228 Palmer Avenue • Falmouth, Massachusetts 02540 • Telephone: (508) 548-5011 Our mission is to operate a safe, effective, and reliable transportation system for the islands of Martha’s Vineyard and Nantucket with a commitment to sustainability, accessibility, our port communities, and public engagement. Posted September 18, 2020 9:00 AM Revised September 21, 2020 2:30 PM STEAMSHIP AUTHORITY Tuesday, September 22, 2020 9:30 AM SSA Nantucket Terminal Building Second-floor Conference Room 1 Steamboat Wharf Nantucket, MA 02554 First Floor Meeting Room SSA Administrative Offices 228 Palmer Avenue Falmouth, MA 02540 NOTE: Due to ongoing concerns regarding COVID-19, the Steamship Authority meeting room will be CLOSED TO THE PUBLIC during this session. The public may participate in the meeting, including Public Comment, by going to zoom.us and using meeting ID 874 1700 9198. Participants can also use the same meeting ID and join telephonically by calling one of the following numbers: 669-900-6833, 346-248-7799, 929-436-2866, 253-215-8782, 301-715-8592, or 312-626-6799. AGENDA 1) Minutes - Approval of the Minutes of the Joint Board/Port Council June 3, 2020 Meeting in Public Session and the June 16, 2020 Meeting in Public Session 2) Port Council Report on their September 9, 2020 Meeting 3) General Manager’s Report a) Seastreak LLC Additional Service Request b) COVID-19 i) Actions Taken to Date ii) Future Considerations c) Results of Operations Business Summary for the Month of July 2020 September 22, 2020 Board Meeting - Agenda 1

Upload: others

Post on 09-May-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STEAMSHIP AUTHORITY

228 Palmer Avenue • Falmouth, Massachusetts 02540 • Telephone: (508) 548-5011

Our mission is to operate a safe, effective, and reliable transportation system for the islands of Martha’s Vineyard and Nantucket with a commitment to sustainability, accessibility, our port communities, and public engagement.

Posted September 18, 2020 9:00 AMRevised September 21, 2020 2:30 PM

STEAMSHIP AUTHORITY

Tuesday, September 22, 2020 – 9:30 AM

SSA Nantucket Terminal BuildingSecond-floor Conference Room

1 Steamboat WharfNantucket, MA 02554

First Floor Meeting Room SSA Administrative Offices

228 Palmer AvenueFalmouth, MA 02540

NOTE: Due to ongoing concerns regarding COVID-19, the Steamship Authority meeting room will be CLOSED TO THE PUBLIC during this session. The public may participate in the meeting, including Public Comment, by going to zoom.us and using meeting ID 874 1700 9198. Participants can also use the same meeting ID and join telephonically by calling one of the following numbers: 669-900-6833, 346-248-7799, 929-436-2866, 253-215-8782, 301-715-8592, or 312-626-6799.

AGENDA

1) Minutes - Approval of the Minutes of the Joint Board/Port Council June 3, 2020 Meeting in Public Session and the June 16, 2020 Meeting in Public Session

2) Port Council Report on their September 9, 2020 Meeting

3) General Manager’s Report

a) Seastreak LLC Additional Service Request

b) COVID-19

i) Actions Taken to Date

ii) Future Considerations

c) Results of Operations – Business Summary for the Month of July 2020

September 22, 2020 Board Meeting - Agenda

1

Page 2: STEAMSHIP AUTHORITY

September 22, 2020 Steamship Authority Meeting Notice & Agenda Page 2

d) Updates on Current Projects

i) Woods Hole Terminal Reconstruction Project (Marine and Terminal)

ii) Vessel Repair Status (M/V Martha’s Vineyard and M/V Gay Head)

iii) Nantucket Terminal Emergency Dredging

iv) SQMS Status

v) eNews

vi) eFerry ticketing

e) Veterans Day Recognition and Ticket Sales Promotion

4) Treasurer/Comptroller’s Report

a) 2019 Cost of Service Analysis and Review

5) Procurement

a) Request for Authorization to Proceed with Purchase Agreement for AS400 Equipment for Reservations

b) Request for Authorization to Award Contract No. 11-2020, “Oak Bluffs Structural Pier Repairs 2020 – Phase II”

c) Request for Authorization to Execute Change Order No. 56 for Contract No. 09B-2012“Contract for Final Design and Construction Administration Services” with BIA.studio LLC

6) Old/New Business

7) Items Not Reasonably Anticipated by the Chair

8) Public Comment

September 22, 2020 Board Meeting - Agenda

2

Page 3: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Board Meeting Memo

3

Page 4: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Board Meeting Memo

4

Page 5: STEAMSHIP AUTHORITY

MINUTES OF THE

WOODS HOLE, MARTHA’S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY

The Meeting in Public Session June 3, 2020

The Members of the Woods Hole, Martha's Vineyard and Nantucket Steamship Authority met this third day of June, 2020, beginning at 9:05 a.m., in the first-floor meeting room (Room 103) of the Authority’s administrative offices, located at 228 Palmer Avenue, Falmouth, Massachusetts. Three (3) members participated via Zoom videoconferencing: Chairman James M. Malkin of Dukes County; Vice Chairman Kathryn Wilson of Falmouth; and Robert R. Jones of Barnstable. Secretary Moira E. Tierney of New Bedford and Robert F. Ranney of Nantucket were absent.

The Authority’s Port Council also met jointly with the Authority Members

at this meeting. Six (6) Port Council members were present: Chairman Edward C. Anthes-Washburn of New Bedford (who joined the meeting during discussion of actions taken to date regarding COVID-19); Vice Chairman George J. Balco of Tisbury; Secretary Eric W. Shufelt of Barnstable; Mark H. Rees of Fairhaven (who joined the meeting during discussion of possible increases to the schedule) Nathaniel E. Lowell of Nantucket; and Robert V. Huss of Oak Bluffs. Robert S. C. Munier of Falmouth was absent.

The following members of management were present: General Manager

Robert B. Davis; General Counsel Terence G. Kenneally; Treasurer/Comptroller Mark K. Rozum; and Communications Director Sean F. Driscoll.

Video and Audio Recording of Today’s Meeting:

Mr. Malkin announced that Steve Baty of All Media Productions was taking a video and audio recording of today’s meeting in public session on behalf of Martha’s Vineyard Community Television, also known as MVTV. Mr. Driscoll was making an audio and video recording of the meeting; Rich Saltzberg (representing the Martha’s Vineyard Times) indicated he was making an audio recording of the meeting.

September 22, 2020 Board Meeting - Minutes

5

Page 6: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 2

Remote Participation by All Members: Mr. Malkin announced that, in response to Governor Charles Baker’s

executive orders concerning the necessity to conduct public meetings in line with social distancing guidelines during the current state of emergency involving the COVID-19 pandemic, all Board Members and Port Council Members were participating remotely in the day’s meeting because their physical attendances would be unreasonably difficult. All Board Members participated in the meeting by the Zoom video conferencing app or by speakerphone and all members were clearly audible to each other. As a result of the Members’ remote participation in this meeting, any and all votes taken by the Members today were to be taken by roll call vote.

Management Report – COVID-19:

Mr. Davis said the health and safety of the Authority’s employees and ridership has been of utmost concern during this period. Since the Board and Port Council last had their respective meetings, one Authority employee has tested positive for COVID-19. As a result, the Authority arranged with the Town of Nantucket and Barnstable County to provide testing for employees who potentially had been exposed to the affected employee. Mr. Davis said seventy-five (75) employees were tested, and all the results were negative for COVID-19. Mr. Davis said the incident highlighted the Authority’s concerns with regard to any kind of outbreak that might happen among its workers and how challenging such an event would make it to man vessels and terminals. Mr. Davis further noted that, after this incident, an employee of Seastreak LLC assigned to the Oak Bluffs Terminal also tested positive for COVID-19; the facility was subsequently sanitized, and employees assigned to that location were instructed to be tested. Mr. Davis said he understood that those tests were also negative for COVID-19. Both incidents underscore the need for everyone to continue to follow best practices with regard to wearing cloth face coverings, maintaining social distance, and frequent hand washing. Mr. Davis also reviewed other recent activities by the Authority:

Vessel crews continue to do an exceptional job of cleaning the vessel interiors during and in between trips, paying particular attention to surfaces most likely to be touch points such as tabletops, faucets and toilets as well as handrails.

Additional crews are assigned to perform deeper cleanings at night. Terminal employees also have been doing an exceptional job of cleaning

September 22, 2020 Board Meeting - Minutes

6

Page 7: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 3

at least three (3) times per shift. Clear acrylic shields have also been installed at all locations to further protect employees.

Buses are being cleaned at least once every four (4) hours, and capacity has been reduced to twenty (20) passengers per bus.

The Authority continues to look for best practices to improve its cleaning efforts, including purchasing a number of electrostatic sprayers to be added to the cleaning options. Mr. Davis said he hoped they would be in the Authority’s possession later this month.

Enough reusable cloth face masks have been obtained to give each employee a supply of five (5), which equates to a week’s work schedule.

The Authority is working on updates to its eFerry mobile ticketing program, which debuted on the fast ferry route in November and, hopefully, it will be in use on the traditional ferries soon.

Mr. Davis, noting that operating schedules have been modified to meet

traffic demands since the onset of the pandemic, said the M/V Island Home was brought into service on the Vineyard route starting May 21, 2020, which meant that three (3) vessels were now serving the route. The Nantucket route continues to be served by the M/V Eagle, M/V Sankaty, and M/V Gay Head. Mr. Davis said the M/V Iyanough was brought back into service for Memorial Day weekend, but the ridership numbers were not very encouraging, so the service was suspended. He said he anticipates the M/V Iyanough being back in service again starting June 17, 2020, the start of what would have been the Authority’s summer schedule. Mr. Davis noted that the Board had previously approved the restarting of the preseason sale for high-speed ticket books, and the sale was currently under way.

Regarding May 2020 traffic, Mr. Davis stated passenger traffic was down

approximately sixty-eight percent (68%), automobile traffic was down forty-six percent (46%), and truck traffic was down thirty-five percent (35%). While those numbers were more encouraging than April 2020, Mr. Davis said they were far lower than what would be expected for this time of year.

Mr. Rozum then shared several charts showing advanced reservation

activity by month as of May 31, 2020 and as of May 24, 2020; a comparison of traffic statistics between 2019 and 2020 using a seven-day moving average; a percentage of credit card receipts between 2019 and 2020 by date using a seven-day moving average; advanced reservation activity by month; and daily vehicle reservation activity for May 2020 compared to May 2019.

