steam injection landfill bioreactors · • steam moves in all ... • determine if steam injection...

28
STEAM INJECTION STEAM INJECTION LANDFILL BIOREACTORS LANDFILL BIOREACTORS By Reg Renaud STI Engineering

Upload: dinhdien

Post on 10-Apr-2018

225 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

STEAM INJECTION STEAM INJECTION LANDFILL BIOREACTORSLANDFILL BIOREACTORS

ByReg Renaud STI Engineering

Page 2: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Biography Biography

• Developed PPT For American Market – Over 1 Million Feet

• Worked On Nuclear PP., MX Missile, Many Dams, Dozens Of Landfills

• PPT Instructor At 4 Universities

• Worked In Solid Waste Industry For 30 Years

• Hold Several Patents

• Author Of Several Papers And A Book

• Member & Presenter At SWANA

Page 3: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

BIOREACTOR LANDFILLSBIOREACTOR LANDFILLSvs.vs.

DRY TOMB LANDFILLSDRY TOMB LANDFILLS• Enhances biodegradation of organic waste

• Increases LFG production for waste-to-energy & Alternative Fuels

• Enhances settlement

• Recovers airspace

• Reduces organic related impacts while landfill is still in operation

Page 4: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

STEAM INJECTIONSTEAM INJECTION

• The intent is to increase the humidity of the landfill not to saturate the refuse

• More uniform distribution

• Only 1/1600th of the water required

• Enhanced settlement, water is not compressible

• Low temperature steam will biodegrade organics

Page 5: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

STEAM vs. LIQUIDSTEAM vs. LIQUID

• Steam warms refuse• Steam moves in all

directions• Steam will not flood

collectors• Better moist. distribution• Will not plug bottom drains• Steam will not displace

void spaces, more settle.• Steam migration can be

monitored easier, by temp.

• Liquid cools refuse• Moves down & laterally

under a head pressure• Liquid could flood collect.• Poor moist. distribution• Could plug bottom drains• Liquid will fill void spaces,

inhibits settlement• Liquid migration is difficult

to monitor• Liquid cannot

Page 6: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

DescriptionDescription

• CPT and PPT Used to Characterize Subsurface Conditions

Page 7: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

DescriptionDescription

• CPT Indicates Material Strength/Density and BehaviorType: Cover Layers vs MSW

• PPT Indicates Liquid, Vacuum and/or LFG Pressure

• Field Review of Data to Select Push-in Gas Well Locations and Screen Intervals

Page 8: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Interpretation of PPT LogsInterpretation of PPT Logs

• Identify Dense/Daily Cover Layers

• Distinguish Liquid and Gas Pressures

• Identify Zones of Vacuum

• Evaluate Zones of Low Density MSW

• Determine The Density Of Bottom Native Soils In Unlined Landfills

Page 9: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

TYPICAL PPT LOGTYPICAL PPT LOG

• Column 1-Depth, ft.

• Column 2-Friction, tsf

• Column 3-Tip Resist., tsf

• Column 4-Pore Pres., psi

• Column 5-Friction Ratio %

• Column 6-Lithology

Page 10: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

HYDROSTATIC PRESSURE SLOPEHYDROSTATIC PRESSURE SLOPE

• PPT Indicates Hydrostatic Liquid Pressure

• Interim Cover Layer at 40-ft Depth Causing Perched Water

• LFG Pressure Indicated Below Water Column

Page 11: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Gassy LiquidLiquidDense Layer

Building 3Building 3--D Profiles in Stages D Profiles in Stages

• Liquids Trapped on Dense Layers

• Gassy Liquids Generally Trapped Between Dense Layers

• Continuity Between Liquid Layers Encountered Below Bench Roads

Page 12: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

33--D Profile Enhances Understanding D Profile Enhances Understanding of Conditionsof Conditions• Continuity of

Liquid or Gassy Liquid Between and Along Bench Roads

• Liquids Above Gassy Liquids Indicates Water Intrusion

Gassy LiquidLiquid

Page 13: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Landfill PPT Profiling Plan ViewLandfill PPT Profiling Plan View

