STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS ENERGY FACILITY SITING BOARD IN RE: INVENERGY THERMAL DEVELOPMENT LLC : APPLICATION TO CONSTRUCT AND : OPERATE THE CLEAR RIVER ENERGY : SB-2015-06 CENTER, BURRILLVILLE, RHODE ISLAND : INVENERGY THERMAL DEVELOPMENT LLC’S RESPONSE TO THE STATE OF RHODE ISLAND DEPARTMENT OF ADMINISTRATION, DIVISION OF LEGAL SERVICES’ DATA REQUESTS DATED APRIL 10, 2017 REQUEST: On January 11, 2017, Invenergy Thermal Development LLC submitted a revised Water Supply Plan for the Clear River Energy Project. Although the revised Water Supply Plan includes a revised traffic analysis, it does not include revised analyses for environmental impacts. The original application notes that construction of the proposed project will result in the alteration of up to approximately 67 acres of the existing forested lands, some of which will be restored, some of which will be permanently replaced by structures or low-growing vegetation which includes: Clearing forest within the proposed construction laydown areas; Permanently replacing forest with impervious surfaces within the footprint of the proposed generation facility, the substation location and along the alignment of the site access road; Permanently replacing forest with low-growing vegetation along the proposed overhead transmission line corridor and the proposed new gas line to the facility; Given the revised submission, the Department of Administration, Division of Statewide Planning would like to know: 1. Are there changes to CREC footprint? If so, please provide a revised site layout. 2. What is the acreage that will be cleared for construction of the facility and associated infrastructure such as electrical transmission lines and natural gas pipelines. 3. How much of the disturbed area will be revegetated and restored. 4. What impact will the revision have on tax revenues to the State and the tax treaty with the Town of Burrillville?

Upload: others

Post on 22-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS

ENERGY FACILITY SITING BOARD

IN RE: INVENERGY THERMAL DEVELOPMENT LLC :

APPLICATION TO CONSTRUCT AND :

OPERATE THE CLEAR RIVER ENERGY : SB-2015-06

CENTER, BURRILLVILLE, RHODE ISLAND :

INVENERGY THERMAL DEVELOPMENT LLC’S RESPONSE TO

THE STATE OF RHODE ISLAND DEPARTMENT OF ADMINISTRATION,

DIVISION OF LEGAL SERVICES’ DATA REQUESTS DATED APRIL 10, 2017

REQUEST:

On January 11, 2017, Invenergy Thermal Development LLC submitted a

revised Water Supply Plan for the Clear River Energy Project. Although the

revised Water Supply Plan includes a revised traffic analysis, it does not

include revised analyses for environmental impacts. The original application

notes that construction of the proposed project will result in the alteration of

up to approximately 67 acres of the existing forested lands, some of which

will be restored, some of which will be permanently replaced by structures

or low-growing vegetation which includes:

Clearing forest within the proposed construction laydown areas;

Permanently replacing forest with impervious surfaces within the

footprint of the proposed generation facility, the substation location and

along the alignment of the site access road;

Permanently replacing forest with low-growing vegetation along the

proposed overhead transmission line corridor and the proposed new gas line

to the facility;

Given the revised submission, the Department of Administration, Division of

Statewide Planning would like to know:

1. Are there changes to CREC footprint? If so, please provide a revised site

layout.

2. What is the acreage that will be cleared for construction of the facility and

associated infrastructure such as electrical transmission lines and natural gas

pipelines.

3. How much of the disturbed area will be revegetated and restored.

4. What impact will the revision have on tax revenues to the State and the

tax treaty with the Town of Burrillville?

Page 2: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

2

RESPONSE:

1. There are minor changes to the Clear River Energy Center

(CREC or Facility) footprint and a revised site layout is

enclosed. The minor changes include:

a.) The center line spacing between the two power blocks was

reduced from 350 feet to 300 feet; this allowed relocation of

the site perimeter road to be moved out of the wetland buffer

area.

b.) The fuel oil storage tank was relocated from the southeast

side of the site to the northwest and the tank design was

changed from two one-million-gallon storage tanks to a

single two-million-gallon tank.

c.) The switch yard design was modified at the request of

National Grid.

d.) Ammonia tank was relocated and its size reduced.

e.) The property line boundary was re-located to avoid any

portion of the site being located within a designated aquifer

recharge zone (the A-80 Zone) based on comments and

concerns raised by the Burrillville Building Inspector and

Zoning Official.

