steve clark cv 2015

6
Stephen Lee Clark 726 Encino Dr. New Braunfels, Texas 78130 Cell (830) 643-9499 E-Mail:[email protected] Objective: I am seeking employment, either in Planner/P6 Scheduler with a company where my proven leadership skills and construction experience would be of great value. Professional Profile: I am a very self-motivated person who enjoys working as a team leader, but more importantly a team member, to overcome any challenges that may arise while bringing projects in safely, on time and on budget. I have a wide variety of experience pre staging and prioritizing projects, coordinating materials, and supervising labor to complete projects safely, efficiently and on time. I am also quite proficient at communicating thoughts and plans verbally and in writing to ensure the best outcome. I have been in the construction and fabrication field since 1975 and in that time I have amassed a wide array of skills consisting of everything from Planning and Scheduling of work to actual fabrication and installation of structural and piping components for routine maintenance, duty cycle planning and new construction. Tracking and monitoring of Project progress including Engineering, Procurement, Construction, Commissioning and Installation. I have worked in most construction and fabrication environments, from Pipelines to Paper mills, Cogeneration Boilers to large Power Plants, Petroleum Refineries and Chemical Plants both inside and outside the United States. Relevant Experience: Over 25 years of exposure with various companies locally and abroad. Professionally Trained in P6. Well versed in Microsoft Office. Build up, maintain and process Master Project Schedule by using Primavera. Provide the necessary plans/schedules to ensure the development of proper estimates and studies within a project stage and for sanction. Recognize opportunities and resource optimizations to most efficiently execute the planned set of activities. Experience scheduling and pre staged tools and materials for

Upload: stephen-clark

Post on 17-Aug-2015

52 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Steve Clark CV 2015

Stephen Lee Clark 726 Encino Dr. New Braunfels, Texas 78130Cell (830) 643-9499 E-Mail:[email protected]

Objective:

I am seeking employment, either in Planner/P6 Scheduler with a company where my proven leadership skills and construction experience would be of great value.

Professional Profile:

I am a very self-motivated person who enjoys working as a team leader, but more importantly a team member, to overcome any challenges that may arise while bringing projects in safely, on time and on budget. I have a wide variety of experience pre staging and prioritizing projects, coordinating materials, and supervising labor to complete projects safely, efficiently and on time. I am also quite proficient at communicating thoughts and plans verbally and in writing to ensure the best outcome. I have been in the construction and fabrication field since 1975 and in that time I have amassed a wide array of skills consisting of everything from Planning and Scheduling of work to actual fabrication and installation of structural and piping components for routine maintenance, duty cycle planning and new construction. Tracking and monitoring of Project progress including Engineering, Procurement, Construction, Commissioning and Installation. I have worked in most construction and fabrication environments, from Pipelines to Paper mills, Cogeneration Boilers to large Power Plants, Petroleum Refineries and Chemical Plants both inside and outside the United States.

Relevant Experience:

Over 25 years of exposure with various companies locally and abroad. Professionally Trained in P6. Well versed in Microsoft Office. Build up, maintain and process Master Project Schedule by using Primavera. Provide the necessary plans/schedules to ensure the development of proper estimates and studies

within a project stage and for sanction. Recognize opportunities and resource optimizations to most efficiently execute the planned set of

activities. Experience scheduling and pre staged tools and materials for literally hundreds of projects both large

and small including large system shut downs. Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to

avoid any delay or disruption to the Project I am very fluent in reading, interpreting, and implementing all types of Piping and Instrumentation

Diagrams, and Drawings including Isometric and Ortho’s. Extensive inspection and troubleshooting experience with piping specifications including physically

walking down each system to ensure that all valves, bolts, flanges, gaskets, and instrumentation had been installed properly, to industry specifications and relevant safety codes and standards. Exposed to RT, VT, MT and PT. Capable of new and used equipment evaluations.

Preformed hydro and nitrogen pressure tests on multiple systems and all types of piping configurations for various applications.

World class fitter with years of training, and on the job experience in all methods of welding, manufacturing and Installation.

