Power System Profile of the State
Of
ANDHRA PRADESH
National Load Despatch Centre
New Delhi
S.No. Description
1(a) State at a glance
2(a) Power Supply Position: Reqirement ‐ Availability2(b) Power Supply Position: Peak Demand ‐ Peak Met2(c) Anticipated Power Supply Position
3(a) Reqirement ‐ Availability Pattern (2013‐14)3(b) Peak Demand ‐ Peak Met Pattern (2013‐14)3(c) Reqirement ‐ Availability Pattern (2012‐13)3(d) Peak Demand ‐ Peak Met Pattern (2012‐13)3(e) Reqirement ‐ Availability Pattern (Last 3 years)3(f) Peak Demand ‐ Peak Met Pattern (Last 3 years)
4(a) Allocation of Power from CGSs
5(a) Schedule, Drawal, Generation and Total Demand5(b) STOA and UI Details5(c) Year Wise UI Details (Financial Terms)5(d) Long Term Access (LTA) Details
6(a) Generation Summary6(b) Generation Stations Details
7(a) Summary of Tranmission Lines and Sub‐Stations7(b) Transmission Network Details7(c) Details of Sub‐Stations7(d) Details of Reactors7(e) List of Transmission Lines with compensation
8(a) Applicable POC Charges and Loss Slabs
9(a) Transmission Constraints (As per NLDC operational feedback)
10(a) UFR, df/dt and Capacitor Installation Status
11(a) Radial feeders for Demand Disconnection
12(a) Generating Units and Stations Under Construction 12(b) Transmission Lines Under Construction
13(a) Power Map13(b) Traction Map
14(a) Political Map14(b) Road Map14(c) Railway Map14(d) Agriculture Map14(e) Mineral Map14(f) River Map
15(a) Storage position of Reservoir based hydroelectric Projects
16(a) Details of Generating Companies, Transmission Utilities and Distribution Utilities
4. Allocation of Power
Table of Contents
1. State at a glance
2. Power Supply Position
3. Power Supply Position and Consumption Pattern
16. Contact and Website Details
5. Schedule, Drawal, Generation and STOA Details
6. Generation Stations Details
7. Transmission Network Details
8. PoC Charges and Losses
9. Transmission Constraints
10. Defense Mechanism
11. Load Management Details
12. Future Anticipated Projects
13.Power System Map
14. Physical & Geographical Maps
15.Reservoir based Hydroelectric Projects
Andhra Pradesh Power system Profile
State Andhra Pradesh
Capital Hyderabad
Population 84,580,777
Area 275,045 km2(106,195 sq mi)
Surrounding States Maharashtra, Chattisgarh , Orissa, Karnataka, Tamil Nadu
Number of Districts 23
Hyderabad (6,809,970)
Visakhapatnam (1,730,320)
Vijayawada (1,048,240)
Website of State Government http://www.ap.gov.in/
Grid Code of the State http://www.aperc.gov.in/Guidelines/Guidelines.html
Tariff Order (ARR) of the State http://www.aperc.gov.in/TariffOrders/transmissiontariffsfor2009-2014.pdf
1(a) State at a Glance
Main 3 Cities (Population)
Andhra Pradesh Power System Profile
SLDC Fees and Charges http://www.aperc.gov.in/TariffOrders/SLDCchargesforFY2009-2014.pdf
Per Capita Consumption 1013 KWHr (All India - 778 KWHr)
Source: Census 2011
Andhra Pradesh Power System Profile
Requirement Availability Requirement Availability
(MU / day) (MU / day) (MU / day) (%) (MU / day) (MU / day) (MU / day) (%)
1 Apr 245.5 216.7 -28.7 -11.7 256.6 240.3 -16.3 -6.3
2 May 219.1 203.8 -15.3 -7.0 234.1 231.9 -2.2 -1.0
3 Jun 205.7 193.0 -12.7 -6.2 219.9 216.6 -3.3 -1.5
4 Jul 207.4 200.1 -7.3 -3.5 234.5 229.3 -5.2 -2.2
5 Aug 222.6 217.7 -4.9 -2.2 241.1 238.8 -2.3 -0.9
6 Sep 207.6 206.7 -0.9 -0.4 253.1 239.1 -14.0 -5.5
7 Oct 222.4 221.1 -1.3 -0.6 277.5 236.9 -40.7 -14.7
8 Nov 183.9 183.8 -0.1 -0.1 252.5 224.8 -27.8 -11.0
9 Dec 199.4 198.6 -0.7 -0.4 253.8 222.7 -31.0 -12.2
10 Jan 226.3 224.4 -1.8 -0.8 246.9 237.5 -9.4 -3.8
11 Feb 221.3 219.0 -2.3 -1.0 266.6 246.5 -20.1 -7.6
12 Mar 271.2 263.3 -7.9 -2.9 321.1 274.0 -47.1 -14.7
2(a) Power Supply Position
Requirement / Availability
*Average Figures
S.No. Month
2010-11 2011-12
Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)
2012-13 2013-14
Andhra Pradesh Power system Profile
Requirement Availability Requirement Availability
(MU / day) (MU / day) (MU / day) (%) (MU / day) (MU / day) (MU / day) (%)
1 Apr 281.6 244.3 -37.2 -13.2 295.3 244.5 -50.7 -17.2
2 May 272.9 245.4 -27.5 -10.1 294.0 248.7 -45.4 -15.4
3 Jun 253.0 217.4 -35.6 -14.1 251.6 222.9 -28.6 -11.4
4 Jul 256.9 212.4 -44.5 -17.3 253.9 229.5 -24.4 -9.6
5 Aug 272.6 215.2 -57.4 -21.1 256.3 255.3 -1.0 -0.4
6 Sep 279.1 217.7 -61.4 -22.0 251.0 249.3 -1.7 -0.7
7 Oct 286.1 231.8 -54.3 -19.0
8 Nov 252.0 209.3 -42.7 -17.0
9 Dec 282.0 230.6 -51.4 -18.2
10 Jan 297.5 240.9 -56.6 -19.0
11 Feb 268.5 219.0 -49.5 -18.4
12 Mar 320.8 254.9 -65.8 -20.5
*Source: CEA Power Supply Position ReportWeb-link: http://cea.nic.in/monthly_power_sup.html
S.No. Month Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)
Andhra Pradesh Power system Profile
Peak Demand Peak Met Peak Demand Peak Met
(MW) (MW) (MW) (%) (MW) (MW) (MW) (%)
1 Apr 12018 10396 -1622 -13.5 12636 11579 -1057 -8.4
2 May 10738 9353 -1385 -12.9 10658 10474 -184 -1.7
3 Jun 10846 9041 -1805 -16.6 10746 10108 -638 -5.9
4 Jul 10026 8904 -1122 -11.2 10975 10542 -433 -3.9
5 Aug 10662 9740 -922 -8.6 11483 11377 -106 -0.9
6 Sep 10347 9883 -464 -4.5 12863 11552 -1311 -10.2
7 Oct 10960 10428 -532 -4.9 13254 11591 -1663 -12.5
8 Nov 9176 9018 -158 -1.7 12112 10835 -1277 -10.5
9 Dec 10129 9683 -446 -4.4 11712 10453 -1259 -10.7
10 Jan 11586 10848 -738 -6.4 12178 11099 -1079 -8.9
11 Feb 11377 11232 -145 -1.3 12913 11313 -1600 -12.4
12 Mar 12630 11829 -801 -6.3 14054 11972 -2082 -14.8
P k D d P k M t P k D d P k M t
2(b) Power Supply Position
Peak Demand / Peak Met
S.No. Month
2010-11 2011-12
Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)
S No Month
2012-13 2013-14
Surplus (+) / Deficit ( ) Surplus (+) / Deficit ( )
Andhra Pradesh Power system Profile
Peak Demand Peak Met Peak Demand Peak Met
(MW) (MW) (MW) (%) (MW) (MW) (MW) (%)
1 Apr 13417 11335 -2082 -15.5 14072 11410 -2662 -18.9
2 May 12658 11099 -1559 -12.3 13294 11369 -1925 -14.5
3 Jun 12764 10826 -1938 -15.2 12330 10723 -1607 -13.0
4 Jul 12644 9508 -3136 -24.8 11989 10932 -1057 -8.8
5 Aug 13876 9929 -3947 -28.4 11779 11717 -62 -0.5
6 Sep 13974 10438 -3536 -25.3 11911 11887 -24 -0.2
7 Oct 13730 10901 -2829 -20.6
8 Nov 12191 10217 -1974 -16.2
9 Dec 12862 10551 -2311 -18.0
10 Jan 14031 11236 -2795 -19.9
11 Feb 13994 11148 -2846 -20.3
12 Mar 14582 11630 -2952 -20.2
*Source: CEA Power Supply Position ReportWeb-link: http://cea.nic.in/monthly_power_sup.html
S.No. Month Surplus (+) / Deficit (-) Surplus (+) / Deficit (-)
Andhra Pradesh Power system Profile
Requirement Availability Peak Demand Peak Met
(MU) (MU) (MU) (%) (MW) (MW) (MW) (%)
Apr-13 9145 7602 -1543 -16.9 14461 11309 -3152 -21.8
May-13 9007 7708 -1299 -14.4 13654 10958 -2696 -19.7
Jun-13 8402 7522 -880 -10.5 13306 11075 -2231 -16.8
Jul-13 8479 7549 -930 -11.0 13408 10712 -2696 -20.1
Aug-13 8915 8446 -469 -5.3 14613 13497 -1116 -7.6
Sep-13 9210 8817 -393 -4.3 14737 13497 -1240 -8.4
Oct-13 9355 8684 -671 -7.2 14621 12662 -1959 -13.4
Nov-13 8392 8426 34 0.4 13116 12787 -329 -2.5
Dec-13 9392 8543 -849 -9.0 13872 12371 -1501 -10.8
Jan-14 8921 8176 -745 -8.4 14107 11979 -2128 -15.1
Feb-14 9154 8335 -819 -8.9 14824 13491 -1333 -9.0
Mar-14 10921 9590 -1331 -12.2 15955 13985 -1970 -12.3
Annual 109293 99398 -9895 -9.1 15955 13985 -1970 -12.3
2(c) Anticipated Power Supply Position
CEA LGBR Report
Month
Requirement/Availability Peak Demand / Peak Met
Surplus/Deficit(-) Surplus/Deficit(-)
* Source - CEA LGBR ReportWeblink: www.cea.nic.in/reports/yearly/lgbr_report.pdf
18th EPS Report
Andhra Pradesh Power system Profile
Requirement Availability Peak Demand Peak Met
(MU) (MU) (MU) (%) (MW) (MW) (MW) (%)
2013-14 101231 100906 -325.0 -0.3 17044 16990 -54 -0.3
2014-15 109968 109722 -246.0 -0.2 18681 18639 -42 -0.2
2015-16 119458 119318 -140.0 -0.1 20476 20452 -24 -0.1
2016-17 129767 129767 0.0 0.0 22445 22445 0 0.0
2017-18 140324 140324 0.0 0.0 24271 24271 0 0.0
2018-19 151743 151743 0.0 0.0 26246 26246 0 0.0
2019-20 164093 164093 0.0 0.0 28382 28382 0 0.0
2020-21 177454 177454 0.0 0.0 30693 30693 0 0.0
2021-22 191912 191912 0.0 0.0 33194 33194 0 0.0
* Source - CEA 18th EPS Report
Financial Year
Requirement/Availability Peak Demand / Peak Met
Surplus/Deficit(-) Surplus/Deficit(-)
Andhra Pradesh Power system Profile
251.5666667 253.9333333 256.3251
244.5333333248.6666667
222.9333333229.5
255.2666667249.3
90
140
190
240
MU / day
3(a) REQUIREMENT / AVAILABILITY (MU / Day) (2013 ‐ 14)
Andhra Pradesh Power system Profile
‐1.033333333 ‐1.7‐10
40
Apr
May Jun
Jul
Aug
Sep
Series1 Series2 Series3
3600
4600
5600
6600
7600
8600
9600
10600
11600
12600
13600
MW
3(b) PEAK DEMAND / PEAK MET (2013 ‐ 14)
PEAK DEMAND DEMAND MET SHORTAGE
Andhra Pradesh Power system Profile
‐400
600
1600
2600
Apr
May Jun
Jul
Aug
Sep
95
145
195
245
MU / day
3(c) REQUIREMENT / AVAILABILITY (MU / Day) (2012‐13)
REQUIREMENT AVALIBILTY SHORTAGE
Andhra Pradesh Power system Profile
‐5
45
Apr
May Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
Feb
Mar
3600
4600
5600
6600
7600
8600
9600
10600
11600
12600
MW
3(d) PEAK DEMAND / PEAK MET (2012 ‐ 13)
PEAK DEMAND PEAK MET SHORTAGE
Andhra Pradesh Power system Profile
‐400
600
1600
2600
Apr
May Jun
Jul
Aug
Sep
Oct
Nov
Dec Jan
Feb
Mar
210.00
230.00
250.00
270.00
290.00
llion Units ‐MU)
3(e) Daily Consumption Pattern Last 3 Years
2011‐12 2012‐13 2013‐14
150.00
170.00
190.00
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
(Mil
9000
10000
11000
12000
130003(f) Peak Demand Pattern Last 3 Years
2011‐12 2012‐13 2013‐14
6000
7000
8000
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
CGS share
Unallocated Share
EntitlementCGS share
Unallocated share
Entitlement
1 Ramagundam (T) 2100 7.75 1937 27.60 4.14 31.74 535 80 615
2Ramagundam STG III
500 6.50 468 29.20 4.22 33.42 137 20 156
3 Madras APS (N) 440 11.00 392 8.50 1.23 9.73 33 5 38
4 Kaiga Unit 1&2 (N) 440 14.50 376 26.10 4.06 30.16 98 15 113
5 Kaiga Unit 3&4 (N) 440 14.50 376 28.20 3.77 31.97 106 14 120
6 Neyveli II St.-I (T) 630 10.00 567 15.40 4.08 19.48 87 23 110
7 Neyveli II St.-II (T) 840 10.00 756 21.40 4.06 25.46 162 31 192
8 Neyveli -I exp. (T) 420 305 0.00 0.00 0.00 0 0 0
9 Talcher St.-II (T) 2000 6.50 2000 18.80 1.64 20.44 376 33 409
10 Simhadri STPS St.II 1000 6.00 1000 38.40 7.15 45.55 384 72 456
11Vallur STPS Unit 1&2
1000 6.50 935 11.90 2.03 13.93 111 19 130
12 IGSTPS 1500 1500 15.07 0.00 15.07 226 0 226
4(a) Allocation from Central Sector Generating Stations
S.No StationsCapacity (MW) #
Normative Loss %
Ex - Bus (MW)
( % ) ( MW )From Central Sector Stations located in host region
Entitlement in SR (MW) 2340
From Central Sector Stations located in other regions
Grand Total Power Allocation (MW) 2566
*Source: CEA Allocation of Power from CGSs Report
http://www.cea.nic.in/reports/monthly/gm_div_rep/power_alloc_sr.pdf*Source: SRPC Allocation of Power from 21.9% Unallocated Share of CGSs Report
Andhra Pradesh Power system Profile
Year Schedule (MU) Drawal (MU)Over-drawal (+) / Under-drawal (-)
(MU)
State Sector Generation (MU)
Total Demand Met (MU)
2009-10 0
2010-11 12469 12370 -100 37451 76450
2011-12 17340 18160 820 42362 85149
2012-13 22938 24183 1245 41394 82171
Apr‐13 2170 2235 65 3673 7336
May‐13 2514 2597 83 3616 7460
Jun‐13 2266 2333 67 2961 6688
Jul‐13 2543 2620 77 2927 6885
Aug‐13 2180.690 2201.965 21 3986 7658
Sep‐13 2276 2312 36 3888 7479
Oct‐13
Nov‐13
Dec‐13
Jan‐14
Feb‐14
Mar‐14
5(a) Schedule, Drawal, Generation and Total Demand
Andhra Pradesh Power system Profile
2013-14 13949 14298 349 21051 43506
Weblink: http://cea.nic.in/monthly_power_sup.html
* (-) indicates sale / export and (+) indicates purchase / importSource: CEA Schedule / Drawal Report, CEA Generation Report, CEA PSP Report
Weblink: http://cea.nic.in/reports/monthly/gm_div_rep/schedule_drawal.pdf
Weblink: http://cea.nic.in/monthly_gen.html
http://www.srldc.org/MonthlyReport.aspx
Andhra Pradesh Power system Profile
Sale Purchase Net* Sale Purchase Net* Sale Purchase Net*Export(U / D)
Import(O / D)
Net*
2009-10 1034 1333 299 158 662 505 1191 1995 804 #REF! 892 972 80 884 #DIV/0!
