STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 1 - of 15
Modification of Bulbous Bow in HRDD (China)
1 – Onboard Inspection.
1.1) – NEW Bulbous Bow Installation
a) – Bulbous Bow Fit Up Inspection – Accepted / OK to weld.
![Page 2: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/2.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 2 - of 15
b) – Bulbous Bow Final Inspection – Accepted.
![Page 3: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/3.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 3 - of 15
c) – Bulbous Bow Air Test – Accepted / No Leakage.
1.2) – Steel Renewal in Water Ballast Tank.
a) – No. 5 Port & Stbd Side WBT observed Stress fracture iwo IBL-21 & 22 (web) at attachment to Transverse Web Frame No. 94. – Propose to
partly insert 300 x 300 web plate & modification of face plate with
attachment reinforcement bracket between IBL-21/22
![Page 4: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/4.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 4 - of 15
Fit-up Inspection – Accepted / OK to weld.
Final Inspection - Accepted
![Page 5: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/5.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 5 - of 15
b) – No. 5 Port & Stbd Side WBT addition of 300 x 300 reinforcement
bracket at SL-27.
Fit-up Inspection – Accepted / OK to weld.
Final Inspection - Accepted
c) – No. 5 Port & Stbd Side WBT observed Stress fracture iwo SL-28 (web) – Propose to partly insert web plate & modification of face plate
to reinforcement soft toe end attachment.
![Page 6: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/6.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 6 - of 15
Fit-up Inspection – Accepted / OK to weld.
Final Inspection - Accepted
![Page 7: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/7.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 7 - of 15
d) – No. 6 Port & Stbd Side WBT observed Stress fracture iwo IBL-21 & 22 (web) at attachment to Transverse Web Frame No. 86. – Propose to partly insert 300 x 300 web plate & modification of face plate with attachment reinforcement bracket between IBL-21/22
Fit-up Inspection – Accepted / OK to weld.
![Page 8: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/8.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 8 - of 15
Final Inspection - Accepted
e) – No. 7 Port & Stbd Side WBT observed Stress fracture iwo IBL-21 & 22 (web) at attachment to Transverse Web Frame No. 78. – Propose to gouge & re-weld iwo fracture location & modification of face plate with attachment reinforcement bracket between IBL-21/22
![Page 9: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/9.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 9 - of 15
Fit-up Inspection – Accepted / OK to weld.
Final Inspection – Accepted
![Page 10: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/10.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 10 - of 15
f) – No. 7 Port & Stbd Side WBT modification of SL-28 face plate to soft toe end attachment.
Fit-up Inspection – Accepted / OK to weld.
Final Inspection – Accepted
![Page 11: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/11.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 11 - of 15
g) – No. 8 Port & Stbd Double Bottom WBT observed Stress fracture iwo
IBL-12 & 13 (web) at attachment to Transverse Web Frame No. 70. – Propose to gouge & re-weld iwo of fracture location & modification of
face plate with attachment reinforcement bracket between IBL-12/13
Fit-up Inspection – Accepted / OK to weld.
![Page 12: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/12.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 12 - of 15
Final Inspection – Accepted
h) – No. 9 Port & Stbd Side WBT observed Stress fracture iwo IBL-9 & 10 (web) at attachment to Transverse Web Frame No. 62. – Propose to gouge & re-weld iwo of fracture location & modification of face plate with attachment reinforcement bracket between IBL-9/10
![Page 13: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/13.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 13 - of 15
Fit-up Inspection – Accepted / OK to weld.
Final Inspection – Accepted
![Page 14: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/14.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 14 - of 15
i) – No. 7 Port Heeling Tank observed Stringer 3 & Shell plate iwo of
Stringer 3 to SL- 44 inclusive of attachment SL-42 longitudinal between Frame No. 74/75 having severe indentation. – Propose partly insert
shell plating, frame No. 74 web & stringer 3 platform + partly renewal of SL-42.
Fit-up Inspection – Accepted / OK to weld.
![Page 15: STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April …hsdmarine.com.sg/wp-content/uploads/2014/09/2354.pdf · 2015-06-06 · STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd](https://reader030.vdocuments.us/reader030/viewer/2022041008/5eb41f82308c3517fc0566b9/html5/thumbnails/15.jpg)
STEEL INSPECTION OFFICIAL REPORT HRDD CHINA ( 23rd April 2015 – 4th May 2015 )
Page - 15 - of 15
Final Inspection & Vacuum Test – Accepted / No leakage.