The pur ControTthe matecan broa
• Instacircu
• Stea
• Proc
inde
• Desi
overl Most pr categorisections:
• Purp
• Stea
•
Leve
• Levegreat
•
Levesyste
• App
• App
• App
• App
•
App The guid in not reDo not h Controls704-644P.O. BoCharlott
SE
ose of thisace steamrial is alsoly be divid
lation-Relaitry, etc.
-Related I
ss-Relatedendent of,
n-Related I
ooked, etc.
oblems ares, but also
se: An intr
System O
l 1 Troubles
l 2 Troubleer time and/
l 3 Troublems, heat tra
ndix A: Ste
ndix B: Ins
ndix C: De
ndix D: Th
ndix E: Per
e is designeuired to su
esitate to co
Southeast I50007500, NC 28241
documenteating systelevant toed into four
ed Issues: P
sues: Low s
Issues: Probnd unrelate
ssues: Desi
either inst briefly add
duction to
erview: A
hooting: Ite
shooting: Ior resource
shooting: Itsfer, and p
am saturatio
ructions for
cription of
rmocouple
anent end-
d to be follcessfully p
ntact CSI fo
c
STEAM
ROUBLE
s to help d m. The guither steamcategories:
oor Contro
team suppl
lems whose to, the hea
n based on
llation orresses the
he guide
introductio
s that are
ems that cequirement
ms that reocess detail
n temperatu
testing the
trainer blo
and IR gun
of-circuit st
wed progrerform trou
r assistance
EATING
SHOOTIN
etermine the is tailore
heating sys
race install
pressure, s
root causeing system.
inaccurate a
steam relather two.
n to steam s
asily perfo
n be perfos.
uire somes.
re table
peration of
-down disc
nstructions.
eam temper
ssively, staleshooting.with troubl
YSTEM
G GUIDE
e root caus for Contr
ems. Probl
tion, inade
eam trap fai
is process r
ssumption,
ed. This ghe guide i
ystems
med by mai
rmed by
n-depth kn
various ste
harge clues.
ture gauge
ting with LHowever,shooting C
of heat-reTrace applims with ste
uate insula
lure, etc.
elated; ofte
components
ide is focs organized
ntenance pe
aintenance
wledge of
m trap styl
source.
vel 1, ItemSI is happyntroTrace s
age 1 of 2
evision: 3
ate: 7 Oct
ated problecations, butam heating
ion, incorre
these prob
that require
sed on th in several
rsonnel
personnel
steam, Con
s.
1. CSI invo to assist asystems.
2010
ms in amost ofsystems
ct steam
ems are
heating
ese twodistinct
ut have
roTrace
lvementneeded.
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 2/24
STEAM
In gener 1 for a c
• Boil press jacke
• Steahead head mani
• Stea
manimanitrap i
• Heat(jack tubincircuelemcond of eato th
•
Steasysteallooper singl
• Conexcestrai
• Con pipethe b
the cretur trap
SYSTEM
l, a steam hnceptual sk
r. In the bure is usedting system
Header.r also servr must be
fold.
Manifold.
fold servesfolds comms located at
ng Circuiteted pipe, bg is used tit. Flexibleent to the nensate fromh heating c jacketing s
Trap. Thm. The pur ing the cotion of the
e steam trap
ensate Mation that eer and is lo
ensate Heaheader refer oiler so that
ondensate h pressure.tyles have
VERVIE
eating systeetch):
oiler, heat ito control t.
Steam exits as a reser large enou
Smaller di
as the braonly have 4the bottom
. A typicolt-on jacke transportmetal hosext within tthe last eleircuit mustystem befor
steam traose of thedensate thaeating systor the cond
ifold. Thch branchated betwe
er. Condered to as thit can be re
eader to avoigh conde
ifferent lev
STEAM
ROUBLE
will cons
s added toe temperat
the boilervoir that feh to mini
ameter pipi
ch point16 branchef the manif
l heatingting, or tubteam from
are comme circuit.ent in the
e carefullye the steam
is locatedsteam trapt is generam. Two seensate may
condensacontains an two isola
sate fromcondensat
heated into
id creatingsate returnls of tolera
EATING
SHOOTIN
st of the fol
water to gere of the st
through pids steam toize pressu
g connects
or supplyi, and each
old to keep
ircuit is c tracing) w
the steamnly used tre-insulate
circuit to thdesigned anas lost too
between tis to mainted to escaarate suppluild up ins
e manifold steam trap.ion valves.
ach of theheader. T
steam. Spe
xcessive p pressure ince for high
YSTEM
G GUIDE
lowing maj
nerate steaeam and to
ing referre the individ e drop bet
the steam h
g the indiranch conthe manifol
mprised ohich are coanifold toallow thetubing is
e steam trad analyzedmuch press
e steam ciin the steae. A worki points (cir de one of t
resemblesThe steam
ondensatee condensaial attentio
essure dropibits stea
condensate
r compone
at a certamotivate th
to as theual heating
een the b
eader to a s
idual heatiins an isola clear of co
a groupnected in s
the first hesteam to flolso used to. The lengo ensure frere.
cuit and thm pressureng steam tr uits) cannoe circuits.
the steamtrap is us
anifolds flte header re must be gi
which lead trap operatreturn press
age 2 of 2
evision: 3
ate: 7 Oct
ts (referenc
in pressure.e steam thr
steam head circuits. Tiler and th
eam manif
g circuits.tion valve.densate.
f heatingeries. Pre-iting elemew from onetransport sth and confish steam is
e condensatin the circap is cruci be combin
manifoldally preced
ows into aurns liquidven to the d
to high coion; differere.