September 22, 2020 Board Meeting - Minutes

7

Page 8: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 4

Regarding future schedules: Mr. Malkin said he had spoken with Mr. Davis about space availability on

the Vineyard route and his concern that the Authority was missing an opportunity to grow its revenue by limiting its schedules. He said he has heard of an “inordinate” number of people who were unable to get reservations for vehicles and that, while staff have been helpful, he is concerned that there is not enough vehicle space to meet the increasing demand. Mr. Malkin further said Mr. Davis had indicated the schedule would open up on June 17, 2020, but he wondered if it made sense to open the full summer schedule as of July 1, 2020, in time for the July 4th holiday to see if the Authority could realize further revenue gains as a result and that, if demand was not present, the Authority could reduce its schedule.

Mr. Davis said he was aware that, prior to the M/V Island Home returning

to the schedule, the Authority had fallen behind demand in terms of its service levels on the Vineyard route, but with that vessel coming online the issue seems to have been rectified. He said the last trips of each night, which have been marked as “unscheduled,” have rarely needed to be run, which indicates the reservation issue is one of lack of preferred travel times, not the lack of overall space. Mr. Davis said he was hopeful the Authority could stay ahead of demand and the next few weeks would prove telling as Governor Baker was expected to announce reopening plans for the state.

Regarding the Fourth of July, Mr. Davis said the week was already

designated as reservation-only, so there should be no issues with a standby line. He also said that, with a few more weeks of data in hand, staff could examine the viability of putting another vessel on the Vineyard run. However, other factors may limit the ability of the Authority to add a vessel; namely, the availability of the third slip in Woods Hole and the repair schedules of the vessels not currently in service. Mr. Rozum added that customers could be encouraged to use the Authority’s waitlist feature to improve their sailing times.

Mr. Malkin said if Jay Cashman Inc. could not be finished by July 1, 2020,

he suspected the Authority might be forced to stop the work regardless of their progress. He said he was still worried about not having enough capacity for the holiday weekend and that, as the Commonwealth rolls out its reopening plans, not having enough capacity to match the increase in traffic would be a disincentive for people to travel.

Mr. Huss noted it might be difficult to reduce the operating schedule after

expanding it and said it remained unclear if it was a problem of not being able to travel at popular times versus not having enough capacity.

September 22, 2020 Board Meeting - Minutes

8

Page 9: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 5

Mr. Davis said staff would review the issue, but noted that, if service did increase and vehicle reservations did not, it would be another negative financial impact on the Authority. He further noted the Authority was now within forty (40) car spaces of its original schedule, and the schedule proposed to start June 17, 2020, would similarly be close to the original schedule.

Mr. Jones noted it was a balancing act, and bringing on bigger boats also

meant larger operating expenses. Mr. Davis said the M/V Governor was currently in repair, but it would be

available at the end of the month. If reservation activity indicated an increase in demand, he said he was not opposed to bringing the vessel online if it makes financial sense to do so.

Regarding COVID-19 testing:

Ms. Wilson asked how the Authority was going to handle ongoing testing issues related to COVID-19, noting that several employees had approached her about whether or not they could be tested. She said she knew it was expensive and a logistical challenge, but Ms. Wilson said she and Mr. Davis had discussed whether it made sense to engage someone who could do medical work in-house and potentially save some money. Mr. Davis said staff were investigating the possibility, including whether or not it could be reimbursable by the federal government. He said he expected to have enough information within the next week to determine if that was the appropriate decision to make. Public Comment:

Noah Asimow from the Vineyard Gazette asked how, if the Authority’s

vessels were running at or near capacity, the Authority could still be facing deficits. Messrs. Malkin and Davis replied that it was because of the ongoing shortfall in walk-on passengers and day-trippers going to the islands.

Mr. Saltzberg asked for an update on the projected $60 million shortfall as

of the end of the year; Mr. Davis said that figure was derived in mid-April as a worst-case scenario. He said there were thousands of different models that could be used to come up with a projection, but the next few weeks could provide valuable in terms of forecasting how summer traffic may or may not rebound.

September 22, 2020 Board Meeting - Minutes

9

Page 10: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 6

Then, at approximately 9:50 a.m., upon a motion from Mr. Lowell and a second from Mr. Shufelt, the six (6) Port Council members in attendance unanimously voted to adjourn the joint meeting in public session.

Mr. Malkin said he would also entertain a separate motion to adjourn from

the three (3) Board members in attendance.

IT WAS VOTED – upon Mr. Jones’ motion, seconded by Ms. Wilson – to adjourn the joint meeting in public session.

VOTING AYE NAY

Mr. Malkin 35 % Ms. Wilson 10 % Mr. Jones 10 % ______

TOTAL 55 % 0 %

A TRUE RECORD _______________________________________________ ERIC W. SHUFELT, Port Council Secretary A TRUE RECORD _______________________________________________ MOIRA E. TIERNEY, Authority Board Secretary

September 22, 2020 Board Meeting - Minutes

10

Page 11: STEAMSHIP AUTHORITY

June 3, 2020 Minutes of the Public Session

Page 7

Documents and Exhibits Used at the

June 3, 2020 Meeting in Public Session of the

Port Council and Board of the

Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority

1. June 3, 2020 Meeting Agenda, Posted June 1, 2020. 2. Advance Reservation Activity by Month, All Routes, as of May 31, 2020. 3. Advance Reservation Activity by Month, All Routes, as of May 24 and May

31, 2020. 4. Traffic Statistics Comparison – 2020 vs. 2019 using a 7-day moving

average. 5. Percent of Credit Card Receipts by Date Using a 7-Day Moving Average. 6. Advanced Reservation Activity by Month Comparison – 2020 vs. 2019. 7. Daily Vehicle Reservation Activity Comparison – May 2020 vs. May 2019,

Using a 7-Day Moving Average.

September 22, 2020 Board Meeting - Minutes

11

Page 12: STEAMSHIP AUTHORITY

MINUTES OF THE

WOODS HOLE, MARTHA’S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY

The Meeting in Public Session June 16, 2020

The Members of the Woods Hole, Martha's Vineyard and Nantucket Steamship Authority met this 16th day of June, 2020, beginning at 10:03 a.m., in the first-floor meeting room (Room 103) of the Authority’s administrative offices, located at 228 Palmer Avenue, Falmouth, Massachusetts. All five (5) members participated via Zoom videoconferencing: Chairman James M. Malkin of Dukes County; Vice Chairman Kathryn Wilson of Falmouth; Secretary Moira E. Tierney of New Bedford (who arrived at 10:05 a.m.); Robert F. Ranney of Nantucket; and Robert R. Jones of Barnstable.

Port Council President Edward C. Anthes-Washburn and Member George

Balco were also present via Zoom, as were the following members of management: General Manager Robert B. Davis; General Counsel Terence G. Kenneally; Treasurer/Comptroller Mark K. Rozum; Communications Director Sean F. Driscoll; Director of Marine Operations Mark H. Amundsen; and Woods Hole Terminal Reconstruction Project Manager William J. Cloutier.

Video and Audio Recording of Today’s Meeting:

Mr. Malkin announced Steve Baty of All Media Productions was making a video and audio recording of today’s meeting in public session on behalf of Martha’s Vineyard Community Television, also known as MVTV. Mr. Driscoll was making an audio and video recording of the meeting; Noah Asimow (representing the Vineyard Gazette) and Rich Saltzberg (representing the Martha’s Vineyard Times) indicated they were making an audio recording of the meeting.

Remote Participation by All Members: Mr. Malkin announced, in response to Governor Charles Baker’s executive

orders concerning the necessity to conduct public meetings in line with social distancing guidelines during the current state of emergency involving the COVID-19 pandemic, all Board Members were participating remotely in the day’s meeting because their physical attendances would be unreasonably difficult. All Board Members participated in the meeting by the Zoom videoconferencing app or by speakerphone and all members were clearly audible to each other. As a

September 22, 2020 Board Meeting - Minutes

12

Page 13: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 2

result of the Members’ remote participation in this meeting, any and all votes taken by the Members today were to be taken by roll call vote.

Executive Session: At 10:06 a.m., Mr. Malkin entertained a motion to go into executive session

to discuss potential litigation matters and to discuss the Authority’s strategy with respect to collective bargaining matters because a public discussion of these matters may have a detrimental effect on the Authority’s negotiating and bargaining positions. These matters include:

Potential for litigation with Senesco Marine LLC regarding Contract No. 02-2020, Overhaul and Dry Dock of the M/V Katama; and Anticipated Negotiations with the Unions (Teamsters Union Local 59, SEIU Local 888 and MEBA) of all the Authority’s represented employees regarding the potential continuation of health insurance benefits for furloughed employees due to the COVID-19 virus pandemic.

Mr. Malkin stated the public disclosure of any more information with

respect to these matters would compromise the purposes for which the executive session is being called. After the conclusion of the executive session, Mr. Malkin said the Board would reconvene in public.

IT WAS VOTED – upon Ms. Tierney’s motion, seconded by Ms. Wilson – to discuss potential litigation matters and to discuss the Authority’s strategy with respect to collective bargaining matters.

VOTING AYE NAY Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 %

Return to Public Session: At 10:27 a.m., the meeting reconvened in public session.

September 22, 2020 Board Meeting - Minutes

13

Page 14: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 3

Video and Audio Recording of Today’s Meeting:

Mr. Malkin announced Steve Baty of All Media Productions was making a video and audio recording of today’s meeting in public session on behalf of Martha’s Vineyard Community Television, also known as MVTV. Mr. Driscoll was making an audio and video recording of the meeting; Noah Asimow (representing the Vineyard Gazette) and Rich Saltzberg (representing the Martha’s Vineyard Times) indicated they were making audio recordings of the meeting.

Minutes:

IT WAS VOTED – upon Ms. Wilson’s motion, seconded by Mr. Ranney, to approve the minutes of the Board’s May 5, 2020 meeting in public session.

