coMMrssroN COMMISSION oF OF TNQUTRY INQUffiY MONTARA MONTARA WELL WELL HEAD HEAD PLATF'ORM PLATFORM I]NCONTROLLED UNCONTROLLED ITYDROCARBON HYDROCARBON RELEASE RELEASE COMMONWEALTH COMMONWEALTH OF OF AUSTRALIA AUSTRALIA DECLARATION DECLARATION I]I\DER UNDER TITE THE STATUTORY STATUTORY DECLARATIONS DECLARATIONS ACT ACT 1959 1959 I, I, Christopher Christopher Allan Allan Wilson Wilson care care of of Level1,162 Level 1, 162 Colin Colin Street, Street, West West Perth Perth in in the the State State of of Western Western Australia, Australia, Drilling Drilling Superintendent, Superintendent, make make the the following following declaration declaration under under the the Statutory Statutory Declarations Declarations Act Act 1959 1959 (Cth): (Cth): Tabte Table of of topics topics - - Christopher Christopher Allan Allan Wilson Wilson Topic Topic Paragrøphs Paragraphs I 1. Current Current position position I 1 2. 2. Qualifications and work work experience experience 3-4 3-4 Qualifications and J. 3. Montara Montara Development Development Project Project 5-7 5-7 4. 4. Atlas Atlas Drilling Drilling 8-9 8-9 5. 5. My My role role and and responsibilities responsibilities 10-15 10-15 6. 6. The The well well construction construction team, team, their their qualifications qualifications and and roles roles 16 t6 7. 7. Communication Communication within within PTTEP PTTEPAA AA 17 t7 8. 8. Communication Communication with with Atlas Atlas Drilling Drilling 18-21 t8-21 9. 9. Key Key documents documents to to manage manage the the HI Hl Well Well 22-48 22-48 10. Changes to the DP 49-55 10. Changes to the DP 49-55 11. 11 Knowledge Knowledge of of the the key key documents documents 56-58 56-58 12. 12. Drilling Drilling Terminology Terminology 59 59 13. Cementing 60-104 60-104 13. Cementing 14. 14. Pore Pore Pressure Pressure & & Fracture Fracture Pressure Pressure HI Hl Well Well 105-109 105-109 15. I 10-1 15. Hydrostatic Hydrostatic balancing balancing 110-115 l5 úóu/ lr r0265808_l WIT.1000.0001.0224

Upload: others

Post on 24-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN COMMISSION oF OF TNQUTRYINQUffiY MONTARA MONTARA WELL WELL HEAD HEAD PLATF'ORMPLATFORM

I]NCONTROLLED UNCONTROLLED ITYDROCARBON HYDROCARBON RELEASERELEASE

COMMONWEALTH COMMONWEALTH OF OF AUSTRALIAAUSTRALIA

DECLARATION DECLARATION I]I\DER UNDER TITE THE STATUTORY STATUTORY DECLARATIONS DECLARATIONS ACT ACT 19591959

I, I, Christopher Christopher Allan Allan Wilson Wilson care care of of Level1,162 Level 1, 162 Colin Colin Street, Street, West West Perth Perth in in the the State State of of Western Western Australia,Australia,

Drilling Drilling Superintendent, Superintendent, make make the the following following declaration declaration under under the the Statutory Statutory Declarations Declarations Act Act 1959 1959 (Cth):(Cth):

Tabte Table of of topics topics - - Christopher Christopher Allan Allan WilsonWilson

TopicTopic ParagrøphsParagraphs

I1. Current Current positionposition I1

2.2. Qualifications and work work experienceexperience 3-43-4 Qualifications and

J.3. Montara Montara Development Development ProjectProject 5-7 5-7

4. 4. Atlas Atlas DrillingDrilling 8-9 8-9

5. 5. My My role role and and responsibilities responsibilities 10-15 10-15

6. 6. The The well well construction construction team, team, their their qualifications qualifications and and roles roles 16 t6

7. 7. Communication Communication within within PTTEP PTTEPAAAA 17 t7

8. 8. Communication Communication with with Atlas Atlas Drilling Drilling 18-21 t8-21

9. 9. Key Key documents documents to to manage manage the the HI Hl Well Well 22-48 22-48

10. Changes to the DP 49-5510. Changes to the DP 49-55

11. 11 Knowledge Knowledge of of the the key key documents documents 56-58 56-58

12. 12. Drilling Drilling Terminology Terminology 59 59

13. Cementing 60-104 60-10413. Cementing

14. 14. Pore Pore Pressure Pressure & & Fracture Fracture Pressure Pressure HI Hl Well Well 105-109 105-109

15. I 10-1 15. Hydrostatic Hydrostatic balancing balancing 110-115 l5

úóu/ lrr0265808_l

WIT.1000.0001.0224

Page 2: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN COMMISSION oF OF TNQUTRYINQUIRY MONTARA MONTARA WELL WELL HEAD HEAD PLATFORMPLATFORM

T]NCONTROLLED UNCONTROLLED ITYDROCARBON HYDROCARBON RELEASERELEASE

16.16. Drilling, Drilling, displacement displacement and and completion completion fluidsfluids tr6-128116-128

17.17. BarriersBarriers 129-143 r29-143

18.18. Temporary Temporary and and long long term term suspension suspension and and abandonmentabandonment t44-152144-152

19. 19. Hl HI Well Well SpecificsSpecifics 153-t62153-162

20.20. March March 20092009 162-202 t62-202

21. 21. The The 340mm 340mm (13%") (13'ls") PCCCPCCC 203-2t4203-214

22.22. Suspension Suspension status status of of the the Hl HI Well Well and and the the plan plan for for the the completion completion of of the the wellswells 2t5-227215-227

23.23. 20 20 August August 20092009 228-234 228-234

24.24. 21 21 August August 20092009 235-238 235-238

25.25. Responses Responses to to specific specific matters matters raised raised by by the the Commissioner Commissioner 239-277239-277

I I make make this this declaration declaration in in response response to to the the request request from from the the Montara Montara Commission Commission of of Inquiry Inquiry (the (he

Commission) Commission) into into the the uncontrolled uncontrolled release release of of oil oil and and gas gas from from the the Montara Montara Wellhead Wellhead Platform Platform inin

the the Timor Timor Sea Sea to to provide provide evidence evidence in in relation relation to to specified specified areas areas of of interest interest relevant relevant to to the the

Commission's Commissionos Terms Terms of of Reference. Reference.

Current Current position position

2 2 I I am am engaged engaged by by PTTEP PTTEP Australasia Australasia (Ashmore (Ashmore Cartier) Cartier) Pty Pty Limited Limited (pTTEPAA) (PTTEPAA) as as a a Senior Senior

Drilling Drilling EngineerlDrilling Engineer/Drilling Superintendent Superintendent and and have have been been in in that that position position since since about about January January 2007. 2007.

&J (tr

2

WIT.1000.0001.0225

Page 3: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF INQUTRYMONTARA WELL HEAD PLATFORM

I]NCONTROLLED IIYDROCARBON RELEASE

Qualifications and work experience

I hold a Bachelor of Science majoring in geology (obtained from Curtin University in 2001) and a

Masters of Petroleum Engineering (obtained from the Universþ of New South Wales in 2004).

My work experience is as follows:

(a) from August 2003 to September 2006I was contracted to Apache Energy for 4 years as a

Night Drilling Supervisor and Senior Drilling Supervisor on Jack-up and Semi Submersible

Mobile Offshore Drilling Units (or MODUs) (North West Shelf and Bass Strait);

from September 2006 to December 2006I was contracted to Apache as a Senior Drillin"

Engineer planning an extended reach platform well for 3 months;

prior to working for Apache I worked from January 2003 to July 2003 on contract for

Woodside as a Drilling Engineer planning a jack-up platform well and a workover on the

Legendre Platform for 7 months;

from April 2001 to October 2002I held various contract Night Drilling Supervisor positions

with OMV, Santos, Anadarko and AGIP;

from April 1998 to April 2001 I worked as a Project Planning Coordinator and Drilling

Engineer on a variety of projects managed by Labrador Petro Management Pty Ltd; and

in January 1990 to April 1998 I worked as an Operations and Wellsite Geologist for WAPET

(now Chevron) including developing an online Drilling Management and Learning system

for Chevron in PNG for 12 months.

(c)

(e)

The Montara Development Project

PTTEPAA is developing the Montara, Skua, Swifl/Swallow Fields in the East Timor Sea. The

development of these fields is referred to as the Montara Development Project and is located about

690 km west of Darwin, Northern Territory, near the Ashmore Cartier reef'

The Montara Development Project involves four production wells including the Hl-STl well (Hl

Well), in the Montara Field, two production wells in the Skua Field and three production wells in the

Swiff/Swallow Field.

The Montara Development facilities include a wellhead platform (WHP) at the Montara Field.

(b)

(d)

(a¿ ur

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

Qualifications and work experience

3 I hold a Bachelor of Science majoring in geology (obtained from Curtin University in 2001) and a

Masters of Petroleum Engineering (obtained from the University of New South Wales in 2004).

4 My work experience is as follows:

(a) from August 2003 to September 2006 I was contracted to Apache Energy for 4 years as a

Night Drilling Supervisor and Senior Drilling Supervisor on Jack-up and Semi Submersible

Mobile Offshore Drilling Units (or MODUs) (North West Shelf and Bass Strait);

(b) from September 2006 to December 2006 I was contracted to Apache as a Senior Drilling

Engineer planning an extended reach platform well for 3 months;

(c) prior to working for Apache I worked from January 2003 to July 2003 on contract for

Woodside as a Drilling Engineer planning a jack-up platform well and a workover on the

Legendre Platform for 7 months;

(d) from April 2001 to October 2002 I held various contract Night Drilling Supervisor positions

with OMV, Santos, Anadarko and AGIP;

(e) from April 1998 to April 2001 I worked as a Project Planning Coordinator and Drilling

Engineer on a variety of projects managed by Labrador Petro Management Pty Ltd; and

(f) in January 1990 to April 1998 I worked as an Operations and WeBsite Geologist for W APET

(now Chevron) including developing an online Drilling Management and Learning system

for Chevron in PNG for 12 months.

The Montara Development Project

5 PTTEPAA is developing the Montara, Skua, Swift/Swallow Fields in the East Timor Sea. The

development of these fields is referred to as the Montara Development Project and is located about

690 km west of Darwin, Northern Territory, near the Ashmore Cartier reef.

6 The Montara Development Project involves four production wells including the Hi-STI well (H1

Well), in the Montara Field, two production wells in the Skua Field and three production wells in the

Swift/Swallow Field.

7 The Montara Development facilities include a wellhead platform (WHP) at the Montara Field.

3

4

WIT.1000.0001.0226

Page 4: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

Atlas Drilling

I Shortly before I was engaged by PTTEPAA, Atlas Drilling (S) Pte Ltd (Atlas Drilling) was

contracted by PTTEPAA for the Montara Drilling campaign, including the construction of the Hl

Well, on the Montara WHP.

9 Atlas Drilling owns the West Atlas jack-up drilling rig(lI/est Atlas), which is a type of MODU.

My responsibilities

10 When I joined PTTEPAA I reported to the Project Manager of the Montara Development Duncan

Clegg (Mr Clegg).

11 Between about January 2007 and June 2007 I held the position of acting Well Construction Manager

in addition to the position of Senior Drilling Engineer. In the role of acting Well Construction

Manager my responsibilities included:

(a) completing contractual negotiations with Atlas Drilling;

(b) developing planning schedules;

(c) developing tender documents and tender review with PTTEPA¡{'5 çsn1¡¿ç1s department;

(d) hiring of Drilling Engineer & Subsea Engineer;

(e) reviewing of field and offset data including offset drilling problems;

(Ð preparing well timing schedule and cost estimates;

(g) working with Atlas Drilling on rig design issues and inspection regime;

(h) working with Methanol Australia (MEO) on rig sharing agreemenq

(Ð ordering of long lead items; and

û) overall managementof the Well Construction Team.

12 In about June 2007 Craig Duncan was appointed PTTEPAA's Well Construction Manager (Mr

Duncan). From that time I took on the role of Senior Drilling Engineer for the Montara

Development. During the development of the Well Construction Management Framework

fu (,,t

Atlas Drilling

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

8 Shortly before I was engaged by PTTEPAA, Atlas Drilling (S) Pte Ltd (Atlas Drilling) was

contracted by PTTEPAA for the Montara Drilling campaign, including the construction of the HI

Well, on the Montara WHP.

9 Atlas Drilling owns the West Atlas jack-up drilling rig (West Atlas), which is a type of MODU.

My responsibilities

10 When I joined PTTEP AA I reported to the Project Manager of the Montara Development, Duncan

Clegg (Mr Clegg).