2010
e Figure
Boilerugh the
r. Thee steame steam
ld. The
SteamA steam
lementsnsulatedt in theheatingam and
gurationsupplied
e returnit whilel to thed into a
ith theed by a
ommonwater toesign of
densatet steam
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 3/24
igure 1: Sy tem Overvi
STEAM
ROUBLE
ew Diagra
EATING
SHOOTIN
(numbers
YSTEM
G GUIDE
orrespond to troublesh
age 3 of 2
evision: 3
ate: 7 Oct
oting steps)
2010
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 4/24
LEVEL
Diagnos•
1. Desi
Descrip
The Coobjectiassump
Action
LocateContro
Data’ b•
•
•
•
•
Respon
If any oimpact.
Results
1 TROUB
ic Tools RSI ControT
n Conditio
tion
troTrace se. While thions are list
he area of trace install
x match thhe process
he thermal
he steam s
he pipe siz
he insulati
e
f the design
Notes
ESHOOT
quired: ace installa
ns
stem desig complete led on the in
e piping thtion drawi
as-built sy
objective
pply press
e
on type and
assumption
STEAM
ROUBLE
NG (Proc
ion drawin
is based onst of designstallation dr
t is suspectgs for that
tem. The
re
thickness.
s do not ma
EATING
SHOOTIN
ss Conditi
s
a set of des assumptiowings.
ed to be therea; Verify
ajor assum
ch the actu
YSTEM
G GUIDE
ns and Sys
ign assumpts may not b
source of ththat the ass
tions are:
l system co
em Install
ions and a se readily av
e problem amptions lis
tact CSI fo
age 4 of 2
evision: 3
ate: 7 Oct
tion)
pecific ther ilable, seve
d obtain thed in the ‘C
an analysi
Initi
2010
alral key
eT Design
of the
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 5/24
2. Con
Descrip
Sometirelated,
Action
Verify tfollowiAppend
• Mi
• Lea
• Da
• Che
• Opeanti
Respon
If a proconcer
Results
irm the Pr
tion
es process but are actu
hat there ar g list givesix D if mak
ing of diffe
ing valves
aged equip
mical reacti
rating procipated)
e
ess issue iss before inv
Notes
blem is He
related issually indepe
no processseveral exang tempera
ent tempera
allowing un
ment (e.g. c
on forming
dures outsi
a likely proestigating t
STEAM
ROUBLE
at Related
s will causdent issues.
related issu ples of proure measur
ture proces
anted proc
talyst) phy
olids in the
e of the des
blem sourcee heating s
EATING
SHOOTIN
plugging,
es that coulcess issuesments):
streams re
ess to enter
ically plug
line (e.g. c
ign conditio
it may mak stem.
YSTEM
G GUIDE
orrosion, et
be the souhat can app
ulting in qu
a line
ing the line
rsul, sulcret
ns (e.g. pro
e more sens
c. These ca
ce of the pr ear as heati
enching of t
e)
ess enters t
e to investig
age 5 of 2
evision: 3
ate: 7 Oct
appear to b
blem. Theg issues (R
e hotter str
e line cold
ate the proc
Initi
2010
e heat
fer to
eam
r than
ess
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 6/24
3. Stea
Descrip
Incorreheat loa
Action
Verify tCSI. V
• All
• All
• The
• Onlune
• Eacmul
Respon
If any pCSI for
Results
Circuitr
tion
t circuitry cd, and other
hat the Conrify that:
ump-overs
ump-overs
steam flow
the compo pected co
circuit hastiple steam
e
ortion of than analysis
Notes
an result in problems.
roTrace cir
are looped
are CSI sup
direction is
nents show ponents)
a single suraps, but no
circuitry diof the impa
STEAM
ROUBLE
condensate
uits are rou
own
lied compo
as indicated
on the inst
ply and a sit visa-versa
ffers from tt.
