STATEMENT OF QUALIFICATIONS GENERAL INFORMATION A. Letter of Intent B. Company Overview C. Insurance Certificate D. SubConsultants Architect / Landscape Architect: Christopher @ Architects LLC Community Engagement: Christopher @ Architects LLC Structural Engineering: Hetman Engineering LLC Mechanical / Plumbing Engineering: Hollman Engineering LLC Electrical Engineering: Charles TECHNICAL AND MANAGEMENT QUALIFICATIONS A. PROJECT TEAM ORGANIZATION a. Team Working Relationship Artistic Renovations of Ohio and Christopher @ Architects LLC have worked together on a number of projects over the last 5.5 years. Two example projects are a $500,000 existingbuilding renovation for Robusto & Briar (Lakewood, Ohio) and a $500,000 renovation and addition at the Shelley Residence (Shaker Heights, Ohio). Robusto & Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher @ Architects LLC managed the design process working directly with these owners. Through a series of schematicdesign and designdevelopment meetings, the owners gave feed back to the design and detailing. Both projects were presented to public Architectural Review Boards for approval. Artistic Renovations of Ohio manage the budgeting, bidding and construction on these projects. Christopher @ Architects LLC provided construction observation advice throughout construction. During construction of Robusto & Briar, existing structural conditions became apparent with the removal of wall and floor finishes. Working as a team, with

Upload: others

Post on 17-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

STATEMENT OF QUALIFICATIONS 

 

GENERAL INFORMATION 

A. Letter of Intent 

B. Company Overview 

C. Insurance Certificate 

D. Sub‐Consultants  Architect / Landscape Architect: Christopher @ Architects LLC 

Community Engagement: Christopher @ Architects LLC 

Structural Engineering: Hetman Engineering LLC 

Mechanical / Plumbing Engineering: Hollman Engineering LLC 

Electrical Engineering: Charles 

TECHNICAL AND MANAGEMENT QUALIFICATIONS 

A. PROJECT TEAM ORGANIZATION 

a. Team Working Relationship 

Artistic Renovations of Ohio and Christopher @ Architects LLC have worked together on 

a number of projects over the last 5.5 years.  Two example projects are a $500,000 

existing‐building renovation for Robusto & Briar (Lakewood, Ohio) and a $500,000 

renovation and addition at the Shelley Residence (Shaker Heights, Ohio).  Robusto & 

Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates 

(MEP).   

   

On the above projects, 

Christopher @ Architects LLC managed the design process working directly with 

these owners.  Through a series of schematic‐design and design‐development 

meetings, the owners gave feed back to the design and detailing.  Both projects 

were presented to public Architectural Review Boards for approval.   

Artistic Renovations of Ohio manage the budgeting, bidding and construction on 

these projects.  Christopher @ Architects LLC provided construction observation 

advice throughout construction.   

During construction of Robusto & Briar, existing structural conditions became 

apparent with the removal of wall and floor finishes.  Working as a team, with 

Page 2: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

structural engineer Chuck Hetman, these structural issues were addressed and 

new framing members were added.   

On this upcoming design‐build project,  

Christopher @ Architects LLC (lead) and Artistic Renovations of Ohio together will 

manage client and community input  

Christopher @ Architects LLC will manage his consulting engineers in collaboration 

with Artistic Renovations of Ohio cost, quality and constructability input during the 

project design, and  

Artistic Renovations of Ohio will manage the construction with Christopher @ 

Architects and his consultants in supporting roles 

b. Construction:  Artistic Renovations of Ohio 

12333 Ridge Road, Suite 1B, North Royalton, Ohio 44133 

Principal‐in‐Charge: Ken Perrin CAPS I, CAPS II, CGP, EPA Certified  

CERTIFICATIONS

Home Builders Association of Greater Cleveland Certified Aging in Place Professional Home Builders Association of Greater Cleveland Certified Green Remodeler

United States Environmental Protection Agency Certified Toxic Substances Control Act 2016-2021 EPA Certified Renovator

ORGANIZATIONS

Board of Director – National Association of the Remodeling Industry, Greater Cleveland Chapter 2007 - Present Board of Director – Home Builders Association of Greater Cleveland 2008 - 2011 Co-Chairman Home Builders Association of Greater Cleveland Remodeling Counsel 2008 - 2009 Chairman Home Builders Association of Greater Cleveland Remodeling Counsel 2010 – 2011 AIA Greater Cleveland Allied Member

