Power System Profile of the State Of ANDHRA PRADESH National Load Despatch Centre New Delhi

Upload: anand-murali

Post on 21-Dec-2015

236 views

Category:

Documents


11 download

TRANSCRIPT

Page 1: State_Profile_Andhra_Pradesh.pdf

Power System Profile of the State

Of

ANDHRA PRADESH

National Load Despatch Centre

New Delhi

Page 2: State_Profile_Andhra_Pradesh.pdf

S.No. Description

1(a) State at a glance

2(a) Power Supply Position: Reqirement ‐ Availability2(b) Power Supply Position: Peak Demand ‐ Peak Met2(c) Anticipated Power Supply Position

3(a) Reqirement ‐ Availability Pattern (2013‐14)3(b) Peak Demand ‐ Peak Met Pattern (2013‐14)3(c) Reqirement ‐ Availability Pattern (2012‐13)3(d) Peak Demand ‐ Peak Met Pattern (2012‐13)3(e) Reqirement ‐ Availability Pattern (Last 3 years)3(f) Peak Demand ‐ Peak Met Pattern (Last 3 years)

4(a) Allocation of Power from CGSs

5(a) Schedule, Drawal, Generation and Total Demand5(b) STOA and UI Details5(c) Year Wise UI Details (Financial Terms)5(d) Long Term Access (LTA) Details

6(a) Generation Summary6(b) Generation Stations Details

7(a) Summary of Tranmission Lines and Sub‐Stations7(b) Transmission Network Details7(c) Details of Sub‐Stations7(d) Details of Reactors7(e) List of Transmission Lines with compensation

8(a) Applicable POC Charges and Loss Slabs

9(a) Transmission Constraints (As per NLDC operational feedback)

10(a) UFR, df/dt and Capacitor Installation Status

11(a) Radial feeders for Demand Disconnection

12(a) Generating Units and Stations Under Construction 12(b) Transmission Lines Under Construction

13(a) Power Map13(b) Traction Map

14(a) Political Map14(b) Road Map14(c) Railway Map14(d) Agriculture Map14(e) Mineral Map14(f) River Map

15(a) Storage position of Reservoir based hydroelectric Projects

16(a)  Details of Generating Companies, Transmission Utilities and Distribution Utilities

4. Allocation of Power

Table of Contents

1. State at a glance

2. Power Supply Position

3. Power Supply Position and Consumption Pattern

16. Contact and Website Details

5. Schedule, Drawal, Generation and STOA Details

6. Generation Stations Details

7. Transmission Network Details

8. PoC Charges and Losses

9. Transmission Constraints

10. Defense Mechanism

11. Load Management Details

12. Future Anticipated Projects

13.Power System Map

14. Physical & Geographical Maps

15.Reservoir based Hydroelectric Projects

Andhra Pradesh Power system Profile

Page 3: State_Profile_Andhra_Pradesh.pdf

State Andhra Pradesh

Capital Hyderabad

Population 84,580,777

Area 275,045 km2(106,195 sq mi)

Surrounding States Maharashtra, Chattisgarh , Orissa, Karnataka, Tamil Nadu

Number of Districts 23

Hyderabad (6,809,970)

Visakhapatnam (1,730,320)

Vijayawada (1,048,240)

Website of State Government http://www.ap.gov.in/

Grid Code of the State http://www.aperc.gov.in/Guidelines/Guidelines.html

Tariff Order (ARR) of the State http://www.aperc.gov.in/TariffOrders/transmissiontariffsfor2009-2014.pdf

1(a) State at a Glance

Main 3 Cities (Population)

Andhra Pradesh Power System Profile

SLDC Fees and Charges http://www.aperc.gov.in/TariffOrders/SLDCchargesforFY2009-2014.pdf

Per Capita Consumption 1013 KWHr (All India - 778 KWHr)

Source: Census 2011

Andhra Pradesh Power System Profile

Page 4: State_Profile_Andhra_Pradesh.pdf

Requirement Availability Requirement Availability

(MU / day) (MU / day) (MU / day) (%) (MU / day) (MU / day) (MU / day) (%)

1 Apr 245.5 216.7 -28.7 -11.7 256.6 240.3 -16.3 -6.3

2 May 219.1 203.8 -15.3 -7.0 234.1 231.9 -2.2 -1.0

3 Jun 205.7 193.0 -12.7 -6.2 219.9 216.6 -3.3 -1.5

4 Jul 207.4 200.1 -7.3 -3.5 234.5 229.3 -5.2 -2.2

5 Aug 222.6 217.7 -4.9 -2.2 241.1 238.8 -2.3 -0.9

6 Sep 207.6 206.7 -0.9 -0.4 253.1 239.1 -14.0 -5.5

7 Oct 222.4 221.1 -1.3 -0.6 277.5 236.9 -40.7 -14.7

8 Nov 183.9 183.8 -0.1 -0.1 252.5 224.8 -27.8 -11.0

9 Dec 199.4 198.6 -0.7 -0.4 253.8 222.7 -31.0 -12.2

10 Jan 226.3 224.4 -1.8 -0.8 246.9 237.5 -9.4 -3.8

11 Feb 221.3 219.0 -2.3 -1.0 266.6 246.5 -20.1 -7.6

12 Mar 271.2 263.3 -7.9 -2.9 321.1 274.0 -47.1 -14.7

2(a) Power Supply Position

Requirement / Availability

*Average Figures

S.No. Month

2010-11 2011-12

Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)

2012-13 2013-14

Andhra Pradesh Power system Profile

Requirement Availability Requirement Availability

(MU / day) (MU / day) (MU / day) (%) (MU / day) (MU / day) (MU / day) (%)

1 Apr 281.6 244.3 -37.2 -13.2 295.3 244.5 -50.7 -17.2

2 May 272.9 245.4 -27.5 -10.1 294.0 248.7 -45.4 -15.4

3 Jun 253.0 217.4 -35.6 -14.1 251.6 222.9 -28.6 -11.4

4 Jul 256.9 212.4 -44.5 -17.3 253.9 229.5 -24.4 -9.6

5 Aug 272.6 215.2 -57.4 -21.1 256.3 255.3 -1.0 -0.4

6 Sep 279.1 217.7 -61.4 -22.0 251.0 249.3 -1.7 -0.7

7 Oct 286.1 231.8 -54.3 -19.0

8 Nov 252.0 209.3 -42.7 -17.0

9 Dec 282.0 230.6 -51.4 -18.2

10 Jan 297.5 240.9 -56.6 -19.0

11 Feb 268.5 219.0 -49.5 -18.4

12 Mar 320.8 254.9 -65.8 -20.5

*Source: CEA Power Supply Position ReportWeb-link: http://cea.nic.in/monthly_power_sup.html

S.No. Month Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)

Andhra Pradesh Power system Profile

Page 5: State_Profile_Andhra_Pradesh.pdf

Peak Demand Peak Met Peak Demand Peak Met

(MW) (MW) (MW) (%) (MW) (MW) (MW) (%)

1 Apr 12018 10396 -1622 -13.5 12636 11579 -1057 -8.4

2 May 10738 9353 -1385 -12.9 10658 10474 -184 -1.7

3 Jun 10846 9041 -1805 -16.6 10746 10108 -638 -5.9

4 Jul 10026 8904 -1122 -11.2 10975 10542 -433 -3.9

5 Aug 10662 9740 -922 -8.6 11483 11377 -106 -0.9

6 Sep 10347 9883 -464 -4.5 12863 11552 -1311 -10.2

7 Oct 10960 10428 -532 -4.9 13254 11591 -1663 -12.5

8 Nov 9176 9018 -158 -1.7 12112 10835 -1277 -10.5

9 Dec 10129 9683 -446 -4.4 11712 10453 -1259 -10.7

10 Jan 11586 10848 -738 -6.4 12178 11099 -1079 -8.9

11 Feb 11377 11232 -145 -1.3 12913 11313 -1600 -12.4

12 Mar 12630 11829 -801 -6.3 14054 11972 -2082 -14.8

P k D d P k M t P k D d P k M t

2(b) Power Supply Position

Peak Demand / Peak Met

S.No. Month

2010-11 2011-12

Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)

S No Month

2012-13 2013-14

Surplus (+) / Deficit ( ) Surplus (+) / Deficit ( )

Andhra Pradesh Power system Profile

Peak Demand Peak Met Peak Demand Peak Met

(MW) (MW) (MW) (%) (MW) (MW) (MW) (%)

1 Apr 13417 11335 -2082 -15.5 14072 11410 -2662 -18.9

2 May 12658 11099 -1559 -12.3 13294 11369 -1925 -14.5

3 Jun 12764 10826 -1938 -15.2 12330 10723 -1607 -13.0

4 Jul 12644 9508 -3136 -24.8 11989 10932 -1057 -8.8

5 Aug 13876 9929 -3947 -28.4 11779 11717 -62 -0.5

6 Sep 13974 10438 -3536 -25.3 11911 11887 -24 -0.2

7 Oct 13730 10901 -2829 -20.6

8 Nov 12191 10217 -1974 -16.2

9 Dec 12862 10551 -2311 -18.0

10 Jan 14031 11236 -2795 -19.9

11 Feb 13994 11148 -2846 -20.3

12 Mar 14582 11630 -2952 -20.2

*Source: CEA Power Supply Position ReportWeb-link: http://cea.nic.in/monthly_power_sup.html

S.No. Month Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)

Andhra Pradesh Power system Profile

Page 6: State_Profile_Andhra_Pradesh.pdf

Requirement Availability Peak Demand Peak Met

(MU) (MU) (MU) (%) (MW) (MW) (MW) (%)

Apr-13 9145 7602 -1543 -16.9 14461 11309 -3152 -21.8

May-13 9007 7708 -1299 -14.4 13654 10958 -2696 -19.7

Jun-13 8402 7522 -880 -10.5 13306 11075 -2231 -16.8

Jul-13 8479 7549 -930 -11.0 13408 10712 -2696 -20.1

Aug-13 8915 8446 -469 -5.3 14613 13497 -1116 -7.6

Sep-13 9210 8817 -393 -4.3 14737 13497 -1240 -8.4

Oct-13 9355 8684 -671 -7.2 14621 12662 -1959 -13.4

Nov-13 8392 8426 34 0.4 13116 12787 -329 -2.5

Dec-13 9392 8543 -849 -9.0 13872 12371 -1501 -10.8

Jan-14 8921 8176 -745 -8.4 14107 11979 -2128 -15.1

Feb-14 9154 8335 -819 -8.9 14824 13491 -1333 -9.0

Mar-14 10921 9590 -1331 -12.2 15955 13985 -1970 -12.3

Annual 109293 99398 -9895 -9.1 15955 13985 -1970 -12.3

2(c) Anticipated Power Supply Position

CEA LGBR Report

Month

Requirement/Availability Peak Demand / Peak Met

Surplus/Deficit(-) Surplus/Deficit(-)

* Source - CEA LGBR ReportWeblink: www.cea.nic.in/reports/yearly/lgbr_report.pdf

18th EPS Report

Andhra Pradesh Power system Profile

Requirement Availability Peak Demand Peak Met

(MU) (MU) (MU) (%) (MW) (MW) (MW) (%)

2013-14 101231 100906 -325.0 -0.3 17044 16990 -54 -0.3

2014-15 109968 109722 -246.0 -0.2 18681 18639 -42 -0.2

2015-16 119458 119318 -140.0 -0.1 20476 20452 -24 -0.1

2016-17 129767 129767 0.0 0.0 22445 22445 0 0.0

2017-18 140324 140324 0.0 0.0 24271 24271 0 0.0

2018-19 151743 151743 0.0 0.0 26246 26246 0 0.0

2019-20 164093 164093 0.0 0.0 28382 28382 0 0.0

2020-21 177454 177454 0.0 0.0 30693 30693 0 0.0

2021-22 191912 191912 0.0 0.0 33194 33194 0 0.0

* Source - CEA 18th EPS Report

Financial Year

Requirement/Availability Peak Demand / Peak Met

Surplus/Deficit(-) Surplus/Deficit(-)

Andhra Pradesh Power system Profile

Page 7: State_Profile_Andhra_Pradesh.pdf

251.5666667 253.9333333 256.3251

244.5333333248.6666667

222.9333333229.5

255.2666667249.3

90

140

190

240

MU / day

3(a) REQUIREMENT / AVAILABILITY (MU / Day) (2013 ‐ 14)

Andhra Pradesh Power system Profile

‐1.033333333 ‐1.7‐10

40

Apr

May Jun

Jul

Aug

Sep

Series1 Series2 Series3

Page 8: State_Profile_Andhra_Pradesh.pdf

3600

4600

5600

6600

7600

8600

9600

10600

11600

12600

13600

MW

3(b) PEAK DEMAND / PEAK MET (2013 ‐ 14)

PEAK DEMAND DEMAND MET SHORTAGE

Andhra Pradesh Power system Profile

‐400

600

1600

2600

Apr

May Jun

Jul

Aug

Sep

Page 9: State_Profile_Andhra_Pradesh.pdf

95

145

195

245

MU / day

3(c) REQUIREMENT / AVAILABILITY (MU / Day) (2012‐13)

REQUIREMENT AVALIBILTY SHORTAGE

Andhra Pradesh Power system Profile

‐5

45

Apr

May Jun

Jul

Aug

Sep

Oct

Nov

Dec Jan

Feb

Mar

Page 10: State_Profile_Andhra_Pradesh.pdf

3600

4600

5600

6600

7600

8600

9600

10600

11600

12600

MW

3(d) PEAK DEMAND / PEAK MET (2012 ‐ 13)

PEAK DEMAND PEAK MET SHORTAGE

Andhra Pradesh Power system Profile

‐400

600

1600

2600

Apr

May Jun

Jul

Aug

Sep

Oct

Nov

Dec Jan

Feb

Mar

Page 11: State_Profile_Andhra_Pradesh.pdf

210.00

230.00

250.00

270.00

290.00

llion Units ‐MU)

3(e) Daily Consumption Pattern Last 3 Years

2011‐12 2012‐13 2013‐14

150.00

170.00

190.00

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

(Mil

Page 12: State_Profile_Andhra_Pradesh.pdf

9000

10000

11000

12000

130003(f) Peak Demand Pattern Last 3 Years

2011‐12 2012‐13 2013‐14

6000

7000

8000

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Page 13: State_Profile_Andhra_Pradesh.pdf

CGS share

Unallocated Share

EntitlementCGS share

Unallocated share

Entitlement

1 Ramagundam (T) 2100 7.75 1937 27.60 4.14 31.74 535 80 615

2Ramagundam STG III

500 6.50 468 29.20 4.22 33.42 137 20 156

3 Madras APS (N) 440 11.00 392 8.50 1.23 9.73 33 5 38

4 Kaiga Unit 1&2 (N) 440 14.50 376 26.10 4.06 30.16 98 15 113

5 Kaiga Unit 3&4 (N) 440 14.50 376 28.20 3.77 31.97 106 14 120

6 Neyveli II St.-I (T) 630 10.00 567 15.40 4.08 19.48 87 23 110

7 Neyveli II St.-II (T) 840 10.00 756 21.40 4.06 25.46 162 31 192

8 Neyveli -I exp. (T) 420 305 0.00 0.00 0.00 0 0 0

9 Talcher St.-II (T) 2000 6.50 2000 18.80 1.64 20.44 376 33 409

10 Simhadri STPS St.II 1000 6.00 1000 38.40 7.15 45.55 384 72 456

11Vallur STPS Unit 1&2

1000 6.50 935 11.90 2.03 13.93 111 19 130

12 IGSTPS 1500 1500 15.07 0.00 15.07 226 0 226

4(a) Allocation from Central Sector Generating Stations

S.No StationsCapacity (MW) #

Normative Loss %

Ex - Bus (MW)

( % ) ( MW )From Central Sector Stations located in host region

Entitlement in SR (MW) 2340

From Central Sector Stations located in other regions

Grand Total Power Allocation (MW) 2566

*Source: CEA Allocation of Power from CGSs Report

http://www.cea.nic.in/reports/monthly/gm_div_rep/power_alloc_sr.pdf*Source: SRPC Allocation of Power from 21.9% Unallocated Share of CGSs Report

Andhra Pradesh Power system Profile

Page 14: State_Profile_Andhra_Pradesh.pdf

Year Schedule (MU) Drawal (MU)Over-drawal (+) / Under-drawal (-)

(MU)

State Sector Generation (MU)

Total Demand Met (MU)

2009-10 0

2010-11 12469 12370 -100 37451 76450

2011-12 17340 18160 820 42362 85149

2012-13 22938 24183 1245 41394 82171

Apr‐13 2170 2235 65 3673 7336

May‐13 2514 2597 83 3616 7460

Jun‐13 2266 2333 67 2961 6688

Jul‐13 2543 2620 77 2927 6885

Aug‐13 2180.690 2201.965 21 3986 7658

Sep‐13 2276 2312 36 3888 7479

Oct‐13

Nov‐13

Dec‐13

Jan‐14

Feb‐14

Mar‐14

5(a) Schedule, Drawal, Generation and Total Demand

Andhra Pradesh Power system Profile

2013-14 13949 14298 349 21051 43506

Weblink: http://cea.nic.in/monthly_power_sup.html

* (-) indicates sale / export and (+) indicates purchase / importSource: CEA Schedule / Drawal Report, CEA Generation Report, CEA PSP Report

Weblink: http://cea.nic.in/reports/monthly/gm_div_rep/schedule_drawal.pdf

Weblink: http://cea.nic.in/monthly_gen.html

http://www.srldc.org/MonthlyReport.aspx

Andhra Pradesh Power system Profile

Page 15: State_Profile_Andhra_Pradesh.pdf

Sale Purchase Net* Sale Purchase Net* Sale Purchase Net*Export(U / D)

Import(O / D)

Net*

2009-10 1034 1333 299 158 662 505 1191 1995 804 #REF! 892 972 80 884 #DIV/0!