VOTING AYE NAY

Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 % Port Council’s Report on its June 3, 2020 Meeting: Mr. Anthes-Washburn said the Port Council’s discussions included the

following items:

The April 2020 business summary and questions related to the Authority’s cash position; The 2021 budget policy statement, which the Port Council voted to recommend to the Board after discussion of how best to prepare for next year in light of the uncertainty caused by COVID-19; The Plymouth and Brockton Bus Co. proposal to run service from Woods Hole to T.F. Green Airport in Cranston, Rhode Island, which Mr. Anthes-Washburn said was recommended in concept although there remain several outstanding questions; and Establishing a subcommittee to review the Enabling Act and recommend amendments to it that would allow the Authority to maintain a larger cash reserve and, therefore, be able to be more nimble in cases such as the COVID-19 pandemic.

September 22, 2020 Board Meeting - Minutes

14

Page 15: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 4

Ms. Wilson noted the Board had previously discussed the Plymouth and Brockton service and had questions regarding how this service would fit in with the existing service from Peter Pan, but otherwise thought it was a good idea. Mr. Anthes-Washburn said that was similar to the Port Council’s line of discussion as well and that their vote was in support of the concept, not any particulars that still needed development.

Report on COVID-19: Mr. Davis provided the following updates regarding the Authority’s

response to the COVID-19 pandemic:

The Authority continues to adjust its schedule in response to travel demand. Initially, fewer than forty-five percent (45%) of the originally scheduled trips were operated; the current schedule, which was to end this day, has service levels at approximately seventy percent (70%) of the originally scheduled trips being operated. Beginning tomorrow, June 17, 2020, the Authority’s schedule will be at approximately ninety-five (95%) of its originally scheduled trips. Mr. Davis said he anticipates tomorrow’s level of service will continue throughout the summer. For the first two weeks of June 2020, passenger traffic was approximately forty-eight percent (48%) of expectations, automobile traffic was at approximately seventy-eight percent (78%) of expectations, and truck traffic was at eighty-five percent (85%) of expectations. Vessel crews continue to do an exceptional job of cleaning the vessels’ interiors during and between trips, paying particular attention to “high-touch” surfaces such as tabletops, faucets and toilets and handrails. Likewise, terminal employees have also been doing an exceptional job of cleaning their facilities. Additional crews are assigned to perform deeper vessel cleanings at night. Buses are being cleaned at least once every four (4) hours. Bus capacities have been reduced to fifty percent (50%) of their ratings. The M/V Iyanough has, likewise, been limited to fifty percent (50%) of its capacity as the staff evaluates the vessel’s capability for social distancing. The Authority continues its efforts to source hand sanitizer; unfortunately, replacement cartridges for the dispensers continue to be back ordered.

September 22, 2020 Board Meeting - Minutes

15

Page 16: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 5

The Authority continues its efforts to expedite its orders for electrostatic sprayers as an additional sanitizing tool. Signage has been posted on board vessels, buses and at terminals. On the Nantucket route, drive-on, drive-off services remain suspended to prevent possible transference of the virus from customers to employees. Information on best practices regarding health measures continues to be uploaded to the Learning Management System for employees. Vessel crews, before the beginning of their watches, are given a wellness check by trained medical professionals. Shoreside personnel are given the wellness questionnaire, which they need to complete and provide to their supervisor to be given clearance to report to work or are sent home. Employees continue to be told that under no circumstances should they be coming to work while they are sick, for their own safety, the safety of their crewmembers and for the safety of our passengers. If any employee comes to work sick, they will be sent home – period. Updates continue to be posted on the Authority’s dedicated landing page (www.steamshipauthority.com/2019coronavirus) as well as on its Facebook and Twitter pages, its eNews and through local media outlets.

Mr. Rozum then shared several charts showing advanced reservation

activity for the weeks ending June 7, 2020, and June 14, 2020; daily directional traffic estimates through June 14, 2020; and credit card activity through June 14, 2020. Ms. Wilson asked if the reservation data included all forms of activity, including creating and changing reservations; Mr. Rozum said the data represented only new reservation activity.

Ms. Wilson said she had heard from employees who reported an inability

to be tested for COVID-19 if they felt it was necessary. Mr. Davis said there have been circumstances where employees have felt the need to be tested, and those tests have been coordinated through local public health agencies. Any employee is free to utilize the drive-through testing centers offered by Cape Cod Healthcare should they choose, and a list of testing sites has also been posted on the Learning Management System.

Mr. Davis said the Authority continues to see a general upward trend in

activity and reminded the Members that it sees between fifty percent (50%) and fifty-five percent (55%) of its annual revenue between June and September. As summer continues, he said, the Authority would get a clearer picture of where its finances stand.

September 22, 2020 Board Meeting - Minutes

16

Page 17: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 6

Mr. Davis also stated staff continues to have productive conversations with the Commonwealth’s Executive along with the Commonwealth’s Executive Office for Administration and Finance on the Authority’s finances. Since the Authority’s immediate cash needs have been mitigated, discussions have turned toward the mechanisms that will be used to certify a deficit to the state should that become necessary.

Ms. Wilson asked about the current deficit projections; Mr. Davis said they

would continue to be updated as time moves on and that different estimates will be prepared based on varying levels of traffic.

Mr. Malkin asked if there had been discussions with the state as to an

appropriation to cover the shortfall versus an assessment of the port communities. Mr. Davis said there had been and that, should the deficit be of such a level that the state does not have to borrow funds to pay it, it was possible that no assessment would be required. Results of Operations: Mr. Davis then reviewed the results of the April 2020 business summary, which shows the Authority carried fewer passengers (down 83.8%), automobiles (down 76.6%) and trucks (down 57.8%) than the same month the prior year. Through the first four months of 2020, the Authority was similarly down in passenger traffic (down 35.3%), automobile traffic (down 30.7%), and truck traffic (down 22.5%) compared to the same period in 2019. Mr. Davis said the Authority’s total income for April 2020 was approximately $2,603,000 and the total expenses were approximately $8,088,000, for a net operating loss for the month of $5,485,000, approximately $3,980,000 more than anticipated in the 2020 operating budget. Year-to-date figures through April 2020 were approximately $15,505,000 in income and $37,419,000 in expenses for a net operating loss of $21,913,000, which was $5,567,000 more than budgeted. During the month of April 2020, the Authority’s vessels made a combined seven hundred and seventy (770) trips, of which zero (0) were canceled for mechanical reasons on either the Martha’s Vineyard or the Nantucket routes, he said.

September 22, 2020 Board Meeting - Minutes

17

Page 18: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 7

Woods Hole Terminal Reconstruction Project Update: Mr. Cloutier said it was hoped Slip No. 2 (the middle slip) would be

operational by July 1, 2020, and said finishing work was now under way on a number of items. He said progress was, in general, moving along quite well.

He then shared a PowerPoint presentation with recent photographs from

the site. Ms. Wilson asked about the lighting at the site and whether or not passing

boaters or those otherwise near the site would be bothered by the lights at night. Mr. Cloutier said the passenger canopy would have both up lighting and direct-down lighting when they are operational and small LED lights in the railings on the perimeter. Mr. Davis noted those lights were already operational, and Ms. Wilson said they might be the cause of the complaints that had been relayed to her. Mr. Cloutier said he had not heard any complaints and noted the up lighting was on a timer and would be off at night. The down lighting was for use only on the trips when the passenger walkway was in use.

Mr. Malkin asked about the coating on the tiles that had to be removed;

Mr. Cloutier said it was a film from the manufacturing process and would be removed with power washers.

Mr. Davis added the Authority has now sent out one hundred and five

(105) community email updates regarding the project.

Vessel Dry Dock and Repair Project Updates: Mr. Amundsen said there were no vessels currently in dry dock, although

maintenance personnel were preparing for the M/V Katama to proceed to dry dock the week of June 22, 2020. He noted the M/V Gay Head is in Fairhaven for a generator overhaul following a failed diode, and work was scheduled to be complete June 24, 2020. Additionally, the M/V Nantucket replaced the M/V Eagle after a supply fan failed on the M/V Eagle; the replacement work was recently completed and the vessels were scheduled to return to their original routes on June 17, 2020.

The M/V Iyanough is returning to service on June 17, 2020, and the next

vessel to be worked on in Fairhaven will be the M/V Governor, which will undergo a Coast Guard inspection before being made available as a standby vessel, Mr. Amundsen said.

September 22, 2020 Board Meeting - Minutes

18

Page 19: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 8

Mr. Davis noted the M/V Nantucket had recently left its dry dock and subsequent repair period and is operating within normal parameters.

Oak Bluffs Pier Repairs Update: Mr. Amundsen said the pier work is complete and that the project was

completed on budget and on schedule. The pier is now suitable for passengers, cars, and light trucks, he said.

Mr. Amundsen then shared a photograph of Pile No. 2 and the concrete

jacket that was placed around it as a precaution to ensure its strength. Mr. Amundsen said the pile encountered resistance while being driven, which necessitated the jacket.

Vineyard Haven Transfer Bridge Repairs: Mr. Amundsen then shared a photograph and discussed the recent

Vineyard Haven transfer bridge failure, which he said had been traced to a failure of the outer race within the bridge’s sheave. It is unclear what the failure mechanism was, he said, but the repairs have been made and the bridge is now in good working order.

Mr. Jones asked how long a bearing like that lasts, and Mr. Amundsen

said it could last quite a while with proper lubrication, which this bearing had. The failure was more likely stress-related, he said, noting the root cause analysis of the situation is still under way.

2021 Operating Schedules: Mr. Davis said a public hearing was held June 11, 2020, on the proposed

2021 operating schedules and noted several Members attended the hearing. He said staff was continuing to gather information on the schedules, including public comments being submitted via email, and it was anticipated that staff would bring recommendations to the Port Council and Board at their July meetings.

Ms. Wilson said that, a year ago, the same conversations were going on, a

report was issued, and the upshot was that Falmouth would just have to deal with it. As an effort to alleviate the effects of the early-morning boat on the community and to look for creative solutions, the long-range task force and the

September 22, 2020 Board Meeting - Minutes

19

Page 20: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 9

Falmouth working group were created with the goals of initiating dialogue with the Vineyard communities so that their needs could be met while reducing the strain on Falmouth. Now, nearly a year later, Falmouth has appointed its representatives to the two (2) bodies, but there continues to be no dialogue on the issue. Ms. Wilson suggested a temporary suspension of the 5:30 a.m. freight boat to the Vineyard to spur discussion on solutions to the issues. She said the Authority has continued to run the boat for eight (8) years and it may be time to step back and evaluate the traffic situation on both the Vineyard and the mainland.

Mr. Malkin said it was an interesting idea and that he, too, was continuing

to gather information in response to questions raised during the hearing. He said it would be part of the Board’s discussion at its July meeting.

