state of biking todd waelterman
DESCRIPTION
Moving to the Next Level, November 20, 2013 Gateway Bike Plan Implementation Workshop Session: State of Biking in the Region: Progress MadeTRANSCRIPT
STATE OF STATE OF BIKINGBIKING
CITY OF ST. LOUISCITY OF ST. LOUISDIRECTOR OF STREETS, TODD DIRECTOR OF STREETS, TODD
WAELTERMANWAELTERMAN
HISTORYHISTORY
1994 - City of St. Louis had ZERO 1994 - City of St. Louis had ZERO miles of bike facilitiesmiles of bike facilities
Mid-90’s - built the Riverfront Trail, Mid-90’s - built the Riverfront Trail, which stretches from north of the which stretches from north of the Arch to Chain of Rocks bridge (10.8 Arch to Chain of Rocks bridge (10.8 miles)miles)
2005 – created first 22 miles of on-2005 – created first 22 miles of on-street bikewaysstreet bikeways
2008 – expanded to 75 miles2008 – expanded to 75 miles
WHERE DO WE WHERE DO WE STAND NOW?STAND NOW?
Off Street TrailsOff Street Trails
Currently 36 miles Currently 36 miles of off-street trails:of off-street trails: Carondelet ParkCarondelet Park Forest ParkForest Park River Des PeresRiver Des Peres Tower Grove Tower Grove
ParkPark Mississippi TrailMississippi Trail
SHARROWSSHARROWS
Currently 74 Currently 74 miles of miles of shared lanes, shared lanes, marked with marked with sharrows sharrows
Bike lanesBike lanes Currently 16 Currently 16
miles of miles of dedicated dedicated bike lanes bike lanes
City’s first buffered bike lane City’s first buffered bike lane ½ mile of Arsenal along TG Park½ mile of Arsenal along TG Park
MODOT - Manchester MODOT - Manchester (McCausland to Vandeventer)(McCausland to Vandeventer)
2 miles of shared lanes
2.6 miles of buffered lanes
Tower Grove at Tower Grove at VandeventerVandeventer
Phase 3Phase 3
42 miles of 42 miles of updatesupdates
14 miles of 14 miles of upgradesupgrades
52 miles of new 52 miles of new bikeways bikeways (including the (including the DesPeres DesPeres Neighborhood Neighborhood Greenway)Greenway)
Totaling 108 Totaling 108 miles of miles of new/improved new/improved facilitiesfacilities
BIKE RACKSBIKE RACKS
46 Art racks 46 Art racks installed by installed by neighborhood neighborhood commercial commercial districts districts
80 Arch racks 80 Arch racks installed across installed across the citythe city
120 Arch racks 120 Arch racks purchased, to be purchased, to be installed by installed by springspring
Bike CorralsBike Corrals
Scouting Scouting locations for 4-locations for 4-6 corrals6 corrals
By end of 2014By end of 2014 97.06 miles of shared 97.06 miles of shared
lane markingslane markings 36.16 miles of bike 36.16 miles of bike
laneslanes 10.06 miles of 10.06 miles of
buffered bike lanesbuffered bike lanes 0.55 miles of 0.55 miles of
neighborhood neighborhood greenways (aka bike greenways (aka bike boulevards)boulevards)
246 bike racks246 bike racks 6 bike corrals6 bike corrals