DEPARTMENT OF TRANSPORTATION SUMMARY OF BIDS LETTING OF STATE OF TENNESSEE MARCH 29, 2019 CHEATHAM COUNTY (Contract No. CNT908 Call 001) THE REPAIR OF THE BRIDGE ON BEECH HILL ROAD OVER I-40 (L.M. 0.96). PROJECT LENGTH - 11003-4136-04 0.0 MILES COMPLETION TIME - ON OR BEFORE JUNE 30, 2019 TOTAL CONTRACT Jamison Construction, LLC $324,307.00 Mid-State Construction Company, Inc. $372,787.75 1 PAGE

Upload: doankhanh

Post on 23-May-2019

212 views

Category:

Documents


0 download

TRANSCRIPT

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

CHEATHAM COUNTY (Contract No. CNT908 Call 001)

THE REPAIR OF THE BRIDGE ON BEECH HILL ROAD OVER I-40 (L.M. 0.96).

PROJECT LENGTH -

11003-4136-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2019

TOTAL CONTRACT

Jamison Construction, LLC $324,307.00

Mid-State Construction Company, Inc. $372,787.75

1PAGE

EXTENSION

CONTRACT CNT908

UNIT PRICE

BRIDGE CATEGORY

602-10.19 JACKING STEEL SPANS

LS1.000

Jamison Construction, LLC $20,000.0000 $20,000.00

Mid-State Construction Company, Inc. $9,466.4300 $9,466.43

602-10.32 STRUCTURAL STEEL (REPAIRS)

LB.100.000

Jamison Construction, LLC $75.0000 $7,500.00

Mid-State Construction Company, Inc. $33.6000 $3,360.00

602-10.81 HEAT STRAIGHTENING

LS1.000

Jamison Construction, LLC $156,875.0000 $156,875.00

Mid-State Construction Company, Inc. $194,289.5800 $194,289.58

603-02.20 SPOT PAINTING EXISTING STEEL STRUCTURES

S.F.1,200.000

Jamison Construction, LLC $15.0000 $18,000.00

Mid-State Construction Company, Inc. $16.0000 $19,200.00

603-05.20 CONTAINMENT & DISPOSAL OF WASTE(BR. NO. 01-SR061-15.67)

LS1.000

Jamison Construction, LLC $5,750.0000 $5,750.00

Mid-State Construction Company, Inc. $6,666.5000 $6,666.50

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH1.000

Jamison Construction, LLC $500.0000 $500.00

Mid-State Construction Company, Inc. $6,666.5000 $6,666.50

712-01 TRAFFIC CONTROL

LS1.000

Jamison Construction, LLC $36,100.0000 $36,100.00

Mid-State Construction Company, Inc. $30,701.4100 $30,701.41

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Jamison Construction, LLC $50.0000 $1,250.00

Mid-State Construction Company, Inc. $33.3300 $833.25

712-06 SIGNS (CONSTRUCTION)

S.F.550.000

Jamison Construction, LLC $10.0000 $5,500.00

Mid-State Construction Company, Inc. $8.6700 $4,768.50

712-08.03 ARROW BOARD (TYPE C)

EACH1.000

Jamison Construction, LLC $2,000.0000 $2,000.00

Mid-State Construction Company, Inc. $1,133.3100 $1,133.31

2PAGE

EXTENSION

CONTRACT CNT908

UNIT PRICE

712-08.10 MOBILE MESSAGE SIGN UNIT W/ATTENUATOR

HOUR120.000

Jamison Construction, LLC $120.0000 $14,400.00

Mid-State Construction Company, Inc. $131.3300 $15,759.60

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.6,116.000

Jamison Construction, LLC $2.0000 $12,232.00

Mid-State Construction Company, Inc. $6.6700 $40,793.72

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.1.000

Jamison Construction, LLC $8,000.0000 $8,000.00

Mid-State Construction Company, Inc. $9,999.7500 $9,999.75

717-01 MOBILIZATION

LS1.000

Jamison Construction, LLC $36,200.0000 $36,200.00

Mid-State Construction Company, Inc. $29,149.2000 $29,149.20

3PAGE

TOTAL CONTRACT

SUB-TOTAL BRIDGE

Jamison Construction, LLC $324,307.00

Mid-State Construction Company, Inc. $372,787.75

Jamison Construction, LLC $324,307.00

Mid-State Construction Company, Inc. $372,787.75

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

FENTRESS COUNTY (Contract No. CNT901 Call 002)

12.00%DBE GOAL

THE CONSTRUCTION OF A CONCRETE SLAB BRIDGE ON VINES RIDGE ROAD OVER BIG LAUREL CREEK (L.M. 1.06) AND A CONCRETE BOXBRIDGE ON ROTTEN FORK ROAD OVER THE ROTTEN FORK OF THE WOLF RIVER (L.M. 0.13), INCLUDING APPROACHES.

PROJECT LENGTH -

BRZ-2500(26),25945-3478-94,BRZ-2500(28),25945-3480-94

0.329 MILES

COMPLETION TIME - ON OR BEFORE NOVEMBER 30, 2019

TOTAL CONTRACT

Twin K Construction, Inc. $1,699,999.99

Adams Contracting, LLC $1,944,221.00

Potter South East LLC $2,277,421.07

1PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Twin K Construction, Inc. $33,435.7200 $33,435.72

Adams Contracting, LLC $50,000.0000 $50,000.00

Potter South East LLC $60,000.0000 $60,000.00

201-01 CLEARING AND GRUBBING

LS1.000

Twin K Construction, Inc. $92,875.3300 $92,875.33

Adams Contracting, LLC $100,000.0000 $100,000.00

Potter South East LLC $285,000.0000 $285,000.00

202-02.01 REMOVAL OF PIPE (12" CMP ,STA. 52+47±, OFFSET 44' LT)

L.F.32.000

Twin K Construction, Inc. $20.8000 $665.60

Adams Contracting, LLC $75.0000 $2,400.00

Potter South East LLC $42.0000 $1,344.00

202-02.02 REMOVAL OF PIPE (12" CMP ,STA. 53+24±, OFFSET 106' LT)

L.F.22.000

Twin K Construction, Inc. $30.2600 $665.72

Adams Contracting, LLC $75.0000 $1,650.00

Potter South East LLC $42.0000 $924.00

202-02.03 REMOVAL OF PIPE (12" CMP, STA. 57+06±, OFFSET 73' LT)

L.F.42.000

Twin K Construction, Inc. $15.8500 $665.70

Adams Contracting, LLC $75.0000 $3,150.00

Potter South East LLC $42.0000 $1,764.00

202-02.04 REMOVAL OF PIPE (18" CMP, STA. 52+12±, OFFSET 11' RT)

L.F.16.000

Twin K Construction, Inc. $41.6100 $665.76

Adams Contracting, LLC $75.0000 $1,200.00

Potter South East LLC $60.0000 $960.00

202-04.50 REMOVAL OF STRUCTURES EXISTING BRIDGE AT STA 53+77.00)

LS1.000

Twin K Construction, Inc. $16,189.1700 $16,189.17

Adams Contracting, LLC $50,000.0000 $50,000.00

Potter South East LLC $74,000.0000 $74,000.00

202-04.51 REMOVAL OF STRUCTURES (EXISTING BRIDGE DECK, STA. 55+55.52)

LS1.000

Twin K Construction, Inc. $16,189.1700 $16,189.17

Adams Contracting, LLC $35,000.0000 $35,000.00

Potter South East LLC $165,000.0000 $165,000.00

2PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

202-06.01 REMOVAL OF BUILDINGS (TRACT NO. 7)

LS1.000

Twin K Construction, Inc. $9,906.3900 $9,906.39

Adams Contracting, LLC $12,500.0000 $12,500.00

Potter South East LLC $6,800.0000 $6,800.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.5,845.000

Twin K Construction, Inc. $28.0000 $163,660.00

Adams Contracting, LLC $40.0000 $233,800.00

Potter South East LLC $12.1800 $71,192.10

203-03 BORROW EXCAVATION (UNCLASSIFIED)

C.Y.3,124.000

Twin K Construction, Inc. $18.0000 $56,232.00

Adams Contracting, LLC $40.0000 $124,960.00

Potter South East LLC $36.0000 $112,464.00

203-04 PLACING AND SPREADING TOPSOIL

C.Y.445.000

Twin K Construction, Inc. $30.8500 $13,728.25

Adams Contracting, LLC $40.0000 $17,800.00

Potter South East LLC $60.0000 $26,700.00

203-06 WATER

M.G.14.000

Twin K Construction, Inc. $1.2300 $17.22

Adams Contracting, LLC $100.0000 $1,400.00

Potter South East LLC $100.0000 $1,400.00

203-07 FURNISHING & SPREADING TOPSOIL

C.Y.42.000

Twin K Construction, Inc. $47.6000 $1,999.20

Adams Contracting, LLC $95.0000 $3,990.00

Potter South East LLC $200.0000 $8,400.00

209-02.03 8" TEMPORARY SLOPE DRAIN

L.F.99.000

Twin K Construction, Inc. $8.0300 $794.97

Adams Contracting, LLC $30.0000 $2,970.00

Potter South East LLC $12.8000 $1,267.20

209-02.07 18" TEMPORARY SLOPE DRAIN

L.F.105.000

Twin K Construction, Inc. $27.3700 $2,873.85

Adams Contracting, LLC $50.0000 $5,250.00

Potter South East LLC $31.0000 $3,255.00

3PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

209-05 SEDIMENT REMOVAL

C.Y.136.000

Twin K Construction, Inc. $32.4300 $4,410.48

Adams Contracting, LLC $25.0000 $3,400.00

Potter South East LLC $0.1000 $13.60

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.6,990.000

Twin K Construction, Inc. $4.8500 $33,901.50

Adams Contracting, LLC $5.0000 $34,950.00

Potter South East LLC $5.1000 $35,649.00

209-08.07 ROCK CHECK DAM PER

EACH61.000

Twin K Construction, Inc. $319.0200 $19,460.22

Adams Contracting, LLC $400.0000 $24,400.00

Potter South East LLC $405.0000 $24,705.00

209-08.08 ENHANCED ROCK CHECK DAM

EACH10.000

Twin K Construction, Inc. $552.1800 $5,521.80

Adams Contracting, LLC $450.0000 $4,500.00

Potter South East LLC $674.0000 $6,740.00

209-09.01 SANDBAGS

BAG100.000

Twin K Construction, Inc. $21.0400 $2,104.00

Adams Contracting, LLC $20.0000 $2,000.00

Potter South East LLC $11.0000 $1,100.00

209-09.04 SEDIMENT FILTER BAG(15' X 10')

EACH3.000

Twin K Construction, Inc. $1,590.0500 $4,770.15

Adams Contracting, LLC $1,500.0000 $4,500.00

Potter South East LLC $492.0000 $1,476.00

209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIMUM)

S.Y.10.200

Twin K Construction, Inc. $10.8100 $110.26

Adams Contracting, LLC $15.0000 $153.00

Potter South East LLC $6.8000 $69.36

209-65.03 TEMPORARY DIVERSION CHANNEL

L.F.65.000

Twin K Construction, Inc. $270.6100 $17,589.65

Adams Contracting, LLC $40.0000 $2,600.00

Potter South East LLC $132.0000 $8,580.00

4PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

209-65.04 TEMPORARY IN STREAM DIVERSION

L.F.359.000

Twin K Construction, Inc. $49.7400 $17,856.66

Adams Contracting, LLC $65.0000 $23,335.00

Potter South East LLC $262.0000 $94,058.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,734.000

Twin K Construction, Inc. $29.6800 $51,465.12

Adams Contracting, LLC $30.0000 $52,020.00

Potter South East LLC $32.0000 $55,488.00

303-01.02 GRANULAR BACKFILL (BRIDGES)

TON76.000

Twin K Construction, Inc. $42.1800 $3,205.68

Adams Contracting, LLC $50.0000 $3,800.00

Potter South East LLC $68.0000 $5,168.00

303-10.01 MINERAL AGGREGATE (SIZE 57)

TON29.200

Twin K Construction, Inc. $55.4900 $1,620.31

Adams Contracting, LLC $50.0000 $1,460.00

Potter South East LLC $84.0000 $2,452.80

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON126.000

Twin K Construction, Inc. $201.4100 $25,377.66

Adams Contracting, LLC $200.0000 $25,200.00

Potter South East LLC $215.0000 $27,090.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON3.000

Twin K Construction, Inc. $1,250.8400 $3,752.52

Adams Contracting, LLC $1,250.0000 $3,750.00

Potter South East LLC $1,500.0000 $4,500.00

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON11.000

Twin K Construction, Inc. $355.1100 $3,906.21

Adams Contracting, LLC $355.0000 $3,905.00

Potter South East LLC $69.0000 $759.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON0.800

Twin K Construction, Inc. $752.6200 $602.10

Adams Contracting, LLC $750.0000 $600.00

Potter South East LLC $3,000.0000 $2,400.00

5PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

403-02 ASPHALT CEMENT FOR TACK COAT (TC)

TON0.400

Twin K Construction, Inc. $752.6200 $301.05

Adams Contracting, LLC $750.0000 $300.00

Potter South East LLC $5,000.0000 $2,000.00

404-01.01 BITUMINOUS MATERIAL (DBST)

TON8.520

Twin K Construction, Inc. $1,272.0400 $10,837.78

Adams Contracting, LLC $1,275.0000 $10,863.00

Potter South East LLC $2,160.0000 $18,403.20

404-01.02 MINERAL AGGREGATE (DBST)

TON67.600

Twin K Construction, Inc. $201.4100 $13,615.32

Adams Contracting, LLC $200.0000 $13,520.00

Potter South East LLC $116.8000 $7,895.68

411-01.10 ACS MIX(PG64-22) GRADING D

TON78.000

Twin K Construction, Inc. $381.6100 $29,765.58

Adams Contracting, LLC $380.0000 $29,640.00

Potter South East LLC $232.0000 $18,096.00

415-01.03 COLD PLANING BITUMINOUS PAVEMENT

C.Y.14.000

Twin K Construction, Inc. $704.9200 $9,868.88

Adams Contracting, LLC $700.0000 $9,800.00

Potter South East LLC $994.0000 $13,916.00

604-10.51 SCARIFYING

S.Y.312.000

Twin K Construction, Inc. $15.5900 $4,864.08

Adams Contracting, LLC $15.0000 $4,680.00

Potter South East LLC $50.0000 $15,600.00

607-05.02 24" CONCRETE PIPE CULVERT (CLASS III)

L.F.78.000

Twin K Construction, Inc. $73.6800 $5,747.04

Adams Contracting, LLC $100.0000 $7,800.00

Potter South East LLC $112.0000 $8,736.00

607-39.02 18" PIPE CULVERT (SIDE DRAIN)

L.F.130.000

Twin K Construction, Inc. $42.7600 $5,558.80

Adams Contracting, LLC $75.0000 $9,750.00

Potter South East LLC $72.0000 $9,360.00

6PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

611-07.01 CLASS A CONCRETE (PIPE ENDWALLS)

C.Y.3.000

Twin K Construction, Inc. $1,265.2600 $3,795.78

Adams Contracting, LLC $2,500.0000 $7,500.00

Potter South East LLC $2,100.0000 $6,300.00

611-07.02 STEEL BAR REINFORCEMENT (PIPE ENDWALLS)

LB.140.000

Twin K Construction, Inc. $2.9600 $414.40

Adams Contracting, LLC $5.0000 $700.00

Potter South East LLC $4.5000 $630.00

705-01.04 METAL BEAM GUARD FENCE

L.F.238.000

Twin K Construction, Inc. $58.3000 $13,875.40

Adams Contracting, LLC $65.0000 $15,470.00

Potter South East LLC $66.8300 $15,905.54

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.298.000

Twin K Construction, Inc. $28.6200 $8,528.76

Adams Contracting, LLC $30.0000 $8,940.00

Potter South East LLC $21.1800 $6,311.64

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.156.250

Twin K Construction, Inc. $28.6200 $4,471.88

Adams Contracting, LLC $30.0000 $4,687.50

Potter South East LLC $26.9500 $4,210.94

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH3.000

Twin K Construction, Inc. $795.0200 $2,385.06

Adams Contracting, LLC $800.0000 $2,400.00

Potter South East LLC $935.0000 $2,805.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH7.000

Twin K Construction, Inc. $2,491.0700 $17,437.49

Adams Contracting, LLC $2,500.0000 $17,500.00

Potter South East LLC $2,640.0000 $18,480.00

705-15.82 TRANSITION PANEL, NEW JERSEY BARRIER

EACH4.000

Twin K Construction, Inc. $954.0300 $3,816.12

Adams Contracting, LLC $1,100.0000 $4,400.00

Potter South East LLC $1,500.0000 $6,000.00

7PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

707-08.11 HIGH-VISIBILITY CONSTRUCTION FENCE

L.F.1,047.000

Twin K Construction, Inc. $2.1200 $2,219.64

Adams Contracting, LLC $3.0000 $3,141.00

Potter South East LLC $2.3700 $2,481.39

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON250.000

Twin K Construction, Inc. $49.3900 $12,347.50

Adams Contracting, LLC $50.0000 $12,500.00

Potter South East LLC $48.0000 $12,000.00

709-05.06 MACHINED RIP-RAP (CLASS A-1)

TON843.200

Twin K Construction, Inc. $34.5700 $29,149.42

Adams Contracting, LLC $50.0000 $42,160.00

Potter South East LLC $41.8000 $35,245.76

709-05.08 MACHINED RIP-RAP (CLASS B)

TON532.000

Twin K Construction, Inc. $53.0000 $28,196.00

Adams Contracting, LLC $50.0000 $26,600.00

Potter South East LLC $43.0000 $22,876.00

712-01 TRAFFIC CONTROL

LS1.000

Twin K Construction, Inc. $17,397.8600 $17,397.86

Adams Contracting, LLC $40,000.0000 $40,000.00

Potter South East LLC $68,000.0000 $68,000.00

712-04.02 FLEXIBLE DRUMS (CHANNELIZATION)

EACH20.000

Twin K Construction, Inc. $29.6800 $593.60

Adams Contracting, LLC $35.0000 $700.00

Potter South East LLC $30.8000 $616.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH22.000

Twin K Construction, Inc. $27.5600 $606.32

Adams Contracting, LLC $35.0000 $770.00

Potter South East LLC $28.6000 $629.20

712-06 SIGNS (CONSTRUCTION)

S.F.262.000

Twin K Construction, Inc. $13.7800 $3,610.36

Adams Contracting, LLC $10.0000 $2,620.00

Potter South East LLC $14.3000 $3,746.60

8PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.128.000

Twin K Construction, Inc. $16.9600 $2,170.88

Adams Contracting, LLC $20.0000 $2,560.00

Potter South East LLC $17.6000 $2,252.80

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.317.000

Twin K Construction, Inc. $4.1300 $1,309.21

Adams Contracting, LLC $7.0000 $2,219.00

Potter South East LLC $4.2900 $1,359.93

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.24.000

Twin K Construction, Inc. $14.7300 $353.52

Adams Contracting, LLC $15.0000 $360.00

Potter South East LLC $15.2900 $366.96

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.45.000

Twin K Construction, Inc. $15.2600 $686.70

Adams Contracting, LLC $16.0000 $720.00

Potter South East LLC $15.8400 $712.80

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Twin K Construction, Inc. $26.5000 $26.50

Adams Contracting, LLC $3,000.0000 $3,000.00

Potter South East LLC $8,000.0000 $8,000.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.0.590

Twin K Construction, Inc. $594.1500 $350.55

Adams Contracting, LLC $1,500.0000 $885.00

Potter South East LLC $14,000.0000 $8,260.00

717-01 MOBILIZATION

LS1.000

Twin K Construction, Inc. $104,753.7300 $104,753.73

Adams Contracting, LLC $97,500.0000 $97,500.00

Potter South East LLC $90,000.0000 $90,000.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.695.500

Twin K Construction, Inc. $5.0200 $3,491.41

Adams Contracting, LLC $4.0000 $2,782.00

Potter South East LLC $4.8000 $3,338.40

9PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

740-10.04 GEOTEXTILE (TYPE IV)(STABILIZATION)

S.Y.5,201.000

Twin K Construction, Inc. $4.7400 $24,652.74

Adams Contracting, LLC $4.0000 $20,804.00

Potter South East LLC $4.0000 $20,804.00

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.485.000

Twin K Construction, Inc. $6.1500 $2,982.75

Adams Contracting, LLC $6.0000 $2,910.00

Potter South East LLC $4.1600 $2,017.60

740-11.02 TEMPORARY SEDIMENT TUBE 12IN

L.F.269.000

Twin K Construction, Inc. $6.4700 $1,740.43

Adams Contracting, LLC $7.0000 $1,883.00

Potter South East LLC $5.7500 $1,546.75

740-11.04 TEMPORARY SEDIMENT TUBE 20IN

L.F.475.000

Twin K Construction, Inc. $6.6300 $3,149.25

Adams Contracting, LLC $8.0000 $3,800.00

Potter South East LLC $8.9000 $4,227.50

801-01 SEEDING (WITH MULCH)

UNIT6.000

Twin K Construction, Inc. $190.8100 $1,144.86

Adams Contracting, LLC $200.0000 $1,200.00

Potter South East LLC $110.0000 $660.00

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT85.000

Twin K Construction, Inc. $33.9200 $2,883.20

Adams Contracting, LLC $40.0000 $3,400.00

Potter South East LLC $82.0000 $6,970.00

801-03 WATER (SEEDING & SODDING)

M.G.70.000

Twin K Construction, Inc. $106.0000 $7,420.00

Adams Contracting, LLC $100.0000 $7,000.00

Potter South East LLC $10.0000 $700.00

803-01 SODDING (NEW SOD)

S.Y.5,946.000

Twin K Construction, Inc. $7.3100 $43,465.26

Adams Contracting, LLC $7.0000 $41,622.00

Potter South East LLC $3.8000 $22,594.80

10PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

805-01.01 TURF REINFORCEMENT MAT (CLASS I)

S.Y.154.000

Twin K Construction, Inc. $10.7600 $1,657.04

Adams Contracting, LLC $15.0000 $2,310.00

Potter South East LLC $9.0000 $1,386.00

11PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

BOX BRIDGE CATEGORY

203-08 CHANNEL EXCAVATION (UNCLASSIFIED)

C.Y.409.000

Twin K Construction, Inc. $23.5400 $9,627.86

Adams Contracting, LLC $40.0000 $16,360.00

Potter South East LLC $20.0000 $8,180.00

204-01 CULVERT EXCAVATION (UNCLASSIFIED)

C.Y.360.000

Twin K Construction, Inc. $23.5400 $8,474.40

Adams Contracting, LLC $40.0000 $14,400.00

Potter South East LLC $20.0000 $7,200.00

204-08 FOUNDATION FILL MATERIAL

C.Y.30.000

Twin K Construction, Inc. $200.3100 $6,009.30

Adams Contracting, LLC $75.0000 $2,250.00

Potter South East LLC $86.0000 $2,580.00

303-01.01 GRANULAR BACKFILL (ROADWAY)

TON305.000

Twin K Construction, Inc. $39.4800 $12,041.40

Adams Contracting, LLC $50.0000 $15,250.00

Potter South East LLC $39.6000 $12,078.00

604-02.01 CLASS A CONCRETE (BOX BRIDGES)

C.Y.376.000

Twin K Construction, Inc. $1,240.7200 $466,510.72

Adams Contracting, LLC $1,025.0000 $385,400.00

Potter South East LLC $1,442.0000 $542,192.00

604-02.02 STEEL BAR REINFORCEMENT (BOX BRIDGES)

LB.79,081.000

Twin K Construction, Inc. $1.3100 $103,596.11

Adams Contracting, LLC $1.5000 $118,621.50

Potter South East LLC $0.9200 $72,754.52

12PAGE

EXTENSION

CONTRACT CNT901

UNIT PRICE

UTILITY CATEGORY

795-01.01 4IN DIP RESTRAINED JOINT WATER LINE

L.F.300.000

Twin K Construction, Inc. $113.3100 $33,993.00

Adams Contracting, LLC $150.0000 $45,000.00

Potter South East LLC $87.0000 $26,100.00

795-09.01 3/4IN WATER SERVICE METER ASSEMBLY

EACH2.000

Twin K Construction, Inc. $838.2600 $1,676.52

Adams Contracting, LLC $2,000.0000 $4,000.00

Potter South East LLC $1,000.0000 $2,000.00

795-09.19 3/4IN PVC SERVICE PIPE

L.F.250.000

Twin K Construction, Inc. $23.1600 $5,790.00

Adams Contracting, LLC $50.0000 $12,500.00

Potter South East LLC $5.9000 $1,475.00

795-11.01 BLOW-OFF ASSEMBLY

EACH1.000

Twin K Construction, Inc. $4,256.1600 $4,256.16

Adams Contracting, LLC $4,500.0000 $4,500.00

Potter South East LLC $1,500.0000 $1,500.00

795-13.01 DI FITTINGS

LB.600.000

Twin K Construction, Inc. $7.2600 $4,356.00

Adams Contracting, LLC $9.0000 $5,400.00

Potter South East LLC $12.0000 $7,200.00

795-15.01 8IN STEEL CASING PIPE OPEN CUT METHOD

L.F.50.000

Twin K Construction, Inc. $116.1600 $5,808.00

Adams Contracting, LLC $250.0000 $12,500.00

Potter South East LLC $560.0000 $28,000.00

13PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Twin K Construction, Inc. $1,037,860.52

Adams Contracting, LLC $1,308,039.50

Potter South East LLC $1,566,161.55

SUB-TOTAL BOX BRIDGE

Twin K Construction, Inc. $606,259.79

Adams Contracting, LLC $552,281.50

Potter South East LLC $644,984.52

SUB-TOTAL UTILITY

Twin K Construction, Inc. $55,879.68

Adams Contracting, LLC $83,900.00

Potter South East LLC $66,275.00

Twin K Construction, Inc. $1,699,999.99

Adams Contracting, LLC $1,944,221.00

Potter South East LLC $2,277,421.07

14PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

SEVIER COUNTY (Contract No. CNT911 Call 004)

4.00%DBE GOAL

THE RESURFACING ON U.S. 321 (S.R. 73) FROM NEAR SHULTZ ROAD (L.M. 19.65) TO THE COCKE COUNTY LINE (L.M. 26.20), INCLUDINGBRIDGE DECK REPAIR.

PROJECT LENGTH -

STP/HSIP-73(69),78013-3239-94,78013-4239-04,78013-8239-14

6.550 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Charles Blalock & Sons, Inc. $1,599,669.71

1PAGE

EXTENSION

CONTRACT CNT911

UNIT PRICE

ROADWAY CATEGORY

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,723.000

Charles Blalock & Sons, Inc. $39.5000 $68,058.50

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON524.000

Charles Blalock & Sons, Inc. $135.9000 $71,211.60

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON36.000

Charles Blalock & Sons, Inc. $1,055.1300 $37,984.68

407-07.01 INTELLIGENT COMPACTION EQUIPMENT

LS1.000

Charles Blalock & Sons, Inc. $54,500.0000 $54,500.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON7,316.000

Charles Blalock & Sons, Inc. $135.9000 $994,244.40

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.13.000

Charles Blalock & Sons, Inc. $700.0000 $9,100.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.227.000

Charles Blalock & Sons, Inc. $21.1400 $4,798.78

712-01 TRAFFIC CONTROL

LS1.000

Charles Blalock & Sons, Inc. $74,811.7500 $74,811.75

712-06 SIGNS (CONSTRUCTION)

S.F.731.000

Charles Blalock & Sons, Inc. $10.0000 $7,310.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH502.000

Charles Blalock & Sons, Inc. $24.0000 $12,048.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH25.000

Charles Blalock & Sons, Inc. $24.0000 $600.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.50.000

Charles Blalock & Sons, Inc. $20.0000 $1,000.00

2PAGE

EXTENSION

CONTRACT CNT911

UNIT PRICE

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH4.000

Charles Blalock & Sons, Inc. $200.0000 $800.00

716-04.04 PLASTIC PAVEMENT MARKING (TRANSVERSE SHOULDER)

L.F.3,335.000

Charles Blalock & Sons, Inc. $7.0000 $23,345.00

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.473.000

Charles Blalock & Sons, Inc. $15.0000 $7,095.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.41.000

Charles Blalock & Sons, Inc. $475.0000 $19,475.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.14.000

Charles Blalock & Sons, Inc. $4,800.0000 $67,200.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.12.000

Charles Blalock & Sons, Inc. $2,000.0000 $24,000.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.1.000

Charles Blalock & Sons, Inc. $2,300.0000 $2,300.00

717-01 MOBILIZATION

LS1.000

Charles Blalock & Sons, Inc. $67,504.0000 $67,504.00

3PAGE

EXTENSION

CONTRACT CNT911

UNIT PRICE

BRIDGE CATEGORY

617-04.01 TYPE 1 THIN EPOXY OVERLAY (EPOXY-URETHANE)

S.Y.1,078.000

Charles Blalock & Sons, Inc. $48.5000 $52,283.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Charles Blalock & Sons, Inc. $1,547,386.71

SUB-TOTAL BRIDGE

Charles Blalock & Sons, Inc. $52,283.00

Charles Blalock & Sons, Inc. $1,599,669.71

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES ANDERSON, BLOUNT, CAMPBELL, CARTER, CLAIBORNE, COCKE, GRAINGER, JEFFERSON, KNOX, MONROE, ROANE, SULLIVAN,UNICOI, AND WASHINGTON (Contract No. CNT125 Call 005)

THE RANDOM ON-CALL ATTENUATOR REPAIR ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98100-4127-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

LU, Inc. $363,966.66

Site-Safe Products, LLC d/b/a Site-Safe, LLC $396,752.43

Tennessee Guardrail, Inc. $777,748.20

1PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

MAINTENANCE CATEGORY

705-08.22 IMPACT ATTENUATOR (TAU-II WIDE)

EACH1.000

LU, Inc. $20,532.9400 $20,532.94

Site-Safe Products, LLC d/b/a Site-Safe, LLC $21,100.2000 $21,100.20

Tennessee Guardrail, Inc. $47,450.0000 $47,450.00

705-08.23 REPOSITIONING IMPACT ATTENUATOR (TAU-II)

EACH1.000

LU, Inc. $1,217.9000 $1,217.90

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $957.60

Tennessee Guardrail, Inc. $1,975.0000 $1,975.00

705-08.25 TAU-II ENERGY ABSORBING CARTRIDGE TYPE A (UNIVERSAL)

EACH1.000

LU, Inc. $517.8000 $517.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $523.8600 $523.86

Tennessee Guardrail, Inc. $1,057.0000 $1,057.00

705-08.26 TAU-II ENERGY ABSORBING CARTRIDGE TYPE B (UNIVERSAL)

EACH1.000

LU, Inc. $517.8000 $517.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $523.8600 $523.86

Tennessee Guardrail, Inc. $1,057.0000 $1,057.00

705-08.28 TAU-II FRONT SUPPORT ASSEMBLY (UNIVERSAL)

EACH1.000

LU, Inc. $865.1200 $865.12

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,138.0300 $1,138.03

Tennessee Guardrail, Inc. $2,856.0000 $2,856.00

705-08.29 TAU-II FRONT SUPPORT LEG KIT (UNIVERSAL)

EACH1.000

LU, Inc. $215.1900 $215.19

Site-Safe Products, LLC d/b/a Site-Safe, LLC $150.2100 $150.21

Tennessee Guardrail, Inc. $1,168.7500 $1,168.75

705-08.30 TAU-II MID SUPPORT ASSEMBLY (UNIVERSAL)

EACH4.000

LU, Inc. $944.5200 $3,778.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,517.3600 $6,069.44

Tennessee Guardrail, Inc. $3,561.0000 $14,244.00

705-08.32 TAU-II SLIDER KIT (UNIVERSAL)

EACH1.000

LU, Inc. $229.9700 $229.97

Site-Safe Products, LLC d/b/a Site-Safe, LLC $379.3400 $379.34

Tennessee Guardrail, Inc. $1,446.0000 $1,446.00

2PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.33 TAU-II SLIDING PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $249.9200 $249.92

Site-Safe Products, LLC d/b/a Site-Safe, LLC $339.4200 $339.42

Tennessee Guardrail, Inc. $1,151.0000 $1,151.00

705-08.34 TAU-II NOSE PIECE (PARALLEL UNIT)

EACH2.000

LU, Inc. $744.1700 $1,488.34

Site-Safe Products, LLC d/b/a Site-Safe, LLC $678.8200 $1,357.64

Tennessee Guardrail, Inc. $1,809.0000 $3,618.00

705-08.36 TAU-II NOSE PIECE (WIDE UNIT)

EACH1.000

LU, Inc. $680.5200 $680.52

Site-Safe Products, LLC d/b/a Site-Safe, LLC $826.1600 $826.16

Tennessee Guardrail, Inc. $2,394.0000 $2,394.00

705-08.43 FORMED ANGLE 05 TRACC

EACH2.000

LU, Inc. $329.5700 $659.14

Site-Safe Products, LLC d/b/a Site-Safe, LLC $381.0000 $762.00

Tennessee Guardrail, Inc. $1,006.0000 $2,012.00

705-08.54 TRACC WASHER 1/4" X 3" X 2-1/4"

EACH2.000

LU, Inc. $2.3700 $4.74

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.7400 $7.48

Tennessee Guardrail, Inc. $10.0000 $20.00

705-08.55 TRACC DOUBLER PL X 38-1/2"

EACH2.000

LU, Inc. $72.6600 $145.32

Site-Safe Products, LLC d/b/a Site-Safe, LLC $84.0000 $168.00

Tennessee Guardrail, Inc. $117.8500 $235.70

705-08.56 TRACC BEAM GUIDE 72"

EACH2.000

LU, Inc. $318.3200 $636.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $368.0000 $736.00

Tennessee Guardrail, Inc. $1,482.0000 $2,964.00

705-08.57 IMPACT ATTENUATOR (QUADGUARD ELITE WIDE)

EACH1.000

LU, Inc. $18,950.0000 $18,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $14,818.8300 $14,818.83

Tennessee Guardrail, Inc. $44,750.0000 $44,750.00

3PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.58 IMPACT ATTENUATOR (QUADGUARD ELITE)

EACH1.000

LU, Inc. $15,150.0000 $15,150.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $17,777.8300 $17,777.83

Tennessee Guardrail, Inc. $34,500.0000 $34,500.00

705-08.59 IMPACT ATTENUATOR REPOSITIONING (QUADGUARD ELITE)

EACH5.000

LU, Inc. $250.0000 $1,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $425.6000 $2,128.00

Tennessee Guardrail, Inc. $1,316.0000 $6,580.00

705-08.66 RIP PLATE REPAIR KIT, STAGE 1

EACH5.000

LU, Inc. $195.0000 $975.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $338.3300 $1,691.65

Tennessee Guardrail, Inc. $2,328.0000 $11,640.00

705-08.67 RIP PLATE REPAIR KIT, STAGE 2

EACH5.000

LU, Inc. $415.0000 $2,075.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $298.9600 $1,494.80

Tennessee Guardrail, Inc. $2,820.0000 $14,100.00

705-08.69 PLASTIC NOSE PIECE/REFLECTOR

EACH6.000

LU, Inc. $450.6200 $2,703.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $410.6900 $2,464.14

Tennessee Guardrail, Inc. $735.7500 $4,414.50

705-08.80 SIDE PANEL - 35"

EACH3.000

LU, Inc. $179.8700 $539.61

Site-Safe Products, LLC d/b/a Site-Safe, LLC $142.5600 $427.68

Tennessee Guardrail, Inc. $924.0000 $2,772.00

705-08.81 SIDE PANEL - 62"

EACH4.000

LU, Inc. $219.9500 $879.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $251.3800 $1,005.52

Tennessee Guardrail, Inc. $1,011.0000 $4,044.00

705-08.91 REPOSITIONING VEHCULR IMP ATTN(2005TRACC)

EACH7.000

LU, Inc. $1,000.0000 $7,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,276.8000 $8,937.60

Tennessee Guardrail, Inc. $1,588.5500 $11,119.85

4PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.92 05 RIP PLATE REPAIR KIT STAGE 2

EACH5.000

LU, Inc. $638.6200 $3,193.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $716.8000 $3,584.00

Tennessee Guardrail, Inc. $2,445.0000 $12,225.00

705-09.10 IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $22,250.0000 $22,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $22,252.2200 $22,252.22

Tennessee Guardrail, Inc. $47,450.0000 $47,450.00

705-09.11 REPOSITIONING OF IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $1,091.4500 $1,091.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $851.20

Tennessee Guardrail, Inc. $1,560.0000 $1,560.00

705-09.35 PANEL DELINEATOR (W/REFLECTIVE HAZARD MARKER)

EACH1.000

LU, Inc. $169.1900 $169.19

Site-Safe Products, LLC d/b/a Site-Safe, LLC $193.3300 $193.33

Tennessee Guardrail, Inc. $183.7500 $183.75

705-14.21 SC B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $53.3900 $53.39

Site-Safe Products, LLC d/b/a Site-Safe, LLC $147.9200 $147.92

Tennessee Guardrail, Inc. $403.5000 $403.50

705-14.22 CONC. B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $109.5100 $109.51

Site-Safe Products, LLC d/b/a Site-Safe, LLC $293.0000 $293.00

Tennessee Guardrail, Inc. $558.5000 $558.50

705-14.30 REPOSITIONING IMPACT ATTENUATOR(REACT 350)

EACH2.000

LU, Inc. $615.9900 $1,231.98

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $1,702.40

Tennessee Guardrail, Inc. $1,729.0000 $3,458.00

705-14.56 REFLECTIVE NOSE LEFT/RIGHT

EACH2.000

LU, Inc. $239.0000 $478.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $331.3700 $662.74

Tennessee Guardrail, Inc. $770.0000 $1,540.00

5PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-15.65 QUADGUARD II IMPACT ATTENUATOR (REPOSITIONING)

EACH8.000

LU, Inc. $1,049.1500 $8,393.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $7,660.80

Tennessee Guardrail, Inc. $1,729.0000 $13,832.00

705-15.66 QUADGUARD II IMPACT ATTENUATOR (WIDE)

EACH1.000

LU, Inc. $13,716.0000 $13,716.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $16,534.7700 $16,534.77

Tennessee Guardrail, Inc. $38,250.0000 $38,250.00

705-15.68 NOSE ASSEMBLY QGII STEEL

EACH5.000

LU, Inc. $752.1300 $3,760.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $742.1300 $3,710.65

Tennessee Guardrail, Inc. $3,045.0000 $15,225.00

705-15.69 SHIM KIT QGII

EACH15.000

LU, Inc. $50.4100 $756.15

Site-Safe Products, LLC d/b/a Site-Safe, LLC $54.4000 $816.00

Tennessee Guardrail, Inc. $137.7500 $2,066.25

705-15.71 HEX FOAM CARTRIDGE, TYPE I

EACH10.000

LU, Inc. $760.9200 $7,609.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $750.0800 $7,500.80

Tennessee Guardrail, Inc. $1,259.0000 $12,590.00

705-15.72 HEX FOAM CARTRIDGE, TYPE II

EACH10.000

LU, Inc. $799.9800 $7,999.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $789.3300 $7,893.30

Tennessee Guardrail, Inc. $1,322.0000 $13,220.00

705-15.74 DIAPHRAGM ASSEMBLY, QC

EACH1.000

LU, Inc. $718.8200 $718.82

Site-Safe Products, LLC d/b/a Site-Safe, LLC $949.7000 $949.70

Tennessee Guardrail, Inc. $3,011.0000 $3,011.00

705-15.75 FENDER PANEL ASSEMBLY

EACH2.000

LU, Inc. $573.3100 $1,146.62

Site-Safe Products, LLC d/b/a Site-Safe, LLC $650.1800 $1,300.36

Tennessee Guardrail, Inc. $1,098.0000 $2,196.00

6PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-15.92 TRANS PANEL NEW JERSEY BARRIER WIDE

EACH1.000

LU, Inc. $544.9700 $544.97

Site-Safe Products, LLC d/b/a Site-Safe, LLC $960.1200 $960.12

Tennessee Guardrail, Inc. $2,755.0000 $2,755.00

705-15.93 TRANS PANEL QUAD TO W WIDE

EACH1.000

LU, Inc. $807.4100 $807.41

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,508.5900 $1,508.59

Tennessee Guardrail, Inc. $3,695.0000 $3,695.00

705-16.75 HAZARD REFLECTORS

EACH10.000

LU, Inc. $72.4300 $724.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $64.0000 $640.00

Tennessee Guardrail, Inc. $68.5000 $685.00

705-16.77 REPAIR OF CONCRETE BACKUP WALL

S.F.15.000

LU, Inc. $18.0700 $271.05

Site-Safe Products, LLC d/b/a Site-Safe, LLC $33.3300 $499.95

Tennessee Guardrail, Inc. $1,690.0000 $25,350.00

705-17.08 CARTRIDGE SUPPORT BRACKETS

EACH4.000

LU, Inc. $41.0700 $164.28

Site-Safe Products, LLC d/b/a Site-Safe, LLC $37.8600 $151.44

Tennessee Guardrail, Inc. $115.0000 $460.00

705-17.24 HDPE NOSE PIECE

EACH2.000

LU, Inc. $206.9700 $413.94

Site-Safe Products, LLC d/b/a Site-Safe, LLC $674.8100 $1,349.62

Tennessee Guardrail, Inc. $2,170.0000 $4,340.00

705-17.32 BREAKAWAY POST (TOP)

EACH2.000

LU, Inc. $116.6300 $233.26

Site-Safe Products, LLC d/b/a Site-Safe, LLC $145.3900 $290.78

Tennessee Guardrail, Inc. $318.0000 $636.00

705-17.33 BREAKAWAY BOLT ASSEMBLY

EACH2.000

LU, Inc. $14.7800 $29.56

Site-Safe Products, LLC d/b/a Site-Safe, LLC $15.8500 $31.70

Tennessee Guardrail, Inc. $34.8000 $69.60

7PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-17.71 WIDETRACC CABLE SYSTEM (W/ HARDWARE)

EACH1.000

LU, Inc. $184.8000 $184.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $225.0200 $225.02

Tennessee Guardrail, Inc. $1,380.0000 $1,380.00

705-17.72 WIDETRACC FRAME (W/ HARDWARE)

EACH1.000

LU, Inc. $276.7800 $276.78

Site-Safe Products, LLC d/b/a Site-Safe, LLC $337.7300 $337.73

Tennessee Guardrail, Inc. $2,095.0000 $2,095.00

705-17.73 WIDETRACC EXTENSION FOOT (RIGHT) (W/ HARDWARE)

EACH1.000

LU, Inc. $266.9300 $266.93

Site-Safe Products, LLC d/b/a Site-Safe, LLC $324.8500 $324.85

Tennessee Guardrail, Inc. $2,290.0000 $2,290.00

705-17.74 WIDETRACC EXTENSION FOOT (LEFT) (W/ HARDWARE)

EACH1.000

LU, Inc. $266.9300 $266.93

Site-Safe Products, LLC d/b/a Site-Safe, LLC $324.8500 $324.85

Tennessee Guardrail, Inc. $2,290.0000 $2,290.00

705-17.89 HEART REFLECTIVE TAPE

EACH4.000

LU, Inc. $46.8200 $187.28

Site-Safe Products, LLC d/b/a Site-Safe, LLC $63.3800 $253.52

Tennessee Guardrail, Inc. $187.5000 $750.00

705-17.92 REPOSITIONING IMPACT ATTENUATOR (HEART)

EACH2.000

LU, Inc. $262.6400 $525.28

Site-Safe Products, LLC d/b/a Site-Safe, LLC $196.4300 $392.86

Tennessee Guardrail, Inc. $1,729.0000 $3,458.00

705-17.93 IMPACT ATTENUATOR (WIDETRACC 2005)

EACH1.000

LU, Inc. $18,068.9900 $18,068.99

Site-Safe Products, LLC d/b/a Site-Safe, LLC $18,208.0300 $18,208.03

Tennessee Guardrail, Inc. $57,350.0000 $57,350.00

705-20.01 IMACT ATTENUATOR (QUADGUARD M10)

EACH1.000

LU, Inc. $22,500.0000 $22,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20,147.4300 $20,147.43

Tennessee Guardrail, Inc. $34,075.0000 $34,075.00

8PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-20.03 REPOSITIONING IMPACT ATTENUATOR (M10)

EACH1.000

LU, Inc. $350.0000 $350.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $957.60

Tennessee Guardrail, Inc. $1,729.0000 $1,729.00

705-20.04 NOSE ASSEMBLY, M10

EACH3.000

LU, Inc. $832.2000 $2,496.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $962.0800 $2,886.24

Tennessee Guardrail, Inc. $2,775.0000 $8,325.00

705-20.05 HEX FOAM CARTRIDGE, TYPE M1

EACH3.000

LU, Inc. $806.7700 $2,420.31

Site-Safe Products, LLC d/b/a Site-Safe, LLC $837.4900 $2,512.47

Tennessee Guardrail, Inc. $1,807.0000 $5,421.00

705-20.06 HEX FOAM CARTRIDGE, TYPE M2

EACH3.000

LU, Inc. $846.7600 $2,540.28

Site-Safe Products, LLC d/b/a Site-Safe, LLC $879.0400 $2,637.12

Tennessee Guardrail, Inc. $1,871.0000 $5,613.00

705-20.30 BELT NOSEPIECE, YELLOW, 24"-36" (QGE, QGEM)

EACH2.000

LU, Inc. $1,560.5000 $3,121.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,408.8800 $4,817.76

Tennessee Guardrail, Inc. $5,800.0000 $11,600.00

705-20.31 BELT NOSEPIECE, YELLOW, 69"-90" (QGE, QGEM)

EACH2.000

LU, Inc. $1,724.7700 $3,449.54

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,402.4300 $2,804.86

Tennessee Guardrail, Inc. $6,195.0000 $12,390.00

705-20.32 QGE HIT INDICATOR

EACH3.000

LU, Inc. $131.4100 $394.23

Site-Safe Products, LLC d/b/a Site-Safe, LLC $203.3900 $610.17

Tennessee Guardrail, Inc. $501.5000 $1,504.50

705-20.33 QGE CYLINDER TYPE I (QGE)

EACH3.000

LU, Inc. $1,067.7100 $3,203.13

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,385.0900 $4,155.27

Tennessee Guardrail, Inc. $4,430.0000 $13,290.00

9PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-20.34 QGE CYLINDER TYPE II (QGE)

EACH3.000

LU, Inc. $780.2600 $2,340.78

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,915.8900 $5,747.67

Tennessee Guardrail, Inc. $5,555.0000 $16,665.00

712-01.50 MAINTENANCE OF TRAFFIC

EACH12.000

LU, Inc. $739.5900 $8,875.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $7,660.80

Tennessee Guardrail, Inc. $925.0000 $11,100.00

712-01.52 MAINTENANCE OF TRAFFIC (NIGHT WORK)

EACH12.000

LU, Inc. $805.1200 $9,661.44

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $10,214.40

Tennessee Guardrail, Inc. $950.0000 $11,400.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY20.000

LU, Inc. $458.2300 $9,164.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $965.9900 $19,319.80

Tennessee Guardrail, Inc. $1,575.0000 $31,500.00

717-01 MOBILIZATION

LS1.000

LU, Inc. $22,100.0000 $22,100.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $30,499.0000 $30,499.00

Tennessee Guardrail, Inc. $25,750.0000 $25,750.00

10PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

MAINTENANCE (CONTINGENCY) CATEGORY

705-07.20 TRANSITION TO SAFETY SHAPE (2005 TRACC)

EACH1.000

LU, Inc. $633.2500 $633.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $633.2500 $633.25

Tennessee Guardrail, Inc. $633.2500 $633.25

705-07.21 TRANSITION TO BARRIER WALL END CAP (2005 TRACC)

EACH1.000

LU, Inc. $212.5000 $212.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $212.5000 $212.50

Tennessee Guardrail, Inc. $212.5000 $212.50

705-07.22 SPLIT FRAME KIT-30IN BACK-UP (2005 TRACC)

EACH1.000

LU, Inc. $559.3000 $559.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $559.3000 $559.30

Tennessee Guardrail, Inc. $559.3000 $559.30

705-08.18 TAU-II XXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,500.0000 $1,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,500.0000 $1,500.00

Tennessee Guardrail, Inc. $1,500.0000 $1,500.00

705-08.19 TAU-II XXXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $2,000.0000 $2,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,000.0000 $2,000.00

Tennessee Guardrail, Inc. $2,000.0000 $2,000.00

705-08.24 TAU-II CABLE GUIDE KIT (UNIVERSAL)

EACH1.000

LU, Inc. $500.0000 $500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $500.0000 $500.00

Tennessee Guardrail, Inc. $500.0000 $500.00

705-08.27 TAU-II END PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $275.0000 $275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $275.0000 $275.00

Tennessee Guardrail, Inc. $275.0000 $275.00

705-08.31 TAU-II PIPE PANEL MOUNT (UNIVERSAL)

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

Tennessee Guardrail, Inc. $120.0000 $120.00

11PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.35 TAU-II PCB BACKSTOP (PARALLEL UNIT)

EACH1.000

LU, Inc. $800.0000 $800.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $800.0000 $800.00

Tennessee Guardrail, Inc. $800.0000 $800.00

705-08.37 TAU-II WIDE SUPPORT LEG ADAPTER (WIDE UNIT)

EACH1.000

LU, Inc. $200.0000 $200.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $200.0000 $200.00

Tennessee Guardrail, Inc. $200.0000 $200.00

705-08.38 TAU-II WING ASSEMBLY (WIDE UNIT)

EACH1.000

LU, Inc. $400.0000 $400.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $400.0000 $400.00

Tennessee Guardrail, Inc. $400.0000 $400.00

705-08.39 TAU-II WING BRACE (WIDE UNIT)

EACH1.000

LU, Inc. $50.0000 $50.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $50.0000 $50.00

Tennessee Guardrail, Inc. $50.0000 $50.00

705-08.40 TAU-II XL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $600.0000 $600.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $600.0000 $600.00

Tennessee Guardrail, Inc. $600.0000 $600.00

705-08.41 TAU-II XXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,100.0000 $1,100.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,100.0000 $1,100.00

Tennessee Guardrail, Inc. $1,100.0000 $1,100.00

705-08.52 QUADGUARD MONORAIL ASSEMBLY, 3 BAY

EACH1.000

LU, Inc. $1,275.0000 $1,275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,275.0000 $1,275.00

Tennessee Guardrail, Inc. $1,275.0000 $1,275.00

705-08.68 RIP PLATE REPAIR KIT, STAGE 3

EACH1.000

LU, Inc. $1,620.2500 $1,620.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,620.2500 $1,620.25

Tennessee Guardrail, Inc. $1,620.2500 $1,620.25

12PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.74 BASE ASSEMBLY - 9'

EACH1.000

LU, Inc. $833.0000 $833.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $833.0000 $833.00

Tennessee Guardrail, Inc. $833.0000 $833.00

705-08.76 BEAM GUIDE - 20'

EACH1.000

LU, Inc. $636.6500 $636.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $636.6500 $636.65

Tennessee Guardrail, Inc. $636.6500 $636.65

705-08.77 END SHOE (LEFT OR RIGHT)

EACH1.000

LU, Inc. $238.0000 $238.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $238.0000 $238.00

Tennessee Guardrail, Inc. $238.0000 $238.00

705-08.84 SLOT PLATE

EACH1.000

LU, Inc. $20.8500 $20.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.8500 $20.85

Tennessee Guardrail, Inc. $20.8500 $20.85

705-08.85 CROSSTIE

EACH1.000

LU, Inc. $109.6500 $109.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $109.6500 $109.65

Tennessee Guardrail, Inc. $109.6500 $109.65

705-08.86 FORM CHANNEL - 3 X 2

EACH1.000

LU, Inc. $187.0000 $187.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $187.0000 $187.00

Tennessee Guardrail, Inc. $187.0000 $187.00

705-08.88 SLED/CUTTER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

Tennessee Guardrail, Inc. $2,465.0000 $2,465.00

705-08.93 05 RIP PLATE REPAIR KIT STAGE 3

EACH1.000

LU, Inc. $1,119.4500 $1,119.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,119.4500 $1,119.45

Tennessee Guardrail, Inc. $1,119.4500 $1,119.45

13PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-08.94 05 FRONT ANCH WELDMENT

EACH1.000

LU, Inc. $410.0000 $410.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $410.0000 $410.00

Tennessee Guardrail, Inc. $410.0000 $410.00

705-08.95 05 SECTION MODULE

EACH1.000

LU, Inc. $1,415.0000 $1,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,415.0000 $1,415.00

Tennessee Guardrail, Inc. $1,415.0000 $1,415.00

705-08.97 05 SLED/SHREDDER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

Tennessee Guardrail, Inc. $2,465.0000 $2,465.00

705-08.98 05 FRAME WELDMENT

EACH1.000

LU, Inc. $310.2500 $310.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $310.2500 $310.25

Tennessee Guardrail, Inc. $310.2500 $310.25

705-08.99 05 BACK-UP FRAME

EACH1.000

LU, Inc. $473.4500 $473.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $473.4500 $473.45

Tennessee Guardrail, Inc. $473.4500 $473.45

705-09.12 CONCRETE ANCHOR BOLT SET (3/4 IN X 7 IN)

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

Tennessee Guardrail, Inc. $306.0000 $306.00

705-09.13 ASPHALT ANCHOR BOLT SET (3/4 IN X 18 IN)

EACH1.000

LU, Inc. $871.0000 $871.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $871.0000 $871.00

Tennessee Guardrail, Inc. $871.0000 $871.00

705-09.14 BOLT CABLE ADJUSTER

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

Tennessee Guardrail, Inc. $120.0000 $120.00

14PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-09.15 BOLT SLED SIDE PANEL

EACH1.000

LU, Inc. $6.0000 $6.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $6.0000 $6.00

Tennessee Guardrail, Inc. $6.0000 $6.00

705-09.16 BOLT FRONT STOP

EACH1.000

LU, Inc. $3.0000 $3.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.0000 $3.00

Tennessee Guardrail, Inc. $3.0000 $3.00

705-09.17 BOLT SHEAR

EACH1.000

LU, Inc. $1.5000 $1.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1.5000 $1.50

Tennessee Guardrail, Inc. $1.5000 $1.50

705-09.18 BOLT SIDE GUIDE

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

Tennessee Guardrail, Inc. $20.0000 $20.00

705-09.19 BOLT TERMINAL BRACE

EACH1.000

LU, Inc. $9.0000 $9.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $9.0000 $9.00

Tennessee Guardrail, Inc. $9.0000 $9.00

705-09.20 BRACE TERMINAL

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.21 CABLE WIRE ROPE W/ SPELTER SOCKET

EACH1.000

LU, Inc. $1,083.0000 $1,083.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,083.0000 $1,083.00

Tennessee Guardrail, Inc. $1,083.0000 $1,083.00

705-09.22 CLIP WIRE ROPE

EACH1.000

LU, Inc. $34.0000 $34.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $34.0000 $34.00

Tennessee Guardrail, Inc. $34.0000 $34.00

15PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-09.23 CYLINDER SHOCK ARRESTING

EACH1.000

LU, Inc. $3,143.0000 $3,143.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3,143.0000 $3,143.00

Tennessee Guardrail, Inc. $3,143.0000 $3,143.00

705-09.24 STRAP CYLINDER

EACH1.000

LU, Inc. $89.0000 $89.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $89.0000 $89.00

Tennessee Guardrail, Inc. $89.0000 $89.00

705-09.25 FRAME MOBILE #1

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.26 FRAME MOBILE #2

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.27 FRAME MOBILE #3

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.28 FRAME MOBILE #4

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.29 FRAME MOBILE #5

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.30 FRAME MOBILE #6

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

16PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-09.31 GUIDE SIDE

EACH1.000

LU, Inc. $94.0000 $94.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94.0000 $94.00

Tennessee Guardrail, Inc. $94.0000 $94.00

705-09.32 KEEPER SIDE #1 (SLED PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

Tennessee Guardrail, Inc. $23.0000 $23.00

705-09.33 KEEPER SIDE #2 (SIDE PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

Tennessee Guardrail, Inc. $23.0000 $23.00

705-09.34 KEEPER SIDE #3 (REAR PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

Tennessee Guardrail, Inc. $23.0000 $23.00

705-09.36 PANEL SIDE

EACH1.000

LU, Inc. $223.0000 $223.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $223.0000 $223.00

Tennessee Guardrail, Inc. $223.0000 $223.00

705-09.37 PANEL SLED

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

Tennessee Guardrail, Inc. $414.0000 $414.00

705-09.38 PANEL REAR

EACH1.000

LU, Inc. $206.0000 $206.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $206.0000 $206.00

Tennessee Guardrail, Inc. $206.0000 $206.00

705-09.39 SHEAVE (PULLEY)

EACH1.000

LU, Inc. $103.0000 $103.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $103.0000 $103.00

Tennessee Guardrail, Inc. $103.0000 $103.00

17PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-09.40 SLED

EACH1.000

LU, Inc. $1,917.0000 $1,917.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,917.0000 $1,917.00

Tennessee Guardrail, Inc. $1,917.0000 $1,917.00

705-09.41 TRANSITION JERSEY BARRIER RIGHT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

Tennessee Guardrail, Inc. $1,263.0000 $1,263.00

705-09.42 TRANSITION JERSEY BARRIER LEFT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

Tennessee Guardrail, Inc. $1,263.0000 $1,263.00

705-09.43 TRANSITION 24IN CONCRETE

EACH1.000

LU, Inc. $794.0000 $794.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $794.0000 $794.00

Tennessee Guardrail, Inc. $794.0000 $794.00

705-09.44 BOOT CYLINDER

EACH1.000

LU, Inc. $57.0000 $57.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $57.0000 $57.00

Tennessee Guardrail, Inc. $57.0000 $57.00

705-14.31 CYLINDER 0.8" CYLINDERS 1 & 2

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

705-14.32 CYLINDER 0.9" CYLINDERS 3 & 4

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

705-14.33 CYLINDER 1.0" CYLINDERS 5 & 6

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

18PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-14.34 CYLINDER 1.108" CYLINDER 7

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

705-14.35 CYLINDER 1.385" CYLINDERS 8 & 9

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

705-14.36 U-BOLTS (1/2" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

Tennessee Guardrail, Inc. $12.0000 $12.00

705-14.37 U-BOLTS (3/8" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

Tennessee Guardrail, Inc. $12.0000 $12.00

705-14.38 BOX BEAM (8" X 6" X 3/16")

EACH1.000

LU, Inc. $35.0000 $35.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $35.0000 $35.00

Tennessee Guardrail, Inc. $35.0000 $35.00

705-14.50 CYLINDER RETAINER (1' 3" X 5")

EACH1.000

LU, Inc. $60.0000 $60.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $60.0000 $60.00

Tennessee Guardrail, Inc. $60.0000 $60.00

705-14.51 FRONT ANCHOR PIN (1/4" X 1 1/2" X 3")

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

Tennessee Guardrail, Inc. $23.0000 $23.00

705-14.53 1/2" GALVANIZED CHAIN WITH HARDWARE

EACH1.000

LU, Inc. $82.0000 $82.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $82.0000 $82.00

Tennessee Guardrail, Inc. $82.0000 $82.00

19PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-14.54 POLYVINYL COVER

EACH1.000

LU, Inc. $71.0000 $71.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $71.0000 $71.00

Tennessee Guardrail, Inc. $71.0000 $71.00

705-14.55 ANCHOR BOLT SET (CONCRETE/ASPHALT)

EACH1.000

LU, Inc. $895.0000 $895.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $895.0000 $895.00

Tennessee Guardrail, Inc. $895.0000 $895.00

705-14.57 BACKUP SINGLE CABLE-(4 BARREL)

EACH1.000

LU, Inc. $660.0000 $660.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $660.0000 $660.00

Tennessee Guardrail, Inc. $660.0000 $660.00

705-14.58 BACKUP SINGLE CABLE-(6 BARREL)

EACH1.000

LU, Inc. $840.0000 $840.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $840.0000 $840.00

Tennessee Guardrail, Inc. $840.0000 $840.00

705-14.59 BACKUP SINGLE CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,050.0000 $1,050.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,050.0000 $1,050.00

Tennessee Guardrail, Inc. $1,050.0000 $1,050.00

705-14.60 CABLE SYSTEM FOR SIDE MOUNT-(4 BARREL)

EACH1.000

LU, Inc. $1,975.0000 $1,975.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,975.0000 $1,975.00

Tennessee Guardrail, Inc. $1,975.0000 $1,975.00

705-14.61 CABLE SYSTEM FOR SIDE MOUNT-(6 BARREL)

EACH1.000

LU, Inc. $2,415.0000 $2,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,415.0000 $2,415.00

Tennessee Guardrail, Inc. $2,415.0000 $2,415.00

705-14.62 CABLE SYSTEM FOR SIDE MOUNT-(9 BARREL)

EACH1.000

LU, Inc. $2,690.0000 $2,690.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,690.0000 $2,690.00

Tennessee Guardrail, Inc. $2,690.0000 $2,690.00

20PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-14.63 BOTTOM CABLE-(4 BARREL)

EACH1.000

LU, Inc. $550.0000 $550.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $550.0000 $550.00

Tennessee Guardrail, Inc. $550.0000 $550.00

705-14.64 BOTTOM CABLE-(6 BARREL)

EACH1.000

LU, Inc. $580.0000 $580.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $580.0000 $580.00

Tennessee Guardrail, Inc. $580.0000 $580.00

705-14.65 BOTTOM CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,407.0000 $1,407.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,407.0000 $1,407.00

Tennessee Guardrail, Inc. $1,407.0000 $1,407.00

705-14.66 SIDE MNT ANCHR/CABLE ANCHR CVR PLT

EACH1.000

LU, Inc. $770.0000 $770.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $770.0000 $770.00

Tennessee Guardrail, Inc. $770.0000 $770.00

705-14.67 PULLOUT BRACKET ASSEMBLY

EACH1.000

LU, Inc. $91.3500 $91.35

Site-Safe Products, LLC d/b/a Site-Safe, LLC $91.3500 $91.35

Tennessee Guardrail, Inc. $91.3500 $91.35

705-14.68 3IN X 3IN TUBING

EACH1.000

LU, Inc. $72.0000 $72.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $72.0000 $72.00

Tennessee Guardrail, Inc. $72.0000 $72.00

705-14.69 GALVANIZED STABALIZER BAR

EACH1.000

LU, Inc. $190.0000 $190.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $190.0000 $190.00

Tennessee Guardrail, Inc. $190.0000 $190.00

705-14.70 TRANSITION PLATE

EACH1.000

LU, Inc. $490.0000 $490.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $490.0000 $490.00

Tennessee Guardrail, Inc. $490.0000 $490.00

21PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-14.71 TOP CABLE (OLD UNIT)-(4 BARREL)

EACH1.000

LU, Inc. $560.0000 $560.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $560.0000 $560.00

Tennessee Guardrail, Inc. $560.0000 $560.00

705-14.72 TOP CABLE (OLD UNIT)-(6 BARREL)

EACH1.000

LU, Inc. $609.0000 $609.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $609.0000 $609.00

Tennessee Guardrail, Inc. $609.0000 $609.00

705-14.73 TOP CABLE (OLD UNIT)-(9 BARREL)

EACH1.000

LU, Inc. $955.0000 $955.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $955.0000 $955.00

Tennessee Guardrail, Inc. $955.0000 $955.00

705-15.77 BACKUP ASSEMBLY, TENSION STRUT

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

Tennessee Guardrail, Inc. $2,120.0000 $2,120.00

705-15.79 MONORAIL ASSEMBLY, 4-6 BAY

EACH1.000

LU, Inc. $2,850.0000 $2,850.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,850.0000 $2,850.00

Tennessee Guardrail, Inc. $2,850.0000 $2,850.00

705-15.80 MONORAIL ASSEMBLY, 7-9 BAY

EACH1.000

LU, Inc. $2,950.0000 $2,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,950.0000 $2,950.00

Tennessee Guardrail, Inc. $2,950.0000 $2,950.00

705-15.82 TRANSITION PANEL, NEW JERSEY BARRIER

EACH1.000

LU, Inc. $638.0000 $638.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.0000 $638.00

Tennessee Guardrail, Inc. $638.0000 $638.00

705-15.83 TRANSITION PANEL, QUAD TO W

EACH1.000

LU, Inc. $930.0000 $930.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $930.0000 $930.00

Tennessee Guardrail, Inc. $930.0000 $930.00

22PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-15.84 DIAPHRAGM ASSEMBLY, WIDE

EACH1.000

LU, Inc. $1,260.0000 $1,260.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,260.0000 $1,260.00

Tennessee Guardrail, Inc. $1,260.0000 $1,260.00

705-15.85 BACKUP ASSEMBLY, TENSION STRUT, WIDE

EACH1.000

LU, Inc. $2,425.0000 $2,425.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,425.0000 $2,425.00

Tennessee Guardrail, Inc. $2,425.0000 $2,425.00

705-15.87 BACKUP ASSEMBLY, CONCRETE

C.Y.1.000

LU, Inc. $1,230.0000 $1,230.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,230.0000 $1,230.00

Tennessee Guardrail, Inc. $1,230.0000 $1,230.00

705-15.88 END SHOE, CONCRETE

C.Y.1.000

LU, Inc. $370.0000 $370.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $370.0000 $370.00

Tennessee Guardrail, Inc. $370.0000 $370.00

705-15.89 BACKUP ASSEMBLY, CONCRETE, WIDE

C.Y.1.000

LU, Inc. $1,423.0000 $1,423.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,423.0000 $1,423.00

Tennessee Guardrail, Inc. $1,423.0000 $1,423.00

705-15.90 EXTENSION PANEL

EACH1.000

LU, Inc. $330.0000 $330.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $330.0000 $330.00

Tennessee Guardrail, Inc. $330.0000 $330.00

705-15.91 PIVOT SUPPORT BRACKET

EACH1.000

LU, Inc. $85.0000 $85.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $85.0000 $85.00

Tennessee Guardrail, Inc. $85.0000 $85.00

705-17.18 CBL 3/4 X 6FT6IN /DLB SWG/NOHWI

EACH1.000

LU, Inc. $113.5000 $113.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $113.5000 $113.50

Tennessee Guardrail, Inc. $113.5000 $113.50

23PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-17.19 CBL 3/4 X 19FT7IN /SNG SWG

EACH1.000

LU, Inc. $209.0000 $209.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $209.0000 $209.00

Tennessee Guardrail, Inc. $209.0000 $209.00

705-17.20 DIAPHRAGM #1

EACH1.000

LU, Inc. $456.0000 $456.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $456.0000 $456.00

Tennessee Guardrail, Inc. $456.0000 $456.00

705-17.21 DIAPHRAGM #2

EACH1.000

LU, Inc. $505.7500 $505.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $505.7500 $505.75

Tennessee Guardrail, Inc. $505.7500 $505.75

705-17.23 DIAPHRAGM #10

EACH1.000

LU, Inc. $352.7500 $352.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $352.7500 $352.75

Tennessee Guardrail, Inc. $352.7500 $352.75

705-17.25 HDPE FRONT PANEL

EACH1.000

LU, Inc. $977.5000 $977.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $977.5000 $977.50

Tennessee Guardrail, Inc. $977.5000 $977.50

705-17.26 HDPE MIDDLE PANEL

EACH1.000

LU, Inc. $980.0000 $980.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $980.0000 $980.00

Tennessee Guardrail, Inc. $980.0000 $980.00

705-17.27 HDPE REAR PANEL

EACH1.000

LU, Inc. $985.0000 $985.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $985.0000 $985.00

Tennessee Guardrail, Inc. $985.0000 $985.00

705-17.28 COMPLETE BASE UNIT

EACH1.000

LU, Inc. $2,195.0000 $2,195.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,195.0000 $2,195.00

Tennessee Guardrail, Inc. $2,195.0000 $2,195.00

24PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-17.29 PLATE WASHER 5/16IN X 2IN X 1FT2IN

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

Tennessee Guardrail, Inc. $20.0000 $20.00

705-17.30 BACK-UP POST

EACH1.000

LU, Inc. $952.0000 $952.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $952.0000 $952.00

Tennessee Guardrail, Inc. $952.0000 $952.00

705-17.31 FRONT BASEPLATE / POST ASSEMBLY

EACH1.000

LU, Inc. $539.7500 $539.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $539.7500 $539.75

Tennessee Guardrail, Inc. $539.7500 $539.75

705-17.36 TRANSITION TO SAFETY SHAPE

EACH1.000

LU, Inc. $1,349.0000 $1,349.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,349.0000 $1,349.00

Tennessee Guardrail, Inc. $1,349.0000 $1,349.00

705-17.37 TRANSITION TO BARRIER WALL (END CAP)

EACH1.000

LU, Inc. $701.2500 $701.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $701.2500 $701.25

Tennessee Guardrail, Inc. $701.2500 $701.25

705-17.40 WIDETRACC LONG WING POST

EACH1.000

LU, Inc. $374.0000 $374.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $374.0000 $374.00

Tennessee Guardrail, Inc. $374.0000 $374.00

705-17.41 WIDETRACC SHORT WING POST

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

Tennessee Guardrail, Inc. $306.0000 $306.00

705-17.42 WIDETRACC EXT CHANNEL

EACH1.000

LU, Inc. $743.7500 $743.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $743.7500 $743.75

Tennessee Guardrail, Inc. $743.7500 $743.75

25PAGE

EXTENSION

CONTRACT CNT125

UNIT PRICE

705-17.43 WIDETRACC PANEL

EACH1.000

LU, Inc. $348.5000 $348.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $348.5000 $348.50

Tennessee Guardrail, Inc. $348.5000 $348.50

705-17.90 HEART REPAIR DPHM-L WR BKT

EACH1.000

LU, Inc. $102.8500 $102.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $102.8500 $102.85

Tennessee Guardrail, Inc. $102.8500 $102.85

705-17.91 HEART CRS-RPR DPH 3-9

EACH1.000

LU, Inc. $412.2500 $412.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $412.2500 $412.25

Tennessee Guardrail, Inc. $412.2500 $412.25

26PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

LU, Inc. $269,522.36

Site-Safe Products, LLC d/b/a Site-Safe, LLC $302,308.13

Tennessee Guardrail, Inc. $683,303.90

SUB-TOTAL MAINTENANCE (CONTINGENCY)

LU, Inc. $94,444.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94,444.30

Tennessee Guardrail, Inc. $94,444.30

LU, Inc. $363,966.66

Site-Safe Products, LLC d/b/a Site-Safe, LLC $396,752.43

Tennessee Guardrail, Inc. $777,748.20

27PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES ANDERSON, BLOUNT, CAMPBELL, CARTER, CLAIBORNE, COCKE, GRAINGER, GREENE, HAMBLEN, HANCOCK, HAWKINS,JEFFERSON, JOHNSON, KNOX, LOUDON, MONROE, MORGAN, ROANE, SCOTT, SEVIER, SULLIVAN, UNICOI, UNION, AND WASHINGTON(Contract No. CNT113 Call 006)

THE ON-CALL GUARDRAIL REPAIR AND NEW GUARDRAIL INSTALLATION ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98100-4128-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

R.D. Construction, LLC $2,992,694.75

Tennessee Guardrail, Inc. $3,252,245.00

1PAGE

EXTENSION

CONTRACT CNT113

UNIT PRICE

MAINTENANCE CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.270.000

R.D. Construction, LLC $75.0000 $20,250.00

Tennessee Guardrail, Inc. $70.0000 $18,900.00

705-01.02 GUARDRAIL AT BRIDGE PIERS

L.F.21.000

R.D. Construction, LLC $33.0000 $693.00

Tennessee Guardrail, Inc. $32.5000 $682.50

705-01.04 METAL BEAM GUARD FENCE

L.F.180.000

R.D. Construction, LLC $55.0000 $9,900.00

Tennessee Guardrail, Inc. $53.5000 $9,630.00

705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.125.000

R.D. Construction, LLC $19.7500 $2,468.75

Tennessee Guardrail, Inc. $18.2500 $2,281.25

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.25,000.000

R.D. Construction, LLC $18.3000 $457,500.00

Tennessee Guardrail, Inc. $18.7500 $468,750.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH500.000

R.D. Construction, LLC $11.0000 $5,500.00

Tennessee Guardrail, Inc. $12.0000 $6,000.00

705-02.20 SINGLE GUARDRAIL (TYPE 2) LONG POST (6 FT-9 FT)

L.F.18,900.000

R.D. Construction, LLC $23.0000 $434,700.00

Tennessee Guardrail, Inc. $24.4000 $461,160.00

705-02.25 SINGLE GUARDRAIL (TYPE 2) LONG POST (9 FT-12 FT)

L.F.475.000

R.D. Construction, LLC $27.0000 $12,825.00

Tennessee Guardrail, Inc. $25.0000 $11,875.00

705-03.01 MEDIAN DIVIDER GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.50.000

R.D. Construction, LLC $20.0000 $1,000.00

Tennessee Guardrail, Inc. $18.0000 $900.00

705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2)

L.F.25.000

R.D. Construction, LLC $21.0000 $525.00

Tennessee Guardrail, Inc. $22.0000 $550.00

2PAGE

EXTENSION

CONTRACT CNT113

UNIT PRICE

705-03.03 MEDIAN DIVIDER GUARDRAIL (TYPE 2) (27" MT HT)

L.F.550.000

R.D. Construction, LLC $21.5000 $11,825.00

Tennessee Guardrail, Inc. $22.0000 $12,100.00

705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONCRETE BARRIER

L.F.25.000

R.D. Construction, LLC $15.0000 $375.00

Tennessee Guardrail, Inc. $14.0000 $350.00

705-04.02 GUARDRAIL TERMINAL (TYPE 12)

EACH2.000

R.D. Construction, LLC $800.0000 $1,600.00

Tennessee Guardrail, Inc. $650.0000 $1,300.00

705-04.03 GUARDRAIL TERMINAL (TYPE 13)

EACH12.000

R.D. Construction, LLC $850.0000 $10,200.00

Tennessee Guardrail, Inc. $885.0000 $10,620.00

705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE)

EACH16.000

R.D. Construction, LLC $500.0000 $8,000.00

Tennessee Guardrail, Inc. $500.0000 $8,000.00

705-04.11 STONE FOR GUARDRAIL END TERMINAL PAD

TON320.000

R.D. Construction, LLC $35.0000 $11,200.00

Tennessee Guardrail, Inc. $47.5000 $15,200.00

705-04.24 GUARDRAIL END TERMINAL DELINEATION SHEETING

S.F.200.000

R.D. Construction, LLC $11.0000 $2,200.00

Tennessee Guardrail, Inc. $10.0000 $2,000.00

705-04.29 C-A-T CRASH CUSHION ATTENUATING TERMINAL

EACH6.000

R.D. Construction, LLC $4,800.0000 $28,800.00

Tennessee Guardrail, Inc. $4,500.0000 $27,000.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.250.000

R.D. Construction, LLC $21.5000 $5,375.00

Tennessee Guardrail, Inc. $18.7500 $4,687.50

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH10.000

R.D. Construction, LLC $900.0000 $9,000.00

Tennessee Guardrail, Inc. $885.0000 $8,850.00

3PAGE

EXTENSION

CONTRACT CNT113

UNIT PRICE

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH10.000

R.D. Construction, LLC $450.0000 $4,500.00

Tennessee Guardrail, Inc. $500.0000 $5,000.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH500.000

R.D. Construction, LLC $2,730.0000 $1,365,000.00

Tennessee Guardrail, Inc. $2,940.0000 $1,470,000.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH10.000

R.D. Construction, LLC $2,000.0000 $20,000.00

Tennessee Guardrail, Inc. $1,915.0000 $19,150.00

705-10.30 GUARDRAIL ATTACHMENT TO SLOPE FACE ENDPOST

L.F.61.000

R.D. Construction, LLC $90.0000 $5,490.00

Tennessee Guardrail, Inc. $95.0000 $5,795.00

705-10.31 GUARDRAIL ATTACHMENT TO VERTICAL FACE ENDPOST

L.F.26.000

R.D. Construction, LLC $50.0000 $1,300.00

Tennessee Guardrail, Inc. $95.0000 $2,470.00

705-10.32 GUARDRAIL ATTACHMENT TO EXISTING BRIDGE PIER PROTECTION

EACH2.000

R.D. Construction, LLC $125.0000 $250.00

Tennessee Guardrail, Inc. $50.0000 $100.00

705-11.01 GUARDRAIL AT BRIDGE ENDS (POWDER COATED)

L.F.40.000

R.D. Construction, LLC $20.0000 $800.00

Tennessee Guardrail, Inc. $10.0000 $400.00

705-11.03 SINGLE GUARDRAIL (TYPE 2) (POWDER COATED)

L.F.220.000

R.D. Construction, LLC $35.0000 $7,700.00

Tennessee Guardrail, Inc. $32.0000 $7,040.00

705-11.08 GUARDRAIL TERMINAL (TYPE 13) (POWDER COATED)

EACH2.000

R.D. Construction, LLC $1,700.0000 $3,400.00

Tennessee Guardrail, Inc. $1,475.0000 $2,950.00

706-01 GUARDRAIL REMOVED

L.F.900.000

R.D. Construction, LLC $1.0000 $900.00

Tennessee Guardrail, Inc. $2.0000 $1,800.00

4PAGE

EXTENSION

CONTRACT CNT113

UNIT PRICE

706-02.21 RESET SINGLE GUARDRAIL (TYPE 2)

L.F.900.000

R.D. Construction, LLC $1.0000 $900.00

Tennessee Guardrail, Inc. $1.5000 $1,350.00

706-03.01 POSTS FURNISHED

EACH60.000

R.D. Construction, LLC $100.0000 $6,000.00

Tennessee Guardrail, Inc. $120.0000 $7,200.00

706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2)

L.F.21.000

R.D. Construction, LLC $38.5000 $808.50

Tennessee Guardrail, Inc. $40.0000 $840.00

706-06.03 RADIUS RAIL

L.F.2,075.000

R.D. Construction, LLC $21.5000 $44,612.50

Tennessee Guardrail, Inc. $23.0000 $47,725.00

706-06.05 RADIUS RAIL LONG POST (6-9 FT)

L.F.900.000

R.D. Construction, LLC $25.0000 $22,500.00

Tennessee Guardrail, Inc. $25.0000 $22,500.00

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.50.000

R.D. Construction, LLC $32.0000 $1,600.00

Tennessee Guardrail, Inc. $30.0000 $1,500.00

706-10.26 ROUNDED END ELEMENT

EACH99.000

R.D. Construction, LLC $48.0000 $4,752.00

Tennessee Guardrail, Inc. $50.0000 $4,950.00

706-10.54 RE-ALIGN GUARDRAIL

L.F.4,500.000

R.D. Construction, LLC $1.8500 $8,325.00

Tennessee Guardrail, Inc. $2.2500 $10,125.00

706-10.56 BUFFER ENDS 88"

EACH5.000

R.D. Construction, LLC $11.0000 $55.00

Tennessee Guardrail, Inc. $10.0000 $50.00

706-10.71 HAZARD MARKERS

EACH6.000

R.D. Construction, LLC $25.0000 $150.00

Tennessee Guardrail, Inc. $15.0000 $90.00

5PAGE

EXTENSION

CONTRACT CNT113

UNIT PRICE

706-10.72 PULL AND REINSTALL GUARDARAIL POST FOR VERIFICATION

EACH16.000

R.D. Construction, LLC $150.0000 $2,400.00

Tennessee Guardrail, Inc. $25.0000 $400.00

706-10.74 CONCRETE BARRIER WALL REPAIR

C.Y.6.000

R.D. Construction, LLC $3,500.0000 $21,000.00

Tennessee Guardrail, Inc. $3,750.0000 $22,500.00

706-10.80 MICHIGAN AND MODIFIED MICHIGAN END SHOE

EACH16.000

R.D. Construction, LLC $50.0000 $800.00

Tennessee Guardrail, Inc. $60.0000 $960.00

706-10.81 GUARDRAIL REFLECTORS

EACH45.000

R.D. Construction, LLC $15.0000 $675.00

Tennessee Guardrail, Inc. $4.7500 $213.75

706-10.82 CONCRETE BRIDGE END OR PIER PROTECTION REPAIR

C.Y.3.000

R.D. Construction, LLC $4,000.0000 $12,000.00

Tennessee Guardrail, Inc. $3,750.0000 $11,250.00

706-10.83 DRILL BR. PAR. WALL FOR MICHIGAN END SHOE

EACH18.000

R.D. Construction, LLC $200.0000 $3,600.00

Tennessee Guardrail, Inc. $300.0000 $5,400.00

712-01.02 LANE CLOSURE

EACH684.000

R.D. Construction, LLC $485.0000 $331,740.00

Tennessee Guardrail, Inc. $600.0000 $410,400.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY75.000

R.D. Construction, LLC $600.0000 $45,000.00

Tennessee Guardrail, Inc. $900.0000 $67,500.00

717-01 MOBILIZATION

LS1.000

R.D. Construction, LLC $30,000.0000 $30,000.00

Tennessee Guardrail, Inc. $33,000.0000 $33,000.00

717-01.04 MOBILIZATION (EMERGENCY CALL-OUT)

EACH25.000

R.D. Construction, LLC $500.0000 $12,500.00

Tennessee Guardrail, Inc. $750.0000 $18,750.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

R.D. Construction, LLC $2,992,694.75

Tennessee Guardrail, Inc. $3,252,245.00

R.D. Construction, LLC $2,992,694.75

Tennessee Guardrail, Inc. $3,252,245.00

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

ANDERSON AND CAMPBELL COUNTIES (Contract No. CNT118 Call 007)

8.00%DBE GOAL

THE RESURFACING ON U.S. 441 (S.R. 71) FROM NEAR THE ANDERSON COUNTY LINE IN CAMPBELL COUNTY (L.M. 0.00) TO U.S. 25W (S.R.9) IN ANDERSON COUNTY (L.M. 1.21), WEAVING IN AND OUT OF EACH COUNTY AT THE COUNTY LINE.

PROJECT LENGTH -

STP/HSIP-71(41),01009-3209-94,01009-8209-14

5.100 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Potter South East LLC $553,802.75

Rogers Group, Inc. $675,838.50

1PAGE

EXTENSION

CONTRACT CNT118

UNIT PRICE

ROADWAY CATEGORY

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON517.000

Potter South East LLC $86.0000 $44,462.00

Rogers Group, Inc. $99.8000 $51,596.60

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON66.000

Potter South East LLC $700.0000 $46,200.00

Rogers Group, Inc. $710.0000 $46,860.00

411-03.08 ACS MIX(PG70-22) THIN LIFT ASPHALT

TON3,212.000

Potter South East LLC $82.6000 $265,311.20

Rogers Group, Inc. $115.7000 $371,628.40

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.8.700

Potter South East LLC $950.0000 $8,265.00

Rogers Group, Inc. $540.0000 $4,698.00

611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN

EACH16.000

Potter South East LLC $1,800.0000 $28,800.00

Rogers Group, Inc. $1,301.0000 $20,816.00

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.1,250.000

Potter South East LLC $21.0000 $26,250.00

Rogers Group, Inc. $24.1500 $30,187.50

701-02.03 CONCRETE CURB RAMP

S.F.275.000

Potter South East LLC $19.8500 $5,458.75

Rogers Group, Inc. $23.6000 $6,490.00

705-04.10 EARTH PAD FOR GUARD RAIL END TREATMENT

EACH1.000

Potter South East LLC $2,400.0000 $2,400.00

Rogers Group, Inc. $1,400.0000 $1,400.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH1.000

Potter South East LLC $3,500.0000 $3,500.00

Rogers Group, Inc. $2,935.0000 $2,935.00

712-01 TRAFFIC CONTROL

LS1.000

Potter South East LLC $4,500.0000 $4,500.00

Rogers Group, Inc. $15,344.0000 $15,344.00

2PAGE

EXTENSION

CONTRACT CNT118

UNIT PRICE

712-06 SIGNS (CONSTRUCTION)

S.F.396.000

Potter South East LLC $7.8000 $3,088.80

Rogers Group, Inc. $6.0000 $2,376.00

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Potter South East LLC $500.0000 $1,000.00

Rogers Group, Inc. $2,150.0000 $4,300.00

713-16.20 SIGNS (OM-3)

EACH2.000

Potter South East LLC $300.0000 $600.00

Rogers Group, Inc. $163.0000 $326.00

713-16.21 SIGNS (W1-8)

EACH1.000

Potter South East LLC $300.0000 $300.00

Rogers Group, Inc. $202.0000 $202.00

713-16.22 SIGNS (R2-1)

EACH1.000

Potter South East LLC $300.0000 $300.00

Rogers Group, Inc. $191.0000 $191.00

713-16.23 SIGNS (TN-2)

EACH1.000

Potter South East LLC $300.0000 $300.00

Rogers Group, Inc. $272.0000 $272.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH340.000

Potter South East LLC $28.5000 $9,690.00

Rogers Group, Inc. $23.0000 $7,820.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH66.000

Potter South East LLC $28.5000 $1,881.00

Rogers Group, Inc. $23.0000 $1,518.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH406.000

Potter South East LLC $5.0000 $2,030.00

Rogers Group, Inc. $6.0000 $2,436.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.55.000

Potter South East LLC $20.0000 $1,100.00

Rogers Group, Inc. $18.0000 $990.00

3PAGE

EXTENSION

CONTRACT CNT118

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.56.000

Potter South East LLC $13.0000 $728.00

Rogers Group, Inc. $10.0000 $560.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH12.000

Potter South East LLC $160.0000 $1,920.00

Rogers Group, Inc. $150.0000 $1,800.00

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.482.000

Potter South East LLC $19.0000 $9,158.00

Rogers Group, Inc. $18.0000 $8,676.00

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH2.000

Potter South East LLC $190.0000 $380.00

Rogers Group, Inc. $125.0000 $250.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.5.000

Potter South East LLC $780.0000 $3,900.00

Rogers Group, Inc. $525.0000 $2,625.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.8.000

Potter South East LLC $4,625.0000 $37,000.00

Rogers Group, Inc. $4,000.0000 $32,000.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.6.000

Potter South East LLC $1,880.0000 $11,280.00

Rogers Group, Inc. $2,200.0000 $13,200.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.8.000

Potter South East LLC $2,250.0000 $18,000.00

Rogers Group, Inc. $2,600.0000 $20,800.00

717-01 MOBILIZATION

LS1.000

Potter South East LLC $16,000.0000 $16,000.00

Rogers Group, Inc. $23,541.0000 $23,541.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Potter South East LLC $553,802.75

Rogers Group, Inc. $675,838.50

Potter South East LLC $553,802.75

Rogers Group, Inc. $675,838.50

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

BEDFORD COUNTY (Contract No. CNT120 Call 008)

9.00%DBE GOAL

THE RESURFACING ON U.S. 41A (S.R. 16) FROM EAST OF HUMMINGBIRD LANE (L.M. 16.00) TO U.S. 231 (S.R. 10) (L.M. 18.16) AND ON S.R. 64FROM NORTH JEFFERSON STREET (L.M. 12.44) TO THE U.S. 41A (S.R. 16) RAMP (L.M. 15.84).