2010-11 1103 1940 837 561 381 -181 1665 2321 656 3.0 1525 411 -1115 -458 3.6
2011-12 713 1126 414 353 842 489 1066 1968 902 2.3 687 399 -288 614 2.8
2012-13 129 4747 4619 662 2005 1343 791 6752 5961 8.2 337 598 165 6127 8.9
2013-14 0 2877 2877 327 1766 1439 327 4643 4316 59.9 187 367 180 4496 68.3
Apr‐13 0.00 281.43 281.43 81.00 317.95 236.95 81.00 599.38 518.38 34.41 40.51 14.85 ‐25.66 492.72 35.3
May‐13 0.00 625.08 625.08 87.47 327.62 240.15 87.47 952.70 865.23 53.70 28.77 31.64 2.87 868.10 55.5
Jun‐13 0.00 602.20 602.20 73.63 422.85 349.22 73.63 1025.05 951.42 75.15 27.18 35.20 8.02 959.44 77.7
Jul‐13 0.00 735.71 735.71 39.11 417.43 378.32 39.11 1153.14 1114.03 87.16 23.83 44.80 20.97 1135.00 90.5
Aug‐13 0.00 632.60 632.60 45.39 279.75 234.36 45.39 912.35 866.96 59.01 25.79 48.91 23.12 890.08 62.2
5(b) STOA and UI Details
All Figures in Million Units (MUs)* (-) indicates sale / export and (+) indicates purchase / import
Year
Through Bilateral Through Power Exchange Total STOA (Bil. + PX) Total STOA Purchase as % of Demand
Through UI with Regional Grid
Total Short Term Net**
Total STOA (Bil. + PX +
UI) purchase as % of Demand
Andhra Pradesh Power system Profile
Sep‐13
Oct‐13
Nov‐13
Dec‐13
Jan‐14
Feb‐14
Mar‐14
** Total net includes net of transactions through bilateral, power exchange and UI.Source: CERC MMC Report
Weblink: http://www.cercind.gov.in/report_MM-2013.html
Andhra Pradesh Power system Profile
2009-10 2010-11 2011-12 2012-13 2013-14
Amount payable into the pool(+)/receivable from the pool(-)
103 -341 -57 113 28
Amount paid into the pool(-)/ received from the pool(+)
-103 341 57 -113 -28
Outstanding Payable(+) / Receivable(-) 0 0 0 0 0
5(c) Yearwise UI Details (Financial Terms)
All Figures in Rupees in Lakhs
Status as on first day/week of the financial year2013- 14 data reconciled upto 16.06.2013
Source: WRLDC Reconcilliation Statement
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
S no Power Station Installed Capacity (MW)
Normative Loss (%)
Sentout (MW) Effective LTA / MTOA (MW)
LTA/MTOA with identified beneficiaries
1Ramagundam (T) 2100
7.75 1937.25615
1937.25
2 Ramagundam STG III 500 6.50 467.5 156 467.53 Madras APS (N) 440 11.00 391.6 38 391.64 Kaiga Unit 1&2 (N) 440 14.50 376.2 113 376.25 Kaiga Unit 3&4 (N) 440 14.5 376.2 120 376.26 Neyveli II St.-I (T) 630 10 567 110 5677 Neyveli II St.-II (T) 840 10 756 192 7568 Talcher St.-II (T) 2000 6.5 1870 409 18709 Simhadri STPS St.II 1000 6 940 456 94010 Vallur STPS Unit 1&2 1000 6.5 935 130 93511 IGSTPS 1500 1.3 1480.5 226 1480.512 LANCO KONDAPALLI 250 - -13 SEPL 300 -14 MEPL 300 -15 KSK MAHANADI 500 - 40016 CORPORATE POWER ----- - ----- 250*
Total 9390 10097.25 2566.43209 10097.25
5(d) LTA / MTOA Details of Central Sector and IPP Stations
Source: CTU / POWERGRID Website
Weblink: http://www.powergridindia.com/_layouts/PowerGrid/WriteReadData/file/LTOA/DetailsofConnectivityMTOALTAapplications/DetailsofLTOA_LTA_Appli
cations/Applications%20Granted%20LTOA%20-%20LTA1.pdf
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
UNITS TOTAL (MW)
1 RAMAGUNDEM STPS 3X200+4X500 26002 SIMHADRI 4X500 2000
TOTAL 46004600
UNITS TOTAL (MW)
1 MACHKUND 3x(23+17)x70% 842 T.B.DAM (8x9)x80% 57.63 UPPER SILERU 4x60 2404 DONKARAYI 1x25 255 LOWER SILERU 4x115 4606 SRISAILAM RBPH 7x110 7707 SRISAILAM LBPH 6x150 9008 N'SAGAR 1x110+7x100.8 815.69 NSR RT.CANAL.P.H 3x30 9010 NSR LT.CANAL.P.H 2x30 6011 NIZAMSAGAR 2x5 1012 POCHAMPAD 4x9 3613 PENNA AHOBILAM 2x10 2014 SINGUR 2x7.5 1515 JURALA 6x39 23416 MINI HYDEL (+ APTRIPCO 1.2 MW 13.36 13.36
TOTAL 3830.56
1 Dr. N.TATA RAO TPS 6x210+1x500 17602 KAKATIYA TPS 1x500 500
3 KOTHAGUDEM TPS 4x60+4x120+2x250+1x500 17204 RAMAGUNDEM - B TPS 1x62.5 62.55 RAYALASEEMA TPS 4x210+1x250 1060
TOTAL 5102.5
1 VIJJESWARAM STAGE 1 (GAS) 2x33+1x34 1002 VIJJESWARAM STAGE 2 (GAS) 1x112.5+1x59.5 1723 WIND 2
HYDRO
6(b) Details of Generating Stations
Central Sector Generating Stations
SL. No. STATIONINSTALLED CAPACITY
THERMAL (COAL)
GRAND TOTALState Sector Generating Stations
SL. No. STATIONINSTALLED CAPACITY
THERMAL (COAL)
OTHER (Co- Gen, Mini-Hydel)
3 WIND 24 SOLAR JURALA 1
TOTAL 9 2759 9208
UNITS TOTAL (MW)
1 JEGURUPADU (GAS) 2x45.8+1x48.9+1x75.5 216.822 GVK EXTENSION(GAS) 1x145+1x75 2203 SPECTRUM (GAS) 1x46.8+2x46.1+1x68.88 208.314 LANCO (GAS) 2x115+1x125 351.495 ISOLATED GAS WELL (GAS) (LVS) 27.04 27.046 RELIANCE ENERGY LTD. (GAS) 1x140+1x80 227 VEMAGIRI POWER GENERATION LTD.(GAS) 1x233+1x137 3708 GAUTAMI CCPP 2x145 + 1x174 4649 KONASEEMA CCPP 145+140+165 44410 GMR (BARG) 237 23711 LANCO KONDAPPILLI POWER LTD. 233 + 133 36612 SEPL 2X150 30013 MEPL 2X150 300
Total 15 3526.66WIND/SOLAR/OTHERS
1 WIND 428.09
2SOLAR (Cuddapah, Ananthpur,SOLAR (Cuddapah, Ananthpur,
22.753 RCL 41
4
5 MINI POWER PLANTS 78.796 MINI HYDRO 102.64
Grand Total 1236.334763
18571
GRAND TOTAL
Private Sector Generating Stations
SL. No. STATIONINSTALLED CAPACITY
Source:
http://www.srldc.org/MonthlyReport.aspx
COAL
BAGASSE+BIOMASS+WASTE BASED
PP+PP+CO-GENERATION (NC)
274.8+205.25+29.25+53.
65 563.06
GRAND TOTALTotal Installed Capacity ( Central + State + Private )
Andhra Pradesh Power system Profile
NumberCircuit Length (CKM)
NumberCircuit Length (CKM)
NumberCircuit Length (CKM)
NumberCircuit Length (CKM)
NumberCircuit Length (CKM)
Central Sector
0 0 27 5981 0 0 0 0 27 5981
State Sector
0 0 21 3566 265 13233 452 0 738 16799
Private Sector
0 0 2 38 0 00
0 454 38
Total 0 0 50 9585 265 13233 452 0 767 22818
NumberCapacity
(MVA)Number
Capacity (MVA)
NumberCapacity
(MVA)Number
Capacity (MVA)
NumberCapacity
(MVA)Central Sector
0 0 8 5270 0 0 0 0 15049 5270
State Sector
0 0 9 5945 74 15041 453 0 462 20986
7 (a) Summary of Transmission Lines and Sub-Stations
Summary of Transmission Lines All Figures in CKM
Ownership Sector
Voltage Level BreakupGrand Total
765 kV 400 kV 220 kV 132 kV
http://www.srldc.org/DownloadDocuments.aspx
Summary of Sub-Stations
Ownership Sector
Voltage Level BreakupGrand Total
765 kV 400 kV 220 kV 132 kV
Andhra Pradesh Power system Profile
SectorPrivate Sector
0 0 10 1215 0 0 0 0 10 1215
Total 0 0 27 12430 74 15041 453 0 554 27471
Andhra Pradesh Power system Profile
1 GOOTY NPS POWERGRID 2 289.004 578.008 QUAD MOOSE2 HYDERABAD GAJWAL POWERGRID 1 72.8 72.8 TWIN MOOSE3 HYDERABAD KURNOOL POWERGRID 1 226.5 226.5 TWIN MOOSE4 HYDERABAD NAGARJUNASAGAR POWERGRID 2 155.264 310.528 TWIN MOOSE5 KHAMMAM NAGARJUNASAGAR POWERGRID 1 144.577 144.577 TWIN MOOSE6 KHAMMAM VIJAYAWADA POWERGRID 1 114.775 114.775 TWIN MOOSE7 KHAMMAM WARANGAL POWERGRID 1 117.5 117.5 TWIN MOOSE8 KURNOOL GOOTY POWERGRID 1 84.19 84.19 TWIN MOOSE9 MALKARAM HYDERABAD POWERGRID 1 54.06 54.06 TWIN AAAC 10 NAGARJUNASAGAR CUDDAPAH POWERGRID 1 277.325 277.325 TWIN MOOSE11 NAGARJUNASAGAR CUDDAPAH POWERGRID 1 278.664 278.664 TWIN MOOSE12 NAGARJUNASAGAR GOOTY POWERGRID 1 308.437 308.437 TWIN MOOSE13 NAGARJUNASAGAR MEHBOOBNAGAR POWERGRID 1 184.35 184.35 TWIN MOOSE14 NELLORE NPS POWERGRID 1 3.647 3.647 QUAD MOOSE15 RAMAGUNDAM GAJWAL POWERGRID 1 135 135 TWIN MOOSE16 RAMAGUNDAM HYDERABAD POWERGRID 2 201.236 402.472 TWIN MOOSE17 RAMAGUNDAM MALKARAM POWERGRID 1 192.4 192.4 TWIN AAAC 18 RAMAGUNDAM NAGARJUNASAGAR POWERGRID 2 267.2 534.4 TWIN MOOSE19 RAMAGUNDAM WARANGAL POWERGRID 1 98.83 98.83 TWIN MOOSE
20SIMHADRI GAJUWAKA POWERGRID 2 13.23 26.46
TWIN MOOSE
A A A C
21VEMAGIRI SIMHADRI POWERGRID 2 193.33 386.66
TWIN MOOSE
A A A C22 VIJAYAWADA GAJUWAKA POWERGRID 1 316.9 316.9 TWIN MOOSE23 VIJAYAWADA NELLORE POWERGRID 2 340 680 TWIN MOOSE24 VIJAYAWADA VEMAGIRI POWERGRID 2 195.41 390.82 TWIN MOOSE25 N P S MEENAKSHI ENERGY LTD POWERGRID 1 30.689 30.689 QUAD MOOSE26 N P S SIMHAPURI ENERGY LTD POWERGRID 1 30.689 30.689 QUAD MOOSE27 MEENAKSHI ENERGY LTD SIMHAPURI ENERGY LTD POWERGRID 1 0.6 0.6 QUAD MOOSE
1 MALKARAM VTS APTRANSCO 2 130.400 260.8 TWIN MOOSE2 GAJWEL SHANKERPALLY APTRANSCO 2 52.500 105 TWIN MOOSE3 KALPAKKA GAZUWAKA APTRANSCO 2 12.000 24 TWIN MOOSE4 KALPAKKA VEMAGIRI APTRANSCO 2 158.000 316 TWIN MOOSE5 KHAMMAM KALPAKKA APTRANSCO 2 364.000 728 TWIN MOOSE6 KHAMMAM MAMIDAPALLY APTRANSCO 2 198.000 396 TWIN MOOSE7 KRISHNAPATNAM MANUBOLU APTRANSCO 2 18.250 36.5 QUAD MOOSE8 MAMIDIPALLY GHANAPUR APTRANSCO 1 45.000 45 TWIN MOOSE9 RAMAGUNDAM DICHPALLY APTRANSCO 1 148.000 148 TWIN MOOSE10 SIMHADRI KALPAKKA APTRANSCO 4 3.700 14.8 TWIN MOOSE11 SRISAILAM KURNOOL APTRANSCO 1 104.000 104 TWIN MOOSE12 SRISAILAM MAMIDAPALLI APTRANSCO 2 147.000 294 TWIN MOOSE13 SRISAILAM VTPS IV APTRANSCO 2 213.000 426 TWIN MOOSE14 VEMAGIRI GMR APTRANSCO 2 1.760 3.52 TWIN MOOSE15 VEMAGIRI GOUTAMI CCPP APTRANSCO 2 39.000 78 TWIN MOOSE16 VEMAGIRI GVK(JPD) APTRANSCO 2 6.840 13.68 TWIN MOOSE17 VEMAGIRI KONASEEMA APTRANSCO 2 26.010 52.02 TWIN MOOSE18 VIJAYAWADA VEMAGIRI APTRANSCO 1 195.410 195.41 TWIN MOOSE19 VIJAYAWADA VEMAGIRI APTRANSCO 1 196.380 196.38 TWIN MOOSE20 VTPS IV VIJAYAWADA APTRANSCO 2 18.660 37.32 TWIN MOOSE21 WARANGAL BOOPALAPPALLI APTRANSCO 2 45.620 91.24 TWIN MOOSE
3565.67
1 GOOTY RTSS GOOTY RECG STATION APTRANSCO 1 3.522 3.522 ZEBRA
2 GOOTY SW.STATION GOOTY RTSS APTRANSCO 1 3.552 3.552 ZEBRA
3 GACHIBOWLI 400KV SHANKERPALLY APTRANSCO 1 27.500 27.5 Zebra/ACSR
4400KV SHANKERPALLY 220KV YEDDUMAILARAM
APTRANSCO 19.500
9.5Zebra/ACSR
5 ANANTHPUR KALYANADURG APTRANSCO 1 63.000 63 MOOSE6 AP CARBIDES KURNOOL 400 KV SS APTRANSCO 2 15.070 30.14 ZEBRA/MOOSE8 BHEEMGANAPUR GANGARAM APTRANSCO 1 42.340 42.34 MOOSE9 BHIMADOLE NIDADAVOLU APTRANSCO 2 64.500 129 ZEBRA
