![Page 1: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/1.jpg)
STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTERS-1-26. )
APPROVED: DEC 2 8 2017
ORDER OF THE COMMISSION
Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.
The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.
Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination.
IT IS SO ORDERED.
ATTERHOLT, FREEMAN, HUSTON, WEBER, AND ZIEGNER CONCUR;
APPROVED: DEC 2 8 2017
I hereby certify that the above is a true and correct copy of the Order as approved.
![Page 2: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/2.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting; Date of Damage:
My Contractor, Inc. Citizens Gas 14819 10/24/2017 9/30/2016
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)(~)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other --------------------------------Abstentions: Warren
APPROVED: Dan Meiners Vice Chairman
![Page 3: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/3.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
James H Drew Corp. Vectren Energy Delivery 15530 10/24/2017 1/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _=:\ ............ 1 ..... G-60 __ ' ---------------0 Other
---------------------------------------------------------------------------------------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 4: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/4.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
American Leak Detection Vectren Energy Delivery 15531 10/24/2017 1/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
D White Lining
/j. Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ ______________________ _
O Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 5: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/5.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Steve Simpson Vectren Energy Delivery 15532 10/24/2017 1/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
g Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 6: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/6.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Duke Energy Indiana 15533 10/24/2017 1/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
Pf.l Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$-----------------------
0 Other -------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 7: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/7.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Niemier Enterprises LLC Vectren Energy Delivery 15534 10/24/2017 1/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 8: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/8.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Osborne Utilities Vectren Energy Delivery 15535 10/24/2017 1/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ w aming 1 etter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: BenWarren ~ Chairman
![Page 9: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/9.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
L & S Underground, Inc. Vectren Energy Delivery 15536 10/24/2017 1/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0- Civil penalty of$---'?2 ........... -"~:;,__-----------------D Other -------------------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 10: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/10.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Affordable Fence Inc. Vectren Energy Delivery 15537 10/24/2017 1/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory Committee recommends the following penalty:
CKJ. W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
tK!. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 11: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/11.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery CSU, Inc. 15539 10/24/2017 1/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 12: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/12.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 15540 10/24/2017 1/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _5_,_o __ o __ D _______________ _
D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 13: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/13.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Weddle Brothers Construction Co., Inc. Vectren Energy Delivery
Case Number: 15564 Date of Advisory Meeting: 10/24/2017 Date of Damage: 1/30/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
Additional Information: to~~ Y } \3' \/.
APPROVED: Ben Warren Chairman
![Page 14: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/14.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
3-D Construction, Inc. Vectren Energy Delivery 15565 10/24/2017 1/30/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 15: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/15.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Burtner Electric Vectren Energy Delivery 15566 10/24/2017 1/31/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
)lS\ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 16: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/16.jpg)
J
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Q C Communications Other Party: Case Number:
Northern Indiana Public Service Company 15567
Date of Advisory Meeting: 10/24/2017 Date of Damage: 1131/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 17: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/17.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Gordon Engineering Other Party: Case Number:
Northern Indiana Public Service Company 15609
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
® Civil penalty of$ _S_, Ef\.99.,__.....___ _______________ _
D Other ------------------------------------------------------------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 18: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/18.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company H & G Underground Utilities LLC
Case Number: 15610 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/15/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
!» Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
il __ ~<
![Page 19: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/19.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company U R 1st Services
Case Number: 15612 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Otl1er __________________________ _
Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
![Page 20: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/20.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Mr. Underground
Case Number: 15613 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
D White Lining
0 Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$--------------------------------
0 Other ------------------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 21: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/21.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Asplundh Construction Corp. Respondent: Other Party: Case Number:
Northern Indiana Public Service Company 15614
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ ___..5--+l=00-0-=--=------------------
0 Other ~---------------------------------------------------
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 22: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/22.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Asplundh Construction Corp.
