steel pipe projects 2011-10-28 - lifelast...2020/04/08  · 3813 helios way, suite 190,...

91
3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com Date Applicator Location Project Owner | Contact Engineer | Contact Polyurethane Quantities Service Environment Northwest Pipe 2004 Portland, OR Kingston Outfall 360.337.7124 Jerry Duppong: 425.453.5000 CH2M Hill 5,442' of 18" 40 mils lining & 40 mils coating Wastewater Transmission Kitsap County Steel Pipe Projects Effective: 04/08/2020 Northwest Pipe 2004 Portland, OR Prospect - Phase II Bob Atwood: 503.813.6696 Wayne Kerns: 913.458.2000 Black & Veatch 2,070' of 96" 20 mils lining & 25 mils coating Penstock Pacificorp Northwest Pipe 2005 Parkersburg, WV Taggert-Lemiuex Mike Wilmets:613.580.2424 Derek Potvin: 613.592.6060 Robinson Consultants 3,413' of 66" 50 mils coating Water Transmission City of Ottawa

Upload: others

Post on 18-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2004

Portland, OR

Kingston Outfall

360.337.7124

Jerry Duppong: 425.453.5000

CH2M Hill

5,442' of 18"

40 mils lining & 40 mils coating

Wastewater Transmission

Kitsap County

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2004

Portland, OR

Prospect - Phase II

Bob Atwood: 503.813.6696

Wayne Kerns: 913.458.2000

Black & Veatch

2,070' of 96"

20 mils lining & 25 mils coating

Penstock Pacificorp

Northwest Pipe

2005

Parkersburg, WV

Taggert-Lemiuex

Mike Wilmets:613.580.2424

Derek Potvin: 613.592.6060

Robinson Consultants

3,413' of 66"

50 mils coating

Water Transmission

City of Ottawa

Page 2: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2005

Portland, OR

Cedar River Pipeline

Martin Jacobson: 206.386.9744

Martin Jacobson: 206.386.9744

City of Seattle

200' & 100' of 74" & 62"

40 mils coating

Water Transmission

City of Seattle

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2005

Portland, OR

Tolt Pipeline Rehab

Brian Eng: 206.386.9744

Brian Eng: 206.386.9744

City of Seattle

4,300' of 56"

30 mils coating

Water Transmission

City of Seattle

Northwest Pipe

2005

Denver, CO

Lowry Redevelopment

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

4,938' of 24"

20 mils lining & 25 mils coating

Water Transmission

Denver Water Board

Page 3: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2005

Parkersburg, WV

Candelaria - Guatemala

Jack Snyder: 360.352.5090

EES Consulting

2,485' of 48"

25 mils lining & 30 mils coating

Penstock Hidroelectrica Candelaria

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2005

Portland, OR

Prospect - Phase III

Bob Atwood: 503.813.6696

Wayne Kerns: 913.458.2000

Black & Veatch

2,200' of 78"

20 mils lining & 25 mils coating

Penstock Pacificorp

Northwest Pipe

2005

Portland, OR

Port Westward Gen. Plant

Rob Phelps: 913.458.2578

Black & Veatch

853' & 200' of 66" & 48"

20 mils lining & 60 mils coating

Penstock Portland General Electric

Page 4: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

VanCon

2005

St George, UT

Reline Joints for Washington County 435.673.3617

170 joints of 30-84"

25 mils potable lining

Water Transmission

Washington County, UT

Steel Pipe Projects Effective: 04/08/2020

Progressive

2005

St George, UT

Reline Joints for Washington County 435.673.3617

45 joints of 60"

25 mils potable lining

Water Transmission

Washington County, UT

Northwest Pipe

2006

Portland, OR

Big Horn Basin Element 5B

307.347.4042

3,700' of 20"

30 mils coating

Water Transmission

Big Horn Regional Joint Powers

Page 5: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2006

Portland, OR

Pilot Butte

541.382.4077

Jason Torrie: 541.389.7614

David Evans & Associates

1,190' & 665' of 72" & 108"

25 mils potable lining & 25 mils coating

Water Transmission

Central Oregon Irrigation District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2006

Portland, OR

Cawelo

Barry Silken: 661.391.5040

Barry Silken: 661.391.5040

Chevron

44,000' of 42"

35 mils coating

Water Transmission

Chevron

Northwest Pipe

2006

Portland, OR

Anchorage Water Transmission Line 907.564.2774

Jerry Duppong: 425.453.5000

CH2M Hill

1,620' of 42"

20 mils potable lining & 25 mils coating

Water Transmission

City of Anchorage

Page 6: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2006

Portland, OR

D Street Realignment

Chris Storey: 253.573.2484

Chris Storey: 253.573.2484

City of Tacoma

400' ID & 1,050' OD of 32"

20 mils potable lining & 25 mils coating

Water Transmission

City of Tacoma

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2006

Portland, OR

Fitzsimmons Creek

Richard Blanchet: 604.633.9990

AECOM (RSW)

1,439' of 42"

20 mils lining & 25 mils coating

Penstock Innergex/Ledcor

Northwest Pipe

2006

Portland, OR

Dever's Canal

936.549.7911

409.833.3363

Carroll & Blackman

1,200' of 96"

20 mils lining & 25 mils coating

Water Transmission

Rice Grower Association

Page 7: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2007

Portland, OR

Douglas and Fire Creek

Richard Blanchet: 604.633.9990

Bert Scherman: 604.685.0543

Knight Piesold

14,500' of 80"

20 mils lining & 25 mils coating

Penstock Innergex (Cloudworks)

Steel Pipe Projects Effective: 04/08/2020

RTLC

2007

Kosse, TX

Lake Fork

Randy Peyton: 214.651.1441

Albert Petrasek: 214.638.0145

Carter Burgess

168" Fittings

25 mils potable lining & 25 mils coating

Water Transmission

Dallas Water Utilities

Northwest Pipe

2007

Portland, OR

Boundary Main #5

Simon So

Simon So

GVRD

9,800' of 72"

30 mils coating

Water Transmission

GVRD

Page 8: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2007

Adelanto, CA

Coastal Distribution System

Thomas Price: 916.286.0263

CH2M Hill

4", 6", 10", 12", 14", 20"

50 mils potable lining & 30 mils coating

Water Transmission

Pajaro Valley

Steel Pipe Projects Effective: 04/08/2020

Ameron/ Mobile Pipe

2007

Adelanto, CA

San Vicente

Mike Kenny: 858.522.6853

Mike Kenny: 858.522.6853

San Diego County Water Authority

60" Pipe & Fittings

30 mils coating

Water Transmission

San Diego County Water Authority

Northwest Pipe

2008

Portland, OR

City of Everett Transmission Lines #2 & #3 Rich Hefti: 425.257.7215

Jay Cooke: 425.896.6906

MWH Global

900' of 48"

25 mils potable lining & 25 mils coating

Water Transmission

City of Everett

Page 9: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2008

Portland, OR

Stokke, Tippela, Lamont Hydro

Richard Blanchet: 604.633.9990

Bert Scherman: 604.685.0543

Knight Piesold

10,560' of 64"

20 mils potable lining & 25 mils coating

Penstock Innergex (Cloudworks)

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2008

Portland, OR

Bart Lake Penstock

907.463.6324

907.463.6324

Alaska Light and Power

8,000' of 60"

25 mils coating

Penstock Alaska Light and Power

Northwest Pipe

2008

Portland, OR

Brightwater - East Tunnel

206.477.5506

Brad Cowles: 206.296.1478

Jacobs Engineering

16,000' of each size of 27", 48", 66", & 84"

40 mils lining

Wastewater Transmission

King County

Page 10: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2008

Adelanto, CA

Brightwater - Outfall

206.477.5506

Jeremy Hailey: 360.826.4570

Northwest Corrosion Engineering

480' of 84"

60 mils potable lining & 60 mils coating

Wastewater Transmission

King County

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2008

Portland, OR

Brightwater - Wastewater Treatment Plant 206.477.5506

Brad Cowles: 206.296.1478

Jacobs Engineering

500' of 66"

60 mils lining

Wastewater Transmission

King County

Northwest Pipe

2008

Portland, OR

Maple Ridge Force Main

Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

7,900' of 42"

40 mils lining & 25 mils coating

Wastewater Transmission

Metro Vancouver

Page 11: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2008

Pleasant Grove, UT

Deer Flat Dams Project

Don Rosbaugh: 208.378.5094

Don Rosbaugh: 208.378-5094

US Bureau of Reclamation

7,900' of 42"

60 mils potable lining

Raw Water Transmission

US Bureau of Reclamation

Steel Pipe Projects Effective: 04/08/2020

RTLC

2008

Kosse, TX

Royce City

Large Fittings

25 mils potable lining & 25 mils coating

Water Transmission

Northwest Pipe

2009

Parkersburg, WV

Glen Hydro Penstock Replacement

207.487.3328

Kleinschmidt Eneergy & Water Cons.