PROJECT LENGTH -

NH/HSIP-16(60),02004-3218-94,02004-8218-14,STP/HSIP-64(23),02008-3214-94,02008-8214-14,STP/HSIP-64(24),02008-3215-94,02008-8215-14

5.560 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Wright Paving Contractors, Inc. $1,512,430.11

Volunteer Paving, LLC $1,596,098.24

1PAGE

EXTENSION

CONTRACT CNT120

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.9.400

Wright Paving Contractors, Inc. $473.5200 $4,451.09

Volunteer Paving, LLC $1,267.0400 $11,910.18

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON50.000

Wright Paving Contractors, Inc. $35.0000 $1,750.00

Volunteer Paving, LLC $56.1800 $2,809.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON1,205.000

Wright Paving Contractors, Inc. $76.7600 $92,495.80

Volunteer Paving, LLC $77.9300 $93,905.65

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON50.000

Wright Paving Contractors, Inc. $609.2800 $30,464.00

Volunteer Paving, LLC $550.0000 $27,500.00

403-05.01 BITUMINOUS MATERIAL (FOG SEAL) SHOULDER

TON7.000

Wright Paving Contractors, Inc. $868.8000 $6,081.60

Volunteer Paving, LLC $808.7900 $5,661.53

411-01.10 ACS MIX(PG64-22) GRADING D

TON6,228.000

Wright Paving Contractors, Inc. $86.9000 $541,213.20

Volunteer Paving, LLC $81.9300 $510,260.04

411-02.10 ACS MIX(PG70-22) GRADING D

TON2,569.000

Wright Paving Contractors, Inc. $92.7300 $238,223.37

Volunteer Paving, LLC $85.0600 $218,519.14

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.5.700

Wright Paving Contractors, Inc. $1,239.4200 $7,064.69

Volunteer Paving, LLC $700.0000 $3,990.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON4,961.000

Wright Paving Contractors, Inc. $13.0800 $64,889.88

Volunteer Paving, LLC $20.3700 $101,055.57

611-03.04 GRAY IRON CASTINGS (CATCHBASIN)

LB.16,750.000

Wright Paving Contractors, Inc. $1.0000 $16,750.00

Volunteer Paving, LLC $5.0000 $83,750.00

2PAGE

EXTENSION

CONTRACT CNT120

UNIT PRICE

611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN

EACH5.000

Wright Paving Contractors, Inc. $500.0000 $2,500.00

Volunteer Paving, LLC $950.0000 $4,750.00

611-09.02 REWORK CATCHBASIN

EACH25.000

Wright Paving Contractors, Inc. $1,200.0000 $30,000.00

Volunteer Paving, LLC $1,200.0000 $30,000.00

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.5,980.000

Wright Paving Contractors, Inc. $30.7000 $183,586.00

Volunteer Paving, LLC $30.7000 $183,586.00

701-02.03 CONCRETE CURB RAMP

S.F.130.000

Wright Paving Contractors, Inc. $17.7500 $2,307.50

Volunteer Paving, LLC $17.7500 $2,307.50

701-02.05 DETECTABLE WARNING SURFACE (REHABILITATION)

EACH56.000

Wright Paving Contractors, Inc. $500.0000 $28,000.00

Volunteer Paving, LLC $50.0000 $2,800.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.362.500

Wright Paving Contractors, Inc. $17.0000 $6,162.50

Volunteer Paving, LLC $22.8500 $8,283.13

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH2.000

Wright Paving Contractors, Inc. $2,750.0000 $5,500.00

Volunteer Paving, LLC $2,854.0000 $5,708.00

706-01 GUARDRAIL REMOVED

L.F.112.500

Wright Paving Contractors, Inc. $0.5100 $57.38

Volunteer Paving, LLC $1.0000 $112.50

712-01 TRAFFIC CONTROL

LS1.000

Wright Paving Contractors, Inc. $36,725.0000 $36,725.00

Volunteer Paving, LLC $28,200.0000 $28,200.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH175.000

Wright Paving Contractors, Inc. $17.3600 $3,038.00

Volunteer Paving, LLC $10.0000 $1,750.00

3PAGE

EXTENSION

CONTRACT CNT120

UNIT PRICE

712-05.01 WARNING LIGHTS (TYPE A)

EACH8.000

Wright Paving Contractors, Inc. $11.2000 $89.60

Volunteer Paving, LLC $5.0000 $40.00

712-06 SIGNS (CONSTRUCTION)

S.F.2,938.000

Wright Paving Contractors, Inc. $5.0000 $14,690.00

Volunteer Paving, LLC $6.5000 $19,097.00

712-08.03 ARROW BOARD (TYPE C)

EACH4.000

Wright Paving Contractors, Inc. $840.0000 $3,360.00

Volunteer Paving, LLC $850.0000 $3,400.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH3.000

Wright Paving Contractors, Inc. $1,400.0000 $4,200.00

Volunteer Paving, LLC $5,650.0000 $16,950.00

713-16.20 SIGNS (OM3-L TYPE 3 OBJECT MARKER)

EACH4.000

Wright Paving Contractors, Inc. $190.0000 $760.00

Volunteer Paving, LLC $156.0000 $624.00

713-16.21 SIGNS (OM3-R TYPE 3 OBJECT MARKER)

EACH4.000

Wright Paving Contractors, Inc. $190.0000 $760.00

Volunteer Paving, LLC $156.0000 $624.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH441.000

Wright Paving Contractors, Inc. $25.0000 $11,025.00

Volunteer Paving, LLC $20.0000 $8,820.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH18.000

Wright Paving Contractors, Inc. $25.0000 $450.00

Volunteer Paving, LLC $20.0000 $360.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.350.000

Wright Paving Contractors, Inc. $12.0000 $4,200.00

Volunteer Paving, LLC $7.5000 $2,625.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.503.000

Wright Paving Contractors, Inc. $20.0000 $10,060.00

Volunteer Paving, LLC $15.0000 $7,545.00

4PAGE

EXTENSION

CONTRACT CNT120

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.1,054.000

Wright Paving Contractors, Inc. $15.0000 $15,810.00

Volunteer Paving, LLC $15.0000 $15,810.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH8.000

Wright Paving Contractors, Inc. $150.0000 $1,200.00

Volunteer Paving, LLC $150.0000 $1,200.00

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.946.000

Wright Paving Contractors, Inc. $22.0000 $20,812.00

Volunteer Paving, LLC $10.0000 $9,460.00

716-02.12 PLASTIC PAVEMENT MARKING (8IN LINE)

L.M.0.100

Wright Paving Contractors, Inc. $11,000.0000 $1,100.00

Volunteer Paving, LLC $8,000.0000 $800.00

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH3.000

Wright Paving Contractors, Inc. $200.0000 $600.00

Volunteer Paving, LLC $250.0000 $750.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.12.100

Wright Paving Contractors, Inc. $900.0000 $10,890.00

Volunteer Paving, LLC $850.0000 $10,285.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.17.600

Wright Paving Contractors, Inc. $4,800.0000 $84,480.00

Volunteer Paving, LLC $5,000.0000 $88,000.00

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.50.000

Wright Paving Contractors, Inc. $3.0000 $150.00

Volunteer Paving, LLC $1.5000 $75.00

716-12.07 ENHANCED FLAT LINE THERMO (8IN BROKEN LN)

L.F.343.000

Wright Paving Contractors, Inc. $3.0000 $1,029.00

Volunteer Paving, LLC $1.5000 $514.50

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.2.400

Wright Paving Contractors, Inc. $2,200.0000 $5,280.00

Volunteer Paving, LLC $2,000.0000 $4,800.00

5PAGE

EXTENSION

CONTRACT CNT120

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Wright Paving Contractors, Inc. $16,264.0000 $16,264.00

Volunteer Paving, LLC $73,500.0000 $73,500.00

730-14.02 SAW SLOT

L.F.869.000

Wright Paving Contractors, Inc. $3.5000 $3,041.50

Volunteer Paving, LLC $3.5000 $3,041.50

730-14.03 LOOP WIRE

L.F.1,838.000

Wright Paving Contractors, Inc. $0.5000 $919.00

Volunteer Paving, LLC $0.5000 $919.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Wright Paving Contractors, Inc. $1,512,430.11

Volunteer Paving, LLC $1,596,098.24

Wright Paving Contractors, Inc. $1,512,430.11

Volunteer Paving, LLC $1,596,098.24

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES BEDFORD, CHEATHAM, DAVIDSON, DICKSON, GILES, HICKMAN, HOUSTON, HUMPHREYS, LAWRENCE, LEWIS, LINCOLN,MACON, MARSHALL, MAURY, MONTGOMERY, MOORE, PERRY, ROBERTSON, RUTHERFORD, SMITH, STEWART, SUMNER, TROUSDALE,WAYNE, WILLIAMSON, AND WILSON (Contract No. CNT115 Call 009)

THE ON-CALL GUARDRAIL REPAIR AND NEW GUARDRAIL INSTALLATION ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98303-4135-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

R.D. Construction, LLC $3,780,767.50

1PAGE

EXTENSION

CONTRACT CNT115

UNIT PRICE

MAINTENANCE CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.216.000

R.D. Construction, LLC $75.0000 $16,200.00

705-01.02 GUARDRAIL AT BRIDGE PIERS

L.F.35.000

R.D. Construction, LLC $35.0000 $1,225.00

705-01.04 METAL BEAM GUARD FENCE

L.F.240.000

R.D. Construction, LLC $65.0000 $15,600.00

705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.75.000

R.D. Construction, LLC $15.0000 $1,125.00

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.30,000.000

R.D. Construction, LLC $17.0000 $510,000.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH500.000

R.D. Construction, LLC $25.0000 $12,500.00

705-02.20 SINGLE GUARDRAIL (TYPE 2) LONG POST (6 FT-9 FT)

L.F.350.000

R.D. Construction, LLC $23.5000 $8,225.00

705-02.25 SINGLE GUARDRAIL (TYPE 2) LONG POST (9 FT-12 FT)

L.F.125.000

R.D. Construction, LLC $25.0000 $3,125.00

705-03.01 MEDIAN DIVIDER GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.50.000

R.D. Construction, LLC $15.0000 $750.00

705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2)

L.F.50.000

R.D. Construction, LLC $15.0000 $750.00

705-03.03 MEDIAN DIVIDER GUARDRAIL (TYPE 2) (27" MT HT)

L.F.225.000

R.D. Construction, LLC $15.0000 $3,375.00

705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONCRETE BARRIER

L.F.50.000

R.D. Construction, LLC $15.0000 $750.00

2PAGE

EXTENSION

CONTRACT CNT115

UNIT PRICE

705-04.02 GUARDRAIL TERMINAL (TYPE 12)

EACH4.000

R.D. Construction, LLC $500.0000 $2,000.00

705-04.03 GUARDRAIL TERMINAL (TYPE 13)

EACH44.000

R.D. Construction, LLC $700.0000 $30,800.00

705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE)

EACH10.000

R.D. Construction, LLC $750.0000 $7,500.00

705-04.11 STONE FOR GUARDRAIL END TERMINAL PAD

TON10,000.000

R.D. Construction, LLC $15.0000 $150,000.00

705-04.24 GUARDRAIL END TERMINAL DELINEATION SHEETING

S.F.200.000

R.D. Construction, LLC $55.0000 $11,000.00

705-04.29 C-A-T CRASH CUSHION ATTENUATING TERMINAL

EACH4.000

R.D. Construction, LLC $4,800.0000 $19,200.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.15,000.000

R.D. Construction, LLC $19.0000 $285,000.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH10.000

R.D. Construction, LLC $1,100.0000 $11,000.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH10.000

R.D. Construction, LLC $750.0000 $7,500.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH500.000

R.D. Construction, LLC $2,700.0000 $1,350,000.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH10.000

R.D. Construction, LLC $2,000.0000 $20,000.00

705-10.30 GUARDRAIL ATTACHMENT TO SLOPE FACE ENDPOST

L.F.35.000

R.D. Construction, LLC $20.0000 $700.00

3PAGE

EXTENSION

CONTRACT CNT115

UNIT PRICE

705-10.31 GUARDRAIL ATTACHMENT TO VERTICAL FACE ENDPOST

L.F.35.000

R.D. Construction, LLC $50.0000 $1,750.00

705-10.32 GUARDRAIL ATTACHMENT TO EXISTING BRIDGE PIER PROTECTION

EACH44.000

R.D. Construction, LLC $100.0000 $4,400.00

705-11.01 GUARDRAIL AT BRIDGE ENDS (POWDER COATED)

L.F.87.000

R.D. Construction, LLC $85.0000 $7,395.00

705-11.03 SINGLE GUARDRAIL (TYPE 2) (POWDER COATED)

L.F.700.000

R.D. Construction, LLC $28.0000 $19,600.00

705-11.08 GUARDRAIL TERMINAL (TYPE 13) (POWDER COATED)

EACH2.000

R.D. Construction, LLC $1,475.0000 $2,950.00

706-01 GUARDRAIL REMOVED

L.F.2,800.000

R.D. Construction, LLC $0.2500 $700.00

706-02.21 RESET SINGLE GUARDRAIL (TYPE 2)

L.F.560.000

R.D. Construction, LLC $7.0000 $3,920.00

706-03.01 POSTS FURNISHED

EACH16.000

R.D. Construction, LLC $100.0000 $1,600.00

706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2)

L.F.35.000

R.D. Construction, LLC $15.0000 $525.00

706-06.03 RADIUS RAIL

L.F.1,400.000

R.D. Construction, LLC $23.5000 $32,900.00

706-06.05 RADIUS RAIL LONG POST (6-9 FT)

L.F.75.000

R.D. Construction, LLC $25.0000 $1,875.00

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.75.000

R.D. Construction, LLC $27.5000 $2,062.50

4PAGE

EXTENSION

CONTRACT CNT115

UNIT PRICE

706-10.26 ROUNDED END ELEMENT

EACH36.000

R.D. Construction, LLC $100.0000 $3,600.00

706-10.54 RE-ALIGN GUARDRAIL

L.F.2,100.000

R.D. Construction, LLC $0.5000 $1,050.00

706-10.56 BUFFER ENDS 88"

EACH6.000

R.D. Construction, LLC $10.0000 $60.00

706-10.71 HAZARD MARKERS

EACH7.000

R.D. Construction, LLC $35.0000 $245.00

706-10.72 PULL AND REINSTALL GUARDARAIL POST FOR VERIFICATION

EACH20.000

R.D. Construction, LLC $150.0000 $3,000.00

706-10.74 CONCRETE BARRIER WALL REPAIR

C.Y.20.000

R.D. Construction, LLC $3,500.0000 $70,000.00

706-10.80 MICHIGAN AND MODIFIED MICHIGAN END SHOE

EACH10.000

R.D. Construction, LLC $50.0000 $500.00

706-10.81 GUARDRAIL REFLECTORS

EACH80.000

R.D. Construction, LLC $7.0000 $560.00

706-10.82 CONCRETE BRIDGE END OR PIER PROTECTION REPAIR

C.Y.4.000

R.D. Construction, LLC $4,000.0000 $16,000.00

706-10.83 DRILL BR. PAR. WALL FOR MICHIGAN END SHOE

EACH12.000

R.D. Construction, LLC $200.0000 $2,400.00

712-01.02 LANE CLOSURE

EACH1,188.000

R.D. Construction, LLC $700.0000 $831,600.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY300.000

R.D. Construction, LLC $800.0000 $240,000.00

5PAGE

EXTENSION

CONTRACT CNT115

UNIT PRICE

717-01 MOBILIZATION

LS1.000

R.D. Construction, LLC $40,000.0000 $40,000.00

717-01.04 MOBILIZATION (EMERGENCY CALL-OUT)

EACH25.000

R.D. Construction, LLC $950.0000 $23,750.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

R.D. Construction, LLC $3,780,767.50

R.D. Construction, LLC $3,780,767.50

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES BENTON, CARROLL, CHESTER, CROCKETT, DECATUR, DYER, GIBSON, HARDEMAN, HARDIN, HAYWOOD, HENDERSON, HENRY,LAKE, MADISON, MCNAIRY, OBION, AND WEAKLEY (Contract No. CNT117 Call 010)

THE ON-CALL GUARDRAIL REPAIR AND NEW GUARDRAIL INSTALLATION ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98400-4115-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

F8th Construction Company, LLC $999,985.50

Tri-State Guardrail & Sign Co., Inc. $1,092,508.00

1PAGE

EXTENSION

CONTRACT CNT117

UNIT PRICE

MAINTENANCE CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.80.000

F8th Construction Company, LLC $35.0000 $2,800.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $2,800.00

705-01.02 GUARDRAIL AT BRIDGE PIERS

L.F.12.000

F8th Construction Company, LLC $35.0000 $420.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $420.00

705-01.04 METAL BEAM GUARD FENCE

L.F.57.000

F8th Construction Company, LLC $38.0000 $2,166.00

Tri-State Guardrail & Sign Co., Inc. $25.0000 $1,425.00

705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.75.000

F8th Construction Company, LLC $14.0000 $1,050.00

Tri-State Guardrail & Sign Co., Inc. $20.0000 $1,500.00

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.7,500.000

F8th Construction Company, LLC $15.0000 $112,500.00

Tri-State Guardrail & Sign Co., Inc. $17.0000 $127,500.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH500.000

F8th Construction Company, LLC $10.0000 $5,000.00

Tri-State Guardrail & Sign Co., Inc. $25.0000 $12,500.00

705-02.20 SINGLE GUARDRAIL (TYPE 2) LONG POST (6 FT-9 FT)

L.F.2,338.000

F8th Construction Company, LLC $13.7500 $32,147.50

Tri-State Guardrail & Sign Co., Inc. $16.0000 $37,408.00

705-02.25 SINGLE GUARDRAIL (TYPE 2) LONG POST (9 FT-12 FT)

L.F.2,100.000

F8th Construction Company, LLC $13.7500 $28,875.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $33,600.00

705-03.01 MEDIAN DIVIDER GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.13.000

F8th Construction Company, LLC $18.0000 $234.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $208.00

705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2)

L.F.75.000

F8th Construction Company, LLC $20.0000 $1,500.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $1,200.00

2PAGE

EXTENSION

CONTRACT CNT117

UNIT PRICE

705-03.03 MEDIAN DIVIDER GUARDRAIL (TYPE 2) (27" MT HT)

L.F.25.000

F8th Construction Company, LLC $14.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $400.00

705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONCRETE BARRIER

L.F.25.000

F8th Construction Company, LLC $14.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $400.00

705-04.02 GUARDRAIL TERMINAL (TYPE 12)

EACH2.000

F8th Construction Company, LLC $100.0000 $200.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $500.00

705-04.03 GUARDRAIL TERMINAL (TYPE 13)

EACH6.000

F8th Construction Company, LLC $400.0000 $2,400.00

Tri-State Guardrail & Sign Co., Inc. $150.0000 $900.00

705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE)

EACH5.000

F8th Construction Company, LLC $400.0000 $2,000.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $1,250.00

705-04.11 STONE FOR GUARDRAIL END TERMINAL PAD

TON1,400.000

F8th Construction Company, LLC $5.0000 $7,000.00

Tri-State Guardrail & Sign Co., Inc. $2.0000 $2,800.00

705-04.24 GUARDRAIL END TERMINAL DELINEATION SHEETING

S.F.200.000

F8th Construction Company, LLC $5.0000 $1,000.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $2,400.00

705-04.29 C-A-T CRASH CUSHION ATTENUATING TERMINAL

EACH2.000

F8th Construction Company, LLC $1,000.0000 $2,000.00

Tri-State Guardrail & Sign Co., Inc. $1,000.0000 $2,000.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.10,000.000

F8th Construction Company, LLC $16.0000 $160,000.00

Tri-State Guardrail & Sign Co., Inc. $22.0000 $220,000.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH5.000

F8th Construction Company, LLC $600.0000 $3,000.00

Tri-State Guardrail & Sign Co., Inc. $900.0000 $4,500.00

3PAGE

EXTENSION

CONTRACT CNT117

UNIT PRICE

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH5.000

F8th Construction Company, LLC $550.0000 $2,750.00

Tri-State Guardrail & Sign Co., Inc. $350.0000 $1,750.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH200.000

F8th Construction Company, LLC $2,200.0000 $440,000.00

Tri-State Guardrail & Sign Co., Inc. $2,500.0000 $500,000.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH5.000

F8th Construction Company, LLC $1,500.0000 $7,500.00

Tri-State Guardrail & Sign Co., Inc. $1,600.0000 $8,000.00

705-10.30 GUARDRAIL ATTACHMENT TO SLOPE FACE ENDPOST

L.F.45.000

F8th Construction Company, LLC $38.0000 $1,710.00

Tri-State Guardrail & Sign Co., Inc. $38.0000 $1,710.00

705-10.31 GUARDRAIL ATTACHMENT TO VERTICAL FACE ENDPOST

L.F.9.000

F8th Construction Company, LLC $22.0000 $198.00

Tri-State Guardrail & Sign Co., Inc. $38.0000 $342.00

705-10.32 GUARDRAIL ATTACHMENT TO EXISTING BRIDGE PIER PROTECTION

EACH2.000

F8th Construction Company, LLC $38.0000 $76.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $500.00

706-01 GUARDRAIL REMOVED

L.F.350.000

F8th Construction Company, LLC $1.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $350.00

706-02.21 RESET SINGLE GUARDRAIL (TYPE 2)

L.F.350.000

F8th Construction Company, LLC $1.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $350.00

706-03.01 POSTS FURNISHED

EACH9.000

F8th Construction Company, LLC $40.0000 $360.00

Tri-State Guardrail & Sign Co., Inc. $33.0000 $297.00

706-06.01 SINGLE THRIE RAIL (TYPE 2)

L.F.25.000

F8th Construction Company, LLC $18.0000 $450.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $450.00

4PAGE

EXTENSION

CONTRACT CNT117

UNIT PRICE

706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2)

L.F.25.000

F8th Construction Company, LLC $18.0000 $450.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $450.00

706-06.03 RADIUS RAIL

L.F.175.000

F8th Construction Company, LLC $20.0000 $3,500.00

Tri-State Guardrail & Sign Co., Inc. $30.0000 $5,250.00

706-06.05 RADIUS RAIL LONG POST (6-9 FT)

L.F.38.000

F8th Construction Company, LLC $20.0000 $760.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $684.00

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.38.000

F8th Construction Company, LLC $20.0000 $760.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $684.00

706-10.26 ROUNDED END ELEMENT

EACH12.000

F8th Construction Company, LLC $25.0000 $300.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $420.00

706-10.54 RE-ALIGN GUARDRAIL

L.F.1,050.000

F8th Construction Company, LLC $1.0000 $1,050.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $1,050.00

706-10.71 HAZARD MARKERS

EACH3.000

F8th Construction Company, LLC $8.0000 $24.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $36.00

706-10.72 PULL AND REINSTALL GUARDARAIL POST FOR VERIFICATION

EACH3.000

F8th Construction Company, LLC $10.0000 $30.00

Tri-State Guardrail & Sign Co., Inc. $33.0000 $99.00

706-10.74 CONCRETE BARRIER WALL REPAIR

C.Y.3.000

F8th Construction Company, LLC $1,000.0000 $3,000.00

Tri-State Guardrail & Sign Co., Inc. $1,000.0000 $3,000.00

706-10.80 MICHIGAN AND MODIFIED MICHIGAN END SHOE

EACH3.000

F8th Construction Company, LLC $25.0000 $75.00

Tri-State Guardrail & Sign Co., Inc. $55.0000 $165.00

5PAGE

EXTENSION

CONTRACT CNT117

UNIT PRICE

706-10.81 GUARDRAIL REFLECTORS

EACH30.000

F8th Construction Company, LLC $10.0000 $300.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $360.00

706-10.82 CONCRETE BRIDGE END OR PIER PROTECTION REPAIR

C.Y.2.000

F8th Construction Company, LLC $1,000.0000 $2,000.00

Tri-State Guardrail & Sign Co., Inc. $750.0000 $1,500.00

706-10.83 DRILL BR. PAR. WALL FOR MICHIGAN END SHOE

EACH2.000

F8th Construction Company, LLC $250.0000 $500.00

Tri-State Guardrail & Sign Co., Inc. $100.0000 $200.00

712-01.02 LANE CLOSURE

EACH160.000

F8th Construction Company, LLC $800.0000 $128,000.00

Tri-State Guardrail & Sign Co., Inc. $300.0000 $48,000.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY50.000

F8th Construction Company, LLC $50.0000 $2,500.00

Tri-State Guardrail & Sign Co., Inc. $1,000.0000 $50,000.00

717-01 MOBILIZATION

LS1.000

F8th Construction Company, LLC $25,000.0000 $25,000.00

Tri-State Guardrail & Sign Co., Inc. $6,000.0000 $6,000.00

717-01.04 MOBILIZATION (EMERGENCY CALL-OUT)

EACH13.000

F8th Construction Company, LLC $1,000.0000 $13,000.00

Tri-State Guardrail & Sign Co., Inc. $550.0000 $7,150.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

F8th Construction Company, LLC $999,985.50

Tri-State Guardrail & Sign Co., Inc. $1,092,508.00

F8th Construction Company, LLC $999,985.50

Tri-State Guardrail & Sign Co., Inc. $1,092,508.00

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES BENTON, CARROLL, CHESTER, GIBSON, HARDEMAN, HARDIN, HENRY, MADISON, AND SHELBY (Contract No. CNT128 Call 011)

THE RANDOM ON-CALL ATTENUATOR REPAIR ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98400-4113-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

LU, Inc. $414,327.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $438,139.75

1PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

MAINTENANCE CATEGORY

705-08.22 IMPACT ATTENUATOR (TAU-II WIDE)

EACH1.000

LU, Inc. $19,709.3800 $19,709.38

Site-Safe Products, LLC d/b/a Site-Safe, LLC $21,100.2000 $21,100.20

705-08.23 REPOSITIONING IMPACT ATTENUATOR (TAU-II)

EACH2.000

LU, Inc. $1,303.2300 $2,606.46

Site-Safe Products, LLC d/b/a Site-Safe, LLC $383.0400 $766.08

705-08.25 TAU-II ENERGY ABSORBING CARTRIDGE TYPE A (UNIVERSAL)

EACH6.000

LU, Inc. $579.2100 $3,475.26

Site-Safe Products, LLC d/b/a Site-Safe, LLC $465.6600 $2,793.96

705-08.26 TAU-II ENERGY ABSORBING CARTRIDGE TYPE B (UNIVERSAL)

EACH7.000

LU, Inc. $579.2100 $4,054.47

Site-Safe Products, LLC d/b/a Site-Safe, LLC $465.6600 $3,259.62

705-08.28 TAU-II FRONT SUPPORT ASSEMBLY (UNIVERSAL)

EACH1.000

LU, Inc. $743.7500 $743.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,138.0300 $1,138.03

705-08.29 TAU-II FRONT SUPPORT LEG KIT (UNIVERSAL)

EACH1.000

LU, Inc. $204.5300 $204.53

Site-Safe Products, LLC d/b/a Site-Safe, LLC $150.2100 $150.21

705-08.30 TAU-II MID SUPPORT ASSEMBLY (UNIVERSAL)

EACH6.000

LU, Inc. $706.5600 $4,239.36

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,517.3600 $9,104.16

705-08.32 TAU-II SLIDER KIT (UNIVERSAL)

EACH1.000

LU, Inc. $229.7500 $229.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $379.3400 $379.34

705-08.33 TAU-II SLIDING PANEL (UNIVERSAL)

EACH6.000

LU, Inc. $289.6100 $1,737.66

Site-Safe Products, LLC d/b/a Site-Safe, LLC $381.8500 $2,291.10

705-08.34 TAU-II NOSE PIECE (PARALLEL UNIT)

EACH3.000

LU, Inc. $656.4400 $1,969.32

Site-Safe Products, LLC d/b/a Site-Safe, LLC $678.8200 $2,036.46

2PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-08.36 TAU-II NOSE PIECE (WIDE UNIT)

EACH1.000

LU, Inc. $431.3800 $431.38

Site-Safe Products, LLC d/b/a Site-Safe, LLC $826.1600 $826.16

705-08.43 FORMED ANGLE 05 TRACC

EACH2.000

LU, Inc. $323.8500 $647.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $211.6700 $423.34

705-08.54 TRACC WASHER 1/4" X 3" X 2-1/4"

EACH2.000

LU, Inc. $2.3300 $4.66

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2.0800 $4.16

705-08.55 TRACC DOUBLER PL X 38-1/2"

EACH2.000

LU, Inc. $71.4000 $142.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $46.6700 $93.34

705-08.56 TRACC BEAM GUIDE 72"

EACH2.000

LU, Inc. $312.8000 $625.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $204.4400 $408.88

705-08.57 IMPACT ATTENUATOR (QUADGUARD ELITE WIDE)

EACH1.000

LU, Inc. $18,950.0000 $18,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $14,818.9300 $14,818.93

705-08.58 IMPACT ATTENUATOR (QUADGUARD ELITE)

EACH1.000

LU, Inc. $15,150.0000 $15,150.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $17,777.7800 $17,777.78

705-08.59 IMPACT ATTENUATOR REPOSITIONING (QUADGUARD ELITE)

EACH5.000

LU, Inc. $250.0000 $1,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $255.3600 $1,276.80

705-08.66 RIP PLATE REPAIR KIT, STAGE 1

EACH5.000

LU, Inc. $557.8100 $2,789.05

Site-Safe Products, LLC d/b/a Site-Safe, LLC $169.1700 $845.85

705-08.67 RIP PLATE REPAIR KIT, STAGE 2

EACH5.000

LU, Inc. $743.7500 $3,718.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $498.2700 $2,491.35

3PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-08.69 PLASTIC NOSE PIECE/REFLECTOR

EACH3.000

LU, Inc. $492.3300 $1,476.99

Site-Safe Products, LLC d/b/a Site-Safe, LLC $462.0300 $1,386.09

705-08.80 SIDE PANEL - 35"

EACH3.000

LU, Inc. $210.7300 $632.19

Site-Safe Products, LLC d/b/a Site-Safe, LLC $142.0560 $426.17

705-08.81 SIDE PANEL - 62"

EACH1.000

LU, Inc. $278.9100 $278.91

Site-Safe Products, LLC d/b/a Site-Safe, LLC $287.2900 $287.29

705-08.91 REPOSITIONING VEHCULR IMP ATTN(2005TRACC)

EACH5.000

LU, Inc. $1,303.2300 $6,516.15

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,276.8000 $6,384.00

705-08.92 05 RIP PLATE REPAIR KIT STAGE 2

EACH2.000

LU, Inc. $533.3600 $1,066.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $716.8000 $1,433.60

705-09.10 IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $22,500.0000 $22,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $24,423.1700 $24,423.17

705-09.11 REPOSITIONING OF IMPACT ATTENUATOR (SCI100GM)

EACH2.000

LU, Inc. $965.3600 $1,930.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $319.2000 $638.40

705-09.35 PANEL DELINEATOR (W/REFLECTIVE HAZARD MARKER)

EACH1.000

LU, Inc. $95.2000 $95.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $232.0000 $232.00

705-14.21 SC B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $104.1300 $104.13

Site-Safe Products, LLC d/b/a Site-Safe, LLC $98.6100 $98.61

705-14.22 CONC. B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $104.1300 $104.13

Site-Safe Products, LLC d/b/a Site-Safe, LLC $270.4600 $270.46

4PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-14.30 REPOSITIONING IMPACT ATTENUATOR(REACT 350)

EACH2.000

LU, Inc. $891.9100 $1,783.82

Site-Safe Products, LLC d/b/a Site-Safe, LLC $319.2000 $638.40

705-14.56 REFLECTIVE NOSE LEFT/RIGHT

EACH2.000

LU, Inc. $316.0900 $632.18

Site-Safe Products, LLC d/b/a Site-Safe, LLC $220.9100 $441.82

705-15.65 QUADGUARD II IMPACT ATTENUATOR (REPOSITIONING)

EACH8.000

LU, Inc. $1,303.2300 $10,425.84

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,276.8000 $10,214.40

705-15.66 QUADGUARD II IMPACT ATTENUATOR (WIDE)

EACH1.000

LU, Inc. $17,950.0000 $17,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $15,664.5200 $15,664.52

705-15.68 NOSE ASSEMBLY QGII STEEL

EACH5.000

LU, Inc. $1,351.5000 $6,757.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $890.5600 $4,452.80

705-15.69 SHIM KIT QGII

EACH25.000

LU, Inc. $37.1900 $929.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $76.1600 $1,904.00

705-15.71 HEX FOAM CARTRIDGE, TYPE I

EACH15.000

LU, Inc. $907.4300 $13,611.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $818.2700 $12,274.05

705-15.72 HEX FOAM CARTRIDGE, TYPE II

EACH20.000

LU, Inc. $868.8200 $17,376.40

Site-Safe Products, LLC d/b/a Site-Safe, LLC $861.0900 $17,221.80

705-15.74 DIAPHRAGM ASSEMBLY, QC

EACH6.000

LU, Inc. $1,230.8300 $7,384.98

Site-Safe Products, LLC d/b/a Site-Safe, LLC $949.7000 $5,698.20

705-15.75 FENDER PANEL ASSEMBLY

EACH5.000

LU, Inc. $724.0200 $3,620.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $650.1800 $3,250.90

5PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-15.92 TRANS PANEL NEW JERSEY BARRIER WIDE

EACH1.000

LU, Inc. $606.1600 $606.16

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,020.1300 $1,020.13

705-15.93 TRANS PANEL QUAD TO W WIDE

EACH1.000

LU, Inc. $966.8800 $966.88

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,602.8800 $1,602.88

705-16.75 HAZARD REFLECTORS

EACH10.000

LU, Inc. $94.8300 $948.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $64.0000 $640.00

705-16.77 REPAIR OF CONCRETE BACKUP WALL

S.F.5.000

LU, Inc. $15.8000 $79.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $40.0000 $200.00

705-17.08 CARTRIDGE SUPPORT BRACKETS

EACH4.000

LU, Inc. $33.4700 $133.88

Site-Safe Products, LLC d/b/a Site-Safe, LLC $49.2200 $196.88

705-17.24 HDPE NOSE PIECE

EACH2.000

LU, Inc. $581.6100 $1,163.22

Site-Safe Products, LLC d/b/a Site-Safe, LLC $487.3600 $974.72

705-17.32 BREAKAWAY POST (TOP)

EACH1.000

LU, Inc. $124.0700 $124.07

Site-Safe Products, LLC d/b/a Site-Safe, LLC $105.0000 $105.00

705-17.33 BREAKAWAY BOLT ASSEMBLY

EACH1.000

LU, Inc. $6.3200 $6.32

Site-Safe Products, LLC d/b/a Site-Safe, LLC $11.4400 $11.44

705-17.71 WIDETRACC CABLE SYSTEM (W/ HARDWARE)

EACH1.000

LU, Inc. $205.0700 $205.07

Site-Safe Products, LLC d/b/a Site-Safe, LLC $162.5400 $162.54

705-17.72 WIDETRACC FRAME (W/ HARDWARE)

EACH1.000

LU, Inc. $306.8900 $306.89

Site-Safe Products, LLC d/b/a Site-Safe, LLC $243.1900 $243.19

6PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-17.73 WIDETRACC EXTENSION FOOT (RIGHT) (W/ HARDWARE)

EACH1.000

LU, Inc. $404.3700 $404.37

Site-Safe Products, LLC d/b/a Site-Safe, LLC $234.6100 $234.61

705-17.74 WIDETRACC EXTENSION FOOT (LEFT) (W/ HARDWARE)

EACH1.000

LU, Inc. $404.3700 $404.37

Site-Safe Products, LLC d/b/a Site-Safe, LLC $234.6100 $234.61

705-17.89 HEART REFLECTIVE TAPE

EACH4.000

LU, Inc. $63.2200 $252.88

Site-Safe Products, LLC d/b/a Site-Safe, LLC $45.7800 $183.12

705-17.92 REPOSITIONING IMPACT ATTENUATOR (HEART)

EACH1.000

LU, Inc. $275.0000 $275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $319.2000 $319.20

705-17.93 IMPACT ATTENUATOR (WIDETRACC 2005)

EACH1.000

LU, Inc. $14,131.2500 $14,131.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $18,208.0300 $18,208.03

705-20.01 IMACT ATTENUATOR (QUADGUARD M10)

EACH1.000

LU, Inc. $22,750.0000 $22,750.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $21,697.2300 $21,697.23

705-20.03 REPOSITIONING IMPACT ATTENUATOR (M10)

EACH3.000

LU, Inc. $743.7500 $2,231.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $1,915.20

705-20.04 NOSE ASSEMBLY, M10

EACH3.000

LU, Inc. $185.9400 $557.82

Site-Safe Products, LLC d/b/a Site-Safe, LLC $824.6400 $2,473.92

705-20.05 HEX FOAM CARTRIDGE, TYPE M1

EACH3.000

LU, Inc. $371.8800 $1,115.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $732.8000 $2,198.40

705-20.06 HEX FOAM CARTRIDGE, TYPE M2

EACH3.000

LU, Inc. $371.8800 $1,115.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $796.1600 $2,388.48

7PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-20.30 BELT NOSEPIECE, YELLOW, 24"-36" (QGE, QGEM)

EACH2.000

LU, Inc. $371.8800 $743.76

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,284.7300 $2,569.46

705-20.31 BELT NOSEPIECE, YELLOW, 69"-90" (QGE, QGEM)

EACH2.000

LU, Inc. $371.8800 $743.76

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,402.4300 $2,804.86

705-20.32 QGE HIT INDICATOR

EACH3.000

LU, Inc. $221.1300 $663.39

Site-Safe Products, LLC d/b/a Site-Safe, LLC $143.8100 $431.43

705-20.33 QGE CYLINDER TYPE I (QGE)

EACH3.000

LU, Inc. $743.7500 $2,231.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $877.2300 $2,631.69

705-20.34 QGE CYLINDER TYPE II (QGE)

EACH3.000

LU, Inc. $743.7500 $2,231.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,213.4000 $3,640.20

712-01.50 MAINTENANCE OF TRAFFIC

EACH12.000

LU, Inc. $868.8200 $10,425.84

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $10,214.40

712-01.52 MAINTENANCE OF TRAFFIC (NIGHT WORK)

EACH6.000

LU, Inc. $473.7700 $2,842.62

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $5,107.20

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY20.000

LU, Inc. $1,487.5000 $29,750.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,293.2600 $25,865.20

717-01 MOBILIZATION

LS1.000

LU, Inc. $24,616.5800 $24,616.58

Site-Safe Products, LLC d/b/a Site-Safe, LLC $46,095.0000 $46,095.00

8PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

MAINTENANCE (CONTINGENCY) CATEGORY

705-07.20 TRANSITION TO SAFETY SHAPE (2005 TRACC)

EACH1.000

LU, Inc. $633.2500 $633.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $633.2500 $633.25

705-07.21 TRANSITION TO BARRIER WALL END CAP (2005 TRACC)

EACH1.000

LU, Inc. $212.5000 $212.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $212.5000 $212.50

705-07.22 SPLIT FRAME KIT-30IN BACK-UP (2005 TRACC)

EACH1.000

LU, Inc. $559.3000 $559.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $559.3000 $559.30

705-08.18 TAU-II XXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,500.0000 $1,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,500.0000 $1,500.00

705-08.19 TAU-II XXXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $2,000.0000 $2,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,000.0000 $2,000.00

705-08.24 TAU-II CABLE GUIDE KIT (UNIVERSAL)

EACH1.000

LU, Inc. $500.0000 $500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $500.0000 $500.00

705-08.27 TAU-II END PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $275.0000 $275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $275.0000 $275.00

705-08.31 TAU-II PIPE PANEL MOUNT (UNIVERSAL)

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-08.35 TAU-II PCB BACKSTOP (PARALLEL UNIT)

EACH1.000

LU, Inc. $800.0000 $800.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $800.0000 $800.00

705-08.37 TAU-II WIDE SUPPORT LEG ADAPTER (WIDE UNIT)

EACH1.000

LU, Inc. $200.0000 $200.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $200.0000 $200.00

9PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-08.38 TAU-II WING ASSEMBLY (WIDE UNIT)

EACH1.000

LU, Inc. $400.0000 $400.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $400.0000 $400.00

705-08.39 TAU-II WING BRACE (WIDE UNIT)

EACH1.000

LU, Inc. $50.0000 $50.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $50.0000 $50.00

705-08.40 TAU-II XL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $600.0000 $600.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $600.0000 $600.00

705-08.41 TAU-II XXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,100.0000 $1,100.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,100.0000 $1,100.00

705-08.52 QUADGUARD MONORAIL ASSEMBLY, 3 BAY

EACH1.000

LU, Inc. $1,275.0000 $1,275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,275.0000 $1,275.00

705-08.68 RIP PLATE REPAIR KIT, STAGE 3

EACH1.000

LU, Inc. $1,620.2500 $1,620.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,620.2500 $1,620.25

705-08.74 BASE ASSEMBLY - 9'

EACH1.000

LU, Inc. $833.0000 $833.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $833.0000 $833.00

705-08.76 BEAM GUIDE - 20'

EACH1.000

LU, Inc. $636.6500 $636.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $636.6500 $636.65

705-08.77 END SHOE (LEFT OR RIGHT)

EACH1.000

LU, Inc. $238.0000 $238.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $238.0000 $238.00

705-08.84 SLOT PLATE

EACH1.000

LU, Inc. $20.8500 $20.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.8500 $20.85

10PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-08.85 CROSSTIE

EACH1.000

LU, Inc. $109.6500 $109.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $109.6500 $109.65

705-08.86 FORM CHANNEL - 3 X 2

EACH1.000

LU, Inc. $187.0000 $187.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $187.0000 $187.00

705-08.88 SLED/CUTTER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.93 05 RIP PLATE REPAIR KIT STAGE 3

EACH1.000

LU, Inc. $1,119.4500 $1,119.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,119.4500 $1,119.45

705-08.94 05 FRONT ANCH WELDMENT

EACH1.000

LU, Inc. $410.0000 $410.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $410.0000 $410.00

705-08.95 05 SECTION MODULE

EACH1.000

LU, Inc. $1,415.0000 $1,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,415.0000 $1,415.00

705-08.97 05 SLED/SHREDDER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.98 05 FRAME WELDMENT

EACH1.000

LU, Inc. $310.2500 $310.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $310.2500 $310.25

705-08.99 05 BACK-UP FRAME

EACH1.000

LU, Inc. $473.4500 $473.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $473.4500 $473.45

705-09.12 CONCRETE ANCHOR BOLT SET (3/4 IN X 7 IN)

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

11PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-09.13 ASPHALT ANCHOR BOLT SET (3/4 IN X 18 IN)

EACH1.000

LU, Inc. $871.0000 $871.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $871.0000 $871.00

705-09.14 BOLT CABLE ADJUSTER

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-09.15 BOLT SLED SIDE PANEL

EACH1.000

LU, Inc. $6.0000 $6.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $6.0000 $6.00

705-09.16 BOLT FRONT STOP

EACH1.000

LU, Inc. $3.0000 $3.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.0000 $3.00

705-09.17 BOLT SHEAR

EACH1.000

LU, Inc. $1.5000 $1.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1.5000 $1.50

705-09.18 BOLT SIDE GUIDE

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-09.19 BOLT TERMINAL BRACE

EACH1.000

LU, Inc. $9.0000 $9.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $9.0000 $9.00

705-09.20 BRACE TERMINAL

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.21 CABLE WIRE ROPE W/ SPELTER SOCKET

EACH1.000

LU, Inc. $1,083.0000 $1,083.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,083.0000 $1,083.00

705-09.22 CLIP WIRE ROPE

EACH1.000

LU, Inc. $34.0000 $34.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $34.0000 $34.00

12PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-09.23 CYLINDER SHOCK ARRESTING

EACH1.000

LU, Inc. $3,143.0000 $3,143.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3,143.0000 $3,143.00

705-09.24 STRAP CYLINDER

EACH1.000

LU, Inc. $89.0000 $89.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $89.0000 $89.00

705-09.25 FRAME MOBILE #1

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.26 FRAME MOBILE #2

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.27 FRAME MOBILE #3

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.28 FRAME MOBILE #4

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.29 FRAME MOBILE #5

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.30 FRAME MOBILE #6

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.31 GUIDE SIDE

EACH1.000

LU, Inc. $94.0000 $94.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94.0000 $94.00

705-09.32 KEEPER SIDE #1 (SLED PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

13PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-09.33 KEEPER SIDE #2 (SIDE PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.34 KEEPER SIDE #3 (REAR PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.36 PANEL SIDE

EACH1.000

LU, Inc. $223.0000 $223.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $223.0000 $223.00

705-09.37 PANEL SLED

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.38 PANEL REAR

EACH1.000

LU, Inc. $206.0000 $206.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $206.0000 $206.00

705-09.39 SHEAVE (PULLEY)

EACH1.000

LU, Inc. $103.0000 $103.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $103.0000 $103.00

705-09.40 SLED

EACH1.000

LU, Inc. $1,917.0000 $1,917.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,917.0000 $1,917.00

705-09.41 TRANSITION JERSEY BARRIER RIGHT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.42 TRANSITION JERSEY BARRIER LEFT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.43 TRANSITION 24IN CONCRETE

EACH1.000

LU, Inc. $794.0000 $794.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $794.0000 $794.00

14PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-09.44 BOOT CYLINDER

EACH1.000

LU, Inc. $57.0000 $57.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $57.0000 $57.00

705-14.31 CYLINDER 0.8" CYLINDERS 1 & 2

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.32 CYLINDER 0.9" CYLINDERS 3 & 4

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.33 CYLINDER 1.0" CYLINDERS 5 & 6

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.34 CYLINDER 1.108" CYLINDER 7

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.35 CYLINDER 1.385" CYLINDERS 8 & 9

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.36 U-BOLTS (1/2" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.37 U-BOLTS (3/8" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.38 BOX BEAM (8" X 6" X 3/16")

EACH1.000

LU, Inc. $35.0000 $35.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $35.0000 $35.00

705-14.50 CYLINDER RETAINER (1' 3" X 5")

EACH1.000

LU, Inc. $60.0000 $60.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $60.0000 $60.00

15PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-14.51 FRONT ANCHOR PIN (1/4" X 1 1/2" X 3")

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-14.53 1/2" GALVANIZED CHAIN WITH HARDWARE

EACH1.000

LU, Inc. $82.0000 $82.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $82.0000 $82.00

705-14.54 POLYVINYL COVER

EACH1.000

LU, Inc. $71.0000 $71.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $71.0000 $71.00

705-14.55 ANCHOR BOLT SET (CONCRETE/ASPHALT)

EACH1.000

LU, Inc. $895.0000 $895.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $895.0000 $895.00

705-14.57 BACKUP SINGLE CABLE-(4 BARREL)

EACH1.000

LU, Inc. $660.0000 $660.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $660.0000 $660.00

705-14.58 BACKUP SINGLE CABLE-(6 BARREL)

EACH1.000

LU, Inc. $840.0000 $840.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $840.0000 $840.00

705-14.59 BACKUP SINGLE CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,050.0000 $1,050.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,050.0000 $1,050.00

705-14.60 CABLE SYSTEM FOR SIDE MOUNT-(4 BARREL)

EACH1.000

LU, Inc. $1,975.0000 $1,975.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,975.0000 $1,975.00

705-14.61 CABLE SYSTEM FOR SIDE MOUNT-(6 BARREL)

EACH1.000

LU, Inc. $2,415.0000 $2,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,415.0000 $2,415.00

705-14.62 CABLE SYSTEM FOR SIDE MOUNT-(9 BARREL)

EACH1.000

LU, Inc. $2,690.0000 $2,690.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,690.0000 $2,690.00

16PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-14.63 BOTTOM CABLE-(4 BARREL)

EACH1.000

LU, Inc. $550.0000 $550.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $550.0000 $550.00

705-14.64 BOTTOM CABLE-(6 BARREL)

EACH1.000

LU, Inc. $580.0000 $580.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $580.0000 $580.00

705-14.65 BOTTOM CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,407.0000 $1,407.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,407.0000 $1,407.00

705-14.66 SIDE MNT ANCHR/CABLE ANCHR CVR PLT

EACH1.000

LU, Inc. $770.0000 $770.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $770.0000 $770.00

705-14.67 PULLOUT BRACKET ASSEMBLY

EACH1.000

LU, Inc. $91.3500 $91.35

Site-Safe Products, LLC d/b/a Site-Safe, LLC $91.3500 $91.35

705-14.68 3IN X 3IN TUBING

EACH1.000

LU, Inc. $72.0000 $72.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $72.0000 $72.00

705-14.69 GALVANIZED STABALIZER BAR

EACH1.000

LU, Inc. $190.0000 $190.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $190.0000 $190.00

705-14.70 TRANSITION PLATE

EACH1.000

LU, Inc. $490.0000 $490.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $490.0000 $490.00

705-14.71 TOP CABLE (OLD UNIT)-(4 BARREL)

EACH1.000

LU, Inc. $560.0000 $560.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $560.0000 $560.00

705-14.72 TOP CABLE (OLD UNIT)-(6 BARREL)

EACH1.000

LU, Inc. $609.0000 $609.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $609.0000 $609.00

17PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-14.73 TOP CABLE (OLD UNIT)-(9 BARREL)

EACH1.000

LU, Inc. $955.0000 $955.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $955.0000 $955.00

705-15.77 BACKUP ASSEMBLY, TENSION STRUT

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-15.79 MONORAIL ASSEMBLY, 4-6 BAY

EACH1.000

LU, Inc. $2,850.0000 $2,850.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,850.0000 $2,850.00

705-15.80 MONORAIL ASSEMBLY, 7-9 BAY

EACH1.000

LU, Inc. $2,950.0000 $2,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,950.0000 $2,950.00

705-15.82 TRANSITION PANEL, NEW JERSEY BARRIER

EACH1.000

LU, Inc. $638.0000 $638.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.0000 $638.00

705-15.83 TRANSITION PANEL, QUAD TO W

EACH1.000

LU, Inc. $930.0000 $930.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $930.0000 $930.00

705-15.84 DIAPHRAGM ASSEMBLY, WIDE

EACH1.000

LU, Inc. $1,260.0000 $1,260.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,260.0000 $1,260.00

705-15.85 BACKUP ASSEMBLY, TENSION STRUT, WIDE

EACH1.000

LU, Inc. $2,425.0000 $2,425.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,425.0000 $2,425.00

705-15.87 BACKUP ASSEMBLY, CONCRETE

C.Y.1.000

LU, Inc. $1,230.0000 $1,230.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,230.0000 $1,230.00

705-15.88 END SHOE, CONCRETE

C.Y.1.000

LU, Inc. $370.0000 $370.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $370.0000 $370.00

18PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-15.89 BACKUP ASSEMBLY, CONCRETE, WIDE

C.Y.1.000

LU, Inc. $1,423.0000 $1,423.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,423.0000 $1,423.00

705-15.90 EXTENSION PANEL

EACH1.000

LU, Inc. $330.0000 $330.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $330.0000 $330.00

705-15.91 PIVOT SUPPORT BRACKET

EACH1.000

LU, Inc. $85.0000 $85.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $85.0000 $85.00

705-17.18 CBL 3/4 X 6FT6IN /DLB SWG/NOHWI

EACH1.000

LU, Inc. $113.5000 $113.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $113.5000 $113.50

705-17.19 CBL 3/4 X 19FT7IN /SNG SWG

EACH1.000

LU, Inc. $209.0000 $209.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $209.0000 $209.00

705-17.20 DIAPHRAGM #1

EACH1.000

LU, Inc. $456.0000 $456.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $456.0000 $456.00

705-17.21 DIAPHRAGM #2

EACH1.000

LU, Inc. $505.7500 $505.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $505.7500 $505.75

705-17.23 DIAPHRAGM #10

EACH1.000

LU, Inc. $352.7500 $352.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $352.7500 $352.75

705-17.25 HDPE FRONT PANEL

EACH1.000

LU, Inc. $977.5000 $977.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $977.5000 $977.50

705-17.26 HDPE MIDDLE PANEL

EACH1.000

LU, Inc. $980.0000 $980.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $980.0000 $980.00

19PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-17.27 HDPE REAR PANEL

EACH1.000

LU, Inc. $985.0000 $985.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $985.0000 $985.00

705-17.28 COMPLETE BASE UNIT

EACH1.000

LU, Inc. $2,195.0000 $2,195.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,195.0000 $2,195.00

705-17.29 PLATE WASHER 5/16IN X 2IN X 1FT2IN

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-17.30 BACK-UP POST

EACH1.000

LU, Inc. $952.0000 $952.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $952.0000 $952.00

705-17.31 FRONT BASEPLATE / POST ASSEMBLY

EACH1.000

LU, Inc. $539.7500 $539.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $539.7500 $539.75

705-17.36 TRANSITION TO SAFETY SHAPE

EACH1.000

LU, Inc. $1,349.0000 $1,349.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,349.0000 $1,349.00

705-17.37 TRANSITION TO BARRIER WALL (END CAP)

EACH1.000

LU, Inc. $701.2500 $701.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $701.2500 $701.25

705-17.40 WIDETRACC LONG WING POST

EACH1.000

LU, Inc. $374.0000 $374.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $374.0000 $374.00

705-17.41 WIDETRACC SHORT WING POST

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

705-17.42 WIDETRACC EXT CHANNEL

EACH1.000

LU, Inc. $743.7500 $743.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $743.7500 $743.75

20PAGE

EXTENSION

CONTRACT CNT128

UNIT PRICE

705-17.43 WIDETRACC PANEL

EACH1.000

LU, Inc. $348.5000 $348.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $348.5000 $348.50

705-17.90 HEART REPAIR DPHM-L WR BKT

EACH1.000

LU, Inc. $102.8500 $102.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $102.8500 $102.85

705-17.91 HEART CRS-RPR DPH 3-9

EACH1.000

LU, Inc. $412.2500 $412.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $412.2500 $412.25

21PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

LU, Inc. $319,883.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $343,695.45

SUB-TOTAL MAINTENANCE (CONTINGENCY)

LU, Inc. $94,444.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94,444.30

LU, Inc. $414,327.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $438,139.75

22PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES BLEDSOE, BRADLEY, CANNON, COFFEE, CUMBERLAND, DEKALB, FENTRESS, FRANKLIN, GRUNDY, HAMILTON, JACKSON,MARION, MCMINN, MEIGS, OVERTON, PICKETT, POLK, PUTNAM, RHEA, SEQUATCHIE, VAN BUREN, WARREN, AND WHITE (Contract No.CNT114 Call 012)

THE ON-CALL GUARDRAIL REPAIR AND NEW GUARDRAIL INSTALLATION ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98200-4114-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

Cumberland Guardrail, Inc. $2,754,551.50

1PAGE

EXTENSION

CONTRACT CNT114

UNIT PRICE

MAINTENANCE CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.270.000

Cumberland Guardrail, Inc. $65.0000 $17,550.00

705-01.02 GUARDRAIL AT BRIDGE PIERS

L.F.18.000

Cumberland Guardrail, Inc. $10.0000 $180.00

705-01.04 METAL BEAM GUARD FENCE

L.F.100.000

Cumberland Guardrail, Inc. $45.0000 $4,500.00

705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.75.000

Cumberland Guardrail, Inc. $25.0000 $1,875.00

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.30,000.000

Cumberland Guardrail, Inc. $18.5000 $555,000.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH500.000

Cumberland Guardrail, Inc. $50.0000 $25,000.00

705-02.20 SINGLE GUARDRAIL (TYPE 2) LONG POST (6 FT-9 FT)

L.F.2,950.000

Cumberland Guardrail, Inc. $26.0000 $76,700.00

705-02.25 SINGLE GUARDRAIL (TYPE 2) LONG POST (9 FT-12 FT)

L.F.275.000

Cumberland Guardrail, Inc. $30.0000 $8,250.00

705-03.01 MEDIAN DIVIDER GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.50.000

Cumberland Guardrail, Inc. $25.0000 $1,250.00

705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2)

L.F.50.000

Cumberland Guardrail, Inc. $25.0000 $1,250.00

705-03.03 MEDIAN DIVIDER GUARDRAIL (TYPE 2) (27" MT HT)

L.F.50.000

Cumberland Guardrail, Inc. $10.0000 $500.00

705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONCRETE BARRIER

L.F.18.000

Cumberland Guardrail, Inc. $10.0000 $180.00

2PAGE

EXTENSION

CONTRACT CNT114

UNIT PRICE

705-04.02 GUARDRAIL TERMINAL (TYPE 12)

EACH4.000

Cumberland Guardrail, Inc. $700.0000 $2,800.00

705-04.03 GUARDRAIL TERMINAL (TYPE 13)

EACH10.000

Cumberland Guardrail, Inc. $700.0000 $7,000.00

705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE)

EACH17.000

Cumberland Guardrail, Inc. $750.0000 $12,750.00

705-04.11 STONE FOR GUARDRAIL END TERMINAL PAD

TON3,200.000

Cumberland Guardrail, Inc. $20.0000 $64,000.00

705-04.24 GUARDRAIL END TERMINAL DELINEATION SHEETING

S.F.200.000

Cumberland Guardrail, Inc. $50.0000 $10,000.00

705-04.29 C-A-T CRASH CUSHION ATTENUATING TERMINAL

EACH3.000

Cumberland Guardrail, Inc. $500.0000 $1,500.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.5,000.000

Cumberland Guardrail, Inc. $19.5000 $97,500.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH10.000

Cumberland Guardrail, Inc. $1,200.0000 $12,000.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH10.000

Cumberland Guardrail, Inc. $800.0000 $8,000.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH400.000

Cumberland Guardrail, Inc. $2,750.0000 $1,100,000.00

705-06.21 TANGENT ENERGY ABSORBING TERM MASH TL-3 (POWDER COATING)

EACH1.000

Cumberland Guardrail, Inc. $6,000.0000 $6,000.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH10.000

Cumberland Guardrail, Inc. $2,200.0000 $22,000.00

3PAGE

EXTENSION

CONTRACT CNT114

UNIT PRICE

705-10.30 GUARDRAIL ATTACHMENT TO SLOPE FACE ENDPOST

L.F.53.000

Cumberland Guardrail, Inc. $52.5000 $2,782.50

705-10.31 GUARDRAIL ATTACHMENT TO VERTICAL FACE ENDPOST

L.F.26.000

Cumberland Guardrail, Inc. $50.0000 $1,300.00

705-10.32 GUARDRAIL ATTACHMENT TO EXISTING BRIDGE PIER PROTECTION

EACH2.000

Cumberland Guardrail, Inc. $200.0000 $400.00

705-11.01 GUARDRAIL AT BRIDGE ENDS (POWDER COATED)

L.F.18.000

Cumberland Guardrail, Inc. $100.0000 $1,800.00

705-11.03 SINGLE GUARDRAIL (TYPE 2) (POWDER COATED)

L.F.70.000

Cumberland Guardrail, Inc. $100.0000 $7,000.00

705-11.08 GUARDRAIL TERMINAL (TYPE 13) (POWDER COATED)

EACH2.000

Cumberland Guardrail, Inc. $2,000.0000 $4,000.00

706-01 GUARDRAIL REMOVED

L.F.800.000

Cumberland Guardrail, Inc. $0.0500 $40.00

706-02.21 RESET SINGLE GUARDRAIL (TYPE 2)

L.F.584.000

Cumberland Guardrail, Inc. $1.0000 $584.00

706-03.01 POSTS FURNISHED

EACH40.000

Cumberland Guardrail, Inc. $80.0000 $3,200.00

706-06.01 SINGLE THRIE RAIL (TYPE 2)

L.F.18.000

Cumberland Guardrail, Inc. $5.0000 $90.00

706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2)

L.F.18.000

Cumberland Guardrail, Inc. $5.0000 $90.00

706-06.03 RADIUS RAIL

L.F.550.000

Cumberland Guardrail, Inc. $30.0000 $16,500.00

4PAGE

EXTENSION

CONTRACT CNT114

UNIT PRICE

706-06.05 RADIUS RAIL LONG POST (6-9 FT)

L.F.100.000

Cumberland Guardrail, Inc. $30.0000 $3,000.00

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.75.000

Cumberland Guardrail, Inc. $20.0000 $1,500.00

706-10.26 ROUNDED END ELEMENT

EACH24.000

Cumberland Guardrail, Inc. $45.0000 $1,080.00

706-10.54 RE-ALIGN GUARDRAIL

L.F.4,000.000

Cumberland Guardrail, Inc. $5.0000 $20,000.00

706-10.56 BUFFER ENDS 88"

EACH10.000

Cumberland Guardrail, Inc. $20.0000 $200.00

706-10.71 HAZARD MARKERS

EACH4.000

Cumberland Guardrail, Inc. $15.0000 $60.00

706-10.72 PULL AND REINSTALL GUARDARAIL POST FOR VERIFICATION

EACH7.000

Cumberland Guardrail, Inc. $150.0000 $1,050.00

706-10.74 CONCRETE BARRIER WALL REPAIR

C.Y.4.000

Cumberland Guardrail, Inc. $3,500.0000 $14,000.00

706-10.80 MICHIGAN AND MODIFIED MICHIGAN END SHOE

EACH12.000

Cumberland Guardrail, Inc. $20.0000 $240.00

706-10.81 GUARDRAIL REFLECTORS

EACH400.000

Cumberland Guardrail, Inc. $15.0000 $6,000.00

706-10.82 CONCRETE BRIDGE END OR PIER PROTECTION REPAIR

C.Y.3.000

Cumberland Guardrail, Inc. $3,500.0000 $10,500.00

706-10.83 DRILL BR. PAR. WALL FOR MICHIGAN END SHOE

EACH18.000

Cumberland Guardrail, Inc. $75.0000 $1,350.00

5PAGE

EXTENSION

CONTRACT CNT114

UNIT PRICE

712-01.02 LANE CLOSURE

EACH720.000

Cumberland Guardrail, Inc. $600.0000 $432,000.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY150.000

Cumberland Guardrail, Inc. $1,000.0000 $150,000.00

717-01 MOBILIZATION

LS1.000

Cumberland Guardrail, Inc. $20,000.0000 $20,000.00

717-01.04 MOBILIZATION (EMERGENCY CALL-OUT)

EACH25.000

Cumberland Guardrail, Inc. $800.0000 $20,000.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

Cumberland Guardrail, Inc. $2,754,551.50

Cumberland Guardrail, Inc. $2,754,551.50

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

BRADLEY COUNTY (Contract No. CNT083 Call 013)

8.00%DBE GOAL

THE RESURFACING ON S.R. 60 FROM NORTH OF S.R. 306 (L.M. 20.35) TO THE HAMILTON COUNTY LINE (L.M. 25.06).

PROJECT LENGTH -

NH/HSIP-60(34),06009-3224-94,06009-8224-14

4.710 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Talley Construction Company, Inc. $897,557.14

Wright Brothers Construction Company, Inc. $949,495.85

1PAGE

EXTENSION

CONTRACT CNT083

UNIT PRICE

ROADWAY CATEGORY

403-01.10 High Performance Fog Seals

S.Y.2,300.000

Talley Construction Company, Inc. $5.1500 $11,845.00

Wright Brothers Construction Company, Inc. $5.1000 $11,730.00

403-02.01 TRACKLESS TACK COAT

TON20.000

Talley Construction Company, Inc. $894.7600 $17,895.20

Wright Brothers Construction Company, Inc. $905.0000 $18,100.00

411-03.12 ACS MIX(PG64-22) THIN LIFT D ASPHALT

TON3,980.000

Talley Construction Company, Inc. $116.7700 $464,744.60

Wright Brothers Construction Company, Inc. $128.5000 $511,430.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.7.600

Talley Construction Company, Inc. $777.4100 $5,908.32

Wright Brothers Construction Company, Inc. $802.0000 $6,095.20

414-04.03 ASPHALT EMULSION (SCRUB SEAL)

TON92.000

Talley Construction Company, Inc. $1,579.5000 $145,314.00

Wright Brothers Construction Company, Inc. $1,040.0000 $95,680.00

414-04.04 MINERAL AGGREGATE (SCRUB SEAL)

TON755.000

Talley Construction Company, Inc. $64.3500 $48,584.25

Wright Brothers Construction Company, Inc. $130.0000 $98,150.00

611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN

EACH4.000

Talley Construction Company, Inc. $1,404.0000 $5,616.00

Wright Brothers Construction Company, Inc. $1,290.0000 $5,160.00

712-01 TRAFFIC CONTROL

LS1.000

Talley Construction Company, Inc. $34,000.0000 $34,000.00

Wright Brothers Construction Company, Inc. $34,300.0000 $34,300.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH4.000

Talley Construction Company, Inc. $32.7600 $131.04

Wright Brothers Construction Company, Inc. $22.2500 $89.00

712-06 SIGNS (CONSTRUCTION)

S.F.997.000

Talley Construction Company, Inc. $8.7800 $8,753.66

Wright Brothers Construction Company, Inc. $6.7000 $6,679.90

2PAGE

EXTENSION

CONTRACT CNT083

UNIT PRICE

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Talley Construction Company, Inc. $3,802.5000 $7,605.00

Wright Brothers Construction Company, Inc. $5,030.0000 $10,060.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH338.000

Talley Construction Company, Inc. $25.7400 $8,700.12

Wright Brothers Construction Company, Inc. $24.5000 $8,281.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH3.000

Talley Construction Company, Inc. $8.7800 $26.34

Wright Brothers Construction Company, Inc. $8.4000 $25.20

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.70.000

Talley Construction Company, Inc. $19.6000 $1,372.00

Wright Brothers Construction Company, Inc. $18.7500 $1,312.50

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.355.000

Talley Construction Company, Inc. $9.6500 $3,425.75

Wright Brothers Construction Company, Inc. $9.2500 $3,283.75

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH1.000

Talley Construction Company, Inc. $169.6500 $169.65

Wright Brothers Construction Company, Inc. $162.0000 $162.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.16.600

Talley Construction Company, Inc. $672.7500 $11,167.65

Wright Brothers Construction Company, Inc. $643.0000 $10,673.80

716-08.04 REMOVAL OF PAVEMENT MARKING (CHANNELIZATION STRIPING)

S.Y.70.000

Talley Construction Company, Inc. $9.0700 $634.90

Wright Brothers Construction Company, Inc. $8.6500 $605.50

716-08.20 REMOVAL OF PAVEMENT MARKING (LINE)

L.M.18.000

Talley Construction Company, Inc. $2,193.7500 $39,487.50

Wright Brothers Construction Company, Inc. $2,100.0000 $37,800.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.7.100

Talley Construction Company, Inc. $4,475.2500 $31,774.28

Wright Brothers Construction Company, Inc. $4,280.0000 $30,388.00

3PAGE

EXTENSION

CONTRACT CNT083

UNIT PRICE

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.100.000

Talley Construction Company, Inc. $1.1700 $117.00

Wright Brothers Construction Company, Inc. $1.1000 $110.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.9.500

Talley Construction Company, Inc. $2,135.2500 $20,284.88

Wright Brothers Construction Company, Inc. $2,040.0000 $19,380.00

717-01 MOBILIZATION

LS1.000

Talley Construction Company, Inc. $30,000.0000 $30,000.00

Wright Brothers Construction Company, Inc. $40,000.0000 $40,000.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Talley Construction Company, Inc. $897,557.14

Wright Brothers Construction Company, Inc. $949,495.85

Talley Construction Company, Inc. $897,557.14

Wright Brothers Construction Company, Inc. $949,495.85

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES BRADLEY, DEKALB, HAMILTON, MARION, POLK, PUTNAM, RHEA, AND WHITE (Contract No. CNT126 Call 014)

THE RANDOM ON-CALL ATTENUATOR REPAIR ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98200-4113-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

LU, Inc. $345,586.77

Site-Safe Products, LLC d/b/a Site-Safe, LLC $346,661.71

1PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

MAINTENANCE CATEGORY

705-08.22 IMPACT ATTENUATOR (TAU-II WIDE)

EACH1.000

LU, Inc. $10,024.0000 $10,024.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $18,617.8200 $18,617.82

705-08.23 REPOSITIONING IMPACT ATTENUATOR (TAU-II)

EACH1.000

LU, Inc. $1,074.6000 $1,074.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $478.0800 $478.08

705-08.25 TAU-II ENERGY ABSORBING CARTRIDGE TYPE A (UNIVERSAL)

EACH1.000

LU, Inc. $453.0800 $453.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $465.6600 $465.66

705-08.26 TAU-II ENERGY ABSORBING CARTRIDGE TYPE B (UNIVERSAL)

EACH1.000

LU, Inc. $453.0800 $453.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $465.6600 $465.66

705-08.28 TAU-II FRONT SUPPORT ASSEMBLY (UNIVERSAL)

EACH1.000

LU, Inc. $844.6900 $844.69

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,138.0300 $1,138.03

705-08.29 TAU-II FRONT SUPPORT LEG KIT (UNIVERSAL)

EACH1.000

LU, Inc. $210.1000 $210.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $150.2100 $150.21

705-08.30 TAU-II MID SUPPORT ASSEMBLY (UNIVERSAL)

EACH4.000

LU, Inc. $922.2100 $3,688.84

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,517.3600 $6,069.44

705-08.32 TAU-II SLIDER KIT (UNIVERSAL)

EACH1.000

LU, Inc. $224.5400 $224.54

Site-Safe Products, LLC d/b/a Site-Safe, LLC $379.3400 $379.34

705-08.33 TAU-II SLIDING PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $244.0200 $244.02

Site-Safe Products, LLC d/b/a Site-Safe, LLC $339.4200 $339.42

705-08.34 TAU-II NOSE PIECE (PARALLEL UNIT)

EACH2.000

LU, Inc. $601.4400 $1,202.88

Site-Safe Products, LLC d/b/a Site-Safe, LLC $678.8200 $1,357.64

2PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-08.36 TAU-II NOSE PIECE (WIDE UNIT)

EACH1.000

LU, Inc. $664.4500 $664.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $826.1600 $826.16

705-08.43 FORMED ANGLE 05 TRACC

EACH2.000

LU, Inc. $305.5300 $611.06

Site-Safe Products, LLC d/b/a Site-Safe, LLC $381.0000 $762.00

705-08.54 TRACC WASHER 1/4" X 3" X 2-1/4"

EACH2.000

LU, Inc. $2.2000 $4.40

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.7400 $7.48

705-08.55 TRACC DOUBLER PL X 38-1/2"

EACH2.000

LU, Inc. $67.3600 $134.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $84.0000 $168.00

705-08.56 TRACC BEAM GUIDE 72"

EACH2.000

LU, Inc. $295.1100 $590.22

Site-Safe Products, LLC d/b/a Site-Safe, LLC $368.0000 $736.00

705-08.57 IMPACT ATTENUATOR (QUADGUARD ELITE WIDE)

EACH1.000

LU, Inc. $18,195.0800 $18,195.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $13,075.5300 $13,075.53

705-08.58 IMPACT ATTENUATOR (QUADGUARD ELITE)

EACH1.000

LU, Inc. $15,150.0000 $15,150.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $10,666.6700 $10,666.67

705-08.59 IMPACT ATTENUATOR REPOSITIONING (QUADGUARD ELITE)

EACH5.000

LU, Inc. $250.0000 $1,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $255.3600 $1,276.80

705-08.66 RIP PLATE REPAIR KIT, STAGE 1

EACH5.000

LU, Inc. $425.7200 $2,128.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $338.3300 $1,691.65

705-08.67 RIP PLATE REPAIR KIT, STAGE 2

EACH5.000

LU, Inc. $870.3700 $4,351.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $298.9600 $1,494.80

3PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-08.69 PLASTIC NOSE PIECE/REFLECTOR

EACH6.000

LU, Inc. $435.6200 $2,613.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $369.6200 $2,217.72

705-08.80 SIDE PANEL - 35"

EACH2.000

LU, Inc. $179.5300 $359.06

Site-Safe Products, LLC d/b/a Site-Safe, LLC $142.5600 $285.12

705-08.81 SIDE PANEL - 62"

EACH4.000

LU, Inc. $192.4600 $769.84

Site-Safe Products, LLC d/b/a Site-Safe, LLC $670.3300 $2,681.32

705-08.91 REPOSITIONING VEHCULR IMP ATTN(2005TRACC)

EACH7.000

LU, Inc. $1,237.4400 $8,662.08

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,021.4400 $7,150.08

705-08.92 05 RIP PLATE REPAIR KIT STAGE 2

EACH3.000

LU, Inc. $462.5500 $1,387.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $716.8000 $2,150.40

705-09.10 IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $22,250.0000 $22,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20,229.2900 $20,229.29

705-09.11 REPOSITIONING OF IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $1,205.5600 $1,205.56

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $638.40

705-09.35 PANEL DELINEATOR (W/REFLECTIVE HAZARD MARKER)

EACH1.000

LU, Inc. $177.7400 $177.74

Site-Safe Products, LLC d/b/a Site-Safe, LLC $145.0000 $145.00

705-14.21 SC B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $56.1600 $56.16

Site-Safe Products, LLC d/b/a Site-Safe, LLC $110.9400 $110.94

705-14.22 CONC. B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $106.9200 $106.92

Site-Safe Products, LLC d/b/a Site-Safe, LLC $219.7500 $219.75

4PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-14.30 REPOSITIONING IMPACT ATTENUATOR(REACT 350)

EACH2.000

LU, Inc. $684.7200 $1,369.44

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $1,276.80

705-14.56 REFLECTIVE NOSE LEFT/RIGHT

EACH2.000

LU, Inc. $265.8200 $531.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $331.3700 $662.74

705-15.65 QUADGUARD II IMPACT ATTENUATOR (REPOSITIONING)

EACH8.000

LU, Inc. $1,101.5900 $8,812.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $383.0400 $3,064.32

705-15.66 QUADGUARD II IMPACT ATTENUATOR (WIDE)

EACH1.000

LU, Inc. $13,392.0700 $13,392.07

Site-Safe Products, LLC d/b/a Site-Safe, LLC $15,031.6100 $15,031.61

705-15.68 NOSE ASSEMBLY QGII STEEL

EACH5.000

LU, Inc. $915.0000 $4,575.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $636.1100 $3,180.55

705-15.69 SHIM KIT QGII

EACH15.000

LU, Inc. $44.1100 $661.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $54.4000 $816.00

705-15.71 HEX FOAM CARTRIDGE, TYPE I

EACH5.000

LU, Inc. $799.2800 $3,996.40

Site-Safe Products, LLC d/b/a Site-Safe, LLC $642.9300 $3,214.65

705-15.72 HEX FOAM CARTRIDGE, TYPE II

EACH5.000

LU, Inc. $840.3100 $4,201.55

Site-Safe Products, LLC d/b/a Site-Safe, LLC $676.5700 $3,382.85

705-15.74 DIAPHRAGM ASSEMBLY, QC

EACH3.000

LU, Inc. $701.8400 $2,105.52

Site-Safe Products, LLC d/b/a Site-Safe, LLC $814.0300 $2,442.09

705-15.75 FENDER PANEL ASSEMBLY

EACH1.000

LU, Inc. $559.7700 $559.77

Site-Safe Products, LLC d/b/a Site-Safe, LLC $557.3000 $557.30

5PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-15.92 TRANS PANEL NEW JERSEY BARRIER WIDE

EACH1.000

LU, Inc. $532.1000 $532.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $906.7800 $906.78

705-15.93 TRANS PANEL QUAD TO W WIDE

EACH1.000

LU, Inc. $706.5700 $706.57

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,424.7800 $1,424.78

705-16.75 HAZARD REFLECTORS

EACH10.000

LU, Inc. $70.5900 $705.90

Site-Safe Products, LLC d/b/a Site-Safe, LLC $64.0000 $640.00

705-16.77 REPAIR OF CONCRETE BACKUP WALL

S.F.15.000

LU, Inc. $17.8400 $267.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $33.3300 $499.95

705-17.08 CARTRIDGE SUPPORT BRACKETS

EACH4.000

LU, Inc. $40.1000 $160.40

Site-Safe Products, LLC d/b/a Site-Safe, LLC $35.1600 $140.64

705-17.24 HDPE NOSE PIECE

EACH2.000

LU, Inc. $568.4700 $1,136.94

Site-Safe Products, LLC d/b/a Site-Safe, LLC $548.2800 $1,096.56

705-17.32 BREAKAWAY POST (TOP)

EACH1.000

LU, Inc. $114.2700 $114.27

Site-Safe Products, LLC d/b/a Site-Safe, LLC $118.1300 $118.13

705-17.33 BREAKAWAY BOLT ASSEMBLY

EACH1.000

LU, Inc. $14.6500 $14.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.8800 $12.88

705-17.71 WIDETRACC CABLE SYSTEM (W/ HARDWARE)

EACH1.000

LU, Inc. $160.8700 $160.87

Site-Safe Products, LLC d/b/a Site-Safe, LLC $182.8300 $182.83

705-17.72 WIDETRACC FRAME (W/ HARDWARE)

EACH1.000

LU, Inc. $240.7400 $240.74

Site-Safe Products, LLC d/b/a Site-Safe, LLC $273.5900 $273.59

6PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-17.73 WIDETRACC EXTENSION FOOT (RIGHT) (W/ HARDWARE)

EACH1.000

LU, Inc. $232.2400 $232.24

Site-Safe Products, LLC d/b/a Site-Safe, LLC $263.9400 $263.94

705-17.74 WIDETRACC EXTENSION FOOT (LEFT) (W/ HARDWARE)

EACH1.000

LU, Inc. $232.2400 $232.24

Site-Safe Products, LLC d/b/a Site-Safe, LLC $263.9400 $263.94

705-17.89 HEART REFLECTIVE TAPE

EACH4.000

LU, Inc. $50.5600 $202.24

Site-Safe Products, LLC d/b/a Site-Safe, LLC $51.5000 $206.00

705-17.92 REPOSITIONING IMPACT ATTENUATOR (HEART)

EACH1.000

LU, Inc. $291.9500 $291.95

Site-Safe Products, LLC d/b/a Site-Safe, LLC $182.4000 $182.40

705-17.93 IMPACT ATTENUATOR (WIDETRACC 2005)

EACH1.000

LU, Inc. $17,642.2500 $17,642.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $16,065.9100 $16,065.91

705-20.01 IMACT ATTENUATOR (QUADGUARD M10)

EACH1.000

LU, Inc. $22,500.0000 $22,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20,147.4300 $20,147.43

705-20.03 REPOSITIONING IMPACT ATTENUATOR (M10)

EACH1.000

LU, Inc. $350.0000 $350.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $957.60

705-20.04 NOSE ASSEMBLY, M10

EACH3.000

LU, Inc. $948.0000 $2,844.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $769.6700 $2,309.01

705-20.05 HEX FOAM CARTRIDGE, TYPE M1

EACH3.000

LU, Inc. $666.5300 $1,999.59

Site-Safe Products, LLC d/b/a Site-Safe, LLC $781.6500 $2,344.95

705-20.06 HEX FOAM CARTRIDGE, TYPE M2

EACH3.000

LU, Inc. $699.5700 $2,098.71

Site-Safe Products, LLC d/b/a Site-Safe, LLC $820.4400 $2,461.32

7PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-20.30 BELT NOSEPIECE, YELLOW, 24"-36" (QGE, QGEM)

EACH2.000

LU, Inc. $1,523.6500 $3,047.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,028.5300 $4,057.06

705-20.31 BELT NOSEPIECE, YELLOW, 69"-90" (QGE, QGEM)

EACH2.000

LU, Inc. $1,684.0300 $3,368.06

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,214.3700 $4,428.74

705-20.32 QGE HIT INDICATOR

EACH3.000

LU, Inc. $128.3100 $384.93

Site-Safe Products, LLC d/b/a Site-Safe, LLC $158.1900 $474.57

705-20.33 QGE CYLINDER TYPE I (QGE)

EACH3.000

LU, Inc. $1,042.5000 $3,127.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $877.2300 $2,631.69

705-20.34 QGE CYLINDER TYPE II (QGE)

EACH3.000

LU, Inc. $761.8200 $2,285.46

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,213.4000 $3,640.20

712-01.50 MAINTENANCE OF TRAFFIC

EACH12.000

LU, Inc. $902.8000 $10,833.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $7,660.80

712-01.52 MAINTENANCE OF TRAFFIC (NIGHT WORK)

EACH6.000

LU, Inc. $818.0100 $4,908.06

Site-Safe Products, LLC d/b/a Site-Safe, LLC $851.2000 $5,107.20

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY20.000

LU, Inc. $547.9800 $10,959.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $955.7000 $19,114.00

717-01 MOBILIZATION

LS1.000

LU, Inc. $20,500.0000 $20,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $24,981.1900 $24,981.19

8PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

MAINTENANCE (CONTINGENCY) CATEGORY

705-07.20 TRANSITION TO SAFETY SHAPE (2005 TRACC)

EACH1.000

LU, Inc. $633.2500 $633.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $633.2500 $633.25

705-07.21 TRANSITION TO BARRIER WALL END CAP (2005 TRACC)

EACH1.000

LU, Inc. $212.5000 $212.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $212.5000 $212.50

705-07.22 SPLIT FRAME KIT-30IN BACK-UP (2005 TRACC)

EACH1.000

LU, Inc. $559.3000 $559.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $559.3000 $559.30

705-08.18 TAU-II XXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,500.0000 $1,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,500.0000 $1,500.00

705-08.19 TAU-II XXXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $2,000.0000 $2,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,000.0000 $2,000.00

705-08.24 TAU-II CABLE GUIDE KIT (UNIVERSAL)

EACH1.000

LU, Inc. $500.0000 $500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $500.0000 $500.00

705-08.27 TAU-II END PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $275.0000 $275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $275.0000 $275.00

705-08.31 TAU-II PIPE PANEL MOUNT (UNIVERSAL)

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-08.35 TAU-II PCB BACKSTOP (PARALLEL UNIT)

EACH1.000

LU, Inc. $800.0000 $800.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $800.0000 $800.00

705-08.37 TAU-II WIDE SUPPORT LEG ADAPTER (WIDE UNIT)

EACH1.000

LU, Inc. $200.0000 $200.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $200.0000 $200.00

9PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-08.38 TAU-II WING ASSEMBLY (WIDE UNIT)

EACH1.000

LU, Inc. $400.0000 $400.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $400.0000 $400.00

705-08.39 TAU-II WING BRACE (WIDE UNIT)

EACH1.000

LU, Inc. $50.0000 $50.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $50.0000 $50.00

705-08.40 TAU-II XL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $600.0000 $600.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $600.0000 $600.00

705-08.41 TAU-II XXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,100.0000 $1,100.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,100.0000 $1,100.00

705-08.52 QUADGUARD MONORAIL ASSEMBLY, 3 BAY

EACH1.000

LU, Inc. $1,275.0000 $1,275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,275.0000 $1,275.00

705-08.68 RIP PLATE REPAIR KIT, STAGE 3

EACH1.000

LU, Inc. $1,620.2500 $1,620.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,620.2500 $1,620.25

705-08.74 BASE ASSEMBLY - 9'

EACH1.000

LU, Inc. $833.0000 $833.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $833.0000 $833.00

705-08.76 BEAM GUIDE - 20'

EACH1.000

LU, Inc. $636.6500 $636.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $636.6500 $636.65

705-08.77 END SHOE (LEFT OR RIGHT)

EACH1.000

LU, Inc. $238.0000 $238.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $238.0000 $238.00

705-08.84 SLOT PLATE

EACH1.000

LU, Inc. $20.8500 $20.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.8500 $20.85

10PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-08.85 CROSSTIE

EACH1.000

LU, Inc. $109.6500 $109.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $109.6500 $109.65

705-08.86 FORM CHANNEL - 3 X 2

EACH1.000

LU, Inc. $187.0000 $187.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $187.0000 $187.00

705-08.88 SLED/CUTTER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.93 05 RIP PLATE REPAIR KIT STAGE 3

EACH1.000

LU, Inc. $1,119.4500 $1,119.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,119.4500 $1,119.45

705-08.94 05 FRONT ANCH WELDMENT

EACH1.000

LU, Inc. $410.0000 $410.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $410.0000 $410.00

705-08.95 05 SECTION MODULE

EACH1.000

LU, Inc. $1,415.0000 $1,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,415.0000 $1,415.00

705-08.97 05 SLED/SHREDDER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.98 05 FRAME WELDMENT

EACH1.000

LU, Inc. $310.2500 $310.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $310.2500 $310.25

705-08.99 05 BACK-UP FRAME

EACH1.000

LU, Inc. $473.4500 $473.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $473.4500 $473.45

705-09.12 CONCRETE ANCHOR BOLT SET (3/4 IN X 7 IN)

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

11PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-09.13 ASPHALT ANCHOR BOLT SET (3/4 IN X 18 IN)

EACH1.000

LU, Inc. $871.0000 $871.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $871.0000 $871.00

705-09.14 BOLT CABLE ADJUSTER

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-09.15 BOLT SLED SIDE PANEL

EACH1.000

LU, Inc. $6.0000 $6.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $6.0000 $6.00

705-09.16 BOLT FRONT STOP

EACH1.000

LU, Inc. $3.0000 $3.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.0000 $3.00

705-09.17 BOLT SHEAR

EACH1.000

LU, Inc. $1.5000 $1.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1.5000 $1.50

705-09.18 BOLT SIDE GUIDE

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-09.19 BOLT TERMINAL BRACE

EACH1.000

LU, Inc. $9.0000 $9.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $9.0000 $9.00

705-09.20 BRACE TERMINAL

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.21 CABLE WIRE ROPE W/ SPELTER SOCKET

EACH1.000

LU, Inc. $1,083.0000 $1,083.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,083.0000 $1,083.00

705-09.22 CLIP WIRE ROPE

EACH1.000

LU, Inc. $34.0000 $34.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $34.0000 $34.00

12PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-09.23 CYLINDER SHOCK ARRESTING

EACH1.000

LU, Inc. $3,143.0000 $3,143.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3,143.0000 $3,143.00

705-09.24 STRAP CYLINDER

EACH1.000

LU, Inc. $89.0000 $89.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $89.0000 $89.00

705-09.25 FRAME MOBILE #1

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.26 FRAME MOBILE #2

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.27 FRAME MOBILE #3

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.28 FRAME MOBILE #4

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.29 FRAME MOBILE #5

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.30 FRAME MOBILE #6

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.31 GUIDE SIDE

EACH1.000

LU, Inc. $94.0000 $94.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94.0000 $94.00

705-09.32 KEEPER SIDE #1 (SLED PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

13PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-09.33 KEEPER SIDE #2 (SIDE PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.34 KEEPER SIDE #3 (REAR PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.36 PANEL SIDE

EACH1.000

LU, Inc. $223.0000 $223.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $223.0000 $223.00

705-09.37 PANEL SLED

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.38 PANEL REAR

EACH1.000

LU, Inc. $206.0000 $206.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $206.0000 $206.00

705-09.39 SHEAVE (PULLEY)

EACH1.000

LU, Inc. $103.0000 $103.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $103.0000 $103.00

705-09.40 SLED

EACH1.000

LU, Inc. $1,917.0000 $1,917.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,917.0000 $1,917.00

705-09.41 TRANSITION JERSEY BARRIER RIGHT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.42 TRANSITION JERSEY BARRIER LEFT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.43 TRANSITION 24IN CONCRETE

EACH1.000

LU, Inc. $794.0000 $794.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $794.0000 $794.00

14PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-09.44 BOOT CYLINDER

EACH1.000

LU, Inc. $57.0000 $57.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $57.0000 $57.00

705-14.31 CYLINDER 0.8" CYLINDERS 1 & 2

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.32 CYLINDER 0.9" CYLINDERS 3 & 4

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.33 CYLINDER 1.0" CYLINDERS 5 & 6

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.34 CYLINDER 1.108" CYLINDER 7

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.35 CYLINDER 1.385" CYLINDERS 8 & 9

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.36 U-BOLTS (1/2" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.37 U-BOLTS (3/8" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.38 BOX BEAM (8" X 6" X 3/16")

EACH1.000

LU, Inc. $35.0000 $35.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $35.0000 $35.00

705-14.50 CYLINDER RETAINER (1' 3" X 5")

EACH1.000

LU, Inc. $60.0000 $60.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $60.0000 $60.00

15PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-14.51 FRONT ANCHOR PIN (1/4" X 1 1/2" X 3")

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-14.53 1/2" GALVANIZED CHAIN WITH HARDWARE

EACH1.000

LU, Inc. $82.0000 $82.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $82.0000 $82.00

705-14.54 POLYVINYL COVER

EACH1.000

LU, Inc. $71.0000 $71.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $71.0000 $71.00

705-14.55 ANCHOR BOLT SET (CONCRETE/ASPHALT)

EACH1.000

LU, Inc. $895.0000 $895.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $895.0000 $895.00

705-14.57 BACKUP SINGLE CABLE-(4 BARREL)

EACH1.000

LU, Inc. $660.0000 $660.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $660.0000 $660.00

705-14.58 BACKUP SINGLE CABLE-(6 BARREL)

EACH1.000

LU, Inc. $840.0000 $840.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $840.0000 $840.00

705-14.59 BACKUP SINGLE CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,050.0000 $1,050.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,050.0000 $1,050.00

705-14.60 CABLE SYSTEM FOR SIDE MOUNT-(4 BARREL)

EACH1.000

LU, Inc. $1,975.0000 $1,975.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,975.0000 $1,975.00

705-14.61 CABLE SYSTEM FOR SIDE MOUNT-(6 BARREL)

EACH1.000

LU, Inc. $2,415.0000 $2,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,415.0000 $2,415.00

705-14.62 CABLE SYSTEM FOR SIDE MOUNT-(9 BARREL)

EACH1.000

LU, Inc. $2,690.0000 $2,690.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,690.0000 $2,690.00

16PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-14.63 BOTTOM CABLE-(4 BARREL)

EACH1.000

LU, Inc. $550.0000 $550.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $550.0000 $550.00

705-14.64 BOTTOM CABLE-(6 BARREL)

EACH1.000

LU, Inc. $580.0000 $580.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $580.0000 $580.00

705-14.65 BOTTOM CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,407.0000 $1,407.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,407.0000 $1,407.00

705-14.66 SIDE MNT ANCHR/CABLE ANCHR CVR PLT

EACH1.000

LU, Inc. $770.0000 $770.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $770.0000 $770.00

705-14.67 PULLOUT BRACKET ASSEMBLY

EACH1.000

LU, Inc. $91.3500 $91.35

Site-Safe Products, LLC d/b/a Site-Safe, LLC $91.3500 $91.35

705-14.68 3IN X 3IN TUBING

EACH1.000

LU, Inc. $72.0000 $72.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $72.0000 $72.00

705-14.69 GALVANIZED STABALIZER BAR

EACH1.000

LU, Inc. $190.0000 $190.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $190.0000 $190.00

705-14.70 TRANSITION PLATE

EACH1.000

LU, Inc. $490.0000 $490.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $490.0000 $490.00

705-14.71 TOP CABLE (OLD UNIT)-(4 BARREL)

EACH1.000

LU, Inc. $560.0000 $560.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $560.0000 $560.00

705-14.72 TOP CABLE (OLD UNIT)-(6 BARREL)

EACH1.000

LU, Inc. $609.0000 $609.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $609.0000 $609.00

17PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-14.73 TOP CABLE (OLD UNIT)-(9 BARREL)

EACH1.000

LU, Inc. $955.0000 $955.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $955.0000 $955.00

705-15.77 BACKUP ASSEMBLY, TENSION STRUT

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-15.79 MONORAIL ASSEMBLY, 4-6 BAY

EACH1.000

LU, Inc. $2,850.0000 $2,850.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,850.0000 $2,850.00

705-15.80 MONORAIL ASSEMBLY, 7-9 BAY

EACH1.000

LU, Inc. $2,950.0000 $2,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,950.0000 $2,950.00

705-15.82 TRANSITION PANEL, NEW JERSEY BARRIER

EACH1.000

LU, Inc. $638.0000 $638.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.0000 $638.00

705-15.83 TRANSITION PANEL, QUAD TO W

EACH1.000

LU, Inc. $930.0000 $930.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $930.0000 $930.00

705-15.84 DIAPHRAGM ASSEMBLY, WIDE

EACH1.000

LU, Inc. $1,260.0000 $1,260.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,260.0000 $1,260.00

705-15.85 BACKUP ASSEMBLY, TENSION STRUT, WIDE

EACH1.000

LU, Inc. $2,425.0000 $2,425.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,425.0000 $2,425.00

705-15.87 BACKUP ASSEMBLY, CONCRETE

C.Y.1.000

LU, Inc. $1,230.0000 $1,230.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,230.0000 $1,230.00

705-15.88 END SHOE, CONCRETE

C.Y.1.000

LU, Inc. $370.0000 $370.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $370.0000 $370.00

18PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-15.89 BACKUP ASSEMBLY, CONCRETE, WIDE

C.Y.1.000

LU, Inc. $1,423.0000 $1,423.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,423.0000 $1,423.00

705-15.90 EXTENSION PANEL

EACH1.000

LU, Inc. $330.0000 $330.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $330.0000 $330.00

705-15.91 PIVOT SUPPORT BRACKET

EACH1.000

LU, Inc. $85.0000 $85.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $85.0000 $85.00

705-17.18 CBL 3/4 X 6FT6IN /DLB SWG/NOHWI

EACH1.000

LU, Inc. $113.5000 $113.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $113.5000 $113.50

705-17.19 CBL 3/4 X 19FT7IN /SNG SWG

EACH1.000

LU, Inc. $209.0000 $209.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $209.0000 $209.00

705-17.20 DIAPHRAGM #1

EACH1.000

LU, Inc. $456.0000 $456.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $456.0000 $456.00

705-17.21 DIAPHRAGM #2

EACH1.000

LU, Inc. $505.7500 $505.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $505.7500 $505.75

705-17.23 DIAPHRAGM #10

EACH1.000

LU, Inc. $352.7500 $352.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $352.7500 $352.75

705-17.25 HDPE FRONT PANEL

EACH1.000

LU, Inc. $977.5000 $977.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $977.5000 $977.50

705-17.26 HDPE MIDDLE PANEL

EACH1.000

LU, Inc. $980.0000 $980.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $980.0000 $980.00

19PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-17.27 HDPE REAR PANEL

EACH1.000

LU, Inc. $985.0000 $985.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $985.0000 $985.00

705-17.28 COMPLETE BASE UNIT

EACH1.000

LU, Inc. $2,195.0000 $2,195.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,195.0000 $2,195.00

705-17.29 PLATE WASHER 5/16IN X 2IN X 1FT2IN

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-17.30 BACK-UP POST

EACH1.000

LU, Inc. $952.0000 $952.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $952.0000 $952.00

705-17.31 FRONT BASEPLATE / POST ASSEMBLY

EACH1.000

LU, Inc. $539.7500 $539.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $539.7500 $539.75

705-17.36 TRANSITION TO SAFETY SHAPE

EACH1.000

LU, Inc. $1,349.0000 $1,349.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,349.0000 $1,349.00

705-17.37 TRANSITION TO BARRIER WALL (END CAP)

EACH1.000

LU, Inc. $701.2500 $701.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $701.2500 $701.25

705-17.40 WIDETRACC LONG WING POST

EACH1.000

LU, Inc. $374.0000 $374.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $374.0000 $374.00

705-17.41 WIDETRACC SHORT WING POST

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

705-17.42 WIDETRACC EXT CHANNEL

EACH1.000

LU, Inc. $743.7500 $743.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $743.7500 $743.75

20PAGE

EXTENSION

CONTRACT CNT126

UNIT PRICE

705-17.43 WIDETRACC PANEL

EACH1.000

LU, Inc. $348.5000 $348.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $348.5000 $348.50

705-17.90 HEART REPAIR DPHM-L WR BKT

EACH1.000

LU, Inc. $102.8500 $102.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $102.8500 $102.85

705-17.91 HEART CRS-RPR DPH 3-9

EACH1.000

LU, Inc. $412.2500 $412.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $412.2500 $412.25

21PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

LU, Inc. $251,142.47

Site-Safe Products, LLC d/b/a Site-Safe, LLC $252,217.41

SUB-TOTAL MAINTENANCE (CONTINGENCY)

LU, Inc. $94,444.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94,444.30

LU, Inc. $345,586.77

Site-Safe Products, LLC d/b/a Site-Safe, LLC $346,661.71

22PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES CAMPBELL, CARTER, COCKE, DICKSON, GREENE, HAMBLEN, HICKMAN, JEFFERSON, LOUDON, MONROE, PUTNAM,RUTHERFORD, UNICOI, WASHINGTON, WILLIAMSON, AND WILSON (Contract No. CNT119 Call 015)

THE INSTALLATION OF EMERGENCY REFERENCE MARKERS ON VARIOUS INTERSTATE ROUTES STATEWIDE.