Mr. Davis said he understood Falmouth’s frustrations, as the town acted

quickly to name its representatives to the task force and working group. The island towns were preparing to do so when COVID-19 hit, and he said he believed the matter would be taken up soon at various island town meetings.

2019 Audited Financial Statements: Mr. Rozum said the Authority’s auditing firm, RSM, has the Authority’s

audit in partner review, which is one of the final stages in the auditing process. He said he did not expect any changes to the Authority’s financial statements other than an increase of $250,000 in operating revenue and an increase of $500,000 in pension expenses due to a change in the applicable mortality table.

Mr. Davis said the audit would be presented to the entire Board following

its completion and, given the attention it has received this year, he planned to have the full Board serve as the audit review committee instead of the customary practice of the current and past chairmen. Mr. Jones said he would be in favor of the full Board hearing the review.

2021 Budget Policy Statement: Mr. Rozum then presented the 2021 budget policy statement, noting that,

following the Port Council meeting, he added additional language to allow for flexibility due to the unknown effects of COVID-19. He said the Authority would use traffic figures from March 2019 through February 2020 as the baseline and then determine what adjustments would be necessary from there.

September 22, 2020 Board Meeting - Minutes

20

Page 21: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 10

Ms. Wilson asked if the Authority’s insurance renewals had shown increased costs due to COVID-19, and Mr. Kenneally said the Authority was working with its insurance brokers and more information should be forthcoming within a few weeks. Ms. Wilson asked if any mention of a “pandemic insurance” had come up; Mr. Kenneally said it had not, but he would ask about it.

Ms. Wilson noted that, with the changes in business operations caused by

COVID-19 and the need for employees to work from home, the Authority also had to be on top of its technology needs in the coming year.

Ms. Wilson asked what the focus of the Authority’s advertising program

was; Mr. Driscoll said the bulk of the advertising program was focused on the high-speed service to Nantucket, especially on the fifty-dollar ($50) same-day round-trip rate during the week. The rest of the advertising program is aimed at the day-tripper market, as passenger capacity is an area in which the Authority has room to increase its traffic. Mr. Driscoll noted that, with COVID-19, a lot of information had been put out about policies and procedures, but most of that had been done via social media on an unpaid basis. What little advertising will be done in 2020 would be along the lines of encouraging travel when it is safe to do so, he said.

Ms. Wilson asked if the Authority anticipated it would be able to offer

electronic ticketing in the next year; Mr. Davis said the eFerry ticketing would resume on the high-speed service and should roll out on the traditional ferry service soon. The Authority was also working on developing a new website and/or mobile app, he said.

Mr. Malkin noted that the Authority’s website looks like a booking

reservation site and that the new website should be more user-friendly for travelers seeking information.

IT WAS VOTED – upon Mr. Jones’ motion, seconded by Mr. Ranney, to approve the budget policy statement as proposed in Staff Summary #A-651, dated June 11, 2020.

VOTING AYE NAY Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 %

September 22, 2020 Board Meeting - Minutes

21

Page 22: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 11

Contract No. 02-2020, Dry-Dock and Overhaul Services for the M/V Katama: Messrs. Jones and Malkin noted they were pleased the matter had come

to a resolution.

IT WAS VOTED – upon Ms. Wilson’s motion, seconded by Mr. Jones, to approve the settlement agreement with Senesco Marine LLC for the purpose of resolving the parties’ dispute arising out of Contract No. 02-2020, Overhaul and Dry Dock of the M/V Katama, as proposed in Staff Summary #L-497, dated June 13, 2020.

VOTING AYE NAY

Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 %

IT WAS VOTED – upon Ms. Tierney’s motion, seconded by Ms. Wilson, to authorize the General Manager to take all necessary and appropriate actions to deliver all purchased materials, parts, and equipment from Senesco LLC’s premises and deliver it to the contract’s next and only other eligible bidder, Thames Shipyard and Repair Co. of New London, Connecticut, and to further authorize the general manager to negotiate with Thames on lowering its contract price in light of owner supplied equipment being provided, as proposed in Staff Summary #L-497, dated June 13, 2020.

VOTING AYE NAY

Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 %

September 22, 2020 Board Meeting - Minutes

22

Page 23: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 12

Public Comment: In response to a question from Mr. Saltzberg, Mr. Amundsen said the

generator failure on the M/V Gay Head was related to a failed diode on the alternator. The failure happened while the vessel was under way; it was subsequently taken out of service and proceeded to Fairhaven for repairs.

Mr. Saltzberg asked if the Authority had considered hiring an outside crisis

team to help it deal with the financial effects of COVID-19. Mr. Davis said the Authority had capable members on its staff to provide those services. Mr. Saltzberg noted that the HMS Consulting report on the Authority had noted the Authority’s “hero culture” and asked if that was in play; Mr. Davis said he would be hard-pressed to see how spending money on a consultant would help the Authority’s financial situation.

Mr. Saltzberg asked if Mr. Davis had spoken with any of the island’s six

(6) town administrators about the possibility of an assessment at the end of the year; Mr. Davis said Mr. Malkin had spoken with the county and Mr. Balco and Robert V. Huss of the Port Council had, likewise, spoken with their respective communities. Ms. Tierney noted that federal discussions were also ongoing about additional aid to the nation’s ferry companies.

Then, at 12:05 p.m., Mr. Malkin entertained a motion to adjourn.

IT WAS VOTED – upon Ms. Wilson’s motion, seconded by Mr. Jones, to adjourn the meeting in public session.

VOTING AYE NAY Mr. Malkin 35 % Ms. Wilson 10 % Ms. Tierney 10 % Mr. Ranney 35 % Mr. Jones 10 % ______

TOTAL 100 % 0 %

September 22, 2020 Board Meeting - Minutes

23

Page 24: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 13

A TRUE RECORD _________________________________________ MOIRA E. TIERNEY, Secretary

September 22, 2020 Board Meeting - Minutes

24

Page 25: STEAMSHIP AUTHORITY

June 16, 2020 Minutes of the Public Session

Page 14

Documents and Exhibits Used at the

June 16, 2020 Meeting in Public Session of the

Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority

1. June 16, 2020 Meeting Memorandum, dated June 15, 2020. 2. Video and audio recording announcement. 3. Statement regarding remote participation. 4. Statement to be read prior to going into executive session. 5. Minutes of the Board’s May 5, 2020 meeting in public session (draft). 6. Minutes of the Port Council’s June 3, 2020 meeting in public session (draft

dated May 18, 2020) 7. Advance Reservation Activity by Month, All Routes, as of June 7 and June

14, 2020. 8. Traffic Statistics Comparison – 2020 vs. 2019 using a 7-day moving

average. 9. Percent of Credit Card Receipts by Date using a 7-day moving average. 10. Advance Reservation Activity by Month, All Routes, 2020 vs. 2019. 11. Daily Vehicle Reservation Activity, 2020 vs. 2019, May 1 – June 14, 2020,

using seven-day moving average. 12. Business Summary for the month of April 2020. 13. PowerPoint presentation, Woods Hole Terminal Reconstruction Project,

June 16, 2020. 14. Photo of concrete jacket surrounding a pile at the Oak Bluffs pier. 15. Photo of a bearing from the transfer bridge at Vineyard Haven. 16. Staff Summary #A-651, 2021 Budget Policy Statement, dated June 11,

2020. 17. Staff Summary #L-497, Approval of Settlement with Senesco Marine LLC,

dated June 13, 2020.

September 22, 2020 Board Meeting - Minutes

25

Page 26: STEAMSHIP AUTHORITY

MINUTES

OF THE

PORT COUNCIL

OF THE

WOODS HOLE, MARTHA’S VINEYARDAND NANTUCKET STEAMSHIP AUTHORITY

September 9, 2020

First-Floor Meeting Room (Room 103)Steamship Authority Administrative Offices

228 Palmer Avenue, Falmouth, Massachusetts

Port Council Members present: Chairman Edward C. Anthes-Washburn of New Bedford; Vice Chairman Robert V. Huss of Oak Bluffs; Secretary Eric W. Shufelt of Barnstable; Robert S.C. Munier of Falmouth;Nathaniel E. Lowell of Nantucket; and George J. Balco of Tisbury (all of whom participated via Zoom videoconferencing).

Port Council Members absent: Mark H. Rees of Fairhaven.

Authority Board Members present: Chairman James M. Malkin of Dukes County; and Robert R. Jones of Barnstable (both of whom observed the meeting via Zoom videoconferencing).

Authority Management present: General Manager Robert B. Davis; Treasurer/Comptroller Mark K. Rozum; General Counsel Terence G. Kenneally; Communications Director Sean F. Driscoll; Director of Marine Operations Mark H. Amundsen; Woods Hole Reconstruction Project Manager William J. Cloutier; and Health, Safety, Quality, and Environment Manager Angela M. Sampson (who participated via Zoom videoconferencing).

1. Mr. Anthes-Washburn called the meeting to order at 9:00 a.m.

2. Mr. Anthes-Washburn announced that Mr. Driscoll was making a video and audio recording of today’s meeting.

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

26

Page 27: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 2 of 8

3. Mr. Anthes-Washburn announced that, in response to Gov. Charlie Baker’s executive orders concerning the necessity to conduct public meetings in line with social distancing guidelines during the current state of emergency involving the COVID-19 pandemic, all of the Port Council members were participating remotely in the day’s meeting because their physical attendance would be unreasonably difficult. All the members were participating via Zoom videoconferencing and were clearly audible to one another. As a result of the members’ remote participation, all votes taken were to be by roll call vote.

4. Upon a motion by Mr. Balco and a second by Mr. Huss, the Port Council voted 6-0 toapprove the minutes of their joint meeting in public session with the Board on June 3, 2020.

Upon a motion by Mr. Huss and a second by Mr. Shufelt, the Port Council voted 4-0 toapprove the minutes of their meeting in public session on August 5, 2020 (Messrs. Anthes-Washburn and Munier abstained from the vote).