AWARDS & ACCOMPLISHMENTS

2016 Lifetime Achievement Award – National Association of the Remodeling Industry 2015 National Commercial Renovation Award – National Association of the Remodeling Industry

2013 Most Valuable Player – National Association of the Remodeling Industry 2009 & 2010 Remodeler of the Year – Chrysalis Award

2005 - 2019 Winner of over 200 National and Local Design and Remodeling Awards NARI and Chrysalis National Historical Renovation Awards

2007 Big 50 – Remodeling Magazine  

Facilitates the remodeling and construction needs of residential and 

commercial clients who have unique requirements and high demand of 

individual attention.   

Has facilitated and completed the site / sewer / roadway development 

of over 500 lots in 3 counties around greater Cleveland. Secured the 

purchase and site design to maximize ROI while protecting the 

neighborhood and surrounding  properties. Worked with the 

Page 3: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

surrounding residents for their input and concerns. Because of such 

meetings we would use this input to save trees, add buffering 

landscaping, changed lot locations and lowered density that made the 

local community very happy.  

Ken has a long working relationship with the city of Lakewood’s building 

department, ARB and zoning departments, having multiple jobs going 

on in the city at this time.  

 

 

(216) 520‐0838; [email protected] 

Person responsible for overall management of the Project and 

design‐build contract; Ken Perrin  

Person responsible for overall construction management 

Person responsible for quality assurance: Matt Batzel  

Person responsible for risk management: Sue Perrin  

Person responsible for cost controls and budgeting: Sue Perrin and 

Ken Perrin  

Person responsible for scheduling: Sue Perrin  

Person responsible for system testing, configuration and 

commissioning: Ken Perrin and Anthony Perrin  

Site Superintendent: Eric Bican  

c. Design:   Christopher @ Architects LLC 

820 West Superior Avenue, Suite 425, Cleveland, Ohio 44113‐1800 

Principal‐in‐Charge: Christopher Toddy, AIA 

(440) 239‐9560, christopher@architects‐llc.cc 

Designer of Record 

d. Engineering:  Hetman Engineering LLC 

10315 Edgerton Road, North Royalton, Ohio 44122 

Principal‐in‐Charge: Chuck Hetman P.E. 

 

Fred H. Hollman P.E. Consulting 

7010 Wolf Avenue, Parma, Ohio 44129 

Principal‐in‐Charge: Fred Hollman P.E. 

 

Charles A. Lewis & Associates, Inc. 

13700 State Road, Suite 11, North Royalton, Ohio 44133 

Principal‐in‐Charge: John Campbell P.E.  

• Negotiate construction contracts with property owners and principal clients. • Review, analyze, and resolve construction problems and discrepancies between t

architects, and subcontractors. • Conduct project meetings, coordinate construction activities, prepared man-power

develop, manage, and control budget and job costing of projects. • Coordinate with architect entire building plans; work in conjunction with city in perm

approval process. • Prepare and present documents for ARB and Zoning boards in various cites throu

Northeast Ohio for successful approvals

Page 4: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

 

 

 

B. PROJECTS OF SIMILAR SCOPE AND COMPLEXITY 

a. Artistic Renovations of Ohio: 

                           i. Society Lounge on East 4th in Cleveland  

Successfully completed a 1.8‐million‐dollar renovation of a Historical Building complete 

with lowering the basement floor over 3 feet and the complete build with furnishings.  

Ken Perrin was responsible to oversee the overall design, structural, engineering, ADA 

compliance, fire protection, all mechanicals and furniture design and build out. Ken 

worked closely with the building’s owner to comply with all historical requirements to 

protect the historical tax credits.  

    

   

                     b.    Christopher @ Architects LLC: 20‐year firm with experience on  

i. Civic and Education projects, ranging from $100,000 to $300,000 

1. C.Toddy experience with other firms,        

  ranging from $300,000 to $5,000,000 

ii. Orthopedic Clinic Projects, ranging from $1,000,000 to $6,000,000 

iii. Auto Dealership Projects, ranging from 100,000 to $4,000,000 

iv. Industrial Projects, ranging from $500,000 to $3,000,000 

v. Multi‐Family Projects, ranging from $1,000,000 to $40,000,000 

vi. Example project: Below are three projects for an Orthopedic Group in Northern 

Indiana: a $6,000,000 phased renovation and additions totaling 70,000 SF to 

their main campus in Elkhart, a $2,000,000 new construction 10,000 SF facility in 

Middlebury, and a $3,000,000 new construction 20,000 SF facility in Goshen.   