PROJECT LENGTH -

99112-4153-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Caution, Inc. $346,999.99

LU, Inc. $423,569.46

Superior Traffic Control, LLC $450,612.00

1PAGE

EXTENSION

CONTRACT CNT119

UNIT PRICE

MAINTENANCE CATEGORY

712-01.02 LANE CLOSURE

EACH50.000

Caution, Inc. $250.0000 $12,500.00

LU, Inc. $1,250.0000 $62,500.00

Superior Traffic Control, LLC $800.0000 $40,000.00

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.54,198.000

Caution, Inc. $2.1400 $115,983.72

LU, Inc. $2.4700 $133,869.06

Superior Traffic Control, LLC $3.0000 $162,594.00

713-16.31 SIGNS (ERM-SIGN FACES)

EACH2,372.000

Caution, Inc. $68.7500 $163,075.00

LU, Inc. $73.1700 $173,559.24

Superior Traffic Control, LLC $86.5000 $205,178.00

713-16.32 SIGNS (ERM-CONCRETE MOUNT)

EACH348.000

Caution, Inc. $110.0000 $38,280.00

LU, Inc. $73.1700 $25,463.16

Superior Traffic Control, LLC $80.0000 $27,840.00

717-01 MOBILIZATION

LS1.000

Caution, Inc. $17,161.2700 $17,161.27

LU, Inc. $28,178.0000 $28,178.00

Superior Traffic Control, LLC $15,000.0000 $15,000.00

2PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

Caution, Inc. $346,999.99

LU, Inc. $423,569.46

Superior Traffic Control, LLC $450,612.00

Caution, Inc. $346,999.99

LU, Inc. $423,569.46

Superior Traffic Control, LLC $450,612.00

3PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

CHEATHAM COUNTY (Contract No. CNT093 Call 016)

6.00%DBE GOAL

THE RESURFACING ON S.R. 249 FROM S.R. 49 (L.M. 16.52) TO I-24 (L.M. 26.01).

PROJECT LENGTH -

11016-4213-04,HSIP-249(88),11016-3213-94

9.490 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Jones Bros. Contractors, LLC $1,214,314.95

Eubank Asphalt Paving & Sealing $1,281,567.50

Rogers Group, Inc. $1,775,149.90

Vulcan Construction Materials, LLC $1,819,450.45

1PAGE

EXTENSION

CONTRACT CNT093

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.19.000

Jones Bros. Contractors, LLC $1,000.0000 $19,000.00

Eubank Asphalt Paving & Sealing $650.0000 $12,350.00

Rogers Group, Inc. $1,900.0000 $36,100.00

Vulcan Construction Materials, LLC $3,000.0000 $57,000.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON3,011.000

Jones Bros. Contractors, LLC $15.0000 $45,165.00

Eubank Asphalt Paving & Sealing $16.0000 $48,176.00

Rogers Group, Inc. $30.0000 $90,330.00

Vulcan Construction Materials, LLC $30.0000 $90,330.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON500.000

Jones Bros. Contractors, LLC $72.0000 $36,000.00

Eubank Asphalt Paving & Sealing $85.0000 $42,500.00

Rogers Group, Inc. $95.0000 $47,500.00

Vulcan Construction Materials, LLC $100.0000 $50,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON74.000

Jones Bros. Contractors, LLC $600.0000 $44,400.00

Eubank Asphalt Paving & Sealing $475.0000 $35,150.00

Rogers Group, Inc. $900.0000 $66,600.00

Vulcan Construction Materials, LLC $900.0000 $66,600.00

411-03.12 ACS MIX(PG64-22) THIN LIFT D ASPHALT

TON7,276.000

Jones Bros. Contractors, LLC $88.0000 $640,288.00

Eubank Asphalt Paving & Sealing $91.0000 $662,116.00

Rogers Group, Inc. $120.0000 $873,120.00

Vulcan Construction Materials, LLC $128.0000 $931,328.00

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.15.200

Jones Bros. Contractors, LLC $400.0000 $6,080.00

Eubank Asphalt Paving & Sealing $500.0000 $7,600.00

Rogers Group, Inc. $430.0000 $6,536.00

Vulcan Construction Materials, LLC $412.0000 $6,262.40

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON6,741.000

Jones Bros. Contractors, LLC $18.9500 $127,741.95

Eubank Asphalt Paving & Sealing $14.5000 $97,744.50

Rogers Group, Inc. $22.0000 $148,302.00

Vulcan Construction Materials, LLC $27.0000 $182,007.00

2PAGE

EXTENSION

CONTRACT CNT093

UNIT PRICE

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH20.000

Jones Bros. Contractors, LLC $65.8000 $1,316.00

Eubank Asphalt Paving & Sealing $190.0000 $3,800.00

Rogers Group, Inc. $52.7500 $1,055.00

Vulcan Construction Materials, LLC $51.5000 $1,030.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH4.000

Jones Bros. Contractors, LLC $950.0000 $3,800.00

Eubank Asphalt Paving & Sealing $850.0000 $3,400.00

Rogers Group, Inc. $790.0000 $3,160.00

Vulcan Construction Materials, LLC $772.5000 $3,090.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH20.000

Jones Bros. Contractors, LLC $2,680.0000 $53,600.00

Eubank Asphalt Paving & Sealing $2,800.0000 $56,000.00

Rogers Group, Inc. $2,650.0000 $53,000.00

Vulcan Construction Materials, LLC $2,575.0000 $51,500.00

706-01 GUARDRAIL REMOVED

L.F.1,264.000

Jones Bros. Contractors, LLC $1.5000 $1,896.00

Eubank Asphalt Paving & Sealing $1.0000 $1,264.00

Rogers Group, Inc. $1.0500 $1,327.20

Vulcan Construction Materials, LLC $1.2500 $1,580.00

712-01 TRAFFIC CONTROL

LS1.000

Jones Bros. Contractors, LLC $15,000.0000 $15,000.00

Eubank Asphalt Paving & Sealing $15,000.0000 $15,000.00

Rogers Group, Inc. $77,000.0000 $77,000.00

Vulcan Construction Materials, LLC $83,430.0000 $83,430.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Jones Bros. Contractors, LLC $10.0000 $250.00

Eubank Asphalt Paving & Sealing $5.0000 $125.00

Rogers Group, Inc. $13.5000 $337.50

Vulcan Construction Materials, LLC $10.0000 $250.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Jones Bros. Contractors, LLC $5.0000 $20.00

Eubank Asphalt Paving & Sealing $5.0000 $20.00

Rogers Group, Inc. $13.5000 $54.00

Vulcan Construction Materials, LLC $5.0000 $20.00

3PAGE

EXTENSION

CONTRACT CNT093

UNIT PRICE

712-06 SIGNS (CONSTRUCTION)

S.F.1,888.000

Jones Bros. Contractors, LLC $6.7500 $12,744.00

Eubank Asphalt Paving & Sealing $6.5000 $12,272.00

Rogers Group, Inc. $7.0000 $13,216.00

Vulcan Construction Materials, LLC $9.2500 $17,464.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH635.000

Jones Bros. Contractors, LLC $30.0000 $19,050.00

Eubank Asphalt Paving & Sealing $30.0000 $19,050.00

Rogers Group, Inc. $31.5000 $20,002.50

Vulcan Construction Materials, LLC $30.0000 $19,050.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH20.000

Jones Bros. Contractors, LLC $30.0000 $600.00

Eubank Asphalt Paving & Sealing $30.0000 $600.00

Rogers Group, Inc. $31.5000 $630.00

Vulcan Construction Materials, LLC $31.0000 $620.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH655.000

Jones Bros. Contractors, LLC $15.0000 $9,825.00

Eubank Asphalt Paving & Sealing $7.0000 $4,585.00

Rogers Group, Inc. $10.5000 $6,877.50

Vulcan Construction Materials, LLC $10.5000 $6,877.50

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.450.000

Jones Bros. Contractors, LLC $63.0000 $28,350.00

Eubank Asphalt Paving & Sealing $30.0000 $13,500.00

Rogers Group, Inc. $31.5000 $14,175.00

Vulcan Construction Materials, LLC $31.0000 $13,950.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.500.000

Jones Bros. Contractors, LLC $14.0000 $7,000.00

Eubank Asphalt Paving & Sealing $20.0000 $10,000.00

Rogers Group, Inc. $21.0000 $10,500.00

Vulcan Construction Materials, LLC $21.0000 $10,500.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH10.000

Jones Bros. Contractors, LLC $150.0000 $1,500.00

Eubank Asphalt Paving & Sealing $200.0000 $2,000.00

Rogers Group, Inc. $210.5000 $2,105.00

Vulcan Construction Materials, LLC $206.0000 $2,060.00

4PAGE

EXTENSION

CONTRACT CNT093

UNIT PRICE

716-03.03 PLASTIC WORD PAVEMENT MARKING (STOP AHEAD)

EACH1.000

Jones Bros. Contractors, LLC $600.0000 $600.00

Eubank Asphalt Paving & Sealing $800.0000 $800.00

Rogers Group, Inc. $845.0000 $845.00

Vulcan Construction Materials, LLC $824.0000 $824.00

716-03.07 PLASTIC WORD PAVEMENT MARKING (STOP)

EACH1.000

Jones Bros. Contractors, LLC $300.0000 $300.00

Eubank Asphalt Paving & Sealing $500.0000 $500.00

Rogers Group, Inc. $530.0000 $530.00

Vulcan Construction Materials, LLC $515.0000 $515.00

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.20.000

Jones Bros. Contractors, LLC $7.0000 $140.00

Eubank Asphalt Paving & Sealing $30.0000 $600.00

Rogers Group, Inc. $31.5000 $630.00

Vulcan Construction Materials, LLC $31.0000 $620.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.37.500

Jones Bros. Contractors, LLC $400.0000 $15,000.00

Eubank Asphalt Paving & Sealing $850.0000 $31,875.00

Rogers Group, Inc. $895.0000 $33,562.50

Vulcan Construction Materials, LLC $875.5000 $32,831.25

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.18.500

Jones Bros. Contractors, LLC $2,640.0000 $48,840.00

Eubank Asphalt Paving & Sealing $5,280.0000 $97,680.00

Rogers Group, Inc. $5,550.0000 $102,675.00

Vulcan Construction Materials, LLC $5,438.4000 $100,610.40

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.19.000

Jones Bros. Contractors, LLC $1,900.0000 $36,100.00

Eubank Asphalt Paving & Sealing $2,300.0000 $43,700.00

Rogers Group, Inc. $2,420.0000 $45,980.00

Vulcan Construction Materials, LLC $2,369.0000 $45,011.00

717-01 MOBILIZATION

LS1.000

Jones Bros. Contractors, LLC $36,000.0000 $36,000.00

Eubank Asphalt Paving & Sealing $55,000.0000 $55,000.00

Rogers Group, Inc. $115,000.0000 $115,000.00

Vulcan Construction Materials, LLC $40,000.0000 $40,000.00

5PAGE

EXTENSION

CONTRACT CNT093

UNIT PRICE

730-14.02 SAW SLOT

L.F.802.000

Jones Bros. Contractors, LLC $3.5000 $2,807.00

Eubank Asphalt Paving & Sealing $3.5000 $2,807.00

Rogers Group, Inc. $3.7500 $3,007.50

Vulcan Construction Materials, LLC $3.7500 $3,007.50

730-14.03 LOOP WIRE

L.F.1,804.000

Jones Bros. Contractors, LLC $0.5000 $902.00

Eubank Asphalt Paving & Sealing $0.7500 $1,353.00

Rogers Group, Inc. $0.5500 $992.20

Vulcan Construction Materials, LLC $0.6000 $1,082.40

6PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Jones Bros. Contractors, LLC $1,214,314.95

Eubank Asphalt Paving & Sealing $1,281,567.50

Rogers Group, Inc. $1,775,149.90

Vulcan Construction Materials, LLC $1,819,450.45

Jones Bros. Contractors, LLC $1,214,314.95

Eubank Asphalt Paving & Sealing $1,281,567.50

Rogers Group, Inc. $1,775,149.90

Vulcan Construction Materials, LLC $1,819,450.45

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

CHEATHAM COUNTY (Contract No. CNT092 Call 017)

THE CONSTRUCTION OF A SMALL DRAINAGE STRUCTURE ON S.R. 12 (L.M. 6.53) IN ASHLAND CITY.

PROJECT LENGTH -

11005-4233-04

0.047 MILES

COMPLETION TIME - ON OR BEFORE JULY 31, 2019

TOTAL CONTRACT

Sessions Paving Company $494,224.00

1PAGE

EXTENSION

CONTRACT CNT092

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Sessions Paving Company $10,000.0000 $10,000.00

202-03 REMOVAL OF RIGID PAVEMENT, SIDEWALK, ETC.

S.Y.200.000

Sessions Paving Company $15.0000 $3,000.00

204-01 CULVERT EXCAVATION (UNCLASSIFIED)

C.Y.437.000

Sessions Paving Company $30.0000 $13,110.00

204-08 FOUNDATION FILL MATERIAL

C.Y.47.000

Sessions Paving Company $400.0000 $18,800.00

209-05 SEDIMENT REMOVAL

C.Y.50.000

Sessions Paving Company $10.0000 $500.00

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.200.000

Sessions Paving Company $7.5000 $1,500.00

209-08.08 ENHANCED ROCK CHECK DAM

EACH1.000

Sessions Paving Company $1,000.0000 $1,000.00

209-09.01 SANDBAGS

BAG950.000

Sessions Paving Company $10.0000 $9,500.00

209-09.03 SEDIMENT FILTER BAG (15' X 15')

EACH1.000

Sessions Paving Company $1,500.0000 $1,500.00

209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIMUM)

S.Y.20.000

Sessions Paving Company $10.0000 $200.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON136.000

Sessions Paving Company $46.0000 $6,256.00

303-01.01 GRANULAR BACKFILL (ROADWAY)

TON118.000

Sessions Paving Company $50.0000 $5,900.00

2PAGE

EXTENSION

CONTRACT CNT092

UNIT PRICE

303-10.01 MINERAL AGGREGATE (SIZE 57)

TON19.000

Sessions Paving Company $50.0000 $950.00

307-02.01 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING A

TON63.000

Sessions Paving Company $172.0000 $10,836.00

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON20.000

Sessions Paving Company $176.0000 $3,520.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON1.000

Sessions Paving Company $880.0000 $880.00

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON2.000

Sessions Paving Company $50.0000 $100.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON1.000

Sessions Paving Company $880.0000 $880.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON86.000

Sessions Paving Company $205.0000 $17,630.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON67.000

Sessions Paving Company $120.0000 $8,040.00

604-01.20 BOX TUBE SAFETY RAIL

L.F.63.000

Sessions Paving Company $150.0000 $9,450.00

606-24.10 SHEET PILES

S.F.25.000

Sessions Paving Company $100.0000 $2,500.00

611-05.01 TRENCH DRAINS

L.F.40.000

Sessions Paving Company $250.0000 $10,000.00

621-03.11 72" TEMPORARY DRAINAGE PIPE

L.F.120.000

Sessions Paving Company $375.0000 $45,000.00

3PAGE

EXTENSION

CONTRACT CNT092

UNIT PRICE

701-01.01 CONCRETE SIDEWALK (4 ")

S.F.176.000

Sessions Paving Company $7.5000 $1,320.00

702-01 CONCRETE CURB

C.Y.2.200

Sessions Paving Company $500.0000 $1,100.00

707-08.11 HIGH-VISIBILITY CONSTRUCTION FENCE

L.F.60.000

Sessions Paving Company $8.0000 $480.00

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON100.000

Sessions Paving Company $45.0000 $4,500.00

709-05.09 MACHINED RIP-RAP (CLASS C)

TON18.000

Sessions Paving Company $45.0000 $810.00

712-01 TRAFFIC CONTROL

LS1.000

Sessions Paving Company $21,000.0000 $21,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Sessions Paving Company $40.0000 $1,000.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Sessions Paving Company $45.0000 $180.00

712-06 SIGNS (CONSTRUCTION)

S.F.193.000

Sessions Paving Company $8.0000 $1,544.00

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.96.000

Sessions Paving Company $15.0000 $1,440.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH7.000

Sessions Paving Company $5,800.0000 $40,600.00

716-12.01 ENHANCED FLATLINE THERMO PVMT MRKNG (4IN LINE)

L.M.0.400

Sessions Paving Company $11,000.0000 $4,400.00

4PAGE

EXTENSION

CONTRACT CNT092

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Sessions Paving Company $14,500.0000 $14,500.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.232.000

Sessions Paving Company $6.5000 $1,508.00

801-03 WATER (SEEDING & SODDING)

M.G.1.000

Sessions Paving Company $110.0000 $110.00

803-01 SODDING (NEW SOD)

S.Y.50.000

Sessions Paving Company $8.0000 $400.00

5PAGE

EXTENSION

CONTRACT CNT092

UNIT PRICE

BOX BRIDGE CATEGORY

202-04.50 REMOVAL OF STRUCTURES (EXISTING 60.5' BOX CULVERT, STA 101+93)

LS1.000

Sessions Paving Company $15,000.0000 $15,000.00

607-50.12 PRECAST CONCRETE BOX CULVERT ( 14' X 5' ARCH)

L.F.60.500

Sessions Paving Company $3,360.0000 $203,280.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Sessions Paving Company $275,944.00

SUB-TOTAL BOX BRIDGE

Sessions Paving Company $218,280.00

Sessions Paving Company $494,224.00

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COCKE COUNTY (Contract No. CNT091 Call 018)

THE SLIPLINING OF CULVERTS AT VARIOUS LOCATIONS ON I-40 BETWEEN LOG MILES 14.14 AND 21.84.

PROJECT LENGTH -

15100-4102-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE AUGUST 31, 2019

TOTAL CONTRACT

Chase Reline, Inc. $389,850.00

MG Underground, LLC $594,500.00

1PAGE

EXTENSION

CONTRACT CNT091

UNIT PRICE

MAINTENANCE CATEGORY

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.500.000

Chase Reline, Inc. $5.0000 $2,500.00

MG Underground, LLC $5.0000 $2,500.00

209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING)

L.F.200.000

Chase Reline, Inc. $2.0000 $400.00

MG Underground, LLC $3.0000 $600.00

607-65.71 60" MINIMUM ID PIPE TO SLIP LINE 72" PIPE

L.F.151.000

Chase Reline, Inc. $900.0000 $135,900.00

MG Underground, LLC $1,600.0000 $241,600.00

607-65.89 10.75" OD PIPE TO SLIP LINE 12" PIPE

L.F.51.000

Chase Reline, Inc. $200.0000 $10,200.00

MG Underground, LLC $450.0000 $22,950.00

607-65.90 12.75" OD PIPE TO SLIP LINE 16" PIPE

L.F.260.000

Chase Reline, Inc. $265.0000 $68,900.00

MG Underground, LLC $225.0000 $58,500.00

607-65.91 16" OD PIPE TO SLIP LINE 18" PIPE

L.F.101.000

Chase Reline, Inc. $300.0000 $30,300.00

MG Underground, LLC $350.0000 $35,350.00

607-65.92 20" OD PIPE TO SLIP LINE 24" PIPE

L.F.106.000

Chase Reline, Inc. $325.0000 $34,450.00

MG Underground, LLC $400.0000 $42,400.00

607-66.01 PORTLAND CEMENT 94 LB BAG

EACH100.000

Chase Reline, Inc. $70.0000 $7,000.00

MG Underground, LLC $300.0000 $30,000.00

709-05.06 MACHINED RIP-RAP (CLASS A-1)

TON50.000

Chase Reline, Inc. $90.0000 $4,500.00

MG Underground, LLC $500.0000 $25,000.00

712-01 TRAFFIC CONTROL

LS1.000

Chase Reline, Inc. $40,000.0000 $40,000.00

MG Underground, LLC $30,000.0000 $30,000.00

2PAGE

EXTENSION

CONTRACT CNT091

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Chase Reline, Inc. $35,000.0000 $35,000.00

MG Underground, LLC $30,000.0000 $30,000.00

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.400.000

Chase Reline, Inc. $8.0000 $3,200.00

MG Underground, LLC $8.0000 $3,200.00

801-01 SEEDING (WITH MULCH)

UNIT10.000

Chase Reline, Inc. $350.0000 $3,500.00

MG Underground, LLC $40.0000 $400.00

801-03 WATER (SEEDING & SODDING)

M.G.10.000

Chase Reline, Inc. $500.0000 $5,000.00

MG Underground, LLC $1,200.0000 $12,000.00

803-01 SODDING (NEW SOD)

S.Y.1,000.000

Chase Reline, Inc. $9.0000 $9,000.00

MG Underground, LLC $60.0000 $60,000.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

Chase Reline, Inc. $389,850.00

MG Underground, LLC $594,500.00

Chase Reline, Inc. $389,850.00

MG Underground, LLC $594,500.00

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COCKE COUNTY (Contract No. CNT005 Call 019)

THE GRADING, DRAINAGE AND PAVING ON A S.I.A. ROUTE SERVING OAKCREST LUMBER.

PROJECT LENGTH -

15946-3430-04

0.093 MILES

COMPLETION TIME - ON OR BEFORE MAY 15, 2019

TOTAL CONTRACT

Charles Blalock & Sons, Inc. $288,669.71

Whaley Construction, LLC $399,577.00

1PAGE

EXTENSION

CONTRACT CNT005

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Charles Blalock & Sons, Inc. $10,523.7200 $10,523.72

Whaley Construction, LLC $10,000.0000 $10,000.00

201-01 CLEARING AND GRUBBING

LS1.000

Charles Blalock & Sons, Inc. $12,000.0000 $12,000.00

Whaley Construction, LLC $15,000.0000 $15,000.00

202-01.13 REMOVAL OF PIPE (36" ,STA.10+54 TO 14+50)

L.F.396.000

Charles Blalock & Sons, Inc. $4.0000 $1,584.00

Whaley Construction, LLC $15.0000 $5,940.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.2,002.000

Charles Blalock & Sons, Inc. $15.0000 $30,030.00

Whaley Construction, LLC $25.0000 $50,050.00

203-04 PLACING AND SPREADING TOPSOIL

C.Y.457.000

Charles Blalock & Sons, Inc. $1.5000 $685.50

Whaley Construction, LLC $25.0000 $11,425.00

203-06 WATER

M.G.16.000

Charles Blalock & Sons, Inc. $10.0000 $160.00

Whaley Construction, LLC $50.0000 $800.00

203-07 FURNISHING & SPREADING TOPSOIL

C.Y.114.000

Charles Blalock & Sons, Inc. $15.0000 $1,710.00

Whaley Construction, LLC $40.0000 $4,560.00

209-05 SEDIMENT REMOVAL

C.Y.25.000

Charles Blalock & Sons, Inc. $5.0000 $125.00

Whaley Construction, LLC $15.0000 $375.00

209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING)

L.F.530.000

Charles Blalock & Sons, Inc. $6.0000 $3,180.00

Whaley Construction, LLC $3.0000 $1,590.00

209-08.08 ENHANCED ROCK CHECK DAM

EACH2.000

Charles Blalock & Sons, Inc. $1,070.0000 $2,140.00

Whaley Construction, LLC $850.0000 $1,700.00

2PAGE

EXTENSION

CONTRACT CNT005

UNIT PRICE

209-40.30 CATCH BASIN PROTECTION (TYPE A)

EACH4.000

Charles Blalock & Sons, Inc. $856.0000 $3,424.00

Whaley Construction, LLC $650.0000 $2,600.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,419.000

Charles Blalock & Sons, Inc. $42.2000 $59,881.80

Whaley Construction, LLC $32.0000 $45,408.00

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON260.000

Charles Blalock & Sons, Inc. $140.0000 $36,400.00

Whaley Construction, LLC $154.0000 $40,040.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON212.000

Charles Blalock & Sons, Inc. $165.0000 $34,980.00

Whaley Construction, LLC $182.0000 $38,584.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON2.300

Charles Blalock & Sons, Inc. $120.0000 $276.00

Whaley Construction, LLC $1,320.0000 $3,036.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON0.500

Charles Blalock & Sons, Inc. $1,200.0000 $600.00

Whaley Construction, LLC $1,320.0000 $660.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON89.000

Charles Blalock & Sons, Inc. $190.0000 $16,910.00

Whaley Construction, LLC $209.0000 $18,601.00

607-03.02 18" CONCRETE PIPE CULVERT (CLASS III)

L.F.48.000

Charles Blalock & Sons, Inc. $120.0000 $5,760.00

Whaley Construction, LLC $85.0000 $4,080.00

607-39.02 18" PIPE CULVERT (SIDE DRAIN)

L.F.145.000

Charles Blalock & Sons, Inc. $50.0000 $7,250.00

Whaley Construction, LLC $40.0000 $5,800.00

611-42.02 CATCH BASINS, TYPE 42, > 4' - 8' DEPTH

EACH2.000

Charles Blalock & Sons, Inc. $4,000.0000 $8,000.00

Whaley Construction, LLC $6,500.0000 $13,000.00

3PAGE

EXTENSION

CONTRACT CNT005

UNIT PRICE

708-02.01 MARKERS (CONCRETE R.O.W. POSTS)

EACH4.000

Charles Blalock & Sons, Inc. $500.0000 $2,000.00

Whaley Construction, LLC $500.0000 $2,000.00

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON40.000

Charles Blalock & Sons, Inc. $55.0000 $2,200.00

Whaley Construction, LLC $55.0000 $2,200.00

712-01 TRAFFIC CONTROL

LS1.000

Charles Blalock & Sons, Inc. $11,000.0000 $11,000.00

Whaley Construction, LLC $50,000.0000 $50,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH50.000

Charles Blalock & Sons, Inc. $45.0000 $2,250.00

Whaley Construction, LLC $33.0000 $1,650.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH50.000

Charles Blalock & Sons, Inc. $15.0000 $750.00

Whaley Construction, LLC $11.0000 $550.00

712-06 SIGNS (CONSTRUCTION)

S.F.236.000

Charles Blalock & Sons, Inc. $12.0000 $2,832.00

Whaley Construction, LLC $8.0000 $1,888.00

713-16.20 SIGNS (R1-1)

EACH1.000

Charles Blalock & Sons, Inc. $500.0000 $500.00

Whaley Construction, LLC $302.5000 $302.50

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.50.000

Charles Blalock & Sons, Inc. $15.0000 $750.00

Whaley Construction, LLC $15.0000 $750.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.0.800

Charles Blalock & Sons, Inc. $1,070.0000 $856.00

Whaley Construction, LLC $1,500.0000 $1,200.00

717-01 MOBILIZATION

LS1.000

Charles Blalock & Sons, Inc. $13,900.0000 $13,900.00

Whaley Construction, LLC $55,000.0000 $55,000.00

4PAGE

EXTENSION

CONTRACT CNT005

UNIT PRICE

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.60.000

Charles Blalock & Sons, Inc. $15.0000 $900.00

Whaley Construction, LLC $5.0000 $300.00

740-11.02 TEMPORARY SEDIMENT TUBE 12IN

L.F.555.000

Charles Blalock & Sons, Inc. $8.5600 $4,750.80

Whaley Construction, LLC $5.0000 $2,775.00

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT9.000

Charles Blalock & Sons, Inc. $300.0000 $2,700.00

Whaley Construction, LLC $65.0000 $585.00

801-02 SEEDING (WITHOUT MULCH)

UNIT18.000

Charles Blalock & Sons, Inc. $32.1000 $577.80

Whaley Construction, LLC $65.0000 $1,170.00

801-03 WATER (SEEDING & SODDING)

M.G.16.000

Charles Blalock & Sons, Inc. $321.0000 $5,136.00

Whaley Construction, LLC $125.0000 $2,000.00

805-12.02 EROSION CONTROL BLANKET (TYPE II)

S.Y.1,583.000

Charles Blalock & Sons, Inc. $1.2300 $1,947.09

Whaley Construction, LLC $2.5000 $3,957.50

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Charles Blalock & Sons, Inc. $288,669.71

Whaley Construction, LLC $399,577.00

Charles Blalock & Sons, Inc. $288,669.71

Whaley Construction, LLC $399,577.00

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COFFEE COUNTY (Contract No. CNT084 Call 020)

6.00%DBE GOAL

THE RESURFACING ON U.S. 41 (S.R. 2) FROM S.R. 127 (L.M. 22.32) TO THE GRUNDY COUNTY LINE (L.M. 29.73).

PROJECT LENGTH -

STP/HSIP-2(265),16002-3216-94,16002-8216-14

7.330 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Rogers Group, Inc. $1,590,267.00

1PAGE

EXTENSION

CONTRACT CNT084

UNIT PRICE

ROADWAY CATEGORY

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON431.000

Rogers Group, Inc. $32.0000 $13,792.00

407-07.01 INTELLIGENT COMPACTION EQUIPMENT

LS1.000

Rogers Group, Inc. $27,750.0000 $27,750.00

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON5,100.000

Rogers Group, Inc. $89.0000 $453,900.00

411-03.12 ACS MIX(PG64-22) THIN LIFT D ASPHALT

TON5,000.000

Rogers Group, Inc. $94.0000 $470,000.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.11.300

Rogers Group, Inc. $750.0000 $8,475.00

414-04.03 ASPHALT EMULSION (SCRUB SEAL)

TON158.000

Rogers Group, Inc. $1,295.0000 $204,610.00

414-04.04 MINERAL AGGREGATE (SCRUB SEAL)

TON1,308.000

Rogers Group, Inc. $74.5000 $97,446.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH1.000

Rogers Group, Inc. $1,700.0000 $1,700.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH1.000

Rogers Group, Inc. $3,100.0000 $3,100.00

706-01 GUARDRAIL REMOVED

L.F.50.000

Rogers Group, Inc. $1.5000 $75.00

712-01 TRAFFIC CONTROL

LS1.000

Rogers Group, Inc. $35,525.0000 $35,525.00

712-06 SIGNS (CONSTRUCTION)

S.F.661.000

Rogers Group, Inc. $8.5000 $5,618.50

2PAGE

EXTENSION

CONTRACT CNT084

UNIT PRICE

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH534.000

Rogers Group, Inc. $26.0000 $13,884.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH8.000

Rogers Group, Inc. $26.0000 $208.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH534.000

Rogers Group, Inc. $11.2500 $6,007.50

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.48.000

Rogers Group, Inc. $12.0000 $576.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.316.000

Rogers Group, Inc. $12.0000 $3,792.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH4.000

Rogers Group, Inc. $180.0000 $720.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.26.000

Rogers Group, Inc. $695.0000 $18,070.00

716-08.03 REMOVAL OF PAVEMENT MARKING (CROSS-WALK)

L.F.48.000

Rogers Group, Inc. $6.0000 $288.00

716-08.06 REMOVAL OF PAVEMENT MARKING (TURN LANE ARROW)

EACH4.000

Rogers Group, Inc. $100.0000 $400.00

716-08.20 REMOVAL OF PAVEMENT MARKING (LINE)

L.M.26.000

Rogers Group, Inc. $1,500.0000 $39,000.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.26.000

Rogers Group, Inc. $4,955.0000 $128,830.00

717-01 MOBILIZATION

LS1.000

Rogers Group, Inc. $56,500.0000 $56,500.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Rogers Group, Inc. $1,590,267.00

Rogers Group, Inc. $1,590,267.00

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

CUMBERLAND COUNTY (Contract No. CNT088 Call 021)

6.50%DBE GOAL

THE RESURFACING ON U.S. 70 (S.R. 1), U.S. 127 (S.R. 28) AND ON S.R. 392.

PROJECT LENGTH -

NH/HSIP-28(72),18006-3217-94,18006-8217-14,STP/HSIP-1(401),18002-3235-94,18002-8235-14,STP-392(6),18083-8213-14

8.830 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Rogers Group, Inc. $2,058,483.49

1PAGE

EXTENSION

CONTRACT CNT088

UNIT PRICE

ROADWAY CATEGORY

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,048.000

Rogers Group, Inc. $32.1800 $33,724.64

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON88.000

Rogers Group, Inc. $350.0000 $30,800.00

407-07.01 INTELLIGENT COMPACTION EQUIPMENT

LS1.000

Rogers Group, Inc. $22,100.5700 $22,100.57

411-01.10 ACS MIX(PG64-22) GRADING D

TON1,452.000

Rogers Group, Inc. $106.5200 $154,667.04

411-02.10 ACS MIX(PG70-22) GRADING D

TON7,235.000

Rogers Group, Inc. $112.1100 $811,115.85

411-03.07 ACS MIX(PG64-22) THIN LIFT ASPHALT

TON4,905.000

Rogers Group, Inc. $113.0100 $554,314.05

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.14.100

Rogers Group, Inc. $449.4400 $6,337.10

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.118,953.000

Rogers Group, Inc. $0.9600 $114,194.88

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH1.000

Rogers Group, Inc. $121.6500 $121.65

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH1.000

Rogers Group, Inc. $2,037.5000 $2,037.50

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.88.000

Rogers Group, Inc. $23.7300 $2,088.24

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH1.000

Rogers Group, Inc. $3,102.0900 $3,102.09

2PAGE

EXTENSION

CONTRACT CNT088

UNIT PRICE

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH3.000

Rogers Group, Inc. $2,493.8300 $7,481.49

706-01 GUARDRAIL REMOVED

L.F.113.000

Rogers Group, Inc. $1.2200 $137.86

712-01 TRAFFIC CONTROL

LS1.000

Rogers Group, Inc. $55,711.0800 $55,711.08

712-06 SIGNS (CONSTRUCTION)

S.F.1,602.000

Rogers Group, Inc. $6.6900 $10,717.38

713-02.14 FLEXIBLE DELINEATOR (WHITE)

EACH55.000

Rogers Group, Inc. $38.9300 $2,141.15

713-16.20 SIGNS (OM-3L - OBJECT MARKER LEFT)

EACH4.000

Rogers Group, Inc. $152.0600 $608.24

713-16.21 SIGNS (OM-3R - OBJECT MARKER RIGHT)

EACH4.000

Rogers Group, Inc. $152.0600 $608.24

713-16.22 SIGNS (W1-8)

EACH8.000

Rogers Group, Inc. $182.4800 $1,459.84

713-16.23 SIGNS (W3-5)

EACH1.000

Rogers Group, Inc. $212.8800 $212.88

713-16.24 SIGNS (S3-1)

EACH1.000

Rogers Group, Inc. $212.8800 $212.88

713-16.25 SIGNS (R1-1)

EACH3.000

Rogers Group, Inc. $200.7300 $602.19

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH624.000

Rogers Group, Inc. $27.5700 $17,203.68

3PAGE

EXTENSION

CONTRACT CNT088

UNIT PRICE

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH31.000

Rogers Group, Inc. $27.5700 $854.67

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH457.000

Rogers Group, Inc. $27.5700 $12,599.49

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH140.000

Rogers Group, Inc. $7.1900 $1,006.60

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.375.000

Rogers Group, Inc. $21.5800 $8,092.50

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.978.000

Rogers Group, Inc. $10.7900 $10,552.62

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH25.000

Rogers Group, Inc. $179.7800 $4,494.50

716-02.11 PLASTIC PAVEMENT MARKING (6" DOTTED LINE)

L.F.220.000

Rogers Group, Inc. $1.2000 $264.00

716-04.04 PLASTIC PAVEMENT MARKING (TRANSVERSE SHOULDER)

L.F.122.000

Rogers Group, Inc. $2.4000 $292.80

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.45.000

Rogers Group, Inc. $4.7900 $215.55

716-04.14 PLASTIC PAVEMENT MARKING (LANE REDUCTION ARROW)

EACH4.000

Rogers Group, Inc. $239.7000 $958.80

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.37.700

Rogers Group, Inc. $479.4000 $18,073.38

716-08.01 REMOVAL OF PAVEMENT MARKING (LINE)

L.F.2,800.000

Rogers Group, Inc. $0.6000 $1,680.00

4PAGE

EXTENSION

CONTRACT CNT088

UNIT PRICE

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.38.200

Rogers Group, Inc. $2,876.4100 $109,878.86

717-01 MOBILIZATION

LS1.000

Rogers Group, Inc. $50,765.4500 $50,765.45

730-14.02 SAW SLOT

L.F.1,125.000

Rogers Group, Inc. $4.1900 $4,713.75

730-14.03 LOOP WIRE

L.F.3,000.000

Rogers Group, Inc. $0.7800 $2,340.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Rogers Group, Inc. $2,058,483.49

Rogers Group, Inc. $2,058,483.49

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

DAVIDSON COUNTY (Contract No. CNT129 Call 023)

THE REPAIR OF BRIDGES ON I-24 OVER U.S. 31E (S.R. 6, MAIN STREET) (L.M. 14.46), OVER WOODLAND STREET (L.M. 14.54) AND OVERTHE CUMBERLAND RIVER (L.M. 15.23).

PROJECT LENGTH -

19010-4169-04

0.110 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Bell & Associates Construction, LP $1,459,532.00

Mid-State Construction Company, Inc. $2,694,669.16

1PAGE

EXTENSION

CONTRACT CNT129

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Bell & Associates Construction, LP $4,000.0000 $4,000.00

Mid-State Construction Company, Inc. $24,492.0000 $24,492.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON2.000

Bell & Associates Construction, LP $1,900.0000 $3,800.00

Mid-State Construction Company, Inc. $2,449.2000 $4,898.40

411-03.10 ACS MIX(PG76-22) GRADING D

TON250.000

Bell & Associates Construction, LP $350.0000 $87,500.00

Mid-State Construction Company, Inc. $434.3200 $108,580.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.0.110

Bell & Associates Construction, LP $50,000.0000 $5,500.00

Mid-State Construction Company, Inc. $81,640.0000 $8,980.40

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.3,139.000

Bell & Associates Construction, LP $10.0000 $31,390.00

Mid-State Construction Company, Inc. $14.0400 $44,071.56

712-01 TRAFFIC CONTROL

LS1.000

Bell & Associates Construction, LP $69,000.0000 $69,000.00

Mid-State Construction Company, Inc. $163,083.4100 $163,083.41

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH225.000

Bell & Associates Construction, LP $75.0000 $16,875.00

Mid-State Construction Company, Inc. $60.4100 $13,592.25

712-06 SIGNS (CONSTRUCTION)

S.F.1,786.000

Bell & Associates Construction, LP $12.0000 $21,432.00

Mid-State Construction Company, Inc. $12.2500 $21,878.50

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.156.000

Bell & Associates Construction, LP $80.0000 $12,480.00

Mid-State Construction Company, Inc. $26.1200 $4,074.72

712-08.01 UNIFORMED POLICE OFFICER

DOLL125,000.000

Bell & Associates Construction, LP $1.0000 $125,000.00

Mid-State Construction Company, Inc. $1.0000 $125,000.00

2PAGE

EXTENSION

CONTRACT CNT129

UNIT PRICE

712-08.03 ARROW BOARD (TYPE C)

EACH8.000

Bell & Associates Construction, LP $1,520.0000 $12,160.00

Mid-State Construction Company, Inc. $1,959.3600 $15,674.88

712-08.10 MOBILE MESSAGE SIGN UNIT W/ATTENUATOR

HOUR2,000.000

Bell & Associates Construction, LP $100.0000 $200,000.00

Mid-State Construction Company, Inc. $160.4200 $320,840.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH4.000

Bell & Associates Construction, LP $9,500.0000 $38,000.00

Mid-State Construction Company, Inc. $12,246.0000 $48,984.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH26.000

Bell & Associates Construction, LP $125.0000 $3,250.00

Mid-State Construction Company, Inc. $163.2800 $4,245.28

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.0.280

Bell & Associates Construction, LP $15,000.0000 $4,200.00

Mid-State Construction Company, Inc. $16,328.0000 $4,571.84

717-01 MOBILIZATION

LS1.000

Bell & Associates Construction, LP $102,250.0000 $102,250.00

Mid-State Construction Company, Inc. $127,785.4600 $127,785.46

3PAGE

EXTENSION

CONTRACT CNT129

UNIT PRICE

BRIDGE CATEGORY

202-01.02 REMOVAL OF ASBESTOS

LS1.000

Bell & Associates Construction, LP $10,000.0000 $10,000.00

Mid-State Construction Company, Inc. $57,148.0000 $57,148.00

604-10.60 EXPANSION JOINT REPAIRS (MODULAR TYPE)

L.F.69.000

Bell & Associates Construction, LP $5,500.0000 $379,500.00

Mid-State Construction Company, Inc. $7,353.2800 $507,376.32

604-10.70 EXPANSION JOINT REPAIRS

L.F.500.000

Bell & Associates Construction, LP $535.0000 $267,500.00

Mid-State Construction Company, Inc. $1,625.7300 $812,865.00

617-01 BRIDGE DECK SEALANT

S.Y.2,580.000

Bell & Associates Construction, LP $20.0000 $51,600.00

Mid-State Construction Company, Inc. $101.2300 $261,173.40

617-02 BRIDGE DECK CRACK SEALING

L.F.1,150.000

Bell & Associates Construction, LP $8.5000 $9,775.00

Mid-State Construction Company, Inc. $10.4900 $12,063.50

617-05 SEALANT (HMWM)

GAL.16.000

Bell & Associates Construction, LP $270.0000 $4,320.00

Mid-State Construction Company, Inc. $205.6400 $3,290.24

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Bell & Associates Construction, LP $736,837.00

Mid-State Construction Company, Inc. $1,040,752.70

SUB-TOTAL BRIDGE

Bell & Associates Construction, LP $722,695.00

Mid-State Construction Company, Inc. $1,653,916.46

Bell & Associates Construction, LP $1,459,532.00

Mid-State Construction Company, Inc. $2,694,669.16

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES DAVIDSON, HUMPHREYS, MAURY, ROBERTSON, RUTHERFORD, SMITH, STEWART, SUMNER, WAYNE, WILLIAMSON, ANDWILSON (Contract No. CNT127 Call 024)

THE RANDOM ON-CALL ATTENUATOR REPAIR ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98303-4134-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

LU, Inc. $394,240.41

Site-Safe Products, LLC d/b/a Site-Safe, LLC $418,924.33

1PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

MAINTENANCE CATEGORY

705-08.22 IMPACT ATTENUATOR (TAU-II WIDE)

EACH1.000

LU, Inc. $15,610.8300 $15,610.83

Site-Safe Products, LLC d/b/a Site-Safe, LLC $21,100.2000 $21,100.20

705-08.23 REPOSITIONING IMPACT ATTENUATOR (TAU-II)

EACH5.000

LU, Inc. $915.7400 $4,578.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $3,192.00

705-08.25 TAU-II ENERGY ABSORBING CARTRIDGE TYPE A (UNIVERSAL)

EACH15.000

LU, Inc. $470.3600 $7,055.40

Site-Safe Products, LLC d/b/a Site-Safe, LLC $523.8600 $7,857.90

705-08.26 TAU-II ENERGY ABSORBING CARTRIDGE TYPE B (UNIVERSAL)

EACH10.000

LU, Inc. $470.3600 $4,703.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $523.8600 $5,238.60

705-08.28 TAU-II FRONT SUPPORT ASSEMBLY (UNIVERSAL)

EACH1.000

LU, Inc. $787.9200 $787.92

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,138.0300 $1,138.03

705-08.29 TAU-II FRONT SUPPORT LEG KIT (UNIVERSAL)

EACH3.000

LU, Inc. $195.9800 $587.94

Site-Safe Products, LLC d/b/a Site-Safe, LLC $168.9900 $506.97

705-08.30 TAU-II MID SUPPORT ASSEMBLY (UNIVERSAL)

EACH4.000

LU, Inc. $800.9000 $3,203.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,517.3600 $6,069.44

705-08.32 TAU-II SLIDER KIT (UNIVERSAL)

EACH1.000

LU, Inc. $217.0200 $217.02

Site-Safe Products, LLC d/b/a Site-Safe, LLC $379.3400 $379.34

705-08.33 TAU-II SLIDING PANEL (UNIVERSAL)

EACH6.000

LU, Inc. $253.3200 $1,519.92

Site-Safe Products, LLC d/b/a Site-Safe, LLC $339.4200 $2,036.52

705-08.34 TAU-II NOSE PIECE (PARALLEL UNIT)

EACH10.000

LU, Inc. $624.3700 $6,243.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $678.8200 $6,788.20

2PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-08.36 TAU-II NOSE PIECE (WIDE UNIT)

EACH1.000

LU, Inc. $577.0400 $577.04

Site-Safe Products, LLC d/b/a Site-Safe, LLC $826.1600 $826.16

705-08.43 FORMED ANGLE 05 TRACC

EACH2.000

LU, Inc. $327.6200 $655.24

Site-Safe Products, LLC d/b/a Site-Safe, LLC $211.6700 $423.34

705-08.54 TRACC WASHER 1/4" X 3" X 2-1/4"

EACH2.000

LU, Inc. $2.3600 $4.72

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2.0800 $4.16

705-08.55 TRACC DOUBLER PL X 38-1/2"

EACH2.000

LU, Inc. $72.2300 $144.46

Site-Safe Products, LLC d/b/a Site-Safe, LLC $46.6700 $93.34

705-08.56 TRACC BEAM GUIDE 72"

EACH2.000

LU, Inc. $316.4400 $632.88

Site-Safe Products, LLC d/b/a Site-Safe, LLC $204.4400 $408.88

705-08.57 IMPACT ATTENUATOR (QUADGUARD ELITE WIDE)

EACH1.000

LU, Inc. $17,950.0000 $17,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $14,818.9300 $14,818.93

705-08.58 IMPACT ATTENUATOR (QUADGUARD ELITE)

EACH1.000

LU, Inc. $15,150.0000 $15,150.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $17,777.7800 $17,777.78

705-08.59 IMPACT ATTENUATOR REPOSITIONING (QUADGUARD ELITE)

EACH5.000

LU, Inc. $250.0000 $1,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $387.4900 $1,937.45

705-08.66 RIP PLATE REPAIR KIT, STAGE 1

EACH2.000

LU, Inc. $195.0000 $390.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $145.0000 $290.00

705-08.67 RIP PLATE REPAIR KIT, STAGE 2

EACH2.000

LU, Inc. $145.0000 $290.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $213.5400 $427.08

3PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-08.69 PLASTIC NOSE PIECE/REFLECTOR

EACH6.000

LU, Inc. $357.1600 $2,142.96

Site-Safe Products, LLC d/b/a Site-Safe, LLC $369.6200 $2,217.72

705-08.80 SIDE PANEL - 35"

EACH3.000

LU, Inc. $187.9300 $563.79

Site-Safe Products, LLC d/b/a Site-Safe, LLC $118.8000 $356.40

705-08.81 SIDE PANEL - 62"

EACH8.000

LU, Inc. $167.1400 $1,337.12

Site-Safe Products, LLC d/b/a Site-Safe, LLC $223.4400 $1,787.52

705-08.91 REPOSITIONING VEHCULR IMP ATTN(2005TRACC)

EACH7.000

LU, Inc. $889.3500 $6,225.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,021.4400 $7,150.08

705-08.92 05 RIP PLATE REPAIR KIT STAGE 2

EACH5.000

LU, Inc. $614.2900 $3,071.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $716.8000 $3,584.00

705-09.10 IMPACT ATTENUATOR (SCI100GM)

EACH1.000

LU, Inc. $21,250.0000 $21,250.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $22,252.2200 $22,252.22

705-09.11 REPOSITIONING OF IMPACT ATTENUATOR (SCI100GM)

EACH2.000

LU, Inc. $915.7400 $1,831.48

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $1,276.80

705-09.35 PANEL DELINEATOR (W/REFLECTIVE HAZARD MARKER)

EACH3.000

LU, Inc. $107.7400 $323.22

Site-Safe Products, LLC d/b/a Site-Safe, LLC $145.0000 $435.00

705-14.21 SC B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $45.2700 $45.27

Site-Safe Products, LLC d/b/a Site-Safe, LLC $110.9400 $110.94

705-14.22 CONC. B-U CABLE STRAP ASSY

EACH1.000

LU, Inc. $92.8600 $92.86

Site-Safe Products, LLC d/b/a Site-Safe, LLC $219.7500 $219.75

4PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-14.30 REPOSITIONING IMPACT ATTENUATOR(REACT 350)

EACH2.000

LU, Inc. $522.3200 $1,044.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.4000 $1,276.80

705-14.56 REFLECTIVE NOSE LEFT/RIGHT

EACH2.000

LU, Inc. $184.5500 $369.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $284.0300 $568.06

705-15.65 QUADGUARD II IMPACT ATTENUATOR (REPOSITIONING)

EACH10.000

LU, Inc. $1,021.3200 $10,213.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $9,576.00

705-15.66 QUADGUARD II IMPACT ATTENUATOR (WIDE)

EACH1.000

LU, Inc. $11,630.4300 $11,630.43

Site-Safe Products, LLC d/b/a Site-Safe, LLC $16,534.7700 $16,534.77

705-15.68 NOSE ASSEMBLY QGII STEEL

EACH15.000

LU, Inc. $874.0200 $13,110.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $742.1300 $11,131.95

705-15.69 SHIM KIT QGII

EACH35.000

LU, Inc. $38.3000 $1,340.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $50.7700 $1,776.95

705-15.71 HEX FOAM CARTRIDGE, TYPE I

EACH20.000

LU, Inc. $823.2500 $16,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $750.0800 $15,001.60

705-15.72 HEX FOAM CARTRIDGE, TYPE II

EACH20.000

LU, Inc. $866.4800 $17,329.60

Site-Safe Products, LLC d/b/a Site-Safe, LLC $789.3300 $15,786.60

705-15.74 DIAPHRAGM ASSEMBLY, QC

EACH6.000

LU, Inc. $765.8000 $4,594.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $949.7000 $5,698.20

705-15.75 FENDER PANEL ASSEMBLY

EACH5.000

LU, Inc. $610.7900 $3,053.95

Site-Safe Products, LLC d/b/a Site-Safe, LLC $600.1700 $3,000.85

5PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-15.92 TRANS PANEL NEW JERSEY BARRIER WIDE

EACH1.000

LU, Inc. $444.3200 $444.32

Site-Safe Products, LLC d/b/a Site-Safe, LLC $906.7800 $906.78

705-15.93 TRANS PANEL QUAD TO W WIDE

EACH1.000

LU, Inc. $647.6800 $647.68

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,424.7800 $1,424.78

705-16.75 HAZARD REFLECTORS

EACH10.000

LU, Inc. $52.7100 $527.10

Site-Safe Products, LLC d/b/a Site-Safe, LLC $64.0000 $640.00

705-16.77 REPAIR OF CONCRETE BACKUP WALL

S.F.5.000

LU, Inc. $14.8000 $74.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $33.3300 $166.65

705-17.08 CARTRIDGE SUPPORT BRACKETS

EACH4.000

LU, Inc. $34.8200 $139.28

Site-Safe Products, LLC d/b/a Site-Safe, LLC $37.8600 $151.44

705-17.24 HDPE NOSE PIECE

EACH2.000

LU, Inc. $458.9500 $917.90

Site-Safe Products, LLC d/b/a Site-Safe, LLC $487.3600 $974.72

705-17.32 BREAKAWAY POST (TOP)

EACH2.000

LU, Inc. $92.6300 $185.26

Site-Safe Products, LLC d/b/a Site-Safe, LLC $105.0000 $210.00

705-17.33 BREAKAWAY BOLT ASSEMBLY

EACH2.000

LU, Inc. $11.8400 $23.68

Site-Safe Products, LLC d/b/a Site-Safe, LLC $11.4400 $22.88

705-17.71 WIDETRACC CABLE SYSTEM (W/ HARDWARE)

EACH1.000

LU, Inc. $156.7000 $156.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $162.5100 $162.51

705-17.72 WIDETRACC FRAME (W/ HARDWARE)

EACH1.000

LU, Inc. $234.7000 $234.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $243.1900 $243.19

6PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-17.73 WIDETRACC EXTENSION FOOT (RIGHT) (W/ HARDWARE)

EACH1.000

LU, Inc. $226.3400 $226.34

Site-Safe Products, LLC d/b/a Site-Safe, LLC $234.6100 $234.61

705-17.74 WIDETRACC EXTENSION FOOT (LEFT) (W/ HARDWARE)

EACH1.000

LU, Inc. $226.3400 $226.34

Site-Safe Products, LLC d/b/a Site-Safe, LLC $234.6100 $234.61

705-17.89 HEART REFLECTIVE TAPE

EACH4.000

LU, Inc. $39.7000 $158.80

Site-Safe Products, LLC d/b/a Site-Safe, LLC $45.7800 $183.12

705-17.92 REPOSITIONING IMPACT ATTENUATOR (HEART)

EACH1.000

LU, Inc. $239.2000 $239.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $255.3600 $255.36

705-17.93 IMPACT ATTENUATOR (WIDETRACC 2005)

EACH1.000

LU, Inc. $15,321.5300 $15,321.53

Site-Safe Products, LLC d/b/a Site-Safe, LLC $18,208.0300 $18,208.03

705-20.01 IMACT ATTENUATOR (QUADGUARD M10)

EACH1.000

LU, Inc. $21,500.0000 $21,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $19,139.4500 $19,139.45

705-20.03 REPOSITIONING IMPACT ATTENUATOR (M10)

EACH1.000

LU, Inc. $350.0000 $350.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $957.6000 $957.60

705-20.04 NOSE ASSEMBLY, M10

EACH3.000

LU, Inc. $853.7300 $2,561.19

Site-Safe Products, LLC d/b/a Site-Safe, LLC $824.6400 $2,473.92

705-20.05 HEX FOAM CARTRIDGE, TYPE M1

EACH3.000

LU, Inc. $946.9400 $2,840.82

Site-Safe Products, LLC d/b/a Site-Safe, LLC $837.4900 $2,512.47

705-20.06 HEX FOAM CARTRIDGE, TYPE M2

EACH3.000

LU, Inc. $993.9000 $2,981.70

Site-Safe Products, LLC d/b/a Site-Safe, LLC $879.0400 $2,637.12

7PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-20.30 BELT NOSEPIECE, YELLOW, 24"-36" (QGE, QGEM)

EACH2.000

LU, Inc. $1,323.2200 $2,646.44

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,284.7300 $2,569.46

705-20.31 BELT NOSEPIECE, YELLOW, 69"-90" (QGE, QGEM)

EACH2.000

LU, Inc. $1,462.5100 $2,925.02

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,402.4300 $2,804.86

705-20.32 QGE HIT INDICATOR

EACH3.000

LU, Inc. $111.4300 $334.29

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94.9100 $284.73

705-20.33 QGE CYLINDER TYPE I (QGE)

EACH3.000

LU, Inc. $972.4400 $2,917.32

Site-Safe Products, LLC d/b/a Site-Safe, LLC $877.2300 $2,631.69

705-20.34 QGE CYLINDER TYPE II (QGE)

EACH3.000

LU, Inc. $661.6100 $1,984.83

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,213.4000 $3,640.20

712-01.50 MAINTENANCE OF TRAFFIC

EACH12.000

LU, Inc. $382.7200 $4,592.64

Site-Safe Products, LLC d/b/a Site-Safe, LLC $425.6000 $5,107.20

712-01.52 MAINTENANCE OF TRAFFIC (NIGHT WORK)

EACH12.000

LU, Inc. $750.0000 $9,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $751.0600 $9,012.72

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY20.000

LU, Inc. $374.0100 $7,480.20

Site-Safe Products, LLC d/b/a Site-Safe, LLC $481.6700 $9,633.40

717-01 MOBILIZATION

LS1.000

LU, Inc. $20,570.7400 $20,570.74

Site-Safe Products, LLC d/b/a Site-Safe, LLC $26,000.0000 $26,000.00

8PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

MAINTENANCE (CONTINGENCY) CATEGORY

705-07.20 TRANSITION TO SAFETY SHAPE (2005 TRACC)

EACH1.000

LU, Inc. $633.2500 $633.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $633.2500 $633.25

705-07.21 TRANSITION TO BARRIER WALL END CAP (2005 TRACC)

EACH1.000

LU, Inc. $212.5000 $212.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $212.5000 $212.50

705-07.22 SPLIT FRAME KIT-30IN BACK-UP (2005 TRACC)

EACH1.000

LU, Inc. $559.3000 $559.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $559.3000 $559.30

705-08.18 TAU-II XXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,500.0000 $1,500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,500.0000 $1,500.00

705-08.19 TAU-II XXXXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $2,000.0000 $2,000.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,000.0000 $2,000.00

705-08.24 TAU-II CABLE GUIDE KIT (UNIVERSAL)

EACH1.000

LU, Inc. $500.0000 $500.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $500.0000 $500.00

705-08.27 TAU-II END PANEL (UNIVERSAL)

EACH1.000

LU, Inc. $275.0000 $275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $275.0000 $275.00

705-08.31 TAU-II PIPE PANEL MOUNT (UNIVERSAL)

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-08.35 TAU-II PCB BACKSTOP (PARALLEL UNIT)

EACH1.000

LU, Inc. $800.0000 $800.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $800.0000 $800.00

705-08.37 TAU-II WIDE SUPPORT LEG ADAPTER (WIDE UNIT)

EACH1.000

LU, Inc. $200.0000 $200.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $200.0000 $200.00

9PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-08.38 TAU-II WING ASSEMBLY (WIDE UNIT)

EACH1.000

LU, Inc. $400.0000 $400.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $400.0000 $400.00

705-08.39 TAU-II WING BRACE (WIDE UNIT)

EACH1.000

LU, Inc. $50.0000 $50.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $50.0000 $50.00

705-08.40 TAU-II XL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $600.0000 $600.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $600.0000 $600.00

705-08.41 TAU-II XXL BULKHEAD (WIDE UNIT)

EACH1.000

LU, Inc. $1,100.0000 $1,100.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,100.0000 $1,100.00

705-08.52 QUADGUARD MONORAIL ASSEMBLY, 3 BAY

EACH1.000

LU, Inc. $1,275.0000 $1,275.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,275.0000 $1,275.00

705-08.68 RIP PLATE REPAIR KIT, STAGE 3

EACH1.000

LU, Inc. $1,620.2500 $1,620.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,620.2500 $1,620.25

705-08.74 BASE ASSEMBLY - 9'

EACH1.000

LU, Inc. $833.0000 $833.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $833.0000 $833.00

705-08.76 BEAM GUIDE - 20'

EACH1.000

LU, Inc. $636.6500 $636.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $636.6500 $636.65

705-08.77 END SHOE (LEFT OR RIGHT)

EACH1.000

LU, Inc. $238.0000 $238.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $238.0000 $238.00

705-08.84 SLOT PLATE

EACH1.000

LU, Inc. $20.8500 $20.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.8500 $20.85

10PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-08.85 CROSSTIE

EACH1.000

LU, Inc. $109.6500 $109.65

Site-Safe Products, LLC d/b/a Site-Safe, LLC $109.6500 $109.65

705-08.86 FORM CHANNEL - 3 X 2

EACH1.000

LU, Inc. $187.0000 $187.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $187.0000 $187.00

705-08.88 SLED/CUTTER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.93 05 RIP PLATE REPAIR KIT STAGE 3

EACH1.000

LU, Inc. $1,119.4500 $1,119.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,119.4500 $1,119.45

705-08.94 05 FRONT ANCH WELDMENT

EACH1.000

LU, Inc. $410.0000 $410.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $410.0000 $410.00

705-08.95 05 SECTION MODULE

EACH1.000

LU, Inc. $1,415.0000 $1,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,415.0000 $1,415.00

705-08.97 05 SLED/SHREDDER ASSEMBLY

EACH1.000

LU, Inc. $2,465.0000 $2,465.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,465.0000 $2,465.00

705-08.98 05 FRAME WELDMENT

EACH1.000

LU, Inc. $310.2500 $310.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $310.2500 $310.25

705-08.99 05 BACK-UP FRAME

EACH1.000

LU, Inc. $473.4500 $473.45

Site-Safe Products, LLC d/b/a Site-Safe, LLC $473.4500 $473.45

705-09.12 CONCRETE ANCHOR BOLT SET (3/4 IN X 7 IN)

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

11PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-09.13 ASPHALT ANCHOR BOLT SET (3/4 IN X 18 IN)

EACH1.000

LU, Inc. $871.0000 $871.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $871.0000 $871.00

705-09.14 BOLT CABLE ADJUSTER

EACH1.000

LU, Inc. $120.0000 $120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $120.0000 $120.00

705-09.15 BOLT SLED SIDE PANEL

EACH1.000

LU, Inc. $6.0000 $6.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $6.0000 $6.00

705-09.16 BOLT FRONT STOP

EACH1.000

LU, Inc. $3.0000 $3.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3.0000 $3.00

705-09.17 BOLT SHEAR

EACH1.000

LU, Inc. $1.5000 $1.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1.5000 $1.50

705-09.18 BOLT SIDE GUIDE

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-09.19 BOLT TERMINAL BRACE

EACH1.000

LU, Inc. $9.0000 $9.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $9.0000 $9.00

705-09.20 BRACE TERMINAL

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.21 CABLE WIRE ROPE W/ SPELTER SOCKET

EACH1.000

LU, Inc. $1,083.0000 $1,083.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,083.0000 $1,083.00

705-09.22 CLIP WIRE ROPE

EACH1.000

LU, Inc. $34.0000 $34.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $34.0000 $34.00

12PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-09.23 CYLINDER SHOCK ARRESTING

EACH1.000

LU, Inc. $3,143.0000 $3,143.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $3,143.0000 $3,143.00

705-09.24 STRAP CYLINDER

EACH1.000

LU, Inc. $89.0000 $89.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $89.0000 $89.00

705-09.25 FRAME MOBILE #1

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.26 FRAME MOBILE #2

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.27 FRAME MOBILE #3

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.28 FRAME MOBILE #4

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.29 FRAME MOBILE #5

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.30 FRAME MOBILE #6

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.31 GUIDE SIDE

EACH1.000

LU, Inc. $94.0000 $94.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94.0000 $94.00

705-09.32 KEEPER SIDE #1 (SLED PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

13PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-09.33 KEEPER SIDE #2 (SIDE PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.34 KEEPER SIDE #3 (REAR PANEL)

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-09.36 PANEL SIDE

EACH1.000

LU, Inc. $223.0000 $223.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $223.0000 $223.00

705-09.37 PANEL SLED

EACH1.000

LU, Inc. $414.0000 $414.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $414.0000 $414.00

705-09.38 PANEL REAR

EACH1.000

LU, Inc. $206.0000 $206.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $206.0000 $206.00

705-09.39 SHEAVE (PULLEY)

EACH1.000

LU, Inc. $103.0000 $103.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $103.0000 $103.00

705-09.40 SLED

EACH1.000

LU, Inc. $1,917.0000 $1,917.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,917.0000 $1,917.00

705-09.41 TRANSITION JERSEY BARRIER RIGHT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.42 TRANSITION JERSEY BARRIER LEFT

EACH1.000

LU, Inc. $1,263.0000 $1,263.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,263.0000 $1,263.00

705-09.43 TRANSITION 24IN CONCRETE

EACH1.000

LU, Inc. $794.0000 $794.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $794.0000 $794.00

14PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-09.44 BOOT CYLINDER

EACH1.000

LU, Inc. $57.0000 $57.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $57.0000 $57.00

705-14.31 CYLINDER 0.8" CYLINDERS 1 & 2

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.32 CYLINDER 0.9" CYLINDERS 3 & 4

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.33 CYLINDER 1.0" CYLINDERS 5 & 6

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.34 CYLINDER 1.108" CYLINDER 7

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.35 CYLINDER 1.385" CYLINDERS 8 & 9

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-14.36 U-BOLTS (1/2" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.37 U-BOLTS (3/8" X 3")

EACH1.000

LU, Inc. $12.0000 $12.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $12.0000 $12.00

705-14.38 BOX BEAM (8" X 6" X 3/16")

EACH1.000

LU, Inc. $35.0000 $35.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $35.0000 $35.00

705-14.50 CYLINDER RETAINER (1' 3" X 5")

EACH1.000

LU, Inc. $60.0000 $60.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $60.0000 $60.00

15PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-14.51 FRONT ANCHOR PIN (1/4" X 1 1/2" X 3")

EACH1.000

LU, Inc. $23.0000 $23.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $23.0000 $23.00

705-14.53 1/2" GALVANIZED CHAIN WITH HARDWARE

EACH1.000

LU, Inc. $82.0000 $82.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $82.0000 $82.00

705-14.54 POLYVINYL COVER

EACH1.000

LU, Inc. $71.0000 $71.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $71.0000 $71.00

705-14.55 ANCHOR BOLT SET (CONCRETE/ASPHALT)

EACH1.000

LU, Inc. $895.0000 $895.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $895.0000 $895.00

705-14.57 BACKUP SINGLE CABLE-(4 BARREL)

EACH1.000

LU, Inc. $660.0000 $660.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $660.0000 $660.00

705-14.58 BACKUP SINGLE CABLE-(6 BARREL)

EACH1.000

LU, Inc. $840.0000 $840.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $840.0000 $840.00

705-14.59 BACKUP SINGLE CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,050.0000 $1,050.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,050.0000 $1,050.00

705-14.60 CABLE SYSTEM FOR SIDE MOUNT-(4 BARREL)

EACH1.000

LU, Inc. $1,975.0000 $1,975.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,975.0000 $1,975.00

705-14.61 CABLE SYSTEM FOR SIDE MOUNT-(6 BARREL)

EACH1.000

LU, Inc. $2,415.0000 $2,415.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,415.0000 $2,415.00

705-14.62 CABLE SYSTEM FOR SIDE MOUNT-(9 BARREL)

EACH1.000

LU, Inc. $2,690.0000 $2,690.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,690.0000 $2,690.00

16PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-14.63 BOTTOM CABLE-(4 BARREL)

EACH1.000

LU, Inc. $550.0000 $550.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $550.0000 $550.00

705-14.64 BOTTOM CABLE-(6 BARREL)

EACH1.000

LU, Inc. $580.0000 $580.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $580.0000 $580.00

705-14.65 BOTTOM CABLE-(9 BARREL)

EACH1.000

LU, Inc. $1,407.0000 $1,407.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,407.0000 $1,407.00

705-14.66 SIDE MNT ANCHR/CABLE ANCHR CVR PLT

EACH1.000

LU, Inc. $770.0000 $770.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $770.0000 $770.00

705-14.67 PULLOUT BRACKET ASSEMBLY

EACH1.000

LU, Inc. $91.3500 $91.35

Site-Safe Products, LLC d/b/a Site-Safe, LLC $91.3500 $91.35

705-14.68 3IN X 3IN TUBING

EACH1.000

LU, Inc. $72.0000 $72.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $72.0000 $72.00

705-14.69 GALVANIZED STABALIZER BAR

EACH1.000

LU, Inc. $190.0000 $190.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $190.0000 $190.00

705-14.70 TRANSITION PLATE

EACH1.000

LU, Inc. $490.0000 $490.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $490.0000 $490.00

705-14.71 TOP CABLE (OLD UNIT)-(4 BARREL)

EACH1.000

LU, Inc. $560.0000 $560.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $560.0000 $560.00

705-14.72 TOP CABLE (OLD UNIT)-(6 BARREL)

EACH1.000

LU, Inc. $609.0000 $609.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $609.0000 $609.00

17PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-14.73 TOP CABLE (OLD UNIT)-(9 BARREL)

EACH1.000

LU, Inc. $955.0000 $955.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $955.0000 $955.00

705-15.77 BACKUP ASSEMBLY, TENSION STRUT

EACH1.000

LU, Inc. $2,120.0000 $2,120.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,120.0000 $2,120.00

705-15.79 MONORAIL ASSEMBLY, 4-6 BAY

EACH1.000

LU, Inc. $2,850.0000 $2,850.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,850.0000 $2,850.00

705-15.80 MONORAIL ASSEMBLY, 7-9 BAY

EACH1.000

LU, Inc. $2,950.0000 $2,950.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,950.0000 $2,950.00

705-15.82 TRANSITION PANEL, NEW JERSEY BARRIER

EACH1.000

LU, Inc. $638.0000 $638.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $638.0000 $638.00

705-15.83 TRANSITION PANEL, QUAD TO W

EACH1.000

LU, Inc. $930.0000 $930.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $930.0000 $930.00

705-15.84 DIAPHRAGM ASSEMBLY, WIDE

EACH1.000

LU, Inc. $1,260.0000 $1,260.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,260.0000 $1,260.00

705-15.85 BACKUP ASSEMBLY, TENSION STRUT, WIDE

EACH1.000

LU, Inc. $2,425.0000 $2,425.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,425.0000 $2,425.00

705-15.87 BACKUP ASSEMBLY, CONCRETE

C.Y.1.000

LU, Inc. $1,230.0000 $1,230.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,230.0000 $1,230.00

705-15.88 END SHOE, CONCRETE

C.Y.1.000

LU, Inc. $370.0000 $370.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $370.0000 $370.00

18PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-15.89 BACKUP ASSEMBLY, CONCRETE, WIDE

C.Y.1.000

LU, Inc. $1,423.0000 $1,423.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,423.0000 $1,423.00

705-15.90 EXTENSION PANEL

EACH1.000

LU, Inc. $330.0000 $330.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $330.0000 $330.00

705-15.91 PIVOT SUPPORT BRACKET

EACH1.000

LU, Inc. $85.0000 $85.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $85.0000 $85.00

705-17.18 CBL 3/4 X 6FT6IN /DLB SWG/NOHWI

EACH1.000

LU, Inc. $113.5000 $113.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $113.5000 $113.50

705-17.19 CBL 3/4 X 19FT7IN /SNG SWG

EACH1.000

LU, Inc. $209.0000 $209.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $209.0000 $209.00

705-17.20 DIAPHRAGM #1

EACH1.000

LU, Inc. $456.0000 $456.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $456.0000 $456.00

705-17.21 DIAPHRAGM #2

EACH1.000

LU, Inc. $505.7500 $505.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $505.7500 $505.75

705-17.23 DIAPHRAGM #10

EACH1.000

LU, Inc. $352.7500 $352.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $352.7500 $352.75

705-17.25 HDPE FRONT PANEL

EACH1.000

LU, Inc. $977.5000 $977.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $977.5000 $977.50

705-17.26 HDPE MIDDLE PANEL

EACH1.000

LU, Inc. $980.0000 $980.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $980.0000 $980.00

19PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-17.27 HDPE REAR PANEL

EACH1.000

LU, Inc. $985.0000 $985.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $985.0000 $985.00

705-17.28 COMPLETE BASE UNIT

EACH1.000

LU, Inc. $2,195.0000 $2,195.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $2,195.0000 $2,195.00

705-17.29 PLATE WASHER 5/16IN X 2IN X 1FT2IN

EACH1.000

LU, Inc. $20.0000 $20.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $20.0000 $20.00

705-17.30 BACK-UP POST

EACH1.000

LU, Inc. $952.0000 $952.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $952.0000 $952.00

705-17.31 FRONT BASEPLATE / POST ASSEMBLY

EACH1.000

LU, Inc. $539.7500 $539.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $539.7500 $539.75

705-17.36 TRANSITION TO SAFETY SHAPE

EACH1.000

LU, Inc. $1,349.0000 $1,349.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $1,349.0000 $1,349.00

705-17.37 TRANSITION TO BARRIER WALL (END CAP)

EACH1.000

LU, Inc. $701.2500 $701.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $701.2500 $701.25

705-17.40 WIDETRACC LONG WING POST

EACH1.000

LU, Inc. $374.0000 $374.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $374.0000 $374.00

705-17.41 WIDETRACC SHORT WING POST

EACH1.000

LU, Inc. $306.0000 $306.00

Site-Safe Products, LLC d/b/a Site-Safe, LLC $306.0000 $306.00

705-17.42 WIDETRACC EXT CHANNEL

EACH1.000

LU, Inc. $743.7500 $743.75

Site-Safe Products, LLC d/b/a Site-Safe, LLC $743.7500 $743.75

20PAGE

EXTENSION

CONTRACT CNT127

UNIT PRICE

705-17.43 WIDETRACC PANEL

EACH1.000

LU, Inc. $348.5000 $348.50

Site-Safe Products, LLC d/b/a Site-Safe, LLC $348.5000 $348.50

705-17.90 HEART REPAIR DPHM-L WR BKT

EACH1.000

LU, Inc. $102.8500 $102.85

Site-Safe Products, LLC d/b/a Site-Safe, LLC $102.8500 $102.85

705-17.91 HEART CRS-RPR DPH 3-9

EACH1.000

LU, Inc. $412.2500 $412.25

Site-Safe Products, LLC d/b/a Site-Safe, LLC $412.2500 $412.25

21PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

LU, Inc. $299,796.11

Site-Safe Products, LLC d/b/a Site-Safe, LLC $324,480.03

SUB-TOTAL MAINTENANCE (CONTINGENCY)

LU, Inc. $94,444.30

Site-Safe Products, LLC d/b/a Site-Safe, LLC $94,444.30

LU, Inc. $394,240.41

Site-Safe Products, LLC d/b/a Site-Safe, LLC $418,924.33

22PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

DYER COUNTY (Contract No. CNT094 Call 025)

8.50%DBE GOAL

THE MISCELLANEOUS SAFETY IMPROVEMENTS ON VARIOUS LOCAL ROADS.