5. Mr. Davis provided an update on the Authority’s activities and performance regarding the COVID-19 pandemic, including the following:

The Authority received its order of six (6) electrostatic sprayers, which have been used daily since their arrival. The sprayers are in addition to backpack foggers that the Authority obtained in early July and have been using daily. Vessel crews, terminal employees, and bus drivers have been doing an excellent job of cleaning their respective areas. Beginning August 9, 2020, the Authority began operating its originally approvedsummer schedule on the Vineyard route, with five (5) vessels operating on the weekdays and four (4) on the weekends. Also as of that day, the vehicle ferries on the Nantucket route resumed their original schedule. The high-speed ferry service aboard the M/V Iyanough continues to be run at four round trips per day, with the fifth trip added on Fridays and Sundays through September 30, 2020. Mr. Davis noted those service levels were modified beginning August 30, 2020, due to the need to have more than 40 crew members tested for COVID-19.As of today, September 9, 2020, the approved late summer operating schedule is beingrun on both routes (with the aforementioned reduction in high-speed service still in place).Capacities on buses have been reduced to 50% of rating, although in some cases that still results in standees. Capacities on vessels has been reduced to 40% to 60% of rated capacity.The Authority continues its efforts to source cleaning materials and hand sanitizer. Through agreement with Centerplate, onboard lunch counters remain closed.Information about the coronavirus continues to be posted on the Authority’s internal Learning Management System.Vessel crews, before the beginning of their watch, are given a wellness screening by a trained medical professional. Shoreside personnel are given the wellness questionnaire, which they need to complete and provide their supervisor to be given clearance to report to work or are sent home.

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

27

Page 28: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 3 of 8

Employees have been told that under no circumstances should they be coming to work while they are sick, for their own safety, the safety of their crew members and for the safety of passengers. If any employee comes to work sick, they will be sent home –period. Face coverings or masks wearing compliance continues to be challenge despite posted signs and multiple announcements. Since Gov. Baker’s order requiring out of state visitors to self-quarantine or have a negative COVID test within 72 hours of arriving in the state, the Authority has been sending out emails to all of its customers traveling on-island about how to register with the state.The Authority has created a dedicated landing page on its website for coronavirus updates (www.steamshipauthority.com/2019coronavirus), as well as its Facebook and Twitter pages, its eNews and local media outlets.

Mr. Rozum then reviewed advanced reservation figures by month, a seven-day moving average of traffic, and credit card receipts by date versus 2019 to further illustrate the Authority’s performance.

Mr. Balco asked if the Authority’s vessels faced cut-offs at any point due to the lowered passenger capacities. Mr. Davis replied that it had, most notably on an August weekend in which there was bad weather on a Sunday, coupled with Oak Bluffs being shut down and Island Queen ceasing its service. The confluence of events resulted in an influx of passengers going to Vineyard Haven to leave the island and, due to passenger cut-offs, it took several hours for some people to get on a boat.

Mr. Balco said he is still hearing that shoreside personnel are not fully complying with face covering policies and asked if the Authority was running checks on its facilities. Mr. Davis said supervisors and terminal managers continually instruct employees to follow the policy and that, personally, he has seen the compliance when he visits the terminal.

Mr. Munier asked for an update on the recent employees who had tested positive for COVID-19; Mr. Davis said the Authority had done its own contact tracing and identified a number of employees who needed to be tested, and said testing was arranged with the assistance of Cape Cod Healthcare and the Barnstable County and Barnstable Town boards of health. Other employees went on to get testing of their own initiative, Mr. Davis said, and the Authority is working on gathering those results.

Mr. Lowell asked about news reports concerning the availability of a “rapid test” that could produce results much quicker than currently possible; Ms. Sampson said she would look into those reports. Ms. Sampson said it is currently difficult to obtain a test because the state laboratories have all shifted their focus to eastern equine encephalitis (“EEE”). Ms. Sampson further noted that it remains best practice to wait about five days from the day of possible exposure to get tested.

Mr. Davis noted that the Authority’s automobile numbers, while down, are still performing well above other ferry operators across the country. Additionally, the Authority’s passenger figures being at 70% to 75% of projections are still better than many other carriers. Mr.

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

28

Page 29: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 4 of 8

Munier asked why automobiles are performing better than passengers; Mr. Rozum said he believed it was because people felt safer traveling in their automobile rather than as a walk-on passenger. Mr. Balco further noted that the Vineyard was seeing more people moving there year-round in the wake of the pandemic.

6. Mr. Rozum then reviewed the July 2020 business summary, which showed that the Authority carried fewer passengers (331,217, down 28.7%) and trucks (17,456, down 3.9%) but more automobiles (62,709, up 0.2%) than it had in June 2019. The total income for the month was approximately $15,781,000, while total expenses were approximately $9,793,000, for a net operating income of approximately $5,987,000, which was approximately $1,964,000 less than anticipated in the 2020 budget. Mr. Rozum said year-to-date losses were approximately $14,205,000, which was $12,249,000 more than anticipated in the budget.

Mr. Balco asked about the Authority’s cash position, and Mr. Rozum stated it was better now than what was expected earlier in the year. He said, if traffic stays at current levels relative to projections, he did not anticipate the need to use the credit line established earlier in the year. Mr. Rozum said the year-end loss was still projected to be approximately $20,000,000, although he noted that the Authority had managed to fund its next round of bond payments with the cash on hand.

7. Mr. Davis said the next phase of the Woods Hole Terminal Reconstruction Project started on this day and that the barge Randy R is on its way to Woods Hole with the ringer crane. The crane will initially be positioned in Slip No. 3 to remove the temporary catwalk and temporary support piles before moving to Slip No. 1 for the remainder of the season. Shoreside demolition is to begin shortly.

Mr. Cloutier said the southern passenger pier would be larger than the northern pier, which would result in additional foundation work this season. Overall, Mr. Cloutier said, a total of 87 piles will be driven this season for the foundation of the structures as follows:

10 monopile dolphins;38 16-inch diameter piles for the fixed passenger pier; and39 18-inch diameter piles for the head dolphins and the transfer bridge.

In response to a question from Mr. Huss, Mr. Davis said the other two (2) slips will remain usable during construction, although as marine contractor Jay Cashman Inc. drives piles for the outer portion of the slip, the positioning of the barge will require some vessels to take a westerly approach to the terminal.

Mr. Munier asked to what depth the monopiles would be driven; Mr. Cloutier said the target was 100 feet, although generally anything hitting a minimum of 85 feet would be acceptable depending on the results of testing on the monopile. The 18-inch piles and 16-inch piles, meanwhile, would be driven to 40 feet.

8. Regarding the terminal building, Mr. Davis noted that both the Port Council and Board had approved the design concept for the building in the fall, which consisted of a one-story,

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

29

Page 30: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 5 of 8

flat-roofed building with solar panels on both the roof and the bus pick-up and drop-off lanes, with the passenger lobby to the north and the restrooms to the south. Due to delays in the design process and COVID-19, the project’s architect, BIA.studio, has been asked to revisit the construction timelines. Mr. Davis said he anticipated presenting those to the Board at its September meeting, at which he would ask for authorization to resume the schematic design phase.

Mr. Munier asked what the timeline was for construction, and Mr. Davis noted that a year had been lost in the process but that, once started, it would take two (2) off-seasons to complete. At that point, the temporary terminal building would be removed and the final grading and landscaping would be completed at the site.

9. Mr. Davis said the M/V Katama had been returned to the Authority’s Fairhaven repair facility and the vessel successfully underwent both company and U.S. Coast Guard sea trials and was transiting to Woods Hole on that day to begin service on the Vineyard run.

10. Mr. Davis said the second phase of the Oak Bluffs pier repair is out to bid and the proposals are due to be opened on Tuesday, September 15, 2020, and hopefully awarded at the September Board meeting. Mr. Davis said the project would begin on the day following the terminal’s seasonal closure, scheduled for October 20, 2021. Mr. Davis reminded the Port Council that the first phase of the repairs focused on finishing enough work to allow the pier to support automobiles and small trucks only; the second phase will restore the pier to its previous functionality. Work is scheduled to be complete by the end of the year.

11. Mr. Davis said proposals were opened the prior day for emergency dredging at the Authority’s Nantucket terminal, where shoaling has occurred at the face of the pier. Mr. Davis said the Authority would now apply for the necessary permitting from the U.S. Army Corps of Engineers to perform the work.

12. Regarding the Safety Quality Management System (“SQMS”) project, Mr. Davis said that work was to resume on it this fall. Ms. Sampson said the contractor, SMSLLC, plans to restart work in October on the vessel operations manual portion of the SQMS, which will include a new reporting system for both shoreside and vessel personnel in the event of a near miss or employee injury.

13. Mr. Driscoll shared a PowerPoint presentation regarding the recent update of the Authority’s eNews, which moved to a new vendor, GovDelivery by Granicus, in May 2020. The change allows the Communications and Marketing Department to send out more robust monthly newsletters, as well as offer new options such as public meeting notices and press releases, in a much more user-friendly and streamlined format. Mr. Driscoll said the department would soon launch a marketing campaign encouraging people to sign up for the new eNews. At Mr. Balco’s suggestion, Mr. Driscoll said he would sign up the Port Council members for the appropriate editions at their Steamship Authority email accounts.

14. Mr. Rozum presented the 2019 Cost of Service report and highlighted several of its findings, including:

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

30

Page 31: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 6 of 8

On the Martha's Vineyard route, the cost of vessel operations and of indirect non-vessel costs increased by $1,228,935 during 2019 versus 2018, a 2.0% increase.

o Direct vessel operating expenses decreased by $397,504 or 1.3%, versus 2018 as this decrease is attributed to decreases in dry-dock expenses and the along with an increase in vessel fuel oil expense for the vessels assigned on this route during 2019.

o Indirect non-vessel operating costs increased by $1,626,439, or 5.3% during 2019 primarily as a result of increases in benefit cost, insurance and depreciation.

On the Nantucket route, the cost of vessel operations and of indirect non-vessel costs, after the allocation of indirect expenses to the M/V Iyanough, increased by $5,039,049 during 2019 versus 2018, a 15.8% increase.

o Direct vessel operating expenses decreased by $2,897,033, or 16.7%, primarily attributed to increases in dry-dock expense and increase in vessel fuel oil expense on this route during 2019.

o Indirect non-vessel operating costs increased by $2,142,016, or 14.8% during 2019, primarily as a result of increases in benefit cost, insurance and depreciation.

Mr. Munier asked if the Authority’s methodology regarding the car-equivalent unit (“CEU”) was an industry standard or its own measurement; Mr. Rozum said other operators use “lane meters” as a measurement, but it was a similar concept to the CEU.

Mr. Munier asked if Messrs. Davis and Rozum had any estimate as to what the occupancy rate would be in 2020 given COVID-19; Mr. Rozum said he believed it would be approximately the same as the Authority had reduced the number of trips in response to lowered demand. Mr. Davis agreed that he would not expect it to be drastically differentthan the range from the last five to 10 years.

