state of tennessee-------------------------- · 717-01.04 m & m contract mowing, llc 4.000 each...

3197
CONTRACT CNM800 CALL 001 CAMPBELL PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM800 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE AND STATE ROUTES. PROJECT LENGTH - 43.210 MILES PROJECT REF - PROJ NUM - 98018-4137-04 - - - - - - COUNTY CAMPBELL, AND ANDERSON COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B) TABULATED BY CONSTRUCTION DIVISION CHECKED BY: ---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT SWARTZ MOWING, INC. 91,107.20 M & M CONTRACT MOWING, LLC 92,253.00 ORR CONTRACTING, INC. 98,782.00 SALAZAR CONTRACTING, LLC 103,996.00 BILL LEDFORD & SON, INC. 123,881.00

Upload: others

Post on 27-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • CONTRACT CNM800 CALL 001 CAMPBELL PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM800 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE AND STATE ROUTES.

    PROJECT LENGTH - 43.210 MILES PROJECT REF - PROJ NUM - 98018-4137-04 - - - - - - COUNTY CAMPBELL, AND ANDERSON

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT SWARTZ MOWING, INC. 91,107.20 M & M CONTRACT MOWING, LLC 92,253.00 ORR CONTRACTING, INC. 98,782.00 SALAZAR CONTRACTING, LLC 103,996.00 BILL LEDFORD & SON, INC. 123,881.00

  • CONTRACT CNM800 CAMPBELL PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 SWARTZ MOWING, INC 4.000 EACH 500.0000 2,000.00 717-01.04 M & M CONTRACT MOWING, LLC 4.000 EACH 300.0000 1,200.00 717-01.04 ORR CONTRACTING, INC. 4.000 EACH 250.0000 1,000.00 717-01.04 SALAZAR CONTRACTING, LLC 4.000 EACH 1.0000 4.00 717-01.04 BILL LEDFORD & SON, INC. 4.000 EACH 500.0000 2,000.00

    INVOLUNTARY WORK SUSPENSION (NON-MOWING DAYS) 717-10.01 SWARTZ MOWING, INC 6.000 DAY 500.0000 3,000.00 717-10.01 M & M CONTRACT MOWING, LLC 6.000 DAY 1.0000 6.00 717-10.01 ORR CONTRACTING, INC. 6.000 DAY 1.0000 6.00 717-10.01 SALAZAR CONTRACTING, LLC 6.000 DAY 1.0000 6.00 717-10.01 BILL LEDFORD & SON, INC. 6.000 DAY 500.0000 3,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 SWARTZ MOWING, INC 219.000 L.M. 200.0000 43,800.00 719-02 M & M CONTRACT MOWING, LLC 219.000 L.M. 165.0000 36,135.00 719-02 ORR CONTRACTING, INC. 219.000 L.M. 200.0000 43,800.00 719-02 SALAZAR CONTRACTING, LLC 219.000 L.M. 150.0000 32,850.00 719-02 BILL LEDFORD & SON, INC. 219.000 L.M. 275.0000 60,225.00

    MOWING 806-01 SWARTZ MOWING, INC 1,248.000 ACRE 33.9000 42,307.20 806-01 M & M CONTRACT MOWING, LLC 1,248.000 ACRE 44.0000 54,912.00 806-01 ORR CONTRACTING, INC. 1,248.000 ACRE 43.2500 53,976.00 806-01 SALAZAR CONTRACTING, LLC 1,248.000 ACRE 57.0000 71,136.00 806-01 BILL LEDFORD & SON, INC. 1,248.000 ACRE 47.0000 58,656.00

    SUB-TOTAL MAINTENANCE SWARTZ MOWING, INC 91,107.20 M & M CONTRACT MOWING, LLC 92,253.00 ORR CONTRACTING, INC. 98,782.00 SALAZAR CONTRACTING, LLC 103,996.00 BILL LEDFORD & SON, INC. 123,881.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE SWARTZ MOWING, INC 91,107.20 M & M CONTRACT MOWING, LLC 92,253.00 ORR CONTRACTING, INC. 98,782.00 SALAZAR CONTRACTING, LLC 103,996.00 BILL LEDFORD & SON, INC. 123,881.00

    TOTAL CONTRACT SWARTZ MOWING, INC 91,107.20 M & M CONTRACT MOWING, LLC 92,253.00 ORR CONTRACTING, INC. 98,782.00 SALAZAR CONTRACTING, LLC 103,996.00 BILL LEDFORD & SON, INC. 123,881.00

  • CONTRACT CNM801 CALL 002 ANDERSON PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM801 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 352.870 MILES PROJECT REF - PROJ NUM - 98018-4238-04 - - - - - - COUNTY ANDERSON, CAMPBELL, CLAIBORNE, SCOTT, AND UNION

    COMPLETION TIME - ON OR BEFORE DECEMBER 31, 2013 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT ORR CONTRACTING, INC. 163,656.00 SWARTZ MOWING, INC. 174,000.00 SALAZAR CONTRACTING, LLC 178,811.50 BILL LEDFORD & SON, INC. 192,300.00 DILLARD FARMS 199,999.95

