Page 1: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Status of ABT beam tests preparation

9-Oct-14

Page 2: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test without beam I

• MKI: – Open valves, conditioning to 55 kV, softstart– Check BETSsim input, SMP energy transmitted– Check MKI waveform logging in OASIS, IQC

• Magnet systems:– Heat run– Pulsing full line– Switch powering

• BI systems: – Movements, acquisition, logging, fixed displays– Screens, BPM, BCT, BLM– SPS extraction region, TL and LHC injection (Francesco, Jose) – LHC extraction region (Matthew, Jose)

Needed for TL test, 22-Nov

Might have issue with TI 8 BLMs for TL test

Page 3: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test without beam II

• Optics– Prepare list of settings for

• SPS extraction: Kicker nom/max voltage, Septum current/girder pos, bumper currents (Francesco, Jose)• TL and LHC injection: MKI nom/max voltage, MSI current (Matthew, Jose)• LHC extraction: MKD max/nom (6.5 TeV), MSE current (Matthew, Jose)

– Beam position on injection/dump region screens• SPS extraction and TL screens (Francesco)• Injection screens (Jose)• Extraction screens (Matthew)

– TCDI and MKI validation knobs, 14/15 MKD extraction knob• Prepare TL phase oscillation knobs every 30 deg (Francesco)• MKI knob (Francesco, Jose)• MKD knob (Matthew)

– Aperture bumps at MSI, TCDIM, MKI, Q5, D2, TCDQ• Prepare screenshots of aperture bumps in YASP

– Screens matching application

Page 4: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

• Protection devices TCDI, TDI, TCLI, TCDQ, TCS– Movement, function/range– Prepare list of gap opening in sigma, beam size at each collimator (different energies at

TCDQ/TCS)– TCDI (Francesco)– TDI, TCLI (Jose)– TCDQ, TCDS (Matthew)

• Interlocking– Downstream TED master BIC, injection permit TT40– Inhibit of MKE in case of MKI erratics

Need ‘dummy’ TCDI settings for automatic setup check at TL test

Page 5: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test without beam III

• Radiation monitoring– Radmons, Ramses in injection/extraction region– Check variable in the logging

• Quality checks: IQC, IPOC– Data reception and logging– Element strengths and limits (thresholds to be updated later)

• Discuss limits with Verena and Lene

– Element updates, new BLMs in injection regions• Get updated drawings from BLM team

– New BETS interlock on MSI, TDI• To be discussed in detail• Maskable BIS input• Access to UA while MSI powered to check HW limits?

Page 6: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test without beam IV

• Beam dump– Arming sequence with global BIS– LBDS settings and MCS (changes of generators)– BETSsim (Q4, MSD input)– XPOC

• Waveforms, VAC, BTVDD, BPMD need beam dumped event• BLMs – new BLMs and filters• BETS interlock TCDQ

Page 7: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test with BIS loop closed

• New TSU link to BIS• Prepare inject&dump

Page 8: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

Preparation of sector test with beam

• SPS extraction to upstream TED (Jose, Francesco, Matthew)– Setup pilot cycle, copy/generate settings,… - Verena/OP early next

week

– Setup extraction bump without extensive aperture scan– Steer through extraction channel– Check beam on screens– Kicker (MKE) timing on OASIS need BCT+MKE

Mid-next week

Page 9: Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check

TL test• 22-23 Nov• Planning will be updated• Main measurements relevant

for ABT– Threading/steering– MKE waveform and TL stability– Aperture scans of lines– BPM/Corr polarities– Rough linear optics– Automatic TCDI setup– MSI/MKI pulsing– LBDS/MKI synch