Fluent in current industry standard in safety, construction, and piping and industrial design codes and regulations.

Page 2: Steve Clark CV 2015

Education

Name of School Location Degree Received Cruse Studies Dates Attended

Wichita FallsHigh School

Wichita Falls, Texas Graduated General From: 9/69 To:5/72

Stephen F. Austin Nacogdoches Tx From: 9/1975

Employment History:

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

Orascom E &C Senior Planner/Field Engineer

From:11-11-13To: Present Date

Steven Gray From: Still Employed

Job duties:Currently I am apart of a management team responsible for work scope development from operational requirements.Provide site support answering scope questions from outside engineering during define and execute phases of engineering work. Build Preliminary Engineering Packages from outside engineering supplied IFA packages. Build Final Engineering Packages from outside engineering supplied IFC packages. Provides engineering support for Turnaround base work list. Collect, review, and mark up equipment drawings, P&ID’s, and other relevant documents to detail engineering and repair scopes. Review and write scope statements to document and communicate the approved turnaround scope. Document construction instructions based on Client’s engineering standards for various critical tasks such as welding, NDE requirements, torqueing requirements, pressure testing, etc. Assist in developing material lists for engineering and repair scope based on Client’s piping specifications. Develop bid packages for various materials or services as requested. Update various databases, folders, and SAP to track and communicate the status of the planning effort. Assist in managing engineering type scope during the turnaround event by coordinating resources, reviewing progress, identifying and mitigating risks to schedule and cost. Assist in finding solutions to issues that arise during the turnaround event.

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

Matrix Service Company

P6 Scheduler/Planner

From:11-4-12To: 11-10-13

Tom Williams From: Still Employed

Job duties:Ensure the preparation and development of appropriate detail and summary plans/schedules; integrate contractor and operator plans/schedules & earned values into the Master Project Schedule. Implement, and monitor schedules within each project stage and for entire project until completion/close-out. .

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

ITC TA Planner/Field Engineer

From:2-6-11To: 11-4-12

Vance Burns From: ROF

Job duties:Responsible for work scope development from operational requirements, earned valves, inspection services and mechanical integrity, development of detailed work packages, job walks, (piping and equipment) assembling drawings, taking pictures, procurement of process equipment and materials, budget development and estimating. Ensure the preparation and development of appropriate detail and summary plans/schedules; integrate contractor and operator plans/schedules into the Master Project Schedule. Implement, and monitor schedules within each project stage and for entire project until completion/close-out. Develop contractor bid packages and perform contractor job walks. Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to avoid any delay or disruption to the Project. Inputting data in Access data base and P6, updating P6 schedules and daily progress reporting during turnarounds as well as AWR planning, scheduling and purchasing of all materials. During

Page 3: Steve Clark CV 2015

these activities responsible for field coordination of all work by general contractors, sub-contractors. Overseas the planning elements of the change control procedure with capture of said changes within the project planning package. Proficient in Maximo, Tab Ware, Excel, Word, Primavera P6

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

Catsi Lead Primavera PlannerValero Aruba

From:8/2011To: 1-15-2012

Terry Pitts Valero Aruba Plant ShutDown

Job duties:A team leader with strong work ethics, integrity, self-motivation, follow thru to develop and maintain team work and lead by example to achieve team success. Experienced in turnaround development and execution. Review and endorse contractor’s schedules and progress reporting systems to facilitate efficient summarization of project reporting. Responsible for job plan package composition for turnarounds, unit outages, major capital projects and extra ordinary maintenance, material procurement and directing of all turnaround activities. Overseas the planning elements of the change control procedure with capture of said changes within the project planning package. During these activities responsible for field coordination of all work by general contractors, sub contractors. Summary of Turnarounds and Capital projects. Proficient in SAP, Tab Ware, Excel, Word, Primavera P5

Company Name & Address

Job Title Dates Em loyedName Of Supervisor

Reason For Leaving

ITC Senior Planner BP Texas City

From:7/2010To:8/2011

Brent Coleman From: ROF

Job Duties:Responsible for work scope development from operational requirements, inspection services and mechanical integrity, development of detailed work packages, job walks, (piping and equipment) assembling drawings, taking pictures, procurement of process equipment and materials, budget development and estimating. Develop contractor bid packages and perform contractor job walks. Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to avoid any delay or disruption to the Project Inputting data in Access data base and P6, updating P6 schedules and daily progress reporting during turnarounds as well as AWR planning, scheduling and purchasing of all materials.