2010-11 1103 1940 837 561 381 -181 1665 2321 656 3.0 1525 411 -1115 -458 3.6

2011-12 713 1126 414 353 842 489 1066 1968 902 2.3 687 399 -288 614 2.8

2012-13 129 4747 4619 662 2005 1343 791 6752 5961 8.2 337 598 165 6127 8.9

2013-14 0 2877 2877 327 1766 1439 327 4643 4316 59.9 187 367 180 4496 68.3

Apr‐13 0.00 281.43 281.43 81.00 317.95 236.95 81.00 599.38 518.38 34.41 40.51 14.85 ‐25.66 492.72 35.3

May‐13 0.00 625.08 625.08 87.47 327.62 240.15 87.47 952.70 865.23 53.70 28.77 31.64 2.87 868.10 55.5

Jun‐13 0.00 602.20 602.20 73.63 422.85 349.22 73.63 1025.05 951.42 75.15 27.18 35.20 8.02 959.44 77.7

Jul‐13 0.00 735.71 735.71 39.11 417.43 378.32 39.11 1153.14 1114.03 87.16 23.83 44.80 20.97 1135.00 90.5

Aug‐13 0.00 632.60 632.60 45.39 279.75 234.36 45.39 912.35 866.96 59.01 25.79 48.91 23.12 890.08 62.2

5(b) STOA and UI Details

All Figures in Million Units (MUs)* (-) indicates sale / export and (+) indicates purchase / import

Year

Through Bilateral Through Power Exchange Total STOA (Bil. + PX) Total STOA Purchase as % of Demand

Through UI with Regional Grid

Total Short Term Net**

Total STOA (Bil. + PX +

UI) purchase as % of Demand

Andhra Pradesh Power system Profile

Sep‐13

Oct‐13

Nov‐13

Dec‐13

Jan‐14

Feb‐14

Mar‐14

** Total net includes net of transactions through bilateral, power exchange and UI.Source: CERC MMC Report

Weblink: http://www.cercind.gov.in/report_MM-2013.html

Andhra Pradesh Power system Profile

Page 16: State_Profile_Andhra_Pradesh.pdf

2009-10 2010-11 2011-12 2012-13 2013-14

Amount payable into the pool(+)/receivable from the pool(-)

103 -341 -57 113 28

Amount paid into the pool(-)/ received from the pool(+)

-103 341 57 -113 -28

Outstanding Payable(+) / Receivable(-) 0 0 0 0 0

5(c) Yearwise UI Details (Financial Terms)

All Figures in Rupees in Lakhs

Status as on first day/week of the financial year2013- 14 data reconciled upto 16.06.2013

Source: WRLDC Reconcilliation Statement

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 17: State_Profile_Andhra_Pradesh.pdf

S no Power Station Installed Capacity (MW)

Normative Loss (%)

Sentout (MW) Effective LTA / MTOA (MW)

LTA/MTOA with identified beneficiaries

1Ramagundam (T) 2100

7.75 1937.25615

1937.25

2 Ramagundam STG III 500 6.50 467.5 156 467.53 Madras APS (N) 440 11.00 391.6 38 391.64 Kaiga Unit 1&2 (N) 440 14.50 376.2 113 376.25 Kaiga Unit 3&4 (N) 440 14.5 376.2 120 376.26 Neyveli II St.-I (T) 630 10 567 110 5677 Neyveli II St.-II (T) 840 10 756 192 7568 Talcher St.-II (T) 2000 6.5 1870 409 18709 Simhadri STPS St.II 1000 6 940 456 94010 Vallur STPS Unit 1&2 1000 6.5 935 130 93511 IGSTPS 1500 1.3 1480.5 226 1480.512 LANCO KONDAPALLI 250 - -13 SEPL 300 -14 MEPL 300 -15 KSK MAHANADI 500 - 40016 CORPORATE POWER ----- - ----- 250*

Total 9390 10097.25 2566.43209 10097.25

5(d) LTA / MTOA Details of Central Sector and IPP Stations

Source: CTU / POWERGRID Website

Weblink: http://www.powergridindia.com/_layouts/PowerGrid/WriteReadData/file/LTOA/DetailsofConnectivityMTOALTAapplications/DetailsofLTOA_LTA_Appli

cations/Applications%20Granted%20LTOA%20-%20LTA1.pdf

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 18: State_Profile_Andhra_Pradesh.pdf

UNITS TOTAL (MW)

1 RAMAGUNDEM STPS 3X200+4X500 26002 SIMHADRI 4X500 2000

TOTAL 46004600

UNITS TOTAL (MW)

1 MACHKUND 3x(23+17)x70% 842 T.B.DAM (8x9)x80% 57.63 UPPER SILERU 4x60 2404 DONKARAYI 1x25 255 LOWER SILERU 4x115 4606 SRISAILAM RBPH 7x110 7707 SRISAILAM LBPH 6x150 9008 N'SAGAR 1x110+7x100.8 815.69 NSR RT.CANAL.P.H 3x30 9010 NSR LT.CANAL.P.H 2x30 6011 NIZAMSAGAR 2x5 1012 POCHAMPAD 4x9 3613 PENNA AHOBILAM 2x10 2014 SINGUR 2x7.5 1515 JURALA 6x39 23416 MINI HYDEL (+ APTRIPCO 1.2 MW 13.36 13.36

TOTAL 3830.56

1 Dr. N.TATA RAO TPS 6x210+1x500 17602 KAKATIYA TPS 1x500 500

3 KOTHAGUDEM TPS 4x60+4x120+2x250+1x500 17204 RAMAGUNDEM - B TPS 1x62.5 62.55 RAYALASEEMA TPS 4x210+1x250 1060

TOTAL 5102.5

1 VIJJESWARAM STAGE 1 (GAS) 2x33+1x34 1002 VIJJESWARAM STAGE 2 (GAS) 1x112.5+1x59.5 1723 WIND 2

HYDRO

6(b) Details of Generating Stations

Central Sector Generating Stations

SL. No. STATIONINSTALLED CAPACITY

THERMAL (COAL)

GRAND TOTALState Sector Generating Stations

SL. No. STATIONINSTALLED CAPACITY

THERMAL (COAL)

OTHER (Co- Gen, Mini-Hydel)

3 WIND 24 SOLAR JURALA 1

TOTAL 9 2759 9208

UNITS TOTAL (MW)

1 JEGURUPADU (GAS) 2x45.8+1x48.9+1x75.5 216.822 GVK EXTENSION(GAS) 1x145+1x75 2203 SPECTRUM (GAS) 1x46.8+2x46.1+1x68.88 208.314 LANCO (GAS) 2x115+1x125 351.495 ISOLATED GAS WELL (GAS) (LVS) 27.04 27.046 RELIANCE ENERGY LTD. (GAS) 1x140+1x80 227 VEMAGIRI POWER GENERATION LTD.(GAS) 1x233+1x137 3708 GAUTAMI CCPP 2x145 + 1x174 4649 KONASEEMA CCPP 145+140+165 44410 GMR (BARG) 237 23711 LANCO KONDAPPILLI POWER LTD. 233 + 133 36612 SEPL 2X150 30013 MEPL 2X150 300

Total 15 3526.66WIND/SOLAR/OTHERS

1 WIND 428.09

2SOLAR (Cuddapah, Ananthpur,SOLAR (Cuddapah, Ananthpur,

22.753 RCL 41

4

5 MINI POWER PLANTS 78.796 MINI HYDRO 102.64

Grand Total 1236.334763

18571

GRAND TOTAL

Private Sector Generating Stations

SL. No. STATIONINSTALLED CAPACITY

Source:

http://www.srldc.org/MonthlyReport.aspx

COAL

BAGASSE+BIOMASS+WASTE BASED

PP+PP+CO-GENERATION (NC)

274.8+205.25+29.25+53.

65 563.06

GRAND TOTALTotal Installed Capacity ( Central + State + Private )

Andhra Pradesh Power system Profile

Page 19: State_Profile_Andhra_Pradesh.pdf

NumberCircuit Length (CKM)

NumberCircuit Length (CKM)

NumberCircuit Length (CKM)

NumberCircuit Length (CKM)

NumberCircuit Length (CKM)

Central Sector

0 0 27 5981 0 0 0 0 27 5981

State Sector

0 0 21 3566 265 13233 452 0 738 16799

Private Sector

0 0 2 38 0 00

0 454 38

Total 0 0 50 9585 265 13233 452 0 767 22818

NumberCapacity

(MVA)Number

Capacity (MVA)

NumberCapacity

(MVA)Number

Capacity (MVA)

NumberCapacity

(MVA)Central Sector

0 0 8 5270 0 0 0 0 15049 5270

State Sector

0 0 9 5945 74 15041 453 0 462 20986

7 (a) Summary of Transmission Lines and Sub-Stations

Summary of Transmission Lines All Figures in CKM

Ownership Sector

Voltage Level BreakupGrand Total

765 kV 400 kV 220 kV 132 kV

http://www.srldc.org/DownloadDocuments.aspx

Summary of Sub-Stations

Ownership Sector

Voltage Level BreakupGrand Total

765 kV 400 kV 220 kV 132 kV

Andhra Pradesh Power system Profile

SectorPrivate Sector

0 0 10 1215 0 0 0 0 10 1215

Total 0 0 27 12430 74 15041 453 0 554 27471

Andhra Pradesh Power system Profile

Page 20: State_Profile_Andhra_Pradesh.pdf

1 GOOTY NPS POWERGRID 2 289.004 578.008 QUAD MOOSE2 HYDERABAD GAJWAL POWERGRID 1 72.8 72.8 TWIN MOOSE3 HYDERABAD KURNOOL POWERGRID 1 226.5 226.5 TWIN MOOSE4 HYDERABAD NAGARJUNASAGAR POWERGRID 2 155.264 310.528 TWIN MOOSE5 KHAMMAM NAGARJUNASAGAR POWERGRID 1 144.577 144.577 TWIN MOOSE6 KHAMMAM VIJAYAWADA POWERGRID 1 114.775 114.775 TWIN MOOSE7 KHAMMAM WARANGAL POWERGRID 1 117.5 117.5 TWIN MOOSE8 KURNOOL GOOTY POWERGRID 1 84.19 84.19 TWIN MOOSE9 MALKARAM HYDERABAD POWERGRID 1 54.06 54.06 TWIN AAAC 10 NAGARJUNASAGAR CUDDAPAH POWERGRID 1 277.325 277.325 TWIN MOOSE11 NAGARJUNASAGAR CUDDAPAH POWERGRID 1 278.664 278.664 TWIN MOOSE12 NAGARJUNASAGAR GOOTY POWERGRID 1 308.437 308.437 TWIN MOOSE13 NAGARJUNASAGAR MEHBOOBNAGAR POWERGRID 1 184.35 184.35 TWIN MOOSE14 NELLORE NPS POWERGRID 1 3.647 3.647 QUAD MOOSE15 RAMAGUNDAM GAJWAL POWERGRID 1 135 135 TWIN MOOSE16 RAMAGUNDAM HYDERABAD POWERGRID 2 201.236 402.472 TWIN MOOSE17 RAMAGUNDAM MALKARAM POWERGRID 1 192.4 192.4 TWIN AAAC 18 RAMAGUNDAM NAGARJUNASAGAR POWERGRID 2 267.2 534.4 TWIN MOOSE19 RAMAGUNDAM WARANGAL POWERGRID 1 98.83 98.83 TWIN MOOSE

20SIMHADRI GAJUWAKA POWERGRID 2 13.23 26.46

TWIN MOOSE

A A A C

21VEMAGIRI SIMHADRI POWERGRID 2 193.33 386.66

TWIN MOOSE

A A A C22 VIJAYAWADA GAJUWAKA POWERGRID 1 316.9 316.9 TWIN MOOSE23 VIJAYAWADA NELLORE POWERGRID 2 340 680 TWIN MOOSE24 VIJAYAWADA VEMAGIRI POWERGRID 2 195.41 390.82 TWIN MOOSE25 N P S MEENAKSHI ENERGY LTD POWERGRID 1 30.689 30.689 QUAD MOOSE26 N P S SIMHAPURI ENERGY LTD POWERGRID 1 30.689 30.689 QUAD MOOSE27 MEENAKSHI ENERGY LTD SIMHAPURI ENERGY LTD POWERGRID 1 0.6 0.6 QUAD MOOSE

1 MALKARAM VTS APTRANSCO 2 130.400 260.8 TWIN MOOSE2 GAJWEL SHANKERPALLY APTRANSCO 2 52.500 105 TWIN MOOSE3 KALPAKKA GAZUWAKA APTRANSCO 2 12.000 24 TWIN MOOSE4 KALPAKKA VEMAGIRI APTRANSCO 2 158.000 316 TWIN MOOSE5 KHAMMAM KALPAKKA APTRANSCO 2 364.000 728 TWIN MOOSE6 KHAMMAM MAMIDAPALLY APTRANSCO 2 198.000 396 TWIN MOOSE7 KRISHNAPATNAM MANUBOLU APTRANSCO 2 18.250 36.5 QUAD MOOSE8 MAMIDIPALLY GHANAPUR APTRANSCO 1 45.000 45 TWIN MOOSE9 RAMAGUNDAM DICHPALLY APTRANSCO 1 148.000 148 TWIN MOOSE10 SIMHADRI KALPAKKA APTRANSCO 4 3.700 14.8 TWIN MOOSE11 SRISAILAM KURNOOL APTRANSCO 1 104.000 104 TWIN MOOSE12 SRISAILAM MAMIDAPALLI APTRANSCO 2 147.000 294 TWIN MOOSE13 SRISAILAM VTPS IV APTRANSCO 2 213.000 426 TWIN MOOSE14 VEMAGIRI GMR APTRANSCO 2 1.760 3.52 TWIN MOOSE15 VEMAGIRI GOUTAMI CCPP APTRANSCO 2 39.000 78 TWIN MOOSE16 VEMAGIRI GVK(JPD) APTRANSCO 2 6.840 13.68 TWIN MOOSE17 VEMAGIRI KONASEEMA APTRANSCO 2 26.010 52.02 TWIN MOOSE18 VIJAYAWADA VEMAGIRI APTRANSCO 1 195.410 195.41 TWIN MOOSE19 VIJAYAWADA VEMAGIRI APTRANSCO 1 196.380 196.38 TWIN MOOSE20 VTPS IV VIJAYAWADA APTRANSCO 2 18.660 37.32 TWIN MOOSE21 WARANGAL BOOPALAPPALLI APTRANSCO 2 45.620 91.24 TWIN MOOSE

3565.67

1 GOOTY RTSS GOOTY RECG STATION APTRANSCO 1 3.522 3.522 ZEBRA

2 GOOTY SW.STATION GOOTY RTSS APTRANSCO 1 3.552 3.552 ZEBRA

3 GACHIBOWLI 400KV SHANKERPALLY APTRANSCO 1 27.500 27.5 Zebra/ACSR

4400KV SHANKERPALLY 220KV YEDDUMAILARAM

APTRANSCO 19.500

9.5Zebra/ACSR

5 ANANTHPUR KALYANADURG APTRANSCO 1 63.000 63 MOOSE6 AP CARBIDES KURNOOL 400 KV SS APTRANSCO 2 15.070 30.14 ZEBRA/MOOSE8 BHEEMGANAPUR GANGARAM APTRANSCO 1 42.340 42.34 MOOSE9 BHIMADOLE NIDADAVOLU APTRANSCO 2 64.500 129 ZEBRA