2. The acreage that will be cleared for construction of the Facility

and associated infrastructure such as electrical transmission lines

and natural gas pipelines, are as follows:

a.) The 67 acres described in the original application is the size

of the entire parcel for the Facility. Only 36.1 acres will be

disturbed (same as cleared) for construction of the facility

and natural gas pipeline infrastructure.

b.) The electric transmission line has two components.

Approximately 55 acres will be cleared in the portion owned

by National Grid along the existing Narragansett Electric

Company Right of Way (TNEC ROW). Approximately 14.5

acres will be cleared in the portion that will be owned by

CREC from the power plant to the existing TNEC ROW.

c.) Trees will be cleared and some vegetation removed to open

the corridor for the construction of the transmission line.

Post-construction maintenance of the transmission line

ROWs will comprise of vegetation management in

accordance with TNEC’s Right of Way Vegetation

Management Plan, which encourages growth of low growing

shrubs, ferns, wildflowers and grasses.

3. A total of 8.2 acres of the disturbed area at the Facility will be

revegetated and restored.

4. There will be a slight increase in tax revenues to the State

associated with the trucking of water from Johnston to the

project site and there will be added taxes paid to the town of

Johnston associated with the truck facility. There is no change

to the tax treaty with the Town of Burrillville.

The acreage references described above are included in the “Application to

Alter Freshwater Wetlands – Clear River Energy Center and Burrillville

Page 3: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

3

Interconnection Project,” which has been submitted to the Rhode Island

Department of Environmental Management.

RESPONDENT: John Niland, Invenergy Thermal Development LLC

DATE: April 25, 2017

Page 4: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

4 405180\003\858397.v2

INVENERGY THERMAL DEVELOPMENT LLC

By its Attorneys,

/s/ Alan M. Shoer

Alan M. Shoer, Esq. (#3248)

Richard R. Beretta, Jr. Esq. (#4313)

Nicole M. Verdi, Esq. (#9370)

ADLER POLLOCK & SHEEHAN, P.C.

One Citizens Plaza, 8th Floor

Providence, RI 02903-1345

Tel: 401-274-7200

Fax: 401-751-0604

Dated: April 25, 2017

CERTIFICATE OF SERVICE

I hereby certify that on April 25, 2017, I delivered a true copy of the foregoing responses to the

State of Rhode Island Department of Administration, Division of Legal Services’ Data Requests dated April

10 2017, via electronic mail to the parties on the attached service list.

_/s/ Alan M. Shoer_______________________

Page 5: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

G

AS

G

AS

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

O

V

H

HDR Engineering, Inc.

CLEAR RIVER ENERGY LLC

CLEAR RIVER ENERGY CENTER

PRELIMINARY

NOT FOR

CONSTRUCTION

OR

RECORDING

NORTH

SITE ARRANGEMENT

238926-0GA-C1000

AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DWN
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
FILENAME
AutoCAD SHX Text
1
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
D
AutoCAD SHX Text
ENGR
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPV
AutoCAD SHX Text
SITE ARRANGEMENT
AutoCAD SHX Text
C1000-0GA-238926.dwg
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
1
AutoCAD SHX Text
04/17/17
AutoCAD SHX Text
REVISED FOR PERMIT
AutoCAD SHX Text
40'-0" SETBACK FROM PROPERTY LINE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
NEW GAS LINE
AutoCAD SHX Text
INTERSECTION AT EXISTING ROAD
AutoCAD SHX Text
SITE ENTRANCE ROAD
AutoCAD SHX Text
SCALE: 1" = 250'-0"
AutoCAD SHX Text
0
AutoCAD SHX Text
250
AutoCAD SHX Text
500
AutoCAD SHX Text
750
AutoCAD SHX Text
250
AutoCAD SHX Text
67 ACRE SITE
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
NOTES: : 1.WETLANDS DELINEATION PROVIDED BY ESS WETLANDS DELINEATION PROVIDED BY ESS GROUP, INC., WALTHAM, MA. SURVEY CONDUCTED JULY 2015. 2.SURVEY PERFORMED BY WATERMAN SURVEY PERFORMED BY WATERMAN ENGINEERING COMPANY, EAST PROVIDENCE, RI. SURVEY DRAWING: REVISED SUBDIVISION_12.06.16.DWG 3.SET-BACK FROM FUTURE CONSTRUCTION. SET-BACK FROM FUTURE CONSTRUCTION. ROW FOR SINGLE OR DOUBLE CIRCUIT. 4.SEE DRAWING C1002 FOR CONSTRUCTION SEE DRAWING C1002 FOR CONSTRUCTION LAYDOWN EXTENTS AND REQUIREMENTS.
AutoCAD SHX Text
EXISTING ROUTE OF TRANSMISSION LINES
AutoCAD SHX Text
WETLAND
AutoCAD SHX Text
PROPOSED PROPERTY LINE
AutoCAD SHX Text
NOTE 3
AutoCAD SHX Text
STREAM
AutoCAD SHX Text
LEGEND INDICATES EXISTING PROPERTY LINES FROM SURVEYOR INDICATES PROPOSED PROPERTY LINES BY HDR INDICATES EXISTING DELINEATED WETLANDS INDICATES CONSTRUCTION LAYDOWN EXTENTS INDICATES SECURITY FENCE INDICATES A80 AQUIFER ZONE
AutoCAD SHX Text
EDC
AutoCAD SHX Text
-
AutoCAD SHX Text
DWM
AutoCAD SHX Text
ASH
AutoCAD SHX Text
PRELIMINARY LOCATION OF FACILITY POTABLE WATER WELL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
A80 AQUIFER ZONE
AutoCAD SHX Text
SECURITY FENCE
Page 6: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

