Statewide Strategic Transportation System Two-Lane Operational Improvement Study Methodology - Final VAR-STW-STS 2-Lane Operational Improvement Study PID No. 97881 February 3, 2017

Upload: others

Post on 18-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

Statewide Strategic Transportation SystemTwo-Lane Operational Improvement Study Methodology - Final

VAR-STW-STS 2-Lane Operational Improvement StudyPID No. 97881

February 3, 2017

Page 2: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page i

StatewideStrategicTransportationSystemTwo‐LaneOperationalImprovementStudyMethodology

Final

February3,2017

VAR‐STW‐STS2‐LaneOperationalImprovementStudyPIDNo.97881

Preparedfor:

OhioDepartmentofTransportationOfficeofStatewidePlanningandResearch

Preparedby:

Page 3: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page ii

CONTENTSLISTOFACRONYMS....................................................................................................................................................................iii

INTRODUCTION.............................................................................................................................................................................1

TASK1–STAKEHOLDEROUTREACHANDPARTICIPATION.................................................................................................3

TASK2–DATACOLLECTION/EVALUATIONCRITERIA.......................................................................................................4

TASK3–EXISTINGANDFUTURECORRIDORASSESSMENT.................................................................................................6

TASK4–EVALUATEPOTENTIALIMPROVEMENTS................................................................................................................8

TASK5–STRATEGICPLAN......................................................................................................................................................13

LISTOFFIGURES

FIGURE1‐STUDYMETHODOLOGYFLOWCHART...................................................................................................................1

FIGURE2‐B/CANALYSISFLOWCHART................................................................................................................................12

APPENDICES

APPENDIXA‐LISTOFDELIVERABLES

APPENDIXB‐STAKEHOLDERINTERVIEWSUMMARY

APPENDIXC‐STAKEHOLDEROUTREACHSUMMARYOUTLINE

APPENDIXD‐DATACOLLECTIONCHECKLIST

APPENDIXE‐EXISTINGCONDITIONSREPORTOUTLINE

APPENDIXF‐NEEDSANDCONDITIONSREPORTOUTLINE

APPENDIXG‐GOODSMOVEMENTACTIVITYMODEL

APPENDIXH‐BENEFITCOSTANALYSISOUTLINE

APPENDIXI‐STRATEGICPLANOUTLINE

APPENDIXJ‐EVALUATIONMATRIXTOOL

Page 4: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page iii

LISTOFACRONYMS ADT AverageDailyTraffic

B/C Benefit/Cost

ECAT EconomicCrashAnalysisTool

EIM EconomicImpactModel

ESRI EnvironmentalSystemsResearchInstitute

FASTAct FixingAmerica'sSurfaceTransportationAct

FIPS FederalInformationProcessingStandards

GIS GeographicInformationSystem

HCS HighwayCapacitySoftware

LOS LevelofService

MAP‐21 MovingAheadforProgressinthe21stCenturyAct

NPV NetPresentValue

PCR PavementConditionRating

QEIM QuickEconomicImpactModule

ROI ReturnonInvestment

ODPS OhioDepartmentofPublicSafety

OSTM OhioStatewideTravelModel

STS StrategicTransportationSystem

QA/QC QualityAssurance/QualityControl

TAZ TransportationAnalysisZones

TIMS TransportationInformationManagementSystem

Page 5: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1

INTRODUCTION AspartofODOT’simplementationofanAccessOhio2040recommendation,OperationalStudieswillbeperformedalongeachofthe2‐LanehighwaycorridorsidentifiedontheStatewideStrategicTransportationSystem(STS)network.Thegoalofthesestudiesistoanalyzeportionsofthe2‐laneSTSthatarecriticaltofreightmovement.Recognizingtheimportantrolethesehighwaysplayinmovingfreightandascriticaltruckroutes,ODOTwishestolearnmoreabouttheiroperation,identifyfreight“bottlenecks”anddevelopandprioritizeneededimprovements.

Towardthisend,thisstudymethodologyisaimedatprovidingarepeatableframeworktoconductdetailedneedsassessmentsonall2‐LaneSTScorridorfreightroutes,withafocusonidentifyingincrementalsystemimprovementsthatwillenhancetheflowoffreighttrafficandfacilitateeconomicdevelopmentintheStateofOhio.

Figure1‐StudyMethodologyFlowchart

Page 6: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 2

AsdetailedhereinandsummarizedinFigure 1,themethodologywillbeconductedinfivetasks:(1)StakeholderOutreach,(2)DataCollection/EvaluationCriteria,(3)Existing&FutureConditionsAssessment,(4)EvaluationofPotentialImprovementsand(5)DevelopmentofaStrategicPlan.Thisdocumentwillbeheavilyutilizedtodevelopacorridor‐specificStudyMethodologyduringTask1.4.

ODOT’sin‐houseexpertiseandplanningtoolswillbereliedupontohelpshapeanddeliverseveralcriticalcomponentsofthestudythroughuseoftheOhioStatewideTravelModel(OSTM)anditsassociatedstandalonemodulesincludingUCost2,EconomicImpactModel(EIM),andtheQuickEconomicImpactModule(QEIM).OSTMoutputforecastdata,forthecurrentyearand2040horizon,willbeusedasthebasisfortheTask2operationalanalysis.

Consistentwiththemethodologycontainedherein,theintentforimprovementsthatarelargeenoughtofitwithintheparametersofEIMandUCost2,istoutilizeEIMandUCost2outputdataduringtheevaluationphase(Task4).Forsmallerimprovementsand/orwhereEIMandUCost2outputisnotavailable,anevaluationwillbenecessarytoincorporateacombinationofofflinecalculationsandtheQEIM,whereapplicable,asdescribedunderTask4.