Case Number: 15615 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 23: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/23.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Jeff Oxley Jr. Respondent: Other Party: Case Number:
Northern Indiana Public Service Company 15616
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
~ W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------0 Other ___________________________________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 24: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/24.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Meade Electric Company, Inc.
Case Number: 15617 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
(ti. Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ----------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 25: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/25.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
T & B Electrical Construction, Inc. Northern Indiana Public Service Company 15618 10/24/2017 2/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
il_ Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D Wbite Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 26: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/26.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Fieldstone Enterprises, LLC
Case Number: 15622 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
RI Civil penalty of $1,000
0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 27: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/27.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company City of Mishawaka
Case Number: 15623 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
m Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: tJ. __ _
Ben Warren Chairman
![Page 28: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/28.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Northwest Indiana Fence Co. Other Party: Case Number:
Northern Indiana Public Service Company 15624
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
![ill Civil penalty of$ _?>-=--1~5b __ O _______________ _ D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 29: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/29.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Grimmer Construction Co.
Case Number: 15626 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 30: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/30.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: NIPSCO-Gas Other Party: Case Number:
Northern Indiana Public Service Company 15627
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _5....,,_()e;CJ _________________ _ D Other
~~~~~~~~~~~~~~~---~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 31: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/31.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: City of Fort Wayne Other Party: Case Number:
Northern Indiana Public Service Company 15628
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
li)i Civil penalty of$ _S__,_1
-=&o()........_ ___________________ _
D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 32: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/32.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Universal Services Other Party: Case Number:
Northern Indiana Public Service Company 15629
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 33: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/33.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: H & H Tiling & Excavating Other Party: Case Number:
Northern Indiana Public Service Company 15630
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
ft Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 34: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/34.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Creed Septic System Specialist Other Party: Case Number:
Northern Indiana Public Service Company 15631
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 35: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/35.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: City of Fort Wayne Other Party: Case Number:
Northern Indiana Public Service Company 15632
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ ....... 5""'",.__e-cJU ________________ _ D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 36: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/36.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Warrick County Highway Department Vectren Energy Delivery
Case Number: 15634 Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/112017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(out)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 37: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/37.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 15635 10/24/2017 2/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _s=-· ...:..'~------------------0 Other ---------------------------Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 38: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/38.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Blankenberger Brothers, Inc. Vectren Energy Delivery 15636 10/24/2017 2/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ =5 ..... ,_l9t/D.........._=-----------------D Other --------------------------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 39: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/39.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Wabash Utilities, Inc. Vectren Energy Delivery 15637 10/24/2017 2/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
t8.. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 40: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/40.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Vectren Energy Delivery 15638 10/24/2017 2/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Cmmnittee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
l)!l Civil penalty of$ _L__,).........._O_D_O ________________ _
D Other ~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions:
APPROVED: Ben Warren Chairman
![Page 41: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/41.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Vectren Energy Delivery Rieth-Riley Construction Co., Inc. 15640
Date of Advisory Meeting: 10/24/2017 Date of Damage: 2/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 42: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/42.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Ben Tryon Vectren Energy Delivery 15641 10/24/2017 2/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
'6J Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
K'J Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ ______________________ _
O Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 43: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/43.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Reitz Electric Service Vectren Energy Delivery 15642 10/24/2017 2/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
~ Clearance Zone D Failure to Plan
D Damaging Lines D Potholing
D Dig Tickets D Probing
D Demolitions
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 44: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/44.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
P P M I Construction Co. Vectren Energy Delivery 15643 10/24/2017 2/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
g Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 45: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/45.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Patriot Electric Co., LLC Vectren Energy Delivery 15647 10/24/2017 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a){2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
& Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 46: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/46.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Hearne Development, LLC Vectren Energy Delivery 15648 10/24/2017 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 47: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/47.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Lubovich Excavating, Inc. 15649 10/24/2017 2/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ~--------------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 48: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/48.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery DirecTV, LLC 15651 10/24/2017 2/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 49: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/49.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Drainage Construction Unlimited, Inc. Vectren Energy Delivery
Case Number: 15810 Date of Advisory Meeting: 10/24/2017 Date of Damage: 3/30/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D W aming 1 etter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
l&_ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other -----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 50: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/50.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Lawnscape Site Development Northern Indiana Public Service Company 15870 10/24/2017 4/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ W aming letter (Special instructions:)
Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 51: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/51.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Area Plumbing & Sewer Co., Inc.