GAS

G

A

S

HDR Engineering, Inc.

CLEAR RIVER ENERGY LLC

CLEAR RIVER ENERGY CENTER

PRELIMINARY

NOT FOR

CONSTRUCTION

OR

RECORDING

GENERAL ARRANGEMENT

238926-0GA-C1001C

NORTH

AutoCAD SHX Text
ISSUE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DWN
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
FILENAME
AutoCAD SHX Text
1
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
D
AutoCAD SHX Text
ENGR
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPV
AutoCAD SHX Text
GENERAL ARRANGEMENT
AutoCAD SHX Text
C1001C-0GA-238926.dwg
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
0
AutoCAD SHX Text
02/16/17
AutoCAD SHX Text
REVISED FOR PERMIT
AutoCAD SHX Text
1
AutoCAD SHX Text
04/17/17
AutoCAD SHX Text
REVISED FOR PERMIT
AutoCAD SHX Text
TOTAL SITE ACREAGE (INSIDE PERIMETER FENCE)= 25.12 ACRES
AutoCAD SHX Text
ADMINISTRATION/CONTROL BUILDING
AutoCAD SHX Text
WATER TREATMENT BUILDING
AutoCAD SHX Text
STORM WATER DETENTION POND #1
AutoCAD SHX Text
AUXILIARY BOILER BUILDING
AutoCAD SHX Text
FIRE PUMP BUILDING
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text
FUEL GAS FILTER/SEPARATOR
AutoCAD SHX Text
NO NAME
AutoCAD SHX Text
BUILDING AND EQUIPMENT LIST
AutoCAD SHX Text
4
AutoCAD SHX Text
8
AutoCAD SHX Text
15
AutoCAD SHX Text
12
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
14
AutoCAD SHX Text
16
AutoCAD SHX Text
TURBINE BUILDING
AutoCAD SHX Text
3
AutoCAD SHX Text
COMBUSTION TURBINE INLET FILTER
AutoCAD SHX Text
1
AutoCAD SHX Text
HEAT RECOVERY STEAM GENERATOR
AutoCAD SHX Text
2
AutoCAD SHX Text
GSU TRANSFORMER
AutoCAD SHX Text
18
AutoCAD SHX Text
SWITCHYARD (HEIGHT TO TOP OF DEAD END STRUCTURE)
AutoCAD SHX Text
5
AutoCAD SHX Text
PIPE RACK
AutoCAD SHX Text
19
AutoCAD SHX Text
FIRE/SERVICE WATER TANK
AutoCAD SHX Text
20
AutoCAD SHX Text
DEMINERALIZED WATER STORAGE TANK
AutoCAD SHX Text
21
AutoCAD SHX Text
AIR-COOLED CONDENSER
AutoCAD SHX Text
6
AutoCAD SHX Text
FUEL OIL STORAGE TANK
AutoCAD SHX Text
7
AutoCAD SHX Text
CTG FUEL GAS DEW POINT HEATER
AutoCAD SHX Text
11
AutoCAD SHX Text
AMMONIA STORAGE TANK
AutoCAD SHX Text
13
AutoCAD SHX Text
EMERGENCY DIESEL GENERATOR
AutoCAD SHX Text
17
AutoCAD SHX Text
BOP ELECTRICAL
AutoCAD SHX Text
22
AutoCAD SHX Text
WASTE WATER TANK
AutoCAD SHX Text
23
AutoCAD SHX Text
HRSG LTE RECIRCULATION PUMPS
AutoCAD SHX Text
24
AutoCAD SHX Text
HYDROGEN TUBE TRAILER
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
WASTE OIL STORAGE SHELTER
AutoCAD SHX Text
SIZE (DIMENSIONS IN FEET)
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
27
AutoCAD SHX Text
50
AutoCAD SHX Text
60
AutoCAD SHX Text
44
AutoCAD SHX Text
135
AutoCAD SHX Text
103
