steel tube summit 2011 boiler industry - user perspective

17
1 Steel Tube Summit 2011 Boiler Industry - User Perspective Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 Sustainable Solutions in Energy and Environment

Upload: darren

Post on 08-Feb-2016

34 views

Category:

Documents


1 download

DESCRIPTION

Steel Tube Summit 2011 Boiler Industry - User Perspective. Sustainable Solutions in Energy and Environment. To be a globally respected high performance organization offering sustainable solutions in energy and environment. Vision. Our Belief. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

1

Steel Tube Summit 2011Boiler Industry - User Perspective

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Sustainable Solutions inEnergy and Environment

Page 2: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

To be a globally respected high performance organization offering sustainable solutions in energy and environment

Vision

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 2

Page 3: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Our Belief

“Profit is not only a set of figures, but of values.”

3

Rohinton D. Aga1935 - 1996

Founder Chairman, Thermax

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Page 4: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

4

Thermax Evolution• Established in 1966 as Wanson

(India)

• Rs. 5,000 Crore Group with sales & service network in Asia, Middle East, Africa, Europe and the Americas.

• Manufacturing facilities in India and China.

• Supports customers in over 75 countries with solutions to conserve energy and preserve the environment.

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Page 5: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Our Core Business

Boiler & Heater

• Package boilers

• Large capacity

power boilers• Thermal oil /

water heaters

• Energy recovery

systems

Boilers & Heaters

Turnkey Power Plants

• Solid fuel based• Gas based

combined cycle • Waste heat

recovery based• RE based incl.

Biomass, Bagasse, solar, etc.

• O&M of power plants

Power Generation

Chemicals• Ion exchange

resins• Cooling water

chemicals• Fireside

chemicals• Polyelectrolyte

Water and wastewater• Wastewater &

Effluent water treatment systems

• Water recycling• Waste

management

Chemicals & Water

Enviro• ESP & Bag

filters• Scrubbers• Air purification• Retrofit &

Revamp

Air Pollution Control

THERMAX

Cooling & Heating

Cooling• Exhaust & Multi-energy

fired chillers• Steam fired chillers• Hot water fired chillers• Direct fired chillers

Heating• Steam/Hot water power

plants• Packaged solid/oil/gas

fired boilers • Fired thermic fluid

heaters• Exhaust waste heat

recovery boilers

Renewable

Solar•

Heating

• Cooling

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 5

Page 6: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

THERMAX - Boiler Business

Industrial Boilers - Present – Capacity - Max 500 T / Hr,– 165 Kg / cm2 pressure range,– 570 deg C

Utility Boilers – Capacity – Max 1000 T / Hr, – 180 Kg / cm2 pressure range, – 570 deg C

Critical and Super Critical range of Boilers – For and up-to 1000 MW.

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 6

Page 7: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

BOILER TUBES / PIPES - APPLICATION

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 7

• Smoke Tubes• Boiler Panels • In bed tubes• Convection Bank• Super-heater• Re-heater• Economizer• Air Preheater• Mineral Oil Heaters• Fired Heaters• Header’s• RCDC• Internal Piping

Page 8: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Boiler Tubes / Pipes Grades• Types of Grades

– Seamless Carbon & Alloy Steel TubesSA 210 A1 , SA 213 T 11, T12, T22, T23 , T 91 and T92

– Seamless Carbon & Alloy Steel PipesSA 106 Gr B , Gr C, SA 335 P11, P22 & P91

– ERW Tubes BS 3059 , Part I / II , Gr 320/360

– Air Preheater Tubes IS 6323 , Part V , NKLM

– Stainless Steel Tubes SS 304 / 316 / 316 L / 430 TI

• Tube Sizes – OD 31.75 mm OD to 101 mm OD

– Thickness range of 3.25 mm to 10 mm

– Maximum length 13 meter Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 8

Page 9: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Industry Scenario

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 9

Growing Industries

Steel

Food

Chemicals

PowerGeneration

Plywood

Beverage Edible Oil

Packaging

Tea

Man Made Fiber

Sponge Iron Automobile

CementTextile

Hospitality

Paper & Pulp

Stagnant, Contracting Industries

Non Ferrous

Refineries &Petrochemical

Pharma

Oil & Gas

Page 10: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Power Scenario– Installed Capacity as on 31st March 2011 – 174,364.4 MW