11 Between about January 2007 and June 2007 I held the position of acting Well Construction Manager

in addition to the position of Senior Drilling Engineer. In the role of acting Well Construction

Manager my responsibilities included:

(a) completing contractual negotiations with Atlas Drilling;

(b) developing planning schedules;

(c) developing tender documents and tender review with PTTEPAA's contracts department;

(d) hiring of Drilling Engineer & Subsea Engineer;

(e) reviewing of field and offset data including offset drilling problems;

(f) preparing well timing schedule and cost estimates;

(g) working with Atlas Drilling on rig design issues and inspection regime;

(h) working with Methanol Australia (MEO) on rig sharing agreement;

(i) ordering of long lead items; and

(j) overall management of the Well Construction Team.

12 In about June 2007 Craig Duncan was appointed PTTEPAA's Well Construction Manager (Mr

Duncan). From that time I took on the role of Senior Drilling Engineer for the Montara

Development. During the development of the Well Construction Management Framework

4

WIT.1000.0001.0227

Page 5: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA \ilELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

(described below) it was decided that the role of Senior Drilling Engineer would move to Drilling

Superintendent for the operations phase of the Montara Development Project.

My responsibilities as Senior Drilling Engineer include:

(a) designing wells;

(d)

preparing well programs;

establishing contracts, procuring equipment and organising logistics; and

risk and change management.

l4 My responsibilities as a Drilling Superintendent include:

(b)

(c)

(a)

(b)

holding the Pre-Spud Meeting;

supervising ongoing operations including the holding of morning meetings, morning and

afternoon calls to the West Atlas, reviewing of reports issued from the \tílest Atlas;

managing day to day logistics of equipment and personnel movemen!,

managing daily cost and schedule updates;

managing risk and change control;

routine liaison with Atlas Drilling on safety and operational issues;

developing a Drilling Supervisor Induction program that consisted of a% day presentation

and workshop as well as a hard copy manual; and

delivering the Drilling Supervisor Inductions to Noel Treasure (PTTEPAA Senior Drilling

Supervisor), CraigKlumpp (PTTBPAA Drilling Supervisor) and Paul O'Shea (PTTEPAA

Senior Drilling Supervisor) on 27 February 2008, and later to Lindsay Wishart (PTTEPAA

Drilling Supervisor) and then to Brian Robinson (then a PTTEPAA Drilling Supervisor).

(c)

(d)

(e)

(e)

(h)

Whenever the West Atlas was working on the Montara Development Project, either Mr Duncan or I

was on call24/7. I was on call for about 20 days a month and Mr Duncan was responsible for 10

days a month. I would also physically visit theWest Atlas and WHP, about every 3 to 4 months in

order to see for myself how operations were progressing and to maintain visibility and relationships

t5

with the offshore personnel. élJ (,(

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(described below) it was decided that the role of Senior Drilling Engineer would move to Drilling

Superintendent for the operations phase of the Montara Development Project.

13 My responsibilities as Senior Drilling Engineer include:

(a) designing wells;

(b) preparing well programs;

(c) establishing contracts, procuring equipment and organising logistics; and

(d) risk and change management.

14 My responsibilities as a Drilling Superintendent include:

(a) holding the Pre-Spud Meeting;

(b) supervising ongoing operations including the holding of morning meetings, morning and

afternoon calls to the West Atlas, reviewing of reports issued from the West Atlas;

(c) managing day to day logistics of equipment and personnel movement;

(d) managing daily cost and schedule updates;

(e) managing risk and change control;

(t) routine liaison with Atlas Drilling on safety and operational issues;

(g) developing a Drilling Supervisor Induction program that consisted of a \tS day presentation

and workshop as well as a hard copy manual; and

(h) delivering the Drilling Supervisor Inductions to Noel Treasure (PTTEPAA Senior Drilling

Supervisor), Craig Klumpp (PTTEPAA Drilling Supervisor) and Paul O'Shea (PTTEPAA

Senior Drilling Supervisor) on 27 February 2008, and later to Lindsay Wishart (PTTEPAA

Drilling Supervisor) and then to Brian Robinson (then a PTTEPAA Drilling Supervisor).

15 Whenever the West Atlas was working on the Montara Development Project, either Mr Duncan or I

was on call 2417. I was on call for about 20 days a month and Mr Duncan was responsible for 10

days a month. I would also physically visit the West Atlas and WHP, about every 3 to 4 months in

order to see for myself how operations were progressing and to maintain visibility and relationships

with the offshore personnel.

5

13

WIT.1000.0001.0228

Page 6: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF INQUTRYMONTARA WELL HEAD PLÄTFORM

T]NCONTROLLED IIYDROCARBON RELEASE

The well construction team and roles

16 The PTTEPAA people who reported to me were:

(a)

(b)

(c)

(d)

(e)

Noel Treasure - Senior Drilling Supervisor

Paul O'Shea - Senior Drilling Supervisor

Lindsay Wishart - Drilling Supervisor

Craig Klumpp - Drilling Supervisor

Brian Robinson - Drilling Supervisor

t7

Communication within PTTEPAA

The following communications took place within PTTEPAA in accordance with PTTEPAA Well

Construction Management System (WCMS) - Construct, Services or Abandon Well Process,

Activity 4.1.4, Tasks 3 and4 (Process Manual):

(a) a morning e-mail was received - usually before 0700hrs (WST) from the PTTEPAA Drilling

Supervisor offshore that contained all of the relevant morning reports (discussed in more

detail in the following point). Additionally the morning email had a summary of the

previous 24 hours operations. This was broken down to HSE (STOP Card statistics and a

description of any incidents), Medics Daily Record, Operations summary (summary of what

has happened "online" over the previous 36 hours), comments and activities (detailed boat

locations, any offline work or equipment preparation that has occurred and finally a section

of outstanding equipment issues;

ttre reports e-mailed would consist of;

Daily Drilling Report (DDR> The DDR includes a description of critical path or

online events with respective durations rounded to the nearest 30 minutes. It also

includes basic information concerning safety, materials, drilling equipment and

drilling parameters. The DDR is similar to the offîcial report prepared by Atlas

Drilling, commonly known as the "IADC report";

Personnel on Board (POB) (this was also e-mailed the previous day by the West

Atlas Piadio Operator once updated after the crew change helicopter);

&¿ pt\J;

(b)

(iÐ

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

The well constrnction team and roles

16 The PTTEPAA people who reported to me were:

(a) Noel Treasure - Senior Drilling Supervisor

(b) PaulO' Shea - Senior Drilling Supervisor

(c) Lindsay Wishart - Drilling Supervisor

(d) Craig Klumpp - Drilling Supervisor

(e) Brian Robinson - Drilling Supervisor

Communication within PTTEP AA

17 The following communications took place within PTTEP AA in accordance with PTTEP AA Well

Construction Management System (WCMS) - Construct, Services or Abandon Well Process,

Activity 4.1.4, Tasks 3 and 4 (Process Manual):

(a) a morning e-mail was received - usually before 0700hrs (WST) from the PTTEPAA Drilling

Supervisor offshore that contained all of the relevant morning reports (discussed in more

detail in the following point). Additionally the morning e-mail had a summary of the

previous 24 hours operations. This was broken down to HSE (STOP Card statistics and a

description of any incidents), Medics Daily Record, Operations summary (summary of what

has happened "online" over the previous 36 hours), comments and activities (detailed boat

locations, any offline work or equipment preparation that has occurred and finally a section

of outstanding equipment issues;

(b) the reports e-mailed would consist of;

(i) Daily Drilling Report (DDR)- The DDR includes a description of critical path or

online events with respective durations rounded to the nearest 30 minutes. It also

includes basic information concerning safety, materials, drilling equipment and

drilling parameters. The DDR is similar to the official report prepared by Atlas

Drilling, commonly known as the "IADC report";

(ii) Personnel on Board (POB) (this was also e-mailed the previous day by the West

Atlas Radio Operator once updated after the crew change helicopter);

6

WIT.1000.0001.0229

Page 7: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

(e)

(d)

(iiÐ

(iv)

(v)

(vi)

(vii)

coMMrssroN oF TNQUIRYMONTARA \ilELL HEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

Mudlogging Daily Repor[

Daily Mud Report;

STOP Card Report;

Bulk Report; and

Directional Surveys.

between 0730 and 0745hrs (WST) every day of the week I had a "morning call" telephone

call with the offshore PTTEPAA Drilling Supervisor. This call was used to expand on

information within the morning smail and it is also an opportunity for me to ask any

questions arising from the morning email. Sometimes Atlas Drilling's Offshore Installation

Manager (OIM) would be involved or listen to the call. Additionally theT day lookahead

was discussed in detail to plan personnel and boat movements. The morning call was also

the opportunity for the PTTEPAA Drilling Supervisor to detail any issues that had arisen

from the moming meeting held on theWest Atlas with Atlas Drilling and the service

company personnel. Mr Duncan would make the morning call if I did not make it or if I was

not on duty;

a daily e-mail is received from the PTTEPAA Offshore Logistics Coordinator issuing the 7

day lookahead to PTTEPAA personnel, Atlas Drilling (Including the Rig Manager,

Toolpusher, Barge Engineer, Singapore HR etc.) and all 3'o pu.ty contractors. The Process

Manual references a l0 day look ahead - this is the same document however the front page

only covered 7 days to keep the font readable on an A4 page. The data that feeds into the

front page extends to 10 days and beyond;

between completing the morning call and before 0900hrs Iprepared and distributed a

morning update e-mail. This e-mail went to all PTTEPAA personnel, all 3'd parly contractors

and to Atlas Drilling (Rig Manager). The morning update e-mail outlined HSE, Operations,

Vessels and comments and look ahead for the next24 hours. This morning update was

issued every day of the week;

at 0900hrs Monday to Friday a morning meeting was held at the PTTEPAA project office in

Perth and was chaired by PTTEPAA's Well Construction Manager (WCM). This meeting

was attended by the Atlas Drilling Rig Manager, Donald Millar (Mr Millar), the

PTTEPAA's onshore Well Construction Team and any interested invited 3'o putry

l,l

()r

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(iii) Mudlogging Daily Report;

(iv) Daily Mud Report;

(v) STOP Card Report;

(vi) Bulk Report; and

(vii) Directional Surveys.

(c) between 0730 and 0745hrs (WST) every day of the week I had a "morning call" telephone

call with the offshore PTTEP AA Drilling Supervisor. This call was used to expand on

information within the morning e-mail and it is also an opportunity for me to ask any

questions arising from the morning e-mail. Sometimes Atlas Drilling's Offshore Installation

Manager (OIM) would be involved or listen to the call. Additionally the 7 day lookahead

was discussed in detail to plan personnel and boat movements. The morning call was also

the opportunity for the PTTEP AA Drilling Supervisor to detail any issues that had arisen

from the morning meeting held on the West Atlas with Atlas Drilling and the service

company personnel. Mr Duncan would make the morning call if I did not make it or if I was

not on duty;

(d) a daily e-mail is received from the PTTEP AA Offshore Logistics Coordinator issuing the 7

day lookahead to PTTEPAA personnel, Atlas Drilling (Including the Rig Manager,

Toolpusher, Barge Engineer, Singapore HR etc.) and a1l3rd party contractors. The Process

Manual references a 10 day look ahead - this is the same document however the front page

only covered 7 days to keep the font readable on an A4 page. The data that feeds into the

front page extends to 10 days and beyond;

(e) between completing the morning call and before 0900hrs I prepared and distributed a

morning update e-mail. This e-mail went to all PTTEP AA personnel, all 3rd party contractors

and to Atlas Drilling (Rig Manager). The morning update e-mail outlined HSE, Operations,

Vessels and comments and look ahead for the next 24 hours. This morning update was

issued every day of the week;

(f) at 0900hrs Monday to Friday a morning meeting was held at the PTTEPAA project office in

Perth and was chaired by PTTEPAA's Well Construction Manager (WCM). This meeting

was attended by the Atlas Drilling Rig Manager, Donald Millar (Mr Millar), the

PTTEPAA's onshore Well Construction Team and any interested invited 3rd party

7

WIT.1000.0001.0230

Page 8: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARÀ WELL I{EAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

contractors. The meeting reviewed the past 24hotr operations and logistics before noting

the look ahead for the next24 hours of operations and logistics. Once the drilling discussion

was complete, each person at the meeting had the opportunity to discuss what they had been

working on or to raise any issues of concern. These meetings usually lasted between 20

Minutes and an hour. The meeting was not "minuted", however I noted most of what was

discussed in my note book;

throughout the day numerous phone calls and e-mails would be made or sent between myself

and the PTTBPAA Drilling Supervisor and the PTTEPAA Offshore Logistics Coordinator.