11 BHIMAVARAM GUDIWADA APTRANSCO 2 59.700 119.4 ZEBRA13 BOMMUR JEGRUPADU APTRANSCO 1 8.200 8.2 ZEBRA14 BOMMUR LOWER SILERU APTRANSCO 1 107.670 107.67 ZEBRA15 BOMMUR PD PURAM(SAMALKOT) APTRANSCO 1 35.760 35.76 ZEBRA16 BOMMUR R C VARAM APTRANSCO 1 67.660 67.66 ZEBRA17 BOMMUR VEMAGIRI APTRANSCO 2 3.830 7.66 ZEBRA19 BOMMUR VIJJESWARAM I APTRANSCO 1 12.040 12.04 ZEBRA20 BOMMUR VIJJESWARAM II APTRANSCO 1 26.090 26.09 ZEBRA21 CHALAKURTHY KONDAMALLEPALLY APTRANSCO 1 45.000 45 MOOSE22 CHELLKURTHY K M PALLY APTRANSCO 1 40.460 40.46 ZEBRA23 CHILLAKALLU NARKETPALLY APTRANSCO 2 231.180 462.36 MOOSE25 CHITTOOR CHITTOOR 400 KV SS APTRANSCO 2 16.710 33.42 ZEBRA27 CHITTOOR KALKIRI APTRANSCO 1 64.000 64 ZEBRA28 CHITTOOR NAGARI APTRANSCO 1 95.490 95.49 Moose + Zebra29 CHITTOOR 400 KV PALAMANERU APTRANSCO 1 58.000 58 MOOSE30 DHONE KAMBALAPADU APTRANSCO 1 12.100 12.1 MOOSE31 DHONE KRISHNAGIRI APTRANSCO 1 11.180 11.18 MOOSE32 DHONE SOMAYAJULAPPALLY APTRANSCO 2 41.880 83.76 MOOSE34 DICHPALLY BHEEMGAL APTRANSCO 1 27.100 27.1 ZEBRA35 DICHPALLY 400 KV SS DICHPALLI APTRANSCO 2 3.990 7.98 ZEBRA37 DINDI CHANDRAYANGUTTA APTRANSCO 2 90.370 180.74 ZEBRA39 DONKARAI LOWER SILERU APTRANSCO 1 19.000 19 ZEBRA40 DONKARAI UPPER SILERU APTRANSCO 1 28.300 28.3 ZEBRA41 GACHIBOWLI SHAPOORNAGAR APTRANSCO 2 15.490 30.98 ZEBRA43 GACHIBOWLI SHAPOORNAGAR APTRANSCO 2 22.010 44.02 ZEBRA45 GACHIBOWLI SIVARAMPALLI APTRANSCO 2 14.000 28 ZEBRA47 GACHIBOWLI TANDUR APTRANSCO 1 90.900 90.9 ZEBRA48 GACHIBOWLI YEDDUMAILARAM APTRANSCO 1 25.720 25.72 ZEBRA49 GAJWEL KAMAREDDY APTRANSCO 2 67.000 134 ZEBRA51 GAJWEL MINPUR APTRANSCO 2 43.135 86.27 Zebra53 GARIVIDI TEKKALI APTRANSCO 1 89.230 89.23 MOOSE54 GAZUWAKA GPL (GNGVM PORT) APTRANSCO 1 6.400 6.4 ZEBRA55 GAZUWAKA 400 KV SS GPL (GNGVM PORT) APTRANSCO 1 9.180 9.18 ZEBRA56 GAZUWAKA 400 KV SS PARAWADA APTRANSCO 1 5.590 5.59 ZEBRA57 GOOTY DHONE APTRANSCO 2 93.400 186.8 MOOSE59 GOOTY REGULAPADU APTRANSCO 1 57.380 57.38 MOOSE60 GOOTY 400 KV SS ANANTAPUR APTRANSCO 1 57.420 57.42 ZEBRA61 GOOTY 400 KV SS GOOTY APTRANSCO 2 4.760 9.52 ZEBRA63 HIAL CHANDRAYANGUTTA APTRANSCO 1 18.710 18.71 ZEBRA64 HIAL SIVARAMPALLI APTRANSCO 1 15.200 15.2 ZEBRA65 HINDUPUR GOOTY 400 KV SS APTRANSCO 1 155.550 155.55 ZEBRA66 HINDUPUR RAMAGIRI APTRANSCO 1 57.610 57.61 ZEBRA67 HWP MANUGURU APTRANSCO 2 8.110 16.22 ZEBRA69 JEGRUPADU NIDADAVOLU APTRANSCO 1 23.490 23.49 ZEBRA
70 JURALA SS JURALA POWER HOUSE APTRANSCO 2 1.850 3.7 MOOSE
72 KADAPA CHINAKAMPALLI APTRANSCO 1 14.160 14.16 ZEBRA73 KAKINADA BOMMUR APTRANSCO 1 63.160 63.16 ZEBRA74 KAKINADA GAZUWAKA(SW STN) APTRANSCO 1 181.360 181.36 ZEBRA75 KAKINADA SPECTRUM APTRANSCO 2 9.820 19.64 ZEBRA77 KALKIRI CHINAKAMPALLI APTRANSCO 1 84.400 84.4 ZEBRA78 KALPAKA D FARM APTRANSCO 2 51.890 103.78 ZEBRA80 KALPAKA GAZUWAKA 400 KV SS APTRANSCO 2 3.390 6.78 ZEBRA82 KALPAKKA BRANDIX APTRANSCO 1 19.060 19.06 MOOSE83 KALPAKKA BRANDIX APTRANSCO 1 20.180 20.18 MOOSE84 KALWAKURTHY BHOOTPUR APTRANSCO 2 51.340 102.68 ZEBRA86 KALWAKURTHY DINDI APTRANSCO 2 23.910 47.82 ZEBRA88 KAMAVARAPUKOTA VIJJESWARAM II APTRANSCO 1 78.850 78.85 ZEBRA89 KAMBALAPADU LAKKASAGARAM APTRANSCO 1 9.300 9.3 MOOSE90 KHAMMAM BHONGIRI APTRANSCO 1 154.540 154.54 ZEBRA91 KHAMMAM (BDMPD) W.K PALLI APTRANSCO 1 82.300 82.3 ZEBRA92 KODUR RAJAMPET APTRANSCO 1 36.680 36.68 ZEBRA93 KRISHNAGIRI SETTIPALLY APTRANSCO 1 10.500 10.5 MOOSE94 KTPS LOWER SILERU APTRANSCO 2 114.670 229.34 DEER & ZEBRA96 KTPS MANUGURU APTRANSCO 1 43.500 43.5 ZEBRA97 KTPS MIRYALAGUDA APTRANSCO 1 170.820 170.82 DEER98 KTPS NUNNA APTRANSCO 1 120.000 120 ZEBRA99 KTPS SHAPOORNAGAR APTRANSCO 1 246.230 246.23 ZEBRA
100 KTPS V KHAMMAM APTRANSCO 2 68.230 136.46 TWIN MOOSE102 KTPS V KTPS APTRANSCO 2 1.190 2.38 ZEBRA104 KTPS V MANUGURU APTRANSCO 1 42.440 42.44 ZEBRA105 KTPS V SITARAMAPATNAM APTRANSCO 2 5.190 10.38 ZEBRA108 MALAYALAPALLI BHEEMGAL APTRANSCO 1 122.400 122.4 ZEBRA109 MALAYALAPALLI DICHPALLI APTRANSCO 1 147.400 147.4 ZEBRA110 MALAYALAPALLI DURSHED APTRANSCO 2 51.200 102.4 ZEBRA112 MALAYALAPALLI JAGATYAL APTRANSCO 1 67.690 67.69 ZEBRA113 MALAYALAPALLI NAGARAM APTRANSCO 1 78.630 78.63 ZEBRA114 MALAYALAPALLI NIRMAL APTRANSCO 1 137.000 137 ZEBRA115 MALAYALAPALLI RAMAGUNDAM APTRANSCO 2 1.100 2.2 ZEBRA117 MALAYALAPALLI RAMAGUNDAM APTRANSCO 1 1.050 1.05 ZEBRA118 MALKARAM BHONGIRI APTRANSCO 2 32.730 65.46 ZEBRA120 MALKARAM GHANAPUR APTRANSCO 2 16.020 32.04 ZEBRA122 MALKARAM GUNROCK APTRANSCO 2 8.024 16.047 XLPE-UGCable124 MALKARAM MEDCHAL APTRANSCO 2 14.000 28 ZEBRA126 MALKARAM MOULALI APTRANSCO 2 9.250 18.5 ZEBRA128 MALKARAM SHAPOORNAGAR APTRANSCO 2 21.380 42.76 ZEBRA130 MALYALA BRAHMANAKOTKUR APTRANSCO 2 10.570 21.14 MOOSE132 MAMIDIPALLY CHANDRAYANGUTTA APTRANSCO 1 22.000 22 ZEBRA133 MAMIDIPALLY HIAL APTRANSCO 1 15.000 15 ZEBRA134 MAMIDIPALLY SIVARAMPALLI APTRANSCO 1 13.100 13.1 ZEBRA135 MARKAPUR PODILI APTRANSCO 1 67.390 67.39 ZEBRA136 MEDARAM DICHPALLY APTRANSCO 1 128.110 128.11 ZEBRA137 MEDCHAL GAJWEL APTRANSCO 2 37.295 74.59 ZEBRA
139MEHBOOBNAGAR 400 KV SS BHOOTPUR
APTRANSCO 232.800
65.6ZEBRA
141MEHBOOBNAGAR 400 KV SS JURALA SS
APTRANSCO 230.280
60.56MOOSE
143MEHBOOBNAGAR 400 KV SS WANAPARTHY
APTRANSCO 219.900
39.8MOOSE
145 MIRIYALAGUDA CHELLAKURTHY APTRANSCO 1 51.460 51.46 ZEBRA146 MIRIYALAGUDA KHAMMAM 400 KV APTRANSCO 1 100.000 100 ZEBRA147 MIRYALAGUDA KHAMMAM 400 KV APTRANSCO 1 99.090 99.09 MOOSE148 MUDDANUR CHINAKAMPALLI APTRANSCO 2 57.310 114.62 ZEBRA150 MUDDANUR YERRAGUNTLA APTRANSCO 2 2.540 5.08 ZEBRA152 MUDDANUR (RTPP) ANANTAPUR APTRANSCO 2 97.830 195.66 ZEBRA154 MYDUKUR KADAPA APTRANSCO 1 31.230 31.23 ZEBRA155 NAGARAM WARANGAL APTRANSCO 1 13.780 13.78 ZEBRA156 NAGARJUNASAGAR CHELLAKURTHY APTRANSCO 1 14.240 14.24 ZEBRA157 NANOOR BRAHMANAKOTKUR APTRANSCO 1 23.180 23.18 MOOSE158 NANSURALLA LAKKASAGARAM APTRANSCO 1 6.850 6.85 MOOSE159 NARASARAOPET PODILI APTRANSCO 1 85.237 85.237 MOOSE160 NARNOOL SOMAYAJULAPALLY APTRANSCO 1 21.970 21.97 ZEBRA161 NELLORE NELLORE 400 KV SS APTRANSCO 2 29.000 58 ZEBRA163 NELLORE NELLORE 400 KV SS APTRANSCO 1 28.540 28.54 ZEBRA
164NELLORE 400 KV SS(MNBL) RENIGUNTA
APTRANSCO 2105.000
210ZEBRA
166NELLORE 400 KV SS(MNBL) SULURPET
APTRANSCO 183.660
83.66ZEBRA
167 NUNNA GUDIWADA APTRANSCO 2 42.520 85.04 ZEBRA169 NUNNA GUNADALA APTRANSCO 1 8.000 8 ZEBRA170 ONGOLE NELLORE APTRANSCO 1 126.980 126.98 ZEBRA171 ONGOLE PARACHUR APTRANSCO 1 62.060 62.06 ZEBRA+MOOSE172 PARAWADA PDPURAM(SAMALKOTA) APTRANSCO 1 158.350 158.35 ZEBRA173 PENDURTHI D FARM APTRANSCO 1 14.840 14.84 ZEBRA174 PENDURTHI GARVIDI APTRANSCO 1 66.000 66 ZEBRA175 PENDURTHI GARVIDI APTRANSCO 1 63.570 63.57 ZEBRA176 PENDURTHI GAZUWAKA 400 KV SS APTRANSCO 2 31.200 62.4 ZEBRA178 PENDURTHI UPPER SILERU APTRANSCO 1 162.980 162.98 ZEBRA179 PENDURTHY DAIRY FARM APTRANSCO 1 14.870 14.87 MOOSE180 PODILI NELLORE APTRANSCO 2 167.000 334 ZEBRA182 PODILI ONGOLE APTRANSCO 2 33.500 67 ZEBRA184 PULAKURTHY BHIMGHANAPUR APTRANSCO 1 65.000 65 MOOSE185 PULAKURTHY NAGARAM APTRANSCO 1 8.780 8.78 ZEBRA186 PULAKURTHY NAGARAM APTRANSCO 1 8.100 8.1 ZEBRA187 PULAKURTHY SALIVAGU APTRANSCO 1 12.520 12.52 MOOSE188 PUTTANGADI CHELLAKURTHY APTRANSCO 1 18.630 18.63 ZEBRA189 R T P P PULIVENDULA APTRANSCO 2 42.430 84.86 MOOSE191 RAJAMPET CHINAKAMPALLI APTRANSCO 1 56.000 56 ZEBRA192 RAMAGIRI ANANTAPUR APTRANSCO 1 62.950 62.95 ZEBRA193 RAMAGUNDAM BELLAMPALLY APTRANSCO 1 37.000 37 MOOSE194 RAMAGUNDAM MEDARAM APTRANSCO 1 36.010 36.01 ZEBRA195 RAMAGUNDAM VEMNUR APTRANSCO 1 26.540 26.54 ZEBRA196 RENIGUNTA CHINAKAMPALLI APTRANSCO 1 130.270 130.27 ZEBRA197 RENIGUNTA CHITTOOR 400 KV SS APTRANSCO 2 81.590 163.18 ZEBRA199 RENIGUNTA KODUR APTRANSCO 1 59.630 59.63 ZEBRA200 RENIGUNTA NAGARI APTRANSCO 1 71.860 71.86 ZEBRA201 RENTACHINTALA TALLAPALLY APTRANSCO 1 18.380 18.38 ZEBRA202 RTPP THIMMAPURAM APTRANSCO 2 24.150 48.3 Zebra + Moose204 SHAADNAGAR MAMIDIPALLY APTRANSCO 1 42.450 42.45 ZEBRA205 SHAMSHABAD MAMIDIPALLY APTRANSCO 1 13.020 13.02 ZEBRA206 SIDDIPET DURSHED APTRANSCO 2 66.590 133.18 ZEBRA208 SOMAYAJULAPALLY GOOTY 400 KV SS APTRANSCO 2 74.920 149.84 ZEBRA210 SOMAYAJULAPALLY KURNOOL 400 KV SS APTRANSCO 2 21.942 43.884 ZEBRA/MOOSE212 SOMAYAJULAPALLY NANDYAL APTRANSCO 1 35.420 35.42 ZEBRA213 SRISAILAM DINDI APTRANSCO 2 80.300 160.6 ZEBRA215 SRISAILAM MARKAPUR APTRANSCO 1 74.120 74.12 ZEBRA216 SRISAILAM MYDUKUR APTRANSCO 1 165.960 165.96 DEER217 SRISAILAM NAGARJUNASAGAR APTRANSCO 1 82.080 82.08 ZEBRA218 SRISAILAM PODILI APTRANSCO 1 116.500 116.5 ZEBRA219 SRISAILAM SOMAYAJULAPALLY APTRANSCO 2 102.250 204.5 ZEBRA221 SRISAILAM TALLAPALLY APTRANSCO 2 100.000 200 ZEBRA223 TADIKONDA PARACHUR APTRANSCO 1 58.260 58.26 ZEBRA+MOOSE224 TALAPALLY CHELLAKURTHY APTRANSCO 1 33.760 33.76 ZEBRA225 TALAPALLY NAGARJUNASAGAR APTRANSCO 3 12.300 36.9 ZEBRA228 THIMMAPURAM ANANTHAPUR APTRANSCO 2 22.150 44.3 Zebra + Moose230 THIMMAPURAM KONDAPURAM APTRANSCO 2 10.200 20.4 MOOSE232 V S S M R S (VIZAG) APTRANSCO 2 5.860 11.72 TWIN MOOSE234 V T S TALAPALLY APTRANSCO 1 265.840 265.84 ZEBRA235 VEMAGIRI BHIMAVARAM APTRANSCO 2 62.600 125.2 ZEBRA
237 VEMAGIRI PD PURAM(SAMALKOTA) APTRANSCO 2 40.860 81.72 ZEBRA
239 VEMAGIRI VIJJESWARAM II APTRANSCO 1 15.560 15.56 ZEBRA240 VEMNUR NIRMAL APTRANSCO 1 110.640 110.64 Zebra241 VIJJESWARAM I BHIMADOLU APTRANSCO 1 54.620 54.62 ZEBRA242 VIJJESWARAM II NIDADAVOLU APTRANSCO 1 5.800 5.8 ZEBRA243 VSP GAZUWAKA 400 KV SS APTRANSCO 2 6.500 13 ZEBRA245 VTS CHILLAKALLU APTRANSCO 2 66.400 132.8 MOOSE247 VTS GUNADALA APTRANSCO 1 18.110 18.11 ZEBRA248 VTS KAMAVARAPUKOTA APTRANSCO 1 105.460 105.46 ZEBRA249 VTS KONDAPALLI APTRANSCO 2 6.100 12.2 ZEBRA251 VTS NARASARAOPET APTRANSCO 1 68 108 68 108 MOOSE
7(b) Details of Transmission Network
CENTRAL SECTOR
S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in
CKMsType of Conductor
400 kV
Total 5981APTRANSCO
S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in
CKMsType of Conductor
400 kV
Total220 kV
251 VTS NARASARAOPET APTRANSCO 1 68.108 68.108 MOOSE252 VTS NUNNA APTRANSCO 1 17.000 17 ZEBRA253 VTS PODILI APTRANSCO 1 147.000 147 MOOSE254 VTS RENTACHINTALA APTRANSCO 1 117.780 117.78 ZEBRA255 VTS TADIKONDA APTRANSCO 1 24.500 24.5 ZEBRA256 VTS TADIKONDA APTRANSCO 1 23.760 23.76 ZEBRA257 W.K PALLI BHONGIRI APTRANSCO 1 86.270 86.27 ZEBRA258 WANAPARTHY BRAHMANAKOTKUR APTRANSCO 1 97.560 97.56 MOOSE259 WANAPARTHY REGUMANAGADDA APTRANSCO 1 43.080 43.08 ZEBRA260 WARANGAL KHAMMAM APTRANSCO 2 113.760 227.52 ZEBRA262 WARANGAL 400 KV NAGARAM APTRANSCO 2 6.300 12.6 ZEBRA264 YEDDUMAILARAM SHAADNAGAR APTRANSCO 1 54.500 54.5 ZEBRA265 YEDDUMAILARAM SHAMSHABAD APTRANSCO 1 49.700 49.7 ZEBRA
13233.341
1 LANCO VIJAYAW ADA LANCO 2 19.00 38.00 TW INMOOSE
S.No Substation Feeder Name
1 132KV ANANDAPURAM 132KV ANANDAPURAM ‐ DIVIS LABORATORIES
2 132KV PAYAKARAOPETA 132KV PAYAKARAOPET ‐ PEDDAPURAM
3 132KV PAYAKARAOPETA ‐ TUNI RLY TRACTION
4 132KV NAKKAVANIPALEM 132KV NAKKAVANIPALEM ‐ PORT SS
5 132KV NAWALWARF 132KV NAWALWARF ‐ APCL
6 132KV NAWALWARF ‐ COMMON POINT
7 132KV NAWALWARF ‐ DGNP CKT 1