500' of 78"

25 mils coating

Penstock Central Vermont Public Service

Page 12: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2009

Portland, OR

East Toba/Montrose

604.669.4999

Bert Scherman: 604.685.0543

Knight Piesold

7,874' & 18,044' of 96" & 108"

20 mils lining & 25 mils coating

Penstock Toba Montrose General Partnership (Alterra)

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2009

Parkersburg, WV

TriCities

MWH

128', 1,117', & 82' of 36", 48" & 60"

40 mils lining & 40 mils coating

Water Transmission

Slayden

Northwest Pipe

2009

Saginaw, TX

Brushy Creek - Phase I

Chris Lippe: 512.844.7419

Glenn Bridges: 512.314.3100

Jacobs Engineering

24,000' of 78"

30 mils coating

Water Transmission

Brushy Creek Regional Utility Authority

Page 13: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2009

Portland, OR

SR900

Tim Larson: 425.450.6200

HDR

2,700' of 42"

25 mils potable lining & 40 mils coating

Water Transmission

Cascade Water Alliance

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2009

Portland, OR

Juniper Ridge

541.382.4077

801.523.0100

Sunrise Engineering

13,523' of 108"

20 mils lining & 25 mils coating

Penstock Central Oregon Irrigation District

Northwest Pipe

2009

Denver, CO

MacClure Rd.

Joel McAllister: 604.852.9256

Dayton & Knight

1,500' & 10,500' of 42" & 48"

25 mils coating

Water Transmission

City of Abbottsford

Page 14: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Corrcoat Services

2009

Surrey, BC

Upper Stave Hydro

Richard Blanchet: 604.633.9990

Bert Scherman: 604.685.0543

Knight Piesold

6,300' of 148"

20 mils potable lining & 25 mils coating

Penstock Innergex (Cloudworks)

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2009

Denver, CO

Conduit 94

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

2,200' of 72"

25 mils potable lining & 25 mils coating

Water Transmission

Denver Water Board

KNK Painting

2009

Temecula, CA

Perris Valley WWTP

Gail Lynch: 714.593.5100

Carollo

Fittings

Interior Joints over CML: 60 mils

Wastewater Transmission

Eastern Municipal Water District

Page 15: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2009

Adelanto, CA

Ashlu Hydro

Richard Blanchet: 604.633.9990

AECOM (RSW)

609' of 110"

20 mils potable lining & 25 mils coating

Penstock Innergex

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2009

Denver, CO

Rural Water System 85th Street Reservoir Troy Larson: 605.336.8688

Banner Associates

70' & 190' of 24" & 30"

35 mils coating

Water Transmission

Lewis & Clark Rural Water System

Northwest Pipe

2009

Portland, OR

Jervis Force Main

Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

10,335' of 48"

40 mils lining & 25 mils coating

Wastewater Transmission

Metro Vancouver

Page 16: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2009

Denver, CO

Stennis Space Station - New Pad

Thom Rich: 228.688.3946

Thom Rich: 228.688.3946

NASA

900' of 66"

30 mils coating

Water Transmission

NASA

Steel Pipe Projects Effective: 04/08/2020

Mobile Pipe

2010

Adelanto, CA

800 N Aquaduct Extension

Various specials and fittings

35 mils coating

Water Transmission

Central Utah Water Conservancy District

Northwest Pipe

2010

Denver, CO

Bellvue Water Transmission Line - Phase 1 Dan Moore: 970.350.9814

Daniel Rice: 303.987.3443

AECOM

10,074' of 60"

25 mils coating

Water Transmission

City of Greeley

Page 17: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2010

Portland, OR

Fanno Basin Pressure Line - Garden Home Section

CH2M Hill/Brown & Caldwell

13,000' of 32"

40 mils coating

Wastewater Transmission

City of Portland BES

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Denver, CO

Southern Delivery Finished Water 1A Dan Higgins: 719.385.5910

Randy Parks: 303.951.0623

CH2M Hill/Drewberry-Integra

4,122' & 7,571' of 42" & 54"

35 mils coating

Water Transmission

Colorado Springs Utilities

Northwest Pipe

2010

Denver, CO

Conduit 70

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

1,200' of 30"

25 mils coating

Water Transmission

Denver Water Board

Page 18: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Jifco, Mobile Pipe & NW Pipe

2010

Livermore, CA/ Adelanto, CA

San Jacinto RWRF Title 22 Upgrade Gabriel Buenagua: 951.928.3777

Rashi Gupta: 714.593.5100

Carollo

2,300' of 20-60"

60 mils lining

Water Transmission

Eastern Municipal Water District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Denver, CO

3200 West Pipeline

Shane Swensen: 801.565.4300

CH2M Hill

22,983' & 1,300' of 36" & 60"

35 mils coating

Water Transmission

Jordan Valley Water Conservancy

Northwest Pipe

2010

Denver, CO

Jackson Springs Water Transmission Main

Dave Muck: 605.343.3311

Ferber Engineering

10,600' of 20"

35 mils coating

Water Transmission

City of Rapid City

Page 19: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2010

Denver, CO

7800 S Phase III

Mark Atencio: 801.565.4300

CH2M Hill

2,760' & 2,613' of 24" & 30"

25 mils coating

Water Transmission

Jordan Valley Water Conservancy

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Saginaw, TX

Stonegate 42" Waterline

David Townsend: 817.392.8430

David Townsend: 817.392.8430

City of Fort Worth Water Department

1,365' of 43.5"

35 mils coating

Water Transmission

City of Fort Worth Water Department

Northwest Pipe

2010

Denver, CO

SWGWTP By-product Pipeline Phase I Todd Marti: 801.565.4300

Bowen, Collins & Associates

3,200' of 24"

35 mils coating

Water Transmission

Jordan Valley Water Conservancy

Page 20: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2010

Denver, CO

Treated Water Line - Segment 10

Troy Larson: 605.369.2400

Banner Associates

20,711' & 5,409' of 30" & 24"

35 mils coating

Water Transmission

Lewis & Clark Rural Water System

Steel Pipe Projects Effective: 04/08/2020

Mid America pipe

2010

Scammon, KS

Water Treatment Plant, Phase 2

Banner Associates

2,725' of 30-72" ctg & 400' of 30" & 48" lng

20 mils potable lining & 30 mils coating

Water Transmission

Lewis & Clark Rural Water System

Northwest Pipe & Mobile Pipe

2010

Adelanto, CA

San Vicente Dam Raise

Mike Kenny: 858.522.6853

Mike Kenny: 858.522.6853

San Diego Co. Water Authority

Pipe & Fittings of 60"

30 mils coating

Water Transmission

San Diego Co. Water Authority

Page 21: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America

2010

Scammon, KS

Village Creek Recycled Water Eastern Delivery System David Townsend: 817.392.8430

David McPherson: 214.631.6100

Alan Plummer & Associates

2,563' of 36"

35 mils coating

Water Transmission

City of Fort Worth Water Department

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Portland, OR

Coleman Penstock

Ashu Shirolkar: 916.858.2423

Ashu Shirolkar: 916.858.2423

Black & Veatch

3,600' of 84"

20 mils potable lining & 25 mils coating

Penstock PG&E

Mid America Pipe

2010

Scammon, KS

San Vicente Dam Raise Package 3

Mike Kenny: 858.522.6853

Mike Kenny: 858.522.6853

San Diego Co. Water Authority

251', 709' & 557' of 110", 92" & 62"

30 mils lining & 30 mils coating

Water Transmission

San Diego Co. Water Authority

Page 22: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2010

Denver, CO

Arapahoe Road 27" Waterline Relocation Cliff Stevens: 303.739.7376

850' of 27"

25 mils coating

Water Transmission

Aurora Water

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Denver, CO

Zone One Waterline

Ed Moreno: 720.977.6272

Ed Moreno: 720.977.6272

City of Thornton

16,699' of 42"

30 mils coating

Water Transmission

City of Thornton

Northwest Pipe

2010

Denver, CO

Pima County Interconnect Siphon

Jaime Rivera: 520.740.6359

Chris Luce: 216.606.1304

Brown & Caldwell

2,400' of 42"

60 mils lining & 25 mils coating

Wastewater Transmission

Pima County Regional Wastewater Reclamation

Page 23: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Specialty Finishes

2010

Portland, OR

Portland Airport De-icing Project

Craig Redlinger: 503.415.6000

Barry Sarin: 503.232.1800

CDM

1,600' of 4-72"

20 mils lining & 25 mils coating

Water Transmission

Port of Portland/PDX Airport

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2010

Adelanto, CA

UDOT SR92 - Provo River Canal Enclosure Pipeline Crossing

Steffanie Rhea

CH2M Hill

760' of 132"