AutoCAD SHX Text
136
AutoCAD SHX Text
80
AutoCAD SHX Text
202
AutoCAD SHX Text
100
AutoCAD SHX Text
25
AutoCAD SHX Text
140
AutoCAD SHX Text
153
AutoCAD SHX Text
70
AutoCAD SHX Text
367
AutoCAD SHX Text
130
AutoCAD SHX Text
110
AutoCAD SHX Text
305
AutoCAD SHX Text
-
AutoCAD SHX Text
48
AutoCAD SHX Text
90%%C
AutoCAD SHX Text
64
AutoCAD SHX Text
30
AutoCAD SHX Text
112
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
34
AutoCAD SHX Text
45
AutoCAD SHX Text
35
AutoCAD SHX Text
54
AutoCAD SHX Text
9
AutoCAD SHX Text
15
AutoCAD SHX Text
18
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
12
AutoCAD SHX Text
15
AutoCAD SHX Text
50
AutoCAD SHX Text
84
AutoCAD SHX Text
25
AutoCAD SHX Text
100
AutoCAD SHX Text
6
AutoCAD SHX Text
15
AutoCAD SHX Text
24
AutoCAD SHX Text
8
AutoCAD SHX Text
15
AutoCAD SHX Text
33
AutoCAD SHX Text
27
AutoCAD SHX Text
15
AutoCAD SHX Text
48
AutoCAD SHX Text
15
AutoCAD SHX Text
55
AutoCAD SHX Text
313
AutoCAD SHX Text
-
AutoCAD SHX Text
49
AutoCAD SHX Text
64%%C
AutoCAD SHX Text
-
AutoCAD SHX Text
55
AutoCAD SHX Text
86%%C
AutoCAD SHX Text
30
AutoCAD SHX Text
25
AutoCAD SHX Text
80
AutoCAD SHX Text
-
AutoCAD SHX Text
30
AutoCAD SHX Text
32.5%%C
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
8.5
AutoCAD SHX Text
15
AutoCAD SHX Text
42
AutoCAD SHX Text
15
AutoCAD SHX Text
12
AutoCAD SHX Text
30
AutoCAD SHX Text
19
AutoCAD SHX Text
22
AutoCAD SHX Text
20
AutoCAD SHX Text
9
AutoCAD SHX Text
4
AutoCAD SHX Text
14
AutoCAD SHX Text
8
AutoCAD SHX Text
10
AutoCAD SHX Text
13
AutoCAD SHX Text
16
AutoCAD SHX Text
5
AutoCAD SHX Text
28
AutoCAD SHX Text
11
AutoCAD SHX Text
27
AutoCAD SHX Text
FEEDWATER PUMP BUILDING
AutoCAD SHX Text
49
AutoCAD SHX Text
25
AutoCAD SHX Text
74
AutoCAD SHX Text
NEW GAS LINE
AutoCAD SHX Text
NEW 345 KV LINE
AutoCAD SHX Text
2
AutoCAD SHX Text
SCALE: 1" = 100'-0"
AutoCAD SHX Text
0
AutoCAD SHX Text
300
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
100
AutoCAD SHX Text
200
AutoCAD SHX Text
HRSG
AutoCAD SHX Text
HRSG
AutoCAD SHX Text
51
AutoCAD SHX Text
AUXILIARY BOILER STACK
AutoCAD SHX Text
NO NAME
AutoCAD SHX Text
AIR EMISSION SOURCES (COMBUSTION SOURCES)
AutoCAD SHX Text
DIESEL FIRE WATER PUMP SKID VENT
AutoCAD SHX Text
HRSG EXHAUST STACK 2
AutoCAD SHX Text
AE-2
AutoCAD SHX Text
HRSG EXHAUST STACK 1
AutoCAD SHX Text
CTG FUEL GAS DEW POINT HEATER STACK
AutoCAD SHX Text
UTM COORDINATES
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E271,730
AutoCAD SHX Text
N4,649,602
AutoCAD SHX Text
AE-1
AutoCAD SHX Text
AE-3
AutoCAD SHX Text
AE-4
AutoCAD SHX Text
AE-5
AutoCAD SHX Text
AE-6
AutoCAD SHX Text
AE-2
AutoCAD SHX Text
AE-3
AutoCAD SHX Text
AE-5