Mr. Lowell asked where the Authority had added space on the Nantucket route; Mr. Rozum said it had increased crewing in 2018 on several vessels. Mr. Lowell said it was tough for people to understand that as it was the same number of vessels serving the route.

15. Regarding the 2021 operating budget, Mr. Rozum said staff would be coming to the Port Council and Board in October with a proposed draft budget and then ask for approval in November. He said staff wanted to get more information on the COVID-19 effects on travel patterns before issuing those documents.

16. Mr. Driscoll then reviewed the 2020 Veterans Day promotion proposal, noting that it offered free travel on Veterans Day for any active duty military personnel and retired veterans. The promotion launched in 2019 and included the following:

All military men and women who have a valid military ID showing their active duty or retired status can travel as a passenger for free on all Steamship Authority ferries on Veterans Day, November 11. This offer is valid only for the active military

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

31

Page 32: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 7 of 8

personnel or the veteran who is traveling either alone or with passenger(s) and does not include the passage of a vehicle.Military personnel who are medically disabled qualify for the Individuals with Disability fare year-round.

That year, 86 tickets were issued to veterans on the Martha’s Vineyard route and 45 tickets were issued to veterans on the Nantucket route, Mr. Driscoll said. With more notice to promote the event, Mr. Driscoll said he believed it would get greater usage this year.

Then, on a motion from Mr. Balco and a second from Mr. Lowell, the Port Council voted6-0 to recommend approval of the promotion as proposed.

17. Mr. Davis noted that Reservations and Customer Relations Manager Gina Barboza was retiring from the Authority on September 30, 2020, after 45 years of service. Mr. Davis said Ms. Barboza was a fixture at the Authority and that the entire company wished her well. Mr. Davis further noted that there were several excellent internal candidates for the positon and he expected it to be filled shortly.

18. Mr. Anthes-Washburn then asked for public comment. Mr. Malkin said he had fielded lots of questions during the recent COVID-19 situation and that he applauded the eNews and asked that it be issued even more frequently in such situations. He said it would help the Authority get accurate information out as opposed to its customers hearing things second-hand through the news media or social media.

Then, at approximately 10:34 a.m., upon a motion from Mr. Balco and a second from Mr. Huss,the Port Council voted 6-0 to adjourn their meeting.

A TRUE RECORD ______________________________Eric W. Shufelt, Secretary

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

32

Page 33: STEAMSHIP AUTHORITY

Port Council Minutes – September 9, 2020DRAFT September 17, 2020

Page 8 of 8

Documents and Exhibits Used at the Port Council’s September 9, 2020 Meeting

1. Agenda for the Port Council’s September 9, 2020 Meeting, updated September 8, 2020.

2. Minutes of the Board and Port Council’s Joint June 3, 2020 Meeting in Public Session (draft).

3. Minutes of the Port Council’s August 5, 2020 Meeting in Public Session (draft dated August 28, 2020).

4. Chart, Advanced Reservation Activity by Month, All Routes as of August 30, 2020 and September 6, 2020.

5. Chart, Advanced Reservation Activity by Month Comparison, 2020 vs. 2019, as of September 6, 2020.

6. Chart, Daily Vehicle Reservation Activity Comparison, 2020 vs. 2019, May 1st to June 28, Using Seven-Day Moving Average.

7. Chart, Traffic Statistics Comparison, 2020-2019, Using a Seven-Day Moving Average,May 1, 2020 through September 6, 2020.

8. Chart, Percent of 2019 Credit Card Receipts by Date, Using Seven-Day Moving Average, March 1to September 6, 2020.

9. Business Summary, July 2020 (draft).

10. PowerPoint presentation, eNews Update, dated September 9, 2020.

11. Staff Summary #A-652, 2019 Analysis of Rate Versus Cost of Service, dated September 4, 2020 (draft).

12. Staff Summary #COMM-2020-04, 2020 Veterans Day Program, dated September 3, 2020 (draft).

September 22, 2020 Board Meeting - Port Council's Report on Its September 9, 2020 meeting

33

Page 34: STEAMSHIP AUTHORITY

A copy of SeaStreak’s latest request is attached hereto as Exhibit 1

September 22, 2020 Board Meeting - General Manager's Report

34

Page 35: STEAMSHIP AUTHORITY

M/V ISLAND HOME

M/V EAGLE

September 22, 2020 Board Meeting - General Manager's Report

35

Page 36: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

36

Page 37: STEAMSHIP AUTHORITY

2 FIRST AVENUE

ATLANTIC HIGHLANDS, NJ 07716

THOMAS M. WYNNE VICE PRESIDENT & GENERAL COUNSEL

(440) 260-6928 [email protected]

September 8, 2020 Terence G. Kenneally, General Counsel Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority 228 Palmer Avenue Falmouth, MA 02540ve. Woods Hole, Massachusetts 02543-0284 Via Email: [email protected]

REQUEST OF SEASTREAK, LLC FOR RENEWAL OF LICENSE AGREEMENT

Dear Mr. Kenneally: SeaStreak, LLC hereby submits its request that the License Agreement dated October 17, 2017, permitting SeaStreak’s operation of passenger transportation service with stops in New Bedford, Martha’s Vineyard and Nantucket, be renewed upon its October 31, 2020 expiration, but with some modifications. As you may be aware, several years ago SeaStreak operated year-round service between New Bedford and Martha’s Vineyard. When a significant and sustained spike in fuel prices rendered the service economically impractical, SeaStreak sought from the Steamship Authority and was granted a modification of its license to suspend regular service from late October through mid-May. Over the past few seasons, we have seen indications that year-round service between New Bedford and the island may again be feasible. We are seeking modification to our

September 22, 2020 Board Meeting - General Manager's Report

37

Page 38: STEAMSHIP AUTHORITY

Terence G. Kenneally, General Counsel Page 2 of 2 Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority September 8, 2020

2 FIRST AVENUE

ATLANTIC HIGHLANDS, NJ 07716

license upon its renewal to allow SeaStreak to resume year-round service. This will allow us to avoid laying off some of our New Bedford employees and instead keep them employed through the winter. It would also allow SeaStreak to continue to provide service to its customers who have changed their work habits over the past several months and desire service between New Bedford and the islands into the fall and winter. SeaStreak proposes the attached service schedule for the period of time from October 3, 2020 through January 3, 2021. SeaStreak would continue to provide limited service after January 3, 2021, and would anticipate proposing a schedule to the Steamship Authority in late fall/early winter 2020. SeaStreak would utilize a combination of vessels for this service that would include a Vineyard-95 class 149 passenger vessel and a SeaStreak class 505 passenger vessel. We request the ability modify the service schedule, with approval, if we have misestimated the demand for service.

Thank you for your consideration of our requests. Please do not hesitate to contact the

undersigned or Jack Bevins should you have any questions. Sincerely, SEASTREAK, LLC

cc: Robert B. Davis, General Manger (via email: [email protected])

September 22, 2020 Board Meeting - General Manager's Report

38

Page 39: STEAMSHIP AUTHORITY

NANTUCKET SCHEDULE

1-800-BOATRIDE 1-800-262-8743 seastreak.com

New Bedford Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

Nantucket Arrivals

9:30 AM 10:20 AM 10:30 AM 11:30 AM

MARTHA’S VINEYARD SCHEDULE

1-800-BOATRIDE 1-800-262-8743 seastreak.com

FRIDAYS (10/16/20—12/18/20)

MONDAY — THURSDAY (10/13/20—12/31/20) New Bedford Departures

Vineyard Haven Arrivals

6:00 AM 7:00 AM

3:15 PM 4:15 PM

Vineyard Haven Departures

New Bedford Arrivals

7:15 AM 8:15 AM

4:30 PM 5:30 PM

New Bedford Departures

Vineyard Haven Arrivals

6:00 AM 7:00 AM

9:30 AM 10:20 AM

3:15 PM 4:15 PM

Vineyard Haven Departures

New Bedford Arrivals

7:15 AM 8:15 AM

1:00 PM 1:50 PM

4:30 PM 5:30 PM

SATURDAY — SUNDAY (10/17/20—1/3/21) New Bedford Departures

Vineyard Haven Arrivals

11:00 AM 11:50 AM

Vineyard Haven Departures

New Bedford Arrivals

2:30 PM 3:20 PM

CHRISTMAS STROLL (12/5/20—12/6/20)

THANKSGIVING (11/26/20) New Bedford Departures

Vineyard Haven Arrivals

9:00 AM 10:00 AM

5:00 PM 6:00 PM

Vineyard Haven Departures

New Bedford Arrivals

12:45 PM 1:45 PM

8:45 PM 9:45 PM

NEW YEAR’S DAY (1/1/21)

CHRISTMAS DAY (12/25/20) - NO SERVICE

HOLIDAYS

New Bedford Departures

Vineyard Haven Arrivals

9:00 AM 10:00 AM

5:00 PM 6:00 PM

Vineyard Haven Departures

New Bedford Arrivals

12:45 PM 1:45 PM

8:45 PM 9:45 PM

New Bedford Departures

Vineyard Haven Arrivals

9:00 AM 10:00 AM

2:00 PM 3:00 PM

Vineyard Haven Departures

New Bedford Arrivals

12:30PM 1:30 PM

5:45 PM 6:45 PM

FRIDAYS (10/16/20—12/18/20)

Nantucket Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

New Bedford Arrivals

11:45 AM 12:45 PM 1:00 PM 1:50 PM

New Bedford Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

Nantucket Arrivals

11:00 AM 11:50 AM 12:00 PM 1:00 PM

SATURDAY— SUNDAY (10/17/20—1/3/21)

Nantucket Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

New Bedford Arrivals

1:15 PM 2:15 PM 2:30 PM 3:20 PM

HOLIDAYS

New Bedford Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

Nantucket Arrivals

9:00 AM 10:00 AM 10:15 AM 11:15 AM

5:00 PM 6:00 PM 6:15 PM 7:15 PM

Nantucket Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

New Bedford Arrivals

11:30 AM 12:30 PM 12:45 PM 1:45 PM

7:30 PM 8:30 PM 8:45 PM 9:45 PM

THANKSGIVING (11/26/20) & CHRISTMAS STROLL (12/5/20—12/6/20)

NEW YEAR’S DAY (1/1/21)