11 BHIMAVARAM GUDIWADA APTRANSCO 2 59.700 119.4 ZEBRA13 BOMMUR JEGRUPADU APTRANSCO 1 8.200 8.2 ZEBRA14 BOMMUR LOWER SILERU APTRANSCO 1 107.670 107.67 ZEBRA15 BOMMUR PD PURAM(SAMALKOT) APTRANSCO 1 35.760 35.76 ZEBRA16 BOMMUR R C VARAM APTRANSCO 1 67.660 67.66 ZEBRA17 BOMMUR VEMAGIRI APTRANSCO 2 3.830 7.66 ZEBRA19 BOMMUR VIJJESWARAM I APTRANSCO 1 12.040 12.04 ZEBRA20 BOMMUR VIJJESWARAM II APTRANSCO 1 26.090 26.09 ZEBRA21 CHALAKURTHY KONDAMALLEPALLY APTRANSCO 1 45.000 45 MOOSE22 CHELLKURTHY K M PALLY APTRANSCO 1 40.460 40.46 ZEBRA23 CHILLAKALLU NARKETPALLY APTRANSCO 2 231.180 462.36 MOOSE25 CHITTOOR CHITTOOR 400 KV SS APTRANSCO 2 16.710 33.42 ZEBRA27 CHITTOOR KALKIRI APTRANSCO 1 64.000 64 ZEBRA28 CHITTOOR NAGARI APTRANSCO 1 95.490 95.49 Moose + Zebra29 CHITTOOR 400 KV PALAMANERU APTRANSCO 1 58.000 58 MOOSE30 DHONE KAMBALAPADU APTRANSCO 1 12.100 12.1 MOOSE31 DHONE KRISHNAGIRI APTRANSCO 1 11.180 11.18 MOOSE32 DHONE SOMAYAJULAPPALLY APTRANSCO 2 41.880 83.76 MOOSE34 DICHPALLY BHEEMGAL APTRANSCO 1 27.100 27.1 ZEBRA35 DICHPALLY 400 KV SS DICHPALLI APTRANSCO 2 3.990 7.98 ZEBRA37 DINDI CHANDRAYANGUTTA APTRANSCO 2 90.370 180.74 ZEBRA39 DONKARAI LOWER SILERU APTRANSCO 1 19.000 19 ZEBRA40 DONKARAI UPPER SILERU APTRANSCO 1 28.300 28.3 ZEBRA41 GACHIBOWLI SHAPOORNAGAR APTRANSCO 2 15.490 30.98 ZEBRA43 GACHIBOWLI SHAPOORNAGAR APTRANSCO 2 22.010 44.02 ZEBRA45 GACHIBOWLI SIVARAMPALLI APTRANSCO 2 14.000 28 ZEBRA47 GACHIBOWLI TANDUR APTRANSCO 1 90.900 90.9 ZEBRA48 GACHIBOWLI YEDDUMAILARAM APTRANSCO 1 25.720 25.72 ZEBRA49 GAJWEL KAMAREDDY APTRANSCO 2 67.000 134 ZEBRA51 GAJWEL MINPUR APTRANSCO 2 43.135 86.27 Zebra53 GARIVIDI TEKKALI APTRANSCO 1 89.230 89.23 MOOSE54 GAZUWAKA GPL (GNGVM PORT) APTRANSCO 1 6.400 6.4 ZEBRA55 GAZUWAKA 400 KV SS GPL (GNGVM PORT) APTRANSCO 1 9.180 9.18 ZEBRA56 GAZUWAKA 400 KV SS PARAWADA APTRANSCO 1 5.590 5.59 ZEBRA57 GOOTY DHONE APTRANSCO 2 93.400 186.8 MOOSE59 GOOTY REGULAPADU APTRANSCO 1 57.380 57.38 MOOSE60 GOOTY 400 KV SS ANANTAPUR APTRANSCO 1 57.420 57.42 ZEBRA61 GOOTY 400 KV SS GOOTY APTRANSCO 2 4.760 9.52 ZEBRA63 HIAL CHANDRAYANGUTTA APTRANSCO 1 18.710 18.71 ZEBRA64 HIAL SIVARAMPALLI APTRANSCO 1 15.200 15.2 ZEBRA65 HINDUPUR GOOTY 400 KV SS APTRANSCO 1 155.550 155.55 ZEBRA66 HINDUPUR RAMAGIRI APTRANSCO 1 57.610 57.61 ZEBRA67 HWP MANUGURU APTRANSCO 2 8.110 16.22 ZEBRA69 JEGRUPADU NIDADAVOLU APTRANSCO 1 23.490 23.49 ZEBRA

70 JURALA SS JURALA POWER HOUSE APTRANSCO 2 1.850 3.7 MOOSE

72 KADAPA CHINAKAMPALLI APTRANSCO 1 14.160 14.16 ZEBRA73 KAKINADA BOMMUR APTRANSCO 1 63.160 63.16 ZEBRA74 KAKINADA GAZUWAKA(SW STN) APTRANSCO 1 181.360 181.36 ZEBRA75 KAKINADA SPECTRUM APTRANSCO 2 9.820 19.64 ZEBRA77 KALKIRI CHINAKAMPALLI APTRANSCO 1 84.400 84.4 ZEBRA78 KALPAKA D FARM APTRANSCO 2 51.890 103.78 ZEBRA80 KALPAKA GAZUWAKA 400 KV SS APTRANSCO 2 3.390 6.78 ZEBRA82 KALPAKKA BRANDIX APTRANSCO 1 19.060 19.06 MOOSE83 KALPAKKA BRANDIX APTRANSCO 1 20.180 20.18 MOOSE84 KALWAKURTHY BHOOTPUR APTRANSCO 2 51.340 102.68 ZEBRA86 KALWAKURTHY DINDI APTRANSCO 2 23.910 47.82 ZEBRA88 KAMAVARAPUKOTA VIJJESWARAM II APTRANSCO 1 78.850 78.85 ZEBRA89 KAMBALAPADU LAKKASAGARAM APTRANSCO 1 9.300 9.3 MOOSE90 KHAMMAM BHONGIRI APTRANSCO 1 154.540 154.54 ZEBRA91 KHAMMAM (BDMPD) W.K PALLI APTRANSCO 1 82.300 82.3 ZEBRA92 KODUR RAJAMPET APTRANSCO 1 36.680 36.68 ZEBRA93 KRISHNAGIRI SETTIPALLY APTRANSCO 1 10.500 10.5 MOOSE94 KTPS LOWER SILERU APTRANSCO 2 114.670 229.34 DEER & ZEBRA96 KTPS MANUGURU APTRANSCO 1 43.500 43.5 ZEBRA97 KTPS MIRYALAGUDA APTRANSCO 1 170.820 170.82 DEER98 KTPS NUNNA APTRANSCO 1 120.000 120 ZEBRA99 KTPS SHAPOORNAGAR APTRANSCO 1 246.230 246.23 ZEBRA

100 KTPS V KHAMMAM APTRANSCO 2 68.230 136.46 TWIN MOOSE102 KTPS V KTPS APTRANSCO 2 1.190 2.38 ZEBRA104 KTPS V MANUGURU APTRANSCO 1 42.440 42.44 ZEBRA105 KTPS V SITARAMAPATNAM APTRANSCO 2 5.190 10.38 ZEBRA108 MALAYALAPALLI BHEEMGAL APTRANSCO 1 122.400 122.4 ZEBRA109 MALAYALAPALLI DICHPALLI APTRANSCO 1 147.400 147.4 ZEBRA110 MALAYALAPALLI DURSHED APTRANSCO 2 51.200 102.4 ZEBRA112 MALAYALAPALLI JAGATYAL APTRANSCO 1 67.690 67.69 ZEBRA113 MALAYALAPALLI NAGARAM APTRANSCO 1 78.630 78.63 ZEBRA114 MALAYALAPALLI NIRMAL APTRANSCO 1 137.000 137 ZEBRA115 MALAYALAPALLI RAMAGUNDAM APTRANSCO 2 1.100 2.2 ZEBRA117 MALAYALAPALLI RAMAGUNDAM APTRANSCO 1 1.050 1.05 ZEBRA118 MALKARAM BHONGIRI APTRANSCO 2 32.730 65.46 ZEBRA120 MALKARAM GHANAPUR APTRANSCO 2 16.020 32.04 ZEBRA122 MALKARAM GUNROCK APTRANSCO 2 8.024 16.047 XLPE-UGCable124 MALKARAM MEDCHAL APTRANSCO 2 14.000 28 ZEBRA126 MALKARAM MOULALI APTRANSCO 2 9.250 18.5 ZEBRA128 MALKARAM SHAPOORNAGAR APTRANSCO 2 21.380 42.76 ZEBRA130 MALYALA BRAHMANAKOTKUR APTRANSCO 2 10.570 21.14 MOOSE132 MAMIDIPALLY CHANDRAYANGUTTA APTRANSCO 1 22.000 22 ZEBRA133 MAMIDIPALLY HIAL APTRANSCO 1 15.000 15 ZEBRA134 MAMIDIPALLY SIVARAMPALLI APTRANSCO 1 13.100 13.1 ZEBRA135 MARKAPUR PODILI APTRANSCO 1 67.390 67.39 ZEBRA136 MEDARAM DICHPALLY APTRANSCO 1 128.110 128.11 ZEBRA137 MEDCHAL GAJWEL APTRANSCO 2 37.295 74.59 ZEBRA

139MEHBOOBNAGAR 400 KV SS BHOOTPUR

APTRANSCO 232.800

65.6ZEBRA

141MEHBOOBNAGAR 400 KV SS JURALA SS

APTRANSCO 230.280

60.56MOOSE

143MEHBOOBNAGAR 400 KV SS WANAPARTHY

APTRANSCO 219.900

39.8MOOSE

145 MIRIYALAGUDA CHELLAKURTHY APTRANSCO 1 51.460 51.46 ZEBRA146 MIRIYALAGUDA KHAMMAM 400 KV APTRANSCO 1 100.000 100 ZEBRA147 MIRYALAGUDA KHAMMAM 400 KV APTRANSCO 1 99.090 99.09 MOOSE148 MUDDANUR CHINAKAMPALLI APTRANSCO 2 57.310 114.62 ZEBRA150 MUDDANUR YERRAGUNTLA APTRANSCO 2 2.540 5.08 ZEBRA152 MUDDANUR (RTPP) ANANTAPUR APTRANSCO 2 97.830 195.66 ZEBRA154 MYDUKUR KADAPA APTRANSCO 1 31.230 31.23 ZEBRA155 NAGARAM WARANGAL APTRANSCO 1 13.780 13.78 ZEBRA156 NAGARJUNASAGAR CHELLAKURTHY APTRANSCO 1 14.240 14.24 ZEBRA157 NANOOR BRAHMANAKOTKUR APTRANSCO 1 23.180 23.18 MOOSE158 NANSURALLA LAKKASAGARAM APTRANSCO 1 6.850 6.85 MOOSE159 NARASARAOPET PODILI APTRANSCO 1 85.237 85.237 MOOSE160 NARNOOL SOMAYAJULAPALLY APTRANSCO 1 21.970 21.97 ZEBRA161 NELLORE NELLORE 400 KV SS APTRANSCO 2 29.000 58 ZEBRA163 NELLORE NELLORE 400 KV SS APTRANSCO 1 28.540 28.54 ZEBRA

164NELLORE 400 KV SS(MNBL) RENIGUNTA

APTRANSCO 2105.000

210ZEBRA

166NELLORE 400 KV SS(MNBL) SULURPET

APTRANSCO 183.660

83.66ZEBRA

167 NUNNA GUDIWADA APTRANSCO 2 42.520 85.04 ZEBRA169 NUNNA GUNADALA APTRANSCO 1 8.000 8 ZEBRA170 ONGOLE NELLORE APTRANSCO 1 126.980 126.98 ZEBRA171 ONGOLE PARACHUR APTRANSCO 1 62.060 62.06 ZEBRA+MOOSE172 PARAWADA PDPURAM(SAMALKOTA) APTRANSCO 1 158.350 158.35 ZEBRA173 PENDURTHI D FARM APTRANSCO 1 14.840 14.84 ZEBRA174 PENDURTHI GARVIDI APTRANSCO 1 66.000 66 ZEBRA175 PENDURTHI GARVIDI APTRANSCO 1 63.570 63.57 ZEBRA176 PENDURTHI GAZUWAKA 400 KV SS APTRANSCO 2 31.200 62.4 ZEBRA178 PENDURTHI UPPER SILERU APTRANSCO 1 162.980 162.98 ZEBRA179 PENDURTHY DAIRY FARM APTRANSCO 1 14.870 14.87 MOOSE180 PODILI NELLORE APTRANSCO 2 167.000 334 ZEBRA182 PODILI ONGOLE APTRANSCO 2 33.500 67 ZEBRA184 PULAKURTHY BHIMGHANAPUR APTRANSCO 1 65.000 65 MOOSE185 PULAKURTHY NAGARAM APTRANSCO 1 8.780 8.78 ZEBRA186 PULAKURTHY NAGARAM APTRANSCO 1 8.100 8.1 ZEBRA187 PULAKURTHY SALIVAGU APTRANSCO 1 12.520 12.52 MOOSE188 PUTTANGADI CHELLAKURTHY APTRANSCO 1 18.630 18.63 ZEBRA189 R T P P PULIVENDULA APTRANSCO 2 42.430 84.86 MOOSE191 RAJAMPET CHINAKAMPALLI APTRANSCO 1 56.000 56 ZEBRA192 RAMAGIRI ANANTAPUR APTRANSCO 1 62.950 62.95 ZEBRA193 RAMAGUNDAM BELLAMPALLY APTRANSCO 1 37.000 37 MOOSE194 RAMAGUNDAM MEDARAM APTRANSCO 1 36.010 36.01 ZEBRA195 RAMAGUNDAM VEMNUR APTRANSCO 1 26.540 26.54 ZEBRA196 RENIGUNTA CHINAKAMPALLI APTRANSCO 1 130.270 130.27 ZEBRA197 RENIGUNTA CHITTOOR 400 KV SS APTRANSCO 2 81.590 163.18 ZEBRA199 RENIGUNTA KODUR APTRANSCO 1 59.630 59.63 ZEBRA200 RENIGUNTA NAGARI APTRANSCO 1 71.860 71.86 ZEBRA201 RENTACHINTALA TALLAPALLY APTRANSCO 1 18.380 18.38 ZEBRA202 RTPP THIMMAPURAM APTRANSCO 2 24.150 48.3 Zebra + Moose204 SHAADNAGAR MAMIDIPALLY APTRANSCO 1 42.450 42.45 ZEBRA205 SHAMSHABAD MAMIDIPALLY APTRANSCO 1 13.020 13.02 ZEBRA206 SIDDIPET DURSHED APTRANSCO 2 66.590 133.18 ZEBRA208 SOMAYAJULAPALLY GOOTY 400 KV SS APTRANSCO 2 74.920 149.84 ZEBRA210 SOMAYAJULAPALLY KURNOOL 400 KV SS APTRANSCO 2 21.942 43.884 ZEBRA/MOOSE212 SOMAYAJULAPALLY NANDYAL APTRANSCO 1 35.420 35.42 ZEBRA213 SRISAILAM DINDI APTRANSCO 2 80.300 160.6 ZEBRA215 SRISAILAM MARKAPUR APTRANSCO 1 74.120 74.12 ZEBRA216 SRISAILAM MYDUKUR APTRANSCO 1 165.960 165.96 DEER217 SRISAILAM NAGARJUNASAGAR APTRANSCO 1 82.080 82.08 ZEBRA218 SRISAILAM PODILI APTRANSCO 1 116.500 116.5 ZEBRA219 SRISAILAM SOMAYAJULAPALLY APTRANSCO 2 102.250 204.5 ZEBRA221 SRISAILAM TALLAPALLY APTRANSCO 2 100.000 200 ZEBRA223 TADIKONDA PARACHUR APTRANSCO 1 58.260 58.26 ZEBRA+MOOSE224 TALAPALLY CHELLAKURTHY APTRANSCO 1 33.760 33.76 ZEBRA225 TALAPALLY NAGARJUNASAGAR APTRANSCO 3 12.300 36.9 ZEBRA228 THIMMAPURAM ANANTHAPUR APTRANSCO 2 22.150 44.3 Zebra + Moose230 THIMMAPURAM KONDAPURAM APTRANSCO 2 10.200 20.4 MOOSE232 V S S M R S (VIZAG) APTRANSCO 2 5.860 11.72 TWIN MOOSE234 V T S TALAPALLY APTRANSCO 1 265.840 265.84 ZEBRA235 VEMAGIRI BHIMAVARAM APTRANSCO 2 62.600 125.2 ZEBRA

237 VEMAGIRI PD PURAM(SAMALKOTA) APTRANSCO 2 40.860 81.72 ZEBRA

239 VEMAGIRI VIJJESWARAM II APTRANSCO 1 15.560 15.56 ZEBRA240 VEMNUR NIRMAL APTRANSCO 1 110.640 110.64 Zebra241 VIJJESWARAM I BHIMADOLU APTRANSCO 1 54.620 54.62 ZEBRA242 VIJJESWARAM II NIDADAVOLU APTRANSCO 1 5.800 5.8 ZEBRA243 VSP GAZUWAKA 400 KV SS APTRANSCO 2 6.500 13 ZEBRA245 VTS CHILLAKALLU APTRANSCO 2 66.400 132.8 MOOSE247 VTS GUNADALA APTRANSCO 1 18.110 18.11 ZEBRA248 VTS KAMAVARAPUKOTA APTRANSCO 1 105.460 105.46 ZEBRA249 VTS KONDAPALLI APTRANSCO 2 6.100 12.2 ZEBRA251 VTS NARASARAOPET APTRANSCO 1 68 108 68 108 MOOSE

7(b) Details of Transmission Network

CENTRAL SECTOR

S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in

CKMsType of Conductor

400 kV

Total 5981APTRANSCO

S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in

CKMsType of Conductor

400 kV

Total220 kV

251 VTS NARASARAOPET APTRANSCO 1 68.108 68.108 MOOSE252 VTS NUNNA APTRANSCO 1 17.000 17 ZEBRA253 VTS PODILI APTRANSCO 1 147.000 147 MOOSE254 VTS RENTACHINTALA APTRANSCO 1 117.780 117.78 ZEBRA255 VTS TADIKONDA APTRANSCO 1 24.500 24.5 ZEBRA256 VTS TADIKONDA APTRANSCO 1 23.760 23.76 ZEBRA257 W.K PALLI BHONGIRI APTRANSCO 1 86.270 86.27 ZEBRA258 WANAPARTHY BRAHMANAKOTKUR APTRANSCO 1 97.560 97.56 MOOSE259 WANAPARTHY REGUMANAGADDA APTRANSCO 1 43.080 43.08 ZEBRA260 WARANGAL KHAMMAM APTRANSCO 2 113.760 227.52 ZEBRA262 WARANGAL 400 KV NAGARAM APTRANSCO 2 6.300 12.6 ZEBRA264 YEDDUMAILARAM SHAADNAGAR APTRANSCO 1 54.500 54.5 ZEBRA265 YEDDUMAILARAM SHAMSHABAD APTRANSCO 1 49.700 49.7 ZEBRA