Page 7: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 3

TASK 1 – STAKEHOLDER OUTREACH AND PARTICIPATION DuringTask1,kick‐off,mobilizeandorganizethestudy,performstakeholderoutreachanddevelopamethodologyspecifictothecorridorbeingstudiedusingthisdocumentasaframework.1.1Kick‐offMeetingArrangeandconductaprojectkick‐offmeetingamongtheprojectteam.Presentanddiscussthescope,issuesandopportunities,milestonedates,communicationprotocols,teamresponsibilities,deliverables,andotherexpectations.Provideameetingagendaandprepareminutesforelectronicdistributiontoallattendees. 1.2DevelopProjectScheduleDevelopaMasterStudySchedule,includingadetailedtask/sub‐taskworksequence.ThescheduleshouldalsoidentifyallmajordeliverablesandreviewtimesforODOTandotheragencystakeholders.1.3StakeholderInterviewsODOT’spublicoutreacheffortsduringtheAccessOhio2040studywereconsiderableandwillbeincorporatedintotheSTS2‐LaneOperationalImprovementStudy,asapplicable.ForthismorefocusedlookatfreightalongtheindividualSTScorridor,identify“targeted”freightusers,andotherstakeholders,includingODOTdistrictpersonnel,truckinglogisticspersonnelfrombusinessesandindustries,andpublicagencies(e.g.economicdevelopmentcorporationsandportauthorities)familiarwiththerouteanditsoperations.Theseinteractions,eitherbyphoneorin‐personasappropriate,withselectshippers,agriculturalrepresentatives,manufacturers,andlogisticsprofessionalsareaimedatgaininganunderstandingoftheirsystemperformanceneeds(e.g.,importanceofcost,velocity,reliability,etc.);modalusagepatterns;andchangingregional/national/internationaltradepatterns.Itisassumedthatten(10)interviewswillbeconducted.PrepareandmaintainacontactlistofstakeholderstobeapprovedbyODOT.Serviceswillincludeidentifyingstakeholders,preparingforandconductingindividualinterviews,inadditiontodocumentingallstakeholdermeetings.Developastakeholdersurveyinstrumentcontainingalist(s)ofquestionsthatwillserveasaframeworkforguidingtheinterviews.AsampleStakeholderInterviewSurveyisprovidedinAppendixB.Provide,intheformofaStakeholderOutreachSummary,aconciseoverviewofthemostpertinentstakeholderfeedback,includingexistingoperationalandsafetyissuesandanypotentialcountermeasuresputforward.AStakeholderSummaryOutlinehasbeenincludedasAppendixC.1.4StudyMethodology(Corridor‐specific)UsingthisVAR‐STW‐STS2‐LaneOperationalImprovementStudy–StudyMethodologyasaframework,prepareacorridor‐specificmethodologytailoredtomeetthespecificneedsofthecorridor.Oncethedraftcorridor‐specificmethodologyisready,itwillbepresentedtoODOTCentralOffice,District(asapplicable),andotherappropriateprojectteampersonnel.Afterreviewcommentsarereceived,allcommentswillbeaddressedandincorporatedintothefinalcorridor‐specificmethodology.

Page 8: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 4

TASK 2 – DATA COLLECTION / EVALUATION CRITERIA DuringTask2,beginimplementationofthecorridor‐specificmethodologydevelopedduringTask1.4.Collectanddistilldata,determinetheevaluationcriteriatogaugeproposedimprovements,developaninitiallistofpotentialimprovements,andsupplementgapsinexistingavailabledatabyconductingadditionalturningmovementtrafficcountsatstrategiclocations.2.1CollectionofExistingDataBegingatheringexistingdatabytakingfulladvantageoftheabundanceofsecondarysourcedatathatisalreadyavailablethroughODOT,includingavailableGeographicInformationSystem(GIS)mapping,theEnvironmentalSystemsResearchInstitute(ESRI)StateRouteInventory,andTransportationInformationManagementSystem(TIMS).AsummaryofavailabledatasourcesisprovidedinAppendixD–DataCollectionChecklist.Inaddition,researchandobtainapplicable,plans,studiesandreportsandseekoutadditionaldatarelatedtooperationalanalysis,levelofservice(LOS),triporiginsanddestinations,traveltime/delaystudies,crashrates,safetyassessments,truckfuelingstationandovernightparkinglocations,diversionanalysis,historicalanalysis,androadwaystandards.Tohelplimitthenumberoftrafficcountlocationsandextentofthedatacollectioneffort,performawindshieldsurveyofpotentialoperational“hotspots”alongthecorridor,includingintersections,segments,andotherindividuallocations.Maintainanongoingregisterofdatacollectioneffortsandprepareamemosummarizingthesourcesexamined,contactsmadeanddatagathered.2.2SiteVisitsTosupplementtheODOT‐availabledataandthealready‐performedwindshieldsurvey,performsitevisitsalongtheSTScorridortoclarifyobservationsandidentifyadditionalopportunitiesnotdiscernabledirectlyfromthedata.SitevisitswillincludequickexaminationsofTrafficControl/Signage,AccessPoints,ObservedOperations,andNon‐InventoryGeometrics(e.g.curveradiiandsightdistance).2.3DevelopEvaluationCriteriaDevelopevaluationcriteriaforthestudy.ThesecriteriawillthenbeusedinevaluationofproposedimprovementsandwillberevisitedaspartofTask4(EvaluatePotentialImprovements)andTask5(StrategicPlan)andincorporatedintothequantitative(i.e.Benefit/Cost(B/C))evaluationprocesstoensuretheprojectgoalsandobjectivesarebeingmet.Thesetofcorridor‐specificevaluationcriteriawillbederivedfromthesevennationalperformancegoalsestablishedinMAP‐21andcarriedforwardintheFASTAct,including:(1)Safety,(2)InfrastructureCondition,(3)CongestionReduction,(4)SystemReliability,(5)FreightMovementandEconomicVitality,(6)EnvironmentalSustainability,and(7)ReducedProjectDeliveryDays.TheevaluationcriteriawillbedocumentedinaSummaryMemo. 2.4ListofPotentialImprovementsWorkingwithODOT,includinglocalDistrictstaff,developapreliminarylistofpotentialprojectsforincrementalimprovementswithintheSTScorridor.ODOTwillprovideastatusupdateforallprogrammedprojectsunderdevelopmentalongthestudycorridor.ThelistwillbefurthersupplementedbyknowledgegainedduringTask1.3(StakeholderInterviews),Task2.1(Data

Page 9: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 5

Collection),andTask2.2(SiteVisits).ThispreliminarylistwillserveasthestartingpointforpotentialimprovementsthatareconsideredandanalyzedinTask3.2.5CollectionofNewTrafficDataItisanticipatedthattherewillbeaneedtosupplementtheabovedatawithlocal,more‐detailedtrafficcountdatainordertoconducttheoperationalanalyses.Afterareviewofdataalreadycollectedandthewindshieldsurvey,identifythenumberandlocationofturningmovementcountsthatarerequired.Turningmovementsaretoincludeindividualcountsfortrucksandpassengervehicles.PerformthenecessaryQualityAssurance/QualityControl(QA/QC)andprovidethecompletedcountstoODOT,forincorporationintotheOSTM.ODOTwillrunthefullOSTM(orasub‐area)andprovidebothcurrentyearandhorizonyear(2040)trafficforecastsfortheno‐buildcondition,andtheseforecastedvolumeswillbeusedduringtheTask3operationalanalysis.

Page 10: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 6

TASK 3 – EXISTING AND FUTURE CORRIDOR ASSESSMENT DuringTask3,performananalysisofexistingandfutureconditions,developadraftlistofneedsandimprovements,developconceptualplansandcostsforselectcountermeasures/improvements,calculateaninitial“litmustest”B/Cforthesediscreteimprovementsanddetermineacategorizationoftheimprovementsbasedonthescaleoftheirimpactsonthetransportationsystem.Theanalysis,atthisstage,islargelybasedontrafficoperations.Freightconsiderationsandeconomicimpacts,whileconsidered,willbeincorporatedviaexaminationofEIMoutputandqualitativeevaluationcriteriaduringTask4EvaluationofPotentialImprovements.Severalinterimdeliverableswillbeproducedduringthistask,andtheoverallfindingswillbesummarizedina“NeedsandConditions”report.3.1ExistingCorridorAssessment