Additionally numerous phone calls and e-mails would be made or sent between myself and

the Atlas Drilling Rig Manager. This occurred 7 days a week;

ad hoc meetings were held as required to discuss operational or safety issues with Atlas

Drilling

on an ad hoc basis as operations dictated the following reports would also be e-mailed to me

within 24-48hrs of the activity being completed:

(h)

(i)

Bottom Hole Assemblies (BHA) Report (with each new BIIA run in the hole);

Bit Report (after a drill bit is recovered from the hole);

Casing Report (after running casing);

Cement Report (PTTEPAA Report - not Halliburton Report) after cementing

casing (which would include the FIT/LOT Report) or after setting a cement plug;

Statement of Facts for the West Atlas and the work boats (after each rig move); and

Rig Positioning Report; and

Drilling Programs and Change Control Forms were issued via the Montara Development

Project Document Controller. The distribution of these documents included internal

PTTEPAA personnel and Atlas Drilling personnel - both onshore and offshore'

Communication with Atlas Drilling

The main person

were:

I dealt with at Atlas Drilling was the manager of theíV'est Atlas. The rig managers

e

(ii)

(iiÐ

(iv)

(v)

(vi)

(')

t8

úf,t

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

contractors. The meeting reviewed the past 24 hour operations and logistics before noting

the look ahead for the next 24 hours of operations and logistics. Once the drilling discussion

was complete, each person at the meeting had the opportunity to discuss what they had been

working on or to raise any issues of concern. These meetings usually lasted between 20

Minutes and an hour. The meeting was not "minuted", however I noted most of what was

discussed in my note book;

(g) throughout the day numerous phone calls and e-mails would be made or sent between myself

and the PTTEPAA Drilling Supervisor and the PTTEPAA Offshore Logistics Coordinator.

Additionally numerous phone calls and e-mails would be made or sent between myself and

the Atlas Drilling Rig Manager. This occurred 7 days a week;

(h) ad hoc meetings were held as required to discuss operational or safety issues with Atlas

Drilling

(i) on an ad hoc basis as operations dictated the following reports would also be e-mailed to me

within 24-48hrs of the activity being completed:

(i) Bottom Hole Assemblies (BBA) Report (with each new BRA run in the hole);

(ii) Bit Report (after a drill bit is recovered from the hole);

(iii) Casing Report (after running casing);

(iv) Cement Report (PTTEPAA Report - not Halliburton Report) after cementing

casing (which would include the FITILOT Report) or after setting a cement plug;

(v) Statement of Facts for the West Atlas and the work boats (after each rig move); and

(vi) Rig Positioning Report; and

G) Drilling Programs and Change Control Forms were issued via the Montara Development

Project Document Controller. The distribution of these documents included internal

PTTEP AA personnel and Atlas Drilling personnel- both onshore and offshore.

Communication with Atlas Drilling

18 The main person I dealt with at Atlas Drilling was the manager of the West Atlas. The rig managers

were:

PI 8

WIT.1000.0001.0231

Page 9: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

(a) Graeme Robertson from January 2007 to May 2008;

(b) Brian Robinson from May 2008 to June 2008;

(c) Eddie Fitzgerald from June 2008 to January 2009; and

(d) Donald Millar from January 2009 to January 2010.

19 I also had some communications with Atlas Drilling's operations manager(s),Bruce Worthington

and later David Gouldin and HSEQ manager(s) who were each based in Singapore.

20 MrMillar:

(a) was the main person I dealt with and I had day to day contact with him. He was Perth based

and had a small office in a different building but close to my offrce;

(b) attended the daily moming meetings in the PTTEPAA offices in Perth during operations

(being the meetings described above atparagraph 16(f);

(c) attended additional meetings as required to cover such activities as rig moves, well testing,

safety matters, safety case revisions and anything not covered in the morning meetings;

(d) was in charge of all Atlas Drilling personnel on the West Atlas; and

(e) reported to Bruce Worthington and later David Gouldin (both based in Singapore).

2l The person in charge on the West Atlas was the OIM. All personnel on board the West Atlas fell

under the OIM's responsibility, this included Atlas Drilling personnel, contractors' personnel and

the PTTEPAA offshore staff.

Key documents to manage the Well

22 The key documents in managing the construction of the Montæa wells including the Hl Well were:

(a) the MODU Safety Case as revised (\ilest Atlas Safety Case);

(b) the Well Construction Management Framework (IVCMF) (ie Well Construction

Management Framework -D4l-502432 Rev 3;23 June2009);

(c) the Well Construction Standards (WCS) (ie Well Construction Standards -D41-502433 Rev

2; 13 March 2009);/!

,//t Iú* r,t

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(a) Graeme Robertson from January 2007 to May 2008;

(b) Brian Robinson from May 2008 to June 2008;

(c) Eddie Fitzgerald from June 2008 to January 2009; and

(d) Donald Millar from January 2009 to January 2010.

19 I also had some communications with Atlas Drilling's operations manager(s), Bruce Worthington

and later David Gouldin and HSEQ manager(s) who were each based in Singapore.

20 Mr Millar:

(a) was the main person I dealt with and I had day to day contact with him. He was Perth based

and had a small office in a different building but close to my office;

(b) attended the daily morning meetings in the PTTEP AA offices in Perth during operations

(being the meetings described above at paragraph 16(f);

(c) attended additional meetings as required to cover such activities as rig moves, well testing,

safety matters, safety case revisions and anything not covered in the morning meetings;

(d) was in charge of all Atlas Drilling personnel on the West Atlas; and

(e) reported to Bruce Worthington and later David Gouldin (both based in Singapore).

21 The person in charge on the West Atlas was the OIM. All personnel on board the West Atlas fell

under the OIM's responsibility, this included Atlas Drilling personnel, contractors' personnel and

the PTTEP AA offshore staff.

Key documents to manage the Well

22 The key documents in managing the construction of the Montara wells including the HI Well were:

(a) the MODU Safety Case as revised (West Atlas Safety Case);

(b) the Well Construction Management Framework (WCMF) (ie Well Construction

Management Framework- D41-502432 Rev 3; 23 June 2009);

(c) the Well Construction Standards (WCS) (ie Well Construction Standards - D41-502433 Rev

2; 13 March 2009);

9

WIT.1000.0001.0232

Page 10: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQTITRYMONTARA WELL IIEAD PLATF'ORM

I]NCONTROLLED I{YDROCARBON RELE^A.SE

(d) the Process Manual;

(e) the Basis Of Well Design (BOWD) (ie MontaraDevelopment Basis ofWell-Design -

Monta¡a Hl - TM-CR-GBN-E-150-00008 Rev 0; July 2008);

(Ð Well Operations Management Plan (WOMP) (ie Montara Hl Well Operations Management

Plan - TM-CR-MON-G-150-00002 Rev 0; 3 November 2008);

(g) the contract between PTTEPAA and Atlas Drilling for Atlas Drilling to provided services to

PTTEPAA including the construction of the Hl Well;

(h) the Drilling Program (DP) (ie. Montara GI, Hl & H4 (Batch Drilled) Drilling Programme-

TM-CR-MON-B-1 50-0000 I ; Rev:2; 6 January 2009);

(Ð the Drilling and Completion Program (DP 1B) (i.e. Montara Phase lB Drilling and

Completion Programme- TM-CR-MON-B-150-00003 Rev: 0; 30 June 2009);

C) forward plans (Instructions To Drillers); and

(k) the Atlas Drilling Well Control Manual (ADWCM).

23 The documents that made up the PTTEPAA Well Construction Management System were the

WCMF, WCS and the Process Manual.

24 When I joined PTTEPAA, there was little documentation in place for the management of well

construction operations. After Mr Duncan was appointed \trell Construction Manager, I was

involved with PTTEPAA's well construction team and a consultant engaged by PTTEPAA in

generating and preparing PTTEPAA's Well Construction Management System (\ilCMS)

documents.

25 The WCMF standard is an interface document between the PTTEPAA management systems and the

standards needed for well construction. The WCMF standard links the PTTEPAA corporate system

to the well construction requirements and includes detailed job descriptions for the positions of

V/CM, Drilling Superintendent, Drilling Supervisor, Drilling Engineer, Completions Engineer, Well

Test Engineer and Materials and Logistics Supervisor'

26 The purpose of the WCS is to provide standards for all aspects of well design, construction, testing,

abandonment and intervention that involve a risk to safety, quality or integrity. The WCS are

applicable to all aspects of well design, well construction, well servicingand well abandonment. We

&L, (I ro

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(d) the Process Manual;

(e) the Basis Of Well Design (BOWD) (ie Montara Development Basis of Welt Design -

Montara HI - TM-CR-GEN-E-150-00008 Rev 0; July 2008);

(f) Well Operations Management Plan (WOMP) (ie Montara HI Well Operations Management

Plan - TM-CR-MON-G-150-00002 Rev 0; 3 November 2008);

(g) the contract between PTTEP AA and Atlas Drilling for Atlas Drilling to provided services to

PTTEPAA including the construction of the HI Well;

(h) the Drilling Program (DP) (ie. Montara GI, HI & H4 (Batch Drilled) Drilling Programme­

TM-CR-MON-B-150-00001; Rev:2; 6 January 2009);

(i) the Drilling and Completion Program (DP IB) (i.e. Montara Phase 1B Drilling and

Completion Programme - TM-CR-MON-B-150-00003 Rev: 0; 30 June 2009);

U) forward plans (Instructions To Drillers); and

(k) the Atlas Drilling Well Control Manual (ADWCM).

23 The documents that made up the PTTEPAA Well Construction Management System were the

WCMF, WCS and the Process Manual.

24 When I joined PTTEPAA, there was little documentation in place for the management of well

construction operations. After Mr Duncan was appointed Well Construction Manager, I was

involved with PTTEPAA's well construction team and a consultant engaged by PTTEPAA in

generating and preparing PTTEPAA's Well Construction Management System (WCMS)

documents.

25 The WCMF standard is an interface document between the PTTEP AA management systems and the

standards needed for well construction. The WCMF standard links the PTTEP AA corporate system

to the well construction requirements and includes detailed job descriptions for the positions of

WCM, Drilling Superintendent, Drilling Supervisor, Drilling Engineer, Completions Engineer, Well

Test Engineer and Materials and Logistics Supervisor.

26 The purpose ofthe WCS is to provide standards for all aspects of well design, construction, testing,

abandonment and intervention that involve a risk to safety, quality or integrity. The WCS are

applicable to all aspects of well design, well construction, well servicing.and well abandonment. We

/~:'~(~/ \~o/"

10

WIT.1000.0001.0233

Page 11: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA WELL IIEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

generated and prepared the WCS through a series of reviews and workshops with the well

construction team. However, the WCS was not a prescriptive set of rules to cover every possible

scenario but includes processes to risk assess and manage scenarios not considered between

document revisions.

I applied the WCS to the process of identiffing, assessing and managing the risks associated with the

drilling, suspension and completion of the Montara production wells, including when:

(a) formulating and approving the drilling programs (including the drilling and completion

programs);

(b)

(c)

managing the implementation of the drilling programs by the POB the West Atlas; and

managing the implementation of any changes or deviations from thce drilling programs.

28

29

30

3t

The Process Manual provides a detailed description of the construction, service or abandon well

process which is applicable to all PTTEPAA's drilling, completion, testing, abandonment and well

intervention activities. It sets out the various activities involved in the well construction process, the

details of the various component tasks and the relative timing of tasks.

The BOWD was required to communicate well requirements/objectives from the PTTEPAA sub

surface group to the well construction team and included information such as the planned surface

location, target locations, formation tops, expected formation pressures, risks to consider based on

offset well data or seismic interpretation and the well evaluation requirements.

I was also involved in preparing the WOMP in respect of the drilling and completion of each of the

Montara production wells.

The WOMP illustrates how the WCMS ensures that drilling activities in respect of the wells meet

regulatory requirements, specifically that:

(a) the design and implementation of downhole activities is in accordance with an accepted well

operations management plan; and

risks are identified and managed in accordance with sound engineering principles and good

oil field practice.

During operations on the West Atlas,the PTTEPAA Drilling Supervisors prepared a forward plan to

communicate to the crew and service companies the details of the work to be done for the next phase

of the well construction operations (as scheduled by the DP (or later the DP lB). The forward plans

(b)

32

(,rt (J '

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

generated and prepared the WCS through a series of reviews and workshops with the well

construction team. However, the WCS was not a prescriptive set of rules to cover every possible

scenario but includes processes to risk assess and manage scenarios not considered between

document revisions.

27 I applied the WCS to the process of identifying, assessing and managing the risks associated with the

drilling, suspension and completion of the Montara production wells, including when:

(a) formulating and approving the drilling programs (including the drilling and completion

programs);

(b) managing the implementation of the drilling programs by the POB the West Atlas; and

(c) managing the implementation of any changes or deviations from these drilling programs.

28 The Process Manual provides a detailed description ofthe construction, service or abandon well

process which is applicable to all PTTEPAA's drilling, completion, testing, abandonment and well

intervention activities. It sets out the various activities involved in the well construction process, the

details of the various component tasks and the relative timing of tasks.

