Statistical ProcessStatistical ProcessControlControl
A. A. ElimamA. A. Elimam
![Page 2: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/2.jpg)
Two Primary Topics in Two Primary Topics in Statistical Quality ControlStatistical Quality Control
Statistical process control (SPC) is a statistical method using control charts to check a production process - prevent poor quality. In TQM all workers are trained in SPC methods.
![Page 3: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/3.jpg)
Two Primary Topics in Two Primary Topics in Statistical Quality ControlStatistical Quality Control
Acceptance Sampling involves inspecting a sample of product. If sample fails reject the entire product - identifies the products to throw away or rework. Contradicts the philosophy of TQM. Why ?
![Page 4: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/4.jpg)
InspectionInspection Traditional Role: at the beginning and end
of the production process Relieves Operator from the responsibility of
detecting defectives & quality problems It was the inspection's job
In TQM, inspection is part of the process & it is the operator’s job
Customers may require independent inspections
![Page 5: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/5.jpg)
How Much to Inspect?How Much to Inspect?
Complete or 100 % Inspection.• Viable for products that can cause safety
problems• Does not guarantee catching all defectives• Too expensive for most cases
Inspection by Sampling• Sample size : representative• A must in destructive testing (e.g...
Tasting food)
![Page 6: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/6.jpg)
Where To Inspect ?Where To Inspect ?
In TQM , inspection occurs throughout the production process
IN TQM, the operator is the inspector Locate inspection where it has the most
effect (e.g.... prior to costly or irreversible operation)
Early detection avoids waste of more resources
![Page 7: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/7.jpg)
Quality Testing Quality Testing Destructive Testing
• Product cannot be used after testing (e.g.. taste or breaking item)
• Sample testing
• Could be costly Non-Destructive Testing
• Product is usable after testing
• 100% or sampling
![Page 8: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/8.jpg)
Quality Measures:AttributesQuality Measures:Attributes
• Attribute is a qualitative measure
• Product characteristics such as color, taste, smell or surface texture
• Simple and can be evaluated with a discrete response (good/bad, yes/no)
• Large sample size (100’s)
![Page 9: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/9.jpg)
Quality Measures:VariablesQuality Measures:Variables
• A quantitative measure of a product characteristic such as weight, length, etc.
• Small sample size (2-20)
• Requires skilled workers
![Page 10: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/10.jpg)
Variation & Process Control ChartsVariation & Process Control Charts
Variation always exists Two Types of Variation
• Causal: can be attributed to a cause. If we know the cause we can eliminate it.
• Random: Cannot be explained by a cause. An act of nature - need to accept it.
Process control charts are designed to detect causal variations
![Page 11: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/11.jpg)
Control Charts: Definition & TypesControl Charts: Definition & Types
A control chart is a graph that builds the control limits of a process
Control limits are the upper and lower bands of a control chart
Types of Charts:• Measurement by Variables: X-bar and R
charts• Measurement by Attributes: p and c
![Page 12: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/12.jpg)
Process Process ControlControl Chart Chart & Control Criteria& Control Criteria
1. No sample points outside control limits.
2. Most points near the process average.
3. Approximately equal No. of points above
& below center.
4. Points appear to be randomly distributed
around the center line.
5. No extreme jumps.
6. Cannot detect trend.
![Page 13: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/13.jpg)
Basis of Control ChartsBasis of Control Charts
Specification Control Charts• Target Specification: Process Average
• Tolerances define the specified upper and lower control limits
• Used for new products (historical measurements are not available)
Historical Data Control Charts • Process Average, upper & lower control limits:
based on historical measurements• Often used in well established processes
![Page 14: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/14.jpg)