25 mils potable lining & 25 mils coating

Water Transmission

Provo River WUA/UDOT

Northwest Pipe

2010

Portland, OR

Bear Creek Hydro

Jean-Francis Martell

All-Span Engineering

3,117' of 42"

20 mils potable lining & 25 mils coating

Penstock Regional Power (BC)

Page 24: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2010

Denver, CO

Core Pipeline, Segment 1

Tony Belcourt: 406.352.8000

Deon Stockert: 406.268.0626

AE2S

7,000' of 36"

25 mils coating

Water Transmission

Rocky Boys/Chippewa Creek Tribe

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Saginaw, TX

Gun Club Road

Elizabeth Carter: 720.859.4338

Bill Landin: 719.668.3738

MWH

8,064' of 42"

30 mils coating

Water Transmission

Aurora Water

Northwest Pipe

2011

Portland, OR

Transmission Line 3 - Phase 7

Rich Hefty: 425.257.7215

Greg Harris: 425.896.6924

MWH Global

3,310' of 48"

20 mils lining & 30 mils coating

Water Transmission

City of Everett

Page 25: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Hallmark Industrial Supply

2011

Houston, TX

Pavaho Storm Water Pump Station

Randy Peyton: 214.651.1441

Junaid Malik: 214.638.0145

Jacobs Engineering

500' & 200' of 72" & 96"

150 mils lining & 40 mils coating

Water Transmission

Dallas Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Denver, CO

Conduit 151

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

2,565' of 24"

25 mils coating

Water Transmission

Denver Water Board

Northwest Pipe

2011

Denver, CO

Conduit 302

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

15,900' & 1,500' of 30" & 36"

35 mils lining & 30 mils coating

Water Transmission

Denver Water Board

Page 26: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Denver, CO

Conduit 302 1B

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

11,600' of 30"

20 mils lining & 25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Denver, CO

Conduit 31 Union Station Relocation John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

540' of 30"

25 mils coating

Water Transmission

Denver Water Board

Northwest Pipe

2011

Denver, CO

Conduit 74

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

2,137' of 42"

25 mils coating

Water Transmission

Denver Water Board

Page 27: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Denver, CO

Dunes Reservoir

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

1,500' of 42"

20 mils lining & 25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Denver, CO

Climax Molybdenum Project

Marlys Weimer: 303.462.7159

Mike Stonefelt: 303.761.4130

W.W. Wheeler & Associates

22,000' of 37"

35 mils coating

Water Transmission

Freeport McMoRan

Northwest Pipe

2011

Portland, OR

16th Ave Main No. 3

Ravi Grewal: 604.432.6200

Ravi Grewal: 604.432.6200

Metro Vancouver

12,000' of 60"

25 mils coating

Water Transmission

Metro Vancouver

Page 28: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Portland, OR

Maple Ridge Main - West Ph I

Ravi Grewal: 604.432.6200

Ravi Grewal: 604.432.6200

Metro Vancouver

19,000' of 36"

25 mils coating

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Adelanto, CA

AA Raw Water Pipeline

George Briest: 760.753.6466

George Briest: 760.753.6466

Olivenhain Municipal WD

17,798' of 48"

30 mils coating

Water Transmission

Olivenhain Municipal WD

Northwest Pipe & Jifco

2011

Adelanto/ Kosse

City of Tucson SAVSARP Pump Station Peter Abraham: 520.837.2193

Peter Abraham: 520.837.2193

Tucson Water

2,600' of 84", 72", 60" & 48" plus extensive

20 mils lining & 25 mils coating

Water Transmission

Tucson Water

Page 29: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Portland, OR

Drum Forebay Hydro Penstock 1 & 2

Cathy Ly: 415.973.3647

PG&E Corp

780' of 66"

20 mils lining & 30 mils coating

Penstock PG&E Corp

Steel Pipe Projects Effective: 04/08/2020

Corrcoat Services

2011

Surrey, BC

Coquitlam UV Disinfection Plant

Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

3,560' of 48" to 120"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2011

Denver, CO

Santa Cruz Interceptor Phase 3

Jaime Rivera: 520.740.6359

Chris Luce: 216.606.1304

Brown & Caldwell

1,600' of 24 to 64"

30 mils lining & 30 mils coating

Wastewater Transmission

Pima County RWRD

Page 30: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Portland, OR

Transmissison Line #5 Replacement Pilchuck River Crossing Rich Hefti: 425.257.7215

Chris Castro: 206.438.2056

URS

429' of 51"

20 mils potable lining & 40 mils coating

Water Transmission

City of Everett

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Denver, CO

Southside Canal

George Cairo: 480.921.4104

GCE

763' of 84"

30 mils potable lining & 30 mils coating

Water Transmission

Pima-Maricopa Irrigation Project

Northwest Pipe

2011

Portland, OR

Parsons Pipeline

1,146' & 1,031' of 30" & 36"

25 mils ppotable lining & 25 mils coating

Water Transmission

Regional Municipality of Wood Buffalo

Page 31: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Portland, OR

Saline Creek Plateau Transmission Main

Associated Engineering

3,323' & 7,793' of 26" & 30"

20 mils lining & 30 mils coating

Water Transmission

Regional Municipality of Wood Buffalo

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2011

Adelanto, CA

San Vicente Dam Raise

Mike Kenny: 858.522.6853

Mike Rogers: 619.239.3888

MWH Americas

200' of 109"

25 mils potable lining & 25 mils coating

Water Transmission

San Diego Co. Water Authority

Northwest Pipe

2011

Portland, OR

Bay Division Pipelines Reliability Upgrade #5 - Peninsula Reach Joe Ortiz: 415.554.3155

Joe Ortiz: 415.554.3155

San Francisco Public Utilities Commission

47,480' of 60"

50 mils coating

Water Transmission

San Francisco Public Utilities Commission

Page 32: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2011

Portland, OR/ Denver, CO

Drum Forebay Penstock 1 & 2

Cathy Ly: 415.973.3647

Cathy Ly: 415.973.3647

PG&E Corp

2,736' of 36"

20 mils lining & 30 mils coating

Penstock PG&E Corp

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2012

Denver, CO

Harvard Ave 66" Waterline Relocation Cliff Stevens: 303.739.7376

1,160' of 66"

25 mils coating

Water Transmission

Aurora Water

Northwest Pipe

2012

Portland, OR

Bitter Root Siphon #1

John Crowley: 406.961.1182

US Army Corps of Engineers

750' of 66"

40 mils lining & 25 mils coating

Water Transmission

Bitter Root Irrigation District

Page 33: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Denver, CO

Conduit 58 & 74

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

2,700' of 36" & 3,000' of 42"

25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2012

Denver, CO

Core Pipeline, Segment 3

Tony Belcourt: 406.352.8000

Deon Stockert: 406.268.0626

AE2S

18,660' of 37"

25 mils coating

Water Transmission

Rocky Boys/Chippewa Creek Tribe

Northwest Pipe

2012

Denver, CO

City of Loveland 36" Morning Drive Waterline Tom Green: 970.962.2371

John Faulkner: 303.772.5282

Tetra Tech

2,630'' of 36"

25 mils coating

Water Transmission

City of Loveland

Page 34: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America Pipe

2012

Scammon, KS

City of Tacoma Green River Filtration Project

Mark Graham: 425.881.1100

MWH Americas

2,075' of 54", 72", 84" & 108"

25 mils lining & 30 mils coating

Water Transmission

City of Tacoma

Steel Pipe Projects Effective: 04/08/2020

T Bailey Inc.

2012

Seattle, WA

Dorena Lake Hydroelectric Project

Judd Lawrence: 801.580.1687

Bingham Engineering

400' of 120"

25 mils lining & 25 mils coating

Penstock Army Corp of Engineers

Northwest Pipe

2012

Adelanto, CA

Unit AA Water Pipeline

George Briest: 760.753.6466

George Briest: 760.753.6466

Olivenhain Municipal Water District

16,575' of 48"

30 mils coating

Water Transmission

Olivenhain Municipal Water District

Page 35: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Portland, OR

McAllister Water Transmission Line

Zheng Lu: 360.709.2672

Zheng Lu: 360.709.2672

City of Olympia

4,000' of 36"

25 mils lining and 30 mils coating

Water Transmission

City of Olympia

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe & Jifco

2012

Portland, OR/ Livermore, CA

Post Point Wastewater Treatment Plant

Tim Karlstrand: 925.932.1710

Carollo

1,260' of 50" & 440' of 20" to 74"

88 mils lining

Wastewater Transmission

City of Bellingham

Hancock Sandblast and Paint

2012

Pasco, WA

Long Lake Penstock Rehabilitation

Eric Atkinson: 800.936.9187

Avista Utilities

236' of 192" lined insitu

40 mils lining

Penstock Avista Utilities

Page 36: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Adelanto, CA

Paisano Water Line Replacement Phase 2 Daniel Avila: 915.594.5526

Gilbert Trejo: 915.747-3904

Arcadis

18,000' of 48" & 1,600' of 60" casing

25 mils coating

Water Transmission

El Paso Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2012

Portland, OR

Nanaimo Pipeline

Bill Sims: 250.756.5338

Chris Downey: 250.248.3151

Koers and Associates Engineering

12,180' of 54", 2,860' of 42" & 1,440' of 30"