29 The BOWD was required to communicate well requirements/objectives from the PTTEPAA sub

surface group to the well construction team and included information such as the planned surface

location, target locations, formation tops, expected formation pressures, risks to consider based on

offset well data or seismic interpretation and the well evaluation requirements.

30 I was also involved in preparing the WOMP in respect of the drilling and completion of each of the

Montara production wells.

31 The WOMP illustrates how the WCMS ensures that drilling activities in respect of the wells meet

regulatory requirements, specifically that:

(a) the design and implementation of downhole activities is in accordance with an accepted well

operations management plan; and

(b) risks are identified and managed in accordance with sound engineering principles and good

oil field practice.

32 During operations on the West Atlas, the PTTEPAA Drilling Supervisors prepared a forward plan to

communicate to the crew and service companies the details of the work to be done for the next phase

of the well construction operations (as scheduled by the DP (or later the DP 1 B)). The forward plans

11

27

WIT.1000.0001.0234

Page 12: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMlvilssroN oF TNQUIRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

contained sequential practical instructions on the well construction operations. These plans were

updated as events changed and generally only covered the next day or so of operations. Sometimes

revised or supplemented forward plans were developed if circumstances changed.

Each forward plan is agreed with the OIM before it is issued. If there was an issue with a forward

plan that could not be resolved offshore, Mr O'Shea or Mr Treasure would call me to discuss the

issue and I would discuss the issue with Atlas Drilling's rig manager (Mr Millar) if his input or

approval was required. The WCMS (described below) refers to these plans as Instructions To

Drillers. The plans are not normally sent to PTTEPAA's office for review unless there was an issue

that could not be resolved offshore with consultation between the PTTEPAA's Drilling Senior

Supervisor and Atlas Drilling's OIM or some additional expertise is required from the onshore staff'

If the Senior Drilling Supervisor (Mr O'Shea or Mr Treasure) needed additional expertise from

onshore staff, he would telephone me (or Mr Duncan).

The West Atlas Safety Case Revision was prepared by Atlas Drilling in consultation with PTTEPAA

and established the interface between the PTTEPAA WCMS and Atlas Drilling's documents for the

management of the West Atlas, including:

34

(a)

(b)

the West Atlas Marine Operations Manual; and

the West Atlas SDI Operations Procedures Manual'

35 There were 2 Safety Cases, as respective revisions, relevant to the incident:

(a) the Montara Development Construction And Installation Safety Case. This safety case was

applicable to Montara facilities including the WHP which was developed by PTTEPAA. It

included a revision covering simultaneous operations (Document No. TM-CR-GEN-G-090-

00006 July 2009 Rev: 3 (SIMOPS Safety Case); and

(b) West Atlas Safety Case Revision Montara SIMOPS Addendum - Forming Part of the West

Atlas Safety Case for Operations on Wells in the Vulcan Sub Basin - Territory of Ashmore

and Cartier Islands - Document No: HSE SCR WA 070002, Rev 0, 4 August 2009 which was

developed by Atlas Drilling. This included a revision covering simultaneous operations.

Section 4.3.2 of the West Atlas Safety Case Revision states that the OIM is responsible for the

management of safety on the West Atlas.

36

rt"r{/

12

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

contained sequential practical instructions on the well construction operations. These plans were

updated as events changed and generally only covered the next day or so of operations. Sometimes

revised or supplemented forward plans were developed if circumstances changed.

33 Each forward plan is agreed with the OIM before it is issued. If there was an issue with a forward

plan that could not be resolved offshore, Mr O'Shea or Mr Treasure would call me to discuss the

issue and I would discuss the issue with Atlas Drilling's rig manager (Mr Millar) ifhis input or

approval was required. The WCMS (described below) refers to these plans as Instructions To

Drillers. The plans are not normally sent to PTTEP AA' s office for review unless there was an issue

that could not be resolved offshore with consultation between the PTTEPAA's Drilling Senior

Supervisor and Atlas Drilling's OIM or some additional expertise is required from the onshore staff.

If the Senior Drilling Supervisor (Mr O'Shea or Mr Treasure) needed additional expertise from

onshore staff, he would telephone me (or Mr Duncan).

34 The West Atlas Safety Case Revision was prepared by Atlas Drilling in consultation with PTTEPAA

and established the interface between the PTTEP AA WCMS and Atlas Drilling's documents for the

management of the West Atlas, including:

(a) the West Atlas Marine Operations Manual; and

(b) the West Atlas SD 1 Operations Procedures Manual.

35 There were 2 Safety Cases, as respective revisions, relevant to the incident:

(a) the Montara Development Construction And Installation Safety Case. This safety case was

applicable to Montara facilities including the WHP which was developed by PTTEPAA. It

included a revision covering simultaneous operations (Document No. TM-CR-GEN-G-090-

00006 July 2009 Rev: 3 (SIMOPS Safety Case); and

(b) West Atlas Safety Case Revision Montara SIMOPS Addendum - Forming Part of the West

Atlas Safety Case for Operations on Wells in the Vulcan Sub Basin - Territory of Ashmore

and Cartier Islands - Document No: HSE SCR W A 070002, Rev 0, 4 August 2009 which was

developed by Atlas Drilling. This included a revision covering simultaneous operations.

36 Section 4.3.2 of the West Atlas Safety Case Revision states that the OIM is responsible for the

management of safety on the West Atlas.

f 12

WIT.1000.0001.0235

Page 13: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF rNQurRYMONTARÄ WELL HEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

As at 21 August 2009,the activities were operating under the SIMOPS Safety Case which makes the

OIM the top of the command and control organisation for any simultaneous operations ofthe WHP

and the West Atlas.

I was involved in preparing and overseeing compliance with the drilling programs.

The drilling program is effectively a step by step procedure for drilling a well.

At the beginning of the drilling program is a list of all the relevant documentation that drilling

supervisors need to have off-shore. The drilling supervisors are required to acknowledge when they

have all the relevant documentation by ticking and signing where indicated in the drilling program.

The last section of the drilling program before the figures and appendices is the Potential Hazards.

This section is a report from the Well Construction Hazards database. At the back of the drilling

program are relevant figures, diagrams and geological information. The appendices section contains

more detail on the specific sections of the well such as casing, cement, directional drilling, drilling

fluids etc.

The DP was revised three times in response to changes in requirements.

The drilling of the reservoir section of the horizontal wells, the running of the sand screens and

completions was covered by a further revision of the DP to DP 18 that was issued with "As Built"

information after the wells had been suspended.

I was the author of the drilling component of the DP and others, including Mr Keith Brand, Mr Gary

Watson and Mr Gus Meredith provided completions input.

When the document draft was ready, Mr Duncan reviewed it and marked up any changes he

considered necessary. These changes were then discussed and ifagreed, incorporated into the

release document.

When the document was considered ready for issue, it was upgraded to revision zero, the first

version to be released.

Changes to the DP were then either covered by the change control process for minor or single point

changes or by issuance of a new revision if the scope of change was significant. The objective was

to have a user friendly document that personnel could use and refer to in order to execute the work.

A change control form was not raised for a document revision as a new revision to the document

38

39

40

4l

42

43

44

45

46

47

involved repeating the entire approval process. (2't(/

13

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

37 As at 21 August 2009, the activities were operating under the SIMOPS Safety Case which makes the

OIM the top of the command and control organisation for any simultaneous operations ofthe WHP

and the West Atlas.

38 I was involved in preparing and overseeing compliance with the drilling programs.

39 The drilling program is effectively a step by step procedure for drilling a well.

40 At the beginning of the drilling program is a list of all the relevant documentation that drilling

supervisors need to have off-shore. The drilling supervisors are required to acknowledge when they

have all the relevant documentation by ticking and signing where indicated in the drilling program.

The last section of the drilling program before the figures and appendices is the Potential Hazards.

This section is a report from the Well Construction Hazards database. At the back of the drilling

program are relevant figures, diagrams and geological information. The appendices section contains

more detail on the specific sections of the well such as casing, cement, directional drilling, drilling

fluids etc.

41 The DP was revised three times in response to changes in requirements.

42 The drilling of the reservoir section of the horizontal wells, the running of the sand screens and

completions was covered by a further revision of the DP to DP IB that was issued with "As Built"

information after the wells had been suspended.

43 I was the author of the drilling component ofthe DP and others, including Mr Keith Brand, Mr Gary

Watson and Mr Gus Meredith provided completions input.

44 When the document draft was ready, Mr Duncan reviewed it and marked up any changes he

considered necessary. These changes were then discussed and if agreed, incorporated into the

release document.

45 When the document was considered ready for issue, it was upgraded to revision zero, the first

version to be released.

46 Changes to the DP were then either covered by the change control process for minor or single point

changes or by issuance of a new revision if the scope of change was significant. The objective was

to have a user friendly document that personnel could use and refer to in order to execute the work.

47 A change control form was not raised for a document revision as a new revision to the document

involved repeating the entire approval process.

13

37

WIT.1000.0001.0236

Page 14: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUIRYMONTARA \ilELL ITEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

48 Original documents, revisions to original documents and change control notices were all distributed

by the PTTEPAA Montara Project Document Management Process. This process involved sending

the original documents to persons listed to receive them and to then send any revisions or change

control notices to the original recipient so that they could maintain an up to date copy of the

document.

Changes to the DPs

49 The change control process for the DP is described in Section 9, Activity 4. I .8, of the Process

Manual and was managed under PTTEPAA's Montara Project Document Management System.

50 If anybody identified something that they thought needed to be changed, they could raise it for

consideration and if considered appropriate I would approve the changg using a Change Control

Request Form. The Change Control Request Form outlined what the change was, the cost impact

and health and safety impact. Any changes were recorded using a convention in the file name that

identified the well by its accounting code (AFE) and then a sequential number.

5l We differentiated between a change of significance and a change of insignificance. A change of

significance would be something like moving a casing shoe or doing something which was amaterial

change to the drilling program. An insignificant change might be a typo, someone's typed"S%

inches" instead of "5 inches".

52 I also regarded as insignificant changes of specific equipment selection such as a drill bit or changes

to preparations to be done to make sure that casing or other equipment was "fit for purpose".

Examples of this included ensuring that all casing and tie backs were in good condition, clean and

free of corrosion.

53 Insignificant matters did not need to go through the change control process.

54 Once complete, I would send the Change Control Request Form to Mr Duncan for approval.

55 The approved Change Control Request Form was then sent to PTTEPAA's Montara Development

document controller and issued to the personnel that received the DP.

Knowledge of key documents

56 Having been closely involved in the generation of the DP, I had a good understanding of it and its

,{,1 Á

contents. I refened to the DP every day.

(/¿¿

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

48 Original documents, revisions to original documents and change control notices were all distributed

by the PTTEP AA Montara Project Document Management Process. This process involved sending

the original documents to persons listed to receive them and to then send any revisions or change

control notices to the original recipient so that they could maintain an up to date copy of the

document.

Changes to the DPs

49 The change control process for the DP is described in Section 9, Activity 4.1.8, of the Process

Manual and was managed under PTTEPAA's Montara Project Document Management System.

50 If anybody identified something that they thought needed to be changed, they could raise it for

consideration and if considered appropriate I would approve the change, using a Change Control

Request Form. The Change Control Request Form outlined what the change was, the cost impact

and health and safety impact. Any changes were recorded using a convention in the file name that

identified the well by its accounting code (AFE) and then a sequential number.

51 We differentiated between a change of significance and a change of insignificance. A change of

significance would be something like moving a casing shoe or doing something which was amaterial

change to the drilling program. An insignificant change might be a typo, someone's typed "5Yz

inches" instead of "5 inches".

52 I also regarded as insignificant changes of specific equipment selection such as a drill bit or changes

to preparations to be done to make sure that casing or other equipment was "fit for purpose".

Examples of this included ensuring that all casing and tie backs were in good condition, clean and

free of corrosion.

53 Insignificant matters did not need to go through the change control process.

54 Once complete, I would send the Change Control Request Form to Mr Duncan for approval.

55 The approved Change Control Request Form was then sent to PTTEPAA's Montara Development

document controller and issued to the personnel that received the DP.

Knowledge of key documents

56 Having been closely involved in the generation of the DP, I had a good understanding of it and its

contents. I referred to the DP every day.

14

WIT.1000.0001.0237

Page 15: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

58

coMMrssroN ox'rNQtrRYMONTARA WELL ITEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

I referred regularly (weekly at least) to the WCS. I used the WCS to plan a well to ensure that the

well met the minimum design criteria (including casing and cement design, abandonment and

directional surveying).

I also regularly referred (on average once every one to two months depending on what activities

were ongoing at the time) to the Process Manual. I would review the Process Manual when

particular tasks were to be undertaken. For example, if planning a well test (not a common activity)

I would refer to the list of tasks required to prepare a well testing program set out in the Process

Manual.