Common CausesCommon Causes
xx
n
ii
n
1
x x
ni
2
1
425 Grams
![Page 15: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/15.jpg)
Assignable CausesAssignable Causes
(a) LocationGrams
Average
![Page 16: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/16.jpg)
Assignable CausesAssignable Causes
(b) SpreadGrams
Average
![Page 17: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/17.jpg)
Assignable CausesAssignable Causes
(b) SpreadGrams
Average
![Page 18: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/18.jpg)
Assignable CausesAssignable Causes
(c) ShapeGrams
Average
![Page 19: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/19.jpg)
Effects of Assignable Causes on Effects of Assignable Causes on Process ControlProcess Control
Assignable Assignable causes presentcauses present
![Page 20: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/20.jpg)
Effects of Assignable Effects of Assignable Causes on Process ControlCauses on Process Control
No No assignable causesassignable causes
![Page 21: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/21.jpg)
Sample Means and theSample Means and theProcess DistributionProcess Distribution
425 Grams
Mean
Processdistribution
Distribution ofsample means
![Page 22: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/22.jpg)
The NormalThe NormalDistributionDistribution
-3 -2 -1 +1 +2 +3Mean
68.26%95.44%99.97%
= Standard deviation
![Page 23: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/23.jpg)
Control Charts
UCL
Nominal
LCL
Assignable causes likely
1 2 3Samples
![Page 24: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/24.jpg)
Using Control Charts for Using Control Charts for Process ImprovementProcess Improvement
Measure the processMeasure the process When problems are indicated, When problems are indicated,
find the assignable causefind the assignable cause Eliminate problems, incorporate Eliminate problems, incorporate
improvementsimprovements Repeat the cycleRepeat the cycle
![Page 25: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/25.jpg)
Control Chart Examples
Nominal
UCL
LCL
Sample number(a)
Var
iati
on
s
![Page 26: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/26.jpg)
Control Chart Examples
Nominal
UCL
LCL
Sample number(b)
Var
iati
on
s
![Page 27: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/27.jpg)
Control Chart Examples
Nominal
UCL
LCL
Sample number(c)
Var
iati
on
s
![Page 28: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/28.jpg)
Control Chart Examples
Nominal
UCL
LCL
Sample number(d)
Var
iati
on
s
![Page 29: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/29.jpg)
Control Chart Examples
Nominal
UCL
LCL
Sample number(e)
Var
iati
on
s
![Page 30: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/30.jpg)
The Normal DistributionThe Normal DistributionMeasures of Variability:
• Most accurate measure
= Standard Deviation
• Approximate Measure - Simpler to compute
R = Range
• Range is less accurate as the sample size
gets larger
Average = Average R when n = 2
![Page 31: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/31.jpg)
Control Limits and Errors
LCL
Processaverage
UCL
(a) Three-sigma limits
Type I error:Probability of searching for a cause when none exists
![Page 32: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/32.jpg)
Control Limits and Errors
Type I error:Probability of searching for a cause when none exists
UCL
LCL
Processaverage
(b) Two-sigma limits
![Page 33: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/33.jpg)
Type II error:Probability of concludingthat nothing has changed
Control Limits and Errors
UCL
Shift in process average
LCL
Processaverage
(a) Three-sigma limits
![Page 34: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/34.jpg)
Type II error:Probability of concludingthat nothing has changed
Control Limits and Errors
UCL
Shift in process average
LCL
Processaverage
(b) Two-sigma limits
![Page 35: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/35.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Mandara Mandara IndustriesIndustries
![Page 36: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/36.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027
2 0.5021 0.5041 0.5032 0.5020
3 0.5018 0.5026 0.5035 0.5023
4 0.5008 0.5034 0.5024 0.5015
5 0.5041 0.5056 0.5034 0.5039
Special Metal Screw
![Page 37: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/37.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027
2 0.5021 0.5041 0.5032 0.5020
3 0.5018 0.5026 0.5035 0.5023
4 0.5008 0.5034 0.5024 0.5015
5 0.5041 0.5056 0.5034 0.5039