Page 5: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

 

      

   

   

b. Hetman Engineering LLC: A 17‐year Structural Engineering firm that has worked on a 

variety of projects from $150,000 to $10,000,000 Cleveland Clinic project 

c. Fred Hollman P.E. Consulting: A 45‐year Mechanical and Plumbing Engineering firm that 

has worked on a variety of projects, from $50,000 to $10,000,000 

d. Charles A. Lewis & Associates: A 59‐year Electrical Engineering firm that has worked on a 

variety of projects, from $50,000 to $10,000,000 

C. DESIGN‐BUILD A/E PAST PERFORMANCE 

a. Design‐Build Experience for Architects 

i. For the last 20+ years, Christopher @ Architects LLC has teamed up with 

General Contractors to provide contractor‐led Design‐Build on the following 

building types: 

1. Orthopedic Clinics 

2. Auto Dealerships 

3. Industrial 

Page 6: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

4. Residential 

b. Architects‐Engineers Joint Experience 

i. For the past 6+ years, Christopher @ Architects LLC has teamed with Hetman 

Engineering, Hollman Consulting and Lewis & Associates on the following 

projects: 

1. Educational 

2. Industrial 

3. Commercial 

ii. No pending litigation and binding arbitration.  Christopher @ Architects LLC has 

one 2006‐2007 mediation ‐ arbitration – lien – judgment collection item in its 

history: Christopher @ Architects won a binding arbitration judgment due to 

non‐payment by a developer of a multi‐family housing project in Spring Lake, 

Michigan.   

iii. An example project: 14,000 SF Gymnastics and Dance School in Berea, Ohio 

  

D. DESIGN‐BUILD CONSTRUCTION PAST PERFORMANCE 

a. Design‐Build Experience for Contractor 

b. Contractor‐Architect Joint Experience 

i. 5.5+ years – see above for Robusto & Briar and Shelley Residence 

E. TEAM’S BENEFIT AND INTEGRATION INTO PROJECT 

a. Interest in the Project 

b. Anticipated Added Value to the Project 

c. Approach to Community Engagement and Inclusivity: 

End‐User Engagement: Interviews with those currently using the services of this 

department at its current locations: By talking to the end‐users of this department, we 

can understand the needs of the building from the visitor’s point of view.  This 

information would be gathered by offering optional interviews to those entering or 

exiting the current buildings.  This information would be gathered and shared with the 

project review team.   

Employee Engagement: In the packet, we see that a new‐building program has been 

compiled.  We assume that this information was gathered through interviews with the 

staff and department directors.  We would like to revisit that process to first‐hand gain 

understanding of the issues important to the functionality of these departments.  From 

this information, we also have the opportunity to consider and propose possible 

solutions to these design challenges.   

Page 7: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

 

 

Community Engagement: We want this building to be a good neighbor.  We will invite 

neighbors to public evening meeting(s) to discuss the project and their needs.  This 

information would be gathered and shared with the project review team.   

F. PROJECT NOTES 

a. We are wondering if the current stair to the assembly loft could be re‐built to 

accommodate access the a newly created upper floor within the cavity of the church 

assembly space in order to gain more space for offices.   

b. Based on the condition of the roof we would like to know if the roof replacement would 

lower long term insurance requirements for the city to reduce operating costs.   

Page 8: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Government / Civic / Recreation

C.T. Designer, with Alan Rensi, Project Architect, Richard Bowen + Associates, Inc. of Cleveland, Ohio;

Middleburg Heights Community Recreation Center, Middleburg Heights, Ohio; project design 1998-1999; 84,000 square feet new construction; 2000 Facility of the Year – Ohio Parks & Recreation Association.

C.T. Designer, with Richard Bowen + Associates, Inc. of Cleveland, Ohio;

Middleburg Heights Service Center, Middleburg Heights, Ohio; project design 1997-1998; 68,000 square feet new construction.

C.T. Proposal Writer, with Richard Fleischman Architects, Inc. of Cleveland, Ohio;

Bowling Green State University, Student Union Renovation, Bowling Green, Ohio, 1988. C.T. Project Assistant, under Art Brenneman, Project Architect, with Richard Fleischman Architects, Inc. of

Cleveland, Ohio; Cuyahoga County, Jail One Renovation and Addition, Cleveland, Ohio; project design 1998.