PROJECT LENGTH -

HSIP-2300(43),23945-3477-94

8.870 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Superior Traffic Control, LLC $285,477.90

1PAGE

EXTENSION

CONTRACT CNT094

UNIT PRICE

ROADWAY CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.216.000

Superior Traffic Control, LLC $115.0000 $24,840.00

705-01.04 METAL BEAM GUARD FENCE

L.F.250.000

Superior Traffic Control, LLC $65.0000 $16,250.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH16.000

Superior Traffic Control, LLC $1,200.0000 $19,200.00

705-04.21 GUARDRAIL DELINEATION ENHANCEMENT

L.F.1,346.000

Superior Traffic Control, LLC $3.7500 $5,047.50

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.126.000

Superior Traffic Control, LLC $24.5000 $3,087.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH16.000

Superior Traffic Control, LLC $3,325.0000 $53,200.00

712-01 TRAFFIC CONTROL

LS1.000

Superior Traffic Control, LLC $9,500.0000 $9,500.00

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.702.000

Superior Traffic Control, LLC $6.5000 $4,563.00

713-11.01 "U" SECTION STEEL POSTS

LB.735.000

Superior Traffic Control, LLC $3.8000 $2,793.00

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.2,279.000

Superior Traffic Control, LLC $3.6000 $8,204.40

713-11.21 P POST SLIP BASE

EACH8.000

Superior Traffic Control, LLC $365.0000 $2,920.00

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.218.000

Superior Traffic Control, LLC $13.5000 $2,943.00

2PAGE

EXTENSION

CONTRACT CNT094

UNIT PRICE

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.395.000

Superior Traffic Control, LLC $14.5000 $5,727.50

713-15.36 REMOVE SIGN, SUPPORT & FOOTING

EACH32.000

Superior Traffic Control, LLC $20.0000 $640.00

713-16.06 DEAD END SIGN AND SUPPORT

EACH1.000

Superior Traffic Control, LLC $225.0000 $225.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.41.000

Superior Traffic Control, LLC $32.0000 $1,312.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.280.000

Superior Traffic Control, LLC $16.5000 $4,620.00

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.11.000

Superior Traffic Control, LLC $43.0000 $473.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.35.000

Superior Traffic Control, LLC $2,960.0000 $103,600.00

716-13.04 SPRAY THERMO PVMT MRKNG (60 mil) (4IN DOTTED LINE)

L.F.1,533.000

Superior Traffic Control, LLC $2.5000 $3,832.50

717-01 MOBILIZATION

LS1.000

Superior Traffic Control, LLC $12,500.0000 $12,500.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Superior Traffic Control, LLC $285,477.90

Superior Traffic Control, LLC $285,477.90

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

DYER COUNTY (Contract No. CNT081 Call 026)

4.50%DBE GOAL

THE RESURFACING WITH HOT IN-PLACE RECYCLING ON U.S. 412 (SR. 20) FROM U.S. 51 (S.R. 3) (L.M. 0.00) TO THE CROCKETT COUNTYLINE (L.M. 12.36).

PROJECT LENGTH -

NH/HSIP-20(73),23009-3209-94,23009-8209-14,STP-NH/HSIP-20(69),23083-3223-94,23083-8223-14

12.360 MILES

COMPLETION TIME - ON OR BEFORE DECEMBER 15, 2019

TOTAL CONTRACT

Ford Construction Company $9,294,337.41

1PAGE

EXTENSION

CONTRACT CNT081

UNIT PRICE

ROADWAY CATEGORY

202-03.01 REMOVAL OF ASPHALT PAVEMENT

S.Y.19,088.000

Ford Construction Company $33.8700 $646,510.56

203-06 WATER

M.G.143.000

Ford Construction Company $1.0000 $143.00

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.42.357

Ford Construction Company $1,112.0000 $47,100.98

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (C OR D)

TON19,078.000

Ford Construction Company $39.0000 $744,042.00

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON6,586.000

Ford Construction Company $134.0000 $882,524.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON2,157.000

Ford Construction Company $159.0000 $342,963.00

311-03.04 HOT IN PLACE RECYCLING OF ASPHALT PAVEMENT (2.00IN)

S.Y.305,418.000

Ford Construction Company $3.8600 $1,178,913.48

311-03.10 Asphalt Rejuvenating Agent

GAL.167,980.000

Ford Construction Company $3.8000 $638,324.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON197.000

Ford Construction Company $410.0000 $80,770.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON3,260.000

Ford Construction Company $134.1000 $437,166.00

411-03.13 ACS MIX(PG70-22) THIN LIFT D ASPHALT

TON20,893.104

Ford Construction Company $111.1000 $2,321,223.85

411-03.24 ACS MIX(PG64-22) THIN LIFT E ASPHALT

TON5,740.784

Ford Construction Company $107.2500 $615,699.08

2PAGE

EXTENSION

CONTRACT CNT081

UNIT PRICE

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.21.270

Ford Construction Company $706.0000 $15,016.62

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.16.890

Ford Construction Company $721.0000 $12,177.69

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.49,215.000

Ford Construction Company $2.8500 $140,262.75

502-08.03 SEALING SHOULDER JOINTS

L.F.51,148.000

Ford Construction Company $1.8000 $92,066.40

607-37.02 18" CORRUGATED METAL PIPE CULVERT

L.F.196.000

Ford Construction Company $30.0000 $5,880.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH10.000

Ford Construction Company $1,285.0000 $12,850.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH19.000

Ford Construction Company $3,230.0000 $61,370.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH3.000

Ford Construction Company $3,045.0000 $9,135.00

712-01 TRAFFIC CONTROL

LS1.000

Ford Construction Company $142,000.0000 $142,000.00

712-06 SIGNS (CONSTRUCTION)

S.F.4,900.000

Ford Construction Company $8.0000 $39,200.00

712-08.03 ARROW BOARD (TYPE C)

EACH6.000

Ford Construction Company $625.0000 $3,750.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH65.000

Ford Construction Company $40.0000 $2,600.00

3PAGE

EXTENSION

CONTRACT CNT081

UNIT PRICE

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH1,829.000

Ford Construction Company $40.0000 $73,160.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH1,894.000

Ford Construction Company $16.0000 $30,304.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.810.000

Ford Construction Company $23.0000 $18,630.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.270.000

Ford Construction Company $16.0000 $4,320.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH17.000

Ford Construction Company $210.0000 $3,570.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.71.320

Ford Construction Company $1,365.0000 $97,351.80

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.60.120

Ford Construction Company $5,775.0000 $347,193.00

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.8,956.000

Ford Construction Company $2.9500 $26,420.20

717-01 MOBILIZATION

LS1.000

Ford Construction Company $221,700.0000 $221,700.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Ford Construction Company $9,294,337.41

Ford Construction Company $9,294,337.41

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

COUNTIES FAYETTE, LAUDERDALE, SHELBY, AND TIPTON (Contract No. CNT116 Call 027)

THE ON-CALL GUARDRAIL REPAIR AND NEW GUARDRAIL INSTALLATION ON VARIOUS INTERSTATE AND STATE ROUTES.

PROJECT LENGTH -

98400-4114-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2020

TOTAL CONTRACT

F8th Construction Company, LLC $998,888.00

Tri-State Guardrail & Sign Co., Inc. $1,109,276.00

1PAGE

EXTENSION

CONTRACT CNT116

UNIT PRICE

MAINTENANCE CATEGORY

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.80.000

F8th Construction Company, LLC $30.0000 $2,400.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $2,800.00

705-01.02 GUARDRAIL AT BRIDGE PIERS

L.F.12.000

F8th Construction Company, LLC $30.0000 $360.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $420.00

705-01.04 METAL BEAM GUARD FENCE

L.F.57.000

F8th Construction Company, LLC $30.0000 $1,710.00

Tri-State Guardrail & Sign Co., Inc. $25.0000 $1,425.00

705-02.01 SINGLE GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.75.000

F8th Construction Company, LLC $14.0000 $1,050.00

Tri-State Guardrail & Sign Co., Inc. $20.0000 $1,500.00

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.7,500.000

F8th Construction Company, LLC $15.0000 $112,500.00

Tri-State Guardrail & Sign Co., Inc. $17.0000 $127,500.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH500.000

F8th Construction Company, LLC $20.0000 $10,000.00

Tri-State Guardrail & Sign Co., Inc. $25.0000 $12,500.00

705-02.20 SINGLE GUARDRAIL (TYPE 2) LONG POST (6 FT-9 FT)

L.F.2,338.000

F8th Construction Company, LLC $14.0000 $32,732.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $37,408.00

705-02.25 SINGLE GUARDRAIL (TYPE 2) LONG POST (9 FT-12 FT)

L.F.2,100.000

F8th Construction Company, LLC $14.0000 $29,400.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $33,600.00

705-03.01 MEDIAN DIVIDER GUARDRAIL, WITH RUB-RAIL (TYPE 2)

L.F.13.000

F8th Construction Company, LLC $14.0000 $182.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $208.00

705-03.02 MEDIAN DIVIDER GUARDRAIL (TYPE 2)

L.F.75.000

F8th Construction Company, LLC $14.0000 $1,050.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $1,200.00

2PAGE

EXTENSION

CONTRACT CNT116

UNIT PRICE

705-03.03 MEDIAN DIVIDER GUARDRAIL (TYPE 2) (27" MT HT)

L.F.25.000

F8th Construction Company, LLC $14.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $400.00

705-03.04 MEDIAN DIVIDER GUARDRAIL AT CONCRETE BARRIER

L.F.25.000

F8th Construction Company, LLC $14.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $16.0000 $400.00

705-04.02 GUARDRAIL TERMINAL (TYPE 12)

EACH2.000

F8th Construction Company, LLC $100.0000 $200.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $500.00

705-04.03 GUARDRAIL TERMINAL (TYPE 13)

EACH6.000

F8th Construction Company, LLC $250.0000 $1,500.00

Tri-State Guardrail & Sign Co., Inc. $150.0000 $900.00

705-04.05 GUARDRAIL TERMINAL (TYPE-IN-LINE)

EACH5.000

F8th Construction Company, LLC $200.0000 $1,000.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $1,250.00

705-04.11 STONE FOR GUARDRAIL END TERMINAL PAD

TON1,400.000

F8th Construction Company, LLC $2.0000 $2,800.00

Tri-State Guardrail & Sign Co., Inc. $2.0000 $2,800.00

705-04.24 GUARDRAIL END TERMINAL DELINEATION SHEETING

S.F.200.000

F8th Construction Company, LLC $1.0000 $200.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $2,400.00

705-04.29 C-A-T CRASH CUSHION ATTENUATING TERMINAL

EACH2.000

F8th Construction Company, LLC $1,001.5000 $2,003.00

Tri-State Guardrail & Sign Co., Inc. $1,000.0000 $2,000.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.5,000.000

F8th Construction Company, LLC $22.0000 $110,000.00

Tri-State Guardrail & Sign Co., Inc. $23.0000 $115,000.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH5.000

F8th Construction Company, LLC $800.0000 $4,000.00

Tri-State Guardrail & Sign Co., Inc. $900.0000 $4,500.00

3PAGE

EXTENSION

CONTRACT CNT116

UNIT PRICE

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH5.000

F8th Construction Company, LLC $420.0000 $2,100.00

Tri-State Guardrail & Sign Co., Inc. $350.0000 $1,750.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH250.000

F8th Construction Company, LLC $1,800.0000 $450,000.00

Tri-State Guardrail & Sign Co., Inc. $2,500.0000 $625,000.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH5.000

F8th Construction Company, LLC $1,250.0000 $6,250.00

Tri-State Guardrail & Sign Co., Inc. $1,600.0000 $8,000.00

705-10.30 GUARDRAIL ATTACHMENT TO SLOPE FACE ENDPOST

L.F.45.000

F8th Construction Company, LLC $38.0000 $1,710.00

Tri-State Guardrail & Sign Co., Inc. $38.0000 $1,710.00

705-10.31 GUARDRAIL ATTACHMENT TO VERTICAL FACE ENDPOST

L.F.9.000

F8th Construction Company, LLC $38.0000 $342.00

Tri-State Guardrail & Sign Co., Inc. $38.0000 $342.00

705-10.32 GUARDRAIL ATTACHMENT TO EXISTING BRIDGE PIER PROTECTION

EACH2.000

F8th Construction Company, LLC $38.0000 $76.00

Tri-State Guardrail & Sign Co., Inc. $250.0000 $500.00

706-01 GUARDRAIL REMOVED

L.F.350.000

F8th Construction Company, LLC $1.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $350.00

706-02.21 RESET SINGLE GUARDRAIL (TYPE 2)

L.F.350.000

F8th Construction Company, LLC $1.0000 $350.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $350.00

706-03.01 POSTS FURNISHED

EACH9.000

F8th Construction Company, LLC $30.0000 $270.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $315.00

706-06.01 SINGLE THRIE RAIL (TYPE 2)

L.F.25.000

F8th Construction Company, LLC $20.0000 $500.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $450.00

4PAGE

EXTENSION

CONTRACT CNT116

UNIT PRICE

706-06.02 MEDIAN DIVIDER THRIE RAIL (TYPE 2)

L.F.25.000

F8th Construction Company, LLC $20.0000 $500.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $450.00

706-06.03 RADIUS RAIL

L.F.175.000

F8th Construction Company, LLC $20.0000 $3,500.00

Tri-State Guardrail & Sign Co., Inc. $30.0000 $5,250.00

706-06.05 RADIUS RAIL LONG POST (6-9 FT)

L.F.38.000

F8th Construction Company, LLC $18.0000 $684.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $684.00

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.38.000

F8th Construction Company, LLC $18.0000 $684.00

Tri-State Guardrail & Sign Co., Inc. $18.0000 $684.00

706-10.26 ROUNDED END ELEMENT

EACH12.000

F8th Construction Company, LLC $25.0000 $300.00

Tri-State Guardrail & Sign Co., Inc. $35.0000 $420.00

706-10.54 RE-ALIGN GUARDRAIL

L.F.1,050.000

F8th Construction Company, LLC $1.0000 $1,050.00

Tri-State Guardrail & Sign Co., Inc. $1.0000 $1,050.00

706-10.71 HAZARD MARKERS

EACH3.000

F8th Construction Company, LLC $10.0000 $30.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $36.00

706-10.72 PULL AND REINSTALL GUARDARAIL POST FOR VERIFICATION

EACH3.000

F8th Construction Company, LLC $10.0000 $30.00

Tri-State Guardrail & Sign Co., Inc. $33.0000 $99.00

706-10.74 CONCRETE BARRIER WALL REPAIR

C.Y.3.000

F8th Construction Company, LLC $5,000.0000 $15,000.00

Tri-State Guardrail & Sign Co., Inc. $1,000.0000 $3,000.00

706-10.80 MICHIGAN AND MODIFIED MICHIGAN END SHOE

EACH3.000

F8th Construction Company, LLC $25.0000 $75.00

Tri-State Guardrail & Sign Co., Inc. $55.0000 $165.00

5PAGE

EXTENSION

CONTRACT CNT116

UNIT PRICE

706-10.81 GUARDRAIL REFLECTORS

EACH30.000

F8th Construction Company, LLC $10.0000 $300.00

Tri-State Guardrail & Sign Co., Inc. $12.0000 $360.00

706-10.82 CONCRETE BRIDGE END OR PIER PROTECTION REPAIR

C.Y.2.000

F8th Construction Company, LLC $500.0000 $1,000.00

Tri-State Guardrail & Sign Co., Inc. $750.0000 $1,500.00

706-10.83 DRILL BR. PAR. WALL FOR MICHIGAN END SHOE

EACH2.000

F8th Construction Company, LLC $100.0000 $200.00

Tri-State Guardrail & Sign Co., Inc. $100.0000 $200.00

712-01.02 LANE CLOSURE

EACH160.000

F8th Construction Company, LLC $850.0000 $136,000.00

Tri-State Guardrail & Sign Co., Inc. $300.0000 $48,000.00

712-08.20 TRUCK MOUNTED ATTENUATOR W/MSSAGE BOARD

DAY75.000

F8th Construction Company, LLC $500.0000 $37,500.00

Tri-State Guardrail & Sign Co., Inc. $650.0000 $48,750.00

717-01 MOBILIZATION

LS1.000

F8th Construction Company, LLC $25,000.0000 $25,000.00

Tri-State Guardrail & Sign Co., Inc. $4,000.0000 $4,000.00

717-01.04 MOBILIZATION (EMERGENCY CALL-OUT)

EACH13.000

F8th Construction Company, LLC $100.0000 $1,300.00

Tri-State Guardrail & Sign Co., Inc. $550.0000 $7,150.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL MAINTENANCE

F8th Construction Company, LLC $998,888.00

Tri-State Guardrail & Sign Co., Inc. $1,109,276.00

F8th Construction Company, LLC $998,888.00

Tri-State Guardrail & Sign Co., Inc. $1,109,276.00

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

FENTRESS COUNTY (Contract No. CNT095 Call 028)

THE REPAIR OF THE BRIDGE ON U.S. 127 (S.R. 28) OVER THE WOLF RIVER (L.M. 29.40).

PROJECT LENGTH -

25043-4213-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE AUGUST 31, 2019

TOTAL CONTRACT

Jamison Construction, LLC $151,119.00

Mid-State Construction Company, Inc. $176,876.88

Twin K Construction, Inc. $198,989.98

Southern Constructors, Inc. $242,167.00

1PAGE

EXTENSION

CONTRACT CNT095

UNIT PRICE

BRIDGE CATEGORY

602-10.51 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,596.0000 $2,596.00

Mid-State Construction Company, Inc. $1,641.7400 $1,641.74

Twin K Construction, Inc. $6,139.8800 $6,139.88

Southern Constructors, Inc. $6,000.0000 $6,000.00

602-10.52 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,591.0000 $2,591.00

Mid-State Construction Company, Inc. $1,634.4500 $1,634.45

Twin K Construction, Inc. $5,510.6400 $5,510.64

Southern Constructors, Inc. $6,000.0000 $6,000.00

602-10.53 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,572.0000 $2,572.00

Mid-State Construction Company, Inc. $1,609.6200 $1,609.62

Twin K Construction, Inc. $5,495.5000 $5,495.50

Southern Constructors, Inc. $5,500.0000 $5,500.00

602-10.54 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,709.0000 $2,709.00

Mid-State Construction Company, Inc. $1,792.1200 $1,792.12

Twin K Construction, Inc. $5,495.5000 $5,495.50

Southern Constructors, Inc. $5,500.0000 $5,500.00

602-10.55 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,936.0000 $2,936.00

Mid-State Construction Company, Inc. $2,094.3300 $2,094.33

Twin K Construction, Inc. $5,979.8000 $5,979.80

Southern Constructors, Inc. $8,500.0000 $8,500.00

602-10.56 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $2,674.0000 $2,674.00

Mid-State Construction Company, Inc. $1,745.4100 $1,745.41

Twin K Construction, Inc. $5,979.8000 $5,979.80

Southern Constructors, Inc. $8,500.0000 $8,500.00

602-10.57 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $8,799.0000 $8,799.00

Mid-State Construction Company, Inc. $18,015.0500 $18,015.05

Twin K Construction, Inc. $26,000.0000 $26,000.00

Southern Constructors, Inc. $50,000.0000 $50,000.00

2PAGE

EXTENSION

CONTRACT CNT095

UNIT PRICE

602-10.58 STRUCTURAL STEEL REPAIR(DESCRIPTION)

EACH1.000

Jamison Construction, LLC $3,122.0000 $3,122.00

Mid-State Construction Company, Inc. $2,342.5300 $2,342.53

Twin K Construction, Inc. $6,005.0200 $6,005.02

Southern Constructors, Inc. $11,000.0000 $11,000.00

603-02.20 SPOT PAINTING EXISTING STEEL STRUCTURES

S.F.69.000

Jamison Construction, LLC $60.0000 $4,140.00

Mid-State Construction Company, Inc. $133.3300 $9,199.77

Twin K Construction, Inc. $174.0000 $12,006.00

Southern Constructors, Inc. $150.0000 $10,350.00

603-05.20 CONTAINMENT & DISPOSAL OF WASTE(BR. 25-SR028-29.40)

LS1.000

Jamison Construction, LLC $3,500.0000 $3,500.00

Mid-State Construction Company, Inc. $6,666.5000 $6,666.50

Twin K Construction, Inc. $12,452.5200 $12,452.52

Southern Constructors, Inc. $8,000.0000 $8,000.00

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH2.000

Jamison Construction, LLC $2,800.0000 $5,600.00

Mid-State Construction Company, Inc. $4,999.8800 $9,999.76

Twin K Construction, Inc. $0.5000 $1.00

Southern Constructors, Inc. $5,000.0000 $10,000.00

712-01 TRAFFIC CONTROL

LS1.000

Jamison Construction, LLC $21,600.0000 $21,600.00

Mid-State Construction Company, Inc. $19,006.9900 $19,006.99

Twin K Construction, Inc. $41,000.0000 $41,000.00

Southern Constructors, Inc. $24,000.0000 $24,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.400.000

Jamison Construction, LLC $16.0000 $6,400.00

Mid-State Construction Company, Inc. $31.7300 $12,692.00

Twin K Construction, Inc. $0.0500 $20.00

Southern Constructors, Inc. $30.0000 $12,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH28.000

Jamison Construction, LLC $40.0000 $1,120.00

Mid-State Construction Company, Inc. $40.0000 $1,120.00

Twin K Construction, Inc. $61.0300 $1,708.84

Southern Constructors, Inc. $35.0000 $980.00

3PAGE

EXTENSION

CONTRACT CNT095

UNIT PRICE

712-04.50 BARRIER RAIL DELINEATOR

EACH20.000

Jamison Construction, LLC $16.0000 $320.00

Mid-State Construction Company, Inc. $26.6700 $533.40

Twin K Construction, Inc. $0.0500 $1.00

Southern Constructors, Inc. $20.0000 $400.00

712-06 SIGNS (CONSTRUCTION)

S.F.427.000

Jamison Construction, LLC $10.0000 $4,270.00

Mid-State Construction Company, Inc. $11.6700 $4,983.09

Twin K Construction, Inc. $7.4900 $3,198.23

Southern Constructors, Inc. $15.0000 $6,405.00

712-09.01 REMOVABLE PAVEMENT MARKING LINE

L.F.4,000.000

Jamison Construction, LLC $3.0000 $12,000.00

Mid-State Construction Company, Inc. $2.6700 $10,680.00

Twin K Construction, Inc. $0.0100 $40.00

Southern Constructors, Inc. $3.5000 $14,000.00

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.1,518.000

Jamison Construction, LLC $4.0000 $6,072.00

Mid-State Construction Company, Inc. $4.3300 $6,572.94

Twin K Construction, Inc. $0.0100 $15.18

Southern Constructors, Inc. $4.0000 $6,072.00

712-09.04 REMOVABLE PAVEMENT MARKING (STOP LINE)

L.F.54.000

Jamison Construction, LLC $20.0000 $1,080.00

Mid-State Construction Company, Inc. $26.6700 $1,440.18

Twin K Construction, Inc. $0.0100 $0.54

Southern Constructors, Inc. $20.0000 $1,080.00

712-09.20 TEMPORARY PLASTIC PAVEMENT MARKING(NOISE STRIP)

L.F.48.000

Jamison Construction, LLC $16.0000 $768.00

Mid-State Construction Company, Inc. $13.3300 $639.84

Twin K Construction, Inc. $0.0100 $0.48

Southern Constructors, Inc. $60.0000 $2,880.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.1.000

Jamison Construction, LLC $6,250.0000 $6,250.00

Mid-State Construction Company, Inc. $8,266.4600 $8,266.46

Twin K Construction, Inc. $5,939.0500 $5,939.05

Southern Constructors, Inc. $8,000.0000 $8,000.00

4PAGE

EXTENSION

CONTRACT CNT095

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Jamison Construction, LLC $30,000.0000 $30,000.00

Mid-State Construction Company, Inc. $26,868.0500 $26,868.05

Twin K Construction, Inc. $56,000.0000 $56,000.00

Southern Constructors, Inc. $12,000.0000 $12,000.00

730-40 TEMPORARY TRAFFIC SIGNAL SYSTEM

EACH1.000

Jamison Construction, LLC $20,000.0000 $20,000.00

Mid-State Construction Company, Inc. $27,332.6500 $27,332.65

Twin K Construction, Inc. $1.0000 $1.00

Southern Constructors, Inc. $25,000.0000 $25,000.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL BRIDGE

Jamison Construction, LLC $151,119.00

Mid-State Construction Company, Inc. $176,876.88

Twin K Construction, Inc. $198,989.98

Southern Constructors, Inc. $242,167.00

Jamison Construction, LLC $151,119.00

Mid-State Construction Company, Inc. $176,876.88

Twin K Construction, Inc. $198,989.98

Southern Constructors, Inc. $242,167.00

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

GIBSON COUNTY (Contract No. CNT008 Call 029)

4.00%DBE GOAL

THE ADDITION OF TURN LANES ON U.S. 45W (S.R. 5) FOR A S.I.A. ROUTE SERVING ANDERSON GRAIN GROUP, INCLUDING GRADING,DRAINAGE AND PAVING (L.M. 7.66 – L.M. 8.175).

PROJECT LENGTH -

NH-5(104),27001-3242-14

0.500 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Delta Contracting Company, LLC $1,408,442.91

J. M. Duncan, INC. $1,932,078.92

1PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Delta Contracting Company, LLC $9,000.0000 $9,000.00

J. M. Duncan, INC. $35,000.0000 $35,000.00

201-01 CLEARING AND GRUBBING

LS1.000

Delta Contracting Company, LLC $53,700.0000 $53,700.00

J. M. Duncan, INC. $20,000.0000 $20,000.00

202-02.01 REMOVAL OF PIPE (18" ,STA. 108+25.47 & 64+19.84 & 104+53.85)

L.F.116.000

Delta Contracting Company, LLC $13.0000 $1,508.00

J. M. Duncan, INC. $50.0000 $5,800.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.10,572.000

Delta Contracting Company, LLC $7.0000 $74,004.00

J. M. Duncan, INC. $20.0000 $211,440.00

203-04 PLACING AND SPREADING TOPSOIL

C.Y.430.000

Delta Contracting Company, LLC $7.0000 $3,010.00

J. M. Duncan, INC. $25.0000 $10,750.00

203-06 WATER

M.G.46.000

Delta Contracting Company, LLC $12.0000 $552.00

J. M. Duncan, INC. $55.0000 $2,530.00

204-08.01 BACKFILL MATERIAL (FLOWABLE FILL)

C.Y.7.000

Delta Contracting Company, LLC $190.0000 $1,330.00

J. M. Duncan, INC. $300.0000 $2,100.00

209-05 SEDIMENT REMOVAL

C.Y.46.000

Delta Contracting Company, LLC $10.0000 $460.00

J. M. Duncan, INC. $65.0000 $2,990.00

209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING)

L.F.1,400.000

Delta Contracting Company, LLC $3.0000 $4,200.00

J. M. Duncan, INC. $3.5000 $4,900.00

209-08.07 ROCK CHECK DAM PER

EACH1.000

Delta Contracting Company, LLC $1,100.0000 $1,100.00

J. M. Duncan, INC. $2,000.0000 $2,000.00

2PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

209-08.08 ENHANCED ROCK CHECK DAM

EACH4.000

Delta Contracting Company, LLC $1,400.0000 $5,600.00

J. M. Duncan, INC. $2,500.0000 $10,000.00

209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIMUM)

S.Y.400.000

Delta Contracting Company, LLC $6.0000 $2,400.00

J. M. Duncan, INC. $3.0000 $1,200.00

209-40.33 CATCH BASIN PROTECTION (TYPE D)

EACH2.000

Delta Contracting Company, LLC $500.0000 $1,000.00

J. M. Duncan, INC. $250.0000 $500.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON6,084.000

Delta Contracting Company, LLC $31.5000 $191,646.00

J. M. Duncan, INC. $50.0000 $304,200.00

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (C OR D)

TON200.000

Delta Contracting Company, LLC $32.0000 $6,400.00

J. M. Duncan, INC. $60.0000 $12,000.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON151.000

Delta Contracting Company, LLC $121.0000 $18,271.00

J. M. Duncan, INC. $140.0000 $21,140.00

307-01.21 ASP. CONC. MIX(PG70-22) (BPMB-HM) GR. A-S

TON108.000

Delta Contracting Company, LLC $129.0000 $13,932.00

J. M. Duncan, INC. $150.0000 $16,200.00

307-02.01 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING A

TON2,089.000

Delta Contracting Company, LLC $114.0000 $238,146.00

J. M. Duncan, INC. $130.0000 $271,570.00

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON834.000

Delta Contracting Company, LLC $118.0000 $98,412.00

J. M. Duncan, INC. $135.0000 $112,590.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON13.000

Delta Contracting Company, LLC $1,040.0000 $13,520.00

J. M. Duncan, INC. $1,200.0000 $15,600.00

3PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON50.000

Delta Contracting Company, LLC $60.0000 $3,000.00

J. M. Duncan, INC. $70.0000 $3,500.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON16.000

Delta Contracting Company, LLC $840.0000 $13,440.00

J. M. Duncan, INC. $960.0000 $15,360.00

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON378.000

Delta Contracting Company, LLC $131.0000 $49,518.00

J. M. Duncan, INC. $150.0000 $56,700.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON118.000

Delta Contracting Company, LLC $133.0000 $15,694.00

J. M. Duncan, INC. $152.0000 $17,936.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON1,605.000

Delta Contracting Company, LLC $124.0000 $199,020.00

J. M. Duncan, INC. $142.0000 $227,910.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.0.415

Delta Contracting Company, LLC $3,090.0000 $1,282.35

J. M. Duncan, INC. $2,400.0000 $996.00

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.0.779

Delta Contracting Company, LLC $3,090.0000 $2,407.11

J. M. Duncan, INC. $2,400.0000 $1,869.60

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.24,140.000

Delta Contracting Company, LLC $3.9800 $96,077.20

J. M. Duncan, INC. $4.6000 $111,044.00

604-36 SCARIFYING

S.Y.546.000

Delta Contracting Company, LLC $9.0000 $4,914.00

J. M. Duncan, INC. $12.0000 $6,552.00

607-03.30 18" PIPE CULVERT

L.F.169.000

Delta Contracting Company, LLC $48.0000 $8,112.00

J. M. Duncan, INC. $85.0000 $14,365.00

4PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

611-07.73 18IN ENDWALL (MEDIAN DRAIN)

EACH2.000

Delta Contracting Company, LLC $5,775.0000 $11,550.00

J. M. Duncan, INC. $5,500.0000 $11,000.00

611-38.02 CATCH BASINS, TYPE 38, > 4' - 8' DEPTH

EACH1.000

Delta Contracting Company, LLC $5,000.0000 $5,000.00

J. M. Duncan, INC. $5,000.0000 $5,000.00

621-03.02 18" TEMPORARY DRAINAGE PIPE

L.F.54.000

Delta Contracting Company, LLC $48.0000 $2,592.00

J. M. Duncan, INC. $65.0000 $3,510.00

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH2.000

Delta Contracting Company, LLC $1,000.0000 $2,000.00

J. M. Duncan, INC. $7,500.0000 $15,000.00

708-02.01 MARKERS (CONCRETE R.O.W. POSTS)

EACH8.000

Delta Contracting Company, LLC $170.0000 $1,360.00

J. M. Duncan, INC. $250.0000 $2,000.00

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON150.000

Delta Contracting Company, LLC $37.0000 $5,550.00

J. M. Duncan, INC. $65.0000 $9,750.00

710-02 AGGREGATE UNDERDRAINS (WITH PIPE)

L.F.420.000

Delta Contracting Company, LLC $15.0000 $6,300.00

J. M. Duncan, INC. $15.0000 $6,300.00

712-01 TRAFFIC CONTROL

LS1.000

Delta Contracting Company, LLC $48,965.0000 $48,965.00

J. M. Duncan, INC. $70,000.0000 $70,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.300.000

Delta Contracting Company, LLC $5.0000 $1,500.00

J. M. Duncan, INC. $35.0000 $10,500.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH258.000

Delta Contracting Company, LLC $22.0000 $5,676.00

J. M. Duncan, INC. $25.2000 $6,501.60

5PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

712-05.01 WARNING LIGHTS (TYPE A)

EACH40.000

Delta Contracting Company, LLC $15.0000 $600.00

J. M. Duncan, INC. $17.2000 $688.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,025.000

Delta Contracting Company, LLC $5.5000 $5,637.50

J. M. Duncan, INC. $6.3000 $6,457.50

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.180.000

Delta Contracting Company, LLC $10.0000 $1,800.00

J. M. Duncan, INC. $11.5000 $2,070.00

712-08.03 ARROW BOARD (TYPE C)

EACH4.000

Delta Contracting Company, LLC $695.0000 $2,780.00

J. M. Duncan, INC. $800.0000 $3,200.00

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.4,590.000

Delta Contracting Company, LLC $3.9000 $17,901.00

J. M. Duncan, INC. $4.5000 $20,655.00

713-02.26 CONCRETE BARRIER/PARAPET DELINEATOR

EACH30.000

Delta Contracting Company, LLC $8.0000 $240.00

J. M. Duncan, INC. $13.7500 $412.50

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.1,163.000

Delta Contracting Company, LLC $4.5000 $5,233.50

J. M. Duncan, INC. $5.1500 $5,989.45

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.220.000

Delta Contracting Company, LLC $14.5000 $3,190.00

J. M. Duncan, INC. $16.6000 $3,652.00

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Delta Contracting Company, LLC $100.0000 $100.00

J. M. Duncan, INC. $115.0000 $115.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Delta Contracting Company, LLC $6,900.0000 $13,800.00

J. M. Duncan, INC. $8,000.0000 $16,000.00

6PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH8.000

Delta Contracting Company, LLC $38.0000 $304.00

J. M. Duncan, INC. $44.0000 $352.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH70.000

Delta Contracting Company, LLC $38.0000 $2,660.00

J. M. Duncan, INC. $44.0000 $3,080.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH110.000

Delta Contracting Company, LLC $38.0000 $4,180.00

J. M. Duncan, INC. $44.0000 $4,840.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.222.000

Delta Contracting Company, LLC $25.0000 $5,550.00

J. M. Duncan, INC. $29.0000 $6,438.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.77.000

Delta Contracting Company, LLC $17.0000 $1,309.00

J. M. Duncan, INC. $20.0000 $1,540.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH8.000

Delta Contracting Company, LLC $200.0000 $1,600.00

J. M. Duncan, INC. $230.0000 $1,840.00

716-02.08 PLASTIC PAVEMENT MARKING (8" DOTTED LINE)

L.F.442.000

Delta Contracting Company, LLC $3.0000 $1,326.00

J. M. Duncan, INC. $3.5000 $1,547.00

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.4.000

Delta Contracting Company, LLC $50.0000 $200.00

J. M. Duncan, INC. $58.0000 $232.00

716-04.14 PLASTIC PAVEMENT MARKING (LANE REDUCTION ARROW)

EACH3.000

Delta Contracting Company, LLC $300.0000 $900.00

J. M. Duncan, INC. $345.0000 $1,035.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.0.564

Delta Contracting Company, LLC $7,000.0000 $3,948.00

J. M. Duncan, INC. $8,000.0000 $4,512.00

7PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

716-05.02 PAINTED PAVEMENT MARKING (8" BARRIER LINE)

L.F.6,495.000

Delta Contracting Company, LLC $0.8200 $5,325.90

J. M. Duncan, INC. $1.0000 $6,495.00

716-05.06 PAINTED PAVEMENT MARKING (TURN LANE ARROW)

EACH8.000

Delta Contracting Company, LLC $115.0000 $920.00

J. M. Duncan, INC. $132.0000 $1,056.00

716-05.20 PAINTED PAVEMENT MARKING (6" LINE)

L.M.2.031

Delta Contracting Company, LLC $1,895.0000 $3,848.75

J. M. Duncan, INC. $2,170.0000 $4,407.27

716-12.01 ENHANCED FLATLINE THERMO PVMT MRKNG (4IN LINE)

L.M.0.564

Delta Contracting Company, LLC $6,000.0000 $3,384.00

J. M. Duncan, INC. $6,900.0000 $3,891.60

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.2.031

Delta Contracting Company, LLC $6,000.0000 $12,186.00

J. M. Duncan, INC. $6,900.0000 $14,013.90

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.277.000

Delta Contracting Company, LLC $3.0000 $831.00

J. M. Duncan, INC. $3.5000 $969.50

717-01 MOBILIZATION

LS1.000

Delta Contracting Company, LLC $70,000.0000 $70,000.00

J. M. Duncan, INC. $138,500.0000 $138,500.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.258.000

Delta Contracting Company, LLC $3.7000 $954.60

J. M. Duncan, INC. $5.0000 $1,290.00

740-11.04 TEMPORARY SEDIMENT TUBE 20IN

L.F.1,390.000

Delta Contracting Company, LLC $5.0000 $6,950.00

J. M. Duncan, INC. $6.0000 $8,340.00

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT24.000

Delta Contracting Company, LLC $40.0000 $960.00

J. M. Duncan, INC. $46.0000 $1,104.00

8PAGE

EXTENSION

CONTRACT CNT008

UNIT PRICE

801-03 WATER (SEEDING & SODDING)

M.G.29.000

Delta Contracting Company, LLC $20.0000 $580.00

J. M. Duncan, INC. $23.0000 $667.00

803-01 SODDING (NEW SOD)

S.Y.2,580.000

Delta Contracting Company, LLC $2.7500 $7,095.00

J. M. Duncan, INC. $3.2500 $8,385.00

9PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Delta Contracting Company, LLC $1,408,442.91

J. M. Duncan, INC. $1,932,078.92

Delta Contracting Company, LLC $1,408,442.91

J. M. Duncan, INC. $1,932,078.92

10PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

GRUNDY COUNTY (Contract No. CNT085 Call 030)

8.00%DBE GOAL

THE RESURFACING ON U.S. 41 (S.R. 56) FROM THE MARION COUNTY LINE (L.M. 0.00) TO S.R. 56 (L.M. 5.50).

PROJECT LENGTH -

HSIP-56(90),31005-3276-94,31005-4276-04

5.500 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Tinsley Asphalt, LLC $898,640.86

Rogers Group, Inc. $988,230.75

1PAGE

EXTENSION

CONTRACT CNT085

UNIT PRICE

ROADWAY CATEGORY

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON34.000

Tinsley Asphalt, LLC $565.0000 $19,210.00

Rogers Group, Inc. $735.0000 $24,990.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON6,897.000

Tinsley Asphalt, LLC $102.1300 $704,390.61

Rogers Group, Inc. $105.0000 $724,185.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.8.800

Tinsley Asphalt, LLC $400.0000 $3,520.00

Rogers Group, Inc. $750.0000 $6,600.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH1.000

Tinsley Asphalt, LLC $1,500.0000 $1,500.00

Rogers Group, Inc. $2,200.0000 $2,200.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH1.000

Tinsley Asphalt, LLC $3,000.0000 $3,000.00

Rogers Group, Inc. $3,100.0000 $3,100.00

706-01 GUARDRAIL REMOVED

L.F.50.000

Tinsley Asphalt, LLC $1.0000 $50.00

Rogers Group, Inc. $1.5000 $75.00

712-01 TRAFFIC CONTROL

LS1.000

Tinsley Asphalt, LLC $36,550.0000 $36,550.00

Rogers Group, Inc. $49,550.0000 $49,550.00

712-06 SIGNS (CONSTRUCTION)

S.F.765.000

Tinsley Asphalt, LLC $6.8500 $5,240.25

Rogers Group, Inc. $8.2500 $6,311.25

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH470.000

Tinsley Asphalt, LLC $24.0000 $11,280.00

Rogers Group, Inc. $30.1000 $14,147.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.25.000

Tinsley Asphalt, LLC $20.0000 $500.00

Rogers Group, Inc. $25.0000 $625.00

2PAGE

EXTENSION

CONTRACT CNT085

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.651.000

Tinsley Asphalt, LLC $10.0000 $6,510.00

Rogers Group, Inc. $12.5000 $8,137.50

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH19.000

Tinsley Asphalt, LLC $150.0000 $2,850.00

Rogers Group, Inc. $190.0000 $3,610.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.22.000

Tinsley Asphalt, LLC $575.0000 $12,650.00

Rogers Group, Inc. $725.0000 $15,950.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.22.000

Tinsley Asphalt, LLC $2,400.0000 $52,800.00

Rogers Group, Inc. $3,010.0000 $66,220.00

716-13.05 SPRAY THERMO PVMT MRKNG (60 mil) (6IN DOTTED LINE)

L.F.160.000

Tinsley Asphalt, LLC $1.0000 $160.00

Rogers Group, Inc. $1.2500 $200.00

717-01 MOBILIZATION

LS1.000

Tinsley Asphalt, LLC $38,430.0000 $38,430.00

Rogers Group, Inc. $62,330.0000 $62,330.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Tinsley Asphalt, LLC $898,640.86

Rogers Group, Inc. $988,230.75

Tinsley Asphalt, LLC $898,640.86

Rogers Group, Inc. $988,230.75

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

HAMILTON COUNTY (Contract No. CNT089 Call 031)

8.00%DBE GOAL

THE RESURFACING ON U.S. 11 (U.S. 64, S.R. 2) FROM EAST OF SHALLOWFORD ROAD (L.M. 18.59) TO YERBEY DRIVE (L.M. 20.28).

PROJECT LENGTH -

NH/HSIP-2(264),33011-3252-94,33011-8252-14

1.690 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Wright Brothers Construction Company, Inc. $783,996.55

Talley Construction Company, Inc. $808,921.78

1PAGE

EXTENSION

CONTRACT CNT089

UNIT PRICE

ROADWAY CATEGORY

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON26.000

Wright Brothers Construction Company, Inc. $600.0000 $15,600.00

Talley Construction Company, Inc. $628.1900 $16,332.94

411-02.10 ACS MIX(PG70-22) GRADING D

TON3,980.000

Wright Brothers Construction Company, Inc. $116.5000 $463,670.00

Talley Construction Company, Inc. $126.2200 $502,355.60

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON3,874.000

Wright Brothers Construction Company, Inc. $31.2500 $121,062.50

Talley Construction Company, Inc. $25.2300 $97,741.02

611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN

EACH1.000

Wright Brothers Construction Company, Inc. $1,100.0000 $1,100.00

Talley Construction Company, Inc. $862.5000 $862.50

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.752.000

Wright Brothers Construction Company, Inc. $46.5000 $34,968.00

Talley Construction Company, Inc. $37.9500 $28,538.40

702-01 CONCRETE CURB

C.Y.1.200

Wright Brothers Construction Company, Inc. $1,730.0000 $2,076.00

Talley Construction Company, Inc. $603.7500 $724.50

702-03 CONCRETE COMBINED CURB & GUTTER

C.Y.2.400

Wright Brothers Construction Company, Inc. $1,810.0000 $4,344.00

Talley Construction Company, Inc. $690.0000 $1,656.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH2.000

Wright Brothers Construction Company, Inc. $745.0000 $1,490.00

Talley Construction Company, Inc. $805.0000 $1,610.00

706-06.03 RADIUS RAIL

L.F.50.000

Wright Brothers Construction Company, Inc. $27.2500 $1,362.50

Talley Construction Company, Inc. $29.3300 $1,466.50

706-10.26 ROUNDED END ELEMENT

EACH2.000

Wright Brothers Construction Company, Inc. $64.0000 $128.00

Talley Construction Company, Inc. $69.0000 $138.00

2PAGE

EXTENSION

CONTRACT CNT089

UNIT PRICE

712-01 TRAFFIC CONTROL

LS1.000

Wright Brothers Construction Company, Inc. $25,000.0000 $25,000.00

Talley Construction Company, Inc. $31,000.0000 $31,000.00

712-06 SIGNS (CONSTRUCTION)

S.F.901.000

Wright Brothers Construction Company, Inc. $6.9000 $6,216.90

Talley Construction Company, Inc. $9.4900 $8,550.49

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH250.000

Wright Brothers Construction Company, Inc. $29.7500 $7,437.50

Talley Construction Company, Inc. $32.2000 $8,050.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH30.000

Wright Brothers Construction Company, Inc. $29.7500 $892.50

Talley Construction Company, Inc. $32.2000 $966.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.25.000

Wright Brothers Construction Company, Inc. $19.0000 $475.00

Talley Construction Company, Inc. $20.4100 $510.25

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.250.000

Wright Brothers Construction Company, Inc. $10.5000 $2,625.00

Talley Construction Company, Inc. $11.2100 $2,802.50

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH34.000

Wright Brothers Construction Company, Inc. $160.0000 $5,440.00

Talley Construction Company, Inc. $172.5000 $5,865.00

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.200.000

Wright Brothers Construction Company, Inc. $20.0000 $4,000.00

Talley Construction Company, Inc. $21.5600 $4,312.00

716-02.23 PLASTIC PAVEMENT MARKING (12IN BARRIER LINE)

L.F.155.000

Wright Brothers Construction Company, Inc. $6.1000 $945.50

Talley Construction Company, Inc. $6.6100 $1,024.55

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH1.000

Wright Brothers Construction Company, Inc. $186.0000 $186.00

Talley Construction Company, Inc. $201.2500 $201.25

3PAGE

EXTENSION

CONTRACT CNT089

UNIT PRICE

716-04.14 PLASTIC PAVEMENT MARKING (LANE REDUCTION ARROW)

EACH1.000

Wright Brothers Construction Company, Inc. $240.0000 $240.00

Talley Construction Company, Inc. $258.7500 $258.75

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.17.600

Wright Brothers Construction Company, Inc. $719.0000 $12,654.40

Talley Construction Company, Inc. $776.2500 $13,662.00

716-05.05 PAINTED PAVEMENT MARKING (STOP LINE)

L.F.250.000

Wright Brothers Construction Company, Inc. $5.0500 $1,262.50

Talley Construction Company, Inc. $5.4600 $1,365.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.10.500

Wright Brothers Construction Company, Inc. $4,230.0000 $44,415.00

Talley Construction Company, Inc. $4,571.2500 $47,998.13

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.115.000

Wright Brothers Construction Company, Inc. $1.3500 $155.25

Talley Construction Company, Inc. $1.4400 $165.60

717-01 MOBILIZATION

LS1.000

Wright Brothers Construction Company, Inc. $14,700.0000 $14,700.00

Talley Construction Company, Inc. $18,000.0000 $18,000.00

730-14.02 SAW SLOT

L.F.1,720.000

Wright Brothers Construction Company, Inc. $3.7500 $6,450.00

Talley Construction Company, Inc. $4.1400 $7,120.80

730-14.03 LOOP WIRE

L.F.6,800.000

Wright Brothers Construction Company, Inc. $0.7500 $5,100.00

Talley Construction Company, Inc. $0.8300 $5,644.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Wright Brothers Construction Company, Inc. $783,996.55

Talley Construction Company, Inc. $808,921.78

Wright Brothers Construction Company, Inc. $783,996.55

Talley Construction Company, Inc. $808,921.78

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

HAMILTON COUNTY (Contract No. CNT096 Call 033)

THE REPAIR OF BRIDGES ON S.R. 111 ON THE RAMP OVER U.S. 27 (S.R. 29) (L.M. 0.02) AND OVER U.S. 27SB (S.R. 29SB) (L.M. 0.15).

PROJECT LENGTH -

33156-4218-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Mid-State Construction Company, Inc. $1,371,136.60

Southern Constructors, Inc. $1,474,614.50

1PAGE

EXTENSION

CONTRACT CNT096

UNIT PRICE

BRIDGE CATEGORY

201-05.31 VEGETATION REMOVAL

LS1.000

Mid-State Construction Company, Inc. $2,126.7200 $2,126.72

Southern Constructors, Inc. $10,000.0000 $10,000.00

202-01.03 REMOVAL OF TRASH AND DEBRIS

LS1.000

Mid-State Construction Company, Inc. $42,074.3900 $42,074.39

Southern Constructors, Inc. $25,000.0000 $25,000.00

202-03.01 REMOVAL OF ASPHALT PAVEMENT

S.Y.650.000

Mid-State Construction Company, Inc. $33.2500 $21,612.50

Southern Constructors, Inc. $35.0000 $22,750.00

209-03.22 FILTER SOCK (18 INCH)

L.F.540.000

Mid-State Construction Company, Inc. $13.3000 $7,182.00

Southern Constructors, Inc. $8.0000 $4,320.00

307-03.08 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING B-M2

TON178.000

Mid-State Construction Company, Inc. $304.7800 $54,250.84

Southern Constructors, Inc. $290.0000 $51,620.00

411-03.10 ACS MIX(PG76-22) GRADING D

TON342.000

Mid-State Construction Company, Inc. $360.2000 $123,188.40

Southern Constructors, Inc. $335.0000 $114,570.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.4,278.000

Mid-State Construction Company, Inc. $6.1000 $26,095.80

Southern Constructors, Inc. $7.0000 $29,946.00

502-06.01 EXPANSION JOINT REPLACEMENT

L.F.324.000

Mid-State Construction Company, Inc. $259.2200 $83,987.28

Southern Constructors, Inc. $225.0000 $72,900.00

604-03.20 BRIDGE JOINT MODIFICATION

L.F.321.000

Mid-State Construction Company, Inc. $112.4700 $36,102.87

Southern Constructors, Inc. $95.0000 $30,495.00

604-04.02 APPLIED TEXTURE FINISH (EXISTING STRUCTURES)

S.Y.6,976.000

Mid-State Construction Company, Inc. $7.7600 $54,133.76

Southern Constructors, Inc. $7.2500 $50,576.00

2PAGE

EXTENSION

CONTRACT CNT096

UNIT PRICE

604-05.31 BRIDGE DECK GROOVING (MECHANICAL)

S.Y.2,860.000

Mid-State Construction Company, Inc. $4.7800 $13,670.80

Southern Constructors, Inc. $6.0000 $17,160.00

604-10.05 CONCRETE

S.F.40.000

Mid-State Construction Company, Inc. $188.2500 $7,530.00

Southern Constructors, Inc. $110.0000 $4,400.00

604-10.20 HYDRODEMOLITION

S.Y.2,860.000

Mid-State Construction Company, Inc. $26.6000 $76,076.00

Southern Constructors, Inc. $32.0000 $91,520.00

604-10.22 CONCRETE PARAPET REPAIR

L.F.3.000

Mid-State Construction Company, Inc. $315.3200 $945.96

Southern Constructors, Inc. $600.0000 $1,800.00

604-10.42 CONCRETE REPAIRS

C.F.31.000

Mid-State Construction Company, Inc. $540.6600 $16,760.46

Southern Constructors, Inc. $275.0000 $8,525.00

604-10.50 BRIDGE DECK REPAIRS (PARTIAL DEPTH OF SLAB)

S.Y.10.000

Mid-State Construction Company, Inc. $299.5300 $2,995.30

Southern Constructors, Inc. $225.0000 $2,250.00

604-10.54 CONCRETE REPAIRS

S.F.40.000

Mid-State Construction Company, Inc. $188.2500 $7,530.00

Southern Constructors, Inc. $110.0000 $4,400.00

604-10.58 EPOXY INJECTION (INJECTION)

GAL.129.000

Mid-State Construction Company, Inc. $166.2500 $21,446.25

Southern Constructors, Inc. $90.0000 $11,610.00

604-10.62 EPOXY INJECTION REPAIR (COMPLETE AND IN PLACE)

L.F.1,275.000

Mid-State Construction Company, Inc. $44.3300 $56,520.75

Southern Constructors, Inc. $65.0000 $82,875.00

604-10.81 CONCRETE REPAIRS

EACH39.000

Mid-State Construction Company, Inc. $1,966.7300 $76,702.47

Southern Constructors, Inc. $2,500.0000 $97,500.00

3PAGE

EXTENSION

CONTRACT CNT096

UNIT PRICE

604-10.89 MISCELLANEOUS BRIDGE ITEMS (WEEP HOLE REPAIRS)

LS1.000

Mid-State Construction Company, Inc. $8,916.0500 $8,916.05

Southern Constructors, Inc. $15,000.0000 $15,000.00

604-10.92 MEDIAN BARRIER REPAIR

L.F.20.000

Mid-State Construction Company, Inc. $315.3200 $6,306.40

Southern Constructors, Inc. $250.0000 $5,000.00

617-04.01 TYPE 1 THIN EPOXY OVERLAY (EPOXY-URETHANE)

S.Y.1,140.000

Mid-State Construction Company, Inc. $37.6800 $42,955.20

Southern Constructors, Inc. $40.0000 $45,600.00

619-01 BRIDGE DECK OVERLAY (PMC)

S.Y.2,860.000

Mid-State Construction Company, Inc. $59.3800 $169,826.80

Southern Constructors, Inc. $85.0000 $243,100.00

620-10.01 CONCRETE PARAPET (BRIDGERAIL REPLACEMENT)

L.F.26.000

Mid-State Construction Company, Inc. $487.2400 $12,668.24

Southern Constructors, Inc. $400.0000 $10,400.00

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.162.000

Mid-State Construction Company, Inc. $79.8000 $12,927.60

Southern Constructors, Inc. $75.0000 $12,150.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH3.000

Mid-State Construction Company, Inc. $110.8300 $332.49

Southern Constructors, Inc. $110.0000 $330.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH3.000

Mid-State Construction Company, Inc. $886.6400 $2,659.92

Southern Constructors, Inc. $1,000.0000 $3,000.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.57.000

Mid-State Construction Company, Inc. $21.6100 $1,231.77

Southern Constructors, Inc. $25.0000 $1,425.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH3.000

Mid-State Construction Company, Inc. $2,937.0000 $8,811.00

Southern Constructors, Inc. $2,800.0000 $8,400.00

4PAGE

EXTENSION

CONTRACT CNT096

UNIT PRICE

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH3.000

Mid-State Construction Company, Inc. $1,662.4600 $4,987.38

Southern Constructors, Inc. $5,000.0000 $15,000.00

706-01 GUARDRAIL REMOVED

L.F.435.000

Mid-State Construction Company, Inc. $1.1100 $482.85

Southern Constructors, Inc. $1.5000 $652.50

712-01 TRAFFIC CONTROL

LS1.000

Mid-State Construction Company, Inc. $50,903.0100 $50,903.01

Southern Constructors, Inc. $65,000.0000 $65,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.1,420.000

Mid-State Construction Company, Inc. $21.8300 $30,998.60

Southern Constructors, Inc. $40.0000 $56,800.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH197.000

Mid-State Construction Company, Inc. $31.0300 $6,112.91

Southern Constructors, Inc. $30.0000 $5,910.00

712-04.50 BARRIER RAIL DELINEATOR

EACH36.000

Mid-State Construction Company, Inc. $12.1900 $438.84

Southern Constructors, Inc. $15.0000 $540.00

712-06 SIGNS (CONSTRUCTION)

S.F.560.000

Mid-State Construction Company, Inc. $6.6500 $3,724.00

Southern Constructors, Inc. $10.0000 $5,600.00

712-08.03 ARROW BOARD (TYPE C)

EACH3.000

Mid-State Construction Company, Inc. $1,219.1300 $3,657.39

Southern Constructors, Inc. $2,500.0000 $7,500.00

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.31,050.000

Mid-State Construction Company, Inc. $3.0500 $94,702.50

Southern Constructors, Inc. $3.5000 $108,675.00

712-09.33 MODIFY EXISTING OVERHEAD SIGNS

EACH6.000

Mid-State Construction Company, Inc. $6,871.4600 $41,228.76

Southern Constructors, Inc. $4,500.0000 $27,000.00

5PAGE

EXTENSION

CONTRACT CNT096

UNIT PRICE

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Mid-State Construction Company, Inc. $5,319.8400 $10,639.68

Southern Constructors, Inc. $6,500.0000 $13,000.00

716-01.06 TEMPORARY RAISED PAVEMENT MARKER,WHITE

EACH167.000

Mid-State Construction Company, Inc. $11.0800 $1,850.36

Southern Constructors, Inc. $15.0000 $2,505.00

716-01.07 TEMPORARY RAISED PAVEMENT MARKER,YELLOW

EACH48.000

Mid-State Construction Company, Inc. $11.0800 $531.84

Southern Constructors, Inc. $15.0000 $720.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH19.000

Mid-State Construction Company, Inc. $105.2900 $2,000.51

Southern Constructors, Inc. $110.0000 $2,090.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.3.000

Mid-State Construction Company, Inc. $5,264.4300 $15,793.29

Southern Constructors, Inc. $5,000.0000 $15,000.00

717-01 MOBILIZATION

LS1.000

Mid-State Construction Company, Inc. $105,516.6600 $105,516.66

Southern Constructors, Inc. $70,000.0000 $70,000.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL BRIDGE

Mid-State Construction Company, Inc. $1,371,136.60

Southern Constructors, Inc. $1,474,614.50

Mid-State Construction Company, Inc. $1,371,136.60

Southern Constructors, Inc. $1,474,614.50

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

HENDERSON COUNTY (Contract No. CNT097 Call 034)

4.00%DBE GOAL

THE RESURFACING ON S.R. 201 FROM THE CHESTER COUNTY LINE (L.M. 0.00) TO S.R. 104 (L.M. 4.60).

PROJECT LENGTH -

STP/HSIP-201(10),39024-3211-94,39024-8211-14

4.600 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Delta Contracting Company, LLC $1,548,253.90

1PAGE

EXTENSION

CONTRACT CNT097

UNIT PRICE

ROADWAY CATEGORY

202-03.01 REMOVAL OF ASPHALT PAVEMENT

S.Y.3,150.000

Delta Contracting Company, LLC $44.6500 $140,647.50

203-06 WATER

M.G.20.000

Delta Contracting Company, LLC $5.0000 $100.00

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.9.200

Delta Contracting Company, LLC $1,315.0000 $12,098.00

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (C OR D)

TON3,045.000

Delta Contracting Company, LLC $34.3500 $104,595.75

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON1,087.000

Delta Contracting Company, LLC $128.3500 $139,516.45

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON356.000

Delta Contracting Company, LLC $128.7500 $45,835.00

307-01.10 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING C-W

TON6,431.000

Delta Contracting Company, LLC $97.9500 $629,916.45

403-02.01 TRACKLESS TACK COAT

TON18.000

Delta Contracting Company, LLC $1,068.0000 $19,224.00

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.6.700

Delta Contracting Company, LLC $895.0000 $5,996.50

414-04.03 ASPHALT EMULSION (SCRUB SEAL)

TON76.000

Delta Contracting Company, LLC $1,380.0000 $104,880.00

414-04.04 MINERAL AGGREGATE (SCRUB SEAL)

TON667.000

Delta Contracting Company, LLC $77.0000 $51,359.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.3,419.000

Delta Contracting Company, LLC $6.8500 $23,420.15

2PAGE

EXTENSION

CONTRACT CNT097

UNIT PRICE

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.240.000

Delta Contracting Company, LLC $65.0000 $15,600.00

712-01 TRAFFIC CONTROL

LS1.000

Delta Contracting Company, LLC $40,445.0000 $40,445.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,168.000

Delta Contracting Company, LLC $12.0000 $14,016.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH361.000

Delta Contracting Company, LLC $44.0000 $15,884.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.49.000

Delta Contracting Company, LLC $18.0000 $882.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.293.000

Delta Contracting Company, LLC $24.0000 $7,032.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.21.810

Delta Contracting Company, LLC $1,560.0000 $34,023.60

716-08.05 REMOVAL OF PAVEMENT MARKING (STOP LINE)

L.F.39.000

Delta Contracting Company, LLC $26.0000 $1,014.00

716-08.20 REMOVAL OF PAVEMENT MARKING (LINE)

L.M.17.500

Delta Contracting Company, LLC $885.0000 $15,487.50

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.21.810

Delta Contracting Company, LLC $3,600.0000 $78,516.00

716-13.04 SPRAY THERMO PVMT MRKNG (60 mil) (4IN DOTTED LINE)

L.F.20.000

Delta Contracting Company, LLC $14.0000 $280.00

717-01 MOBILIZATION

LS1.000

Delta Contracting Company, LLC $47,485.0000 $47,485.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Delta Contracting Company, LLC $1,548,253.90

Delta Contracting Company, LLC $1,548,253.90

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

HENRY COUNTY (Contract No. CNT124 Call 035)

8.50%DBE GOAL

THE MISCELLANEOUS SAFETY IMPROVEMENTS ON VARIOUS LOCAL ROADS.

PROJECT LENGTH -

HSIP-4000(44),40945-3480-94

10.250 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Superior Traffic Control, LLC $325,613.90

1PAGE

EXTENSION

CONTRACT CNT124

UNIT PRICE

ROADWAY CATEGORY

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.27.250

Superior Traffic Control, LLC $580.0000 $15,805.00

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.108.000

Superior Traffic Control, LLC $112.0000 $12,096.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH6.000

Superior Traffic Control, LLC $1,100.0000 $6,600.00

705-04.21 GUARDRAIL DELINEATION ENHANCEMENT

L.F.1,694.000

Superior Traffic Control, LLC $3.7500 $6,352.50

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.1,000.000

Superior Traffic Control, LLC $25.0000 $25,000.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH6.000

Superior Traffic Control, LLC $3,200.0000 $19,200.00

706-01 GUARDRAIL REMOVED

L.F.890.000

Superior Traffic Control, LLC $6.0000 $5,340.00

712-01 TRAFFIC CONTROL

LS1.000

Superior Traffic Control, LLC $10,500.0000 $10,500.00

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.492.000

Superior Traffic Control, LLC $6.8000 $3,345.60

713-11.01 "U" SECTION STEEL POSTS

LB.85.000

Superior Traffic Control, LLC $4.5000 $382.50

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.2,847.000

Superior Traffic Control, LLC $3.8000 $10,818.60

713-11.21 P POST SLIP BASE

EACH8.000

Superior Traffic Control, LLC $370.0000 $2,960.00

2PAGE

EXTENSION

CONTRACT CNT124

UNIT PRICE

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.229.000

Superior Traffic Control, LLC $13.6000 $3,114.40

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.599.000

Superior Traffic Control, LLC $14.2000 $8,505.80

713-15.36 REMOVE SIGN, SUPPORT & FOOTING

EACH58.000

Superior Traffic Control, LLC $25.0000 $1,450.00

713-16.06 DEAD END SIGN AND SUPPORT

EACH1.000

Superior Traffic Control, LLC $225.0000 $225.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH819.000

Superior Traffic Control, LLC $35.0000 $28,665.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.116.000

Superior Traffic Control, LLC $27.0000 $3,132.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.296.000

Superior Traffic Control, LLC $16.5000 $4,884.00

716-02.07 PLASTIC PAVEMENT MARKING (24" BARRIER LINE)

L.F.135.000

Superior Traffic Control, LLC $16.5000 $2,227.50

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.15.000

Superior Traffic Control, LLC $48.0000 $720.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.54.500

Superior Traffic Control, LLC $2,525.0000 $137,612.50

716-13.04 SPRAY THERMO PVMT MRKNG (60 mil) (4IN DOTTED LINE)

L.F.1,275.000

Superior Traffic Control, LLC $2.1000 $2,677.50

717-01 MOBILIZATION

LS1.000

Superior Traffic Control, LLC $14,000.0000 $14,000.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Superior Traffic Control, LLC $325,613.90

Superior Traffic Control, LLC $325,613.90

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

KNOX COUNTY (Contract No. CNT123 Call 037)

7.00%DBE GOAL

THE RESURFACING ON U.S. 11E (U.S. 25W, U.S. 70, S.R. 9) FROM NEAR I-40 (L.M. 7.24) TO S.R. 168 (L.M. 8.16), INCLUDING BRIDGE DECKREPAIR.

PROJECT LENGTH -

47014-4246-04,NH/HSIP-9(102),47014-3246-94,47014-8246-14

0.920 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

APAC-Atlantic, Inc. $885,040.50

Rogers Group, Inc. $1,095,456.85

1PAGE

EXTENSION

CONTRACT CNT123

UNIT PRICE

ROADWAY CATEGORY

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON92.000

APAC-Atlantic, Inc. $120.0000 $11,040.00

Rogers Group, Inc. $136.8000 $12,585.60

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON17.000

APAC-Atlantic, Inc. $500.0000 $8,500.00

Rogers Group, Inc. $942.0000 $16,014.00

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON627.000

APAC-Atlantic, Inc. $96.0000 $60,192.00

Rogers Group, Inc. $118.1000 $74,048.70

411-02.10 ACS MIX(PG70-22) GRADING D

TON1,723.000

APAC-Atlantic, Inc. $118.0000 $203,314.00

Rogers Group, Inc. $120.7000 $207,966.10

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.1.500

APAC-Atlantic, Inc. $4,700.0000 $7,050.00

Rogers Group, Inc. $2,844.0000 $4,266.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON2,282.000

APAC-Atlantic, Inc. $19.5000 $44,499.00

Rogers Group, Inc. $28.6500 $65,379.30

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH1.000

APAC-Atlantic, Inc. $195.0000 $195.00

Rogers Group, Inc. $225.0000 $225.00

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH1.000

APAC-Atlantic, Inc. $1,650.0000 $1,650.00

Rogers Group, Inc. $1,946.0000 $1,946.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH1.000

APAC-Atlantic, Inc. $3,300.0000 $3,300.00

Rogers Group, Inc. $3,892.0000 $3,892.00

712-01 TRAFFIC CONTROL

LS1.000

APAC-Atlantic, Inc. $30,500.0000 $30,500.00

Rogers Group, Inc. $26,665.0000 $26,665.00

2PAGE

EXTENSION

CONTRACT CNT123

UNIT PRICE

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH86.000

APAC-Atlantic, Inc. $5.5000 $473.00

Rogers Group, Inc. $45.0000 $3,870.00

712-06 SIGNS (CONSTRUCTION)

S.F.852.000

APAC-Atlantic, Inc. $6.5000 $5,538.00

Rogers Group, Inc. $14.2000 $12,098.40

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

APAC-Atlantic, Inc. $900.0000 $1,800.00

Rogers Group, Inc. $3,630.0000 $7,260.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH100.000

APAC-Atlantic, Inc. $30.0000 $3,000.00

Rogers Group, Inc. $34.2000 $3,420.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.42.000

APAC-Atlantic, Inc. $22.0000 $924.00

Rogers Group, Inc. $25.6000 $1,075.20

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.252.000

APAC-Atlantic, Inc. $11.0000 $2,772.00

Rogers Group, Inc. $14.1000 $3,553.20

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH5.000

APAC-Atlantic, Inc. $165.0000 $825.00

Rogers Group, Inc. $201.0500 $1,005.25

716-04.04 PLASTIC PAVEMENT MARKING (TRANSVERSE SHOULDER)

L.F.361.000

APAC-Atlantic, Inc. $5.5000 $1,985.50

Rogers Group, Inc. $6.7000 $2,418.70

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.1,138.000

APAC-Atlantic, Inc. $11.0000 $12,518.00

Rogers Group, Inc. $14.1000 $16,045.80

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.4.100

APAC-Atlantic, Inc. $690.0000 $2,829.00

Rogers Group, Inc. $910.0000 $3,731.00

3PAGE

EXTENSION

CONTRACT CNT123

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.4.100

APAC-Atlantic, Inc. $5,300.0000 $21,730.00

Rogers Group, Inc. $6,893.0000 $28,261.30

717-01 MOBILIZATION

LS1.000

APAC-Atlantic, Inc. $58,000.0000 $58,000.00

Rogers Group, Inc. $62,523.0000 $62,523.00

730-14.02 SAW SLOT

L.F.9,000.000

APAC-Atlantic, Inc. $3.0000 $27,000.00

Rogers Group, Inc. $8.1000 $72,900.00

730-14.03 LOOP WIRE

L.F.18,000.000

APAC-Atlantic, Inc. $0.5000 $9,000.00

Rogers Group, Inc. $0.8000 $14,400.00

4PAGE

EXTENSION

CONTRACT CNT123

UNIT PRICE

BRIDGE CATEGORY

604-10.44 EXPANSION JOINT REPAIRS

L.F.196.000

APAC-Atlantic, Inc. $220.0000 $43,120.00

Rogers Group, Inc. $273.1000 $53,527.60

604-10.50 BRIDGE DECK REPAIRS (PARTIAL DEPTH OF SLAB)

S.Y.10.000

APAC-Atlantic, Inc. $270.0000 $2,700.00

Rogers Group, Inc. $517.2000 $5,172.00

604-10.53 CONCRETE REPAIRS

S.Y.10.000

APAC-Atlantic, Inc. $385.0000 $3,850.00

Rogers Group, Inc. $617.5500 $6,175.50

617-04.01 TYPE 1 THIN EPOXY OVERLAY (EPOXY-URETHANE)

S.Y.9,898.000

APAC-Atlantic, Inc. $32.0000 $316,736.00

Rogers Group, Inc. $38.9000 $385,032.20

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

APAC-Atlantic, Inc. $518,634.50

Rogers Group, Inc. $645,549.55

SUB-TOTAL BRIDGE

APAC-Atlantic, Inc. $366,406.00

Rogers Group, Inc. $449,907.30

APAC-Atlantic, Inc. $885,040.50

Rogers Group, Inc. $1,095,456.85

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

LAWRENCE COUNTY (Contract No. CNT099 Call 038)

6.00%DBE GOAL

THE RESURFACING ON U.S. 43 (S.R. 6) FROM THE ALABAMA STATE LINE (L.M. 0.00) TO COUNTRYSIDE DRIVE (L.M. 4.91).

PROJECT LENGTH -

STP-NH/HSIP-6(131),50001-3275-94,50001-8275-14

4.910 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Rogers Group, Inc. $1,672,682.00

1PAGE

EXTENSION

CONTRACT CNT099

UNIT PRICE

ROADWAY CATEGORY

307-01.07 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M

TON100.000

Rogers Group, Inc. $94.0000 $9,400.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON87.000

Rogers Group, Inc. $710.0000 $61,770.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON13,175.000

Rogers Group, Inc. $86.0000 $1,133,050.00

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.2.500

Rogers Group, Inc. $1,020.0000 $2,550.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON13,050.000

Rogers Group, Inc. $13.0000 $169,650.00

611-09.01 ADJUSTMENT OF EXISTING CATCHBASIN

EACH1.000

Rogers Group, Inc. $1,310.0000 $1,310.00

712-01 TRAFFIC CONTROL

LS1.000

Rogers Group, Inc. $31,697.0000 $31,697.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH100.000

Rogers Group, Inc. $16.0000 $1,600.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Rogers Group, Inc. $6.0000 $24.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,272.000

Rogers Group, Inc. $8.0000 $10,176.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH810.000

Rogers Group, Inc. $28.0000 $22,680.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH756.000

Rogers Group, Inc. $28.0000 $21,168.00

2PAGE

EXTENSION

CONTRACT CNT099

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.550.000

Rogers Group, Inc. $17.0000 $9,350.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH60.000

Rogers Group, Inc. $160.0000 $9,600.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.24.600

Rogers Group, Inc. $800.0000 $19,680.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.24.600

Rogers Group, Inc. $5,000.0000 $123,000.00

717-01 MOBILIZATION

LS1.000

Rogers Group, Inc. $45,977.0000 $45,977.00

3PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Rogers Group, Inc. $1,672,682.00

Rogers Group, Inc. $1,672,682.00

4PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

LINCOLN AND MOORE COUNTIES (Contract No. CNT098 Call 039)

6.00%DBE GOAL

THE RESURFACING ON S.R. 50 FROM U.S. 64 (S.R. 15) (L.M. 13.45) IN LINCOLN COUNTY TO EAST OF MAIN STREET (L.M. 3.45) IN MOORECOUNTY.

PROJECT LENGTH -

NH/HSIP-50(65),52007-3206-94,52007-8206-14,STP-NH/HSIP-50(64),64003-3210-94,64003-8210-14

11.950 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 15, 2019

TOTAL CONTRACT

Lincoln Paving, LLC $1,932,557.18

Volunteer Paving, LLC $2,116,311.90

1PAGE

EXTENSION

CONTRACT CNT098

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.23.900

Lincoln Paving, LLC $650.0000 $15,535.00

Volunteer Paving, LLC $1,467.4700 $35,072.53

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON6,047.000

Lincoln Paving, LLC $16.8500 $101,891.95

Volunteer Paving, LLC $10.3100 $62,344.57

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON511.000

Lincoln Paving, LLC $78.4500 $40,087.95

Volunteer Paving, LLC $96.9600 $49,546.56

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON200.000

Lincoln Paving, LLC $85.0000 $17,000.00

Volunteer Paving, LLC $113.2200 $22,644.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON77.000

Lincoln Paving, LLC $635.0000 $48,895.00

Volunteer Paving, LLC $618.5600 $47,629.12

411-01.10 ACS MIX(PG64-22) GRADING D

TON15,563.000

Lincoln Paving, LLC $84.7500 $1,318,964.25

Volunteer Paving, LLC $87.5300 $1,362,229.39

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.18.100

Lincoln Paving, LLC $575.0000 $10,407.50

Volunteer Paving, LLC $489.6900 $8,863.39

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.1.000

Lincoln Paving, LLC $575.0000 $575.00

Volunteer Paving, LLC $489.6900 $489.69

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON562.000

Lincoln Paving, LLC $17.9400 $10,082.28

Volunteer Paving, LLC $46.8200 $26,312.84

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH9.000

Lincoln Paving, LLC $50.0000 $450.00

Volunteer Paving, LLC $51.5500 $463.95

2PAGE

EXTENSION

CONTRACT CNT098

UNIT PRICE

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.613.000

Lincoln Paving, LLC $18.5000 $11,340.50

Volunteer Paving, LLC $19.0700 $11,689.91

705-06.02 W BEAM GR (TYPE 2) MASH TL3 (LONG POST)

L.F.1,725.000

Lincoln Paving, LLC $23.5000 $40,537.50

Volunteer Paving, LLC $24.2300 $41,796.75

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH1.000

Lincoln Paving, LLC $850.0000 $850.00

Volunteer Paving, LLC $876.2900 $876.29

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH14.000

Lincoln Paving, LLC $2,550.0000 $35,700.00

Volunteer Paving, LLC $2,628.8700 $36,804.18

706-01 GUARDRAIL REMOVED

L.F.2,988.000

Lincoln Paving, LLC $2.0000 $5,976.00

Volunteer Paving, LLC $1.0300 $3,077.64

706-06.03 RADIUS RAIL

L.F.12.500

Lincoln Paving, LLC $24.5000 $306.25

Volunteer Paving, LLC $25.2600 $315.75

712-01 TRAFFIC CONTROL

LS1.000

Lincoln Paving, LLC $12,500.0000 $12,500.00

Volunteer Paving, LLC $26,804.1200 $26,804.12

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH50.000

Lincoln Paving, LLC $1.0000 $50.00

Volunteer Paving, LLC $5.1500 $257.50

712-05.01 WARNING LIGHTS (TYPE A)

EACH8.000

Lincoln Paving, LLC $1.0000 $8.00

Volunteer Paving, LLC $2.0600 $16.48

712-06 SIGNS (CONSTRUCTION)

S.F.2,402.000

Lincoln Paving, LLC $6.5000 $15,613.00

Volunteer Paving, LLC $6.7000 $16,093.40

3PAGE

EXTENSION

CONTRACT CNT098

UNIT PRICE

713-02.11 REMOVAL OF EXISTING DELINEATORS

EACH84.000

Lincoln Paving, LLC $15.0000 $1,260.00

Volunteer Paving, LLC $15.4600 $1,298.64

713-16.20 SIGNS (OM-3R, TYPE 3 OBJECT MARKER)

EACH84.000

Lincoln Paving, LLC $180.0000 $15,120.00

Volunteer Paving, LLC $185.5700 $15,587.88

713-16.21 SIGNS (OM-3L, TYPE 3 OBJECT MARKER)

EACH84.000

Lincoln Paving, LLC $180.0000 $15,120.00

Volunteer Paving, LLC $185.5700 $15,587.88

713-16.50 REMOVE AND REPLACE SIGN (OM-3R, TYPE 3 OBJECT MARKER)

EACH8.000

Lincoln Paving, LLC $195.0000 $1,560.00

Volunteer Paving, LLC $201.0300 $1,608.24

713-16.51 REMOVE AND REPLACE SIGN (OM-3L, TYPE 3 OBJECT MARKER)

EACH8.000

Lincoln Paving, LLC $195.0000 $1,560.00

Volunteer Paving, LLC $201.0300 $1,608.24

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH798.000

Lincoln Paving, LLC $30.0000 $23,940.00

Volunteer Paving, LLC $20.0000 $15,960.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH5.000

Lincoln Paving, LLC $30.0000 $150.00

Volunteer Paving, LLC $20.0000 $100.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.3.100

Lincoln Paving, LLC $20.0000 $62.00

Volunteer Paving, LLC $25.0000 $77.50

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.643.000

Lincoln Paving, LLC $15.0000 $9,645.00

Volunteer Paving, LLC $15.0000 $9,645.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH2.000

Lincoln Paving, LLC $150.0000 $300.00

Volunteer Paving, LLC $150.0000 $300.00

4PAGE

EXTENSION

CONTRACT CNT098

UNIT PRICE

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.1.700

Lincoln Paving, LLC $1,500.0000 $2,550.00

Volunteer Paving, LLC $850.0000 $1,445.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.17.900

Lincoln Paving, LLC $4,900.0000 $87,710.00

Volunteer Paving, LLC $5,000.0000 $89,500.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.23.900

Lincoln Paving, LLC $2,900.0000 $69,310.00

Volunteer Paving, LLC $2,500.0000 $59,750.00

717-01 MOBILIZATION

LS1.000

Lincoln Paving, LLC $17,500.0000 $17,500.00

Volunteer Paving, LLC $150,515.4600 $150,515.46

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Lincoln Paving, LLC $1,932,557.18

Volunteer Paving, LLC $2,116,311.90

Lincoln Paving, LLC $1,932,557.18

Volunteer Paving, LLC $2,116,311.90

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

LOUDON COUNTY (Contract No. CNT100 Call 040)

9.00%DBE GOAL

THE RESURFACING ON S.R. 324 FROM I-75 (L.M. 0.00) TO U.S. 11 (S.R. 2) (L.M. 2.17).

PROJECT LENGTH -

STP/HSIP-324(10),53081-3203-94,53081-8203-14

2.170 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

APAC-Atlantic, Inc. $493,264.50

Duracap Asphalt Paving Co., Inc. $497,932.36

Patty Construction Inc. $523,053.00

Rogers Group, Inc. $585,902.17

1PAGE

EXTENSION

CONTRACT CNT100

UNIT PRICE

ROADWAY CATEGORY

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON609.000

APAC-Atlantic, Inc. $31.0000 $18,879.00

Duracap Asphalt Paving Co., Inc. $30.3800 $18,501.42

Patty Construction Inc. $31.7500 $19,335.75

Rogers Group, Inc. $41.2100 $25,096.89

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON69.000

APAC-Atlantic, Inc. $131.0000 $9,039.00

Duracap Asphalt Paving Co., Inc. $159.4200 $10,999.98

Patty Construction Inc. $175.0000 $12,075.00

Rogers Group, Inc. $206.1100 $14,221.59

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON13.000

APAC-Atlantic, Inc. $500.0000 $6,500.00

Duracap Asphalt Paving Co., Inc. $1,225.0000 $15,925.00

Patty Construction Inc. $795.0000 $10,335.00

Rogers Group, Inc. $986.6400 $12,826.32

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON272.000

APAC-Atlantic, Inc. $115.0000 $31,280.00

Duracap Asphalt Paving Co., Inc. $120.8800 $32,879.36

Patty Construction Inc. $160.0000 $43,520.00

Rogers Group, Inc. $127.1200 $34,576.64

411-02.10 ACS MIX(PG70-22) GRADING D

TON2,510.000

APAC-Atlantic, Inc. $110.0000 $276,100.00

Duracap Asphalt Paving Co., Inc. $111.4200 $279,664.20

Patty Construction Inc. $112.5000 $282,375.00

Rogers Group, Inc. $136.3700 $342,288.70

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.0.600

APAC-Atlantic, Inc. $2,150.0000 $1,290.00

Duracap Asphalt Paving Co., Inc. $945.0000 $567.00

Patty Construction Inc. $9,000.0000 $5,400.00

Rogers Group, Inc. $1,055.0000 $633.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.3.100

APAC-Atlantic, Inc. $1,250.0000 $3,875.00

Duracap Asphalt Paving Co., Inc. $1,913.0000 $5,930.30

Patty Construction Inc. $2,800.0000 $8,680.00

Rogers Group, Inc. $1,055.0000 $3,270.50

2PAGE

EXTENSION

CONTRACT CNT100

UNIT PRICE

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH14.000

APAC-Atlantic, Inc. $135.0000 $1,890.00

Duracap Asphalt Paving Co., Inc. $125.0000 $1,750.00

Patty Construction Inc. $140.0000 $1,960.00

Rogers Group, Inc. $139.5200 $1,953.28

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH14.000

APAC-Atlantic, Inc. $1,200.0000 $16,800.00

Duracap Asphalt Paving Co., Inc. $1,100.0000 $15,400.00

Patty Construction Inc. $1,225.0000 $17,150.00

Rogers Group, Inc. $1,227.7900 $17,189.06

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH14.000

APAC-Atlantic, Inc. $2,750.0000 $38,500.00

Duracap Asphalt Paving Co., Inc. $2,250.0000 $31,500.00

Patty Construction Inc. $2,850.0000 $39,900.00

Rogers Group, Inc. $2,846.2400 $39,847.36

706-01 GUARDRAIL REMOVED

L.F.700.000

APAC-Atlantic, Inc. $1.0000 $700.00

Duracap Asphalt Paving Co., Inc. $1.0000 $700.00

Patty Construction Inc. $1.1000 $770.00

Rogers Group, Inc. $1.1200 $784.00

712-01 TRAFFIC CONTROL

LS1.000

APAC-Atlantic, Inc. $18,500.0000 $18,500.00

Duracap Asphalt Paving Co., Inc. $19,000.0000 $19,000.00

Patty Construction Inc. $14,278.5000 $14,278.50

Rogers Group, Inc. $18,268.0900 $18,268.09

712-06 SIGNS (CONSTRUCTION)

S.F.551.000

APAC-Atlantic, Inc. $4.5000 $2,479.50

Duracap Asphalt Paving Co., Inc. $6.0000 $3,306.00

Patty Construction Inc. $6.5000 $3,581.50

Rogers Group, Inc. $4.7400 $2,611.74

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

APAC-Atlantic, Inc. $400.0000 $800.00

Duracap Asphalt Paving Co., Inc. $750.0000 $1,500.00

Patty Construction Inc. $550.0000 $1,100.00

Rogers Group, Inc. $670.0000 $1,340.00

3PAGE

EXTENSION

CONTRACT CNT100

UNIT PRICE

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH167.000

APAC-Atlantic, Inc. $32.0000 $5,344.00

Duracap Asphalt Paving Co., Inc. $31.0000 $5,177.00

Patty Construction Inc. $30.0000 $5,010.00

Rogers Group, Inc. $33.4900 $5,592.83

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH14.000

APAC-Atlantic, Inc. $32.0000 $448.00

Duracap Asphalt Paving Co., Inc. $31.0000 $434.00

Patty Construction Inc. $30.0000 $420.00

Rogers Group, Inc. $33.4900 $468.86

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.53.000

APAC-Atlantic, Inc. $21.0000 $1,113.00

Duracap Asphalt Paving Co., Inc. $20.5000 $1,086.50

Patty Construction Inc. $20.0000 $1,060.00

Rogers Group, Inc. $22.3200 $1,182.96

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.66.000

APAC-Atlantic, Inc. $10.5000 $693.00

Duracap Asphalt Paving Co., Inc. $11.0000 $726.00

Patty Construction Inc. $10.0000 $660.00

Rogers Group, Inc. $11.1600 $736.56

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH2.000

APAC-Atlantic, Inc. $155.0000 $310.00

Duracap Asphalt Paving Co., Inc. $154.0000 $308.00

Patty Construction Inc. $150.0000 $300.00

Rogers Group, Inc. $167.4300 $334.86

716-04.04 PLASTIC PAVEMENT MARKING (TRANSVERSE SHOULDER)

L.F.539.000

APAC-Atlantic, Inc. $4.0000 $2,156.00

Duracap Asphalt Paving Co., Inc. $4.4000 $2,371.60

Patty Construction Inc. $4.0000 $2,156.00

Rogers Group, Inc. $4.4600 $2,403.94

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.9.400

APAC-Atlantic, Inc. $620.0000 $5,828.00

Duracap Asphalt Paving Co., Inc. $590.0000 $5,546.00

Patty Construction Inc. $575.0000 $5,405.00

Rogers Group, Inc. $641.8000 $6,032.92

4PAGE

EXTENSION

CONTRACT CNT100

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.5.000

APAC-Atlantic, Inc. $4,200.0000 $21,000.00

Duracap Asphalt Paving Co., Inc. $4,000.0000 $20,000.00

Patty Construction Inc. $3,900.0000 $19,500.00

Rogers Group, Inc. $4,353.0700 $21,765.35

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.4.000

APAC-Atlantic, Inc. $2,810.0000 $11,240.00

Duracap Asphalt Paving Co., Inc. $2,665.0000 $10,660.00

Patty Construction Inc. $2,600.0000 $10,400.00

Rogers Group, Inc. $2,902.0400 $11,608.16

717-01 MOBILIZATION

LS1.000

APAC-Atlantic, Inc. $18,500.0000 $18,500.00

Duracap Asphalt Paving Co., Inc. $14,000.0000 $14,000.00

Patty Construction Inc. $17,681.2500 $17,681.25

Rogers Group, Inc. $20,868.5600 $20,868.56

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

APAC-Atlantic, Inc. $493,264.50

Duracap Asphalt Paving Co., Inc. $497,932.36

Patty Construction Inc. $523,053.00

Rogers Group, Inc. $585,902.17

APAC-Atlantic, Inc. $493,264.50

Duracap Asphalt Paving Co., Inc. $497,932.36

Patty Construction Inc. $523,053.00

Rogers Group, Inc. $585,902.17

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

MACON COUNTY (Contract No. CNT102 Call 041)

7.50%DBE GOAL

THE RESURFACING ON S.R. 10 FROM SOUTH OF ELLINGTON DRIVE (L.M. 8.88) TO THE KENTUCKY STATE LINE (L.M. 16.89).