Case Number: 15883 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ ______________________ _
O -Other ----------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 52: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/52.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: SuyingWu Other Party: Case Number:
Northern Indiana Public Service Company 15886
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
1721- Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other -------------------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 53: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/53.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lawrence Building Corp. Other Party: Case Number:
Northern Indiana Public Service Company 15887
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
lfil Civil penalty of$ __ S:-_,c.,...C) __ OD _______________ _ D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 54: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/54.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company E & B Paving, Inc.
Case Number: 15888 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 55: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/55.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Action Plumbing, Inc. (Cedar Lake)
Case Number: 15889 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 56: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/56.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Carlisle Utility Contractors, Inc.
Case Number: 15890 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ____________________________________________________________ _
D Other ------------------------------------------------------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 57: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/57.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Wiltjer Excavating, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 15891
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
[Rl Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 58: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/58.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Juan Obregon Other Party: Case Number:
Northern Indiana Public Service Company 15893
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
g Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 59: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/59.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: James Edlen Other Party: Case Number:
Northern Indiana Public Service Company 15894
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 60: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/60.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Smith Projects, Inc. Citizens Gas 15902 10/24/2017 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
f;ZJ. Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Warren
APPROVED: Dan Meiners Vice Chairman
![Page 61: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/61.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Smith Projects, Inc. Citizens Gas 15904 10/24/2017 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(l)
The Advisory Committee recommends the following penalty:
QS- W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
~· Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Warren
APPROVED: Dan Meiners Vice Chairman
![Page 62: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/62.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
· (>.Citizeus~Gas~ e: 't (_> ~. Citizens Energy Group
15905 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
m Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Warren
APPROVED: Dan Meiners Vice Chairman
![Page 63: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/63.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Calumet Civil Contractors, Inc. Citizens Gas
Case Number: 15906 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _y__._ . ....,. tn£0--=------------------D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Warren
APPROVED: DanMemers Vice Chairman
![Page 64: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/64.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Middlebury Septic, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 15941
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 65: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/65.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Midwest Trenchless Services Other Party: Case Number:
Northern Indiana Public Service Company 15942
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _L\.._.,-=EYt9 __ 0 _______________ _ D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 66: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/66.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Woodruff & Sons, Inc.
Case Number: 15948 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/17/2017
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other __________________________ _
Abstentions: Selking
Additional Information:-----------------------
APPROVED: Ben Warren Chairman
![Page 67: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/67.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company ABC Asphalt, Inc.