AutoCAD SHX Text
WATER TRANSFER PUMP BUILDING
AutoCAD SHX Text
10
AutoCAD SHX Text
15
AutoCAD SHX Text
21
AutoCAD SHX Text
28
AutoCAD SHX Text
GAS COMPRESSOR BUILDING
AutoCAD SHX Text
56
AutoCAD SHX Text
30
AutoCAD SHX Text
78.5
AutoCAD SHX Text
15
AutoCAD SHX Text
29
AutoCAD SHX Text
OIL WATER SEPARATOR
AutoCAD SHX Text
5
AutoCAD SHX Text
-
AutoCAD SHX Text
24
AutoCAD SHX Text
30
AutoCAD SHX Text
CCCW HEAT EXCHANGER
AutoCAD SHX Text
58
AutoCAD SHX Text
32
AutoCAD SHX Text
60
AutoCAD SHX Text
32
AutoCAD SHX Text
SUS TRANSFORMERS
AutoCAD SHX Text
25
AutoCAD SHX Text
12
AutoCAD SHX Text
51
AutoCAD SHX Text
31
AutoCAD SHX Text
AUX. TRANSFORMERS
AutoCAD SHX Text
16
AutoCAD SHX Text
15
AutoCAD SHX Text
20
AutoCAD SHX Text
18
AutoCAD SHX Text
6
AutoCAD SHX Text
3
AutoCAD SHX Text
32
AutoCAD SHX Text
AE-4
AutoCAD SHX Text
EMERGENCY DIESEL GENERATOR STACK
AutoCAD SHX Text
33
AutoCAD SHX Text
345 KV UNDERGROUND DUCT BANK
AutoCAD SHX Text
5
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
34
AutoCAD SHX Text
CEMS SHELTER
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
9
AutoCAD SHX Text
35
AutoCAD SHX Text
GENERATOR CIRCUIT BREAKER
AutoCAD SHX Text
8
AutoCAD SHX Text
20
AutoCAD SHX Text
23.5
AutoCAD SHX Text
36
AutoCAD SHX Text
LCI EXCITATION CONTAINER
AutoCAD SHX Text
12
AutoCAD SHX Text
12
AutoCAD SHX Text
52
AutoCAD SHX Text
37
AutoCAD SHX Text
FUEL GAS FLOW METER
AutoCAD SHX Text
9
AutoCAD SHX Text
6
AutoCAD SHX Text
18
AutoCAD SHX Text
38
AutoCAD SHX Text
FUEL GAS PRESSURE REGULATION
AutoCAD SHX Text
11
AutoCAD SHX Text
6
AutoCAD SHX Text
27
AutoCAD SHX Text
37
AutoCAD SHX Text
38
AutoCAD SHX Text
33
AutoCAD SHX Text
39
AutoCAD SHX Text
FUEL OIL EQUIPMENT BUILDING
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
SAMPLE PANEL ENCLOSURE
AutoCAD SHX Text
9
AutoCAD SHX Text
12
AutoCAD SHX Text
31
AutoCAD SHX Text
41
AutoCAD SHX Text
FUEL GAS PERFORMANCE HEATER
AutoCAD SHX Text
13
AutoCAD SHX Text
10
AutoCAD SHX Text
57
AutoCAD SHX Text
42
AutoCAD SHX Text
CCCW PUMPS
AutoCAD SHX Text
16
AutoCAD SHX Text
6
AutoCAD SHX Text
16
AutoCAD SHX Text
27
AutoCAD SHX Text
30
AutoCAD SHX Text
1
AutoCAD SHX Text
41
AutoCAD SHX Text
40
AutoCAD SHX Text
43
AutoCAD SHX Text
WORKSHOP
AutoCAD SHX Text
20
AutoCAD SHX Text
25
AutoCAD SHX Text
20
AutoCAD SHX Text
44
AutoCAD SHX Text
BLOWDOWN TANK
AutoCAD SHX Text
-
AutoCAD SHX Text
10
AutoCAD SHX Text
10%%C
AutoCAD SHX Text
45
AutoCAD SHX Text
LP FUEL GAS DEW POINT HEATER
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
18
AutoCAD SHX Text
46
AutoCAD SHX Text
WATER WASH DRAIN TANK
AutoCAD SHX Text
11
AutoCAD SHX Text
-
AutoCAD SHX Text
11
AutoCAD SHX Text
47
AutoCAD SHX Text