PROJECT LENGTH -

STP-10(76),56001-8227-14

8.010 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Rogers Group, Inc. $1,210,588.85

Charles Deweese Construction, Inc $1,244,832.09

Vulcan Construction Materials, LLC $1,749,240.00

1PAGE

EXTENSION

CONTRACT CNT102

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.16.000

Rogers Group, Inc. $1,800.0000 $28,800.00

Charles Deweese Construction, Inc $1,314.1100 $21,025.76

Vulcan Construction Materials, LLC $1,900.0000 $30,400.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON662.000

Rogers Group, Inc. $25.0000 $16,550.00

Charles Deweese Construction, Inc $38.8900 $25,745.18

Vulcan Construction Materials, LLC $45.0000 $29,790.00

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON1,000.000

Rogers Group, Inc. $84.5000 $84,500.00

Charles Deweese Construction, Inc $95.9100 $95,910.00

Vulcan Construction Materials, LLC $120.0000 $120,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON42.000

Rogers Group, Inc. $800.0000 $33,600.00

Charles Deweese Construction, Inc $950.0000 $39,900.00

Vulcan Construction Materials, LLC $900.0000 $37,800.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON9,142.000

Rogers Group, Inc. $83.0000 $758,786.00

Charles Deweese Construction, Inc $85.8500 $784,840.70

Vulcan Construction Materials, LLC $130.0000 $1,188,460.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.12.800

Rogers Group, Inc. $320.0000 $4,096.00

Charles Deweese Construction, Inc $561.0000 $7,180.80

Vulcan Construction Materials, LLC $310.0000 $3,968.00

712-01 TRAFFIC CONTROL

LS1.000

Rogers Group, Inc. $35,000.0000 $35,000.00

Charles Deweese Construction, Inc $32,400.0000 $32,400.00

Vulcan Construction Materials, LLC $75,000.0000 $75,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Rogers Group, Inc. $13.1500 $328.75

Charles Deweese Construction, Inc $15.4600 $386.50

Vulcan Construction Materials, LLC $10.0000 $250.00

2PAGE

EXTENSION

CONTRACT CNT102

UNIT PRICE

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Rogers Group, Inc. $13.1500 $52.60

Charles Deweese Construction, Inc $12.8900 $51.56

Vulcan Construction Materials, LLC $5.0000 $20.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,672.000

Rogers Group, Inc. $6.7500 $11,286.00

Charles Deweese Construction, Inc $6.8600 $11,469.92

Vulcan Construction Materials, LLC $9.0000 $15,048.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH530.000

Rogers Group, Inc. $30.7500 $16,297.50

Charles Deweese Construction, Inc $30.9300 $16,392.90

Vulcan Construction Materials, LLC $30.0000 $15,900.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH530.000

Rogers Group, Inc. $10.2500 $5,432.50

Charles Deweese Construction, Inc $10.3100 $5,464.30

Vulcan Construction Materials, LLC $10.0000 $5,300.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.48.000

Rogers Group, Inc. $20.5000 $984.00

Charles Deweese Construction, Inc $20.6200 $989.76

Vulcan Construction Materials, LLC $20.0000 $960.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.30.400

Rogers Group, Inc. $820.0000 $24,928.00

Charles Deweese Construction, Inc $824.7400 $25,072.10

Vulcan Construction Materials, LLC $800.0000 $24,320.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.14.300

Rogers Group, Inc. $5,400.0000 $77,220.00

Charles Deweese Construction, Inc $5,443.3000 $77,839.19

Vulcan Construction Materials, LLC $5,280.0000 $75,504.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.16.100

Rogers Group, Inc. $3,275.0000 $52,727.50

Charles Deweese Construction, Inc $3,298.9700 $53,113.42

Vulcan Construction Materials, LLC $3,200.0000 $51,520.00

3PAGE

EXTENSION

CONTRACT CNT102

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Rogers Group, Inc. $60,000.0000 $60,000.00

Charles Deweese Construction, Inc $47,050.0000 $47,050.00

Vulcan Construction Materials, LLC $75,000.0000 $75,000.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Rogers Group, Inc. $1,210,588.85

Charles Deweese Construction, Inc $1,244,832.09

Vulcan Construction Materials, LLC $1,749,240.00

Rogers Group, Inc. $1,210,588.85

Charles Deweese Construction, Inc $1,244,832.09

Vulcan Construction Materials, LLC $1,749,240.00

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

MAURY COUNTY (Contract No. CNT065 Call 043)

10.50%DBE GOAL

THE MISCELLANEOUS SAFETY IMPROVEMENTS ON PORT ROYAL ROAD FROM NORTH OF JIM WARREN ROAD TO OLD PORT ROYAL ROADNORTH IN SPRING HILL, INCLUDING GRADING, DRAINAGE, PAVING AND SIGNALS.

PROJECT LENGTH -

HSIP-9323(3),60952-3503-94

0.435 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Rogers Group, Inc. $1,996,396.00

Volunteer Paving, LLC $2,024,878.26

Civil Constructors, LLC $2,330,996.50

Sessions Paving Company $2,434,546.70

Jones Bros. Contractors, LLC $2,587,334.65

1PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Rogers Group, Inc. $42,000.0000 $42,000.00

Volunteer Paving, LLC $33,152.3400 $33,152.34

Civil Constructors, LLC $28,170.0000 $28,170.00

Sessions Paving Company $100,000.0000 $100,000.00

Jones Bros. Contractors, LLC $62,000.0000 $62,000.00

201-01 CLEARING AND GRUBBING

LS1.000

Rogers Group, Inc. $17,000.0000 $17,000.00

Volunteer Paving, LLC $5,208.3300 $5,208.33

Civil Constructors, LLC $9,685.0000 $9,685.00

Sessions Paving Company $112,000.0000 $112,000.00

Jones Bros. Contractors, LLC $220,000.0000 $220,000.00

202-03 REMOVAL OF RIGID PAVEMENT, SIDEWALK, ETC.

S.Y.480.000

Rogers Group, Inc. $30.0000 $14,400.00

Volunteer Paving, LLC $17.1900 $8,251.20

Civil Constructors, LLC $25.0000 $12,000.00

Sessions Paving Company $20.0000 $9,600.00

Jones Bros. Contractors, LLC $20.0000 $9,600.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.9,958.000

Rogers Group, Inc. $21.0000 $209,118.00

Volunteer Paving, LLC $31.7700 $316,365.66

Civil Constructors, LLC $39.3000 $391,349.40

Sessions Paving Company $30.0000 $298,740.00

Jones Bros. Contractors, LLC $27.0000 $268,866.00

203-03 BORROW EXCAVATION (UNCLASSIFIED)

C.Y.2,985.000

Rogers Group, Inc. $29.0000 $86,565.00

Volunteer Paving, LLC $14.0600 $41,969.10

Civil Constructors, LLC $18.0000 $53,730.00

Sessions Paving Company $40.0000 $119,400.00

Jones Bros. Contractors, LLC $35.0000 $104,475.00

203-04 PLACING AND SPREADING TOPSOIL

C.Y.1,795.000

Rogers Group, Inc. $22.0000 $39,490.00

Volunteer Paving, LLC $11.9800 $21,504.10

Civil Constructors, LLC $18.0000 $32,310.00

Sessions Paving Company $20.0000 $35,900.00

Jones Bros. Contractors, LLC $32.0000 $57,440.00

2PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

203-06 WATER

M.G.20.000

Rogers Group, Inc. $41.0000 $820.00

Volunteer Paving, LLC $10.4200 $208.40

Civil Constructors, LLC $12.0000 $240.00

Sessions Paving Company $20.0000 $400.00

Jones Bros. Contractors, LLC $50.0000 $1,000.00

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.2.000

Rogers Group, Inc. $2,000.0000 $4,000.00

Volunteer Paving, LLC $1,173.4800 $2,346.96

Civil Constructors, LLC $1,300.0000 $2,600.00

Sessions Paving Company $10,000.0000 $20,000.00

Jones Bros. Contractors, LLC $2,000.0000 $4,000.00

209-05 SEDIMENT REMOVAL

C.Y.93.000

Rogers Group, Inc. $40.0000 $3,720.00

Volunteer Paving, LLC $15.6300 $1,453.59

Civil Constructors, LLC $20.0000 $1,860.00

Sessions Paving Company $10.0000 $930.00

Jones Bros. Contractors, LLC $15.0000 $1,395.00

209-08.07 ROCK CHECK DAM PER

EACH9.000

Rogers Group, Inc. $395.0000 $3,555.00

Volunteer Paving, LLC $310.4200 $2,793.78

Civil Constructors, LLC $300.0000 $2,700.00

Sessions Paving Company $300.0000 $2,700.00

Jones Bros. Contractors, LLC $550.0000 $4,950.00

209-08.08 ENHANCED ROCK CHECK DAM

EACH7.000

Rogers Group, Inc. $685.0000 $4,795.00

Volunteer Paving, LLC $345.8300 $2,420.81

Civil Constructors, LLC $395.0000 $2,765.00

Sessions Paving Company $500.0000 $3,500.00

Jones Bros. Contractors, LLC $750.0000 $5,250.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON3,816.000

Rogers Group, Inc. $29.0000 $110,664.00

Volunteer Paving, LLC $20.6700 $78,876.72

Civil Constructors, LLC $39.0000 $148,824.00

Sessions Paving Company $35.0000 $133,560.00

Jones Bros. Contractors, LLC $37.0000 $141,192.00

3PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

307-02.01 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING A

TON221.000

Rogers Group, Inc. $114.0000 $25,194.00

Volunteer Paving, LLC $91.8900 $20,307.69

Civil Constructors, LLC $141.0000 $31,161.00

Sessions Paving Company $142.0000 $31,382.00

Jones Bros. Contractors, LLC $223.0000 $49,283.00

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON145.000

Rogers Group, Inc. $146.0000 $21,170.00

Volunteer Paving, LLC $120.4900 $17,471.05

Civil Constructors, LLC $157.0000 $22,765.00

Sessions Paving Company $146.0000 $21,170.00

Jones Bros. Contractors, LLC $279.0000 $40,455.00

313-03 TREATED PERMEABLE BASE

S.Y.1,995.000

Rogers Group, Inc. $29.7500 $59,351.25

Volunteer Paving, LLC $48.8500 $97,455.75

Civil Constructors, LLC $33.8000 $67,431.00

Sessions Paving Company $31.0000 $61,845.00

Jones Bros. Contractors, LLC $31.0000 $61,845.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON4.900

Rogers Group, Inc. $700.0000 $3,430.00

Volunteer Paving, LLC $625.0000 $3,062.50

Civil Constructors, LLC $1,060.0000 $5,194.00

Sessions Paving Company $875.0000 $4,287.50

Jones Bros. Contractors, LLC $1,100.0000 $5,390.00

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON19.600

Rogers Group, Inc. $100.0000 $1,960.00

Volunteer Paving, LLC $37.0000 $725.20

Civil Constructors, LLC $33.5000 $656.60

Sessions Paving Company $45.0000 $882.00

Jones Bros. Contractors, LLC $95.0000 $1,862.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON8.700

Rogers Group, Inc. $650.0000 $5,655.00

Volunteer Paving, LLC $625.0000 $5,437.50

Civil Constructors, LLC $983.0000 $8,552.10

Sessions Paving Company $875.0000 $7,612.50

Jones Bros. Contractors, LLC $860.0000 $7,482.00

4PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON469.000

Rogers Group, Inc. $125.0000 $58,625.00

Volunteer Paving, LLC $83.8700 $39,335.03

Civil Constructors, LLC $141.0000 $66,129.00

Sessions Paving Company $154.0000 $72,226.00

Jones Bros. Contractors, LLC $140.0000 $65,660.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON1,036.000

Rogers Group, Inc. $135.0000 $139,860.00

Volunteer Paving, LLC $96.2200 $99,683.92

Civil Constructors, LLC $144.0000 $149,184.00

Sessions Paving Company $159.0000 $164,724.00

Jones Bros. Contractors, LLC $153.0000 $158,508.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.14,362.000

Rogers Group, Inc. $2.3500 $33,750.70

Volunteer Paving, LLC $1.7200 $24,702.64

Civil Constructors, LLC $3.4000 $48,830.80

Sessions Paving Company $2.9000 $41,649.80

Jones Bros. Contractors, LLC $2.6000 $37,341.20

501-01.03 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 10"

S.Y.2,018.000

Rogers Group, Inc. $116.0000 $234,088.00

Volunteer Paving, LLC $120.8300 $243,834.94

Civil Constructors, LLC $120.0000 $242,160.00

Sessions Paving Company $128.0000 $258,304.00

Jones Bros. Contractors, LLC $102.0000 $205,836.00

621-03.02 18" TEMPORARY DRAINAGE PIPE

L.F.100.000

Rogers Group, Inc. $42.0000 $4,200.00

Volunteer Paving, LLC $41.6700 $4,167.00

Civil Constructors, LLC $48.5000 $4,850.00

Sessions Paving Company $30.0000 $3,000.00

Jones Bros. Contractors, LLC $45.0000 $4,500.00

702-03 CONCRETE COMBINED CURB & GUTTER

C.Y.53.000

Rogers Group, Inc. $390.0000 $20,670.00

Volunteer Paving, LLC $405.8300 $21,508.99

Civil Constructors, LLC $407.0000 $21,571.00

Sessions Paving Company $430.0000 $22,790.00

Jones Bros. Contractors, LLC $350.0000 $18,550.00

5PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH4.000

Rogers Group, Inc. $100.0000 $400.00

Volunteer Paving, LLC $182.2900 $729.16

Civil Constructors, LLC $100.0000 $400.00

Sessions Paving Company $110.0000 $440.00

Jones Bros. Contractors, LLC $75.0000 $300.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.544.000

Rogers Group, Inc. $18.5000 $10,064.00

Volunteer Paving, LLC $25.5200 $13,882.88

Civil Constructors, LLC $20.0000 $10,880.00

Sessions Paving Company $22.0000 $11,968.00

Jones Bros. Contractors, LLC $17.5000 $9,520.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH4.000

Rogers Group, Inc. $1,500.0000 $6,000.00

Volunteer Paving, LLC $1,302.0800 $5,208.32

Civil Constructors, LLC $700.0000 $2,800.00

Sessions Paving Company $770.0000 $3,080.00

Jones Bros. Contractors, LLC $1,650.0000 $6,600.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH4.000

Rogers Group, Inc. $800.0000 $3,200.00

Volunteer Paving, LLC $598.9600 $2,395.84

Civil Constructors, LLC $650.0000 $2,600.00

Sessions Paving Company $715.0000 $2,860.00

Jones Bros. Contractors, LLC $700.0000 $2,800.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH2.000

Rogers Group, Inc. $2,650.0000 $5,300.00

Volunteer Paving, LLC $3,333.3300 $6,666.66

Civil Constructors, LLC $2,500.0000 $5,000.00

Sessions Paving Company $2,750.0000 $5,500.00

Jones Bros. Contractors, LLC $5,550.0000 $11,100.00

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH4.000

Rogers Group, Inc. $5,500.0000 $22,000.00

Volunteer Paving, LLC $5,729.1700 $22,916.68

Civil Constructors, LLC $6,200.0000 $24,800.00

Sessions Paving Company $6,050.0000 $24,200.00

Jones Bros. Contractors, LLC $5,500.0000 $22,000.00

6PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

706-01 GUARDRAIL REMOVED

L.F.719.000

Rogers Group, Inc. $1.0000 $719.00

Volunteer Paving, LLC $6.2500 $4,493.75

Civil Constructors, LLC $1.0000 $719.00

Sessions Paving Company $1.5000 $1,078.50

Jones Bros. Contractors, LLC $0.5000 $359.50

706-06.06 RADIUS RAIL LONG POST (9-12 FT)

L.F.412.000

Rogers Group, Inc. $27.5000 $11,330.00

Volunteer Paving, LLC $34.5300 $14,226.36

Civil Constructors, LLC $25.0000 $10,300.00

Sessions Paving Company $28.0000 $11,536.00

Jones Bros. Contractors, LLC $28.5000 $11,742.00

707-08.11 HIGH-VISIBILITY CONSTRUCTION FENCE

L.F.260.000

Rogers Group, Inc. $1.5000 $390.00

Volunteer Paving, LLC $1.9700 $512.20

Civil Constructors, LLC $2.0000 $520.00

Sessions Paving Company $10.0000 $2,600.00

Jones Bros. Contractors, LLC $1.8900 $491.40

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON200.000

Rogers Group, Inc. $50.0000 $10,000.00

Volunteer Paving, LLC $50.0000 $10,000.00

Civil Constructors, LLC $52.5000 $10,500.00

Sessions Paving Company $45.0000 $9,000.00

Jones Bros. Contractors, LLC $45.0000 $9,000.00

710-04 FILTER CLOTH UNDERDRAIN (WITH PIPE)

L.F.3,225.000

Rogers Group, Inc. $6.5000 $20,962.50

Volunteer Paving, LLC $6.7700 $21,833.25

Civil Constructors, LLC $6.5000 $20,962.50

Sessions Paving Company $7.1500 $23,058.75

Jones Bros. Contractors, LLC $6.5000 $20,962.50

710-05 LATERAL UNDERDRAIN

L.F.360.000

Rogers Group, Inc. $4.0000 $1,440.00

Volunteer Paving, LLC $6.7700 $2,437.20

Civil Constructors, LLC $4.0000 $1,440.00

Sessions Paving Company $4.4000 $1,584.00

Jones Bros. Contractors, LLC $4.0000 $1,440.00

7PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

710-06.12 LATERAL UNDERDRAIN ENDWALL (3:1)

EACH3.000

Rogers Group, Inc. $700.0000 $2,100.00

Volunteer Paving, LLC $651.0400 $1,953.12

Civil Constructors, LLC $700.0000 $2,100.00

Sessions Paving Company $770.0000 $2,310.00

Jones Bros. Contractors, LLC $700.0000 $2,100.00

710-06.13 LATERAL UNDERDRAIN ENDWALL (4:1)

EACH6.000

Rogers Group, Inc. $700.0000 $4,200.00

Volunteer Paving, LLC $651.0400 $3,906.24

Civil Constructors, LLC $700.0000 $4,200.00

Sessions Paving Company $770.0000 $4,620.00

Jones Bros. Contractors, LLC $700.0000 $4,200.00

710-06.15 LATERAL UNDERDRAIN ENDWALL (6:1)

EACH8.000

Rogers Group, Inc. $700.0000 $5,600.00

Volunteer Paving, LLC $651.0400 $5,208.32

Civil Constructors, LLC $700.0000 $5,600.00

Sessions Paving Company $770.0000 $6,160.00

Jones Bros. Contractors, LLC $700.0000 $5,600.00

712-01 TRAFFIC CONTROL

LS1.000

Rogers Group, Inc. $49,640.6000 $49,640.60

Volunteer Paving, LLC $42,447.9200 $42,447.92

Civil Constructors, LLC $115,370.0000 $115,370.00

Sessions Paving Company $80,000.0000 $80,000.00

Jones Bros. Contractors, LLC $200,000.0000 $200,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.5,220.000

Rogers Group, Inc. $28.2500 $147,465.00

Volunteer Paving, LLC $36.4600 $190,321.20

Civil Constructors, LLC $34.0000 $177,480.00

Sessions Paving Company $35.0000 $182,700.00

Jones Bros. Contractors, LLC $28.0000 $146,160.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH54.000

Rogers Group, Inc. $25.0000 $1,350.00

Volunteer Paving, LLC $26.0400 $1,406.16

Civil Constructors, LLC $25.0000 $1,350.00

Sessions Paving Company $30.0000 $1,620.00

Jones Bros. Contractors, LLC $25.0000 $1,350.00

8PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

712-04.50 BARRIER RAIL DELINEATOR

EACH261.000

Rogers Group, Inc. $10.0000 $2,610.00

Volunteer Paving, LLC $10.4200 $2,719.62

Civil Constructors, LLC $10.0000 $2,610.00

Sessions Paving Company $11.0000 $2,871.00

Jones Bros. Contractors, LLC $10.0000 $2,610.00

712-06 SIGNS (CONSTRUCTION)

S.F.640.000

Rogers Group, Inc. $6.7500 $4,320.00

Volunteer Paving, LLC $7.0300 $4,499.20

Civil Constructors, LLC $6.7500 $4,320.00

Sessions Paving Company $8.0000 $5,120.00

Jones Bros. Contractors, LLC $6.7500 $4,320.00

713-02.14 FLEXIBLE DELINEATOR (WHITE)

EACH143.000

Rogers Group, Inc. $32.0000 $4,576.00

Volunteer Paving, LLC $33.3300 $4,766.19

Civil Constructors, LLC $32.0000 $4,576.00

Sessions Paving Company $35.0000 $5,005.00

Jones Bros. Contractors, LLC $32.0000 $4,576.00

713-02.15 FLEXIBLE DELINEATOR (YELLOW)

EACH143.000

Rogers Group, Inc. $32.0000 $4,576.00

Volunteer Paving, LLC $33.3300 $4,766.19

Civil Constructors, LLC $32.0000 $4,576.00

Sessions Paving Company $35.0000 $5,005.00

Jones Bros. Contractors, LLC $32.0000 $4,576.00

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.48.000

Rogers Group, Inc. $6.6500 $319.20

Volunteer Paving, LLC $6.9300 $332.64

Civil Constructors, LLC $6.5000 $312.00

Sessions Paving Company $7.3000 $350.40

Jones Bros. Contractors, LLC $6.6500 $319.20

713-11.01 "U" SECTION STEEL POSTS

LB.890.000

Rogers Group, Inc. $3.6500 $3,248.50

Volunteer Paving, LLC $3.8000 $3,382.00

Civil Constructors, LLC $3.1000 $2,759.00

Sessions Paving Company $4.0000 $3,560.00

Jones Bros. Contractors, LLC $3.6500 $3,248.50

9PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.137.000

Rogers Group, Inc. $13.0000 $1,781.00

Volunteer Paving, LLC $13.5400 $1,854.98

Civil Constructors, LLC $13.2500 $1,815.25

Sessions Paving Company $14.3000 $1,959.10

Jones Bros. Contractors, LLC $13.0000 $1,781.00

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.126.000

Rogers Group, Inc. $14.0000 $1,764.00

Volunteer Paving, LLC $14.5800 $1,837.08

Civil Constructors, LLC $13.5000 $1,701.00

Sessions Paving Company $15.4000 $1,940.40

Jones Bros. Contractors, LLC $14.0000 $1,764.00

713-14.21 STREET NAME SIGN (RIGID 0.100IN THICK

S.F.28.000

Rogers Group, Inc. $23.0000 $644.00

Volunteer Paving, LLC $23.9600 $670.88

Civil Constructors, LLC $19.2500 $539.00

Sessions Paving Company $32.0000 $896.00

Jones Bros. Contractors, LLC $23.0000 $644.00

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Rogers Group, Inc. $450.0000 $450.00

Volunteer Paving, LLC $468.7500 $468.75

Civil Constructors, LLC $600.0000 $600.00

Sessions Paving Company $500.0000 $500.00

Jones Bros. Contractors, LLC $450.0000 $450.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Rogers Group, Inc. $6,200.0000 $12,400.00

Volunteer Paving, LLC $6,458.3300 $12,916.66

Civil Constructors, LLC $6,600.0000 $13,200.00

Sessions Paving Company $6,825.0000 $13,650.00

Jones Bros. Contractors, LLC $6,200.0000 $12,400.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH88.000

Rogers Group, Inc. $50.0000 $4,400.00

Volunteer Paving, LLC $20.0000 $1,760.00

Civil Constructors, LLC $50.0000 $4,400.00

Sessions Paving Company $50.0000 $4,400.00

Jones Bros. Contractors, LLC $50.0000 $4,400.00

10PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH39.000

Rogers Group, Inc. $50.0000 $1,950.00

Volunteer Paving, LLC $20.0000 $780.00

Civil Constructors, LLC $50.0000 $1,950.00

Sessions Paving Company $50.0000 $1,950.00

Jones Bros. Contractors, LLC $50.0000 $1,950.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH151.000

Rogers Group, Inc. $50.0000 $7,550.00

Volunteer Paving, LLC $20.0000 $3,020.00

Civil Constructors, LLC $50.0000 $7,550.00

Sessions Paving Company $50.0000 $7,550.00

Jones Bros. Contractors, LLC $50.0000 $7,550.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.1,780.000

Rogers Group, Inc. $10.0000 $17,800.00

Volunteer Paving, LLC $2.0000 $3,560.00

Civil Constructors, LLC $10.0000 $17,800.00

Sessions Paving Company $10.0000 $17,800.00

Jones Bros. Contractors, LLC $10.0000 $17,800.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.240.000

Rogers Group, Inc. $15.0000 $3,600.00

Volunteer Paving, LLC $15.0000 $3,600.00

Civil Constructors, LLC $15.0000 $3,600.00

Sessions Paving Company $15.0000 $3,600.00

Jones Bros. Contractors, LLC $15.0000 $3,600.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH27.000

Rogers Group, Inc. $150.0000 $4,050.00

Volunteer Paving, LLC $300.0000 $8,100.00

Civil Constructors, LLC $150.0000 $4,050.00

Sessions Paving Company $150.0000 $4,050.00

Jones Bros. Contractors, LLC $150.0000 $4,050.00

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH3.000

Rogers Group, Inc. $360.0000 $1,080.00

Volunteer Paving, LLC $250.0000 $750.00

Civil Constructors, LLC $360.0000 $1,080.00

Sessions Paving Company $360.0000 $1,080.00

Jones Bros. Contractors, LLC $360.0000 $1,080.00

11PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH2.000

Rogers Group, Inc. $225.0000 $450.00

Volunteer Paving, LLC $250.0000 $500.00

Civil Constructors, LLC $225.0000 $450.00

Sessions Paving Company $225.0000 $450.00

Jones Bros. Contractors, LLC $225.0000 $450.00

716-04.05 PLASTIC PAVEMENT MARKING (STRAIGHT ARROW)

EACH11.000

Rogers Group, Inc. $140.0000 $1,540.00

Volunteer Paving, LLC $150.0000 $1,650.00

Civil Constructors, LLC $140.0000 $1,540.00

Sessions Paving Company $140.0000 $1,540.00

Jones Bros. Contractors, LLC $140.0000 $1,540.00

716-04.14 PLASTIC PAVEMENT MARKING (LANE REDUCTION ARROW)

EACH8.000

Rogers Group, Inc. $700.0000 $5,600.00

Volunteer Paving, LLC $800.0000 $6,400.00

Civil Constructors, LLC $700.0000 $5,600.00

Sessions Paving Company $700.0000 $5,600.00

Jones Bros. Contractors, LLC $700.0000 $5,600.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.1.100

Rogers Group, Inc. $1,500.0000 $1,650.00

Volunteer Paving, LLC $850.0000 $935.00

Civil Constructors, LLC $1,500.0000 $1,650.00

Sessions Paving Company $1,500.0000 $1,650.00

Jones Bros. Contractors, LLC $1,500.0000 $1,650.00

716-05.02 PAINTED PAVEMENT MARKING (8" BARRIER LINE)

L.F.265.000

Rogers Group, Inc. $1.0000 $265.00

Volunteer Paving, LLC $0.5000 $132.50

Civil Constructors, LLC $1.0000 $265.00

Sessions Paving Company $1.0000 $265.00

Jones Bros. Contractors, LLC $1.0000 $265.00

716-05.20 PAINTED PAVEMENT MARKING (6" LINE)

L.M.2.500

Rogers Group, Inc. $2,000.0000 $5,000.00

Volunteer Paving, LLC $1,000.0000 $2,500.00

Civil Constructors, LLC $2,000.0000 $5,000.00

Sessions Paving Company $2,000.0000 $5,000.00

Jones Bros. Contractors, LLC $2,000.0000 $5,000.00

12PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.3.600

Rogers Group, Inc. $8,500.0000 $30,600.00

Volunteer Paving, LLC $10,000.0000 $36,000.00

Civil Constructors, LLC $8,800.0000 $31,680.00

Sessions Paving Company $8,500.0000 $30,600.00

Jones Bros. Contractors, LLC $8,500.0000 $30,600.00

717-01 MOBILIZATION

LS1.000

Rogers Group, Inc. $80,000.0000 $80,000.00

Volunteer Paving, LLC $105,148.9600 $105,148.96

Civil Constructors, LLC $91,935.0000 $91,935.00

Sessions Paving Company $45,000.0000 $45,000.00

Jones Bros. Contractors, LLC $125,000.0000 $125,000.00

730-02.09 SIGNAL HEAD ASSEMBLY (130 WITH BACKPLATE)

EACH8.000

Rogers Group, Inc. $725.0000 $5,800.00

Volunteer Paving, LLC $752.0800 $6,016.64

Civil Constructors, LLC $737.0000 $5,896.00

Sessions Paving Company $722.0000 $5,776.00

Jones Bros. Contractors, LLC $722.0000 $5,776.00

730-02.30 SIGNAL HEAD ASSEMBLY (130 A3 WITH BACKPLATE)

EACH3.000

Rogers Group, Inc. $730.0000 $2,190.00

Volunteer Paving, LLC $758.3300 $2,274.99

Civil Constructors, LLC $745.0000 $2,235.00

Sessions Paving Company $728.0000 $2,184.00

Jones Bros. Contractors, LLC $728.0000 $2,184.00

730-02.31 SIGNAL HEAD ASSEMBLY (130 A2 WITH BACKPLATE)

EACH4.000

Rogers Group, Inc. $730.0000 $2,920.00

Volunteer Paving, LLC $758.3300 $3,033.32

Civil Constructors, LLC $745.0000 $2,980.00

Sessions Paving Company $728.0000 $2,912.00

Jones Bros. Contractors, LLC $728.0000 $2,912.00

730-02.32 SIGNAL HEAD ASSEMBLY (150 A4 WITH BACKPLATE)

EACH1.000

Rogers Group, Inc. $1,185.0000 $1,185.00

Volunteer Paving, LLC $1,233.3300 $1,233.33

Civil Constructors, LLC $1,210.0000 $1,210.00

Sessions Paving Company $1,184.0000 $1,184.00

Jones Bros. Contractors, LLC $1,184.0000 $1,184.00

13PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

730-03.21 INSTALL PULL BOX (TYPE B)

EACH10.000

Rogers Group, Inc. $350.0000 $3,500.00

Volunteer Paving, LLC $364.5800 $3,645.80

Civil Constructors, LLC $360.0000 $3,600.00

Sessions Paving Company $350.0000 $3,500.00

Jones Bros. Contractors, LLC $350.0000 $3,500.00

730-05.01 ELECTRICAL SERVICE CONNECTION

EACH2.000

Rogers Group, Inc. $2,500.0000 $5,000.00

Volunteer Paving, LLC $2,604.1700 $5,208.34

Civil Constructors, LLC $2,550.0000 $5,100.00

Sessions Paving Company $2,500.0000 $5,000.00

Jones Bros. Contractors, LLC $2,500.0000 $5,000.00

730-08.02 SIGNAL CABLE - 5 CONDUCTOR

L.F.1,135.000

Rogers Group, Inc. $1.2500 $1,418.75

Volunteer Paving, LLC $1.3000 $1,475.50

Civil Constructors, LLC $1.3000 $1,475.50

Sessions Paving Company $1.2500 $1,418.75

Jones Bros. Contractors, LLC $1.2500 $1,418.75

730-08.03 SIGNAL CABLE - 7 CONDUCTOR

L.F.1,220.000

Rogers Group, Inc. $1.5000 $1,830.00

Volunteer Paving, LLC $1.5600 $1,903.20

Civil Constructors, LLC $1.5500 $1,891.00

Sessions Paving Company $1.5000 $1,830.00

Jones Bros. Contractors, LLC $1.5000 $1,830.00

730-12.02 CONDUIT 2" DIAMETER (PVC)

L.F.290.000

Rogers Group, Inc. $6.0000 $1,740.00

Volunteer Paving, LLC $6.2500 $1,812.50

Civil Constructors, LLC $6.1500 $1,783.50

Sessions Paving Company $6.0000 $1,740.00

Jones Bros. Contractors, LLC $6.0000 $1,740.00

730-12.13 CONDUIT 2" DIAMETER (JACK AND BORE)

L.F.510.000

Rogers Group, Inc. $22.0000 $11,220.00

Volunteer Paving, LLC $22.9200 $11,689.20

Civil Constructors, LLC $22.5000 $11,475.00

Sessions Paving Company $22.0000 $11,220.00

Jones Bros. Contractors, LLC $22.0000 $11,220.00

14PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

730-13.07 VEHICLE DETECTOR (SIREN ACTIVATED PRIORITY CONTROL)

EACH6.000

Rogers Group, Inc. $3,375.0000 $20,250.00

Volunteer Paving, LLC $3,512.5000 $21,075.00

Civil Constructors, LLC $3,440.0000 $20,640.00

Sessions Paving Company $3,372.0000 $20,232.00

Jones Bros. Contractors, LLC $3,372.0000 $20,232.00

730-13.08 VEHICLE DETECTOR (RADAR- STOP LINE)

EACH6.000

Rogers Group, Inc. $7,915.0000 $47,490.00

Volunteer Paving, LLC $8,243.7500 $49,462.50

Civil Constructors, LLC $8,075.0000 $48,450.00

Sessions Paving Company $7,914.0000 $47,484.00

Jones Bros. Contractors, LLC $7,914.0000 $47,484.00

730-13.09 VEHICLE DETECTOR (RADAR- ADVANCE)

EACH4.000

Rogers Group, Inc. $7,915.0000 $31,660.00

Volunteer Paving, LLC $8,243.7500 $32,975.00

Civil Constructors, LLC $8,500.0000 $34,000.00

Sessions Paving Company $7,914.0000 $31,656.00

Jones Bros. Contractors, LLC $7,914.0000 $31,656.00

730-14.02 SAW SLOT

L.F.400.000

Rogers Group, Inc. $3.5000 $1,400.00

Volunteer Paving, LLC $3.6500 $1,460.00

Civil Constructors, LLC $3.6000 $1,440.00

Sessions Paving Company $3.5000 $1,400.00

Jones Bros. Contractors, LLC $3.5000 $1,400.00

730-14.03 LOOP WIRE

L.F.850.000

Rogers Group, Inc. $0.5000 $425.00

Volunteer Paving, LLC $0.5200 $442.00

Civil Constructors, LLC $0.5500 $467.50

Sessions Paving Company $0.5000 $425.00

Jones Bros. Contractors, LLC $0.5000 $425.00

730-15.32 CABINET (EIGHT PHASE BASE MOUNTED)

EACH2.000

Rogers Group, Inc. $13,650.0000 $27,300.00

Volunteer Paving, LLC $14,218.7500 $28,437.50

Civil Constructors, LLC $13,925.0000 $27,850.00

Sessions Paving Company $13,650.0000 $27,300.00

Jones Bros. Contractors, LLC $13,650.0000 $27,300.00

15PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

730-16.02 EIGHT PHASE ACTUATED CONTROLLER

EACH2.000

Rogers Group, Inc. $3,415.0000 $6,830.00

Volunteer Paving, LLC $3,555.2100 $7,110.42

Civil Constructors, LLC $3,485.0000 $6,970.00

Sessions Paving Company $3,413.0000 $6,826.00

Jones Bros. Contractors, LLC $3,413.0000 $6,826.00

730-23.36 CANTILEVER SIGNAL SUPPORT (2 @ 55' & 60')

EACH1.000

Rogers Group, Inc. $26,000.0000 $26,000.00

Volunteer Paving, LLC $27,019.7900 $27,019.79

Civil Constructors, LLC $29,250.0000 $29,250.00

Sessions Paving Company $25,939.0000 $25,939.00

Jones Bros. Contractors, LLC $25,939.0000 $25,939.00

730-23.38 CANTILEVER SIGNAL SUPPORT (1 ARM @ 80')

EACH2.000

Rogers Group, Inc. $24,520.0000 $49,040.00

Volunteer Paving, LLC $25,537.5000 $51,075.00

Civil Constructors, LLC $27,500.0000 $55,000.00

Sessions Paving Company $24,516.0000 $49,032.00

Jones Bros. Contractors, LLC $24,516.0000 $49,032.00

730-23.88 CANTILEVER SIGNAL SUPPORT (1 ARM @ 45')

EACH2.000

Rogers Group, Inc. $15,500.0000 $31,000.00

Volunteer Paving, LLC $16,070.8300 $32,141.66

Civil Constructors, LLC $15,740.0000 $31,480.00

Sessions Paving Company $15,428.0000 $30,856.00

Jones Bros. Contractors, LLC $15,428.0000 $30,856.00

730-35.01 RF DATA SYSTEM (SPREAD SPECTRUM)

EACH2.000

Rogers Group, Inc. $1,825.0000 $3,650.00

Volunteer Paving, LLC $1,900.0000 $3,800.00

Civil Constructors, LLC $1,860.0000 $3,720.00

Sessions Paving Company $1,824.0000 $3,648.00

Jones Bros. Contractors, LLC $1,824.0000 $3,648.00

730-35.05 DATA SYSTEM POWER SUPPLY

EACH2.000

Rogers Group, Inc. $357.0000 $714.00

Volunteer Paving, LLC $370.8300 $741.66

Civil Constructors, LLC $365.0000 $730.00

Sessions Paving Company $356.0000 $712.00

Jones Bros. Contractors, LLC $356.0000 $712.00

16PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

730-35.10 ANTENNA (OMNI)

EACH1.000

Rogers Group, Inc. $1,160.0000 $1,160.00

Volunteer Paving, LLC $1,207.2900 $1,207.29

Civil Constructors, LLC $1,185.0000 $1,185.00

Sessions Paving Company $1,159.0000 $1,159.00

Jones Bros. Contractors, LLC $1,159.0000 $1,159.00

730-35.11 ANTENNA (YAGI)

EACH1.000

Rogers Group, Inc. $672.0000 $672.00

Volunteer Paving, LLC $698.9600 $698.96

Civil Constructors, LLC $685.0000 $685.00

Sessions Paving Company $671.0000 $671.00

Jones Bros. Contractors, LLC $671.0000 $671.00

730-35.21 RF DATA SYSTEM CABLE(RGA COAXIAL)

L.F.60.000

Rogers Group, Inc. $3.0000 $180.00

Volunteer Paving, LLC $3.1300 $187.80

Civil Constructors, LLC $3.2100 $192.60

Sessions Paving Company $3.0000 $180.00

Jones Bros. Contractors, LLC $3.0000 $180.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.344.000

Rogers Group, Inc. $2.0000 $688.00

Volunteer Paving, LLC $3.2800 $1,128.32

Civil Constructors, LLC $3.5000 $1,204.00

Sessions Paving Company $3.5000 $1,204.00

Jones Bros. Contractors, LLC $3.1500 $1,083.60

740-11.04 TEMPORARY SEDIMENT TUBE 20IN

L.F.4,925.000

Rogers Group, Inc. $4.0000 $19,700.00

Volunteer Paving, LLC $3.5800 $17,631.50

Civil Constructors, LLC $3.2500 $16,006.25

Sessions Paving Company $3.8000 $18,715.00

Jones Bros. Contractors, LLC $3.4400 $16,942.00

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT165.000

Rogers Group, Inc. $32.5000 $5,362.50

Volunteer Paving, LLC $28.1000 $4,636.50

Civil Constructors, LLC $32.5000 $5,362.50

Sessions Paving Company $30.0000 $4,950.00

Jones Bros. Contractors, LLC $46.0000 $7,590.00

17PAGE

EXTENSION

CONTRACT CNT065

UNIT PRICE

801-03 WATER (SEEDING & SODDING)

M.G.109.000

Rogers Group, Inc. $30.0000 $3,270.00

Volunteer Paving, LLC $44.2700 $4,825.43

Civil Constructors, LLC $30.0000 $3,270.00

Sessions Paving Company $47.0000 $5,123.00

Jones Bros. Contractors, LLC $30.0000 $3,270.00

803-01 SODDING (NEW SOD)

S.Y.10,900.000

Rogers Group, Inc. $3.1500 $34,335.00

Volunteer Paving, LLC $4.1000 $44,690.00

Civil Constructors, LLC $3.5000 $38,150.00

Sessions Paving Company $4.4000 $47,960.00

Jones Bros. Contractors, LLC $3.1500 $34,335.00

18PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Rogers Group, Inc. $1,996,396.00

Volunteer Paving, LLC $2,024,878.26

Civil Constructors, LLC $2,330,996.50

Sessions Paving Company $2,434,546.70

Jones Bros. Contractors, LLC $2,587,334.65

Rogers Group, Inc. $1,996,396.00

Volunteer Paving, LLC $2,024,878.26

Civil Constructors, LLC $2,330,996.50

Sessions Paving Company $2,434,546.70

Jones Bros. Contractors, LLC $2,587,334.65

19PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

MEIGS COUNTY (Contract No. CNT103 Call 044)

THE REPAIR OF THE BRIDGE ON S.R. 58 OVER THE HIWASSEE RIVER (L.M. 5.22).

PROJECT LENGTH -

61003-4263-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Mid-State Construction Company, Inc. $1,664,111.07

Southern Constructors, Inc. $1,851,376.00

Jones Bros. Contractors, LLC $2,056,434.50

The Truesdell Corporation $2,123,123.00

Olympus Painting Contractors, Inc. $2,219,477.54

Freyssinet, Inc. $2,387,016.80

Titan Industrial Services, Inc. $2,834,464.58

1PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

BRIDGE CATEGORY

201-01 CLEARING AND GRUBBING

LS1.000

Mid-State Construction Company, Inc. $7,785.1400 $7,785.14

Southern Constructors, Inc. $15,000.0000 $15,000.00

Jones Bros. Contractors, LLC $74,000.0000 $74,000.00

The Truesdell Corporation $4,500.0000 $4,500.00

Olympus Painting Contractors, Inc. $10,000.0000 $10,000.00

Freyssinet, Inc. $26,400.0000 $26,400.00

Titan Industrial Services, Inc. $5,000.0000 $5,000.00

602-10.12 BEARING DEVICE (REPAIR)

LS1.000

Mid-State Construction Company, Inc. $15,708.4600 $15,708.46

Southern Constructors, Inc. $50,000.0000 $50,000.00

Jones Bros. Contractors, LLC $74,000.0000 $74,000.00

The Truesdell Corporation $30,000.0000 $30,000.00

Olympus Painting Contractors, Inc. $40,000.0000 $40,000.00

Freyssinet, Inc. $48,100.0000 $48,100.00

Titan Industrial Services, Inc. $75,060.0000 $75,060.00

602-10.20 BOLTS

EACH10.000

Mid-State Construction Company, Inc. $84.9200 $849.20

Southern Constructors, Inc. $750.0000 $7,500.00

Jones Bros. Contractors, LLC $180.0000 $1,800.00

The Truesdell Corporation $1,300.0000 $13,000.00

Olympus Painting Contractors, Inc. $200.0000 $2,000.00

Freyssinet, Inc. $750.0000 $7,500.00

Titan Industrial Services, Inc. $675.0000 $6,750.00

603-02.01 REPAINTING EXISTING STEEL STRUCTURES (END OF BEAM, SPANS 5 & 7)

LS1.000

Mid-State Construction Company, Inc. $3,375.3000 $3,375.30

Southern Constructors, Inc. $5,000.0000 $5,000.00

Jones Bros. Contractors, LLC $3,000.0000 $3,000.00

The Truesdell Corporation $3,200.0000 $3,200.00

Olympus Painting Contractors, Inc. $85,000.0000 $85,000.00

Freyssinet, Inc. $4,480.0000 $4,480.00

Titan Industrial Services, Inc. $50,000.0000 $50,000.00

603-02.15 REPAINT EXISTING BEARINGS

LS1.000

Mid-State Construction Company, Inc. $22,502.0000 $22,502.00

Southern Constructors, Inc. $25,000.0000 $25,000.00

Jones Bros. Contractors, LLC $20,000.0000 $20,000.00

The Truesdell Corporation $21,250.0000 $21,250.00

Olympus Painting Contractors, Inc. $9,600.0000 $9,600.00

Freyssinet, Inc. $29,900.0000 $29,900.00

Titan Industrial Services, Inc. $50,000.0000 $50,000.00

2PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

604-04.02 APPLIED TEXTURE FINISH (EXISTING STRUCTURES)

S.Y.18,411.000

Mid-State Construction Company, Inc. $11.2500 $207,123.75

Southern Constructors, Inc. $11.0000 $202,521.00

Jones Bros. Contractors, LLC $10.0000 $184,110.00

The Truesdell Corporation $11.0000 $202,521.00

Olympus Painting Contractors, Inc. $8.5000 $156,493.50

Freyssinet, Inc. $25.0000 $460,275.00

Titan Industrial Services, Inc. $51.6200 $950,375.82

604-10.05 CONCRETE

S.F.103.000

Mid-State Construction Company, Inc. $156.8600 $16,156.58

Southern Constructors, Inc. $125.0000 $12,875.00

Jones Bros. Contractors, LLC $350.0000 $36,050.00

The Truesdell Corporation $420.0000 $43,260.00

Olympus Painting Contractors, Inc. $400.0000 $41,200.00

Freyssinet, Inc. $250.0000 $25,750.00

Titan Industrial Services, Inc. $160.0000 $16,480.00

604-10.16 EXPANSION JOINT REPAIRS

LS1.000

Mid-State Construction Company, Inc. $2,358.4200 $2,358.42

Southern Constructors, Inc. $6,000.0000 $6,000.00

Jones Bros. Contractors, LLC $50,000.0000 $50,000.00

The Truesdell Corporation $2,000.0000 $2,000.00

Olympus Painting Contractors, Inc. $40,000.0000 $40,000.00

Freyssinet, Inc. $21,800.0000 $21,800.00

Titan Industrial Services, Inc. $9,000.0000 $9,000.00

604-10.50 BRIDGE DECK REPAIRS (PARTIAL DEPTH OF SLAB)

S.Y.165.000

Mid-State Construction Company, Inc. $169.3700 $27,946.05

Southern Constructors, Inc. $200.0000 $33,000.00

Jones Bros. Contractors, LLC $300.0000 $49,500.00

The Truesdell Corporation $325.0000 $53,625.00

Olympus Painting Contractors, Inc. $850.0000 $140,250.00

Freyssinet, Inc. $600.0000 $99,000.00

Titan Industrial Services, Inc. $1,000.0000 $165,000.00

604-10.54 CONCRETE REPAIRS

S.F.500.000

Mid-State Construction Company, Inc. $156.8600 $78,430.00

Southern Constructors, Inc. $125.0000 $62,500.00

Jones Bros. Contractors, LLC $350.0000 $175,000.00

The Truesdell Corporation $198.0000 $99,000.00

Olympus Painting Contractors, Inc. $400.0000 $200,000.00

Freyssinet, Inc. $200.0000 $100,000.00

Titan Industrial Services, Inc. $160.0000 $80,000.00

3PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

604-10.58 EPOXY INJECTION (INJECTION)

GAL.59.000

Mid-State Construction Company, Inc. $168.7700 $9,957.43

Southern Constructors, Inc. $100.0000 $5,900.00

Jones Bros. Contractors, LLC $150.0000 $8,850.00

The Truesdell Corporation $150.0000 $8,850.00

Olympus Painting Contractors, Inc. $145.0000 $8,555.00

Freyssinet, Inc. $93.0000 $5,487.00

Titan Industrial Services, Inc. $210.0000 $12,390.00

604-10.62 EPOXY INJECTION REPAIR (COMPLETE AND IN PLACE)

L.F.1,687.000

Mid-State Construction Company, Inc. $45.0000 $75,915.00

Southern Constructors, Inc. $65.0000 $109,655.00

Jones Bros. Contractors, LLC $42.0000 $70,854.00

The Truesdell Corporation $60.0000 $101,220.00

Olympus Painting Contractors, Inc. $68.4000 $115,390.80

Freyssinet, Inc. $31.0000 $52,297.00

Titan Industrial Services, Inc. $45.0000 $75,915.00

604-10.83 COMPOSITE FIBER ENCASEMENT

S.F.30,816.000

Mid-State Construction Company, Inc. $23.9100 $736,810.56

Southern Constructors, Inc. $25.0000 $770,400.00

Jones Bros. Contractors, LLC $23.0000 $708,768.00

The Truesdell Corporation $30.0000 $924,480.00

Olympus Painting Contractors, Inc. $25.3900 $782,418.24

Freyssinet, Inc. $16.0000 $493,056.00

Titan Industrial Services, Inc. $19.4000 $597,830.40

617-04.01 TYPE 1 THIN EPOXY OVERLAY (EPOXY-URETHANE)

S.Y.8,783.000

Mid-State Construction Company, Inc. $28.1300 $247,065.79

Southern Constructors, Inc. $30.0000 $263,490.00

Jones Bros. Contractors, LLC $26.5000 $232,749.50

The Truesdell Corporation $30.0000 $263,490.00

Olympus Painting Contractors, Inc. $35.0000 $307,405.00

Freyssinet, Inc. $47.0000 $412,801.00

Titan Industrial Services, Inc. $31.0000 $272,273.00

705-08.11 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH2.000

Mid-State Construction Company, Inc. $1,519.0200 $3,038.04

Southern Constructors, Inc. $5,000.0000 $10,000.00

Jones Bros. Contractors, LLC $4,500.0000 $9,000.00

The Truesdell Corporation $5,100.0000 $10,200.00

Olympus Painting Contractors, Inc. $3,500.0000 $7,000.00

Freyssinet, Inc. $7,820.0000 $15,640.00

Titan Industrial Services, Inc. $6,000.0000 $12,000.00

4PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

712-01 TRAFFIC CONTROL

LS1.000

Mid-State Construction Company, Inc. $24,075.1300 $24,075.13

Southern Constructors, Inc. $30,000.0000 $30,000.00

Jones Bros. Contractors, LLC $60,000.0000 $60,000.00

The Truesdell Corporation $5,700.0000 $5,700.00

Olympus Painting Contractors, Inc. $50,000.0000 $50,000.00

Freyssinet, Inc. $155,000.0000 $155,000.00

Titan Industrial Services, Inc. $8,250.0000 $8,250.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.2,050.000

Mid-State Construction Company, Inc. $27.7000 $56,785.00

Southern Constructors, Inc. $30.0000 $61,500.00

Jones Bros. Contractors, LLC $50.0000 $102,500.00

The Truesdell Corporation $24.0000 $49,200.00

Olympus Painting Contractors, Inc. $55.0000 $112,750.00

Freyssinet, Inc. $65.0000 $133,250.00

Titan Industrial Services, Inc. $75.0000 $153,750.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Mid-State Construction Company, Inc. $32.0700 $801.75

Southern Constructors, Inc. $30.0000 $750.00

Jones Bros. Contractors, LLC $25.0000 $625.00

The Truesdell Corporation $30.0000 $750.00

Olympus Painting Contractors, Inc. $55.0000 $1,375.00

Freyssinet, Inc. $44.0000 $1,100.00

Titan Industrial Services, Inc. $31.2500 $781.25

712-04.50 BARRIER RAIL DELINEATOR

EACH102.000

Mid-State Construction Company, Inc. $14.0600 $1,434.12

Southern Constructors, Inc. $15.0000 $1,530.00

Jones Bros. Contractors, LLC $10.0000 $1,020.00

The Truesdell Corporation $11.0000 $1,122.00

Olympus Painting Contractors, Inc. $20.0000 $2,040.00

Freyssinet, Inc. $18.0000 $1,836.00

Titan Industrial Services, Inc. $12.5000 $1,275.00

712-06 SIGNS (CONSTRUCTION)

S.F.412.000

Mid-State Construction Company, Inc. $9.8400 $4,054.08

Southern Constructors, Inc. $15.0000 $6,180.00

Jones Bros. Contractors, LLC $10.0000 $4,120.00

The Truesdell Corporation $7.0000 $2,884.00

Olympus Painting Contractors, Inc. $15.0000 $6,180.00

Freyssinet, Inc. $23.0000 $9,476.00

Titan Industrial Services, Inc. $8.1300 $3,349.56

5PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

712-09.01 REMOVABLE PAVEMENT MARKING LINE

L.F.2,000.000

Mid-State Construction Company, Inc. $2.3600 $4,720.00

Southern Constructors, Inc. $3.5000 $7,000.00

Jones Bros. Contractors, LLC $2.1000 $4,200.00

The Truesdell Corporation $2.5000 $5,000.00

Olympus Painting Contractors, Inc. $3.5000 $7,000.00

Freyssinet, Inc. $3.5000 $7,000.00

Titan Industrial Services, Inc. $2.8100 $5,620.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Mid-State Construction Company, Inc. $3,881.6000 $7,763.20

Southern Constructors, Inc. $5,000.0000 $10,000.00

Jones Bros. Contractors, LLC $12,000.0000 $24,000.00

The Truesdell Corporation $6,500.0000 $13,000.00

Olympus Painting Contractors, Inc. $5,000.0000 $10,000.00

Freyssinet, Inc. $9,260.0000 $18,520.00

Titan Industrial Services, Inc. $7,750.0000 $15,500.00

714-16.02 NAVIGATIONAL LIGHTING

LS1.000

Mid-State Construction Company, Inc. $14,513.7900 $14,513.79

Southern Constructors, Inc. $25,000.0000 $25,000.00

Jones Bros. Contractors, LLC $12,640.0000 $12,640.00

The Truesdell Corporation $13,500.0000 $13,500.00

Olympus Painting Contractors, Inc. $15,000.0000 $15,000.00

Freyssinet, Inc. $25,800.0000 $25,800.00

Titan Industrial Services, Inc. $12,500.0000 $12,500.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH31.000

Mid-State Construction Company, Inc. $112.5100 $3,487.81

Southern Constructors, Inc. $125.0000 $3,875.00

Jones Bros. Contractors, LLC $100.0000 $3,100.00

The Truesdell Corporation $150.0000 $4,650.00

Olympus Painting Contractors, Inc. $50.0000 $1,550.00

Freyssinet, Inc. $110.0000 $3,410.00

Titan Industrial Services, Inc. $93.7500 $2,906.25

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH31.000

Mid-State Construction Company, Inc. $22.5000 $697.50

Southern Constructors, Inc. $60.0000 $1,860.00

Jones Bros. Contractors, LLC $20.0000 $620.00

The Truesdell Corporation $30.0000 $930.00

Olympus Painting Contractors, Inc. $10.0000 $310.00

Freyssinet, Inc. $18.0000 $558.00

Titan Industrial Services, Inc. $15.0000 $465.00

6PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.4.000

Mid-State Construction Company, Inc. $843.8300 $3,375.32

Southern Constructors, Inc. $1,000.0000 $4,000.00

Jones Bros. Contractors, LLC $750.0000 $3,000.00

The Truesdell Corporation $800.0000 $3,200.00

Olympus Painting Contractors, Inc. $1,800.0000 $7,200.00

Freyssinet, Inc. $940.0000 $3,760.00

Titan Industrial Services, Inc. $1,156.0000 $4,624.00

716-05.05 PAINTED PAVEMENT MARKING (STOP LINE)

L.F.30.000

Mid-State Construction Company, Inc. $11.2500 $337.50

Southern Constructors, Inc. $20.0000 $600.00

Jones Bros. Contractors, LLC $10.0000 $300.00

The Truesdell Corporation $20.0000 $600.00

Olympus Painting Contractors, Inc. $20.0000 $600.00

Freyssinet, Inc. $11.0000 $330.00

Titan Industrial Services, Inc. $9.0600 $271.80

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.2.060

Mid-State Construction Company, Inc. $3,150.2800 $6,489.58

Southern Constructors, Inc. $4,000.0000 $8,240.00

Jones Bros. Contractors, LLC $2,800.0000 $5,768.00

The Truesdell Corporation $2,950.0000 $6,077.00

Olympus Painting Contractors, Inc. $2,500.0000 $5,150.00

Freyssinet, Inc. $5,680.0000 $11,700.80

Titan Industrial Services, Inc. $4,750.0000 $9,785.00

717-01 MOBILIZATION

LS1.000

Mid-State Construction Company, Inc. $60,864.1900 $60,864.19

Southern Constructors, Inc. $90,000.0000 $90,000.00

Jones Bros. Contractors, LLC $106,000.0000 $106,000.00

The Truesdell Corporation $199,664.0000 $199,664.00

Olympus Painting Contractors, Inc. $40,000.0000 $40,000.00

Freyssinet, Inc. $174,890.0000 $174,890.00

Titan Industrial Services, Inc. $140,000.0000 $140,000.00

730-05.01 ELECTRICAL SERVICE CONNECTION

EACH1.000

Mid-State Construction Company, Inc. $1.1300 $1.13

Southern Constructors, Inc. $2,000.0000 $2,000.00

Jones Bros. Contractors, LLC $5,860.0000 $5,860.00

The Truesdell Corporation $6,250.0000 $6,250.00

Olympus Painting Contractors, Inc. $10.0000 $10.00

Freyssinet, Inc. $500.0000 $500.00

Titan Industrial Services, Inc. $11,812.5000 $11,812.50

7PAGE

EXTENSION

CONTRACT CNT103

UNIT PRICE

730-40 TEMPORARY TRAFFIC SIGNAL SYSTEM

EACH1.000

Mid-State Construction Company, Inc. $19,689.2500 $19,689.25

Southern Constructors, Inc. $20,000.0000 $20,000.00

Jones Bros. Contractors, LLC $25,000.0000 $25,000.00

The Truesdell Corporation $30,000.0000 $30,000.00

Olympus Painting Contractors, Inc. $15,000.0000 $15,000.00

Freyssinet, Inc. $37,400.0000 $37,400.00

Titan Industrial Services, Inc. $85,500.0000 $85,500.00

8PAGE

TOTAL CONTRACT

SUB-TOTAL BRIDGE

Mid-State Construction Company, Inc. $1,664,111.07

Southern Constructors, Inc. $1,851,376.00

Jones Bros. Contractors, LLC $2,056,434.50

The Truesdell Corporation $2,123,123.00

Olympus Painting Contractors, Inc. $2,219,477.54

Freyssinet, Inc. $2,387,016.80

Titan Industrial Services, Inc. $2,834,464.58

Mid-State Construction Company, Inc. $1,664,111.07

Southern Constructors, Inc. $1,851,376.00

Jones Bros. Contractors, LLC $2,056,434.50

The Truesdell Corporation $2,123,123.00

Olympus Painting Contractors, Inc. $2,219,477.54

Freyssinet, Inc. $2,387,016.80

Titan Industrial Services, Inc. $2,834,464.58

9PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

OBION COUNTY (Contract No. CNT104 Call 045)

2.50%DBE GOAL

THE RESURFACING WITH HOT IN-PLACE RECYCLING ON U.S. 51 (S.R. 3) FROM SOUTH MAIN STREET (L.M. 9.39) TO NORTH OF ALLIECAMPBELL ROAD (L.M. 15.35).

PROJECT LENGTH -

NH/HSIP-3(153),66001-3286-94,66001-8286-14

5.960 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Ford Construction Company $3,156,021.14

1PAGE

EXTENSION

CONTRACT CNT104

UNIT PRICE

ROADWAY CATEGORY

202-03.01 REMOVAL OF ASPHALT PAVEMENT

S.Y.320.000

Ford Construction Company $60.0000 $19,200.00

203-06 WATER

M.G.25.000

Ford Construction Company $1.0000 $25.00

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.21.759

Ford Construction Company $970.0000 $21,106.23

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (C OR D)

TON3,355.000

Ford Construction Company $22.8000 $76,494.00

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON111.000

Ford Construction Company $187.0000 $20,757.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON37.000

Ford Construction Company $227.0000 $8,399.00

311-03.04 HOT IN PLACE RECYCLING OF ASPHALT PAVEMENT (2.00IN)

S.Y.164,746.000

Ford Construction Company $4.1800 $688,638.28

311-03.10 Asphalt Rejuvenating Agent

GAL.90,611.000

Ford Construction Company $3.7500 $339,791.25

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON78.000

Ford Construction Company $410.0000 $31,980.00

407-07.01 INTELLIGENT COMPACTION EQUIPMENT

LS1.000

Ford Construction Company $81,000.0000 $81,000.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON825.000

Ford Construction Company $121.0000 $99,825.00

411-03.13 ACS MIX(PG70-22) THIN LIFT D ASPHALT

TON10,825.000

Ford Construction Company $111.5000 $1,206,987.50

2PAGE

EXTENSION

CONTRACT CNT104

UNIT PRICE

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.11.444

Ford Construction Company $696.0000 $7,965.02

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.8.252

Ford Construction Company $757.0000 $6,246.76

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.12,450.000

Ford Construction Company $4.2000 $52,290.00

712-01 TRAFFIC CONTROL

LS1.000

Ford Construction Company $64,000.0000 $64,000.00

712-06 SIGNS (CONSTRUCTION)

S.F.3,032.000

Ford Construction Company $8.0000 $24,256.00

712-08.03 ARROW BOARD (TYPE C)

EACH4.000

Ford Construction Company $630.0000 $2,520.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH790.000

Ford Construction Company $40.0000 $31,600.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH160.000

Ford Construction Company $40.0000 $6,400.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH950.000

Ford Construction Company $16.0000 $15,200.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.111.000

Ford Construction Company $26.0000 $2,886.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.575.000

Ford Construction Company $16.0000 $9,200.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH32.000

Ford Construction Company $210.0000 $6,720.00

3PAGE

EXTENSION

CONTRACT CNT104

UNIT PRICE

716-03.04 PLASTIC WORD PAVEMENT MARKING (SCHOOL)

EACH4.000

Ford Construction Company $400.0000 $1,600.00

716-04.05 PLASTIC PAVEMENT MARKING (STRAIGHT ARROW)

EACH2.000

Ford Construction Company $210.0000 $420.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.27.420

Ford Construction Company $1,430.0000 $39,210.60

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.27.420

Ford Construction Company $5,775.0000 $158,350.50

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.620.000

Ford Construction Company $3.1500 $1,953.00

717-01 MOBILIZATION

LS1.000

Ford Construction Company $131,000.0000 $131,000.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Ford Construction Company $3,156,021.14

Ford Construction Company $3,156,021.14

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

OBION COUNTY (Contract No. CNT016 Call 046)

6.50%DBE GOAL

THE GRADING, DRAINAGE, CONSTRUCTION OF BRIDGES AND PAVING ON FUTURE I-69 FROM WEST OF S.R. 21 TO U.S. 51 (S.R. 3).

PROJECT LENGTH -

NH-I-69(97),66269-3114-14

4.128 MILES

COMPLETION TIME - ON OR BEFORE JUNE 30, 2023

TOTAL CONTRACT

Ford Construction Company $70,826,945.21

Jones Bros. Contractors, LLC $71,410,782.51

Dement Construction Company, LLC $76,469,621.07

Kolb Grading, LLC $82,681,782.03

1PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Ford Construction Company $403,190.0000 $403,190.00

Jones Bros. Contractors, LLC $510,000.0000 $510,000.00

Dement Construction Company, LLC $460,000.0000 $460,000.00

Kolb Grading, LLC $715,000.0000 $715,000.00

109-10.01 TRAINEE

HOUR7,180.000

Ford Construction Company $0.8000 $5,744.00

Jones Bros. Contractors, LLC $0.8000 $5,744.00

Dement Construction Company, LLC $0.8000 $5,744.00

Kolb Grading, LLC $0.8000 $5,744.00

201-01 CLEARING AND GRUBBING

LS1.000

Ford Construction Company $2,276,548.0000 $2,276,548.00

Jones Bros. Contractors, LLC $3,000,000.0000 $3,000,000.00

Dement Construction Company, LLC $3,450,000.0000 $3,450,000.00

Kolb Grading, LLC $4,750,000.0000 $4,750,000.00

202-02.01 REMOVAL OF PIPE (18" CMP, LINDENWOOD 119+72.14)

L.F.45.000

Ford Construction Company $50.0000 $2,250.00

Jones Bros. Contractors, LLC $35.0000 $1,575.00

Dement Construction Company, LLC $16.0000 $720.00

Kolb Grading, LLC $20.0000 $900.00

202-02.02 REMOVAL OF PIPE (24" CMP, SR-21 35+89.39)

L.F.42.000

Ford Construction Company $50.0000 $2,100.00

Jones Bros. Contractors, LLC $35.0000 $1,470.00

Dement Construction Company, LLC $16.0000 $672.00

Kolb Grading, LLC $20.0000 $840.00

202-02.03 REMOVAL OF PIPE (30" CMP, PERRY BROWDER 131+65.42)

L.F.118.000

Ford Construction Company $50.0000 $5,900.00

Jones Bros. Contractors, LLC $35.0000 $4,130.00

Dement Construction Company, LLC $21.0000 $2,478.00

Kolb Grading, LLC $20.0000 $2,360.00

202-02.04 REMOVAL OF PIPE (30" CMP, BETHLEHEM 18+88.13)

L.F.40.000

Ford Construction Company $50.0000 $2,000.00

Jones Bros. Contractors, LLC $35.0000 $1,400.00

Dement Construction Company, LLC $21.0000 $840.00

Kolb Grading, LLC $21.5000 $860.00

2PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

202-02.05 REMOVAL OF PIPE (2 @ 36" RCP, SECTION LINE 23+15.96)

L.F.50.000

Ford Construction Company $50.0000 $2,500.00

Jones Bros. Contractors, LLC $35.0000 $1,750.00

Dement Construction Company, LLC $26.0000 $1,300.00

Kolb Grading, LLC $21.5000 $1,075.00

202-02.06 REMOVAL OF PIPE (15" CMP, CLAUDE TUCKER 41+64.45)

L.F.27.000

Ford Construction Company $50.0000 $1,350.00

Jones Bros. Contractors, LLC $35.0000 $945.00

Dement Construction Company, LLC $135.0000 $3,645.00

Kolb Grading, LLC $21.5000 $580.50

202-04.50 REMOVAL OF STRUCTURES (5'X4' RCBC, SR-21 16+35.38)

LS1.000

Ford Construction Company $10,000.0000 $10,000.00

Jones Bros. Contractors, LLC $20,000.0000 $20,000.00

Dement Construction Company, LLC $9,000.0000 $9,000.00

Kolb Grading, LLC $45,395.0000 $45,395.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.1,377,571.000

Ford Construction Company $5.0000 $6,887,855.00

Jones Bros. Contractors, LLC $2.7100 $3,733,217.41

Dement Construction Company, LLC $3.3500 $4,614,862.85

Kolb Grading, LLC $3.5000 $4,821,498.50

203-02.01 BORROW EXCAVATION (GRADED SOLID ROCK)

TON5,000.000

Ford Construction Company $25.0000 $125,000.00

Jones Bros. Contractors, LLC $40.0000 $200,000.00

Dement Construction Company, LLC $32.0000 $160,000.00

Kolb Grading, LLC $40.0000 $200,000.00

203-03 BORROW EXCAVATION (UNCLASSIFIED)

C.Y.1,232,494.000

Ford Construction Company $2.0000 $2,464,988.00

Jones Bros. Contractors, LLC $2.7100 $3,340,058.74

Dement Construction Company, LLC $3.3500 $4,128,854.90

Kolb Grading, LLC $3.6000 $4,436,978.40

203-03.10 SELECT GRANULAR MATERIAL

TON287,173.000

Ford Construction Company $6.2500 $1,794,831.25

Jones Bros. Contractors, LLC $8.7500 $2,512,763.75

Dement Construction Company, LLC $11.0000 $3,158,903.00

Kolb Grading, LLC $19.1500 $5,499,362.95

3PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

203-04 PLACING AND SPREADING TOPSOIL

C.Y.17,550.000

Ford Construction Company $0.5000 $8,775.00

Jones Bros. Contractors, LLC $5.0000 $87,750.00

Dement Construction Company, LLC $3.0000 $52,650.00

Kolb Grading, LLC $3.9500 $69,322.50

203-05 UNDERCUTTING

C.Y.162,833.000

Ford Construction Company $1.0000 $162,833.00

Jones Bros. Contractors, LLC $4.7500 $773,456.75

Dement Construction Company, LLC $4.0000 $651,332.00

Kolb Grading, LLC $5.7500 $936,289.75

204-08 FOUNDATION FILL MATERIAL

C.Y.805.000

Ford Construction Company $43.0000 $34,615.00

Jones Bros. Contractors, LLC $60.0000 $48,300.00

Dement Construction Company, LLC $70.0000 $56,350.00

Kolb Grading, LLC $60.0000 $48,300.00

204-08.01 BACKFILL MATERIAL (FLOWABLE FILL)

C.Y.278.000

Ford Construction Company $230.0000 $63,940.00

Jones Bros. Contractors, LLC $250.0000 $69,500.00

Dement Construction Company, LLC $230.0000 $63,940.00

Kolb Grading, LLC $230.0000 $63,940.00

209-02.07 18" TEMPORARY SLOPE DRAIN

L.F.171.000

Ford Construction Company $20.0000 $3,420.00

Jones Bros. Contractors, LLC $35.0000 $5,985.00

Dement Construction Company, LLC $20.0000 $3,420.00

Kolb Grading, LLC $31.1500 $5,326.65

209-03.23 FILTER SOCK (24 INCH)

L.F.327.000

Ford Construction Company $15.0000 $4,905.00

Jones Bros. Contractors, LLC $10.0000 $3,270.00

Dement Construction Company, LLC $10.0000 $3,270.00

Kolb Grading, LLC $15.0000 $4,905.00

209-05 SEDIMENT REMOVAL

C.Y.8,775.000

Ford Construction Company $3.3600 $29,484.00

Jones Bros. Contractors, LLC $2.0000 $17,550.00

Dement Construction Company, LLC $5.0000 $43,875.00

Kolb Grading, LLC $6.1500 $53,966.25

4PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

209-06.02 12" DIA COIR LOG (LOW FLOW CHANNEL)

L.F.192.000

Ford Construction Company $12.0000 $2,304.00

Jones Bros. Contractors, LLC $7.0000 $1,344.00

Dement Construction Company, LLC $7.0000 $1,344.00

Kolb Grading, LLC $12.0000 $2,304.00

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.91,000.000

Ford Construction Company $3.5000 $318,500.00

Jones Bros. Contractors, LLC $3.7500 $341,250.00

Dement Construction Company, LLC $3.7500 $341,250.00

Kolb Grading, LLC $3.6000 $327,600.00

209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING)

L.F.74,876.000

Ford Construction Company $1.5000 $112,314.00

Jones Bros. Contractors, LLC $1.5500 $116,057.80

Dement Construction Company, LLC $1.5500 $116,057.80

Kolb Grading, LLC $1.5000 $112,314.00

209-08.07 ROCK CHECK DAM PER

EACH174.000

Ford Construction Company $460.0000 $80,040.00

Jones Bros. Contractors, LLC $665.0000 $115,710.00

Dement Construction Company, LLC $960.0000 $167,040.00

Kolb Grading, LLC $600.0000 $104,400.00

209-08.08 ENHANCED ROCK CHECK DAM

EACH186.000

Ford Construction Company $550.0000 $102,300.00

Jones Bros. Contractors, LLC $750.0000 $139,500.00

Dement Construction Company, LLC $1,200.0000 $223,200.00

Kolb Grading, LLC $600.0000 $111,600.00

209-08.09 FILTER SOCK CHECK DAM

EACH60.000

Ford Construction Company $400.0000 $24,000.00

Jones Bros. Contractors, LLC $300.0000 $18,000.00

Dement Construction Company, LLC $300.0000 $18,000.00

Kolb Grading, LLC $400.0000 $24,000.00

209-09.01 SANDBAGS

BAG8,804.000

Ford Construction Company $4.0000 $35,216.00

Jones Bros. Contractors, LLC $8.0000 $70,432.00

Dement Construction Company, LLC $7.0000 $61,628.00

Kolb Grading, LLC $3.8500 $33,895.40

5PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

209-09.03 SEDIMENT FILTER BAG (15' X 15')

EACH12.000

Ford Construction Company $650.0000 $7,800.00

Jones Bros. Contractors, LLC $650.0000 $7,800.00

Dement Construction Company, LLC $350.0000 $4,200.00

Kolb Grading, LLC $300.0000 $3,600.00

209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIMUM)

S.Y.10,000.000

Ford Construction Company $2.0000 $20,000.00

Jones Bros. Contractors, LLC $1.3000 $13,000.00

Dement Construction Company, LLC $2.0000 $20,000.00

Kolb Grading, LLC $2.0000 $20,000.00

209-40.41 CATCH BASIN FILTER ASSEMBLY(TYPE 1)

EACH25.000

Ford Construction Company $450.0000 $11,250.00

Jones Bros. Contractors, LLC $500.0000 $12,500.00

Dement Construction Company, LLC $500.0000 $12,500.00

Kolb Grading, LLC $550.0000 $13,750.00

209-40.42 CATCH BASIN FILTER ASSEMBLY(TYPE 2)

EACH9.000

Ford Construction Company $550.0000 $4,950.00

Jones Bros. Contractors, LLC $600.0000 $5,400.00

Dement Construction Company, LLC $600.0000 $5,400.00

Kolb Grading, LLC $550.0000 $4,950.00

209-40.43 CATCH BASIN FILTER ASSEMBLY(TYPE 3)

EACH5.000

Ford Construction Company $550.0000 $2,750.00

Jones Bros. Contractors, LLC $600.0000 $3,000.00

Dement Construction Company, LLC $700.0000 $3,500.00

Kolb Grading, LLC $650.0000 $3,250.00

209-40.44 CATCH BASIN FILTER ASSEMBLY(TYPE 4)

EACH2.000

Ford Construction Company $550.0000 $1,100.00

Jones Bros. Contractors, LLC $600.0000 $1,200.00

Dement Construction Company, LLC $800.0000 $1,600.00

Kolb Grading, LLC $700.0000 $1,400.00

209-65.03 TEMPORARY DIVERSION CHANNEL

L.F.2,560.000

Ford Construction Company $37.0000 $94,720.00

Jones Bros. Contractors, LLC $14.0000 $35,840.00

Dement Construction Company, LLC $13.0000 $33,280.00

Kolb Grading, LLC $39.0000 $99,840.00

6PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

303-01.01 GRANULAR BACKFILL (ROADWAY)

TON13,877.000

Ford Construction Company $25.0000 $346,925.00

Jones Bros. Contractors, LLC $30.0000 $416,310.00

Dement Construction Company, LLC $30.0000 $416,310.00

Kolb Grading, LLC $34.2500 $475,287.25

303-01.08 MINERAL AGGREGATE, TYPE A BASE,GRADING D GRAVEL

TON9.000

Ford Construction Company $80.0000 $720.00

Jones Bros. Contractors, LLC $210.0000 $1,890.00

Dement Construction Company, LLC $100.0000 $900.00

Kolb Grading, LLC $150.0000 $1,350.00

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (MAINT. GRAVEL)

TON4,000.000

Ford Construction Company $26.0000 $104,000.00

Jones Bros. Contractors, LLC $28.0000 $112,000.00

Dement Construction Company, LLC $25.0000 $100,000.00

Kolb Grading, LLC $39.7500 $159,000.00

303-10.01 MINERAL AGGREGATE (SIZE 57)

TON280.000

Ford Construction Company $38.0000 $10,640.00

Jones Bros. Contractors, LLC $60.0000 $16,800.00

Dement Construction Company, LLC $40.0000 $11,200.00

Kolb Grading, LLC $45.0000 $12,600.00

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON1,826.000

Ford Construction Company $99.7000 $182,052.20

Jones Bros. Contractors, LLC $87.0000 $158,862.00

Dement Construction Company, LLC $99.7000 $182,052.20

Kolb Grading, LLC $99.7000 $182,052.20

307-01.20 ASP. CONC. MIX(PG64-22) (BPMB-HM) GR. A-S

TON601.000

Ford Construction Company $99.8000 $59,979.80

Jones Bros. Contractors, LLC $85.0000 $51,085.00

Dement Construction Company, LLC $99.8000 $59,979.80

Kolb Grading, LLC $99.8000 $59,979.80

307-01.21 ASP. CONC. MIX(PG70-22) (BPMB-HM) GR. A-S

TON769.000

Ford Construction Company $98.7500 $75,938.75

Jones Bros. Contractors, LLC $85.0000 $65,365.00

Dement Construction Company, LLC $98.7500 $75,938.75

Kolb Grading, LLC $98.7500 $75,938.75

7PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

307-02.01 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING A

TON1,915.000

Ford Construction Company $94.5500 $181,063.25

Jones Bros. Contractors, LLC $85.0000 $162,775.00

Dement Construction Company, LLC $94.5500 $181,063.25

Kolb Grading, LLC $94.5500 $181,063.25

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON603.000

Ford Construction Company $99.0000 $59,697.00

Jones Bros. Contractors, LLC $99.0000 $59,697.00

Dement Construction Company, LLC $99.0000 $59,697.00

Kolb Grading, LLC $99.0000 $59,697.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON1,672.000

Ford Construction Company $127.0000 $212,344.00

Jones Bros. Contractors, LLC $109.0000 $182,248.00

Dement Construction Company, LLC $127.0000 $212,344.00

Kolb Grading, LLC $127.0000 $212,344.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON338.000

Ford Construction Company $99.5000 $33,631.00

Jones Bros. Contractors, LLC $122.0000 $41,236.00

Dement Construction Company, LLC $99.5000 $33,631.00

Kolb Grading, LLC $99.5000 $33,631.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.16.000

Ford Construction Company $845.0000 $13,520.00

Jones Bros. Contractors, LLC $425.0000 $6,800.00

Dement Construction Company, LLC $425.0000 $6,800.00

Kolb Grading, LLC $1,000.0000 $16,000.00

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.1.000

Ford Construction Company $845.0000 $845.00

Jones Bros. Contractors, LLC $425.0000 $425.00

Dement Construction Company, LLC $425.0000 $425.00

Kolb Grading, LLC $1,500.0000 $1,500.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.5,512.000

Ford Construction Company $4.2000 $23,150.40

Jones Bros. Contractors, LLC $5.0000 $27,560.00

Dement Construction Company, LLC $5.0000 $27,560.00

Kolb Grading, LLC $4.0000 $22,048.00

8PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

501-01.03 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 10"

S.Y.29,414.000

Ford Construction Company $115.0000 $3,382,610.00

Jones Bros. Contractors, LLC $90.0000 $2,647,260.00

Dement Construction Company, LLC $115.0000 $3,382,610.00

Kolb Grading, LLC $95.0000 $2,794,330.00

604-01.01 CLASS A CONCRETE (ROADWAY)

C.Y.1,940.000

Ford Construction Company $495.0000 $960,300.00

Jones Bros. Contractors, LLC $500.0000 $970,000.00

Dement Construction Company, LLC $525.0000 $1,018,500.00

Kolb Grading, LLC $604.0000 $1,171,760.00

604-01.02 STEEL BAR REINFORCEMENT (ROADWAY)

LB.297,946.000

Ford Construction Company $1.0100 $300,925.46

Jones Bros. Contractors, LLC $0.9800 $291,987.08

Dement Construction Company, LLC $1.0000 $297,946.00

Kolb Grading, LLC $1.0000 $297,946.00

604-03.07 CLASS A CONCRETE (BARRIER WALL FOOTING)

C.Y.9.000

Ford Construction Company $250.0000 $2,250.00

Jones Bros. Contractors, LLC $1,500.0000 $13,500.00

Dement Construction Company, LLC $550.0000 $4,950.00

Kolb Grading, LLC $250.0000 $2,250.00

607-03.02 18" CONCRETE PIPE CULVERT (CLASS III)

L.F.3,137.000

Ford Construction Company $48.0000 $150,576.00

Jones Bros. Contractors, LLC $45.0000 $141,165.00

Dement Construction Company, LLC $43.0000 $134,891.00

Kolb Grading, LLC $65.5000 $205,473.50

607-03.03 18" CONCRETE PIPE CULVERT (CLASS IV)

L.F.142.000

Ford Construction Company $51.0000 $7,242.00

Jones Bros. Contractors, LLC $50.0000 $7,100.00

Dement Construction Company, LLC $47.0000 $6,674.00

Kolb Grading, LLC $82.2500 $11,679.50

607-05.02 24" CONCRETE PIPE CULVERT (CLASS III)

L.F.2,560.000

Ford Construction Company $64.0000 $163,840.00

Jones Bros. Contractors, LLC $59.0000 $151,040.00

Dement Construction Company, LLC $57.0000 $145,920.00

Kolb Grading, LLC $79.4000 $203,264.00

9PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

607-05.03 24" CONCRETE PIPE CULVERT (CLASS IV)

L.F.386.000

Ford Construction Company $69.0000 $26,634.00

Jones Bros. Contractors, LLC $67.0000 $25,862.00

Dement Construction Company, LLC $64.0000 $24,704.00

Kolb Grading, LLC $85.0000 $32,810.00

607-06.02 30" CONCRETE PIPE CULVERT (CLASS III)

L.F.1,318.000

Ford Construction Company $82.0000 $108,076.00

Jones Bros. Contractors, LLC $80.0000 $105,440.00

Dement Construction Company, LLC $75.0000 $98,850.00

Kolb Grading, LLC $95.0000 $125,210.00

607-07.02 36" CONCRETE PIPE CULVERT (CLASS III)

L.F.624.000

Ford Construction Company $112.0000 $69,888.00

Jones Bros. Contractors, LLC $95.0000 $59,280.00

Dement Construction Company, LLC $92.0000 $57,408.00

Kolb Grading, LLC $115.0000 $71,760.00

607-07.03 36" CONCRETE PIPE CULVERT (CLASS IV)

L.F.354.000

Ford Construction Company $120.0000 $42,480.00

Jones Bros. Contractors, LLC $110.0000 $38,940.00

Dement Construction Company, LLC $107.0000 $37,878.00

Kolb Grading, LLC $130.0000 $46,020.00

607-08.03 42" CONCRETE PIPE CULVERT (CLASS IV)

L.F.465.000

Ford Construction Company $162.0000 $75,330.00

Jones Bros. Contractors, LLC $207.0000 $96,255.00

Dement Construction Company, LLC $130.0000 $60,450.00

Kolb Grading, LLC $135.0000 $62,775.00

607-08.05 42" CONCRETE PIPE CULVERT(CLASS IV)JACKED-IN-PLACE

L.F.175.000

Ford Construction Company $162.0000 $28,350.00

Jones Bros. Contractors, LLC $1,350.0000 $236,250.00

Dement Construction Company, LLC $1,400.0000 $245,000.00

Kolb Grading, LLC $1,400.0000 $245,000.00

607-09.02 48" CONCRETE PIPE CULVERT (CLASS III)

L.F.394.000

Ford Construction Company $175.0000 $68,950.00

Jones Bros. Contractors, LLC $160.0000 $63,040.00

Dement Construction Company, LLC $140.0000 $55,160.00

Kolb Grading, LLC $170.0000 $66,980.00

10PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

607-10.03 54" CONCRETE PIPE CULVERT (CLASS IV)

L.F.286.000

Ford Construction Company $205.0000 $58,630.00

Jones Bros. Contractors, LLC $235.0000 $67,210.00

Dement Construction Company, LLC $190.0000 $54,340.00

Kolb Grading, LLC $235.0000 $67,210.00

607-11.03 60" CONCRETE PIPE CULVERT (CLASS III)

L.F.352.000

Ford Construction Company $220.0000 $77,440.00

Jones Bros. Contractors, LLC $240.0000 $84,480.00

Dement Construction Company, LLC $200.0000 $70,400.00

Kolb Grading, LLC $240.0000 $84,480.00

607-16.01 23"X 14" HORIZONTAL OVAL CONCRETE PIPE CULVERT

L.F.144.000

Ford Construction Company $65.0000 $9,360.00

Jones Bros. Contractors, LLC $65.0000 $9,360.00

Dement Construction Company, LLC $60.0000 $8,640.00

Kolb Grading, LLC $100.0000 $14,400.00

607-39.02 18" PIPE CULVERT (SIDE DRAIN)

L.F.358.000

Ford Construction Company $45.0000 $16,110.00

Jones Bros. Contractors, LLC $35.0000 $12,530.00

Dement Construction Company, LLC $36.0000 $12,888.00

Kolb Grading, LLC $77.0000 $27,566.00

607-39.03 24" PIPE CULVERT (SIDE DRAIN)

L.F.434.000

Ford Construction Company $60.0000 $26,040.00

Jones Bros. Contractors, LLC $40.0000 $17,360.00

Dement Construction Company, LLC $50.0000 $21,700.00

Kolb Grading, LLC $83.0000 $36,022.00

607-39.06 42" PIPE CULVERT (SIDE DRAIN)

L.F.38.000

Ford Construction Company $100.0000 $3,800.00

Jones Bros. Contractors, LLC $70.0000 $2,660.00

Dement Construction Company, LLC $60.0000 $2,280.00

Kolb Grading, LLC $140.0000 $5,320.00

607-45 12" SLOTTED DRAIN PIPE

L.F.40.000

Ford Construction Company $175.0000 $7,000.00

Jones Bros. Contractors, LLC $165.0000 $6,600.00

Dement Construction Company, LLC $200.0000 $8,000.00

Kolb Grading, LLC $375.0000 $15,000.00

11PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

610-07.03 18" PIPE DRAIN (BRIDGE DRAIN)

L.F.878.000

Ford Construction Company $36.0000 $31,608.00

Jones Bros. Contractors, LLC $45.0000 $39,510.00

Dement Construction Company, LLC $50.0000 $43,900.00

Kolb Grading, LLC $72.0000 $63,216.00

611-01.03 MANHOLES, > 8' - 12' DEPTH

EACH1.000

Ford Construction Company $9,000.0000 $9,000.00

Jones Bros. Contractors, LLC $8,600.0000 $8,600.00

Dement Construction Company, LLC $8,000.0000 $8,000.00

Kolb Grading, LLC $9,500.0000 $9,500.00

611-02.10 JUNCTION BOX, TYPE 1

EACH2.000

Ford Construction Company $3,000.0000 $6,000.00

Jones Bros. Contractors, LLC $4,500.0000 $9,000.00

Dement Construction Company, LLC $3,200.0000 $6,400.00

Kolb Grading, LLC $3,250.0000 $6,500.00

611-07.01 CLASS A CONCRETE (PIPE ENDWALLS)

C.Y.72.000

Ford Construction Company $1,000.0000 $72,000.00

Jones Bros. Contractors, LLC $1,500.0000 $108,000.00

Dement Construction Company, LLC $1,400.0000 $100,800.00

Kolb Grading, LLC $1,650.0000 $118,800.00

611-07.02 STEEL BAR REINFORCEMENT (PIPE ENDWALLS)

LB.1,104.000

Ford Construction Company $2.5000 $2,760.00

Jones Bros. Contractors, LLC $2.3500 $2,594.40

Dement Construction Company, LLC $3.1500 $3,477.60

Kolb Grading, LLC $2.5000 $2,760.00

611-07.31 18IN ENDWALL (SIDE DRAIN)

EACH2.000

Ford Construction Company $3,600.0000 $7,200.00

Jones Bros. Contractors, LLC $2,700.0000 $5,400.00

Dement Construction Company, LLC $3,500.0000 $7,000.00

Kolb Grading, LLC $3,500.0000 $7,000.00

611-07.32 24IN ENDWALL (SIDE DRAIN)

EACH3.000

Ford Construction Company $4,500.0000 $13,500.00

Jones Bros. Contractors, LLC $4,000.0000 $12,000.00

Dement Construction Company, LLC $4,750.0000 $14,250.00

Kolb Grading, LLC $4,850.0000 $14,550.00

12PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

611-07.54 18IN ENDWALL (CROSS DRAIN) 3:1

EACH8.000

Ford Construction Company $2,000.0000 $16,000.00

Jones Bros. Contractors, LLC $2,000.0000 $16,000.00

Dement Construction Company, LLC $2,400.0000 $19,200.00

Kolb Grading, LLC $3,500.0000 $28,000.00

611-07.55 18IN ENDWALL (CROSS DRAIN) 4:1

EACH5.000

Ford Construction Company $2,400.0000 $12,000.00

Jones Bros. Contractors, LLC $2,300.0000 $11,500.00

Dement Construction Company, LLC $2,900.0000 $14,500.00

Kolb Grading, LLC $3,500.0000 $17,500.00

611-07.56 18IN ENDWALL (CROSS DRAIN) 6:1

EACH11.000

Ford Construction Company $3,000.0000 $33,000.00

Jones Bros. Contractors, LLC $2,500.0000 $27,500.00

Dement Construction Company, LLC $3,300.0000 $36,300.00

Kolb Grading, LLC $3,500.0000 $38,500.00

611-07.57 24IN ENDWALL (CROSS DRAIN) 3:1

EACH14.000

Ford Construction Company $2,800.0000 $39,200.00

Jones Bros. Contractors, LLC $2,700.0000 $37,800.00

Dement Construction Company, LLC $3,100.0000 $43,400.00

Kolb Grading, LLC $4,850.0000 $67,900.00

611-07.58 24IN ENDWALL (CROSS DRAIN) 4:1

EACH2.000

Ford Construction Company $3,000.0000 $6,000.00

Jones Bros. Contractors, LLC $3,000.0000 $6,000.00

Dement Construction Company, LLC $3,600.0000 $7,200.00

Kolb Grading, LLC $4,850.0000 $9,700.00

611-07.59 24IN ENDWALL (CROSS DRAIN) 6:1

EACH3.000

Ford Construction Company $3,500.0000 $10,500.00

Jones Bros. Contractors, LLC $4,000.0000 $12,000.00

Dement Construction Company, LLC $3,800.0000 $11,400.00

Kolb Grading, LLC $4,850.0000 $14,550.00

611-07.60 30IN ENDWALL (CROSS DRAIN) 3:1

EACH3.000

Ford Construction Company $3,800.0000 $11,400.00

Jones Bros. Contractors, LLC $4,000.0000 $12,000.00

Dement Construction Company, LLC $4,100.0000 $12,300.00

Kolb Grading, LLC $5,200.0000 $15,600.00

13PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

611-07.61 30IN ENDWALL (CROSS DRAIN) 4:1

EACH3.000

Ford Construction Company $4,200.0000 $12,600.00

Jones Bros. Contractors, LLC $4,200.0000 $12,600.00

Dement Construction Company, LLC $4,100.0000 $12,300.00

Kolb Grading, LLC $5,200.0000 $15,600.00

611-07.62 30IN ENDWALL (CROSS DRAIN) 6:1

EACH2.000

Ford Construction Company $4,800.0000 $9,600.00

Jones Bros. Contractors, LLC $5,800.0000 $11,600.00

Dement Construction Company, LLC $5,700.0000 $11,400.00

Kolb Grading, LLC $5,200.0000 $10,400.00

611-07.63 36IN ENDWALL (CROSS DRAIN) 3:1

EACH2.000

Ford Construction Company $4,000.0000 $8,000.00

Jones Bros. Contractors, LLC $5,000.0000 $10,000.00

Dement Construction Company, LLC $4,300.0000 $8,600.00

Kolb Grading, LLC $5,400.0000 $10,800.00

611-07.64 36IN ENDWALL (CROSS DRAIN) 4:1

EACH2.000

Ford Construction Company $5,400.0000 $10,800.00

Jones Bros. Contractors, LLC $5,700.0000 $11,400.00

Dement Construction Company, LLC $5,300.0000 $10,600.00

Kolb Grading, LLC $5,400.0000 $10,800.00

611-07.65 36IN ENDWALL (CROSS DRAIN) 6:1

EACH4.000

Ford Construction Company $6,000.0000 $24,000.00

Jones Bros. Contractors, LLC $7,300.0000 $29,200.00

Dement Construction Company, LLC $7,200.0000 $28,800.00

Kolb Grading, LLC $5,400.0000 $21,600.00

611-07.66 42IN ENDWALL (CROSS DRAIN) 3:1

EACH1.000

Ford Construction Company $5,000.0000 $5,000.00

Jones Bros. Contractors, LLC $5,800.0000 $5,800.00

Dement Construction Company, LLC $5,100.0000 $5,100.00

Kolb Grading, LLC $6,300.0000 $6,300.00

611-07.67 42IN ENDWALL (CROSS DRAIN) 4:1

EACH1.000

Ford Construction Company $5,500.0000 $5,500.00

Jones Bros. Contractors, LLC $6,300.0000 $6,300.00

Dement Construction Company, LLC $6,300.0000 $6,300.00

Kolb Grading, LLC $6,300.0000 $6,300.00

14PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

611-07.68 42IN ENDWALL (CROSS DRAIN) 6:1

EACH1.000

Ford Construction Company $7,000.0000 $7,000.00

Jones Bros. Contractors, LLC $8,900.0000 $8,900.00

Dement Construction Company, LLC $8,300.0000 $8,300.00

Kolb Grading, LLC $6,300.0000 $6,300.00

611-07.70 48IN ENDWALL (CROSS DRAIN) 4:1

EACH4.000

Ford Construction Company $7,200.0000 $28,800.00

Jones Bros. Contractors, LLC $6,800.0000 $27,200.00

Dement Construction Company, LLC $7,900.0000 $31,600.00

Kolb Grading, LLC $7,200.0000 $28,800.00

611-07.71 48IN ENDWALL (CROSS DRAIN) 6:1

EACH1.000

Ford Construction Company $9,100.0000 $9,100.00

Jones Bros. Contractors, LLC $11,000.0000 $11,000.00

Dement Construction Company, LLC $11,600.0000 $11,600.00

Kolb Grading, LLC $7,800.0000 $7,800.00

611-38.01 CATCH BASINS, TYPE 38, 0' - 4' DEPTH

EACH20.000

Ford Construction Company $3,800.0000 $76,000.00

Jones Bros. Contractors, LLC $4,100.0000 $82,000.00

Dement Construction Company, LLC $3,200.0000 $64,000.00

Kolb Grading, LLC $2,585.0000 $51,700.00

611-38.02 CATCH BASINS, TYPE 38, > 4' - 8' DEPTH

EACH6.000

Ford Construction Company $4,500.0000 $27,000.00

Jones Bros. Contractors, LLC $6,600.0000 $39,600.00

Dement Construction Company, LLC $4,700.0000 $28,200.00

Kolb Grading, LLC $3,000.0000 $18,000.00

611-39.01 CATCH BASINS, TYPE 39, 0' - 4' DEPTH

EACH3.000

Ford Construction Company $5,000.0000 $15,000.00

Jones Bros. Contractors, LLC $5,700.0000 $17,100.00

Dement Construction Company, LLC $4,700.0000 $14,100.00

Kolb Grading, LLC $3,700.0000 $11,100.00

611-39.02 CATCH BASINS, TYPE 39, > 4' - 8' DEPTH

EACH6.000

Ford Construction Company $6,000.0000 $36,000.00

Jones Bros. Contractors, LLC $7,300.0000 $43,800.00

Dement Construction Company, LLC $6,000.0000 $36,000.00

Kolb Grading, LLC $4,780.0000 $28,680.00

15PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

611-39.03 CATCH BASINS, TYPE 39, > 8' - 12' DEPTH

EACH2.000

Ford Construction Company $9,000.0000 $18,000.00

Jones Bros. Contractors, LLC $13,500.0000 $27,000.00

Dement Construction Company, LLC $9,200.0000 $18,400.00

Kolb Grading, LLC $6,205.0000 $12,410.00

611-42.01 CATCH BASINS, TYPE 42, 0' - 4' DEPTH

EACH3.000

Ford Construction Company $4,500.0000 $13,500.00

Jones Bros. Contractors, LLC $6,200.0000 $18,600.00

Dement Construction Company, LLC $3,500.0000 $10,500.00

Kolb Grading, LLC $2,900.0000 $8,700.00

621-03.02 18" TEMPORARY DRAINAGE PIPE

L.F.60.000

Ford Construction Company $50.0000 $3,000.00

Jones Bros. Contractors, LLC $75.0000 $4,500.00

Dement Construction Company, LLC $33.0000 $1,980.00

Kolb Grading, LLC $77.0000 $4,620.00

621-03.05 36" TEMPORARY DRAINAGE PIPE

L.F.80.000

Ford Construction Company $100.0000 $8,000.00

Jones Bros. Contractors, LLC $100.0000 $8,000.00

Dement Construction Company, LLC $56.0000 $4,480.00

Kolb Grading, LLC $109.0000 $8,720.00

701-02 CONCRETE DRIVEWAY

S.F.5,616.000

Ford Construction Company $8.4500 $47,455.20

Jones Bros. Contractors, LLC $10.7300 $60,259.68

Dement Construction Company, LLC $8.0000 $44,928.00

Kolb Grading, LLC $8.4500 $47,455.20

703-02.05 CEMENT CONCRETE DITCH PAVING (SLOTTED DRAINS)

C.Y.2.000

Ford Construction Company $520.0000 $1,040.00

Jones Bros. Contractors, LLC $2,500.0000 $5,000.00

Dement Construction Company, LLC $2,500.0000 $5,000.00

Kolb Grading, LLC $2,000.0000 $4,000.00

705-01.01 GUARDRAIL AT BRIDGE ENDS

L.F.686.000

Ford Construction Company $76.5000 $52,479.00

Jones Bros. Contractors, LLC $58.0000 $39,788.00

Dement Construction Company, LLC $58.0000 $39,788.00

Kolb Grading, LLC $76.5000 $52,479.00

16PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.17,762.000

Ford Construction Company $21.2500 $377,442.50

Jones Bros. Contractors, LLC $17.0000 $301,954.00

Dement Construction Company, LLC $17.0000 $301,954.00

Kolb Grading, LLC $21.2500 $377,442.50

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH24.000

Ford Construction Company $1,200.0000 $28,800.00

Jones Bros. Contractors, LLC $650.0000 $15,600.00

Dement Construction Company, LLC $650.0000 $15,600.00

Kolb Grading, LLC $1,200.0000 $28,800.00

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH9.000

Ford Construction Company $575.0000 $5,175.00

Jones Bros. Contractors, LLC $600.0000 $5,400.00

Dement Construction Company, LLC $600.0000 $5,400.00

Kolb Grading, LLC $575.0000 $5,175.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH38.000

Ford Construction Company $2,850.0000 $108,300.00

Jones Bros. Contractors, LLC $2,100.0000 $79,800.00

Dement Construction Company, LLC $2,100.0000 $79,800.00

Kolb Grading, LLC $2,850.0000 $108,300.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH4.000

Ford Construction Company $2,675.0000 $10,700.00

Jones Bros. Contractors, LLC $2,100.0000 $8,400.00

Dement Construction Company, LLC $2,500.0000 $10,000.00

Kolb Grading, LLC $2,675.0000 $10,700.00

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH2.000

Ford Construction Company $4,800.0000 $9,600.00

Jones Bros. Contractors, LLC $9,000.0000 $18,000.00

Dement Construction Company, LLC $4,800.0000 $9,600.00

Kolb Grading, LLC $6,500.0000 $13,000.00

705-17.97 ATTENUATOR (NARROW- LOW MAINTENANCE)

EACH1.000

Ford Construction Company $25,100.0000 $25,100.00

Jones Bros. Contractors, LLC $27,500.0000 $27,500.00

Dement Construction Company, LLC $22,500.0000 $22,500.00

Kolb Grading, LLC $21,750.0000 $21,750.00

17PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

707-01.11 CHAIN LINK FENCE (6 FOOT)

L.F.14,073.000

Ford Construction Company $10.3500 $145,655.55

Jones Bros. Contractors, LLC $10.4500 $147,062.85

Dement Construction Company, LLC $10.9000 $153,395.70

Kolb Grading, LLC $12.4800 $175,631.04

707-01.12 END & CORNER POST ASSEMBLY(CHAIN-LINK FENCE 6')

EACH66.000

Ford Construction Company $210.0000 $13,860.00

Jones Bros. Contractors, LLC $210.0000 $13,860.00

Dement Construction Company, LLC $220.0000 $14,520.00

Kolb Grading, LLC $205.0000 $13,530.00

707-01.13 GATE - CHAIN-LINK FENCE-6 FOOT (ACCESS TO DRAINAGE ESMT.)