– Per Capita Energy consumption (2008-09) – 733.54 Kwh / year

– Per Capita Global Energy Consumption – 2,340 Kwh / year

(USA – 15,000 Kwh / year, China – 1,800 Kwh / year)

– Thermal Power generation – 65% ( 113,337 MW)

– “POWER FOR ALL” Mission

• Target to add by 2012 (end of 11th Plan) – 78,000 MW(could be curtailed to 58,000

MW)

• Power required by 2020 – 400,000 MW

by 2030 – 950,000 MW

– A significant reason for missing capacity addition for the 10th & current 11th five

year plan has been equipment shortage “Boiler”.

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 10

Page 11: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Power Capacity Addition Plan

Year Generation Capacity (MW)

Tubes Required (Tonnes)

Pipes Required(Tonnes)

11th Plan 78,000 400,000 160,000

Curtailed 11th Plan – By 2012

58,000 300,000 120,000

2020 400,000 2,100,000 820,000

2030 950,000 5,000,000 1,940,000

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 11

Page 12: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Source Countries for Tubes & Pipes

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 12

China Japan Germany

France Spain Italy

Romania

Page 13: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

Market Expectations

• Deliveries

Boiler supply completion

– Process Boilers up-to 10 TPH (Tubes – BS 3059)

Required within Current Performance

• < 1 TPH : 8 Weeks 10-12 Weeks

• 1-6 TPH : 12-14 Weeks 16 Weeks

• 7-10 TPH : 16 Weeks 22 Weeks

– Bi-drum Boilers

• 15-25 TPH : 7 Months 9 Months

– Power Boilers

• 200 TPH 12 months Tubes are expected on 3rd

month from the O date in plant

• 500 T / Hr 18 months Tubes are expected on 4th

month from the O date in plant

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011 13

Page 14: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

14

Deliveries– Heaters

• 8 - 10 Mkcal/hr : 5 Months 8 Months

– Europe manufacturers’ take 3/4 months , – China supplies within 2 / 3 months.

– Indian manufacturers’ For Carbon Steel Tubes 4 / 6 months.

However, there are in-ordinate delays.

On Alloy Steel tubes There no firm commitment.

– Allocation of capacities OCTG vs Boiler

– Competition from China – is now a reality to the Indian Boiler manufacturers !!!

Also there is a substantial price difference ?Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Market Expectations

Page 15: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

15

Market Expectations

Availability• Along with schedule pipes – Heavy sizes above 14” & extra wall thickness like 28 mm,

35 mm , 40 mm , 60 mm thk seamless pipes for higher pressure ranges for Headers

• T11, T22 & T 91 seamless tubes & P11 , P22 , P91 – heavy thick seamless pipes with straightness requirement of 3 mm / meter

• Availability of alloy steel tubes / pipes from Indian mills on a firm schedule basis.

Quality• For Seamless Tubes/ Pipes – Improvement in surface coating/treatment • For ERW tubes/ Pipes – Improvements in Stenciling / Surface finish desired.

• Value addition - Finning facility , Tube bending by Tube manufacturers ?

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Page 16: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

16

Market Expectations

Others• Fixed Prices

• Latent defects – Warranty / Guaranties (as desired by end users)

• Completion of a Boiler with assembly-wise 100% tubes supply of fixed length – No waiting time on the shop floor – cycle time reduction

• Regular production update with status on Billet / Strip availability to plan in house production

• Documentation – As desired.

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011

Page 17: Steel Tube Summit 2011 Boiler Industry  - User  Perspective

17

Thank you

Thermax Group/ P K Davar/ CII Steel Tube Summit, New Delhi/ 26th Aug. 2011