EATING
SHOOTIN
back-up, ex
ted accordi
nents
on the dra
llation dra
ngle steam
e installati
YSTEM
G GUIDE
essive stea
g to the ins
ings
ing are inc
rap (note th
n drawings
pressure d
allation dra
uded in the
at a single s
, correct the
age 6 of 2
evision: 3
ate: 7 Oct
rop, excessi
ings provi
circuit (no
pply can fe
circuitry or
Initi
2010
ve steam
ed by
ed
contact
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 7/24
4. Unh
Descrip
In geneconditirequire
Action
Check tmight r shoes c
• In-l
• Pip
•
Jac
• Bra
Respon
Contact
Results
5. Insu
Descrip
Proper i Action
Verify t
• Fitti
• Val
• Fla
•
Inst
• Bra
• Sup
• Co
ResponFully in
Results
ated Com
tion
al, all in-lins, other itheating.
he line for aquire additiuld be pro
ne valves a
supports
eted compo
ch connect
e
CSI to disc
Notes
ation Qual
tion
nsulation is
hat the line
ngs
es
ges
umentation
ch Connec
ports
troHeats
esulate any p
Notes
onents
e componems, such a
ny unheated onal heatinlem. The fo
d instrume
nents witho
ons
uss the imp
ty
critical to t
is fully insu
ions
ortion of th
STEAM
ROUBLE
ts (valves,ranch conn
in-line co. For exam
llowing list
tation
t a steam s
ct of unhea
e operation
ated includ
line that is
EATING
SHOOTIN
ittings, etc)ections, fla
ponents. Alle, an unhe
contains so
pply
ed compon
of a Contro
ng all:
found to be
YSTEM
G GUIDE
require heatge pairs, lar
so check foted trunione generic i
nts.
Trace syste
lacking.
ing. Depenge supports,
any conspion a line wiems to look
.
age 7 of 2
evision: 3
ate: 7 Oct
ing on the s etc. may al
uous itemsth several h for:
Initi
Initi
2010
pecifico
thateated tee
ls / Date
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 8/24
6. Stea
Descrip
Significsteam l
Action
Check t
Respon
Repairlikely a
Results
Leaks
tion
ant steam leaks are not
he line for s
e
ny signific problem so
Notes
aks increaslikely to ha
team leaks.
nt steam lerce.
STEAM
ROUBLE
the steam le a signific
ks; while it
EATING
SHOOTIN
oad of a cir nt impact.
is prudent t
YSTEM
G GUIDE
uit and red
repair any
ce the oper
small stea
age 8 of 2
evision: 3
ate: 7 Oct
ting pressu
leaks, thes
Initi
2010
e. Small
are not
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 9/24
LEVEL
Diagnos•
• S
• S
•
7. Strai
Descrip
A clogg
Action
Open t properl
Respon
If the stvalve w
Results
8.
Stea Descrip
The steend of tis accep
Action
Measur before tsteam t by proc
Respon• If t
• If t
Results
2 TROUB
ic Tools RSI ControT
urface ther
team trap di
eference th
ner Blow-
tion
ed strainer
e blow-dow operating
e
rainer has bill remove t
Notes
Temperation
m pressurehe circuit istable throu
e the tempehe steam tramperature,
ess instructi
ee temperatu
e temperatu
Notes
ESHOOT
quired: ace installa
ocouple pr
agnostic too
diagram in
own
ill inhibit c
n valve on tircuit shoul
come cloge contamin
ture (end o
temperatur the worst chout the cir
ature of the p). The temthough thisons. (Appen
re is accept
re is below
STEAM
ROUBLE
NG (Stea
ion drawin
be and met
ls (varies b
the ‘Steam
ondensate r
he steam trad have a str
ed with coants and res
circuit)
gradually r se location;uit.
steam at therature shoumber will
dix D conta
ble: skip to
pecificatio
EATING
SHOOTIN
System Di
s
er (or IR gu
trap style)
System Ov
emoval.
p strainer (ing, clean d
taminants, itore proper
educes as itif the stea
end of theuld typicall vary fromns procedu
Level 3 ite
: proceed t
YSTEM
G GUIDE
gnostic)
)
rview’ secti
equipped)scharge of
t is possibleircuit oper
progresses pressure/te
ircuit (eith be no cold rocess to pes for meas
s.
item 9.
on
and observeteam with s
that openintion.
hrough themperature i
r at the laster than 10°ocess. Contring tempe
age 9 of 2
evision: 3
ate: 7 Oct
the dischar ome conde
the blow-
Initi
team circui acceptable
CT element below thect CSI forature.)
Initi
2010
e. Asate.
own
ls / Date
. Thehere, it
or justupplyrocess
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 10/24
9. Stea
Descrip
If the st pressur
Action
Measur shouldsteam t
Respon
• If tThecon
• If tInvsize
Results
10. Sup
Descrip
In orde/ pipe bspecific
Action
Measur
Respon
• If t
• If t
first5°Fcon11.to a
Results
Tempera
tion
eam pressur .
e the tempeorrespond
ble in App
e
e temperature is eitherensate; pro
e temperatustigate thed, etc.), also
Notes
ly Tubing
tion
to minimize used, andations, it is
e the supply
e
e supply tu
e supply tu element of below the sact CSI forf the tempealyze the i
Notes
ture (suppl
e/temperatu
ature of theith the stea
ndix A).
re is acceptxcessive pr ceed to item
re is belowteam utiliti check item
e the pressuhat the lengossible tha
tubing dia
ing meets t
ing does noControTrac pply steam
process byrature is lo pact.