8 132KV NAWALWARF ‐ DGNP CKT 2
9 132KV NAWALWARF ‐ DGNP SS
10 132KV NAWALWARF ‐ HPCL CKT 1
11 132KV NAWALWARF ‐ HPCL CKT 2
12 132KV NAWALWARF ‐ HSL
13 132KV NAWALWARF ‐ RCL
14 132KV NAWALWARF ‐ESSAR
15 132KV KORUPROLU 132KV KORUPROLU ‐ MY HOME CEMENTS
16 132KV KORUPROLU ‐ NARSIPATNAM
17 132KV KORUPROLU ‐ PAYAKARAOPET
18 132KV TYDA 132KV TYDA ‐ SIMILIGUDA RLY TRACTION CKT 1
19 132KV TYDA ‐ SIMILIGUDA RLY TRACTION CKT 2
20 132KV RCL 132KV RCL ‐ ESSAR
21 132KV RCL SS ‐ ESSAR
22 132KV VSEZ 132KV VSEZ ‐ RAILWAY TRACTION
23 132KV SIMHACHALAM 132KV SIMHACHALAM ‐ ANDHRA CEMENTS
24 132KV SIMHACHALAM ‐ COMMON POINT
25 132KV SIMHACHALAM ‐ NAKKAVANIPALEM
26 132KV SIMHACHALAM ‐ RAILWAY TRACTION CKT 1
27 132KV SIMHACHALAM ‐ RAILWAY TRACTION CKT 2
28 132KV KASIMKOTA 132KV KASIMKOTA ‐ ANAKAPALLI RLY TRACTION
29 132KV PORT 132KV PORT SS ‐ CIRCUIT 1
30 132KV PORT SS ‐ CIRCUIT 2
31 132KV PORT SS ‐ DGNP SS
32 220KV GAJUWAKA 132KV GAJUWAKA ‐ CFL CKT 1
33 132KV GAJUWAKA ‐ CFL CKT 2
34 132KV GAJUWAKA ‐ HINDUSTAN ZINC LTD CKT 1
35 132KV GAJUWAKA ‐ HINDUSTAN ZINC LTD CKT 2
36 132KV GAJUWAKA ‐ NAWALRAF CKT 1
37 132KV GAJUWAKA ‐ NAWALRAF CKT 2
38 132KV GAJUWAKA ‐ SIMHACHALAM CKT 1
39 132KV GAJUWAKA ‐ SIMHACHALAM CKT 2
40 132KV GAJUWAKA ‐ VSEZ
41 132KV ARAKU 132KV ARAKU ‐ GORAPUR RLY TRACTION CKT 1
42 132KV ARAKU ‐ GORAPUR RLY TRACTION CKT 2
43 132KV ARAKU ‐ MACHKUND CKT 1
44 132KV ARAKU ‐ MACHKUND CKT 2
45 132KV ARAKU ‐ TYDA CKT 1
46 132KV ARAKU ‐ TYDA CKT 2
47 220KV BRANDIX 132KV BRANDIX ‐ ANJENEYA ALLOYS CKT 1
48 132KV BRANDIX ‐ ANJENEYA ALLOYS CKT 2
49 132KV BRANDIX ‐ PEDDAPURAM
50 132KV DGNP 132KV DGNP ‐ PORT
51 132KV DGNP ‐ SBC
52 220KV PARAWADA 132KV PARAWADA ‐ KORUPROLU
53 132KV PARAWADA ‐ SILK ROAD SUGARS SW STN
54 220KV PENDURTHI 132KV PENDURTHI ‐ ANANDAPURAM
55 132KV PENDURTHI ‐ DECCAN FERROW ALLOYS
56 132KV PENDURTHI ‐ GOLD STAR
57 132KV PENDURTHI ‐ JINDAL
58 132KV PENDURTHI ‐ KASIMKOTA CKT 1
59 132KV PENDURTHI ‐ KASIMKOTA CKT 2
60 132KV PENDURTHI ‐ KOTHAVALASA
61 132KV PENDURTHI ‐ LVS
62 132KV PENDURTHI ‐ SIMHACHALAM CKT 1
63 132KV PENDURTHI ‐ SIMHACHALAM CKT 2
1
132KV SILK ROAD SUGARS SWITCHING
STATION 132KV SILK ROAD SUGARS ‐ CIL
2 220KV KAKINADA 132KV KAKINADA ‐ NFCL
3 132KV KAKINADA ‐ PEDDAPURAM CKT 2
4 132KV KAKINADA ‐ R C PURAM
5 132KV KAKINADA ‐ SILK ROAD SUGARS
6 132KV KAKINADA ‐ YANAM
7 132KV MALLAYYAPETA 132KV MALLAIAHPETA ‐ APP MILLS
8 132KV RAJANAGARAM 132KV RAJANAGARAM ‐ PEDDAPURAM
9 132KV RAMACHANDRAPURAM 132KV RAMACHANDRAPURAM ‐ AMALAPURAM
10 132KV RAMACHANDRAPURAM ‐ SRI SARVARAYA SUGARS
11
220KV SAMALKOTA SWITCHING STN
(SSS) 132KV SAMALKOTA ‐ RLY TRACTION
12 220KV BOMMURU 132KV BOMMURU ‐ MALLAIAHPETA CKT 1
13 132KV BOMMURU ‐ MALLAIAHPETA CKT 2
14 132KV BOMMURU ‐ NIDADAVOLE CKT 1
15 132KV BOMMURU ‐ NIDADAVOLE CKT 2
16 132KV BOMMURU ‐ PEDDAPURAM
17 132KV BOMMURU ‐ RAILWAY TRACTION
18 132KV BOMMURU ‐ RAJANAGARAM
19 132KV BOMMURU ‐ RVK
20 132KV RAZOLE 132KV RAZOLE ‐ SRI VATHSA
21 132KV PRATHIPADU 132KV PRATHIPADU ‐ NVBL
22 132KV PEDDAPURAM 132KV PEDDAPURAM ‐ BRANDEX
23 132KV PEDDAPURAM ‐ PAYAKARAO PET CKT 1
24 132KV PEDDAPURAM ‐ PAYAKARAO PET CKT 2
25 132KV PEDDAPURAM ‐ PRATHIPADU CKT 1
26 132KV PEDDAPURAM ‐ PRATHIPADU CKT 2
27 132KV AMALAPURAM 132KV AMALAPURAM ‐ RAZOLE
28 132KV RVK SWICHING STATION 132KV RVK SS ‐ EDITHA
29 132KV EDITHA 132KV EDITHA ‐ RAMACHANDRAPURAM
1 132KV PEDATADEPALLI 132KV PEDA TADEPALLI ‐ NIDADAVOLU
2 132KV PEDATADEPALLY ‐ RAILWAY TRACTION
3 132KV BHIMAVARAM 132KV BHIMAVARAM ‐ NARASAPURAM
4 132KV NARASAPURAM 132KV NARASAPURAM ‐ RAZOLE
5 132KV ELURU 132KV ELURU ‐ KANUMOLU
6 132KV ELURU ‐ PEDAVEGI
7 132KV ELURU ‐ RAILWAY TRACTION
8 132KV NALLAJERAL 132KV NALLAJERLA ‐ VRK SUGARS
9 132KV SAGGONDA 132KV SAGGONDA‐ANDHRA SUGARS
10 220KV BHIMADOLU 132KV BHIMADOLE ‐ PEDATADEPALLI
11 132KV BHIMADOLU ‐ KAMAVARAPUKOTA
12 132KV BHIMADOLU ‐ KANUMOLU
13 132KV BHIMADOLU ‐ NIDADAVOLE
14 132KV BHIMADOLU ‐ PEDAVEGI
15 132KV KOVVURU 132KV KOVVURU ‐ ANDHRA SUGARS
16 132KV KOVVURU ‐ SAGGONDA
17 220KV NIDADAVOLU 132KV NIDADAVOLU ‐ KOVVURU CKT 1
18 132KV NIDADAVOLU ‐ KOVVURU CKT 2
19 132KV NIDADAVOLU ‐ NALLAJERLA
20 132KV NIDADAVOLU ‐ NIDADAVOLU TIE 1
21 132KV NIDADAVOLU ‐ NIDADAVOLU TIE 2
22 220KV KAMAVARAPUKOTA 132KV KAMAVARAPUKOTA ‐ ASWARAOPETA CKT 1
23 132KV KAMAVARAPUKOTA ‐ ASWARAOPETA CKT 2
24 132KV KAMAVARAPUKOTA ‐ CHINTALAPUDI
25 132KV KAMAVARAPUKOTA ‐ JANGAREDDYGUDEM CKT 1
26 132KV KAMAVARAPUKOTA ‐ JANGAREDDYGUDEM S.CKT
27 132KV KAMAVARAPUKOTA ‐ NALLAJERLA
1 132KV TENALI 132KV TENALI ‐ RAILWAY TRACTION ‐ 1
2 132KV TENALI ‐ RAILWAY TRACTION ‐ 2
3 132KV TENALI ‐ REPALLE
4 132KV CHILAKALURIPET 132KV CHILAKALURIPET ‐ MARRIPALEM
5 132KV CHILAKALURIPET ‐ NALLAPADU
6 132KV CHILAKALURIPET ‐ VINUKONDA
7 220KV RENTACHINTALA 132KV PARASAKTHI CEMENTS
8 132KV RENTACHINTALA ‐ MACHERLA
9 220KV TADIKONDA 132KV TADIKONDA ‐ GUJJANAGULLA
10 132KV TADIKONDA ‐ GUNTUR 1
11 132KV TADIKONDA ‐ GUNTUR 2
12 132KV TADIKONDA ‐ MARRIPALEM
13 132KV TADIKONDA ‐ NALLAPADU
14 132KV TADIKONDA ‐ RENTAPALLA
15 132KV TADIKONDA ‐ TADEPALLY
16 132KV TANGEDA 132KV TANGEDA ‐ WADAPALLI
17 132KV GUNTUR 132KV GUNTUR ‐ BAPATLA
18 132KV GUNTUR ‐ TENALI CKT 1
19 132KV GUNTUR ‐ TENALI CKT 2
20 220KV NARASARAOPET 132KV NARASARAOPET ‐ CHILAKALURIPET CKT 1
21 132KV NARASARAOPET ‐ CHILAKALURIPET CKT 2
22 132KV MACHERLA 132KV MACHERLA ‐ KARAMPUDI
23 132KV MACHERLA ‐ KCP CEMENTS
24 132KV MACHERLA ‐ NSRCPH
25 132KV PIDUGURALLA 132KV PIDUGURALLA ‐ KARAMPUDI
26 132KV PIDUGURALLA ‐ RENTAPALLA
27 132KV PIDUGURALLA ‐ TANGEDA
28 132KV PIDUGURALLA ‐ WADAPALLI
29 132KV TADEPALLI 132KV TADEPALLI ‐ GUNTUR
30 132KV TADEPALLI ‐ RAILWAY TRACTION I
31 132KV TADEPALLI ‐ RAILWAY TRACTION II
32 132KV BAPATLA 132KV BAPATLA ‐ RAILWAY TRACTION ‐ 1
33 132KV BAPATLA ‐ RAILWAY TRACTION ‐ 2
34 132KV BAPATLA ‐ REPALLE
1 132KV KANDUKUR 132KV KANDUKUR ‐ KAVALI
2 132KV ONGOLE TOWN 132KV ONGOLE ‐ INKOLLU
3 132KV MEDARAMETLA 132KV MEDARAMETLA ‐ TEAMAC
4 132KV MEDARMETLA ‐ ADDANKI
5 132KV CUMBUM 132KV CUMBUM ‐ GIDDALUR
6 132KV CUMBUM ‐ YERRAGONDAPALEM
7 132KV PEDADORNALA 132KV PEDADORNALA ‐ SRISAILAM
8 132KV PEDADORNALA ‐ YERRAGONDAPALEM
9 132KV KANIGIRI 132KV KANIGIRI ‐ PAMURU
10 220KV ONGOLE 132KV ONGOLE ‐ KANDUKUR
11 132KV ONGOLE ‐ KANIGIRI
12 132KV ONGOLE ‐ MEDARMETLA
13 132KV ONGOLE ‐ ONGOLE
14 132KV ONGOLE ‐ RAILWAY TRACTION CKT 1
15 132KV ONGOLE ‐ RAILWAY TRACTION CKT 2
16 132KV ONGOLE ‐ TANGUTUR
17 132KV TANGUTUR 132KV TANGUTURU ‐ AGRIGOLD
18 220KV PARCHURU 132KV PARCHURU ‐ BAPATLA
19 132KV PARCHURU ‐ CHILAKALURIPET
20 132KV PARCHURU ‐ CHIRALA
21 132KV PARCHURU ‐ INKOLLU
22 132KV PARCHURU ‐ MARTUR
23 220KV MARKAPUR 132KV MARKAPUR ‐ CUMBUM
1 132KV NTS KOVUR 132KV NTS ‐ ALLURU
2 132KV NTS ‐ N V GARDENS
3 132KV NTS ‐ RAILWAY TRACTION CKT 1
4 132KV NTS ‐ RAILWAY TRACTION CKT 2
5 132KV GUDUR 132KV GUDUR ‐ NAIDUPET
6 132KV GUDUR ‐ RAILWAY TRACTION CKT 1
7 132KV GUDUR ‐ RAILWAY TRACTION CKT 2
8 220KV NELLORE 132KV NELLORE ‐ ADURUPALLI
9 132KV NELLORE ‐ ATMAKUR
10 132KV NELLORE ‐ BRAMHADEVAM
11 132KV NELLORE ‐ N V GARDENS
12 132KV NELLORE ‐ NTS
13 132KV NAIDUPETA 132KV NAIDUPETA ‐ EMPEE SUGAR CKT 2
14 132KV NAIDUPETA ‐ EMPEE SUGARS CKT 1
15 132KV NAIDUPETA ‐ MJ STEELS CKT 1
16 132KV NAIDUPETA ‐ MJ STEELS CKT 2
17 132KV NAIDUPETA ‐ VIKKI IND CKT 1
18 132KV NAIDUPETA ‐ VIKKI IND CKT 2
19 132KV ALLURU 132KV ALLURU ‐ KAVALI
20 400KV MANUBOLU 132KV MANUBOLU ‐ CHENDODU
21 132KV MANUBOLU ‐ GUDUR CKT 1
22 132KV MANUBOLU ‐ GUDUR CKT 2
23 132KV MANUBOLU ‐ NELLORE
24 132KV MANUBOLU ‐ SBQ STEELS
25 132KV VENKATAGIRI 132KV VENKATAGIRI ‐ RAILWAY TRACTION
26 132KV VENKATAGIRI ‐ RAILWAY TRACTION CKT 2
27 132KV VENKATAGIRI ‐ SRIKALAHASTHI
28 132KV BRAHMDEVAM 132KV BRAMHADEVAM ‐ KRISHNAPATNAM PORT
29 132KV BRAMHADEVAM ‐ NIDUGUNTAPALEM
30 132KV KAVALI 132KV KAVALI ‐ RAILWAY TRACTION CKT 1
31 132KV KAVALI ‐ RAILWAY TRACTION CKT 2
Total
Total 22780Private
S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in
CKMs
Source: SRLDC List of Important Elements
http://www.srldc.org/DownloadDocuments.aspx
132 kV
Type of Conductor
400 kV
Total 38
Grand Total 22818
Andhra Pradesh Power system Profile
S.No From To Owner Utility No. of Circuit Line Length in CKMsTotal Length in
CKMsType of Conductor
32 132KV ATMAKUR 132KV ATMAKUR ‐ BADVEL
33 132KV ATMAKUR ‐ UDAYAGIRI
34 220KV SULLURPETA 132KV SULLURUPETA ‐ NAIDUPET
35 132KV SULLURUPETA ‐ RAILWAY TRACTION CKT 1
36 132KV SULLURUPETA ‐ RAILWAY TRACTION CKT 2
37 132KV SULLURUPETA ‐ S H A R
38 132KV SULLURUPETA ‐ SRIKALAHASTI
1 132KV PUTTUR 132KV PUTTUR ‐ NAGARI
2 132KV PUTTUR ‐ RAILWAY TRACTION CKT 1
3 132KV PUTTUR ‐ RAILWAY TRACTION CKT 2
4 132KV NAGARI 132KV NAGARI ‐ K.P. MITTA
5 132KV NAGARI ‐ NAGALAPURAM
6 132KV K.P.MITTA 132KV K.P.MITTA ‐ PAKALA
7 132KV K.P.MITTA ‐ SAGAR SUGARS
8 220KV KALIKIRI 132KV KALIKIRI ‐ GURRAMKONDA
9 132KV KALIKIRI ‐ MADANAPALLI CKT 1
10 132KV KALIKIRI ‐ MADANAPALLI CKT 2
11 132KV KALIKIRI ‐ ROMPICHARLA
12 132KV KALIKIRI ‐ SOMALA
13 132KV PAKALA 132KV PAKALA ‐ RAILWAY TRACTION
14 132KV PAKALA ‐ ROMPICHERLA
15 220KV CHITTOOR 132KV CHITTOOR ‐ PAKALA
16 132KV CHITTOOR ‐ PALAMANERU CKT 1
17 132KV CHITTOR‐IRALA
18 132KV IRALA 132KV IRALA ‐ SOMALA
19 220KV RENIGUNTA 132KV RENIGUNTA ‐ AMARA RAJA BATTERY LTD
20 132KV RENIGUNTA ‐ CHANDRAGIRI CKT 1
21 132KV RENIGUNTA ‐ CHANDRAGIRI CKT 2
22 132KV RENIGUNTA ‐ G W NORTON
23 132KV RENIGUNTA ‐ PUTTUR CKT 1
24 132KV RENIGUNTA ‐ PUTTUR CKT 2
25 132KV RENIGUNTA ‐ RAILWAY TRACTION CKT 1
26 132KV RENIGUNTA ‐ RAILWAY TRACTION CKT 2
27 132KV RENIGUNTA ‐ SRIKALAHASTHI
28 132KV RENIGUNTA ‐ TIRUPATHI
29 132KV SANTHIPURAM 132KV SANTHIPURAM ‐ KUPPAM CKT 1
30 132KV SANTHIPURAM ‐ KUPPAM CKT 2
31 132KV CHANDRAGIRI 132KV CHANDRAGIRI ‐ TIRUMALA CKT 1
32 132KV CHANDRAGIRI ‐ TIRUMALA CKT 2
33 132KV SRIKALAHASTI 132KV SRIKALAHASTHI ‐ VENKATAGIRI
34 132KV PUNGANUR 132KV PUNGANUR ‐ MADANAPALLY
35 132KV TIRUPATI 132KV TIRUPATHI ‐ K.P. MITTA
36 220KV PALAMANER 132KV PALAMANER ‐ PUNGANUR
37 132KV PALAMANER ‐ SANTHIPURAM CKT 1
38 132KV PALAMANER ‐ SANTHIPURAM CKT 2
39 132KV MADANAPALLI 132KV MADANAPALLI ‐ B.K.KOTA
1 132KV PRODDUTUR 132KV PRODDUTUR ‐ JAMMALAMADUGU
2 132KV RAYACHOTI 132KV RAYACHOTI ‐ SAMBEPALLI
3 220KV CHINAKAMPALLY 132KV CHINAKAMPALLY ‐ RAYACHOTY