Case Number: 15949 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 68: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/68.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
v Respondent: Shroeder' s Trucking & Excavating Other Party: Ohio Valley Gas Corp Case Number: 15951 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
lR Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ~--------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 69: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/69.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Brady Tolle 15954 10/24/2017 4/1/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 70: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/70.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Blackmore Construction Vectren Energy Delivery 15955 10/24/2017 4/112017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(3)(b)
The Advisory Colillilittee recolillilends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
~ Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 71: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/71.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Gordon Scherer Vectren Energy Delivery 15956 10/24/2017 4/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 72: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/72.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Arc American, Inc. Vectren Energy Delivery 15957 10/24/2017 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000 ?>,ooo ~,ooO
~ Civil penalty of $+;500, can mitigate $1-,500- by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 73: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/73.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
German Township Water Vectren Energy Delivery 15958 10/24/2017 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
tLf- Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other __________________________ _
Abstentions:
APPROVED: Ben Warren Chairman
![Page 74: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/74.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Underground Contractors of Indiana, Inc. Vectren Energy Delivery
Case Number: 15959 Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/4/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D W aming letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 75: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/75.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Milestone Contractors, LP 15963 10/24/2017 4/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
tcL
![Page 76: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/76.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Reliable Handyman Service Vectren Energy Delivery 15964 10/24/2017 4/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: =--=:::: Ben Warren Chairman
![Page 77: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/77.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Hartco Cable, Inc. 15965 10/24/2017 4/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 78: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/78.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Jones Brothers Electric Vectren Energy Delivery 15966 10/24/2017 4/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
f§J Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other -----------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 79: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/79.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Elm Ridge Funeral Home Vectren Energy Delivery 15967 10/24/2017 417/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 80: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/80.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Troy Jessup Vectren Energy Delivery 15969 10/24/2017 4/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(1)
The Advisory Committee recommends the following penalty:
~ W aming letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
~Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 81: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/81.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Michael Wood Vectren Energy Delivery 15971 10/24/2017 4/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
& Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
~ Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of$1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 82: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/82.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Wilson Concrete Construction Vectren Energy Delivery 15972
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(l)
The Advisory Committee recommends the following penalty:
Warning letter (Special instructions:)
D Clearance Zone ~ Failure to Plan
D Damaging Lines D Potholing
0 Dig Tickets 0 Probing
D Demolitions
D Self-Repair
~ Using Stakes or Post Hole Diggers
0 White Lining
D Training or $ 5, 000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 83: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/83.jpg)
- -·
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 15973 10/24/2017 4/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
I& Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 84: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/84.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Gaylor Electric, Inc. 15974 10/24/2017 4/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 85: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/85.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
C H Garrnong & Son, Inc. Vectren Energy Delivery 15975 10/24/2017 4/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
0 W aming letter (Special instructions:)
0 Clearance Zone
D Damaging Lines
0 Dig Tickets
0 Demolitions
D Failure to Plan
0 Potholing
D Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
R Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ ______________________ _
O Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 86: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/86.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Rodney W Harp Vectren Energy Delivery 15976 10/24/2017 4/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 87: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/87.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
City of New Albany Vectren Energy Delivery 15977 10/24/2017 4/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other -----------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 88: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/88.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Dave O'Mara Construction 15978 10/24/2017 4/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 89: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/89.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Milestone Contractors, LP 15979 10/24/2017 4/11/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
lil Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ___________________________ _
D Other ---------------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 90: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/90.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
D R Watson Co. Vectren Energy Delivery 15980 10/24/2017 4/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _'j,,,,__1 Qt_......:X ..... :J-'------------------0 Other -----------------------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 91: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/91.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Addison Underground Utilities LLC Vectren Energy Delivery 15981 10/24/2017 4/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D
D
g
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
Training or $5,000 civil penalty if fail to complete training
Civil penalty of $1,000
Civil penalty of $1,500,, ~an mitigate $1,500 by completing training apd CO{Tective actionplanlfor ~~\1~ 1-o ~<t..,\J, \-oJlL --\--v-o. ... ;1n\"3)
..---Civil penalty of$ -~-1-"~---------------------0ther ---------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 92: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/92.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Vectren Energy Delivery 15982 10/24/2017 4/12/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _U__._\ ~l-150D=------------------D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions:
APPROVED: Ben Warren Chairman
![Page 93: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/93.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Bruns Landscape, Inc. Vectren Energy Delivery 15983 10/24/2017 4/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
!R Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