STEAM
ROUBLE
manifold)
e in the cir
steam at thm supply pr
ble at thessure drop10.
pecificatios (boiler se12.
e drop in thth not excee excess pre
eter and le
e 100ft of
t meet the 1 in the circ
temperatur rocess instr , replace th
EATING
SHOOTIN
uit is low, i
supply maessure liste
anifold (butn the suppl
at the man-point appr
e supply tud 100ft. If tsure drop i
gth.
/4” require
00ft of 3/4”it. The tem, though thi
uctions. If t supply tub
YSTEM
G GUIDE
t may be a r
ifold in theon the inst
too cold attubing / ci
fold: The st priate, stea
ing, CSI tye supply tu the supply
ent procee
requiremenerature sho
s number we temperat
ing with 10
esult of low
same mannllation dra
the last elecuit or the
eam supplydistributi
ically speci bing/pipe d tubing may
to item 11
t, measure tuld typicallill vary frore is reasonft of 3/4” t
age 10 of
evision: 3
ate: 7 Oct
steam syste
r. The teming (refere
ent / steamircuit is fill
pressure isn header pr
Initi
fies that 3/4es not meet
occur.
.
e temperat be no cold process toable, procee bing or con
Initi
4
2010
supply
eraturece the
trap):d with
oo low. perly
ls / Date
” tubingthese
re of theer than process;d to item
tact CSI
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 11/24
11. Stea
Descrip
Steam tsteam udiagnosfor anyadvancgreater
Action
CSI recoperati
• Dis
gen
pur •
Rep Note th
the ther
thermo
Respon
• The
•
The
Results
Trap Op
tion
ap failure incontrolled tic methodstype of stead diagnostievel of fam
ommends tn:
onnect theral, the dis
condensatlace the stet thermosta
mal perfor
ynamic ste
e
steam trap
steam trap
Notes
ration
a commonor closed (vary from t trap, but r
procedureiliarity with
at one of th
team trap f harge shoul
or live steam trap withtic steam tr
ance of the
m traps are
s operating
s failed (eit
STEAM
ROUBLE
cause of steompletelyap style toequire that t which dosteam trap
following
om the cond be a mixt
m, the trapa known g ps back up
circuit even
sensitive to
correctly: P
er open or
EATING
SHOOTIN
am circuit f r partiallyrap style. The trap be d ot require t peration.
ool-proof
ensate reture of flash
hould be cood unit.condensate
if the steam
condensate
oceed to ite
losed): Re
YSTEM
G GUIDE
ilures. Stealocking thee followin
isconnected e steam tra
ethods be u
n system ateam and c
nsidered fa
into the ste
trap is ope
return pres
m 12.
lace the ste
m traps canflow of stea two diagno. Appendix
to be remo
sed to verif
d observe tndensate. I
lty.
m circuit; t
ating corre
sure (refere
m trap.
age 11 of
evision: 3
ate: 7 Oct
fail open (pm). Steam tstic method contains
ved but req
proper ste
e discharge the dischar
is can com
ctly. Note th
ce item 13)
Initi
4
2010
assingap
s workoreire a
m trap
. Inge is
romise
at
.
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 12/24
12. Stea
Descrip
If the stroutedcondensupply
Action
Check t
Respon
• The
• The
Results
Supply
tion
eam trap onrom the supate load woanifold we
he operatio
e
steam trap
steam trap
Notes
anifold Tr
the steam s ply piping iuld create ere to fail op
of the stea
s operating
s failed (eit
STEAM
ROUBLE
p
pply manif to the circucessive pre
en, the leak
trap on th
correctly: P
er open or
EATING
SHOOTIN
old were toits that feed ssure drop icould reduc
supply ma
oceed to ite
losed): Re
YSTEM
G GUIDE
ail closed,from the lo the circuit
e the supply
ifold.
m 13.
lace the ste
xcessive coer manifol
. If the stea pressure.
m trap.
age 12 of
evision: 3
ate: 7 Oct
ndensate wd taps. The
trap on th
Initi
4
2010
uld beexcessivesteam
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 13/24
13. Stea
Descrip
The ratacross tcondenhigh, th
Action
Measur load at
•
•
•
•
Alternaoperati
Respon
•
TheLev
•
Thetheone
Results
Trap Siz
tion
at which ae trap. If tate at the rae trap may
e the condehe measure
he differeressure dro
supply presressure)
typical Che condenondensate
and Appe
hermodynively, discon is restore
e
steam trapel 3 items.
condensateteam utiliticapable of
Notes
/ Condens
steam trap ce condensatte it is beinot be able t
sate returndifferentia
tial pressur p (usually aure – 10psi
ntroTrace cate return pemperaturendix D)
mic steamnnect the st, the conde
s properly s
return presss or, if theandling the
STEAM
ROUBLE
ate Return
an discharge return pre generateddischarge
ressure anl pressure.
