status of seismic risk assessment in cities of nepal and …€¦ · cities of nepal and upcoming...

35
Status of Seismic Risk Assessment in Status of Seismic Risk Assessment in Cities of Nepal and Upcoming Initiatives Cities of Nepal and Upcoming Initiatives Ramesh Guragain Director, Earthquake Engineering and Research Kathmandu, Nepal 27 September 2007 Workshop on Workshop on Collaborative Research and Collaborative Research and Development Project for Disaster Development Project for Disaster Mitigation in Earthquake Prone Areas in Mitigation in Earthquake Prone Areas in Asia Asia

Upload: others

Post on 16-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Status of Seismic Risk Assessment in Status of Seismic Risk Assessment in Cities of Nepal and Upcoming InitiativesCities of Nepal and Upcoming Initiatives

Ramesh GuragainDirector, Earthquake Engineering and

Research

Kathmandu, Nepal27 September 2007

Workshop onWorkshop on

Collaborative Research and Collaborative Research and Development Project for Disaster Development Project for Disaster

Mitigation in Earthquake Prone Areas in Mitigation in Earthquake Prone Areas in AsiaAsia

Page 2: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Content: Sharing 5 Experiences of NSET in Risk Assessment (1997-2007)

1. KVERMP Experience (1997-2000)2. SEDM (JICA) Experience (2001)3. MERMP Experience (2002-2003)4. SLARIM (ITC) Experience (2003-2006)5. Ongoing Research with Universities

Students (2007)6. Near Future Programs (2007-)

Page 3: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

NSET - Nepal GeoHazards International

MMI X

MMI IX

MMI VIII

MMI VII

KathmanduKathmandu Valley Intensity Map of 1934 Valley Intensity Map of 1934 EarthqukeEarthquke

KVERMP Experience (1997-2000)

Page 4: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Kathmandu Valley: Earthquake Risk

Increased Population Increased Population Haphazard ConstructionsHaphazard Constructions

Page 5: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Kathmandu Valley: Infrastructures

• Vulnerable

Buildings

• Narrow Roads

Page 6: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Estimated Building Damage In Kathmandu Valley

(Based on Buildings Survey during UNDP Building Code Project)

PlacePlace Building Stock DamagedBuilding Stock Damaged(Beyond Repair)

Kathmandu 60%Lalitpur 60%Bhaktapur 75%Entire ValleyEntire Valley 60%60%

ATCATC--13 13 MethodologyMethodology

Page 7: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

KathmanduKathmandu, , LalitpurLalitpur & &

KirtipurKirtipur Road Road & Bridges & Bridges

Damage MapsDamage Maps

30% unusable

10% unusable

60% - 100%unusable30% unusable

NSET - Nepal GeoHazards International

ATCATC--25 Methodology25 Methodology

Page 8: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

<30% users served

30% to 60% users served

60% to 100% users served

100% users served

Water System Functionality: One

Week after the Scenario Earthquake

ATCATC--25 Methodology25 Methodology

+ Interpretation+ Interpretation

Page 9: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Potential Impact due to scenario EQ in KVPotential Impact due to scenario EQ in KV (KVERMP estimates for IX MMI)(KVERMP estimates for IX MMI)

Impact Extent Death >40,000Injuries >95,000Buildings destroyed/collapsed >60%Homeless population >700,000Bridges impassable >50%Road length damaged >10%Water supply pipes damaged >95%Telephone Exchange Buildings mostTelephone lines >60%Electric substations mostElectric lines 40%

Page 10: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

500m x 500m Grid

SEDM (JICA Study) Experience (2001)

Seismic Intensity Map I. Mid Nepal Earthquake

Page 11: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Building Inventory: Six Category of Area

Page 12: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Building Inventory: Detail Survey Settlement Type No. Building Sample

Areas Main Type Sub-type

No. Of areas sampled

Total Number of samples

1 Institutional Urban (Schools, Hospitals, College, Cinema)

32

2 Commercial Urban 6 150

3 Industrial (Light Industry)

Urban 4 40

Urban Core 19 281 Urban

Urban Fringe 17 219 Suburban Core 2 46

Suburban Suburban Fringe 7 151

Rural Rural Core 3 81

4 Residential

Rural Fringe 7 183 5 Total 1183 Source: (NSET 2001)

Page 13: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Area wise Total Building Typology

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

Areas

Perc

enta

ge

Adobe 13.8% 3.4% 15.2% 30.5% 53.1% 32.8%Stone 0.0% 3.8% 0.0% 4.6% 1.2% 37.2%Brick in Mud 29.2% 8.3% 10.9% 16.6% 17.3% 7.7%Brick in Cement 20.8% 26.3% 47.8% 27.2% 9.9% 8.2%Frame (Reinforced Concrete) 26.1% 44.0% 15.2% 11.3% 2.5% 3.3%Stone and Adobe (Mixed) 0.2% 0.0% 2.2% 0.7% 3.7% 3.3%Stone and Brick in Mud (Mixed) 0.2% 2.3% 0.0% 2.0% 0.0% 1.1%Brick in Mud and Brick in Cement (Mixed) 5.0% 9.4% 6.5% 4.6% 1.2% 1.6%Others 4.6% 2.6% 2.2% 2.6% 11.1% 4.9%

Urban Core Urban Fringe Sub-Urban Core Sub-Urban Fringe Rural Core Rural Fringe

Total Number of Sample Surveyed=1183

Page 14: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,
Page 15: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Vulnerability Function

Nepal National Building CodeNepal National Building Code

Page 16: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Vulnerability Functions Modified using 1988 Eq Damage Data

Page 17: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,
Page 18: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