  • CONTRACT CNM801 ANDERSON PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 ORR CONTRACTING, INC. 3.000 EACH 500.0000 1,500.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,800.0000 5,400.00 717-01.04 SALAZAR CONTRACTING, LLC 3.000 EACH 33.3330 100.00 717-01.04 BILL LEDFORD & SON, INC. 3.000 EACH 1,000.0000 3,000.00 717-01.04 DILLARD FARMS 3.000 EACH 1,819.9500 5,459.85

    INVOLUNTARY WORK SUSPENSION (NON-MOWING DAYS) 717-10.01 ORR CONTRACTING, INC. 6.000 DAY 1.0000 6.00 717-10.01 SWARTZ MOWING, INC 6.000 DAY 500.0000 3,000.00 717-10.01 SALAZAR CONTRACTING, LLC 6.000 DAY 0.2500 1.50 717-10.01 BILL LEDFORD & SON, INC. 6.000 DAY 500.0000 3,000.00 717-10.01 DILLARD FARMS 6.000 DAY 804.1000 4,824.60

    MOWING 806-01 ORR CONTRACTING, INC. 3,450.000 ACRE 47.0000 162,150.00 806-01 SWARTZ MOWING, INC 3,450.000 ACRE 48.0000 165,600.00 806-01 SALAZAR CONTRACTING, LLC 3,450.000 ACRE 51.8000 178,710.00 806-01 BILL LEDFORD & SON, INC. 3,450.000 ACRE 54.0000 186,300.00 806-01 DILLARD FARMS 3,450.000 ACRE 54.9900 189,715.50

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 163,656.00 SWARTZ MOWING, INC 174,000.00 SALAZAR CONTRACTING, LLC 178,811.50 BILL LEDFORD & SON, INC. 192,300.00 DILLARD FARMS 199,999.95 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 163,656.00 SWARTZ MOWING, INC 174,000.00 SALAZAR CONTRACTING, LLC 178,811.50 BILL LEDFORD & SON, INC. 192,300.00 DILLARD FARMS 199,999.95

    TOTAL CONTRACT ORR CONTRACTING, INC. 163,656.00 SWARTZ MOWING, INC 174,000.00 SALAZAR CONTRACTING, LLC 178,811.50 BILL LEDFORD & SON, INC. 192,300.00 DILLARD FARMS 199,999.95

  • CONTRACT CNM802 CALL 003 BEDFORD PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM802 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 289.200 MILES PROJECT REF - PROJ NUM - 98300-4263-04 - - - - - - COUNTY BEDFORD, MARSHALL, MAURY, AND MOORE

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 215,542.25 CAUDILL MOWING, INC. 245,465.50 SWARTZ MOWING, INC. 338,763.10

  • CONTRACT CNM802 BEDFORD PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 VANDERBILT LANDSCAPING LLC 3.000 EACH 1.0000 3.00 717-01.04 CAUDILL MOWING, INC. 3.000 EACH 1.0000 3.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,000.0000 3,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 VANDERBILT LANDSCAPING LLC 868.000 L.M. 125.0000 108,500.00 719-02 CAUDILL MOWING, INC. 868.000 L.M. 106.0000 92,008.00 719-02 SWARTZ MOWING, INC 868.000 L.M. 169.0000 146,692.00

    MOWING 806-01 VANDERBILT LANDSCAPING LLC 3,789.000 ACRE 28.2500 107,039.25 806-01 CAUDILL MOWING, INC. 3,789.000 ACRE 40.5000 153,454.50 806-01 SWARTZ MOWING, INC 3,789.000 ACRE 49.9000 189,071.10

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 215,542.25 CAUDILL MOWING, INC. 245,465.50 SWARTZ MOWING, INC 338,763.10 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 215,542.25 CAUDILL MOWING, INC. 245,465.50 SWARTZ MOWING, INC 338,763.10

    TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 215,542.25 CAUDILL MOWING, INC. 245,465.50 SWARTZ MOWING, INC 338,763.10

  • CONTRACT CNM803 CALL 004 BENTON PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM803 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE SWATH MOWING AND LITTER REMOVAL ON I-40.

    PROJECT LENGTH - 52.700 MILES PROJECT REF - PROJ NUM - 98048-4128-04 - - - - - - COUNTY BENTON, CARROLL, DECATUR, HENDERSON, AND MADISON

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT J. R. CONSTRUCTION, INC. 126,484.00 SWARTZ MOWING, INC. 172,383.00

  • CONTRACT CNM803 BENTON PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 J. R. CONSTRUCTION, INC. 4.000 EACH 1.0000 4.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 1,000.0000 4,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 J. R. CONSTRUCTION, INC. 211.000 L.M. 160.0000 33,760.00 719-02 SWARTZ MOWING, INC 211.000 L.M. 275.0000 58,025.00

    MOWING 806-01 J. R. CONSTRUCTION, INC. 806.000 ACRE 40.0000 32,240.00 806-01 SWARTZ MOWING, INC 806.000 ACRE 45.0000 36,270.00

    SWATH MOWING 806-02.13 J. R. CONSTRUCTION, INC. 1,512.000 ACRE 40.0000 60,480.00 806-02.13 SWARTZ MOWING, INC 1,512.000 ACRE 49.0000 74,088.00

    SUB-TOTAL MAINTENANCE J. R. CONSTRUCTION, INC. 126,484.00 SWARTZ MOWING, INC 172,383.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE J. R. CONSTRUCTION, INC. 126,484.00 SWARTZ MOWING, INC 172,383.00