4 132KV KONDAPURAM 132KV KONDAPURAM ‐ BCL CKT 1
5 132KV KONDAPURAM ‐ BCL CKT 2
6 132KV KONDAPURAM ‐ TADIPATRI
7 132KV PULIVENDULA 132KV PULIVENDULA ‐ KADIRI
8 132KV PULIVENDULA ‐ LINGALA
9 132KV PULIVENDULA ‐ UCIL
10 220KV RAJAMPETA 132KV RAJAMPETA ‐ T.G.PALLI
11 132KV GKLIS 132KV GKILS ‐ KONDAPURAM
12 132KV JAMMALAMADUGU 132KV JAMMALAMADUGU ‐ DALMIA CEMENTS
13 220KV YERRAGUNTLA 132KV YERRAGUNTLA ‐ BHARATHI CEMENTS CKT 1
14 132KV YERRAGUNTLA ‐ BHARATHI CEMENTS CKT 2
15 132KV YERRAGUNTLA ‐ CCI CKT 1
16 132KV YERRAGUNTLA ‐ CCI CKT 2
17 132KV YERRAGUNTLA ‐ ICL CKT 1
18 132KV YERRAGUNTLA ‐ ICL CKT 2
19 132KV YERRAGUNTLA ‐ PRODDUTUR CKT 1
20 132KV YERRAGUNTLA ‐ PRODDUTUR CKT 2
21 132KV YERRAGUNTLA ‐ PULIVENDULA
22 132KV YERRAGUNTLA ‐ RTSS
23 132KV YERRAGUNTLA ‐ VEMPALLI
24 132KV YERRAGUNTLA ‐ ZUARI CKT 1
25 132KV YERRAGUNTLA ‐ ZUARI CKT 2
26 220KV PULIVENDULA 132KV PULIVENDULA ‐ BALAPANUR
27 132KV PULIVENDULA ‐ PULIVENDULA
28 132KV RTSS MUDDANUR SWT.STN 132KV RTSS MUDDANUR ‐ RAILWAYS
29 132KV RTSS KADAPA SWT.STN 123KV RTSS KADAPA ‐ GKLIS
30 132KV RTSS KADAPA ‐ MOOLAVANKA
31 132KV RTSS KADAPA SWT.STN ‐ RAILWAYS
32 132KV MOOLAVANKA 132KV MOOLAVANKA ‐ C.K.PALLY
33 132KV VONTIMITTA 132KV VONTIMITTA ‐ BADVEL
34 220KV KADAPA 132KV KADAPA ‐ BHARATHI CEMENTS CKT 1
35 132KV KADAPA ‐ BHARATHI CEMENTS CKT 2
36 132KV KADAPA ‐ RTSS
37 132KV KADAPA ‐ VONTIMITTA
38 132KV BADWEL 132KV BADWEL ‐ ATMAKUR
39 132KV BADWEL ‐ PORUMAMILLA
1 132KV GUNTAKAL 132KV GUNTAKAL ‐ HAMPI POWER HOUSE
2 132KV GUNTAKAL ‐ URAVAKONDA
3 220KV TADIPATRI 132KV TADIPARTRI ‐ TAP LINE TO PENNA CEMENTS
4 132KV TADIPATRI ‐ ANKI REDDY PALLI
5 132KV TADIPATRI ‐ KOMATIKUNTA
6 132KV TADIPATRI ‐ RS KONDAPURAM
7 132KV TADIPATRI ‐ TAP LINE TO SJK STEELS
8 220KV KALYANDURG 132KV KALYANDURG ‐ RAYADURG
9 132KV ANKAMPALLI 132KV ANKAMPALLI ‐ KALYANDURG
10 220KV HINDUPUR 132KV HINDUPUR ‐ DHARMAVARAM
11 132KV HINDUPUR ‐ JAMMALABANDA
12 132KV HINDUPUR ‐ PUTTAPARTHY
13 132KV HINDUPUR ‐ THUMMAKUNTA
14 220KV GOOTY RS 132KV GOOTY RS ‐ ANANTHAPUR
15 132KV GOOTY RS ‐ GUDIPADU
16 132KV GOOTY RS ‐ GUNTAKAL
17 132KV GOOTY RS ‐ PATTIKONDA
18 132KV GOOTY RS ‐ RACHERLA
19 132KV GUDIPADU SWT.STN 132KV GUDIPADU ‐ A.R.PALLI
20 132KV GUDIPADU ‐ BMM CEMENTS
21 132KV PUTTAPARTHY 132KV PUTTAPARTHY ‐ KADIRI
22 220KV ANANTHPUR 132KV ANATHAPUR ‐ ANKAMPALLI
23 132KV ANATHAPUR ‐ DHARMAVARAM
24 132KV KADIRI 132KV KADIRI ‐ PULIVENDULA
1 132KV ADONI 132KV ADONI ‐ YEMMIGANUR CKT 1
2 132KV ADONI ‐ YEMMIGANUR CKT 2
3 132KV ADONI ‐PATHIKONDA
4 132KV GUDUR(KNL) 132KV GUDUR ‐ YEMMIGANUR
5 220KV NANDYAL 132KV NANDYAL ‐ ALLAGADDA CKT 1
6 132KV NANDYAL ‐ ALLAGADDA CKT 2
7 132KV NANDYAL ‐ BANAGANAPALLI
8 132KV NANDYAL ‐ CEMENT NAGAR
9 132KV KURNOOL 132KV KURNOL ‐ RAYALASEEMA ALAKALIES
10 132KV KURNOOL ‐ AP CARBIDES CKT 1
11 132KV KURNOOL ‐ AP CARBIDES CKT 2
12 132KV DHONE 132KV DHONE ‐ KURNOOL
13 132KV DHONE ‐ RACHERLA
14 132KV BANAGANAPALLI 132KV BANAGANAPALLI ‐SRI JAYA JYOTHI
15 220KV APCARBIDES 132KV AP CARBIDES ‐ ALAMPUR
16 132KV AP CARBIDES ‐ BHARAT ALLOYS AND ENERGY LTD
17 132KV AP CARBIDES ‐ CEMENT NAGAR
18 132KV AP CARBIDES ‐ GADWAL
19 132KV AP CARBIDES ‐ GUDUR19 132KV AP CARBIDES GUDUR
20 132KV AP CARBIDES ‐ NANDIKOTKUR
21 132KV AP CARBIDES ‐ YEMMIGANUR
22 132KV NANDIKOTKUR 132KV NANDIKOTKUR ‐ ATMAKUR
23 220KV SRISAILAM(GENCO) 132KV SRISAILAM ‐ ATMAKUR
1 220KV BOOTHPUR 132KV BOOTHPUR‐BALANAGAR
2 132KV BOOTHPUR‐KOTHAKOTA
3 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐I
4 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐II
5 132KV BOOTHPUR‐MAHABOOBNAGAR CKT‐III
6 132KV BOOTHPUR‐MARIKAL
7 132KV BOOTHPUR‐PUTTAPAHAD CKT‐I
8 132KV BOOTHPUR‐PUTTAPAHAD CKT‐II
9 220KV KALWAKURTHY 132KV KALWAKURTHY‐ACHAMPET
10 132KV KALWAKURTHY‐AMANGAL
11 132KV KALWAKURTHY‐MIDJIL
12 132KV KALWAKURTHY‐NAGARKURNOOL
13 220KV WANAPARTHY 132KV WANAPARTHY‐BOOTHPUR
14 132KV WANAPARTHY‐CHINNAMAROOR
15 132KV WANAPARTHY‐GADWAL
16 132KV WANAPARTHY‐KOTHAKOTA
17 220KV SHADNAGAR 132KV SHADNAGAR‐BALANAGAR
18 132KV SHADNAGAR‐KOTHUR
1 220KV YEDDUMYLARAM 132KV YEDDUMYARAM ‐ ORDINANCE FACTORY
2 132KV CHEGUNTA 132KV CHEGUNTA ‐ GSN INDUSTRIES
3 132KV CHEGUNTA ‐ JEEVAKA INDUSTRIES
4 132KV MANOHARABAD 132KV MANOHARABAD ‐ AGARWAL FOUNDRIES LTD
5 220KV SADASIVAPET 132KV SADASIVAPET ‐ MRF
6 400KV GAJWEL 132KV GAJWEL ‐ TUKKAPUR
7 132KV GAJWEL ‐ TUMKI BOLLARAM
8 132KV GAJWEL‐CHEGUNTA
9 132KV GAJWEL‐GAJWEL
10 132KV GAJWEL‐MANOHARABAD
11 132KV PASHAMAILARAM 132KV PASHAMAILARAM ‐ VBC FERRO ALLOYS
12 132KV KANDI 132KV KANDI ‐ GANAPATHI SUGARS
13 132KV KANDI ‐ HYD METRO WATER SUPPLY
14 132KV KANDI ‐ VBC FERRO ALLOYS
1 220KV TANDUR 132 KV TANDUR ‐ PENNA CEMENTS
2 132 KV TANDUR ‐CCI‐I
3 132 KV TANDUR ‐CCI‐II
4 132KV TANDUR ‐ KODANGAL
5 132KV TANDUR ‐ PARIGI
6 132KV TANDUR ‐ RTS(TANDUR TRACTION)
7 132KV TANDUR ‐ VISHAKA
1 220KV DURSHED 132KV DURSHED‐SIRCILLA
2 220KV JAGITYAL 132KV JAGITYAL‐ GANGADHARA
3 132KV JAGITYAL‐DHARMAPURI
4 132KV JAGITYAL‐JAGITYAL
5 132KV JAGITYAL‐KORUTLA
6 132KV JAGITYAL‐PUDUR
1 132KV PALASA 132KV PALASA ‐ BARUVA RAILWAY TRACTION
2 132KV PALASA ‐ ICHAPURAM
3 132KV PONDURU 132KV PONDURU ‐ RAILWAY TRACTION CKT 1
4 132KV PONDURU ‐ RAILWAY TRACTION CKT 2
5 132KV CHILAKAPALEM 132KV CHILAKAPALEM ‐ PONDURU RAILWAY TRACTION
6 132KV PALAKONDA 132KV PALKONDA ‐ GMR CO‐GENERATION
7 220KV TEKKALI 132KV TEKKALI ‐ GMR INDUSTRIES
8 132KV TEKKALI ‐ NARASANNAPETA
9 132KV TEKKALI ‐ NAUPADA RLY TRACTION
10 132KV TEKKALI ‐ PALAKONDA
11 132KV TEKKALI ‐ PALASA CKT 1
12 132KV TEKKALI ‐ PALASA CKT 2
13 132KV TEKKALI ‐ PATHAPATNAM
14 132KV TEKKALI ‐ PONDURU
1 132KV KOTHAVALASA 132KV KOTHAVALASA ‐ ZINDAL
2 220KV GARIVIDI 132KV GARIVIDI ‐ ANDHRA FERRO ALLOYS LTD
3 132KV GARIVIDI ‐ BOBBILI CKT 1
4 132KV GARIVIDI ‐ BOBBILI CKT 2
5 132KV GARIVIDI ‐ JAYALAKHMI FERRO ALLOYS LTD
6 132KV GARIVIDI ‐ PALAKONDA
7 132KV GARIVIDI ‐ PYDI BHIMAVARAM
8 132KV GARIVIDI ‐ TB VARA
9 132KV GARIVIDI ‐ VONTITHADI
10 132KV GARIVIDI‐FACOR‐1
11 132KV GARIVIDI‐FACOR‐II
12 132KV BOBBILI 132KV BOBBILI ‐ BERRY FERRO ALLOYS
13 132KV BOBBILI ‐ IMPEX
14 132KV BOBBILI ‐ NCS CO‐GENARATION
15 132KV BOBBILI ‐ PARVATHIPURAM
16 132KV PYDI BHEEMAVARAM 132KV PYDI BHIMAVARAM ‐ AUROBINDO PHARMA
17 132KV PYDI BHIMAVARAM ‐ CHILAKAPALEM
18 132KV VONTITHADI 132KV VONTITHADI ‐ VIJAYANAGARAM RAILWAY TRACTION
19 132KV T.B.VARA 132KV T.B.VARA ‐ ARAKU CKT 1
20 132KV T.B.VARA ‐ ARAKU CKT 2
21 132KV T.B.VARA ‐ GOLD STAR
22 132KV T.B.VARA ‐ S.KOTA RLY TRACTION CKT 1
23 132KV T.B.VARA ‐ S.KOTA RLY TRACTION CKT 2
24 132KV T.B.VARA ‐ ZINDAL
25 132KV TB VARA ‐ VONTITHADI
1 220KV KONDAPALLI 132KV KONDAPALLI ‐ KHAMBHAMPADU
2 132KV KONDAPALLI ‐ NUZIVID
3 132KV KONDAPALLI ‐ RAILWAY TRACTION CKT 1
4 132KV KONDAPALLI ‐ RAILWAY TRACTION CKT 2
5 132KV KONDAPALLI ‐ VIJAYAWADA
6 132KV AUTONAGAR 132KV AUTONAGAR ‐ TADEPALLI
7 132KV MACHILIPATNAM 132KV MACHILIPATNAM ‐ KONIKEPUDI
8 132KV GANGOOR 132KV GANGOOR ‐ TADEPALLI
9 220KV CHILLAKALLU 132KV CHILLAKALLU ‐ JP CEMENTS
10 132KV CHILLAKALLU ‐ KODAD
11 132KV CHILLAKALLU ‐ MADHIRA
12 132KV CHILLAKALLU ‐ MADRAS CEMENTS
13 132KV CHILLAKALLU ‐ NANDIGAMA
14 132KV CHILLAKALLU ‐ RAILWAY TRACTION CKT 1
15 132KV CHILLAKALLU ‐ RAILWAY TRACTION CKT 2
16 220KV GUDIVADA 132KV GUDIVADA ‐ KANUMOLU CKT 1
17 132KV GUDIVADA ‐ KANUMOLU CKT 2
18 132KV GUDIVADA ‐ PAMARRU
19 132KV GUDIVADA ‐ SRIBA
20 220KV GUNADALA 132KV GUNADALA ‐ AUTONAGAR
21 132KV GUNADALA ‐ GANGOOR
22 132KV GUNADALA ‐ KANUMOLU CKT 1
23 132KV GUNADALA ‐ KANUMOLU CKT 2
24 132KV PAMARRU 132KV PAMARRU ‐ AVANIGADDA
25 132KV PAMARRU ‐ MACHILIPATNAM CKT 1
26 132KV PAMARRU ‐ MACHILIPATNAM CKT 2
27 132KV KANUMOLU 132KV KANUMOLU ‐ NUZIVID
28 132KV KANUMOLU ‐ PAMARRU
29 132KV BHAVANIPURAM 132KV BHAVANIPURAM ‐ VIJAYAWADA
Andhra Pradesh Power system Profile
S.No. Name of Transmission LineVoltage
(KV)Length
(Ckt Kms)End 1(MVAr)
End 2 (MVAr)
Agency
1 Cuddappah‐ Nagarjuna Sagar I 400 50 POWERGRID
2 Cuddappah‐ Nagarjuna Sagar I I 400 50 POWERGRID
3 Gooty ‐ Nagarjuna Sagar 400 50 POWERGRID
4 Gooty ‐ Nellore ‐ 1 400 63 POWERGRID
5 Gooty ‐ Nellore ‐ 2 400 63 POWERGRID
6 Gooty ‐ Somanhally 400 63 POWERGRID
7 Hyderabad ‐ Gajwel 400 50 POWERGRID
8 Hyderabad ‐ Malkaram 400 50 POWERGRID
9 Khammam ‐ Warangal 400 50 POWERGRID
10 Nagarjuna Sagar‐ Ramagundam I 400 50 50 POWERGRID
11 Nagarjuna Sagar‐Ramagundam II 400 50 50 POWERGRID
12 Nagarjuna Sagar ‐ Gooty 400 50 POWERGRID
13 Nagarjuna Sagar ‐ Meh' Nagar 400 50 POWERGRID
15 Nellore ‐ Vijaywada I 400 50 50 POWERGRID
16 Nellore ‐ Vijaywada II 400 50 50 POWERGRID
17 Nellore‐Nellore (NPS) ‐2 400 8018 Vijaywada ‐ Gazuwaka 400 63 63 POWERGRID
19 Vijaywada ‐ Vemagiri IV 400 50 POWERGRID
20 Vijaywada ‐ Vemagiri III 400 63 POWERGRID
21 Gazuwaka ‐ Jaypore I 400 80 POWERGRID
22 G k J II 400 80 POWERGRID
7(d) List of Reactors
List of Lines with Shunt Reactors
Andhra Pradesh Power system Profile
22 Gazuwaka ‐ Jaypore II 400 80 POWERGRID
23 Simhadri ‐ Gazuwaka I 400 50 POWERGRID
24 Simhadri ‐ Gazuwaka II 400 50 POWERGRID
25 Kalpakka ‐ Khammam I 400 63 63 APTRANSCO
27 Kalpakka ‐ Khammam II 400 63 63 APTRANSCO
List of Bus Reactors
S.NO
1 420 POWERGRID2 420 POWERGRID3 420 POWERGRID4 420 POWERGRID5 420 POWERGRID6 420 NTPC7 420 NTPC8 420 LANCO9 420 POWERGRID10 420 POWERGRID11 420 APTRANSCO12 420 APTRANSCO
13 420 APTRANSCO
Name of Sub-StationVoltage
(kV)Reactor Rating
(MVAr)Agency
SIMHADRI ST2 63
LANCO 63
VIJAYAWADA 63
KHAMMAM 50
NAGARJUN SAGAR 50
RAMAGUNDAM 63
CUDDAPAH 3*16.67
GOOTY 63
HYDERABAD 63
KURNOOL 63
Source: SRLDC List of Important Elements
VISAKHAPATNAM 50
VIJAYAWADA 63
KALPAKKA 2X50+63
http://www.srldc.org/DownloadDocuments.aspx
Andhra Pradesh Power system Profile
S.No. Name of Transmission LineLength
(Ckt Kms)Location & (%) Agency
1NSR - CUDDAPAH - I
CUDDAPA,40 % POWERGRID
2 NSR - CUDDAPAH - II CUDDAPA, 40 % POWERGRID
3 GOOTY - SOMANAHALLI GOOTY,40 % POWERGRID
4 GOOTY - NELMANGALA GOOTY, 40 % POWERGRID
7(e) List of Transmission Lines with Compensation
400 kV LINES WITH FIXED SERIES COMPENSATION
Source: SRLDC List of Important Elementshttp://www.srldc.org/DownloadDocuments.aspx
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
Slab Rate (Rs/MW/Month)
Slab Rate (Paisa/Unit)
Slab Rate (Rs/MW/Month)
Slab Rate (Paisa/Unit)
