steps to check e1 in case of abis optimization

5
Steps to check the E1 in case of Abis Optimization

Upload: mohamedsalah

Post on 16-Nov-2015

8 views

Category:

Documents


1 download

DESCRIPTION

Steps to Check E1 in Case of Abis Optimization

TRANSCRIPT

  • Steps to check the E1 in case of Abis Optimization

  • Table of Contents:

    Check the SCGR connected to the TG ........................................................................... 2

    Check the SC and the Device connected to the SCGR ................................................... 3

    Get the SNT that contains the specified device(s) .......................................................... 3

    Get the RBL from the SNT ............................................................................................. 4

    Check the RBL status...................................................................................................... 4

    Check the SCGR connected to the TG

    You can use command RXMOP to check the SCGR connected to the TG.

  • Check the SC and the Device connected to the SCGR

    You can use command RRSCP to get the number of SC connected and the device specified for

    each SC.

  • Get the RBL from the SNT

    Use command NTCOP to get the RBL connected in this SNT

  • COMMAND SUMMARY

    RXMOP:MO=RXOTG-2; RRSCP:SCGR=2; RADEP:DEV=RBLT2-65; NTCOP:SNT=ETM2-4; DTSTP:DIP=2RBL2;

    Hope you find this KO useful.

    For any help please contact me on

    [email protected]

    MOATAZ YOUSRY

    mailto:[email protected]