    TOTAL CONTRACT J. R. CONSTRUCTION, INC. 126,484.00 SWARTZ MOWING, INC 172,383.00

  • CONTRACT CNM804 CALL 005 BENTON PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM804 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 796.260 MILES PROJECT REF - PROJ NUM - 98048-4229-04 - - - - - - COUNTY BENTON, CARROLL, DECATUR, HENRY, OBION, AND WEAKLEY

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT A & W LEASING CORPORATION 604,242.70 J. R. CONSTRUCTION, INC. 612,137.00 SWARTZ MOWING, INC. 1,075,270.00

  • CONTRACT CNM804 BENTON PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 A & W LEASING CORPORATION 4.000 EACH 1.0000 4.00 717-01.04 J. R. CONSTRUCTION, INC. 4.000 EACH 1.0000 4.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 1,500.0000 6,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 A & W LEASING CORPORATION 2,389.000 L.M. 90.0000 215,010.00 719-02 J. R. CONSTRUCTION, INC. 2,389.000 L.M. 100.0000 238,900.00 719-02 SWARTZ MOWING, INC 2,389.000 L.M. 150.0000 358,350.00

    MOWING 806-01 A & W LEASING CORPORATION 17,773.000 ACRE 21.9000 389,228.70 806-01 J. R. CONSTRUCTION, INC. 17,773.000 ACRE 21.0000 373,233.00 806-01 SWARTZ MOWING, INC 17,773.000 ACRE 40.0000 710,920.00

    SUB-TOTAL MAINTENANCE A & W LEASING CORPORATION 604,242.70 J. R. CONSTRUCTION, INC. 612,137.00 SWARTZ MOWING, INC 1,075,270.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE A & W LEASING CORPORATION 604,242.70 J. R. CONSTRUCTION, INC. 612,137.00 SWARTZ MOWING, INC 1,075,270.00

    TOTAL CONTRACT A & W LEASING CORPORATION 604,242.70 J. R. CONSTRUCTION, INC. 612,137.00 SWARTZ MOWING, INC 1,075,270.00

  • CONTRACT CNM805 CALL 006 BLEDSOE PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM805 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 364.990 MILES PROJECT REF - PROJ NUM - 98027-4294-04 - - - - - - COUNTY BLEDSOE, GRUNDY, MARION, SEQUATCHIE, AND VAN BUREN

    COMPLETION TIME - ON OR BEFORE DECEMBER 31, 2013 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT BLEVINS ENTERPRISES, INC. 216,049.00 LOVIN CONTRACTING COMPANY, INC. 218,749.00 M & M CONTRACT MOWING, LLC 239,366.00 BUMBALOUGH'S CONSTRUCTION 245,738.38 SALAZAR CONTRACTING, LLC 248,105.30 SWARTZ MOWING, INC. 304,363.80

  • CONTRACT CNM805 BLEDSOE PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 BLEVINS ENTERPRISES, INC. 3.000 EACH 100.0000 300.00 717-01.04 LOVIN CONTRACTING COMPANY, INC. 3.000 EACH 1,000.0000 3,000.00 717-01.04 M & M CONTRACT MOWING, LLC 3.000 EACH 1,500.0000 4,500.00 717-01.04 BUMBALOUGH'S CONSTRUCTION 3.000 EACH 1.0000 3.00 717-01.04 SALAZAR CONTRACTING, LLC 3.000 EACH 43.5000 130.50 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,500.0000 4,500.00

    MOWING 806-01 BLEVINS ENTERPRISES, INC. 5,462.000 ACRE 39.5000 215,749.00 806-01 LOVIN CONTRACTING COMPANY, INC. 5,462.000 ACRE 39.5000 215,749.00 806-01 M & M CONTRACT MOWING, LLC 5,462.000 ACRE 43.0000 234,866.00 806-01 BUMBALOUGH'S CONSTRUCTION 5,462.000 ACRE 44.9900 245,735.38 806-01 SALAZAR CONTRACTING, LLC 5,462.000 ACRE 45.4000 247,974.80 806-01 SWARTZ MOWING, INC 5,462.000 ACRE 54.9000 299,863.80

    SUB-TOTAL MAINTENANCE BLEVINS ENTERPRISES, INC. 216,049.00 LOVIN CONTRACTING COMPANY, INC. 218,749.00 M & M CONTRACT MOWING, LLC 239,366.00 BUMBALOUGH'S CONSTRUCTION 245,738.38 SALAZAR CONTRACTING, LLC 248,105.30 SWARTZ MOWING, INC 304,363.80 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE BLEVINS ENTERPRISES, INC. 216,049.00 LOVIN CONTRACTING COMPANY, INC. 218,749.00 M & M CONTRACT MOWING, LLC 239,366.00 BUMBALOUGH'S CONSTRUCTION 245,738.38 SALAZAR CONTRACTING, LLC 248,105.30 SWARTZ MOWING, INC 304,363.80

    TOTAL CONTRACT BLEVINS ENTERPRISES, INC. 216,049.00 LOVIN CONTRACTING COMPANY, INC. 218,749.00 M & M CONTRACT MOWING, LLC 239,366.00 BUMBALOUGH'S CONSTRUCTION 245,738.38 SALAZAR CONTRACTING, LLC 248,105.30 SWARTZ MOWING, INC 304,363.80

  • CONTRACT CNM806 CALL 007 BLOUNT PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM806 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE AND STATE ROUTES.