Drilling terminology

59 Various equipment and processes were involved in drilling the Montara wells, including:

(a)

(b)

(c)

(e)

the WHP which comprises two main parts. The Jacket is the lattice structure connected to

the seabed. The Topsides Module - which includes controls, process equipment and a

helicopter deck - is attached to the Jacket;

the Ilest Atlas;

casing or string of casing, including:

508mm (20") diameter casing;

340mm (13 3/8') diameter casing;

244mm (9tl*") diameter casing;

the annulus which is a space between two conduits, typically the space between the drill

pipe or casing and the wellbore or the space between two pipes.

Mud Line Suspension (MLS) which is a tool that comprises part of the casing shing that

retains a full bore inside diameter, incorporates a hanger part to support the weight of the

casing string and a running tool part which seals to form a hydraulically competent

connection between the running tool and the hanger. The purpose of the MLS is to provide a

means to support casing strings and suspend the well temporarily such that the well can be

returned to service in the future;

(iÐ

(iiÐ

(d)

t5

(Ð PCCC or pressure containing corrosion cap;

€t'/ r,Å

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

57 I referred regularly (weekly at least) to the WCS. I used the WCS to plan a well to ensure that the

well met the minimum design criteria (including casing and cement design, abandonment and

directional surveying).

58 I also regularly referred (on average once every one to two months depending on what activities

were ongoing at the time) to the Process Manual. I would review the Process Manual when

particular tasks were to be undertaken. For example, if planning a well test (not a common activity)

I would refer to the list of tasks required to prepare a well testing program set out in the Process

Manual.

Drilling terminology

59 Various equipment and processes were involved in drilling the Montara wells, including:

(a) the WHP which comprises two main parts. The Jacket is the lattice structure connected to

the seabed. The Topsides Module - which includes controls, process equipment and a

helicopter deck - is attached to the Jacket;

(b) the West Atlas;

(c) casing or string of casing, including:

(i) 508mm (20") diameter casing;

(ii) 340mm (13 3/8") diameter casing;

(iii) 244mm (9%") diameter casing;

(d) the annulus which is a space between two conduits, typically the space between the drill

pipe or casing and the wellbore or the space between two pipes.

(e) Mud Line Suspension (MLS) which is a tool that comprises part of the casing string that

retains a full bore inside diameter, incorporates a hanger part to support the weight of the

casing string and a running tool part which seals to form a hydraulically competent

connection between the running tool and the hanger. The purpose of the MLS is to provide a

means to support casing strings and suspend the well temporarily such that the well can be

returned to service in the future;

(f) PCCC or pressure containing corrosion cap;

15

57

WIT.1000.0001.0238

Page 16: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

(h)

coMMrssloN oF TNQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED I{YDROCARBON RELEASE

a blow-out preventer (BOP) is a set of hydraulic controlled rams or elements which can

close around a pipe and isolate the pipe from the reservoir;

batch drilling and sequential drilling - the drilling of a well can be broken down into a series

of tasks or operations performed in sequence. This is sometimes described as the drilling

sequence of operations. There are certain points in the sequence where it is practical to

interrupt the sequence of operations. For example, once a certain casing string has been set

and cemented, it is practical to interrupt the sequence. Batch drilling is where a number of

wells are drilled and the sequence of operations on one well is intenupted allowing work to

be undertaken on the same sequence of operations on a different well. Batch drilling has

some benefits including optimal use of drilling fluids and equipment supply. It also has a

disadvantage in that intemrpting the sequence of operations on one well comes at a time cost

for the rig to be moved from one well to the next. It is generally accepted that the

advantages of batch drilling outweigh the disadvantages andbatch drilling is preferred to

sequential drilling.

Cementing

60 Cementing an oil well requires a certain amount of engineering at the design stage plus the

application of procedures and practices during execution.

Slurry design

6I

62

For the Hl Well there were different functions for the cement slurry and each function had be

addressed in the design of the slurry.

The design required a tail cement slurry that would inhibit the formation of gas channels across the

reservoir interval and up into the regional sealing shale. We also required a less dense lead cement

slurry that would isolate exposed wellbore fluids.

The objective was to use the higher density tail cement slurry in the reservoir and a lighter lead slurry

in the formations above the tail slurry and extending above the 340mm (13 %") casing shoe' The

density of the cement is often about l.9sg for the tail slurry and 1.55sg for the lead slurry.

The slurries were designed to set at different times and those times were temperature dependant.

This allowed the maintenance of hydrostatic pressure (described below) during the time that the

cement was setting.

63

64

(/t6

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(g) a blow-out preventer (BOP) is a set of hydraulic controlled rams or elements which can

close around a pipe and isolate the pipe from the reservoir;

(h) batch drilling and sequential drilling - the drilling of a well can be broken down into a series

of tasks or operations performed in sequence. This is sometimes described as the drilling

sequence of operations. There are certain points in the sequence where it is practical to

interrupt the sequence of operations. For example, once a certain casing string has been set

and cemented, it is practical to interrupt the sequence. Batch drilling is where a number of

wells are drilled and the sequence of operations on one well is interrupted allowing work to

be undertaken on the same sequence of operations on a different well. Batch drilling has

some benefits including optimal use of drilling fluids and equipment supply. It also has a

disadvantage in that interrupting the sequence of operations on one well comes at a time cost

for the rig to be moved from one well to the next. It is generally accepted that the

advantages of batch drilling outweigh the disadvantages and batch drilling is preferred to

sequential drilling.

Cementing

60 Cementing an oil well requires a certain amount of engineering at the design stage plus the

application of procedures and practices during execution.

Slurry design

61 For the HI Well there were different functions for the cement slurry and each function had be

addressed in the design of the slurry.

62 The design required a tail cement slurry that would inhibit the formation of gas channels across the

reservoir interval and up into the regional sealing shale. We also required a less dense lead cement

slurry that would isolate exposed wellbore fluids.

63 The objective was to use the higher density tail cement slurry in the reservoir and a lighter lead slurry

in the formations above the tail slurry and extending above the 340mm (13 %") casing shoe. The

density of the cement is often about 1.9sg for the tail slurry and 1.55sg for the lead slurry.

64 The slurries were designed to set at different times and those times were temperature dependant.

This allowed the maintenance of hydrostatic pressure (described below) during the time that the

cement was setting.

fJ 16

WIT.1000.0001.0239

Page 17: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF INQUTRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

Shoe track

In order to install a string of casing into the wellbore there are a number of components required.

The bottom 1 to 3 joints of casing form what is known as the shoe track.

65

66

67

The lowermost

68

item of the shoe track is the casing shoe. This is where the steel casing ends.

To make it easier to slide into the wellbore, the casing shoe is given a slightly rounded off profile.

The material that provides the rounded shape is usually cement but it may also be a composite plastic

or even machined aluminium. The important function is that it must be robust enough to guide the

casing over any ledges or imperfections in the wellbore yet be able to be drilled out after the casing

is cemented.

Often the casing shoe has a float valve in it making it a casing float shoe. In the case of the Hl Well

the casing shoe did not incorporate a float valve.

Above the casing shoe there are between one and three joints of casing. These joints form a spacer

between the casing shoe and the float collar. The longer the spacer, the longer the shoe track..

Above the spacer joints is the float collar. This is a short section of casing that incorporates a built-

in landing point for cement displacement plugs and one or more float valves. In the case of the Hl

Well, the float collar incorporated two float valves.

The float valves, either in the casing shoe or the float collar, are one way valves that allow passage of

fluid from inside the casing but prevent its return. There are a number of proprietary float valve

designs. The most common designs are a poppet type valve and a flapper type valve'

With the float collar used for Hl Well we had two flapper type valves and a small piece of plastic

pipe which held the flappers open. While that is in place, the flappers are open and fluid can come

back up through the shoe hack. This is known as a self filling or auto filling float collar- A ball

would normally be dropped inside the casing and when the ball hits the top of the hold open pipe,

pressure from above causes a retaining lug to shear. The small pipe that holds the flappers open is

then displaced down the hole allowing the flapper valves to shut converting the valve from auto fill

to conventional one way valves. In the case of the Hl Well the ball was pre-installed.

The space inside the casing below the float collar and above the casing shoe is expected to be left

filled with cement. This is known as the shoe track volume and is important for cement displacement

69

70

7l

72

73

calculations. 1"/c/t'v (/n

Shoe track

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

65 In order to install a string of casing into the wellbore there are a number of components required.

The bottom I to 3 joints of casing form what is known as the shoe track.

66 The lowermost item of the shoe track is the casing shoe. This is where the steel casing ends.

67 To make it easier to slide into the wellbore, the casing shoe is given a slightly rounded off profile.

The material that provides the rounded shape is usually cement but it may also be a composite plastic

or even machined aluminium. The important function is that it must be robust enough to guide the

casing over any ledges or imperfections in the wellbore yet be able to be drilled out after the casing

is cemented.

68 Often the casing shoe has a float valve in it making it a casing float shoe. In the case of the HI Well

the casing shoe did not incorporate a float valve.

69 Above the casing shoe there are between one and three joints of casing. These joints form a spacer

between the casing shoe and the float collar. The longer the spacer, the longer the shoe track..

70 Above the spacer joints is the float collar. This is a short section of casing that incorporates a built­

in landing point for cement displacement plugs and one or more float valves. In the case of the HI

Well, the float collar incorporated two float valves.

71 The float valves, either in the casing shoe or the float collar, are one way valves that allow passage of

fluid from inside the casing but prevent its return. There are a number of proprietary float valve

designs. The most common designs are a poppet type valve and a flapper type valve.

72 With the float collar used for HI Well we had two flapper type valves and a small piece of plastic

pipe which held the flappers open. While that is in place, the flappers are open and fluid can come

back up through the shoe track. This is known as a self filling or auto filling float collar. A ball

would normally be dropped inside the casing and when the ball hits the top of the hold open pipe,

pressure from above causes a retaining lug to shear. The small pipe that holds the flappers open is

then displaced down the hole allowing the flapper valves to shut converting the valve from auto fill

to conventional one way valves. In the case of the HI Well the ball was pre-installed.

73 The space inside the casing below the float collar and above the casing shoe is expected to be left

filled with cement. This is known as the shoe track volume and is important for cement displacement

calculations.

17

WIT.1000.0001.0240

Page 18: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQITTRYMONTARA \ryELL IIEAD PLATF'ORM

T]NCONTROLLED ITYDROCARBON RDLEASE

74 The cementing process has several elements and takes a number of hours to complete (explained

below).

75 During the cementing process, cement is pumped into the casing to exit into the annulus between the

outside of the casing and the inside of the hole that has been drilled. During, and for a period after

the cement has been pumped, it remains liquid.

76 The hydrostatic pressure generated by the fluids outside the casing is generally greater than the

hydrostatic pressure on the inside of the casing, which would cause the cement to flow into the

casing after displacement if it were not restrained by the float valves in the float collar and/or casing

shoe.

Circulate fluid

77 Prior to cementing, drilling fluid equivalent to I l0% of the casing volume is circulated through the

casing.

78 This circulation serves two purposes. The casing volume is greater than the annulus volume so

circulating 110% of the casing volume ensures that drilling fluid on bottom is cycled outof the hole

and it can be checked for wellbore fluid influx prior to committing to cement.

79 The second purpose is a check of the casing to ensure that any debris that may have been left in the

casing and may cause a blockage of the float valves in the casing shoe track is removed.

Launching the plugs

80 After the drilling fluid is circulated and the surface cement lines pressure tested, the cementing

process begins.

81 The first step is to launch the bottom plug. This is a displacement plug with elastomeric wiper fins

to wipe the casing clean ahead of the cement.

82 This plug has a built in membrane designed to rupture after the plug reaches the float collar.

83 After the bottom plug has been launched, the lead slurry is pumped into the casing followed by the

tail slurry.

84 As the cement is mixed and pumped the drilling supervisor monitors the operation and causes

samples of the cement slurries to be taken for later evaluation.,/') /clu

lrl r8

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

74 The cementing process has several elements and takes a number of hours to complete (explained

below).

75 During the cementing process, cement is pumped into the casing to exit into the annulus between the

outside of the casing and the inside ofthe hole that has been drilled. During, and for a period after

the cement has been pumped, it remains liquid.

76 The hydrostatic pressure generated by the fluids outside the casing is generally greater than the

hydrostatic pressure on the inside of the casing, which would cause the cement to flow into the

casing after displacement if it were not restrained by the float valves in the float collar and/or casing

shoe.

Circulate fluid

77 Prior to cementing, drilling fluid equivalent to 110% of the casing volume is circulated through the

casing.

78 This circulation serves two purposes. The casing volume is greater than the annulus volume so

circulating 110% of the casing volume ensures that drilling fluid on bottom is cycled out ofthe hole

and it can be checked for wellbore fluid influx prior to committing to cement.

79 The second purpose is a check of the casing to ensure that any debris that may have been left in the

casing and may cause a blockage of the float valves in the casing shoe track is removed.

Launching the plugs

80 After the drilling fluid is circulated and the surface cement lines pressure tested, the cementing

process begins.