Jul. 2011 - Mar. 2012 Tier - III Tier - III Tier - I Tier - IApr. 2012 - Sep. 2012 Tier - I Tier - I Tier - II Tier - IIOct. 2012 - Mar. 2013 Tier - II Tier - II Tier - III Tier - IIIApr. 2013 - Jun. 2013 Tier - II Tier - II Tier - III Tier - IIIJul. 2013 - Sep. 2013 Tier - I Tier - I Tier - II Tier - IIOct. 2013 - Dec. 2013 Tier - I Tier - I Tier - II Tier - IIJan. 2014 - Mar. 2014 Tier - I Tier - I Tier - III Tier - IIIApr. 2014 - Jun. 2014Jul. 2014 - Sep. 2014Oct. 2014 - Dec. 2014
Jul. 2011 - Mar. 2012Apr. 2012 - Sep. 2012Oct. 2012 - Mar. 2013Apr. 2013 - Jun. 2013Jul. 2013 - Sep. 2013Oct. 2013 - Dec. 2013Jan. 2014 - Mar. 2014Apr. 2014 - Jun. 2014Jul. 2014 - Sep. 2014Oct. 2014 - Dec. 2014
High Normal
8(a) PoC Charges and Loss Slabs
Slabs for PoC Rates
PeriodAndhra Pradesh Injection Andhra Pradesh Withdrawal
Slabs for PoC Losses
Period Andhra Pradesh Injection Andhra Pradesh WithdrawalLoss Slab Loss Slab
High NormalHigh NormalHigh NormalHigh NormalHigh NormalHigh Normal
All India PoC Slab Rates
Tier ‐ I Tier ‐ II Tier ‐ III Tier ‐ I Tier ‐ II Tier ‐ III
2011‐12 Jul'11 ‐ Apr'12 70000 85000 100000 10.00 12.00 14.00
H1 (Apr'12 ‐ Sep'12) 80000 95000 110000 11.00 13.00 15.00
H2 (Oct'12 ‐ Mar'13) 79968 94968 109968 11.19 13.19 15.19
Q1 (Apr'13 ‐ Jun'13) 79350 94350 109350 11.10 13.10 15.10
Q2 (Jul'13 ‐ Sep'13) 79544 94544 109544 11.13 13.13 15.13
Q3 (Oct'13 ‐ Dec'13) 79391 94391 109391 11.11 13.11 15.11
Q4 (Jan'14 ‐ Mar'14)
Q1 (Apr'14 ‐ Jun'14)
Q2 (Jul'14 ‐ Sep'14)
Q3 (Oct'14 ‐ Dec'14)
Q4 (Jan'15 ‐ Mar'15)
2011‐12 Jul'11 ‐ Apr'12 80000 95000 110000 11.00 13.00 15.00
H1 (Apr'12 ‐ Sep'12) 70000 85000 100000 10.00 12.00 14.00
H2 (Oct'12 ‐ Mar'13) 59520 74520 89520 8.35 10.35 12.35
Q1 (Apr'13 ‐ Jun'13) 63219 78219 93219 8.86 10.86 12.86
Q2 (Jul'13 ‐ Sep'13) 67773 82773 97773 9.50 11.50 13.50
Q3 (Oct'13 ‐ Dec'13) 71819 86819 101819 10.06 12.06 14.06
Q4 (Jan'14 ‐ Mar'14) 65055 80055 95055 9.12 11.12 13.12
Q1 (Apr'14 ‐ Jun'14)
Q2 (Jul'14 ‐ Sep'14)
Q3 (Oct'14 ‐ Dec'14)
Q4 (Jan'15 ‐ Mar'15)
All India PoC Slab Rates
Grid Year PeriodPoC Slab Rate (Rs/MW) PoC Slab Rate (paise/unit)
Source: CERC PoC OrdersWeblink: http://www.cercind.gov.in/order1.html
NEW Grid
2012‐13
2013‐14
2014‐15
SR Grid
2012‐13
2013‐14
2014‐15
54
Chapter 5: Transmission Constraints in Southern Region
5.1. Transmission Line Constraints
S. No Corridor Season/ Antecedent Conditions
Description of the constraints Figure/ table no.
Has the constraint occurred in earlier quarter?
1 765kV Raichur-Sholapur single circuit
-
Flow on the line is oscillating continuously. Power flow increasing sharply for any change in load/Generation in any part of Indian grid. Re-synchronisation of two large grids is a tedious task every time the line trips. Second line needs to bring immediately. More inter connecting lines between SR with NEW Grid have to be commissioned as early as possible.
2 High loading on 400kV Hosur-Salem SC line and 400kV Bangalore-Salem SC line
November-July
Constraint is due to Delay of commissioning of Generating units in S2 area and no addition of internal generation in Tamilnadu.
Fig. 221-222 Yes
3 High loading on 400kV Hiriyur-Nelamangala DC line
Whole year
With the commissioning of Jindal 4th unit and BTPS 2nd unit the flow on 400kV Hiriyur-Nelamangala DC line continuously near to 550MW.
Fig.223 Yes
4 High loading on 400kV Kolar-Hosur DC line
Whole year High loading on these lines during High import at Talcher Kolar. N-1 condition is alarming
Fig.224 Yes
5 High loading on 400kV Jindal-BTPS SC Line
Whole year
With the full generation at Jindal, 400kV Jindal-BTPS SC line getting loaded beyond 650 MW. Other evacuation paths are 400kV Jindal-Guttur and Two ICTs. But at 220kV side also generation is available.
Fig.225 Yes
6 High loading on 400kv Sriperumbudur-SV chathram SC line
During full generation at NCTPS
Due to non-commissioning of 400KV Alamatti-Tiruvalam DC line, 400kV NCTPS-SV Chatram and 400kV Alamathy-SV chathram. Vallur evacuation system with compromise on N-1 security under certain conditions and severe loading on 230kV Network.
Fig.226 No
55
Expected Transmission Constraints in future:
S. No Corridor Season/ Antecedent Conditions
Description of the constraints
1 High loading on 400kV Srisailam-Karnool SC line
-
With full generation in Srisailam left bank the flow on 400kV Srisailam-Karnool SC line exceeds 650 MW.Depending on gas availability in Vemagiri complex, import at HVDC Gazuwaka. The flow on this line would exceed 800 MW. Also there are new generations going to come at Vemagiri complex and at Srikakulam
2 400kV Khammam-Nagarjunasagar SC line
- During outage of HVDC Pole at Kolar, full generation at Vemagiri, KTS U11 and High import at Gazuwaka this line is expected to carry flow> 650 MW as Geneartion at Nellore Chennai increases.
3 North-South corridor -
With the increase in power flow on 765kV Raichur-Sholapur line, Corridors from Raichur-Gooty-Bangalore-Salem-Udumalpet and Hiriyur-Nelamangala lines would be severely stressed and N-1 severely compromised. Also Voltages at Bangalore, Mysore, Chennai, Salem, Thrichy, Udumalpet, Trichur, Cochin and Palakkad would dip
56
5.2. ICT Constraints
S. No ICT Season/ Antecedent Conditions
Description of the constraints Figure/ table no. Has the constraint occurred in earlier quarter? Details.
1
400/220kV 315MVA ICTs at Hyderabad (Ghanapur, Mamidipalli and Malkaram SS)
During peak period of every day
During the Peak load period Hyderabad loads will be high
Fig.227-229
400/220kV 315MVA ICTs at Hyderabad (Ghanapur, Mamidipalli and Malkaram SS)
2 400/230kV 315MVA ICTs at Hosur
During peak period of every day
N-1 criteria will not satisfy during the peak Fig.230 400/230kV 315MVA ICTs at Hosur
3 400/220kV 500 MVA ICTs at Somanahalli, Nelamangala and Hoody
During peak period of every day
N-1 criteria will not satisfy during the peak Fig.231-233
400/220kV 500 MVA ICTs at Somanahalli, Nelamangala and Hoody
4 400/220kV 315MVA ICTs at Mysore
During peak period of every day
N-1 criteria will not satisfy during the peak Fig.234 400/220kV 315MVA ICTs at Mysore
5 400/220kV 315MVA ICTs at Kalvindapattu
During peak period of every day
N-1 criteria will not satisfy during the peak Fig.235 400/220kV 315MVA ICTs at Kalvindapattu
57
5.3. Nodes Experiencing High Voltage
S. No Nodes Season/ Antecedent Conditions
Description of the constraints Figure/ table no.
Has the constraint occurred in earlier quarter?
1 400kV Vijayawada SS Whole Year Voltages at Vemagiri and Vijayawada area remain very high (>415 kV) even during peak
months.
Fig.236 Yes
2 400kV Vemagiri SS Whole Year Fig.237 Yes
3 400kV Gooty SS Monsoon period and
off peak period
Voltages at Gooty, Karnool and Srisailam remain very high during monsoon period and offpeak
condition.
Fig.238 Yes
4 400kV Karnool SS Fig.239 Yes
5 400kV Srisailam SS Fig.240 Yes
6 400kV Ghanapur SS
During off peak
Voltages are high during monsoon period and offpeak condition.
Fig.241 Yes
7 400kV Mamidipalli SS Fig.242 Yes
8 400kV Mehaboobnagar SS Fig.243 Yes
9 400kV Nagarjunasagar SS Fig.244 Yes
10 400kV Nellore SS Fig.245 Yes
11 400kV Khammam SS Fig.246 Yes
12 400kV Kaiga SS Whole Year During Low generation period and offpeak
period 400kV Kaiga, 400kV Narendra Voltage are very High.
Fig.247 Yes
13 400kV Guttur SS Whole Year Fig.248 Yes
14 400kV Narendra SS Whole Year Fig.249 Yes
15 400kV Hassan SS
During off peak
During Low generation period of Sharawathi and UPCL and offpeak period Voltages are High.
Fig.250 Yes
16 400kV Raichur TPS SS Fig.251 Yes
17 400kV Talaguppa SS, 400kV Nelamangala SS
Fig.252 Yes
18 400kV Tirunelvelli SS During off peak
During Low wind condition and offpeak condition Voltages are very High
Fig.253 Yes
19 400kV Koodankulam SS Fig.254 Yes
58
5.4. Lines opened on high voltage
Sr. No.
Name Total no. days open during Quarter
Corresponding nodes experiencing high voltage
Graph No.
1 400 kV TALAGUPPA - NEELAMANGALA
116 TALAGUPPA,
NELAMANGALA, GOOTY, NELLORE PS, VIJAYAWADA, VEMAGIRI, VTPS,
MALKARAM, GAJWEL,
SHANKARAPALLY, SRISAILAM, KHAMMAM, GHANAPUR,
TIRUNELVELLI, KOODANKULAM,
HASSAN, NELLORE,
GUTTUR, KAIGA, NARENDRA
2 400 Kv HASSAN - UPCL 2 72
3 400 Kv GOOTY - NPS 1 59
4 400 kV VEMAGIRI - GMR 1 55
5 400 Kv VTPS - MALKARAM 2 54
6 400 kV VIJAYAWADA - VEMAGIRI 2
53
7 400 Kv GAJWEL - BHOOPALAPALLY 1
51
8 400 Kv GOOTY - NPS 2 51
9 400 kV VIJAYAWADA - VEMAGIRI 1
50
10 400 kV VEMAGIRI - GVK (JPD) 1 48
11 400 Kv GAJWEL - SHANKARPALLY 1
47
12 400 Kv GAJWEL - SHANKARPALLY 2
47
13 400 Kv GAJWEL - BHOOPALAPALLY 2
46
14 400 Kv KRISHNAPATNAM - NELLORE 2
46
15 400 kV VEMAGIRI - GOUTHAMI CCCP 1
42
16 400 kV VEMAGIRI - KONASEEMA 1
42
17 400 kV VTPS IV - SRISAILAM 2 42
18 400 kV VEMAGIRI - GMR 2 41
19 400 kV GUTTUR - NARENDRA 1 40
20 400 kV VEMAGIRI - GVK (JPD) 2 40
21 400 Kv VTPS - MALKARAM 1 39
22 400 kV VEMAGIRI - GOUTHAMI CCCP 2
38
23 400 kV TIRUNELVELI - KUDAMKULAM 3
35
24 400 kV VEMAGIRI - KONASEEMA 2
34
25 400 kV VTPS IV - SRISAILAM 1 32
26 400 Kv KRISHNAPATNAM - 29
59
Sr. No.
Name Total no. days open during Quarter
Corresponding nodes experiencing high voltage
Graph No.
NELLORE 1
27 400 kV TIRUNELVELI - KUDAMKULAM 4
29
28 400 kV GUTTUR - NARENDRA 2 23
29 400 kV KAIGA - GUTTUR 2 23
30 400 kV SRISAILAM-MAMIDIPALLI 1
21
31 400 kV TIRUNELVELI - KUDAMKULAM 2
19
32 400 kV KAIGA - GUTTUR 1 17
33 400 kV MYSORE - HASAN 2 16
34 400 kV KALPAKKA - VEMAGIRI 1 13
35 400 kV VIJAYAWADA - LANCO 2 10
36 400 kV KHAMMAM - MAMIDIPALLY 2
7
37 400 kV SRISAILAM-MAMIDIPALLI 2
7
38 400 kV TALAGUPPA - HASSAN 6
39 400 kV HYDERABAD - KURNOOL
5
40 400 kV RAMAGUNDAM - HYDERABAD 4
5
41 400 kV KAIGA - NARENDRA 2 3
42 400 kV KHAMMAM - KTPS 2 3
43 400 kV MALKARAM - HYDERABAD
3
44 400 kV NELLORE - ALAMATHI 3
45 400 kV RAMAGUNDAM - HYDERABAD 3
3
46 400 Kv HASSAN - UPCL 1 2
47 400 kV KAIGA - NARENDRA 1 2
48 400 kV KALPAKKA - VEMAGIRI 2 2
49 400 kV KHAMMAM - KALPAKKA 2
2
50 400 kV KHAMMAM - KTPS 1 2
51 400 Kv NELLORE - SPDR 2
52 400 kV RAICHUR - GOOTY 1 2
53 400 kV VIJAYAWADA - LANCO 1 2
54 400 Kv NPS - SEPL 1
55 400 kV N'SAGAR - CUDDAPPA 1 1
56 400 kV TALAGUPPA - HASSAN 1 1
57 400 Kv UDUMALPET - PALLAKAD 1
1
58 400 kV VIJAYAWADA - GAZUWAKA 1
1
60
Sr. No.