13233.341

1 LANCO VIJAYAW ADA LANCO 2 19.00 38.00 TW INMOOSE

S.No Substation Feeder Name

1 132KV ANANDAPURAM 132KV ANANDAPURAM ‐ DIVIS LABORATORIES

2 132KV PAYAKARAOPETA 132KV PAYAKARAOPET ‐ PEDDAPURAM

3 132KV PAYAKARAOPETA ‐ TUNI RLY TRACTION 

4 132KV NAKKAVANIPALEM 132KV NAKKAVANIPALEM ‐ PORT SS

5 132KV NAWALWARF 132KV NAWALWARF ‐ APCL  

6 132KV NAWALWARF ‐ COMMON POINT

7 132KV NAWALWARF ‐ DGNP CKT 1

8 132KV NAWALWARF ‐ DGNP CKT 2

9 132KV NAWALWARF ‐ DGNP SS

10 132KV NAWALWARF ‐ HPCL CKT 1

11 132KV NAWALWARF ‐ HPCL CKT 2

12 132KV NAWALWARF ‐ HSL

13 132KV NAWALWARF ‐ RCL  

14 132KV NAWALWARF ‐ESSAR

15 132KV KORUPROLU 132KV KORUPROLU ‐ MY HOME CEMENTS

16 132KV KORUPROLU ‐ NARSIPATNAM

17 132KV KORUPROLU ‐ PAYAKARAOPET

18 132KV TYDA 132KV TYDA ‐ SIMILIGUDA RLY TRACTION CKT 1

19 132KV TYDA ‐ SIMILIGUDA RLY TRACTION CKT 2

20 132KV RCL 132KV RCL ‐ ESSAR 

21 132KV RCL SS ‐ ESSAR 

22 132KV VSEZ 132KV VSEZ ‐ RAILWAY TRACTION

23 132KV SIMHACHALAM 132KV SIMHACHALAM ‐ ANDHRA CEMENTS

24 132KV SIMHACHALAM ‐ COMMON POINT

25 132KV SIMHACHALAM ‐ NAKKAVANIPALEM

26 132KV SIMHACHALAM ‐ RAILWAY TRACTION CKT 1

27 132KV SIMHACHALAM ‐ RAILWAY TRACTION CKT 2

28 132KV KASIMKOTA 132KV KASIMKOTA ‐ ANAKAPALLI RLY TRACTION 

29 132KV PORT 132KV PORT SS ‐ CIRCUIT 1

30 132KV PORT SS ‐ CIRCUIT 2

31 132KV PORT SS ‐ DGNP SS

32 220KV GAJUWAKA 132KV GAJUWAKA ‐ CFL CKT 1

33 132KV GAJUWAKA ‐ CFL CKT 2

34 132KV GAJUWAKA ‐ HINDUSTAN ZINC LTD  CKT 1

35 132KV GAJUWAKA ‐ HINDUSTAN ZINC LTD CKT 2

36 132KV GAJUWAKA ‐ NAWALRAF CKT 1

37 132KV GAJUWAKA ‐ NAWALRAF CKT 2

38 132KV GAJUWAKA ‐ SIMHACHALAM CKT 1

39 132KV GAJUWAKA ‐ SIMHACHALAM CKT 2

40 132KV GAJUWAKA ‐ VSEZ

41 132KV ARAKU 132KV ARAKU ‐ GORAPUR RLY TRACTION CKT 1

42 132KV ARAKU ‐ GORAPUR RLY TRACTION CKT 2

43 132KV ARAKU ‐ MACHKUND CKT 1

44 132KV ARAKU ‐ MACHKUND CKT 2

45 132KV ARAKU ‐ TYDA CKT 1

46 132KV ARAKU ‐ TYDA CKT 2

47 220KV BRANDIX 132KV BRANDIX ‐ ANJENEYA ALLOYS CKT 1

48 132KV BRANDIX ‐ ANJENEYA ALLOYS CKT 2

49 132KV BRANDIX ‐ PEDDAPURAM

50 132KV DGNP 132KV DGNP ‐ PORT

51 132KV DGNP ‐ SBC

52 220KV PARAWADA 132KV PARAWADA ‐ KORUPROLU

53 132KV PARAWADA ‐ SILK ROAD SUGARS SW STN

54 220KV PENDURTHI 132KV PENDURTHI ‐ ANANDAPURAM

55 132KV PENDURTHI ‐ DECCAN FERROW ALLOYS

56 132KV PENDURTHI ‐ GOLD STAR 

57 132KV PENDURTHI ‐ JINDAL

58 132KV PENDURTHI ‐ KASIMKOTA CKT 1

59 132KV PENDURTHI ‐ KASIMKOTA CKT 2

60 132KV PENDURTHI ‐ KOTHAVALASA

61 132KV PENDURTHI ‐ LVS

62 132KV PENDURTHI ‐ SIMHACHALAM CKT 1

63 132KV PENDURTHI ‐ SIMHACHALAM CKT 2

1

132KV SILK ROAD SUGARS SWITCHING 

STATION 132KV SILK ROAD SUGARS ‐ CIL

2 220KV KAKINADA 132KV KAKINADA ‐ NFCL

3 132KV KAKINADA ‐ PEDDAPURAM CKT 2

4 132KV KAKINADA ‐ R C PURAM

5 132KV KAKINADA ‐ SILK ROAD SUGARS

6 132KV KAKINADA ‐ YANAM

7 132KV MALLAYYAPETA 132KV MALLAIAHPETA ‐ APP MILLS

8 132KV RAJANAGARAM 132KV RAJANAGARAM ‐ PEDDAPURAM

9 132KV RAMACHANDRAPURAM 132KV RAMACHANDRAPURAM ‐ AMALAPURAM

10 132KV RAMACHANDRAPURAM ‐ SRI SARVARAYA SUGARS

11

220KV SAMALKOTA SWITCHING STN 

(SSS) 132KV SAMALKOTA ‐ RLY TRACTION

12 220KV BOMMURU 132KV BOMMURU ‐ MALLAIAHPETA CKT 1

13 132KV BOMMURU ‐ MALLAIAHPETA CKT 2

14 132KV BOMMURU ‐ NIDADAVOLE CKT 1

15 132KV BOMMURU ‐ NIDADAVOLE CKT 2

16 132KV BOMMURU ‐ PEDDAPURAM

17 132KV BOMMURU ‐ RAILWAY TRACTION 

18 132KV BOMMURU ‐ RAJANAGARAM

19 132KV BOMMURU ‐ RVK

20 132KV RAZOLE 132KV RAZOLE ‐ SRI VATHSA

21 132KV PRATHIPADU 132KV PRATHIPADU ‐ NVBL

22 132KV PEDDAPURAM 132KV PEDDAPURAM ‐ BRANDEX

23 132KV PEDDAPURAM ‐ PAYAKARAO PET CKT 1

24 132KV PEDDAPURAM ‐ PAYAKARAO PET CKT 2

25 132KV PEDDAPURAM ‐ PRATHIPADU CKT 1

26 132KV PEDDAPURAM ‐ PRATHIPADU CKT 2

27 132KV AMALAPURAM 132KV AMALAPURAM ‐ RAZOLE

28 132KV RVK SWICHING STATION  132KV RVK SS ‐ EDITHA

29 132KV EDITHA 132KV EDITHA ‐ RAMACHANDRAPURAM

1 132KV PEDATADEPALLI 132KV PEDA TADEPALLI ‐ NIDADAVOLU

2 132KV PEDATADEPALLY ‐ RAILWAY TRACTION 

3 132KV BHIMAVARAM 132KV BHIMAVARAM ‐ NARASAPURAM

4 132KV NARASAPURAM 132KV NARASAPURAM ‐ RAZOLE

5 132KV ELURU 132KV ELURU ‐ KANUMOLU

6 132KV ELURU ‐ PEDAVEGI

7 132KV ELURU ‐ RAILWAY TRACTION 

8 132KV NALLAJERAL 132KV NALLAJERLA ‐ VRK SUGARS

9 132KV SAGGONDA 132KV SAGGONDA‐ANDHRA SUGARS 

10 220KV BHIMADOLU 132KV BHIMADOLE ‐ PEDATADEPALLI

11 132KV BHIMADOLU ‐ KAMAVARAPUKOTA

12 132KV BHIMADOLU ‐ KANUMOLU

13 132KV BHIMADOLU ‐ NIDADAVOLE

14 132KV BHIMADOLU ‐ PEDAVEGI

15 132KV KOVVURU 132KV KOVVURU ‐ ANDHRA SUGARS

16 132KV KOVVURU ‐ SAGGONDA

17 220KV NIDADAVOLU 132KV NIDADAVOLU ‐ KOVVURU CKT 1

18 132KV NIDADAVOLU ‐ KOVVURU CKT 2

19 132KV NIDADAVOLU ‐ NALLAJERLA

20 132KV NIDADAVOLU ‐ NIDADAVOLU TIE 1

21 132KV NIDADAVOLU ‐ NIDADAVOLU TIE 2

22 220KV KAMAVARAPUKOTA 132KV KAMAVARAPUKOTA ‐ ASWARAOPETA CKT 1

23 132KV KAMAVARAPUKOTA ‐ ASWARAOPETA CKT 2

24 132KV KAMAVARAPUKOTA ‐ CHINTALAPUDI

25 132KV KAMAVARAPUKOTA ‐ JANGAREDDYGUDEM CKT 1

26 132KV KAMAVARAPUKOTA ‐ JANGAREDDYGUDEM S.CKT

27 132KV KAMAVARAPUKOTA ‐ NALLAJERLA

1 132KV TENALI 132KV TENALI ‐ RAILWAY TRACTION ‐ 1

2 132KV TENALI ‐ RAILWAY TRACTION ‐ 2

3 132KV TENALI ‐ REPALLE

4 132KV CHILAKALURIPET 132KV CHILAKALURIPET ‐ MARRIPALEM

5 132KV CHILAKALURIPET ‐ NALLAPADU

6 132KV CHILAKALURIPET ‐ VINUKONDA

7 220KV RENTACHINTALA 132KV PARASAKTHI CEMENTS

8 132KV RENTACHINTALA ‐ MACHERLA

9 220KV TADIKONDA 132KV TADIKONDA ‐ GUJJANAGULLA

10 132KV TADIKONDA ‐ GUNTUR 1

11 132KV TADIKONDA ‐ GUNTUR 2

12 132KV TADIKONDA ‐ MARRIPALEM

13 132KV TADIKONDA ‐ NALLAPADU

14 132KV TADIKONDA ‐ RENTAPALLA

15 132KV TADIKONDA ‐ TADEPALLY

16 132KV TANGEDA 132KV TANGEDA ‐ WADAPALLI

17 132KV GUNTUR 132KV GUNTUR ‐ BAPATLA

18 132KV GUNTUR ‐ TENALI CKT 1

19 132KV GUNTUR ‐ TENALI CKT 2

20 220KV NARASARAOPET 132KV NARASARAOPET ‐ CHILAKALURIPET CKT 1

21 132KV NARASARAOPET ‐ CHILAKALURIPET CKT 2

22 132KV MACHERLA 132KV MACHERLA ‐ KARAMPUDI

23 132KV MACHERLA ‐ KCP CEMENTS

24 132KV MACHERLA ‐ NSRCPH

25 132KV PIDUGURALLA 132KV PIDUGURALLA ‐ KARAMPUDI

26 132KV PIDUGURALLA ‐ RENTAPALLA

27 132KV PIDUGURALLA ‐ TANGEDA

28 132KV PIDUGURALLA ‐ WADAPALLI

29 132KV TADEPALLI 132KV TADEPALLI ‐ GUNTUR

30 132KV TADEPALLI ‐ RAILWAY TRACTION I

31 132KV TADEPALLI ‐ RAILWAY TRACTION II

32 132KV BAPATLA 132KV BAPATLA ‐ RAILWAY TRACTION ‐ 1

33 132KV BAPATLA ‐ RAILWAY TRACTION ‐ 2

34 132KV BAPATLA ‐ REPALLE

1 132KV KANDUKUR 132KV KANDUKUR ‐ KAVALI

2 132KV ONGOLE TOWN 132KV ONGOLE ‐ INKOLLU

3 132KV MEDARAMETLA 132KV MEDARAMETLA ‐ TEAMAC

4 132KV MEDARMETLA ‐ ADDANKI

5 132KV CUMBUM 132KV CUMBUM ‐ GIDDALUR

6 132KV CUMBUM ‐ YERRAGONDAPALEM

7 132KV PEDADORNALA 132KV PEDADORNALA ‐ SRISAILAM

8 132KV PEDADORNALA ‐ YERRAGONDAPALEM

9 132KV KANIGIRI 132KV KANIGIRI ‐ PAMURU

10 220KV ONGOLE 132KV ONGOLE ‐ KANDUKUR

11 132KV ONGOLE ‐ KANIGIRI

12 132KV ONGOLE ‐ MEDARMETLA

13 132KV ONGOLE ‐ ONGOLE

14 132KV ONGOLE ‐ RAILWAY TRACTION CKT 1

15 132KV ONGOLE ‐ RAILWAY TRACTION CKT 2

16 132KV ONGOLE ‐ TANGUTUR

17 132KV TANGUTUR 132KV TANGUTURU ‐ AGRIGOLD

18 220KV PARCHURU 132KV PARCHURU ‐ BAPATLA

19 132KV PARCHURU ‐ CHILAKALURIPET

20 132KV PARCHURU ‐ CHIRALA

21 132KV PARCHURU ‐ INKOLLU

22 132KV PARCHURU ‐ MARTUR

23 220KV MARKAPUR 132KV MARKAPUR ‐ CUMBUM

1 132KV NTS KOVUR 132KV NTS ‐ ALLURU

2 132KV NTS ‐ N V GARDENS

3 132KV NTS ‐ RAILWAY TRACTION CKT 1

4 132KV NTS ‐ RAILWAY TRACTION CKT 2

5 132KV GUDUR 132KV GUDUR ‐ NAIDUPET

6 132KV GUDUR ‐ RAILWAY TRACTION CKT 1

7 132KV GUDUR ‐ RAILWAY TRACTION CKT 2

8 220KV NELLORE 132KV NELLORE ‐ ADURUPALLI

9 132KV NELLORE ‐ ATMAKUR

10 132KV NELLORE ‐ BRAMHADEVAM

11 132KV NELLORE ‐ N V GARDENS

12 132KV NELLORE ‐ NTS

13 132KV NAIDUPETA 132KV NAIDUPETA ‐ EMPEE SUGAR CKT 2

14 132KV NAIDUPETA ‐ EMPEE SUGARS CKT 1

15 132KV NAIDUPETA ‐ MJ STEELS CKT 1

16 132KV NAIDUPETA ‐ MJ STEELS CKT 2

17 132KV NAIDUPETA ‐ VIKKI IND CKT 1

18 132KV NAIDUPETA ‐ VIKKI IND CKT 2

19 132KV ALLURU 132KV ALLURU ‐ KAVALI

20 400KV MANUBOLU 132KV MANUBOLU ‐ CHENDODU

21 132KV MANUBOLU ‐ GUDUR CKT 1

22 132KV MANUBOLU ‐ GUDUR CKT 2

23 132KV MANUBOLU ‐ NELLORE

24 132KV MANUBOLU ‐ SBQ STEELS

25 132KV VENKATAGIRI 132KV VENKATAGIRI ‐ RAILWAY TRACTION 

26 132KV VENKATAGIRI ‐ RAILWAY TRACTION CKT 2

27 132KV VENKATAGIRI ‐ SRIKALAHASTHI

28 132KV BRAHMDEVAM 132KV BRAMHADEVAM ‐ KRISHNAPATNAM PORT

29 132KV BRAMHADEVAM ‐ NIDUGUNTAPALEM

30 132KV KAVALI 132KV KAVALI ‐ RAILWAY TRACTION CKT 1

31 132KV KAVALI ‐ RAILWAY TRACTION CKT 2

Total

Total 22780Private

S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in

CKMs

Source: SRLDC List of Important Elements

http://www.srldc.org/DownloadDocuments.aspx

132 kV

Type of Conductor

400 kV

Total 38

Grand Total 22818

Andhra Pradesh Power system Profile

Page 21: State_Profile_Andhra_Pradesh.pdf

S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in

CKMsType of Conductor

32 132KV ATMAKUR 132KV ATMAKUR ‐ BADVEL

33 132KV ATMAKUR ‐ UDAYAGIRI

34 220KV SULLURPETA 132KV SULLURUPETA ‐ NAIDUPET

35 132KV SULLURUPETA ‐ RAILWAY TRACTION CKT 1

36 132KV SULLURUPETA ‐ RAILWAY TRACTION CKT 2

37 132KV SULLURUPETA ‐ S H A R

38 132KV SULLURUPETA ‐ SRIKALAHASTI

1 132KV PUTTUR 132KV PUTTUR ‐ NAGARI

2 132KV PUTTUR ‐ RAILWAY TRACTION CKT 1

3 132KV PUTTUR ‐ RAILWAY TRACTION CKT 2

4 132KV NAGARI 132KV NAGARI ‐ K.P. MITTA

5 132KV NAGARI ‐ NAGALAPURAM

6 132KV K.P.MITTA 132KV K.P.MITTA ‐ PAKALA

7 132KV K.P.MITTA ‐ SAGAR SUGARS

8 220KV KALIKIRI 132KV KALIKIRI ‐ GURRAMKONDA

9 132KV KALIKIRI ‐ MADANAPALLI CKT 1

