state route 268 rutherford county, tn design public meeting june 2, 2015
DESCRIPTION
Tonight’s Schedule 5:15Presentation and Questions 5:45Open House Staff at displays to answer questions Complete comment cards and/or provide verbal comments to court reporter 7:00 AdjournTRANSCRIPT
State Route 268Rutherford County, TN
DESIGN PUBLIC MEETINGJune 2, 2015
Project Team Introduction
• TDOT Region 3 Project Development
• Wiser Consultants
Tonight’s Schedule
• 5:15 Presentation and Questions
• 5:45 Open House• Staff at displays to answer questions• Complete comment cards and/or provide verbal
comments to court reporter
• 7:00 Adjourn
Purpose of Today’s Meeting
• Discuss proposed improvements to SR 268 – Broad Street to Memorial Boulevard
• Receive input from the public
• Answer questions and address concerns
Long Range Transportation Map
Project Description
• 4.3 miles of roadway improvement• Road widening, addition of shoulders, curb
and gutter, and sidewalks
Proposed Image Render
Project Location
SR-268 THOMPSON LANE
BROAD STREET
MEMORIAL BOULEVARD
END PROJECT
BEGIN PROJECT
SR-268
SR-10
SR-1
1
2
Project Location
SR-268 THOMPSON LANE
END PROJECT
BEGIN PROJECT
MEMORIAL BOULVEVARD
BROAD STREET
SR-10
0 0.25 0.50 0.75 1.0
SR-1
SR-268
1
2
Proposed Overlay #1(Battlefield)
STATE ROUTE 268
Retaining Wall
Proposed Overlay #2(Between Hampton and Blanton)
STATE ROUTE 268
BLAN
TON
DRIV
E
Existing Brick Wall
Project Status
Environmental
Planning
Design
Right-of-Way
Construction
Project Currently in the Environmental and Design Phases
Comments
Your comments are important to us!
• Participate in the question-and-answer session
• Submit or mail-in comment cards
• Provide verbal comments to the court reporter
Contacts
Lori Lange, DirectorTDOT Region 3 Project Development (615) [email protected]
Fred Miller, Assistant DirectorTDOT Roadway Design Division (615) 741-0835 [email protected]
Questions?