Page 14: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Landfill PPT ProfilingLandfill PPT Profiling33--D ProfileD Profile

Page 15: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Landfill PPT ProfilingLandfill PPT ProfilingSide ViewSide View

Page 16: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Steam Injection BioreactorsSteam Injection BioreactorsMiramar Landfill Pilot StudyMiramar Landfill Pilot Study

Page 17: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Site Layout MapSite Layout Map

GENERATOR OFFICE BOILER WATER TANKS PIEZO-1 X T-8 EW-1 SI-1 o PPT 19 EW-6 CEW-1 SM-5 SM-1 T-6,7 o PPT 10 o PPT 12 EW-5 SM-6 T-5 EW-2 T-4 T-3 T-2 T-1 SI-2 o PPT 20 SM-4 o PPT 18 o PPT 17 SM-2 SM-3 X PIEZO-2 SI-3 EW-4 EW-3 T-9

Page 18: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

LFG Collector SystemLFG Collector System

Page 19: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Steam InjectorSteam Injector

Page 20: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Four GPM BoilerFour GPM Boiler

Page 21: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Landfill SettlementLandfill Settlement

Page 22: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Miramar Landfill Pilot Study Miramar Landfill Pilot Study ObjectivesObjectives

• Determine If The Steam Migration Can Be Controlled By The LFG Collectors

• Determine If The Steam Can Heat Up & Moisten The Waste

• Determine If The Steam Increases Quality & Quantity Of Methane Gas

• Determine If Steam Injection Can Recover Airspace

• Determine If Leachate and Condensate Can Be Used In The Steam Process

Page 23: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Miramar Landfill Pilot Study Miramar Landfill Pilot Study All Objectives Were AchievedAll Objectives Were Achieved

• By Increasing The Vacuum At The Collectors Steam Migration Was Indicated By The Thermocouples

• Thermocouples Indicated Increased Waste Temperature And Moisture

• Methane Started At 54% Increased To 66%

• Test Cell Settled 26 Inches Near Injector # 2, In 7 Months

• Leachate and Condensate Was Used In The Steam Process

Page 24: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Study Gas ProductionStudy Gas Production

• 1,500 Gallons/Steam Per Day• Average 229 scfm Of LFG • 229 x 1440 Minutes = 329,760 Cu. Ft. / Day• 329,760 / 12,000 = 27.5 Organic Tons Converted/Day• 25,212 / 27.5 = 917 / 365 = 2.5 Years

• If 5,000 Gallons/Steam Per Day• 5,000 / 7.5 x1,600 = 1,066,666 Cu.Ft. Steam• 1:1 Conversion Ratio = 1,066,666 Cu.Ft. LFG • 1,066,666 / 12,000 = 89 Organic Tons Converted/Day• 25,212 / 89 = 283 / 365 = 9 Months

Page 25: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Conversion RateConversion Rate

18 36 54 72 90

Tons/Day

Pilot Study Conversion Rate 27.5 Tons

Gallons/Day

5000

4000

3000

2000

1000

18 36 54 72 90

Tons/Day

Pilot Study Conversion Rate 27.5 Tons

Gallons/Day

5000

4000

3000

2000

1000

Page 26: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Conventional Biomass ReactorConventional Biomass ReactorChino CaliforniaChino California

500 Ton/1.2 Million Gallons500 Ton/1.2 Million Gallons

Page 27: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

Steam Biomass ReactorSteam Biomass Reactor500 Ton 500 Ton

Spreader Auger 50’ Silo Tank Gas Pipeline to LNG 15,700 cu.ft. Shaker Hopper Purge Steam Line Boiler Auger Discharge Not to Scale 20’

Page 28: STEAM INJECTION LANDFILL BIOREACTORS · • Steam moves in all ... • Determine If Steam Injection Can Recover Airspace ... • 25,212 / 89 = 283 / 365 = 9 Months. Conversion Rate

QUESTIONS?QUESTIONS?

• Answer All Questions If Time Allows Today And/Or

• Contact:

• Reg Renaud, President

• STI Engineering• P.O. Box 792, Silverado, CA • Phone: (714)649-4422• Web Site: www.landfillengineering.com• E-mail: [email protected]