EACH2.000

Ford Construction Company $800.0000 $1,600.00

Jones Bros. Contractors, LLC $800.0000 $1,600.00

Dement Construction Company, LLC $1,250.0000 $2,500.00

Kolb Grading, LLC $1,850.0000 $3,700.00

707-03.01 STOCK FENCE

L.F.27,921.000

Ford Construction Company $5.1500 $143,793.15

Jones Bros. Contractors, LLC $5.2200 $145,747.62

Dement Construction Company, LLC $5.9500 $166,129.95

Kolb Grading, LLC $6.4800 $180,928.08

707-03.02 END, BRACED LINE, CORNER POST ASSEMBLY(STOCK FENCE)

EACH153.000

Ford Construction Company $152.0000 $23,256.00

Jones Bros. Contractors, LLC $152.0000 $23,256.00

Dement Construction Company, LLC $170.0000 $26,010.00

Kolb Grading, LLC $155.0000 $23,715.00

707-08.11 HIGH-VISIBILITY CONSTRUCTION FENCE

L.F.12,191.000

Ford Construction Company $1.5000 $18,286.50

Jones Bros. Contractors, LLC $1.5000 $18,286.50

Dement Construction Company, LLC $1.5000 $18,286.50

Kolb Grading, LLC $1.5500 $18,896.05

708-02.01 MARKERS (CONCRETE R.O.W. POSTS)

EACH189.000

Ford Construction Company $210.0000 $39,690.00

Jones Bros. Contractors, LLC $225.0000 $42,525.00

Dement Construction Company, LLC $175.0000 $33,075.00

Kolb Grading, LLC $175.0000 $33,075.00

18PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

709-01.01 RUBBLE STONE RIP-RAP

C.Y.51.000

Ford Construction Company $55.0000 $2,805.00

Jones Bros. Contractors, LLC $100.0000 $5,100.00

Dement Construction Company, LLC $52.0000 $2,652.00

Kolb Grading, LLC $52.0000 $2,652.00

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON1,860.000

Ford Construction Company $35.0000 $65,100.00

Jones Bros. Contractors, LLC $42.0000 $78,120.00

Dement Construction Company, LLC $39.0000 $72,540.00

Kolb Grading, LLC $41.0000 $76,260.00

709-05.06 MACHINED RIP-RAP (CLASS A-1)

TON18,318.000

Ford Construction Company $40.0000 $732,720.00

Jones Bros. Contractors, LLC $42.0000 $769,356.00

Dement Construction Company, LLC $39.0000 $714,402.00

Kolb Grading, LLC $41.0000 $751,038.00

709-05.08 MACHINED RIP-RAP (CLASS B)

TON4,122.000

Ford Construction Company $42.0000 $173,124.00

Jones Bros. Contractors, LLC $45.0000 $185,490.00

Dement Construction Company, LLC $39.0000 $160,758.00

Kolb Grading, LLC $41.0000 $169,002.00

709-05.09 MACHINED RIP-RAP (CLASS C)

TON2,518.000

Ford Construction Company $45.0000 $113,310.00

Jones Bros. Contractors, LLC $45.0000 $113,310.00

Dement Construction Company, LLC $39.0000 $98,202.00

Kolb Grading, LLC $38.0000 $95,684.00

710-02 AGGREGATE UNDERDRAINS (WITH PIPE)

L.F.70,475.000

Ford Construction Company $6.5000 $458,087.50

Jones Bros. Contractors, LLC $6.5000 $458,087.50

Dement Construction Company, LLC $6.5000 $458,087.50

Kolb Grading, LLC $6.5000 $458,087.50

710-05 LATERAL UNDERDRAIN

L.F.8,720.000

Ford Construction Company $4.5000 $39,240.00

Jones Bros. Contractors, LLC $4.5000 $39,240.00

Dement Construction Company, LLC $4.5000 $39,240.00

Kolb Grading, LLC $4.5000 $39,240.00

19PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

710-06.11 LATERAL UNDERDRAIN ENDWALL (2:1)

EACH1.000

Ford Construction Company $800.0000 $800.00

Jones Bros. Contractors, LLC $800.0000 $800.00

Dement Construction Company, LLC $800.0000 $800.00

Kolb Grading, LLC $800.0000 $800.00

710-06.12 LATERAL UNDERDRAIN ENDWALL (3:1)

EACH64.000

Ford Construction Company $800.0000 $51,200.00

Jones Bros. Contractors, LLC $800.0000 $51,200.00

Dement Construction Company, LLC $800.0000 $51,200.00

Kolb Grading, LLC $800.0000 $51,200.00

710-06.13 LATERAL UNDERDRAIN ENDWALL (4:1)

EACH49.000

Ford Construction Company $800.0000 $39,200.00

Jones Bros. Contractors, LLC $800.0000 $39,200.00

Dement Construction Company, LLC $800.0000 $39,200.00

Kolb Grading, LLC $800.0000 $39,200.00

710-06.15 LATERAL UNDERDRAIN ENDWALL (6:1)

EACH214.000

Ford Construction Company $800.0000 $171,200.00

Jones Bros. Contractors, LLC $800.0000 $171,200.00

Dement Construction Company, LLC $800.0000 $171,200.00

Kolb Grading, LLC $800.0000 $171,200.00

711-05.71 51IN SINGLE SLOPE CONCRETE BARRIER WALL

L.F.83.000

Ford Construction Company $350.0000 $29,050.00

Jones Bros. Contractors, LLC $250.0000 $20,750.00

Dement Construction Company, LLC $250.0000 $20,750.00

Kolb Grading, LLC $350.0000 $29,050.00

712-01 TRAFFIC CONTROL

LS1.000

Ford Construction Company $78,500.0000 $78,500.00

Jones Bros. Contractors, LLC $200,000.0000 $200,000.00

Dement Construction Company, LLC $26,800.0000 $26,800.00

Kolb Grading, LLC $40,000.0000 $40,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.3,690.000

Ford Construction Company $28.0000 $103,320.00

Jones Bros. Contractors, LLC $30.0000 $110,700.00

Dement Construction Company, LLC $30.0000 $110,700.00

Kolb Grading, LLC $45.0000 $166,050.00

20PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH162.000

Ford Construction Company $29.0000 $4,698.00

Jones Bros. Contractors, LLC $29.0000 $4,698.00

Dement Construction Company, LLC $29.0000 $4,698.00

Kolb Grading, LLC $37.0000 $5,994.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH82.000

Ford Construction Company $22.0000 $1,804.00

Jones Bros. Contractors, LLC $22.0000 $1,804.00

Dement Construction Company, LLC $22.0000 $1,804.00

Kolb Grading, LLC $45.0000 $3,690.00

712-06 SIGNS (CONSTRUCTION)

S.F.2,090.000

Ford Construction Company $6.9500 $14,525.50

Jones Bros. Contractors, LLC $8.0000 $16,720.00

Dement Construction Company, LLC $6.9500 $14,525.50

Kolb Grading, LLC $7.5000 $15,675.00

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.636.000

Ford Construction Company $10.0000 $6,360.00

Jones Bros. Contractors, LLC $10.0000 $6,360.00

Dement Construction Company, LLC $10.0000 $6,360.00

Kolb Grading, LLC $17.5000 $11,130.00

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Ford Construction Company $795.0000 $1,590.00

Jones Bros. Contractors, LLC $3,500.0000 $7,000.00

Dement Construction Company, LLC $795.0000 $1,590.00

Kolb Grading, LLC $1,200.0000 $2,400.00

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.5,520.000

Ford Construction Company $3.9000 $21,528.00

Jones Bros. Contractors, LLC $3.9000 $21,528.00

Dement Construction Company, LLC $3.9000 $21,528.00

Kolb Grading, LLC $3.0000 $16,560.00

713-01.01 CLASS A CONCRETE (FOUNDATION FOR SIGN SUPPORTS)

C.Y.10.000

Ford Construction Company $685.0000 $6,850.00

Jones Bros. Contractors, LLC $685.0000 $6,850.00

Dement Construction Company, LLC $610.0000 $6,100.00

Kolb Grading, LLC $850.0000 $8,500.00

21PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

713-01.02 STEEL BAR REINFORCEMENT(FOUNDATION FOR SIGN SUPPORTS)

LB.2,562.000

Ford Construction Company $3.5000 $8,967.00

Jones Bros. Contractors, LLC $3.5000 $8,967.00

Dement Construction Company, LLC $2.7500 $7,045.50

Kolb Grading, LLC $3.5000 $8,967.00

713-02.04 DELINEATOR (MILE MARKER) & STEEL POST

EACH8.000

Ford Construction Company $195.0000 $1,560.00

Jones Bros. Contractors, LLC $195.0000 $1,560.00

Dement Construction Company, LLC $170.0000 $1,360.00

Kolb Grading, LLC $235.0000 $1,880.00

713-02.14 FLEXIBLE DELINEATOR (WHITE)

EACH216.000

Ford Construction Company $31.0000 $6,696.00

Jones Bros. Contractors, LLC $31.0000 $6,696.00

Dement Construction Company, LLC $33.5000 $7,236.00

Kolb Grading, LLC $45.5000 $9,828.00

713-02.15 FLEXIBLE DELINEATOR (YELLOW)

EACH82.000

Ford Construction Company $31.0000 $2,542.00

Jones Bros. Contractors, LLC $31.0000 $2,542.00

Dement Construction Company, LLC $33.5000 $2,747.00

Kolb Grading, LLC $45.5000 $3,731.00

713-02.26 CONCRETE BARRIER/PARAPET DELINEATOR

EACH167.000

Ford Construction Company $12.0000 $2,004.00

Jones Bros. Contractors, LLC $12.0000 $2,004.00

Dement Construction Company, LLC $8.2500 $1,377.75

Kolb Grading, LLC $12.7500 $2,129.25

713-05 STEEL HOLLOW SQUARE POST (BREAKAWAY) SIGN SUPPORTS

LB.67.000

Ford Construction Company $4.0000 $268.00

Jones Bros. Contractors, LLC $4.0000 $268.00

Dement Construction Company, LLC $4.0500 $271.35

Kolb Grading, LLC $8.2500 $552.75

713-06 STEEL I-BEAMS & WF-BEAMS(BREAKAWAY) SIGN SUPPORT

LB.16,485.000

Ford Construction Company $4.0000 $65,940.00

Jones Bros. Contractors, LLC $4.0000 $65,940.00

Dement Construction Company, LLC $3.8000 $62,643.00

Kolb Grading, LLC $3.5000 $57,697.50

22PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

713-09.01 STEEL OVERHEAD SIGN STRUCTURE (SPAN 55'-0")

EACH1.000

Ford Construction Company $35,500.0000 $35,500.00

Jones Bros. Contractors, LLC $35,500.0000 $35,500.00

Dement Construction Company, LLC $44,000.0000 $44,000.00

Kolb Grading, LLC $59,050.0000 $59,050.00

713-09.02 STEEL OVERHEAD SIGN STRUCTURE (SPAN 55'-0")

EACH1.000

Ford Construction Company $35,500.0000 $35,500.00

Jones Bros. Contractors, LLC $35,500.0000 $35,500.00

Dement Construction Company, LLC $44,000.0000 $44,000.00

Kolb Grading, LLC $59,050.0000 $59,050.00

713-09.03 STEEL OVERHEAD SIGN STRUCTURE (SPAN 60'-0")

EACH1.000

Ford Construction Company $36,500.0000 $36,500.00

Jones Bros. Contractors, LLC $36,500.0000 $36,500.00

Dement Construction Company, LLC $45,200.0000 $45,200.00

Kolb Grading, LLC $59,900.0000 $59,900.00

713-11.01 "U" SECTION STEEL POSTS

LB.87.000

Ford Construction Company $4.0000 $348.00

Jones Bros. Contractors, LLC $4.0000 $348.00

Dement Construction Company, LLC $3.2500 $282.75

Kolb Grading, LLC $3.9500 $343.65

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.2,563.000

Ford Construction Company $3.5000 $8,970.50

Jones Bros. Contractors, LLC $3.5000 $8,970.50

Dement Construction Company, LLC $3.7500 $9,611.25

Kolb Grading, LLC $4.2500 $10,892.75

713-11.05 SQUARE TUBE SIGN SUPPORT

LB.534.000

Ford Construction Company $4.0000 $2,136.00

Jones Bros. Contractors, LLC $4.0000 $2,136.00

Dement Construction Company, LLC $4.0500 $2,162.70

Kolb Grading, LLC $7.5000 $4,005.00

713-11.21 P POST SLIP BASE

EACH64.000

Ford Construction Company $325.0000 $20,800.00

Jones Bros. Contractors, LLC $325.0000 $20,800.00

Dement Construction Company, LLC $310.0000 $19,840.00

Kolb Grading, LLC $325.0000 $20,800.00

23PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.351.000

Ford Construction Company $13.0000 $4,563.00

Jones Bros. Contractors, LLC $13.0000 $4,563.00

Dement Construction Company, LLC $12.5000 $4,387.50

Kolb Grading, LLC $17.7500 $6,230.25

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.733.000

Ford Construction Company $13.6000 $9,968.80

Jones Bros. Contractors, LLC $13.6000 $9,968.80

Dement Construction Company, LLC $12.7500 $9,345.75

Kolb Grading, LLC $17.5000 $12,827.50

713-14 EXTRUDED ALUMINUM PANEL SIGNS

S.F.3,223.000

Ford Construction Company $21.0000 $67,683.00

Jones Bros. Contractors, LLC $21.0000 $67,683.00

Dement Construction Company, LLC $22.5000 $72,517.50

Kolb Grading, LLC $17.8500 $57,530.55

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Ford Construction Company $1,500.0000 $1,500.00

Jones Bros. Contractors, LLC $1,500.0000 $1,500.00

Dement Construction Company, LLC $980.0000 $980.00

Kolb Grading, LLC $1,200.0000 $1,200.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH4.000

Ford Construction Company $7,280.0000 $29,120.00

Jones Bros. Contractors, LLC $8,900.0000 $35,600.00

Dement Construction Company, LLC $8,900.0000 $35,600.00

Kolb Grading, LLC $9,500.0000 $38,000.00

713-16.06 DEAD END SIGN AND SUPPORT

EACH2.000

Ford Construction Company $220.0000 $440.00

Jones Bros. Contractors, LLC $220.0000 $440.00

Dement Construction Company, LLC $195.0000 $390.00

Kolb Grading, LLC $650.0000 $1,300.00

713-16.07 END OF ROADWAY SIGN AND SUPPORT

EACH4.000

Ford Construction Company $220.0000 $880.00

Jones Bros. Contractors, LLC $220.0000 $880.00

Dement Construction Company, LLC $195.0000 $780.00

Kolb Grading, LLC $650.0000 $2,600.00

24PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

713-17.02 INSTALL AUXILIARY SUPPORT FOR EXIT NUMBER PANEL

EACH8.000

Ford Construction Company $75.0000 $600.00

Jones Bros. Contractors, LLC $75.0000 $600.00

Dement Construction Company, LLC $120.0000 $960.00

Kolb Grading, LLC $550.0000 $4,400.00

713-30.09 BARRIER MOUNTED SIGN SUPPORT

EACH6.000

Ford Construction Company $450.0000 $2,700.00

Jones Bros. Contractors, LLC $450.0000 $2,700.00

Dement Construction Company, LLC $345.0000 $2,070.00

Kolb Grading, LLC $675.0000 $4,050.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH43.000

Ford Construction Company $38.0000 $1,634.00

Jones Bros. Contractors, LLC $38.0000 $1,634.00

Dement Construction Company, LLC $38.0000 $1,634.00

Kolb Grading, LLC $35.0000 $1,505.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH85.000

Ford Construction Company $38.0000 $3,230.00

Jones Bros. Contractors, LLC $38.0000 $3,230.00

Dement Construction Company, LLC $38.0000 $3,230.00

Kolb Grading, LLC $31.0000 $2,635.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH878.000

Ford Construction Company $38.0000 $33,364.00

Jones Bros. Contractors, LLC $38.0000 $33,364.00

Dement Construction Company, LLC $38.0000 $33,364.00

Kolb Grading, LLC $35.0000 $30,730.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.220.000

Ford Construction Company $24.0000 $5,280.00

Jones Bros. Contractors, LLC $24.0000 $5,280.00

Dement Construction Company, LLC $24.0000 $5,280.00

Kolb Grading, LLC $24.0000 $5,280.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.200.000

Ford Construction Company $16.0000 $3,200.00

Jones Bros. Contractors, LLC $16.0000 $3,200.00

Dement Construction Company, LLC $16.0000 $3,200.00

Kolb Grading, LLC $16.0000 $3,200.00

25PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH2.000

Ford Construction Company $240.0000 $480.00

Jones Bros. Contractors, LLC $240.0000 $480.00

Dement Construction Company, LLC $240.0000 $480.00

Kolb Grading, LLC $240.0000 $480.00

716-02.07 PLASTIC PAVEMENT MARKING (24" BARRIER LINE)

L.F.2,045.000

Ford Construction Company $16.0000 $32,720.00

Jones Bros. Contractors, LLC $16.0000 $32,720.00

Dement Construction Company, LLC $16.0000 $32,720.00

Kolb Grading, LLC $16.0000 $32,720.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.6.000

Ford Construction Company $1,500.0000 $9,000.00

Jones Bros. Contractors, LLC $1,500.0000 $9,000.00

Dement Construction Company, LLC $1,500.0000 $9,000.00

Kolb Grading, LLC $1,500.0000 $9,000.00

716-05.02 PAINTED PAVEMENT MARKING (8" BARRIER LINE)

L.F.9,537.000

Ford Construction Company $0.9000 $8,583.30

Jones Bros. Contractors, LLC $0.9000 $8,583.30

Dement Construction Company, LLC $0.9000 $8,583.30

Kolb Grading, LLC $0.9000 $8,583.30

716-05.05 PAINTED PAVEMENT MARKING (STOP LINE)

L.F.80.000

Ford Construction Company $14.0000 $1,120.00

Jones Bros. Contractors, LLC $14.0000 $1,120.00

Dement Construction Company, LLC $14.0000 $1,120.00

Kolb Grading, LLC $14.0000 $1,120.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.37.000

Ford Construction Company $5,650.0000 $209,050.00

Jones Bros. Contractors, LLC $5,650.0000 $209,050.00

Dement Construction Company, LLC $5,650.0000 $209,050.00

Kolb Grading, LLC $5,650.0000 $209,050.00

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.6,728.000

Ford Construction Company $3.0000 $20,184.00

Jones Bros. Contractors, LLC $3.0000 $20,184.00

Dement Construction Company, LLC $3.0000 $20,184.00

Kolb Grading, LLC $4.0000 $26,912.00

26PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.3,882.000

Ford Construction Company $2.8000 $10,869.60

Jones Bros. Contractors, LLC $2.8000 $10,869.60

Dement Construction Company, LLC $2.8000 $10,869.60

Kolb Grading, LLC $3.0000 $11,646.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.2.000

Ford Construction Company $3,800.0000 $7,600.00

Jones Bros. Contractors, LLC $3,800.0000 $7,600.00

Dement Construction Company, LLC $3,800.0000 $7,600.00

Kolb Grading, LLC $2,850.0000 $5,700.00

717-01 MOBILIZATION

LS1.000

Ford Construction Company $2,845,849.0000 $2,845,849.00

Jones Bros. Contractors, LLC $3,550,000.0000 $3,550,000.00

Dement Construction Company, LLC $3,750,000.0000 $3,750,000.00

Kolb Grading, LLC $2,282,752.0000 $2,282,752.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.16,344.000

Ford Construction Company $2.5000 $40,860.00

Jones Bros. Contractors, LLC $2.2500 $36,774.00

Dement Construction Company, LLC $2.5000 $40,860.00

Kolb Grading, LLC $2.2000 $35,956.80

740-10.04 GEOTEXTILE (TYPE IV)(STABILIZATION)

S.Y.498,157.000

Ford Construction Company $1.2000 $597,788.40

Jones Bros. Contractors, LLC $1.0500 $523,064.85

Dement Construction Company, LLC $1.6000 $797,051.20

Kolb Grading, LLC $1.1000 $547,972.70

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.392.000

Ford Construction Company $3.0000 $1,176.00

Jones Bros. Contractors, LLC $5.0000 $1,960.00

Dement Construction Company, LLC $2.8500 $1,117.20

Kolb Grading, LLC $3.0000 $1,176.00

740-11.03 TEMPORARY SEDIMENT TUBE 18IN

L.F.2,580.000

Ford Construction Company $3.2500 $8,385.00

Jones Bros. Contractors, LLC $3.5000 $9,030.00

Dement Construction Company, LLC $3.5000 $9,030.00

Kolb Grading, LLC $3.2500 $8,385.00

27PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

740-11.04 TEMPORARY SEDIMENT TUBE 20IN

L.F.41,883.000

Ford Construction Company $3.5000 $146,590.50

Jones Bros. Contractors, LLC $3.5000 $146,590.50

Dement Construction Company, LLC $3.5000 $146,590.50

Kolb Grading, LLC $3.5000 $146,590.50

801-01 SEEDING (WITH MULCH)

UNIT751.000

Ford Construction Company $21.0000 $15,771.00

Jones Bros. Contractors, LLC $25.0000 $18,775.00

Dement Construction Company, LLC $25.0000 $18,775.00

Kolb Grading, LLC $21.0000 $15,771.00

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT12,013.000

Ford Construction Company $17.0000 $204,221.00

Jones Bros. Contractors, LLC $17.2500 $207,224.25

Dement Construction Company, LLC $17.2500 $207,224.25

Kolb Grading, LLC $17.0000 $204,221.00

801-01.30 COVER CROP SEED MIX (RIPZN/FLPL) W/MULCH

UNIT3.000

Ford Construction Company $200.0000 $600.00

Jones Bros. Contractors, LLC $75.0000 $225.00

Dement Construction Company, LLC $75.0000 $225.00

Kolb Grading, LLC $200.0000 $600.00

801-01.35 GRASS SEED MIX (RIPZN/FLPL) W/MULCH

UNIT3.000

Ford Construction Company $200.0000 $600.00

Jones Bros. Contractors, LLC $75.0000 $225.00

Dement Construction Company, LLC $75.0000 $225.00

Kolb Grading, LLC $200.0000 $600.00

801-01.65 TEMPORARY MULCH

UNIT12,013.000

Ford Construction Company $10.0000 $120,130.00

Jones Bros. Contractors, LLC $10.0000 $120,130.00

Dement Construction Company, LLC $10.0000 $120,130.00

Kolb Grading, LLC $10.0000 $120,130.00

801-02 SEEDING (WITHOUT MULCH)

UNIT3,796.000

Ford Construction Company $20.0000 $75,920.00

Jones Bros. Contractors, LLC $10.0000 $37,960.00

Dement Construction Company, LLC $10.0000 $37,960.00

Kolb Grading, LLC $20.0000 $75,920.00

28PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

801-03 WATER (SEEDING & SODDING)

M.G.7,951.000

Ford Construction Company $1.0000 $7,951.00

Jones Bros. Contractors, LLC $1.0000 $7,951.00

Dement Construction Company, LLC $1.0000 $7,951.00

Kolb Grading, LLC $0.0100 $79.51

801-07 SEED (SUPPLEMENTAL APPLICATION)

LB.1,296.000

Ford Construction Company $12.0000 $15,552.00

Jones Bros. Contractors, LLC $8.0000 $10,368.00

Dement Construction Company, LLC $8.0000 $10,368.00

Kolb Grading, LLC $12.0000 $15,552.00

801-08 FERTILIZER (SUPPLEMENTAL APPLICATION)

TON10.000

Ford Construction Company $600.0000 $6,000.00

Jones Bros. Contractors, LLC $450.0000 $4,500.00

Dement Construction Company, LLC $450.0000 $4,500.00

Kolb Grading, LLC $600.0000 $6,000.00

802-01.07 TREES(LIQUIDAMBER STYRACIFLUA) (1.5 - 2" CAL. B&B)

EACH14.000

Ford Construction Company $230.0000 $3,220.00

Jones Bros. Contractors, LLC $250.0000 $3,500.00

Dement Construction Company, LLC $250.0000 $3,500.00

Kolb Grading, LLC $230.0000 $3,220.00

802-01.08 TREES(PLATANUS OCCIDENTALIS) (1.5 - 2"CAL. B&B)

EACH14.000

Ford Construction Company $230.0000 $3,220.00

Jones Bros. Contractors, LLC $250.0000 $3,500.00

Dement Construction Company, LLC $250.0000 $3,500.00

Kolb Grading, LLC $230.0000 $3,220.00

802-01.10 TREES (POPULUS DELTOIDS)

EACH14.000

Ford Construction Company $230.0000 $3,220.00

Jones Bros. Contractors, LLC $250.0000 $3,500.00

Dement Construction Company, LLC $250.0000 $3,500.00

Kolb Grading, LLC $230.0000 $3,220.00

802-01.11 TREES (LIQUIDAMBER STYRACIFLUA)

EACH14.000

Ford Construction Company $230.0000 $3,220.00

Jones Bros. Contractors, LLC $250.0000 $3,500.00

Dement Construction Company, LLC $250.0000 $3,500.00

Kolb Grading, LLC $230.0000 $3,220.00

29PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

802-01.12 TREES (PLATANUS OCCIDENTALIS)

EACH14.000

Ford Construction Company $230.0000 $3,220.00

Jones Bros. Contractors, LLC $250.0000 $3,500.00

Dement Construction Company, LLC $250.0000 $3,500.00

Kolb Grading, LLC $230.0000 $3,220.00

803-01 SODDING (NEW SOD)

S.Y.680,547.000

Ford Construction Company $2.3000 $1,565,258.10

Jones Bros. Contractors, LLC $2.4000 $1,633,312.80

Dement Construction Company, LLC $2.4000 $1,633,312.80

Kolb Grading, LLC $2.3500 $1,599,285.45

805-01.03 TURF REINFORCEMENT MAT (CLASS III)

S.Y.13,813.000

Ford Construction Company $2.9000 $40,057.70

Jones Bros. Contractors, LLC $4.0000 $55,252.00

Dement Construction Company, LLC $4.0000 $55,252.00

Kolb Grading, LLC $2.9000 $40,057.70

805-12.01 EROSION CONTROL BLANKET (TYPE I)

S.Y.27,237.000

Ford Construction Company $1.3000 $35,408.10

Jones Bros. Contractors, LLC $1.1000 $29,960.70

Dement Construction Company, LLC $1.1000 $29,960.70

Kolb Grading, LLC $1.3000 $35,408.10

805-12.02 EROSION CONTROL BLANKET (TYPE II)

S.Y.186,672.000

Ford Construction Company $1.3000 $242,673.60

Jones Bros. Contractors, LLC $1.1000 $205,339.20

Dement Construction Company, LLC $1.1000 $205,339.20

Kolb Grading, LLC $1.3000 $242,673.60

805-12.03 EROSION CONTROL BLANKET (TYPE III)

S.Y.182.000

Ford Construction Company $2.0000 $364.00

Jones Bros. Contractors, LLC $1.4000 $254.80

Dement Construction Company, LLC $1.4000 $254.80

Kolb Grading, LLC $2.0000 $364.00

806-02.03 PROJECT MOWING

CYCL6.000

Ford Construction Company $6,500.0000 $39,000.00

Jones Bros. Contractors, LLC $10,000.0000 $60,000.00

Dement Construction Company, LLC $6,000.0000 $36,000.00

Kolb Grading, LLC $6,500.0000 $39,000.00

30PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

BRIDGE CATEGORY

204-02.01 DRY EXCAVATION (BRIDGES)

C.Y.3,677.000

Ford Construction Company $9.0000 $33,093.00

Jones Bros. Contractors, LLC $15.0000 $55,155.00

Dement Construction Company, LLC $10.0000 $36,770.00

Kolb Grading, LLC $10.0000 $36,770.00

303-01.02 GRANULAR BACKFILL (BRIDGES)

TON315.000

Ford Construction Company $35.0000 $11,025.00

Jones Bros. Contractors, LLC $25.0000 $7,875.00

Dement Construction Company, LLC $35.0000 $11,025.00

Kolb Grading, LLC $45.0000 $14,175.00

602-04.01 STEEL STRUCTURES (BRIDGE NO. 5, STA. 327+90.96)

LS1.000

Ford Construction Company $1,490,735.0000 $1,490,735.00

Jones Bros. Contractors, LLC $1,890,000.0000 $1,890,000.00

Dement Construction Company, LLC $1,000,000.0000 $1,000,000.00

Kolb Grading, LLC $1,585,000.0000 $1,585,000.00

602-04.02 STEEL STRUCTURES (BRIDGE NO. 6, STA. 411+27.00)

LS1.000

Ford Construction Company $3,072,869.0000 $3,072,869.00

Jones Bros. Contractors, LLC $3,280,000.0000 $3,280,000.00

Dement Construction Company, LLC $2,500,000.0000 $2,500,000.00

Kolb Grading, LLC $2,815,000.0000 $2,815,000.00

604-02.03 EPOXY COATED REINFORCING STEEL

LB.883,934.000

Ford Construction Company $1.1500 $1,016,524.10

Jones Bros. Contractors, LLC $1.1000 $972,327.40

Dement Construction Company, LLC $1.0000 $883,934.00

Kolb Grading, LLC $1.3000 $1,149,114.20

604-03.01 CLASS A CONCRETE (BRIDGES)

C.Y.2,127.000

Ford Construction Company $495.0000 $1,052,865.00

Jones Bros. Contractors, LLC $475.0000 $1,010,325.00

Dement Construction Company, LLC $750.0000 $1,595,250.00

Kolb Grading, LLC $525.0000 $1,116,675.00

604-03.02 STEEL BAR REINFORCEMENT (BRIDGES)

LB.443,961.000

Ford Construction Company $1.1000 $488,357.10

Jones Bros. Contractors, LLC $0.9300 $412,883.73

Dement Construction Company, LLC $0.9100 $404,004.51

Kolb Grading, LLC $1.1500 $510,555.15

31PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

604-03.04 PAVEMENT @ BRIDGE ENDS

S.Y.1,208.000

Ford Construction Company $245.0000 $295,960.00

Jones Bros. Contractors, LLC $355.0000 $428,840.00

Dement Construction Company, LLC $250.0000 $302,000.00

Kolb Grading, LLC $225.0000 $271,800.00

604-03.09 CLASS D CONCRETE (BRIDGE DECK)

C.Y.1,609.000

Ford Construction Company $573.0000 $921,957.00

Jones Bros. Contractors, LLC $515.0000 $828,635.00

Dement Construction Company, LLC $650.0000 $1,045,850.00

Kolb Grading, LLC $550.0000 $884,950.00

604-03.32 CLASS DS CONCRETE

C.Y.932.000

Ford Construction Company $590.0000 $549,880.00

Jones Bros. Contractors, LLC $575.0000 $535,900.00

Dement Construction Company, LLC $875.0000 $815,500.00

Kolb Grading, LLC $575.0000 $535,900.00

604-03.74 CLASS X CONCRETE

C.Y.377.000

Ford Construction Company $550.0000 $207,350.00

Jones Bros. Contractors, LLC $630.0000 $237,510.00

Dement Construction Company, LLC $600.0000 $226,200.00

Kolb Grading, LLC $550.0000 $207,350.00

604-04.01 APPLIED TEXTURE FINISH (NEW STRUCTURES)

S.Y.21,960.000

Ford Construction Company $6.9900 $153,500.40

Jones Bros. Contractors, LLC $5.5000 $120,780.00

Dement Construction Company, LLC $5.3500 $117,486.00

Kolb Grading, LLC $9.0000 $197,640.00

604-04.41 THREE STAR STATE EMBLEM

EACH24.000

Ford Construction Company $1,500.0000 $36,000.00

Jones Bros. Contractors, LLC $2,500.0000 $60,000.00

Dement Construction Company, LLC $150.0000 $3,600.00

Kolb Grading, LLC $1,000.0000 $24,000.00

604-05.31 BRIDGE DECK GROOVING (MECHANICAL)

S.Y.9,642.000

Ford Construction Company $2.2000 $21,212.40

Jones Bros. Contractors, LLC $4.0000 $38,568.00

Dement Construction Company, LLC $3.4300 $33,072.06

Kolb Grading, LLC $3.5000 $33,747.00

32PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

604-11.01 EXPANSION DEVICE (MODULAR, 6" MOVEMENT)

L.F.32.000

Ford Construction Company $2,225.0000 $71,200.00

Jones Bros. Contractors, LLC $260.0000 $8,320.00

Dement Construction Company, LLC $1,200.0000 $38,400.00

Kolb Grading, LLC $2,400.0000 $76,800.00

606-09.01 TEST PILES (PRECAST CONCRETE, SIZE 1)

L.F.255.000

Ford Construction Company $54.0000 $13,770.00

Jones Bros. Contractors, LLC $47.0000 $11,985.00

Dement Construction Company, LLC $75.0000 $19,125.00

Kolb Grading, LLC $98.0000 $24,990.00

606-09.02 LOADING TEST (PRECAST CONCRETE, SIZE 1)

EACH5.000

Ford Construction Company $5,500.0000 $27,500.00

Jones Bros. Contractors, LLC $7,500.0000 $37,500.00

Dement Construction Company, LLC $4,000.0000 $20,000.00

Kolb Grading, LLC $20,000.0000 $100,000.00

606-09.03 PRECAST CONCRETE PILES (SIZE 1)

L.F.10,775.000

Ford Construction Company $47.0000 $506,425.00

Jones Bros. Contractors, LLC $40.0000 $431,000.00

Dement Construction Company, LLC $32.0000 $344,800.00

Kolb Grading, LLC $76.0000 $818,900.00

606-12.01 PILE ANCHORAGE SYSTEM (SEISMIC)

EACH268.000

Ford Construction Company $126.0000 $33,768.00

Jones Bros. Contractors, LLC $200.0000 $53,600.00

Dement Construction Company, LLC $200.0000 $53,600.00

Kolb Grading, LLC $175.0000 $46,900.00

606-19.01 TEST PILES (STEEL PIPE PILES, 16-INCH)

L.F.1,395.000

Ford Construction Company $90.0000 $125,550.00

Jones Bros. Contractors, LLC $75.0000 $104,625.00

Dement Construction Company, LLC $100.0000 $139,500.00

Kolb Grading, LLC $118.0000 $164,610.00

606-19.02 LOADING TEST (STEEL PIPE PILES, 16-INCH)

EACH6.000

Ford Construction Company $5,500.0000 $33,000.00

Jones Bros. Contractors, LLC $7,500.0000 $45,000.00

Dement Construction Company, LLC $4,000.0000 $24,000.00

Kolb Grading, LLC $20,000.0000 $120,000.00

33PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

606-19.03 STEEL PIPE PILES (16-INCH)

L.F.28,310.000

Ford Construction Company $79.0000 $2,236,490.00

Jones Bros. Contractors, LLC $64.0000 $1,811,840.00

Dement Construction Company, LLC $60.0000 $1,698,600.00

Kolb Grading, LLC $94.0000 $2,661,140.00

615-01.12 PRESTRESSED CONCRETE BULB TEE BEAM (6" WEB)(BT-72)

L.F.7,386.000

Ford Construction Company $320.0000 $2,363,520.00

Jones Bros. Contractors, LLC $315.0000 $2,326,590.00

Dement Construction Company, LLC $365.0000 $2,695,890.00

Kolb Grading, LLC $332.0000 $2,452,152.00

620-05.01 CONC PARAPET SINGLE SLOPE (STD-1-1SS)

L.F.4,977.000

Ford Construction Company $95.0000 $472,815.00

Jones Bros. Contractors, LLC $75.0000 $373,275.00

Dement Construction Company, LLC $75.0000 $373,275.00

Kolb Grading, LLC $80.0000 $398,160.00

710-09.01 6" PERFORATED PIPE WITH VERTICAL DRAIN SYSTEM

L.F.918.000

Ford Construction Company $15.0000 $13,770.00

Jones Bros. Contractors, LLC $38.0000 $34,884.00

Dement Construction Company, LLC $55.0000 $50,490.00

Kolb Grading, LLC $20.0000 $18,360.00

710-09.02 6" PIPE UNDERDRAIN

L.F.266.000

Ford Construction Company $12.0000 $3,192.00

Jones Bros. Contractors, LLC $20.0000 $5,320.00

Dement Construction Company, LLC $12.0000 $3,192.00

Kolb Grading, LLC $16.0000 $4,256.00

34PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

UTILITY CATEGORY

795-01.03 6IN DIP RESTRAINED JOINT WATER LINE

L.F.1,145.000

Ford Construction Company $26.0000 $29,770.00

Jones Bros. Contractors, LLC $26.0000 $29,770.00

Dement Construction Company, LLC $26.0000 $29,770.00

Kolb Grading, LLC $57.0000 $65,265.00

795-01.05 8IN DIP RESTRAINED JOINT WATER LINE

L.F.410.000

Ford Construction Company $32.0000 $13,120.00

Jones Bros. Contractors, LLC $32.0000 $13,120.00

Dement Construction Company, LLC $32.0000 $13,120.00

Kolb Grading, LLC $67.0000 $27,470.00

795-03.05 6IN PVC WATER LINE

L.F.4,203.000

Ford Construction Company $14.0000 $58,842.00

Jones Bros. Contractors, LLC $14.0000 $58,842.00

Dement Construction Company, LLC $14.0000 $58,842.00

Kolb Grading, LLC $59.0000 $247,977.00

795-03.06 8IN PVC WATER LINE

L.F.4,006.000

Ford Construction Company $16.0000 $64,096.00

Jones Bros. Contractors, LLC $16.0000 $64,096.00

Dement Construction Company, LLC $16.0000 $64,096.00

Kolb Grading, LLC $54.0000 $216,324.00

795-05.02 HDD 4IN HDPE CASING PIPE-UNCON

L.F.150.000

Ford Construction Company $68.0000 $10,200.00

Jones Bros. Contractors, LLC $68.0000 $10,200.00

Dement Construction Company, LLC $68.0000 $10,200.00

Kolb Grading, LLC $58.0000 $8,700.00

795-05.65 BORE/JACK 16IN STEEL CASING PIPE-UNCON.

L.F.75.000

Ford Construction Company $400.0000 $30,000.00

Jones Bros. Contractors, LLC $400.0000 $30,000.00

Dement Construction Company, LLC $400.0000 $30,000.00

Kolb Grading, LLC $665.0000 $49,875.00

795-07.03 6IN X 6IN TAPPING SLEEVE AND VALVE

EACH7.000

Ford Construction Company $2,800.0000 $19,600.00

Jones Bros. Contractors, LLC $2,800.0000 $19,600.00

Dement Construction Company, LLC $2,800.0000 $19,600.00

Kolb Grading, LLC $6,200.0000 $43,400.00

35PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

795-07.31 INSERTION VALVE (6IN)

EACH8.000

Ford Construction Company $4,800.0000 $38,400.00

Jones Bros. Contractors, LLC $4,800.0000 $38,400.00

Dement Construction Company, LLC $4,800.0000 $38,400.00

Kolb Grading, LLC $8,100.0000 $64,800.00

795-08.03 4IN GATE VALVE ASSEMBLY

EACH4.000

Ford Construction Company $850.0000 $3,400.00

Jones Bros. Contractors, LLC $850.0000 $3,400.00

Dement Construction Company, LLC $850.0000 $3,400.00

Kolb Grading, LLC $1,715.0000 $6,860.00

795-08.04 6IN GATE VALVE ASSEMBLY

EACH1.000

Ford Construction Company $1,400.0000 $1,400.00

Jones Bros. Contractors, LLC $1,400.0000 $1,400.00

Dement Construction Company, LLC $1,400.0000 $1,400.00

Kolb Grading, LLC $1,850.0000 $1,850.00

795-08.05 8IN GATE VALVE ASSEMBLY

EACH4.000

Ford Construction Company $1,400.0000 $5,600.00

Jones Bros. Contractors, LLC $1,400.0000 $5,600.00

Dement Construction Company, LLC $1,400.0000 $5,600.00

Kolb Grading, LLC $2,160.0000 $8,640.00

795-09.02 1IN WATER SERVICE METER ASSEMBLY

EACH18.000

Ford Construction Company $700.0000 $12,600.00

Jones Bros. Contractors, LLC $700.0000 $12,600.00

Dement Construction Company, LLC $700.0000 $12,600.00

Kolb Grading, LLC $4,365.0000 $78,570.00

795-09.15 1IN HDPE SERVICE PIPE

L.F.440.000

Ford Construction Company $15.0000 $6,600.00

Jones Bros. Contractors, LLC $15.0000 $6,600.00

Dement Construction Company, LLC $15.0000 $6,600.00

Kolb Grading, LLC $33.0000 $14,520.00

795-11.02 FIRE HYDRANT ASSEMBLY

EACH4.000

Ford Construction Company $5,000.0000 $20,000.00

Jones Bros. Contractors, LLC $5,000.0000 $20,000.00

Dement Construction Company, LLC $5,000.0000 $20,000.00

Kolb Grading, LLC $3,825.0000 $15,300.00

36PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

795-13.01 DI FITTINGS

LB.9,000.000

Ford Construction Company $8.0000 $72,000.00

Jones Bros. Contractors, LLC $8.4500 $76,050.00

Dement Construction Company, LLC $8.0000 $72,000.00

Kolb Grading, LLC $11.4000 $102,600.00

795-15.04 18IN STEEL CASING PIPE OPEN CUT METHOD

L.F.1,030.000

Ford Construction Company $175.0000 $180,250.00

Jones Bros. Contractors, LLC $175.0000 $180,250.00

Dement Construction Company, LLC $175.0000 $180,250.00

Kolb Grading, LLC $115.0000 $118,450.00

795-15.05 20IN STEEL CASING PIPE OPEN CUT METHOD

L.F.400.000

Ford Construction Company $175.0000 $70,000.00

Jones Bros. Contractors, LLC $175.0000 $70,000.00

Dement Construction Company, LLC $175.0000 $70,000.00

Kolb Grading, LLC $125.0000 $50,000.00

37PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

ROADWAY ALTERNATE AA1 CATEGORY

203-06 WATER

M.G.8,741.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON439,794.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON9,183.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-01.22 ASP. CONC. MIX(PG76-22) (BPMB-HM) GR. A-S

TON22,306.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-03.01 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING A

TON60,417.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-03.08 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING B-M2

TON19,393.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

309-01.01 MINERAL AGGREGATE (A-CBC)

TON9,066.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

38PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

309-01.02 PORTLAND CEMENT (A-CBC)

TON350.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

309-02 BITUMINOUS MATERIAL (A-CBC)

TON30.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

313-03 TREATED PERMEABLE BASE

S.Y.64,192.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON526.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON2,079.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON133.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON3,852.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

39PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

411-03.10 ACS MIX(PG76-22) GRADING D

TON10,509.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

501-01.04 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 11"

S.Y.33,988.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

40PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

ROADWAY ALTERNATE AA2 CATEGORY

203-06 WATER

M.G.7,974.000

Ford Construction Company $15.0000 $119,610.00

Jones Bros. Contractors, LLC $25.0000 $199,350.00

Dement Construction Company, LLC $15.0000 $119,610.00

Kolb Grading, LLC $25.0000 $199,350.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON227,154.000

Ford Construction Company $17.5000 $3,975,195.00

Jones Bros. Contractors, LLC $20.0000 $4,543,080.00

Dement Construction Company, LLC $25.0000 $5,678,850.00

Kolb Grading, LLC $26.2500 $5,962,792.50

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON9,183.000

Ford Construction Company $87.5500 $803,971.65

Jones Bros. Contractors, LLC $85.0000 $780,555.00

Dement Construction Company, LLC $87.5500 $803,971.65

Kolb Grading, LLC $87.5500 $803,971.65

307-01.22 ASP. CONC. MIX(PG76-22) (BPMB-HM) GR. A-S

TON22,306.000

Ford Construction Company $80.1000 $1,786,710.60

Jones Bros. Contractors, LLC $79.0000 $1,762,174.00

Dement Construction Company, LLC $80.1000 $1,786,710.60

Kolb Grading, LLC $80.1000 $1,786,710.60

307-03.01 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING A

TON60,417.000

Ford Construction Company $85.9000 $5,189,820.30

Jones Bros. Contractors, LLC $78.0000 $4,712,526.00

Dement Construction Company, LLC $85.9000 $5,189,820.30

Kolb Grading, LLC $85.9000 $5,189,820.30

307-03.08 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING B-M2

TON19,393.000

Ford Construction Company $89.3000 $1,731,794.90

Jones Bros. Contractors, LLC $91.0000 $1,764,763.00

Dement Construction Company, LLC $89.3000 $1,731,794.90

Kolb Grading, LLC $89.3000 $1,731,794.90

309-01.01 MINERAL AGGREGATE (A-CBC)

TON61,816.000

Ford Construction Company $15.0000 $927,240.00

Jones Bros. Contractors, LLC $21.0000 $1,298,136.00

Dement Construction Company, LLC $24.5000 $1,514,492.00

Kolb Grading, LLC $34.0000 $2,101,744.00

41PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

309-01.02 PORTLAND CEMENT (A-CBC)

TON2,387.000

Ford Construction Company $245.0000 $584,815.00

Jones Bros. Contractors, LLC $245.0000 $584,815.00

Dement Construction Company, LLC $345.0000 $823,515.00

Kolb Grading, LLC $250.0000 $596,750.00

309-02 BITUMINOUS MATERIAL (A-CBC)

TON171.000

Ford Construction Company $1,200.0000 $205,200.00

Jones Bros. Contractors, LLC $1,200.0000 $205,200.00

Dement Construction Company, LLC $855.0000 $146,205.00

Kolb Grading, LLC $1,500.0000 $256,500.00

313-03 TREATED PERMEABLE BASE

S.Y.64,192.000

Ford Construction Company $18.0000 $1,155,456.00

Jones Bros. Contractors, LLC $16.0000 $1,027,072.00

Dement Construction Company, LLC $18.0000 $1,155,456.00

Kolb Grading, LLC $18.0000 $1,155,456.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON526.000

Ford Construction Company $470.0000 $247,220.00

Jones Bros. Contractors, LLC $525.0000 $276,150.00

Dement Construction Company, LLC $470.0000 $247,220.00

Kolb Grading, LLC $470.0000 $247,220.00

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON2,079.000

Ford Construction Company $5.0000 $10,395.00

Jones Bros. Contractors, LLC $20.0000 $41,580.00

Dement Construction Company, LLC $5.0000 $10,395.00

Kolb Grading, LLC $5.0000 $10,395.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON133.000

Ford Construction Company $380.0000 $50,540.00

Jones Bros. Contractors, LLC $400.0000 $53,200.00

Dement Construction Company, LLC $380.0000 $50,540.00

Kolb Grading, LLC $380.0000 $50,540.00

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON3,852.000

Ford Construction Company $99.2000 $382,118.40

Jones Bros. Contractors, LLC $99.0000 $381,348.00

Dement Construction Company, LLC $99.2000 $382,118.40

Kolb Grading, LLC $99.2000 $382,118.40

42PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

411-03.10 ACS MIX(PG76-22) GRADING D

TON10,509.000

Ford Construction Company $99.7500 $1,048,272.75

Jones Bros. Contractors, LLC $100.0000 $1,050,900.00

Dement Construction Company, LLC $99.7500 $1,048,272.75

Kolb Grading, LLC $99.7500 $1,048,272.75

501-01.04 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 11"

S.Y.33,988.000

Ford Construction Company $125.0000 $4,248,500.00

Jones Bros. Contractors, LLC $120.0000 $4,078,560.00

Dement Construction Company, LLC $125.0000 $4,248,500.00

Kolb Grading, LLC $117.6500 $3,998,688.20

43PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

ROADWAY ALTERNATE AA3 CATEGORY

203-06 WATER

M.G.7,799.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON202,007.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON3,713.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-01.22 ASP. CONC. MIX(PG76-22) (BPMB-HM) GR. A-S

TON345.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-03.01 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING A

TON6,016.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

307-03.08 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING B-M2

TON2,700.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

309-01.01 MINERAL AGGREGATE (A-CBC)

TON62,549.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

44PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

309-01.02 PORTLAND CEMENT (A-CBC)

TON2,415.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

309-02 BITUMINOUS MATERIAL (A-CBC)

TON202.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

313-03 TREATED PERMEABLE BASE

S.Y.262,112.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON187.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON739.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON15.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON772.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

45PAGE

EXTENSION

CONTRACT CNT016

UNIT PRICE

411-03.10 ACS MIX(PG76-22) GRADING D

TON722.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

501-01.04 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 11"

S.Y.222,191.000

Ford Construction Company

Jones Bros. Contractors, LLC

Dement Construction Company, LLC

Kolb Grading, LLC

46PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Ford Construction Company $32,471,879.61

Jones Bros. Contractors, LLC $32,888,707.38

Dement Construction Company, LLC $36,460,707.90

Kolb Grading, LLC $39,770,112.38

SUB-TOTAL BRIDGE

Ford Construction Company $15,252,328.00

Jones Bros. Contractors, LLC $15,122,738.13

Dement Construction Company, LLC $14,435,563.57

Kolb Grading, LLC $16,268,944.35

SUB-TOTAL UTILITY

Ford Construction Company $635,878.00

Jones Bros. Contractors, LLC $639,928.00

Dement Construction Company, LLC $635,878.00

Kolb Grading, LLC $1,120,601.00

SUB-TOTAL ROADWAY ALTERNATE AA1

SUB-TOTAL ROADWAY ALTERNATE AA2

Ford Construction Company $22,466,859.60

Jones Bros. Contractors, LLC $22,759,409.00

Dement Construction Company, LLC $24,937,471.60

Kolb Grading, LLC $25,522,124.30

SUB-TOTAL ROADWAY ALTERNATE AA3

Ford Construction Company $70,826,945.21

Jones Bros. Contractors, LLC $71,410,782.51

Dement Construction Company, LLC $76,469,621.07

Kolb Grading, LLC $82,681,782.03

47PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

POLK COUNTY (Contract No. CNT090 Call 047)

7.00%DBE GOAL

THE RESURFACING ON U.S. 64 (U.S. 74, S.R. 40) FROM WEST OF S.R. 30 (L.M. 9.78) TO NEAR LITTLE CANEY CREEK BRIDGE (L.M. 13.00).

PROJECT LENGTH -

STP-NH/HSIP-40(41),70068-3215-94,70068-8215-14

3.220 MILES

COMPLETION TIME - ON OR BEFORE JUNE 26, 2019

TOTAL CONTRACT

Talley Construction Company, Inc. $1,035,922.96

Wright Brothers Construction Company, Inc. $1,184,444.15

1PAGE

EXTENSION

CONTRACT CNT090

UNIT PRICE

ROADWAY CATEGORY

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON207.000

Talley Construction Company, Inc. $46.6100 $9,648.27

Wright Brothers Construction Company, Inc. $68.2500 $14,127.75

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON150.000

Talley Construction Company, Inc. $171.9700 $25,795.50

Wright Brothers Construction Company, Inc. $176.0000 $26,400.00

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON1,953.000

Talley Construction Company, Inc. $107.6000 $210,142.80

Wright Brothers Construction Company, Inc. $122.0000 $238,266.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON47.000

Talley Construction Company, Inc. $628.1900 $29,524.93

Wright Brothers Construction Company, Inc. $695.0000 $32,665.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON3,555.000

Talley Construction Company, Inc. $122.3400 $434,918.70

Wright Brothers Construction Company, Inc. $148.0000 $526,140.00

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.5.200

Talley Construction Company, Inc. $1,077.8600 $5,604.87

Wright Brothers Construction Company, Inc. $997.0000 $5,184.40

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON3,298.000

Talley Construction Company, Inc. $32.2600 $106,393.48

Wright Brothers Construction Company, Inc. $44.7500 $147,585.50

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH2.000

Talley Construction Company, Inc. $115.0000 $230.00

Wright Brothers Construction Company, Inc. $112.0000 $224.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.13.000

Talley Construction Company, Inc. $30.4800 $396.24

Wright Brothers Construction Company, Inc. $22.5000 $292.50

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH2.000

Talley Construction Company, Inc. $3,450.0000 $6,900.00

Wright Brothers Construction Company, Inc. $3,360.0000 $6,720.00

2PAGE

EXTENSION

CONTRACT CNT090

UNIT PRICE

706-01 GUARDRAIL REMOVED

L.F.100.000

Talley Construction Company, Inc. $2.8800 $288.00

Wright Brothers Construction Company, Inc. $1.1000 $110.00

712-01 TRAFFIC CONTROL

LS1.000

Talley Construction Company, Inc. $34,000.0000 $34,000.00

Wright Brothers Construction Company, Inc. $50,600.0000 $50,600.00

712-04.02 FLEXIBLE DRUMS (CHANNELIZATION)

EACH25.000

Talley Construction Company, Inc. $32.7800 $819.50

Wright Brothers Construction Company, Inc. $5.6000 $140.00

712-06 SIGNS (CONSTRUCTION)

S.F.618.000

Talley Construction Company, Inc. $97.7500 $60,409.50

Wright Brothers Construction Company, Inc. $7.5500 $4,665.90

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.130.000

Talley Construction Company, Inc. $7.4800 $972.40

Wright Brothers Construction Company, Inc. $6.7000 $871.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Talley Construction Company, Inc. $3,737.5000 $7,475.00

Wright Brothers Construction Company, Inc. $5,040.0000 $10,080.00

713-16.20 SIGNS (W1-8L - CHEVERON ALIGNMENT (LEFT)

EACH13.000

Talley Construction Company, Inc. $201.2500 $2,616.25

Wright Brothers Construction Company, Inc. $213.0000 $2,769.00

713-16.21 SIGNS (W1-8R - CHEVERON ALIGNMENT (RIGHT)

EACH13.000

Talley Construction Company, Inc. $201.2500 $2,616.25

Wright Brothers Construction Company, Inc. $213.0000 $2,769.00

713-16.22 SIGNS (R8-3 - NO PARKING (SYMBOL)

EACH3.000

Talley Construction Company, Inc. $402.5000 $1,207.50

Wright Brothers Construction Company, Inc. $202.0000 $606.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH240.000

Talley Construction Company, Inc. $32.2000 $7,728.00

Wright Brothers Construction Company, Inc. $31.2500 $7,500.00

3PAGE

EXTENSION

CONTRACT CNT090

UNIT PRICE

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH25.000

Talley Construction Company, Inc. $32.2000 $805.00

Wright Brothers Construction Company, Inc. $31.2500 $781.25

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.96.000

Talley Construction Company, Inc. $20.4100 $1,959.36

Wright Brothers Construction Company, Inc. $20.0000 $1,920.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.13.000

Talley Construction Company, Inc. $11.5000 $149.50

Wright Brothers Construction Company, Inc. $11.2500 $146.25

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH6.000

Talley Construction Company, Inc. $172.5000 $1,035.00

Wright Brothers Construction Company, Inc. $168.0000 $1,008.00

716-04.04 PLASTIC PAVEMENT MARKING (TRANSVERSE SHOULDER)

L.F.160.000

Talley Construction Company, Inc. $6.6100 $1,057.60

Wright Brothers Construction Company, Inc. $6.4500 $1,032.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.12.900

Talley Construction Company, Inc. $661.2500 $8,530.13

Wright Brothers Construction Company, Inc. $644.0000 $8,307.60

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.6.500

Talley Construction Company, Inc. $4,743.7500 $30,834.38

Wright Brothers Construction Company, Inc. $4,620.0000 $30,030.00

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.45.000

Talley Construction Company, Inc. $1.4400 $64.80

Wright Brothers Construction Company, Inc. $1.4000 $63.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.6.400

Talley Construction Company, Inc. $2,156.2500 $13,800.00

Wright Brothers Construction Company, Inc. $2,100.0000 $13,440.00

717-01 MOBILIZATION

LS1.000

Talley Construction Company, Inc. $30,000.0000 $30,000.00

Wright Brothers Construction Company, Inc. $50,000.0000 $50,000.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Talley Construction Company, Inc. $1,035,922.96

Wright Brothers Construction Company, Inc. $1,184,444.15

Talley Construction Company, Inc. $1,035,922.96

Wright Brothers Construction Company, Inc. $1,184,444.15

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

RHEA COUNTY (Contract No. CNT073 Call 048)

8.50%DBE GOAL

THE GRADING, DRAINAGE AND PAVING ON S.R. 30 FROM WEST OF NEW UNION ROAD/WHITE OAK ROAD (L.M. 12.56) TO SKY DRIVE (L.M.12.89).

PROJECT LENGTH -

HSIP-30(70),72004-3232-94

0.322 MILES

COMPLETION TIME - ON OR BEFORE NOVEMBER 30, 2019

TOTAL CONTRACT

Twin K Construction, Inc. $2,716,942.73

Talley Construction Company, Inc. $2,801,606.76

Rogers Group, Inc. $2,802,383.16

1PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Twin K Construction, Inc. $47,141.5200 $47,141.52

Talley Construction Company, Inc. $46,800.0000 $46,800.00

Rogers Group, Inc. $47,726.0040 $47,726.00

201-01 CLEARING AND GRUBBING

LS1.000

Twin K Construction, Inc. $86,640.8700 $86,640.87

Talley Construction Company, Inc. $58,530.8000 $58,530.80

Rogers Group, Inc. $16,055.5770 $16,055.58

202-01 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

LS1.000

Twin K Construction, Inc. $17,312.1000 $17,312.10

Talley Construction Company, Inc. $8,385.6100 $8,385.61

Rogers Group, Inc. $30,869.6140 $30,869.61

202-06.01 REMOVAL OF BUILDINGS (TRACT NO. 9)

LS1.000

Twin K Construction, Inc. $33,408.1000 $33,408.10

Talley Construction Company, Inc. $15,496.0000 $15,496.00

Rogers Group, Inc. $13,561.8300 $13,561.83

202-13 WATER WELL ABANDONMENT

EACH1.000

Twin K Construction, Inc. $3,731.9700 $3,731.97

Talley Construction Company, Inc. $4,911.3300 $4,911.33

Rogers Group, Inc. $8,027.3040 $8,027.30

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.26,879.000

Twin K Construction, Inc. $8.3000 $223,095.70

Talley Construction Company, Inc. $9.4100 $252,931.39

Rogers Group, Inc. $14.1650 $380,741.04

203-02.01 BORROW EXCAVATION (GRADED SOLID ROCK)

TON3,446.000

Twin K Construction, Inc. $23.8100 $82,049.26

Talley Construction Company, Inc. $19.9100 $68,609.86

Rogers Group, Inc. $26.8960 $92,683.62

203-03 BORROW EXCAVATION (UNCLASSIFIED)

C.Y.4,952.000

Twin K Construction, Inc. $15.7500 $77,994.00

Talley Construction Company, Inc. $11.1500 $55,214.80

Rogers Group, Inc. $9.4850 $46,969.72

2PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

203-04 PLACING AND SPREADING TOPSOIL

C.Y.831.000

Twin K Construction, Inc. $8.3000 $6,897.30

Talley Construction Company, Inc. $20.7000 $17,201.70

Rogers Group, Inc. $20.1760 $16,766.26

203-06 WATER

M.G.248.000

Twin K Construction, Inc. $20.6000 $5,108.80

Talley Construction Company, Inc. $11.8600 $2,941.28

Rogers Group, Inc. $20.1850 $5,005.88

204-08 FOUNDATION FILL MATERIAL

C.Y.51.000

Twin K Construction, Inc. $245.2100 $12,505.71

Talley Construction Company, Inc. $57.2000 $2,917.20

Rogers Group, Inc. $51.3750 $2,620.13

204-08.01 BACKFILL MATERIAL (FLOWABLE FILL)

C.Y.5.000

Twin K Construction, Inc. $245.2100 $1,226.05

Talley Construction Company, Inc. $150.2400 $751.20

Rogers Group, Inc. $298.0380 $1,490.19

209-02.07 18" TEMPORARY SLOPE DRAIN

L.F.40.000

Twin K Construction, Inc. $21.3700 $854.80

Talley Construction Company, Inc. $41.6000 $1,664.00

Rogers Group, Inc. $42.8120 $1,712.48

209-05 SEDIMENT REMOVAL

C.Y.288.000

Twin K Construction, Inc. $16.7400 $4,821.12

Talley Construction Company, Inc. $23.2200 $6,687.36

Rogers Group, Inc. $94.6760 $27,266.69

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.3,173.000

Twin K Construction, Inc. $3.9200 $12,438.16

Talley Construction Company, Inc. $3.8000 $12,057.40

Rogers Group, Inc. $3.9070 $12,396.91

209-08.07 ROCK CHECK DAM PER

EACH32.000

Twin K Construction, Inc. $296.5700 $9,490.24

Talley Construction Company, Inc. $442.0000 $14,144.00

Rogers Group, Inc. $454.8810 $14,556.19

3PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

209-08.08 ENHANCED ROCK CHECK DAM

EACH4.000

Twin K Construction, Inc. $1,461.6800 $5,846.72

Talley Construction Company, Inc. $624.0000 $2,496.00

Rogers Group, Inc. $642.1840 $2,568.74

209-09.01 SANDBAGS

BAG900.000

Twin K Construction, Inc. $4.7100 $4,239.00

Talley Construction Company, Inc. $3.1200 $2,808.00

Rogers Group, Inc. $3.2110 $2,889.90

209-09.03 SEDIMENT FILTER BAG (15' X 15')

EACH1.000

Twin K Construction, Inc. $1,588.7800 $1,588.78

Talley Construction Company, Inc. $1,354.8800 $1,354.88

Rogers Group, Inc. $535.1540 $535.15

209-20.03 POLYETHYLENE SHEETING (6 MIL. MINIMUM)

S.Y.67.000

Twin K Construction, Inc. $13.1500 $881.05

Talley Construction Company, Inc. $3.3800 $226.46

Rogers Group, Inc. $10.7030 $717.10

209-40.33 CATCH BASIN PROTECTION (TYPE D)

EACH1.000

Twin K Construction, Inc. $2,330.2100 $2,330.21

Talley Construction Company, Inc. $520.0000 $520.00

Rogers Group, Inc. $535.1540 $535.15

209-65.03 TEMPORARY DIVERSION CHANNEL

L.F.215.000

Twin K Construction, Inc. $18.4700 $3,971.05

Talley Construction Company, Inc. $87.3600 $18,782.40

Rogers Group, Inc. $78.1320 $16,798.38

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON10,840.000

Twin K Construction, Inc. $30.6100 $331,812.40

Talley Construction Company, Inc. $30.0600 $325,850.40

Rogers Group, Inc. $28.9000 $313,276.00

303-01.01 GRANULAR BACKFILL (ROADWAY)

TON1,075.000

Twin K Construction, Inc. $36.1600 $38,872.00

Talley Construction Company, Inc. $36.4000 $39,130.00

Rogers Group, Inc. $37.4610 $40,270.58

4PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

303-10.01 MINERAL AGGREGATE (SIZE 57)

TON74.000

Twin K Construction, Inc. $45.5200 $3,368.48

Talley Construction Company, Inc. $30.3900 $2,248.86

Rogers Group, Inc. $65.5520 $4,850.85

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON2,028.000

Twin K Construction, Inc. $97.0000 $196,716.00

Talley Construction Company, Inc. $95.2500 $193,167.00

Rogers Group, Inc. $91.5800 $185,724.24

307-01.02 ASPHALT CEMENT (PG64-22) (BPMB-HM) GRADING A-S

TON39.000

Twin K Construction, Inc. $898.6700 $35,048.13

Talley Construction Company, Inc. $882.4100 $34,413.99

Rogers Group, Inc. $848.4700 $33,090.33

307-01.03 AGGREGATE (BPMB-HM) GRADING A-S

TON1,161.000

Twin K Construction, Inc. $71.2900 $82,767.69

Talley Construction Company, Inc. $70.0000 $81,270.00

Rogers Group, Inc. $67.3100 $78,146.91

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON1,402.000

Twin K Construction, Inc. $109.0300 $152,860.06

Talley Construction Company, Inc. $107.0600 $150,098.12

Rogers Group, Inc. $102.9400 $144,321.88

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON34.000

Twin K Construction, Inc. $953.2500 $32,410.50

Talley Construction Company, Inc. $936.0000 $31,824.00

Rogers Group, Inc. $900.0000 $30,600.00

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON78.000

Twin K Construction, Inc. $26.4800 $2,065.44

Talley Construction Company, Inc. $26.0000 $2,028.00

Rogers Group, Inc. $25.0000 $1,950.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON6.000

Twin K Construction, Inc. $1,057.1400 $6,342.84

Talley Construction Company, Inc. $1,038.0100 $6,228.06

Rogers Group, Inc. $988.0900 $5,928.54

5PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON96.000

Twin K Construction, Inc. $180.8400 $17,360.64

Talley Construction Company, Inc. $177.5700 $17,046.72

Rogers Group, Inc. $170.7400 $16,391.04

411-01.10 ACS MIX(PG64-22) GRADING D

TON872.000

Twin K Construction, Inc. $143.5300 $125,158.16

Talley Construction Company, Inc. $140.9300 $122,890.96

Rogers Group, Inc. $135.5100 $118,164.72

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.0.500

Twin K Construction, Inc. $7,651.9800 $3,825.99

Talley Construction Company, Inc. $15,444.0000 $7,722.00

Rogers Group, Inc. $4,816.3820 $2,408.19

604-01.01 CLASS A CONCRETE (ROADWAY)

C.Y.216.000

Twin K Construction, Inc. $743.8200 $160,665.12

Talley Construction Company, Inc. $992.1000 $214,293.60

Rogers Group, Inc. $818.7850 $176,857.56

604-01.02 STEEL BAR REINFORCEMENT (ROADWAY)

LB.39,439.000

Twin K Construction, Inc. $1.1400 $44,960.46

Talley Construction Company, Inc. $0.9400 $37,072.66

Rogers Group, Inc. $0.9630 $37,979.76

604-15.01 PORTLAND CEMENT GROUT

C.Y.2.000

Twin K Construction, Inc. $247.6400 $495.28

Talley Construction Company, Inc. $423.8200 $847.64

Rogers Group, Inc. $557.8650 $1,115.73

607-03.02 18" CONCRETE PIPE CULVERT (CLASS III)

L.F.32.000

Twin K Construction, Inc. $81.8700 $2,619.84

Talley Construction Company, Inc. $210.4800 $6,735.36

Rogers Group, Inc. $241.9780 $7,743.30

607-05.30 24" PIPE CULVERT

L.F.44.000

Twin K Construction, Inc. $89.0800 $3,919.52

Talley Construction Company, Inc. $169.1800 $7,443.92

Rogers Group, Inc. $172.2250 $7,577.90

6PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

607-06.30 30" PIPE CULVERT

L.F.52.000

Twin K Construction, Inc. $107.1900 $5,573.88

Talley Construction Company, Inc. $206.9700 $10,762.44

Rogers Group, Inc. $180.8060 $9,401.91

607-39.02 18" PIPE CULVERT (SIDE DRAIN)

L.F.184.000

Twin K Construction, Inc. $63.2600 $11,639.84

Talley Construction Company, Inc. $74.4300 $13,695.12

Rogers Group, Inc. $109.4330 $20,135.67

611-07.54 18IN ENDWALL (CROSS DRAIN) 3:1

EACH2.000

Twin K Construction, Inc. $2,589.7200 $5,179.44

Talley Construction Company, Inc. $2,023.2300 $4,046.46

Rogers Group, Inc. $1,321.7750 $2,643.55

611-07.57 24IN ENDWALL (CROSS DRAIN) 3:1

EACH2.000

Twin K Construction, Inc. $3,649.6000 $7,299.20

Talley Construction Company, Inc. $2,607.7100 $5,215.42

Rogers Group, Inc. $2,935.0180 $5,870.04

611-07.60 30IN ENDWALL (CROSS DRAIN) 3:1

EACH2.000

Twin K Construction, Inc. $4,183.4200 $8,366.84

Talley Construction Company, Inc. $3,263.5100 $6,527.02

Rogers Group, Inc. $4,185.9180 $8,371.84

621-03.02 18" TEMPORARY DRAINAGE PIPE

L.F.85.000

Twin K Construction, Inc. $59.9400 $5,094.90

Talley Construction Company, Inc. $53.9800 $4,588.30

Rogers Group, Inc. $100.7020 $8,559.67

621-03.09 60" TEMPORARY DRAINAGE PIPE

L.F.155.000

Twin K Construction, Inc. $166.6700 $25,833.85

Talley Construction Company, Inc. $176.8000 $27,404.00

Rogers Group, Inc. $160.5460 $24,884.63

621-05.01 TEMPORARY SHORING

S.F.1,680.000

Twin K Construction, Inc. $15.0600 $25,300.80

Talley Construction Company, Inc. $14.2500 $23,940.00

Rogers Group, Inc. $14.5340 $24,417.12

7PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

705-01.04 METAL BEAM GUARD FENCE

L.F.19.000

Twin K Construction, Inc. $68.8500 $1,308.15

Talley Construction Company, Inc. $67.6000 $1,284.40

Rogers Group, Inc. $69.5700 $1,321.83

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.138.000

Twin K Construction, Inc. $16.9500 $2,339.10

Talley Construction Company, Inc. $16.6400 $2,296.32

Rogers Group, Inc. $17.1250 $2,363.25

705-04.50 PORTABLE BARRIER RAIL DELINEATOR

EACH33.000

Twin K Construction, Inc. $12.7100 $419.43

Talley Construction Company, Inc. $12.4800 $411.84

Rogers Group, Inc. $12.8440 $423.85

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH2.000

Twin K Construction, Inc. $2,965.6700 $5,931.34

Talley Construction Company, Inc. $2,912.0000 $5,824.00

Rogers Group, Inc. $2,996.8600 $5,993.72

705-20.25 TEMPORARY CRASH CUSHION (MASH TL-3)

EACH2.000

Twin K Construction, Inc. $4,766.2500 $9,532.50

Talley Construction Company, Inc. $4,680.0000 $9,360.00

Rogers Group, Inc. $4,816.3820 $9,632.76

706-01 GUARDRAIL REMOVED

L.F.661.000

Twin K Construction, Inc. $0.5300 $350.33

Talley Construction Company, Inc. $0.5200 $343.72

Rogers Group, Inc. $0.5350 $353.64

707-08.11 HIGH-VISIBILITY CONSTRUCTION FENCE

L.F.486.000

Twin K Construction, Inc. $5.4500 $2,648.70

Talley Construction Company, Inc. $1.3000 $631.80

Rogers Group, Inc. $1.3380 $650.27

708-02.01 MARKERS (CONCRETE R.O.W. POSTS)

EACH74.000

Twin K Construction, Inc. $145.6400 $10,777.36

Talley Construction Company, Inc. $179.6200 $13,291.88

Rogers Group, Inc. $335.1160 $24,798.58

8PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON271.000

Twin K Construction, Inc. $39.8700 $10,804.77

Talley Construction Company, Inc. $55.9100 $15,151.61

Rogers Group, Inc. $38.9990 $10,568.73

709-05.06 MACHINED RIP-RAP (CLASS A-1)

TON20.000

Twin K Construction, Inc. $51.1200 $1,022.40

Talley Construction Company, Inc. $55.9100 $1,118.20

Rogers Group, Inc. $55.4720 $1,109.44

709-05.08 MACHINED RIP-RAP (CLASS B)

TON1,545.000

Twin K Construction, Inc. $37.9500 $58,632.75

Talley Construction Company, Inc. $57.4100 $88,698.45

Rogers Group, Inc. $51.3750 $79,374.38

709-05.09 MACHINED RIP-RAP (CLASS C)

TON32.000

Twin K Construction, Inc. $34.0600 $1,089.92

Talley Construction Company, Inc. $53.6400 $1,716.48

Rogers Group, Inc. $47.0380 $1,505.22

710-02 AGGREGATE UNDERDRAINS (WITH PIPE)

L.F.2,136.000

Twin K Construction, Inc. $10.0600 $21,488.16

Talley Construction Company, Inc. $9.8800 $21,103.68

Rogers Group, Inc. $10.1680 $21,718.85

710-05 LATERAL UNDERDRAIN

L.F.294.000

Twin K Construction, Inc. $6.8800 $2,022.72

Talley Construction Company, Inc. $6.7600 $1,987.44

Rogers Group, Inc. $6.9570 $2,045.36

710-06.12 LATERAL UNDERDRAIN ENDWALL (3:1)

EACH1.000

Twin K Construction, Inc. $741.4200 $741.42

Talley Construction Company, Inc. $728.0000 $728.00

Rogers Group, Inc. $749.2150 $749.22

710-06.13 LATERAL UNDERDRAIN ENDWALL (4:1)

EACH5.000

Twin K Construction, Inc. $741.4200 $3,707.10

Talley Construction Company, Inc. $728.0000 $3,640.00

Rogers Group, Inc. $749.2150 $3,746.08

9PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

710-06.15 LATERAL UNDERDRAIN ENDWALL (6:1)

EACH6.000

Twin K Construction, Inc. $741.4200 $4,448.52

Talley Construction Company, Inc. $728.0000 $4,368.00

Rogers Group, Inc. $749.2150 $4,495.29

710-09.01 6" PERFORATED PIPE WITH VERTICAL DRAIN SYSTEM

L.F.85.000

Twin K Construction, Inc. $27.8200 $2,364.70

Talley Construction Company, Inc. $45.7600 $3,889.60

Rogers Group, Inc. $40.6720 $3,457.12

712-01 TRAFFIC CONTROL

LS1.000

Twin K Construction, Inc. $92,314.4200 $92,314.42

Talley Construction Company, Inc. $129,658.4700 $129,658.47

Rogers Group, Inc. $99,000.0000 $99,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.660.000

Twin K Construction, Inc. $40.5900 $26,789.40

Talley Construction Company, Inc. $28.3600 $18,717.60

Rogers Group, Inc. $45.1880 $29,824.08

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH67.000

Twin K Construction, Inc. $30.1900 $2,022.73

Talley Construction Company, Inc. $29.1200 $1,951.04

Rogers Group, Inc. $30.8680 $2,068.16

712-05.01 WARNING LIGHTS (TYPE A)

EACH8.000

Twin K Construction, Inc. $26.4800 $211.84

Talley Construction Company, Inc. $27.0400 $216.32

Rogers Group, Inc. $28.6630 $229.30

712-05.03 WARNING LIGHTS (TYPE C)

EACH25.000

Twin K Construction, Inc. $26.4800 $662.00

Talley Construction Company, Inc. $27.0400 $676.00

Rogers Group, Inc. $28.6630 $716.58

712-06 SIGNS (CONSTRUCTION)

S.F.148.000

Twin K Construction, Inc. $9.2700 $1,371.96

Talley Construction Company, Inc. $14.5600 $2,154.88

Rogers Group, Inc. $15.4340 $2,284.23

10PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.120.000

Twin K Construction, Inc. $28.0700 $3,368.40

Talley Construction Company, Inc. $17.1600 $2,059.20

Rogers Group, Inc. $18.1900 $2,182.80

713-11.01 "U" SECTION STEEL POSTS

LB.61.000

Twin K Construction, Inc. $4.1800 $254.98

Talley Construction Company, Inc. $4.0600 $247.66

Rogers Group, Inc. $4.2990 $262.24

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.499.000

Twin K Construction, Inc. $4.2400 $2,115.76

Talley Construction Company, Inc. $4.1600 $2,075.84

Rogers Group, Inc. $4.4100 $2,200.59

713-11.04 SURFACE MNT BREAKAWAY BASE FOR SIGN POST

EACH2.000

Twin K Construction, Inc. $317.7500 $635.50

Talley Construction Company, Inc. $395.2000 $790.40

Rogers Group, Inc. $418.9180 $837.84

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.81.000

Twin K Construction, Inc. $14.8300 $1,201.23

Talley Construction Company, Inc. $14.4600 $1,171.26

Rogers Group, Inc. $15.3240 $1,241.24

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.54.000

Twin K Construction, Inc. $16.9500 $915.30

Talley Construction Company, Inc. $14.9200 $805.68

Rogers Group, Inc. $15.8200 $854.28

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Twin K Construction, Inc. $529.5800 $529.58

Talley Construction Company, Inc. $364.0000 $364.00

Rogers Group, Inc. $165.3620 $165.36

716-01.05 TEMPORARY RAISED PAVEMENT MARKER

EACH58.000

Twin K Construction, Inc. $10.5900 $614.22

Talley Construction Company, Inc. $10.4000 $603.20

Rogers Group, Inc. $10.7030 $620.77

11PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH101.000

Twin K Construction, Inc. $52.9600 $5,348.96

Talley Construction Company, Inc. $52.0000 $5,252.00

Rogers Group, Inc. $53.5150 $5,405.02

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH14.000

Twin K Construction, Inc. $52.9600 $741.44

Talley Construction Company, Inc. $52.0000 $728.00

Rogers Group, Inc. $53.5150 $749.21

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.18.000

Twin K Construction, Inc. $21.1800 $381.24

Talley Construction Company, Inc. $20.8000 $374.40

Rogers Group, Inc. $21.4060 $385.31

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.32.000

Twin K Construction, Inc. $10.5900 $338.88

Talley Construction Company, Inc. $10.4000 $332.80

Rogers Group, Inc. $10.7030 $342.50

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH4.000

Twin K Construction, Inc. $158.8700 $635.48

Talley Construction Company, Inc. $156.0000 $624.00

Rogers Group, Inc. $160.5460 $642.18

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.1.700

Twin K Construction, Inc. $688.4600 $1,170.38

Talley Construction Company, Inc. $676.0000 $1,149.20

Rogers Group, Inc. $695.7000 $1,182.69

716-05.02 PAINTED PAVEMENT MARKING (8" BARRIER LINE)

L.F.520.000

Twin K Construction, Inc. $0.4800 $249.60

Talley Construction Company, Inc. $0.4700 $244.40

Rogers Group, Inc. $0.4820 $250.64

716-05.05 PAINTED PAVEMENT MARKING (STOP LINE)

L.F.12.000

Twin K Construction, Inc. $5.3000 $63.60

Talley Construction Company, Inc. $5.2000 $62.40

Rogers Group, Inc. $5.3520 $64.22

12PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.1.600

Twin K Construction, Inc. $5,507.6700 $8,812.27

Talley Construction Company, Inc. $5,408.0000 $8,652.80

Rogers Group, Inc. $5,565.5970 $8,904.96

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.67.000

Twin K Construction, Inc. $2.1200 $142.04

Talley Construction Company, Inc. $2.0800 $139.36

Rogers Group, Inc. $2.1410 $143.45

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.1.000

Twin K Construction, Inc. $2,965.6700 $2,965.67

Talley Construction Company, Inc. $2,912.0000 $2,912.00

Rogers Group, Inc. $2,996.8600 $2,996.86

717-01 MOBILIZATION

LS1.000

Twin K Construction, Inc. $188,696.1000 $188,696.10

Talley Construction Company, Inc. $244,649.8900 $244,649.89

Rogers Group, Inc. $168,620.0000 $168,620.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.2,319.000

Twin K Construction, Inc. $4.0900 $9,484.71

Talley Construction Company, Inc. $2.6000 $6,029.40

Rogers Group, Inc. $2.6760 $6,205.64

740-10.04 GEOTEXTILE (TYPE IV)(STABILIZATION)

S.Y.4,398.000

Twin K Construction, Inc. $3.8200 $16,800.36

Talley Construction Company, Inc. $2.6600 $11,698.68

Rogers Group, Inc. $4.7240 $20,776.15

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.200.000

Twin K Construction, Inc. $11.7700 $2,354.00

Talley Construction Company, Inc. $4.1600 $832.00

Rogers Group, Inc. $4.2810 $856.20

801-01 SEEDING (WITH MULCH)

UNIT131.000

Twin K Construction, Inc. $36.1200 $4,731.72

Talley Construction Company, Inc. $47.8400 $6,267.04

Rogers Group, Inc. $49.2340 $6,449.65

13PAGE

EXTENSION

CONTRACT CNT073

UNIT PRICE

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT1,175.000

Twin K Construction, Inc. $22.2400 $26,132.00

Talley Construction Company, Inc. $36.9200 $43,381.00

Rogers Group, Inc. $37.9960 $44,645.30

801-01.65 TEMPORARY MULCH

UNIT100.000

Twin K Construction, Inc. $26.6900 $2,669.00

Talley Construction Company, Inc. $26.0000 $2,600.00

Rogers Group, Inc. $26.7580 $2,675.80

801-02 SEEDING (WITHOUT MULCH)

UNIT330.000

Twin K Construction, Inc. $29.8700 $9,857.10

Talley Construction Company, Inc. $20.8000 $6,864.00

Rogers Group, Inc. $21.4060 $7,063.98

801-03 WATER (SEEDING & SODDING)

M.G.78.000

Twin K Construction, Inc. $105.9200 $8,261.76

Talley Construction Company, Inc. $104.0000 $8,112.00

Rogers Group, Inc. $107.0310 $8,348.42

803-01 SODDING (NEW SOD)

S.Y.19,435.000

Twin K Construction, Inc. $7.3100 $142,069.85

Talley Construction Company, Inc. $4.9400 $96,008.90

Rogers Group, Inc. $5.0840 $98,807.54

805-01.01 TURF REINFORCEMENT MAT (CLASS I)

S.Y.265.000

Twin K Construction, Inc. $11.6300 $3,081.95

Talley Construction Company, Inc. $5.7200 $1,515.80

Rogers Group, Inc. $5.8870 $1,560.06

805-12.02 EROSION CONTROL BLANKET (TYPE II)

S.Y.36,700.000

Twin K Construction, Inc. $0.8000 $29,360.00

Talley Construction Company, Inc. $1.1400 $41,838.00

Rogers Group, Inc. $1.1770 $43,195.90

806-02.03 PROJECT MOWING

CYCL1.000

Twin K Construction, Inc. $828.1200 $828.12

Talley Construction Company, Inc. $2,080.0000 $2,080.00

Rogers Group, Inc. $2,140.6140 $2,140.61

14PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Twin K Construction, Inc. $2,716,942.73

Talley Construction Company, Inc. $2,801,606.76

Rogers Group, Inc. $2,802,383.16

Twin K Construction, Inc. $2,716,942.73

Talley Construction Company, Inc. $2,801,606.76

Rogers Group, Inc. $2,802,383.16

15PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

ROBERTSON COUNTY (Contract No. CNT105 Call 050)

8.50%DBE GOAL

THE RESURFACING ON S.R. 76 FROM EAST OF BETHLEHEM ROAD (L.M. 11.00) TO THE SUMNER COUNTY LINE (L.M. 17.55).