DUCT BURNER FUEL SKID
AutoCAD SHX Text
8.5
AutoCAD SHX Text
8
AutoCAD SHX Text
16
AutoCAD SHX Text
48
AutoCAD SHX Text
DUCT BURNER COOLING AIR BLOWER
AutoCAD SHX Text
8.5
AutoCAD SHX Text
6
AutoCAD SHX Text
12
AutoCAD SHX Text
49
AutoCAD SHX Text
SEPTIC LEACH FIELD
AutoCAD SHX Text
30
AutoCAD SHX Text
-
AutoCAD SHX Text
60
AutoCAD SHX Text
12
AutoCAD SHX Text
2
AutoCAD SHX Text
17
AutoCAD SHX Text
21
AutoCAD SHX Text
30
AutoCAD SHX Text
29
AutoCAD SHX Text
31
AutoCAD SHX Text
41
AutoCAD SHX Text
34
AutoCAD SHX Text
23
AutoCAD SHX Text
35
AutoCAD SHX Text
36
AutoCAD SHX Text
45
AutoCAD SHX Text
42
AutoCAD SHX Text
43
AutoCAD SHX Text
44
AutoCAD SHX Text
46
AutoCAD SHX Text
48
AutoCAD SHX Text
47
AutoCAD SHX Text
AE-6
AutoCAD SHX Text
7
AutoCAD SHX Text
29
AutoCAD SHX Text
50
AutoCAD SHX Text
SEPTIC TANK
AutoCAD SHX Text
6
AutoCAD SHX Text
-
AutoCAD SHX Text
8
AutoCAD SHX Text
N4,649,648E271,808E271,808
AutoCAD SHX Text
N4,649,606E271,759 E271,759
AutoCAD SHX Text
N4,649,557E271,674 E271,674
AutoCAD SHX Text
N4,649,562E271,789E271,789
AutoCAD SHX Text
AE-1
AutoCAD SHX Text
26
AutoCAD SHX Text
39
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
770.00'
AutoCAD SHX Text
770.00'
AutoCAD SHX Text
587.00'
AutoCAD SHX Text
625.00'
AutoCAD SHX Text
601.00'
AutoCAD SHX Text
591.00'
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
1.UTM COORDINATES ARE FOR UTM GRID ZONE 19T. COORDINATES REMAIN UNCHANGED UTM COORDINATES ARE FOR UTM GRID ZONE 19T. COORDINATES REMAIN UNCHANGED FOR ZONE 19 NORTHERN HEMISPHERE, UTM ZONE 19N DESIGNATION. 2.BASE ELEVATION IS 575 FEET AMSLBASE ELEVATION IS 575 FEET AMSL
AutoCAD SHX Text
GATE
AutoCAD SHX Text
RESERVED SEPTIC FIELD AREA (15FT X 30FT)
AutoCAD SHX Text
PRIMARY SEPTIC FIELD AREA (15FT X 30FT)
AutoCAD SHX Text
N4,649,684E271,800E271,800
AutoCAD SHX Text
25
AutoCAD SHX Text
PERIMETER FENCE
AutoCAD SHX Text
WATER TRUCK UNLOADING STATION
AutoCAD SHX Text
DEMIN TRAILER STATION
AutoCAD SHX Text
PROPOSED PROPERTY LINE, TYP
AutoCAD SHX Text
-
AutoCAD SHX Text
DWM
AutoCAD SHX Text
ASH
AutoCAD SHX Text
EDC
AutoCAD SHX Text
SWING GATE TO TRANSMISSION LINE SERVICE DRIVE
AutoCAD SHX Text
STORM WATER LEVEL SPREADER
AutoCAD SHX Text
24
AutoCAD SHX Text
52
AutoCAD SHX Text
51
AutoCAD SHX Text
NITROGEN/CO BOTTLES
AutoCAD SHX Text
7.5
AutoCAD SHX Text
-
AutoCAD SHX Text
12
AutoCAD SHX Text
52
AutoCAD SHX Text
LP REGULATION
AutoCAD SHX Text
8.5
AutoCAD SHX Text
-
AutoCAD SHX Text
18
AutoCAD SHX Text
24
AutoCAD SHX Text
50
AutoCAD SHX Text
49
AutoCAD SHX Text
-
AutoCAD SHX Text
DWM
AutoCAD SHX Text
ASH
AutoCAD SHX Text
EDC
Page 7: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