Asafirststep,reviewOSTMforecastoutputdataforboththecurrentyearandfutureyear(2040)conditions.Then,toserveasaverificationmechanismandlaythegroundworkforthemore“finite”analysisrequiredtoanalyzetheimpactsofproposedimprovementsinTask3.2,performanoperationalanalysisforexistingconditionsusingtheappropriate,ODOT‐approvedanalysissoftware(i.e.HighwayCapacitySoftware(HCS),Synchro,etc.)forboththecurrentyearandfutureyear(2040)conditions.UsingOSTMdatasuppliedbyODOTasabasis,performanoperationalanalysisofboththeintersectionsandroadwaysegments,includingthefollowing:existingyearAMandPMpeakhourturningmovementsatidentified“hotspot”projectstudyareaintersections,existingyearADTforadjacentroadwaysegments,andexistingyearcapacityanalysisforstudyareaintersectionsandroadwaysegments.Inadditiontotheoperationsanalyses,performaSafetyAssessment,andaStandards(Roadway)review.Determineandsummarizeroadwaysegmentandintersectiondeficiencies.PrepareaDraftExistingConditionsReportforreviewandincorporatecommentsintotheFinalExistingConditionsReport.AnExistingConditionsReportOutlinehasbeenincludedasAppendixE.3.2ProposedCorridorAssessmentExamineandreviewdataforthefuture(build)conditionsanalysis,includingafurtherreviewoftheOSTMtobecomemorefamiliarwiththeinputdatarelatedtotheSTScorridor.ThereviewwillalsoconsidertheOSTMinputandrefinementsthattheprojectteammightsuggesttoeithermoreaccuratelydepictconditionsalongtheSTScorridororincorporatemorecurrentdata.ProvideODOTwiththeTask3.1operationalanalysisoutput.ODOT,attheirdiscretion,maywanttoincorporatethefindingsintotheOSTMandre‐runthemodel(orasub‐area),withtheintentofgettingupdatedfuturecondition/no‐buildoutput.StartingwiththeinitiallistofimprovementsdevelopedduringTask2.4,performoperationaltrafficanalysestodeterminethetrafficbehaviorassociatedwitheachdiscreteimprovement,foreithercurrentyearorfutureyear(2040)conditions,asappropriate.Likewithexistingconditions,performacapacityanalysisofboththeintersectionsandroadwaysegments,includingthefollowing:existingyearAMandPMpeakhourturningmovementsatidentified“hotspot”projectstudyareaintersections,existingyearADTforadjacentroadwaysegments,andexistingyearcapacityanalysisforstudyareaintersectionsandroadwaysegments.Proposedimprovementswillbeanalyzedtoensurethattheirimplementationdoesnotadverselyimpactadjacentroutesormerelyrelocateissuesontoothersectionsofthecorridor.Theimprovementswillberefinedbasedontheresultsoftheinitialanalysisandcapacityanalysis.

Page 11: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 7

Forthoseresultantimprovements,developconceptplans,asummaryfeaturesdescriptionandplanning‐levelcosts.TolimittheextentofthesubsequentworkinTasks4and5,performabasicB/Cevaluationofeachpotentialimprovementbasedonbenefitsderivedfromtraveltimesavingsandcrashreductions. 3.3IdentifyNeedsandImprovements(DraftList)ProvidealistofrecommendedimprovementsalongtheSTScorridor.Improvementswilllargelyfocusonoperationalenhancementstotheinfrastructureandmayinclude,butarenotlimitedtoitemssuchas:improvedsignage,signalcoordination,additionalsignals,shoulderexpansion,laneexpansion,turnlaneadditionsandlengthening,increasedbridgeclearance,increasedloadcapacity,intersectionreconfiguration,safety‐typeimprovementsanddataintegration(e.g.OHGO).Eachrecommendedimprovementwillincludeabriefdescription,costandB/Cratio.Recommendedimprovementswillbecategorizedintofourgroupsbasedonthescaleoftheirimpactsonthetransportationsystem:

GroupA–“Larger‐scale”Improvementsthataddcapacityand/ordiverttraffic(e.g.addingthrulanes;constructionofabypass)

GroupB–“Smaller‐scale”Improvementswheretraveltimesavingscanbequantified(e.g.additionofturnlane(s);installationofatrafficsignal;adjustingtrafficsignaltimings)

GroupC–“Smaller‐scale”Improvementswheretraveltimesavingscannotbequantified,butsafetybenefitscanbequantified(e.g.installingsignage;wideningshoulderwidths)

GroupD–“Smallerscale”Improvementswhereneithertraveltimesavingsnorsafetybenefitscanbequantified(e.g.increasingturnradii;wideningstructures)

PrepareaDraftNeedsandConditionsReportforreviewandincorporatecommentsintotheFinalNeedsandConditionsReport.ANeedsandConditionsReportOutlinehasbeenincludedasAppendixF.

Page 12: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 8

TASK 4 – EVALUATE POTENTIAL IMPROVEMENTS DuringTask4,beginbyreviewingtheevaluationcriteria,confirmingtheirapplicability,andmakingadditions,revisions,andadjustments,asneeded.TheevaluationofproposedimprovementsrecommendedinTask3.3willvarybasedontheircategorization(GroupA,GroupB,GroupC,orGroupD),asfollows:

GroupA–evaluatedusingEIM/UCost2. GroupB–evaluatedusingacombinationofECAT,QEIMandothertools. GroupC–evaluatedusingacombinationofECAT,othertoolsandqualitativemethods. GroupD–evaluatedusingacombinationofothertoolsandqualitativemethods.

MuchliketheOSTMinputsandparametersexaminedinTask3,reviewtheEIM/QEIMdefaultvaluesforinputsandparametersandrecommendedrefinementsoradjustments,asnecessary.Whereapplicable,ODOTwillperformthedirectentry,preparethenecessaryEIM/QEIMinputs(e.g.traveltime,cost,andphysicallayout)foreachimprovementandeachmodelrun.Uponreceipt,reviewtheEIM/QEIMfinaloutputs,forboththeindividualproject(i.e.incremental)andtheentiresystem(i.e.cumulative).Withthisinformationinhand,performtheeconomicdevelopmentanalysisandevaluategoodsmovementforGroupAandGroupBimprovements,utilizetheGoodsMovementActivityModel(seeAppendixG)tomakequalitativedeterminationsregardinggoodsmovementforallGroupCandGroupDimprovements.PerformareviewofB/CoutputfromEIM/QEIM,makingadjustmentstotheB/Cdataorperformingseparate,individualB/CanalysisforimprovementsthatcannotbeaccuratelymodelledinEIM/QEIM.Task4willculminateinpreparationofaB/CAnalysisSummaryReport.ABenefitCostAnalysis(BCA)ReportOutlinehasbeenincludedasAppendixH.4.1ReviewEvaluationCriteriaRevisittheTask2.3EvaluationCriteriaSummaryMemotoensuretheirutilityduringevaluationoftheneteconomicimpactsofvariousprojectalternativesandtheB/CAnalysis.Reviewthetrafficoperationalmetricssuchasdelay,LOS,traveltimesavings,alongwithsafety,mobility,access,andjobs/commerceevaluationcriteria.Atthisjuncture,considerreducing,weighting,andcombiningmeasurestodevelopODOT‐specificindicesasappropriate.Anattemptwillbemadetoascribeaquantitativefactororcosttoeachevaluationcriteria. 4.2ReviewEconomicImpactModel(EIM/QEIM)DefaultValuesForGroupAimprovements,reviewtheEIMdefaultvaluesforinputsandparametersandrecommendrefinementsoradjustments,asnecessary.ReviewEIMparameterfiles,includingFederalInformationProcessingStandards(FIPS)andTransportationAnalysisZones(TAZ),demographicdatafiles,employmentdatafilesandterminalsfilestodeterminewhichfactorsareused,theirsource,howtheyinformtheEIMmodeloutputandifanyadjustmentsarerequiredthatwouldprovidemorerefinedresults.ForGroupBimprovements,reviewQEIMparameterfilestodeterminewhichfactorsareused,theirsource,howtheyinformtheQEIMmodeloutputandifanyadjustmentsarerequiredthatwouldprovidemorerefinedresults. 4.3InputstoEIM/UCost2&QEIM,perImprovementPreparethenecessaryEIM/QEIMinputsforeachproposedimprovementandeachmodelrunbasedontheirTask3.3categorizationasfollows:

Page 13: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 9

GroupA‐Foreachoftheidentified“larger‐scale”potentialimprovements,providerepresentativeinputdataforuseintheEIMmoduleandobtaining“improvement‐specific”EIMoutput.Theinputdatawillincludecost,physicallayout,andtraveltimesavingsdata,byapproach,separatedbypassengervehiclesandheavytrucks,andforfourtimeperiods:AM(6AM–9AM),MD(9AM–2PM),PM(2PM–6PM)andNT(6PM–6AM).Whetherindirectly,viaAgeAssetorUCOST2,ordirectly,providethefollowinginputdatainaccordancewithODOT’sEIMUtilityUserGuide(dated8/11/2014)foreachoftheproposedimprovements:ProjectInformation,Costs(Project&Agency),andTraffic/Operations"Manual"DataAdjustments.GroupB‐Foreachoftheidentified“smaller‐scale”potentialimprovementswhereatraveltimesavingscanbequantified,providerepresentativeinputdataforuseintheQEIMmoduleandobtaining“improvement‐specific”QEIMoutput.Theinputdatawillincludecost,physicallayout,andtraveltimesavingsdata,byintersection,separatedbypassengervehiclesandheavytrucks,andforfourtimeperiods:AM(6AM–9AM),MD(9AM–2PM),PM(2PM–6PM)andNT(6PM–6AM).TheinputdatawillalsoincludeProjectLocation(i.e.County),ProjectCosts,andDailyTravelTimeSavings.GroupCandGroupD‐Foreachoftheidentified“smaller‐scale”potentialimprovementswheretraveltimesavingscannotbequantified,EIMandQEIMwillnotbeapplicable.PrepareaqualitativeassessmentofeconomicvitalityandgoodsmovementasdescribedinTask4.6andTask4.7.

4.4EIM/UCost2&QEIMModelRuns(ODOT)ODOTwilldirectlyinteractwiththeEIM/UCost2andQEIMmodulestomake“manual”datainputadjustments,runtheEIM/UCost2andQEIM,andprovideoutputdata.ApplicabilityoftheEIM/UCost2orQEIMtoaproposedimprovementwilldependonitsTask3.3categorizationasfollows:

GroupA‐ODOTwilldirectlyinteractwiththeEIMandUCost2modulestomake“manual”datainputadjustments,runtheEIM/UCost2,andprovideoutputdata.RelyuponthisEIM/UCost2outputdata,includingbutnotlimitedto,incremental(project)andcumulative(overall)impacts,economicmeasures(earnings,businessoutputs,jobscreated,valueadded,production,consumption,employment,andhouseholds,etc.)asthebasisoftheeconomicanalysis.RelyupontheEIMandUCost2modulesforexistingandforecasttraveldataandotheroutputrelatedtoB/C,andEconomicandFreightAnalysis.Provideassistance,asneeded,andrefineorcorrectinputdata,astherunsaremade.GroupB‐ODOTwilldirectlyinteractwiththeQEIMmoduletomake“manual”datainputadjustments,runtheQEIMandprovideoutputdatawhichwillinclude,forbothhouseholdsandfreight:Income,Employment(jobscreated),andEconomicOutput(summaryoftotaleconomicactivity(i.e.servicesprovidedandgoodproduced)generatedbytheimprovement).GroupCandGroupD‐EIMandQEIMwillnotbeapplicable.PrepareaqualitativeassessmentofeconomicvitalityandgoodsmovementasdescribedinTask4.6andTask4.7.

Page 14: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 10

4.5ReviewofEIM&QEIMOutputPerformareviewofB/CoutputfromEIM/QEIM,makingadjustmentstotheB/Cdataorperformingseparate,individualB/CanalysisforimprovementsthatcannotbeaccuratelymodelledinEIM/QEIM:

GroupA‐ReviewandanalyzetheoutputEIMdata,asavailable.Theoutputdatawillprovidethebasisformuchoftheevaluationandanalysisofeachproposedimprovement.Examinetheincrementalimpactsthatcanbeassociatedwitheachindividualproject,includingtheOperational,MarketAccessandConstructionoutputfiles.Fromthese,deriveearnings,businessoutput,jobscreatedandvalue‐addedoutput.Examinethetotalcumulativeimpactsofeachproject,asprovidedviaEIM,intheProduction,Consumption,Employment,Households,andSummarydata.TheseforecastsincludebaselineeconomicforecastdatafromTREDISandMoody’s.Usingthisdata,makefurtherdeterminationsasnecessaryregardingearnings,businessoutputandjobcreation.GroupB‐ReviewtheQEIMoutputdatawhichwillinclude:Income,Employment(jobscreated),andEconomicOutput(summaryoftotaleconomicactivity(i.e.servicesprovidedandgoodproduced)generatedbytheimprovement).GroupCandGroupD‐EIMandQEIMwillnotbeapplicable.PrepareaqualitativeassessmentofeconomicvitalityandgoodsmovementasdescribedinTask4.6andTask4.7.

4.6EconomicDevelopmentEvaluation

Evaluatetheeconomicanddemographicimplicationsofvariousprojectalternatives,includinginterpretationofEIM/QEIMandselectimprovement‐specificevaluations:

GroupA‐TakeadvantageofthevariousdataandgraphicaloutputsgenerateddirectlyfromEIM,withtheaimofmakingimprovement‐specificdeterminationsofthefollowingeconomicimpacts:Geography/Region,Sector&Industry,Labor/Jobs,Productivity/Operations/Efficiency,Development,andTax/AgencyBenefits.ThefindingsofTask4.6willbeincorporatedintotheoverallevaluation.PrepareanEconomicDevelopmentEvaluationMemo,andsummarizeeconomicdevelopmentevaluationlanguagefordirectinsertionintheTask5StrategicPlan.GroupB‐UtilizeQEIMtoevaluateeconomicbenefits.GroupCandGroupD‐Provideaqualitativeevaluationofeconomicvitalityandgoodsmovement,intandem,usingtheGoodsMovementActivityTool.Usingthetool,aweightedGoodsMovementIndexwillbeassignedtoeachpotentialimprovement.ThisqualitativemeasureprovidesarepresentationofthesignificanceofthegoodsmovementsectorandhowanimprovementalongthecorridormayaffecteconomicactivitywithinagivenCounty.ThequalitativeevaluationwillalsoincludeanyinformationprovidedbystakeholdersduringTask1.3andconsiderhowproposedimprovementsmayaffecteconomicactivity.