PROJECT LENGTH -

STP/HSIP-76(110),74013-3233-94,74013-8233-14

6.170 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Charles Deweese Construction, Inc $1,225,014.91

Rogers Group, Inc. $1,350,700.00

Vulcan Construction Materials, LLC $1,638,788.70

1PAGE

EXTENSION

CONTRACT CNT105

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.12.400

Charles Deweese Construction, Inc $1,440.0600 $17,856.74

Rogers Group, Inc. $1,400.0000 $17,360.00

Vulcan Construction Materials, LLC $3,000.0000 $37,200.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON980.000

Charles Deweese Construction, Inc $26.1100 $25,587.80

Rogers Group, Inc. $20.0000 $19,600.00

Vulcan Construction Materials, LLC $31.0000 $30,380.00

307-01.07 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M

TON500.000

Charles Deweese Construction, Inc $87.4500 $43,725.00

Rogers Group, Inc. $78.0000 $39,000.00

Vulcan Construction Materials, LLC $100.0000 $50,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON55.000

Charles Deweese Construction, Inc $950.0000 $52,250.00

Rogers Group, Inc. $790.0000 $43,450.00

Vulcan Construction Materials, LLC $900.0000 $49,500.00

411-03.14 ACS MIX(PG76-22) THIN LIFT D ASPHALT

TON5,247.000

Charles Deweese Construction, Inc $81.9900 $430,201.53

Rogers Group, Inc. $104.5000 $548,311.50

Vulcan Construction Materials, LLC $135.0000 $708,345.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.10.000

Charles Deweese Construction, Inc $876.2900 $8,762.90

Rogers Group, Inc. $905.0000 $9,050.00

Vulcan Construction Materials, LLC $412.0000 $4,120.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON4,880.000

Charles Deweese Construction, Inc $23.8000 $116,144.00

Rogers Group, Inc. $21.6500 $105,652.00

Vulcan Construction Materials, LLC $27.0000 $131,760.00

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.4,810.000

Charles Deweese Construction, Inc $30.0000 $144,300.00

Rogers Group, Inc. $32.5000 $156,325.00

Vulcan Construction Materials, LLC $36.0000 $173,160.00

2PAGE

EXTENSION

CONTRACT CNT105

UNIT PRICE

712-01 TRAFFIC CONTROL

LS1.000

Charles Deweese Construction, Inc $27,777.7800 $27,777.78

Rogers Group, Inc. $69,000.0000 $69,000.00

Vulcan Construction Materials, LLC $96,400.0000 $96,400.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH200.000

Charles Deweese Construction, Inc $15.0000 $3,000.00

Rogers Group, Inc. $15.5000 $3,100.00

Vulcan Construction Materials, LLC $30.0000 $6,000.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Charles Deweese Construction, Inc $12.8900 $51.56

Rogers Group, Inc. $5.2500 $21.00

Vulcan Construction Materials, LLC $10.0000 $40.00

712-06 SIGNS (CONSTRUCTION)

S.F.2,208.000

Charles Deweese Construction, Inc $6.8600 $15,146.88

Rogers Group, Inc. $6.8500 $15,124.80

Vulcan Construction Materials, LLC $9.2500 $20,424.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH600.000

Charles Deweese Construction, Inc $30.9300 $18,558.00

Rogers Group, Inc. $30.5000 $18,300.00

Vulcan Construction Materials, LLC $31.0000 $18,600.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH300.000

Charles Deweese Construction, Inc $30.9300 $9,279.00

Rogers Group, Inc. $30.5000 $9,150.00

Vulcan Construction Materials, LLC $31.0000 $9,300.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.1,100.000

Charles Deweese Construction, Inc $8.2500 $9,075.00

Rogers Group, Inc. $8.1500 $8,965.00

Vulcan Construction Materials, LLC $8.2500 $9,075.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.3,300.000

Charles Deweese Construction, Inc $15.4600 $51,018.00

Rogers Group, Inc. $15.2500 $50,325.00

Vulcan Construction Materials, LLC $15.5000 $51,150.00

3PAGE

EXTENSION

CONTRACT CNT105

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.800.000

Charles Deweese Construction, Inc $15.4600 $12,368.00

Rogers Group, Inc. $15.2500 $12,200.00

Vulcan Construction Materials, LLC $15.5000 $12,400.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH46.000

Charles Deweese Construction, Inc $154.6400 $7,113.44

Rogers Group, Inc. $155.0000 $7,130.00

Vulcan Construction Materials, LLC $154.5000 $7,107.00

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.32.000

Charles Deweese Construction, Inc $36.0800 $1,154.56

Rogers Group, Inc. $35.5000 $1,136.00

Vulcan Construction Materials, LLC $36.2500 $1,160.00

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH6.000

Charles Deweese Construction, Inc $412.3700 $2,474.22

Rogers Group, Inc. $407.0000 $2,442.00

Vulcan Construction Materials, LLC $412.0000 $2,472.00

716-03.09 PLASTIC WORD PAVEMENT MARKING (NO PARKING)

EACH4.000

Charles Deweese Construction, Inc $309.2800 $1,237.12

Rogers Group, Inc. $305.0000 $1,220.00

Vulcan Construction Materials, LLC $309.0000 $1,236.00

716-03.10 PLASTIC WORD PAVEMENT MARKING (BIKE-XING)

EACH2.000

Charles Deweese Construction, Inc $824.7400 $1,649.48

Rogers Group, Inc. $815.0000 $1,630.00

Vulcan Construction Materials, LLC $824.0000 $1,648.00

716-04.05 PLASTIC PAVEMENT MARKING (STRAIGHT ARROW)

EACH5.000

Charles Deweese Construction, Inc $154.6400 $773.20

Rogers Group, Inc. $155.0000 $775.00

Vulcan Construction Materials, LLC $154.5000 $772.50

716-05.20 PAINTED PAVEMENT MARKING (6" LINE)

L.M.23.000

Charles Deweese Construction, Inc $824.7400 $18,969.02

Rogers Group, Inc. $815.0000 $18,745.00

Vulcan Construction Materials, LLC $824.0000 $18,952.00

4PAGE

EXTENSION

CONTRACT CNT105

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.23.000

Charles Deweese Construction, Inc $5,154.6400 $118,556.72

Rogers Group, Inc. $5,100.0000 $117,300.00

Vulcan Construction Materials, LLC $5,150.0000 $118,450.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.0.200

Charles Deweese Construction, Inc $3,092.7800 $618.56

Rogers Group, Inc. $3,060.0000 $612.00

Vulcan Construction Materials, LLC $3,090.0000 $618.00

717-01 MOBILIZATION

LS1.000

Charles Deweese Construction, Inc $56,700.0000 $56,700.00

Rogers Group, Inc. $43,419.7000 $43,419.70

Vulcan Construction Materials, LLC $45,800.0000 $45,800.00

730-14.02 SAW SLOT

L.F.6,416.000

Charles Deweese Construction, Inc $3.6100 $23,161.76

Rogers Group, Inc. $3.6500 $23,418.40

Vulcan Construction Materials, LLC $3.7500 $24,060.00

730-14.03 LOOP WIRE

L.F.14,432.000

Charles Deweese Construction, Inc $0.5200 $7,504.64

Rogers Group, Inc. $0.5500 $7,937.60

Vulcan Construction Materials, LLC $0.6000 $8,659.20

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Charles Deweese Construction, Inc $1,225,014.91

Rogers Group, Inc. $1,350,700.00

Vulcan Construction Materials, LLC $1,638,788.70

Charles Deweese Construction, Inc $1,225,014.91

Rogers Group, Inc. $1,350,700.00

Vulcan Construction Materials, LLC $1,638,788.70

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

ROBERTSON AND SUMNER COUNTIES (Contract No. CNT055 Call 051)

7.50%DBE GOAL

THE INSTALLATION OF INTERCHANGE LIGHTING ON I-65 AT THE JUNCTION OF S.R. 257 (BETHEL ROAD, EXIT 104) IN MILLERSVILLE.

PROJECT LENGTH -

STP-M-I-65-3(130),74003-3169-44

0.625 MILES

COMPLETION TIME - ON OR BEFORE MARCH 31, 2020

TOTAL CONTRACT

Stansell Electric Company, Inc. $586,763.30

Davis H. Elliot Construction Company, Inc. $599,815.48

J. Ranck Electric, Inc. $913,161.88

1PAGE

EXTENSION

CONTRACT CNT055

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Stansell Electric Company, Inc. $5,308.0000 $5,308.00

Davis H. Elliot Construction Company, Inc. $6,500.0000 $6,500.00

J. Ranck Electric, Inc. $11,523.0000 $11,523.00

201-01 CLEARING AND GRUBBING

LS1.000

Stansell Electric Company, Inc. $9,500.0000 $9,500.00

Davis H. Elliot Construction Company, Inc. $18,000.0000 $18,000.00

J. Ranck Electric, Inc. $14,656.0000 $14,656.00

209-05 SEDIMENT REMOVAL

C.Y.16.000

Stansell Electric Company, Inc. $50.0000 $800.00

Davis H. Elliot Construction Company, Inc. $350.0000 $5,600.00

J. Ranck Electric, Inc. $313.0000 $5,008.00

712-01 TRAFFIC CONTROL

LS1.000

Stansell Electric Company, Inc. $7,743.0000 $7,743.00

Davis H. Elliot Construction Company, Inc. $8,500.0000 $8,500.00

J. Ranck Electric, Inc. $6,417.0000 $6,417.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH14.000

Stansell Electric Company, Inc. $40.0000 $560.00

Davis H. Elliot Construction Company, Inc. $52.0000 $728.00

J. Ranck Electric, Inc. $0.7800 $10.92

712-06 SIGNS (CONSTRUCTION)

S.F.352.000

Stansell Electric Company, Inc. $8.1000 $2,851.20

Davis H. Elliot Construction Company, Inc. $8.5000 $2,992.00

J. Ranck Electric, Inc. $0.0100 $3.52

712-08.03 ARROW BOARD (TYPE C)

EACH1.000

Stansell Electric Company, Inc. $1,249.0000 $1,249.00

Davis H. Elliot Construction Company, Inc. $1,850.0000 $1,850.00

J. Ranck Electric, Inc. $615.0000 $615.00

714-03.01 DIRECT BURIAL CONDUIT (2" PVC, SCHEDULE 40)

L.F.6,868.000

Stansell Electric Company, Inc. $9.0000 $61,812.00

Davis H. Elliot Construction Company, Inc. $16.0700 $110,368.76

J. Ranck Electric, Inc. $10.2700 $70,534.36

2PAGE

EXTENSION

CONTRACT CNT055

UNIT PRICE

714-04.03 CONDUIT (2" JACKED OR BORED)

L.F.958.000

Stansell Electric Company, Inc. $32.0000 $30,656.00

Davis H. Elliot Construction Company, Inc. $28.0000 $26,824.00

J. Ranck Electric, Inc. $43.7600 $41,922.08

714-05.04 PULL BOXES (TYPE C)

EACH18.000

Stansell Electric Company, Inc. $500.0000 $9,000.00

Davis H. Elliot Construction Company, Inc. $2,500.0000 $45,000.00

J. Ranck Electric, Inc. $1,529.0000 $27,522.00

714-06.05 CABLE (1/C # 6 AWG)

L.F.15,769.000

Stansell Electric Company, Inc. $1.3000 $20,499.70

Davis H. Elliot Construction Company, Inc. $0.4800 $7,569.12

J. Ranck Electric, Inc. $2.0000 $31,538.00

714-06.06 CABLE (1/C # 4 AWG)

L.F.14,244.000

Stansell Electric Company, Inc. $1.6000 $22,790.40

Davis H. Elliot Construction Company, Inc. $0.6500 $9,258.60

J. Ranck Electric, Inc. $2.5000 $35,610.00

714-08.09 LIGHT STANDARDS (45' MH)

EACH9.000

Stansell Electric Company, Inc. $2,500.0000 $22,500.00

Davis H. Elliot Construction Company, Inc. $4,000.0000 $36,000.00

J. Ranck Electric, Inc. $3,329.0000 $29,961.00

714-08.11 LIGHT STANDARDS (130' MH - HIGH MAST)

EACH1.000

Stansell Electric Company, Inc. $30,739.0000 $30,739.00

Davis H. Elliot Construction Company, Inc. $26,000.0000 $26,000.00

J. Ranck Electric, Inc. $54,999.0000 $54,999.00

714-08.12 LIGHT STANDARDS (150' MH - HIGH MAST)

EACH5.000

Stansell Electric Company, Inc. $35,794.0000 $178,970.00

Davis H. Elliot Construction Company, Inc. $30,000.0000 $150,000.00

J. Ranck Electric, Inc. $55,992.0000 $279,960.00

714-08.20 FOUNDATION (ONLY) FOR LIGHT STANDARD

EACH9.000

Stansell Electric Company, Inc. $1,625.0000 $14,625.00

Davis H. Elliot Construction Company, Inc. $1,000.0000 $9,000.00

J. Ranck Electric, Inc. $4,614.0000 $41,526.00

3PAGE

EXTENSION

CONTRACT CNT055

UNIT PRICE

714-08.46 FOUNDATION (ONLY) FOR HIGH MAST LIGHT STANDARD

EACH6.000

Stansell Electric Company, Inc. $11,869.0000 $71,214.00

Davis H. Elliot Construction Company, Inc. $5,000.0000 $30,000.00

J. Ranck Electric, Inc. $20,476.0000 $122,856.00

714-09.09 LUMINAIRES (255 WATT)

EACH9.000

Stansell Electric Company, Inc. $1,088.0000 $9,792.00

Davis H. Elliot Construction Company, Inc. $800.0000 $7,200.00

J. Ranck Electric, Inc. $1,167.0000 $10,503.00

714-09.10 LUMINAIRES (376 WATT - HIGH MAST)

EACH44.000

Stansell Electric Company, Inc. $1,339.0000 $58,916.00

Davis H. Elliot Construction Company, Inc. $980.0000 $43,120.00

J. Ranck Electric, Inc. $1,399.0000 $61,556.00

714-12 CONTROL CENTER

LS1.000

Stansell Electric Company, Inc. $8,407.0000 $8,407.00

Davis H. Elliot Construction Company, Inc. $12,000.0000 $12,000.00

J. Ranck Electric, Inc. $27,895.0000 $27,895.00

714-25 ELECTRICAL CONNECTION

EACH1.000

Stansell Electric Company, Inc. $1,265.0000 $1,265.00

Davis H. Elliot Construction Company, Inc. $4,500.0000 $4,500.00

J. Ranck Electric, Inc. $8,844.0000 $8,844.00

717-01 MOBILIZATION

LS1.000

Stansell Electric Company, Inc. $7,893.0000 $7,893.00

Davis H. Elliot Construction Company, Inc. $29,990.0000 $29,990.00

J. Ranck Electric, Inc. $18,891.0000 $18,891.00

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.1,000.000

Stansell Electric Company, Inc. $7.1000 $7,100.00

Davis H. Elliot Construction Company, Inc. $6.5000 $6,500.00

J. Ranck Electric, Inc. $6.3800 $6,380.00

801-01 SEEDING (WITH MULCH)

UNIT2.000

Stansell Electric Company, Inc. $1,224.0000 $2,448.00

Davis H. Elliot Construction Company, Inc. $1,100.0000 $2,200.00

J. Ranck Electric, Inc. $875.0000 $1,750.00

4PAGE

EXTENSION

CONTRACT CNT055

UNIT PRICE

801-03 WATER (SEEDING & SODDING)

M.G.1.000

Stansell Electric Company, Inc. $125.0000 $125.00

Davis H. Elliot Construction Company, Inc. $115.0000 $115.00

J. Ranck Electric, Inc. $2,681.0000 $2,681.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Stansell Electric Company, Inc. $586,763.30

Davis H. Elliot Construction Company, Inc. $599,815.48

J. Ranck Electric, Inc. $913,161.88

Stansell Electric Company, Inc. $586,763.30

Davis H. Elliot Construction Company, Inc. $599,815.48

J. Ranck Electric, Inc. $913,161.88

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

RUTHERFORD COUNTY (Contract No. CNT106 Call 052)

8.50%DBE GOAL

THE RESURFACING ON U.S. 231 (S.R. 10) FROM TIGER HILL ROAD (L.M. 8.67) TO NORTH OF RUTHERFORD BOULEVARD (L.M. 12.08).

PROJECT LENGTH -

NH/HSIP-10(77),75005-3231-94,75005-8231-14

3.410 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Volunteer Paving, LLC $2,255,389.28

BWI MTN ii Inc. & dba Blue Water Industries $2,341,009.00

Jones Bros. Contractors, LLC $2,389,111.40

Vulcan Construction Materials, LLC $2,922,672.80

1PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

ROADWAY CATEGORY

202-03 REMOVAL OF RIGID PAVEMENT, SIDEWALK, ETC.

S.Y.320.000

Volunteer Paving, LLC $10.2000 $3,264.00

BWI MTN ii Inc. & dba Blue Water Industries $100.0000 $32,000.00

Jones Bros. Contractors, LLC $81.0000 $25,920.00

Vulcan Construction Materials, LLC $115.0000 $36,800.00

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.4.920

Volunteer Paving, LLC $1,344.8700 $6,616.76

BWI MTN ii Inc. & dba Blue Water Industries $2,325.0000 $11,439.00

Jones Bros. Contractors, LLC $1,400.0000 $6,888.00

Vulcan Construction Materials, LLC $4,900.0000 $24,108.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON653.000

Volunteer Paving, LLC $19.5100 $12,740.03

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $16,325.00

Jones Bros. Contractors, LLC $30.0000 $19,590.00

Vulcan Construction Materials, LLC $50.0000 $32,650.00

307-03.08 ASPHALT CONCRETE MIX (PG76-22) (BPMB-HM) GRADING B-M2

TON2,000.000

Volunteer Paving, LLC $87.9000 $175,800.00

BWI MTN ii Inc. & dba Blue Water Industries $67.0000 $134,000.00

Jones Bros. Contractors, LLC $92.0000 $184,000.00

Vulcan Construction Materials, LLC $120.0000 $240,000.00

307-04.08 ASPHALT CONCRETE MIX (PG82-22) (BPMB-HM) GRADING B-M2

TON261.000

Volunteer Paving, LLC $107.4100 $28,034.01

BWI MTN ii Inc. & dba Blue Water Industries $69.0000 $18,009.00

Jones Bros. Contractors, LLC $117.0000 $30,537.00

Vulcan Construction Materials, LLC $150.0000 $39,150.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON74.000

Volunteer Paving, LLC $666.6700 $49,333.58

BWI MTN ii Inc. & dba Blue Water Industries $875.0000 $64,750.00

Jones Bros. Contractors, LLC $578.0000 $42,772.00

Vulcan Construction Materials, LLC $1,000.0000 $74,000.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON11,873.000

Volunteer Paving, LLC $96.2700 $1,143,013.71

BWI MTN ii Inc. & dba Blue Water Industries $95.0000 $1,127,935.00

Jones Bros. Contractors, LLC $95.0000 $1,127,935.00

Vulcan Construction Materials, LLC $120.0000 $1,424,760.00

2PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

411-04.10 ACS MIX(PG82-22) GRADING D

TON153.000

Volunteer Paving, LLC $110.6800 $16,934.04

BWI MTN ii Inc. & dba Blue Water Industries $105.0000 $16,065.00

Jones Bros. Contractors, LLC $174.0000 $26,622.00

Vulcan Construction Materials, LLC $198.0000 $30,294.00

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.2.900

Volunteer Paving, LLC $1,020.4100 $2,959.19

BWI MTN ii Inc. & dba Blue Water Industries $1,000.0000 $2,900.00

Jones Bros. Contractors, LLC $1,000.0000 $2,900.00

Vulcan Construction Materials, LLC $990.0000 $2,871.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON11,166.000

Volunteer Paving, LLC $16.6700 $186,137.22

BWI MTN ii Inc. & dba Blue Water Industries $19.5000 $217,737.00

Jones Bros. Contractors, LLC $19.6000 $218,853.60

Vulcan Construction Materials, LLC $27.0000 $301,482.00

611-01.20 ADJUSTMENT OF EXISTING MANHOLE

EACH3.000

Volunteer Paving, LLC $714.2900 $2,142.87

BWI MTN ii Inc. & dba Blue Water Industries $1,000.0000 $3,000.00

Jones Bros. Contractors, LLC $2,000.0000 $6,000.00

Vulcan Construction Materials, LLC $1,500.0000 $4,500.00

701-01.01 CONCRETE SIDEWALK (4 ")

S.F.75.000

Volunteer Paving, LLC $20.4100 $1,530.75

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $1,875.00

Jones Bros. Contractors, LLC $20.0000 $1,500.00

Vulcan Construction Materials, LLC $20.0000 $1,500.00

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.4,680.000

Volunteer Paving, LLC $32.3500 $151,398.00

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $117,000.00

Jones Bros. Contractors, LLC $31.7000 $148,356.00

Vulcan Construction Materials, LLC $31.7000 $148,356.00

701-02.03 CONCRETE CURB RAMP

S.F.390.000

Volunteer Paving, LLC $19.9000 $7,761.00

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $9,750.00

Jones Bros. Contractors, LLC $19.5000 $7,605.00

Vulcan Construction Materials, LLC $19.5000 $7,605.00

3PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

701-02.05 DETECTABLE WARNING SURFACE (REHABILITATION)

EACH74.000

Volunteer Paving, LLC $408.1600 $30,203.84

BWI MTN ii Inc. & dba Blue Water Industries $750.0000 $55,500.00

Jones Bros. Contractors, LLC $400.0000 $29,600.00

Vulcan Construction Materials, LLC $400.0000 $29,600.00

702-03 CONCRETE COMBINED CURB & GUTTER

C.Y.73.000

Volunteer Paving, LLC $396.5300 $28,946.69

BWI MTN ii Inc. & dba Blue Water Industries $450.0000 $32,850.00

Jones Bros. Contractors, LLC $388.6000 $28,367.80

Vulcan Construction Materials, LLC $388.6000 $28,367.80

712-01 TRAFFIC CONTROL

LS1.000

Volunteer Paving, LLC $54,336.7300 $54,336.73

BWI MTN ii Inc. & dba Blue Water Industries $132,000.0000 $132,000.00

Jones Bros. Contractors, LLC $120,000.0000 $120,000.00

Vulcan Construction Materials, LLC $140,250.0000 $140,250.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Volunteer Paving, LLC $25.5100 $637.75

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $625.00

Jones Bros. Contractors, LLC $25.0000 $625.00

Vulcan Construction Materials, LLC $10.0000 $250.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH10.000

Volunteer Paving, LLC $5.1000 $51.00

BWI MTN ii Inc. & dba Blue Water Industries $5.0000 $50.00

Jones Bros. Contractors, LLC $5.0000 $50.00

Vulcan Construction Materials, LLC $5.0000 $50.00

712-06 SIGNS (CONSTRUCTION)

S.F.2,960.000

Volunteer Paving, LLC $6.3800 $18,884.80

BWI MTN ii Inc. & dba Blue Water Industries $6.2500 $18,500.00

Jones Bros. Contractors, LLC $6.2500 $18,500.00

Vulcan Construction Materials, LLC $9.2500 $27,380.00

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Volunteer Paving, LLC $918.3700 $1,836.74

BWI MTN ii Inc. & dba Blue Water Industries $900.0000 $1,800.00

Jones Bros. Contractors, LLC $900.0000 $1,800.00

Vulcan Construction Materials, LLC $900.0000 $1,800.00

4PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH4.000

Volunteer Paving, LLC $5,918.3700 $23,673.48

BWI MTN ii Inc. & dba Blue Water Industries $5,800.0000 $23,200.00

Jones Bros. Contractors, LLC $5,800.0000 $23,200.00

Vulcan Construction Materials, LLC $5,800.0000 $23,200.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH600.000

Volunteer Paving, LLC $20.0000 $12,000.00

BWI MTN ii Inc. & dba Blue Water Industries $20.0000 $12,000.00

Jones Bros. Contractors, LLC $20.0000 $12,000.00

Vulcan Construction Materials, LLC $20.0000 $12,000.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH862.000

Volunteer Paving, LLC $20.0000 $17,240.00

BWI MTN ii Inc. & dba Blue Water Industries $20.0000 $17,240.00

Jones Bros. Contractors, LLC $20.0000 $17,240.00

Vulcan Construction Materials, LLC $20.0000 $17,240.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH260.000

Volunteer Paving, LLC $10.0000 $2,600.00

BWI MTN ii Inc. & dba Blue Water Industries $10.0000 $2,600.00

Jones Bros. Contractors, LLC $10.0000 $2,600.00

Vulcan Construction Materials, LLC $10.0000 $2,600.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.427.000

Volunteer Paving, LLC $7.5000 $3,202.50

BWI MTN ii Inc. & dba Blue Water Industries $12.0000 $5,124.00

Jones Bros. Contractors, LLC $12.0000 $5,124.00

Vulcan Construction Materials, LLC $12.0000 $5,124.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.300.000

Volunteer Paving, LLC $15.0000 $4,500.00

BWI MTN ii Inc. & dba Blue Water Industries $10.0000 $3,000.00

Jones Bros. Contractors, LLC $10.0000 $3,000.00

Vulcan Construction Materials, LLC $10.0000 $3,000.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.1,070.000

Volunteer Paving, LLC $15.0000 $16,050.00

BWI MTN ii Inc. & dba Blue Water Industries $15.0000 $16,050.00

Jones Bros. Contractors, LLC $15.0000 $16,050.00

Vulcan Construction Materials, LLC $15.0000 $16,050.00

5PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH59.000

Volunteer Paving, LLC $150.0000 $8,850.00

BWI MTN ii Inc. & dba Blue Water Industries $150.0000 $8,850.00

Jones Bros. Contractors, LLC $150.0000 $8,850.00

Vulcan Construction Materials, LLC $150.0000 $8,850.00

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH6.000

Volunteer Paving, LLC $250.0000 $1,500.00

BWI MTN ii Inc. & dba Blue Water Industries $350.0000 $2,100.00

Jones Bros. Contractors, LLC $350.0000 $2,100.00

Vulcan Construction Materials, LLC $350.0000 $2,100.00

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH12.000

Volunteer Paving, LLC $250.0000 $3,000.00

BWI MTN ii Inc. & dba Blue Water Industries $200.0000 $2,400.00

Jones Bros. Contractors, LLC $200.0000 $2,400.00

Vulcan Construction Materials, LLC $200.0000 $2,400.00

716-04.05 PLASTIC PAVEMENT MARKING (STRAIGHT ARROW)

EACH4.000

Volunteer Paving, LLC $150.0000 $600.00

BWI MTN ii Inc. & dba Blue Water Industries $140.0000 $560.00

Jones Bros. Contractors, LLC $140.0000 $560.00

Vulcan Construction Materials, LLC $140.0000 $560.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.19.100

Volunteer Paving, LLC $850.0000 $16,235.00

BWI MTN ii Inc. & dba Blue Water Industries $900.0000 $17,190.00

Jones Bros. Contractors, LLC $900.0000 $17,190.00

Vulcan Construction Materials, LLC $900.0000 $17,190.00

716-08.32 HYDROBLAST REMOVAL OF PAVEMENT MARKING (LINE)

L.F.2,281.000

Volunteer Paving, LLC $2.5000 $5,702.50

BWI MTN ii Inc. & dba Blue Water Industries $1.0000 $2,281.00

Jones Bros. Contractors, LLC $1.0000 $2,281.00

Vulcan Construction Materials, LLC $1.0000 $2,281.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.19.100

Volunteer Paving, LLC $5,000.0000 $95,500.00

BWI MTN ii Inc. & dba Blue Water Industries $4,800.0000 $91,680.00

Jones Bros. Contractors, LLC $4,000.0000 $76,400.00

Vulcan Construction Materials, LLC $4,800.0000 $91,680.00

6PAGE

EXTENSION

CONTRACT CNT106

UNIT PRICE

716-12.07 ENHANCED FLAT LINE THERMO (8IN BROKEN LN)

L.F.590.000

Volunteer Paving, LLC $2.0000 $1,180.00

BWI MTN ii Inc. & dba Blue Water Industries $3.0000 $1,770.00

Jones Bros. Contractors, LLC $3.0000 $1,770.00

Vulcan Construction Materials, LLC $3.0000 $1,770.00

716-13.05 SPRAY THERMO PVMT MRKNG (60 mil) (6IN DOTTED LINE)

L.F.425.000

Volunteer Paving, LLC $2.0000 $850.00

BWI MTN ii Inc. & dba Blue Water Industries $3.0000 $1,275.00

Jones Bros. Contractors, LLC $3.0000 $1,275.00

Vulcan Construction Materials, LLC $3.0000 $1,275.00

716-13.08 SPRAY THERMO PVMT MRKNG (40 mil) (8IN BARRIER LINE)

L.F.1,326.000

Volunteer Paving, LLC $0.2500 $331.50

BWI MTN ii Inc. & dba Blue Water Industries $3.0000 $3,978.00

Jones Bros. Contractors, LLC $3.0000 $3,978.00

Vulcan Construction Materials, LLC $3.0000 $3,978.00

717-01 MOBILIZATION

LS1.000

Volunteer Paving, LLC $98,775.5100 $98,775.51

BWI MTN ii Inc. & dba Blue Water Industries $95,000.0000 $95,000.00

Jones Bros. Contractors, LLC $115,000.0000 $115,000.00

Vulcan Construction Materials, LLC $95,000.0000 $95,000.00

730-14.02 SAW SLOT

L.F.4,612.000

Volunteer Paving, LLC $3.3200 $15,311.84

BWI MTN ii Inc. & dba Blue Water Industries $3.2500 $14,989.00

Jones Bros. Contractors, LLC $4.0000 $18,448.00

Vulcan Construction Materials, LLC $3.2500 $14,989.00

730-14.03 LOOP WIRE

L.F.11,224.000

Volunteer Paving, LLC $0.5100 $5,724.24

BWI MTN ii Inc. & dba Blue Water Industries $0.5000 $5,612.00

Jones Bros. Contractors, LLC $1.0000 $11,224.00

Vulcan Construction Materials, LLC $0.5000 $5,612.00

7PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Volunteer Paving, LLC $2,255,389.28

BWI MTN ii Inc. & dba Blue Water Industries $2,341,009.00

Jones Bros. Contractors, LLC $2,389,111.40

Vulcan Construction Materials, LLC $2,922,672.80

Volunteer Paving, LLC $2,255,389.28

BWI MTN ii Inc. & dba Blue Water Industries $2,341,009.00

Jones Bros. Contractors, LLC $2,389,111.40

Vulcan Construction Materials, LLC $2,922,672.80

8PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

SHELBY COUNTY (Contract No. CNT107 Call 053)

4.00%DBE GOAL

THE RESURFACING ON S.R. 385 FROM NEAR HACKS CROSS ROAD (L.M. 6.13) TO BYHALIA ROAD (L.M. 12.43).

PROJECT LENGTH -

NH/HSIP-385(31),79191-3211-94,79191-8211-14

6.300 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

APAC-Tennessee, Inc. $3,693,154.15

Standard Construction Company, Inc. $3,873,969.15

Lehman-Roberts Company $4,330,102.02

1PAGE

EXTENSION

CONTRACT CNT107

UNIT PRICE

ROADWAY CATEGORY

202-03.01 REMOVAL OF ASPHALT PAVEMENT

S.Y.1,500.000

APAC-Tennessee, Inc. $20.7100 $31,065.00

Standard Construction Company, Inc. $30.5000 $45,750.00

Lehman-Roberts Company $30.3100 $45,465.00

203-06 WATER

M.G.8.000

APAC-Tennessee, Inc. $20.8000 $166.40

Standard Construction Company, Inc. $20.0000 $160.00

Lehman-Roberts Company $63.9000 $511.20

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.23.435

APAC-Tennessee, Inc. $1,428.2200 $33,470.34

Standard Construction Company, Inc. $1,100.0000 $25,778.50

Lehman-Roberts Company $2,002.7700 $46,934.91

303-02 MINERAL AGGREGATE, TYPE B BASE, GRADING (C or D)

TON1,075.000

APAC-Tennessee, Inc. $34.5400 $37,130.50

Standard Construction Company, Inc. $33.5000 $36,012.50

Lehman-Roberts Company $56.5000 $60,737.50

307-01.01 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING A

TON690.000

APAC-Tennessee, Inc. $136.2200 $93,991.80

Standard Construction Company, Inc. $135.0000 $93,150.00

Lehman-Roberts Company $136.3300 $94,067.70

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON132.000

APAC-Tennessee, Inc. $529.8000 $69,933.60

Standard Construction Company, Inc. $820.0000 $108,240.00

Lehman-Roberts Company $851.0000 $112,332.00

411-01.07 ACS MIX (PG64-22) GRADING E SHOULDER

TON6,093.000

APAC-Tennessee, Inc. $101.2600 $616,977.18

Standard Construction Company, Inc. $98.5000 $600,160.50

Lehman-Roberts Company $100.1900 $610,457.67

411-03.10 ACS MIX(PG76-22) GRADING D

TON14,969.000

APAC-Tennessee, Inc. $96.5800 $1,445,706.02

Standard Construction Company, Inc. $96.3000 $1,441,514.70

Lehman-Roberts Company $104.0400 $1,557,374.76

2PAGE

EXTENSION

CONTRACT CNT107

UNIT PRICE

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.23.435

APAC-Tennessee, Inc. $354.9200 $8,317.55

Standard Construction Company, Inc. $850.0000 $19,919.75

Lehman-Roberts Company $1,294.1100 $30,327.47

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.316,610.000

APAC-Tennessee, Inc. $1.3600 $430,589.60

Standard Construction Company, Inc. $1.8500 $585,728.50

Lehman-Roberts Company $2.2900 $725,036.90

502-08.03 SEALING SHOULDER JOINTS

L.F.3,700.000

APAC-Tennessee, Inc. $2.1000 $7,770.00

Standard Construction Company, Inc. $2.5000 $9,250.00

Lehman-Roberts Company $10.3800 $38,406.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH14.000

APAC-Tennessee, Inc. $175.0000 $2,450.00

Standard Construction Company, Inc. $185.0000 $2,590.00

Lehman-Roberts Company $181.6700 $2,543.38

705-04.09 EARTH PAD FOR TYPE 38 GR END TREATMENT

EACH14.000

APAC-Tennessee, Inc. $850.0000 $11,900.00

Standard Construction Company, Inc. $892.5000 $12,495.00

Lehman-Roberts Company $882.3900 $12,353.46

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH14.000

APAC-Tennessee, Inc. $2,900.0000 $40,600.00

Standard Construction Company, Inc. $3,045.0000 $42,630.00

Lehman-Roberts Company $3,010.5200 $42,147.28

712-01 TRAFFIC CONTROL

LS1.000

APAC-Tennessee, Inc. $205,561.2500 $205,561.25

Standard Construction Company, Inc. $185,000.0000 $185,000.00

Lehman-Roberts Company $187,456.7500 $187,456.75

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH300.000

APAC-Tennessee, Inc. $25.0000 $7,500.00

Standard Construction Company, Inc. $26.3000 $7,890.00

Lehman-Roberts Company $25.9500 $7,785.00

3PAGE

EXTENSION

CONTRACT CNT107

UNIT PRICE

712-05.03 WARNING LIGHTS (TYPE C)

EACH50.000

APAC-Tennessee, Inc. $5.0000 $250.00

Standard Construction Company, Inc. $26.3000 $1,315.00

Lehman-Roberts Company $5.1900 $259.50

712-06 SIGNS (CONSTRUCTION)

S.F.2,832.000

APAC-Tennessee, Inc. $6.5000 $18,408.00

Standard Construction Company, Inc. $5.3000 $15,009.60

Lehman-Roberts Company $6.7500 $19,116.00

712-08.03 ARROW BOARD (TYPE C)

EACH4.000

APAC-Tennessee, Inc. $965.0000 $3,860.00

Standard Construction Company, Inc. $1,020.0000 $4,080.00

Lehman-Roberts Company $1,001.7800 $4,007.12

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH2,400.000

APAC-Tennessee, Inc. $37.0000 $88,800.00

Standard Construction Company, Inc. $38.9000 $93,360.00

Lehman-Roberts Company $38.7900 $93,096.00

716-02.07 PLASTIC PAVEMENT MARKING (24" BARRIER LINE)

L.F.5,000.000

APAC-Tennessee, Inc. $16.0000 $80,000.00

Standard Construction Company, Inc. $16.8000 $84,000.00

Lehman-Roberts Company $16.7800 $83,900.00

716-05.20 PAINTED PAVEMENT MARKING (6" LINE)

L.M.27.585

APAC-Tennessee, Inc. $1,579.7100 $43,576.30

Standard Construction Company, Inc. $1,660.0000 $45,791.10

Lehman-Roberts Company $1,656.6200 $45,697.86

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.36.890

APAC-Tennessee, Inc. $5,700.0000 $210,273.00

Standard Construction Company, Inc. $5,900.0000 $217,651.00

Lehman-Roberts Company $5,976.4100 $220,469.76

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.14,250.000

APAC-Tennessee, Inc. $2.8000 $39,900.00

Standard Construction Company, Inc. $2.9000 $41,325.00

Lehman-Roberts Company $2.9400 $41,895.00

4PAGE

EXTENSION

CONTRACT CNT107

UNIT PRICE

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.12,840.000

APAC-Tennessee, Inc. $2.4000 $30,816.00

Standard Construction Company, Inc. $2.5000 $32,100.00

Lehman-Roberts Company $2.5200 $32,356.80

717-01 MOBILIZATION

LS1.000

APAC-Tennessee, Inc. $122,261.6100 $122,261.61

Standard Construction Company, Inc. $110,000.0000 $110,000.00

Lehman-Roberts Company $184,089.6600 $184,089.66

730-03.20 INSTALL PULL BOX (TYPE A)

EACH6.000

APAC-Tennessee, Inc. $500.0000 $3,000.00

Standard Construction Company, Inc. $550.0000 $3,300.00

Lehman-Roberts Company $882.3900 $5,294.34

730-12.02 CONDUIT 2" DIAMETER (PVC)

L.F.60.000

APAC-Tennessee, Inc. $18.0000 $1,080.00

Standard Construction Company, Inc. $19.8000 $1,188.00

Lehman-Roberts Company $17.6500 $1,059.00

730-14.02 SAW SLOT

L.F.1,200.000

APAC-Tennessee, Inc. $5.0000 $6,000.00

Standard Construction Company, Inc. $5.5000 $6,600.00

Lehman-Roberts Company $14.5300 $17,436.00

730-14.03 LOOP WIRE

L.F.3,600.000

APAC-Tennessee, Inc. $0.5000 $1,800.00

Standard Construction Company, Inc. $0.5500 $1,980.00

Lehman-Roberts Company $2.0800 $7,488.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

APAC-Tennessee, Inc. $3,693,154.15

Standard Construction Company, Inc. $3,873,969.15

Lehman-Roberts Company $4,330,102.02

APAC-Tennessee, Inc. $3,693,154.15

Standard Construction Company, Inc. $3,873,969.15

Lehman-Roberts Company $4,330,102.02

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

SMITH COUNTY (Contract No. CNT108 Call 054)

9.50%DBE GOAL

THE RESURFACING ON S.R. 53 FROM S.R. 141/S.R. 264 TO U.S. 70N (S.R. 24), INCLUDING BRIDGE DECK REPAIR, AND ON S.R. 96 FROMTHE PUTNAM COUNTY LINE TO THE PUTNAM COUNTY LINE.

PROJECT LENGTH -

80004-4248-04,STP/HSIP-53(56),80004-3248-94,80004-8248-14,STP-96(58),80050-8201-14

5.280 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Jones Bros. Contractors, LLC $1,404,816.10

Vulcan Construction Materials, LLC $1,557,738.50

1PAGE

EXTENSION

CONTRACT CNT108

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.10.700

Jones Bros. Contractors, LLC $1,000.0000 $10,700.00

Vulcan Construction Materials, LLC $2,000.0000 $21,400.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,049.000

Jones Bros. Contractors, LLC $19.5000 $20,455.50

Vulcan Construction Materials, LLC $28.0000 $29,372.00

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON500.000

Jones Bros. Contractors, LLC $108.0000 $54,000.00

Vulcan Construction Materials, LLC $110.0000 $55,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON44.000

Jones Bros. Contractors, LLC $580.0000 $25,520.00

Vulcan Construction Materials, LLC $900.0000 $39,600.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON9,494.000

Jones Bros. Contractors, LLC $105.6000 $1,002,566.40

Vulcan Construction Materials, LLC $110.0000 $1,044,340.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.0.700

Jones Bros. Contractors, LLC $765.0000 $535.50

Vulcan Construction Materials, LLC $765.0000 $535.50

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.6.400

Jones Bros. Contractors, LLC $765.0000 $4,896.00

Vulcan Construction Materials, LLC $765.0000 $4,896.00

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.1.400

Jones Bros. Contractors, LLC $765.0000 $1,071.00

Vulcan Construction Materials, LLC $765.0000 $1,071.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH14.000

Jones Bros. Contractors, LLC $215.0000 $3,010.00

Vulcan Construction Materials, LLC $75.0000 $1,050.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.100.000

Jones Bros. Contractors, LLC $22.4500 $2,245.00

Vulcan Construction Materials, LLC $19.0000 $1,900.00

2PAGE

EXTENSION

CONTRACT CNT108

UNIT PRICE

705-06.11 GR TERMINAL (IN-INLINE) MASH TL3

EACH1.000

Jones Bros. Contractors, LLC $1,415.0000 $1,415.00

Vulcan Construction Materials, LLC $850.0000 $850.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH14.000

Jones Bros. Contractors, LLC $2,925.0000 $40,950.00

Vulcan Construction Materials, LLC $2,550.0000 $35,700.00

706-01 GUARDRAIL REMOVED

L.F.750.000

Jones Bros. Contractors, LLC $2.1000 $1,575.00

Vulcan Construction Materials, LLC $1.0000 $750.00

712-01 TRAFFIC CONTROL

LS1.000

Jones Bros. Contractors, LLC $23,500.0000 $23,500.00

Vulcan Construction Materials, LLC $60,000.0000 $60,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH50.000

Jones Bros. Contractors, LLC $20.0000 $1,000.00

Vulcan Construction Materials, LLC $20.0000 $1,000.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Jones Bros. Contractors, LLC $5.0000 $20.00

Vulcan Construction Materials, LLC $5.0000 $20.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,602.000

Jones Bros. Contractors, LLC $6.7500 $10,813.50

Vulcan Construction Materials, LLC $9.0000 $14,418.00

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Jones Bros. Contractors, LLC $925.0000 $1,850.00

Vulcan Construction Materials, LLC $900.0000 $1,800.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH612.000

Jones Bros. Contractors, LLC $30.0000 $18,360.00

Vulcan Construction Materials, LLC $30.0000 $18,360.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH36.000

Jones Bros. Contractors, LLC $30.0000 $1,080.00

Vulcan Construction Materials, LLC $30.0000 $1,080.00

3PAGE

EXTENSION

CONTRACT CNT108

UNIT PRICE

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH70.000

Jones Bros. Contractors, LLC $30.0000 $2,100.00

Vulcan Construction Materials, LLC $30.0000 $2,100.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH40.000

Jones Bros. Contractors, LLC $10.0000 $400.00

Vulcan Construction Materials, LLC $10.0000 $400.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.50.000

Jones Bros. Contractors, LLC $20.0000 $1,000.00

Vulcan Construction Materials, LLC $30.0000 $1,500.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.180.000

Jones Bros. Contractors, LLC $15.0000 $2,700.00

Vulcan Construction Materials, LLC $20.0000 $3,600.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH17.000

Jones Bros. Contractors, LLC $150.0000 $2,550.00

Vulcan Construction Materials, LLC $200.0000 $3,400.00

716-03.03 PLASTIC WORD PAVEMENT MARKING (STOP AHEAD)

EACH1.000

Jones Bros. Contractors, LLC $750.0000 $750.00

Vulcan Construction Materials, LLC $800.0000 $800.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.21.100

Jones Bros. Contractors, LLC $1,200.0000 $25,320.00

Vulcan Construction Materials, LLC $850.0000 $17,935.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.13.300

Jones Bros. Contractors, LLC $5,200.0000 $69,160.00

Vulcan Construction Materials, LLC $5,000.0000 $66,500.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.1.400

Jones Bros. Contractors, LLC $2,400.0000 $3,360.00

Vulcan Construction Materials, LLC $2,200.0000 $3,080.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.9.200

Jones Bros. Contractors, LLC $3,100.0000 $28,520.00

Vulcan Construction Materials, LLC $3,000.0000 $27,600.00

4PAGE

EXTENSION

CONTRACT CNT108

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Jones Bros. Contractors, LLC $20,000.0000 $20,000.00

Vulcan Construction Materials, LLC $85,000.0000 $85,000.00

730-14.02 SAW SLOT

L.F.518.000

Jones Bros. Contractors, LLC $3.8000 $1,968.40

Vulcan Construction Materials, LLC $3.5000 $1,813.00

730-14.03 LOOP WIRE

L.F.1,136.000

Jones Bros. Contractors, LLC $0.5500 $624.80

Vulcan Construction Materials, LLC $0.5000 $568.00

5PAGE

EXTENSION

CONTRACT CNT108

UNIT PRICE

BRIDGE CATEGORY

604-10.44 EXPANSION JOINT REPAIRS

L.F.48.000

Jones Bros. Contractors, LLC $350.0000 $16,800.00

Vulcan Construction Materials, LLC $100.0000 $4,800.00

604-10.53 CONCRETE REPAIRS

S.Y.5.000

Jones Bros. Contractors, LLC $800.0000 $4,000.00

Vulcan Construction Materials, LLC $1,100.0000 $5,500.00

6PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Jones Bros. Contractors, LLC $1,384,016.10

Vulcan Construction Materials, LLC $1,547,438.50

SUB-TOTAL BRIDGE

Jones Bros. Contractors, LLC $20,800.00

Vulcan Construction Materials, LLC $10,300.00

Jones Bros. Contractors, LLC $1,404,816.10

Vulcan Construction Materials, LLC $1,557,738.50

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

STEWART COUNTY (Contract No. CNT109 Call 055)

5.00%DBE GOAL

THE RESURFACING ON U.S. 79 (S.R. 76) FROM THE CUMBERLAND RIVER BRIDGE (L.M. 13.66) TO EAST OF LONG PINE DRIVE (L.M. 19.38),INCLUDING BRIDGE DECK REPAIR.

PROJECT LENGTH -

81004-4246-04,NH/HSIP-76(109),81004-3246-94,81004-8246-14

5.720 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Jones Bros. Contractors, LLC $2,192,125.35

Vulcan Construction Materials, LLC $2,818,118.00

1PAGE

EXTENSION

CONTRACT CNT109

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.12.100

Jones Bros. Contractors, LLC $1,200.0000 $14,520.00

Vulcan Construction Materials, LLC $2,500.0000 $30,250.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON2,402.000

Jones Bros. Contractors, LLC $23.5000 $56,447.00

Vulcan Construction Materials, LLC $31.0000 $74,462.00

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON500.000

Jones Bros. Contractors, LLC $70.0000 $35,000.00

Vulcan Construction Materials, LLC $104.0000 $52,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON94.000

Jones Bros. Contractors, LLC $580.0000 $54,520.00

Vulcan Construction Materials, LLC $803.0000 $75,482.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON18,674.000

Jones Bros. Contractors, LLC $84.0000 $1,568,616.00

Vulcan Construction Materials, LLC $106.0000 $1,979,444.00

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.1.700

Jones Bros. Contractors, LLC $500.0000 $850.00

Vulcan Construction Materials, LLC $500.0000 $850.00

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.9.200

Jones Bros. Contractors, LLC $500.0000 $4,600.00

Vulcan Construction Materials, LLC $500.0000 $4,600.00

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON1,359.000

Jones Bros. Contractors, LLC $17.6500 $23,986.35

Vulcan Construction Materials, LLC $27.5000 $37,372.50

712-01 TRAFFIC CONTROL

LS1.000

Jones Bros. Contractors, LLC $42,800.0000 $42,800.00

Vulcan Construction Materials, LLC $109,800.0000 $109,800.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH120.000

Jones Bros. Contractors, LLC $37.5000 $4,500.00

Vulcan Construction Materials, LLC $38.5000 $4,620.00

2PAGE

EXTENSION

CONTRACT CNT109

UNIT PRICE

712-06 SIGNS (CONSTRUCTION)

S.F.1,694.000

Jones Bros. Contractors, LLC $7.0000 $11,858.00

Vulcan Construction Materials, LLC $9.2500 $15,669.50

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH647.000

Jones Bros. Contractors, LLC $30.0000 $19,410.00

Vulcan Construction Materials, LLC $30.0000 $19,410.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH750.000

Jones Bros. Contractors, LLC $30.0000 $22,500.00

Vulcan Construction Materials, LLC $30.0000 $22,500.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH110.000

Jones Bros. Contractors, LLC $30.0000 $3,300.00

Vulcan Construction Materials, LLC $30.0000 $3,300.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.1,250.000

Jones Bros. Contractors, LLC $63.0000 $78,750.00

Vulcan Construction Materials, LLC $25.0000 $31,250.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.144.000

Jones Bros. Contractors, LLC $14.0000 $2,016.00

Vulcan Construction Materials, LLC $15.0000 $2,160.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH44.000

Jones Bros. Contractors, LLC $150.0000 $6,600.00

Vulcan Construction Materials, LLC $150.0000 $6,600.00

716-02.11 PLASTIC PAVEMENT MARKING (6" DOTTED LINE)

L.F.200.000

Jones Bros. Contractors, LLC $0.5000 $100.00

Vulcan Construction Materials, LLC $3.0000 $600.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.2.200

Jones Bros. Contractors, LLC $400.0000 $880.00

Vulcan Construction Materials, LLC $1,500.0000 $3,300.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.28.300

Jones Bros. Contractors, LLC $2,640.0000 $74,712.00

Vulcan Construction Materials, LLC $5,300.0000 $149,990.00

3PAGE

EXTENSION

CONTRACT CNT109

UNIT PRICE

717-01 MOBILIZATION

LS1.000

Jones Bros. Contractors, LLC $62,000.0000 $62,000.00

Vulcan Construction Materials, LLC $86,950.0000 $86,950.00

4PAGE

EXTENSION

CONTRACT CNT109

UNIT PRICE

BRIDGE CATEGORY

604-10.44 EXPANSION JOINT REPAIRS

L.F.372.000

Jones Bros. Contractors, LLC $280.0000 $104,160.00

Vulcan Construction Materials, LLC $289.0000 $107,508.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Jones Bros. Contractors, LLC $2,087,965.35

Vulcan Construction Materials, LLC $2,710,610.00

SUB-TOTAL BRIDGE

Jones Bros. Contractors, LLC $104,160.00

Vulcan Construction Materials, LLC $107,508.00

Jones Bros. Contractors, LLC $2,192,125.35

Vulcan Construction Materials, LLC $2,818,118.00

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

VAN BUREN COUNTY (Contract No. CNT122 Call 056)

8.00%DBE GOAL

THE RESURFACING ON S.R. 111 FROM SOUTH OF CONNELL ROAD (L.M. 17.80) TO THE WHITE COUNTY LINE (L.M. 19.54).

PROJECT LENGTH -

NH/HSIP-111(108),88027-3247-94,88027-8247-14

1.740 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Tinsley Asphalt, LLC $722,937.20

Rogers Group, Inc. $762,094.16

1PAGE

EXTENSION

CONTRACT CNT122

UNIT PRICE

ROADWAY CATEGORY

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON37.000

Tinsley Asphalt, LLC $565.0000 $20,905.00

Rogers Group, Inc. $350.0000 $12,950.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON5,550.000

Tinsley Asphalt, LLC $83.7000 $464,535.00

Rogers Group, Inc. $87.7300 $486,901.50

411-12.01 SCORING SHOULDERS (CONTINUOUS) (16IN WIDTH)

L.M.3.500

Tinsley Asphalt, LLC $500.0000 $1,750.00

Rogers Group, Inc. $704.3200 $2,465.12

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.2.800

Tinsley Asphalt, LLC $500.0000 $1,400.00

Rogers Group, Inc. $704.3200 $1,972.10

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.82,975.000

Tinsley Asphalt, LLC $1.0000 $82,975.00

Rogers Group, Inc. $0.8500 $70,528.75

705-04.21 GUARDRAIL DELINEATION ENHANCEMENT

L.F.2,196.000

Tinsley Asphalt, LLC $2.7500 $6,039.00

Rogers Group, Inc. $3.3300 $7,312.68

712-01 TRAFFIC CONTROL

LS1.000

Tinsley Asphalt, LLC $11,250.0000 $11,250.00

Rogers Group, Inc. $22,087.0500 $22,087.05

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH50.000

Tinsley Asphalt, LLC $5.0000 $250.00

Rogers Group, Inc. $28.0000 $1,400.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,292.000

Tinsley Asphalt, LLC $6.3500 $8,204.20

Rogers Group, Inc. $7.1100 $9,186.12

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Tinsley Asphalt, LLC $500.0000 $1,000.00

Rogers Group, Inc. $980.2300 $1,960.46

2PAGE

EXTENSION

CONTRACT CNT122

UNIT PRICE

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.460.000

Tinsley Asphalt, LLC $5.8500 $2,691.00

Rogers Group, Inc. $6.5500 $3,013.00

713-02.26 CONCRETE BARRIER/PARAPET DELINEATOR

EACH50.000

Tinsley Asphalt, LLC $10.0000 $500.00

Rogers Group, Inc. $56.0100 $2,800.50

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.7,165.000

Tinsley Asphalt, LLC $3.5000 $25,077.50

Rogers Group, Inc. $3.9200 $28,086.80

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.263.000

Tinsley Asphalt, LLC $13.0000 $3,419.00

Rogers Group, Inc. $14.5700 $3,831.91

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.1,039.000

Tinsley Asphalt, LLC $13.5000 $14,026.50

Rogers Group, Inc. $15.1300 $15,720.07

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Tinsley Asphalt, LLC $500.0000 $500.00

Rogers Group, Inc. $560.1300 $560.13

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Tinsley Asphalt, LLC $1,500.0000 $3,000.00

Rogers Group, Inc. $5,041.1900 $10,082.38

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH290.000

Tinsley Asphalt, LLC $30.0000 $8,700.00

Rogers Group, Inc. $33.2700 $9,648.30

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH290.000

Tinsley Asphalt, LLC $8.0000 $2,320.00

Rogers Group, Inc. $8.8700 $2,572.30

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.266.000

Tinsley Asphalt, LLC $10.0000 $2,660.00

Rogers Group, Inc. $11.0900 $2,949.94

3PAGE

EXTENSION

CONTRACT CNT122

UNIT PRICE

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH12.000

Tinsley Asphalt, LLC $150.0000 $1,800.00

Rogers Group, Inc. $166.3700 $1,996.44

716-03.03 PLASTIC WORD PAVEMENT MARKING (STOP AHEAD)

EACH4.000

Tinsley Asphalt, LLC $450.0000 $1,800.00

Rogers Group, Inc. $499.1300 $1,996.52

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.9.200

Tinsley Asphalt, LLC $575.0000 $5,290.00

Rogers Group, Inc. $637.7700 $5,867.48

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.8.100

Tinsley Asphalt, LLC $4,200.0000 $34,020.00

Rogers Group, Inc. $4,658.5200 $37,734.01

717-01 MOBILIZATION

LS1.000

Tinsley Asphalt, LLC $15,265.0000 $15,265.00

Rogers Group, Inc. $14,701.3600 $14,701.36

730-03.20 INSTALL PULL BOX (TYPE A)

EACH2.000

Tinsley Asphalt, LLC $500.0000 $1,000.00

Rogers Group, Inc. $510.2200 $1,020.44

730-12.02 CONDUIT 2" DIAMETER (PVC)

L.F.20.000

Tinsley Asphalt, LLC $18.0000 $360.00

Rogers Group, Inc. $16.6400 $332.80

730-14.02 SAW SLOT

L.F.400.000

Tinsley Asphalt, LLC $4.0000 $1,600.00

Rogers Group, Inc. $3.8800 $1,552.00

730-14.03 LOOP WIRE

L.F.1,200.000

Tinsley Asphalt, LLC $0.5000 $600.00

Rogers Group, Inc. $0.7200 $864.00

4PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Tinsley Asphalt, LLC $722,937.20

Rogers Group, Inc. $762,094.16

Tinsley Asphalt, LLC $722,937.20

Rogers Group, Inc. $762,094.16

5PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

WASHINGTON COUNTY (Contract No. CNT079 Call 057)

10.00%DBE GOAL

THE GRADING, DRAINAGE, CONSTRUCTION OF A CONCRETE BOX BRIDGE, RETAINING WALLS AND PAVING ON I-26 AT THE S.R. 354INTERCHANGE (EXIT 17), INCLUDING REPAIR OF THE BRIDGE OVER S.R. 354 AND BOONES CREEK (L.M. 6.82).

PROJECT LENGTH -

90085-4166-04,NH-I-26(44),90085-3164-44

0.634 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2020

TOTAL CONTRACT

Summers-Taylor, Inc. $15,268,841.26

Jones Bros. Contractors, LLC $16,249,959.62

1PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

ROADWAY CATEGORY

105-01 CONSTRUCTION STAKES, LINES AND GRADES

LS1.000

Summers-Taylor, Inc. $105,000.0000 $105,000.00

Jones Bros. Contractors, LLC $650,000.0000 $650,000.00

109-10.01 TRAINEE

HOUR2,760.000

Summers-Taylor, Inc. $0.8000 $2,208.00

Jones Bros. Contractors, LLC $0.8000 $2,208.00

201-01 CLEARING AND GRUBBING

LS1.000

Summers-Taylor, Inc. $45,000.0000 $45,000.00

Jones Bros. Contractors, LLC $725,000.0000 $725,000.00

202-02.21 REMOVAL OF PIPE (VARIOUS SIZES AND TYPES)

L.F.2,050.000

Summers-Taylor, Inc. $45.0000 $92,250.00

Jones Bros. Contractors, LLC $20.0000 $41,000.00

202-04.01 REMOVAL OF STRUCTURES (23 CATCH BASINS)

LS1.000

Summers-Taylor, Inc. $29,000.0000 $29,000.00

Jones Bros. Contractors, LLC $50,000.0000 $50,000.00

202-04.02 REMOVAL OF STRUCTURES (RETAINING WALL, RAMP A, 125 L.F.)

LS1.000

Summers-Taylor, Inc. $6,000.0000 $6,000.00

Jones Bros. Contractors, LLC $50,000.0000 $50,000.00

202-04.03 REMOVAL OF STRUCTURES (RETAINING WALL, RAMP CC, 93 L.F.)

LS1.000

Summers-Taylor, Inc. $3,000.0000 $3,000.00

Jones Bros. Contractors, LLC $50,000.0000 $50,000.00

202-04.05 REMOVAL OF STRUCTURES (RETAINING WALL, RAMP DD, 166 L.F.)

LS1.000

Summers-Taylor, Inc. $5,450.0000 $5,450.00

Jones Bros. Contractors, LLC $10,000.0000 $10,000.00

203-01 ROAD & DRAINAGE EXCAVATION (UNCLASSIFIED)

C.Y.71,839.000

Summers-Taylor, Inc. $22.5000 $1,616,377.50

Jones Bros. Contractors, LLC $17.0000 $1,221,263.00

203-04 PLACING AND SPREADING TOPSOIL

C.Y.3,498.000

Summers-Taylor, Inc. $15.0000 $52,470.00

Jones Bros. Contractors, LLC $8.0000 $27,984.00

2PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

203-05 UNDERCUTTING

C.Y.128.000

Summers-Taylor, Inc. $37.0000 $4,736.00

Jones Bros. Contractors, LLC $30.0000 $3,840.00

203-06 WATER

M.G.70.000

Summers-Taylor, Inc. $6.7000 $469.00

Jones Bros. Contractors, LLC $50.0000 $3,500.00

203-07 FURNISHING & SPREADING TOPSOIL

C.Y.2,020.000

Summers-Taylor, Inc. $27.0000 $54,540.00

Jones Bros. Contractors, LLC $30.0000 $60,600.00

204-08.01 BACKFILL MATERIAL (FLOWABLE FILL)

C.Y.50.000

Summers-Taylor, Inc. $364.0000 $18,200.00

Jones Bros. Contractors, LLC $195.0000 $9,750.00

209-02.04 10" TEMPORARY SLOPE DRAIN

L.F.50.000

Summers-Taylor, Inc. $21.0000 $1,050.00

Jones Bros. Contractors, LLC $34.0000 $1,700.00

209-05 SEDIMENT REMOVAL

C.Y.679.000

Summers-Taylor, Inc. $29.0000 $19,691.00

Jones Bros. Contractors, LLC $16.0000 $10,864.00

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.1,057.000

Summers-Taylor, Inc. $4.5000 $4,756.50

Jones Bros. Contractors, LLC $4.3000 $4,545.10

209-08.03 TEMPORARY SILT FENCE (WITHOUT BACKING)

L.F.4,508.000

Summers-Taylor, Inc. $1.9000 $8,565.20

Jones Bros. Contractors, LLC $1.0900 $4,913.72

209-09.03 SEDIMENT FILTER BAG (15' X 15')

EACH1.000

Summers-Taylor, Inc. $846.0000 $846.00

Jones Bros. Contractors, LLC $550.0000 $550.00

209-09.40 CURB INLET PROTECTION (TYPE 1)

EACH52.000

Summers-Taylor, Inc. $145.0000 $7,540.00

Jones Bros. Contractors, LLC $175.0000 $9,100.00

3PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

209-40.30 CATCH BASIN PROTECTION (TYPE A)

EACH28.000

Summers-Taylor, Inc. $133.0000 $3,724.00

Jones Bros. Contractors, LLC $375.0000 $10,500.00

209-65.03 TEMPORARY DIVERSION CHANNEL

L.F.195.000

Summers-Taylor, Inc. $59.5000 $11,602.50

Jones Bros. Contractors, LLC $40.0000 $7,800.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON13,698.000

Summers-Taylor, Inc. $31.0000 $424,638.00

Jones Bros. Contractors, LLC $33.0000 $452,034.00

303-01.01 GRANULAR BACKFILL (ROADWAY)

TON328.000

Summers-Taylor, Inc. $45.0000 $14,760.00

Jones Bros. Contractors, LLC $35.0000 $11,480.00

303-10.01 MINERAL AGGREGATE (SIZE 57)

TON700.000

Summers-Taylor, Inc. $48.0000 $33,600.00

Jones Bros. Contractors, LLC $40.0000 $28,000.00

303-10.02 MINERAL AGGREGATE (SIZE 2)

TON262.000

Summers-Taylor, Inc. $45.0000 $11,790.00

Jones Bros. Contractors, LLC $40.0000 $10,480.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON459.000

Summers-Taylor, Inc. $165.0000 $75,735.00

Jones Bros. Contractors, LLC $162.0000 $74,358.00

307-01.21 ASP. CONC. MIX(PG70-22) (BPMB-HM) GR. A-S

TON1,724.000

Summers-Taylor, Inc. $109.0000 $187,916.00

Jones Bros. Contractors, LLC $110.1000 $189,812.40

307-02.01 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING A

TON2,203.000

Summers-Taylor, Inc. $109.0000 $240,127.00

Jones Bros. Contractors, LLC $110.1000 $242,550.30

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON1,445.000

Summers-Taylor, Inc. $125.0000 $180,625.00

Jones Bros. Contractors, LLC $126.2600 $182,445.70

4PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

313-03 TREATED PERMEABLE BASE

S.Y.10,200.000

Summers-Taylor, Inc. $23.0000 $234,600.00

Jones Bros. Contractors, LLC $23.2300 $236,946.00

402-01 BITUMINOUS MATERIAL FOR PRIME COAT (PC)

TON20.000

Summers-Taylor, Inc. $645.0000 $12,900.00

Jones Bros. Contractors, LLC $651.5100 $13,030.20

402-02 AGGREGATE FOR COVER MATERIAL (PC)

TON113.000

Summers-Taylor, Inc. $31.0000 $3,503.00

Jones Bros. Contractors, LLC $31.3100 $3,538.03

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON16.000

Summers-Taylor, Inc. $975.0000 $15,600.00

Jones Bros. Contractors, LLC $984.8500 $15,757.60

403-02 ASPHALT CEMENT FOR TACK COAT (TC)

TON11.000

Summers-Taylor, Inc. $1,350.0000 $14,850.00

Jones Bros. Contractors, LLC $1,363.6400 $15,000.04

411-01.10 ACS MIX(PG64-22) GRADING D

TON249.000

Summers-Taylor, Inc. $185.0000 $46,065.00

Jones Bros. Contractors, LLC $186.8700 $46,530.63

411-02.10 ACS MIX(PG70-22) GRADING D

TON1,728.000

Summers-Taylor, Inc. $115.0000 $198,720.00

Jones Bros. Contractors, LLC $116.1600 $200,724.48

411-12.02 SCORING SHOULDERS (NON-CONTINUOUS) (16IN WIDTH)

L.M.1.000

Summers-Taylor, Inc. $9,600.0000 $9,600.00

Jones Bros. Contractors, LLC $2,000.0000 $2,000.00

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.10,357.000

Summers-Taylor, Inc. $3.3500 $34,695.95

Jones Bros. Contractors, LLC $3.3800 $35,006.66

501-01.03 PORTLAND CEMENT CONCRETE PAVEMENT (PLAIN) 10"

S.Y.10,192.000

Summers-Taylor, Inc. $94.3500 $961,615.20

Jones Bros. Contractors, LLC $115.0000 $1,172,080.00

5PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

604-01.20 BOX TUBE SAFETY RAIL

L.F.160.000

Summers-Taylor, Inc. $260.0000 $41,600.00

Jones Bros. Contractors, LLC $180.0000 $28,800.00

604-07.01 RETAINING WALL (WALL #1, SR-354, STA. 110+80 TO 112+50 LT.)

S.F.665.000

Summers-Taylor, Inc. $169.0000 $112,385.00

Jones Bros. Contractors, LLC $85.0000 $56,525.00

604-07.02 RETAINING WALL (WALL #2, SR-354, STA. 110+80 TO 112+50 RT.)

S.F.340.000

Summers-Taylor, Inc. $171.0000 $58,140.00

Jones Bros. Contractors, LLC $100.0000 $34,000.00

604-07.03 RETAINING WALL (WALL #3, RAMP B, STA. 1208+00 TO 1211+00 RT.)

S.F.2,903.000

Summers-Taylor, Inc. $135.0000 $391,905.00

Jones Bros. Contractors, LLC $200.0000 $580,600.00

604-07.04 RETAINING WALL (WALL #4, SHARED USE, STA. 904+50 TO 909+00 LT.)

S.F.4,368.000

Summers-Taylor, Inc. $170.0000 $742,560.00

Jones Bros. Contractors, LLC $95.0000 $414,960.00

604-07.05 RETAINING WALL (WALL #5, RAMP CC, STA. 1401+77 TO SR 354 311+46 LT.)

S.F.1,500.000

Summers-Taylor, Inc. $147.0000 $220,500.00

Jones Bros. Contractors, LLC $95.0000 $142,500.00

604-07.06 RETAINING WALL (WALL #6, RAMP D, STA. 1700+54 TO 1701+08 RT.)

