S.No. State File No. Name of the Power utility Name of the Power line KV Ckt Type PL KM CKT. Km. Date of receipt of proposal in CEA Date of receipt of BSNL details Date of receipt of Railway details Date of IV comments sent by CEA Approved on 1 Arunachal Pradesh AP-01 PGCIL 1st Ckt. Of 400kV D/C Lower Subansiri (Gerukhamukh) - Biswanath Charali Transmission Line 400 D/C 176.0 352.0 28-Jul-11 2-Dec-08 2 Arunachal Pradesh AP-02 PGCIL 2nd Ckt. Of 400kV D/C Lower Subansiri - Biswanath Chariali Transmission Line 400 D/C 176.0 352.0 18-Jun-08 2-Dec-08 3 Arunachal Pradesh AP-03 PGCIL LILO of 400kV D/C existing Ranganadi - Balipara Line at Biswanath Chariali S/S 400 D/C 13.3 26.6 18-Jun-08 1-Oct-10 4 Arunachal Pradesh AP-04 PGCIL 400kV D/C Kameng (KIMI) - Balipara Transmission Line 400 D/C 55.4 110.8 23-Jul-08 21-Oct-08 5 Arunachal Pradesh AP-05 PGCIL Biswanath Chariali to Kailajuli (Thaigibari) Earth electrode Line (110kV) associated with 800kV HVDC Transmission Line 110 D/C 72.4 144.8 23-Jul-08 12-Nov-08 6 Arunachal Pradesh AP-06 PGCIL 400 kV D/C from Balipara-Biswanath Chariali Line 400 D/C 131.3 262.6 6-Oct-10 19-Oct-10 7 Arunachal Pradesh AP-08 PGCIL 110/132kV Earth Electrode line from Biswanath CHARIALI-NAGSANKAR- KAILAJULI (THAIGIBAR) associated with 800kV HVDC 110 D/C 126.0 252.0 12-Aug-11 8-Nov-11 6-Nov-11 1-Apr-13 8 Arunachal Pradesh AP-09 TCAPL 220KV DC S/S at PALAMANERU - Propsed 220 kv S/S MAANAPALLI 220 D/C 58.3 116.7 25-Jul-13 9 Assam ASM-01 PGCIL 800kV HVDC Biswanath Chariali- Tanga (Bongaigaon Section) Assam 800 D/C 320.0 640.0 14-Jan-08 26-Nov-07 10 Assam ASM-06 PGCIL 400kV D/C Silchar - Meliriat (Mizoram) 400 D/C 120.0 240.0 8-Jun-11 12-Jan-12 8-Oct-12 12-Jul-13 11 Assam ASM-11 PGCIL LILO of 400kV D/C Silchar - Bongaigaon Tx. Line of one ckt at Byrnihat Meghalaya 400 D/C 2.1 4.2 2-Apr-12 10-May-12 6-Aug-12 12 Assam ASM-14 JPCL 220 KV double CKT T/L from Switch Yard of Rangit-IV HEP, SIKKIM to 220 KV Sub Station of PGCIL at New Malli(Tokal) in South Sikkim 220 D/C 3.3 6.6 16-Nov-12 CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014 EASTERN REGION 1 of 5

Upload: doantu

Post on 21-Dec-2016

240 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Status of PTCC cases

S.No. State File No.

Name of

the Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal

in CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

1Arunachal

PradeshAP-01 PGCIL

1st Ckt. Of 400kV D/C Lower Subansiri

(Gerukhamukh) - Biswanath Charali

Transmission Line

400 D/C 176.0 352.0 28-Jul-11 2-Dec-08

2Arunachal

PradeshAP-02 PGCIL

2nd Ckt. Of 400kV D/C Lower Subansiri

- Biswanath Chariali Transmission Line400 D/C 176.0 352.0 18-Jun-08 2-Dec-08

3Arunachal

PradeshAP-03 PGCIL

LILO of 400kV D/C existing Ranganadi -

Balipara Line at Biswanath Chariali S/S400 D/C 13.3 26.6 18-Jun-08 1-Oct-10

4Arunachal

PradeshAP-04 PGCIL

400kV D/C Kameng (KIMI) - Balipara

Transmission Line400 D/C 55.4 110.8 23-Jul-08 21-Oct-08

5Arunachal

PradeshAP-05 PGCIL

Biswanath Chariali to Kailajuli

(Thaigibari) Earth electrode Line

(110kV) associated with 800kV HVDC

Transmission Line

110 D/C 72.4 144.8 23-Jul-08 12-Nov-08

6Arunachal

PradeshAP-06 PGCIL

400 kV D/C from Balipara-Biswanath

Chariali Line400 D/C 131.3 262.6 6-Oct-10 19-Oct-10

7Arunachal

PradeshAP-08 PGCIL

110/132kV Earth Electrode line from

Biswanath CHARIALI-NAGSANKAR-

KAILAJULI (THAIGIBAR) associated

with 800kV HVDC

110 D/C 126.0 252.0 12-Aug-11 8-Nov-11 6-Nov-11 1-Apr-13

8Arunachal

PradeshAP-09 TCAPL

220KV DC S/S at PALAMANERU -

Propsed 220 kv S/S MAANAPALLI220 D/C 58.3 116.7 25-Jul-13

9 Assam ASM-01 PGCIL800kV HVDC Biswanath Chariali-

Tanga (Bongaigaon Section) Assam800 D/C 320.0 640.0 14-Jan-08 26-Nov-07

10 Assam ASM-06 PGCIL 400kV D/C Silchar - Meliriat (Mizoram) 400 D/C 120.0 240.0 8-Jun-11 12-Jan-12 8-Oct-12 12-Jul-13

11 Assam ASM-11 PGCIL

LILO of 400kV D/C Silchar -

Bongaigaon Tx. Line of one ckt at

Byrnihat Meghalaya

400 D/C 2.1 4.2 2-Apr-12 10-May-12 6-Aug-12

12 Assam ASM-14 JPCL

220 KV double CKT T/L from Switch

Yard of Rangit-IV HEP, SIKKIM to 220

KV Sub Station of PGCIL at New

Malli(Tokal) in South Sikkim

220 D/C 3.3 6.6 16-Nov-12

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

EASTERN REGION 1 of 5

Page 2: Status of PTCC cases

S.No. State File No.

Name of

the Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal

in CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

13 Assam ASM-15 AEGCIL400kV DC LILO of 400kV pallatana-

bangaigaon transmission line at Azara400 D/C 3.2 6.5 14-Jan-13 28-Mar-13

14 Assam ASM-16 PGCIL 400kV DC SILCHAR-IMPHAL T/L 400 D/C 167.0 334.0 11-Jul-13 19-Aug-13 12-Sep-13 7-Mar-14

15 Bihar BHR-110 DVC220kV D/C MTPS(Mejia) to Gola S/S

With extention upto Ramgarh S/S 220 D/C 201.0 402.0 11-Apr-08 23-Jul-08 6-Nov-12 26-Jun-13

16 Bihar BHR-121 PGCIL800 kV HVDC Saharsa-Gopalganj

Transmission Line800 D/C 182.7 365.3 15-Dec-10 31-Oct-11 8-Jun-11 14-Apr-13

17 Bihar BHR-124 ENICL400kV D/C Quad Purnea - Biharshariff

Trans Line400 D/C 233.0 465.9 31-Oct-11 11-Mar-13 10-May-13 13-May-13

18 Bihar BHR-125 PGCIL400kV D/C Quad Kisanganj - Patna

Trans Line400 D/C 342.0 1368.0 31-Oct-11 31-May-13 23-Jan-12

19 Bihar BHR-127 PGCIL

800kV HVDC Islampur - Sahara Section

at Biswanathcharali - Agra 800kV

HVDC (Pkg - A4)

800 D/C 202.7 405.4 22-Dec-11

20 Bihar BHR-129 PGCIL 400KV Sasaram-Daltouganj T/L 400 D/C 195.8 391.6 16-Aug-12 14-Jan-13 1-Aug-13

21 Bihar BHR-130 PGCILLILO of Ist 400 KV D/C Kahalgaon -

Biharsharif T/L at Lakhisarai400 D/C 15.8 31.6 20-Dec-12 25-Mar-13 17-Jan-13 11-Apr-13

22 Bihar BHR-132 PGCIL400KV D/C Quard Chandwa to Gaya

T/L400 D/C 117.0 234.0 29-Apr-13 7-Apr-13

23 Bihar BHR-133 PGCIL 400 kV D/C Barh-Gorakhpur T/C 400 D/C 348.0 696.0 14-Jun-13 30-Sep-13

24 Bihar BHR-134 PGCIL800 kV HVDC GOPALGANJ-

GORAKHPUR T/L800 D/C 187.4 374.8 22-Nov-13 22-Nov-13 22-Nov-13

25 Bihar BHR-135 PGCIL400 KV D/C BIHARSHARIF -

SASARAM EXTN. T/L400 D/C 45.1 90.2 25-Mar-14

26 Jharkhand JHR-17 DVC 400kV D/C Raghunathpur TPS - Ranchi 400 D/C 150.6 301.2 16-Feb-10 9-Sep-10 10-May-11 18-Dec-13

27 Jharkhand JHR-21 DVC220 kV D/C Kalyaneshwari(DVC)-

Pithakari(PGCIL) Line220 D/C 7.6 15.2 27-Sep-10 12-Oct-10 8-Feb-11

28 Jharkhand JHR-23 DVCRamgarh DVC D/C to JSPL, Patratu

220kV D/C Tx. Line220 D/C 38.0 76.0 12-Jul-11 26-Mar-12 8-Aug-11

29 Jharkhand JHR-24 IVRCL 220kV D/C Lahardaga - Latehar 220 D/C 56.0 111.9 24-Oct-11

30 Jharkhand JHR-25 IVRCL 220kV D/C Latehar - Daltonganj 220 D/C 64.0 127.9 24-Oct-11

31 Jharkhand JHR-26 PGCIL

LILO OF 400 KV D/C Jamshedpur-

Rourkela T/L at Chaibasa, (W)

Singhbhum Jharkhand

400 D/C 27.0 54.0 19-Sep-12 19-Aug-13 10-Jan-13

EASTERN REGION 2 of 5

Page 3: Status of PTCC cases

S.No. State File No.

Name of

the Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal

in CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

32 Jharkhand JHR-27 PGCIL

400 KV D/C QUAD T/L from

765/400KV Rauelu (Bero) S/S to 400KV

Chandwa S/S

400 D/C 69.0 138.0 18-Sep-12 22-Jun-13 8-Oct-12 18-Mar-14

33 Jharkhand JHR-28 PGCIL765kV S/C T/C from Raneli (Dero) S/S

to 765/400 Dharam-Jaygarh S/S765 S/C 176.0 176.0 18-Sep-12 1-May-13 7-Jan-13

34 Jharkhand JHR-29 PGCIL400kV D/C quad from 400kV Chandwa

ss to 765/400kV Gaya ss400 D/C 117.0 234.0 1-Apr-13 7-Apr-13

35 Jharkhand JHR-31 PGCIL400kV D/C PTPS PATRATU TO

BORO (New Ranchi) T/L400 D/C 49.7 99.5 8-Aug-13 5-Feb-14

36 Jharkhand JHR-32 PGCIL400 KV D/C LATEHAR (JSEB) PTPS

T/L TO PATRATU400 D/C 110.2 220.3 24-Sep-13 3-Feb-14

37 Jharkhand JHR-33 PGCIL220KV D/C RAMCHANDRAPUR -

CHAIBASA T/L220 D/C 39.0 78.0 21-Mar-14

38 Orrisa ORS-169 GMR

Diversion of 220kV D/C Line of

Meramundali-Duburi (Loc. No. 11 to

Loc. No. 18) to provide adequate

clearance over the proposed Rly Line of

M/s GMR Kamalanga Energy Ltd Orissa

220 D/C 2.0 4.0 15-Mar-11 23-Jan-12

39 Orrisa ORS-172 ESSAR

220kV D/C Line from 220/132/33 kV

Paradeep S/S to M/S Essar Steel Ltd at

Paradeep

220 D/C 8.7 17.4 14-Jul-11 2-Mar-12 9-Aug-12 20-Mar-14

40 Orrisa ORS-173 GMR

LILO at 400kV D/C Talehar -

Meramandoli PGCIL Line at GMR

Kamalanga Energy Ltd, Dhenkanal,

Odisha

400 D/C 0.8 1.7 16-Aug-11 31-Oct-11 2-Nov-11

41 Orrisa ORS-174Sterlite

Energy Ltd

400kV D/C Line from 400kV S/S M/S

Sterlite Enrgy Ltd to Lapanga OPTCL

S/S

400 D/C 14.3 28.6 23-Aug-11 6-Aug-12 26-Dec-12 18-Apr-13

42 Orrisa ORS-175 OPTCL 400kV Ib - Meramundali 400 D/C 235.0 470.0 19-Oct-11 6-Nov-12 20-Feb-14

43 Orrisa ORS-177 OPTCLLILO of 220kV D/C Budhipadar -

Tarkera power line at Kuanrmunda S/S220 D/C 14.9 29.8 25-Oct-11 26-Dec-13 10-Jan-12

44 Orrisa ORS-181 PGCIL400kV D/C Talcher II - Rourkela Tx.

Line400 D/C 157.2 314.5 30-Apr-12 24-Jul-12

45 Orrisa ORS-182 PGCIL400kV D/C Talcher II - Berhampur Tx.

Line400 D/C 217.0 434.0 30-Apr-12

EASTERN REGION 3 of 5

Page 4: Status of PTCC cases

S.No. State File No.

Name of

the Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal

in CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

46 Orrisa ORS-183 PGCIL400kV D/C Berhampur - Gajuwaka Tx.

Line400 D/C 293.7 587.4 30-Apr-12

47 Orrisa ORS-189 PGCIL

765 kv D/C Jharsuguda Pooling Station

Dharamjaygarh T/L (Odisha Portion

only) Part-B

765 D/C 44.1 88.2 6-Sep-12 6-Nov-12 1-Mar-14 4-Mar-14

48 Orrisa ORS-191 IBPIL

LILO at 400kV DC Raigarh-Rourkela

T/l at cktI at Sahojbal 2X300 Mw TPS

Jharsaguwada odissa

400 D/C 23.5 47.0 10-Jan-13 7-May-13 1-Jul-13 2-Jul-13

49 Orrisa ORS-192 PGCIL765kV S/C ANGUL P/S -

JHARSUGUDA P/S T/Line-I765 S/C 270.0 270.0 6-Feb-13 17-Jun-13

50 Orrisa ORS-193 PGCIL

765kV s/c Angul pooling station-

Jharsuguda pooling station transmission

lineII

765 S/C 270.0 270.0 6-Feb-13 17-Jun-13

51 Orrisa ORS-194 OPTCL220KV D/C transline from Lakshmipur

Grid S/S to Kansariguda220 D/C 14.9 29.8 15-May-13 19-Aug-13 30-Sep-13 13-Feb-14

52 Orrisa ORS-195 OPTCL

220 kV S/C T/C on DC tower from

220/132/33 kV grid substation at

Paradeep to M/C IOCL at Paradap

220 S/C 6.3 6.3 17-Jun-13

53 Orrisa ORS-196 OPTCL765 D/C ARGUL PS TO

SRIKAKULAM PS TL PART-I765 D/C 275.6 551.2 16-Jul-13

54 Orrisa ORS-197 OPTCL

220KV D/C T/L FROM LAXMIPUR

S/S TO Proposed S/S of M/s Utkal

alumina International Ltd.

220 D/C 31.6 63.2 25-Jul-13 25-Nov-13

55 Orrisa ORS-198 PGCIL

LILO of 400KV D/C AT

MORAMUNDLI-TALCHER CKT-II

T/L AT ANGUL POOLING STN.

400 D/C 17.4 34.8 9-Sep-13 14-Jul-13 9-Sep-13 27-Sep-13

56 Orrisa ORS-199 OPTCL

220 KV DC Line from Proposed

400/220kV GRID S/S BANAPANJARI

(KHURDA) of PGCIL to proposed

220/132kv GRID S/S

220 D/C 45.9 91.8 28-Oct-13

57 West Bengal WB-95 NHPC220kV S/C from Teesta Low Dam III to

Binaguri (NJP) West Bengal220 S/C 80.8 80.8 17-Dec-09

58 West Bengal WB-96 NHPC220kV D/C from Teesta Low Dam IV to

Binaguri (NJP) West Bengal220 D/C 93.7 187.4 17-Dec-09

EASTERN REGION 4 of 5

Page 5: Status of PTCC cases

S.No. State File No.

Name of

the Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal

in CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

59 West Bengal WB-101 PGCIL800kV Barobisa - Moynaguri Islampur

(Bongaigaon - Islampur) line800 D/C 212.1 424.1 17-Oct-11 12-Jul-12

60 West Bengal WB-104 CESC

220kV O/H PGCL Subhasgram S/S to

Eastern Metropolitan S/S at Kasba

(CESC)

220 D/C 23.5 47.0 17-Jan-13 22-May-12 24-May-12

61 West Bengal WB-105 TEESTA400kV D/C Teesta-III HEP to

Karandighi S/S T/L400 D/C 228.0 456.0 15-Oct-12

62 West Bengal WB-106 DVC

220kV D/C 30, MTPS-GOLA-

RAMGARH T/L CLIENT-DVC

KOLKATTA

220 D/C 207.5 415.0 19-Oct-12 9-Apr-13

63 West Bengal WB-107 PGCILLILO of Ckt-1 of 400 kV Teesta V -

New Siliguri D/C line at Rangpo GIS S/S400 D/C 3.4 6.8 7-Mar-13

64 West Bengal WB-108 PGCIL 220 kV New Melli-Rangpo D/C line 220 D/C 26.1 52.3 7-Mar-13

65 West Bengal WB-109 PGCILLILO of Ckt-1 of 400 kV Teesta V -

New Siliguri D/C line at Rangpo GIS.400 D/C 26.1 52.3 7-Mar-13

66 West Bengal WB-110 PTCOC220 kV DOMJUR tapping point to

Foundary Park S/S of WBSEICL220 S/C 10-May-13 10-May-13

67 West Bengal WB-111 PGCIL

400KV D/C QUAD LATEHAR

(ESSAR) S/S TO 400KV

LATEHAR(JSEB) S/S

400 D/C 40.4 80.9 27-Jan-14

Note:Discrepancy if any, may please be communicated to Director(PTCC)

EASTERN REGION 5 of 5

Page 6: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

1 Delhi DL-7 BSES220kV S/C PPK II - Matiyala Grid

66kV220 S/C 5 5.00 8-Mar-09

2 Delhi DL-9Delhi

Transco Ltd

220 kV D/C XLPE U/G Cable between

Peragarhi-Wazirpur220 D/C 8.6 17.20 8-Nov-10 10-Nov-10 10-Nov-10

3 Delhi DL-8 &10Delhi

Transco Ltd

220 kV D/C XLPE Cable from

Shalimarbagh - Wazirpur Indl. Area220 D/C 4.5 9.00 28-Mar-11 17-Dec-13 19-Jan-14 21-Jan-14 10-Feb-14

4 DELHI DEL-11 DTRANSCO

220kV XLPE U/G Power Cable lying

between 400/220kV MUNDKA S/S &

220 Kv PEERAGARHI GIS S/S at New

Delhi

220 D/C 13 26.00 26-Nov-13 10-Feb-14 10-Mar-14

5 Haryana HRA-174 HVPNL220kV D/C LILO for Durala from

Shahbad-Pehowa220 D/C 6 12.00 1-Oct-08 2-Feb-09

6 Haryana HRA-184 HVPNL220kV D/C Line from Sampla S/S to

Mohana S/S220 D/C 34.7 69.40 11-May-10 11-May-10 8-Mar-10

7 Haryana HRA-194 PGCILLILO of 400kV D/C Patiala - Hissar

Line at Kaithal400 D/C 32.76 65.52 10-May-11

8 Haryana HRA-198 PGCIL 400kV D/C Bhiwani - Jind power line 400 D/C 82.798 165.60 22-Sep-11 23-Sep-11 31-Oct-11 25-May-12 26-May-12

9 Haryana HRA-199 PGCIL400kV Quad D/C Jharli - Kabulpur -

Dipalpur trans. Line400 D/C 102.5 205.00 9-Jan-12 5-Jan-12 9-Jan-12 18-Jan-12 2-Feb-12

10 Haryana HRA-200 PGCILLILO of 400kV D/C Abdullapur -

Bawana line at Dipalpur400 D/C 0.706 1.41 24-Jan-12 27-Jan-12 27-Jan-12 27-Jan-12 10-Feb-12

11 Haryana HRA-201 Adani Power400kV D/C Quad Mohindargarh -

Dhanonda (Haryana)400 D/C 4.47 8.94 20-Jan-12 7-Mar-12 24-Feb-12 14-Mar-12 19-Mar-12

12 Haryana HRA-202 PGCIL

LILO of both circuits of 400kV D/C

Mundka (DTL) - Bamnauli (DTL) line

at Jattikalan S/S (PGCIL)