25 mils coating

Water Transmission

City of Nanaimo

Corrcoat Services

2012

Surrey, BC

Gladwin Road Waterline

Joel McAllister: 604.852.9256

Dayton & Knight

5,880' of 48"

25 mils coating

Water Transmission

City of Abbotsford

Page 37: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Saginaw, TX

East Side Water Treatment Plant

Chris Schmidt: 972.392.7340

CP&Y Engineers

4,925' & 1,470' of 84" & 72"

30 mils coating

Water Transmission

Dallas Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2012

Saginaw, TX & Denver, CO

T-Bar Well Fields WTM - Segment 4

Todd Larson: 720.834.4200

Black & Veach

65,740' of 48"

35 mils coating

Water Transmission

Midland County Fresh Water Supply District

Northwest Pipe

2012

Denver, CO

Conduit 302 & 93

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

10,860' of 36" & 540' of 42"

20 mils lining & 25 mils coating

Water Transmission

Denver Water Board

Page 38: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Portland, OR

Douglas Road Water Transmission Line Ravi Grewal: 604.432.6200

Ravi Grewal: 604.432.6200

Metro Vancouver

12,120' of 60"

25 mils coating

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2012

Portland, OR

Maple Ridge Barnston

Ravi Grewal: 604.432.6200

Ravi Grewal: 604.432.6200

Metro Vancouver

3,960' of 30", 36" & 54"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2012

Portland, OR

Maple Ridge West Phase One

Ravi Grewal: 604.432.6201

Ravi Grewal: 604.432.6201

Metro Vancouver

9,060' of 36"

25 mils coating

Water Transmission

Metro Vancouver

Page 39: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2012

Adelanto, CA

Otay Water - Hunte Parkway Potable Water Line Ron Posada: 619.670.2293

Ron Posada: 619.670.2293

Otay Municpal Water District

2,400' of 30"

30 mils coating

Water Transmission

Otay Municpal Water District

Steel Pipe Projects Effective: 04/08/2020

Hallmark Industrial

2012

Houston, TX

North Holly High Service Pump Station David Townsend: 817.392.8430

David Townsend: 817.392.8430

City of Fort Worth Water Department

2,350' of 36", 42", 48" & 54"

35 mils coating

Water Transmission

City of Fort Worth Water Department

T-Bailey

2012

Seattle, WA

Blue Lake Penstock

Peter Rodrigue: 716.689.3737

Hatch Associates Engineering

380' of 108"

20 mils lining & 25 mils coating

Penstock City of Sitka

Page 40: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America Pipe

2012

Scammon, KS

Rueter-Hes Water Treatment Plant

Dewberry Engineering

400' & 1,300' of 36" & 48"

25 mils lining & 30 mils coating

Water Transmission

Parker Sanitation District

Steel Pipe Projects Effective: 04/08/2020

Hallmark Industrial Supply

2013

Houston, TX

Baker Storm Water Pump Station

Randy Peyton: 214.651.1441

Barry Hampson: 214.638.0145

Jacobs Engineering

1,900' of 84" & 520' of 102"

150 mils lining & 40 mils coating

Water Transmission

Dallas Water Utilities

Mobile Pipe

2013

Adelanto, CA

South Weber Waterline Replacement

Katie Jones: 801.359.5565

Caldwell, Richards, Sorensen Engineers

5,000' of 36"

35 mils coating

Water Transmission

Weber Basin Water Conservancy District

Page 41: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Jifco

2013

Livermore, CA

Mokelumne Aqueducts Interconnection Project

Mark Lewis: 510.287.1079

East Bay Municipal Utiltiy District

590' of 24" to 66" and fittings

30 mils lining & 30 mils coating

Water Transmission

East Bay Municipal Utiltiy District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2013

Portland, OR

East Langley Water Supply Line

City of Langley

24,000' of 36"

25 mils potable lining & 25 mils coating

Water Transmission

City of Langley

Northwest Pipe

2013

Denver, CO

Southside Water Transmission Main

Ute Water Conservancy District

7,600' of 32"

25 mils coating

Water Transmission

Ute Water Conservancy District

Page 42: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2013

Saginaw, TX

Integrated Pipeline Line J - Segment 1C

Matt Gaughan: 817.720.4474

AECOM

3,074' of 108"

35 mils coating

Water Transmission

Terrant Regional Water District& DWU

Steel Pipe Projects Effective: 04/08/2020

Corrcoat Services

2013

Surrey, BC

Sakwi Creek Hydro

Glenn Ichikawa: 604.669.5292

Kawa Engineering

1,740' of 24"

20 mils lining & 25 mils coating

Penstock Wind River Hydro

Northwest Pipe

2013

Saginaw, TX

48" Water Transmission Main Extension - Portland Ave to McArthur

Eric Wegner: 405.297.2581

Peter Borelli: 405.235.8075

Johnson and Associates

10,700' of 48"

25 mils coating

Water Transmission

The Oklahoma City Water Utilities Trust

Page 43: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2013

Portland, OR

Volcano Creek Hydro

Travis Anderson: 604.623.4772

Travis Anderson: 604.623.4772

AltaGas

8,200' of 72"

20 mils lining & 25 mils coating

Penstock AltaGas

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2013

Adelanto, CA

San Ramon Pipeline

Andy Winje: 310.544.5249

925.827.4900

Harris and Associates

4,000' of 54"

80 mil coating & 25 mils lining

Water Transmission

City of Rancho Palos Verdes

Corrcoat Services

2013

Surrey, BC

Jamie Creek Hydro

204.927.0290

Eric Redmond: 604.688.8271

Sigma Engineering

2,460' of 54"

20 mils lining and 25 mils coating

Penstock Sequoia Energy

Page 44: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Corrcoat Services

2013

Surrey, BC

Highland Valley Copper Mine Redundant Line 250.523.2443

250.523.2443

Highland Valley Copper Mine

5,200' of 20"

25 mils coating

Water Transmission

Highland Valley Copper Mine

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2013

Portland, OR

Kokish Hydro

Egbert Scherman: 604.685.0543

Knight Piesold

25,402' of 109"

25 mils lining & 25 mils coating

Penstock Brookfield Renewable Energy

PSL North America

2013

Bay St. Louis, MS

City of Calgary - Artist View Feeder Main Jim Buker: 403.268.5716

403.245.3800

Associated Engineering

3,382' of 36"

40 mils coating

Water Transmission

City of Calgary

Page 45: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe & Jifco

2013

Saginaw/ Kosse

66" Pipeline Along Almeda- Genoa & Monroe

Christine Kirby: 713.266.6900

Lockwood, Andrews & Newnam Inc.

9,000' of 66" coated (2,518' lined and coated)

35 mils lining & 25 mils coating

Water Transmission

City of Houston

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2013

Portland, OR

Volcano Creek Hydro

Travis Anderson: 604.623.4772

Adrian Gygax: 604.254.3914

Gygax Engineering Associtates, Ltd.

8,200' of 72"

20 mils lining & 30 mils coating

Penstock Alta Gas

Northwest Pipe

2013

Denver, CO

Moffat Tunnel - Siphon 1

John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

1,200' of 72"

25 mils coating

Water Transmission

Denver Water Board

Page 46: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

PSL North America

2013

Bay St. Louis, MS

Saline Creek Water Supply Line

604.293.1411

Associated Engineering

5,000' of 28" and 32"

20 mils lining

Water Transmission

Regional Municipality of Wood Buffalo

Steel Pipe Projects Effective: 04/08/2020

NW Pipe, Mobile Pipe

2013

Adelanto, CA/ Livermore, CA

San Jacinto Valley RWRF - Plant 2

Li-Min Shih: 951.928.3777

Rashi Gupta: 714.593.5100

Corollo

2,300' of 20", 30", 36", 42", 48" & 60" plus

80 mils lining

Wastewater Transmission

Eastern Municipal Water District

Northwest Pipe

2013

Portland, OR & Adelanto, CA

Kwoiek Creek Hydro Project

Richard Blanchet: 604.633.9990

HDR (Amnis)

7,886' of 80" & 15,605' of 76"

20 mils lining & 25 mils coating

Penstock Innergex/Kanaka Bar Indian Band

Page 47: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2013

Portland, OR

Thompson Pump Station

Michael Britch: 503.848.3045

Jeff Fuchs: 503.423.3852

HDR

6,400' of 24"

