinuedCold Storage ContinuedCold Storage Continued

Admirable Inspection Services Ltd.

Page 101 of 104

Admirable Inspection Services Ltd.

Page 101 of 104

Admirable Inspection Services Ltd.

Page 101 of 104

Expansive cracks and settling observed,suggest sealing cracks as necessary.

A separation or control joist is present the slab,watch your step

6. Electrical ConditionsGood Fair Poor NA

✔Observations:• Not all lights are working, multiple ballasts are very loud, replacement canbe expected at some point.

Not all lights are working, multiple ballasts arevery loud, replacement can be expected at

some point.

Electrical is located in the SW corner of thecold storage

7. Foundation ConditionGood Fair Poor NA

✔Materials: Concrete grade beamObservations:• Cracking is present throughout the cold storage foundation. No majorareas for further inspection noted.

Page 103: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Cold Storage ContinuedCold Storage ContinuedCold Storage Continued

Admirable Inspection Services Ltd.

Page 102 of 104

Admirable Inspection Services Ltd.

Page 102 of 104

Admirable Inspection Services Ltd.

Page 102 of 104

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Page 104: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Cold Storage ContinuedCold Storage ContinuedCold Storage Continued

Admirable Inspection Services Ltd.

Page 103 of 104

Admirable Inspection Services Ltd.

Page 103 of 104

Admirable Inspection Services Ltd.

Page 103 of 104

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Cracking is present throughout the coldstorage foundation. No major areas for further

inspection noted.

Page 105: Steven Letendre&HUWLILHG0DVWHU,QVSHFWRU€¦ · roofing contractor as needed, these can be signs of building movement, This condition can result in membrane damage leading to leaking

Admirable Inspection Services Ltd.

Page 104 of 104

Admirable Inspection Services Ltd.

Page 104 of 104

Admirable Inspection Services Ltd.

Page 104 of 104

GlossaryGlossary

Term DefinitionABS Acronym for acrylonitrile butadiene styrene; rigid black plastic

pipe used only for drain lines.PVC Polyvinyl chloride, which is used in the manufacture of white

plastic pipe typically used for water supply lines.