400 D/C 12.2 12.20 6-Feb-12 24-Aug-12 23-Aug-12 24-Aug-12 27-Aug-12

13 Haryana HRA-203 PGCILMEERUT - MOGA T/L 765 KV S/C

QUAD 765 S/C 179 179.00 18-Nov-13 3-Dec-13

14 Haryana HRA-204 PGCIL400kV D/C KURUKSHETRA-

JALANDHAR LINE400 D/C 113.58 227.16 11-Dec-13

15 Haryana HRA-205 PGCIL

i) 400 KV D/C KURUKSHETRA -

JALANDHAR T/L ii) LILO OF 400KV

ABDULLAPUR-SONEPAT AT

KURUKSHETRA

400 D/C 129.73 259.45 10-Dec-13

16Himachal

PradeshHP-51 PGCIL

220kV S/C Line from Karian to PGCIL

s/s Rajera220 S/C 32 32.00 6-Jan-11 6-Jan-11 6-Jan-11 10-Sep-13

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

NORTHERN REGION 1 of 14

Page 7: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

17Himachal

PradeshHP-52 HPPTCL

220kV D/C Line from 220/33 kV GIS

S/S Lahal to Budhil Power House HEP

at Kharamukh, Chamba

220 D/C 2.0666 4.13 22-Jun-11 22-Jun-11 22-Jun-11 8-Aug-13

18Himachal

PradeshHP-53

SORANG

POWER

400kV LILO to Karehham Wangtoo -

Abdullapur line from 100MW Sorang

Hydroproject

400 D/C 3.2 6.40 19-Jul-11 9-Sep-11 5-Dec-11 15-Jun-12 3-Jul-12

19Himachal

PradeshHP-54 HPPTCL

220kV S/C line from 220kV Budhil GIS

S/S to Chamera-III GIS S/S220 S/C 20 20.00 24-Feb-12 27-Feb-12 27-Feb-12 27-Feb-12 27-Feb-12

20Himachal

PradeshHP-55 HPPTCL

220kV D/C T/L from Hatkoti (Shale) to

220/400 KV Gumma Pooling S/S220 D/C 39.17 78.34 24-Aug-12 24-Aug-12 24-Aug-12 26-Aug-13

21Himachal

PradeshHP-56 HPPTCL

LILO OF 400 KV D/C Jhakri -

Abdulapur (PGCIL) Line at Gumma

220/400 KV pooling S/S

400 D/C 3.198 6.40 24-Aug-12 24-Aug-12 24-Aug-12 26-Aug-13

22Himachal

PradeshHP-57 HPPTCL

220kV D/C T/L from Kunihar to Rouri

line220 D/C 25.8 51.60 28-Jan-13 30-Jan-13 30-Jan-13 20-May-13

23Himachal

PradeshHP-58 PGCIL

LILO OF 400KV D/C NATHPA -

JHAKRI -MALAGARH T/L AT

RAMPUR

400 D/C 3.556 7.11 30-Jan-13 16-Feb-14 17-Feb-14 17-Feb-14

24Himachal

PradeshHP-59 PGCIL

LILO OF 220 KV JALANDHAR -

HAMEERPUR T/L AT HAMEERPUR220 D/C 16.75 33.50 28-Jun-13 2-Jul-13 7-Aug-13

25Himachal

PradeshHP-60 HPPTCL

220 KV D/C T/L FROM 66/132/220

KV POWER STATION SUNDA TO

220 KV SUBSTATION HATKOTI

220 D/C 22.593 45.19 18-Jul-13 29-Jul-13 29-Jul-13 8-Aug-13

26Jammu &

KashmirJ&K-40 PGCIL

220 kV d/c chamera-III PGCIL rajesh-

chameraIII 400 D/C 30 60.00 24-Aug-09

27Jammu &

kashmirJ&K-42 PGCIL 400 KV D/C Kishanpur to Samba T/L 400 D/C 34.8 69.60 26-Feb-13 16-Mar-13 16-Mar-13 18-Mar-13 19-Mar-13

28Jammu &

kashmirJ&K-43 PGCIL

400KV D/C KISHENPUR-NEW

WANPOH T/L AND LILO of 400KV

D/C KISHENPUR-WAGOORA T/L

400 D/C 134 268.00 6-Mar-14 6-Mar-14 6-Mar-14 11-Mar-14 25-Mar-14

29 Punjab PNB-273 PGCIL765 kV S/C Jattikalan-Moga via

Bhiwani Transmission Line765 S/C 177.09 177.09 24-Nov-10 16-Sep-11 19-Sep-11 30-Mar-12 30-Mar-12

30 Punjab PNB-275 PSTCL

LILO of 220kV D/C Malerkotla -

Gobindgarh Power line at 220kV kolaha

S/S

220 D/C 6.65 13.30 14-Jul-11 28-Nov-11

NORTHERN REGION 2 of 14

Page 8: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

31 Punjab PNB-276 PSTCL220kV D/C Line from Bahadurgarh to

Devigarh220 D/C 28.059 56.12 20-Jul-11 28-Nov-11

32 Punjab PNB-277 PSTCL400kV D/C Talwandi Saboo TPS -

Mukatsar400 D/C 100.3 200.60 28-Jul-11 12-Feb-14 12-Feb-14

33 Punjab PNB-278 PSTCL400kV D/C Talwandi Sabo TPS - Dhuri

S/S400 D/C 87.789 175.58 28-Jul-11 2-Jul-12 12-Feb-14 13-Feb-14

34 Punjab PNB-279 PSTCL400kV D/C Talwandi Sabo TPS -

Nakodar & One Ckt. LILO at Moga400 D/C 166.02 332.04 16-Aug-11 25-Jul-12 29-Nov-12 22-Jan-14

35 Punjab PNB-280 PSTCL220kV D/C line on DC towers from

Bottianwala- Mastewala220 D/C 11.798 23.60 16-Aug-11 16-Sep-11 16-Sep-11

36 Punjab PNB-281 PSTCL220kV D/C Bathinda - Malout line

LILO for Badal220 D/C 25.15 50.30 16-Aug-11 10-Feb-12

37 Punjab PNB-282 PSTCL400kV D/C Mukatsar - Makhu

transmission line400 D/C 95.52 191.04 24-Oct-11 10-Feb-12 13-Dec-11 13-Sep-13

38 Punjab PNB-283 PSTCL400kV D/C Makhu - Amritsar

transmission line400 D/C 64.55 129.10 31-Oct-11 18-Jun-13 20-Nov-12 13-Feb-14

39 Punjab PNB-284 PSTCL400kV D/C Nakodar - Makhu

transmission line400 D/C 52.49 104.98 14-Mar-12 2-Jul-12 11-Apr-12 29-Oct-12 3-Nov-12

40 Punjab PNB-285 PSTCL400kV D/C Rajpura - Dhuri

Transmission Line400 D/C 85.169 170.34 14-May-12 5-Mar-13 24-Jul-12 12-Apr-13

41 Punjab PNB-286 PSTCL 400kV D/C Rajpura TPS - Rajpura S/S 400 D/C 8.839 17.68 6-Jun-12 9-Oct-12 24-Jul-12 13-Mar-13

42 Punjab PNB-287 PGCILLILO OF 400 KV D/C BANOLA-

AMRITSAR line at Hamirpur400 D/C 3.36 6.72 13-Jul-12 11-Sep-12 30-Aug-12 19-Mar-14

43 Punjab PNB-288 PSTCL220 KV D/C Line from MUKTASAR -

KOTAKPURA (SANDHVAN) LINE-I220 D/C 38.18 76.36 25-Oct-12 30-Jan-13

44 Punjab PNB-289 PSTCL

220 KV D/C Line from MUKTASAR -

BAJAKHANA LILO for

KALKAPURA

220 D/C 1.52 3.04 25-Oct-12 30-Jan-13

45 Punjab PNB-290 PSTCL220KV D/C GHTP Lehra MOHABBAT

- MANSA LILO for Talwandi Sabo T/L220 D/C 29.85 59.70 3-Dec-12

46 Punjab PNB-291 PSTCL

220 KV D/C GHTP Lehra

MOHABBAT - MANSA LILO for

Dhanaula T/L

220 D/C 38.76 77.52 3-Dec-12

47 Punjab PNB-292 PSTCL

220 KV D/C T/L from 400 KV S/Stn .

MUKATSAR - 220 KV S/Stn.

GHUBAYA

220 D/C 37.913 75.83 3-Dec-12 19-Feb-13 19-Feb-13 22-Jan-14

NORTHERN REGION 3 of 14

Page 9: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

48 Punjab PNB-293 PSTCL220 KV GOINDWAL SAHIB -

CHOHLA SAHIB D/C Line220 D/C 27.623 55.25 11-Dec-12 21-Aug-13

49 Punjab PNB-294 PSTCL220 KV GOINDWAL SAHIB -

SULTANPUR D/C Line220 D/C 18.995 37.99 11-Dec-12 21-Mar-13 25-Mar-14 28-Mar-14

50 Punjab PNB-295 PSTCL

LILO of one ckt of 220kV Rajila to

patran at kakrala D/C on D/C ckt tower

line

220 D/C 3.275 6.55 16-Feb-13

51 Punjab PNB-296 PSTCL220kV Dhuri to Bhalvan loop out D/C

on D/C tower 220 D/C 13.5 27.00 11-Feb-13

52 Punjab PNB-297 PSTCL220kV Dhuri to Bhalwan loop out D/C

on D/C tower 220 D/C 13.522 27.04 11-Feb-13 2-Jul-13

53 Punjab PNB-298 PSTCL 220kV Dhuri to Bhalwan loop line 220 D/C 13.7 27.40 13-Feb-13 2-Jul-13 22-Apr-13 22-Jan-14

54 Punjab PNB-299 PSTCL220kV Dhuri to Bhalwan D/C line on

D/C tower220 D/C 13.7 27.40 25-Feb-13

55 Punjab PNB-300 PSTCL220kV line from 400kV sub station

Dhuri(Bhalwan) - Banyan line220 D/C 50.343 100.69 14-Mar-13 2-Jul-13 25-Nov-13

56 Punjab PNB-301 PSTCL220kV D/C Goindwal Saheb to

Bottiyawalla trans line220 D/C 64.245 128.49 25-Mar-13 18-Jun-13 25-Mar-14 28-Mar-14

57 Punjab PNB-302 PSTCL 400kV Rajpura to Dhuri D/C trans line 400 D/C 187.9 375.81 4-Mar-13

58 Punjab PNB-303 PSTCL 220kV Goindwal Saheb to Chola Saheb 220 D/C 27.623 55.25 9-Apr-13 25-Mar-14 25-Mar-14 29-Mar-14

59 Punjab PNB-304 PSTCL220KV D/C Ferozpur-Talwandi LILO at

Sadiq220 D/C 38.764 77.53 22-Apr-13 28-Jan-14 29-May-13

60 Punjab PNB-305 PSTCL 220KV D/C Rajpura labur line 220 D/C 29.36 58.72 26-Apr-13 18-Jun-13 18-Jun-13

61 Punjab PNB-306 PSTCL220KV D/C T/L from 400KV S/S

Mukatsar to 220KV S/S Abohar 220 D/C 42.531 85.06 26-Apr-13 18-Jun-13 21-Oct-13 22-Jan-14 24-Jan-14

62 Punjab PNB-307 PSTCL400KV D/C line from 400KV S/S

Rajpura to Nakodar 400 D/C 139.53 279.06 7-May-13 29-Jul-13 11-Jul-13 7-Nov-13 21-Nov-13

63 Punjab PNB-308 PSTCL220KV D/C line from 400KV S/S from

Rajpura to Devigarh220 D/C 36.944 73.89 15-May-13

NORTHERN REGION 4 of 14

Page 10: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

64 Punjab PNB-309 PSTCL

220KV S/C from D/C tower from

400KV S/S LUDHIANA to DORAHA

T/L

220 S/C 27.063 27.06 9-May-13 28-Jan-14

65 Punjab PNB-310 PSTCL

220KV D/C Line on D/C tower from

220KV S/S Bagha, Purana to Baza

Khana

220 D/C 34.47 68.94 8-Jul-13 7-Aug-13

66 Punjab PNB-311 PSTCLMAKHU-RASHINA D/C/ LINE

220KV 220 D/C 45.917 91.83 16-Sep-13 26-Nov-13

67 Punjab PNB-312 PSTCL NAKODAR-NURMEHAL LINE 220 D/C 15.18 30.36 21-Nov-13 28-Jan-14

68 Punjab PNB-313 PSTCL NAKODAR-KARTARPUR LINE 220 D/C 26.84 53.68 6-Feb-14

69 Punjab PNB-314 PSTCL

LILO OF Ist CKT of 220kV PATIALA

TO PATRAN D/C LINE AT 220KV

PASIANA S/S

220 D/C 1.24 2.48 25-Mar-14

70 Punjab PNB-315 PSTCL

LILO OF II CKT of 220kV PATIALA

TO PATRAN D/C LINE AT 220KV

RAJALA S/S

221 D/C 6.073 12.15 25-Mar-14

71 Punjab PNB-316 PSTCLLILO OFBHALWAN-BANGAN AT

CHHAJLI 220 KV S/S (LOOP-100)222 D/C 14.525 29.05 25-Mar-14

72 Rajasthan RAJ-375 RVPNL220kV D/C LILO to Mahindra SEZ

from Bassi-Heerapura220 D/C 24 48.00 23-May-08 13-Aug-08 17-Jun-08

73 Rajasthan RAJ-381 BSNL telephone line anta-singhpur 220 S/C 12 12.00 1-Sep-08

74 Rajasthan RAJ-382 BSNLtelephone line gangapur -

KHANKHALA220 S/C 6 6.00 1-Sep-08

75 Rajasthan RAJ-386 BSNL AOFC route mohanamandi- jaipur 220 S/C 3.5 3.50 5-Aug-08 5-Aug-08

76 Rajasthan RAJ-387

VEDANTA

HINDUSTA

N ZINC

LTD.

220kV s/c chittorgarh-CPP VPZL

station220 S/C 10 10.00 1-Oct-08

77 Rajasthan RAJ-410 RVPNL 400kV D/C&S/C STPS-Bikaner 400 D/C 4 8.00 16-Jun-09 1-Sep-09 1-Sep-09

78 Rajasthan RAJ-420 RVPNL220kV D/C (LILO) Ajmer - Beawer

Line220 D/C 18 36.00 26-Mar-10 5-May-11 17-Jun-10

79 Rajasthan RAJ-421 RVPNL220kV D/C (LILO) Ajmer - Kishangarh

Line220 D/C 6 12.00 26-Mar-10 5-May-11 17-Jun-10

NORTHERN REGION 5 of 14

Page 11: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

80 Rajasthan RAJ-433 RVPNL220kV D/C Mandawar(Dausa)-

MIA(Alwar)Line220 D/C 56 112.00 22-Jul-10 9-Dec-10 23-Sep-10 6-Feb-12 12-Feb-13

81 Rajasthan RAJ-435 RVPNL

220kV D/C line to connect LILO of

220kV S/C Heerapura-Khetri(II Ckt) to

LILO of one ckt of 220kV D/C Kotputli-

Neemrana Line

220 D/C 50 100.00 28-Jul-10 21-Dec-10 21-Dec-10 5-Sep-13

82 Rajasthan RAJ-436 RVPNL220 kV S/C Jhunjhunu-Nawalgarh

Power Line220 S/C 30.5 30.50 3-Nov-10 28-Nov-11 24-Nov-10

83 Rajasthan RAJ-437 RVPNL220 kV D/C LILO to Sawa from

Chittorgarh-Nimbahera Line220 D/C 2 4.00 23-Dec-10 25-Jul-12 18-Jun-12 21-Aug-12 28-Aug-12

84 Rajasthan RAJ-441 RVPNL 220kV D/C Dhechu to Phulod 220 D/C 32 64.00 11-Mar-11 26-Jul-11 15-Apr-11 28-Feb-12 29-Feb-12

85 Rajasthan RAJ-442 RVPNL 400kV D/C Phagi - Heerapura 400 D/C 48 96.00 31-Mar-11 13-Dec-11 12-May-11 11-Sep-13

86 Rajasthan RAJ-443 RVPNL 400kV D/C Phagi - Ajmer 400 D/C 105 210.00 1-Apr-11 2-Apr-12 12-May-11 13-Sep-13

87 Rajasthan RAJ-446 RVPNL 220kV D/C Hindaun - Gangapur 220 D/C 50.2 100.40 5-May-11 2-Mar-12 2-Mar-12 29-Aug-13

88 Rajasthan RAJ-447 RVPNL220kV D/C Bikaner (400kV GSS) S/S -

Gajner220 D/C 59.2 118.40 24-May-11 26-Jul-11 20-Jun-11 14-Mar-13 19-Mar-13

89 Rajasthan RAJ-448 PGCIL 400kV D/C Nimrana to Sikar transline 400 D/C 176 352.00 30-May-11 19-Oct-11 30-May-11 3-Jan-12 28-Dec-11

90 Rajasthan RAJ-450 RVPNL

220kV D/C LILO at 200kV D/C KTPS

(Kota) – Beawer line (Ckt. I) to

proposed 220kV GSS Bundi

220 D/C 6 12.00 7-Jul-11 10-Feb-12 10-Feb-12 12-Nov-12 23-Nov-12

91 Rajasthan RAJ-451 RVPNL 220kV S/C Suratgarh - Padampur 220 S/C 55 55.00 18-Jul-11 28-Nov-11 29-Aug-11 14-Mar-13 19-Mar-13

92 Rajasthan RAJ-453 RVPNL 220kV S/C Dechu - Tinwari Line 220 S/C 70.84 70.84 3-Oct-11 28-Nov-11 31-Oct-11 13-Apr-12 16-Apr-12

93 Rajasthan RAJ-454 RVPNLLILO of 220kV Dausa - Hindaun Line at

Sikrai220 D/C 9 18.00 5-Oct-11 27-Aug-12 27-Oct-11 21-Jan-13

94 Rajasthan RAJ-456 RVPNLLILO of 220kV Sirohi - Kankroli line at

Bali220 D/C 2.424 4.85 5-Oct-11 10-Feb-12 12-Dec-11 11-Apr-12 16-Apr-12

95 Rajasthan RAJ-457 RVPNL220kV S/C Bhilwara - M/S Jindal Saw

Ltd. Bhilwara220 S/C 3 9.00 4-Oct-11 13-Dec-11 14-Nov-11

96 Rajasthan RAJ-458 RVPNLLILO of 220kV Metra - Nagaur line at

Kuchera220 D/C 9 18.00 4-Oct-11 23-Mar-12 31-Oct-11

97 Rajasthan RAJ-459 RVPNL220kV S/C Hanumangarh - Udyogvihar

Trans. Line220 S/C 46.25 46.25 4-Oct-11 28-Nov-11 31-Oct-11 13-Mar-13 19-Mar-13

NORTHERN REGION 6 of 14

Page 12: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

98 Rajasthan RAJ-460 RVPNL220kV S/C Padampur - Udyogvihar

Trans. Line220 S/C 37.55 37.55 4-Oct-11 10-Feb-12 27-Oct-11 24-Feb-12 29-Feb-12

99 Rajasthan RAJ-461 RVPNL765kV 2XS/C Anta (Baran) - Phagi

Line Ckt - I765 S/C 210 210.00 17-Oct-11 31-Dec-12 17-Oct-11 21-Aug-13 30-Aug-13

100 Rajasthan RAJ-462 RVPNL765kV 2XS/C Anta (Baran) - Phagi

Line Ckt - II765 S/C 215 215.00 17-Oct-11 20-Aug-13 21-Oct-11 23-Aug-13 30-Aug-13

101 Rajasthan RAJ-463 BSNLArmoured OFC Nadasar - Rajlani

Telecom line220 S/C 8 8.00 19-Oct-11 1-Jul-12 1-Jul-12 23-Jul-12

102 Rajasthan RAJ-464 BSNLArmoured OFC Badanwari - Godan

Telecom line220 S/C 5 5.00 19-Oct-11 1-Jul-12 1-Jul-12 23-Jul-12

103 Rajasthan RAJ-465 BSNLArmoured OFC Jajod - Srimadhopur

Telecom line220 S/C 9 9.00 19-Oct-11 1-Jul-12 1-Jul-12 23-Jul-12

104 Rajasthan RAJ-466 RVPNLLILO of 220kV Bhilwara - Chittorgarh

line at Hamirgarh S/S220 D/C 8 16.00 28-Nov-11 30-Apr-12 14-Dec-11

105 Rajasthan RAJ-467 RVPNL 220kV S/C Sikar - Nawalgarh Tx. Line 220 S/C 24 24.00 28-Nov-11 30-Apr-12 17-Jan-12

106 Rajasthan RAJ-468 RVPNLLILO of 220kV Bharatpur - Mandawar

line at Nadbai S/S220 D/C 5 10.00 28-Nov-11 2-Jul-12 2-Jul-12 26-Nov-12 26-Nov-12

107 Rajasthan RAJ-469 RVPNL

220kV S/C XLPE Cable between

Heerapura (400kV GIS) S/S to NPH

Jaipur (proposed 220kV GIS S/S)

220 S/C 11.45 11.45 5-Dec-11 2-Apr-12 24-Feb-12 29-Aug-13

108 Rajasthan RAJ-470 PGCIL

LILO of 220kV D/C line from Sikar -

Ratangarh (RVPNL) at Sikar (400kV)