10 132KV KALIKIRI ‐ MADANAPALLI CKT 2

11 132KV KALIKIRI ‐ ROMPICHARLA

12 132KV KALIKIRI ‐ SOMALA

13 132KV PAKALA 132KV PAKALA ‐ RAILWAY TRACTION 

14 132KV PAKALA ‐ ROMPICHERLA

15 220KV CHITTOOR 132KV CHITTOOR ‐ PAKALA

16 132KV CHITTOOR ‐ PALAMANERU CKT 1

17 132KV CHITTOR‐IRALA

18 132KV IRALA 132KV IRALA ‐ SOMALA

19 220KV RENIGUNTA 132KV RENIGUNTA ‐ AMARA RAJA BATTERY LTD

20 132KV RENIGUNTA ‐ CHANDRAGIRI CKT 1

21 132KV RENIGUNTA ‐ CHANDRAGIRI CKT 2

22 132KV RENIGUNTA ‐ G W NORTON

23 132KV RENIGUNTA ‐ PUTTUR CKT 1

24 132KV RENIGUNTA ‐ PUTTUR CKT 2

25 132KV RENIGUNTA ‐ RAILWAY TRACTION CKT 1

26 132KV RENIGUNTA ‐ RAILWAY TRACTION CKT 2

27 132KV RENIGUNTA ‐ SRIKALAHASTHI

28 132KV RENIGUNTA ‐ TIRUPATHI

29 132KV SANTHIPURAM 132KV SANTHIPURAM ‐ KUPPAM CKT 1 

30 132KV SANTHIPURAM ‐ KUPPAM CKT 2

31 132KV CHANDRAGIRI 132KV CHANDRAGIRI ‐ TIRUMALA CKT 1

32 132KV CHANDRAGIRI ‐ TIRUMALA CKT 2

33 132KV SRIKALAHASTI 132KV SRIKALAHASTHI ‐ VENKATAGIRI

34 132KV PUNGANUR 132KV PUNGANUR ‐ MADANAPALLY

35 132KV TIRUPATI 132KV TIRUPATHI ‐ K.P. MITTA

36 220KV PALAMANER 132KV PALAMANER ‐ PUNGANUR

37 132KV PALAMANER ‐ SANTHIPURAM CKT 1

38 132KV PALAMANER ‐ SANTHIPURAM CKT 2

39 132KV MADANAPALLI 132KV MADANAPALLI ‐ B.K.KOTA

1 132KV PRODDUTUR 132KV PRODDUTUR ‐ JAMMALAMADUGU

2 132KV RAYACHOTI 132KV RAYACHOTI ‐ SAMBEPALLI

3 220KV CHINAKAMPALLY 132KV CHINAKAMPALLY ‐ RAYACHOTY

4 132KV KONDAPURAM 132KV KONDAPURAM ‐ BCL CKT 1

5 132KV KONDAPURAM ‐ BCL CKT 2

6 132KV KONDAPURAM ‐ TADIPATRI

7 132KV PULIVENDULA 132KV PULIVENDULA ‐ KADIRI

8 132KV PULIVENDULA ‐ LINGALA

9 132KV PULIVENDULA ‐ UCIL

10 220KV RAJAMPETA 132KV RAJAMPETA ‐ T.G.PALLI

11 132KV GKLIS 132KV GKILS ‐ KONDAPURAM

12 132KV JAMMALAMADUGU 132KV JAMMALAMADUGU ‐ DALMIA CEMENTS

13 220KV YERRAGUNTLA 132KV YERRAGUNTLA ‐ BHARATHI CEMENTS CKT 1

14 132KV YERRAGUNTLA ‐ BHARATHI CEMENTS CKT 2

15 132KV YERRAGUNTLA ‐ CCI CKT 1

16 132KV YERRAGUNTLA ‐ CCI CKT 2

17 132KV YERRAGUNTLA ‐ ICL CKT 1

18 132KV YERRAGUNTLA ‐ ICL CKT 2

19 132KV YERRAGUNTLA ‐ PRODDUTUR CKT 1

20 132KV YERRAGUNTLA ‐ PRODDUTUR CKT 2

21 132KV YERRAGUNTLA ‐ PULIVENDULA

22 132KV YERRAGUNTLA ‐ RTSS

23 132KV YERRAGUNTLA ‐ VEMPALLI

24 132KV YERRAGUNTLA ‐ ZUARI CKT 1

25 132KV YERRAGUNTLA ‐ ZUARI CKT 2

26 220KV PULIVENDULA 132KV PULIVENDULA ‐ BALAPANUR

27 132KV PULIVENDULA ‐ PULIVENDULA

28 132KV RTSS MUDDANUR SWT.STN 132KV RTSS MUDDANUR ‐ RAILWAYS

29 132KV RTSS KADAPA SWT.STN 123KV RTSS KADAPA ‐ GKLIS 

30 132KV RTSS KADAPA ‐ MOOLAVANKA

31 132KV RTSS KADAPA SWT.STN ‐ RAILWAYS

32 132KV MOOLAVANKA 132KV MOOLAVANKA ‐ C.K.PALLY

33 132KV VONTIMITTA 132KV VONTIMITTA ‐ BADVEL

34 220KV KADAPA 132KV KADAPA ‐ BHARATHI CEMENTS CKT 1

35 132KV KADAPA ‐ BHARATHI CEMENTS CKT 2

36 132KV KADAPA ‐ RTSS

37 132KV KADAPA ‐ VONTIMITTA

38 132KV BADWEL 132KV BADWEL ‐ ATMAKUR

39 132KV BADWEL ‐ PORUMAMILLA

1 132KV GUNTAKAL 132KV GUNTAKAL ‐ HAMPI POWER HOUSE

2 132KV GUNTAKAL ‐ URAVAKONDA

3 220KV TADIPATRI 132KV TADIPARTRI ‐ TAP LINE TO PENNA CEMENTS

4 132KV TADIPATRI ‐ ANKI REDDY PALLI

5 132KV TADIPATRI ‐ KOMATIKUNTA

6 132KV TADIPATRI ‐ RS KONDAPURAM

7 132KV TADIPATRI ‐ TAP LINE TO SJK STEELS

8 220KV KALYANDURG 132KV KALYANDURG ‐ RAYADURG

9 132KV ANKAMPALLI 132KV ANKAMPALLI ‐ KALYANDURG

10 220KV HINDUPUR 132KV HINDUPUR ‐ DHARMAVARAM

11 132KV HINDUPUR ‐ JAMMALABANDA

12 132KV HINDUPUR ‐ PUTTAPARTHY

13 132KV HINDUPUR ‐ THUMMAKUNTA

14 220KV GOOTY RS 132KV GOOTY RS ‐ ANANTHAPUR

15 132KV GOOTY RS ‐ GUDIPADU

16 132KV GOOTY RS ‐ GUNTAKAL

17 132KV GOOTY RS ‐ PATTIKONDA

18 132KV GOOTY RS ‐ RACHERLA

19 132KV GUDIPADU SWT.STN 132KV GUDIPADU ‐ A.R.PALLI

20 132KV GUDIPADU ‐ BMM CEMENTS

21 132KV PUTTAPARTHY 132KV PUTTAPARTHY ‐ KADIRI

22 220KV ANANTHPUR 132KV ANATHAPUR ‐ ANKAMPALLI

23 132KV ANATHAPUR ‐ DHARMAVARAM

24 132KV KADIRI 132KV KADIRI ‐ PULIVENDULA

1 132KV ADONI 132KV ADONI ‐ YEMMIGANUR CKT 1

2 132KV ADONI ‐ YEMMIGANUR CKT 2

3 132KV ADONI ‐PATHIKONDA

4 132KV GUDUR(KNL) 132KV GUDUR ‐ YEMMIGANUR

5 220KV NANDYAL 132KV NANDYAL ‐ ALLAGADDA CKT 1

6 132KV NANDYAL ‐ ALLAGADDA CKT 2

7 132KV NANDYAL ‐ BANAGANAPALLI

8 132KV NANDYAL ‐ CEMENT NAGAR

9 132KV KURNOOL 132KV KURNOL ‐ RAYALASEEMA ALAKALIES

10 132KV KURNOOL ‐ AP CARBIDES CKT 1

11 132KV KURNOOL ‐ AP CARBIDES CKT 2

12 132KV DHONE 132KV DHONE ‐ KURNOOL

13 132KV DHONE ‐ RACHERLA

14 132KV BANAGANAPALLI 132KV BANAGANAPALLI ‐SRI JAYA JYOTHI

15 220KV APCARBIDES 132KV AP CARBIDES ‐ ALAMPUR

16 132KV AP CARBIDES ‐ BHARAT ALLOYS AND ENERGY LTD

17 132KV AP CARBIDES ‐ CEMENT NAGAR

18 132KV AP CARBIDES ‐ GADWAL

19 132KV AP CARBIDES ‐ GUDUR19 132KV AP CARBIDES   GUDUR

20 132KV AP CARBIDES ‐ NANDIKOTKUR

21 132KV AP CARBIDES ‐ YEMMIGANUR

22 132KV NANDIKOTKUR 132KV NANDIKOTKUR ‐ ATMAKUR

23 220KV SRISAILAM(GENCO) 132KV SRISAILAM ‐ ATMAKUR

1 220KV BOOTHPUR 132KV BOOTHPUR‐BALANAGAR

2 132KV BOOTHPUR‐KOTHAKOTA

3 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐I

4 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐II

5 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐III

6 132KV BOOTHPUR‐MARIKAL

7 132KV BOOTHPUR‐PUTTAPAHAD CKT‐I

8 132KV BOOTHPUR‐PUTTAPAHAD CKT‐II

9 220KV KALWAKURTHY 132KV KALWAKURTHY‐ACHAMPET

10 132KV KALWAKURTHY‐AMANGAL

11 132KV KALWAKURTHY‐MIDJIL

12 132KV KALWAKURTHY‐NAGARKURNOOL

13 220KV WANAPARTHY 132KV WANAPARTHY‐BOOTHPUR

14 132KV WANAPARTHY‐CHINNAMAROOR

15 132KV WANAPARTHY‐GADWAL

16 132KV WANAPARTHY‐KOTHAKOTA

17 220KV SHADNAGAR 132KV SHADNAGAR‐BALANAGAR

18 132KV SHADNAGAR‐KOTHUR

1 220KV YEDDUMYLARAM 132KV YEDDUMYARAM ‐ ORDINANCE FACTORY

2 132KV CHEGUNTA 132KV CHEGUNTA ‐ GSN INDUSTRIES

3 132KV CHEGUNTA ‐ JEEVAKA INDUSTRIES

4 132KV MANOHARABAD 132KV MANOHARABAD ‐ AGARWAL FOUNDRIES LTD

5 220KV SADASIVAPET 132KV SADASIVAPET ‐ MRF

6 400KV GAJWEL 132KV GAJWEL ‐ TUKKAPUR

7 132KV GAJWEL ‐ TUMKI BOLLARAM

8 132KV GAJWEL‐CHEGUNTA

9 132KV GAJWEL‐GAJWEL

10 132KV GAJWEL‐MANOHARABAD

11 132KV PASHAMAILARAM 132KV PASHAMAILARAM ‐ VBC FERRO ALLOYS

12 132KV KANDI 132KV KANDI ‐ GANAPATHI SUGARS

13 132KV KANDI ‐ HYD METRO WATER SUPPLY

14 132KV KANDI ‐ VBC FERRO ALLOYS

1 220KV TANDUR 132 KV TANDUR ‐ PENNA CEMENTS

2 132 KV TANDUR ‐CCI‐I

3 132 KV TANDUR ‐CCI‐II

4 132KV TANDUR ‐ KODANGAL

5 132KV TANDUR ‐ PARIGI

6 132KV TANDUR ‐ RTS(TANDUR TRACTION)

7 132KV TANDUR ‐ VISHAKA 

1 220KV DURSHED 132KV DURSHED‐SIRCILLA 

2 220KV JAGITYAL 132KV JAGITYAL‐ GANGADHARA

3 132KV JAGITYAL‐DHARMAPURI

4 132KV JAGITYAL‐JAGITYAL

5 132KV JAGITYAL‐KORUTLA

6 132KV JAGITYAL‐PUDUR

1 132KV PALASA 132KV PALASA ‐ BARUVA RAILWAY TRACTION 

2 132KV PALASA ‐ ICHAPURAM

3 132KV PONDURU 132KV PONDURU ‐ RAILWAY TRACTION CKT 1

4 132KV PONDURU ‐ RAILWAY TRACTION CKT 2

5 132KV CHILAKAPALEM 132KV CHILAKAPALEM ‐ PONDURU RAILWAY TRACTION

6 132KV PALAKONDA 132KV PALKONDA ‐ GMR CO‐GENERATION

7 220KV TEKKALI 132KV TEKKALI ‐ GMR INDUSTRIES

8 132KV TEKKALI ‐ NARASANNAPETA

9 132KV TEKKALI ‐ NAUPADA RLY TRACTION 

10 132KV TEKKALI ‐ PALAKONDA

11 132KV TEKKALI ‐ PALASA CKT 1

12 132KV TEKKALI ‐ PALASA CKT 2

13 132KV TEKKALI ‐ PATHAPATNAM

14 132KV TEKKALI ‐ PONDURU

1 132KV KOTHAVALASA 132KV KOTHAVALASA ‐ ZINDAL

2 220KV GARIVIDI 132KV GARIVIDI ‐ ANDHRA FERRO ALLOYS LTD

3 132KV GARIVIDI ‐ BOBBILI CKT 1

4 132KV GARIVIDI ‐ BOBBILI CKT 2

5 132KV GARIVIDI ‐ JAYALAKHMI FERRO ALLOYS LTD

6 132KV GARIVIDI ‐ PALAKONDA

7 132KV GARIVIDI ‐ PYDI BHIMAVARAM

8 132KV GARIVIDI ‐ TB VARA

9 132KV GARIVIDI ‐ VONTITHADI

10 132KV GARIVIDI‐FACOR‐1

11 132KV GARIVIDI‐FACOR‐II

12 132KV BOBBILI 132KV BOBBILI ‐ BERRY FERRO ALLOYS

13 132KV BOBBILI ‐ IMPEX

14 132KV BOBBILI ‐ NCS CO‐GENARATION

15 132KV BOBBILI ‐ PARVATHIPURAM

16 132KV PYDI BHEEMAVARAM 132KV PYDI BHIMAVARAM ‐ AUROBINDO PHARMA

17 132KV PYDI BHIMAVARAM ‐ CHILAKAPALEM

18 132KV VONTITHADI 132KV VONTITHADI ‐ VIJAYANAGARAM RAILWAY TRACTION

19 132KV T.B.VARA 132KV T.B.VARA ‐ ARAKU CKT 1

20 132KV T.B.VARA ‐ ARAKU CKT 2

21 132KV T.B.VARA ‐ GOLD STAR

22 132KV T.B.VARA ‐ S.KOTA RLY TRACTION CKT 1

23 132KV T.B.VARA ‐ S.KOTA RLY TRACTION CKT 2

24 132KV T.B.VARA ‐ ZINDAL

25 132KV TB VARA ‐ VONTITHADI

1 220KV KONDAPALLI 132KV KONDAPALLI ‐ KHAMBHAMPADU

2 132KV KONDAPALLI ‐ NUZIVID

3 132KV KONDAPALLI ‐ RAILWAY TRACTION CKT 1

4 132KV KONDAPALLI ‐ RAILWAY TRACTION CKT 2

5 132KV KONDAPALLI ‐ VIJAYAWADA

6 132KV AUTONAGAR 132KV AUTONAGAR ‐ TADEPALLI

7 132KV MACHILIPATNAM 132KV MACHILIPATNAM ‐ KONIKEPUDI

8 132KV GANGOOR 132KV GANGOOR ‐ TADEPALLI

9 220KV CHILLAKALLU 132KV CHILLAKALLU ‐ JP CEMENTS

10 132KV CHILLAKALLU ‐ KODAD

11 132KV CHILLAKALLU ‐ MADHIRA

12 132KV CHILLAKALLU ‐ MADRAS CEMENTS

13 132KV CHILLAKALLU ‐ NANDIGAMA

14 132KV CHILLAKALLU ‐ RAILWAY TRACTION CKT 1

15 132KV CHILLAKALLU ‐ RAILWAY TRACTION CKT 2

16 220KV GUDIVADA 132KV GUDIVADA ‐ KANUMOLU CKT 1

17 132KV GUDIVADA ‐ KANUMOLU CKT 2

18 132KV GUDIVADA ‐ PAMARRU

19 132KV GUDIVADA ‐ SRIBA 

20 220KV GUNADALA 132KV GUNADALA ‐ AUTONAGAR

21 132KV GUNADALA ‐ GANGOOR

22 132KV GUNADALA ‐ KANUMOLU CKT 1

23 132KV GUNADALA ‐ KANUMOLU CKT 2

24 132KV PAMARRU 132KV PAMARRU ‐ AVANIGADDA

25 132KV PAMARRU ‐ MACHILIPATNAM CKT 1

26 132KV PAMARRU ‐ MACHILIPATNAM CKT 2

27 132KV KANUMOLU 132KV KANUMOLU ‐ NUZIVID

28 132KV KANUMOLU ‐ PAMARRU

29 132KV BHAVANIPURAM 132KV BHAVANIPURAM ‐ VIJAYAWADA

Andhra Pradesh Power system Profile

Page 22: State_Profile_Andhra_Pradesh.pdf

S.No. Name of Transmission LineVoltage

(KV)Length

(Ckt Kms)End 1(MVAr)

End 2 (MVAr)