    PROJECT LENGTH - 251.370 MILES PROJECT REF - PROJ NUM - 98018-4139-04 - - - - - - COUNTY BLOUNT, AND SEVIER

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT ORR CONTRACTING, INC. 161,513.00 SWARTZ MOWING, INC. 190,238.00

  • CONTRACT CNM806 BLOUNT PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 ORR CONTRACTING, INC. 4.000 EACH 250.0000 1,000.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 1,400.0000 5,600.00

    INVOLUNTARY WORK SUSPENSION (NON-MOWING DAYS) 717-10.01 ORR CONTRACTING, INC. 6.000 DAY 1.0000 6.00 717-10.01 SWARTZ MOWING, INC 6.000 DAY 400.0000 2,400.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 ORR CONTRACTING, INC. 84.000 L.M. 100.0000 8,400.00 719-02 SWARTZ MOWING, INC 84.000 L.M. 114.0000 9,576.00

    MOWING 806-01 ORR CONTRACTING, INC. 4,111.000 ACRE 37.0000 152,107.00 806-01 SWARTZ MOWING, INC 4,111.000 ACRE 42.0000 172,662.00

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 161,513.00 SWARTZ MOWING, INC 190,238.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 161,513.00 SWARTZ MOWING, INC 190,238.00

    TOTAL CONTRACT ORR CONTRACTING, INC. 161,513.00 SWARTZ MOWING, INC 190,238.00

  • CONTRACT CNM807 CALL 008 BRADLEY PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM807 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON I-75.

    PROJECT LENGTH - 69.060 MILES PROJECT REF - PROJ NUM - 99109-4177-04 - - - - - - COUNTY BRADLEY, LOUDON, MCMINN, AND MONROE

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT LOVIN CONTRACTING COMPANY, INC. 184,911.45 SALAZAR CONTRACTING, LLC 186,000.00 M & M CONTRACT MOWING, LLC 190,183.00 SWARTZ MOWING, INC. 227,997.30

  • CONTRACT CNM807 BRADLEY PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 LOVIN CONTRACTING COMPANY, INC. 4.000 EACH 250.0000 1,000.00 717-01.04 SALAZAR CONTRACTING, LLC 4.000 EACH 0.2675 1.07 717-01.04 M & M CONTRACT MOWING, LLC 4.000 EACH 1.0000 4.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 1,000.0000 4,000.00

    INVOLUNTARY WORK SUSPENSION (NON-MOWING DAYS) 717-10.01 LOVIN CONTRACTING COMPANY, INC. 6.000 DAY 250.0000 1,500.00 717-10.01 SALAZAR CONTRACTING, LLC 6.000 DAY 2.0000 12.00 717-10.01 M & M CONTRACT MOWING, LLC 6.000 DAY 1.0000 6.00 717-10.01 SWARTZ MOWING, INC 6.000 DAY 1,000.0000 6,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 LOVIN CONTRACTING COMPANY, INC. 277.000 L.M. 200.0000 55,400.00 719-02 SALAZAR CONTRACTING, LLC 277.000 L.M. 150.2500 41,619.25 719-02 M & M CONTRACT MOWING, LLC 277.000 L.M. 165.0000 45,705.00 719-02 SWARTZ MOWING, INC 277.000 L.M. 264.0000 73,128.00

    MOWING 806-01 LOVIN CONTRACTING COMPANY, INC. 4,013.000 ACRE 31.6500 127,011.45 806-01 SALAZAR CONTRACTING, LLC 4,013.000 ACRE 35.9750 144,367.68 806-01 M & M CONTRACT MOWING, LLC 4,013.000 ACRE 36.0000 144,468.00 806-01 SWARTZ MOWING, INC 4,013.000 ACRE 36.1000 144,869.30

    SUB-TOTAL MAINTENANCE LOVIN CONTRACTING COMPANY, INC. 184,911.45 SALAZAR CONTRACTING, LLC 186,000.00 M & M CONTRACT MOWING, LLC 190,183.00 SWARTZ MOWING, INC 227,997.30 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE LOVIN CONTRACTING COMPANY, INC. 184,911.45 SALAZAR CONTRACTING, LLC 186,000.00 M & M CONTRACT MOWING, LLC 190,183.00 SWARTZ MOWING, INC 227,997.30

    TOTAL CONTRACT LOVIN CONTRACTING COMPANY, INC. 184,911.45 SALAZAR CONTRACTING, LLC 186,000.00 M & M CONTRACT MOWING, LLC 190,183.00 SWARTZ MOWING, INC 227,997.30

  • CONTRACT CNM808 CALL 009 BRADLEY PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM808 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 334.190 MILES PROJECT REF - PROJ NUM - 98027-4296-04 - - - - - - COUNTY BRADLEY, MCMINN, MEIGS, AND POLK

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT SALAZAR CONTRACTING, LLC 224,800.00 LOVIN CONTRACTING COMPANY, INC. 225,023.80 SWARTZ MOWING, INC. 262,714.90

  • CONTRACT CNM808 BRADLEY PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 SALAZAR CONTRACTING, LLC 3.000 EACH 2.5167 7.55 717-01.04 LOVIN CONTRACTING COMPANY, INC. 3.000 EACH 250.0000 750.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,000.0000 3,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 SALAZAR CONTRACTING, LLC 499.000 L.M. 150.3000 74,999.70 719-02 LOVIN CONTRACTING COMPANY, INC. 499.000 L.M. 160.0000 79,840.00 719-02 SWARTZ MOWING, INC 499.000 L.M. 169.0000 84,331.00