S/S

220 D/C 3 6.00 21-Dec-11 22-Nov-11 26-Nov-11 18-Jan-12 10-Feb-12

109 Rajasthan RAJ-471 RVPNL220kV D/C Kotputli - Manoharpur

power line220 S/C 30 30.00 27-Jan-12 18-Oct-12 6-Feb-12 8-Feb-13 15-Feb-13

110 Rajasthan RAJ-472 RVPNL

220kV LILO to 400kV GSS Neemrana

PGCIL S/S from 1 ckt at Neemrana -

Khushkera power line

220 D/C 4 8.00 10-Feb-12 18-Oct-12 21-Feb-12 8-Nov-12 23-Nov-12

111 Rajasthan RAJ-473 RVPNL220kV LILO to Amberi S/S from Debari-

Kankroli line220 D/C 16 32.00 10-Feb-12 25-Jul-12 24-Feb-12

112 Rajasthan RAJ-474 RVPNL220kV LILO to Bamantukda S/S from

Kankroli-Bali power line220 D/C 4 8.00 10-Feb-12 25-Jul-12 21-Feb-12 5-Sep-13

113 Rajasthan RAJ-475 RVPNL 220kV S/C Renwal - Danta power line 220 S/C 30 30.00 21-Feb-12 18-Oct-12 25-Apr-12

114 Rajasthan RAJ-476 RVPNL 220kV S/C Dhod-Danta power line 220 S/C 30 30.00 21-Feb-12 18-Oct-12 2-Mar-12 8-Feb-13 15-Feb-13

115 Rajasthan RAJ-477 RVPNL 400kV D/C Chhabra - Anta power line 400 D/C 89.788 179.58 21-Feb-12 18-Oct-12 12-Sep-12 6-Sep-13

NORTHERN REGION 7 of 14

Page 13: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

116 Rajasthan RAJ-478 RVPNL 400kV D/C Kawad - Anta power line 400 D/C 50.3 100.60 21-Feb-12 18-Oct-12 12-Sep-12 21-Jun-13

117 Rajasthan RAJ-479 RVPNL 400kV D/C Kalisindhi - Anta power line 400 D/C 82.443 164.89 21-Feb-12 18-Oct-12 12-Sep-12 7-Jun-13

118 Rajasthan RAJ-480 RVPNL 220kV S/C Sirohi - Pindwara line 220 S/C 25 25.00 14-Mar-12 18-Oct-12 25-Apr-12

119 Rajasthan RAJ-481 RVPNLLILO of 220kV D/C Bhilwara - Bali line

at Bamantukda S/S220 D/C 9.5 19.00 12-Mar-12 25-Jul-12 21-Mar-12 5-Sep-13

120 Rajasthan RAJ-482 DSPPL 220kV D/C Doorsar Dechu S/S 220 D/C 31.02 62.04 21-Mar-12 30-Mar-12 30-Mar-12 30-Mar-12 30-Mar-12

121 Rajasthan RAJ-483 DSPPL 220kv D/.C Dangri to Akal T/L 220 D/C 47 94.00 10-May-12 14-May-12 14-May-12 14-May-12 14-May-12

122 Rajasthan RAJ-484 RVPNL220kV D/C Sanganer - Sitapura Jaipur

GIS S/S220 D/C 11.5 23.00 21-May-12 18-Oct-12 18-Oct-12 11-Sep-13

123 Rajasthan RAJ-485 RVPNL220kV LILO to Jethana S/S from Ras-

Merta Tx. Line220 D/C 21 42.00 21-May-12 28-Dec-12

124 Rajasthan RAJ-486 RVPNL220kV D/C LILO to Babai from Khetri -

Jaipur line220 D/C 2.5 5.00 22-May-12 24-Aug-12 24-Aug-12 19-Mar-14

125 Rajasthan RAJ-487 RVPNL 220kV S/C Sujangarh - Tahendesar Line 220 S/C 54.9 54.90 22-May-12 30-Jan-13 30-Jan-13

126 Rajasthan RAJ-488 RVPNL 400kV D/C Bhilwara - Chittorgarh Line 400 D/C 48 96.00 22-May-12 30-Jan-13 16-Jul-12

127 Rajasthan RAJ-489 RVPNL220kV LILO to Lalsot from Dausa -

Anta Line220 D/C 10 20.00 31-May-12 28-Dec-12 18-Jun-12 10-Sep-13

128 Rajasthan RAJ-490 RVPNL220kV LILO to Badhu from Fatangarh -

Bikaner power line220 D/C 21.106 42.21 31-May-12 24-Aug-12 24-Aug-12

129 Rajasthan RAJ-491 RVPNLLILO 220KV Khetri to Renges at Babai

power line220 D/C 1.1 2.20 14-Jun-12 24-Aug-12 16-Jul-12 12-Oct-12 16-Oct-12

130 Rajasthan RAJ-492 RVPNL220 kv D/C Jethana - Ajmer (400 KV

GSS) power line220 D/C 7 14.00 14-Jun-12 16-Jul-12

131 Rajasthan RAJ-493 RVPNL 220kV D/C Jodhpur - Bhopalgarh line 220 D/C 84.12 168.24 21-Jun-12 31-Dec-12 16-Jul-12 21-Jan-13

132 Rajasthan RAJ-494 RVPNL

400 KV S/C line from Tower No. 69 of

400 KV Chhabra-Hindaun Line to

Kawai SCTPS

400 S/C 16.34 16.34 2-Jul-12 18-Oct-12 12-Sep-12 23-Nov-12 27-Nov-12

133 Rajasthan RAJ-495 PGCIL

765 KV S/C line Gwalior-Jaipur ckt-I

(part-II) T/L from Piloud c.point to

Jaipur

765 S/C 130 130.00 13-Jun-12 13-Jun-12 31-May-13 19-Mar-14

NORTHERN REGION 8 of 14

Page 14: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

134 Rajasthan RAJ-496 GMR 400 KV S/C Ajmer - Didwana T/L. 400 S/C 108.84 108.84 10-Jul-12 7-Nov-12 3-Aug-12 4-Jan-13 7-Jan-13

135 Rajasthan RAJ-497 RVPNLUpgradation of existing 132 KV S/C

Sanganer - Chaksu line to 220 KV D/C220 D/C 42 84.00 24-Jul-12 30-Jan-13 30-Jul-12 29-Jan-14 4-Feb-14

136 Rajasthan RAJ-498 RVPNL 220 KV D/C Ramgarh-Deehu Line 220 D/C 196.29 392.58 3-Aug-12 31-Dec-12 6-Sep-12

137 Rajasthan RAJ-499 RVPNL400 Kv S/C Bikaner to Didwana

transmission line 400 S/C 129 129.00 3-Aug-12 7-Nov-12 6-Sep-12 29-Nov-12 30-Nov-12

138 Rajasthan RAJ-500 GMR 220 KV D/C Didwana - Sujangarh T/L 220 D/C 29.687 59.37 3-Aug-12 7-Nov-12 6-Sep-12 11-Feb-13 12-Feb-13

139 Rajasthan RAJ-501 RVPNL220 KV LILO to Choukarweda from

Nadbai - Mandawar T/L220 D/C 2.5 5.00 1-Jul-13 10-Jul-13 1-Jul-13 9-Sep-13

140 Rajasthan RAJ-502 RVPNL220 KV D/C Jethana - Mangaliyawas

TSS (DFCC) Line220 D/C 7 14.00 24-Aug-12 28-Dec-12 6-Sep-12

141 Rajasthan RAJ-503 PGCIL400 KV D/C Quad Jaipur (RVPNL-

Jaipur, Bassi PGCIL)400 D/C 47.8 95.60 17-Sep-12 28-Sep-12 6-Sep-12 11-Dec-12 3-Jan-13

142 Rajasthan RAJ-504 PGCIL765 KV S/C Gwalior - Jaipur circuit-II

T/L765 S/C 143 143 5-Mar-13 29-Jul-13 31-May-13 20-Mar-14

143 Rajasthan RAJ-505 RVPNLLILO AT 220 KV S/C Alwar-Dausa T/L

for Alwar 400 KV S/S220 S/C 4 4.00 15-Oct-12 7-Aug-13 23-Oct-12

144 Rajasthan RAJ-506 GMR400 KV S/C Alwar - Hindaun

Transmission Line400 S/C 96.947 97.00 1-Jan-13 27-Dec-12 27-Dec-12 28-Jan-13 29-Jan-13

145 Rajasthan RAJ-507 RVPNL220 KV D/C NEEMRANA(PGCIL)

BEHROR LINE220 D/C 27 54.00 11-Dec-12 16-Feb-13 26-Dec-12 6-Sep-13

146 Rajasthan RAJ-508 RVPNL220 KV LILO to BANSAR (220KV

GSS) from ALWAR-KOTPUTTI line220 D/C 1.048 2.10 11-Dec-12 22-Apr-13 26-Dec-12 9-Sep-13

147 Rajasthan RAJ-509 RVPNL220 KV D/C CHITTORGARH (400KV

GSS) SAWA LINE220 D/C 25 50.00 11-Dec-12 7-Aug-13 29-Jul-13

148 Rajasthan RAJ-510 RVPNL220KV D/C BABAI - 220KV TSS of

M/s. DFCC MAONDA LINE220 D/C 9.5 19.00 11-Dec-12 30-Jan-13 26-Dec-12

149 Rajasthan RAJ-511 RVPNL

220KV D/C KISHANGARH - 220 KV

TSS of M/S OFCC KISHANGARH

Line.

220 D/C 25 50.00 11-Dec-12 29-Jul-13 26-Dec-12

150 Rajasthan RAJ-512 RVPNL

220KV LILO TO 400/220 KV GSS

PGCIL, Jaipur (south) from Duni-SEZ-I

Line

220 D/C 28 56.00 21-Dec-12 30-Jan-13 26-Dec-12

NORTHERN REGION 9 of 14

Page 15: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

151 Rajasthan RAJ-513 RVPNL220kV LILO to lalsot from dausa to anta

line220 D/C 2 4.00 8-Jan-13

152 Rajasthan RAJ-514 PGCIL 765kV S/C Jaipur to Bhiwani 765 S/C 133.41 133.41 12-Feb-13 8-Aug-13 5-Mar-13

153 Rajasthan RAJ-515 PGCIL 765kV S/C Jaipur to Bhiwani 765 S/C 137.43 137.43 25-Feb-13 30-Sep-13 1-Apr-13

154 Rajasthan RAJ-516 RVPNL 220kV D/C Bapbhadla 220 D/C 60 120.00 28-Feb-13 26-Feb-12 25-Mar-13

155 Rajasthan RAJ-517 RVPNL220kV S/C Barsighsir to Fhalori LILO

at 220kV GSS 220 S/C 25 25.00 28-Mar-13 23-Sep-13 25-Mar-13

156 Rajasthan RAJ-518 RVPNL 400kV D/C Bhilwara to Ajmer 400 D/C 155 310.00 7-Mar-13 25-Mar-13

157 Rajasthan RAJ-519 RVPNL 220kV D/C Bhawad to Baithwasia 220 D/C 33.1 66.20 7-Mar-13 2-Jul-13 1-Sep-13 9-Sep-13

158 Rajasthan RAJ-520 RVPNL220KV LILO from Ratangarh-

REENGUS to Laxmangarh line220 D/C 4 8.00 10-May-13 26-Nov-13 27-May-13 26-Nov-13

159 Rajasthan RAJ-521 RVPNL220KV D/C LILO of 220KV S/C KTPS

Sanganar line at 220KV GSS vatika220 D/C 8 16.00 31-May-13 27-Jun-13

160 Rajasthan RAJ-522 RVPNL220KV D/C Jaipur to proposed GSS

vatika220 D/C 30 60.00 31-May-13 27-Jun-13 26-Nov-13 26-Nov-13

161 Rajasthan RAJ-523 RVPNL220 kV GSS Phulera to proposed 220

kV TSS PFCCIL Phulera 220 D/C 10.2 20.40 13-Jun-13 26-Nov-13 27-Jun-13 26-Nov-13

162 Rajasthan RAJ-524 RVPNL220 kV S/S line from 220 kV GSS

Jalare to 220 kV GSS Sayla220 S/C 53 53.00 5-Jun-13 13-Sep-13

163 Rajasthan RAJ-525 RVPNL

220 kV D/C line from PGCIL 400 kV

GSS Bhimal to RVPN 220 kV GSS

Sayla

220 D/C 42 84.00 6-Jun-13 27-Jun-13 13-Sep-13

164 Rajasthan RAJ-526 RVPNL

220 kV D/C LILO to 400 kV GSS

Udaipur from 220 kV S/C Deboi -

Chittorgarh line

220 D/C 2 4.00 21-Jun-13 21-Oct-13 29-Jul-13

165 Rajasthan RAJ-527 RVPNL

220 kV D/C LILO to 400 kV GSS

Udaipur from 220 kV S/C Deboi -

Kankral line

220 D/C 4 8.00 22-Jun-13 29-Jul-13 29-Jul-13

166 Rajasthan RAJ-528 RVPNL220 KV LILO TO DHEEDWANA

FROM KUCHAMAN -DHOD LINE220 D/C 45 90.00 23-Jul-13 13-Sep-13 29-Jul-13

167 Rajasthan RAJ-529 RVPNL230KV D/C PRATAPGARH-

BANSWARA T/L220 D/C 64 128.00 5-Sep-13 20-Sep-13

NORTHERN REGION 10 of 14

Page 16: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

168 Rajasthan RAJ-530 RVPNL220KV D/C CHAKSU(PGCIL 400KV

GSS) TO CHAKSU(220KV GSS) LINE220 D/C 8 16.00 26-Sep-13 15-Oct-13 8-Oct-13 18-Mar-14

169 Rajasthan RAJ-531 RVPNL 400 KV S/C BIKANER-MERTA T/L 400 S/C 170 170.00 28-Oct-13 25-Mar-14 19-Nov-13

170 Rajasthan RAJ-532 RVPNL220 K/V D/CCHHONKARWARA-

HINDAUN T/L220 D/C 38.2 76.40 18-Nov-13 4-Mar-14

171 Rajasthan RAJ-533 RVPNL220KV D/C BALI-FALNA TSS FOR

M/S DFCC LINE220 D/C 15 30.00 30-Jan-14 25-Mar-14 19-Feb-14

172 Rajasthan RAJ-534 PGCIL

LILO of 400KV S/C BHIWADI BASSI

T/L AT KOTPUTLI associated with

"NRTSS"

400 S/C 8.722 8.72 3-Mar-14 26-Mar-14 7-Mar-14 27-Mar-14

173Uttar

PradeshUP-374 NTPC 400kV D/C Dadri - Loni Road Line 400 D/C 54.18 108.36 3-Feb-10 25-Nov-11 10-Nov-10 10-Apr-12 7-May-12

174Uttar

PradeshUP-376A PGCIL

765kV S/C Sasaram-Fatehpur (Part-I)

Transmission Line (Pkg-A4)765 S/C 167 334.00 29-Mar-12 9-Sep-11 23-Mar-12

175Uttar

PradeshUP-376B PGCIL

765kV S/C Sasaram-Fatehpur(Part-II)

Transmission Line (Pkg-A5)765 S/C 170 340.00 22-Sep-10 22-Sep-10 28-Nov-11 20-Mar-12 21-Mar-12

176Uttar

PradeshUP-377 PGCIL

800 HVDC Bipole T/L - Unnao Pkg-A8

(Gomti river xing to Nidhaura)800 D/C 200 400.00 8-Nov-10 24-Jan-11 18-Apr-11 15-Mar-12 17-Mar-12

177Uttar

PradeshUP-379 PGCIL

800kV HVDC Gorakhpur - Gopalganj

(Package A6)800 D/C 187.4 374.79 28-Apr-11 22-Nov-13 22-Nov-13

178Uttar

PradeshUP-380 PGCIL

800kV HVDC Bipole Gorakhpur -

Gomti River Xing (Package A7)800 D/C 190.5 381.00 10-May-11

179Uttar

PradeshUP-381 PGCIL 765kV S/C Fatehpur - Agra 765 S/C 167 167.00 1-May-12 30-Apr-12 16-May-11 23-May-12 24-May-12

180Uttar

PradeshUP-382 PGCIL

400kV D/C Balia - Lucknow Tx. Line at

Sohawal400 D/C 6 12.00 1-Aug-11 12-Oct-11 13-Apr-12 15-May-12 17-May-12

181Uttar

PradeshUP-386 PGCIL

220kV S/C Gonda S/S to Basti S/S

Trans. Line220 S/C 104.37 104.37 22-Sep-11 13-Jan-12 17-Jan-12 9-May-13

182Uttar

PradeshUP-387 PGCIL

765kV S/C Fatehpur - Agra (Upto

Auriya) Trans. Line765 S/C 166.37 166.37 26-Sep-11 11-Oct-11 11-Oct-11 2-Mar-12 2-Mar-12

183Uttar

PradeshUP-388 PGCIL

LILO of 400kV D/C Allahabad -

Mainpuri line at 765/400/220 kV

Fatehpur S/S (LI-18.96 LO-17.984)

400 D/C 36.9 36.90 26-Sep-11 12-Oct-11 6-Feb-12 14-Mar-12 14-Mar-12

184Uttar

PradeshUP-389 PGCIL

765kV S/C Meerut - Agra Trans. Line

(Part - II)765 S/C 131.28 131.28 17-Oct-11 9-Apr-13 9-Apr-13 16-Apr-13

185Uttar

PradeshUP-390 PGCIL

LILO of 400kV D/C Agra - Jaipur

power line400 D/C 37.16 74.32 2-Nov-11 28-Nov-11 4-Nov-11 29-Mar-12 2-Apr-12

NORTHERN REGION 11 of 14

Page 17: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

186Uttar

PradeshUP-392 PGCIL

765kV S/C Agra - Jattikalan (Part-I)

(UP Portion)765 S/C 120.46 120.46 15-Nov-11 28-Nov-11 28-Nov-11 8-Mar-13 18-Mar-13

187Uttar

PradeshUP-393 PGCIL

765kV S/C Agra - Jattikalan (Part-II)

(Delhi & Haryana Portion)765 S/C 132 132.00 14-Nov-11 13-Mar-13 13-Mar-13 25-Mar-13 25-May-13

188Uttar

PradeshUP-394 PGCIL

400kV D/C RPSCL Sharjahapur to

Sharjahanpur PGCIL400 D/C 7.2 14.40 12-Dec-11 18-Dec-11 12-Dec-11 3-Jan-12 5-Jan-12

189Uttar

PradeshUP-395 PGCIL

765kV S/C Meerut - Bhiwani Trans.

Line765 S/C 174 174.00 29-Dec-11 5-Jan-12 31-May-12 7-Feb-13 8-Feb-13

190Uttar

PradeshUP-396 PGCIL

LILO of 400kV D/C Quad Dehradun -

Bagpat line at Saharanpur S/S400 D/C 28.54 57.08 13-Jan-12 10-Feb-12 2-Mar-12

191Uttar

PradeshUP-397 PGCIL

LILO of 400kV D/C Bareilly - Mondola

line at Meerut400 D/C 54.3 108.60 22-Feb-12 11-Aug-12 3-May-12 1-Mar-13 4-Mar-13

192Uttar

PradeshUP-398 PGCIL

LILO of 400kV S/C Panki - Muradnagar

line at Aligarh S/S400 S/C 33 33.00 6-Mar-12 30-May-12 30-May-12 5-Sep-12 6-Sep-12

193Uttar

PradeshUP-399 PGCIL 400kV D/C Aligarh - Sikandrabad line 400 D/C 95 190.00 6-Mar-12 30-May-12 30-May-12 5-Sep-12 6-Sep-12

194Uttar

PradeshUP-400 PGCIL

400kV D/C Kaithal - Meerut line (L/in=

30.142 L/out= 30.95)400 D/C 61.092 61.09 30-Apr-12

195Uttar

PradeshUP-401 PGCIL

765kV S/C fatehpur to agra (pkg-G3)

powerline765 S/C 166.68 166.68 1-Sep-12 3-May-12 16-May-11 18-Sep-12 19-Sep-12

196Uttar

PradeshUP-402 PGCIL

765kV S/C Sasaram - Fatehpur (Part-II)

line - package G2 Ckt-II (UP Portion)765 S/C 179.8 179.80 9-May-12 30-May-12 17-Oct-12 13-Dec-12 17-Dec-12

197Uttar

PradeshUP-403 PGCIL

400kV D/C Tanda - Gonda

Transmission line400 D/C 92 184.00 8-Jun-12 11-Sep-12 11-Sep-12

198Uttar

PradeshUP-404 PGCIL 400kV D/C Gonda - Shahjahanpur line 400 D/C 220 440.00 8-Jun-12 11-Sep-12 11-Sep-12

199Uttar

PradeshUP-405 SEUPPTCL

400KV D/C Mainpuri-Aligarh Power

line400 D/C 93 186.00 2-Jul-12 17-Jan-13 11-Dec-12

200Uttar

PradeshUP-406 PGCIL 765kV S/C Meerat to Agra T/L (part-I) 765 S/C 136.09 136.09 23-Aug-12 12-Sep-12 23-Aug-12 12-Sep-12 13-Sep-12

201Uttar

PradeshUP-407 PGCIL

400KV D/C QUAD Barreilly-Kashipur-

Roorkee T/L400 D/C 251 502.00 1-Oct-12 20-Nov-12 18-Oct-12 4-Mar-13 5-Mar-13

202Uttar

PradeshUP-408 PGCIL

400KV D/C QUAD Barreilly-Barreilly

T/L400 D/C 1.477 2.95 16-Oct-12 16-Oct-12 16-Oct-12 10-Dec-12

NORTHERN REGION 12 of 14

Page 18: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

203Uttar

PradeshUP-409 PGCIL

765KV S/C Barreilly-Lucknow T/L

(part-I)765 S/C 129.3 129.30 16-Oct-12 16-Oct-12 16-Oct-12 10-Dec-12

204Uttar

PradeshUP-410 SEUPPTCL

765KV S/C Mainpuri-Unnao T/L pakg-

1)765 S/C 185 185.00 10-Oct-12 21-Mar-13 25-Nov-13

205Uttar

PradeshUP-411 SEUPPTCL

400KV D/C Rewa Road-Meja T/L pckg-

1400 D/C 33.5 67.00 12-Oct-12 3-May-13 3-May-13 3-Feb-14

206Uttar

PradeshUP-412 SEUPPTCL 400KV D/C Bara-Meja T/L pckg-1 400 D/C 28 56.00 12-Oct-12 3-May-13 20-Jan-14 31-Jan-14