across the bout 10psi) pressure dr
ircuit steamressure canand looking
raps are espam trap frosate return
ized and the
ure is too hiondensatecondensate
EATING
SHOOTIN
Pressure
e condensatsure is tooy the circuihe condens
verify thatote that:
rap is the stminus the c p – 20psi c
load is lessoften be me up the pres
ecially sens the conde
pressure is
condensate
gh for the sressure is nreturn press
YSTEM
G GUIDE
is a functiigh, the tra
t. If the conte at all.
the steam tr
eam supplyndensate rendensate re
than 150 lbsured indir
sure on a st
tive to highnsate returnoo high.
return pres
eam trap siot too excesure.
n of the dif will be unensate retu
p is rated t
pressure miturn pressur turn pressur
hr.ectly by meam table. (r
condensatesystem; if c
ure is reaso
e / style beisive, replac
age 13 of
evision: 3
ate: 7 Oct
erential pre ble to discn pressure i
handle the
us the circe. (e.g. 50pe = 20psi di
suring theeference Ap
return presorrect circu
able: Proc
g used: In the steam t
Initi
4
2010
ssurearge thes very
steam
iti steamfferential
pendix
ures.t
ed to
estigaterap with
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 14/24
LEVEL
14.
Desi Descrip
The Coobjectilisted oreadily
Action
Contactassump
• Cop
• The
•
The
• The
• Pipi
Respon
• Co
Results
3 TROUB
n Conditiotion
troTrace se. Each of t the Controvailable to
CSI to coions listed
ies of appli
process na
process flo
process te
ng material,
e
tact CSI for
Notes
ESHOOT
ns (Advanc
stem is desiese design
Trace instalthe end use
pare the desn the instal
able P&ID
e
rate
perature
and schedu
assistance.
STEAM
ROUBLE
NG (CSI I
ed)
gn is basedassumptionlation drawi.
ign assumpation drawi
le
EATING
SHOOTIN
volvement
on a set of d should bengs, the co
ions to theg, CSI will
YSTEM
G GUIDE
Recomme
esign assuerified. W plete list o
s-built syst likely requi
ded)
ptions andile a few ba design ass
m. In additire:
age 14 of
evision: 3
ate: 7 Oct
specific thsic assumptimptions ma
on to the
Initi
4
2010
rmalons arey not be
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 15/24
15. Poor
Descrip
Poorlyflanges,
Action
Contact
• Co
the
• Loofro
• Pho
Respon
• Co
Results
16. Con
Descrip
Poor qu pipe. T
Action
In gene
• Mis
• Lar co
• Poo
Respon
• Co
Results
ly Heated
tion
eated areassupports, fi
CSI for hel
pare the obontroTrac
k for items process to
tograph sus
e
tact CSI for
Notes
roTrace In
tion
ality installe installati
al, look for:
sing heat tra
e gaps bet pound shou
rly spaced
e
tact CSI for
Notes
reas
are difficulttings, etc r
p spotting p
served locat installatio
hat may req process. (e.
ect areas.
assistance.
stallation
tion will ren quality ca
:
nsfer comp
een the pipld not excee
ontroTrace
assistance.
STEAM
ROUBLE
to spot oncquire heati
orly heated
ions of Con drawings.
uire additio. supports,
ult in inaden be difficu
und.
and the Cd 1/8”).
elements (l
EATING
SHOOTIN
e a system ig is depend
areas on a
troTrace co
al heating,flanges, ins
uate heat tt to ascertai
ntroTrace e
ngitudinall
YSTEM
G GUIDE
s insulated.ent on the s
insulated li
nections to
though theruments, br
ansfer betwn once the s
lements (Th
or circumf
Additionallecific proc
ne. As a sta
the expecte
eating requnch connec
een the Conystem is ins
e thickness
erentially).
age 15 of
evision: 3
ate: 7 Oct
, the extentss conditio
ting place:
locations
irements witions, etc)
Initi
troTrace anlated.
f the heat t
Initi
4
2010
to whichs.
ased on
l vary
ls / Date
the
ansfer
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 16/24
17. Bloc
Descrip
It is rar circuit.
Action
It maycircuit;suspectforcing
Respon
• An
•
The
Results
age in the
tion
, but possibThis will re
e possible ta sudden dr d the easie
water or air
e
bstruction
circuit is cl
Notes
Circuit
le for foreigult in exces
o locate an p in tempet approach backwards
s present: C
ear: Contact
STEAM
ROUBLE
n material tsive pressur
bstructionature/pressay be to at
hrough the
lear the obs
CSI for ass
EATING
SHOOTIN
become loe drop throu
y measurinre indicatestempt to clecircuit.
ruction usi
stance.
YSTEM
G GUIDE
dged in thegh the circu
the steaman obstructr the obstr
g appropria
supply tubiit.
temperatureon. If an obction witho
te means.
age 16 of
evision: 3
ate: 7 Oct
g or the Co
pressure alstruction ist locating i
Initi
4
2010
troTrace
ng the
by
ls / Date
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 17/24
APPEN
IX A (Sat rated Stea
psig0
5
10
15
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
5658
60
62
64
66
68
70
72
74
76
7880
85
90
95
100
105
110
115
120
STEAM
ROUBLE
m Table)
°F212.
227.