C.T. Project Assistant, with Richard Fleischman Architects, Inc. of Cleveland, Ohio; Cuyahoga Hills Boys School, Addition and Renovation, Cleveland, Ohio; project design 1998. Project Architect, with Richard Fleischman Architects, Inc. of Cleveland, Ohio:

Greater Cleveland Growth Association: Visitors’ Bureau at Cleveland Hopkins Airport, Brook Park, Ohio; project design and

construction 1998. Visitors’ Bureau at Tower City, Cleveland, Ohio; project design and construction 1998.

C.T. Project Assistant, with Steven H. Beilstein Architects Inc. of Mansfield, Ohio; Mansfield YMCA, Mansfield, Ohio; project design 1997, $3.1 Million budget, 1998 construction. C.T. Project Architect, with Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio:

Page 9: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

Rotary Club of Ontario Playground, Ontario, Ohio; design 1996, partially constructed 1996-1997.

City of Mansfield, Ohio

Renovation of Courtrooms; project design 1996, construction completed 1997.

Renovation of Security; project design 1996, construction completed 1997.

C.T. Designer and Assistant Project Architect, with Zarzycki Architects, Inc. of Lakewood, Ohio

Fire Station #1, Wickliffe, Ohio; project design and construction 1994

C.T. Project Architect and Designer, with James E. Childs and Associates, Inc. of South Bend, Indiana,

Administrative Offices for the Department of Housing and Urban Development of South Bend, South Bend, Indiana, 1989 project design, 1990 construction completed, $1.1 Million budget.

C.T. Project Assistant, under Ian McCaulley, Project Architect, with Hurtt-Kenrick Associates, PC, of South

Bend, Indiana; Central Station Renovation, South Bend, Indiana, renovation of historic train station into a banquet hall; project design 1987, construction completed 1992.

Libraries

Proposal Writer, Project Assistant, Schematic Design, with Richard Fleischman Architects, Inc. of Cleveland, Ohio in association with Gwathmey Siegel, New York City; Akron Public Library, Main Building Addition and Renovation, Akron, Ohio; project design 1998.

Project Architect and Schematic Designer, with Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio; Loudonville Public Library, Addition and Renovation, Loudonville, Ohio; project design 1996, 10,000 square foot renovation, 12,000 square foot addition, $1,400,000 budget.

Project Architect, with Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio, under Timothy Leist, Principal-in-Charge; South Central High School, Library Addition, Greenwich, Ohio; project design 1995, 8,000 square foot addition, construction 1997.

C.T. Project Architect, as Design Etcetera of Austin, TX; Heritage Park Branch Library, Austin Public

Libraries, Austin, TX; project design 1993, 12,000 square feet proposed, $1,100,000 budget, not constructed.

Page 10: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Planning C.T. Project Architect, with Richard Bowen + Associates, Inc. of Cleveland, Ohio; Jeep Industrial Park,

Toledo, Ohio; 1998 design; reclaimed brownfield, project in association with Hemisphere. Project Designer, as Christopher @ Architects LLC, Cleveland, Ohio; Cleveland (Ohio City Area) Re-Zoning

Proposal for the Ohio City Near West Development Corporation; design 1999. C.T. Project Leader, with Charles W. Moore, FAIA and the Graham Foundation, project sponsors;

Documentation of the Historic District of Guanajuato, Mexico; project 1992-93, unpublished.

Transportation Designer, with Ken Emling, Project Architect, Richard Bowen + Associates, Inc. of Cleveland, Ohio;

Greater Cleveland Regional Transit Authority Transit Center, North Olmsted, Ohio; project design 1998-1999; 1,800 square feet new construction.

Construction Representative, with Richard Fleischman Architects, Inc. of Cleveland, Ohio;

Louis B. Stokes Red Line Rapid Transit Station at Windermere, East Cleveland, Ohio; project design 1994, construction completed 1997, $12.7 Million. Client: John Goodworth, Greater Cleveland Rapid Transit Authority. Won 1998 American Institute of Architects Cleveland Chapter Merit Award.