207Uttar

PradeshUP-413 SEUPPTCL

765KV S/C Barreilly-Lucknow T/L

(part-II)765 S/C 121.71 121.71 26-Oct-12 10-Dec-12 10-Dec-12 8-Jan-13 10-Jan-13

208Uttar

PradeshUP-414 SEUPPTCL

765KV S/C Mainpuri-Bara CKT-2 T/L

under UP BOOT Scheme 765 S/C 380 380.00 30-Oct-12 2-Jul-13 3-Dec-13

209Uttar

PradeshUP-415 SEUPPTCL

765KV S/C Mainpuri-Bara CKT-1 T/L

under UP BOOT Scheme 765 S/C 385 385.00 30-Oct-12 2-Jul-13 3-Dec-13

210Uttar

PradeshUP-416 PGCIL 400kV D/C Agra - Sikar T/L PART-I 400 D/C 196.62 393.24 14-Jan-13 3-May-13 20-Feb-13 5-Dec-13

211Uttar

PradeshUP-416A PGCIL 400kV D/C Agra - Sikar T/L PART-II 400 D/C 196.62 393.24 14-Jan-13 3-May-13 20-Feb-13 25-Nov-13

212Uttar

PradeshUP-417 PGCIL

765KV S/C Fatehpur to Agra T/L Part-

II(Pkg. G4) (Second line) Associated

with Sasan Ultra Mega power projects

scheme II

765 S/C 167 167.00 8-Apr-13 6-Sep-13 6-Sep-13 19-Sep-13

213Uttar

PradeshUP-418 SEUPPTCL

400 kV D/C Durai -Mainpuri LILO S/S

under UP Boot Scheme(Package-1)400 D/C 43 86.00 11-Jun-13 29-Jul-13 30-Sep-13

214Uttar

PradeshUP-419 PGCIL 765 KV GAYA-VARANASI T/L 765 D/C 272.85 86.00 6-Aug-13 28-Oct-13 4-Sep-13

215Uttar

PradeshUP-420 PGCIL

Extension of 400KV D/C (QUAD)

BIHAR SHAREEF-SASARAM T/L TO

VARANASI

400 D/C 125.12 86.00 30-Aug-13 20-Oct-13 14-Oct-13

216Uttar

PradeshUP-421 PGCIL

765 KV S/C KANPUR -

JHATIKALAN (PART-i) T/L765 S/C 236.84 236.84 29-Aug-13 29-Aug-13 29-Aug-13 1-Jan-14

217Uttar

PradeshUP-422 PGCIL

765kV D/C RIHAND -

VINDHYACHAL P/S T/L765 D/C 31.154 62.31 11-Dec-13 14-Mar-14 14-Mar-14 24-Mar-14

218Uttar

PradeshUP-423 PGCIL 400 kv D/C MEJA-ALLAHABAD 400 D/C 28.191 56.38 19-Feb-14 6-Mar-14

219Uttar

PradeshUP-424 PGCIL

765 KV D/C VARANASI-KANPUR

PART-II under Transmission System.765 D/C 163.66 327.33 12-Feb-14

NORTHERN REGION 13 of 14

Page 19: Status of PTCC cases

S.N

o.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

by DET on

BSNL

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

220Uttarancha

lUTR-08 PGCIL

220kV S/C Maneribhali State-II HP to

220kV S/S Rishikesh220 S/C 110 110.00 3-Feb-10

221Uttarancha

lUTR-09 PTCUL

220kV S/C Barhaini Pant Nagar Trans

Line220 S/C 35.5 35.50 15-Mar-10

222Uttarancha

lUTR-10 PGCIL

400 kV D/C (Quad) Dehradun-Bagpat

Transmission Line Package A-4400 D/C 81 162.00 7-Oct-10 22-Jun-11 6-Sep-11

223Uttarancha

lUTR-11 PGCIL

400 kV D/C (Quad) Dehradun-Bagpat

Transmission Line Package A-3,Part-I400 D/C 84 168.00 7-Oct-10 13-Apr-11 16-Apr-12 12-Jul-13

224Uttarancha

lUTR-12 UTRTCL

220 kV D/C SEPL - Mahuakheraganj

T/L220 D/C 2.512 5.02 2-Feb-12 3-Apr-12 3-Apr-12 10-Apr-12 11-Apr-12

225Uttarancha

lUTR-13 PGCIL

LILO of 400 KV D/C Kashipur to

Roorkee transmission line of PGCIL at

SEPL switch yard

400 D/C 16 32.00 11-Apr-12 4-Jun-12 4-Jun-12 25-Jul-12 6-Aug-12

226Uttarancha

lUTR-14 PGCIL

400kV D/C Quad Roorkee-Saharanpur

line 400 D/C 36.062 72.12 30-Apr-12 30-Apr-12 18-May-12

227Uttarancha

lUTR-15 PGCIL

220 kV D/C Ghuttu-Ghansali Trans.

Line220 D/C 19.38 38.76 16-Jul-12 9-Oct-12

228Uttarancha

lUTR-16 PGCIL

LILO of 400KV D/C T/L from

Moradabad-Rishikesh Line at Dhampur

for Kashipur

400 D/C 59.514 119.03 22-Oct-12

229Uttarancha

lUTR-17 PTCUL

220kV LILO of Roshnahad to Roorkee

line at 400kV D/C220 D/C 36.71 73.42 30-Mar-12 23-Mar-12

230Uttarancha

lUTR-18 PGCIL

400 kV D/C Dehradun-Abdullapur

Quad T/C400 D/C 90 180.00 13-Jun-13 14-Oct-13

Note:Discrepancy if any, may please be communicated to Director(PTCC)

NORTHERN REGION 14 of 14

Page 20: Status of PTCC cases

S.No

.State File No.

Name of

the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of

receipt of

complete

Power line

details

Date of IV

comments

sent by CEA

Approved

on

1Andra

PradeshAND-509

APTRAN

SCO

220kV LILO line to Chillakallu from 220kV

VTS-Narketpalli main line220 D/C 1.7 3.35 7-Jan-08 5-Aug-09

2Andra

PradeshAND-523

APTRAN

SCO

220kV LILO to the Proposed 220kV S/S at

RTSS Gooty from 220kV Gooty Switching

Station

220 D/C 1.5 3.00 23-Nov-09 31-Dec-12 17-Feb-11 30-Nov-10 18-Mar-14

3Andra

PradeshAND-527

APTRAN

SCO

220kV D/C Line from 220kV S/S Podili to

Proposed 220kV S/S Parchur220 D/C 74.4 148.70 15-Mar-10 27-Dec-12 14-May-10 27-Dec-12 10-Jan-13

4Andra

PradeshAND-528

APTRAN

SCO

220kV D/C Line from Samarlakota 220kV S/S

to Proposed 220MW Barge Mounted Power

Plant at Kakinada in East Godavari

220 D/C 26.3 52.54 29-Mar-10 31-Mar-11 23-Feb-11 31-Mar-11

5Andra

PradeshAND-534

APTRAN

SCO

220 kV D/C line from Hindupur to

pulivendula.220 D/C 124.0 248.00 16-Aug-10 31-Dec-12 19-Jul-11 31-Dec-12

6Andra

PradeshAND-535 PGCIL

400 kV D/C Krishnapatnam to 400 kV

Kurnool S/S400 D/C 328.1 656.29 11-Aug-10 18-Feb-11

7Andra

PradeshAND-536 PGCIL

400 kV D/C Krishnapatnam to 400 kV Gooty

S/S.400 D/C 315.9 631.82 13-Aug-10 18-Feb-11

8Andra

PradeshAND-537 PGCIL

400 kV D/C Krishnapatnam to 400 kV Nellore

S/S400 D/C 32.0 63.90 13-Aug-10 18-Feb-11

9Andra

PradeshAND-539 PGCIL

400kV D/C Line from 400kV Nannuru S/S to

400kV (New) S/S at Kurnool associated to

Krishnapatnam UMPP

400 D/C 9.3 18.63 15-Nov-10 31-Dec-13 15-Mar-11 31-Dec-13 10-Jan-14

10Andra

PradeshAND-540 PGCIL

LILO of Nagarjunasagar-Gooty 400kV S/C

Line at Kurnool 400kV S/S Tx. Line associated

to Krishnapatnam UMPP

400 D/C 35.8 71.64 15-Nov-10 6-Jan-14 5-Apr-11 6-Jan-14 10-Jan-14

11Andra

PradeshAND-542

APTRAN

SCO

1) .220 kv d/c\s/c line from jurala 220 kv s/s

to gudemdodi 220/110 kv s/s

2). 220 kv d/c\s/c line from jurala 220 kv s/s

to marlavidu 220/110 kv s/s

3). 220 kv dc/sc line from gudemdodi 220/110

kv s/s to marlavidu 220 /110 kv s/s

220 D/C 28.8 57.60 1-Feb-11 13-Jun-11 5-Dec-11 2-Jan-11 9-Jan-12

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

SOUTHERN REGION 1 of 10

Page 21: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

12Andra

PradeshAND-543

APTRAN

SCO

220kV LILO to Vemnur from Ramagundam -

Nirmal line220 D/C 0.9 1.89 8-Feb-11 4-Mar-11 8-Jul-11

13Andra

PradeshAND-544 TCAPL

400 kv d/c vijayawada TPS- malkaran 400 kv

s/s 400 D/C 261.4 522.86 6-May-11 24-Aug-12 12-Jul-11 24-Aug-12 13-Sep-12

14Andra

PradeshAND-546

APTRAN

SCO

220 kv d/c line from 400 kv mamidpally s/s to

proposed 220 kv s/s on narrow based m/c

towers

220 D/C 6.0 12.00 12-Aug-11 24-Aug-12 7-Dec-11 1-Sep-12 4-Sep-12

15Andra

PradeshAND-547

APTRAN

SCO

400 kv d/c line from yeddumailaram

(shankarapally) to gajwel s/s 400 D/C 105.0 210.00 16-Aug-12 16-Jul-12 27-Sep-11 27-Sep-11 26-Sep-12

16Andra

PradeshAND-548

APTRAN

SCO

220kV XLPE UG Cable from

Chandrayangutta 220kV SS to 220kV Imliban

GIS SS

220 D/C 9.5 18.98 24-Aug-11 5-Oct-12 2-Jul-12 5-Oct-12 9-Jan-14

17Andra

PradeshAND-549

APTRAN

SCO

220 kv XLDE UG cable from

chandrayangutta 220 kv ss to 220 kv imliban

GIS s/s

220 D/C 16.9 33.80 25-Aug-11 20-Mar-12 19-Sep-11 20-Mar-12 21-Mar-12

18Andra

PradeshAND-550

APTRAN

SCO

220kV XLPE UG Cable from LILO of one

Single circuit of 220kV Gachibowli -

Shapurnagar DC OH

220 D/C 9.4 18.80 30-Aug-11 27-Dec-12 2-Jul-12 27-Dec-12 28-Mar-13

19Andra

PradeshAND-551

APTRAN

SCO

220kV XLPE UG Cable from 220kV SS

Moulali to 220/132/33 kV SS at Osmania

University

220 S/C 9.8 9.80 30-Aug-11 8-Aug-12 2-Jul-12 8-Aug-12 28-Mar-13

20Andra

PradeshAND-552

APTRAN

SCO

400kV D/C line from Nunna - Sattenapalli

400/220 kV SS400 D/C 107.9 215.74 29-Aug-11 5-Oct-12 17-Oct-11 5-Oct-12 26-Mar-14

21Andra

PradeshAND-553

APTRAN

SCO

LILO of 400kV Srisailam - VTPS Stage IV

DC line from Lakkarajugarlapadu village to

proposed 400/220kV SS at Sattenapalli

400 D/C 6.9 13.82 14-Sep-11 22-Oct-13 17-Oct-11 22-Oct-13 7-Nov-13

22Andra

PradeshAND-554

APTRAN

SCO

400kV D/C line from LILO of 400kV

Srisailam - Hyderabad D/C Line (Ckt. I) to

proposed 400kV S/S at Shankarapally

(Yeddumailaram)

400 D/C 82.0 164.00 24-Nov-11 20-Dec-11

23Andra

PradeshAND-556

APTRAN

SCO

400 kv d/c krishnaputnam TPP-nellone

(manubolu) quad moose line 400 D/C 35.8 71.51 13-Dec-11 5-Oct-12 28-Sep-12 5-Oct-12 10-Oct-12 3-Nov-12

24Andra

PradeshAND-557 Reliance

400kV D/C Tx. line with 2400MW Samalkot

power station to Vemagiri pooling station

(Two lines)

400 D/C 26.0 52.00 11-Jan-12

25Andra

PradeshAND-558

APTRAN

SCO

220kV D/C line from 400/220kV

Yeddumailaram S/S to 220kV Sadasivpet S/S

in Medak Distt.

220 D/C 37.5 75.00 5-Mar-12 18-Sep-13 3-Sep-12 15-Oct-13

SOUTHERN REGION 2 of 10

Page 22: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

26Andra

PradeshAND-559

APTRAN

SCO

220kV D/C line from Ragulpadu 220kV S/S to

proposed 33/220kV pooling station at

Vajrakarur S/S

220 D/C 5.7 11.32 16-Mar-12 3-Dec-12

27Andra

PradeshAND-560

APTRAN

SCO

LILO of 220 kv tandur-gachibowli line at

400/220 kv yeddumailaram s/s 220 D/C 10.0 20.00 26-Mar-12 8-Aug-12 9-Apr-12 1-Aug-12 31-Aug-12

28Andra

PradeshAND-561 Reliance

LILO of 400kV Kalpaka - Vemagiri

(APTRANSCO line) of one ckt of Samalkot

Genrating Station

400 D/C 12.8 25.60 15-Mar-12 20-May-13

29Andra

Pradesh

AND-562

A,B,C

APTRAN

SCO

A) 220kV DC/SC line from Regumanugadda

220kV S/S to Jonnalaboguda 220kV S/S

B) 220kV DC/SC line from Regumanugadda

220kV S/S to Gudipallygattu 220kV S/S

C) 220kV DC/SC line from Jonnalaboguda

220kV S/S to Gudipallygattu 220kV S/S

220 D/C 65.4 130.80 16-Mar-12 12-Apr-12

30Andra

PradeshAND-563

APTRAN

SCO

220KV D/C Line from M/s Sri Girija Alloys

power pvt Ltd. At Valuthimmapuram to

220KV Samatkota S/S

220 D/C 3.9 7.81 29-Jun-12 15-May-13 24-Jul-12

31Andra

PradeshAND-564

APTRAN

SCO

220 kv LILO to lower jurala hydro electric

project from veltoor-jurala main line 220 D/C 4.5 8.91 3-Jul-12 5-Oct-12 24-Jul-12 5-Oct-12 27-Nov-12

32Andra

PradeshAND-565 PGCIL

400KV D/C QUAD Line from

Thermapowertech corp. of India to Nullore

pooling stn.

400 D/C 32.4 64.86 6-Jul-12 14-Jan-13 18-Feb-13 18-Feb-13 20-May-13

33Andra

PradeshAND-566 PGCIL

400KV D/C QUAD Line from Nullore to

pooling stn. To Gooty S/S400 D/C 289.1 578.26 6-Jul-12 22-Jan-13 18-Feb-13 18-Feb-13 11-Mar-13 14-Mar-13

34Andra

Pradesh

AND-

567A

APTRAN

SCO

220 kv LILO line to 400 kv yeddumailaram

from existing 220 kv shadnagar-yedduailaram220 D/C 4.0 7.92 1-Aug-12 26-Oct-12 27-Aug-12 26-Oct-12 27-Nov-12 16-Jan-13

35Andra

Pradesh

AND-

567B

APTRAN

SCO

LILO at 400 kv yeddumailaram from 220 kv

gachibowli-yeddumailaram m/c tower in

medak dist.

220 D/C 4.0 7.92 1-Aug-12 26-Oct-12 27-Aug-12 26-Oct-12 27-Nov-12 16-Jan-13

36Andra

PradeshAND-568

APTRAN

SCO

220KV D/C Line from 220/132 pendurthi S/S

to 220KV Bhimannadorapalem Switchyard,

Vizianagram

220 D/C 9.4 18.80 7-Aug-12 27-Dec-12 11-Dec-12 27-Dec-12 8-Jan-13

37Andra

PradeshAND-569

APTRAN

SCO

220KV D/C Line from Bhimannadorapalem

Switchyard to 220 KV Bobbili S/S in

vizianagaram distt.

220 D/C 81.5 163.00 7-Aug-12

38Andra

PradeshAND-570

APTRAN

SCO

220KV D/C Line from 220/132 KV Garivid

S/S to 220/132KV Bobbili S/S in Vizianagram220 D/C 37.8 75.50 8-Jul-12 29-May-13

SOUTHERN REGION 3 of 10

Page 23: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

39Andra

PradeshAND-571

APTRAN

SCO

220kV D/C Line from 220kV S/S

Bhimannadorapalem to M/S Sarda Metals &

Alloys, Kantakapalli

220 D/C 8.4 16.74 1-Oct-12 7-Jan-13 11-Dec-12 7-Jan-13 7-Jan-13

40Andra

PradeshAND-572

APTRAN

SCO

220KV D/C Line from existing 220 KV D/C

line from existing 220 KV Budidampadu S/S

to the proposed 1X150 MW Power Plant of

M/S Nava Bharat Energy India Ltd. At

Paloncha, Khammam Distt.

220 D/C 60.4 120.82 18-Oct-12 1-Jan-13 4-Jan-13 4-Jan-13 4-Jan-13

41Andra

PradeshAND-573 PGCIL

LILO of 400kV D/C Simhapuri to Nellore

400kV s/s transmission line at nellore pooling

station

400 D/C 7.5 14.95 21-Jan-13 18-Feb-13 11-Feb-13 18-Feb-13 11-Mar-13 14-Mar-13

42Andra

PradeshAND-574 PGCIL

400kV D/C Gooty to Madhugiri(Tumkur)

T/L(Part I & II)400 D/C 208.7 417.48 25-Feb-13 1-Apr-13

43Andra

PradeshAND-575 TCAPL

220kV LILO to the proposed 220/33kV s/s

from existing 220kV Wanaparthy to

Regumangadda D/C line

220 D/C 5.3 10.55 1-Mar-13 9-Apr-13

44Andra

PradeshAND-576 TCAPL

220kV DC line from proposed 220kV lower

Jurala HES to existing 220/132kV Jurala S/S220 D/C 10.6 21.14 28-Feb-13 9-Apr-13

45Andra

PradeshAND-577 TCAPL

220kV DC/SC line from 220kV S/S Tadipatri

to proposed 220/33kV pooling station at

Kadavakallu,Anantpur dist.

220 D/C 26.3 52.64 12-Mar-13 25-Jun-13 9-Apr-13 25-Jun-13 27-Jun-13

46Andra

PradeshAND-578 PGCIL

400kV D/C(Quard) Salem New (Dharmapuri)

station - Somanahalli S/S T/L400 D/C 121.2 242.32 12-Mar-13 29-May-13

47Andra

PradeshAND-579

APTRAN

SCO

400kV D/C line from Bhoopalapalle TPP to

400kV s/s at Gajwel400 D/C 131.2 262.42 27-May-13 15-Mar-13 27-May-13 27-May-13 4-Jun-13

48Andra

Prades

h

AND-580 TCAPL220 KV DC LINE FROM PULIVENDULA

TO MUTHYALACHERUVULU220 D/C 54.7 109.4 23-Apr-13 11-Jun-13

49Andra

Prades

h

AND-581 PGCIL765KV D/C (Hexa-Zebra) Nellore pooling

station-Kurnool T/L765 D/C 302.3 604.6 7-Apr-13 4-Jul-13

50Andra

Prades

h

AND-582 PGCIL400KV D/C Vijaywada-Nellore T/L under

SRSS-XVIII400 D/C 341.4 682.8 6-May-13 4-Jul-13

51Andra

Prades

h

AND-583 TCAPL

220KV M/C line of 220KV cable from

220/132KV S/S Ghanpur to proposed

220/33KV S/S Hayathnagar

220 D/C 25.2 50.4 29-May-13 8-Jul-13

SOUTHERN REGION 4 of 10

Page 24: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

52Andra

Prades

h

AND-584 TCAPL220KV line from S/S Parschur to 400KV S/S

Sathnapally220 D/C 53.3 106.6 21-Apr-12 12-Apr-13 21-May-12 8-Aug-13

53

Andra

Prades

h

AND-585 TCAPL

220 kV M/C line from 220 kV S/S Ghanapur

to common point at marripally and erection of

220 kV D/C line from commom point at

maripally to cable 2 at Nagala Bridge

220 D/C 18.0 36.0 17-Jun-13 8-Jul-13

54Andra

Prades

h

AND-586 TCAPL220 kV line from shapuram 220 kV switching

station to prposed Subbarayunipally220 D/C 9.9 19.70 17-Jun-13 2-Jul-13

55Andra

Prades

h

AND-587 TCAPL

220 KV LILO to 220 kV Wadekothapally S/S

from 220 kV Budidampady to Bhangiri 2nd

circuit line

220 S/C 6.7 6.7 17-Jun-13 2-Jul-13

56Andra

Prades

h

AND-588 TCAPL

220 KV D/C LINE FROM

SHANKARPALLY 400/220 KV SS TO

PROPOSED 220/132KV SS PARIGI

220 S/C 43.6 43.6 12-Jul-13 30-Sep-13

57Andra

Prades

h

AND-589 TCAPL

220 KV DC/SC LINE from existing 220kv SS

PALAMANERU - Proposed 220 KV SS

MADANAPALLI

220 S/C 58.3 58.3 2-Jul-13 6-Aug-13

58Andra

Prades

h

AND-590 TCAPL220/132 KV CHINDEPALLI IN CHITOOR

DISTT.220 S/C 18.0 18.0 19-Jul-13 6-Aug-13

59Andra

Prades

h

AND-591 TCAPL220KV RENIGUNTA-MANUBALA DC

LINE220 D/C 1.2 2.4 19-Jul-13 6-Aug-13

60Andra

Prades

h

AND-592APTRAN

SCO

220 KV D/C LINE FROM

NARASARAOPET TO 400KV

SATTENAPALLY S/S

220 D/C 19.8 39.6 1-Mar-12 5-Oct-12 21-May-12 5-Oct-12 8-Aug-13

61Andra

Prades

h

AND-593 TCAPL

erection of 220 kv dc line from 400 kv s/s

MONUBELU - 220KV S/S SULLPURPET in

NELLORE Distt.