ThefindingsofTask4.6willbeincorporatedintotheevaluation.DevelopsummaryeconomicdevelopmentevaluationlanguagefordirectinsertionintheTask5StrategicPlan.

Page 15: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 11

4.7GoodsMovementEvaluationEvaluatethefreightandgoodsmovementimplicationsofvariousprojectalternatives,includinginterpretationofEIM/QEIMandselectimprovement‐specificevaluations:

GroupA‐ReviewEIMoutputandidentifytheexistingandemergingindustriesthataredrivingthestate’stradebasedeconomy.GroupB‐Identifytheexistingandemergingindustriesthataredrivingthestate’stradebasedeconomytosupplementthereviewofQEIMoutput.GroupCandGroupD‐For“smaller‐scale”improvementswheretraveltimesavingscannotbequantified,provideaqualitativeevaluationofeconomicvitalityandgoodsmovement,intandem,usingtheGoodsMovementActivityTool.Usingthetool,aweightedGoodsMovementIndexwillbeassignedtoeachpotentialimprovement.ThisqualitativemeasureprovidesarepresentationofthesignificanceofthegoodsmovementsectorandhowanimprovementalongthecorridormayaffecteconomicactivitywithinagivenCounty.ThisqualitativeevaluationwillincorporatestakeholderinputgatheredinTask1.3andconsiderhowincrementalproposedimprovementsaffectindustriesandnoteanyinfrastructuredeficienciesinthemovementoffreightalongthecorridor.

ThefindingsofTask4.7willbeincorporatedintotheevaluation.DevelopsummarygoodsmovementevaluationlanguagefordirectinsertionintheTask5StrategicPlan. 4.8B/CAnalysis

DevelopaB/CAnalysisforeachproposedimprovementassummarizedinFigure 2onpage12.Foreachimprovement,determine:NetPresentValue(NPV)oftheimprovementcost,NPVofthebenefit,andaB/Cratio.Wheredataisavailable,monetizebenefitsinthefollowingcategories:Safety(e.g.crashesbytype‐fatal,injury,andpropertydamage),Mobility(e.g.traveltimesavings,traveltimereliability),Access(e.g.tojobsandnon‐workactivities),JobsandCommerce(e.g.changesinemploymentandvalue‐addedoutput,changesinfreighttonnage),environmental(e.g.emissionreduction,improvedairquality,habitatimpacts)andInfrastructurePreservation(lifecyclecosts).DevelopaB/CAnalysisforeachproposedimprovementbasedonitsTask3.3categorizationasfollows:

GroupA‐EntireB/CAnalysiswillbeprovideddirectlyfromEIMandUCost2output.GroupB‐EconomicbenefitswillbeprovidedbyQEIMoutput.ThisoutputwillthenbeincorporatedintotheoverallB/CAnalysis.Transportationuserbenefits(e.g.fuelsavings)andsafetybenefits(e.g.crashreduction)for“smaller‐scale”improvementswillbecalculatedusingtrafficanalysissoftwareandODOT’sEconomicCrashAnalysisTool(ECAT),respectively.CompiletheindividualB/Ccomponentsprovidedbyeachmodel/tool(e.g.QEIM,Synchro,ECAT)intoaspreadsheettoprovideanoverallB/CAnalysis.GroupC‐SafetybenefitswillbecalculatedusingECATtoquantifyaB/Cratio.TransportationuserbenefitsandeconomicbenefitswillbeassessedqualitativelytosupplementthequantifiedB/Cfortheseimprovements.GroupD‐B/Cwillnotbedeveloped,andbenefitswillbeassessedqualitatively.

Page 16: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 12

PrepareaDraftBenefitCostAnalysis(BCA)SummaryReportforreviewandincorporatecommentsintotheFinalBenefitCostAnalysis(BCA)SummaryReport.TheBenefitCost(BCA)AnalysiswillserveasthebasisforevaluatingeachproposedimprovementandtoassistODOTindeterminingaprioritizationofimprovementsduringTask5.

Figure2‐B/CAnalysisFlowchart

Page 17: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 13

TASK 5 – STRATEGIC PLAN DuringTask5,developaStrategicPlanandgroupimprovementsintocategories,byimprovementtype,tohelpguidedecisionmakingforvariousprogramsandfundingsources.Prepareareportdocumentingtheworkperformedandrecommendationsmade.Thereportwillincludeaneasy‐to‐read,stand‐aloneoverviewmatrix/chartofproposedimprovementscompletewithcategorization,approximatecosts,andBenefitCostratio.ThevarioustechnicalmemosandreportsdevelopedinTasks1through4willbeincludedasappendices.TheStrategicPlan,excludingappendices,shouldbelimitedtoapproximately40pages.PreparetheStrategicPlanandpresent,includingfindingsandrecommendations,toODOTataStrategicPlanworkshop.AStrategicPlanOutlineisincludedasAppendixI.5.1PrepareDraftPlanandEvaluation

RevisittheTask2.3EvaluationCriteriaSummaryMemotoensuretheirutilityduringdevelopmentoftheStrategicPlan.AdraftStrategicPlan,incorporatingallfindingsandrecommendations,willbeprepared.ThedraftStrategicPlanwillprovideasummaryoverviewoftheindividualdeliverables,includingthestudymethodology,stakeholderoutreach,existingconditions,conceptdevelopment,analysis,andevaluation.Thereportwilldemonstratehowcriteriawereapplied,discussdatasources,analyticaltoolsandmethods,andprovideanoverviewoftheevaluationprocess.AcomprehensiveEvaluationMatrixwillbeincludedalongwithanarrativedescriptionofthemetricsandevaluationcriteriausedtoevaluateproposedimprovements.Improvementswillbegroupedintocategoriesaccordingtoprojecttype(e.g.,intersections,signals,signingandpavementmarking,bridges,pavement,andrailroadcrossings).TofacilitatefurtherevaluationanddecisionmakingbyODOT,theevaluationmatrixwillincludeallbenefits(quantitativeandqualitative).Thematrixwillbeprovidedinadigital,sortableformattoallowODOTplannersanddecisionmakerstodynamicallysortandviewinformationtosuitaparticularprogramneedorfundingsource,whetheraccordingtoprojecttype,cost,B/C,oranyindividualfactororsub‐factor.Thematrixwillalsoincludeaprioritizationofimprovementsintothreecategories:short‐term(1to3yrs.),medium‐term(3to10yrs.),andlong‐term(>10yrs.).AsampleEvaluationMatrixisincludedasAppendixJ.Asappropriate,thedraftplanwilladdressMAP‐21fundingrequirements.PresentthedraftStrategicPlanandEvaluationMatrixatahalf‐dayworkshoptobeheldatCentralOffice.Recognizingthatindividualprojectimplementationisdependentuponfundingavailability,need,projectdevelopmenttimeandotherfactors,projectprioritizationwillbediscussedduringtheworkshop.5.2SubmitFinalPlanIncorporateallcommentsmadeattheTask5.1workshopandsubmitarevisedfinalreporttoODOT.TheStrategicPlanwillbecomprisedoftwoparts:anexecutivesummaryandamainbody.Theexecutivesummaryshouldbestructuredtoserveasastand‐alonesynopsisoftheStrategicPlan.Themainbodywillincludesectionsthatspeaktoallelementsofthestudyprocess,asfollows:

Background Corridor‐SpecificMethodology StakeholderOutreach EvaluationCriteria ExistingConditions

FutureConditions NeedsAndImprovements BenefitCostAnalysis Evaluation

Theevaluationwillincludeastand‐alonematrixandsummarytablesforeachprojectcategorytypeand/orscenario.