239.
249.
258.
261.
265.
268.
271.
274.
276.
279.
281.
284.
286.
289.
291.
293.
295.
297.
299.
301.
303.305.
307.
309.
310.
312.
314.
316.
317.
319.
320.
322.323.
327.
331.
334.
337.
341.
344.
347.
350.
EATING
SHOOTIN
b0 0
1 0
4 0
8 1
8 1
2 1
3 1
3 1
2 1
1 2
8 2
3 2
8 2
4 2
7 2
0 2
2 3
5 3
5 3
7 3
9 3
6 3
6 34 4
4 4
2 4
8 4
6 4
2 4
0 4
7 5
3 5
9 5
3 58 5
6 5
2
6
8
1 7
1 7
2 7
1 8
YSTEM
G GUIDE
rg.0
.3
.7
.0
.4
.5
.7
.8
.9
.1
.2
.3
.5
.6
.8
.9
.0
.2
.3
.4
.6
.7
.9
.0
.1
.3
.4
.5
.7
.8
.0
.1
.2
.4.5
.9
.2
.5
.9
.2
.6
.9
.3
°C100.0
108.4
115.2
121.0
126.0
127.8
129.6
131.3
132.9
134.5
136.0
137.4
138.8
140.2
141.5
142.8
144.0
145.3
146.4
147.6
148.7
149.8
150.9151.9
153.0
154.0
154.9
155.9
156.8
157.0
158.7
159.6
160.5
161.3162.1
164.2
166.2
168.1
169.9
171.7
173.4
175.1
176.7
age 17 of
evision: 3
ate: 7 Oct
4
2010
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 18/24
psig125
130135
140
145
150
155
160
165
170
175
180
185
190
195
200
STEAM
ROUBLE
°F352.
355.358.
360.
363.
365.
368.
370.
373.
375.
377.
379.
381.
383.
385.
387.
EATING
SHOOTIN
b9 8
6 93 9
9 9
4 1
9 1
2 1
6 1
9 1
3 1
4 1
6 1
7 1
7 1
9 1
9 1
YSTEM
G GUIDE
rg.6
.0
.3
.7
.0
.3
.7
1.0
1.4
1.7
.1
.4
.8
.1
.4
.8
°C178.3
179.8181.3
182.7
184.1
185.5
186.8
188.1
189.4
190.7
191.9
193.1
194.3
195.4
196.6
197.7
age 18 of
evision: 3
ate: 7 Oct
4
2010
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 19/24
APPEN
Diagnoso
o
T Inverte
o Failu
o
Veri
Float an
o Failu
o
Veri
IX B (Ste
ic Tools Rechanics st
rap manufa
Bucket Tr
re modes:PluggedLost priRestore pDamaged or open p
ying normaListen tocontinuodischargeIf trap isthan othe
d Thermos
re modes:Float collDamaged
or open pAir ventAir ventcontinuodrop in t
ying normaListen todischargethan a pr If a downreturn to
dischargereturns toA failedfrom thevent.
m Trap Di
quired: ethoscope oturer consu
aps
ent: fail col
e: fail hot , crime by clo, worn, or bosition.
operation:trap with ms discharge(characteriailed open t, properly
atic Traps
apsed or pu, worn, or b
osition.lugged or f ailed open:sly dischar e circuit.operation:
trap with m continuous perly workistream valvhe continuo
its condens steady state pen air venondensate
STEAM
ROUBLE
gnostic)
appropriatltative supp
d due to inaharacterizeing valve aund mecha
chanics ste(characteristic of normhe dischargorking trap
ctured: fail
und mecha
iled closed:ail hot ; thees live stea
chanics stey. A failedng trap.
is closed f us discharg
ate rapidly.may be dif
eturn syste
EATING
SHOOTIN
trap diagnrt
bility to dis by continuter trap fornism: fail c
hoscope. Ntic of lightl to heavywill be co
s.
cold due tonism: fail c
fail cold d primary tra
; this may
hoscope (c pen trap’s
r a minutesound righ
nd then sett
icult to det is a fool-p
YSTEM
G GUIDE
stic tool
harge air.ous dischar few minutld or hot d
rmal operateam loads)team loads)tinuous an
inability ofld or hot d
e to inabilit mechanisor may not
mpare to k ischarge w
nd then re-t away. A p
le down to
ct by listenroof metho
e with boues and re-ope to trap eit
ion is eitheor an inter .a louder, hi
float to opee to trap eit
y to dischar is operatioause signifi
own good tll be louder
opened, a faoperly oper
slow disch
ng. Discon of detectin
age 19 of
evision: 3
ate: 7 Oct
cing buckeening.er stuck in
a light, quiittent open
gher pitch s
discharge.er stuck in
e air.nal but the tcant steam
aps). Floatand a highe
iled open tr ating trap w
rge as the t
ecting the t a failed op
4
2010
.
closed
etclose
ound
closed
rapressure
rapsr pitch
p willill
ap
apen air
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 20/24
Thermo
o Failu
o Veri
Thermo
o Failu
o Veri
ynamic T
re modes:
Trap seatDebris in passagew
ying normaListen toevery 10DischargicondensaDisconnetrap oper operation
tatic Trap
re modes:Damaged or open pDebris in passagew
ying normaIn some cintermitteIf the tra
stop, theClose vallisten to tvolume aThermostconsult
aps
disk worn:trap: fail ho
ay.operation:
trap with mo 30 seconng every 5e back-prescting the tration as the.
