Status of FAIRStatus of FAIR

Boris SharkovBoris SharkovFAIR Joint Core TeamFAIR Joint Core Team

Page 2: Status of FAIR Boris Sharkov FAIR Joint Core Team

April 10, 2023 2

FAIR Baseline Technical Report 2005

100 m

UNILAC

SIS 18

SIS 100/300

HESRSuperFRS

NESR

CR

RESR

FLAIR

Radioactive Ion Production Target

Anti-Proton Production Target

Nuclear Structure Physics and Nuclear Astrophysics with RIBs

Hadron Physics with Anti-Proton Beams

Physics of Nuclear Matter with Relativistic Nuclear Collisions

Atomic Physics Plasma Physics and Applied Science with highly charged, highly Bunched ion Beams and low energy anti-protons

++ Accelerator PhysicsAccelerator Physics

FAIR will provide worldwide unique accelerator and FAIR will provide worldwide unique accelerator and experimental facilities allowing for a large variety of experimental facilities allowing for a large variety of fore-front research in physics and applied sciencesfore-front research in physics and applied sciences

Page 3: Status of FAIR Boris Sharkov FAIR Joint Core Team

FAIR – Facility for Antiproton and Ion Research

Helmholtzzentrum GmbH

Austria IndiaChina Finnland France Germany Greece UKItaly Poland Slovakia Slovenia Spain Sweden Romania Russia

Observers

Modularized Start Version

Boris Sharkov

FAIR Joint Core Team Leader

GSI Helmholtzzentrum fuer Schwerionenforschung

GmbH

Page 4: Status of FAIR Boris Sharkov FAIR Joint Core Team

Development of Project StructureDevelopment of Project Structure2005 Entire

Facility

BTR

2007 Phase A

BTR

Phase B

SIS300 +

e-ring

2009 Module 0

SIS100

Module 1

expt areas HADES/CBM and APPA

Module 2

Super-FRS

fixed target area

NuSTAR

Module 3

pbar facility, incl. CR for

PANDA,

options for NuSTAR

Module 4

LEB for NuSTAR, NESR for NuSTAR and APPA,

FLAIR for APPA

Module 5

RESR

higher intensity for PANDA & parallel operations with NuSTAR and APPA

Phase B

SIS300 +

e-ring

Startversion Phase B

Page 5: Status of FAIR Boris Sharkov FAIR Joint Core Team

April 10, 2023 5

Project Staging

2005 idea: Staging of the project ( total cost 2005: 1187 M€) three stages defined by optimizing start of science

2007 idea: Staging of the project ( available funds 940 M€ )two phases defined / matched with assured funding level Phase A = start-version, Phase B = all that‘s left out in Phase A

2009 idea: Modularized FAIR Start Version 2009start with module 0 to 3, modules 4 and 5 (when funds available)

Page 6: Status of FAIR Boris Sharkov FAIR Joint Core Team

ModulesModules

Module 0: Heavy-Ion Synchrotron SIS100, basis and core of FAIR, required for all physics programmes

Module 1: Experiment halls at SIS100 for extracted beam diagnostics, HADES/CBMHADES/CBM, APPA, and detector calibration.

Module 2: Super-FRS for NUSTAR.

Module 3: Antiproton facility for PANDA, providing further options also for NUSTAR

Module 4: Additional low-energy caves for NUSTAR, NESR storage ring for NUSTAR und APPA, building for antimatter programme FLAIR

Module 5: RESR storage ring for a higher beam intensity for PANDA and parallel operation with NUSTAR

Page 7: Status of FAIR Boris Sharkov FAIR Joint Core Team

Modular VersionModular Version

APPA

CBM

Page 8: Status of FAIR Boris Sharkov FAIR Joint Core Team

Rationale for new Modularized Start Version (WP)Rationale for new Modularized Start Version (WP)

• Cost estimate for modular version presented by architects•Detailed list of site related construction costs worked out•based upon a new cost estimate in 2009 for the accelerator complex• firm commitments of FAIR Member States•Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget

+ 110 M€ + 110 M€ !!