Page 18: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

 

 

 

 

 

 

 

 

 

 

 

APPENDIXA

LISTOFDELIVERABLES

Page 19: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixA

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

Deliverable

StakeholderListing

DraftStudyMethodology

FinalStudyMethodology

EvaluationCriteriaSummaryMemo

DataCollectionSummaryMemo

DraftExistingConditionsReport

FinalExistingConditionsReport

DraftNeedsandConditionsReport

FinalNeedsandConditionsReport

CostBenefitAnalysisSummaryReport

DraftStrategicPlan

FinalStrategicPlan

EvaluationMatrixTool

Page 20: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXB

STAKEHOLDERINTERVIEWSURVEY

Page 21: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixB

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

US250FREIGHTSTUDY‐STAKEHOLDERINTERVIEWQUESTIONS

INTRODUCTION:TheOhioDepartmentofTransportation(ODOT)isconductinganeedsassessmentonUS250focusedonidentifyingincrementalsystemimprovementstoenhancefreightflows.ToensureODOTunderstandshowUS250isbeingutilizedforfreightmovement,theprojectteamisreachingouttoanumberofbusinessandpublicagenciesalongthecorridortogaintheirinsights.Wehaveafewquestionswewouldliketoaskyou.

QUESTIONSFORCOMMISSIONS/PORTAUTHORITIES:1. Haveyoureceivedanyfeedbackfromorganizations/companiesexpressinganyissuesorconcernswithtransportingtheirgoodsalongUS250?

2. Areyouawareofanypotentialorganizations/companiesthathaveexpressedinterestinlocatinginthisregionthatcouldhaveanimpactonthefreightflowalongtheUS250corridor?

3. Hasanorganization/companyindicatedtoyouthattheydecidednottolocatetothisregionbecauseofissues/concernswithlogistics,specificallyasitrelatestoUS250?

4. Basedonyourexperienceinthisregion,areyouawareofanyincrementalsystemimprovementsthatcouldbemadealongtheUS250corridorthatmightenhancefreightflows?

QUESTIONSFORPRIVATECOMPANIES:1. Business‐‐Whatdoesyourbusiness/agencydo?Whatdoyoumake/whatservicesdoyou

provide?Howmanytrucksdoesyourcompanyhave?Howmanydeliveriesperday/week?2. Shipping‐‐Howdoesyourcompanygetitsgoodstomarket‐‐Rail,truck,water?Doyouhave

truckingin‐house?Ifnotin‐house,whoareyourfreightforwarders,logisticspartners?3. Arethereanybottlenecks?Howmanytrucksadayarrive/departfromyourfacility?Whatare

thecommoditytypes?Wheredotheyenter/exitthecorridor?4. Inputs–Wheredoyoursuppliesandmaterialscomefrom?Fromwhatradiusisyoursupply

chaincomingfrom?Internationalvs.domesticshipments?Whichsegment(s)oftheUS‐250corridordoesyourfreighttrafficmostfrequentlytravel?Arethereanybottlenecksorconcernsthatyouhaveexperiencedorsuppliershavenotedlikeroadwayroughness,etc.?

5. Permitting–Doesyourcompany/constituentsrequirespecialhaulingpermitsforoversize/overweightloads?Haveyouexperiencedlimitationswithverticalclearances,bridgeloadlimits,pavementwidth,geometricswerefindingssuitableroutingisanissueonUS250?

6. DeliveryTimes–Whattime(s)ofdaydoyourdeliveriestypicallyarrive/depart?Dothesetimescoincidewithmorningandevening“rushhours”?Doesyourcompanyutilizejust‐in‐timedeliveryforfreight?Ifso,approximatelywhatpercentageofyourfreightutilizesjust‐in‐timeorjust‐in‐sequencedelivery?Aredriversabletomaketheirdoortimesconsistently?Ifnotwhy?

7. TruckSize/Configuration–Whatisthetypicallengthortypeofyoursemitrailers?Whatisthetypicalnumberofaxels(5or6)onyourtrucks?DoyouutilizeTruckTractor‐Semitrailer‐Trailer(DoubleTrailer)combinations?

8. WithrespecttoUS250inparticular,pleasedescribeindetailthenatureandlocationofany:a. Capacity/recurringcongestionissues.b. Signage–candriversfindyourfacilitywithoutissue?c. Operationalissues–e.g.segmentsorjunctionswheretruckmovementsareimpededd. Safetyissues–accidentsorotherincidentsthatcausehazardsanddelayse. Reliabilityissues–somedaysittakeslongerthanotherstotravelthesamesegments

9. Employees–Howmanyemployeestraveltoyourlocation?Wheredotheycomefrom?

10. OtherBenefits‐‐CanyouthinkofanyimprovementstoUS250thatmaybenefityourcompany/constituents?

Page 22: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXC

STAKEHOLDEROUTREACHSUMMARYOUTLINE

Page 23: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixC

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

STAKEHOLDEROUTREACHSUMMARYOUTLINE

1. Overview

2. IndividualStakeholderSummaries

2.1. PublicAgencies

2.2. Trucking/Logistics

2.3. Manufacturing

2.4. Retail

2.5. EconomicDevelopment

2.6. Intermodal

2.7. Oil&GasExploration

2.8. ODOTCountyManagers

2.9. Tourism

2.10. LawEnforcement

3. SummaryofIdentifiedOperationalandSafetyIssues

3.1. Map/FigureofIdentifiedOperationalandSafetyIssues

4. Appendices

StakeholderMeetingMinutes

 

Page 24: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXD

DATACOLLECTIONCHECKLIST

Page 25: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixD

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

Data Source InstructionsDate

Collected

ExistingTrafficData

TransportationInformationMappingSystem(TIMS)&Transportation

DataManagementSystem

(TDMS)

SelectLayers>RoadwayInformation>TrafficCountStationsIdentifydesiredTrafficCountStationonmapandfollowResultsweblinktoTrafficReportsforavailabledataatlocation

ForecastedTrafficData OhioStatewideTravelDemandModel(OSTM)&SimplifiedHighwayForecastingTool(SHIFT)

ContactGregGiamoGreg.Giaimo@dot.ohio.govatODOTOfficeofStatewidePlanning&Research

Safety/CrashData GISCrashAnalysisTool

(GCAT)&OhioDepartment

ofPublicSafety(ODPS)