220 D/C 67.9 135.8 30-Jun-12 26-Jul-13

62Andra

Prades

h

AND-594 TCAPL 220 KV DC MUTTALA-RAMAGIRI T/L 220 D/C 45.0 90.0 11-Sep-13 20-Oct-13 30-Sep-13 20-Oct-13 24-Oct-13

63Andra

Prades

h

AND-595 PGCIL ANGUL P/S TO SRIKAKULAM P/S 765 D/C 275.6 551.2 10-Oct-13

64Andra

Prades

h

AND-596 TCAPL

220kV DC/SC line from 400/220KV

NANOOR S/S - 220/11kV

BRAMHANAKOTKUR S/S

220 D/C 17.2 34.3 14-Oct-13 25-Nov-13

SOUTHERN REGION 5 of 10

Page 25: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

65Andra

Prades

h

AND-597 TCAPL400kV DC Line with AL-59 Twin Moose from

Kalpaka 400kV SS to HNPCL Switch yard400 D/C 7.3 14.6 28-Oct-13 20-Dec-13 25-Nov-13 20-Dec-13 23-Dec-13

66Andra

Prades

h

AND-598 PGCIL

765 kV d/c (Hexa-Zebra) T/l from 765 kV S/S

at KURNOOL(AP) to 765kV S/S at

TIRUVALAM(TN)

765 D/C 355.0 710.0 7-Nov-13

67

Andra

Prades

h

AND-599 TCAPL

220kV DC/SC T/L from 400KV SS

MANUBOLO - M/s. SBQ Steels Ltd at

ANKULAPATURU in SPSR NELLORE

Distt.

220 S/C 17.5 17.5 3-Dec-13 3-Feb-14 3-Feb-14 3-Feb-14 19-Mar-14

68Andra

Prades

h

AND-600APTRAN

SCO

NARKETPALLY 220 KV S/S -

UDAYASAMUDRAM (proposed 220/11kv

S/S)

220 D/C 8.8 17.5 6-Feb-14

69Andra

Prades

h

AND-601APTRAN

SCO

ERECTION OF 400 KV QUAD D/C LINE

FROM JAIPURAM TPP - GAJEWAL S/S400 D/C 162.9 325.8 17-Feb-14

70Karnatak

aKNK-774 KPTCL

Deviation Route of 220kV D/C B.Bagewadi-

Indi Power Line220 D/C 15.812 31.62 6-Jul-09 7-Sep-10

71Karnatak

aKNK-776 KPTCL

220 KV M/C line from existing 220/66 KV

Badadi S/S to Proposal 220/66 KV Ramnagar

S/S in Banglore

220 D/C 18.33 36.66 9-Mar-10 1-Oct-10 23-Dec-10 23-Dec-10 4-Jun-12

72Karnatak

aKNK-777 KPTCL

220 KV M/C LINE FROM EXISTING 220/66

KV BADADI S/S TO PROPOSED 220/66 KV

TKML S/S AT KIABD INDUSTRIAL AREA

BADADI

220 M/C 67.5 135.00 9-Mar-10 16-Jul-12 23-Dec-10 16-Jul-12 18-Jan-13

73Karnatak

aKNK-778 KPTCL

220kV D/C Line from Existing 220/66kV

Tubinakere S/S to Proposed 220/66kV

Ramanagar S/S

220 D/C 67.5 135.00 9-Mar-10 16-Jul-12 23-Dec-10 1-Jan-13 18-Jan-13 18-Jan-13

74Karnatak

aKNK-779 KPTCL

220kV D/C Line from 220/110 kV

Ghataprabha S/S to Proposed 220/110 kV

Chikkodi S/S

220 D/C 36.219 72.44 23-Apr-10 6-Mar-10 23-Dec-10 23-Dec-10 21-May-13

75Karnatak

aKNK-780 KPTCL

220 KV UGC line from existing 220 KV A

station to existing East division station

Bangalore

220 D/C 4.0 8.00 3-Jun-10 11-Oct-10 23-Dec-10 23-Dec-10 12-Dec-12

76Karnatak

aKNK-781 KPTCL

220 KV UGC line from existing east division

station to 220 KV HAL station 220 D/C 8.0 16.00 13-Jun-10 15-Apr-11 23-Dec-10 15-Apr-11 12-Dec-12

77Karnatak

aKNK-783 KPTCL

220kV S/C line from 220/110kV Allipur S/S

to Proposed 400/220kV Kudatini (BPTS)

station in Bellary Dist.

220 S/C 18.263 18.26 30-Sep-10 19-Oct-10

78Karnatak

aKNK-785 PGCIL 765kV S/C Raichur - Sholapur 765 S/C 207.37 207.37 31-Mar-11 4-Oct-11 30-Sep-13 30-Sep-13 1-Nov-13

79Karnatak

aKNK-786 PGCIL 765kV S/C Raichur - Kurnool 765 S/C 116.2 116.20 31-Mar-11 22-Dec-12 20-May-11 21-Jul-11 10-Jan-14

SOUTHERN REGION 6 of 10

Page 26: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

80Karnatak

aKNK-787 KPTCL

220 KV D/C line from Jurala hydro power

project to existing 220 KV S/S at Raichur 220 D/C 48.1 96.28 19-Jul-11 7-Jun-12 31-Oct-11 7-Jun-12 2-Jul-12

81Karnatak

aKNK-790 KPTCL

220kV D/C line from existing 400/220kV

HVDC station Kolar to 220/66kV Hoskote220 D/C 35.057 70.11 21-Nov-11 15-Jun-12

82Karnatak

aKNK-791 KPTCL

220kV D/C line from proposed 400/220kV

PGCIL S/S Bidadi to existing 220/66kV

Bidadi S/S

220 D/C 3.358 6.72 21-Feb-12 25-Feb-13 15-Jun-12 25-May-13 24-Sep-13

83Karnatak

aKNK-792 KPTCL

220 KV D/C Line from existing 220KV

BIDVAL S/S TO Proposed 220KV S/S AT

M/S ENERCON INDIA INFRASTRUCTURE

LTD.

220 D/C 25.865 51.73 21-Feb-12 26-Mar-12 23-Mar-12 26-Mar-12 26-Mar-12

84Karnatak

aKNK-793 PGCIL

400 KV M/C line for Neelamamgala to Hooti

S/C and Somanahalli to Hooti S/C line at

Yelahanka Banglore

400 D/C 8 16.00 19-Sep-11 9-May-12 20-Dec-11 9-May-12 13-Jun-12 28-Sep-12

85Karnatak

aKNK-794 KPTCL

220KV D/C LINE from Madhugiri S/S to

proposed 220/66 KV pavagada S/S Tumkur

Distt.

220 D/C 60.49 120.98 24-Jul-12

86Karnatak

aKNK-795 KPTCL

220KV D/C LINE from Kemar to 220 KV

Kavoor in Mangalore Distt. 220 D/C 43.3 86.60 1-Aug-12 4-Feb-13

87Karnatak

aKNK-796 KPTCL

220 KV D/C Line from Ittagi S/S to New

proposed Kudligi (Badeladoku) in Kudligi

Taluk, Bellary Distt.

220 D/C 32.636 65.27 6-Aug-12 11-Oct-12

88Karnatak

aKNK-797 KPTCL

220 KV D/C Line from Basavana Bagevadi

S/S to proposed 220/33 KV pooling station at

M/s Suzolou Putra Structures Ltd.

220 D/C 25.84 51.68 3-Sep-12

89Karnatak

aKNK-798 SPL

400 KV D/C Line from proposed 2 X 210 MW

SPLTPP Near Raichur to proposed 2 X 1599

MVA 765/400 KV Raichur PGCIL S/S

400 D/C 22.143 44.29 3-Sep-12 13-Mar-13

90Karnatak

aKNK-799 KPTCL

220KV D/C Line from 400/220KV PGCIL

G/S Bidadi S/S to proposed 220/66 KV

Magadi S/S in Bangalore Distt.

220 D/C 32.189 64.38 8-Oct-12 13-Feb-13

91Karnatak

aKNK-800 KPTCL

220KV D/C Line from HUDC Kolar S/S to

existing 220/66 KV HOSKOTE S/S at Kolar

Distt.

220 D/C 32.189 64.38 5-Oct-12

92Karnatak

aKNK-801 KPTCL

200kV D/C line from existing 220/66kV

homnali s/s to proposed 220/66 s/s at

Benkikere in Davanagere dist

220 D/C 47.439 94.88 11-Mar-13 29-May-13

93Karnatak

aKNK-802 KPTCL

220KV S/C Line on D/C TOWERS from

existing 220/66/11 KV Bidadi Station to

proposed Bidadi Railways Traction S/S

220 S/C 5.585 5.585 28-Mar-13 29-Jul-13

SOUTHERN REGION 7 of 10

Page 27: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

94Karnatak

aKNK-803 KPTCL

220kV MCVTP line to proposed 220

KV/66KV exora gis station in banglore220 S/C 1.0 1.0 9-Apr-13

95Karnatak

aKNK-804 KPTCL

220 KV D/C LINE FROM GM NAWARRA

WIND ENERGY PVT. LTD SAWALSANGA

VLG. BIJAPUR DISTT.

220 D/C 21.1 42.172 9-Apr-13

96Karnatak

aKNK-805 KPTCL

220/120 KV ALIPUR STATION TO

PROPOSED 400/220 KV KUDATINI S/S220 S/C 18.3 18.3 9-Jul-13

97Karnatak

aKNK-806 PGCIL

400KV D/C BANGLORE-SALAM LILO

LINE AT HOSUR S/S 400 D/C 112.3 224.554 5-Jul-13 18-Sep-13 1-Oct-13 1-Oct-13 11-Dec-13

98Karnatak

aKNK-807 KPTCL

220kV DC line from existing 220KV Gadge

s/s to exsiting 220KV BAGALKOT S/S IN

BAGALKOT DISTT.

220 D/C 95.7 191.416 5-Aug-13

99Karnatak

aKNK-808 KPTCL

220KV DC Line from Existing 220 KV

BASAVANA BEGEVADI SS TO

PROPOSED 33/220KV P/S OF M/S

FORTUNE FIVE HYDAL PRJ PVT LTD.

220 D/C 14.5 29.03 29-Jul-13

100Karnatak

aKNK-809 KPTCL

LILO of 400 kV D/C RAICHUR-GOOTY T/L

at New Raichur 765/400 S/S400 D/C 5.2 10.4 28-Jul-13 28-Nov-13 28-Nov-13 28-Nov-13 29-Nov-13

101Karnatak

aKNK-810 PGCIL

400kV QUAD MADHUGIRI (TUMKUR) -

YELAHANKA T/L400 D/C 74.9 149.806 6-Dec-13

102Tamil

naiduTN-613 TNTCL 400 KV D/C line from MTPS stage -3 to Arasur 400 KV S/S 400 D/C 109.8 219.54 20-Jan-11 25-Jul-12 12-Jul-12 23-May-11 24-Dec-12

103Tamil

NaiduTN-614 TNTCL

LILO 400kV D/C Tuticorin- Madurai power

line to 400 KV Coastal energen's power plant

S/S

400 D/C 11.0 21.96 22-Jul-11 18-Apr-12 11-Mar-12 18-Apr-12 4-May-12 15-Jun-12

104Tamil

NaiduTN-615 TNTCL

LILO of 400kV S/C Sriperumbudur –

puducherry at Sunguvarchatram 400kV S/S400 S/C 7.76 7.76 10-Aug-11 16-Mar-12

105Tamil

NaiduTN-616 TNTCL

400 KV M/C line from NCTPS stage 2 to

Alamathy 400 KV S/S 400 D/C 34 68.00 18-Aug-11 25-Jul-12 12-Sep-11 25-Jul-12 17-Sep-12 22-Oct-12

106Tamil

NaiduTN-617 TNTCL

400 KV D/C NCTPS stage 2 to Vallur JV

Project transmission line 400 D/C 3.0 6.00 18-Aug-11 25-Jul-12 12-Sep-11 25-Jul-12 1-Aug-12

107Tamil

NaiduTN-618 TNTCL

400kV M/C Line from Alamathy 400kV S/S to

Sunguvarchatram 400kV S/S400 D/C 48.5 97.00 24-May-12 20-Feb-13 6-Aug-12 20-Feb-13 3-Jun-13

108Tamil

naiduTN-619 TNTCL

220 KV D/C LINE FROM 2*80 CPP

SWITCHYARD TO 230 KV STERLITE

SWITCHING STATION

220 D/C 1.8 3.60 29-May-12 12-Oct-12 12-Oct-12 12-Oct-12 12-Oct-12

109Tamil

naiduTN-620 TNTCL

220 KV D/C LINE FROM 2*80 CPP

SWITCHYARD TO 230 KV STERLITE

SWITCHING STATION

220 D/C 0.95 1.90 29-May-12 12-Oct-12 12-Oct-12 12-Oct-12 12-Oct-12

SOUTHERN REGION 8 of 10

Page 28: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

110Tamil

NaiduTN-621 PGCIL

400KV D/C Quad line from Tiruvalam-Chittor

T/L400 D/C 21.772 43.54 26-Jul-12 12-Apr-13 22-Aug-12 12-Apr-13 15-May-13 21-May-13

111Tamil

NaiduTN-622 TTCL

LILO OF 230kV Myvadi-Othakkalmandapm

feeder-II at the proposed Regen Anaikadu

230KV.

230 D/C 3.005 6.01 4-Apr-12 1-Jan-13

112Tamil

NaiduTN-623 TTCL

LILO of 230kV Gummidipoondi-

Sriperumbudur line on DC/MC towers at the

proposed Swiyaada Alloys Switchyard

230 D/C 2 4.00 29-Nov-12 14-Jan-13 18-Dec-12 14-Jan-13 15-Jan-13

113Tamil

NaiduTN-624 TTCL

230KV S/C Line on DC Towers from the

proposed Valeppaneri 230KV SS by M/s.

Suzlon to the existing TRNTRANSCO

Kayathar 230KV SS

230 S/C 21.0 21.0 12-Mar-12 17-Feb-14 1-Apr-13 17-Feb-14

114Tamil

NaiduTN-625 PGCIL

765KV D/C (Hez. Zebra) Tuticorin P/S to

Salem P/S T/L765 D/C 366.8 733.61 20-Nov-12 25-Jul-13 20-Jan-13 25-Jul-13 11-Dec-13 11-Feb-14

115Tamil

NaiduTN-626 PGCIL 400kV D/C vallur to melakottiyar t/l 400 D/C 36 72.00 2-Jan-13 6-Dec-12 6-Dec-12 6-Dec-12 3-Jan-13

116Tamil

NaiduTN-627 PGCIL

765kV S/C line from New Salom - Madguri to

Tuticorin765 S/C 245 245.00 10-Jan-13 25-Sep-13

117Tamil

NaiduTN-628 PGCIL

400kV D/C quad Sehlom pooling station

Salem S/S trans line400 D/C 60.122 120.24 7-Jan-13 29-May-13 11-Feb-13 11-Feb-13 19-Feb-14

118Tamil

NaiduTN-629 RPPL

LILO OF 230kV Myvadi-Othakkalmandapm

feeder-II at the prop aged Regen Anitkhatan230 D/C 4.992 9.98 17-Jan-13 1-Mar-13 1-Mar-13 1-Mar-13 1-Mar-13 1-Mar-13

119Tamil

NaiduTN-630 PGCIL

230kV S/C line on D/C tower from 1X60 mw

thermal power plant ARS Metal ltd

Gumidipondi

230 S/C 6.8 6.80 18-Feb-13 9-Apr-13 27-Feb-13 9-Apr-13 11-Apr-13

120Tamil

NaiduTN-631 PGCIL

400 KV NEW SALEM P/S (Dharmapuri)

S/T/C Somanahalli (earlier AND-578)400 D/C 121.2 242.3 12-Mar-13 21-Jan-14 1-Sep-13 21-Jan-14 21-Feb-14

121Tamil

NaiduTN-632 PGCIL 400 kV D/C Quad Nellore-Thiruvalan T/C 400 D/C 174.5 349.0 17-Jun-13 21-Jan-14 19-Nov-13 21-Jan-14 11-Feb-14

122Tamil

NaiduTN-633 IL&FS

400KV DC Dedicated T/L from IL&FS TN

power project at CUDDALORE TO

POWERGRID P/S AT NAGAPATTINAM

400 D/C 46.2 92.4 2-Jul-13 21-Mar-14 6-Nov-13

123Tamil

naiduTN-634 PGCIL

765 KV S/C KURNOOL - RAICHUR

SHALAPUR T/L765 D/C 116.2 232.3 6-Nov-12

124Tamil

naiduTN-635 PGCIL

LILO of 400kV D/C QUAD RAICHUR-

GOOTY T/L at 765/400kV Raichur(New) S/S400 D/C 5.2 10.4 30-Nov-13 14-Oct-13

125Tamil

naiduTN-636 PGCIL

LILO of both CKT of TUTICORIN JV -

MADURAI 400 kV D/C QUAD T/L at

Tuticorin P/S

400 D/C 2.2 4.4 26-Nov-13 21-Jan-14 18-Feb-14 18-Feb-14 20-Feb-14

SOUTHERN REGION 9 of 10

Page 29: Status of PTCC cases

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

126Tamil

naiduTN-637 PGCIL

LILO of NEYVELI-TRICHY S/C LINE AT

NAGAPATTINAM P/S400 D/C 22.6 45.2 13-Jan-14 4-Mar-14 24-Mar-14 24-Mar-14 26-Mar-14

127Tamil

naiduTN-638 PGCIL

400KV DC LINE with QUADRUPLE

MOOSE ACSR from KAYATHAR (400KV

SS) TO KARAIKUDI (400KV SS)

400 D/C 192.0 384.0 30-Jan-14

128Tamil

naiduTN-639 TNTCL

230 KV S/C LINE FROM PARUTHIYUR TO

PUGALUR S/S230 S/C 64.0 64.0 6-Feb-14 13-Mar-14

129 Kerala KER-321 PGCIL220kV m/c line from 400kV S/S at PGCIL at

Manukad to 220kV S/S220 D/C 4 8.00 21-Feb-12 21-Feb-12 21-Feb-12 21-Feb-12 22-Feb-12

130 Kerala KER-322 KPTCL220kV m/c line from 400kV S/S at Pallikkra to

220kV S/S Brahamanpuram220 D/C 6.5 13.00 25-May-10 4-Feb-13 20-Jul-10 4-Feb-13 8-Mar-13

131 Kerala KER-323 KSEB220kV M/C line from Katta kada-

Balaramapuram-Vizhiriam220 D/C 22.0 44.00 21-May-13

SOUTHERN REGION 10 of 10

Page 30: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

1 Chattisgarh CHH-20 PGCIL

LILO of 765kV S/C Sipat - Seoni Ckt - I &

Ckt - II line at pooling station 765/400kV

Bharari S/S

765 D/C 15.8 15.83 22-Sep-11 2-Feb-12 2-Jan-12 22-Feb-12

2 Chattisgarh CHH-21 Essar Power 400kV D/C (Quad) line from Mahan - Sipat 400 D/C 336.4 772.88 4-Oct-11 4-Oct-11 24-Oct-11 14-Feb-12

3 Chattisgarh CHH-22Vandana

Vidhyut Ltd.