    MOWING 806-01 SALAZAR CONTRACTING, LLC 3,821.000 ACRE 39.2025 149,792.75 806-01 LOVIN CONTRACTING COMPANY, INC. 3,821.000 ACRE 37.8000 144,433.80 806-01 SWARTZ MOWING, INC 3,821.000 ACRE 45.9000 175,383.90

    SUB-TOTAL MAINTENANCE SALAZAR CONTRACTING, LLC 224,800.00 LOVIN CONTRACTING COMPANY, INC. 225,023.80 SWARTZ MOWING, INC 262,714.90 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE SALAZAR CONTRACTING, LLC 224,800.00 LOVIN CONTRACTING COMPANY, INC. 225,023.80 SWARTZ MOWING, INC 262,714.90

    TOTAL CONTRACT SALAZAR CONTRACTING, LLC 224,800.00 LOVIN CONTRACTING COMPANY, INC. 225,023.80 SWARTZ MOWING, INC 262,714.90

  • CONTRACT CNM809 CALL 010 CANNON PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM809 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 240.270 MILES PROJECT REF - PROJ NUM - 98027-4297-04 - - - - - - COUNTY CANNON, VAN BUREN, AND WARREN

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT BLEVINS ENTERPRISES, INC. 212,764.00 SALAZAR CONTRACTING, LLC 258,014.25 BUMBALOUGH'S CONSTRUCTION 270,040.81 SWARTZ MOWING, INC. 280,687.80

  • CONTRACT CNM809 CANNON PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 BLEVINS ENTERPRISES, INC. 3.000 EACH 100.0000 300.00 717-01.04 SALAZAR CONTRACTING, LLC 3.000 EACH 1.0000 3.00 717-01.04 BUMBALOUGH'S CONSTRUCTION 3.000 EACH 1.0000 3.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,500.0000 4,500.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 BLEVINS ENTERPRISES, INC. 721.000 L.M. 130.0000 93,730.00 719-02 SALAZAR CONTRACTING, LLC 721.000 L.M. 153.2500 110,493.25 719-02 BUMBALOUGH'S CONSTRUCTION 721.000 L.M. 164.9900 118,957.79 719-02 SWARTZ MOWING, INC 721.000 L.M. 158.0000 113,918.00

    MOWING 806-01 BLEVINS ENTERPRISES, INC. 3,598.000 ACRE 33.0000 118,734.00 806-01 SALAZAR CONTRACTING, LLC 3,598.000 ACRE 41.0000 147,518.00 806-01 BUMBALOUGH'S CONSTRUCTION 3,598.000 ACRE 41.9900 151,080.02 806-01 SWARTZ MOWING, INC 3,598.000 ACRE 45.1000 162,269.80

    SUB-TOTAL MAINTENANCE BLEVINS ENTERPRISES, INC. 212,764.00 SALAZAR CONTRACTING, LLC 258,014.25 BUMBALOUGH'S CONSTRUCTION 270,040.81 SWARTZ MOWING, INC 280,687.80 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE BLEVINS ENTERPRISES, INC. 212,764.00 SALAZAR CONTRACTING, LLC 258,014.25 BUMBALOUGH'S CONSTRUCTION 270,040.81 SWARTZ MOWING, INC 280,687.80

    TOTAL CONTRACT BLEVINS ENTERPRISES, INC. 212,764.00 SALAZAR CONTRACTING, LLC 258,014.25 BUMBALOUGH'S CONSTRUCTION 270,040.81 SWARTZ MOWING, INC 280,687.80

  • CONTRACT CNM810 CALL 011 CARTER PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM810 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE AND STATE ROUTES.

    PROJECT LENGTH - 500.030 MILES PROJECT REF - PROJ NUM - 98018-4140-04 - - - - - - COUNTY CARTER, JOHNSON, SULLIVAN, UNICOI, AND WASHINGTON

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT ORR CONTRACTING, INC. 534,272.00 SALAZAR CONTRACTING, LLC 550,000.00 BILL LEDFORD & SON, INC. 587,700.00 SWARTZ MOWING, INC. 649,200.00

  • CONTRACT CNM810 CARTER PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 ORR CONTRACTING, INC. 4.000 EACH 1.0000 4.00 717-01.04 SALAZAR CONTRACTING, LLC 4.000 EACH 29.0000 116.00 717-01.04 BILL LEDFORD & SON, INC. 4.000 EACH 1,000.0000 4,000.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 2,000.0000 8,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 ORR CONTRACTING, INC. 248.000 L.M. 180.0000 44,640.00 719-02 SALAZAR CONTRACTING, LLC 248.000 L.M. 195.5000 48,484.00 719-02 BILL LEDFORD & SON, INC. 248.000 L.M. 200.0000 49,600.00 719-02 SWARTZ MOWING, INC 248.000 L.M. 300.0000 74,400.00

    MOWING 806-01 ORR CONTRACTING, INC. 10,900.000 ACRE 44.9200 489,628.00 806-01 SALAZAR CONTRACTING, LLC 10,900.000 ACRE 46.0000 501,400.00 806-01 BILL LEDFORD & SON, INC. 10,900.000 ACRE 49.0000 534,100.00 806-01 SWARTZ MOWING, INC 10,900.000 ACRE 52.0000 566,800.00