40 mils coating

Water Transmission

Tualatin Valley Water District

Steel Pipe Projects Effective: 04/08/2020

Corrcoat Services

2013

Surrey, BC

Highland Valley Copper Mine Waterline 250.523.2443

250.523.2443

Highland Valley Copper Mine

4,800' of 20"

25 mils coating

Water Transmission

Highland Valley Copper Mine

Northwest Pipe

2013

Portland, OR

Lake Oswego to Tigard Finished Water Pipeline Schedule 5 Joel Komarek: 503.697.6588

Brad Moore: 503.423.4000

Kennedy/Jenks Consultants

11,500' of 36" & 42"

35 mils coating

Water Transmission

City of Lake Oswego

Page 48: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2013

Portland, OR

Angus Drive Water Transmission Line Ravi Grewal: 604.432.6201

Ravi Grewal: 604.432.6201

Metro Vancouver

13,600' of 60 & 1,500' of 36", 42", 48" & 78"

25 mils coating

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2013

Portland, OR

Seymour Capilano #9, Phase 1 Water Transmission Line Ravi Grewal: 604.432.6201

Ravi Grewal: 604.432.6201

Metro Vancouver

6,000' of 84"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2014

Adelanto, CA

Bay Division Pipelines Reliability Seismic Upgrade, Phase 1 Joe Ortiz: 415.554.3155

Joe Ortiz: 415.554.3155

San Francisco Public Utilities Commission

920' & 2,550' of 61" & 54"

60 mils lining & 60 mils coating

Water Transmission

San Francisco Public Utilities Commission

Page 49: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2014

Denver, CO

South Boulder Collection System Replacement - Siphon 4 John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

1,200' of 84"

25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2014

Portland, OR

Lake Oswego to Tigard Willamette River Crossing - HDD Joel Komarek: 503.697.6588

Brad Moore: 503.423.4000

Staheli Trenchless

4,000' of 36"

40 mils lining & 80 mils coating

Water Transmission

City of Lake Oswego

Northwest Pipe

2014

Denver, CO

Bellvue Transmission Line - Northern Segment, Phase 1 Dan Moore: 970.350.9814

Daniel Rice: 303.987.3443

AECOM

22,000' of 60"

25 mils coating

Water Transmission

City of Greeley

Page 50: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2014

Adelanto, CA

North Rialto Interceptor

Jaime Rivera: 520.740.6359

Chris Luce: 216.606.1304

Brown & Caldwell

1,300' of 24"

60 mils lining & 30 mils coating

Wastewater Transmission

Pima County Regional Wastewater Reclamation

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2014

Saginaw, TX

Integrated Pipeline Line, Section 12-13 Midlothian Balancing Reservoir

Matt Gaughan: 708.577.9018

Michael McClure: 913.458.2000

Black & Veatch

34,500 of 108"

35 mils coating

Water Transmission

Terrant Regional Water District & DWU

Northwest Pipe

2014

Denver, CO

Southside Water Transmission Main Replacement, Schedule F

Ute Water Conservancy District

9,000' of 32"

25 mils coating

Water Transmission

Ute Water Conservancy District

Page 51: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2014

Portland, OR

Port Mann Tunnel

Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

3,423', 266',112' & 112' of 84", 66", 24" & 48"

25 mils lining

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2014

Denver, CO

Marston Dam and Forebay Multiple Level Outlet & Upgrade John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

1,800' of 61"

25 mils lining & 25 mils coating

Water Transmission

Denver Water Board

Northwest Pipe

2014

Portland, OR

Highway 28 Water Transmission Line, Phase 1 Clinton Crook: 250.286.5766

Mark Byrum: 250.475.1000

Levelton Consultants

3,674' of 48"

20 mils lining

Water Transmission

City of Campbell River

Page 52: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2014

Denver, CO

Roxborough - Rampart Street Waterline Relocation Cliff Stevens: 303.739.7376

Cliff Stevens: 303.739.7376

Aurora Water

1,500' of 42"

25 mils coating

Water Transmission

Aurora Water

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2014

Denver, CO

Core Pipeline, Procurement No. 4

Tony Belcourt: 406.352.8000

Deon Stockert: 406.268.0626

AE2S

7,880 of 37"

25 mils coating

Water Transmission

Rocky Boys/Chippewa Creek Tribe

Northwest Pipe

2014

Denver, CO

South Interceptor Force Main

Joel Komarek: 503.697.6588

Jeff Giddings: 402.399.1000

HDR

17,557' of 65"

35 mils lining & coating

Wastewater Transmission

City of Omaha Public Works Department

Page 53: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2014

Portland, OR

Upper Waiahii Penstock Replacement Project Harold Edwards: 808.630.1738

McMillen, LLC.

456' of 36"

40 mil lining & 45 mil coating

Penstock ITC Water Management

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2014

Denver, CO

Conduit 74 - Smith Road Replacement John Bambei: 303.628.6669

John Bambei: 303.628.6669

Denver Water Board

5,000' of 44"

25 mils coating

Water Transmission

Denver Water Board

Northwest Pipe

2014

Denver, CO

Core Pipeline, Segment 3

Tony Belcourt: 406.352.8000

Deon Stockert: 406.268.0626

AE2S

7,880' of 37"

25 mils coating

Water Transmission

Rocky Boys/Chippewa Creek Tribe

Page 54: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2015

Portland, OR

Port Mann Main No. 2 North and No 1 & 2 South Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

7,200' of 60"

25 mils coating

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2015

Portland, OR

Seymour Capilano #9, Phase 2 Water Transmission Line Ravi Grewal: 604.432.6201

Ravi Grewal: 604.432.6201

Metro Vancouver

6,241' of 84"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2015

Denver, Co

48" Water Transmission Main Extension - SW 29th Street Eric Wegner: 405.297.2581

405.416.8100

C.H. Guernsey Engineers

7,655' of 48"

25 mils coating

Water Transmission

The Oklahoma City Water Utilities Trust

Page 55: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America Pipe

2015

Scammon, KS

Integrated Pipeline Line J - Segment 1C Matt Gaughan: 708.577.9018

Matt Gaughan: 817.720.4474

AECOM

4,050' of 108"

35 mils coating

Water Transmission

Terrant Regional Water District & DWU

Steel Pipe Projects Effective: 04/08/2020

Corrcoat Services

2015

Surrey, BC

Lorenzetta Creek Hydro Project

Michael Sohy: 604.746.7724

Michael Sohy: 604.746.7724

Zella Corporation

3,500' of 24"

20 mils lining

Penstock Zella Corporation

Jindal Tubular

2015

Bay St. Louis, MS

Integrated Pipeline Line J - Segment 1C Matt Gaughan: 708.577.9018

Matt Gaughan: 817.720.4474

AECOM

4,150' of 108"

35 mils coating

Water Transmission

Terrant Regional Water District & DWU

Page 56: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2015

Portland, OR

Franklin County Irrigation Pipeline

Dave Van Schoiak: 509.627.8717

Dave V Consulting

4,660' of 48"

25 mils lining & coating

Raw Water Transmission

Franklin County Irrigation District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2015

Adelanto, CA

Bay Division Pipelines Reliability Seismic Upgrade, Phase 2 Joe Ortiz: 415.554.3155

Joe Ortiz: 415.554.3155

San Francisco Public Utilities Commission

1,911' & 3,006' of 68" & 56"

60 mils lining & 60 mils coating

Water Transmission

San Francisco Public Utilities Commission

Northwest Pipe

2015

Portland, OR

Upper and Lower Waiahii Penstock

Harold Edwards: 808.630.1738

McMillen, LLC.

1,200' of 36"

40 mil lining & 45 mil coating

Penstock ITC Water Management

Page 57: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Jindal Tubular

2015

Bay St. Louis, MS

Southwest Water Supply Line, Phase 1

604.293.1411

Associated Engineering

7,000' of 30"

20 mils lining

Water Transmission

Regional Municipality of Wood Buffalo

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2015

Portland, OR

Opal Springs Water Transmission Line

541.504.9960

Newton Consultants, Inc.

2,520' of 24"

20 mils lining & 25 mils coating

Water Transmission

Deschutes Valley Water District

Jindal Tubular

2015

Bay St. Louis, MS

Integrated Pipeline - Richland Chambers and Cedar Creek Interconnect, Section 12-2

Matt Gaughan: 708.577.9018

Matt Gaughan: 817.720.4474

AECOM

1,300' of 60-108"

40 mils coating

Water Transmission

Terrant Regional Water District & DWU

Page 58: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2015

Portland, OR

Highway 28 Water Transmission Line, Tower Road to PowerHouse Road

Clinton Crook: 250.286.5766

Mark Byrum: 250.475.1000

Levelton Consultants

1,640 of 48"

20 mils lining

Water Transmission

City of Campbell River

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2015

Portland, OR

LeGrow Farms Irrigation Pipeline, Phase 1 208.462.5200

11,600', 7,200' & 2,400' of 54", 72" & 36"

25 mils lining & 25 mils coating

Raw Water Transmission

LeGrow Water Company

Northwest Pipe

2015

Portland, OR

LeGrow Farms Irrigation Pipeline, Phase 2 208.462.5200

7,200' of 44"

25 mils lining & 25 mils coating

Raw Water Transmission

LeGrow Water Company

Page 59: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2015

Portland, OR

Allison Creek Hydro

Travis Shelton: 208.921.9593

McMillen, LLC.

