status of wastewater implementation
DESCRIPTION
Status of Wastewater Implementation. July 10, 2013. Management Entities and Service Area. NKLUC. KLWTD. Islamorada. Key West. Key Colony Beach . Marathon. FKAA. KWRU. Florida Keys Aqueduct Authority. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/1.jpg)
Status of Wastewater Implementation
July 10, 2013
![Page 2: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/2.jpg)
Management Entities and Service Area
NKLUC
KLWTD
Islamorada
FKAA Marathon
Key West
KWRU
Key Colony Beach
![Page 3: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/3.jpg)
The Florida Keys Aqueduct Authority (FKAA) is responsible for the construction, operation and maintenance of the Layton, Duck Key/Conch Key, Cudjoe, Bay Point, and Big Coppitt facilities.
Florida Keys Aqueduct Authority
![Page 4: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/4.jpg)
The collection system serving residential Duck Key is currently being constructed as part of an overall utilities upgrade project.
The utilities upgrade project located on Duck Key is divided into seven (7) phases. Construction of phases 1, 2 and 3 is complete and residents have been invited to connect. Construction for phases 4, 5 and 6 are substantially complete. Phase 7 is projected to be completed by September 2013
Duck KeyFlorida Keys Aqueduct Authority
![Page 5: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/5.jpg)
![Page 6: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/6.jpg)
Cudjoe Regional
![Page 7: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/7.jpg)
Contracts are in place for the construction of the Cudjoe Regional Centralized Treatment Facility as required by March 2013 deadline for State Assistance Grant.
Projects are broken into 3 contracts: Treatment Plant, Inner Islands (Upper Sugarloaf, Cudjoe and Summerland), and Outer Islands (Lower Sugarloaf and Ramrod north to Big Pine Key).
Cudjoe Regional
![Page 8: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/8.jpg)
Cudjoe Regional WWTP
June 14, 2013 July 1, 2013
![Page 9: Status of Wastewater Implementation](https://reader036.vdocuments.us/reader036/viewer/2022081520/568161d9550346895dd1e30c/html5/thumbnails/9.jpg)
Connection Report
Service Area EDUs Connected Percent ConnectedOcean Reef (NKLUC) 1,884 1,884 100%Key Largo (KLWTD) 16,713 14,185 85%Islamorada 8,483 1,055 12%Layton (FKAA) 351 351 100%Duck Key / Conch Key (FKAA) 1,454 1,167 80%Key Colony Beach 1,502 1,502 100%City of Marathon (see City report)Cudjoe (FKAA) 8,600 0%Big Coppitt (FKAA) 1,726 1,417 82%Bay Point (FKAA) 437 420 96%Stock Island * 2,750 2,650 96%Key West 24,075 24,075 100%Total 67,975 48,706 72%