LILO of 400kV D/C PGCIL line Korba NTPC -

Birsinghpur to M/S Vandana Vidhyut Ltd.,

Korba

400 D/C 3.4 6.74 7-Oct-11 17-Apr-12 27-Feb-12 30-Apr-12 4-May-12

4 Chattisgarh CHH-23 CSPTCL220kV DCDS line from 220/132kV Chhuri

S/S to 220/132kV S/S Mopka220 D/C 90.0 180.00 19-Dec-11

5 Chattisgarh CHH-24 CSPTCL400kV D/C Marwa TPP to Raipur (Raita S/S)

Trans. Line400 D/C 140.8 281.58 12-Jan-12

6 Chattisgarh CHH-25 CSPTCL400kV D/C (MM) Korba West - Khedamara

line to Marwa TPP 2X500MW400 D/C 57.8 115.51 13-Feb-12

7 Chattisgarh CHH-26 GMR400kV D/C Quad GMR Generating Station

Raikheda to Medesara 765/400kV S/S PGCIL400 D/C 62.5 125.07 2-Mar-12 18-Sep-12 3-Apr-12 29-Jan-13

8 Chattisgarh CHH-27 PGCIL400kV D/C Raipur (Kumhari 400/220kV S/S) -

Raipur (Dhamdha 765/400kV S/S)400 D/C 21.5 43.05 2-Apr-12 28-Dec-12 11-Feb-13 18-Mar-13

9 Chattisgarh CHH-28 PGCIL765kV s/c Champa pooling station to

Dharamjaigarh(Korba) t/l765 S/C 58.7 58.70 23-Apr-12 3-Mar-14 29-May-13 11-Mar-14

10 Chattisgarh CHH-29 PGCIL

765kV D/C Champa pooling station-Raipur

pooling station for gen Champa and Raigarh at

Chattisgarh

765 D/C 75.0 150.00 8-May-12 20-Feb-14 10-Jun-13 11-Mar-14

11 Chattisgarh CHH-30 PGCIL765kV D/C Raigarh p5 to Raipur pooling

station765 D/C 241.0 482.05 31-May-12 17-Jan-13 11-Feb-13 25-Oct-13

12 Chattisgarh CHH-31 PGCIL

400kV D/C T/L from 4X300 mw sks power

plant (Chattisgarh)-pooling station at

PGCIL,Bansia s/s

400 D/C 26.7 53.45 18-Jun-12

13 Chattisgarh CHH-32 JINDAL400kV D/C quad t/l from 4X600 mw jpl

Tamnar to PGCIL s/sBhendra,Raigarh400 D/C 23.2 46.40 24-Jul-12 28-Dec-12 21-Dec-12 16-Jan-13

14 Chattisgarh CHH-33 KWPCLLILO of cktI(II) at 400kV D/C Raigarh-Raipur

t/l to KWPCL switchyard 400 D/C 5.3 10.60 25-Jul-12 16-Oct-12 17-Oct-12 25-Oct-12

15 Chattisgarh CHH-34 PGCIL765kV D/C Raigarh(Kotra)-Raigarh(Tamnar)

t/l765 D/C 48.0 96.00 3-Aug-12 28-Dec-12 18-Sep-12 18-Apr-13

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

WESTERN REGION 1 of 19

Page 31: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

16 Chattisgarh CHH-35 PGCIL 765 s/c Raigarh-Champa pooling Station t/l 765 S/C 96.3 96.29 3-Aug-12 17-Jan-13 12-Mar-14 13-Mar-14

17 Chattisgarh CHH-36 PGCIL 765kV D/C Raipur-Wardha t/l-I part I 765 D/C 120.0 240.00 23-Aug-12 22-Jan-14 10-Dec-13 13-Mar-14

18 Chattisgarh CHH-37 DBPL

400kV D/C line to 2X600 mw power plant at

DBPL at Baradhara to 765kV c/s at

Bansia(Raigarh) of PGCIL

400 D/C 18.8 37.69 6-Sep-12 29-Oct-12 25-Sep-12 1-Nov-12

19 Chattisgarh CHH-38 PGCIL

400kV m/s t/l from Raigarh(Kotra) 400/220kV

PGCIL s/s to Raigarh(Bansia) 765/400kV

PGCIL s/s

400 D/C 6.3 12.58 10-Sep-12 28-Dec-12 14-Mar-12 18-Mar-13

20 Chattisgarh CHH-39 KWPCL400kV D/C line from KWPCL Switchyard to

PGCIL s/s Bansia,Raigarh400 D/C 16.6 33.18 20-Sep-12 16-Oct-12 6-Nov-12 9-Apr-13

21 Chattisgarh CHH-40 SEW

400kV D/C line from 4X300 mw sks Power

generation(Chattisgarh) to upcomming pooling

station of PGCIL at Bansia

400 D/C 26.9 53.81 14-Nov-12 6-Nov-13 6-Nov-13 18-Nov-13 19-Feb-14

22 Chattisgarh CHH-41 CSPTCL400kV D/C transmission line from Korba west

to Khedamara 400 D/C 223.5 447.00 4-Dec-12

23 Chattisgarh CHH-42 DBPL

400kV cktIII of Raigarh-Raipur line for

400kV switchyard of DBPL Badadhara

dist.janjgir Champa(CG)

400 D/C 14.9 29.84 12-Dec-12 22-Feb-13 22-Jan-13 26-Feb-13

24 Chattisgarh CHH-43 PGCIL765kV D/C Jharsuguda-Dharamjaigarh

(Chattisgarh portion only)765 D/C 70.0 140.00 30-Aug-12 17-Jan-13 12-Mar-14 13-Mar-14

25 Chattisgarh CHH-44 TRNEL400kV D/C t/l from TRN TPS to Tammar

pooling station400 D/C 14.2 28.38 1-Mar-13 24-Jul-13 24-Jul-13 26-Jul-13 5-Aug-13

26 Chattisgarh CHH-45 ATHENA 400KV D/C T/L at Janjgir, Champa Distt. 400 D/C 24.4 28.38 29-Apr-13 12-Sep-13 28-Jun-13 3-Jan-14

27 Chattisgarh CHH-46 LANCO 400 KV D/C KORBA-TAGA QUAD T/LINE 400 D/C 46.0 92.03 1-May-13

28 Chattisgarh CHH-47 MCCPL400 KV MCCPL S/S TO existing 400KV D/C

ACBIL T/L BANDAKHAR TO BILASPUR400 D/C 2.8 5.62 23-Jul-13 27-Sep-13 27-Sep-13 27-Sep-13 27-Sep-13

29 Chattisgarh CHH-48 PGCIL765 KV S/C (Delta) RANCHI -

DHARMJAYA GARH (KORBA) T/L765 S/C 164.0 164.00 27-Aug-13

30 Chattisgarh CHH-49 PGCIL765 KV S/C DHARMJAYA GARH

(KORBA) T/L - JABALPUR T/L PART-I765 D/C 153.2 306.46 23-Sep-13

31 Chattisgarh CHH-50 PGCILLILO of 765KV RANCHI SIPAT WR P/S -

DHARMJAYAGARH (Korba)765 D/C 9.0 18.08 30-Sep-13 6-Jan-14 25-Feb-14 11-Mar-14

WESTERN REGION 2 of 19

Page 32: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

32 Chattisgarh CHH-51 Visa Power 765kV PGCDC AT BANSIA RAIGARH 765 D/C 13.0 26.00 14-Nov-13 20-Feb-14 20-Feb-14 26-Feb-14

33 Chattisgarh CHH-52 PGCIL765kV D/C Raipur-Wardha t/l part I line-2

(ckt-1,3,4) CG Portion765 D/C 114.3 228.62 14-Nov-13 10-Mar-14

34 DNH DNH-1 PGCIL

220KV D/C KALA-KHADOLI (through D/C

& M/C) and 220KV D/C KALA-

KHARADPADA (through D/C & M/C) T/L

for feeding Power to U.T. Of DNH from

220 D/C 26.5 53.00 14-Mar-14

35 Gujrat GUJ-599 GETCO

220 kV D/C Tower Line with ACSR 'Zebra'

conductor from 220 kV Dahej S/S to M/s

ONGC

220 D/C 7.5 15.00 17-Apr-08

36 Gujrat GUJ-603 GETCO

220 kV D/C Tower Line with ACSR Zebra

conductor from 220 kV Nanikhakar S/S to

M/s Adani Power Project Ltd. At Vill-Tunda,

Tal-Mundra, Distt-Kutchchh

220 D/C 18.0 36.00 26-Aug-08 30-Apr-10 5-Jul-11 19-Jun-12

37 Gujrat GUJ-606 GETCO

220 kV D/C Tower Line with ACSR 'Zebra'

conductor from 220 kV Mangrol S/S to 220

kV Mobha S/S.

220 D/C 110.0 220.00 16-Feb-09 7-Dec-09 17-Feb-11

38 Gujrat GUJ-612 GETCO

220 kV LILO line to proposed 220 kV

Kangasiyali S/S from existing 220 kV Gondal-

Rajkot tower line

220 D/C 14.0 28.00 17-Mar-09 6-Jul-09 3-Mar-11 28-May-12

39 Gujrat GUJ-613 GETCO400kV D/C Vadinar (Essar)-Hadala (Rajkot)

S/S400 D/C 112.0 224.00 31-Mar-09 14-Jan-10 13-Aug-12

40 Gujrat GUJ-614 GETCO220 kV D/C Varsana - 220 kV Morbi line with

ACSR Zebra conductor220 D/C 107.0 214.00 1-May-09 6-Jul-09 11-Feb-11

41 GujratGUJ-

620A

Torrent

Energy

220 kV D/C Line from Dahej SEZ Tele

Generating Station to 220/33kV GETCO West

S/S at Dahej

220 D/C 7.4 14.80 18-Jun-09 1-Dec-09 17-Dec-09 1-Mar-12

42 GujratGUJ-

620B

Torrent

Energy

220 kV D/C Line from Tele Generating Station

Sly to 220/66kV GETCO S/S at Dahej220 D/C 3.4 6.80 18-Jun-09 1-Dec-09 17-Dec-09 1-Mar-12

43 GujratGUJ-

620C

Torrent

Energy

220 kV D/C Line from Tele Generating Station

S/Y Dahej to Opal at Dahej SEZ220 D/C 2.0 4.00 18-Jun-09 1-Dec-09 1-Dec-09 1-Mar-12

44 GujratGUJ-

620D

Torrent

Energy

220 kV D/C Line 220/33kV Dahej West S/S to

ONGC C2-C3 at Dahej SEZ220 D/C 1.2 2.40 18-Jun-09 1-Dec-09 17-Dec-09 1-Mar-12

45 Gujrat GUJ-615 GETCO 220kVS/C Nanikhakher-Coastal Guj Power 220 S/C 18.0 18.00 24-Jun-09 10-Jun-09 24-Jun-09 2-Jan-13

WESTERN REGION 3 of 19

Page 33: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

46 Gujrat GUJ-608 GETCO

220 kV D/C tower line with Zebra conductor

from 220 kV Shivlakha S/S to Wind Farm S/S

of M/s Vestas-RRB India Tech. Pvt. Ltd. At

Village-Vandhiya, Tal-Bhachau, Distt-

Kutchchh

220 D/C 44.0 88.00 10-Aug-09 17-Feb-09 24-Feb-09

47 Gujrat GUJ-627 PGCIL400 kV D/C Gandhar (Jhanor, near Bharuch)-

Navasari (Dastan, near Bardoli) T/L.400 D/C 101.5 202.94 3-Dec-09 23-Apr-10 17-Jan-12 13-Feb-12 28-Feb-12

48 Gujrat GUJ-633 GETCO220 kV D/C line from Utran gas power plant

to 400 kV Kosamba S/S.220 D/C 43.0 86.00 11-Jun-10 23-Jul-10

49 Gujrat GUJ-634 GETCO

220 kV D/C tower line with AL-59 conductor

from 400 kV Varsana S/S to 220 kV Tappar

S/S

220 D/C 4.0 8.00 11-Jun-10 26-Jul-10 12-Oct-12 19-Mar-14

50 Gujrat GUJ-635 GETCO

220 kV D/C tower line from 220 kV

Nakhatrana S/S to 400 kV Varsana (Tappar)

S/S with AL-59 conductor, Taluka-

Anjar,Distt. -Kutchchh,Gujarat.

220 D/C 106.8 213.56 29-Jun-10 3-Nov-10 12-Jul-12 14-Jan-13

51 Gujrat GUJ-636 GETCO220 kV LILO to Bhat S/S from 220 kV D/C

Salejada-Viramgam line on Zebra conductor.220 D/C 17.8 35.63 9-Jul-10 23-Jul-10

52 Gujrat GUJ-637 GETCO220 kV LILO to 220 kV Lalpar S/S from

existing 220 kV Morbi-Dhrangadhra line220 D/C 6.7 13.40 15-Jul-10 23-Sep-10 3-May-11 10-May-12

53 Gujrat GUJ-639 GETCO220kV D/C Viramgam-Chharodi(Nano)

Tower Line220 D/C 26.9 53.80 15-Sep-10 23-Sep-10 10-May-12

54 Gujrat GUJ-640 GETCO220kV D/C Morbi-Halwad Line LILO at

Bhimasar Line-1220 D/C 108.0 216.00 26-Oct-10 12-Jan-11 1-Jun-12

55 Gujrat GUJ-641 GETCO220kV D/C Morbi-Halwad Line LILO at

Bhimasar Line-2220 D/C 107.0 214.00 26-Oct-10 12-Jan-11 27-Feb-12

56 Gujrat GUJ-642 GETCO

220kV D/C Tower Line (LILO) to proposed

220kV Batad S/S from 220kV D/C Kasor-

Vartej main line

220 D/C 20.0 40.00 26-Oct-10 12-Jan-11

57 Gujrat GUJ-643 GETCO400kV D/C LILO Line from existing Ukai

TPS-Asoj Line at 400kV Kosamba S/S400 D/C 32.0 64.00 26-Oct-10 23-May-11 12-Jul-12 6-Dec-12

58 Gujrat GUJ-644 GETCO 400kV D/C Mundra-Zerda Tx. Line -2 400 D/C 330.6 661.13 9-Dec-10 31-Jan-13

59 Gujrat GUJ-630 GETCO 220 kV D/C Kheralu-Bhutiya Line 220 D/C 99.8 199.52 25-Jan-11 7-Dec-09 3-Mar-11

WESTERN REGION 4 of 19

Page 34: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

60 Gujrat GUJ-607 GETCO220kV D/C Vapi-Bhilad LILO at 400 kV

Ambheti (PGCIL) S/S.220 D/C 8.0 16.00 3-Mar-11 3-Mar-11 3-Mar-11 6-Dec-12

61 Gujrat GUJ-609 GETCO220 kV D/C Vav-Ukai line LILO at 220 kV

Mota (Bardoli) S/S220 D/C 4.3 8.58 3-Mar-11 3-Mar-11 17-Feb-09 20-Mar-14

62 Gujrat GUJ-645 GETCO33kV D/C Pri-pole X- Electrod line from

Adani power plant Siracha to Dhokda33 D/C 32.1 64.23 25-Jul-11

63 Gujrat GUJ-646 torrent powerLILO of one circuit of 400kV SUGEN -

PIRANA line at UNOSUGEN400 D/C 1.2 2.38 4-Nov-11 16-Feb-12 14-Feb-12 22-Feb-12

64 Gujrat GUJ-647 GETCO 220kV D/C Kosamba - Mobha power line 220 D/C 89.0 178.00 6-Feb-12 30-Apr-12 12-Jul-12

65 Gujrat GUJ-649 torrent power400kV DC & MC triple snowbird from

degenrating station Dahej to 400kV Navsari400 D/C 105.0 210.00 11-May-12 14-Sep-12 14-Sep-12 26-Sep-12

66 Gujrat GUJ-648 PGCIL 400kV DC Navsari-Boisar T/L 400 D/C 106.1 212.10 14-May-12 27-Aug-12 27-Aug-12 8-Nov-12

67 Gujrat GUJ-650 GETCO 400kV DC Wakai -Kosamba line 400 D/C 72.0 144.00 22-May-12 17-Sep-12 16-Jul-12

68 Gujrat GUJ-651 GETCO220kV LILO line from 220kV Navsari-Vav to

220kV Popda s/s220 D/C 8.2 16.42 28-May-12 29-May-13

69 Gujrat GUJ-652 GETCO220kV DC line from 400kV Kosamba S/S -

TO -220kV Jagadia220 D/C 24.0 48.00 1-Jun-12 9-Apr-13 21-Dec-12

70 Gujrat GUJ-653 GETCO 220kv DC line from GSEG to Mota 220 D/C 59.0 118.00 1-Jun-12 9-Apr-13

71 Gujrat GUJ-654 GETCO 220kV DC line from Kosamba to Mobha 220 D/C 4.5 9.00 1-Jun-12

72 Gujrat GUJ-655 GETCO220kV LILO on M/C-D/C tower from existing

220kV Haldarwa IPCL line 220 D/C 3.6 7.10 1-Jun-12 12-Oct-12

73 Gujrat GUJ-656 PGCIL 400kV DC Pirana to vadodra T/L 400 D/C 132.0 264.00 30-Jul-12 26-Feb-13 27-May-13 28-Jun-13

74 Gujrat GUJ-657 PGCIL 400kV DC quad vadodra-asoj T/L line 400 D/C 14.4 28.87 31-Dec-12 26-Feb-13 20-Jun-13 28-Jun-13

75 Gujrat GUJ-658 GETCO220kV DC transline from TEBHDA-Enercom

wind from s/s 220kV Nyara s/s 220 D/C 89.6 179.19 3-Jan-13 29-May-13

76 Gujrat GUJ-659 GETCO220kV Ukheda Suslon s/s to 400kV Varsana

tappar220 S/C 130.5 130.53 3-Jan-13 29-May-13

77 Gujrat GUJ-660 GETCO 220kV Jamanvada - Suslan to 400kV Varsna 220 S/C 179.9 179.90 3-Jan-13 29-May-13

WESTERN REGION 5 of 19

Page 35: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

78 Gujrat GUJ-661 GETCO200kV Kalavad to Kangasiyali line on DC

tower 200 D/C 56.0 112.00 3-Jan-13 29-May-13

79 Gujrat GUJ-662 GETCO220kV LILO at 400kV Hadalar s/s from

existing 220kv nayara-kangashiyali line 220 D/C 17.0 34.00 3-Jan-13 29-May-13 16-Aug-13

80 Gujrat GUJ-663 GETCO400kV DC Kasamba to Charanja line twin

moose conductor 400 D/C 229.2 458.40 3-Jan-13 20-Sep-13

81 Gujrat GUJ-664 GETCO220kV LILO at 220kV Sartanpar s/s from

existing 220kV DC Hardala-Halwad line 220 D/C 13.0 26.00 2-Jan-13 29-May-13 22-Aug-13

82 Gujrat GUJ-665 PGCIL765kV indore - Vadodra part of indore -

Vadodra tl part II765 S/C 315.0 315.00 21-Jan-13 7-Oct-13 19-Aug-13 24-Dec-13

83 Gujrat GUJ-666 PGCIL400 Kv M/C LILO of both ckt of NAVSARI-

BOISAR T/L at MAGARWADA GIS S/S400 D/C 15.9 31.72 21-Feb-13 27-May-13 14-Nov-13 19-Nov-13

84 Gujrat GUJ-667 GETCEL220kV OPG project Bahadareshwar.ta

Mundra dist Bhuj to 400kV Varsana tapper ss220 D/C 56.7 113.38 9-Apr-13

85 Gujrat GUJ-668 PGCIL400 KV D/C T/L from Betul(New s/s)-

Khandwa(s/s)400 D/C 168.5 336.97 30-Jun-13

86 Gujrat GUJ-669 PGCIL400kV D/C ESSAR TPS (JAMNAGAR)

BACHHAU S/S T/L.400 D/C 225.1 450.20 2-Jul-13 23-Jul-13

87 Gujrat GUJ-670 PGCILBHACHAU S/S(PGCIL) -

VARSANA(GETCO) T/L400 D/C 9.1 18.20 30-Oct-13 6-Dec-13 25-Nov-13

88 Gujrat GUJ-671 GETCO

220 KV D/C & M/C LILO FROM

SAVARKUNDLA - OTHA LINE NO. 1 at

GPPC PLANT

220 D/C 45.3 90.52 18-Feb-14

89 Gujrat GUJ-672 GETCO 220KV D/C OTHA - SAGAPARA T/L 220 D/C 48.0 96.00 20-Feb-14

90 Gujrat GUJ-673 GETCO

1) 220KV LILO from existing BHIMASAR-

LAIPAR T/LTO SARTANPAR S/S 2)132KV

LILO from 132kv LALPAR-WANKANER

LINE(ON 220KV M/C TOWER) TO

SARTANPAR

220 D/C 8.6 17.26 3-Mar-14

91 Gujrat GUJ-674 GETCO

132 KV LILO to PADAVALA S/S from

Existing 132KV PALIYAD-VIKRAM Line on

D/C tower

132 D/C 2.0 4.00 6-Mar-14

WESTERN REGION 6 of 19

Page 36: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

92 Gujrat GUJ-675 GETCO

220KV D/C LILO to PS-2 (OF SSNNL - at

NANI HAMIRPAR) from SHIVLAKHA-

DEODAR Line

220 D/C 27.7 55.3 6-Mar-14

93 Gujrat GUJ-676 GETCO220KV HALVAD-SADIA Line on D/C tower

Line 220 D/C 37.6 75.2 14-Mar-14

94 Gujrat GUJ-677 GETCO220KV D/C LILO TO PS-3 (OF SSNNL - at

BHACHAU) from TAPPAR-SHIVLAKHA 220 D/C 1.4 2.9 10-Mar-14

95 Gujrat GUJ-678 GETCO

220KV D/C T/L from PS-2 (of SSNNL-at

Nani Hamirpar) to PS-1 (of SSNNL-at

Manjuvas)

220 D/C 10.3 20.5 10-Mar-14

96 Gujrat GUJ-679 GETCO220KV MOKHA - VARSANA Line on D/C

& M/C Tower220 D/C 57.8 115.7 10-Mar-14

97 Gujrat GUJ-680 GETCO

220KV MOKHA (VADALA S/S) from

Existing 220 KV Nani Khakhar-Tappar Line

no. 1

220 D/C 10.4 20.8 10-Mar-14

98 Gujrat GUJ-681 GETCO

400kv MUNDRA - HADALA LILO at

proposed 400kv HALVAD S/S on D/C tower

Line

400 D/C 45.0 90.0 14-Mar-14 5-Jan-00

99 Gujrat GUJ-682 GETCO220KV D/C LILO TO SUVA FROM

KOSAMBA-MOBHA LINE220 D/C 56.0 112.0 25-Mar-14

100 Gujrat GUJ-683 GETCO220KV D/C HALWVAD-HADALA Line on

D/C Tower 220 D/C 84.7 169.3 25-Mar-14

101 Gujrat GUJ-684 GETCO220KV S/C CHORANIA - GONDAL LINE

LILO AT 220KV SADLA S/S220 D/C 29.2 58.4 31-Mar-14

WESTERN REGION 7 of 19

Page 37: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

102 Gujrat GUJ-685 GETCO220 KV LILO FROM 220KV JETPUR TO

SIKKA S/S JAMNAGAR LINE -I220 D/C 60.0 120.0 31-Mar-14

103Madhya

PradeshMP-339 PGCIL 400kV D/C Indore - Indore (Quad) 400 D/C 49.7 99.46 29-Mar-10 11-Feb-11 17-Jan-12 13-Feb-12 28-Feb-12

104Madhya

PradeshMP-340 PGCIL 765kV S/C Bina - Indore 765 S/C 316.0 316.00 29-Mar-10 14-Dec-11 24-Nov-10 23-Feb-12 28-Feb-12

105Madhya

PradeshMP-341 PGCIL 765kV S/C Bina - Satna Line Ckt-I 765 S/C 274.0 274.00 17-Apr-10 28-Nov-11 24-Nov-10 3-Jan-12 10-Jan-12

106Madhya

PradeshMP-343 PGCIL 765kV S/C Satna-Bina Line Ckt-II 765 S/C 276.0 276.00 11-May-10 28-Nov-11 24-Nov-10 3-Jan-12 10-Jan-12

107Madhya

PradeshMP-345 PGCIL

765kV S/C Sasan-Satna Transmission Line

Ckt-I765 S/C 246.0 246.00 16-Aug-10 25-Apr-11 5-Dec-11 8-Feb-12

108Madhya

PradeshMP-346 MPPTCL

220kV DCDS Line for LILO of one circuit of

220kV DCDS Satana-Bansagar(Tons) for

proposed 220kV S/s Kotar

220 D/C 4.3 8.58 10-Sep-10 28-Dec-12

109Madhya

PradeshMP-347 PGCIL

765kV S/C Sasan-Satna Ckt-II Transmission

Line asociated with SASAN UMPP for

Western Region

765 S/C 244.0 244.00 14-Sep-10 25-Apr-11 5-Dec-11 8-Feb-12

110Madhya

PradeshMP-348 MPPTCL

220kV DCSS Line from 220kV S/s Sidhi for

P.S. to Mohan Aluminium Project Plant of M/s

Hindalco Industries at Bargawan Distt.