SB-2015-06 Invenergy CREC Service List as of 04/17/2017

Name/Address E-mail Phone/FAX

File an original and 10 copies with EFSB:

Todd Bianco, Coordinator

Energy Facility Siting Board

89 Jefferson Boulevard

Warwick, RI 02888

Margaret Curran, Chairperson

Janet Coit, Board Member

Assoc. Dir., Div. of Planning Parag Agrawal

Patti Lucarelli Esq., Board Counsel

Susan Forcier Esq., Counsel

Rayna Maguire, Asst. to the Director DEM

Catherine Pitassi, Asst. to. Assoc. Dir. Plann.

Margaret Hogan, Sr. Legal Counsel

[email protected]; 401-780-2106

[email protected];

[email protected];

[email protected];

[email protected];

[email protected];

[email protected];

[email protected];

[email protected];

[email protected];

Parties (Electronic Service Only, Unless by

Request)

Invenergy Thermal Development LLC

Alan Shoer, Esq.

Richard Beretta, Esq.

Elizabeth Noonan, Esq.

Nicole Verdi, Esq.

Adler, Pollock & Sheehan

One Citizens Plaza, 8th Floor

Providence, RI 02903

John Niland, Dir. Of Business Development

Tyrone Thomas, Esq., Asst. General Counsel

Invenergy Thermal Development LLC

One South Wacker Drive, Suite 1900

Chicago, IL 60600

[email protected]; 401-274-7200

[email protected];

[email protected];

[email protected];

[email protected]; 312-224-1400

[email protected];

Town of Burrillville

Michael McElroy, Esq., Special Counsel

Leah Donaldson, Esq., Special Counsel

Schacht & McElroy

PO Box 6721

Providence, RI 02940-6721

William Dimitri, Esq., Acting Town Solicitor

[email protected]; 401-351-4100

[email protected];

[email protected]; 401-273-9092

Conservation Law Foundation

Jerry Elmer, Esq.

Max Greene, Esq.

55 Dorrance Street

Providence RI, 02903

[email protected]; 401-351-1102

[email protected];

Ms. Bess B. Gorman, Esq.

Assistant General Counsel and Director

Legal Department, National Grid

[email protected]; 781-907-1834

Page 8: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

40 Sylvan Road

Waltham, MA 02451

Mark Rielly, Esq.

Senior Counsel

[email protected];

Office of Energy Resources

Andrew Marcaccio, Esq.

Nick Ucci, Chief of Staff

Chris Kearns, Chief Program Development

One Capitol Hill

Providence, RI 02908

Ellen Cool

Levitan & Associates

[email protected]; 401-222-3417

[email protected]; 401-574-9100

[email protected];

[email protected];

[email protected];

Rhode Island Building and Construction Trades

Council

Gregory Mancini, Esq.

Sinapi Law Associates, Ltd.

2374 Post Road, Suite 201

Warwick, RI 02886

[email protected]; 401-739-9690

Residents of Wallum Lake Road, Pascoag, RI

Dennis Sherman and Kathryn Sherman

Christian Capizzo, Esq.

Shechtman Halperin Savage, LLP

1080 Main Street

Pawtucket, RI 02869

[email protected]; 401-272-1400

[email protected];

Residents of Wallum Lake Road, Pascoag, RI

Paul Bolduc and Mary Bolduc

Joseph Keough Jr., Esq.

41 Mendon Avenue

Pawtucket, RI 02861

Paul and Mary Bolduc

915 Wallum Lake Road

Pascoag, RI 02859

[email protected]; 401-724-3600

[email protected]; 401-529-0367

Abutter David B. Harris

Michael Sendley, Esq.

600 Putnam Pike, St. 13

Greenville, RI 02828

[email protected]; 401-349-4405

Interested Persons (Electronic Service Only)

Harrisville Fire District

Richard Sinapi, Esq.

Joshua Xavier, Esq.

2347 Post Road, Suite 201

Warwick, RI 02886

[email protected]; 401-739-9690

[email protected];

Residents of 945 Wallum Lake Road, Pascoag,

RI (Walkers)

Nicholas Gorham, Esq.

P.O. Box 46

North Scituate, RI 02857

[email protected]; 401-647-1400

[email protected];

Page 9: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

Peter Nightingale, member

Fossil Free Rhode Island

52 Nichols Road

Kingston, RI 02881

[email protected]; 401-789-7649

Sister Mary Pendergast, RSM

99 Fillmore Street

Pawtucket, RI 02860

[email protected]; 401-724-2237

Patricia J. Fontes, member

Occupy Providence

57 Lawton Foster Road South

Hopkinton, RI 02833

[email protected]; 401-516-7678

Burrillville Land Trust

Marc Gertsacov, Esq.