81 The first step is to launch the bottom plug. This is a displacement plug with elastomeric wiper fins

to wipe the casing clean ahead of the cement.

82 This plug has a built in membrane designed to rupture after the plug reaches the float collar.

83 After the bottom plug has been launched, the lead slurry is pumped into the casing followed by the

tail slurry.

84 As the cement is mixed and pumped the drilling supervisor monitors the operation and causes

samples of the cement slurries to be taken for later evaluation.

18

WIT.1000.0001.0241

Page 19: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA \ryELL IIEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

When the tail slurry has been pumped, the top plug is launched. The top plug also has wiper fins

designed to wipe the casing clean of cement but it does not have a rupture mechanism. The top plug

is a solid plug.

With the release of the top cement plug the next part of the operation is the displacement. In this

operation, fluid is pumped above the top plug to displace or push it to the float collar.

Two types of pumps are used for this process. These are known as the cement pumps and the rig

pumps.

A cement unit is a small volumevery high pressure pump with cement mixing capabilities. The rig

pumps are high volume high pressure pumps that can pump much bigger volumes of fluid than the

cement pumps. The volume pumped by the rig pumps can be measured and monitored a number of

ways:

each stroke of the rig pump delivers a given volume. Stroke counters are fitted to the pumps

and stroke counter displays are on the rig floor and within the mudlogging unit; and

the rig pumps pump fluid from a mud tank. The volume of the mud tank is monitored by two

independent systems - the Atlas Drilling monitoring system and the mudlogging monitoring

system.

Because of the differences in the capacity of the cement pumps and the rig pumps, the cement pumps

are only used to pump cement into the casing above the bottom plug. The rig pump is used to pump

the displacement fluids into the casing above the top plug. This means that the cement column can be

put into place much faster than would be the case if the cement pump were used for that purpose.

Using the rig pump in this way also means that wet cement will be delivered to its planned position.

When the bottom plug reaches the float collar during displacement a small pressure increase is often

noted indicating that the membrane in the bottom plug has ruptured.

Continued displacement of the cement forces the cement out of the shoe track into the annulus rising

towards a planned top of cement (TOC) depth.

The volume of fluid used for displacement is calculated as accurately as possible.

Prior to running the casing several joints are callipered internally to check what the average inside

diameter of the pipe is. It is quite normal for the calliper dimensions to be larger than the nominal

./t(ih-/

86

87

88

(a)

(b)

89

90

91

92

93

(,t t9

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

85 When the tail slurry has been pumped, the top plug is launched. The top plug also has wiper fins

designed to wipe the casing clean of cement but it does not have a rupture mechanism. The top plug

is a solid plug.

86 With the release of the top cement plug the next part ofthe operation is the displacement. In this

operation, fluid is pumped above the top plug to displace or push it to the float collar.

87 Two types of pumps are used for this process. These are known as the cement pumps and the rig

pumps.

88 A cement unit is a small volume very high pressure pump with cement mixing capabilities. The rig

pumps are high volume high pressure pumps that can pump much bigger volumes of fluid than the

cement pumps. The volume pumped by the rig pumps can be measured and monitored a number of

ways:

(a) each stroke of the rig pump delivers a given volume. Stroke counters are fitted to the pumps

and stroke counter displays are on the rig floor and within the mudlogging unit; and

(b) the rig pumps pump fluid from a mud tank. The volume of the mud tank is monitored by two

independent systems - the Atlas Drilling monitoring system and the mudlogging monitoring

system.

89 Because of the differences in the capacity of the cement pumps and the rig pumps, the cement pumps

are only used to pump cement into the casing above the bottom plug. The rig pump is used to pump

the displacement fluids into the casing above the top plug. This means that the cement column can be

put into place much faster than would be the case if the cement pump were used for that purpose.

Using the rig pump in this way also means that wet cement will be delivered to its planned position.

90 When the bottom plug reaches the float collar during displacement a small pressure increase is often

noted indicating that the membrane in the bottom plug has ruptured.

91 Continued displacement of the cement forces the cement out of the shoe track into the annulus rising

towards a planned top of cement (TOC) depth.

92 The volume of fluid used for displacement is calculated as accurately as possible.

93 Prior to running the casing several joints are callipered internally to check what the average inside

diameter ofthe pipe is. It is quite normal for the calliper dimensions to be larger than the nominal

19

85

WIT.1000.0001.0242

Page 20: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

95

coMMrssroN oF TNQUIRYMONTARÁ, WELL HEAD PLATFORM

T]NCONTROLLED IIYDROCARBON RELEASE

values published in casing tables. This calliper inside diameter measurement is used to calculate the

casing volume.

Checks are also made of the mud pump efficiency so that a corrected pump stroke volume is used for

displacement.

The net result is that cement displacement figures are important so that the drilling team know, by

reference to the number of pump strokes, when to expect the top plug to reach the float collar and

ttbumpt',

Just before the expected number of pump strokes, the pump rate is slowed to allow the drilling team

to more accurately monitor the pressure within the casing. This is known as the final cement

displacement circulating pressure and is an important part of calculating the height of the cement

within the annulus.

It happens occasionally that instead of sealing at the float collar as intended, the top plug fails to seal.

If that were to occur cement would be pumped past the float collar. In order to avoid displacing all of

the cement from the shoe track, the rule of thumb is to pump the calculated displacement volume and

if no bump of the cement displacement plug is seen, limit further pumping to 50%of the shoe track

volume. This ensures that cement is left in the shoe track if the top plug fails to seal.

When the plug bumps, it typically seals on the inside diameter of the casing and because itcannot

pass the float collar, the pressure within the casing increases'

At this point a cement unit will commence pressure testing the casing as set out in section 9.2 of the

WCS.

After the pressure test is completed, pressure is bled off inflow testing the float valves. Cemented

casing tested in this manner is considered a permanent banier as per section 5 of the WCS.

Item I . I .3 1 of the West Atlas SD 1 Operations Procedures Manual sets out procedures to be followed

in the event of float valve failure post cementing. Essentially the cement is to be held in place while

it sets.

points 15 and 16 of item 1.1.31 of West Atlas SDl Operations Procedures Manual stated that:

15. Observe for return flow from the line broken off in the previous step.

96

97

98

99

100

101

102

é^,

t/ 20

COMMISSION OF INQUffiY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

values published in casing tables. This calliper inside diameter measurement is used to calculate the

casing volume.

94 Checks are also made of the mud pump efficiency so that a corrected pump stroke volume is used for

displacement.

95 The net result is that cement displacement figures are important so that the drilling team know, by

reference to the number of pump strokes, when to expect the top plug to reach the float collar and

"bump".

96 Just before the expected number of pump strokes, the pump rate is slowed to allow the drilling team

to more accurately monitor the pressure within the casing. This is known as the final cement

displacement circulating pressure and is an important part of calculating the height of the cement

within the annulus.

97 It happens occasionally that instead of sealing at the float collar as intended, the top plug fails to seal.

If that were to occur cement would be pumped past the float collar. In order to avoid displacing all of

the cement from the shoe track, the rule of thumb is to pump the calculated displacement volume and

ifno bump of the cement displacement plug is seen, limit further pumping to 50% of the shoe track

volume. This ensures that cement is left in the shoe track if the top plug fails to seal.

98 When the plug bumps, it typically seals on the inside diameter of the casing and because it cannot

pass the float collar, the pressure within the casing increases.

99 At this point a cement unit will commence pressure testing the casing as set out in section 9.2 of the

WCS.

100 After the pressure test is completed, pressure is bled off inflow testing the float valves. Cemented

casing tested in this manner is considered a permanent barrier as per section 5 of the WCS.

101 Item 1.1.31 of the West Atlas SD 1 Operations Procedures Manual sets out procedures to be followed

in the event of float valve failure post cementing. Essentially the cement is to be held in place while

it sets.

102 Points 15 and 16 of item 1.1.31 of West Atlas SD 1 Operations Procedures Manual stated that:

15. Observe for return flow from the line broken off in the previous step.

Pj 20

94

WIT.1000.0001.0243

Page 21: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

104

coMMrssroN oF TNQUTRYMONTARA WELL HEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

NOTE: If the floats fail, the valve must be closed to prevent the cement from flowing back

inside the casing.

16. Observe the annulus flow or pressure for &12 hours after cementing or until a compression strength

of 500 to 700 psi is reached to determine whether or not to remove the BOP stack entirely. The BOP

may be partially nippled down, as long as enough is left to control and kill the well if it should

become necessary

Cement plugs are intervals of cement within a casing string and are referred to as a Barrier per

section 5 of the WCS. Although cemented shoe casings could be described as cement plugs, they are

referred to as "cemented casing" because they are located at points in the casing where there is

cement inside the shoe track and in the annulus surrounding it.

The verification of a cement plug can either be by pressure testing or weight testing ("tagging" -

weight testing pressure must equal the equivalent of 3500kPa)- both options are industry practice

and were also part of the Schedule of Specific Requirements direction under the Petroleum

(Submerged Lønds) lcr (P(SL)A). Testing a plug by tagging does not always guarantee the integrity

as a channel may have formed through the plug. Pressure testing can also be ambiguous depending

on where the plug is set - if set deep in the well (inside cemented casing) the volume to pressure-up

and test will not be a lot different to the volume required to test the casing. Installing a mechanical

barrier such as a PCCC provides a visible pressure containing barrier that has been engineered and

manufactured to withstand a know pressure - 10,000psi in the case of the 244mm (V/e") PCCCs and

5000 psi for the 340mm (13%") PCCCs used for the Montara wells.

Pore pressure & fracture pressure'Hl Well

The pore pressure of the Hl Well was listed in the BOWD as Normal - 1.04sg.

This figure was provided by the Montara Project geologist David Thornton. To me, the word

"normal" was of more importance than the numerical pressure value.

"Normal pressure" is equivalent to that of seawater which is usually considered to be 1.03sg. When

the field discovery wells were evaluated, the reservoir pressures were resolved to be slightly less than

sea water.

The fracture pressure in the Hl Well was listed in the BOWD as being 1.40sg near the reservoir.

This is the fluid density which at reservoir depth could result in fracture break down of the

105

106

107

108

formations. This figure was an estimate.

ûtdP,{ 2l

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

NOTE: If the floats fail, the valve must be closed to prevent the cement from flowing back

inside the casing.

16. Observe the annulus flow or pressure for 8-12 hours after cementing or until a compression strength

of 500 to 700 psi is reached to determine whether or not to remove the BOP stack entirely. The BOP

may be partially nippled down, as long as enough is left to control and kill the well if it should

become necessary

103 Cement plugs are intervals of cement within a casing string and are referred to as a Barrier per

section 5 of the WCS. Although cemented shoe casings could be described as cement plugs, they are

referred to as "cemented casing" because they are located at points in the casing where there is

cement inside the shoe track and in the annulus surrounding it.

104 The verification of a cement plug can either be by pressure testing or weight testing ("tagging" -

weight testing pressure must equal the equivalent of 3500kPa) - both options are industry practice

and were also part of the Schedule of Specific Requirements direction under the Petroleum

(Submerged Lands) Act (P(SL)A). Testing a plug by tagging does not always guarantee the integrity

as a channel may have formed through the plug. Pressure testing can also be ambiguous depending

on where the plug is set - if set deep in the well (inside cemented casing) the volume to pressure-up

and test will not be a lot different to the volume required to test the casing. Installing a mechanical

barrier such as a PCCC provides a visible pressure containing barrier that has been engineered and

manufactured to withstand a know pressure - 10,000psi in the case of the 244mm (9%") PCCCs and

5000 psi for the 340mm (13 %") PCCCs used for the Montara wells.

Pore pressure & fracture pressure - HI Well

105 The pore pressure of the HI Well was listed in the BOWD as Normal- 1.04sg.

106 This figure was provided by the Montara Project geologist David Thornton. To me, the word

"normal" was of more importance than the numerical pressure value.

107 "Normal pressure" is equivalent to that of seawater which is usually considered to be 1.03sg. When

the field discovery wells were evaluated, the reservoir pressures were resolved to be slightly less than

sea water.

108 The fracture pressure in the HI Well was listed in the BOWD as being 1.40sg near the reservoir.

This is the fluid density which at reservoir depth could result in fracture break down of the

formations. This figure was an estimate.

21

103

WIT.1000.0001.0244

Page 22: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUIRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

109 These pore and fracture pressure figures mean that the Hl Well would be overbalanced to formation

if the well was filled with sea water.

Ifydrostatic pressure

110 Hydrostatic pressure is the pressure exerted by a fluid at rest. In the context of well construction, it

is the pressure exerted by the fluid in the well at a particular vertical depth in that well.

I l1 The pressure can be calculated as the vertical depth * the fluid density * gravity. At any point in the

well, gravþ and vertical depth can be considered constant. As density is the only variable it is

common to refer to the reservoir pressure in a well in terms of densþ.

ll2 This allows easy comparisons between reseryoir or formation pressures and mud densities.