, worn, or bosition.trap: fail ho
ay.operation:
ases (typicantly, this in is cooled b
return to stve after trape dischargd pitch wh
atic traps caanufacturer
STEAM
ROUBLE
ail hot duet or cold du
chanics stes. Dischargeconds or lsure, or (3)
p from the condensate
und mecha
t or cold du
lly with neaicates a pr spraying i
ady state.to allow co. If the trapn the disch
n usually befor proper
EATING
SHOOTIN
o inabilitye to debris p
hoscope. Ne durationss is a signn undersiz
ondensate r eturn press
nism: fail c
e to debris p
r-to-steam t perly functi with water
densate tois failed oprge transiti tested by procedure.
YSTEM
G GUIDE
o seal propreventing d
rmal operaill dependof either (1)d trap.turn systere plays a s
ld or hot d
reventing tr
mperatureoning trap.the dischar
build up inn, the discns from coacing them
rly.sc from sea
ion is a perin the circui a worn trap
is not a relgnificant ro
e to trap eit
ap from clo
odels) the
e should in
he trap. Oparge sounddensate to
in a pot of
age 20 of
evision: 3
ate: 7 Oct
ing or plug
odic discha steam load , (2) excessi
able way tole in the tra
er stuck in
ing or plug
trap may di
rease briefl
n the valveill increas
ive steam.oiling wate
4
2010
ing a
ge.ve
verify
closed
ing a
charge
y, then
andin
,
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 21/24
APPEN
The blofollowin
• If thestrai
• If the
too hsmalstea
• If the
supplow.
•
If the possi
• If thethe cdue t
IX C (Blo
-down disc list shows
re is no diser is plugge
discharge iigh due to i supply tubi supply pre
discharge iy tubing, or
discharge bly the trap.
discharge ircuit steamo improper
-Down Di
arge will plikely probl
harge: Thed.
s primarily proper roung, or a restssure is too
s weak: The a restrictio
ontains a lo
s normal: Tload is tooouting, sma
STEAM
ROUBLE
charge)
ovide someems based o
ircuit is no
ondensate:ing; the cir riction; excow; the co
circuit pres; the strain
of contami
e steam traigh due to ill supply tu
EATING
SHOOTIN
insight inton the strain
supplied w
The steam tuit pressur ssive condedensate ret
sure drop isr is partiall
nants: Exce
is failed omproper roing, or a re
YSTEM
G GUIDE
the steam cr discharge.
ith steam; t
ap is faileddrop is too
nsate is beirn pressure
too high du clogged; t
sive debris
en; the steating; the cir triction.
onditions in.
e circuit is
closed; thehigh due tog routed inis too high.
e to imprope steam sup
has built up
m supply pr cuit pressur
age 21 of
evision: 3
ate: 7 Oct
the circuit.
lugged, or
ircuit steaimproper roo the circui
r routing, s ply pressur
in the circu
essure is to drop is too
4
2010
The
he
load isuting,; the
allis too
t, and
low;high
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 22/24
APPEN
The best probe thwith steasystem bfor measis used,temperatinsulated Thermo
impacte
the meas1.
2. bS
3.
t4. I
tr
5. t
Infrare
temperatnegative1.
2. se
IX D (Te
method oft directly cm systems.y measurinring the sureat care m
ure; in gene.
ouple Met
by the emi
urement. Inemove a semove dirt,ttach the thead is presseveral meth
For singlIf multiplthermocoFor small plastic zi
the thermeplace the iake sure the thermoco directly mmperatureading.ead the ther ermocoupl
Gun Meth
ure, but exty impactedemove a semove a litemove dirt,ote the mateel, rusty st
issivity se
perature
easuring tntacts the sIt is usuallythe surfaceface tempest be takenal, this is a
od: The thsivity of th
general, useall amountdebris, scalrmocoupled against t
ods of attac measureme measuremuple with a bore piping-tie or a me
ocouple beasulation ovt there are
uple.asuring theeading. If
mocouple t type being
od: An infr
a care must by the ambiall amountle insulatiodebris, scalrial and co
eel, fresh stting as appr
STEAM
ROUBLE
easureme
e steam teeam. Howenecessary ttemperatur ature, ther to assure thcomplished
rmocouple pipe and t
the followif insulatio rust, insul
bead to thee pipe/tracement maynt use a pieent over se appropriat when the etal hose cla
d from the cer the ther o air gaps t
trace or steaeasuring pr
mperatureused.
red gun ca
be used toent air tempf insulatio as possible rust, insuldition of thel, etc.) Reopriate for t
EATING
SHOOTIN
t Procedu
perature iser, this typ measure t of the pipiocouples at the ambie
by ensurin
method is ge piping ca
g procedur from the pition remnaipe/trace isurface; ane used:ce of high-teral days ar epoxy suctire circum p may be
lamp usingocouple anhat allow a
m piping,cess piping
ith a meter
successfull
revent the perature. In g from the pi while stilltion remna
e surface toer to the IRhe surface.