\ll Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 94: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/94.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Wabash Utilities, Inc. Vectren Energy Delivery 15984 10/24/2017 4/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
a Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 95: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/95.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Miller Pipeline, LLC 15985 10/24/2017 4/13/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
0-. Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 96: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/96.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 15986 10/24/2017 4/14/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
Civil penalty of$ 5 I eoo
Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 97: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/97.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Vectren Energy Delivery Other Party: Case Number:
City of Evansville (Water & Sewer Departments) 15987
Date of Advisory Meeting: 10/24/2017 Date of Damage: 4/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
ijl Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: f~-c -
Ben Warren Chairman
![Page 98: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/98.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery The Hoosier Co., Inc. 15988 10/24/2017 4/17/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ~------------------------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 99: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/99.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Midwest Paving Vectren Energy Delivery 15990 10/24/2017 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 100: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/100.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 15991 10/24/2017 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
0 Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _5_,CJ\JD _________________ _ 0 Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 101: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/101.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Alan Acuff Construction LLC Vectren Energy Delivery 15994 10/24/2017 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civilpenalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 102: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/102.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Hartco Cable, Inc. 15995 10/24/2017 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$------------------------
0 Other -----------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 103: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/103.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Wabash Utilities, Inc. 15996 10/24/2017 4/18/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
0 Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ----------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 104: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/104.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Sikma Plumbing, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16071
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
l}(J. Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 105: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/105.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Northern Indiana Public Service Company All Seasons General Contracting, LLC 16072 10/24/2017 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
l)IJ. Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 106: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/106.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Kenneth Stringer Other Party: Case Number:
Northern Indiana Public Service Company 16073
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
®, Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other __________________________ _
Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 107: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/107.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Sons of Realty LLC Other Party: Case Number:
Northern Indiana Public Service Company 16075
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 108: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/108.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company GE Marshall, Inc.
Case Number: 16076 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
[fl Civilpenaltyof$1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 109: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/109.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Dave's Electric Heating & Cooling, Inc. Northern Indiana Public Service Company 16077
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 110: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/110.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Lewis Backhoe, Inc.
Case Number: 16078 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 111: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/111.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company T L C Plumbing
Case Number: 16079 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 112: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/112.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Dyer Construction Co., Inc.
Case Number: 16080 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 113: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/113.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company NIPSCO - Electric
Case Number: 16081 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 114: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/114.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Max Thompson Other Party: Case Number:
Northern Indiana Public Service Company 16082
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/7/2017
The IURC Pipeline SafetyDivision finds the following violation(s): IC 8-1-26-16(h)(prior)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 115: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/115.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Chris N adratowski Other Party: Case Number:
Northern Indiana Public Service Company 16084
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/6/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
l) Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 116: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/116.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company City of Valparaiso
Case Number: 16085 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D W aming letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 117: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/117.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Chris Ewing Other Party: Case Number:
Northern Indiana Public Service Company 16086
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/5/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
Oil. Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
Ci! Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$----------------------
0 Other -----------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 118: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/118.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number:
Garcia Concrete Construction, Inc. Northern Indiana Public Service Company 16089
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
{& Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
v
![Page 119: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/119.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Lower Electric, Inc. Other Party: Case Number:
Northern Indiana Public Service Company 16090
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
l2'I- Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 120: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/120.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Paul Decker Other Party: Case Number:
Northern Indiana Public Service Company 16091
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
rrz Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: z Ben Warren Chairman
![Page 121: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/121.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Town of Munster
Case Number: 16093 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
0- Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 122: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/122.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Whay's Signs LLC Other Party: Case Number:
Northern Indiana Public Service Company 16095
Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 123: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/123.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Northern Indiana Public Service Company Reeves Fence Co.