113 If the mud hydrostatic pressure is greater than the formation pressure, the mud within the well is said

to be "over balanced" to formation.

ll4 If the formation pressure is greater that the hydrostatic pressure due to the mud then the mud is said

to be "under balanced".

115 An unrestrained, and under balanced situation leads to an influx of formation fluids into the well.

Drilling, displacement and completion fluids

116 Typically there are three main types of fluids used in well construction operations: drilling fluids,

displacement fluids and completion fluids.

Il7 Most drilling operations use a drilling fluid (Mud) to transport rock fragments from the well, cool

the drill bit and to provide hydrostatic pressure to support the hole being drilled.

118 Often, the Mud is comprised of water and various chemicals which help to stabilise the rock

formations being drilled. The fluid properties of the Mud are engineered specifically for a particular

hole section and are often adjusted during the drilling process to respond to wellbore conditions.

llg The completion fluid might come into contact with the producing formations so it is kept clean to

reduce the risk of contaminating the reservoir. Much of the completion fluid will not contact the

reservoir formations and has corrosion inhibitors added to slow degradation of the well casing and

completion components.

120 Two types of completion fluids are brine and seawater.

ër"ll zz

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

109 These pore and fracture pressure figures mean that the HI Well would be overbalanced to formation

if the well was filled with sea water.

Hydrostatic pressure

110 Hydrostatic pressure is the pressure exerted by a fluid at rest. In the context of well construction, it

is the pressure exerted by the fluid in the well at a particular vertical depth in that well.

III The pressure can be calculated as the vertical depth * the fluid density * gravity. At any point in the

well, gravity and vertical depth can be considered constant. As density is the only variable it is

common to refer to the reservoir pressure in a well in terms of density.

112 This allows easy comparisons between reservoir or formation pressures and mud densities.

113 If the mud hydrostatic pressure is greater than the formation pressure, the mud within the well is said

to be "over balanced" to formation.

114 If the formation pressure is greater that the hydrostatic pressure due to the mud then the mud is said

to be "under balanced".

115 An unrestrained, and under balanced situation leads to an influx of formation fluids into the well.

Drilling, displacement and completion fluids

116 Typically there are three main types of fluids used in well construction operations: drilling fluids,

displacement fluids and completion fluids.

117 Most drilling operations use a drilling fluid (Mud) to transport rock fragments from the well, cool

the drill bit and to provide hydrostatic pressure to support the hole being drilled.

118 Often, the Mud is comprised of water and various chemicals which help to stabilise the rock

formations being drilled. The fluid properties of the Mud are engineered specifically for a particular

hole section and are often adjusted during the drilling process to respond to wellbore conditions.

119 The completion fluid might come into contact with the producing formations so it is kept clean to

reduce the risk of contaminating the reservoir. Much of the completion fluid will not contact the

reservoir formations and has corrosion inhibitors added to slow degradation of the well casing and

completion components.

120 Two types of completion fluids are brine and seawater.

fj 22

WIT.1000.0001.0245

Page 23: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

121

122

coMMrssroN oF TNQUTRYMONTARA WELL HEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

The difference between brine and seawater is that brine is saþ water and the salt may or may not be

sodium chloride. Typically sea water is about 35,000 - 39,000 parts per million of chloride and the

weight is about 1.03 sg.

Section 6.6 of the WCS states that:

6.6 Primary \ilell Control

Formation lntegrity Tests or Leak off Tests shall be carried out below each pressure containmentcasing shoe on allwells.

For development wells the FIT/LOT may be omitted on the production casing string.

Kick tolerance shall be calculated for all pressure-containment casings using the followingparameters:

o Maximum anticipated reservoir pressure. Gas gradient of 0.23 SG (0.1 psi/ft) unless the actual is knowno 700 kPa (100 psi) surface handling safety margin

The following kick tolerance limits shall be applied:

Condition Minimal Acceptable KickTolerance

For wells in which the reservoir pressure is known and the mud hydrostaticpressure exceeds this known pressure then the most likely cause of a wellcontrol incident is swabbing

0.75m3 (5 bbls)

For wells in which the reservoir pressure is uncertain 3.18m3 (20 bbls)

\Â/hile drilling, a detailed ongoing assessment of the actual kick tolerance shall be conducted. Drilling

must not continue with a kick tolerance below the levels stipulated in the Drilling Program (and asdefined above).

The mud loggers should continuously monitor pore pressure indicators during drilling operations and

report increasing trends. On critical wells an on-site pore pressure prediction contractor should be

considered.

The following minimum stock levels shall be maintained onboard during exploration or appraisaldrilling:

. Enough cement and additives to set a 150m (500 ft) plug in open hole 406mm (16")or smaller.

. Enough weighting materials and additives to raise the active mud system by 0.12 SG (1.0 ppg)

Primary well control shall be carried out in accordance with the Registered Operator Well ControlManuai. Any additional procedures and deviation shall be specified in the Vessel Safety CaseRevision.

Primary well control shall be maintained at all times during conventional drilling operations. Theprogrammed mud gradient shall exceed the highest pore pressure gradient of the exposedpermeable formations with a minimum static overbalance of 1,000 kPa. (143 psi )

\Â/hen the pressure margins between pore pressure and fracture gradient are narrow, the ECD shall

be calculated continuously../')

///., ./\_/'' "(/

23

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

121 The difference between brine and seawater is that brine is salty water and the salt mayor may not be

sodium chloride. Typically sea water is about 35,000 - 39,000 parts per million of chloride and the

weight is about 1.03 sg.

122 Section 6.6 of the WCS states that:

6.6 Primary Well Control

Formation Integrity Tests or Leak off Tests shall be carried out below each pressure containment casing shoe on all wells.

For development wells the FIT/LOT may be omitted on the production casing string.

Kick tolerance shall be calculated for all pressure-containment casings using the following parameters:

• Maximum anticipated reservoir pressure • Gas gradient of 0.23 SG (0.1 psi/ft) unless the actual is known • 700 kPa (100 psi) surface handling safety margin

The following kick tolerance limits shall be applied:

Condition Minimal Acceptable Kick Tolerance

For wells in which the reservoir pressure is known and the mud hydrostatic 0.75m3 (5 bbls) pressure exceeds this known pressure then the most likely cause of a well control incident is swabbing

For wells in which the reservoir pressure is uncertain 3.18m3 (20 bbls)

While drilling, a detailed ongoing assessment of the actual kick tolerance shall be conducted. Drilling must not continue with a kick tolerance below the levels stipulated in the Drilling Program (and as defined above).

The mud loggers should continuously monitor pore pressure indicators during drilling operations and report increasing trends. On critical wells an on-site pore pressure prediction contractor should be considered.

The following minimum stock levels shall be maintained onboard during exploration or appraisal drilling:

• Enough cement and additives to set a 150m (500 ft) plug in open hole 406mm (16")or smaller. • Enough weighting materials and additives to raise the active mud system by 0.12 SG (1.0 ppg)

Primary well control shall be carried out in accordance with the Registered Operator Well Control Manual. Any additional procedures and deviation shall be specified in the Vessel Safety Case Revision.

Primary well control shall be maintained at all times during conventional drilling operations. The programmed mud gradient shall exceed the highest pore pressure gradient of the exposed permeable formations with a minimum static overbalance of 1,000 kPa. (143 psi)

When the pressure margins between pore pressure and fracture gradient are narrow, the ECD shall be calculated continuously.

23

WIT.1000.0001.0246

Page 24: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

TINCONTROLLED ITYDROCARBON RELEASE

During exploration drilling, to detect the transition from normally pressured formations to abnormallyhigh pressured formations, the following characteristics of the formation lithology and the formationfluid content shall be continuously monitored:

. Gas levels in the drilling fluid return¡ The shape of shale cuttings in returns. FEWD log responseo The change in temperature and salinity of the drilling fluid return. lndications of bore hole instability or torque and drag

Flow checks shall be performed in the following circumstances using the Registered Operator'sprocedures unless otherwise specified in the Safety Case Revision. ln addition to the requirementsof the Vessel Safety Case the following must be flow checked:

. Any indications of downhole gains or losses

. lmmediately a known hydrocarbon bearing objective is penetrated

. Prior to POH, prior to pumping a slug, at the last casing shoe, just prior to pulling the BHA and iftrip displacement is incorrect

. Drilling breaks in the reservoir section exceeding 1.5m (5 ft) in lengtho Prior to dropping a survey or dropping a core ball

The Drilling Supervisor shall include any special or additional requirements for flow checks in thelnstructions to Drillers.

lf the fluid volume to fill the hole is not correct, a further flow check shall be performed and the bitshall be returned to the bottom and bottoms up circulated before continuing.

The trip tank shall be used while tripping.

123 However, in a cased hole, nothing is "exposed".

124 Section 11 of the WCS states that:

"The density of any completionfluid, workoverfluid or packerfluid must be designed to balance

formation pressure øt the top perforation plus, as a minimum, 1000Kpa (I43psi)"

125 Section 5 WCS (set out in full below) refers to "fluids" being overbalanced to formation.

126 Displacement fluids are used in the cementing and do not typically come in contact with open hole.

127 The WCS does not expressly deal with the characteristics of any displacement fluids.

128 Section 2.3.1 of the ADWCM states, without defining "drilling fluids", that *all drilling fluids be of

sufficient density to contain formation pressure". This requires all "drilling fluids" to be

overbalanced to formation pressure.

Barriers

129 Section 2 of the WCS defines "barriers" to mean "any means of preventing an uncontrolled release

or flow of well bore fluids to surface". er (/ 24

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

During exploration drilling, to detect the transition from normally pressured formations to abnormally high pressured formations, the following characteristics of the formation lithology and the formation fluid content shall be continuously monitored:

• Gas levels in the drilling fluid return • The shape of shale cuttings in returns • FEWD log response • The change in temperature and salinity of the drilling fluid return • Indications of bore hole instability or torque and drag

Flow checks shall be performed in the following circumstances using the Registered Operator's procedures unless otherwise specified in the Safety Case Revision. In addition to the requirements of the Vessel Safety Case the following must be flow checked:

• Any indications of downhole gains or losses • Immediately a known hydrocarbon bearing objective is penetrated • Prior to POH, prior to pumping a slug, at the last casing shoe, just prior to pulling the BHA and if

trip displacement is incorrect • Drilling breaks in the reservoir section exceeding 1.5m (5 ft) in length • Prior to dropping a surveyor dropping a core ball

The Drilling Supervisor shall include any special or additional requirements for flow checks in the Instructions to Drillers.

If the fluid volume to fill the hole is not correct, a further flow check shall be performed and the bit shall be returned to the bottom and bottoms up circulated before continuing.

The trip tank shall be used while tripping.

123 However, in a cased hole, nothing is "exposed".

124 Section 11 of the WCS states that:

"The density of any completion fluid, workover fluid or packer fluid must be designed to balance

formation pressure at the top perforation plus, as a minimum, lOOOKpa (143psi) "

125 Section 5 WCS (set out in full below) refers to "fluids" being overbalanced to formation.

126 Displacement fluids are used in the cementing and do not typically come in contact with open hole.

127 The WCS does not expressly deal with the characteristics of any displacement fluids.

128 Section 2.3.1 of the ADWCM states, without defining "drilling fluids", that "all drilling fluids be of

sufficient density to contain formation pressure". This requires all "drilling fluids" to be

overbalanced to formation pressure.

Barriers

129 Section 2 of the WCS defines "barriers" to mean "any means of preventing an uncontrolled release

or flow of well bore fluids to surface".

24

WIT.1000.0001.0247

Page 25: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA \ilELL IIEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

130 Section 5 of the WCS states:

During drilling, completion, testing, intervention and other open hole operations the following barriersshall be maintained in the annulus:

o Two proven barriers between hydrocarbon bearing permeable zones and the surface. One proven barrier between permeable fresh water bearing zones and surface

Barriers during Gompletion, Testing , lntervention and Other Open Hole Operations

Barrier Type Description

Proven

a Each annular or ram BOPWellbore fluid stable at surface, provided it can be monitoredWireline set plugs in the tubing that have been pressure testedRTTS type packer that has been pressure testedMaster valveLubricator

a

a

a

a

a

Temporary suspension is where the MODU or well intervention vessel remains on location. Thefollowing minimum number of tested, independent barriers shall be installed on annulus andtubing/casing above the highest open hydrocarbon zone or over-pressured water zone:

Heavy Weather

Heavy Lifting

Move Rig OverWell

Remove/lnstallBOP/Xmas Tree

Dri lling/Com pletion/Testing or I nterventionOperations

1 permanent and1 temporary

1 permanent or2 temporary

2 temporary

Barriers during Temporary Suspension

Barrier Type Description

Permanenta Cement Plug

Permanent Packer with no controlled internal flow pathCemented Casing

a

a

Temporary

. BOP closed and locked on drill pipe or tubing

. Retrievable Packers

. Wireline Plugs

. Fluid with a hydrostatic head greater than formation pressure, provided that the liquidlevel and density can be monitored and maintained.