Page 9: Status of FAIR Boris Sharkov FAIR Joint Core Team

RoadmapRoadmap

• Driven by civil construction• Aim for earliest commissioning of accelerators and respective experiments

Module Construction time (months)

Start of construction

Operational

0 72 2010 / 11 2015 / 16 1 28 2010 / 11 2015 / 16 2 60 2012 2016 3 60 2012 2016

Page 10: Status of FAIR Boris Sharkov FAIR Joint Core Team

The new Testing Hall for FAIRThe new Testing Hall for FAIR

Boris Sharkov – Leader FAIR Joint Core Team

Page 11: Status of FAIR Boris Sharkov FAIR Joint Core Team

Roofing Ceremony in the new Testing Hall Roofing Ceremony in the new Testing Hall - September 3, 2009- September 3, 2009

Boris Sharkov – Leader FAIR Joint Core Team

Page 12: Status of FAIR Boris Sharkov FAIR Joint Core Team

ConclusionsConclusions

• Based on recent cost estimates and firm commitments of FAIR Member States the MSV is elaborated

• Modules 0-3 ensure a physics programme that is still unique, competitive with great discovery potential

• all FAIR science communities can perform excellent physics from early on

• the facility can be smoothly upgraded towards the full version of FAIR facility

• JCT continues efforts on cost savings measures in cc, accelerator design etc…

• Setup of the international company proceeds in parallel

Page 13: Status of FAIR Boris Sharkov FAIR Joint Core Team

FAIR will open a new research era in hadronic, nuclear and FAIR will open a new research era in hadronic, nuclear and atomic physics as well as in applied science. The White atomic physics as well as in applied science. The White Paper outlines a Paper outlines a realistic pathrealistic path to achieve this goal. The to achieve this goal. The Modularized Start Version provides an outstanding and Modularized Start Version provides an outstanding and world-leading research program for all scientific FAIR world-leading research program for all scientific FAIR communities which will be further strengthened by the communities which will be further strengthened by the addition of further modulesaddition of further modules

Thank you for attention !Thank you for attention !

Page 14: Status of FAIR Boris Sharkov FAIR Joint Core Team
Page 15: Status of FAIR Boris Sharkov FAIR Joint Core Team

Status in October:Status in October:

Revised costs: 1027 M€*

Firm commitments: 1039 M€ (total 1104 M€ )

Challenge: define project for 1039 M€ that allows excellent physics and serves all communities !

This is beeing evaluated financially and scientifically

*(2005 prices)

Page 16: Status of FAIR Boris Sharkov FAIR Joint Core Team

PAC on Nuclear Structure and Nuclear Astrophysics (NUSTAR-PAC): 667 authors

1.) Low Energy Branch (LEB)High-resolution In-Flight Spectroscopy (HISPEC)/ Zs.Podolyak/ SurreyDecay Spectroscopy with Implanted Ion Beams (DESPEC) + B. Rubio ValenciaPrecision Measurements of very short-lived Nuclei using an Advanced Trapping System for highly-charged Ions (MATS) K.Blaum MainzLASER Spectroscopy for the Study of Nuclear Properties (LASPEC) P. Campbell ManchesterNeutron Capture Measurements (NCAP) M.Heil FZKAntiprotonic Radioactive Nuclides (Exo+pbar) M. Wada Riken

2.) High Energy Branch (R3B)A Universal Setup for Kinematical Complete Measurements of Reactions with Relativistic Radioactive Beams (R3B) T. Aumann GSI

3.) Ring Branch (STORIB)Study of Isomeric Beams, Lifetimes and Masses (ILIMA) Y .Novikov SPNPIExotic Nuclei Studied in Light-Ion Induced Reactions at the NESR Storage Ring (EXL) M. Chartier Liverpool Electron-Ion Scattering in a Storage Ring (e-A Collider) (ELISe) H. Simon GSIAntiproton-Ion Collider: A Tool for the Measurement of Neutron and Proton rms radii of Stable and Radioactive Nuclei (AIC) R. Krücken TUM