Case Number: 16242 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 124: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/124.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Marlin Steury General Contracting Inc. Northern Indiana Public Service Company 16257 10/24/2017 11/15/2016
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
0 Warning letter (Special instructions:)
0 Clearance Zone
0 Damaging Lines
0 Dig Tickets
0 Demolitions
0 Failure to Plan
0 Potholing
0 Probing
0 Self-Repair
0 Using Stakes or Post Hole Diggers
0 White Lining
~ Training or $5,000 civil penalty if fail to complete training
0 Civil penalty of $1,000
0 Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
0 Civil penalty of$ ______________________ _
O Other ---------------------------Abstentions: Selking
APPROVED: Ben Warren Chairman
![Page 125: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/125.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Q C Communications Vectren Energy Delivery 16321 10/24/2017 5/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ _3=--,_l5t.50 _________________ _ D Other
~~~~~~~~~~~~~~~~~~~~~~~~~~-
Abstentions:
APPROVED: Ben Warren Chairman
![Page 126: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/126.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
A I Excavating LLC Vectren Energy Delivery 16323 10/24/2017 5/2/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ~---------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 127: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/127.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Manns, Inc. Vectren Energy Delivery 16325 10/24/2017 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-l-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
Kl Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$-----------------------
0 Other ---------------------------Abstentions:
APPROVED: .. ~U-Ben Warren Chairman
![Page 128: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/128.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Corgroup, LLC Vectren Energy Delivery 16326 10/24/2017 5/3/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------~-----
Abstentions:
APPROVED: Ben Warren Chairman
![Page 129: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/129.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
B & T Drainage & Excavating Vectren Energy Delivery 16328 10/24/2017 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
i§(l W aming 1 etter (Special instructions:)
D Clearance Zone
D Damaging Lines
ra. Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 130: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/130.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery CSU, Inc. 16329 10/24/2017 5/8/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
!Ill Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other -------------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 131: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/131.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
David D. Sanders Vectren Energy Delivery 16331 10/24/2017 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)(expire)
The Advisory Committee recommends the following penalty:
R Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
© Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1, 000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ----------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 132: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/132.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Miller Pipeline, LLC Vectren Energy Delivery 16332 10/24/2017 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-l-26-20(a)(2)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
~ Civil penalty of$ ---"5"'-"\aeQ ___________________ _
D Other ~--------------------------
Abstentions: Miller
APPROVED: Ben Warren Chairman
![Page 133: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/133.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Custom Wood Fencing 16333 10/24/2017 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-18(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Specialinstructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
~ Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________________________ _
D Other ------------------------------------------------------------------------------------------------
Abstentions:
APPROVED: Ben Warren Chairman
![Page 134: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/134.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Jake Potter Vectren Energy Delivery 16334 10/24/2017 5/9/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
00 Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
~ Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 135: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/135.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
S T Construction Vectren Energy Delivery 16335 10/24/2017 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s ): IC 8-1-26-16(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
0 Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
0 White Lining
~ Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
Additional Information: -~-~--_W_kd ___ o_l_d:_:ci_\,_~-------
APPROVED: Ben Warren Chairman
![Page 136: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/136.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party: Case Number: Date of Advisory Meeting: Date of Damage:
Vectren Energy Delivery Duke Energy Indiana 16337 10/24/2017 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-lS(h)
The Advisory Committee recommends the following penalty:
D Warning letter (Special instructions:)
D Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
g Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ ______________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman
![Page 137: STATE OF INDIANA INDIANA UTILITY REGULATORY … · W aming letter (Special instructions:) D Clearance Zone D Damaging Lines tK!. Dig Tickets D Demolitions D Failure to Plan D Potholing](https://reader033.vdocuments.us/reader033/viewer/2022043009/5f9ca6629fce035e574a4964/html5/thumbnails/137.jpg)
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Respondent: Other Party:
Roberts Boring/Trenching/Excavating LLC Vectren Energy Delivery
Case Number: 16338 Date of Advisory Meeting: 10/24/2017 Date of Damage: 5/10/2017
The IURC Pipeline Safety Division finds the following violation(s): IC 8-1-26-20(a)(2)
The Advisory Committee recommends the following penalty:
~ Warning letter (Special instructions:)
~ Clearance Zone
D Damaging Lines
D Dig Tickets
D Demolitions
D Failure to Plan
D Potholing
D Probing
D Self-Repair
D Using Stakes or Post Hole Diggers
D White Lining
D Training or $5,000 civil penalty if fail to complete training
D Civil penalty of $1,000
D Civil penalty of $1,500, can mitigate $1,500 by completing training and corrective action plan
D Civil penalty of$ _____________________ _
D Other ---------------------------Abstentions:
APPROVED: Ben Warren Chairman