Agency

1  Cuddappah‐ Nagarjuna Sagar I 400 50 POWERGRID

2  Cuddappah‐ Nagarjuna Sagar I I 400 50 POWERGRID

3 Gooty ‐ Nagarjuna Sagar  400 50 POWERGRID

4 Gooty ‐ Nellore ‐ 1 400 63 POWERGRID

5 Gooty ‐ Nellore ‐ 2 400 63 POWERGRID

6 Gooty ‐ Somanhally  400 63 POWERGRID

7 Hyderabad ‐ Gajwel    400 50 POWERGRID

8  Hyderabad ‐ Malkaram  400 50 POWERGRID

9 Khammam ‐ Warangal   400 50 POWERGRID

10 Nagarjuna Sagar‐ Ramagundam I  400 50 50 POWERGRID

11 Nagarjuna Sagar‐Ramagundam II 400 50 50 POWERGRID

12 Nagarjuna Sagar ‐ Gooty 400 50 POWERGRID

13  Nagarjuna Sagar ‐ Meh' Nagar 400 50 POWERGRID

15 Nellore ‐ Vijaywada I 400 50 50 POWERGRID

16 Nellore ‐ Vijaywada II 400 50 50 POWERGRID

17 Nellore‐Nellore (NPS) ‐2 400 8018 Vijaywada ‐ Gazuwaka   400 63 63 POWERGRID

19 Vijaywada ‐ Vemagiri IV 400 50 POWERGRID

20 Vijaywada ‐ Vemagiri III 400 63 POWERGRID

21 Gazuwaka ‐ Jaypore  I 400 80 POWERGRID

22 G k J II 400 80 POWERGRID

7(d) List of Reactors

List of Lines with Shunt Reactors

Andhra Pradesh Power system Profile

22 Gazuwaka ‐ Jaypore  II 400 80 POWERGRID

23 Simhadri ‐ Gazuwaka  I 400 50 POWERGRID

24  Simhadri ‐ Gazuwaka  II 400 50 POWERGRID

25 Kalpakka ‐ Khammam  I 400 63 63 APTRANSCO

27 Kalpakka ‐ Khammam  II 400 63 63 APTRANSCO

List of Bus Reactors

S.NO

1 420 POWERGRID2 420 POWERGRID3 420 POWERGRID4 420 POWERGRID5 420 POWERGRID6 420 NTPC7 420 NTPC8 420 LANCO9 420 POWERGRID10 420 POWERGRID11 420 APTRANSCO12 420 APTRANSCO

13 420 APTRANSCO

Name of Sub-StationVoltage

(kV)Reactor Rating

(MVAr)Agency

SIMHADRI ST2 63

LANCO 63

VIJAYAWADA 63

KHAMMAM  50

NAGARJUN SAGAR  50

RAMAGUNDAM 63

CUDDAPAH  3*16.67

GOOTY  63

HYDERABAD 63

KURNOOL 63

Source: SRLDC List of Important Elements

VISAKHAPATNAM  50

VIJAYAWADA 63

KALPAKKA 2X50+63

http://www.srldc.org/DownloadDocuments.aspx

Andhra Pradesh Power system Profile

Page 23: State_Profile_Andhra_Pradesh.pdf

S.No. Name of Transmission LineLength

(Ckt Kms)Location & (%) Agency

1NSR - CUDDAPAH - I

CUDDAPA,40 % POWERGRID

2 NSR - CUDDAPAH - II CUDDAPA, 40 % POWERGRID

3 GOOTY - SOMANAHALLI GOOTY,40 % POWERGRID

4 GOOTY - NELMANGALA GOOTY, 40 % POWERGRID

7(e) List of Transmission Lines with Compensation

400 kV LINES WITH FIXED SERIES COMPENSATION

Source: SRLDC List of Important Elementshttp://www.srldc.org/DownloadDocuments.aspx

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 24: State_Profile_Andhra_Pradesh.pdf

Slab Rate (Rs/MW/Month)

Slab Rate (Paisa/Unit)

Slab Rate (Rs/MW/Month)

Slab Rate (Paisa/Unit)

Jul. 2011 - Mar. 2012 Tier - III Tier - III Tier - I Tier - IApr. 2012 - Sep. 2012 Tier - I Tier - I Tier - II Tier - IIOct. 2012 - Mar. 2013 Tier - II Tier - II Tier - III Tier - IIIApr. 2013 - Jun. 2013 Tier - II Tier - II Tier - III Tier - IIIJul. 2013 - Sep. 2013 Tier - I Tier - I Tier - II Tier - IIOct. 2013 - Dec. 2013 Tier - I Tier - I Tier - II Tier - IIJan. 2014 - Mar. 2014 Tier - I Tier - I Tier - III Tier - IIIApr. 2014 - Jun. 2014Jul. 2014 - Sep. 2014Oct. 2014 - Dec. 2014

Jul. 2011 - Mar. 2012Apr. 2012 - Sep. 2012Oct. 2012 - Mar. 2013Apr. 2013 - Jun. 2013Jul. 2013 - Sep. 2013Oct. 2013 - Dec. 2013Jan. 2014 - Mar. 2014Apr. 2014 - Jun. 2014Jul. 2014 - Sep. 2014Oct. 2014 - Dec. 2014

High Normal

8(a) PoC Charges and Loss Slabs

Slabs for PoC Rates

PeriodAndhra Pradesh Injection Andhra Pradesh Withdrawal

Slabs for PoC Losses

Period Andhra Pradesh Injection Andhra Pradesh WithdrawalLoss Slab Loss Slab

High NormalHigh NormalHigh NormalHigh NormalHigh NormalHigh Normal

All India PoC Slab Rates

Tier ‐ I Tier ‐ II Tier ‐ III Tier ‐ I Tier ‐ II Tier ‐ III

2011‐12 Jul'11 ‐ Apr'12 70000 85000 100000 10.00 12.00 14.00

H1 (Apr'12 ‐ Sep'12) 80000 95000 110000 11.00 13.00 15.00

H2 (Oct'12 ‐ Mar'13) 79968 94968 109968 11.19 13.19 15.19

Q1 (Apr'13 ‐ Jun'13) 79350 94350 109350 11.10 13.10 15.10

Q2 (Jul'13 ‐ Sep'13) 79544 94544 109544 11.13 13.13 15.13

Q3 (Oct'13 ‐ Dec'13) 79391 94391 109391 11.11 13.11 15.11

Q4 (Jan'14 ‐ Mar'14)

Q1 (Apr'14 ‐ Jun'14)

Q2 (Jul'14 ‐ Sep'14)

Q3 (Oct'14 ‐ Dec'14)

Q4 (Jan'15 ‐ Mar'15)

2011‐12 Jul'11 ‐ Apr'12 80000 95000 110000 11.00 13.00 15.00

H1 (Apr'12 ‐ Sep'12) 70000 85000 100000 10.00 12.00 14.00

H2 (Oct'12 ‐ Mar'13) 59520 74520 89520 8.35 10.35 12.35

Q1 (Apr'13 ‐ Jun'13) 63219 78219 93219 8.86 10.86 12.86

Q2 (Jul'13 ‐ Sep'13) 67773 82773 97773 9.50 11.50 13.50

Q3 (Oct'13 ‐ Dec'13) 71819 86819 101819 10.06 12.06 14.06

Q4 (Jan'14 ‐ Mar'14) 65055 80055 95055 9.12 11.12 13.12

Q1 (Apr'14 ‐ Jun'14)

Q2 (Jul'14 ‐ Sep'14)

Q3 (Oct'14 ‐ Dec'14)

Q4 (Jan'15 ‐ Mar'15)

All India PoC Slab Rates

Grid Year PeriodPoC Slab Rate (Rs/MW) PoC Slab Rate (paise/unit)

Source: CERC PoC OrdersWeblink: http://www.cercind.gov.in/order1.html

NEW Grid

2012‐13

2013‐14

2014‐15

SR Grid

2012‐13

2013‐14

2014‐15

Page 25: State_Profile_Andhra_Pradesh.pdf

54

Chapter 5: Transmission Constraints in Southern Region

5.1. Transmission Line Constraints

S. No Corridor Season/ Antecedent Conditions

Description of the constraints Figure/ table no.

Has the constraint occurred in earlier quarter?

1 765kV Raichur-Sholapur single circuit

-

Flow on the line is oscillating continuously. Power flow increasing sharply for any change in load/Generation in any part of Indian grid. Re-synchronisation of two large grids is a tedious task every time the line trips. Second line needs to bring immediately. More inter connecting lines between SR with NEW Grid have to be commissioned as early as possible.

2 High loading on 400kV Hosur-Salem SC line and 400kV Bangalore-Salem SC line

November-July

Constraint is due to Delay of commissioning of Generating units in S2 area and no addition of internal generation in Tamilnadu.

Fig. 221-222 Yes

3 High loading on 400kV Hiriyur-Nelamangala DC line

Whole year

With the commissioning of Jindal 4th unit and BTPS 2nd unit the flow on 400kV Hiriyur-Nelamangala DC line continuously near to 550MW.

Fig.223 Yes

4 High loading on 400kV Kolar-Hosur DC line

Whole year High loading on these lines during High import at Talcher Kolar. N-1 condition is alarming

Fig.224 Yes

5 High loading on 400kV Jindal-BTPS SC Line

Whole year

With the full generation at Jindal, 400kV Jindal-BTPS SC line getting loaded beyond 650 MW. Other evacuation paths are 400kV Jindal-Guttur and Two ICTs. But at 220kV side also generation is available.

Fig.225 Yes

6 High loading on 400kv Sriperumbudur-SV chathram SC line

During full generation at NCTPS

Due to non-commissioning of 400KV Alamatti-Tiruvalam DC line, 400kV NCTPS-SV Chatram and 400kV Alamathy-SV chathram. Vallur evacuation system with compromise on N-1 security under certain conditions and severe loading on 230kV Network.

Fig.226 No

Page 26: State_Profile_Andhra_Pradesh.pdf

55

Expected Transmission Constraints in future:

S. No Corridor Season/ Antecedent Conditions

Description of the constraints

1 High loading on 400kV Srisailam-Karnool SC line

-

With full generation in Srisailam left bank the flow on 400kV Srisailam-Karnool SC line exceeds 650 MW.Depending on gas availability in Vemagiri complex, import at HVDC Gazuwaka. The flow on this line would exceed 800 MW. Also there are new generations going to come at Vemagiri complex and at Srikakulam

2 400kV Khammam-Nagarjunasagar SC line

- During outage of HVDC Pole at Kolar, full generation at Vemagiri, KTS U11 and High import at Gazuwaka this line is expected to carry flow> 650 MW as Geneartion at Nellore Chennai increases.

3 North-South corridor -

With the increase in power flow on 765kV Raichur-Sholapur line, Corridors from Raichur-Gooty-Bangalore-Salem-Udumalpet and Hiriyur-Nelamangala lines would be severely stressed and N-1 severely compromised. Also Voltages at Bangalore, Mysore, Chennai, Salem, Thrichy, Udumalpet, Trichur, Cochin and Palakkad would dip

Page 27: State_Profile_Andhra_Pradesh.pdf

56

5.2. ICT Constraints

S. No ICT Season/ Antecedent Conditions

Description of the constraints Figure/ table no. Has the constraint occurred in earlier quarter? Details.

1

400/220kV 315MVA ICTs at Hyderabad (Ghanapur, Mamidipalli and Malkaram SS)

During peak period of every day

During the Peak load period Hyderabad loads will be high

Fig.227-229

400/220kV 315MVA ICTs at Hyderabad (Ghanapur, Mamidipalli and Malkaram SS)

2 400/230kV 315MVA ICTs at Hosur

During peak period of every day

N-1 criteria will not satisfy during the peak Fig.230 400/230kV 315MVA ICTs at Hosur

3 400/220kV 500 MVA ICTs at Somanahalli, Nelamangala and Hoody

During peak period of every day

N-1 criteria will not satisfy during the peak Fig.231-233

400/220kV 500 MVA ICTs at Somanahalli, Nelamangala and Hoody

4 400/220kV 315MVA ICTs at Mysore

During peak period of every day

N-1 criteria will not satisfy during the peak Fig.234 400/220kV 315MVA ICTs at Mysore

5 400/220kV 315MVA ICTs at Kalvindapattu

During peak period of every day

N-1 criteria will not satisfy during the peak Fig.235 400/220kV 315MVA ICTs at Kalvindapattu

Page 28: State_Profile_Andhra_Pradesh.pdf

57

5.3. Nodes Experiencing High Voltage

S. No Nodes Season/ Antecedent Conditions

Description of the constraints Figure/ table no.

Has the constraint occurred in earlier quarter?

1 400kV Vijayawada SS Whole Year Voltages at Vemagiri and Vijayawada area remain very high (>415 kV) even during peak

months.

Fig.236 Yes

2 400kV Vemagiri SS Whole Year Fig.237 Yes

3 400kV Gooty SS Monsoon period and

off peak period

Voltages at Gooty, Karnool and Srisailam remain very high during monsoon period and offpeak

condition.

Fig.238 Yes

4 400kV Karnool SS Fig.239 Yes

5 400kV Srisailam SS Fig.240 Yes

6 400kV Ghanapur SS

During off peak

Voltages are high during monsoon period and offpeak condition.

Fig.241 Yes

7 400kV Mamidipalli SS Fig.242 Yes

8 400kV Mehaboobnagar SS Fig.243 Yes

9 400kV Nagarjunasagar SS Fig.244 Yes

10 400kV Nellore SS Fig.245 Yes

11 400kV Khammam SS Fig.246 Yes

12 400kV Kaiga SS Whole Year During Low generation period and offpeak

period 400kV Kaiga, 400kV Narendra Voltage are very High.

Fig.247 Yes

13 400kV Guttur SS Whole Year Fig.248 Yes

14 400kV Narendra SS Whole Year Fig.249 Yes

15 400kV Hassan SS

During off peak

During Low generation period of Sharawathi and UPCL and offpeak period Voltages are High.

Fig.250 Yes

16 400kV Raichur TPS SS Fig.251 Yes

17 400kV Talaguppa SS, 400kV Nelamangala SS

Fig.252 Yes

18 400kV Tirunelvelli SS During off peak

During Low wind condition and offpeak condition Voltages are very High

Fig.253 Yes

19 400kV Koodankulam SS Fig.254 Yes

Page 29: State_Profile_Andhra_Pradesh.pdf

58

5.4. Lines opened on high voltage

Sr. No.

Name Total no. days open during Quarter

Corresponding nodes experiencing high voltage

Graph No.

1 400 kV TALAGUPPA - NEELAMANGALA

116 TALAGUPPA,

NELAMANGALA, GOOTY, NELLORE PS, VIJAYAWADA, VEMAGIRI, VTPS,

MALKARAM, GAJWEL,

SHANKARAPALLY, SRISAILAM, KHAMMAM, GHANAPUR,

TIRUNELVELLI, KOODANKULAM,

HASSAN, NELLORE,

GUTTUR, KAIGA, NARENDRA

2 400 Kv HASSAN - UPCL 2 72

3 400 Kv GOOTY - NPS 1 59

4 400 kV VEMAGIRI - GMR 1 55

5 400 Kv VTPS - MALKARAM 2 54

6 400 kV VIJAYAWADA - VEMAGIRI 2

53

7 400 Kv GAJWEL - BHOOPALAPALLY 1

51

8 400 Kv GOOTY - NPS 2 51

9 400 kV VIJAYAWADA - VEMAGIRI 1

50

10 400 kV VEMAGIRI - GVK (JPD) 1 48

11 400 Kv GAJWEL - SHANKARPALLY 1

47

12 400 Kv GAJWEL - SHANKARPALLY 2

47

13 400 Kv GAJWEL - BHOOPALAPALLY 2

46

14 400 Kv KRISHNAPATNAM - NELLORE 2

46

15 400 kV VEMAGIRI - GOUTHAMI CCCP 1

42

16 400 kV VEMAGIRI - KONASEEMA 1

42

17 400 kV VTPS IV - SRISAILAM 2 42

18 400 kV VEMAGIRI - GMR 2 41

19 400 kV GUTTUR - NARENDRA 1 40

20 400 kV VEMAGIRI - GVK (JPD) 2 40

21 400 Kv VTPS - MALKARAM 1 39

22 400 kV VEMAGIRI - GOUTHAMI CCCP 2

38

23 400 kV TIRUNELVELI - KUDAMKULAM 3

35

24 400 kV VEMAGIRI - KONASEEMA 2

34

25 400 kV VTPS IV - SRISAILAM 1 32

26 400 Kv KRISHNAPATNAM - 29

Page 30: State_Profile_Andhra_Pradesh.pdf

59

Sr. No.

Name Total no. days open during Quarter

Corresponding nodes experiencing high voltage

Graph No.

NELLORE 1

27 400 kV TIRUNELVELI - KUDAMKULAM 4

29

28 400 kV GUTTUR - NARENDRA 2 23

29 400 kV KAIGA - GUTTUR 2 23

30 400 kV SRISAILAM-MAMIDIPALLI 1

21

31 400 kV TIRUNELVELI - KUDAMKULAM 2

19

32 400 kV KAIGA - GUTTUR 1 17

33 400 kV MYSORE - HASAN 2 16

34 400 kV KALPAKKA - VEMAGIRI 1 13

35 400 kV VIJAYAWADA - LANCO 2 10

36 400 kV KHAMMAM - MAMIDIPALLY 2

7

37 400 kV SRISAILAM-MAMIDIPALLI 2

7

38 400 kV TALAGUPPA - HASSAN 6

39 400 kV HYDERABAD - KURNOOL

5

40 400 kV RAMAGUNDAM - HYDERABAD 4

5

41 400 kV KAIGA - NARENDRA 2 3

42 400 kV KHAMMAM - KTPS 2 3

43 400 kV MALKARAM - HYDERABAD

3

44 400 kV NELLORE - ALAMATHI 3

45 400 kV RAMAGUNDAM - HYDERABAD 3

3

46 400 Kv HASSAN - UPCL 1 2

47 400 kV KAIGA - NARENDRA 1 2

48 400 kV KALPAKKA - VEMAGIRI 2 2

49 400 kV KHAMMAM - KALPAKKA 2

2

50 400 kV KHAMMAM - KTPS 1 2

51 400 Kv NELLORE - SPDR 2

52 400 kV RAICHUR - GOOTY 1 2

53 400 kV VIJAYAWADA - LANCO 1 2

54 400 Kv NPS - SEPL 1

55 400 kV N'SAGAR - CUDDAPPA 1 1

56 400 kV TALAGUPPA - HASSAN 1 1

57 400 Kv UDUMALPET - PALLAKAD 1

1

58 400 kV VIJAYAWADA - GAZUWAKA 1

1

Page 31: State_Profile_Andhra_Pradesh.pdf

60

Sr. No.