S.F.260.000

Summers-Taylor, Inc. $168.0000 $43,680.00

Jones Bros. Contractors, LLC $90.0000 $23,400.00

607-03.30 18" PIPE CULVERT

L.F.2,253.000

Summers-Taylor, Inc. $98.0000 $220,794.00

Jones Bros. Contractors, LLC $75.0000 $168,975.00

607-05.30 24" PIPE CULVERT

L.F.1,022.000

Summers-Taylor, Inc. $118.0000 $120,596.00

Jones Bros. Contractors, LLC $92.0000 $94,024.00

607-06.30 30" PIPE CULVERT

L.F.350.000

Summers-Taylor, Inc. $135.0000 $47,250.00

Jones Bros. Contractors, LLC $115.0000 $40,250.00

6PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

607-11.30 60" PIPE CULVERT

L.F.82.000

Summers-Taylor, Inc. $325.0000 $26,650.00

Jones Bros. Contractors, LLC $285.0000 $23,370.00

611-01.02 MANHOLES, > 4' - 8' DEPTH

EACH2.000

Summers-Taylor, Inc. $3,900.0000 $7,800.00

Jones Bros. Contractors, LLC $4,500.0000 $9,000.00

611-01.03 MANHOLES, > 8' - 12' DEPTH

EACH2.000

Summers-Taylor, Inc. $4,400.0000 $8,800.00

Jones Bros. Contractors, LLC $4,100.0000 $8,200.00

611-01.22 CAPPING EXISTING MANHOLE

EACH2.000

Summers-Taylor, Inc. $1,500.0000 $3,000.00

Jones Bros. Contractors, LLC $1,700.0000 $3,400.00

611-02.10 JUNCTION BOX, TYPE 1

EACH1.000

Summers-Taylor, Inc. $5,800.0000 $5,800.00

Jones Bros. Contractors, LLC $3,600.0000 $3,600.00

611-02.13 JUNCTION BOX, TYPE 4

EACH1.000

Summers-Taylor, Inc. $16,000.0000 $16,000.00

Jones Bros. Contractors, LLC $12,500.0000 $12,500.00

611-07.01 CLASS A CONCRETE (PIPE ENDWALLS)

C.Y.20.000

Summers-Taylor, Inc. $1,400.0000 $28,000.00

Jones Bros. Contractors, LLC $1,650.0000 $33,000.00

611-07.02 STEEL BAR REINFORCEMENT (PIPE ENDWALLS)

LB.571.000

Summers-Taylor, Inc. $3.0000 $1,713.00

Jones Bros. Contractors, LLC $1.0000 $571.00

611-12.01 CATCH BASINS, TYPE 12, 0' - 4' DEPTH

EACH7.000

Summers-Taylor, Inc. $3,200.0000 $22,400.00

Jones Bros. Contractors, LLC $3,800.0000 $26,600.00

611-12.02 CATCH BASINS, TYPE 12, > 4' - 8' DEPTH

EACH18.000

Summers-Taylor, Inc. $3,600.0000 $64,800.00

Jones Bros. Contractors, LLC $4,300.0000 $77,400.00

7PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

611-12.03 CATCH BASINS, TYPE 12, > 8' - 12' DEPTH

EACH5.000

Summers-Taylor, Inc. $4,300.0000 $21,500.00

Jones Bros. Contractors, LLC $4,700.0000 $23,500.00

611-12.04 CATCH BASINS, TYPE 12, > 12' - 16' DEPTH

EACH3.000

Summers-Taylor, Inc. $5,500.0000 $16,500.00

Jones Bros. Contractors, LLC $9,100.0000 $27,300.00

611-14.02 CATCH BASINS, TYPE 14, > 4' - 8' DEPTH

EACH3.000

Summers-Taylor, Inc. $5,600.0000 $16,800.00

Jones Bros. Contractors, LLC $5,500.0000 $16,500.00

611-25.01 CATCH BASINS, TYPE 25, 0' - 4' DEPTH

EACH1.000

Summers-Taylor, Inc. $3,100.0000 $3,100.00

Jones Bros. Contractors, LLC $3,900.0000 $3,900.00

611-25.02 CATCH BASINS, TYPE 25, > 4' - 8' DEPTH

EACH2.000

Summers-Taylor, Inc. $3,900.0000 $7,800.00

Jones Bros. Contractors, LLC $4,400.0000 $8,800.00

611-41.03 CATCH BASINS, TYPE 41, > 8' - 12' DEPTH

EACH1.000

Summers-Taylor, Inc. $4,950.0000 $4,950.00

Jones Bros. Contractors, LLC $4,900.0000 $4,900.00

611-42.01 CATCH BASINS, TYPE 42, 0' - 4' DEPTH

EACH2.000

Summers-Taylor, Inc. $4,220.0000 $8,440.00

Jones Bros. Contractors, LLC $4,600.0000 $9,200.00

611-42.02 CATCH BASINS, TYPE 42, > 4' - 8' DEPTH

EACH5.000

Summers-Taylor, Inc. $4,350.0000 $21,750.00

Jones Bros. Contractors, LLC $4,900.0000 $24,500.00

611-42.03 CATCH BASINS, TYPE 42, > 8' - 12' DEPTH

EACH6.000

Summers-Taylor, Inc. $4,750.0000 $28,500.00

Jones Bros. Contractors, LLC $4,600.0000 $27,600.00

611-42.06 CATCH BASINS, TYPE 42, > 20' - 24' DEPTH

EACH1.000

Summers-Taylor, Inc. $9,150.0000 $9,150.00

Jones Bros. Contractors, LLC $18,000.0000 $18,000.00

8PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

611-43.02 CATCH BASINS, TYPE 43, > 4' - 8' DEPTH

EACH1.000

Summers-Taylor, Inc. $5,700.0000 $5,700.00

Jones Bros. Contractors, LLC $6,000.0000 $6,000.00

620-03 CONCRETE PARAPET (STD-1-1SS)

L.F.100.000

Summers-Taylor, Inc. $145.0000 $14,500.00

Jones Bros. Contractors, LLC $150.0000 $15,000.00

620-05 CONCRETE PARAPET WITH STRUCTURAL TUBING

L.F.238.000

Summers-Taylor, Inc. $302.0000 $71,876.00

Jones Bros. Contractors, LLC $300.0000 $71,400.00

701-01.01 CONCRETE SIDEWALK (4 ")

S.F.18,781.000

Summers-Taylor, Inc. $5.8100 $109,117.61

Jones Bros. Contractors, LLC $5.4000 $101,417.40

701-01.02 CONCRETE SIDEWALK (6 ")

S.F.10,894.000

Summers-Taylor, Inc. $8.1000 $88,241.40

Jones Bros. Contractors, LLC $7.2500 $78,981.50

701-02 CONCRETE DRIVEWAY

S.F.1,120.000

Summers-Taylor, Inc. $9.9000 $11,088.00

Jones Bros. Contractors, LLC $7.2500 $8,120.00

701-02.03 CONCRETE CURB RAMP

S.F.2,480.000

Summers-Taylor, Inc. $18.5000 $45,880.00

Jones Bros. Contractors, LLC $15.0000 $37,200.00

701-03 CONCRETE MEDIAN PAVEMENT

C.Y.186.000

Summers-Taylor, Inc. $406.0000 $75,516.00

Jones Bros. Contractors, LLC $540.0000 $100,440.00

702-01 CONCRETE CURB

C.Y.149.000

Summers-Taylor, Inc. $330.0000 $49,170.00

Jones Bros. Contractors, LLC $840.0000 $125,160.00

702-03 CONCRETE COMBINED CURB & GUTTER

C.Y.512.000

Summers-Taylor, Inc. $331.0000 $169,472.00

Jones Bros. Contractors, LLC $575.0000 $294,400.00

9PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

703-01 PORTLAND CEMENT CONCRETE DITCH PAVING

C.Y.125.000

Summers-Taylor, Inc. $769.0000 $96,125.00

Jones Bros. Contractors, LLC $680.0000 $85,000.00

705-06.01 W BEAM GR (TYPE 2) MASH TL3

L.F.1,080.000

Summers-Taylor, Inc. $27.5000 $29,700.00

Jones Bros. Contractors, LLC $19.7500 $21,330.00

705-06.10 GR TERMINALTRAILING END (TYPE 13) MASH TL3

EACH3.000

Summers-Taylor, Inc. $1,380.0000 $4,140.00

Jones Bros. Contractors, LLC $1,200.0000 $3,600.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH2.000

Summers-Taylor, Inc. $3,860.0000 $7,720.00

Jones Bros. Contractors, LLC $3,500.0000 $7,000.00

705-20.25 TEMPORARY CRASH CUSHION (MASH TL-3)

EACH12.000

Summers-Taylor, Inc. $10,400.0000 $124,800.00

Jones Bros. Contractors, LLC $5,600.0000 $67,200.00

706-01 GUARDRAIL REMOVED

L.F.1,578.000

Summers-Taylor, Inc. $1.4000 $2,209.20

Jones Bros. Contractors, LLC $1.5000 $2,367.00

709-05.05 MACHINED RIP-RAP (CLASS A-3)

TON150.000

Summers-Taylor, Inc. $53.0000 $7,950.00

Jones Bros. Contractors, LLC $46.0000 $6,900.00

709-05.06 MACHINED RIP-RAP (CLASS A-1)

TON246.000

Summers-Taylor, Inc. $45.0000 $11,070.00

Jones Bros. Contractors, LLC $46.0000 $11,316.00

709-05.08 MACHINED RIP-RAP (CLASS B)

TON200.000

Summers-Taylor, Inc. $44.0000 $8,800.00

Jones Bros. Contractors, LLC $46.0000 $9,200.00

709-05.09 MACHINED RIP-RAP (CLASS C)

TON100.000

Summers-Taylor, Inc. $46.5000 $4,650.00

Jones Bros. Contractors, LLC $46.0000 $4,600.00

10PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

710-02 AGGREGATE UNDERDRAINS (WITH PIPE)

L.F.4,263.000

Summers-Taylor, Inc. $8.1000 $34,530.30

Jones Bros. Contractors, LLC $7.0000 $29,841.00

711-05.70 32IN SINGLE SLOPE CONCRETE BARRIER WALL

L.F.505.000

Summers-Taylor, Inc. $79.0000 $39,895.00

Jones Bros. Contractors, LLC $150.0000 $75,750.00

711-05.78 GRADE SEPARATED SINGE SLOPE MEDIAN WALL

L.F.458.000

Summers-Taylor, Inc. $265.0000 $121,370.00

Jones Bros. Contractors, LLC $400.0000 $183,200.00

712-01 TRAFFIC CONTROL

LS1.000

Summers-Taylor, Inc. $319,000.0000 $319,000.00

Jones Bros. Contractors, LLC $330,000.0000 $330,000.00

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.7,020.000

Summers-Taylor, Inc. $30.5000 $214,110.00

Jones Bros. Contractors, LLC $20.0000 $140,400.00

712-02.36 REMOVE AND RELOCATE PORTABLE BARRIER RAIL

L.F.3,150.000

Summers-Taylor, Inc. $16.5000 $51,975.00

Jones Bros. Contractors, LLC $3.0000 $9,450.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH1,581.000

Summers-Taylor, Inc. $33.5000 $52,963.50

Jones Bros. Contractors, LLC $26.5000 $41,896.50

712-06 SIGNS (CONSTRUCTION)

S.F.1,639.000

Summers-Taylor, Inc. $10.5000 $17,209.50

Jones Bros. Contractors, LLC $6.5000 $10,653.50

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.173.000

Summers-Taylor, Inc. $13.5000 $2,335.50

Jones Bros. Contractors, LLC $28.0000 $4,844.00

712-08.03 ARROW BOARD (TYPE C)

EACH4.000

Summers-Taylor, Inc. $671.0000 $2,684.00

Jones Bros. Contractors, LLC $2,675.0000 $10,700.00

11PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

712-09.01 REMOVABLE PAVEMENT MARKING LINE

L.F.12,714.000

Summers-Taylor, Inc. $2.6000 $33,056.40

Jones Bros. Contractors, LLC $2.2500 $28,606.50

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.7,000.000

Summers-Taylor, Inc. $3.5000 $24,500.00

Jones Bros. Contractors, LLC $3.0000 $21,000.00

713-01.01 CLASS A CONCRETE (FOUNDATION FOR SIGN SUPPORTS)

C.Y.11.000

Summers-Taylor, Inc. $715.0000 $7,865.00

Jones Bros. Contractors, LLC $518.0000 $5,698.00

713-01.02 STEEL BAR REINFORCEMENT(FOUNDATION FOR SIGN SUPPORTS)

LB.2,731.000

Summers-Taylor, Inc. $3.1000 $8,466.10

Jones Bros. Contractors, LLC $2.5900 $7,073.29

713-02.21 SIGN POST DELINEATION ENHANCEMENT

L.F.345.000

Summers-Taylor, Inc. $6.3000 $2,173.50

Jones Bros. Contractors, LLC $4.9300 $1,700.85

713-02.26 CONCRETE BARRIER/PARAPET DELINEATOR

EACH287.000

Summers-Taylor, Inc. $9.5000 $2,726.50

Jones Bros. Contractors, LLC $6.0400 $1,733.48

713-05 STEEL HOLLOW SQUARE POST (BREAKAWAY) SIGN SUPPORTS

LB.6,839.000

Summers-Taylor, Inc. $3.9000 $26,672.10

Jones Bros. Contractors, LLC $3.9700 $27,150.83

713-06 STEEL I-BEAMS & WF-BEAMS(BREAKAWAY) SIGN SUPPORT

LB.7,681.000

Summers-Taylor, Inc. $5.1500 $39,557.15

Jones Bros. Contractors, LLC $4.3200 $33,181.92

713-09.01 STEEL OVERHEAD SIGN STRUCTURE (SPAN 117' - 3")

EACH1.000

Summers-Taylor, Inc. $68,500.0000 $68,500.00

Jones Bros. Contractors, LLC $59,341.0000 $59,341.00

713-09.02 STEEL OVERHEAD SIGN STRUCTURE (SPAN 130' - 0")

EACH1.000

Summers-Taylor, Inc. $81,000.0000 $81,000.00

Jones Bros. Contractors, LLC $68,560.0000 $68,560.00

12PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

713-09.03 STEEL OVERHEAD SIGN STRUCTURE (SPAN 85' - 0")

EACH1.000

Summers-Taylor, Inc. $56,200.0000 $56,200.00

Jones Bros. Contractors, LLC $49,726.0000 $49,726.00

713-09.04 STEEL OVERHEAD SIGN STRUCTURE (SPAN 72' - 6")

EACH1.000

Summers-Taylor, Inc. $55,000.0000 $55,000.00

Jones Bros. Contractors, LLC $48,278.0000 $48,278.00

713-09.05 STEEL OVERHEAD SIGN STRUCTURE (SPAN 123' - 3")

EACH1.000

Summers-Taylor, Inc. $75,000.0000 $75,000.00

Jones Bros. Contractors, LLC $68,443.0000 $68,443.00

713-09.06 STEEL OVERHEAD SIGN STRUCTURE (SPAN 70' - 0")

EACH1.000

Summers-Taylor, Inc. $53,500.0000 $53,500.00

Jones Bros. Contractors, LLC $47,883.0000 $47,883.00

713-11.02 PERFORATED/KNOCKOUT SQUARE TUBE POST

LB.4,785.000

Summers-Taylor, Inc. $3.5000 $16,747.50

Jones Bros. Contractors, LLC $3.4100 $16,316.85

713-11.03 2 1/2" DIA ROUND STEEL TUBE SIGN POST

LB.852.000

Summers-Taylor, Inc. $3.7500 $3,195.00

Jones Bros. Contractors, LLC $3.8400 $3,271.68

713-11.21 P POST SLIP BASE

EACH5.000

Summers-Taylor, Inc. $390.0000 $1,950.00

Jones Bros. Contractors, LLC $411.0000 $2,055.00

713-11.23 ROUND POST SLIP BASE

EACH23.000

Summers-Taylor, Inc. $425.0000 $9,775.00

Jones Bros. Contractors, LLC $411.0000 $9,453.00

713-13.02 FLAT SHEET ALUMINUM SIGNS (0.080" THICK)

S.F.469.000

Summers-Taylor, Inc. $15.0000 $7,035.00

Jones Bros. Contractors, LLC $9.3800 $4,399.22

713-13.03 FLAT SHEET ALUMINUM SIGNS (0.100" THICK)

S.F.857.000

Summers-Taylor, Inc. $15.3000 $13,112.10

Jones Bros. Contractors, LLC $9.9400 $8,518.58

13PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

713-14 EXTRUDED ALUMINUM PANEL SIGNS

S.F.1,097.000

Summers-Taylor, Inc. $33.0000 $36,201.00

Jones Bros. Contractors, LLC $20.8800 $22,905.36

713-15 REMOVAL OF SIGNS, POSTS AND FOOTINGS

LS1.000

Summers-Taylor, Inc. $5,920.0000 $5,920.00

Jones Bros. Contractors, LLC $7,801.0000 $7,801.00

713-15.07 SUSPENDED FLAT SHEET ALUMINUM SIGN (0.080" THICK)

EACH8.000

Summers-Taylor, Inc. $365.0000 $2,920.00

Jones Bros. Contractors, LLC $351.0000 $2,808.00

713-30.09 BARRIER MOUNTED SIGN SUPPORT

EACH2.000

Summers-Taylor, Inc. $750.0000 $1,500.00

Jones Bros. Contractors, LLC $378.0000 $756.00

713-30.10 BARRIER MOUNTED SIGN SUPPORT (DESCRIPTION)

EACH1.000

Summers-Taylor, Inc. $375.0000 $375.00

Jones Bros. Contractors, LLC $501.0000 $501.00

716-01.23 SNOWPLOWABLE RAISED PAVEMENT MARKERS (BI-DIR)(2 COLOR)

EACH52.000

Summers-Taylor, Inc. $35.0000 $1,820.00

Jones Bros. Contractors, LLC $35.0000 $1,820.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.480.000

Summers-Taylor, Inc. $8.0000 $3,840.00

Jones Bros. Contractors, LLC $7.7500 $3,720.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.308.000

Summers-Taylor, Inc. $17.5000 $5,390.00

Jones Bros. Contractors, LLC $15.2500 $4,697.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.360.000

Summers-Taylor, Inc. $9.0000 $3,240.00

Jones Bros. Contractors, LLC $8.7500 $3,150.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH23.000

Summers-Taylor, Inc. $135.0000 $3,105.00

Jones Bros. Contractors, LLC $128.0000 $2,944.00

14PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.634.000

Summers-Taylor, Inc. $19.0000 $12,046.00

Jones Bros. Contractors, LLC $18.2500 $11,570.50

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH3.000

Summers-Taylor, Inc. $185.0000 $555.00

Jones Bros. Contractors, LLC $175.0000 $525.00

716-03.09 PLASTIC WORD PAVEMENT MARKING (WEST )

EACH6.000

Summers-Taylor, Inc. $235.0000 $1,410.00

Jones Bros. Contractors, LLC $225.0000 $1,350.00

716-03.10 PLASTIC WORD PAVEMENT MARKING ( EAST)

EACH6.000

Summers-Taylor, Inc. $235.0000 $1,410.00

Jones Bros. Contractors, LLC $225.0000 $1,350.00

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH7.000

Summers-Taylor, Inc. $165.0000 $1,155.00

Jones Bros. Contractors, LLC $150.0000 $1,050.00

716-04.02 PLASTIC PAVEMENT MARKING(DOUBLE TURNING ARROW)

EACH2.000

Summers-Taylor, Inc. $165.0000 $330.00

Jones Bros. Contractors, LLC $150.0000 $300.00

716-04.05 PLASTIC PAVEMENT MARKING (STRAIGHT ARROW)

EACH32.000

Summers-Taylor, Inc. $135.0000 $4,320.00

Jones Bros. Contractors, LLC $125.0000 $4,000.00

716-04.06 PLASTIC PAVEMENT MARKING (WRONG WAY ARROW)

EACH4.000

Summers-Taylor, Inc. $185.0000 $740.00

Jones Bros. Contractors, LLC $175.0000 $700.00

716-04.12 PLASTIC PAVEMENT MARKING (YIELD LINE)

S.F.120.000

Summers-Taylor, Inc. $14.0000 $1,680.00

Jones Bros. Contractors, LLC $12.0000 $1,440.00

716-04.13 PLASTIC PAVEMENT MARKING (BIKELANE SYMBOL & ARROW)

EACH17.000

Summers-Taylor, Inc. $350.0000 $5,950.00

Jones Bros. Contractors, LLC $325.0000 $5,525.00

15PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.16.000

Summers-Taylor, Inc. $695.0000 $11,120.00

Jones Bros. Contractors, LLC $675.0000 $10,800.00

716-08.03 REMOVAL OF PAVEMENT MARKING (CROSS-WALK)

L.F.50.000

Summers-Taylor, Inc. $6.7000 $335.00

Jones Bros. Contractors, LLC $5.7500 $287.50

716-08.06 REMOVAL OF PAVEMENT MARKING (TURN LANE ARROW)

EACH23.000

Summers-Taylor, Inc. $55.0000 $1,265.00

Jones Bros. Contractors, LLC $50.0000 $1,150.00

716-08.20 REMOVAL OF PAVEMENT MARKING (LINE)

L.M.16.000

Summers-Taylor, Inc. $1,800.0000 $28,800.00

Jones Bros. Contractors, LLC $1,800.0000 $28,800.00

716-10.50 PREFORMED PLASTIC PAVEMENT MARKING (INTERSTATE SHIELD)

EACH12.000

Summers-Taylor, Inc. $2,100.0000 $25,200.00

Jones Bros. Contractors, LLC $2,000.0000 $24,000.00

716-12.01 ENHANCED FLATLINE THERMO PVMT MRKNG (4IN LINE)

L.M.4.000

Summers-Taylor, Inc. $4,550.0000 $18,200.00

Jones Bros. Contractors, LLC $4,450.0000 $17,800.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.2.000

Summers-Taylor, Inc. $3,975.0000 $7,950.00

Jones Bros. Contractors, LLC $3,975.0000 $7,950.00

716-12.05 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN DOTTED LINE)

L.F.2,216.000

Summers-Taylor, Inc. $1.8500 $4,099.60

Jones Bros. Contractors, LLC $1.7500 $3,878.00

716-12.06 ENHANCED FLAT LINE THERMO (8IN LINE)

L.F.460.000

Summers-Taylor, Inc. $1.5500 $713.00

Jones Bros. Contractors, LLC $1.5000 $690.00

716-12.07 ENHANCED FLAT LINE THERMO (8IN BROKEN LN)

L.F.545.000

Summers-Taylor, Inc. $1.8500 $1,008.25

Jones Bros. Contractors, LLC $1.7500 $953.75

16PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

716-16.10 PREFORMED YIELD WORD (8FT W/ 1 ½IN BLACK CONTRAST)

EACH1.000

Summers-Taylor, Inc. $450.0000 $450.00

Jones Bros. Contractors, LLC $425.0000 $425.00

717-01 MOBILIZATION

LS1.000

Summers-Taylor, Inc. $770,253.0000 $770,253.00

Jones Bros. Contractors, LLC $812,300.0000 $812,300.00

730-01.02 REMOVAL OF SIGNAL EQUIPMENT

EACH2.000

Summers-Taylor, Inc. $3,000.0000 $6,000.00

Jones Bros. Contractors, LLC $2,754.0000 $5,508.00

730-02.08 SIGNAL HEAD ASSEMBLY (130 POLE MOUNTED)

EACH6.000

Summers-Taylor, Inc. $700.0000 $4,200.00

Jones Bros. Contractors, LLC $694.0000 $4,164.00

730-02.09 SIGNAL HEAD ASSEMBLY (130 WITH BACKPLATE)

EACH8.000

Summers-Taylor, Inc. $950.0000 $7,600.00

Jones Bros. Contractors, LLC $913.0000 $7,304.00

730-02.17 SIGNAL HEAD ASSEMBLY (150 A2H WITH BACKPLATE)

EACH1.000

Summers-Taylor, Inc. $1,550.0000 $1,550.00

Jones Bros. Contractors, LLC $1,453.0000 $1,453.00

730-02.30 SIGNAL HEAD ASSEMBLY (130 A3R WITH BACKPLATE)

EACH4.000

Summers-Taylor, Inc. $965.0000 $3,860.00

Jones Bros. Contractors, LLC $935.0000 $3,740.00

730-03.21 INSTALL PULL BOX (TYPE B)

EACH15.000

Summers-Taylor, Inc. $495.0000 $7,425.00

Jones Bros. Contractors, LLC $484.0000 $7,260.00

730-03.23 INSTALL PULL BOX (FIBER OPTIC-TYPE A)

EACH8.000

Summers-Taylor, Inc. $2,100.0000 $16,800.00

Jones Bros. Contractors, LLC $2,070.0000 $16,560.00

730-03.24 INSTALL PULL BOX (FIBER OPTIC-TYPE B)

EACH5.000

Summers-Taylor, Inc. $2,500.0000 $12,500.00

Jones Bros. Contractors, LLC $2,482.0000 $12,410.00

17PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

730-05.01 ELECTRICAL SERVICE CONNECTION

EACH3.000

Summers-Taylor, Inc. $3,000.0000 $9,000.00

Jones Bros. Contractors, LLC $2,965.0000 $8,895.00

730-08.01 SIGNAL CABLE - 3 CONDUCTOR

L.F.1,384.000

Summers-Taylor, Inc. $1.0000 $1,384.00

Jones Bros. Contractors, LLC $1.0000 $1,384.00

730-08.02 SIGNAL CABLE - 5 CONDUCTOR

L.F.2,189.000

Summers-Taylor, Inc. $1.1000 $2,407.90

Jones Bros. Contractors, LLC $1.1000 $2,407.90

730-08.03 SIGNAL CABLE - 7 CONDUCTOR

L.F.2,322.000

Summers-Taylor, Inc. $1.3000 $3,018.60

Jones Bros. Contractors, LLC $1.3000 $3,018.60

730-08.40 INTERCONNECT CABLE - FIBER OPTIC (48 STRAND-SM CABLE)

L.F.3,123.000

Summers-Taylor, Inc. $3.5000 $10,930.50

Jones Bros. Contractors, LLC $3.4000 $10,618.20

730-08.41 INTERCONNECT CABLE - FIBER OPTIC (12 STRAND-SM DROP CABLE)

L.F.65.000

Summers-Taylor, Inc. $2.5000 $162.50

Jones Bros. Contractors, LLC $2.5000 $162.50

730-12.01 CONDUIT 1" DIAMETER (PVC)

L.F.320.000

Summers-Taylor, Inc. $7.0000 $2,240.00

Jones Bros. Contractors, LLC $6.9000 $2,208.00

730-12.02 CONDUIT 2" DIAMETER (PVC)

L.F.4,903.000

Summers-Taylor, Inc. $8.6500 $42,410.95

Jones Bros. Contractors, LLC $8.5000 $41,675.50

730-12.03 CONDUIT 3" DIAMETER (PVC)

L.F.578.000

Summers-Taylor, Inc. $14.2500 $8,236.50

Jones Bros. Contractors, LLC $14.1000 $8,149.80

730-12.14 CONDUIT 3" DIAMETER (JACK AND BORE)

L.F.261.000

Summers-Taylor, Inc. $35.0000 $9,135.00

Jones Bros. Contractors, LLC $34.4000 $8,978.40

18PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

730-12.16 CONDUIT (2" C - SCHEDULE 80)

L.F.2,484.000

Summers-Taylor, Inc. $8.6500 $21,486.60

Jones Bros. Contractors, LLC $8.5000 $21,114.00

730-12.17 CONDUIT (3" C - SCHEDULE 80)

L.F.344.000

Summers-Taylor, Inc. $15.2500 $5,246.00

Jones Bros. Contractors, LLC $15.1000 $5,194.40

730-13.02 VEHICLE DETECTOR (VIDEO)

EACH10.000

Summers-Taylor, Inc. $8,050.0000 $80,500.00

Jones Bros. Contractors, LLC $7,960.0000 $79,600.00

730-13.08 VEHICLE DETECTOR (EMERGENCY PREEMPTION)

EACH10.000

Summers-Taylor, Inc. $2,800.0000 $28,000.00

Jones Bros. Contractors, LLC $2,764.0000 $27,640.00

730-15.32 CABINET (EIGHT PHASE BASE MOUNTED)

EACH3.000

Summers-Taylor, Inc. $21,000.0000 $63,000.00

Jones Bros. Contractors, LLC $20,803.0000 $62,409.00

730-16.02 EIGHT PHASE ACTUATED CONTROLLER

EACH3.000

Summers-Taylor, Inc. $4,500.0000 $13,500.00

Jones Bros. Contractors, LLC $4,500.0000 $13,500.00

730-23.30 PEDESTAL POLE (10' PEDESTRIAN)

EACH9.000

Summers-Taylor, Inc. $1,800.0000 $16,200.00

Jones Bros. Contractors, LLC $1,716.0000 $15,444.00

730-23.31 PEDESTAL POLE (17' PEDESTRIAN)

EACH5.000

Summers-Taylor, Inc. $1,800.0000 $9,000.00

Jones Bros. Contractors, LLC $1,716.0000 $8,580.00

730-23.36 CANTILEVER SIGNAL SUPPORT (1 @ 45' & 1 @ 48')

EACH1.000

Summers-Taylor, Inc. $29,000.0000 $29,000.00

Jones Bros. Contractors, LLC $28,496.0000 $28,496.00

730-23.80 CANTILEVER SIGNAL SUPPORT (1 ARM @ 40')

EACH1.000

Summers-Taylor, Inc. $16,500.0000 $16,500.00

Jones Bros. Contractors, LLC $16,246.0000 $16,246.00

19PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

730-23.86 CANTILEVER SIGNAL SUPPORT (2 @ 40' & 40')

EACH1.000

Summers-Taylor, Inc. $27,000.0000 $27,000.00

Jones Bros. Contractors, LLC $26,082.0000 $26,082.00

730-23.88 CANTILEVER SIGNAL SUPPORT (1 ARM @ 45')

EACH1.000

Summers-Taylor, Inc. $18,100.0000 $18,100.00

Jones Bros. Contractors, LLC $18,046.0000 $18,046.00

730-26.11 COUNTDOWN PED SGNL HEAD W/AUDIBLE PUSH BUTTON & 15IN SIGN

EACH16.000

Summers-Taylor, Inc. $1,450.0000 $23,200.00

Jones Bros. Contractors, LLC $1,378.0000 $22,048.00

730-35.06 BATTERY BACK-UP AND POWER CONDITIONER

EACH3.000

Summers-Taylor, Inc. $9,100.0000 $27,300.00

Jones Bros. Contractors, LLC $9,021.0000 $27,063.00

730-40 TEMPORARY TRAFFIC SIGNAL SYSTEM

EACH6.000

Summers-Taylor, Inc. $7,150.0000 $42,900.00

Jones Bros. Contractors, LLC $7,000.0000 $42,000.00

740-06.01 GEOMEMBRANE

S.Y.1,122.000

Summers-Taylor, Inc. $15.0000 $16,830.00

Jones Bros. Contractors, LLC $11.0000 $12,342.00

740-10.03 GEOTEXTILE (TYPE III)(EROSION CONTROL)

S.Y.1,028.000

Summers-Taylor, Inc. $7.5000 $7,710.00

Jones Bros. Contractors, LLC $7.1200 $7,319.36

740-10.04 GEOTEXTILE (TYPE IV)(STABILIZATION)

S.Y.386.000

Summers-Taylor, Inc. $2.9000 $1,119.40

Jones Bros. Contractors, LLC $2.2500 $868.50

740-11.01 TEMPORARY SEDIMENT TUBE 8IN

L.F.3,500.000

Summers-Taylor, Inc. $2.4500 $8,575.00

Jones Bros. Contractors, LLC $2.7700 $9,695.00

740-11.04 TEMPORARY SEDIMENT TUBE 20IN

L.F.1,490.000

Summers-Taylor, Inc. $4.0100 $5,974.90

Jones Bros. Contractors, LLC $3.3700 $5,021.30

20PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

801-01.07 TEMPORARY SEEDING (WITH MULCH)

UNIT536.000

Summers-Taylor, Inc. $25.5000 $13,668.00

Jones Bros. Contractors, LLC $18.5000 $9,916.00

801-02 SEEDING (WITHOUT MULCH)

UNIT2.000

Summers-Taylor, Inc. $58.0000 $116.00

Jones Bros. Contractors, LLC $30.0000 $60.00

801-03 WATER (SEEDING & SODDING)

M.G.31.000

Summers-Taylor, Inc. $46.5000 $1,441.50

Jones Bros. Contractors, LLC $50.0000 $1,550.00

803-01 SODDING (NEW SOD)

S.Y.9,588.000

Summers-Taylor, Inc. $4.5000 $43,146.00

Jones Bros. Contractors, LLC $5.6400 $54,076.32

805-12.02 EROSION CONTROL BLANKET (TYPE II)

S.Y.20,217.000

Summers-Taylor, Inc. $1.1500 $23,249.55

Jones Bros. Contractors, LLC $0.8700 $17,588.79

806-02.03 PROJECT MOWING

CYCL6.000

Summers-Taylor, Inc. $1,280.0000 $7,680.00

Jones Bros. Contractors, LLC $2,000.0000 $12,000.00

714-03.01 DIRECT BURIAL CONDUIT (2" PVC, SCHEDULE 40)

L.F.3,869.000

Summers-Taylor, Inc. $11.0000 $42,559.00

Jones Bros. Contractors, LLC $10.9000 $42,172.10

714-03.03 DIRECT BURIAL CONDUIT (2" PVC, SCHEDULE 80)

L.F.663.000

Summers-Taylor, Inc. $3.0000 $1,989.00

Jones Bros. Contractors, LLC $2.8000 $1,856.40

714-04.02 CONDUIT (STRUCTURES - 2" RGS)

L.F.374.000

Summers-Taylor, Inc. $20.0000 $7,480.00

Jones Bros. Contractors, LLC $19.9000 $7,442.60

714-04.03 CONDUIT (2" PVC, JACKED OR BORED)

L.F.1,273.000

Summers-Taylor, Inc. $25.0000 $31,825.00

Jones Bros. Contractors, LLC $23.9000 $30,424.70

21PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

714-04.04 CONDUIT (2" PVC, IN CONCRETE BARRIER)

L.F.94.000

Summers-Taylor, Inc. $5.5000 $517.00

Jones Bros. Contractors, LLC $5.4000 $507.60

714-04.05 CONDUIT 2" DIAMETER RGS. ATTACH TO UTILITY POLE)

L.F.40.000

Summers-Taylor, Inc. $20.0000 $800.00

Jones Bros. Contractors, LLC $20.0000 $800.00

714-05.03 PULL BOXES (TYPE B)

EACH51.000

Summers-Taylor, Inc. $990.0000 $50,490.00

Jones Bros. Contractors, LLC $967.0000 $49,317.00

714-06.05 CABLE (1/C # 6 AWG)

L.F.6,453.000

Summers-Taylor, Inc. $1.6500 $10,647.45

Jones Bros. Contractors, LLC $1.6000 $10,324.80

714-06.06 CABLE (1/C # 4 AWG)

L.F.17,390.000

Summers-Taylor, Inc. $2.0000 $34,780.00

Jones Bros. Contractors, LLC $2.0000 $34,780.00

714-06.08 CABLE (1/C #6 AWG GROUND WIRE)

L.F.4,248.000

Summers-Taylor, Inc. $1.2000 $5,097.60

Jones Bros. Contractors, LLC $1.2000 $5,097.60

714-06.09 CABLE (1/C #4 AWG GROUND WIRE)

L.F.9,565.000

Summers-Taylor, Inc. $1.5000 $14,347.50

Jones Bros. Contractors, LLC $1.4000 $13,391.00

714-06.10 CABLE (1C #3 AWG)

L.F.60.000

Summers-Taylor, Inc. $2.4000 $144.00

Jones Bros. Contractors, LLC $2.4000 $144.00

714-08.09 LIGHT STANDARDS (40' M.H., 12' ARM)

EACH17.000

Summers-Taylor, Inc. $2,950.0000 $50,150.00

Jones Bros. Contractors, LLC $2,913.0000 $49,521.00

714-08.11 LIGHT STANDARDS (DECORATIVE LIGHT)

EACH8.000

Summers-Taylor, Inc. $1,500.0000 $12,000.00

Jones Bros. Contractors, LLC $1,014.0000 $8,112.00

22PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

714-08.12 LIGHT STANDARDS (DECORATIVE, BARRIER MOUNTED)

EACH1.000

Summers-Taylor, Inc. $1,050.0000 $1,050.00

Jones Bros. Contractors, LLC $980.0000 $980.00

714-08.13 LIGHT STANDARDS (40' M.H., 12' ARM, BARRIER MOUNTED)

EACH2.000

Summers-Taylor, Inc. $3,100.0000 $6,200.00

Jones Bros. Contractors, LLC $2,913.0000 $5,826.00

714-08.26 FOUNDATION FOR LIGHT STANDARDS(MEDIAN BARRIER)

EACH3.000

Summers-Taylor, Inc. $3,100.0000 $9,300.00

Jones Bros. Contractors, LLC $3,077.0000 $9,231.00

714-08.43 FOUNDATION FOR LIGHT STANDARDS - ROADWAY (40' M.H.)

EACH17.000

Summers-Taylor, Inc. $1,850.0000 $31,450.00

Jones Bros. Contractors, LLC $1,726.0000 $29,342.00

714-08.44 FOUNDATION FOR LIGHT STANDARDS - ROADWAY (DECORATIVE POLE)

EACH8.000

Summers-Taylor, Inc. $1,600.0000 $12,800.00

Jones Bros. Contractors, LLC $1,570.0000 $12,560.00

714-09.09 LUMINAIRES (138 WATT LED)

EACH34.000

Summers-Taylor, Inc. $600.0000 $20,400.00

Jones Bros. Contractors, LLC $573.0000 $19,482.00

714-09.10 LUMINAIRES (79 WATT LED - UNDERPASS)

EACH4.000

Summers-Taylor, Inc. $1,100.0000 $4,400.00

Jones Bros. Contractors, LLC $1,041.0000 $4,164.00

714-09.11 LUMINAIRES (100 WATT LED - DECORATIVE)

EACH9.000

Summers-Taylor, Inc. $1,950.0000 $17,550.00

Jones Bros. Contractors, LLC $1,922.0000 $17,298.00

714-12 CONTROL CENTER

LS1.000

Summers-Taylor, Inc. $6,750.0000 $6,750.00

Jones Bros. Contractors, LLC $6,360.0000 $6,360.00

714-14.03 MASTARM (12' ARM ONLY)

EACH15.000

Summers-Taylor, Inc. $650.0000 $9,750.00

Jones Bros. Contractors, LLC $584.0000 $8,760.00

23PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

714-25 ELECTRICAL CONNECTION

EACH1.000

Summers-Taylor, Inc. $1,850.0000 $1,850.00

Jones Bros. Contractors, LLC $1,772.0000 $1,772.00

24PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

BOX BRIDGE CATEGORY

204-08 FOUNDATION FILL MATERIAL

C.Y.95.000

Summers-Taylor, Inc. $57.0000 $5,415.00

Jones Bros. Contractors, LLC $65.8700 $6,257.65

303-01.02 GRANULAR BACKFILL (BRIDGES)

TON2,233.000

Summers-Taylor, Inc. $31.0000 $69,223.00

Jones Bros. Contractors, LLC $35.0000 $78,155.00

604-02.01 CLASS A CONCRETE (BOX BRIDGES)

C.Y.511.000

Summers-Taylor, Inc. $785.0000 $401,135.00

Jones Bros. Contractors, LLC $950.0000 $485,450.00

604-02.02 STEEL BAR REINFORCEMENT (BOX BRIDGES)

LB.93,100.000

Summers-Taylor, Inc. $1.2500 $116,375.00

Jones Bros. Contractors, LLC $0.9000 $83,790.00

25PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

BRIDGE CATEGORY

602-10.32 STRUCTURAL STEEL (REPAIRS)

LB.565.000

Summers-Taylor, Inc. $250.0000 $141,250.00

Jones Bros. Contractors, LLC $28.0000 $15,820.00

602-10.81 HEAT STRAIGHTENING

LS1.000

Summers-Taylor, Inc. $102,800.0000 $102,800.00

Jones Bros. Contractors, LLC $89,500.0000 $89,500.00

603-02.20 SPOT PAINTING EXISTING STEEL STRUCTURES

S.F.350.000

Summers-Taylor, Inc. $9.5000 $3,325.00

Jones Bros. Contractors, LLC $7.9500 $2,782.50

603-05.20 CONTAINMENT & DISPOSAL OF WASTE(BR. NO. 90-I26-6.82)

LS1.000

Summers-Taylor, Inc. $1,740.0000 $1,740.00

Jones Bros. Contractors, LLC $2,500.0000 $2,500.00

604-10.90 MISCELLANEOUS BRIDGE ITEMS

LS1.000

Summers-Taylor, Inc. $295,000.0000 $295,000.00

Jones Bros. Contractors, LLC $262,530.4200 $262,530.42

713-02.27 CONCRETE BARRIER/PARAPET DELINEATOR (BI-DIRECTIONAL)

EACH65.000

Summers-Taylor, Inc. $35.0000 $2,275.00

Jones Bros. Contractors, LLC $20.0000 $1,300.00

26PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

UTILITY CATEGORY

203-05 UNDERCUTTING

C.Y.50.000

Summers-Taylor, Inc. $18.0000 $900.00

Jones Bros. Contractors, LLC $50.0000 $2,500.00

793-01.40 ANCHOR 3/4IN

EACH6.000

Summers-Taylor, Inc. $525.0000 $3,150.00

Jones Bros. Contractors, LLC $511.0000 $3,066.00

793-02.07 GUY WIRE 6.6M OR 1/4IN

EACH5.000

Summers-Taylor, Inc. $120.0000 $600.00

Jones Bros. Contractors, LLC $116.0000 $580.00

793-02.08 GUY WIRE 10M OR 3/8IN

EACH1.000

Summers-Taylor, Inc. $125.0000 $125.00

Jones Bros. Contractors, LLC $119.0000 $119.00

793-03.01 25 PAIR GROUP AERIAL SPLICE

EACH52.000

Summers-Taylor, Inc. $120.0000 $6,240.00

Jones Bros. Contractors, LLC $117.0000 $6,084.00

793-03.02 6M STRAND

L.F.600.000

Summers-Taylor, Inc. $2.5000 $1,500.00

Jones Bros. Contractors, LLC $2.3000 $1,380.00

793-03.12 50 PAIR CABLE

L.F.755.000

Summers-Taylor, Inc. $8.6000 $6,493.00

Jones Bros. Contractors, LLC $8.6000 $6,493.00

793-04.01 RELASH/DELASH CABLE

L.F.615.000

Summers-Taylor, Inc. $1.8500 $1,137.75

Jones Bros. Contractors, LLC $1.6000 $984.00

793-04.06 READY ACCESS CLOSURE

EACH4.000

Summers-Taylor, Inc. $685.0000 $2,740.00

Jones Bros. Contractors, LLC $682.0000 $2,728.00

793-04.08 TRANSFER AERIAL CABLE

EACH4.000

Summers-Taylor, Inc. $200.0000 $800.00

Jones Bros. Contractors, LLC $187.0000 $748.00

27PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

793-04.12 UNDERGROUND SPLICE CLOSURE

EACH9.000

Summers-Taylor, Inc. $1,600.0000 $14,400.00

Jones Bros. Contractors, LLC $1,570.0000 $14,130.00

793-07.02 24 FIBER(MATERIAL ONLY)

L.F.535.000

Summers-Taylor, Inc. $0.5500 $294.25

Jones Bros. Contractors, LLC $0.5500 $294.25

793-07.05 96 FIBER(MATERIAL ONLY)

L.F.1,115.000

Summers-Taylor, Inc. $1.5000 $1,672.50

Jones Bros. Contractors, LLC $1.4000 $1,561.00

793-07.07 144 FIBER(MATERIAL ONLY)

L.F.2,485.000

Summers-Taylor, Inc. $2.6500 $6,585.25

Jones Bros. Contractors, LLC $2.6000 $6,461.00

793-07.16 12-96 FIBER(INSTALLATION ONLY)

L.F.1,650.000

Summers-Taylor, Inc. $1.6500 $2,722.50

Jones Bros. Contractors, LLC $1.5000 $2,475.00

793-07.17 108-144 FIBER(INSTALLATION ONLY)

L.F.2,485.000

Summers-Taylor, Inc. $1.4500 $3,603.25

Jones Bros. Contractors, LLC $1.4000 $3,479.00

793-07.23 FIBER OPTIC MAINTENANCE LOOP

EACH9.000

Summers-Taylor, Inc. $235.0000 $2,115.00

Jones Bros. Contractors, LLC $230.0000 $2,070.00

793-11.13 BURIED RISER GUARD

EACH6.000

Summers-Taylor, Inc. $125.0000 $750.00

Jones Bros. Contractors, LLC $119.0000 $714.00

793-11.17 COMPOSITE HANDHOLE 5FTX3FTX3FT

EACH5.000

Summers-Taylor, Inc. $3,600.0000 $18,000.00

Jones Bros. Contractors, LLC $3,593.0000 $17,965.00

793-12.02 REARRANGEMENT EXISTING CABLE

EACH3.000

Summers-Taylor, Inc. $1,600.0000 $4,800.00

Jones Bros. Contractors, LLC $1,483.0000 $4,449.00

28PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

793-12.03 100 PAIR UG CABLE

L.F.1,471.000

Summers-Taylor, Inc. $15.0000 $22,065.00

Jones Bros. Contractors, LLC $14.6000 $21,476.60

793-12.08 600 PAIR UG CABLE

L.F.765.000

Summers-Taylor, Inc. $55.0000 $42,075.00

Jones Bros. Contractors, LLC $52.1000 $39,856.50

793-13.06 25 PAIR GROUP UG SPLICE

EACH118.000

Summers-Taylor, Inc. $130.0000 $15,340.00

Jones Bros. Contractors, LLC $127.0000 $14,986.00

793-13.12 1 DUCT FORMATION @ 36IN DEPTH

L.F.30.000

Summers-Taylor, Inc. $35.0000 $1,050.00

Jones Bros. Contractors, LLC $33.4000 $1,002.00

793-13.17 2 DUCT FORMATION @ 36IN DEPTH

L.F.1,515.000

Summers-Taylor, Inc. $33.0000 $49,995.00

Jones Bros. Contractors, LLC $32.2000 $48,783.00

793-14.01 SAND ENCASEMENT PER DUCT

L.F.3,030.000

Summers-Taylor, Inc. $3.0000 $9,090.00

Jones Bros. Contractors, LLC $2.8000 $8,484.00

793-14.08 MH PRECAST (DESCRIPTION)

EACH3.000

Summers-Taylor, Inc. $8,750.0000 $26,250.00

Jones Bros. Contractors, LLC $8,650.0000 $25,950.00

793-14.12 1 1/4IN INNERDUCT

L.F.4,120.000

Summers-Taylor, Inc. $2.2000 $9,064.00

Jones Bros. Contractors, LLC $2.0000 $8,240.00

793-16.01 MH(RETIRE/REMOVE/GRAVEL BACKFILL)

EACH1.000

Summers-Taylor, Inc. $900.0000 $900.00

Jones Bros. Contractors, LLC $883.0000 $883.00

793-16.04 DIRECTIONAL BORE 4IN/FLEX SLEEVE

L.F.950.000

Summers-Taylor, Inc. $65.0000 $61,750.00

Jones Bros. Contractors, LLC $30.1000 $28,595.00

29PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

793-98.01 REMOVE AERIAL CABLE AND WIRE

L.F.1,965.000

Summers-Taylor, Inc. $0.6500 $1,277.25

Jones Bros. Contractors, LLC $0.6000 $1,179.00

793-98.04 REMOVE POLES ALL SIZES

EACH2.000

Summers-Taylor, Inc. $200.0000 $400.00

Jones Bros. Contractors, LLC $185.0000 $370.00

793-98.05 RETIRE BURIED FACILITIES IN PLACE

L.F.1,480.000

Summers-Taylor, Inc. $0.8500 $1,258.00

Jones Bros. Contractors, LLC $0.8500 $1,258.00

793-98.06 REMOVE PEDESTALS

EACH3.000

Summers-Taylor, Inc. $31.0000 $93.00

Jones Bros. Contractors, LLC $30.9000 $92.70

793-98.08 REMOVE ANCHOR (ANY SIZE)

EACH4.000

Summers-Taylor, Inc. $31.0000 $124.00

Jones Bros. Contractors, LLC $30.3900 $121.56

795-01.05 8IN DIP RESTRAINED JOINT WATER LINE

L.F.10.000

Summers-Taylor, Inc. $145.0000 $1,450.00

Jones Bros. Contractors, LLC $165.0000 $1,650.00

795-01.09 12IN DIP RESTRAINED JOINT WATER LINE

L.F.830.000

Summers-Taylor, Inc. $151.0000 $125,330.00

Jones Bros. Contractors, LLC $152.0000 $126,160.00

795-01.13 16IN DIP RESTRAINED JOINT WATER LINE

L.F.1,980.000

Summers-Taylor, Inc. $230.0000 $455,400.00

Jones Bros. Contractors, LLC $270.0000 $534,600.00

795-06.05 CONNECT TO 8IN WATER LINE

EACH1.000

Summers-Taylor, Inc. $31,500.0000 $31,500.00

Jones Bros. Contractors, LLC $15,000.0000 $15,000.00

795-06.34 CUT AND CAP 8IN WATERLINE

EACH1.000

Summers-Taylor, Inc. $17,600.0000 $17,600.00

Jones Bros. Contractors, LLC $15,000.0000 $15,000.00

30PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

795-06.36 CUT & CAP 10IN WATERLINE

EACH2.000

Summers-Taylor, Inc. $19,000.0000 $38,000.00

Jones Bros. Contractors, LLC $20,000.0000 $40,000.00

795-06.38 CUT AND CAP 14IN WATERLINE

EACH4.000

Summers-Taylor, Inc. $38,000.0000 $152,000.00

Jones Bros. Contractors, LLC $39,000.0000 $156,000.00

795-07.06 8IN X 8IN TAPPING SLEEVE AND VALVE

EACH1.000

Summers-Taylor, Inc. $5,500.0000 $5,500.00

Jones Bros. Contractors, LLC $5,900.0000 $5,900.00

795-07.15 12IN X 12IN TAPPING SLEEVE AND VALVE

EACH3.000

Summers-Taylor, Inc. $7,200.0000 $21,600.00

Jones Bros. Contractors, LLC $10,480.0000 $31,440.00

795-07.21 16IN X 16IN TAPPING SLEEVE AND VALVE

EACH4.000

Summers-Taylor, Inc. $18,200.0000 $72,800.00

Jones Bros. Contractors, LLC $21,200.0000 $84,800.00

795-08.05 8IN GATE VALVE ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $1,450.0000 $1,450.00

Jones Bros. Contractors, LLC $3,500.0000 $3,500.00

795-08.09 12IN GATE VALVE ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $2,500.0000 $2,500.00

Jones Bros. Contractors, LLC $5,500.0000 $5,500.00

795-08.13 16IN BUTTERFLY VALVE ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $10,200.0000 $10,200.00

Jones Bros. Contractors, LLC $9,350.0000 $9,350.00

795-09.01 3/4IN WATER SERVICE METER ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $1,942.0000 $1,942.00

Jones Bros. Contractors, LLC $2,120.0000 $2,120.00

795-09.28 3/4IN COPPER SERVICE PIPE

L.F.20.000

Summers-Taylor, Inc. $50.5000 $1,010.00

Jones Bros. Contractors, LLC $48.0000 $960.00

31PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

795-10.03 1IN AUTO AIR RELEASE VALVE ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $1,607.0000 $1,607.00

Jones Bros. Contractors, LLC $2,924.0000 $2,924.00

795-11.02 FIRE HYDRANT ASSEMBLY

EACH3.000

Summers-Taylor, Inc. $4,950.0000 $14,850.00

Jones Bros. Contractors, LLC $5,133.0000 $15,399.00

795-12.01 REMOVE FIRE HYDRANT

EACH3.000

Summers-Taylor, Inc. $1,800.0000 $5,400.00

Jones Bros. Contractors, LLC $2,800.0000 $8,400.00

795-12.02 REMOVAL OF EXISTING LINE

LS1.000

Summers-Taylor, Inc. $3,950.0000 $3,950.00

Jones Bros. Contractors, LLC $42,000.0000 $42,000.00

795-12.03 PIPE GROUTING

LS1.000

Summers-Taylor, Inc. $9,800.0000 $9,800.00

Jones Bros. Contractors, LLC $29,000.0000 $29,000.00

797-05.02 8IN DIP GRAVITY SEWER 6FT-12FT DEPTH

L.F.100.000

Summers-Taylor, Inc. $235.0000 $23,500.00

Jones Bros. Contractors, LLC $256.0000 $25,600.00

797-05.03 8IN DIP GRAVITY SEWER 12FT-18FT DEPTH

L.F.200.000

Summers-Taylor, Inc. $275.0000 $55,000.00

Jones Bros. Contractors, LLC $289.0000 $57,800.00

797-05.06 10IN DIP GRAVITY SEWER 6FT-12FT DEPTH

L.F.75.000

Summers-Taylor, Inc. $345.0000 $25,875.00

Jones Bros. Contractors, LLC $270.0000 $20,250.00

797-05.07 10IN DIP GRAVITY SEWER 12FT-18FT DEPTH

L.F.75.000

Summers-Taylor, Inc. $475.0000 $35,625.00

Jones Bros. Contractors, LLC $310.0000 $23,250.00

797-05.21 24IN DIP GRAVITY SEWER 0FT-6FT DEPTH

L.F.30.000

Summers-Taylor, Inc. $510.0000 $15,300.00

Jones Bros. Contractors, LLC $600.0000 $18,000.00

32PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

797-05.22 24IN DIP GRAVITY SEWER 6FT-12FT DEPTH

L.F.95.000

Summers-Taylor, Inc. $520.0000 $49,400.00

Jones Bros. Contractors, LLC $625.0000 $59,375.00

797-05.23 24IN DIP GRAVITY SEWER 12FT-18FT DEPTH

L.F.1,500.000

Summers-Taylor, Inc. $525.0000 $787,500.00

Jones Bros. Contractors, LLC $649.0000 $973,500.00

797-05.24 24IN DIP GRAVITY SEWER >18FT DEPTH

L.F.85.000

Summers-Taylor, Inc. $550.0000 $46,750.00

Jones Bros. Contractors, LLC $692.0000 $58,820.00

797-06.90 OPEN CUT 16IN STEEL CASING PIPE

L.F.130.000

Summers-Taylor, Inc. $98.0000 $12,740.00

Jones Bros. Contractors, LLC $253.0000 $32,890.00

797-06.92 OPEN CUT 20IN STEEL CASING PIPE

L.F.80.000

Summers-Taylor, Inc. $115.0000 $9,200.00

Jones Bros. Contractors, LLC $347.0000 $27,760.00

797-07.04 48IN MANHOLE 8FT-10FT DEPTH

EACH1.000

Summers-Taylor, Inc. $4,500.0000 $4,500.00

Jones Bros. Contractors, LLC $6,900.0000 $6,900.00

797-07.05 48IN MANHOLE 10FT-12FT DEPTH

EACH1.000

Summers-Taylor, Inc. $4,500.0000 $4,500.00

Jones Bros. Contractors, LLC $8,500.0000 $8,500.00

797-07.06 48IN MANHOLE 12FT-14FT DEPTH

EACH1.000

Summers-Taylor, Inc. $4,500.0000 $4,500.00

Jones Bros. Contractors, LLC $9,700.0000 $9,700.00

797-07.18 60IN MANHOLE 14FT-16FT DEPTH

EACH1.000

Summers-Taylor, Inc. $11,750.0000 $11,750.00

Jones Bros. Contractors, LLC $9,800.0000 $9,800.00

797-07.19 60IN MANHOLE 16FT-20FT DEPTH

EACH4.000

Summers-Taylor, Inc. $11,750.0000 $47,000.00

Jones Bros. Contractors, LLC $10,400.0000 $41,600.00

33PAGE

EXTENSION

CONTRACT CNT079

UNIT PRICE

797-07.27 72IN MANHOLE 10FT-12FT DEPTH

EACH1.000

Summers-Taylor, Inc. $12,500.0000 $12,500.00

Jones Bros. Contractors, LLC $8,900.0000 $8,900.00

797-07.41 84IN MANHOLE 16FT-20FT DEPTH

EACH1.000

Summers-Taylor, Inc. $17,500.0000 $17,500.00

Jones Bros. Contractors, LLC $12,300.0000 $12,300.00

797-07.56 MANHOLE DROP CONNECTION ASSEMBLY

EACH1.000

Summers-Taylor, Inc. $2,200.0000 $2,200.00

Jones Bros. Contractors, LLC $8,950.0000 $8,950.00

797-07.62 MANHOLE MODIFICATION

EACH1.000

Summers-Taylor, Inc. $2,100.0000 $2,100.00

Jones Bros. Contractors, LLC $3,950.0000 $3,950.00

797-11.25 RETIREIN PLACE 48IN MANHOLE

EACH6.000

Summers-Taylor, Inc. $1,000.0000 $6,000.00

Jones Bros. Contractors, LLC $2,450.0000 $14,700.00

797-11.26 RETIREIN PLACE 60IN MANHOLE

EACH4.000

Summers-Taylor, Inc. $2,100.0000 $8,400.00

Jones Bros. Contractors, LLC $2,950.0000 $11,800.00

797-11.30 RETIREIN PLACE EXISTING SEWER <8IN

L.F.345.000

Summers-Taylor, Inc. $7.0000 $2,415.00

Jones Bros. Contractors, LLC $23.0000 $7,935.00

797-11.31 RETIREIN PLACE EXISTING SEWER 8IN-14IN

L.F.1,155.000

Summers-Taylor, Inc. $8.0000 $9,240.00

Jones Bros. Contractors, LLC $24.0000 $27,720.00

797-11.32 RETIREIN PLACE EXISTING SEWER 15IN-24IN

L.F.630.000

Summers-Taylor, Inc. $24.0000 $15,120.00

Jones Bros. Contractors, LLC $36.0000 $22,680.00

797-11.38 BY-PASS PUMPING

LS1.000

Summers-Taylor, Inc. $85,000.0000 $85,000.00

Jones Bros. Contractors, LLC $34,000.0000 $34,000.00

34PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Summers-Taylor, Inc. $11,543,439.51

Jones Bros. Contractors, LLC $12,285,933.44

SUB-TOTAL BOX BRIDGE

Summers-Taylor, Inc. $592,148.00

Jones Bros. Contractors, LLC $653,652.65

SUB-TOTAL BRIDGE

Summers-Taylor, Inc. $546,390.00

Jones Bros. Contractors, LLC $374,432.92

SUB-TOTAL UTILITY

Summers-Taylor, Inc. $2,586,863.75

Jones Bros. Contractors, LLC $2,935,940.61

Summers-Taylor, Inc. $15,268,841.26

Jones Bros. Contractors, LLC $16,249,959.62

35PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

WHITE COUNTY (Contract No. CNT110 Call 058)

THE REPAIR OF THE BRIDGE ON U.S. 70 (S.R. 1) OVER THE CALFKILLER RIVER (L.M. 9.35) IN SPARTA.

PROJECT LENGTH -

93001-4263-04

0.0 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Southern Constructors, Inc. $798,930.00

Mid-State Construction Company, Inc. $959,142.30

1PAGE

EXTENSION

CONTRACT CNT110

UNIT PRICE

BRIDGE CATEGORY

201-05.31 VEGETATION REMOVAL

LS1.000

Southern Constructors, Inc. $10,000.0000 $10,000.00

Mid-State Construction Company, Inc. $2,340.1000 $2,340.10

202-01.03 REMOVAL OF TRASH AND DEBRIS

LS1.000

Southern Constructors, Inc. $30,000.0000 $30,000.00

Mid-State Construction Company, Inc. $38,532.1700 $38,532.17

209-08.02 TEMPORARY SILT FENCE (WITH BACKING)

L.F.300.000

Southern Constructors, Inc. $8.0000 $2,400.00

Mid-State Construction Company, Inc. $5.6600 $1,698.00

307-02.08 ASPHALT CONCRETE MIX (PG70-22) (BPMB-HM) GRADING B-M2

TON184.000

Southern Constructors, Inc. $190.0000 $34,960.00

Mid-State Construction Company, Inc. $213.4100 $39,267.44

411-02.10 ACS MIX(PG70-22) GRADING D

TON166.000

Southern Constructors, Inc. $230.0000 $38,180.00

Mid-State Construction Company, Inc. $262.1900 $43,523.54

415-01.02 COLD PLANING BITUMINOUS PAVEMENT

S.Y.860.000

Southern Constructors, Inc. $35.0000 $30,100.00

Mid-State Construction Company, Inc. $36.5900 $31,467.40

602-10.28 PEDESTRIAN SIDEWALK REPAIRS

LS1.000

Southern Constructors, Inc. $4,000.0000 $4,000.00

Mid-State Construction Company, Inc. $6,516.4600 $6,516.46

603-02.15 REPAINT EXISTING BEARINGS

LS1.000

Southern Constructors, Inc. $30,000.0000 $30,000.00

Mid-State Construction Company, Inc. $35,121.6000 $35,121.60

603-05.20 CONTAINMENT & DISPOSAL OF WASTE(BEARINGS)

LS1.000

Southern Constructors, Inc. $10,000.0000 $10,000.00

Mid-State Construction Company, Inc. $6,097.5000 $6,097.50

604-04.02 APPLIED TEXTURE FINISH (EXISTING STRUCTURES)

S.Y.2,570.000

Southern Constructors, Inc. $12.0000 $30,840.00

Mid-State Construction Company, Inc. $12.2000 $31,354.00

2PAGE

EXTENSION

CONTRACT CNT110

UNIT PRICE

604-10.05 CONCRETE

S.F.352.000

Southern Constructors, Inc. $120.0000 $42,240.00

Mid-State Construction Company, Inc. $156.4000 $55,052.80

604-10.14 REMOVE EXISTING WEARING SURFACE

LS1.000

Southern Constructors, Inc. $35,000.0000 $35,000.00

Mid-State Construction Company, Inc. $35,365.5000 $35,365.50

604-10.17 NON-PENETRATING CONCRETE SEAL

S.Y.400.000

Southern Constructors, Inc. $22.0000 $8,800.00

Mid-State Construction Company, Inc. $30.5400 $12,216.00

604-10.30 BRIDGE DECK REPAIRS (FULL DEPTH OF SLAB)

S.Y.10.000

Southern Constructors, Inc. $600.0000 $6,000.00

Mid-State Construction Company, Inc. $505.8500 $5,058.50

604-10.42 CONCRETE REPAIRS

C.F.95.000

Southern Constructors, Inc. $250.0000 $23,750.00

Mid-State Construction Company, Inc. $844.3800 $80,216.10

604-10.44 EXPANSION JOINT REPAIRS

L.F.320.000

Southern Constructors, Inc. $25.0000 $8,000.00

Mid-State Construction Company, Inc. $129.0100 $41,283.20

604-10.45 EXPANSION JOINT REPAIRS (TYPE F)

L.F.80.000

Southern Constructors, Inc. $600.0000 $48,000.00

Mid-State Construction Company, Inc. $811.9800 $64,958.40

604-10.50 BRIDGE DECK REPAIRS (PARTIAL DEPTH OF SLAB)

S.Y.265.000

Southern Constructors, Inc. $190.0000 $50,350.00

Mid-State Construction Company, Inc. $183.5600 $48,643.40

604-10.54 CONCRETE REPAIRS

S.F.351.000

Southern Constructors, Inc. $120.0000 $42,120.00

Mid-State Construction Company, Inc. $156.4100 $54,899.91

604-10.55 CONCRETE (FOUNDATION REPAIRS)

C.Y.5.000

Southern Constructors, Inc. $1,800.0000 $9,000.00

Mid-State Construction Company, Inc. $1,538.2900 $7,691.45

3PAGE

EXTENSION

CONTRACT CNT110

UNIT PRICE

604-10.58 EPOXY INJECTION (INJECTION)

GAL.26.000

Southern Constructors, Inc. $110.0000 $2,860.00

Mid-State Construction Company, Inc. $182.9300 $4,756.18

604-10.62 EPOXY INJECTION REPAIR (COMPLETE AND IN PLACE)

L.F.255.000

Southern Constructors, Inc. $110.0000 $28,050.00

Mid-State Construction Company, Inc. $48.7800 $12,438.90

617-01 BRIDGE DECK SEALANT

S.Y.2,000.000

Southern Constructors, Inc. $18.0000 $36,000.00

Mid-State Construction Company, Inc. $26.5200 $53,040.00

701-01.10 CONCRETE SIDEWALK (DESCRIPTION)

S.F.180.000

Southern Constructors, Inc. $25.0000 $4,500.00

Mid-State Construction Company, Inc. $36.1500 $6,507.00

705-04.50 PORTABLE BARRIER RAIL DELINEATOR

EACH34.000

Southern Constructors, Inc. $15.0000 $510.00

Mid-State Construction Company, Inc. $15.8500 $538.90

705-08.51 PORTABLE IMPACT ATTENUATOR NCHRP350 TL-3

EACH3.000

Southern Constructors, Inc. $5,000.0000 $15,000.00

Mid-State Construction Company, Inc. $1,829.2500 $5,487.75

709-02.02 SACKED SAND CEMENT RIPRAP

C.Y.11.000

Southern Constructors, Inc. $900.0000 $9,900.00

Mid-State Construction Company, Inc. $861.4400 $9,475.84

712-01 TRAFFIC CONTROL

LS1.000

Southern Constructors, Inc. $40,000.0000 $40,000.00

Mid-State Construction Company, Inc. $24,869.3800 $24,869.38

712-02.02 INTERCONNECTED PORTABLE BARRIER RAIL

L.F.670.000

Southern Constructors, Inc. $33.0000 $22,110.00

Mid-State Construction Company, Inc. $41.1000 $27,537.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH75.000

Southern Constructors, Inc. $30.0000 $2,250.00

Mid-State Construction Company, Inc. $30.4900 $2,286.75

4PAGE

EXTENSION

CONTRACT CNT110

UNIT PRICE

712-05.01 WARNING LIGHTS (TYPE A)

EACH4.000

Southern Constructors, Inc. $40.0000 $160.00

Mid-State Construction Company, Inc. $42.6800 $170.72

712-06 SIGNS (CONSTRUCTION)

S.F.271.000

Southern Constructors, Inc. $15.0000 $4,065.00

Mid-State Construction Company, Inc. $7.9300 $2,149.03

712-07.03 TEMPORARY BARRICADES (TYPE III)

L.F.48.000

Southern Constructors, Inc. $20.0000 $960.00

Mid-State Construction Company, Inc. $17.0700 $819.36

712-08.03 ARROW BOARD (TYPE C)

EACH2.000

Southern Constructors, Inc. $2,200.0000 $4,400.00

Mid-State Construction Company, Inc. $1,280.4800 $2,560.96

712-09.02 REMOVABLE PAVEMENT MARKING (8" BARRIER LINE)

L.F.16,200.000

Southern Constructors, Inc. $4.0000 $64,800.00

Mid-State Construction Company, Inc. $3.9000 $63,180.00

712-09.04 REMOVABLE PAVEMENT MARKING (STOP LINE)

L.F.100.000

Southern Constructors, Inc. $20.0000 $2,000.00

Mid-State Construction Company, Inc. $14.6300 $1,463.00

713-16.01 CHANGEABLE MESSAGE SIGN UNIT

EACH2.000

Southern Constructors, Inc. $5,500.0000 $11,000.00

Mid-State Construction Company, Inc. $6,097.5000 $12,195.00

716-01.06 TEMPORARY RAISED PAVEMENT MARKER,WHITE

EACH74.000

Southern Constructors, Inc. $15.0000 $1,110.00

Mid-State Construction Company, Inc. $12.2000 $902.80

716-01.07 TEMPORARY RAISED PAVEMENT MARKER,YELLOW

EACH127.000

Southern Constructors, Inc. $15.0000 $1,905.00

Mid-State Construction Company, Inc. $12.2000 $1,549.40

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH28.000

Southern Constructors, Inc. $100.0000 $2,800.00

Mid-State Construction Company, Inc. $91.4600 $2,560.88

5PAGE

EXTENSION

CONTRACT CNT110

UNIT PRICE

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.68.000

Southern Constructors, Inc. $15.0000 $1,020.00

Mid-State Construction Company, Inc. $14.6300 $994.84

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH1.000

Southern Constructors, Inc. $200.0000 $200.00

Mid-State Construction Company, Inc. $182.9300 $182.93

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.3.000

Southern Constructors, Inc. $3,000.0000 $9,000.00

Mid-State Construction Company, Inc. $3,414.6000 $10,243.80

717-01 MOBILIZATION

LS1.000

Southern Constructors, Inc. $39,000.0000 $39,000.00

Mid-State Construction Company, Inc. $70,702.3100 $70,702.31

730-14.02 SAW SLOT

L.F.210.000

Southern Constructors, Inc. $5.0000 $1,050.00

Mid-State Construction Company, Inc. $4.2700 $896.70

730-14.03 LOOP WIRE

L.F.540.000

Southern Constructors, Inc. $1.0000 $540.00

Mid-State Construction Company, Inc. $0.6100 $329.40

6PAGE

TOTAL CONTRACT

SUB-TOTAL BRIDGE

Southern Constructors, Inc. $798,930.00

Mid-State Construction Company, Inc. $959,142.30

Southern Constructors, Inc. $798,930.00

Mid-State Construction Company, Inc. $959,142.30

7PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

WILLIAMSON COUNTY (Contract No. CNT111 Call 059)

7.00%DBE GOAL

THE RESURFACING ON S.R. 46 FROM NORTH OF SETTLERS COURT (L.M. 5.46) TO NEAR NATCHEZ TRACE PARKWAY (L.M. 12.00).

PROJECT LENGTH -

STP/HSIP-46(34),94017-3217-94,94017-8217-14

6.540 MILES

COMPLETION TIME - ON OR BEFORE SEPTEMBER 30, 2019

TOTAL CONTRACT

Tennessee Valley Paving Co., Inc. $919,392.00

Volunteer Paving, LLC $949,590.54

Jones Bros. Contractors, LLC $997,867.98

Eubank Asphalt Paving & Sealing $1,044,338.00

Vulcan Construction Materials, LLC $1,162,382.50

1PAGE

EXTENSION

CONTRACT CNT111

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.13.100

Tennessee Valley Paving Co., Inc. $535.0000 $7,008.50

Volunteer Paving, LLC $1,435.5400 $18,805.57

Jones Bros. Contractors, LLC $1,000.0000 $13,100.00

Eubank Asphalt Paving & Sealing $700.0000 $9,170.00

Vulcan Construction Materials, LLC $1,800.0000 $23,580.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,245.000

Tennessee Valley Paving Co., Inc. $10.0000 $12,450.00

Volunteer Paving, LLC $17.8900 $22,273.05

Jones Bros. Contractors, LLC $15.0000 $18,675.00

Eubank Asphalt Paving & Sealing $25.0000 $31,125.00

Vulcan Construction Materials, LLC $20.0000 $24,900.00

307-01.08 ASPHALT CONCRETE MIX (PG64-22) (BPMB-HM) GRADING B-M2

TON1,000.000

Tennessee Valley Paving Co., Inc. $75.0000 $75,000.00

Volunteer Paving, LLC $78.0100 $78,010.00

Jones Bros. Contractors, LLC $75.0000 $75,000.00

Eubank Asphalt Paving & Sealing $88.0000 $88,000.00

Vulcan Construction Materials, LLC $104.0000 $104,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON32.000

Tennessee Valley Paving Co., Inc. $600.0000 $19,200.00

Volunteer Paving, LLC $631.5800 $20,210.56

Jones Bros. Contractors, LLC $600.0000 $19,200.00

Eubank Asphalt Paving & Sealing $469.0000 $15,008.00

Vulcan Construction Materials, LLC $900.0000 $28,800.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON6,831.000

Tennessee Valley Paving Co., Inc. $78.0000 $532,818.00

Volunteer Paving, LLC $85.7400 $585,689.94

Jones Bros. Contractors, LLC $98.0000 $669,438.00

Eubank Asphalt Paving & Sealing $95.0000 $648,945.00

Vulcan Construction Materials, LLC $104.0000 $710,424.00

411-12.04 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (4IN WIDTH)

L.M.9.500

Tennessee Valley Paving Co., Inc. $995.0000 $9,452.50

Volunteer Paving, LLC $475.0000 $4,512.50

Jones Bros. Contractors, LLC $475.0000 $4,512.50

Eubank Asphalt Paving & Sealing $500.0000 $4,750.00

Vulcan Construction Materials, LLC $325.0000 $3,087.50

2PAGE

EXTENSION

CONTRACT CNT111

UNIT PRICE

705-02.02 SINGLE GUARDRAIL (TYPE 2)

L.F.50.000

Tennessee Valley Paving Co., Inc. $28.0000 $1,400.00

Volunteer Paving, LLC $19.0000 $950.00

Jones Bros. Contractors, LLC $19.0000 $950.00

Eubank Asphalt Paving & Sealing $25.0000 $1,250.00

Vulcan Construction Materials, LLC $17.0000 $850.00

705-02.10 GUARDRAIL TRANSITION 27IN TO 31IN

EACH15.000

Tennessee Valley Paving Co., Inc. $165.0000 $2,475.00

Volunteer Paving, LLC $100.0000 $1,500.00

Jones Bros. Contractors, LLC $100.0000 $1,500.00

Eubank Asphalt Paving & Sealing $200.0000 $3,000.00

Vulcan Construction Materials, LLC $75.0000 $1,125.00

705-06.20 TANGENT ENERGY ABSORBING TERM MASH TL-3

EACH11.000

Tennessee Valley Paving Co., Inc. $3,200.0000 $35,200.00

Volunteer Paving, LLC $2,600.0000 $28,600.00

Jones Bros. Contractors, LLC $2,600.0000 $28,600.00

Eubank Asphalt Paving & Sealing $2,800.0000 $30,800.00

Vulcan Construction Materials, LLC $2,800.0000 $30,800.00

705-06.30 GR TERMINAL (ENERGY ABSORBING) MASH TL2

EACH4.000

Tennessee Valley Paving Co., Inc. $3,000.0000 $12,000.00

Volunteer Paving, LLC $2,100.0000 $8,400.00

Jones Bros. Contractors, LLC $2,100.0000 $8,400.00

Eubank Asphalt Paving & Sealing $2,550.0000 $10,200.00

Vulcan Construction Materials, LLC $2,450.0000 $9,800.00

706-01 GUARDRAIL REMOVED

L.F.700.000

Tennessee Valley Paving Co., Inc. $7.0000 $4,900.00

Volunteer Paving, LLC $1.0000 $700.00

Jones Bros. Contractors, LLC $1.0000 $700.00

Eubank Asphalt Paving & Sealing $1.0000 $700.00

Vulcan Construction Materials, LLC $1.0000 $700.00

712-01 TRAFFIC CONTROL

LS1.000

Tennessee Valley Paving Co., Inc. $26,500.0000 $26,500.00

Volunteer Paving, LLC $21,315.7900 $21,315.79

Jones Bros. Contractors, LLC $21,397.8800 $21,397.88

Eubank Asphalt Paving & Sealing $10,000.0000 $10,000.00

Vulcan Construction Materials, LLC $55,000.0000 $55,000.00

3PAGE

EXTENSION

CONTRACT CNT111

UNIT PRICE

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH25.000

Tennessee Valley Paving Co., Inc. $20.0000 $500.00

Volunteer Paving, LLC $5.0000 $125.00

Jones Bros. Contractors, LLC $5.0000 $125.00

Eubank Asphalt Paving & Sealing $10.0000 $250.00

Vulcan Construction Materials, LLC $10.0000 $250.00

712-06 SIGNS (CONSTRUCTION)

S.F.1,024.000

Tennessee Valley Paving Co., Inc. $8.0000 $8,192.00

Volunteer Paving, LLC $6.6500 $6,809.60

Jones Bros. Contractors, LLC $6.6500 $6,809.60

Eubank Asphalt Paving & Sealing $8.0000 $8,192.00

Vulcan Construction Materials, LLC $9.2500 $9,472.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH440.000

Tennessee Valley Paving Co., Inc. $30.0000 $13,200.00

Volunteer Paving, LLC $20.0000 $8,800.00

Jones Bros. Contractors, LLC $30.0000 $13,200.00

Eubank Asphalt Paving & Sealing $30.0000 $13,200.00

Vulcan Construction Materials, LLC $35.0000 $15,400.00

716-02.03 PLASTIC PAVEMENT MARKING (CROSS-WALK)

L.F.50.000

Tennessee Valley Paving Co., Inc. $8.0000 $400.00

Volunteer Paving, LLC $7.5000 $375.00

Jones Bros. Contractors, LLC $14.0000 $700.00

Eubank Asphalt Paving & Sealing $8.0000 $400.00

Vulcan Construction Materials, LLC $12.0000 $600.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.625.000

Tennessee Valley Paving Co., Inc. $30.0000 $18,750.00

Volunteer Paving, LLC $15.0000 $9,375.00

Jones Bros. Contractors, LLC $63.0000 $39,375.00

Eubank Asphalt Paving & Sealing $30.0000 $18,750.00

Vulcan Construction Materials, LLC $20.0000 $12,500.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.175.000

Tennessee Valley Paving Co., Inc. $20.0000 $3,500.00

Volunteer Paving, LLC $15.0000 $2,625.00

Jones Bros. Contractors, LLC $14.0000 $2,450.00

Eubank Asphalt Paving & Sealing $20.0000 $3,500.00

Vulcan Construction Materials, LLC $15.0000 $2,625.00

4PAGE

EXTENSION

CONTRACT CNT111

UNIT PRICE

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.2.700

Tennessee Valley Paving Co., Inc. $850.0000 $2,295.00

Volunteer Paving, LLC $850.0000 $2,295.00

Jones Bros. Contractors, LLC $400.0000 $1,080.00

Eubank Asphalt Paving & Sealing $850.0000 $2,295.00

Vulcan Construction Materials, LLC $1,200.0000 $3,240.00

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.12.900

Tennessee Valley Paving Co., Inc. $5,280.0000 $68,112.00

Volunteer Paving, LLC $5,000.0000 $64,500.00

Jones Bros. Contractors, LLC $2,640.0000 $34,056.00

Eubank Asphalt Paving & Sealing $5,280.0000 $68,112.00

Vulcan Construction Materials, LLC $5,200.0000 $67,080.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.13.100

Tennessee Valley Paving Co., Inc. $2,300.0000 $30,130.00

Volunteer Paving, LLC $2,000.0000 $26,200.00

Jones Bros. Contractors, LLC $1,900.0000 $24,890.00

Eubank Asphalt Paving & Sealing $2,300.0000 $30,130.00

Vulcan Construction Materials, LLC $2,400.0000 $31,440.00

717-01 MOBILIZATION

LS1.000

Tennessee Valley Paving Co., Inc. $32,200.0000 $32,200.00

Volunteer Paving, LLC $34,210.5300 $34,210.53

Jones Bros. Contractors, LLC $10,000.0000 $10,000.00

Eubank Asphalt Paving & Sealing $42,000.0000 $42,000.00

Vulcan Construction Materials, LLC $23,000.0000 $23,000.00

730-14.02 SAW SLOT

L.F.802.000

Tennessee Valley Paving Co., Inc. $3.5000 $2,807.00

Volunteer Paving, LLC $3.0000 $2,406.00

Jones Bros. Contractors, LLC $3.5000 $2,807.00

Eubank Asphalt Paving & Sealing $4.0000 $3,208.00

Vulcan Construction Materials, LLC $3.5000 $2,807.00

730-14.03 LOOP WIRE

L.F.1,804.000

Tennessee Valley Paving Co., Inc. $0.5000 $902.00

Volunteer Paving, LLC $0.5000 $902.00

Jones Bros. Contractors, LLC $0.5000 $902.00

Eubank Asphalt Paving & Sealing $0.7500 $1,353.00

Vulcan Construction Materials, LLC $0.5000 $902.00

5PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Tennessee Valley Paving Co., Inc. $919,392.00

Volunteer Paving, LLC $949,590.54

Jones Bros. Contractors, LLC $997,867.98

Eubank Asphalt Paving & Sealing $1,044,338.00

Vulcan Construction Materials, LLC $1,162,382.50

Tennessee Valley Paving Co., Inc. $919,392.00

Volunteer Paving, LLC $949,590.54

Jones Bros. Contractors, LLC $997,867.98

Eubank Asphalt Paving & Sealing $1,044,338.00

Vulcan Construction Materials, LLC $1,162,382.50

6PAGE

DEPARTMENT OF TRANSPORTATION

SUMMARY OF BIDS

LETTING OF

STATE OF TENNESSEE

MARCH 29, 2019

WILSON COUNTY (Contract No. CNT112 Call 060)

8.00%DBE GOAL

THE RESURFACING ON U.S. 231 (S.R. 10) FROM MARKET STREET TO NEAR FORREST AVENUE, ON U.S. 70N (S.R. 24) FROM U.S. 70 (S.R.26) TO THE SMITH COUNTY LINE AND ON S.R. 141 FROM EAST OF STOKES STREET TO SUGAR FLAT ROAD.

PROJECT LENGTH -

95005-4211-04,95014-4226-04,STP-141(37),95014-8226-14,STP-NH/HSIP-10(75),95003-3220-94,95003-8220-14

14.050 MILES

COMPLETION TIME - ON OR BEFORE OCTOBER 31, 2019

TOTAL CONTRACT

Jones Bros. Contractors, LLC $2,246,449.49

BWI MTN ii Inc. & dba Blue Water Industries $2,470,915.50

Vulcan Construction Materials, LLC $2,532,101.35

1PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

ROADWAY CATEGORY

208-01.05 BROOMING & DEGRASSING SHOULDERS

L.M.28.200

Jones Bros. Contractors, LLC $900.0000 $25,380.00

BWI MTN ii Inc. & dba Blue Water Industries $2,250.0000 $63,450.00

Vulcan Construction Materials, LLC $2,000.0000 $56,400.00

303-01 MINERAL AGGREGATE, TYPE A BASE, GRADING D

TON1,251.000

Jones Bros. Contractors, LLC $25.0000 $31,275.00

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $31,275.00

Vulcan Construction Materials, LLC $31.5000 $39,406.50

307-01.15 ASC MIX (PG64-22) (BPMLC-HM) GRADING CS

TON2,000.000

Jones Bros. Contractors, LLC $100.0000 $200,000.00

BWI MTN ii Inc. & dba Blue Water Industries $90.0000 $180,000.00

Vulcan Construction Materials, LLC $94.0000 $188,000.00

403-01 BITUMINOUS MATERIAL FOR TACK COAT (TC)

TON86.200

Jones Bros. Contractors, LLC $580.0000 $49,996.00

BWI MTN ii Inc. & dba Blue Water Industries $875.0000 $75,425.00

Vulcan Construction Materials, LLC $900.0000 $77,580.00

411-01.10 ACS MIX(PG64-22) GRADING D

TON11,361.000

Jones Bros. Contractors, LLC $91.3000 $1,037,259.30

BWI MTN ii Inc. & dba Blue Water Industries $95.0000 $1,079,295.00

Vulcan Construction Materials, LLC $98.0000 $1,113,378.00

411-02.10 ACS MIX(PG70-22) GRADING D

TON1,475.000

Jones Bros. Contractors, LLC $100.0000 $147,500.00

BWI MTN ii Inc. & dba Blue Water Industries $95.0000 $140,125.00

Vulcan Construction Materials, LLC $110.0000 $162,250.00

411-03.12 ACS MIX(PG64-22) THIN LIFT D ASPHALT

TON2,557.000

Jones Bros. Contractors, LLC $97.1500 $248,412.55

BWI MTN ii Inc. & dba Blue Water Industries $95.0000 $242,915.00

Vulcan Construction Materials, LLC $95.0000 $242,915.00

411-12.03 SCORING FOR RUMBLE STRIPE (NON-CONTINUOUS) (8IN WIDTH)

L.M.20.900

Jones Bros. Contractors, LLC $500.0000 $10,450.00

BWI MTN ii Inc. & dba Blue Water Industries $500.0000 $10,450.00

Vulcan Construction Materials, LLC $500.0000 $10,450.00

2PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

415-01.01 COLD PLANING BITUMINOUS PAVEMENT

TON1,460.000

Jones Bros. Contractors, LLC $20.0000 $29,200.00

BWI MTN ii Inc. & dba Blue Water Industries $19.0000 $27,740.00

Vulcan Construction Materials, LLC $22.0000 $32,120.00

611-03.04 GRAY IRON CASTINGS (CATCHBASIN)

LB.3,750.000

Jones Bros. Contractors, LLC $3.0000 $11,250.00

BWI MTN ii Inc. & dba Blue Water Industries $5.0000 $18,750.00

Vulcan Construction Materials, LLC $5.0000 $18,750.00

701-02.01 CONCRETE CURB RAMP (RETROFIT)

S.F.1,170.000

Jones Bros. Contractors, LLC $36.4500 $42,646.50

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $29,250.00

Vulcan Construction Materials, LLC $40.0000 $46,800.00

701-02.03 CONCRETE CURB RAMP

S.F.130.000

Jones Bros. Contractors, LLC $22.1000 $2,873.00

BWI MTN ii Inc. & dba Blue Water Industries $25.0000 $3,250.00

Vulcan Construction Materials, LLC $40.0000 $5,200.00

701-02.05 DETECTABLE WARNING SURFACE (REHABILITATION)

EACH56.000

Jones Bros. Contractors, LLC $400.0000 $22,400.00

BWI MTN ii Inc. & dba Blue Water Industries $750.0000 $42,000.00

Vulcan Construction Materials, LLC $100.0000 $5,600.00

712-01 TRAFFIC CONTROL

LS1.000

Jones Bros. Contractors, LLC $31,200.0000 $31,200.00

BWI MTN ii Inc. & dba Blue Water Industries $105,000.0000 $105,000.00

Vulcan Construction Materials, LLC $95,000.0000 $95,000.00

712-04.01 FLEXIBLE DRUMS (CHANNELIZING)

EACH150.000

Jones Bros. Contractors, LLC $5.0000 $750.00

BWI MTN ii Inc. & dba Blue Water Industries $5.0000 $750.00

Vulcan Construction Materials, LLC $30.0000 $4,500.00

712-05.01 WARNING LIGHTS (TYPE A)

EACH8.000

Jones Bros. Contractors, LLC $2.0000 $16.00

BWI MTN ii Inc. & dba Blue Water Industries $2.0000 $16.00

Vulcan Construction Materials, LLC $15.0000 $120.00

3PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

712-06 SIGNS (CONSTRUCTION)

S.F.2,870.000

Jones Bros. Contractors, LLC $6.7000 $19,229.00

BWI MTN ii Inc. & dba Blue Water Industries $6.7000 $19,229.00

Vulcan Construction Materials, LLC $9.0000 $25,830.00

716-01.21 SNOWPLOWABLE RAISED PAVMENT MARKERS (BI-DIR) (1 COLOR)

EACH660.000

Jones Bros. Contractors, LLC $30.0000 $19,800.00

BWI MTN ii Inc. & dba Blue Water Industries $30.0000 $19,800.00

Vulcan Construction Materials, LLC $30.0000 $19,800.00

716-01.22 SNOWPLOWABLE RAISED PAVMENT MARKERS (MONO-DIR)(1 COLOR)

EACH140.000

Jones Bros. Contractors, LLC $30.0000 $4,200.00

BWI MTN ii Inc. & dba Blue Water Industries $30.0000 $4,200.00

Vulcan Construction Materials, LLC $30.0000 $4,200.00

716-01.30 REMOVAL OF SNOWPLOWABLE REFLECTIVE MARKER

EACH890.000

Jones Bros. Contractors, LLC $10.0000 $8,900.00

BWI MTN ii Inc. & dba Blue Water Industries $10.0000 $8,900.00

Vulcan Construction Materials, LLC $10.0000 $8,900.00

716-02.04 PLASTIC PAVEMENT MARKING(CHANNELIZATION STRIPING)

S.Y.25.000

Jones Bros. Contractors, LLC $20.0000 $500.00

BWI MTN ii Inc. & dba Blue Water Industries $20.0000 $500.00

Vulcan Construction Materials, LLC $20.0000 $500.00

716-02.05 PLASTIC PAVEMENT MARKING (STOP LINE)

L.F.418.000

Jones Bros. Contractors, LLC $15.0000 $6,270.00

BWI MTN ii Inc. & dba Blue Water Industries $15.0000 $6,270.00

Vulcan Construction Materials, LLC $15.0000 $6,270.00

716-02.06 PLASTIC PAVEMENT MARKING (TURN LANE ARROW)

EACH14.000

Jones Bros. Contractors, LLC $150.0000 $2,100.00

BWI MTN ii Inc. & dba Blue Water Industries $150.0000 $2,100.00

Vulcan Construction Materials, LLC $150.0000 $2,100.00

716-02.08 PLASTIC PAVEMENT MARKING (8" DOTTED LINE)

L.F.800.000

Jones Bros. Contractors, LLC $3.0000 $2,400.00

BWI MTN ii Inc. & dba Blue Water Industries $3.0000 $2,400.00

Vulcan Construction Materials, LLC $3.0000 $2,400.00

4PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

716-02.09 PLASTIC PAVEMENT MARKING (LONGITUDINAL CROSS-WALK)

L.F.750.000

Jones Bros. Contractors, LLC $35.0000 $26,250.00

BWI MTN ii Inc. & dba Blue Water Industries $35.0000 $26,250.00

Vulcan Construction Materials, LLC $35.0000 $26,250.00

716-02.12 PLASTIC PAVEMENT MARKING (8IN LINE)

L.M.0.200

Jones Bros. Contractors, LLC $4,700.0000 $940.00

BWI MTN ii Inc. & dba Blue Water Industries $4,700.0000 $940.00

Vulcan Construction Materials, LLC $1,600.0000 $320.00

716-02.22 PLASTIC AERIAL SPEED BARS

L.F.88.000

Jones Bros. Contractors, LLC $20.0000 $1,760.00

BWI MTN ii Inc. & dba Blue Water Industries $20.0000 $1,760.00

Vulcan Construction Materials, LLC $20.0000 $1,760.00

716-03.01 PLASTIC WORD PAVEMENT MARKING (ONLY)

EACH3.000

Jones Bros. Contractors, LLC $350.0000 $1,050.00

BWI MTN ii Inc. & dba Blue Water Industries $350.0000 $1,050.00

Vulcan Construction Materials, LLC $400.0000 $1,200.00

716-03.03 PLASTIC WORD PAVEMENT MARKING (STOP AHEAD)

EACH1.000

Jones Bros. Contractors, LLC $700.0000 $700.00

BWI MTN ii Inc. & dba Blue Water Industries $700.0000 $700.00

Vulcan Construction Materials, LLC $750.0000 $750.00

716-04.01 PLASTIC PAVEMENT MARKING (STRAIGHT-TURN ARROW)

EACH2.000

Jones Bros. Contractors, LLC $200.0000 $400.00

BWI MTN ii Inc. & dba Blue Water Industries $200.0000 $400.00

Vulcan Construction Materials, LLC $300.0000 $600.00

716-05.01 PAINTED PAVEMENT MARKING (4" LINE)

L.M.6.500

Jones Bros. Contractors, LLC $1,500.0000 $9,750.00

BWI MTN ii Inc. & dba Blue Water Industries $1,500.0000 $9,750.00

Vulcan Construction Materials, LLC $850.0000 $5,525.00

716-12.01 ENHANCED FLATLINE THERMO PVMT MRKNG (4IN LINE)

L.M.2.000

Jones Bros. Contractors, LLC $3,900.0000 $7,800.00

BWI MTN ii Inc. & dba Blue Water Industries $3,900.0000 $7,800.00

Vulcan Construction Materials, LLC $3,500.0000 $7,000.00

5PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

716-12.02 ENHANCED FLATLINE THERMO PVMT MRKNG (6IN LINE)

L.M.13.600

Jones Bros. Contractors, LLC $5,000.0000 $68,000.00

BWI MTN ii Inc. & dba Blue Water Industries $5,000.0000 $68,000.00

Vulcan Construction Materials, LLC $5,000.0000 $68,000.00

716-12.03 ENHANCED FLATLINE THERMO PVMT MRKNG (8IN BARRIER LINE)

L.F.300.000

Jones Bros. Contractors, LLC $4.0000 $1,200.00

BWI MTN ii Inc. & dba Blue Water Industries $4.0000 $1,200.00

Vulcan Construction Materials, LLC $3.0000 $900.00

716-13.01 SPRAY THERMO PVMT MRKNG (60 mil) (4IN LINE)

L.M.16.500

Jones Bros. Contractors, LLC $2,300.0000 $37,950.00

BWI MTN ii Inc. & dba Blue Water Industries $2,300.0000 $37,950.00

Vulcan Construction Materials, LLC $2,200.0000 $36,300.00

716-13.02 SPRAY THERMO PVMT MRKNG (60 mil) (6IN LINE)

L.M.18.500

Jones Bros. Contractors, LLC $3,000.0000 $55,500.00

BWI MTN ii Inc. & dba Blue Water Industries $3,000.0000 $55,500.00

Vulcan Construction Materials, LLC $3,200.0000 $59,200.00

716-13.04 SPRAY THERMO PVMT MRKNG (60 mil) (4IN DOTTED LINE)

L.F.4,500.000

Jones Bros. Contractors, LLC $3.0000 $13,500.00

BWI MTN ii Inc. & dba Blue Water Industries $3.0000 $13,500.00

Vulcan Construction Materials, LLC $1.0000 $4,500.00

717-01 MOBILIZATION

LS1.000

Jones Bros. Contractors, LLC $29,000.0000 $29,000.00

BWI MTN ii Inc. & dba Blue Water Industries $95,000.0000 $95,000.00

Vulcan Construction Materials, LLC $115,000.0000 $115,000.00

730-14.02 SAW SLOT

L.F.2,423.000

Jones Bros. Contractors, LLC $3.4000 $8,238.20

BWI MTN ii Inc. & dba Blue Water Industries $3.5000 $8,480.50

Vulcan Construction Materials, LLC $3.5000 $8,480.50

730-14.03 LOOP WIRE

L.F.5,246.000

Jones Bros. Contractors, LLC $0.5000 $2,623.00

BWI MTN ii Inc. & dba Blue Water Industries $0.5000 $2,623.00

Vulcan Construction Materials, LLC $0.5000 $2,623.00

6PAGE

EXTENSION

CONTRACT CNT112

UNIT PRICE

BRIDGE CATEGORY

617-04.01 TYPE 1 THIN EPOXY OVERLAY (EPOXY-URETHANE)

S.Y.641.000

Jones Bros. Contractors, LLC $43.3400 $27,780.94

BWI MTN ii Inc. & dba Blue Water Industries $42.0000 $26,922.00

Vulcan Construction Materials, LLC $39.3500 $25,223.35

7PAGE

TOTAL CONTRACT

SUB-TOTAL ROADWAY

Jones Bros. Contractors, LLC $2,218,668.55

BWI MTN ii Inc. & dba Blue Water Industries $2,443,993.50

Vulcan Construction Materials, LLC $2,506,878.00

SUB-TOTAL BRIDGE

Jones Bros. Contractors, LLC $27,780.94

BWI MTN ii Inc. & dba Blue Water Industries $26,922.00

Vulcan Construction Materials, LLC $25,223.35

Jones Bros. Contractors, LLC $2,246,449.49

BWI MTN ii Inc. & dba Blue Water Industries $2,470,915.50

Vulcan Construction Materials, LLC $2,532,101.35

8PAGE