6,000' of 38"

25 mils lining & 35 mils coating

Penstock Copper Valley Electric Association

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2015

Portland, OR

Southwest Water Supply Line, Phase 1 - Athabasca River Crossing - HDD

4,000' of 30"

20 mils lining

Water Transmission

Regional Municipality of Wood Buffalo

Industrial Coatings and Fireproofing

2015

Los Angeles, CA

McCarrell Canyon Re-Line Project

Andy Winje: 310.544.5249

Mike Jenkins: 310.329.0102

KOA Corporation

2,200' of 66"

80 mils lining on the bottom 1/3, 30 mils top

Water Transmission

City of Rancho Palos Verdes

Page 60: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2015

Denver, CO

Ashland Reservoir

Robert J. Mahoney: 303.628.6669

Robert J. Mahoney: 303.628.6669

Denver Water Board

2,000, 1,000 & 250 LF of 36", 30 & 24"

25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Mid America Pipe

2015

Scammon, KS

Lake Oswego to Tigard Finished Water Pipeline Schedule 4 Joel Komarek: 503.697.6588

Brad Moore: 503.423.4000

Kennedy/Jenks Consultants

5,230 of 42"

35 mils coating

Water Transmission

City of Lake Oswego

Northwest Pipe

2015

Denver, CO

Conduit 93

Robert J. Mahoney: 303.628.6669

Robert J. Mahoney: 303.628.6669

Denver Water Board

3,700 LF of 42"

25 mils coating

Water Transmission

Denver Water Board

Page 61: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Portland, OR

South Delta Water Main #1 - Phase 2 & 3 Ravi Grewal: 604.432.6201

Ravi Grewal: 604.432.6201

Metro Vancouver

14,000 LF of 36"

25 mils coating

Wastewater Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Denver, CO

Timber Intake Pipeline

Tony Belcourt: 406.352.8000

Deon Stockert: 406.268.0626

AE2S

10,500' of 30"

25 mils coating

Water Transmission

Rocky Boys/Chippewa Creek Tribe

Northwest Pipe

2016

Denver, CO

Moffat Tunnel - Siphon 1 Add On

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

280' of 72"

30 mils coating

Water Transmission

Denver Water Board

Page 62: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Denver, CO

20th Street Transmission Line - 74th Ave to 83rd Ave Rafael Samaniego: 970.336.4122

Jeff Tempele: 970.377.3602

JUB Engineers

1,200' of 24" & 1,200' of 30"

35 mils coating

Water Transmission

City of Greeley

Steel Pipe Projects Effective: 04/08/2020

Jindal Tubular

2016

Bay St. Louis, MS

Bellvue Water Transmission Line - Phase 2 Dan Moore: 970.350.9814

Daniel Rice: 303.987.3443

AECOM

10,074' of 60"

25 mils coating

Water Transmission

City of Greeley

Northwest Pipe

2016

Adelanto, CA

Trackline 24" Waterline Project 801.399.4357

Katie Jones: 801.359.5565

Caldwell, Richards, Sorensen Engineers

3,800' of 24"

50 mils coating

Water Transmission

City of Ogden

Page 63: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America Pipe

2016

Scammon, KS

Integrated Pipeline - JB3 Pumpstation Matt Gaughan: 708.577.9018

Matt Gaughan: 708.577.9018

Plus Six Engineering

4,000' of 108" coated 270 lined and coated),

30 mils lining & 35 mils coating

Water Transmission

Terrant Regional Water District & DWU

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Adelanto, CA

Barrick - Cortez Gold Mine

David Pully: 775.738.2121

Farwest Engineering

79,300' of 36" and 490' of 42" unlined pipe

25 mils coating

Water Transmission

Barrick Gold Corporation

Northwest Pipe

2016

Portland, OR

Kinsman Road Pipeline

Jerry Duppong: 425.453.5000

CH2M Hill

2,960' of 68"

80 mils coating

Water Transmission

Oregon Department of Transportation

Page 64: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Portland, OR

Hancock Creek Hydro

Dawn Pressler: 425.783.1709

Scott Mahnken: 425.889.2700

EES Consulting

7,920' of 44"

Penstock Snohomish Public Utility District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Portland, OR

Calligan Creek Hydro

Dawn Pressler: 425.783.1709

Scott Mahnken: 425.889.2700

EES Consulting

6,336' of 46"

Penstock Snohomish Public Utility District

Jindal Tubular

2016

Bay St. Louis, MS

College Park Reservoir Duplicate Supply Main Bill Sims: 250.756.5338

Phil Cook: 604.852.9256

Opus Dayton Knight

5,095' 30" and 580' of 61" Poly X Poly

Water Transmission

City opf Nanaimo

Page 65: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Jindal Tubular

2016

Bay St. Louis, MS

Fleish Penstock Replacement

Paul Winkelman: 775.329.5599

Shaw Engineering

360' of 96"

40 mils lining and 25 mils coating

Penstock Truckee Meadows Water Authority

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Portland, OR

West McLeod Feeder Main

Bill Ng: 403.268.5007

Hussain Iftikhar: 403.716.8188

Stantec Engineering

8,000' of 42" epoxy lined, poly coated

40 mils coating

Water Transmission

City of Calgary

Mid America Pipe

2016

Scammon, KS

Low Lift Pump Station Improvement - Hefner WTP 405.297.1774

Carollo Engineers

200' 84", 300' 72", 300' 64", 500' 48", 50' 42",

35 mils coating

Water Transmission

Oklahoma City Water Utilities Trust

Page 66: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Denver, CO

Siphon No. 1 Phase 3 & 4 Jim Creek Siphon Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

1,870' of 66" and 350' of 72"

35 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Portland, OR

Hunter Creek Hydro

604.854.5465

Glenn Ichikawa: 604.669.5292

Kawa Engineering

6,600' of 42"

25 mils

Penstock Wind River Hydro

Jindal Tubular

2016

Bay St. Louis, MS

Airport BLVD 60"

Christine Kirby: 713.266.6900

Lockwood, Andrews & Newnam Inc.

7,000' of 60"

35 mils coating

Water Transmission

City of Houston

Page 67: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Denver, CO

Moffat Tunnel Siphon 1

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

280 'of 74"

30 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Portland, OR

Seymour Capilano #7

Mark MacConnell: 604.436.6964

Mark MacConnell: 604.436.6965

Metro Vancouver

680' of 48"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2016

Portland, OR

"C" Flume Replacement

James Gale: 541.880.7580

Brett Moore: 541.4864491

Anderson Perry

4,200' of 120"

25 mils lining & coating

Penstock Bureau of Reclamation

Page 68: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2016

Portland, OR

Hancock Creek Hydro

Dawn Pressler: 425.783.1709

Scott Mahnken: 425.889.2700

EES Consulting

7,920' of 44"

25 mils lining & coating

Penstock Snohomish PUD District 1

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2016

Adelanto, CA

Navajo-Gallup Water Supply Project - San Juan Lateral - Reach 12B Leslie Corpening: 801.524.3600

Leslie Corpening: 801.524.3600

Bureau of Reclamation

8,300' of 36" CML X Poly

25 mils

Water Transmission

Bureau of Reclamation

Northwest Pipe

2016

Portland, OR

Chickwat Creek Hydro

403.668.1575

Glenn Ichikawa: 604.669.5292

Kawa Engineering

1,440' of 54"

25 mils

Penstock Blue Earth Renewables

Page 69: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Saginaw, TX

Luce Bayou NE Transmission Line

David Miller: 713.658.0855

Aaron Hargrove: 713.488.8234

Brown & Gay Engineers

30,066' of 99"

35 mils coating

Water Transmission

Coastal Water Authority

Steel Pipe Projects Effective: 04/08/2020

Mid America

2017

Scammon, KS

Grandfather Falls Hydroelectric Project

Winsconsin Public Service

1,350' of 132" & 156"

30 mils coating

Penstock Wisconsin Public Service

Northwest Pipe

2017

Portland, OR

Willamette Water Supply - PL1.1

Mike Britch: 503.848.3045

Andre Tolme: 503.220.5422

MWH

1,600' of 48"

40 mils coating

Water Transmission

Tualatin Valley Water District

Page 70: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Portland, OR

Willamette Water Supply - PLW 1.1

Mike Britch: 503.848.3045

Andre Tolme: 503.220.5422

MWH

4,800' of 48"