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 534,272.00 SALAZAR CONTRACTING, LLC 550,000.00 BILL LEDFORD & SON, INC. 587,700.00 SWARTZ MOWING, INC 649,200.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 534,272.00 SALAZAR CONTRACTING, LLC 550,000.00 BILL LEDFORD & SON, INC. 587,700.00 SWARTZ MOWING, INC 649,200.00

    TOTAL CONTRACT ORR CONTRACTING, INC. 534,272.00 SALAZAR CONTRACTING, LLC 550,000.00 BILL LEDFORD & SON, INC. 587,700.00 SWARTZ MOWING, INC 649,200.00

  • CONTRACT CNM812 CALL 013 CHEATHAM PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM812 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE ROUTES.

    PROJECT LENGTH - 55.660 MILES PROJECT REF - PROJ NUM - 98300-4166-04 - - - - - - COUNTY CHEATHAM, MONTGOMERY, ROBERTSON, AND SUMNER

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 171,569.00 SWARTZ MOWING, INC. 219,634.60 HRAY LLC 254,240.00

  • CONTRACT CNM812 CHEATHAM PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 VANDERBILT LANDSCAPING LLC 4.000 EACH 1.0000 4.00 717-01.04 SWARTZ MOWING, INC 4.000 EACH 3,100.0000 12,400.00 717-01.04 HRAY LLC 4.000 EACH 2,000.0000 8,000.00

    INVOLUNTARY WORK SUSPENSION (NON-MOWING DAYS) 717-10.01 VANDERBILT LANDSCAPING LLC 5.000 DAY 1.0000 5.00 717-10.01 SWARTZ MOWING, INC 5.000 DAY 750.0000 3,750.00 717-10.01 HRAY LLC 5.000 DAY 800.0000 4,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 VANDERBILT LANDSCAPING LLC 223.000 L.M. 150.0000 33,450.00 719-02 SWARTZ MOWING, INC 223.000 L.M. 256.0000 57,088.00 719-02 HRAY LLC 223.000 L.M. 290.0000 64,670.00

    MOWING 806-01 VANDERBILT LANDSCAPING LLC 3,946.000 ACRE 35.0000 138,110.00 806-01 SWARTZ MOWING, INC 3,946.000 ACRE 37.1000 146,396.60 806-01 HRAY LLC 3,946.000 ACRE 45.0000 177,570.00

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 171,569.00 SWARTZ MOWING, INC 219,634.60 HRAY LLC 254,240.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 171,569.00 SWARTZ MOWING, INC 219,634.60 HRAY LLC 254,240.00

    TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 171,569.00 SWARTZ MOWING, INC 219,634.60 HRAY LLC 254,240.00

  • CONTRACT CNM813 CALL 014 CHEATHAM PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM813 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 240.450 MILES PROJECT REF - PROJ NUM - 98300-4267-04 - - - - - - COUNTY CHEATHAM, AND ROBERTSON

    COMPLETION TIME - ON OR BEFORE DECEMBER 31, 2013 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 109,883.00 CCS CONTRACTING, LLC 133,976.96 HRAY LLC 138,362.00 BILL LEDFORD & SON, INC. 154,085.00 DOUBLE G, LLC 161,711.50 SWARTZ MOWING, INC. 161,979.00

  • CONTRACT CNM813 CHEATHAM PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 VANDERBILT LANDSCAPING LLC 3.000 EACH 1.0000 3.00 717-01.04 CCS CONTRACTING, LLC 3.000 EACH 1,000.0000 3,000.00 717-01.04 HRAY LLC 3.000 EACH 4,000.0000 12,000.00 717-01.04 BILL LEDFORD & SON, INC. 3.000 EACH 1,000.0000 3,000.00 717-01.04 DOUBLE G, LLC 3.000 EACH 4,000.0000 12,000.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,800.0000 5,400.00

    MOWING 806-01 VANDERBILT LANDSCAPING LLC 2,747.000 ACRE 40.0000 109,880.00 806-01 CCS CONTRACTING, LLC 2,747.000 ACRE 47.6800 130,976.96 806-01 HRAY LLC 2,747.000 ACRE 46.0000 126,362.00 806-01 BILL LEDFORD & SON, INC. 2,747.000 ACRE 55.0000 151,085.00 806-01 DOUBLE G, LLC 2,747.000 ACRE 54.5000 149,711.50 806-01 SWARTZ MOWING, INC 2,747.000 ACRE 57.0000 156,579.00

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 109,883.00 CCS CONTRACTING, LLC 133,976.96 HRAY LLC 138,362.00 BILL LEDFORD & SON, INC. 154,085.00 DOUBLE G, LLC 161,711.50 SWARTZ MOWING, INC 161,979.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 109,883.00 CCS CONTRACTING, LLC 133,976.96 HRAY LLC 138,362.00 BILL LEDFORD & SON, INC. 154,085.00 DOUBLE G, LLC 161,711.50 SWARTZ MOWING, INC 161,979.00

    TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 109,883.00 CCS CONTRACTING, LLC 133,976.96 HRAY LLC 138,362.00 BILL LEDFORD & SON, INC. 154,085.00 DOUBLE G, LLC 161,711.50 SWARTZ MOWING, INC 161,979.00