Name Total no. days open during Quarter
Corresponding nodes experiencing high voltage
Graph No.
59 400 kV VIJAYAWADA - NELLORE 1
1
60 400 kV VIJAYAWADA - VEMAGIRI 4
1
61 400 kV VIJAYAWADA - VTPS IV 2
1
Grand Total 1489
61
5.5. Delay in generation affecting grid operation adversely
S. No Generating Unit Area/ State Proposed
Commissioning Date
Actual/ Likely Commissioning Date Transmission
Constraint Caused
1 Kudamkulam Unit-1 Tamilnadu Dec-07 Oct-13
Transmission congestion on North-South
corridor and S1-S2 corridor
2 Kudamkulam Unit-2 Tamilnadu Dec-08 6 months after commissioning of Unit-1
3 Neyveli TPSII Exp Unit-1 Tamilnadu Feb-09 Achieved full load on 04.02.2012. Now out
of service. COD yet to be declared
4 Neyveli TPSII Exp Unit-2 Tamilnadu Jun-09 Dec-13
6 North Chennai Stage-2 Unit-1
Tamilnadu Feb-11 Synchronised to grid. COD yet to be
declared
6 North Chennai Stage-2 Unit-2
Tamilnadu Aug-11 Synchronised to grid.After Unit-1
commissioning
5.6. Delay in transmission lines affecting grid operation adversely
S. No.
Transmission Corridor Proposed
Commissioning Date
Actual/ Likely Commissioning
Date Transmission Constraint Caused
1 400kv Narsaraopet SS and connected Tr. lines Mar-12 - Congestion on 400kV Vijayawada-Nellore DC line
2 400kV Edaman-Cochin DC line Held up Heldup 220kV South-North corridor of Kerala
3 400kV Mysore-Khozhikode DC line --- Mar-14 Congestion on North Kerala connected lines like
220kV Kadakola-Kaniyampet.
4
NCTPS-II Evacuation: 400kV NCTPSII-SV
Chathram DC line, 400kV Alamathy-SV Chathram DC line and Alamathy-Tiruvalam DC line
Feb-11 Dec-14 Congestion on 400kV Vallur evacuation system
5
Stage-1 Wind evacuation system of TNEB: 400kv Kanarapatti SS, 400kV Kayathar SS, 400kV Tirunelvelli-Kanarpatti-Kayathar DC line,400kV Kayathar-Karaikudi-Pugalur DC line
- - Congestion on 400/230kV Tirunelvelli ICTs, 230kV Kayathar-Tirunelvelli, 230kV Udayathur-Tirunelvelli,
230kV Veerannam-Tirunelvelli etc
UFR Setting (Hz)Time delay (Sec.)
Recommended Load Relief for SR (MW)
Load relief implemented in
SR (MW)Approved Actual
49.2 Inst. 2350 2937 802 51149.0 Inst. 2360 2892 812 56648.8 Inst. 2390 2855 822 56248.6 Inst. 2400 2529 825 549Total Inst. 9500 11213 3261 2188
Settings (Hz/Sec)
Approved Actualdf/[email protected] 3537 712 45df/[email protected] 2000 1767 784
Total 5537 2479 829
Recommended Load Relief for
SR (MW) Load relief implemented in SR (MW)
Implemented Load Relief (MW)
10(a) Under Frequency Load Shedding Scheme & Capacitor Installation Status
Automatic Under Frequency Load Shedding Scheme in SR-AP
Discrete Relays (AUFLS)
Load Relief (MW)
Frequency Trend Relays (df/dt relays)
1925373
2298
Source: SRPC
Andhra Pradesh Power system Profile
State/U.T/ SystemInstalled as on 01.04.2013 (MVAr)
Addl.Reqmt. During 2012-13 (MVAr)
Actual Addition from 01.04.2013 (MVAr)
Andhra Pradesh 3033.5
Balance (MVAr)
Source: SRPC
Status of Capacitor Installation
Andhra Pradesh Power system Profile
Sl.No. Feeder/ICT Expd.Load relief by forced LS(MW)
1 GOOTY ICTS 200
2 CADAPA ICTS 200
3 ICT 1 AT HYD OR RAMGUNDAM- DICHIPALLY 200Source: SRLDC
11(a) List of feeders and ICTs emanating from POWERGRID S/S which can be opened as
emergency measures in case of overdrawal by Andhra Pradesh
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
S.NO. SECTOR PROJECT NAMEIMPL.
AGENCYLOA UNIT NO.
CAP.(MW)
ANTICIPATEDCOMM.DATE
1 STATTE TAIL POND PH AT NAGARJUNASAGAR 2X50 U1‐JULY 2‐14
U2‐AUGUST 2014
2 LOWER JURALA 6X40 U1‐JUNE‐2013
BALANCE 5 UNITS AT 3 MONTHS INTERVAL
3 PULICHINTALA 4X120 U1‐JUNE 2014
U2‐OCTOBER 2014
U3‐ FEBERUARY 2015 & U4
4 DUMMUGUDEM 320 2013‐15
5 KAMTHANAPALLY 450 150 MW‐2013
300 MW‐2013‐14
THERMAL (STATE)
6 KAKTIYA TPP STG.II 1X600 Dec‐13
7 RAYALASEEM STG‐IV 1X600 UNIT VI‐2014
8 POLAVARAM 960 2016‐17
9 SATTUPALLI TPS 1X600 2013‐14
10 SINGAREDDIPALLI 5X40 Mar‐14
11 KOTHGUDEM ST VII 1X800 2016‐17
12 Dr.NTTPS VIJAYAWADA ST‐V 1X800 2016‐17
13 Vadarevu Ultra Mega Power Project 5 x 800 = 4000 U1,2‐2016‐17
14 Stage I (U‐1,2) & Stage II (U‐3,4,5) U3,4‐2017‐20
Thermal (Joint Venture) :
1 Sri Damodaram Sanjeev(Krishnapatnam JV) U1‐AUG 2013
U2‐AUG 2014
2 Srikakulam TPS (JV) 2014 ‐ 16 (To be tied up)
Thermal (Private) :
1 Bhavanapadu TPP (East Coast Energy Ltd), (2x660) Phase I → April 2014
2 Kakarapalli, Srikakulam (Dist) + (2x660) Phase II → September 201
3 Paloncha (Nava Bharat), Khammam 150 Jan‐14
4 Thermal Powertech ‐ Nellaturu 2x660 = 1320 Unit 1 → Apr 2014, Unit 2 → Oct 2014
5 Krishnapattanam UMPP 6x660 = 3960 June 2013 to Feb 2015
6 Gunupudi (Surya Chakra TEPL) 660 + 660
7 HNPCL (Hinduja), Pavalavasa, Vizag 2x520 = 1040 Unit 1 → Dec 2013, Unit 2 →
8 Thamminapatnam TPP(Ph‐II‐U 1&2) 2x150 = 300 Unit 1 → Aug 2012, Unit 2 → Nov 2012
Nuclear (State JV) :
1 Kadappa Nuclear Power Plant
Gas Based (State) :
12(a) Generation Units Under Construction
2 x 800 = 1600
4 x 600 = 2400
Andhra Pradesh Power system Profile
Gas Based (State) :
1 Integrated gassification combined 1 x 182 = 182 2017‐18
2 cycle (IGCC) plant at Dr. NTTPS (JV)
3 Shankarpally Gas Power Plant 1x1000=1000 2016‐17
4
Combined cycle gas based project near Karimnagar 2100 2014‐19
Gas Based (Private) :
1 1 Patancheru(Asta PCPL),Medak (Dt) 28
2 2 Peddapuram (SPP Ltd), EG (Dist) 2262
3 3 Chigurukota (Sriba Industries), Krishna (Dt) 13.6
4 4 Gautami CCPP Stage‐II, Peddapuram 2 x 400 = 800
5 5 GVK Phase‐III, Jegurupadu 2 x 400 = 800
6 6 Mathya Giri (Vasavi), Nalgonda (Dist) 210
7 7 Guggilla, Karimnagar (Dist) ‐ Elgen 2x350
8 8 Konaseema Phase‐II, Ravulapalem 820 Jan‐14
9 9 Lanco Phase ‐ III, Kondapalli 2x371=742
10 10 Chandaparu, WG (Dist) 20
11 11 Vetlapalem, EG Dist (Greenco) 2x60=120
12 12 Vemagiri, EG Dist (GMR) 2x384=768
13 13 Gurrampalem, Vizag Dist (LVS) 2x16.75+2x9.73=52
14 14 RVK, Jegurupadu, EG Dist 76+120+2x120+50
15 15 Thamminapatnam (K.Patnam PCL), Nellore 1320+660 Mar-15
Renewable Energy Sources (RES) :
1 Municipal waste based 67.43 30 mw commisioned
2 Bio mas bsed c-generation 66.25 29.25 MW commissioned
3 Industrial waste based power plants 55 21 MW commissioned
4 Mini Hydal projects 141 104 mw commissioned
5 Bio mas bsed Power Plant 224 190 MW commissioned
6 Bio mas based co-genaration 420 270 MW commissioned
Wind (Private)
Wind (Private) 399.34 MW 114 MW commissioned
MINI power plants 595 MW 74MW commissioned
Solar (State)
P.JuralaHEP111 1 MW
Solar Power Project 75 MW
Source:SRLDC Report
http://www.srldc.org/MonthlyReport.aspx
Andhra Pradesh Power system Profile
Sl. No. Sector Name of the Transmission LineVoltage Level
(kV)Ckts (S/C) & (D/C)
Length in Circuit Kms.
Stringing Completed
Target date of completion
Remarks
1 STATE Achutapuram(Brandix)‐Koruprolu 220 S/C 40 15‐Mar
2 STATE Amangal‐chevella 220 D/C 15‐Mar SCHEMES TO BE FORMULATED
3 STATE Appannadorapalem‐Bobbili 220 D/C 13‐Dec
4 STATE Armoor‐Nandipeta 220 S/C 15 15‐Mar
5 STATE Asupaka‐Bandragudem 220 S/C 7 15‐Mar
6 STATE Asupaka‐Medapalli 220 S/C 6 15‐Mar
7 STATE Bellampalli‐Mailaram 220 D/C 20 15‐Mar
8 STATE Bellampalli‐Sirpurkagaznagar 220 D/C 90 15‐Mar
9 STATE Bhongiri‐Baswapuram 220 D/C 20 15‐Mar
10 STATE Bhongiri‐Jangampalli 220 D/C 12 15‐Mar
11 STATE Bhoopalapally (Kakatiya)‐ Gajwel 400 D/C 262 COMMISIONED
12 STATE Bonapally‐chittor (Quad) 400 D/C 194 15 13‐Dec WORK UNDER PROGRESS
13 STATE CCGT Power Plant‐KarimNagar 400 D/C 40 15‐Mar SCHMES TO BE FORMULATED
14 STATE CCGT Power Plant‐Gajwel 400 D/C 200 15‐Mar SCHMES TO BE FORMULATED
15 STATE Chalakurthy‐Puliathandra 220 S/C 10 16‐Mar
16 STATE Chandrayanagutta SS ‐ Imiliban (GIS) SS 220 S/C 19 Dec‐13
Last section works are under progress at Nala crossing and work stopped due to
rainy season.
17 STATE Chittoor 400 KvSS‐ Manapalli 220 D/C 19 18 Mar‐15
18 STATE Dichpalli‐Manchippa 220 S/C 15 Mar‐15
19 STATE Dichpalli‐Nizamabad 220 D/C 30 Mar‐15
20 STATE Dummagudem‐Palocha 400 D/C 68 Mar‐15 SCHMES TO BE FORMULATED
21 STATE Durshed‐Husnabab 220 S/C 20 14‐Mar
22 STATE Durshed‐Husnabab (2nd Ckt) 220 S/C 20 14‐Mar
23 STATE Gaddamvaripalli‐ Goddumari 220 D/C 9 13‐Apr WORK UNDER PROGRESS
24 STATE Gajwel‐ Narsapur 400 D/C 200 Mar‐13 Preliminary survey completed. Detailed survey to be awarded
25 STATE Gajwel‐Tipparam 220 D/C 20 Mar‐13
26 STATE Garividi‐Bobbili 220 D/C 75 Dec‐13 WORK UNDER PROGRESS
27 STATE Gas Station‐R.C.Puram(EG) 220 D/C 60 Mar‐1328 STATE Gas station 4‐Nidadavolu 400 D/C 60 Mar‐13 SCHMES TO BE FORMULATED
29 STATE Gas station‐Tanuku 220 S/C 70 Mar‐13
30 STATE Gooty‐Adoni 220 S/C 45 Mar‐13
31 STATE Gooty‐Adoni (2nd ckt) 220 S/C 32 Mar‐13
32 STATE Hinduja Vizag TPP‐Kamavarapukota 400 D/C 600 Mar‐13
33 STATE Jaipur TPP‐ Gajwel (Quad) 400 D/C 328 Mar‐13
34 STATE Jangampalli‐Mulkapalli 220 S/C 6 Mar‐13 EVALUTION UNDER PROGRESS.
35 STATE KTS‐Regalla 220 S/C 7 Feb‐13 Work awarded on 06.02.2013.Works commenced
36 STATE Kalpaka‐Pendurti 400 D/C 50 Mar‐13
37 STATE Kalpaka ‐proposed Garividi 400 D/C 300 Mar‐13
38 STATE Kalwakurthy‐Balanagar S/S 220 S/C 27‐Jan Mar‐13 SCHMES TO BE FORMULATED
39 STATE Kalwakurthy‐Balanagar (2nd Ckt) 220 S/C Mar‐14
40 STATE Kalwakurthy‐Dindi 3RD LINE 220 S/C 24 Mar‐14
41 STATE Kalyandurg‐Anantapur 220 S/C 61 Mar‐14
42 STATE Kamareddy‐Bhumpally 220 S/C 15 Mar‐15
43 STATE Kamavarapukota‐Suryapet 400 D/C 424 Mar‐15 LOI issued on 15.07.2013.Detailed survey is under progress
44 STATE Kanthanapally‐Warangal 400 D/C 110 Mar‐15 Scheme to be formulated
45 STATE Karimnagar ‐Bellampalli 400 D/C 70 Mar‐15 Scheme to be formulated
46 STATE Karimnagar‐Dichipalli 400 S/C 85 Mar‐16 Scheme to be formulated
47 STATE Karimnagar‐Anantagiri 220 S/C 30 Mar‐15
48 STATE Karimnagar‐Vemulavada 220 D/C 40 Mar‐15
49 STATE Karimnagar‐Yellampalli 220 D/C 80 Mar‐15
50 STATE Khammam‐Bayyaram 220 S/C 35 Mar‐15
51 STATE Koruprolu‐Narsipatnam 220 S/C 35 Mar‐15
52 STATE Krishnapatnam TPS _Bonapally (Quad) 400 D/C 182
53 STATE LILO ofGachibowli_thandur at Yeddumailaram 220 D/C 20 Oct‐13 Works are under progress. Stringing at Railway crossing is pending
54 STATE LILO of Mamidipalli‐Yeddumailaram 220 D/C 10 October‐13
55 STATE LILO of Manubolu ‐Renigunta at ranchagunneri S/S 220 D/C 3 March‐13
56 STATE LILO Pulivendula‐Hindupur(Ckt Kadiri) 220 D/C 50 February‐13
Shadnagar ‐ Yeddumailaram line proposed to be commissioned by
Oct'2013.ADSS(Data communications) works are under progress.
57 STATE
LILO of Shadnagar ‐ Yeddumailaram at 12
Yeddumailaram 220 D/C 12 December‐13
Cable laying completed. Cable jointing works completed. End termination works
to be taken up.
58 STATE
LILO of Shapur Nagar ‐ Gachilbowli feeder at GIS
Erragadda SS 220 D/C 19 July‐13
Works under progress.As the contractor has totally failed in completion of
works.The contract was terminated.New tenders are proposed to be called for
the balance works.
59 STATE LILO of Srisailam ‐ Hyderabad line at Edulapally 400 D/C 75 October‐13 Works are under progress
60 STATE LILO of Tadikanda ‐ Ongoliat at Poddili 220 D/C 144 October‐13
All works completed, except Works to be taken up under shut down, which will
be taken during this month
61 STATE LILO of Veltoor ‐Jurala at Lower Jurala HEP 220 D/C 10 December‐13 P.O.issued on 18.05.2013
62 STATE LILO of Vizag ‐ Khammam (Ckt‐I) at Asupaka 400 D/C 34 December‐13 WORK UNDER PROGRESS
63 STATE
LILO of Wanaparthy ‐ Ragimanagadda at Singotam
Road SS 220 D/C 11 December‐13 WORK UNDER PROGRESS
64 STATE Lower Jurala HEP ‐ Upper Jurala 220 D/C 22 March‐13
65 STATE Mailaram‐Sargapalli 220 S/C 43 October‐13 WORK UNDER PROGRESS
66 STATE Mamidipally S/S M/s K.S.K. Photo Voltaic near Fabcity Ravirala (V) 220 D/C 11 March‐14
67 STATE Manikonda SS‐Mamidipally‐Gachibowli 220 S/C 1 March‐15
68 STATE Manuguru‐Anantharam 220 D/C 16 December‐13
p g / j p g
are under progress
69 STATE Marripally common point‐ Hayatnagar S/S XLPE cable 220 D/C UG Cable 10 March‐15
70 STATE Midmaneru‐Kakatiya(Canal) 220 S/C 15 March‐15
71 STATE Minpur‐Kamareddy 220 S/C 55 December‐13
p g g p y g
work to be taken up.