Singarauli

220 D/C 80.0 160.00 23-Sep-10 20-Apr-11 23-Feb-11 25-Jun-12

111Madhya

PradeshMP-352 PGCIL

LILO of one circuit of 220kV Bina - Shivpuri

line at Bina (PGCIL) 400kV S/S220 D/C 0.8 1.66 27-Sep-11 28-Dec-12 12-Jul-12 22-Oct-13

112Madhya

PradeshMP-351 MPPTCL

220kV DCSS Line from S/S at M/S Jaiprakash

Associates Ltd, Rewa to 220kV S/S Rewa

(Silpra) at MPPTCL

220 D/C 1.0 2.02 8-Nov-11 27-Feb-12 9-Jul-12 23-Mar-14

113Madhya

PradeshMP-353 MPPTCL

220kV D/C Malwa (Singhaji) TPH -

Chhegaon 220kV DCDS line220 D/C 47.9 95.79 12-Dec-11 27-Feb-12 10-Jul-12

114Madhya

PradeshMP-354 MPPTCL

LILO of 220kV DCDS Nagda - Neemuch line

for 220kV Daloda S/S220 D/C 4.4 8.80 29-Dec-11 17-Jan-13

115Madhya

PradeshMP-355 MPPTCL

400kV DCDS line from Malwa (Singhaji) TPS

- Chhegaon 400kV S/S400 D/C 52.3 104.69 10-Jan-12 31-Jan-13 22-Oct-12

WESTERN REGION 8 of 19

Page 38: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

116Madhya

PradeshMP-356 MPPTCL

220kV DCDS line from 400kV S/S PGCIL

Satna to 220kV S/S Satna MPPTCL220 D/C 2.0 4.00 23-Jan-12 10-Apr-12 10-Apr-12 24-Mar-14

117Madhya

PradeshMP-357 MPPTCL

220kV DCDS line from Gwalior (400kV)

PGCIL S/S to Gwalior-II 220kV S/S220 D/C 2.4 4.73 7-Mar-12 17-Jan-13 2-Jul-12

118Madhya

PradeshMP-358 MPPTCL

220kV DCSS line from 220kV S/S Ratlam to

220kV S/S Daloda220 D/C 75.0 150.00 21-Mar-12 28-Dec-12

119Madhya

PradeshMP-359 PGCIL

400kV D/C power line from Vindhyachal

(NTPC) - Vindhyachal pooling station400 D/C 29.3 58.56 13-Mar-12 2-Feb-12 6-Jul-12 27-Aug-12

120Madhya

PradeshMP-360 MPPTCL 400kV DCDS line from Malwa -Pithampur 400 D/C 135.9 271.70 7-May-12 28-Oct-13

121Madhya

PradeshMP-361 MPPTCL

400kV DCDS Chhegaon-400kV s/s

Jhulwahiya400 D/C 112.6 225.14 7-May-12 16-Jul-12

122Madhya

PradeshMP-362 PGCIL 765kV s/c Bhopal-Indore 765 S/C 174.0 174.00 1-Jun-12 19-Jun-13 19-Jun-13 26-Jul-13

123Madhya

PradeshMP-363 Jaypee

400kV DC quad line JNSTPP Nigari-PGCIL

s/s Satna400 D/C 156.0 312.00 24-Jul-12 28-Dec-12 26-Oct-12 7-Feb-13 3-Mar-13

124Madhya

PradeshMP-364 Sterlite 765kV s/s Jabalpur to bhopal 765 S/C 260.4 260.38 27-Jul-12 8-Mar-13 27-Dec-12 24-Jul-13

125Madhya

PradeshMP-365 PGCIL 765kV s/s Satna - Gwalior cktII 765 S/C 342.0 341.96 27-Aug-12 19-Feb-13 12-Feb-13 16-Apr-13 30-Apr-13

126Madhya

PradeshMP-366 PGCIL 765kV S/c Bina-Gwalior cktIII 765 S/C 231.0 231.00 10-Sep-12 30-Oct-13 23-Oct-13 13-Jan-14

127Madhya

PradeshMP-367 MDTCL

400kV quad line from bhopal s/s(BDTCL)-

Bhopal s/s(MPPTCL) Sukhisawaniya400 D/C 7.4 14.80 18-Sep-12 31-Jan-13 26-Dec-12 5-Jun-13

128Madhya

PradeshMP-368 PGCIL 400kV DC Annuppur - Jabalpur T/L 400 D/C 240.0 480.00 19-Nov-12 19-Aug-13 23-Jul-13 11-Feb-14

129Madhya

PradeshMP-369 PGCIL 400kV dc Jabalpur pool-Jabalpur tl 400 D/C 15.5 30.90 14-Nov-12 19-Aug-13 20-Jun-13 11-Oct-13

130Madhya

PradeshMP-370 PGCIL 765kV dc Jabalpur poal - Bina tl 765 D/C 229.1 458.22 19-Nov-12 19-Aug-13 16-Jul-13 25-Oct-13

131Madhya

PradeshMP-371 PGCIL

765kV DC Dharamjaigarh-Jabalpur pooling

SS T/l 765 D/C 384.0 768.00 19-Nov-12 7-Oct-13 19-Jun-13

132Madhya

PradeshMP-372 MPPTCL

400kV DCDS from 400kV s/s Pithampur-

765/400kV s/s Indore400 D/C 63.6 127.20 26-Dec-12 4-Sep-13

WESTERN REGION 9 of 19

Page 39: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

133Madhya

PradeshMP-373 PGCIL 765kV s/c Satna-Gwalior cktI transline 765 S/C 300.0 300.00 26-Feb-13 19-Feb-13 12-Feb-13 16-Apr-13 30-Apr-13

134Madhya

PradeshMP-374 PGCIL

400kV D/C Barda(Seoni)-New Pooling s/s at

Jabalpur T/L400 D/C 64.6 129.28 20-Feb-13 8-Jul-13 8-Jul-13 18-Jul-13

135Madhya

PradeshMP-375 BDTCL

765kV S/C T/L from 765kV-Dhule S/S to

Aurangabad 765 S/C 192.0 384 16-Apr-13 27-Jun-13 26-Jun-13 16-Jul-13

136Madhya

PradeshMP-376 BDTCL

400kV T/L from 400kV Dhule S/S to Dhule

S/S 400 S/C 17.8 17.8 16-Apr-13 28-Mar-13 30-May-13 3-Jul-13

137Madhya

PradeshMP-377 BDTCL 765kV Dhule S/S to Vadodara S/S(Gujrat) 765 S/C 262.0 262 16-Apr-13 27-Jun-13 30-May-13 11-Jul-13

138Madhya

PradeshMP-379 PGCIL

765 kV S/C & D/C Gwalior Jaipur T/C circuit-

1765 D/C 115.8 231.54 13-Jun-13 27-Mar-14 23-Oct-13

139Madhya

PradeshMP-380 PGCIL 765 kV S/C(Quad) Gwalior-Jaipur Circuit -2 765 S/C 117.2 234.31 13-Jun-13 27-Mar-14 10-Feb-14

140Madhya

PradeshMP-378 JTCL

765kV D/C Dharamjaygah(Korba)-Jabalpur

T/L765 D/C 376.4 752.86 23-Jul-13 6-Feb-14 16-Jul-13

141Madhya

PradeshMP-381 BACL

400KV D/C T/L from KORBA (BALCO 1200

MW Power plant) TO BHARAMJAGARH

P/S (PGCIL 765/400 KV)

400 D/C 21.9 43.858 6-Aug-13

142Madhya

PradeshMP-382 PGCIL

765 KV S/C VINDHYACHAL P/S T/L

CKT-I765 S/C 247.0 247.0 26-Aug-13 3-Dec-13

143Madhya

PradeshMP-383 PGCIL

766 KV S/C VINDHYACHAL P/S T/L

CKT-II765 S/C 96.5 96.5 26-Aug-13 3-Dec-13

144Madhya

PradeshMP-384 MPPTCL

LILO of one Ckt of 220kV DCDS

BHOPAL - ASHTA line at proposed

220kV S/s Mungaliya Chhap

220 D/C 24.7 49.33 6-Jan-14

145Madhya

PradeshMP-385 MPPTCL

220 KV DCSS LINE FROM DALODA

S/S TO BHATKHEDA S/S AT DISST.

RATLAM(M/s.D.J.ENERGY PVT.

LTD.)

220 D/C 20.4 40.72 11-Feb-14

146 Maharastra MRA-907 AIRTELBharti Airtel Shriman Complex to Mangaon

Telephone Exchange220 D/C 1.3 2.50 8-Jun-09

WESTERN REGION 10 of 19

Page 40: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

147 Maharastra MRA-908 MSETCL220kV D/C Lamboti (Solapur) - Tuljapur

power line. 220 D/C 38.0 76.00 27-Jul-09 1-Dec-09 9-Apr-12 4-Oct-12 28-Dec-12

148 Maharastra MRA-911 MSETCL220kV D/C LILO on M/s Seerum Intitute of

India Ltd from 220kV Theur-Magarpatta 220 D/C 1.0 2.00 18-Aug-09 7-Sep-09 9-Jul-09

149 Maharastra MRA-912 MSETCL220kV D/C Tap line for M/s Blue Ridge from

220kV Phursungi-Chinchwad 220 D/C 0.5 1.00 18-Aug-09 1-Feb-10

150 Maharastra MRA-913 MSETCL220kV D/C LILO for Kudus from 220kV

Padghe - Wada 220 D/C 13.0 26.00 18-Aug-09

151 Maharastra MRA-924 PGCIL 400kV Solapur-Kolhapur 400 D/C 219 438.00 25-Sep-09 17-Oct-11 17-Nov-11 23-Apr-12 12-Jun-12

152 Maharastra MRA-916 MSETCL220kV LILO to Baramati Agro from 220kV

Baramati-Bhigavam220 D/C 8.4 16.80 4-Nov-09 5-Nov-09 10-May-10

153 Maharastra MRA-919 MSETCL 220kV Murad-Girwali 220 D/C 93.08 186.16 9-Nov-09 18-Mar-10

154 Maharastra MRA-920 MSETCL LILO of 220kV Murud-Girawali to Harangal 220 D/C 70 140.00 9-Nov-09 18-Mar-10

155 Maharastra MRA-921 MSETCL220kV D/C LILO of Padghe-Kamba to

Rajlaxmi S/C220 D/C 9.68 19.36 10-Nov-09 6-Feb-14

156 Maharastra MRA-931 PGCIL400kV D/C Vapi - KALA (orginally Navi

Mumbai)400 D/C 360 720.00 31-Dec-09 26-Jul-10 6-Feb-14

157 Maharastra MRA-932MAHATRA

NSCO220kV M/C Paras - Balapur 220 D/C 5 10.00 18-Jan-10 20-Apr-11 23-Apr-10 16-Feb-12

158 Maharastra MRA-933 PGCIL 400kV D/C Parli - Pune 400 D/C 323 646.00 21-Jan-10 10-Aug-11 17-Nov-11

159 Maharastra MRA-937 MSETCL

220kV D/C Tap (LILO) Line for Bhosri-II S/S

from Ex. 220kV TELCO S/S - Bhosri-I S/S

Line

220 D/C 0.04 0.08 26-Feb-10 15-Mar-11 13-Jan-12 2-Mar-12 19-Mar-12

160 Maharastra MRA-940MAHATRA

NSCO

Conversion of 220 kV S/C to D/C Chalisgaon-

Bhabhaleshwar Transmission line up to

Kopargaon Tap point No. 26

220 D/C 74.63 149.26 28-Jun-10 11-Feb-11 15-Mar-11 11-Jan-12 24-Jan-12

161 Maharastra MRA-945MAHATRA

NSCO

220 kV D/C line from Akola (Apatapa) to

Anjangaon.220 D/C 52 104.00 2-Jul-10 20-Apr-11 20-Nov-11 7-Mar-12

162 Maharastra MRA-949 Mahatransco 220 kV D/C Parbhani - Shelu line. 220 D/C 53.878 107.76 17-Aug-10 24-Nov-10

163 Maharastra MRA-950 Mahatransco 220 kV D/C Paranda - Barshi line 220 D/C 36.853 73.71 17-Aug-10 31-Jan-13 15-Feb-13 19-Jul-13

WESTERN REGION 11 of 19

Page 41: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

164 Maharastra MRA-952 Mahatransco 220 kV D/C Nanded - Bhokar line. 220 D/C 36.4 72.80 20-Aug-10 23-Feb-11 24-Nov-10 28-Mar-12

165 Maharastra MRA-954 MSETCL

220kV D/C LILO line from Kandalgaon-

Khalapur line for M/s Top Worth S/s at

Khalapur

220 D/C 0.483 0.97 13-Jan-11 22-Sep-10 2-Dec-10 19-Mar-14

166 Maharastra MRA-955 Mahatransco

220kV D/C LILO Lineon proposed 220kV

Sawangi-Bhokordon Line for 220kV Phulambi

S/S

220 D/C 10.8 21.60 1-Oct-10 12-Jul-12 6-Jan-12 4-Sep-12 27-Oct-12

167 Maharastra MRA-959 MSETCL220kV LILO line from Satara - Vankusawada

line for M/s Ajinkyatara SSK Ltd. Dist.Satara220 D/C 2.996 5.99 3-Mar-11 20-Jun-11 21-Jun-11

168 Maharastra MRA-960GMR/

EMCO

400kV D/C EMCO TPS Warora - Bhadrawati

power line400 D/C 33.3 66.60 3-Mar-11 20-Jun-11 26-Jul-12 30-Jul-12

169 Maharastra MRA-961 Mahatransco220kV D/C LILO on Kandalgaon - Kharghar

for Villebagad s/s220 D/C 6.606 13.21 15-Mar-11 10-Aug-11 15-Jan-12 7-Feb-12 9-Feb-12

170 MaharastraMRA-

962AMSETCL 220kV D/C Balapur S/S to Malegaon S/S Line 220 D/C 70 140.00 15-Apr-11 20-Mar-14 11-Jan-12

171 Maharastra MRA-964 MSETCL 220kV D/C Koradi - Khaparkheda II S/S 220 D/C 14 28.00 3-May-11 13-Aug-12 23-May-11 10-Jan-14

172 Maharastra MRA-965 MSETCL 400kV D/C Chandrapur II S/S to Wardha S/S 400 D/C 123 246.00 3-May-11 3-Oct-11 19-Mar-12 30-Apr-12 25-Jun-12

173 Maharastra MRA-966 MSETCL 220kV M/C Koradi II S/S - Butibori III S/S 220 D/C 53 106.00 3-May-11 13-Aug-12 23-May-11 14-Jan-13

174 Maharastra MRA-967 MSETCL 400kV D/C Koradi II S/S - Wardha S/S 400 D/C 119 238.00 3-May-11 13-Aug-12 3-Oct-12 22-Mar-13

175 Maharastra MRA-970 Reliance220kV D/C Line from Rinta-T Aarey to Saki

EHV S/S220 D/C 4.06 8.12 17-Jun-11 21-Feb-12 21-Feb-12 24-May-12 7-Jun-12

176 Maharastra MRA-971 PGCIL400kV D/C (Quad) Mouda (Generating

station) - Wardha400 D/C 123.95 247.90 24-Jun-11 7-Oct-11 6-Feb-12 10-Feb-12

177 Maharastra MRA-972 MEGPTCL 400kV D/C Akola-II to Akola-I Line 400 D/C 29.74 59.44 22-Jul-11 26-Jul-12 16-May-12 11-Sep-12 6-Nov-12

178 Maharastra MRA-973 MSETCL220kV D/C LILO line from existing pusad -

Nanded line fro Ghatodi S/S220 D/C 16 32.00 9-Aug-11 29-Oct-12 10-Apr-11 14-Jan-13

179 Maharastra MRA-975 MSETCL 220kV D/C Deoli S/S to Ghatodi S/S 220 D/C 161 322.00 11-Aug-11 29-Oct-12 21-Aug-13

180 Maharastra MRA-977 MSETCL400kV D/C Chandrapur II S/S to Tadali

(Dhariwal Power Plant)400 D/C 8.6 17.20 16-Aug-11 3-Oct-11 10-Jan-13 14-Feb-13

WESTERN REGION 12 of 19

Page 42: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

181 Maharastra MRA-978 MSETCL

220kV D/C Line from M/S Vidarbha

Industries Power Ltd (MS/VIL) at Buttibori

MIDC to 220kV Buttibori II S/S (Phase-I)

220 D/C 1.2 2.40 16-Aug-11 4-Oct-11

182 Maharastra MRA-979

MEGPTCL +

Adani +

PGCIL

765kV S/C Koradi-III to Akola-II Ckt no.I 765 S/C 223 223.00 12-Sep-11 13-Aug-12 13-Feb-13 13-Feb-13 12-Apr-13

183 Maharastra MRA-980 MSETCL220kV D/C Line from Ghatodi (Pusad) -

Hingoli S/S220 D/C 84 168.00 3-Oct-11 29-Oct-12

184 Maharastra MRA-981 MSETCLLILO of 400kV D/C line Koradi-II to Wardha

line at 2X270MW TPS (IEPL) at Village Bela400 D/C 24.36 48.72 17-Oct-11 2-May-12 10-Apr-12 9-May-12

185 Maharastra MRA-983 MEGPTCL 765 kV S/C Tiroda - Koradi-III line 765 S/C 137.5 137.50 17-Nov-11 13-Aug-12 30-Apr-12 1-Oct-12 10-Jan-13

186 Maharastra MRA-985 MSETCLLILO of 220kV D/C Mahad - Nagothane line

at 220kV POSCO S/S220 D/C 3.5 7.00 5-Dec-11 24-Feb-12 7-Nov-12 12-Dec-12

187 Maharastra MRA-986 MSETCL 220kV Butibori-I - Butibori-III line 220 D/C 2 4.00 7-Dec-11 18-Feb-12 18-Feb-12 18-Feb-12 18-Feb-12

188 Maharastra MRA-987 MSETCL

LILO of 400kV D/C Aurangabad (Waluj) -

Bhusawal line for Tapti Tanda (Aurangabad-

II) S/S on circuits-II

400 D/C 84.73 169.46 8-Dec-11 26-Jul-12 11-Jan-12 3-Dec-12

189 Maharastra MRA-988 MSETCL

LILO of 400kV D/C Aurangabad (Waluj) -

Bhusawal line for Tapti Tanda (Aurangabad-

II) S/S on circuits-I

400 D/C 76.499 153.00 8-Dec-11 26-Jul-12 11-Jan-12 9-Nov-12

190 Maharastra MRA-989 MSETCL

220kV D/C Bidri (Mudal Titta) S/S to LILO

point on 220kV D/C Kolhapur - Samantwadi

line

220 D/C 13.156 26.31 8-Dec-11 1-May-12 12-Jul-12

191 Maharastra MRA-992 MSETCL220kV D/C Phulambri S/S to Kankora

Windmill S/S trans. Line (Aurangabad)220 D/C 19.6 39.20 14-Dec-11 12-Jul-12 8-Oct-12

