New link between BIS and LBDS CIBDS recap and Experience from LBDS reliability run. Stéphane Gabourin TE/MPE-EP MPP – 31 st October 2014. Outline. CIBDS recap Why and How From v1 to v2/3 Experience from LBDS reliability run Installation in UA63 & UA67 Commissioning steps - PowerPoint PPT PresentationTRANSCRIPT
Stéphane GabourinTE/MPE-EP
MPP – 31st October 2014
New link between BIS and LBDS
CIBDS recap and Experience from LBDS reliability run
S. Gabourin – 31st October 2014
Outline
CIBDS recap
Why and How
From v1 to v2/3
Experience from LBDS reliability run
Installation in UA63 & UA67
Commissioning steps
CIBDS issues during the reliability runs
S. Gabourin – 31st October 2014
CIBDS recap
S. Gabourin – 31st October 2014
Why and How 1/3
Courtesy E. Carlier- Fully redundant Synchronous Beam Dump Triggers (SBDT)
CIBG
A
B
CIBM
A
BCIBM
A
B
S. Gabourin – 31st October 2014
Trigger Delay (TD): 200us
Why and How 2/3
- Fully redundant Synchronous Beam Dump Triggers (SBDT)Courtesy E. Carlier
CIBG
A
B
CIBM
A
BCIBM
A
B
12V
12V
- Asynchronous Beam Dump Triggers (ABDT)- Issue of common 12V
S. Gabourin – 31st October 2014
CIBU CIBG
A
B
CIBM
A
BCIBM
A
B
CIBDS
A
B
RTB
200us
250usFrequency loss(A:9.375MHz / B:8.375MHz) Pulse
Why and How 3/3
Courtesy E. Carlier
- Add a link directly from the BIS to the retrigger lines- Connect the CIBDS as User on a CIBM to avoid spurious asynchronous beam dumps
S. Gabourin – 31st October 2014
From v1 to v2/3
Updates v1 → v2:
- Change the lemo connector to the CIBU
- To simplify soldering
- Bad for CIBU commissioning…
- LED inversion, …
v1 v2
Updates v2 → v3:
- Change polarity for the “PLC local mode” read
back
- Add resistors to
- Protect output to the CIBU
- Protect output to the TD Box
- Get exactly 12V pulse for the TD Box
v3 NOT in operation as not working properly !
S. Gabourin – 31st October 2014
Experience from LBDS reliability run
S. Gabourin – 31st October 2014
Installation in UA63 & UA67
Full rack for:- The BIS FEC
- CIBG B1- CIBM B1- CIBM B2- CIBDS B1
- The CIBU of the CIBDS- The 2 Trigger Delay boxes (+ 1 spare)
Better to have a “how to plug” patch- For optic fibers- For electrical cables
S. Gabourin – 31st October 2014
Installation in UA63 & UA67
S. Gabourin – 31st October 2014
Commissioning steps
(Updated) commissioning steps were followed
S. Gabourin – 31st October 2014
Commissioning steps
(Updated) commissioning steps were followed
Status view:No GUI available (for 2015) → use of Nodal
S. Gabourin – 31st October 2014
PPS Mark Mask
Ch. Beam 10 SIS
1 Vacuum Valves B1
2 not used
3 not used
4
5
6
7
8 BPM A Left/Right B1
9 FMCM RMSD B1
10 BTV B1
11
12
13 PLC
14 BETS
SIS
FMCM RMSD B2
BTV B2
not used
PIC MSK
Vacuum Valves B2
TSU LBDS B2
PLC LBDS B2
not used
PIC UNM
CIBDS B2
BPM A Left/Right B2
not used
CIB.UA67.R6 (Latch Mode)Beam 2
TCDQ B1
TCDQ B1
Commissioning steps
(Updated) commissioning steps were followed
Status view:No GUI available (for 2015) → use of Nodal
PPS Mark Mask
Ch. Beam 10 SIS
1 Vacuum Valves B1
2 TSU LBDS B1
3 PLC LBDS B1
4
5
6
7
8 Collimation Motor B1
9 Collimation Env B1
10 BPM B Left/Right B1
11
12
13 PLC
14 BETS
SIS
CIB.UA63.L6 (Latch Mode)Beam 2
Vacuum Valves B2
not used
not used
BLM UNM
PIC UNM
CIBDS B1
WIC
Collimation Motor B2
Collimation Env B2
BPM B Left/Right B2
PIC MSK
TCDQ B2
TCDQ B2
BLM MSK
TSU 1-A
TSU 1-B
TSU 2-A
TSU 2-A
Arm
Sta
rt
Arming sequence:After some time, done by the sequencer, but before…
→ use of Nodal
Quite challenging to arm and maintain both beams:
4 TSU + 2 CIBDS + 2CIBG to arm and start manually…
All within 5 sec…
→ Keep B1 and B2 independent
S. Gabourin – 31st October 2014
Commissioning steps
S. Gabourin – 31st October 2014
CIBDS issues during the reliability runs
CIBDS failures observed:
- none…
-
-
-
-
-
-
-
-
-
-
S. Gabourin – 31st October 2014
Questions
S. Gabourin – 31st October 2014
Spare slide: local mode read back