C.T. Project Architect and Designer, Schematic Design, with Richard Fleischman Architects, Inc. of

Cleveland, Ohio; under Richard Fleischman for O’Brien Kreizberger, Inc., a subsidiary of Dames and Moore, Inc.; Euclid Corridor Improvement Project, eight red line rapid transit stations and a prototypical bus station, Cleveland, Ohio. Client: Steve Sabo of O’Brien Kreizberger; project design 1998, $240 Million budget.

C.T. Project Architect, with Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio; Lorain Bridge Maintenance Building, Lorain, Ohio; project design 1997, 2,000 square feet, $500,000 construction cost, construction completed 1998.

Page 11: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Religious

Mar Thoma Cathedral, Bellwood, Illinois; 2006 design, 2007 construction, $15

Million. Design Development and Construction Documents as Christopher @ Architects LLC, Cleveland, Ohio for Phase Two Architects LLC;

Architect-of-Record as Christopher @ Architects LLC, Cleveland, Ohio;

People’s Community Church, Berea, Ohio; design 1999-2000, modified construction 2000. St. Peters U.C.C. Church, Middleburg Heights, Ohio; design 2006. Saint Matthew the Evangelist Greek Orthodox Church, North Royalton, Ohio; design 1999, construction 2000;

2,300 square feet renovation and 3,300 square feet addition. St. Paul’s U.C.C. Courtyard and Building Renovations, Cleveland, Ohio; 2004-2005 design. Hope Chapel, Boston, Massachusetts; 1986 design, unbuilt

C.T. Assistant Project Architect, with Richard Fleischman Architects, Inc. of Cleveland, Ohio;

Saint Michael’s Catholic Church, new church, new gathering area, and renovation of existing church into a school gymnasium; project design 1998, 50,000 square feet, $6 Million construction cost.

C.T. Project Architect, with Richard Fleischman Architects, Inc. of Cleveland, Ohio; Christ the King Lutheran Church, Addition and Renovation, Twinsburg, Ohio, project design 1997, 9,000 square foot addition, $600,000 budget.

C.T. Project Assistant, with Richard Fleischman Architects, Inc. of Cleveland, Ohio; Chapel of the Divine Word Lutheran Church, Cleveland, Ohio; project design 1998.

C.T. Designer and Architect, with Jim Schmidt, Project Architect, Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio; St. Peters Activity Center, Mansfield, Ohio; 1996 design and new construction; 1999 American School & University Architectural Portfolio Award.

C.T. Project Architect, with Robert Zarzycki Architects, Inc. of Lakewood, Ohio: Church of the Covenant, Greeting Lobby Addition, Canton, Ohio; project design 1993, construction 1994; 2,000

square feet, connection to two floors; $230,000 Budget Saint Joseph the Worker Catholic Church, Administrative Offices and Banquet Hall Addition, Strongsville,

Ohio; project design 1993, 1995 construction, 22,000 square feet with Commercial Kitchen; $1,500,000. Saint John de Bosco, Interior Sanctuary Renovation, Middleburg Heights, Ohio; project design 1993, construction

completed 1994.

Page 12: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Industrial Architect-of-Record as Christopher @ Architects LLC, Cleveland, Ohio:

Durham Industrial Building site master planning, Durham, North Carolina; design

2007. Sanford Industrial Building site master planning, Sanford, North Carolina; design

2007. 1399 Bagley Incubator, Berea, Ohio; design 2006. TNT Warehousing, Elyria, Ohio; 2005 design and construction of 1500 square foot

new offices and 175,000 square foot renovation. Petrasek Incubator Condominiums, Berea, Ohio; preliminary design 2002,

construction projected 2008; 30,000 square feet new. Weber Incubator Offices, Eaton Township, Ohio; preliminary design 2003; 100,000

square feet new. Reserve Two Properties Building Addition, North Royalton, Ohio; project design

2003, construction projected 2008; 4,500 square feet. LA West, Inc., LaGrange, Indiana; project design 1999, construction 1999-2000;

80,000 square feet new construction. General Sheet Metal, Inc., Main Offices Renovation, South Bend, Indiana; project

design 2001, construction 2001; 12,000 square feet renovation.

Designer, Christopher @ Architects LLC, Cleveland, Ohio; Eastpointe Office/Warehouse Building; project design 2003-2004. C.T. Co-Project Designer, with Ken Emling at Richard L. Bowen + Associates, Inc. of Cleveland, Ohio;

NoShok World Headquarters and Distribution Center, Berea, Ohio; project design 1998; construction 1999-2000; 40,000 square feet manufacturing and 10,000 square feet office; 2003 Design Award of Merit – Society of American Registered Architects and 2000 Merit Award – AIA Cleveland Design Awards, 2000 Architectural Design of the Year Award – NAIOP and SIOR.