SEDM: Casualties (Deaths)

Mid Nepal EQ

•• Used 1988 Used 1988 EqEq DataData

•• Verified by Coburn Verified by Coburn and Spence (1992)and Spence (1992)

Page 19: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

MERMP Experience 2003MERMP Experience 2003

DharanDharan

BanepaBanepa

VyasVyas

PokharaPokhara

•• Under ADPC/AUDMPUnder ADPC/AUDMP

•• Consolidation Phase of KVERMPConsolidation Phase of KVERMP

Page 20: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Seismic Hazard in RADIUS

Page 21: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

13 13

13 1313 13 13 14

13 13 14 1416 16 16 1 14 14

17 17 11 11 11 11 16 16 4 14 1417 17 11 17 18 11 10 12 2 14 14

17 17 17 17 181 181 181 10 10 6 14 1417 17 17 18 181 181 181 19 8 7 15 15

17 17 17 181 19 8 8 15 158 8 15 15

8 151 15 15151 15 15

8.8

7.8

Color ID

Automatic RangeFrom To

8.08.38.5

abcd

8.08.38.5

Manual RangeFrom To

7.5 8.5

10.0 11.0

8.5 9.09.0 10.0

Intensity Map

MMI

Page 22: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Earthquake Risk Assessment (Scenario Earthquake)

VIII: Damage to masonry buildings. IX: Poorly built

masonry structures collapse; all structures are damaged. Underground pipes broken.X: Most well-built

masonry and frame structures and bridges are destroyed.

Page 23: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Building Damage Estimation (for Scenario Earthquake)

40 % of the Total Building Stock Could be Damaged40 % of the Total Building Stock Could be Damaged

Page 24: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

The MethodologyRisk Assessment requires undertaking the following steps:

Collection and collation of available existing dataKick-off meeting to introduce the project to the communityHazard assessmentVulnerability assessmentDamage estimation (theoretical)Damage estimation (non-theoretical) using interviewsPreparation of the earthquake scenarioImplementation of the scenario workshopDissemination of the earthquake scenario

Process!

Page 25: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

SLARIM Experience: Use of Homogeneous Unit

Page 26: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Vulnerability Functions Modified using 1988 Eq Damage Data

Page 27: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Building Damage: Building Damage: About 50%About 50%

Total Number of Total Number of Building Damage: Building Damage:

20,00020,000

Building Damage

(Source: (Source: GuragainGuragain, 2004), 2004)

Page 28: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

AD2%

BM26%

BC24%

RCC321%

RCC427%

Selected Wards: Individual Buildings

Building Classification (Jimee, 2006)

Page 29: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Selected Wards: Detail Building Parameters

MMI VI VII VIII IX X

Damage Grades for Different Classes of Buildings

Weak DG4 DG5 DG5 DG5 DG5

Average DG3 DG4 DG5 DG5 DG5

Good DG2 DG3 DG4 DG4 DG5

Page 30: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Severity Level 1 - Day

Severity Level 4 -Day Severity Level 4 - Night

Severity Level 1 - Night

Schools (class rooms)

Casualties due to intensity IX earthquake

Page 31: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Wd 6

Wd 16Wd 3

Wd 35

Wd 9

Wd 4

Wd 15

Wd 8

Wd 14 Wd 34

Wd 29

Wd 13

Wd 7

Wd 11

Wd 1

Wd 10

Wd 32

Wd 31

Wd 2

Wd 5

Wd 33

Wd 17

Wd12

Wd 30

Wd 22

Wd 18

Wd 20

Pashupati and Golf

Ratnapark Area

Chhauni Millitary

Baneshwor Area

Balaju Bus Park

National Trading

Very Detail: Water during EmergencyVery Detail: Water during Emergency

Major Probable Evacuation Points in Kathmandu metropolitan City (KMC)

Evacuation PlacesEvacuation PlacesPeople People holding holding capacitycapacity

Water Water ((ltrsltrs/day/day ))

ReservReserv e tanks e tanks for for three three daysdays

Golf Course and Pashupati area 68,099 1,021,479 383

Birendra Intl. Conference Hall 14,286 214,286 80

Trally Park 8,893 133,393 50

Tudikhel (Khula Manch, Tudinkhel, Ratna park, Stadium, and Bhricuti Mandap area)

66,571 998,571 374

Exhibition Road area 4,957 74,350 28

Bhadrakali Military Camp area 10,809 162,141 61

Thapathali campus area 3,305 49,569 19

Chhauni Military area 28,055 420,822 158

National Trading Corporation 10,136 152,044 57

Balaju Buspark area 12,237 183,551 69

Total 227 347 3 410 205 1279

Page 32: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Very Detail: Identification of NonVery Detail: Identification of Non--structural structural Vulnerability Reduction OptionsVulnerability Reduction Options

Improving Safety of Operation TheatersImproving Safety of Operation Theaters

Steel FrameSteel Frame

Page 33: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Ongoing/Upcoming Programs

With UniversitiesTU Master’s Degree Students ( 3 Persons) working in Ilam at Individual Buildings Level

Buildings

Population

Infrastructure

GRIP

2 Municipalities

MPPW+UNDP+IRP

5 Municipalities

Page 34: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Lessons

RA can be done at different level/accuracy

RA as a Powerful City Planning Tool

RA has been very Important Awareness Tool

Involvement from City/Community Level is Very Important for Proper Utilization of the Outcome

Page 35: Status of Seismic Risk Assessment in Cities of Nepal and …€¦ · Cities of Nepal and Upcoming Initiatives Ramesh Guragain. Director, Earthquake Engineering and Research. Kathmandu,

Thank You!Thank You!