  • CONTRACT CNM814 CALL 015 CHESTER PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM814 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 727.250 MILES PROJECT REF - PROJ NUM - 98048-4230-04 - - - - - - COUNTY CHESTER, FAYETTE, HARDEMAN, HARDIN, AND MCNAIRY

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 581,909.00 A & W LEASING CORPORATION 670,858.80 J. R. CONSTRUCTION, INC. 699,163.00 SWARTZ MOWING, INC. 820,898.00

  • CONTRACT CNM814 CHESTER PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 VANDERBILT LANDSCAPING LLC 3.000 EACH 1.0000 3.00 717-01.04 A & W LEASING CORPORATION 3.000 EACH 1.0000 3.00 717-01.04 J. R. CONSTRUCTION, INC. 3.000 EACH 1.0000 3.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 2,000.0000 6,000.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 VANDERBILT LANDSCAPING LLC 2,182.000 L.M. 83.0000 181,106.00 719-02 A & W LEASING CORPORATION 2,182.000 L.M. 124.5000 271,659.00 719-02 J. R. CONSTRUCTION, INC. 2,182.000 L.M. 100.0000 218,200.00 719-02 SWARTZ MOWING, INC 2,182.000 L.M. 131.0000 285,842.00

    MOWING 806-01 VANDERBILT LANDSCAPING LLC 16,032.000 ACRE 25.0000 400,800.00 806-01 A & W LEASING CORPORATION 16,032.000 ACRE 24.9000 399,196.80 806-01 J. R. CONSTRUCTION, INC. 16,032.000 ACRE 30.0000 480,960.00 806-01 SWARTZ MOWING, INC 16,032.000 ACRE 33.0000 529,056.00

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 581,909.00 A & W LEASING CORPORATION 670,858.80 J. R. CONSTRUCTION, INC. 699,163.00 SWARTZ MOWING, INC 820,898.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE VANDERBILT LANDSCAPING LLC 581,909.00 A & W LEASING CORPORATION 670,858.80 J. R. CONSTRUCTION, INC. 699,163.00 SWARTZ MOWING, INC 820,898.00

    TOTAL CONTRACT VANDERBILT LANDSCAPING LLC 581,909.00 A & W LEASING CORPORATION 670,858.80 J. R. CONSTRUCTION, INC. 699,163.00 SWARTZ MOWING, INC 820,898.00

  • CONTRACT CNM815 CALL 016 CLAY PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM815 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS INTERSTATE AND STATE ROUTES.

    PROJECT LENGTH - 528.680 MILES PROJECT REF - PROJ NUM - 98027-4198-04 - - - - - - COUNTY CLAY, DEKALB, JACKSON, OVERTON, PUTNAM, SMITH, AND WHITE

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT SWARTZ MOWING, INC. 473,505.80 BUMBALOUGH'S CONSTRUCTION 474,383.88 SALAZAR CONTRACTING, LLC 494,000.00 DILLARD FARMS 499,493.88 BILL LEDFORD & SON, INC. 541,420.00

  • CONTRACT CNM815 CLAY PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,500.0000 4,500.00 717-01.04 BUMBALOUGH'S CONSTRUCTION 3.000 EACH 1.0000 3.00 717-01.04 SALAZAR CONTRACTING, LLC 3.000 EACH 22.6833 68.05 717-01.04 DILLARD FARMS 3.000 EACH 2,000.0000 6,000.00 717-01.04 BILL LEDFORD & SON, INC. 3.000 EACH 1,200.0000 3,600.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 SWARTZ MOWING, INC 937.000 L.M. 161.0000 150,857.00 719-02 BUMBALOUGH'S CONSTRUCTION 937.000 L.M. 184.0000 172,408.00 719-02 SALAZAR CONTRACTING, LLC 937.000 L.M. 174.3500 163,365.95 719-02 DILLARD FARMS 937.000 L.M. 165.0000 154,605.00 719-02 BILL LEDFORD & SON, INC. 937.000 L.M. 180.0000 168,660.00

    MOWING 806-01 SWARTZ MOWING, INC 6,712.000 ACRE 47.4000 318,148.80 806-01 BUMBALOUGH'S CONSTRUCTION 6,712.000 ACRE 44.9900 301,972.88 806-01 SALAZAR CONTRACTING, LLC 6,712.000 ACRE 49.2500 330,566.00 806-01 DILLARD FARMS 6,712.000 ACRE 50.4900 338,888.88 806-01 BILL LEDFORD & SON, INC. 6,712.000 ACRE 55.0000 369,160.00

    SUB-TOTAL MAINTENANCE SWARTZ MOWING, INC 473,505.80 BUMBALOUGH'S CONSTRUCTION 474,383.88 SALAZAR CONTRACTING, LLC 494,000.00 DILLARD FARMS 499,493.88 BILL LEDFORD & SON, INC. 541,420.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE SWARTZ MOWING, INC 473,505.80 BUMBALOUGH'S CONSTRUCTION 474,383.88 SALAZAR CONTRACTING, LLC 494,000.00 DILLARD FARMS 499,493.88 BILL LEDFORD & SON, INC. 541,420.00

    TOTAL CONTRACT SWARTZ MOWING, INC 473,505.80 BUMBALOUGH'S CONSTRUCTION 474,383.88 SALAZAR CONTRACTING, LLC 494,000.00 DILLARD FARMS 499,493.88 BILL LEDFORD & SON, INC. 541,420.00