192 Maharastra MRA-991 MEGPTCL 765kV S/C Tiroda - Koradi III line Ckt-II 765 S/C 137.5 137.50 16-Dec-11 13-Aug-12 30-Apr-12 1-Oct-12 10-Jan-13

193 Maharastra MRA-993 MEGPTCL 765kV S/C Koradi-III to Akola-II trans. Line 765 S/C 223 223.00 26-Dec-11 13-Aug-12

194 Maharastra MRA-994 MSETCLLILO of 220kV S/C Pedambe - Karad and

Pophali - Karad II for 220kV Nerle S/S220 D/C 1.05 2.10 26-Dec-11 2-Feb-12 2-Feb-12

195 Maharastra MRA-995 SNTCL 400kV D/C Quad Nasik - Babhaleshwar T/L 400 D/C 56.27 112.54 29-Dec-11 9-Apr-12 9-Apr-12 20-Jul-12

WESTERN REGION 13 of 19

Page 43: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

196 Maharastra MRA-996 APTCL400kV D/C Quad Amravati TPP to Akola-II

Trans. Line400 D/C 103 206.00 16-Jan-12 26-Jul-12 21-Aug-12 30-Nov-12

197 Maharastra MRA-997 MEGPTCL 765kV S/C Quad Akola-III to Aurangabad line 765 S/C 220 220.00 2-Feb-12 26-Jul-12 2-May-12 23-Oct-12 10-Dec-12

198 MaharastraMRA-

997AMEGPTCL

765kV S/C Quad Akola-III to Aurangabad line

ckt-2765 S/C 223 223.00 2-Feb-12 26-Jul-12 2-May-12 23-Oct-12 10-Dec-12

199 Maharastra MRA-998 Reliance

LILO of 220kV MSETCL Borivali - Boisar

line at R.Infra-T Ghodbunder EHV S/S (XLPE

Cable)

220 D/C 4.3 8.60 2-Feb-12 12-Jul-12 18-Jul-12 24-Jul-12 9-Jul-12

200 Maharastra MRA-999 Reliance

XLPE Cable at 220kV D/C Cable between R

Infra Chembur EHV S/S to MSETCL

Trombay EHV S/S

220 D/C 8.125 16.25 24-Feb-12 1-Jun-12 5-Jun-12 6-Jun-12 11-Jun-12

201 MaharastraMRA-

1000MSETCL

LILO of 220kV D/C Kolhapur - Ponda line at

Hydro generating station Tillarri (Konalkatta)

S/S

220 D/C 0.199 0.40 23-Feb-12 1-Mar-12 1-Mar-12 14-Mar-12 30-Mar-12

202 MaharastraMRA-

1001

MAHATRA

NSCO220kV D/C Maishal S/S to Jath S/S 220 D/C 67.98 135.96 26-Mar-12 1-May-12 25-May-12 7-Mar-13

203 MaharastraMRA-

1002MSETCL

LILO of 220kV D/C Amaravati to Badhera

line at Nandgaon S/S220 D/C 30 60.00 26-Mar-12 26-Jul-12 8-Oct-12

204 MaharastraMRA-

1003MSETCL

220kV D/C line from 300MW Phase-II TPS

M/S VIPL to Butibori-I S/S220 D/C 1.7 3.40 26-Mar-12

205 MaharastraMRA-

1004STCL

LILO of 220kV D/C Pedamba - Karad line for

M/S Ratnagiri Wind Power Project, Dasgaon

S/S

220 D/C 4.091 8.18 26-Mar-12 1-May-12 1-May-12 22-May-12

206 MaharastraMRA-

1005MEGPTCL

LILO of 220kV D/C Satar MIDC -

Vankuswada line for Ajinkyatara SSK Ltd for

Co generation of Shri Renuka Sugar Ltd

220 D/C 4.133 8.27 26-Mar-12 2-May-12 2-May-12 22-May-12

207 MaharastraMRA-

1006Reliance

220kV D/C UG 220kV MSETCL Borivali s/s

to R.infrastucture,Borivali ENU s/s220 D/C 2.5 5.00 16-Apr-12 8-Oct-12 23-Jul-12 11-Oct-12

208 MaharastraMRA-

1007MSETCL

220kV D/C UG R infrastucture 220kV EHV

s/s 220kV MSETCL Borivali s/s220 D/C 8.3 16.60 16-Apr-12 8-Oct-12 23-Jul-12 11-Oct-12

209 MaharastraMRA-

1008

INDIA

BULL

LILO of 220kV D/C Eklahera - Babhaleshwar

line at Sinner220 D/C 0.3 0.60 25-Apr-12 13-Jul-12 21-Jul-12 21-Jul-12 21-Jul-12

210 MaharastraMRA-

1009MSETCL

LILO of 220kV D/C Gangapur - Satana line at

220kV Sakari (Sivajinagar) S/S220 D/C 27.625 55.25 24-Apr-12 8-Mar-13 1-Mar-14 11-Mar-14

WESTERN REGION 14 of 19

Page 44: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

211 MaharastraMRA-

1010MSETCL

220kV D/C Line LILO on Vita - Pandharpur

line for Hiwarwadi S/S220 D/C 6 12.00 6-Jun-12 12-Jul-12 17-Jul-12 17-Aug-12

212 MaharastraMRA-

1011MSETCL

LILO on 220kV D/C Khaperkheda-Khanan-

Sunblag line for 25 mw power plant at M/S

Surya laxmi cotton mills,Nagardhan

220 D/C 3.455 6.91 25-Jun-12 18-Sep-12 28-Aug-12 22-Oct-12 15-Dec-12

213 MaharastraMRA-

1012MSETCL

LILO on 220kV Mulund-Borivali line for

bhandup gis s/s by ug cable 220 D/C 0.9 1.80 7-Jul-12 3-Oct-12 3-Oct-12 20-Dec-12

214 MaharastraMRA-

1013MSETCL

LILO on 220KV Volkswagon S/S to 220KV

Mahindra S/S line for M/S Bridgestone

220KV S/S at Chakan MIDC

220 D/C 6 12.00 10-Jul-12 12-Dec-12

215 MaharastraMRA-

1014MSETCL

400KV D/C Chandrapur-II to Chandrapur S/S

Line400 D/C 2.268 4.54 12-Jul-12 17-Sep-12 4-Apr-13

216 MaharastraMRA-

1015MSETCL

400KV D/C Babhleshwar S/S to Thapti Tanda

(Aurangabad-II) S/S Line400 D/C 121.58 243.16 16-Jul-12 30-May-13 8-Mar-14 11-Mar-14

217 MaharastraMRA-

1016MSETCL

220KV D/C Line from Ahmednagar-Bhose

(Belwandi)220 D/C 47.5 95.00 13-Aug-12 28-Mar-13 28-Mar-13 22-Jul-13

218 MaharastraMRA-

1017MSETCL 220KV D/C line from Eklahare-Pimpalgaon 220 D/C 43.8 87.60 16-Aug-12 28-Mar-13 21-Dec-12 12-Sep-13

219 MaharastraMRA-

1018MSETCL

220KV D/C Line, LILO on Lonand-

Kandalgaon line for M/S Birla Surya Ltd.220 D/C 10.3 20.60 6-Sep-12

220 MaharastraMRA-

1019MSETCL

220KV D/C Line, LILO on Kandalgaon-

Lonand line for Lonand MIDC S/S220 D/C 1.65 3.30 7-Sep-12

221 MaharastraMRA-

1024MSETCL

220KV D/C Line-TAP on Bhableshwar-

Chalisgaon Line for Kopargaon S/S220 D/C 10.6 21.20 1-Oct-12 30-May-13 19-Aug-13 10-Jan-14

222 MaharastraMRA-

1020MSETCL

220KV D/C T/L from Malegaon S/S to

Kalwan S/S220 D/C 47.1 94.20 8-Oct-12 28-Mar-13

223 MaharastraMRA-

1021PGCIL

400KV D/C Navasari-Boisar T/L

(Maharashtra Portion)400 D/C 49 98.00 9-Oct-12 6-Aug-13 14-Jan-13 8-Nov-12

224 MaharastraMRA-

1022

MAHATRA

NSCO

LILO OF 400KV D/C Chandrapur-Parli Line

of CKT-I & CKT-II for 400KV Chandrapur-II

S/S

400 D/C 2.03 4.06 12-Oct-12 17-Jan-13 4-Mar-13

225 MaharastraMRA-

1023Reliance

220KV XLPE Cable Line from R'-Intra

220KV Saki EHV S/S to TATA 220KV Saki

EHV S/S

220 D/C 1.45 2.90 25-Oct-12 28-Mar-13 4-Feb-13 28-May-13

226 MaharastraMRA-

1025MSETCL

220KV D/C Line from Chandrapur MIDC S/S

to Ballarsha S/S220 D/C 24 48.00 29-Nov-12 4-Mar-13

WESTERN REGION 15 of 19

Page 45: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

227 MaharastraMRA-

1026MSETCL

220KV D/C Line from Wardha-II(Bhugaon)

S/S TO Warodra S/S220 D/C 83 166.00 29-Nov-12

228 MaharastraMRA-

1027PGCIL

400KV M/C(TWIN) LILO of both CKT of

400 KV D/C Vapi-Navi Mumbai T/L at kala

(New 400/220KV GIS SS)

400 D/C 9.014 18.03 12-Dec-12 26-Feb-13 10-Jun-13 28-Jun-13 12-Jul-13

229 MaharastraMRA-

1028MSETCL

220kV M/C line from kopergaon Taping point

to 400KV Babhleshwar s/s.220 D/C 37.988 75.98 21-Dec-12 30-May-13 19-Aug-13

230 MaharastraMRA-

1029GOA,SEB

220KV D/C Line from Xeldem S/S to

Cuncalim S/S in South Goa.220 D/C 12.5 25.00 26-Dec-12 12-Nov-13

231 MaharastraMRA-

1030DIL

LILO at 400kv DC parli bhadrawati Tl at

2X300 mw tadali tps chandrapur400 D/C 15.2 30.40 4-Jan-13 19-Feb-13 28-Mar-13 2-Apr-13

232 MaharastraMRA-

1031MSETCL

220kv DC LILO on 220kv chalisgram to

malegaon line for sayne220 D/C 5.0 10.00 14-Jan-13 28-Mar-13 7-Jan-14 8-Jan-14

233 MaharastraMRA-

1032MSETCL

220kv DC line LILO on 220 kv flagship

(blueridge)s/s to 220 kv theur s/s line for

220kv kondhwa s/s

220 D/C 0.6 1.20 22-Jan-13 30-May-13 3-Apr-13 8-Jan-14

234 MaharastraMRA-

1033MSETCL

220kv DC line LILO on 220 kv flagship

(blueridge)s/s to 220 kv theur s/s line for

220kv nanded citys/s

220 D/C 1.2 2.40 22-Jan-13 30-May-13 3-Apr-13 8-Jan-14

235 MaharastraMRA-

1034MSETCL

220 kv DC LILO on 220 kv deep nagar s/s to

220 kv khadka s/s line for 220kv chalisgram

s/s

220 D/C 123.0 246.00 6-Feb-13 12-Nov-13 1-Apr-13

236 MaharastraMRA-

1035MSETCL

220 kv KHARGHAR - KALWA line from

D/C to M/C220 D/C 21.9 43.75 1-Feb-13

237 MaharastraMRA-

1036MSETCL

765 KV D/C (HEX Bundle) Raipur pooling

station Wardha T/L - 01765 D/C 125.2 250.42 18-Feb-13 19-Oct-13 24-Dec-13 23-Jan-14

238 MaharastraMRA-

1037MSETCL

LILO ON 220 KV WALUJ-BBLR LINE at

220KV Deagaonrangari S/S220 D/C 26.3 52.60 13-Mar-13 30-May-13 9-Apr-13 11-Jun-13

239 MaharastraMRA-

1038PGCIL 400 KV D/c line from Dhule-Dhule 400 D/C 9.5 19.00 8-Mar-13 8-Mar-13 28-Mar-13 3-Jul-13

240 MaharastraMRA-

1039PGCIL

765 KV D/C line Raipur pooling station to

Wardha T/L765 D/C 242.4 484.778 15-Apr-13 14-Oct-13 14-Oct-13 23-Jan-14

241 MaharastraMRA-

1040MSETCL

220 KV D/C line for 220 KV D/C Vita-

Ghatnandra line220 D/C 0.9 1.81 9-Apr-13 10-May-13 10-May-13 14-May-13

242 MaharastraMRA-

1041PGCIL 400 KV D/C (quad) Padghe -Padghe 400 D/C 17.0 33.92 12-Apr-13 6-Aug-13 6-Aug-13 27-Mar-14

WESTERN REGION 16 of 19

Page 46: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

243 MaharastraMRA-

1042Mahatransco

Upgraadation of existing 220kV Kalwa-

Borivali line from D/C to M/C220 D/C 17.0 34.00 26-Apr-13 21-Aug-13

244 MaharastraMRA-

1043Mahatransco

220kV D/C LILO on 220kV AHMED

NAGAR S/S to 220kV BABHALESHWAR

S/S line for 220kV Kandgam

220 D/C 33.6 67.18 30-Apr-13 12-Aug-13 12-Aug-13 25-Jul-13

245 MaharastraMRA-

1044Mahatransco

220kV D/C line from Waghoda(Distt. Dhule)

to Amaner Distt. Jalgaon220 D/C 34.4 68.80 3-Jun-13

246 MaharastraMRA-

1045MSETCL

400 kv D/C line lilo on 400 kv Padghe S/S to

400 Kv Tarapur S/S line for 400 kV Kardus400 D/C 3.4 6.80 17-Jun-13

247 MaharastraMRA-

1046MSETCL

220 kv D/C line from 400 kV Kudus S/S to

220 kV wada-2(Bhavegar)S/S220 D/C 15.3 30.66 17-Jun-13

248 MaharastraMRA-

1047MSETCL

400 KV D/C LINE from 400KV JEJURI S/S

TO 400KV Hingewadi s/s400 D/C 46.2 92.35 17-Jun-13 6-Feb-14

249 MaharastraMRA-

1048MSETCL 220 kV Borivalli-Baisar line from D/c to M/c 220 D/C 87.0 174.00 17-Jun-13

250 MaharastraMRA-

1049MSETCL

220 KV D/C Line from 220KV JATH S/S TO

220KV M/S SHRI MARUTI WIND PARK

Developer at SHEDYAL S/S

220 D/C 17.6 35.20 8-Jul-13 26-Jul-13 26-Jul-13 26-Jul-13

251 MaharastraMRA-

1050PTCC

220KV D/C PODGHEWADA LINE FOR

220KV BHAVAGHAR S/S220 D/C 0.5 1.08 29-Jul-13

252 MaharastraMRA-

1051

MAHATRA

NSCO

400 KV JAJURI-TO-HINJEWADI LINE

(Jaduri-Winjihar)400 D/C 51.1 102.20 19-Aug-13 6-Feb-14

253 MaharastraMRA-

1052

MAHATRA

NSCO

220kV D/C KANDALGAON-TO-DASTURI

LINE220 D/C 74.0 148.06 19-Aug-13

254 MaharastraMRA-

1053MSETCL

220KV D/C LINE From BHAGAD S/S -

MANGAON (220KV M/s. Inox Air Products

Ltd.)

220 D/C 2.3 4.62 4-Sep-13 6-Feb-14

255 MaharastraMRA-

1054MSETCL

220kv D/C line from KUDUS (400kv S/S) -

BHIVANDI IV (Rajlaxmi) (220kv proposed)220 D/C 26.2 52.45 4-Sep-13

256 MaharastraMRA-

1055MSETCL 220kv M/C UPPALWADI-PARDI T/L 220 M/C 12.2 24.40 1-Oct-13

257 MaharastraMRA-

1056MSETCL

220kv M/C MANKAPUR - UPPALWADI

T/L (PL-7.99+2.5) KM220 M/C 10.5 20.98 3-Oct-13

WESTERN REGION 17 of 19

Page 47: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

258 MaharastraMRA-

1057MSETCL

400kv M/C LINE AURANGABAD(PGCIL)

S/S - AURANGABAD (MSETCL) S/S400 M/C 51.7 103.38 21-Oct-13 3-Oct-13 3-Oct-13 30-Oct-13

259 MaharastraMRA-

1058MSETCL SALAPUR S/S- BALE (SALAPUR-II) 220 D/C 41.8 83.67 28-Oct-13

260 MaharastraMRA-

1059MSETCL

PANDHARPUR-VITA LINE-

PHANDERPUR-II(BHALWANI)S/S220 D/C 12.9 25.72 6-Nov-13

261 MaharastraMRA-

1060MSETCL KATEL-WARUD LINE 220kv D/C 220 D/C 49.0 98.00 6-Nov-13

262 MaharastraMRA-

1061MSETCL

PANDHARPUR-MALINAGAR For proposed

220kv Bhalarahi s/s220 D/C 19.6 39.26 6-Nov-13

263 MaharastraMRA-

1062MSETCL KALMESHWAR-KATOL LINE 220 KV D/C 220 D/C 38.0 76.00 6-Nov-13

264 MaharastraMRA-

1063MSETCL

WARORA-WARDHA-II (BHUGAON)

220kv M/C220 D/C 9.9 19.80 6-Nov-13

265 MaharastraMRA-

1064MSETCL

HINJEWADI(220KV D/C U/G) -

HINJEWADI(220KV)-II 220 D/C 3.9 7.80 7-Nov-13

266 MaharastraMRA-

1065PGCIL

1.PARLI-PUNE(12KM) 2. AURANGABAD-

PUNE(18 KM) BOTH LINES 400 KV D/C400 D/C 30.0 60.00 5-Nov-13

267 MaharastraMRA-

1066PGCIL 765kv SALAPUR-PUNE 765 S/C 270.0 270.00 5-Nov-13

268 MaharastraMRA-

1067MSETCL

220kV M/C LINE from VILE BHAGAD S/S -

PIONEER GAS POWER PRJ. 220 M/C 2.7 5.40 13-Nov-13 6-Feb-14

269 MaharastraMRA-

1068PGCIL 400KV VAPI - KALA LINE 400 D/C 22.0 44.00 22-Nov-13 24-Mar-14 24-Mar-14 26-Mar-14

270 MaharastraMRA-

1069PGCIL

765KV D/C WARDHA - AURANGABAD

LINE-I765 D/C 348.0 696.00 24-Dec-13 24-Dec-13 24-Dec-13 21-Jan-14

271 MaharastraMRA-

1070PGCIL

765KV D/C WARDHA - AURANGABAD

LINE-II765 D/C 349.0 698.00 24-Dec-13 24-Dec-13 24-Dec-13 24-Jan-14

272 MaharastraMRA-

1071PGCIL

400 KV D/C WARDHA - AURANGABAD

LINE-9 UPGRADABLE TO 1200 KV (PNR)400 D/C 27-Jan-14

273 MaharastraMRA-

1072PGCIL

220 KV D/C BHIGWAN-WALCHAND

NAGAR LINE220 D/C 32.0 64.00 19-Feb-14

274 MaharastraMRA-

1073RSTCL 765KV S/C RAICHUR TO SOLAPUR T/L 765 S/C 208.0 208.00 10-Dec-13

WESTERN REGION 18 of 19

Page 48: Status of PTCC cases

S.

No.State File No.

Name of the

Power

utility

Name of the Power line KVCkt

Type

PL

KM

CKT.

Km.

Date of

receipt of

proposal in

CEA

Date of

receipt of

BSNL

details

Date of

receipt of

Railway

details

Date of IV

comments

sent by

CEA

Approved

on

CEA LD&T DIVISION - STATUS OF PTCC PROPOSALS IN CEA as on 31.03.2014

275 MaharastraMRA-

1074

MAHATRA

NSCO

400KV INTERCONNECTION LINE between

765 KV EKTUNI S/S & THAPTI TANDA

(A'BAD-II) S/S CKT-I & II

400 D/C 4.7 9.40 10-Mar-14

276 MaharastraMRA-

1075

MAHATRA

NSCO

Extension of 400kv D/C BABHLESHWAR-

THAPTI TANDA (Aurangabad-II) Line from

Location No. 5 (new) to 765 KV EKTUNI

(Aurangabad) S/S

400 D/C 4.7 9.40 10-Mar-14

277 MaharastraMRA-

1076

MAHATRA

NSCO220KV PHALTAN - WALCHAND NAGAR 220 D/C 58.8 117.60 14-Mar-14

278 MaharastraMRA-

1077

MAHATRA

NSCO

220KV D/C LILO on 220kv PANDHARPUR -

JEUR line for M/S Vithalrao Shinde SSK Ltd.

220 kv s/s at GANGAMAINAGAR

220 D/C 2.5 5.00 14-Mar-14

279 MaharastraMRA-

1078

MAHATRA

NSCO

220kv D/C Line from 400KV PGCIL

Talegaon s/s for 220KV HINJEWADI MIDC

phase-I S/S & 220 KV HINJEWADI MIDC

Phase-II s/s

220 D/C 37.5 75.00 13-Mar-14

280 MaharastraMRA-

1079

MAHATRA

NSCO

LILO ON 220KV D/C VITA-LAMBOTI

LINE FROM MARUTI 220KV WINDMILL

KHANAPUR S/S AT BHUD SITE, DISTT.

SANGLI

220 D/C 23.2 46.34 25-Mar-14

Note:Discrepancy if any, may please be communicated to Director(PTCC)