New Bedford Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

Nantucket Arrivals

9:00 AM 10:00 AM 10:15 AM 11:15 AM

2:00 PM 3:00 PM 3:15 PM 4:15 PM

Nantucket Departures

Vineyard Haven Arrivals

Vineyard Haven Departures

New Bedford Arrivals

11:30 AM 12:15 PM 12:30 PM 1:30 PM

4:30 PM 5:30 PM 5:45 PM 6:45 PM

CHRISTMAS DAY (12/25/20) - NO SERVICE

September 22, 2020 Board Meeting - General Manager's Report

39

Page 40: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

40

Page 41: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

41

Page 42: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

42

Page 43: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

43

Page 44: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

44

Page 45: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

45

Page 46: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

46

Page 47: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

47

Page 48: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

48

Page 49: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

49

Page 50: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

50

Page 51: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

51

Page 52: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

52

Page 53: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

53

Page 54: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

54

Page 55: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

55

Page 56: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

56

Page 57: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

57

Page 58: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

58

Page 59: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

59

Page 60: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

60

Page 61: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

61

Page 62: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

62

Page 63: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

63

Page 64: STEAMSHIP AUTHORITY

o

ooo

o

September 22, 2020 Board Meeting - General Manager's Report

64

Page 65: STEAMSHIP AUTHORITY

ooo

oooo

September 22, 2020 Board Meeting - General Manager's Report

65

Page 66: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

66

Page 67: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

67

Page 68: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - General Manager's Report

68

Page 69: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

69

Page 70: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

70

Page 71: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

71

Page 72: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

72

Page 73: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

73

Page 74: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

74

Page 75: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Treasurer/Comptroller's report

75

Page 76: STEAMSHIP AUTHORITY

Page 1

TO:

FOR:

FROM:

X

General Manager

X

Vote Dept.: MIS Author: Curt Van Riper

X

Board Members

Information

Subject: Replacement of Computer Hardware used for Authority’s Reservation System

STAFF SUMMARY Date: September 16, 2020 File# MIS2020-1

PURPOSE: To request a vote of the Board authorizing the replacement of the computer hardware currently being used for the Authority’s reservation system.

BACKGROUND: The current reservation system hardware will be end-of-life on December 31, 2020. IBM will no longer provide hardware and software support for the current hardware we use for the Authority’s reservation system as of January 1, 2021. The current hardware was purchased in the spring of 2013.

The processors for the proposed new equipment are approximately twice as fast as the current system and the data storage will have five times the performance capabilities compared to the current hardware.

The total cost of the new hardware, software and installation is $364,647, plus $324,974 for a five-year hardware and software maintenance agreement for an overall total of $689,621. Shipping charges are expected to be under $5,000.

Delivery is expected to take six weeks from order placement. This will provide ample time prior to January 2021 web openings to ensure the system is performing correctly.

This project was added to the state’s Transportation Improvement Plan earlier this year allowing the project to be eligible for partial funding (eighty percent) through the Federal Highway Administration’s Ferry Boat Formula Grant Program, as authorized under the Fixing America’s Surface Transportation (FAST) Act.

The equipment would be purchased from Continental Resources, Inc., an IBM business partner under the Commonwealth of Massachusetts ITC47 contract. Continental Resources, Inc is a state vendor under the Commonwealth of Massachusetts ITC47 contract.

Under our current procurement policy, any purchase of $100,000 requires the approval of the Board.

September 22, 2020 Board Meeting - Procurement

76

Page 77: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

77

Page 78: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

78

Page 79: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

79

Page 80: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

80

Page 81: STEAMSHIP AUTHORITY

Peggy Nickerson

September 22, 2020 Board Meeting - Procurement

81

Page 82: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

82

Page 83: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

83

Page 84: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

84

Page 85: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

85

Page 86: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

86

Page 87: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

87

Page 88: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

88

Page 89: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

89

Page 90: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

90

Page 91: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

91

Page 92: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

92

Page 93: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

93

Page 94: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

94

Page 95: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

95

Page 96: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

96

Page 97: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

97

Page 98: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

98

Page 99: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

99

Page 100: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

100

Page 101: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

101

Page 102: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

102

Page 103: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

103

Page 104: STEAMSHIP AUTHORITY

September 22, 2020 Board Meeting - Procurement

104

Page 105: STEAMSHIP AUTHORITY

BIA.studio

Architecture | Planning | Experience Design 118 South Street • Boston • MA 02111 T: (617) 423-6500 W: bia.studio

Mr. William Cloutier, PE

Facilities Engineering Manager

Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority

228 Palmer Avenue

Falmouth, MA 02544

Re: Revised Basic Services Proposal – Woods Hole Ferry Terminal Reconstruction Landside Tasks:

2.10 Schematic Design, 2.20 Design Development and 2.30 Construction Documents

Changes in scope, schedule, phasing, and fee – CO 56

Dear Bill:

At the request of the Steamship Authority BIA.studio has prepared the following proposal for revised

Landside Basic Services. This proposal modifies the scope, schedule and fees for the Woods Hole Ferry

Terminal Landside Tasks: 2.10 Schematic Design (including BOD), 2.20 Design Development and 2.30

Construction Documents, including modifications to these phases that were approved under CO43.

Overview

The new concept design approach was approved by the SSA Board on November 19, 2019 and will serve as

the basis for the project moving forward (see attachment). This concept design approach was also

presented to, and favorably received by, the Falmouth Board of Selectmen on October 9, 2019; the

Falmouth Conservation Commission on January 29, 2020; and the Falmouth Historic Commission on

February 4, 2020. The basic parameters of the landside portion of the terminal reconstruction project

include:

• One-story flat-roof terminal building with rooftop solar panels; dry flood proofed; approx. 6,900 GSF

• Two-story utility building with staff spaces on the upper level; wet flood proofed; approx. 8,230 GSF

• High level of sustainable design measures, including the goals of zero net energy performance

(including on-site solar and geothermal systems as feasible)

• General site layout as shown on the approved concept design (page 2 of the attached concept

design presentation)

• Solar Canopies in Bus/Car Queuing areas

• Modifications to portions of the existing employee parking lot to accommodate new Utility Building

functions and previously constructed sanitary pump-out odor control system (installed separately by

SSA).

• Detailed construction phasing plans (interim condition plans) to reduce operational impacts during

construction

• Longer duration of phased construction (see schedule following)

• Covid 19 considerations

September 16, 2020

September 22, 2020 Board Meeting - Procurement

105

Page 106: STEAMSHIP AUTHORITY

BIA.studio

- 2 –

• Our January 2020 order of magnitude construction cost estimate for the landside buildings and site

work was approximately $24.5M ($13.7 buildings + $10.8M site). Due to the current unprecedented

circumstances involving economic impacts from Covid 19 it is not possible to provide a meaningful

update of that estimate at this time.

Flood Design Assumptions

Terminal Building

In order to facilitate pedestrian accessibility to and from all parts of the site, the first floor of the terminal is

positioned at elevation 13.0’, which is 2.5 feet above the plaza at elevation of 10.5’. This permits accessible

routes to the terminal to be made with single 30’ long ramps at either end. In order to achieve flood

protection the building will have a 4-foot high deployable dry flood proof wall and waterproof construction

at solid walls. This solution has been presented to both the Massachusetts Architectural Access Board

(MAAB) and the State Building Inspector, showing that the Ferry Terminal is an essential service and that

further elevating the first floor up to the range of 15-18 feet high (4.5. to 7.5 feet above the plaza) would

result in extreme accessibility challenges where numerous switchback ramps and/or elevators would to be

required. Mark LaPointe, the State Building Inspector with responsibility for this region, is aware of this

design approach and has previously assured the SSA that he is supportive. This proposal assumes that the

Building Code Appeals Board (BCAB) will approve needed variances and does not cover any redesign effort

that might potentially evolve from an unfavorable ruling by the BCAB.

Utility Building

Under current flood zone mapping, the utility building is outside of the AE zone and the first floor is not

habitable. The design for this structure is predicated on wet floodproofing the first floor. No variances are

required for the utility building to meet current flood zone requirements.

Community Presentations

During the Schematic Design and Design Development Phases Community presentations will be

conducted via Zoom video. Presentations will be made at appropriate intervals during these phases to

communicate design progress and receive community feedback. The number of required meetings under

the prime agreement is two per phase, but this may be increased if SSA determines that more public

presentations are warranted.

Task 2.10 Schematic Design, Code Review & Basis of Design

The Schematic Design Phase services will advance the concept design in accordance with the provisions of

the prime contract, and will include a new review of applicable building codes for each building and an

update of the Basis of Design (BOD) to define criteria for all building and site parameters that have changed

from the last version of the BOD. This will include a review of program elements for each building, site

requirements, new sections for Covid 19, solar energy, geothermal, and updates on building HVAC, electrical

and plumbing systems.

Design work will focus on alternative roof configurations, solar array options, building entrance options,

cladding and roofing systems, interior configurations, HVAC and plumbing systems, and refinement of

program elements and accommodation. The team will also study critical path construction alternatives with

special attention to interim condition solutions needed to maintain operations throughout construction.

September 22, 2020 Board Meeting - Procurement

106

Page 107: STEAMSHIP AUTHORITY

BIA.studio

- 3 –

The proposed changes to the site plan will require review and update of the existing grading and drainage,

utilities and other aspects of the previously completed Schematic Design for Phases 5 and 6. Components of

the Civil Schematic Design Drawings will require significant revisions or changes to accommodate the

proposed changes to the site plan and construction phasing.

Task 2.20 Design Development Phase

Following Schematic Design, the Design Development Phase will advance the design in accordance with

the provisions of the prime contract. Due to the multi-year construction phasing schedule, special attention

will be given to phasing documentation and overall strategy for maintaining operations during each phase

of construction.

Task 2.30 Construction Document Phase (including bid phase)

Following Design Development, the Construction Documents Phase will continue with detailed

development of the drawings and specifications in accordance with the provisions of the prime contract.

Our proposal is predicated on a creating a single construction document package, including all building and

site work under one phased construction contract.

Bid Phase services are expected to consist of responding to bidder questions, participating in conference

calls and meetings of the design team, assisting in addendum preparation and evaluation of bids received.

Design Schedule

This proposal is based on the following design schedule. Both SSA and the BIA.studio design team will

endeavor to work closely together to maintain the project schedule in order to enable bidding to

commence in the time frame indicated below. If the schedule is delayed for reasons beyond the control of

the design team, the fee shall be equitably adjusted to account for any delays in design team services.