  • CONTRACT CNM816 CALL 017 CLAY PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM816 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING AND LITTER REMOVAL ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 304.750 MILES PROJECT REF - PROJ NUM - 98027-4299-04 - - - - - - COUNTY CLAY, FENTRESS, OVERTON, AND PICKETT

    COMPLETION TIME - ON OR BEFORE MARCH 31, 2014 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT ORR CONTRACTING, INC. 218,646.25 BUMBALOUGH'S CONSTRUCTION 229,496.12 SWARTZ MOWING, INC. 230,254.10 M & M CONTRACT MOWING, LLC 231,301.75 DILLARD FARMS 259,995.65 BILL LEDFORD & SON, INC. 269,256.00

  • CONTRACT CNM816 CLAY PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 ORR CONTRACTING, INC. 3.000 EACH 150.0000 450.00 717-01.04 BUMBALOUGH'S CONSTRUCTION 3.000 EACH 1.0000 3.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,000.0000 3,000.00 717-01.04 M & M CONTRACT MOWING, LLC 3.000 EACH 1,200.0000 3,600.00 717-01.04 DILLARD FARMS 3.000 EACH 1,000.0000 3,000.00 717-01.04 BILL LEDFORD & SON, INC. 3.000 EACH 1,200.0000 3,600.00

    REMOVAL AND DISPOSAL OF LITTER 719-02 ORR CONTRACTING, INC. 489.000 L.M. 160.0000 78,240.00 719-02 BUMBALOUGH'S CONSTRUCTION 489.000 L.M. 174.9900 85,570.11 719-02 SWARTZ MOWING, INC 489.000 L.M. 171.0000 83,619.00 719-02 M & M CONTRACT MOWING, LLC 489.000 L.M. 150.0000 73,350.00 719-02 DILLARD FARMS 489.000 L.M. 170.0000 83,130.00 719-02 BILL LEDFORD & SON, INC. 489.000 L.M. 190.0000 92,910.00

    MOWING 806-01 ORR CONTRACTING, INC. 3,199.000 ACRE 43.7500 139,956.25 806-01 BUMBALOUGH'S CONSTRUCTION 3,199.000 ACRE 44.9900 143,923.01 806-01 SWARTZ MOWING, INC 3,199.000 ACRE 44.9000 143,635.10 806-01 M & M CONTRACT MOWING, LLC 3,199.000 ACRE 48.2500 154,351.75 806-01 DILLARD FARMS 3,199.000 ACRE 54.3500 173,865.65 806-01 BILL LEDFORD & SON, INC. 3,199.000 ACRE 54.0000 172,746.00

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 218,646.25 BUMBALOUGH'S CONSTRUCTION 229,496.12 SWARTZ MOWING, INC 230,254.10 M & M CONTRACT MOWING, LLC 231,301.75 DILLARD FARMS 259,995.65 BILL LEDFORD & SON, INC. 269,256.00 -----------------------------------------------------------------------------------------------------------------------

    SUB-TOTAL MAINTENANCE ORR CONTRACTING, INC. 218,646.25 BUMBALOUGH'S CONSTRUCTION 229,496.12 SWARTZ MOWING, INC 230,254.10 M & M CONTRACT MOWING, LLC 231,301.75 DILLARD FARMS 259,995.65 BILL LEDFORD & SON, INC. 269,256.00

    TOTAL CONTRACT ORR CONTRACTING, INC. 218,646.25 BUMBALOUGH'S CONSTRUCTION 229,496.12 SWARTZ MOWING, INC 230,254.10 M & M CONTRACT MOWING, LLC 231,301.75 DILLARD FARMS 259,995.65 BILL LEDFORD & SON, INC. 269,256.00

  • CONTRACT CNM817 CALL 018 COCKE PAGE 1 ------------------------------STATE OF TENNESSEE----------------------------------------- DEPARTMENT OF TRANSPORTATION CONTRACT CNM817 SUMMARY OF BIDS OPENED AT NASHVILLE 01/11/13 10AM DESCRIPTION OF WORK THE MOWING ON VARIOUS STATE ROUTES.

    PROJECT LENGTH - 402.270 MILES PROJECT REF - PROJ NUM - 98018-4241-04 - - - - - - COUNTY COCKE, GREENE, AND JEFFERSON

    COMPLETION TIME - ON OR BEFORE DECEMBER 31, 2013 (SEE SPECIAL PROVISION 108B)

    TABULATED BY CONSTRUCTION DIVISION CHECKED BY:---------------------------------------------------------------------------------------------------------------------------------------- TOTAL CONTRACT ORR CONTRACTING, INC. 202,911.76 BILL LEDFORD & SON, INC. 245,200.00 SWARTZ MOWING, INC. 246,251.20

  • CONTRACT CNM817 COCKE PAGE 2 ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE EXTENSION

    MAINTENANCE

    MOBILIZATION (PER CYCLE) 717-01.04 ORR CONTRACTING, INC. 3.000 EACH 100.0000 300.00 717-01.04 BILL LEDFORD & SON, INC. 3.000 EACH 1,000.0000 3,000.00 717-01.04 SWARTZ MOWING, INC 3.000 EACH 1,000.0000 3,000.00

    INVOLUNTARY WORK SUSPEN