0.5027 - 0.50090.5027 - 0.5009 == 0.00180.0018
Special Metal Screw
![Page 38: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/38.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027 0.0018
2 0.5021 0.5041 0.5032 0.5020
3 0.5018 0.5026 0.5035 0.5023
4 0.5008 0.5034 0.5024 0.5015
5 0.5041 0.5056 0.5034 0.5039
0.5027 - 0.50090.5027 - 0.5009 == 0.00180.0018
Special Metal Screw
![Page 39: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/39.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027 0.0018 0.5018
2 0.5021 0.5041 0.5032 0.5020
3 0.5018 0.5026 0.5035 0.5023
4 0.5008 0.5034 0.5024 0.5015
5 0.5041 0.5056 0.5034 0.5039
0.5027 - 0.50090.5027 - 0.5009 == 0.00180.0018(0.5014 + 0.5022 +(0.5014 + 0.5022 + 0.5009 + 0.5027)/40.5009 + 0.5027)/4 == 0.50180.5018
Special Metal Screw
![Page 40: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/40.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027 0.0018 0.5018
2 0.5021 0.5041 0.5032 0.5020
3 0.5018 0.5026 0.5035 0.5023
4 0.5008 0.5034 0.5024 0.5015
5 0.5041 0.5056 0.5034 0.5039
0.5027 - 0.50090.5027 - 0.5009 == 0.00180.0018(0.5014 + 0.5022 +(0.5014 + 0.5022 + 0.5009 + 0.5027)/40.5009 + 0.5027)/4 == 0.50180.5018
Special Metal Screw
![Page 41: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/41.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Sample Sample
Number 1 2 3 4 Range Mean
1 0.5014 0.5022 0.5009 0.5027 0.0018 0.5018
2 0.5021 0.5041 0.5032 0.5020 0.0021 0.5029
3 0.5018 0.5026 0.5035 0.5023 0.0017 0.5026
4 0.5008 0.5034 0.5024 0.5015 0.0026 0.5020
5 0.5041 0.5056 0.5034 0.5039 0.0022 0.5043
R = 0.0020
x = 0.5025
Special Metal Screw
![Page 42: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/42.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Control Charts - Special Metal Screw
R - Charts R = 0.0020
UCLR = D4RLCLR = D3R
![Page 43: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/43.jpg)
Control Charts for VariablesControl Charts for Variables
Control Charts - Special Metal Screw
R - Charts R = 0.0020 D4 = 2.2080
Control Chart FactorsControl Chart Factors
Factor for UCLFactor for UCL Factor forFactor for FactorFactorSize ofSize of and LCL forand LCL for LCL forLCL for UCL forUCL forSampleSample xx-Charts-Charts RR-Charts-Charts RR-Charts-Charts
((nn)) ((AA22)) ((DD33)) ((DD44))
22 1.8801.880 00 3.2673.26733 1.0231.023 00 2.5752.57544 0.7290.729 00 2.2822.28255 0.5770.577 00 2.1152.11566 0.4830.483 00 2.0042.00477 0.4190.419 0.0760.076 1.9241.924
![Page 44: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/44.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Control Charts - Special Metal Screw
R - Charts R = 0.0020 D4 = 2.282D3 = 0
UCLR = 2.282 (0.0020) = 0.00456 in.LCLR = 0 (0.0020) = 0 in.
UCLR = D4RLCLR = D3R
![Page 45: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/45.jpg)
0.005
0.004
0.003
0.002
0.001
0 1 2 3 4 5 6
Ran
ge
(in
.)
Sample number
UCLR = 0.00456
LCLR = 0
R = 0.0020
Range Chart - Special Metal Screw
![Page 46: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/46.jpg)
Control Charts for Variables
Control Charts - Special Metal Screw
R = 0.0020x = 0.5025
x - Charts
UCLx = x + A2RLCLx = x - A2R
Control Chart FactorsControl Chart Factors
Factor for UCLFactor for UCL Factor forFactor for FactorFactorSize ofSize of and LCL forand LCL for LCL forLCL for UCL forUCL forSampleSample xx-Charts-Charts RR-Charts-Charts RR-Charts-Charts
((nn)) ((AA22)) ((DD33)) ((DD44))
22 1.8801.880 00 3.2673.26733 1.0231.023 00 2.5752.57544 0.7290.729 00 2.2822.28255 0.5770.577 00 2.1152.11566 0.4830.483 00 2.0042.00477 0.4190.419 0.0760.076 1.9241.924
![Page 47: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/47.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Control Charts - Special Metal Screw
R = 0.0020 A2 = 0.729x = 0.5025
x - Charts
UCLx = x + A2RLCLx = x - A2R
UCLx = 0.5025 + 0.729 (0.0020) = 0.5040 in.
![Page 48: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/48.jpg)
Control ChartsControl Chartsfor Variablesfor Variables
Control Charts - Special Metal Screw
R = 0.0020 A2 = 0.729x = 0.5025
x - Charts
UCLx = x + A2RLCLx = x - A2R
UCLx = 0.5025 + 0.729 (0.0020) = 0.5040 in.LCLx = 0.5025 - 0.729 (0.0020) = 0.5010 in.
![Page 49: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/49.jpg)
0.5050
0.5040
0.5030
0.5020
0.5010
1 2 3 4 5 6
Ave
rag
e (i
n.)
Sample number
x = 0.5025
UCLx = 0.5040
LCLx = 0.5010
Average Chart - Special Metal Screw
![Page 50: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/50.jpg)
0.5050
0.5040
0.5030
0.5020
0.5010
Ave
rag
e (i
n.)