2.10 Schematic Design / BOD 10/2020 – 06/2021 8 mo

2.20 Design Development 07/2021 – 12/31/21 7 mo

2.30 Construction Documents 01/0222 – 08/2022 8 mo

2.30 Bidding (CD Phase) 09/2022 – 11/2022 2 - 3 mo

Construction Schedule

We anticipate that the landside construction contract will be a single contract for both horizontal and

vertical construction and will require four and a half to five years to complete. While each phase is under

construction it is imperative that the terminal facilities be kept fully operational for all modes of

transportation, including vessels, autos, buses, vans, trucks, bikes, and pedestrians. This schedule assumes

that construction activity will be performed during the offseason as much as practicable, consistent with

construction schedule limitations detailed in the project permits. The following outlines the general scope

of construction that will occur in Phases 5-9:

Award 2022 Prior to year end

Phase 5 2023 Partial site regrading and site utilities; terminal building geopiers installed

Phase 6 2024 Terminal building construction

Phase 7 2025 Terminal and plaza completed; Freight shed demo; reuse of temp terminal for staff

Phase 8 2026 Utility building construction

Phase 9 2027 Utility building completes, temp terminal demo, final site work, solar canopies

September 22, 2020 Board Meeting - Procurement

107

Page 108: STEAMSHIP AUTHORITY

BIA.studio

- 4 –

Schedule Acceleration Potential

Upon completion of the Schematic Design Phase, the design team and SSA will review the feasibility of

accelerating the construction schedule. While it may be possible to revise the phasing or issue an early site

work construction package for bid, the associated benefits and risks are better determined after the BOD

and Schematic Design work has been completed and the parameters of the project are more fully defined.

Basic Services Revised Compensation

The net fee for proposed change order 56 is the difference between the new fee for services less the current

unbilled balances for each phase (the unbilled balances are the sum of the original fee amounts and the

additions approved under CO43).

Landside Design Phases Revised Fee - Balance CO56 Net Reimb Allow

2.10 Schematic Design/BOD $569,935 $0 $569,935 $7,000

2.20 Design Development $735,078 $483,247 $251,831 $5,000

2.30 Construction Documents $980,797 $846,540 $134,257 $12,000

Total $2,285,810 $1,329,787 $956,023 $24,000

C056 Amount: $956,023

(Nine hundred fifty-six thousand and twenty three dollars). These Revised Fee amounts above will be carried

as revised basic services fees for each phase as listed above, rather than as a separate change order. For

reference, this Revised Fee total for basic services is a 3.2% increase over our previously submitted, but not

approved, CO53 on January 7, 2020. This increase is attributable to the need to develop COVID-19 /

pandemic response criteria in the BOD and escalation accrued in the 8 month delay in starting design

(October rather than February 2020):

CO 53 $2,215,468

CO 56 $2,285,810

Increase $ 70,343 – 3.2%

Construction Administration Budget

While this proposal does not include a fee for Construction Administration Phase services, we have been

asked to provide an estimate for SSA to use in approximating future costs. The following fee values are

approximate and to be used for budgeting purposes only. Actual fee proposals will be provided nearer to

the time of construction and will be tuned to the services needed in a given year of work, depending on

what work is actually scheduled to occur in that time period:

CA Phase Labor Est Reimb Allow Testing Allow

Phase 5 $650,000 $17,000 $17,000

Phase 6 $760,000 $22,000 $23,000

Phase 7 $770,000 $24,000 $23,000

Phase 8 $790,000 $25,000 $23,000

Phase 9 $530,000 $44,000 $12,000

Total $3,500,000 $132,000 $98,000

September 22, 2020 Board Meeting - Procurement

108

Page 109: STEAMSHIP AUTHORITY

BIA.studio

- 5 –

Please let me know if you have any questions. We look forward to starting up this final phase of the project.

Sincerely yours,

Chris Iwerks AIA, Principal, BIA.studio

Attachment: Concept Design Terminal Presentation February 4, 2020

September 22, 2020 Board Meeting - Procurement

109

Page 110: STEAMSHIP AUTHORITY

Terminal Concept Design

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

September 22, 2020 Board Meeting - Procurement

110

Page 111: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

Option 2019.10 One Story Terminal

BULKHEAD

PAVED PARKING

CONC

BRIDGE ABO

ABUTMENT WALL

CONCRETE

12.85'

14.58' CANOPY

CANOPY

TRANSFER BRIDGE 1

1

S

N

2

3

FLOATING

PLATFORM 1

14.54'

TRANSFER BRIDGE 3

8.0'

TRUCK STAGING AREA

ENTRY BOOTH 1

ENTRY BOOTH 2

FENCE

ACTI

VE P

ICK-

UP

AN

D D

ROP-

OFF

BUS

BUS

BUS

Sola

r Can

opy

Sola

r Can

opy

Sola

r Can

opy

8.13'

8.85'

13.92'

9.92'

10.5'

10.0'

10.5'

10.5'10.5'

10.5'

10.5'

AUTO STAGING AREA

ENTRY

7.0'

STAGING BOOTH

CRAN

E ST

COWDRY RD

JUN

IPER

PO

INT

RD

EMPLOYEEPARKING

BIKE PATH

BIKE PARK

RAILROAD AVE

LUSC

OM

BE A

VE

9.22'

7.41'

FLOATING

PLATFORM 2

FIXED PLATFORM 2

FIXED PLATFORM 1SOUTH PIER

NORTH PIER

EXIT

5.85'

TRANSFER BRIDGE 2

����

�����

LUGGAGEPICK UP

LUGGAGEDROP OFF

LUGGAGEDROP OFF

September 22, 2020 Board Meeting - Procurement

111

Page 112: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

Option 2019.10 One Story Terminal

September 22, 2020 Board Meeting - Procurement

112

Page 113: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

123’- 0”

56’- 0”

1

74

2

85

3

11

10

9

12

13

14 166

Option 2019.10 One Story Terminal

First Floor Plan WAITING ROOM 40’-0” x 50’-0”

1.

4.

7.

2.

5.

8.

3.

6.

9.

10.

11.

12.TICKETING 12’-0” x 20’-0”

CASH ROOM 15’-0” x 8’-0”

PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”

PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”

ELECTRICAL ROOM 8’-6” x 12’-0”

EMPLOYEE RESTROOM - MEN 8’-0” x 10’-0”

BREAK ROOM 12’-0” x 12’-0”

JANITOR 5’-0” X 8’-0”

13.

15.EMPLOYEE RESTROOM - WOMEN 8’-0” x 10’-0”

VENDING 15’-0” x 8’-0”

TELECOM / DATA 9’-0” x 17’-6”

UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”

14.

TERMINAL AGENTS OFFICE 13’-0” X 17’-6”

TERMINAL MANAGER’S OFFICE 9’-0” X 17’-6”

15

MECHANICAL 20’-0” x 23’-0”

16.

September 22, 2020 Board Meeting - Procurement

113

Page 114: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

MECHANICAL - EL. 17’-0”

18’-6”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

MECHANICAL - EL. 17’-0”

North Elevation

East Elevation

Option 2019.10 One Story Terminal

Solar Array

Pergola

September 22, 2020 Board Meeting - Procurement

114

Page 115: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

18’-6”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

MECHANICAL - EL. 17’-0”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

MECHANICAL - EL. 17’-0”

South Elevation

West Elevation

Option 2019.10 One Story Terminal

Solar Array

Pergola

September 22, 2020 Board Meeting - Procurement

115

Page 116: STEAMSHIP AUTHORITY

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

MECHANICAL - EL. 17’-0”

18’-6”

Option 2019.10 One Story Terminal

Section

September 22, 2020 Board Meeting - Procurement

116

Page 117: STEAMSHIP AUTHORITY

1 4

2

6

3

11

1012

13

First Floor Plan ENTRY 10’-0” x 10’-0”

1.

4.

7.

2.

5.

8.

3.

6.

9.

10.

11.

12.ELEVATOR

STAIR

CONSUMABLE STORAGE 33’-6” x 13’-6”

MISCELLANEOUS STORAGE 9’-0” x 33’-6”

TRASH & RECYCLING YARD

LOST & FOUND 14’-6” x 16’-6”

WORK AREA 15’-6” x 10’-0”

STAIR

13.

15.RUNNER PICK UP / DROP OFF 14’-6” X 10’-6”

JANITOR 8’-6” x 5’-0”

WASTE OIL STORAGE 28’-0” x 16’-0”

EQUIPMENT STORAGE 31’-0” x 33’-6”

14.

VINEYARD SPACE 14’-6” X 10’-6”

CENTERPLATE STORAGE 14’-6” X 17’-6”

14

15

5

7

8

9

Option 2019.10 Utility Building

(Uncovered / Exterior)

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

September 22, 2020 Board Meeting - Procurement

117

Page 118: STEAMSHIP AUTHORITY

Second Floor Plan ELEVATOR LOBBY 10’-0” x 10’-0”

16.

19.

22.

17.

20.

23.

18.

21.

24.

25.

26.

27.ELEVATOR MACHINE ROOM 10’-0” x 6’-0”

ELEVATOR

MULTI-PURPOSE ROOM 25’-6” x 14’-6”

TELECOM / DATA 15’-0” x 8’-6”

EMPLOYEE RESTROOM - MEN 8’-0” x 10’-0”

EMPLOYEE LOCKER ROOM 20’-0” x 21’-0”

EMPLOYEE BREAK ROOM 11’-0” X 8’-0”

28.

EMPLOYEE RESTROOM - WOMEN 8’-0” x 10’-0”

JANITOR 8’-6” x 4’-6”

TERMINAL STORAGE 15’-0” x 32’-0”

LINEN 19’-6” x 15’-0”

29.

MECHANICAL 20’-0” X 18’-6”

ELECTRICAL ROOM 11’-0” X 8’-0”

Option 2019.10 Utility Building

16

17

18 19

20

21 22

23

24

25

26

27

28

29

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

September 22, 2020 Board Meeting - Procurement

118

Page 119: STEAMSHIP AUTHORITY

Option 2019.10 Utility Building

Steamship Authority Woods Hole Ferry Terminal Reconstruction February 2020

BIA .studio Copyright © 2019 BIA Studio

FIRST FLOOR - EL. 11’-0”

SECOND FLOOR - EL. 23’-0”

North Elevation

West ElevationEast Elevation

FIRST FLOOR - EL. 11’-0”

SECOND FLOOR - EL. 23’-0”

September 22, 2020 Board Meeting - Procurement

119