GCAT:https://gcat.dot.state.oh.us/SSL/Login.aspx

OPDSCrashStatistics:

https://ext.dps.state.oh.us/crashstatistics/crashreports.asp

x

SpeedData INRIX RequestODOTProjectManagertocoordinatewiththeODOTOfficeofTrafficOperationstocontactTedTrepanierted@inrix.comatINRIXtoobtainprojectusagerightsforconsultant

BridgeConditionRatings TIMS/BridgeManagementSystem

SelectAssets>BridgeInventory

ForBMRP‐191/BR‐86:

http://bmsreports.dot.state.oh.us//bmsreports/jsp/de

faultFrames.jsp

BridgeLoadRatings/BridgeClearances

BridgeManagementSystem

http://bmsreports.dot.state.oh.us//bmsreports/jsp/defaultFrames.jsp

PavementConditionRatings(PCR)

TIMS SelectLayers>RoadwayInformation>PCR(State)

Oversize/OverweightLoads ODOTSpecialHaulingPermits

Section

ContactMikeMorelandMike.Moreland2@dot.state.oh.usSupervisorofPermits

Geometrics(forlocationsindicatingasignificant

safetyoroperational

issueonly)

RecordPlans/AerialMapping/TIMS

RecordPlans:SelectLayers>ProjectsinTIMSorContactLocalODOTDistrictMapRoom

AerialMapping:availablefordownloadbyCountyat

http://ogrip.oit.ohio.gov/ProjectsInitiatives/OSIPData

Downloads.aspx

HistoricalProjectActivity/AnticipatedFutureProjects

TIMS SelectLayers>Projects

EconomicData OSTMEconomicImpactModel(EIM)

ContactRebekahAndersonRebekah.Anderson@dot.ohio.govatODOTOfficeofStatewidePlanning&Research

GoodsMovementConsumption

2010IMPLANdata ContactGregGiamoGreg.Giaimo@dot.ohio.govatODOTOfficeofStatewidePlanning&Research

GoodsMovementEmployment

2014LongitudinalEmployer‐HouseholdDynamics(LEHD)

data&2016CoStar*data

http://lehd.ces.census.gov/data/

http://www.costar.com/

GoodsMovementTruckTrips

OSTM ContactGregGiamoGreg.Giaimo@dot.ohio.govatODOTOfficeofStatewidePlanning&Research

Page 26: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXE

EXISTINGCONDITIONSREPORTOUTLINE

Page 27: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixE

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

EXISTINGCONDITIONSREPORTOUTLINE

1. Overview

2. Methodology

3. LocationswithIssuesIdentified

3.1. Traffic

3.2. Safety

3.3. Geometry

3.4. PhysicalConditions

4. IndividualLocationAssessments(ModularSummaries)

Foreachlocationstudied:

4.1. LocationOverview

4.2. ExistingConditions

4.3. ProblemStatement

4.4. PotentialCountermeasures

5. ExistingCorridorAssessmentSummary

6. AppendicesOperationalAnalysisOutput(CurrentYear–AMPeakHour)OperationalAnalysisOutput(CurrentYear–PMPeakHour)OperationalAnalysisOutput(DesignYear–AMPeakHour)OperationalAnalysisOutput(DesignYear–PMPeakHour)

 

Page 28: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXF

NEEDSANDCONDITIONSREPORTOUTLINE

Page 29: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixF

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

NEEDSANDCONDITIONSREPORTOUTLINE

1. ExecutiveSummary

2. Overview

3. ExistingCorridorAssessment

3.1. Traffic

3.2. Safety

3.3. Geometry

3.4. PhysicalConditions

4. ProposedCorridorAssessment

4.1. Traffic

4.2. Safety

4.3. Geometry

4.4. PhysicalConditions

4.5. Cost/PreliminaryIndications

5. IndividualLocationAssessments(ModularSummaries)

Foreachlocationstudied:

5.1. LocationOverview

5.2. ExistingConditions

5.3. ProblemStatement

5.4. PotentialCountermeasures

5.5. ConceptsandCountermeasuresConsidered

5.6. OperationalAnalysis

5.7. Cost

5.8. PreliminaryIndications

6. ExistingCorridorAssessmentSummary

7. ProposedCorridorAssessmentSummary

8. SummaryofProposedCountermeasures

9. NextSteps/Actions

10. Appendices

ProposedCountermeasuresConsidered

EvaluationDataInputsSummary

OperationalAnalysisOutput(CurrentYear–AMPeakHour&PMPeakHour)

OperationalAnalysisOutput(DesignYear–AMPeakHour&PMPeakHour) 

Page 30: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXG

GOODSMOVEMENTACTIVITYMODEL

Page 31: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixG

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

GOODSMOVEMENTACTIVITYMODELGUIDE

ODOThasdevelopedasetofmetricsdesignedtoassessthesizeandeconomicsignificanceofGoodsMovementsectorsineachofOhio’s88counties.TheinformationispresentedasananalyticaltooltosupporttheODOTasitconsidersfutureinfrastructureimprovementsalongvarioustransportationcorridorsintheState.

ThismodelproduceskeymetricsofGoodsMovementactivitiesandthesignificanceofGoodsMovementsectorsineachofOhio’s88counties.

TheGoodsMovementActivityModelsummarizesthepreliminaryscoringforall88countiesintheState.Thetoolincludesaweightingsystemtoallowforvaryingtheweightsofthevariablesandprovideflexibilityonacorridor‐by‐corridorbasis.Theinitialweightsaresetacrossallvariablestoadefaultweightof5.0.Attheirdiscretion,ODOTstaffmaycalibratetheweightforeachvariablewithavaluebetween1.0(lowimportance)and5.0(highimportance).

TheGoodsMovementActivityModelintheaccompanyingMicrosoftExcelworkbookprovidesODOTstaffwiththeabilitytocalibratetheweightsforeachofthevariablesaccordingtoimportanceandtotoggletheresultsaccordingly.ThefirstsheetoftheworkbookpresentstheTableofContents:

1 Goods Movement Rank

2 Goods Movement Summary

3 Weight Methodology (Calibration Tab)

4 Summary of Consumption

5 Summary of Employment

6 Summary of Real Estate

7 Summary of Truck Trips

8 Measure Definitions

9 Data Tabs

TheGoodsMovementRankandGoodsMovementSummarytabsprovideanoverviewoftheoutputs.TheTab3WeightMethodology(CalibrationTab)iswherestaffcancalibratetheweights.Tab3istheonlytabthroughwhichstaffwillalterinputs,asnotedintheensuringnarrative.TheSummaryofConsumption,Employment,RealEstate,andTruckTripstabsprovideconsolidatedinformationforeachoftheGoodsMovementmetriccategoriesandtheirinputderivations.TheMeasureDefinitionstabisareferencepageforeachofthevariablesconsideredinthisstudy,andTab9DataTabsisacoverpageprecedingallrawinputdatausedforthisstudy.