Name Total no. days open during Quarter

Corresponding nodes experiencing high voltage

Graph No.

59 400 kV VIJAYAWADA - NELLORE 1

1

60 400 kV VIJAYAWADA - VEMAGIRI 4

1

61 400 kV VIJAYAWADA - VTPS IV 2

1

Grand Total 1489

Page 32: State_Profile_Andhra_Pradesh.pdf

61

5.5. Delay in generation affecting grid operation adversely

S. No Generating Unit Area/ State Proposed

Commissioning Date

Actual/ Likely Commissioning Date Transmission

Constraint Caused

1 Kudamkulam Unit-1 Tamilnadu Dec-07 Oct-13

Transmission congestion on North-South

corridor and S1-S2 corridor

2 Kudamkulam Unit-2 Tamilnadu Dec-08 6 months after commissioning of Unit-1

3 Neyveli TPSII Exp Unit-1 Tamilnadu Feb-09 Achieved full load on 04.02.2012. Now out

of service. COD yet to be declared

4 Neyveli TPSII Exp Unit-2 Tamilnadu Jun-09 Dec-13

6 North Chennai Stage-2 Unit-1

Tamilnadu Feb-11 Synchronised to grid. COD yet to be

declared

6 North Chennai Stage-2 Unit-2

Tamilnadu Aug-11 Synchronised to grid.After Unit-1

commissioning

5.6. Delay in transmission lines affecting grid operation adversely

S. No.

Transmission Corridor Proposed

Commissioning Date

Actual/ Likely Commissioning

Date Transmission Constraint Caused

1 400kv Narsaraopet SS and connected Tr. lines Mar-12 - Congestion on 400kV Vijayawada-Nellore DC line

2 400kV Edaman-Cochin DC line Held up Heldup 220kV South-North corridor of Kerala

3 400kV Mysore-Khozhikode DC line --- Mar-14 Congestion on North Kerala connected lines like

220kV Kadakola-Kaniyampet.

4

NCTPS-II Evacuation: 400kV NCTPSII-SV

Chathram DC line, 400kV Alamathy-SV Chathram DC line and Alamathy-Tiruvalam DC line

Feb-11 Dec-14 Congestion on 400kV Vallur evacuation system

5

Stage-1 Wind evacuation system of TNEB: 400kv Kanarapatti SS, 400kV Kayathar SS, 400kV Tirunelvelli-Kanarpatti-Kayathar DC line,400kV Kayathar-Karaikudi-Pugalur DC line

- - Congestion on 400/230kV Tirunelvelli ICTs, 230kV Kayathar-Tirunelvelli, 230kV Udayathur-Tirunelvelli,

230kV Veerannam-Tirunelvelli etc

Page 33: State_Profile_Andhra_Pradesh.pdf

UFR Setting (Hz)Time delay (Sec.)

Recommended Load Relief for SR (MW)

Load relief implemented in

SR (MW)Approved Actual

49.2 Inst. 2350 2937 802 51149.0 Inst. 2360 2892 812 56648.8 Inst. 2390 2855 822 56248.6 Inst. 2400 2529 825 549Total Inst. 9500 11213 3261 2188

Settings (Hz/Sec)

Approved Actualdf/[email protected] 3537 712 45df/[email protected] 2000 1767 784

Total 5537 2479 829

Recommended Load Relief for

SR (MW) Load relief implemented in SR (MW)

Implemented Load Relief (MW)

10(a) Under Frequency Load Shedding Scheme & Capacitor Installation Status

Automatic Under Frequency Load Shedding Scheme in SR-AP

Discrete Relays (AUFLS)

Load Relief (MW)

Frequency Trend Relays (df/dt relays)

1925373

2298

Source: SRPC

Andhra Pradesh Power system Profile

State/U.T/ SystemInstalled as on 01.04.2013 (MVAr)

Addl.Reqmt. During 2012-13 (MVAr)

Actual Addition from 01.04.2013 (MVAr)

Andhra Pradesh 3033.5

Balance (MVAr)

Source: SRPC

Status of Capacitor Installation

Andhra Pradesh Power system Profile

Page 34: State_Profile_Andhra_Pradesh.pdf

Sl.No. Feeder/ICT Expd.Load relief by forced LS(MW)

1 GOOTY ICTS 200

2 CADAPA ICTS 200

3 ICT 1 AT HYD OR RAMGUNDAM- DICHIPALLY 200Source: SRLDC

11(a) List of feeders and ICTs emanating from POWERGRID S/S which can be opened as 

emergency measures  in case of overdrawal by Andhra Pradesh

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 35: State_Profile_Andhra_Pradesh.pdf

S.NO. SECTOR PROJECT NAMEIMPL.

AGENCYLOA UNIT NO.

CAP.(MW)

ANTICIPATEDCOMM.DATE

1 STATTE TAIL POND PH AT NAGARJUNASAGAR 2X50 U1‐JULY 2‐14

U2‐AUGUST 2014

2 LOWER JURALA 6X40 U1‐JUNE‐2013

BALANCE 5 UNITS AT 3 MONTHS INTERVAL

3 PULICHINTALA 4X120 U1‐JUNE 2014

U2‐OCTOBER 2014

U3‐ FEBERUARY 2015 & U4

4 DUMMUGUDEM 320 2013‐15

5 KAMTHANAPALLY 450 150 MW‐2013

300 MW‐2013‐14

THERMAL (STATE)

6 KAKTIYA TPP STG.II 1X600 Dec‐13

7 RAYALASEEM STG‐IV 1X600 UNIT VI‐2014

8 POLAVARAM 960 2016‐17

9 SATTUPALLI TPS 1X600 2013‐14

10 SINGAREDDIPALLI 5X40 Mar‐14

11 KOTHGUDEM ST VII 1X800 2016‐17

12 Dr.NTTPS VIJAYAWADA ST‐V 1X800 2016‐17

13 Vadarevu Ultra Mega Power Project 5 x 800 = 4000  U1,2‐2016‐17

14 Stage I (U‐1,2)   &   Stage II (U‐3,4,5) U3,4‐2017‐20

Thermal (Joint Venture) :

1 Sri Damodaram Sanjeev(Krishnapatnam JV) U1‐AUG 2013

U2‐AUG 2014

2 Srikakulam TPS (JV)  2014 ‐ 16 (To be tied up)

Thermal (Private) :

1 Bhavanapadu TPP (East Coast Energy Ltd),  (2x660) Phase I  → April 2014

2 Kakarapalli, Srikakulam (Dist) + (2x660) Phase II → September 201

3 Paloncha (Nava Bharat), Khammam  150 Jan‐14

4 Thermal Powertech ‐ Nellaturu  2x660 = 1320  Unit 1 → Apr 2014,      Unit 2 → Oct 2014

5 Krishnapattanam UMPP  6x660 = 3960  June 2013 to Feb 2015

6 Gunupudi (Surya Chakra TEPL)  660 + 660

7 HNPCL (Hinduja), Pavalavasa, Vizag  2x520 = 1040  Unit 1 → Dec 2013,      Unit 2 →

8 Thamminapatnam TPP(Ph‐II‐U 1&2)  2x150 = 300  Unit 1 → Aug 2012,      Unit 2 → Nov 2012

Nuclear (State JV) :

1 Kadappa Nuclear Power Plant 

Gas Based (State) :

12(a) Generation Units Under Construction

2 x 800 = 1600 

4 x 600 = 2400 

Andhra Pradesh Power system Profile

Gas Based (State) :

1 Integrated gassification combined 1 x 182 =  182  2017‐18

2 cycle (IGCC) plant at Dr. NTTPS (JV)

3 Shankarpally Gas Power Plant  1x1000=1000  2016‐17

4

Combined cycle gas based project near Karimnagar 2100 2014‐19

Gas Based (Private) :

1 1 Patancheru(Asta PCPL),Medak (Dt) 28

2 2 Peddapuram (SPP Ltd), EG (Dist)  2262

3 3 Chigurukota (Sriba Industries), Krishna (Dt) 13.6

4 4 Gautami CCPP Stage‐II, Peddapuram 2 x 400 =  800

5 5 GVK Phase‐III, Jegurupadu 2 x 400 =  800

6 6 Mathya Giri (Vasavi), Nalgonda (Dist) 210

7 7 Guggilla, Karimnagar (Dist) ‐ Elgen 2x350

8 8 Konaseema Phase‐II, Ravulapalem 820 Jan‐14

9 9 Lanco Phase ‐ III, Kondapalli 2x371=742

10 10 Chandaparu, WG (Dist) 20

11 11 Vetlapalem, EG Dist (Greenco) 2x60=120

12 12 Vemagiri, EG Dist (GMR) 2x384=768

13 13 Gurrampalem, Vizag Dist (LVS) 2x16.75+2x9.73=52

14 14 RVK, Jegurupadu, EG Dist 76+120+2x120+50

15 15 Thamminapatnam (K.Patnam PCL), Nellore  1320+660 Mar-15

Renewable Energy Sources (RES) :

1 Municipal waste based 67.43 30 mw commisioned

2 Bio mas bsed c-generation 66.25 29.25 MW commissioned

3 Industrial waste based power plants 55 21 MW commissioned

4 Mini Hydal projects 141 104 mw commissioned

5 Bio mas bsed Power Plant 224 190 MW commissioned

6 Bio mas based co-genaration 420 270 MW commissioned

Wind (Private)

Wind (Private) 399.34 MW 114 MW commissioned

MINI power plants 595 MW 74MW commissioned

Solar (State)

P.JuralaHEP111 1 MW

Solar Power Project 75 MW

Source:SRLDC Report

http://www.srldc.org/MonthlyReport.aspx

Andhra Pradesh Power system Profile

Page 36: State_Profile_Andhra_Pradesh.pdf

Sl. No. Sector Name of the Transmission LineVoltage Level

(kV)Ckts (S/C) & (D/C)

Length in Circuit Kms.

Stringing Completed

Target date of completion

Remarks

1 STATE Achutapuram(Brandix)‐Koruprolu 220 S/C 40 15‐Mar

2 STATE Amangal‐chevella 220 D/C 15‐Mar SCHEMES TO BE FORMULATED

3 STATE Appannadorapalem‐Bobbili 220 D/C 13‐Dec

4 STATE Armoor‐Nandipeta 220 S/C 15 15‐Mar

5 STATE Asupaka‐Bandragudem 220 S/C 7 15‐Mar

6 STATE Asupaka‐Medapalli 220 S/C 6 15‐Mar

7 STATE Bellampalli‐Mailaram 220 D/C 20 15‐Mar

8 STATE Bellampalli‐Sirpurkagaznagar 220 D/C 90 15‐Mar

9 STATE Bhongiri‐Baswapuram 220 D/C 20 15‐Mar

10 STATE Bhongiri‐Jangampalli 220 D/C 12 15‐Mar

11 STATE Bhoopalapally (Kakatiya)‐ Gajwel 400 D/C 262 COMMISIONED

12 STATE Bonapally‐chittor (Quad) 400 D/C 194 15 13‐Dec WORK UNDER PROGRESS

13 STATE CCGT Power Plant‐KarimNagar 400 D/C 40 15‐Mar SCHMES TO BE FORMULATED

14 STATE CCGT Power Plant‐Gajwel 400 D/C 200 15‐Mar SCHMES TO BE FORMULATED

15 STATE Chalakurthy‐Puliathandra 220 S/C 10 16‐Mar

16 STATE Chandrayanagutta SS ‐ Imiliban (GIS) SS 220 S/C 19 Dec‐13

Last section works are under progress at Nala crossing and work stopped due to

rainy season.

17 STATE Chittoor 400 KvSS‐ Manapalli 220 D/C 19 18 Mar‐15

18 STATE Dichpalli‐Manchippa 220 S/C 15 Mar‐15

19 STATE Dichpalli‐Nizamabad 220 D/C 30 Mar‐15

20 STATE Dummagudem‐Palocha 400 D/C 68 Mar‐15 SCHMES TO BE FORMULATED

21 STATE Durshed‐Husnabab 220 S/C 20 14‐Mar

22 STATE Durshed‐Husnabab (2nd Ckt) 220 S/C 20 14‐Mar

23 STATE Gaddamvaripalli‐ Goddumari 220 D/C 9 13‐Apr WORK UNDER PROGRESS

24 STATE Gajwel‐ Narsapur 400 D/C 200 Mar‐13 Preliminary survey completed. Detailed survey to be awarded

25 STATE Gajwel‐Tipparam 220 D/C 20 Mar‐13

26 STATE Garividi‐Bobbili 220 D/C 75 Dec‐13 WORK UNDER PROGRESS

27 STATE Gas Station‐R.C.Puram(EG) 220 D/C 60 Mar‐1328 STATE Gas station 4‐Nidadavolu 400 D/C 60 Mar‐13 SCHMES TO BE FORMULATED

29 STATE Gas station‐Tanuku 220 S/C 70 Mar‐13

30 STATE Gooty‐Adoni 220 S/C 45 Mar‐13

31 STATE Gooty‐Adoni (2nd ckt) 220 S/C 32 Mar‐13

32 STATE Hinduja Vizag TPP‐Kamavarapukota 400 D/C 600 Mar‐13

33 STATE Jaipur TPP‐ Gajwel (Quad) 400 D/C 328 Mar‐13

34 STATE Jangampalli‐Mulkapalli 220 S/C 6 Mar‐13 EVALUTION UNDER PROGRESS.

35 STATE KTS‐Regalla 220 S/C 7 Feb‐13 Work awarded on 06.02.2013.Works commenced

36 STATE Kalpaka‐Pendurti 400 D/C 50 Mar‐13

37 STATE Kalpaka ‐proposed Garividi  400 D/C 300 Mar‐13

38 STATE Kalwakurthy‐Balanagar S/S 220 S/C 27‐Jan Mar‐13 SCHMES TO BE FORMULATED

39 STATE Kalwakurthy‐Balanagar (2nd Ckt) 220 S/C Mar‐14

40 STATE Kalwakurthy‐Dindi 3RD LINE 220 S/C 24 Mar‐14

41 STATE Kalyandurg‐Anantapur 220 S/C 61 Mar‐14

42 STATE Kamareddy‐Bhumpally 220 S/C 15 Mar‐15

43 STATE Kamavarapukota‐Suryapet 400 D/C 424 Mar‐15 LOI issued on 15.07.2013.Detailed survey is under progress

44 STATE Kanthanapally‐Warangal 400 D/C 110 Mar‐15 Scheme to be formulated

45 STATE Karimnagar ‐Bellampalli 400 D/C 70 Mar‐15 Scheme to be formulated

46 STATE Karimnagar‐Dichipalli 400 S/C 85 Mar‐16 Scheme to be formulated

47 STATE Karimnagar‐Anantagiri 220 S/C 30 Mar‐15

48 STATE Karimnagar‐Vemulavada 220 D/C 40 Mar‐15

49 STATE Karimnagar‐Yellampalli 220 D/C 80 Mar‐15

50 STATE Khammam‐Bayyaram 220 S/C 35 Mar‐15

51 STATE Koruprolu‐Narsipatnam 220 S/C 35 Mar‐15

52 STATE Krishnapatnam TPS _Bonapally (Quad) 400 D/C 182

53 STATE LILO ofGachibowli_thandur at Yeddumailaram 220 D/C 20 Oct‐13 Works are under progress. Stringing at Railway crossing is pending

54 STATE  LILO of Mamidipalli‐Yeddumailaram 220 D/C 10 October‐13

55 STATE LILO of Manubolu ‐Renigunta at ranchagunneri S/S 220 D/C 3 March‐13

56 STATE  LILO Pulivendula‐Hindupur(Ckt Kadiri) 220 D/C 50 February‐13

Shadnagar ‐ Yeddumailaram line proposed to be commissioned by

Oct'2013.ADSS(Data communications) works are under progress.

57 STATE

LILO of Shadnagar ‐ Yeddumailaram at 12

Yeddumailaram 220 D/C 12 December‐13

Cable laying completed. Cable jointing works completed. End termination works

to be taken up.

58 STATE

LILO of Shapur Nagar ‐ Gachilbowli feeder at GIS 

Erragadda SS 220 D/C 19 July‐13

Works under progress.As the contractor has totally failed in completion of

works.The contract was terminated.New tenders are proposed to be called for

the balance works.

59 STATE LILO of Srisailam ‐ Hyderabad line at Edulapally 400 D/C 75 October‐13 Works are under progress

60 STATE LILO of Tadikanda ‐ Ongoliat at Poddili 220 D/C 144 October‐13

All works completed, except Works to be taken up under shut down, which will

be taken during this month

61 STATE LILO of Veltoor ‐Jurala at Lower Jurala HEP 220 D/C 10 December‐13 P.O.issued on 18.05.2013

62 STATE LILO of Vizag ‐ Khammam (Ckt‐I) at Asupaka 400 D/C 34 December‐13 WORK UNDER PROGRESS

63 STATE

LILO of Wanaparthy ‐ Ragimanagadda at Singotam 

Road SS 220 D/C 11 December‐13 WORK UNDER PROGRESS

64 STATE Lower Jurala HEP ‐ Upper Jurala 220 D/C 22 March‐13

65 STATE Mailaram‐Sargapalli 220 S/C 43 October‐13 WORK UNDER PROGRESS

66 STATE Mamidipally S/S M/s K.S.K. Photo Voltaic near Fabcity Ravirala (V) 220 D/C 11 March‐14

67 STATE Manikonda SS‐Mamidipally‐Gachibowli 220 S/C 1 March‐15

68 STATE Manuguru‐Anantharam 220 D/C 16 December‐13

p g / j p g

are under progress

69 STATE Marripally common point‐ Hayatnagar S/S XLPE cable 220 D/C UG Cable 10 March‐15

70 STATE Midmaneru‐Kakatiya(Canal) 220 S/C 15 March‐15

71 STATE Minpur‐Kamareddy 220 S/C 55 December‐13

p g g p y g

work to be taken up.