YSTEM
G GUIDE
e)
o have a tee of temper e steam teg/tracing.d infrarednt conditio that the ar
enerally theeasily rem
e: ping/tracint, etc fromthe expose air gap wil
mperaturee desired ita JB weld.
ference of tsed. If usin
a layer of i the pipe/tr bient air to
ait approxi, wait appro
that is prop
y be used to
ipe/trace teeneral use t pe/trace in txposing sut, etc from
be measuregun manual
perature gature equip
perature athere are twuns. No mas are not ima being me
most accur in insulate
in the areahe pipe sur area. It is i
l cause erro
ape is usuals better to a
e pipe is ex a metal ho
sulating mace around tcontact the
ately 30miximately 2h
erly progra
measure th
perature fr e followinhe area to bficient areahe pipe sur (stainlessand adjust
age 22 of
evision: 3
ate: 7 Oct
uge installeent is rarel given poin commonter which
pacting thesured rema
te as it is n while perf
to be measuace.mportant theous readi
ly adequate.tach the
posed, a hese clamp, i
erial.e thermoco pipe/trace a
before tak r before tak
med for th
pipe/trace
om being proceedure measured.
for the IR gace.teel, galvanhe IR gun
4
2010
with aused
t in theethodsethodipe
ns fully
trming
red.
at thegs.
vysulate
uple.ound
ng ang a
:
n.
ized
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 23/24
3. r
a4. Itr
5. t p
Note thaadditionnote thatthermoc
e-insulate tmoved. Ma
ound the ar directly mmperatureading.emove the imperatureipe/trace wa once the Il locationsthe IR gunuple and th
e area to beke sure that
ea to be measuring theeading. If
nsulation pas quickly all temperatu gun emissiy pealing b
emissivity ce IR gun; th
STEAM
ROUBLE
measuredthere are no
sured.trace or steaeasuring pr
tch and qui possible asre.vity is set cack existingn be calibr IR gun ca
EATING
SHOOTIN
ith a patchair gaps th
m piping,cess piping
kly take theven brief
rrectly, itinsulationted by mea then be adj
YSTEM
G GUIDE
of insulatiot allow am
ait approxi, wait appro
temperatur xposure to
ay be possind quicklyuring the susted to ma
that can beient air to c
ately 30miximately 2h
e using the Ihe ambient
ble to takeeasuring t
me surfacech the ther
age 23 of
evision: 3
ate: 7 Oct
easily andntact the pi
before tak r before tak
R gun. Tak air will imp
easuremene surface.
with both aocouple re
4
2010
uickly pe/trace
ng ang a
thect the
s inlso
ding.
7/23/2019 Steam Troubleshooting Guide Rev 3
http://slidepdf.com/reader/full/steam-troubleshooting-guide-rev-3 24/24
APPEN
Accuratediagnosiinstallinsuitableit will be The gauline at thlast elemThe gautee it is i
clearancMcMast
The spec
• 3
•
•
2
• 1
• 5
•
5
•
±
IX E (Per
ly measuring the opera a permaneemperatureapproxima
e screws ine end of theent of Conte must not portant th
between tr-Carr. The
ifications o
” dial
ack connec
-1/2” Stem l
/2” NPT co
0-400oF te
oF subdivis
1% full scal
anent Ste
g the steamtion of a stet temperatugauge for tely $50 for
o a standar circuit. TheoTrace ande placed af t only the t
e gauge stefollowing p
Desc
3/4" St
Bu
WIK
the temper
ion
ength
nection
perature ra
ons
e accuracy
STEAM
ROUBLE
m Tempe
temperatuream circuit.re gauge atis applicatiach circuit.
3/4” tee fitoptimal locthe return ter the steae and bushi
and the inart list is cu
ription
aight Tee
shing
Gauge
ture gauge
ge
EATING
SHOOTIN
ature Gau
at the endhe measurehe end of en. The total
ting via a bation for the bing, or bet trap. If the
ng listed bel
side of the f rrent as of 4
Part Nu
44605
4513K
3946K
S
re:
YSTEM
G GUIDE
e)
f the circuitment procech steam ci cost of the
shing. Thetemperatur
ween the regauge is toow be used
tting. All p-Oct-2010.
mber
155
347
118
btotal:
(Step 8) iss can be str rcuit. CSI hgauge and t
ee fitting cae gauge is eiurn tubing
be installedin order to
rts can be o
Price
$2.24
$1.91
43.60
47.75
age 24 of
evision: 3
ate: 7 Oct
crucial steamlined bys identified e fittings to
n then be plther betweend the steain the brancchieve prop
rdered thro
4
2010
in
ainstall
aced in-n the
trap.h of theer
gh