C.T. Project Architect and Designer, with Steven H. Beilstein Architects, Inc. of Mansfield, Ohio:

Jay Plastics Addition / Renovation, Mansfield, Ohio; project design 1997, construction completed 1997, 16,000 square feet, $1,200,000 budget.

Mohawk Industries Inc. Administrative Offices Addition, Second Phase Addition, Mansfield, Ohio; 1995 design and construction.

Taylor Metals Addition, Mansfield, Ohio; project design and construction 1997. Kronis Fabrication, Inc. Addition, Mansfield, Ohio; project design 1996-1997, construction 1997-1998.

Page 13: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Medical / Healthcare / Senior Living

Christopher Allen Tadych, AIA as Project Architect / Assistant Project Manager, while working for DHPY,

GreenFields of Geneva for Friendship Senior Options, in partnership with Greystone Communities and Bovis Lend Lease; Geneva, IL; design 2008; $51 M budget; 320,000 SF; construct 2009-2010.

Architect-of-Record and Designer as Christopher @ Architects LLC, Cleveland, Ohio; Orthopedic & Sports Medicine

Clinic MRI Addition, Goshen, Indiana; design 2015; 3,000 SF; $1M; construction 2015-2016. Architect-of-Record and Designer as Christopher @ Architects LLC, Cleveland, Ohio; Orthopedic & Sports Medicine

Clinic Satellite, Goshen, Indiana; design 2011-2012; 20,000 SF; $3M; construction 2012-2013.

Page 14: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

Designer, in association with Phase Two Architects LLC, South Bend, Indiana; Orthopedic & Sports Medicine Clinic Satellite, Middlebury, Indiana; design 2005-2006, construct 2006-2007. Designer, in association with Phase Two Architects LLC, South Bend, Indiana; Orthopedic & Sports Medicine Clinic Satellite, Shipshewana, Indiana; design 2005. Designer / Production, in association with Phase Two Architects LLC, South Bend, Indiana; Orthopedic & Sports Medicine Clinic Satellite, Nappanee, Indiana; design 2004-2005, construct 2005-2006. Designer, in association with Phase Two Architects LLC, South Bend, Indiana; Dunlap Primecare Offices, South Bend, Indiana; design and construction 2005 Designer as Christopher @ Architects LLC, Cleveland, Ohio: Lutheran Emergency Department Remodeling, Cleveland, Ohio; design 2005. Architect-of-Record and Designer as Christopher @ Architects LLC, Cleveland, Ohio;

Falls Pediatrics, Berea, Ohio; design 2005.

Architect-of-Record and Designer as Christopher @ Architects LLC, Cleveland, Ohio; Orthopedic & Sports Medicine Center of Northern Indiana, Inc., Elkhart, Indiana; project design 1999-2002, phased construction 2002-2003; 31,000 square feet renovation, 18,000 square feet addition; $4.5 M construction cost.

C.T. Project Manager and Designer, with Richard L. Bowen + Associates, Inc. of Cleveland, Ohio;

Assisted Living Developments for CareMatrix, Boston, Massachusetts: Brooklyn, Ohio; project design 1998; 200,000 square feet/3-story new construction. Memphis, Tennessee; project design 1998. Toledo, Ohio; project design 1998. Westlake, Ohio; project design 1998; 200,000 square feet/3-floor new construction

plus 5-12,000 square feet Independent-Living residential villas.

Project Manager and Designer, with Richard L. Bowen + Associates, Inc. of Cleveland, Ohio:

Portage County Nursing Home, Ravenna, Ohio; project design 1998, construction 1999; 165,000 square feet, 3-stories, 154 units.

Portage County Adult Day Care Center, Ravenna, Ohio; project design 1998.

Portage County Senior Center, Ravenna, Ohio; project design 1998.

