steering life cycle costs in the early design phasein the ... · microsoft powerpoint - presentatie...
TRANSCRIPT
![Page 1: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/1.jpg)
Steering Life Cycle Costs in the Early Design Phasein the Early Design Phase
Master thesis project uitgevoerd bij Vanderlande IndustriesRutger VlasblomRadj Bachoe (VanderLande)j ( )Tarkan Tan (TU Eindhoven)Geert-Jan van Houtum (TU Eindhoven)
![Page 2: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/2.jpg)
Agenda
Opdracht
Model ontwikkeling
Toegepast model
Conclusies
2
![Page 3: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/3.jpg)
OpdrachtOpdracht
“Ontwikkel een berekeningsmodel dat de relatie beschrijft tussen technische systeem beschikbaarheidbeschrijft tussen technische systeem beschikbaarheid en levenscyclus kosten (LCC)”
Ontwikkel een toegepast model dat het mogelijk maakt verschillende systeemontwerpen te vergelijken op basisverschillende systeemontwerpen te vergelijken op basis van:• technische systeem beschikbaarheidtechnische systeem beschikbaarheid • levenscyclus kosten
3
![Page 4: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/4.jpg)
Model ontwikkelingSamenstelling van een systeem
Check in area
Transport zone
Check in
Section: Beltfloorveyor
zoneSection:
Weighing belt
section level (building blocks) zone level area level system level
4
system level
![Page 5: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/5.jpg)
Model ontwikkelingFactoren die systeembeschikbaarheid beïnvloeden (1)
Hogere materiaalbetrouwbaarheid - Hogere technische beschikbaarheid
Grotere materiaal investering- Grotere materiaal investering
EquipmentSystem
Inspections and Preventive Modifications
and Retrofitsredundancy Maintenance and Retrofits
ConstantMeer inspecties
- Hogere technische beschikbaarheid
Meer redundantie- Hogere technische beschikbaarheid
Grotere materiaal in estering
g- Hogere onderhoudskosten
5
- Grotere materiaal investering
![Page 6: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/6.jpg)
Model developingFactoren die systeembeschikbaarheid beïnvloeden (2)
EquipmentSystem
Inspections and Preventive Modifications
and Retrofitsredundancy Maintenance and Retrofits
Constant Constant Constant
Hogere spare part voorraden- hogere technische beschikbaarheid- Grotere investering in spare parts
6
![Page 7: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/7.jpg)
Model ontwikkelingFactoren die systeembeschikbaarheid beïnvloeden (3)
P d ti lProduction loss(Down Time
Costs)
Vormt een groot deel van de
levenscyclus-kosten
7
![Page 8: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/8.jpg)
Model ontwikkeling
Inzichten in de levenscycluskosten van de: – Effecten van ontwerpbeslissingen Innovation!Effecten van ontwerpbeslissingen– Effecten van systeembeschikbaarheid
beslissingen
Innovation!
Innovation!beslissingen
8
![Page 9: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/9.jpg)
Toegepast modelToegepast model voor BHSVelddata (metingen):
– MTBF metingenNew insights
g– Relatie tussen inspecties en MTBF– Onderhoudstijd per onderdeelOnderhoudstijd per onderdeel– Spare part verbruik
9
![Page 10: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/10.jpg)
Toegepast modelCase study• 2 verschillende ontwerpen (redundantie niveau)
Departure Carousel
Departure Carousel
X-ray X-ray X-ray X-ray
10Check in 1-12 Check in 13-27 Check in 28-39 Check in 40-54
![Page 11: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/11.jpg)
Toegepast modelResultaten van de case study• 2 ontwerpen (verschillend redundantie niveau)
Design 1 Design 4Equipment investment 100% 20 8%+Equipment investment 100% 20,8%Technical system availability 100% 0,4%Designed capacity (hour) 100% 50,0%Expected peak flow (hour) 100% 0 0%
++
Expected peak flow (hour) 100% 0,0%Expected delayed bags (LC) 100% -30,6%LCC 100% -4,7%
• Design:– Investeringstoename van 21% Gewenste – Afname van down time kosten met 30%– Reductie in LCC 5%
inzichten
11
![Page 12: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/12.jpg)
ConclusiesConclusies/ Inzichten
• Beter inzicht in LCC en beschikbaarheid van verschillende systeem ontwerpen
• Investering in systeem redundantie kan leiden tot d ti i LCCreductie in LCC
• Generiek model > toepasbaar op systemen met een modulaire opbouwmodulaire opbouw
12
![Page 13: Steering Life Cycle Costs in the Early Design Phasein the ... · Microsoft PowerPoint - Presentatie Rutger Vlasblom IOP d.d. 02-12-10 (10 min).ppt [Compatibility Mode] Author: nlrbac](https://reader034.vdocuments.us/reader034/viewer/2022050413/5f899498be306145225ce2fb/html5/thumbnails/13.jpg)
Vragen?
Dank voor uw aandacht!13
Dank voor uw aandacht!