40 mils coating

Water Transmission

Tualatin Valley Water District

Steel Pipe Projects Effective: 04/08/2020

Mid America

2017

Scammon, KS

North Chestnut Over South Douglas Creek Pipeline

Clay Rahn: 303.764.1520

HDR

200' of 26"

35 mils coating

Water Transmission

City of Colorado Springs

Northwest Pipe

2017

Portland, OR

Upper Ramona Penstock

Glen Ichikawa: 604.661.2111

BBA Engineering

4,100' 26"

20 mils lining & 25 mils coating

Penstock Blue Earth Renewables

Page 71: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America

2017

Scammon, KS

Wylie Water Treatmenmt Plant IV Expansion Project - Package One Steve Long: 972.442.5405

Paul Dossett: 817.882.0528

Carollo Engineers

4,596' of 16" - 99"

35 mils coating

Water Transmission

North Texas Municipal Water District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2017

Portland, OR

Annacis Island Stage 5 Waste Water Treatment Plant Mark MacConnell: 604.436.6964

Mark MacConnell: 604.436.6965

Metro Vancouver

3,690' of 30-88"

25 mils coating

Wastewater Transmission

Metro Vancouver

Hallmark Supply

2017

Houston, TX

Casa View Pump Station

Steve Long: 972.442.5405

Jeni Tatum: 817.335.6500

Kimley Horn

880' of 30, 36 & 42"

40 mils lining & 25 mils coating

Wastewater Transmission

North Texas Municipal Water District

Page 72: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Portland, OR

New Cold Pipeline Relocation Project Chris Storey: 253.573.2484

Chris Storey: 253.573.2484

City of Tacoma

1,300' of 42"

25 mils lining & 25 mils coating

Water Transmission

City of Tacoma

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2017

Saginaw, TX

Highway 287 Replacement Pipe

Dan Moore: 970.350.9814

Michael Yost: 402.474.6311

Olsson and Associates

3.662' of 30"

25 mils coating

Water Transmission

City of Greeley

Northwest Pipe

2017

Saginaw, TX

Zone 3 Water Transmission Main Improvements

Joel Spence: 303.951.0621

Dewberry Engineering

6,710' of 30"

30 mils coating

Water Transmission

City of Boulder

Page 73: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Adelanto, CA

Putnam Street 48" Replacement Pipe

Elmer Cheung: 415.551.4668

Elmer Cheung: 415.551.4669

San Francisco Public Utilities Commission

1,600' of 42" and 200 LF 36"

50 mils lining & coating

Water Transmission

San Francisco Public Utilities Commission

Steel Pipe Projects Effective: 04/08/2020

Mid America

2017

Scammon, KS

Integrated Pipeline - Kennedale Balancing Reservoir Pressure Reduction Station

Matt Gaughan: 708.577.9018

Neill Hampton: 817.916.2942

CDM Smith Engineering

1,200' of 48" - 108"

30 mils coating

Water Transmission

Terrant Regional Water District & DWU

Mid America

2017

Scammon, KS

34th Street Pump Station

David Maxwell: 210.233.3502

Tetratech Engineers

1,750' of 4" to 42"

25 mils coating

Water Transmission

San Antonio Water System

Page 74: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Portland, OR

McLaughlin Point Wastewater Horizontal Directional Drill Mark MacConnell: 604.436.6964

Mark MacConnell: 604.436.6965

Metro Vancouver

3,250' 42"

60 mils lining

Wastewater Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Mid America

2017

Scammon, KS

Vista Ridge Pump Stations (4)

David Maxwell: 210.233.3502

Vrrsp Consultants

3,150' of 24" to 62"

25 mils coating

Water Transmission

San Antonio Water System

Northwest Pipe

2017

Saginaw, TX

Canyons Pipeline

Stantec Engineering

18,000 LF of 36"

25 mils coating

Water Transmission

Parker Water and Sanitation District

Page 75: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America

2017

Scammon, KS

Atoka Surge Control

Larry Hare: 405.297.3681

Brent Hauser: 405.231.4025

CDM Smith Engineering

1,200' of 48" & 300' of 60"

35 mils coating

Water Transmission

Oklahoma City Water Utilities Trust

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2017

Saginaw, TX

Redbud Pump Station Water Transmission Line

Greg Vaughn: 214.522.8778

Lockwood, Andrews & Newnam Inc.

4,800' of 54" & 500' of 36"

25 mils coating

Water Transmission

City of McKinney

Mid America

2017

Scammon, KS

Low Lift Pump Station Improvement - Draper Water Treatment Plant

Larry Hare: 405.297.3681

Robert Cullwell: 512.453.5383

Carollo Engineers

840' of 60" & 1,250' of 36" - 96"

35 mils coating

Water Transmission

Oklahoma City Water Utilities Trust

Page 76: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2017

Adelanto, CA and Saginaw, TX

Eastern Pipeline

Daniel Rice: 720.318.5410

Providence Infrastucture Consultants

57,588 LF of 32"

25 mils coating

Water Transmission

Dominion Water and Sanitation

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2018

Saginaw, TX

Conduit 83

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

125' of 38"

25 mils coating

Water Transmission

Denver Water Board

Mid America

2018

Scammon, KS

Rio Grande Dam Intake

Deere and Alt Engineering

450' of 127" & 100' of 84"

25 mils lining and 25 mils coating

Penstock San Luis Valley Irrigation District

Page 77: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America

2018

Scammon, KS

Elm fork Pump Station and Yard Piping Randy Peyton: 214.651.1441

Arcadis Egineering

3,600' of 36" - 96"

35 mils coating

Water Transmission

Dallas Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2018

Adelanto, CA

Navajo-Gallup Water Supply Project - San Juan Lateral - Block 9-11 Leslie Corpening: 801.524.3600

Leslie Corpening: 801.524.3600

Bureau of Reclamation

62,000' of 42"

25 mils coating

Water Transmission

Bureau of Reclamation

Northwest Pipe

2018

Adelanto, CA

Mill Meadows Pipeline

435.836.2784

435.628.6500

Alpha Engineering

31,500' of 48"

25 mils coating

Water Transmission

Freemont Waterworks Company

Page 78: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2018

Saginaw, TX

Hillcrest Reservoir Package #3

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

850' of 86"

25 mils coating

Water Transmission

Denver Water Board

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2018

Saginaw

Conduit 16 & 22 - Central Segment

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

14,850 LF of 66"

30 mils coating

Water Transmission

Denver Water Board

Mid America

2018

Scammon, KS

Pipeline Relocations Ahead of Conduit 16 Whitney Smith: 720.898.7091

Andrew Stevens: 303.951.0623

Dewberry Engineering

2,400' of 24" - 48"

30 mils coating

Water Transmission

City of Arvada

Page 79: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2018

Saginaw, TX

Haskell Street Wastewater Treatment Plant Headwords Effluent Pipe

Robert Davidson: 915.594.5528

Robert Torres: 915.545.4400

Brown and Caldwell

535' of 60"

60 mils lining & 25 mils coating

Wastewater Transmission

El Paso Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2018

Portland., OR

Olokele Penstock

Jack Snyder: 360.352.5090

EES Consulting

2,600' of 40"

25 mils lining & 25 mils coating

Penstock Kauai Island Utility

Northwest Pipe

2018

Saginaw, TX

Quincy and Gun Club Northern Waterline Re-Alignment Pipeline

Andrew Stevens: 303.951.0623

Dewberry Engineering

708' of 48"

30 mils coating

Water Transmission

East Cherry Creek Balley Water & Sanitation

Page 80: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe & Mid America

2019

Saginaw TX/ Scammon, KS

Integrated Pipeline - JCC1 Lake Pump Station Matt Gaughan: 708.577.9018

Matt Gaughan: 708.577.9018

Plus Six Engineering

2,200' of 48" - 108"

35 mils coating

Water Transmission

Terrant Regional Water District & DWU

Steel Pipe Projects Effective: 04/08/2020

Thompson Pipe Group

2019

Grand Prairie, TX

108" Northeast Transmission Line from Union Pacific Railroad to John Ralston Road

Kevin Tran: 832.395.2242

Michael Liga 713.266.6900

Lockwood, Andrews & Newnam Inc.

7,900 LF of 108"

25 mils coating

Water Transmission

City of Houston

Thompson Pipe Group

2019

Grand Prairie, TX

108" Northeast Transmission Line from Smith to Bellows Falls Kevin Tran: 832.395.2242

Michael Liga 713.266.6900

Lockwood, Andrews & Newnam Inc.

10,320 LF of 108"

25 mils coating

Water Transmission

City of Houston

Page 81: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Saginaw, TX

108" Northeast Transmission Line from John Ralston Road to Bellows Falls

Kevin Tran: 832.395.2242

Michael Liga 713.266.6900

Lockwood, Andrews & Newnam Inc.