   

Page 32: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixG

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

WEIGHTMETHODOLOGY(CALIBRATIONTAB)

AcopyoftheCalibrationTool(Tab3)belowshowsthevariablesthatwereassignedweightsversusthevariablesthatwereexcludedfromthescoringsystem.Asmentionedabove,adefaultweightof5.0wasassignedtoeachoftherelevantvariablesandistobecalibratedbyODOTstaffaccordingtosignificanceofvariable.Aweightingsystemhasbeenintroducedforeachoftherelevantvariables,usingascaleof1(lowest)to5(highest)intheorderoflowesttohighestdegreeofrelevancetoprevalenceoftheGoodsMovementsectorinthecounty.Therelevantcountyattributeisthenmultipliedbytheweightestablishedforthatvariabletoproduceavariablescore.Allvariablescoresarethentotaledforanoverallcountyscore.Amaximumscoreof40.0ispossibleifallattributesarethehighestpossiblevalueandifitisdeterminedbystaffthatallvariablesshouldbegivenaweightof5.0

ODOTandthestudyteamshouldassignindividualweightstoeachvariableallowstoaccountforcorridor‐specificconditions.Forexample,ifConsumptionandRealEstatearehighlyrelatedtoGoodsMovementsize,variablesinthosecategoriesshouldbegivenahigherweight(4.0‐5.0)thanthevariablesinEmploymentandTruckTrips(2.5),oranyvariationthereof.Ifanyvariablesarelowpriorities,theymaybeassignedalesserweight(<2.5).

 

Calibration Tool (Tab 3) 

 

VariableWeight (1 (low)

to 5 (high))2

MIN WEIGHT

MAX WEIGHT

MIN ATTRIBUTE

MAX ATTRIBUTE

MIN OUTPUT

AVG OUTPUT

MAX OUTPUT

Goods Movement ConsumptionPercentile Rank against all sectors in county 1.0 1.0 5.00 0.01 1.00 0.01 5.00Percentile Rank against other counties in State 3.0 1.0 5.00 0.01 1.00 0.01 5.00

0.00 0.00Goods Movement Employment 0.00 0.00

County Pct. of Total Employment/State Pct. of Total Employment 1 4.0 1.0 5.00 0.17 1.00 0.17 5.00

0.00 0.00Goods Movement Related Real Estate 0.00 0.00

County GM Inventory Pct. of Total/State GM Inventory Pct. of Total 1 1.0 1.0 5.00 0.02 1.00 0.02 5.00

County GM Sq. Ft. per Resident/State GM Sq. Ft. per Resident 1 1.0 1.0 5.00 0.00 1.00 0.00 5.00

County GM Sq. Ft. per Employee/State GM Sq. Ft. per Employee 1 5.0 1.0 5.00 0.01 1.00 0.01 5.00

Truck DestinationPercentile (of 88 Ohio Counties) 1.0 1.0 5.00 0.01 1.00 0.01 5.00

County Trips per Employee/State Trips per Employee 1 1.0 1.0 5.00 0.01 1.00 0.01 5.00

Total (max= 40.0 | average= 20.0) 0.25 20.1 40.00[1] If the ratio of county to state is greater than 1.0, the county is attributed with a maximum score of 1.0.[2] Used as a multiplier for county attribute to weight importance of measure against all other measures. The lowest possible weight is 1.0 (not important); the highest possible weight is 5.0 (very important). The default for each of the attributes is set to 5.0; to be calibrated with input from ODOT staff.

Page 33: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXH

BENEFITCOSTANALYSISOUTLINE

Page 34: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixH

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

BENEFITCOSTANALYSISOUTLINE

1. Overview

1.1. Purpose

1.2. StudyEvaluationGroups

2. Costs

2.1. CostEstimatingTechniques

2.2. NetPresentValueandDiscountRate

3. Benefits

3.1. Mobility

3.2. Safety

3.3. Economic

4. BenefitCostAnalysis

4.1. InterpretationofBenefitCostAnalysis

4.2. ResultsforStudyCorridor

5. NextSteps

6. Appendices

MobilityAnalysis

SafetyAnalysis

EconomicAnalysis

BenefitCostAnalysisMatrix

 

Page 35: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

 

APPENDIXI

STRATEGICPLANOUTLINE

Page 36: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixI

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

STRATEGICPLANOUTLINE

1. ExecutiveSummary

2. Introduction

3. StudyMethodology

4. StakeholderOutreach

5. EvaluationCriteria

6. NeedsandConditions

7. BenefitCostAnalysis

8. Evaluation

9. Appendices(AllReferencedReports)

StudyMethodology

StakeholderOutreachSummary

EvaluationCriteriaSummaryMemo

NeedsandConditionsReport

BenefitCostAnalysisSummary

Page 37: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

 

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

APPENDIXJ

EVALUATIONMATRIXTOOL

Page 38: Statewide Strategic Transportation System Two-Lane ... · VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology Page 1 INTRODUCTION As part of ODOT’s implementation

AppendixJ

 VAR-STW-STS 2-Lane Operational Improvement Study – Study Methodology

EVALUATIONMATRIXTOOL

Tofacilitateevaluation,anevaluationmatrixtool,intheformofaMicrosoftExcelworkbookwillbedeveloped.Thetoolnotonlysummarizestheevaluationcriteriaassessmentsbutalsocanbeusedtodynamicallysortandviewdataandaidinfurtherevaluation.Asshownintheexamplebelow,thematrixincludesbothnumericalratingandgraphicalratingscalestoclearlydepictratingsandlevelsofbenefits.Thematrixcanbesortedusingvariouscriteriasuchasby:location(county,district),locationtype(bridge/culvert,intersection,roadwaysegment),estimatedprojectcost,evaluationgroup(A,B,C,orD),countermeasuretype,B/Cratio,andestimatedprojecttimeframe.Givenvariouscriteria,thematrixallowsdifferentusesforvariousendusers,fordifferentperspectivesandforfundingpurposes.Awiderangeofusers,includingplanners,programmers,funders,local,ODOTdistrictandcentralofficepersonnelcansorttheimprovementsaccordingtotheirparticularneedorenduse,asappropriate.

 

Evaluation Matrix (Example) 

Thetoolispopulatedwithlocationswhereaproposedcountermeasurewasidentified.Anysub‐factorsfromeachoftheevaluationcriteriaareinputintothetool.ThematrixincludesthecostandbenefitcalculationsfromtheB/CAnalysis.BeyondtheB/CAnalysis,additionalevaluationcriteriacategoriessuchasInfrastructureCondition(PCR,BridgeRating,VerticalClearance,HorizontalClearance),GoodsMovement(fromtheGoodsMovementActivityModeldescribedinAppendixE),andSystemReliabilityareincluded.

 

Replace Structure / Inc. Vert. Clear. $1,630,000 D n/a n/a ●

Adjust signal clearance timings  $3,000 C 45.6 44.6 ●

Adjust signal clearance timings  $3,000 C 21.0 20.0 ●

Widen Shoulders $5,857,000 C 0.5 ‐0.5 ●

Replace & Widen Structure $151,000 D n/a n/a ●

Widen Pavement $65,000 D n/a n/a ●

Estimated 

Project Cost Congestion Reduction

Evaluation Group

Safety

Proposed Countermeasures Infrastructure Condition

System reliability

B/C

 Ratio

Freight movement and 

economic vitality

Environmental Sustainability

Return on Investment (ROI)

Short Term

Medium Term

Long Term