www.mckenneys.com © 2012 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214 G eorgia Tech constructed a state-of-the-art basketball arena to enhance its existing coliseum, built in 1956. The new arena included 2,000 feet of mechanical piping and 2,500 feet of ductwork. THE CHALLENGE McKenney’s needed to account for the existing building structure and work within limited floor space. The coliseum was a circular building, which made mechanical field locations and dimensioning a challenge. THE SOLUTION The project team took a laser scan of the existing building for use in the Building Information Modeling (BIM) process and also used Trimble GPS technologies for trade layouts. All major mechanical components were prefabricated to limit onsite work. Local knowledge and engineering expertise were used to assist the design engineer and coordinate multiple trades. THE RESULTS McKenney’s significantly helped the customer lower its budgeted costs while maintaining system integrity and perform- ance. By leveraging its detailing and shop capabilities, McKenney’s helped complete the project on schedule with minimal field trim or call-ins. New Basketball Arena Scores Big PROJECT NAME McCamish Pavilion PROJECT LOCATION Georgia Institute of Technology Atlanta, Georgia PROJECT TEAM Owner: Georgia Institute of Technology General Contractor: Whiting – Turner Co. Architect: Populous Engineer: ME Engineers PROJECT STATUS Completed LEED ® CERTIFICATION LEVEL Gold

Upload: mckenneys-inc

Post on 12-Apr-2017

439 views

Category:

Business


0 download

TRANSCRIPT

Page 1: State-Of-The-Art Basketball Arena at Georgia Institute of Technology Atlanta, Georgia

www.mckenneys.com© 2012 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214

Georgia Tech constructed a state-of-the-art basketball arena to enhance its existing

coliseum, built in 1956. The new arena included 2,000 feet of mechanical piping and 2,500 feet of ductwork.

The ChallengeMcKenney’s needed to account for the existing building structure and work within limited floor space. The coliseum was a

circular building, which made mechanical field locations and dimensioning a challenge.

The SoluTionThe project team took a laser scan of the existing building for use in the Building Information Modeling (BIM) process and also used Trimble GPS technologies for trade layouts. All major mechanical components were prefabricated to limit onsite work. Local knowledge and engineering expertise

were used to assist the design engineer and coordinate multiple trades.

The ReSulTSMcKenney’s significantly helped the customer lower its budgeted costs while maintaining system integrity and perform- ance. By leveraging its detailing and shop capabilities, McKenney’s helped complete the project on schedule with minimal field trim or call-ins.

New Basketball Arena Scores BigPRojeCT name

� McCamish Pavilion

PRojeCT loCaTion

� Georgia Institute of Technology Atlanta, Georgia

PRojeCT Team

� Owner: Georgia Institute of Technology

� General Contractor: Whiting – Turner Co.

� Architect: Populous

� Engineer: ME Engineers

PRojeCT STaTuS

� Completed

leeD® CeRTifiCaTion level

� Gold