x = 0.5025
UCLx = 0.5040
LCLx = 0.5010
1 2 3 4 5 6Sample number
Measure the process Find the assignable cause Eliminate the problem Repeat the cycle
Average Chart - Special Metal Screw
![Page 51: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/51.jpg)
Control ChartsControl Chartsfor Attributesfor Attributes
MANDARA BankMANDARA Bank
UCLUCLpp = = pp + + zzpp
LCLLCLpp = = pp - - zzpp
pp = = pp(1 - (1 - pp))//nn
![Page 52: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/52.jpg)
MANDARA BankMANDARA Bank
UCLUCLpp = = pp + + zzpp
LCLLCLpp = = pp - - zzpp
pp = = pp(1 - (1 - pp))//nn
Sample Wrong ProportionNumber Account Number Defective
1 15 0.0062 12 0.00483 19 0.00764 2 0.00085 19 0.00766 4 0.00167 24 0.00968 7 0.00289 10 0.004
10 17 0.006811 15 0.00612 3 0.0012
Total 147
p = 0.0049
n = 2500
Control Charts for AttributesControl Charts for Attributes
![Page 53: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/53.jpg)
Control ChartsControl Chartsfor Attributesfor Attributes
MANDARA BankMANDARA Bank
UCLUCLpp = = pp + + zzpp
LCLLCLpp = = pp - - zzpp
pp = 0.0049(1 - 0.0049)/2500 = 0.0049(1 - 0.0049)/2500
n = 2500 p = 0.0049
![Page 54: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/54.jpg)
Control ChartsControl Chartsfor Attributesfor Attributes
MANDARA BankMANDARA Bank
UCLUCLpp = = pp + + zzpp
LCLLCLpp = = pp - - zzpp
pp = 0.0014 = 0.0014
n = 2500 p = 0.0049
![Page 55: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/55.jpg)
Control ChartsControl Chartsfor Attributesfor Attributes
MANDARA BankMANDARA Bank
UCLUCLpp = 0.0049 + 3(0.0014) = 0.0049 + 3(0.0014)
LCLLCLpp = 0.0049 - 3(0.0014) = 0.0049 - 3(0.0014)
pp = 0.0014 = 0.0014
n = 2500 p = 0.0049
![Page 56: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/56.jpg)
Control ChartsControl Chartsfor Attributesfor Attributes
MANDARA BankMANDARA Bank
UCLUCLpp = 0.0091 = 0.0091
LCLLCLpp = 0.0007 = 0.0007
pp = 0.0014 = 0.0014
n = 2500 p = 0.0049
![Page 57: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/57.jpg)
1 2 3 4 5 6 7 8 9 10 11 12 13
Sample number
UCL
p
LCL
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0Pro
po
rtio
n d
efec
tive
in s
amp
lep-Chart
Wrong Account Numbers
![Page 58: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/58.jpg)
1 2 3 4 5 6 7 8 9 10 11 12 13
Sample number
UCL
p
LCL
0.011
0.010
0.009
0.008
0.007
0.006
0.005
0.004
0.003
0.002
0.001
0Pro
po
rtio
n d
efec
tive
in s
amp
lep-Chart
Wrong Account Numbers
Measure the process Find the assignable cause Eliminate the problem Repeat the cycle
![Page 59: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/59.jpg)
Process CapabilityProcess Capability
Nominalvalue
80 100 120 Hours
Upperspecification
Lowerspecification
Process distribution
(a) Process is capable
![Page 60: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/60.jpg)
Process CapabilityProcess Capability
Nominalvalue
80 100 120 Hours
Upperspecification
Lowerspecification
Process distribution
(b) Process is not capable
![Page 61: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/61.jpg)
Process CapabilityProcess Capability
Lowerspecification
Mean
Upperspecification
Two sigma
![Page 62: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/62.jpg)
Process CapabilityProcess Capability
Lowerspecification
Mean
Upperspecification
Four sigma
Two sigma
![Page 63: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/63.jpg)
Process CapabilityProcess Capability
Lowerspecification
Mean
Upperspecification
Six sigma
Four sigma
Two sigma
![Page 64: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/64.jpg)
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Process CapabilityProcess CapabilityLight-bulb Production
Cp =
Upper specification - Lower specification
6s
Process Capability RatioProcess Capability Ratio
![Page 65: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/65.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 120 - 80
6(4.8)
Process Capability RatioProcess Capability Ratio
![Page 66: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/66.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 1.39
Process Capability RatioProcess Capability Ratio
![Page 67: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/67.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 1.39
Cpk = Minimum of
Upper specification - x
3s
x - Lower specification
3s
ProcessProcessCapabilityCapabilityIndexIndex
,
![Page 68: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/68.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 1.39
Cpk = Minimum of
120 - 90
3(4.8)
90 - 80
3(4.8)
ProcessProcessCapabilityCapabilityIndexIndex
,
![Page 69: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/69.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 1.39
Cpk = Minimum of [ 0.69, 2.08 ]
ProcessProcessCapabilityCapabilityIndexIndex
![Page 70: Statistical Process Control A. A. Elimam A. A. Elimam](https://reader030.vdocuments.us/reader030/viewer/2022012918/56649d395503460f94a13585/html5/thumbnails/70.jpg)
Process CapabilityProcess CapabilityLight-bulb Production
Upper specification = 120 hoursLower specification = 80 hoursAverage life = 90 hours s = 4.8 hours
Cp = 1.39Cpk = 0.69
ProcessProcessCapabilityCapabilityIndexIndex
ProcessProcessCapabilityCapabilityRatioRatio