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

STS CONSTULATING Sr. Pipeline Inspector

From: 12/09To:6/2010

Greg McDaniel

ROF

Job duties:3rd party Pipeline Inspector for Chesapeake Energy. From start to finish all aspects of a gas pipeline.Evaluated and supervised clean-up for 18 – 80 miles of natural gas pipelineon various projectsInspected lower-in pipeline ranging 8 – 42 inchesEnvironmental foreman for projects including silt fence, curlex, staking hay bales, hydro-seeding, broadcast seeding and hay mulching.Ensured compliance with FERC requirements during projects.

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

TTMCPhone:281-461-9340

Senior/Lead Planner/Scheduler

From:4/07To: 12/09

Lee Umheres ROF

Job duties:Working with ExxonMobil setting up a PSV program. For tracking purposes. Front end Load the scope of work. For varies shutdowns Plant WideTo estimate a budget & manpower for an up & coming plant wide shut down for 2010 at Valero ref. in Port Arthur Texas.

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

Page 4: Steve Clark CV 2015

IMTCMazeikiu, Lithuania

Project Piping Manager

From: 10/06To: 1/07

Jessie Doty ROF

Job Duties:Consulted and managed a Polish contractor and a Lithuanian sub-contractor in the rebuild of a VDU and the start up process of the unit.

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

KAP Project ServicesLa Porte, TxPhone: 281-842-8333

Lead Planner/ Estimator

From: 6/05To: 10/06

Steve Pipkin ROF

Job Duties:Planned and estimated man hours & material take off for Chevron in El Segundo, CA; Valero in Dumas, TX. And Valero in Port Arthur, TX. Coordinated and executed the schedule. Tracking and monitoring of Project progress including Engineering, Procurement, Construction, Commissioning and Installation. Provide the necessary plans/schedules to ensure the development of proper estimates. Understand the technical scope of the work and the right sequence and duration of activities to create a viable project plan to achieve the business objectives. Implement, and monitor schedules within each project stage and for entire project until completion/close-out. Recognize opportunities and resource optimizations to most efficiently execute the planned set of activities. Review and endorse contractor’s schedules and progress reporting systems to facilitate efficient summarization of project reporting. Overseas the planning elements of the change control procedure with capture of said changes within the project planning package. Ensure timing of deliverables by contractors are adequately defined and subsequently tracked to avoid any delay or disruption to the Project

Company Name & Address

Job Title Dates Employed Name Of Supervisor

Reason For Leaving

Piping EngineeringStar ConJV Piping

QA/QC Manager,General Forman,Piping Superintendent

From: 1987To: 2006

Ron Artzburger

ROF

Job Duties:Worked for the above contractors for over 20 years from a Piping Foreman to Project Manager in various locations here and abroad. Including turnkey turnarounds in St. Croix, Honduras, Trinidad & Tobago, Argentina, Aruba and China. Specializing in Gas Phase, Power Plants and Loop Reactors, Sulfur Recovery, Cokers, CCUs, Flue Gas Coolers, Waste Heat Boilers and Furnaces. Duties included, but not limited to, pre-walking scope of work; maintaining a quality control program; reading, interpreting, and implementing all types of piping and instrumentation diagrams, and drawings including isometric and ortho’s; setting up fabrication shops; overseeing certification testing; payroll time sheets; interacting with various personnel to ensure that the job is completed in a safe, professional and timely manner; drawing up ISO plans; performing specialty welding (pressure parts). Working and performing on and around hazardous materials including blinding and pressure testing of various piping systems and final inspection of project before startup begins.

Personal References

Name Occupation Address Phone Number

Years Known

Steve Alves Qa/Qc manager Colorado 8Philip Frazier Human