Law Offices of Ronald C. Markoff

144 Medway Street

Providence, RI 02906

Paul Roselli, President

Burrillville Land Trust

PO Box 506

Harrisville, RI 02830

[email protected]; 401-272-9330

[email protected]; 401-447-1560

Rhode Island Progressive Democrats of

America

Andrew Aleman, Esq.

168 Elmgrove Avenue

Providence, RI 02906

[email protected]; 401-429-6779

Fighting Against Natural Gas and Burrillville

Against Spectra Expansion

Jillian Dubois, Esq.

The Law Office of Jillian Dubois

91 Friendship Street, 4th Floor

Providence, RI 02903

[email protected]; 401-274-4591

Burrillville Town Council

c/o Louise Phaneuf, Town Clerk

105 Harrisville Main Street

Harrisville, RI 02830

[email protected]; 401-568-4300

Christine Langlois, Deputy Planner

Town of Burrillville

144 Harrisville Main Street

Harrisville, RI 02830

Joseph Raymond, Building Official

[email protected]; 401-568-4300

[email protected];

Michael C. Wood, Town Manager

Town of Burrillville

105 Harrisville Main Street

Harrisville, RI 02830

[email protected]; 401-568-4300

ext. 115

Page 10: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

Mr. Leo Wold, Esq.

Department of Attorney General

150 South Main Street

Providence, RI 02903

[email protected]; 401-274-4400

Public Utilities Commission

Cynthia Wilson Frias, Esq., Dep. Chief of Legal

Alan Nault, Rate Analyst

[email protected]; 401-941-4500

[email protected];

Division of Public Utilities and Carriers

John J. Spirito, Esq., Chief of Legal

Steve Scialabba, Chief Accountant

Tom Kogut, Chief of Information

[email protected]; 401-941-4500

[email protected];

[email protected];

Matthew Jerzyk, Deputy Legal Counsel

Office of the Speaker of the House

State House, Room 302

Providence RI, 02903

[email protected]; 401-222-2466

Hon. Cale Keable, Esq.,

Representative of Burrillville and Glocester

[email protected]; 401-222-2258

Nick Katkevich [email protected];

Avory Brookins [email protected];

Joseph Bucci, Acting Administrator

Highway and Bridge Maintenance Operations

RI Department of Transportation

[email protected];

Jared Rhodes, Chief

Statewide Planning Program

Jennifer Sternick

Chief of Legal Services

RI Department of Administration

[email protected];

[email protected];

Doug Gablinske, Executive Director

TEC-RI

[email protected];

Tim Faulkner

ecoRI News

111 Hope Street

Providence, RI 02906

[email protected]; 401-330-6276

Robert Tormey

Conanicut Energy, LLC

[email protected]; 617-306-1601

Sally Mendzela [email protected];

Keep Burrillville Beautiful

Paul LeFebvre

[email protected]; 401-714-4493

Mark Baumer [email protected];

Nisha Swinton

Food & Water Watch New England

[email protected];

Kaitlin Kelliher [email protected];

Page 11: STATE OF RHODE ISLAND AND PROVIDENCE ...3 Interconnection Project,” which has been submitted to the Rhode Island Department of Environmental Management. RESPONDENT: John Niland,

Joe Piconi, Jr. [email protected];

Hon. Aaron Regunberg

Representative of Providence, District 4

[email protected];

Paul Ernest [email protected];

Skip Carlson [email protected];

Kathryn Scaramella [email protected];

Diana Razzano [email protected];

David Goldstein [email protected];

Douglas Jobling [email protected];

Claudia Gorman [email protected];

Curt Nordgaard [email protected];

Colleen Joubert [email protected];

Matt Smith

Food & Water Watch

[email protected];

Christina Hoefsmit, Esq.

Senior Legal Counsel

RI Department of Environmental Management

[email protected];

Steven Ahlquist, RIFuture [email protected];

Pascoag Utility District

William Bernstein, Esq.

Michael Kirkwood, General Manager

Robert Ferrari, Northeast Water Solutions, Inc.

[email protected];

[email protected];

[email protected];

Ben Weilerstein

Toxics Action Center

[email protected];

Russ Olivo

Woonsocket Call

[email protected];

Celine Schmidt [email protected];

Suzanne Enser [email protected];

Rhode Island Student Climate Coalition [email protected];