10,320 LF of 108"

25 mils coating

Water Transmission

City of Houston

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

Kennedy - Newton Forcemain

Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

8,000 LF of 82"

40 mils lining & 25 mils coating

Wastewater Transmission

Metro Vancouver

Northwest Pipe

2019

Portland, OR

Kennedy - Newton Forcemain - Phase One Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

7,260 LF of 72"

40 mils lining & 25 mils coating

Wastewater Transmission

Metro Vancouver

Page 82: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Thompson Pipe Group

2019

Grand Prairie, TX

Wintergreen Road Water Transmis-sion Line Randy Peyton: 214.651.1441

Randy Peyton: 214.651.1441

Dallas Water Utilities

1,305 LF of 96"

25 mils coating

Water Transmission

Dallas Water Utilities

Steel Pipe Projects Effective: 04/08/2020

Thompson Pipe Group

2019

Grand Prairie, TX

120" Northeast Water Purification Plant to Union Pacific Railroad Michael Liga 713.266.6900

Michael Liga 713.266.6900

Lockwood, Andrews & Newnam Inc.

1,400 LF of 120"

25 mils coating

Water Transmission

City of Houston

Northwest Pipe

2019

Adelanto, CA

Walker Recharge Southside Main, Ph. 1

8,200 LF of 24"

25 mils lining & 25 mils coating

Water Transmission

Central Colorado Water Conservancy District

Page 83: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

Odessa E Low Canal Pipeline

Jeremy Underdown: (509) 488-9671

Jeremy Underdown: 509.488.9671

East Columbia Irrigation District

2,439 LF of 54"

30 mils lining & 30 mils coating

Water Transmission

East Columbia Irrigation District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

San Louis Rio Colo-rado, MX

Northshore Wastewater Treatment Pland Tonveyance Project Paul Wilting: 604.432.6200

Paul Wilting: 604.432.6200

Metro Vancouver

6,575 LF of 84"

40 mils lining & 25 mils coating

Wastewater Transmission

Metro Vancouver

Northwest Pipe

2019

Portland, OR

Frasier River HDD Crossing

Joel McAllister: 604.996.4722

OnSite Engineering

9,400 LF of 36"

40 mils lining & 25 mils coating

Wastewater Transmission

City of Mission

Page 84: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

Willamette Water Supply - PLM 5.2 Owner Supplied Pipe Mike Britch: 503.848.3045

Andre Tolme: 503.220.5422

MWH

1,400' of 68"

40 mils coating

Water Transmission

Tualatin Valley Water District

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

Columbia River Pipeline

3,700 LF of 78"

20 mils lining & 25 mils coating

Water Transmission Raw Water Transmission

East Improvement District

Northwest Pipe

2019

Parkersburg, WV

North Renewal System

Antonio Flori: 303.628.6622

Antonio Flori: 303.628.6622

Denver Water Board

3,800 LF of 86" & 2,600 LF of 48"

35 mils coating

Water Transmission

Denver Water Board

Page 85: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Mid America

2019

Scammon, KS

Bud Ervin Water Treatment Plant Clearwell #4 and High Service Pump Station

Marshall Plunk: 817.806.1764

Alan Plummer & Associates

500 LF of 36" & 340 LF of 48"

35 mils coating

Water Transmission

City of Mansfield

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

Willamette Water Supply - PLM 5.1 - Roy Rogers Road Mike Britch: 503.848.3045

Jacobs Engineering

7,000 LF of 66"

40 mils coating

Water Transmission

Tualatin Valley Water District

Northwest Pipe

2019

Adelanto, CA

24" Pipeline

5,000 LF of 24"

25 mils coating

Water Transmission

Left Hand Water District

Page 86: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Saginaw , TX

42" Waterline from Bellfort to Bis-sonnet Michael Liga 713.266.6900

Michael Liga 713.266.6900

Lockwood, Andrews & Newnam Inc.

12,000 LF of 42"

25 mils coating

Water Transmission

City of Houston

Steel Pipe Projects Effective: 04/08/2020

Thompson Pipe Group

2019

Grand Prairie, TX

Willamette Water Supply - PLM 1.1

Mike Britch: 503.848.3045

Andre Tolme: 503.220.5422

MWH

1,600' of 66"

40 mils coating

Water Transmission

Tualatin Valley Water District

Northwest Pipe

2019

Portland, OR

Willamette Water Supply - PLM 5.2 Adjacent to Scholls Ferry Road Mike Britch: 503.848.3045

Andre Tolme: 503.220.5422

MWH

8,507 LF of 68"

40 mils coating

Water Transmission

Tualatin Valley Water District

Page 87: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

West Calgary Ring Road Vallege Ridge Feeder Main Bill Ng: 403.268.5716

403.245.3800

Associated Engineering

766 LF if 36"

40 mils coating

Water Transmission

City of Calgary

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

Provisional Item for 96th Ave

Mark McConnell: 604.451.6593

Mark McConnell: 604.451.6593

Metro Vancouver

2,214 LF of 72"

25 mils coating

Water Transmission

Metro Vancouver

Thompson Pipe Group

2019

Grand Prairie, TX

Lower Bois d' Arc Creek Reservoir - Raw Water Pipeline Bid Package 1, Segment C

Scott Maughn: 214.217.2200

Freese and Nichols

53,000 LF of 90"

35 mils coating

Water Transmission

North Texas Municipal Water District

Page 88: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Saginaw, TX

Lower Bois d' Arc Creek Reservoir - Raw Water Pipeline Bid Package 1, Segment A & B

Scott Maughn: 214.217.2200

Freese and Nichols

125,430 LF of 90"

35 mils coating

Water Transmission

North Texas Municipal Water District

Steel Pipe Projects Effective: 04/08/2020

Mid America

2019

Scammon, KS

Northeast Water Purification Plant Yard Piping Package 8

Peter Rude: 530.229.3396

Houston Water Works Team

5,950 LF of 120", 4,200 LF of 108", 4,000 LF

35 mils coating

Water Transmission

City of Houston

Mid America

2019

Scammon, KS

48" Cherokee Water Transmission Main 918.596.7777

Rhonda Dudeck: 918.492.1600

Benham Design, LLC

18,000 LF of 48"

35 mils coating

Water Transmission

City of Tulsa

Page 89: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

Northridge and Sarcee Feedermains

Bill Ng: 403.268.5716

403.245.3800

Associated Engineering

16,928 LF of 56", 230 LF of 50" & 8,920 LF of

40 mils coating

Water Transmission

City of Calgary

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

San Andreas Pipeline

Joe Ortiz: 415.554.3155

Joe Ortiz: 415.554.3155

San Francisco Public Utilities Commission

1,600 LF of 43" & 5,000 LF of 56"

60 mils lining & 60 mils coating

Water Transmission

San Francisco Public Utilities Commission

Mid America

2019

Scammon, KS

Verdigris Water Treatment Plant

HDR

350 LF of 48" and 50 LF of 36"

35 mils coating

Water Transmission

City of Broken Arrow

Page 90: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

Gunnuk Creek Hydro

Brandon Shaw: 907.364.3033

Paul Berkshire: 907.644.2000

HDR

2,400 LF of 54"

25 mils lining and 25 mils coating

Penstock Inside Passage Electric Cooperative

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Portland, OR

2019 RFP - Wally Main

Mark McConnell: 604.451.6593

Mark McConnell: 604.451.6593

Metro Vancouver

6,360 LF of 60"

25 mils coating

Water Transmission

Metro Vancouver

Northwest Pipe

2019

Portland, OR

2019 RFP - Port Mann

Mark McConnell: 604.451.6593

Mark McConnell: 604.451.6593

Metro Vancouver

8,100 LF of 60"

25 mils coating

Water Transmission

Metro Vancouver

Page 91: Steel Pipe Projects 2011-10-28 - LifeLast...2020/04/08  · 3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 Date Applicator Location Project Owner | Contact Engineer

3813 Helios Way, Suite 190, Pflugerville, TX 78660 O: 512-628-2112 www.LifeLast.com

Date

Applicator

Location Project

Owner | Contact

Engineer | Contact Polyurethane

Quantities Service

Environment

Northwest Pipe

2019

Portland, OR

2019 RFP - Vancouver Heights

Mark McConnell: 604.451.6593

Mark McConnell: 604.451.6593

Metro Vancouver

6,960 LF of 60"

25 mils coating

Water Transmission

Metro Vancouver

Steel Pipe Projects Effective: 04/08/2020

Northwest Pipe

2019

Saginaw, TX

Contract 38 Pipeline

713.520.9570

Terttu Britton: 713.527.6376

Dannenbaum

6,000 LF of 60"

25 mils coating

Water Transmission

West Harris County Regional Water Authority

Thompson Pipe Group

2019

Grand Prairie, TX

Raw Water Pipeline Relocation

HDR

2,894 LF of 36" & 313 LF of 42"

35 mils coating

Water Transmission

City of Lewisville