12(b) Important Transmission Lines Under Construction

Andhra Pradesh Power system Profile

72 STATE Moulali ‐ Osmania University (Chilakalaguda) SS 220 D/C UG Cable 18 March‐14

73 STATE Muddanur‐Anantapur (3RD Line) 220 S/C 100 March‐14

74 STATE Nagarjunsasagar‐Chalakurthy (2nd Ckt) 220 S/C 14 March‐15

75 STATE Narasaraopet ‐ Parchur 220 D/C 106 October‐13 All works completed. Statutory remarks being completed

76 STATE Narketpally_Suryapet 220 S/C 60 March‐14

77 STATE Narsapur‐Doultabad 220 S/C 15 March‐15

78 STATE Narsapur‐Manoharabad 220 S/C 15 March‐15

79 STATE Nirmal‐Nandipeta 220 S/C 20 March‐15

80 STATE Nizamabad‐Janakampeta 220 S/C 10 March‐15

81 STATE Oddugudem‐Koyagudem 220 D/C 20 March‐15

82 STATE Oglapur 400kV S/S‐ Durshed 220 D/C 142 October‐13 All works completed. Statutory remarks being completed

83 STATE Oglapur(Warangal 400 kV SS)‐Warangal 220 kV SS 220 D/C 36 March‐15

84 STATE Painampuram ‐ Nellore Pooling Stations 400 D/C Nellore March‐15

85 STATE Palamaneru‐Madanapalli 220 S/C 50 March‐15

86 STATE Paloncha‐Kalyanapuram 220 D/C 20 March‐15

87 STATE Paloncha‐Oddugudem 220 D/C 20 March‐15

88 STATE Paloncha‐Yellandu 220 S/C 25 March‐15

89 STATE Peddapuram‐jaggampet‐LI 220 S/C 15 March‐15

90 STATE Pendurthy‐Vizianagaram 220 D/C 88 March‐16

91 STATE Polavaram ‐ Nidadavolu 400 D/C 120 March‐15

92 STATE Polavaram ‐ Suryapet 400 D/C 390 March‐14

93 STATE Priyadarshni Jurala‐Lower Jurala 220 S/C 8 March‐15

94 STATE Pulichintala HEP ‐ Chillakallu 132 D/C

95 STATE Pulichintala‐Piduguralla 220 S/C 35 March‐15

96 STATE Pulivendula Generation ‐ Kurnool 400 D/C 350 March‐17

97 STATE Pulivendula‐Hindupur 220 D/C 250 December‐13

98 STATE Purushottapatnam (Nunna) Jujjuru 400 D/C 112 December‐13

99 STATE RTPP‐Kondapuram 220 S/C 15 March‐14

100 STATE Ramagundam (BPL) ‐ Dichpally 400 S/C 150 March‐15 Scheme to be formulated.

101 STATE Ramagundam (BPL) ‐ Gazwel 400 S/C 120 March‐15 Scheme to be formulated.

102 STATE Ramagundam‐Jagityala (2nd Ckt) 220 S/C 68 March‐14

103 STATE Rayalaseema Stage‐IV ‐ Chittoor 400 D/C 420 March‐15

104 STATE Rayalseema ‐ Chitoor 400 D/C 420 June‐14 Tender to be colled for.

105 STATE Rentachintala ‐ Macherla S/S 132 S/C 17 March‐13 LINE CHARGED ON11.07.2013

106 STATE Rentachintala ‐ Nagarjuna Sagar Plant 132 S/C 16 October‐13

107 STATE Sargapalli‐Karjavelli 220 S/C 15 March‐15

108 STATE Sattenapalli (Narsaraopet) ‐ Narsaraopet 220 D/C 40 October‐13 Sub station works are under progress

109 STATE Siddipeta‐Tadkapalli 220 S/C 15 March‐15

110 STATE Sirpurkagaznagar‐Tummdihetty 220 S/C 15 March‐15

111 STATE Sitarampatnam‐Karakavagu 220 S/C 5 March‐15

112 STATE Suryapet ‐ Yeddumailaram 400 D/C 480 March‐15

113 STATE Thimmapuram‐ Yellanur 220 D/C 8 April‐13

114 STATE Vadarevu ‐ Amangal 765 S/C 240 March‐15

115 STATE Vadarevu ‐ Bhongiri 765 S/C 275 March‐16

116 STATE Veltoor‐Maktal 220 S/C 36 March‐14

117 STATE Veltur‐Maktal 220 S/C 36 March‐14

118 STATE Veltur‐Ragimanugadda 220 D/C 40 March‐15

119 STATE Veltur‐Tandur 220 S/C 84 March‐16

120 STATE Vemulavada‐Midmaneru 220 S/C 15 March‐15

121 STATE Vizag ( Hinduja) TPP ‐ Kalpaka (By Hinduja) 400 D/C 15 August‐13

122 STATE Warangal‐Raghunathapalli 220 S/C 25 March‐14

123 STATE Warangal‐Wardhanapet 220 S/C 45 March‐14

124 STATE Yedduailaram ‐ Edulapally (AP‐24 A) 400 D/C 83 July‐13

p g y p

works.The contract was terminated.New tenders are proposed to be called for

the balance works.

125 STATE Yeddumailaram ‐ Sadasivpet 220 D/C 78 December‐13 Works are under progress

126 STATE Yeddumailaram 400n KV SS‐Kandi 220 S/C 20 March‐15

127 STATE Yeddumailaram 400n KV SS‐Moosi (Sankarapalli 220 S/C 5 March‐15

128 STATE Yeddumailaram‐Cherial 220 D/C 30 March‐15

129 STATE Yeddumailaram‐Vattinagulapalli 220 S/C 5 March‐14

130 STATE Yellampalli‐Medaram(Chevellali) 220 S/C 2 March‐15

131 STATE Yellanur‐ Gaddamvaripalli 220 D/C 5 April‐13 Works are under progress

132 STATE

a) Jujjuru ‐ Sattenapalli (b) LILO of VTS ‐ Srisailam 

line at Sattenapalli 400 D/C 134 October‐13 Works are under progress

CTU ( POWERGRID)1 POWERGRID GOOTY ‐MADUGIRI 400 D/C 422 83 June‐14

2 POWERGRID Krishnapatanm UMPP‐Gooty line (Quad) 400 D/C 632 578 March‐13 400KV D/C Nellor‐Gooty line commissioned in Mar'13. (early K'patnam UMPP Gooty

3 POWERGRID Kurnool (new) ‐ Kurnool line  400 D/C 18 August‐14 AWAARD UNDER PROGRESS

4 POWERGRID Kurnool ‐ Raichur (IInd Ckt)  765 S/C 246 16 August‐14

5 POWERGRID LILO of Gazuwaka ‐ Vijayawada at Vemagiri  400 S/C 38 June‐14 SCHEME UNDER REVIEW IN VIEW OF CERC DIRECTION

6 POWERGRID LILO of Nagarjunsagar ‐ Gooty at Kurnool  400 D/C 37 August‐14 AWARD UNDER PROGRESS

7 POWERGRID Nellore Pooling Station ‐ Kurnool  765 D/C 606

8 POWERGRID Tiruvelam (PG) ‐ Chitoor  400 D/C 42

Website: http://cea.nic.in/reports/proj_mon/pspm/trans_line_220kv_status.pdf

SOURCE: CEA WEBSITE

Andhra Pradesh Power system Profile

Page 37: State_Profile_Andhra_Pradesh.pdf
Page 38: State_Profile_Andhra_Pradesh.pdf

SRLDC

Black Start Restoration Procedure of SR 2013

���������������������������� ����������������������

VIK

AR

AB

AD

JN

B

EL

LA

MP

AL

LI

K

AR

IMA

NA

GE

R

MA

NU

GU

RU

P

AT

AN

CH

ER

VU

KA

KIN

AD

A P

OR

T

H

YD

ER

AB

AD

P

ED

DA

PA

LL

IB

AD

RA

CH

AL

AM

SA

MA

LK

OT

JN

SE

CU

ND

ER

AB

AD

H

AS

AN

PA

RT

IS

C V

ISH

AK

AP

TN

AM

JN

B

IBIN

AG

ER

T

UN

IA

NA

KA

PA

LL

E

WA

RA

NG

AL

KA

RE

PA

LL

I J

NA

NN

AV

AR

AM

K

AZ

IPE

T J

N R

AJ

AM

AN

DR

Y

K

OV

VU

R N

DV

M

IRY

AL

AG

UD

AN

IDU

DA

VO

LU

JN

N

ZM

BA

DD

OR

NA

KA

L J

NB

HIM

AV

AR

AM

JN

p

ed

da

KA

MM

AM

J

AN

KA

MP

ET

JN

N

AD

IKU

DI J

N

GU

DIW

AD

A J

N

MM

E

LU

RU

E

luru

M

AC

HE

RL

AJ

P

B

HO

DA

N M

AC

HIL

IPT

NA

M

V

IJA

YA

WA

DA

JN

DR

ON

AC

HA

LA

M J

N G

IDD

AL

UR

N

AL

LA

PA

DU

JN

NA

ND

YA

L D

ON

AK

ON

DA

KR

ISH

NA

CA

NA

L J

N

N

AR

AS

RA

OP

ET

GU

NT

UR

JN

TE

NA

LI J

N

BA

PA

TL

A

D

HA

RM

AV

AR

AM

JN

P

AK

AL

A J

N

A

NA

NT

AP

UR

GU

DU

R J

N

N

EL

LO

RE

KA

VA

LI

ON

GO

LE

TIR

UP

AT

I

PA

MID

IC

UD

DA

PA

HM

UD

DA

NU

R

KO

DU

RU

S

RIK

AL

AH

AS

TI

GO

OT

YR

AJ

AM

PE

T R

EN

IGU

NT

A J

N

G

UN

TA

KA

L J

N

V

EN

KA

TA

GIR

I

P

UT

TU

R

TIT

LE

AN

DH

RA

PR

AD

ES

H &

KA

RN

AT

AK

A T

RA

CT

ION

FE

ED

ING

SU

BS

TA

TIO

NS

W

HIT

EF

IEL

DB

AN

GA

RP

ET

JN

K

UP

PA

M2

20

kV

SU

B S

TA

TIO

NS

11

0kV

SU

B S

TA

TIO

NS

Ka

lah

asti

Ko

du

ru2

20

kV

Ra

jam

pet

22

0kV

Ka

lkiri

22

0kV

Ch

ittu

r2

20

kV

Ne

llo

re

22

0kV

Allu

rK

ava

liK

an

du

ku

rS

ing

ara

yako

nd

a

Su

lurp

et

22

0kV

Gud

ur

On

go

le2

20

kV

Re

nik

un

ta2

20

kV

Ve

nka

tag

iri

Viz

ag

22

0kV

Bo

mm

ur

22

0kV

Pe

dd

ap

ura

mT

un

iK

oru

pro

lu

Ka

kin

ad

a2

20

kV

PE

DD

AP

UR

AM

Bo

mm

ur

22

0kV

Bim

ad

ole

22

0kV

ND

V 2

20

kV

Bh

ima

vara

m2

20

kv

Bh

imd

ole

22

0kV

Nid

ud

avo

lu 2

20

kV

Ta

dik

on

da

22

0kV

Gu

na

da

la

Gu

ntu

rT

en

ali

Pa

ruch

ur

22

0kV

Ch

.pe

ta

gH

AN

AP

UR

22

0kV

Na

rke

tpa

lli 2

20

kV

Mirya

lag

ud

a 2

20

kV N

alg

on

da

Pid

ug

ura

lla

Ma

ch

erl

a

Mirya

lag

ud

a2

20

kV

Ko

nd

ap

alli

22

0kV

VT

PS

22

0kV

Vija

yaw

ada

Ka

mm

am

2

20

kV

Do

rna

ka

l

Wa

ran

ga

l2

20

kV

Sin

ga

ren

y co

lle

rie

s

Pa

lam

an

eru

22

0kV

ku

pp

am

Sh

an

tipu

ram

wh

itefie

ld 2

20

kV

Ko

lar

22

0kV

Ba

ng

arp

et

TA

ND

UR

22

0kV

MU

DD

AN

UR

GO

OT

Y

22

0kV

TA

DIP

IRI

22

0kV

86

Page 39: State_Profile_Andhra_Pradesh.pdf

SIRPUR KAGHAZNAGAR (SKZR)

POWER SUPPLY NETWORK FORRAILWAY TRACTION OVERSOUTH CENTRAL RAILWAY

VATLUR (VAT)

:

~?f~~:=~~~~~~~~~~~~~~~~~~~ElURU KANUMOlUKRISHNA CANAL IN. (KCG)

IAYAJULULI

LEGEND

~~:----L_.nSULURUPETA

RENIGUNTA IN. (RU)SCR LIMIT 133.56

110 kV SUPPLY (KPTCL)

TRACTION SUB STATION

132 kV SUPPLY

220 kV SUPPLY

220 kV SUPPLY (MSEB)

400 kV SUPPLY

GRID SUB STATION CJ

THERMAL POWER STATION ~

HYDEl POWER STATIONSCR LIMIT AT CH: 0.850

KATPADIJN.ELECTRIFIED TRACK ~

Page 40: State_Profile_Andhra_Pradesh.pdf

SIRPUR KAGHAZNAGAR (SKZR)

ONGOLE (OGL)

':l~~~~~~~~~~~SULURUPETAJ RENIGUNTA IN.(RU)SCR LIMIT 133.56

SCR LIMIT AT CH: 0.850

KATPAOIJN.

Page 41: State_Profile_Andhra_Pradesh.pdf

T••~~~.-otMC) •••~

"'·O'o'lC i'CTtH rfCl.t"S!.•• ...-AQ I"O~~ I-oOCJSi:

Jo...A'" 'L9·"TJ.T1I';" .

.- ".. :; :- ...~-'.'~2 ••'j S•.!3~S·"·C'll•• - 4,. ~.:_ ~-.- ~' •

. 11 1(\- ',-

. .: e , - ',:.

IIAND~RA PRADESH Ii, ,

1;-

BAY OF BENGAl

RAILWAYS

SHOWING

POWER SUPPLY DIAGRAM

CONNECTED GENERATING

STATIONS

C Korthi

D Venkot

Dt . C.06_U

(K.PALANI)Dy.CEE/TRD/Co-ord.

Page 42: State_Profile_Andhra_Pradesh.pdf

14(a) Political Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 43: State_Profile_Andhra_Pradesh.pdf

14(b) Road Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 44: State_Profile_Andhra_Pradesh.pdf

14(c) Railway Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 45: State_Profile_Andhra_Pradesh.pdf

14(d) Agriculture Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 46: State_Profile_Andhra_Pradesh.pdf

14(e) Mineral Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 47: State_Profile_Andhra_Pradesh.pdf

14(f) River Map

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 48: State_Profile_Andhra_Pradesh.pdf

832.8 670 551.6 892.55 513.59179.83 2237 1398.13 6537.8 150.88269.75 4300 1317.02 6780.75 243.84

15(a) Andhra Pradesh Reservoir Information

Reservoir Full

reservoir level (m)

Annual Design

Potential (Mu)

Energy Content at F.R.L

Effective Capacity at

F.R.L (MCM)

Min. Draw Down Level

(m)

MACHKANDNAGARJUNA SAGAR

SRISAILAMSource: CEA Report as on 09th OCTOBER, 2013

Weblink: http://cea.nic.in/daily_hydro.html

Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile

Page 49: State_Profile_Andhra_Pradesh.pdf

Name Designation Contact. No.Chairman

Sri. Mrutyunjay Sahoo, IAS Chairman 2345545223317643

Sri.S.A.M Rigvi Chairman 23454884

Sri.H.Y.Dora Chairman 2284101

S i K ik Mi Ch i 2461501

MD

ANDHRA PRADESH Southern Power Distribution Company Limited http://www.apspdcl.in/

MD

Website:http://apgenco.gov.in/

Sri K. Vijayanand I.A.S MD

ANDHRA PRADESH Central Power Distribution Company Limited http://www.apcentralpower.com/

16(a) Details of GENCOs, TRANSCOs, DISCOMs and SLDC

ANDHRA PRADESH Power Transmission Corporation Limited

MDSri S. Suresh chandra

ANDHRA PRADESH Power Generation Company Limited23317657

ANDHRA PRADESH Northen Power Distribution Company Limited http://www.apnpdcl.in/

Andhra Pradesh Power system Profile

Sri.Kartikeya Misra Chairman 2461501

Sri.Seshagiri Babu Chairman 2582501

Sri.SurendarBabu CHIEF ENGINEER 9440811106

Sri.S.Sairam CHIEF ENGINEER (LD) 23317645ADDL. CHIEF ENGINEER (LD)

Sri.A.K.V BhaskarSUPERINTENDING ENGINEER (LD)

9490153116

Sri.P.V.Kumara Swami MANGER (F&A - LD) 9490153147

MD

SLDC CONTROL ROOM

ANDHRA PRADESH Eastern Power Distribution Company Limited https://www.apeasternpower.com/EPDCL_Home.portal

MD

As on 01st Sept., 2013

ANDHRA PRADESH Power Trading Company Limited http://www.aptransco.gov.in/

ANDHRA PRADESH State Load Despatch Centre http://www.apsldc.gov.in/

Andhra Pradesh Power system Profile