12(b) Important Transmission Lines Under Construction
Andhra Pradesh Power system Profile
72 STATE Moulali ‐ Osmania University (Chilakalaguda) SS 220 D/C UG Cable 18 March‐14
73 STATE Muddanur‐Anantapur (3RD Line) 220 S/C 100 March‐14
74 STATE Nagarjunsasagar‐Chalakurthy (2nd Ckt) 220 S/C 14 March‐15
75 STATE Narasaraopet ‐ Parchur 220 D/C 106 October‐13 All works completed. Statutory remarks being completed
76 STATE Narketpally_Suryapet 220 S/C 60 March‐14
77 STATE Narsapur‐Doultabad 220 S/C 15 March‐15
78 STATE Narsapur‐Manoharabad 220 S/C 15 March‐15
79 STATE Nirmal‐Nandipeta 220 S/C 20 March‐15
80 STATE Nizamabad‐Janakampeta 220 S/C 10 March‐15
81 STATE Oddugudem‐Koyagudem 220 D/C 20 March‐15
82 STATE Oglapur 400kV S/S‐ Durshed 220 D/C 142 October‐13 All works completed. Statutory remarks being completed
83 STATE Oglapur(Warangal 400 kV SS)‐Warangal 220 kV SS 220 D/C 36 March‐15
84 STATE Painampuram ‐ Nellore Pooling Stations 400 D/C Nellore March‐15
85 STATE Palamaneru‐Madanapalli 220 S/C 50 March‐15
86 STATE Paloncha‐Kalyanapuram 220 D/C 20 March‐15
87 STATE Paloncha‐Oddugudem 220 D/C 20 March‐15
88 STATE Paloncha‐Yellandu 220 S/C 25 March‐15
89 STATE Peddapuram‐jaggampet‐LI 220 S/C 15 March‐15
90 STATE Pendurthy‐Vizianagaram 220 D/C 88 March‐16
91 STATE Polavaram ‐ Nidadavolu 400 D/C 120 March‐15
92 STATE Polavaram ‐ Suryapet 400 D/C 390 March‐14
93 STATE Priyadarshni Jurala‐Lower Jurala 220 S/C 8 March‐15
94 STATE Pulichintala HEP ‐ Chillakallu 132 D/C
95 STATE Pulichintala‐Piduguralla 220 S/C 35 March‐15
96 STATE Pulivendula Generation ‐ Kurnool 400 D/C 350 March‐17
97 STATE Pulivendula‐Hindupur 220 D/C 250 December‐13
98 STATE Purushottapatnam (Nunna) Jujjuru 400 D/C 112 December‐13
99 STATE RTPP‐Kondapuram 220 S/C 15 March‐14
100 STATE Ramagundam (BPL) ‐ Dichpally 400 S/C 150 March‐15 Scheme to be formulated.
101 STATE Ramagundam (BPL) ‐ Gazwel 400 S/C 120 March‐15 Scheme to be formulated.
102 STATE Ramagundam‐Jagityala (2nd Ckt) 220 S/C 68 March‐14
103 STATE Rayalaseema Stage‐IV ‐ Chittoor 400 D/C 420 March‐15
104 STATE Rayalseema ‐ Chitoor 400 D/C 420 June‐14 Tender to be colled for.
105 STATE Rentachintala ‐ Macherla S/S 132 S/C 17 March‐13 LINE CHARGED ON11.07.2013
106 STATE Rentachintala ‐ Nagarjuna Sagar Plant 132 S/C 16 October‐13
107 STATE Sargapalli‐Karjavelli 220 S/C 15 March‐15
108 STATE Sattenapalli (Narsaraopet) ‐ Narsaraopet 220 D/C 40 October‐13 Sub station works are under progress
109 STATE Siddipeta‐Tadkapalli 220 S/C 15 March‐15
110 STATE Sirpurkagaznagar‐Tummdihetty 220 S/C 15 March‐15
111 STATE Sitarampatnam‐Karakavagu 220 S/C 5 March‐15
112 STATE Suryapet ‐ Yeddumailaram 400 D/C 480 March‐15
113 STATE Thimmapuram‐ Yellanur 220 D/C 8 April‐13
114 STATE Vadarevu ‐ Amangal 765 S/C 240 March‐15
115 STATE Vadarevu ‐ Bhongiri 765 S/C 275 March‐16
116 STATE Veltoor‐Maktal 220 S/C 36 March‐14
117 STATE Veltur‐Maktal 220 S/C 36 March‐14
118 STATE Veltur‐Ragimanugadda 220 D/C 40 March‐15
119 STATE Veltur‐Tandur 220 S/C 84 March‐16
120 STATE Vemulavada‐Midmaneru 220 S/C 15 March‐15
121 STATE Vizag ( Hinduja) TPP ‐ Kalpaka (By Hinduja) 400 D/C 15 August‐13
122 STATE Warangal‐Raghunathapalli 220 S/C 25 March‐14
123 STATE Warangal‐Wardhanapet 220 S/C 45 March‐14
124 STATE Yedduailaram ‐ Edulapally (AP‐24 A) 400 D/C 83 July‐13
p g y p
works.The contract was terminated.New tenders are proposed to be called for
the balance works.
125 STATE Yeddumailaram ‐ Sadasivpet 220 D/C 78 December‐13 Works are under progress
126 STATE Yeddumailaram 400n KV SS‐Kandi 220 S/C 20 March‐15
127 STATE Yeddumailaram 400n KV SS‐Moosi (Sankarapalli 220 S/C 5 March‐15
128 STATE Yeddumailaram‐Cherial 220 D/C 30 March‐15
129 STATE Yeddumailaram‐Vattinagulapalli 220 S/C 5 March‐14
130 STATE Yellampalli‐Medaram(Chevellali) 220 S/C 2 March‐15
131 STATE Yellanur‐ Gaddamvaripalli 220 D/C 5 April‐13 Works are under progress
132 STATE
a) Jujjuru ‐ Sattenapalli (b) LILO of VTS ‐ Srisailam
line at Sattenapalli 400 D/C 134 October‐13 Works are under progress
CTU ( POWERGRID)1 POWERGRID GOOTY ‐MADUGIRI 400 D/C 422 83 June‐14
2 POWERGRID Krishnapatanm UMPP‐Gooty line (Quad) 400 D/C 632 578 March‐13 400KV D/C Nellor‐Gooty line commissioned in Mar'13. (early K'patnam UMPP Gooty
3 POWERGRID Kurnool (new) ‐ Kurnool line 400 D/C 18 August‐14 AWAARD UNDER PROGRESS
4 POWERGRID Kurnool ‐ Raichur (IInd Ckt) 765 S/C 246 16 August‐14
5 POWERGRID LILO of Gazuwaka ‐ Vijayawada at Vemagiri 400 S/C 38 June‐14 SCHEME UNDER REVIEW IN VIEW OF CERC DIRECTION
6 POWERGRID LILO of Nagarjunsagar ‐ Gooty at Kurnool 400 D/C 37 August‐14 AWARD UNDER PROGRESS
7 POWERGRID Nellore Pooling Station ‐ Kurnool 765 D/C 606
8 POWERGRID Tiruvelam (PG) ‐ Chitoor 400 D/C 42
Website: http://cea.nic.in/reports/proj_mon/pspm/trans_line_220kv_status.pdf
SOURCE: CEA WEBSITE
Andhra Pradesh Power system Profile
SRLDC
Black Start Restoration Procedure of SR 2013
���������������������������� ����������������������
VIK
AR
AB
AD
JN
B
EL
LA
MP
AL
LI
K
AR
IMA
NA
GE
R
MA
NU
GU
RU
P
AT
AN
CH
ER
VU
KA
KIN
AD
A P
OR
T
H
YD
ER
AB
AD
P
ED
DA
PA
LL
IB
AD
RA
CH
AL
AM
SA
MA
LK
OT
JN
SE
CU
ND
ER
AB
AD
H
AS
AN
PA
RT
IS
C V
ISH
AK
AP
TN
AM
JN
B
IBIN
AG
ER
T
UN
IA
NA
KA
PA
LL
E
WA
RA
NG
AL
KA
RE
PA
LL
I J
NA
NN
AV
AR
AM
K
AZ
IPE
T J
N R
AJ
AM
AN
DR
Y
K
OV
VU
R N
DV
M
IRY
AL
AG
UD
AN
IDU
DA
VO
LU
JN
N
ZM
BA
DD
OR
NA
KA
L J
NB
HIM
AV
AR
AM
JN
p
ed
da
KA
MM
AM
J
AN
KA
MP
ET
JN
N
AD
IKU
DI J
N
GU
DIW
AD
A J
N
MM
E
LU
RU
E
luru
M
AC
HE
RL
AJ
P
B
HO
DA
N M
AC
HIL
IPT
NA
M
V
IJA
YA
WA
DA
JN
DR
ON
AC
HA
LA
M J
N G
IDD
AL
UR
N
AL
LA
PA
DU
JN
NA
ND
YA
L D
ON
AK
ON
DA
KR
ISH
NA
CA
NA
L J
N
N
AR
AS
RA
OP
ET
GU
NT
UR
JN
TE
NA
LI J
N
BA
PA
TL
A
D
HA
RM
AV
AR
AM
JN
P
AK
AL
A J
N
A
NA
NT
AP
UR
GU
DU
R J
N
N
EL
LO
RE
KA
VA
LI
ON
GO
LE
TIR
UP
AT
I
PA
MID
IC
UD
DA
PA
HM
UD
DA
NU
R
KO
DU
RU
S
RIK
AL
AH
AS
TI
GO
OT
YR
AJ
AM
PE
T R
EN
IGU
NT
A J
N
G
UN
TA
KA
L J
N
V
EN
KA
TA
GIR
I
P
UT
TU
R
TIT
LE
AN
DH
RA
PR
AD
ES
H &
KA
RN
AT
AK
A T
RA
CT
ION
FE
ED
ING
SU
BS
TA
TIO
NS
W
HIT
EF
IEL
DB
AN
GA
RP
ET
JN
K
UP
PA
M2
20
kV
SU
B S
TA
TIO
NS
11
0kV
SU
B S
TA
TIO
NS
Ka
lah
asti
Ko
du
ru2
20
kV
Ra
jam
pet
22
0kV
Ka
lkiri
22
0kV
Ch
ittu
r2
20
kV
Ne
llo
re
22
0kV
Allu
rK
ava
liK
an
du
ku
rS
ing
ara
yako
nd
a
Su
lurp
et
22
0kV
Gud
ur
On
go
le2
20
kV
Re
nik
un
ta2
20
kV
Ve
nka
tag
iri
Viz
ag
22
0kV
Bo
mm
ur
22
0kV
Pe
dd
ap
ura
mT
un
iK
oru
pro
lu
Ka
kin
ad
a2
20
kV
PE
DD
AP
UR
AM
Bo
mm
ur
22
0kV
Bim
ad
ole
22
0kV
ND
V 2
20
kV
Bh
ima
vara
m2
20
kv
Bh
imd
ole
22
0kV
Nid
ud
avo
lu 2
20
kV
Ta
dik
on
da
22
0kV
Gu
na
da
la
Gu
ntu
rT
en
ali
Pa
ruch
ur
22
0kV
Ch
.pe
ta
gH
AN
AP
UR
22
0kV
Na
rke
tpa
lli 2
20
kV
Mirya
lag
ud
a 2
20
kV N
alg
on
da
Pid
ug
ura
lla
Ma
ch
erl
a
Mirya
lag
ud
a2
20
kV
Ko
nd
ap
alli
22
0kV
VT
PS
22
0kV
Vija
yaw
ada
Ka
mm
am
2
20
kV
Do
rna
ka
l
Wa
ran
ga
l2
20
kV
Sin
ga
ren
y co
lle
rie
s
Pa
lam
an
eru
22
0kV
ku
pp
am
Sh
an
tipu
ram
wh
itefie
ld 2
20
kV
Ko
lar
22
0kV
Ba
ng
arp
et
TA
ND
UR
22
0kV
MU
DD
AN
UR
GO
OT
Y
22
0kV
TA
DIP
IRI
22
0kV
86
SIRPUR KAGHAZNAGAR (SKZR)
POWER SUPPLY NETWORK FORRAILWAY TRACTION OVERSOUTH CENTRAL RAILWAY
VATLUR (VAT)
:
~?f~~:=~~~~~~~~~~~~~~~~~~~ElURU KANUMOlUKRISHNA CANAL IN. (KCG)
IAYAJULULI
LEGEND
~~:----L_.nSULURUPETA
RENIGUNTA IN. (RU)SCR LIMIT 133.56
110 kV SUPPLY (KPTCL)
TRACTION SUB STATION
132 kV SUPPLY
220 kV SUPPLY
220 kV SUPPLY (MSEB)
400 kV SUPPLY
GRID SUB STATION CJ
THERMAL POWER STATION ~
HYDEl POWER STATIONSCR LIMIT AT CH: 0.850
KATPADIJN.ELECTRIFIED TRACK ~
SIRPUR KAGHAZNAGAR (SKZR)
ONGOLE (OGL)
':l~~~~~~~~~~~SULURUPETAJ RENIGUNTA IN.(RU)SCR LIMIT 133.56
SCR LIMIT AT CH: 0.850
KATPAOIJN.
T••~~~.-otMC) •••~
"'·O'o'lC i'CTtH rfCl.t"S!.•• ...-AQ I"O~~ I-oOCJSi:
Jo...A'" 'L9·"TJ.T1I';" .
.- ".. :; :- ...~-'.'~2 ••'j S•.!3~S·"·C'll•• - 4,. ~.:_ ~-.- ~' •
. 11 1(\- ',-
. .: e , - ',:.
IIAND~RA PRADESH Ii, ,
1;-
BAY OF BENGAl
RAILWAYS
SHOWING
POWER SUPPLY DIAGRAM
CONNECTED GENERATING
STATIONS
C Korthi
D Venkot
Dt . C.06_U
(K.PALANI)Dy.CEE/TRD/Co-ord.
14(a) Political Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
14(b) Road Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
14(c) Railway Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
14(d) Agriculture Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
14(e) Mineral Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
14(f) River Map
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
832.8 670 551.6 892.55 513.59179.83 2237 1398.13 6537.8 150.88269.75 4300 1317.02 6780.75 243.84
15(a) Andhra Pradesh Reservoir Information
Reservoir Full
reservoir level (m)
Annual Design
Potential (Mu)
Energy Content at F.R.L
Effective Capacity at
F.R.L (MCM)
Min. Draw Down Level
(m)
MACHKANDNAGARJUNA SAGAR
SRISAILAMSource: CEA Report as on 09th OCTOBER, 2013
Weblink: http://cea.nic.in/daily_hydro.html
Andhra Pradesh Power system ProfileAndhra Pradesh Power system Profile
Name Designation Contact. No.Chairman
Sri. Mrutyunjay Sahoo, IAS Chairman 2345545223317643
Sri.S.A.M Rigvi Chairman 23454884
Sri.H.Y.Dora Chairman 2284101
S i K ik Mi Ch i 2461501
MD
ANDHRA PRADESH Southern Power Distribution Company Limited http://www.apspdcl.in/
MD
Website:http://apgenco.gov.in/
Sri K. Vijayanand I.A.S MD
ANDHRA PRADESH Central Power Distribution Company Limited http://www.apcentralpower.com/
16(a) Details of GENCOs, TRANSCOs, DISCOMs and SLDC
ANDHRA PRADESH Power Transmission Corporation Limited
MDSri S. Suresh chandra
ANDHRA PRADESH Power Generation Company Limited23317657
ANDHRA PRADESH Northen Power Distribution Company Limited http://www.apnpdcl.in/
Andhra Pradesh Power system Profile
Sri.Kartikeya Misra Chairman 2461501
Sri.Seshagiri Babu Chairman 2582501
Sri.SurendarBabu CHIEF ENGINEER 9440811106
Sri.S.Sairam CHIEF ENGINEER (LD) 23317645ADDL. CHIEF ENGINEER (LD)
Sri.A.K.V BhaskarSUPERINTENDING ENGINEER (LD)
9490153116
Sri.P.V.Kumara Swami MANGER (F&A - LD) 9490153147
MD
SLDC CONTROL ROOM
ANDHRA PRADESH Eastern Power Distribution Company Limited https://www.apeasternpower.com/EPDCL_Home.portal
MD
As on 01st Sept., 2013
ANDHRA PRADESH Power Trading Company Limited http://www.aptransco.gov.in/
ANDHRA PRADESH State Load Despatch Centre http://www.apsldc.gov.in/
Andhra Pradesh Power system Profile