C.T. Designer, under Alan Renzi, Project Manager with Richard L. Bowen + Associates, Inc. of Cleveland, Ohio;

Middleburg Heights Recreation Center, Middleburg Heights, Ohio; project design 1998, construct 1999-2000. C.T. Designer, under Alan Renzi, Project Manager with Richard L. Bowen + Associates, Inc. of Cleveland, Ohio; Portage

County Recreation Center, Ravenna, Ohio; project design 1998, construction 2000. C.T. Job Captain under Noel Cupkovic, Project Architect with Kenneth H. Martin, Architect of Cleveland, Ohio;

Northwestern Assisted Living Development, Berea, Ohio; project design 1985, construction completed 1987. C.T. Job Captain under Joe Dzierla with Joseph A. Dzierla and Associates, Inc. of South Bend, Indiana, a subsidiary of

Congre-Care, Inc. of Denver, Colorado; Bakersfield Assisted Living Development, Bakersfield, California; project design 1986, construction completed 1987.

C.T. Designer and Draftsperson on a variety of Assisted Living Developments for Congre-Care, Inc. with Joseph A. Dzierla and Associates, Inc. 1986-1991.

Page 15: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher

C r e a t i n g L a s t i n g E x p r e s s i o n s o f V i s i o n a n d V a l u e – A r c h i t e c t u r e · P l a n n i n g · I n t e r i o r s 820 West Superior Avenue, Suite 400, Cleveland, Ohio 44113-1800 ·(440) 239-9560 · [email protected]

Christopher @ Architects LLC a m e m b e r f i r m o f t h e A m e r i c a n I n s t i t u t e o f A r c h i t e c t s

Educational

Architect-of-Record and Designer as Christopher @ Architects LLC, Cleveland, Ohio; Above-the-Barre School of

Dance and Gymnastics, Cleveland, Ohio;

Phase Three, design 2016; 7,000 SF; $1.0M; construction 2016. Renovation, design 2015; 3,000 SF; $0.5M; construction 2015-2016. Phase Two, design and drawings 2014; 7,000 SF; $2.5M. Phase One, design 2014; 14,000 SF; $1.5M; construction 2014-2015.

Schematic Design, Christopher @ Architects LLC, Cleveland, Ohio; Vanity School of Cosmetology, Avon, Ohio; design

2005. Architect-of-Record as Christopher @ Architects LLC, Cleveland, Ohio;

Berea City School District Transportation Department Office Renovation/Addition; design and construction 2007. Olmsted Falls School District Transportation Depart. Office Renovation/Addition; design and construction 2004.

C.T. Project Architect, with Richard Fleischman Architects, Inc. of Cleveland, Ohio:

Cuyahoga Community College, East Campus Connectors Study, Cleveland, Ohio, 1998.

Cuyahoga Community College, East Campus East 1 Renovation and Addition, Cleveland, Ohio; project design 1998, 11,000 square feet, $900,000 budget.

St. Jerome Catholic School, Computer Room Renovation; Cleveland, Ohio; design 1998.

Captain Roth Elementary School, Courtyard Skylight, Cleveland, Ohio; project design 1998.

C.T. Project Architect, with Marr Knapp Crawfis Associates, Inc. of Mansfield, Ohio:

Mansfield City School District, Space Utilization Study of the Existing High

School, Report, and new School Proposal, Mansfield, Ohio; project 1996, 2001 Citation Award – American School and University Magazine.

Ontario Local School District, Space Utilization Report, School Additions Proposal & Bond-Issue Presentations, Ontario, Ohio; project design and presentation, 1996.

Clear Fork Valley Local School District, Bellville, Ohio; Space Utilization Report, School Additions Proposal, and Bond-Issue Presentations; project design and presentation 1996; recognized for educational design excellence – 2000 American School & University Architectural Portfolio.

South Central High School, Renovation and Additions, Greenwich, Ohio; project design 1996, construction completed 1997, $750,000 budget; 1998 “Learning by Design” Award.

Highland High School Addition, Ravenna, Ohio; project design 1997.

C.T. Project Architect, with Robert Zarzycki Architects, Inc. of Lakewood, Ohio; Saints Joseph and John Catholic School, Gymnasium and Classroom Additions, Strongsville, Ohio; project design 1994, construction 1995, $900,000.

C.T. Job Captain, with James E. Childs and Associates, Inc. of South Bend, Indiana under Marty Murphy, project architect; various Schools and Gymnasiums.

Page 16: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher
Page 17: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher
Page 18: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher
Page 19: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher
Page 20: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher
Page 21: STATEMENT OF QUALIFICATIONS (003) - Lakewood, Ohio · Briar was engineered by Chuck Hetman P.E. (structural) and Tim Norris P.E. & Associates (MEP). On the above projects, Christopher