. Closed SSSV that has been tested

A single temporary barrier may be used for temporary suspension, provided that petrophysical logsand other data confirm beyond doubt that no hydrocarbon zones or over-pressured water zones arepresent in either the wellbore or annuli.

For long terms suspension and abandonment requirement refer to Section 14.

Barriers must be verified in-situ as follows:

Barrier Type Verification

Cement PlugNot surface plugs

a

a

a

Tagging with sufficient force to confirm the top of good cementTagging pressure must equal the equivalent of 3500KPa (500 psi)

Or Pressure testino to 7000 KPa 11000PSl) over leak offCement plug on bridgenlrro

. Tag bridge plug then pressure testing to 7000 KPa (1000PS1) over leak off aftersettinq cement pluq

&¿(/ 2s

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

130 Section 5 of the WCS states:

During drilling, completion, testing, intervention and other open hole operations the following barriers shall be maintained in the annulus:

• Two proven barriers between hydrocarbon bearing permeable zones and the surface • One proven barrier between permeable fresh water bearing zones and surface

Barriers during Completion, Testing, Intervention and Other Open Hole Operations

Barrier Type Description

• Each annular or ram BOP

• Well bore fluid stable at surface, provided it can be monitored • Wireline set plugs in the tubing that have been pressure tested

Proven • RTIS type packer that has been pressure tested • Master valve

• Lubricator

Temporary suspension is where the MODU or well intervention vessel remains on location. The following minimum number of tested, independent barriers shall be installed on annulus and tubing/casing above the highest open hydrocarbon zone or over-pressured water zone:

Heavy Lifting

Heavy Weather Move Rig Over Well Drilling/Completion/Testing or Intervention

Remove/Install Operations

BOP/Xmas Tree

1 permanent and 1 permanent or 2 temporary 1 temporary 2 temporary

Barriers during Temporary Suspension

Barrier Type Description

• Cement Plug Permanent • Permanent Packer with no controlled internal flow path

• Cemented Casing

• BOP closed and locked on drill pipe or tubing

• Retrievable Packers

Temporary • Wireline Plugs • Fluid with a hydrostatic head greater than formation pressure, provided that the liquid

level and density can be monitored and maintained.

• Closed SSSV that has been tested

A single temporary barrier may be used for temporary suspension, provided that petrophysical logs and other data confirm beyond doubt that no hydrocarbon zones or over-pressured water zones are present in either the wellbore or annuli.

For long terms suspension and abandonment requirement refer to Section 14.

Barriers must be verified in-situ as follows:

Barrier Type Verification

• Tagging with sufficient force to confirm the top of good cement Cement Plug • Tagging pressure must equal the equivalent of 3500KPa (500 psi) Not surface plugs

• Or Pressure testing to 7000 KPa (1000PSI) over leak off Cement plug on bridge • Tag bridge plug then pressure testing to 7000 KPa (1000PSI) over leak off after plug settinQ cement pluQ

25

WIT.1000.0001.0248

Page 26: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA \ilELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

Annulus Cement

a Waiting until the surface cement (tail) samples are set, providing that the cementjob proceeded normally and a clear pressure differential was observed prior tobumping the plugThe differential pressure must confirm that the TOC is a minimum of 50m aboveany hydrocarbon or over-pressured water zone

a

All Other Barriers ¡ Bv either Dressure or inflow testino

l3l "Open hole" operations involve drilling beyond some existing casing so that there is some uncased

hole exposed.

132 Sections 14.1 and l4.2of the WCS relevantly state:

14.1 Long Term Suspension

Long Term Suspension is when the MODU leaves the well site. Wells must be suspended so thatthey can be abandoned with rig less intervention to meet the standards below.

Two permanent tested barriers must be installed in the annulus and well bore above anyhydrocarbon zone or over pressured zone. The following are permanent barriers:

Barrier Type Description

Permanent o Pressure tested cement Plug (min 30m in length)o Permanent Packer with no controlled internal flow path and cement on topo Cemented Casing with proven TOCr Hanger Packer. Tubing Seals. Annular Master Valve

14.2 Abandonment

Two permanent tested barriers must be installed in the annulus and well bore above anyhydrocarbon zone or over pressured zone. Abandonment Programs must comply with the following:

Section Requirement

Open hole . Cement plugs shall be placed with a minimum of 30m of cement above and aminimum of 30m below anv siqnificant oil. qas or fresh water zones

Casing Where there is open hole below the casing shoe a cement plug shall be placedextending a minimum of 30m above and 30m below the casing shoe,

orA cement retainer with effective back pressure control shall be set >10m and<30m above the casing shoe with a cement plug calculated to extend at >30mbelow and >15m above the retainer. Where lost circulation conditions exist apermanent type bridge plug should be set <45m above the shoe with >15m ofcement on top.lntervals of cased hole between cement plugs shall be filled with fluid suitablyinhibited to orevent the corrosion of casino strino.

Potentiallyproductivezones behindcasino

. All must be cemented off.

Casing Stubsinside Casinq

. A cement plug shall be placed to extend >10m above >40m below the stub. Aretainer may be used in settinq the required pluq.

&¿(l 26

Annulus Cement

All Other Barriers

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

• Waiting until the surface cement (tail) samples are set, providing that the cement job proceeded normally and a clear pressure differential was observed prior to bumping the plug

• The differential pressure must confirm that the TOC is a minimum of 50m above any hydrocarbon or over-pressured water zone

• By either pressure or inflow testing

131 "Open hole" operations involve drilling beyond some existing casing so that there is some uncased

hole exposed.

132 Sections 14.1 and 14.2 of the WCS relevantly state:

14.1 Long Term Suspension

Long Term Suspension is when the MODU leaves the well site. Wells must be suspended so that they can be abandoned with rig less intervention to meet the standards below.

Two permanent tested barriers must be installed in the annulus and well bore above any hydrocarbon zone or over pressured zone. The following are permanent barriers:

Barrier Type Description

Permanent • Pressure tested cement Plug (min 30m in length) • Permanent Packer with no controlled internal flow path and cement on top

• Cemented Casing with proven TOC • Hanger Packer • Tubing Seals

• Annular Master Valve

14.2 Abandonment

Two permanent tested barriers must be installed in the annulus and well bore above any hydrocarbon zone or over pressured zone. Abandonment Programs must comply with the following:

Section Requirement

Open hole • Cement plugs shall be placed with a minimum of 30m of cement above and a minimum of 30m below any significant oil, gas or fresh water zones

Casing • Where there is open hole below the casing shoe a cement plug shall be placed extending a minimum of 30m above and 30m below the casing shoe,

or • A cement retainer with effective back pressure control shall be set> 10m and

<30m above the casing shoe with a cement plug calculated to extend at >30m below and >15m above the retainer. Where lost circulation conditions exist a permanent type bridge plug should be set <45m above the shoe with >15m of cement on top.

• Intervals of cased hole between cement plugs shall be filled with fluid suitably inhibited to prevent the corrosion of casing string.

Potentially • All must be cemented off. productive zones behind casing

Casing Stubs • A cement plug shall be placed to extend >10m above >40m below the stub. A inside Casing retainer may be used in setting the required pluQ.

<'

26

WIT.1000.0001.0249

Page 27: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMn[rssroN oF rNQr]rRYMONTARA WELL ITEAD PLATFORM

TTNCONTROLLED ITYDROCARBON RELEASE

Section Requirement

Perforations A cement plug shall be spotted and extend from at least from 30m below to atleast 30m above the top perforated interval

orA cement retainer set in the casing not more than 45m above the top of theperforated interval with a cement plug extending at least 15m above the retainerprovided the perforated interval is isolated from open hole below or subject to theabove if a succession of retainers are used to isolate a series of perforatedintervals.

The top-most retainer requires a minimum of 15m of cement placed above it. Thisplug must be tagged or pressure tested to a minimum of 3500KPa (500psi) abovethe leak-off or estimated fracture qradient at the point of iniection.

Liners . A cement plug shall be placed immediately above each liner hanger to extend>30m above the hanger.

. This plug must be tagged or pressure tested to 3500KPa (500psi) above the leakoff or estimated fracture qradient at the point of iniection.

Surface a

a

a

All casing strings on wells to be abandoned shall be severed below the seabed.A surface cement plug >45m in length shall be placed in the innermost casingstring extending to the seabed with the top of the plug <45m below the seabed.No annular space which extends to the seabed shall be left open to drilled holebelow the annular space.

For offshore wells, a seabed survey and subsequent cleanup by ROV shall be conducted and notedin the IADC Drilling Report. A video shall be made and sent to the Drilling Superintendent.

A well abandonment schematic shall be prepared at the wellsite and sent to the Drilling Superintendentfor final drafting together with full details of the components. The schematic shall include all relevantdimensions and equipment serial numbers to ensure traceability.

A corrosion cap should be installed on the MLS.

A trash cap should be installed on the conductor or the subsea wellhead.

133 Neither section 5 nor section 14 of the WCS expressly mention pressure containing corrosion cap

but, instead, refer to 2 different types of functionally similar casing seals. These are RTTS type

packers (section 5) and tubing seals (section l4).

I34 These seals like pressure containing corrosion caps are also manufactured devices machined to

withstand manufacturer's specified amounts of pressure and designed to be inserted into and

removed from wells as required.

135 RTTS packer stands for "Retrievable Test Treat and Squeeze" packer and they work by essentially

squeezing an elastima element against the inside of the casing to form a seal.

136 The tubing seals are O rings fitted to a tubing hanger to form a seal within a machined surface in a

well head.

Ú¿¿

f,l z7

Section

Perforations

Liners

Surface

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

Requirement

• A cement plug shall be spotted and extend from at least from 30m below to at least 30m above the top perforated interval

or

• A cement retainer set in the casing not more than 45m above the top of the perforated interval with a cement plug extending at least 15m above the retainer provided the perforated interval is isolated from open hole below or subject to the above if a succession of retainers are used to isolate a series of perforated intervals.

.. The top-most retainer requires a minimum of 15m of cement placed above it. This plug must be tagged or pressure tested to a minimum of 3500KPa (500psi) above the leak-off or estimated fracture gradient at the point of injection.

.. A cement plug shall be placed immediately above each liner hanger to extend >30m above the hanger.

.. This plug must be tagged or pressure tested to 3500KPa (500psi) above the leak off or estimated fracture gradient at the point of injection.

• All casing strings on wells to be abandoned shall be severed below the seabed. • A surface cement plug >45m in length shall be placed in the innermost casing

string extending to the seabed with the top of the plug <45m below the seabed. • No annular space which extends to the seabed shall be left open to drilled hole

below the annular space.

For offshore wells, a seabed survey and subsequent cleanup by ROV shall be conducted and noted in the lADe Drilling Report. A video shall be made and sent to the Drilling Superintendent.

A well abandonment schematic shall be prepared at the wellsite and sent to the Drilling Superintendent for final drafting together with full details of the components. The schematic shall include all relevant dimensions and equipment serial numbers to ensure traceability.

A corrosion cap should be installed on the MLS.

A trash cap should be installed on the conductor or the subsea wellhead.

133 Neither section 5 nor section 14 of the WCS expressly mention pressure containing corrosion cap

but, instead, refer to 2 different types offunctionally similar casing seals. These are RTTS type

packers (section 5) and tubing seals (section 14).

134 These seals like pressure containing corrosion caps are also manufactured devices machined to

withstand manufacturer's specified amounts of pressure and designed to be inserted into and

removed from wells as required.

135 RTTS packer stands for "Retrievable Test Treat and Squeeze" packer and they work by essentially

squeezing an elastima element against the inside of the casing to form a seal.

136 The tubing seals are 0 rings fitted to a tubing hanger to form a seal within a machined surface in a

well head.

27

WIT.1000.0001.0250

Page 28: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA \ilELL HEAD PLATFORM

TINCONTROLLED ITYDROCARBON RELEASE

137 A pressure containing corrosion cap uses O rings to form a seal within a machined surface within a

MLS hanger.

138 The tubing hanger has a flow path through the middle which must be plugged to form a seal.

Typically the plug is a tubing hanger plug (very similar in design to a pressure containing corrosion

cap) and secured into place within the flow path of the tubing hanger.

139 The RTTS packer and the pressure containing corrosion cap both have mechanical valves that allow

for pressure testing or fluid to be pumped below the barrier and serve to form a seal that can be

removed as required.

140 The pressure containing corrosion cap is at surface and threaded onto the MLS hanger and the RTTS

packer is designed for use at points deeper into the well. The pressure containing corrosion cap also

protects the threads required for tie back from corrosion that might occur through exposure to the

elements.

l4l Each ofa RTTS packer, tubing hanger and pressure containing corrosion cap are designed to allow

the pressure beneath them to be checked and released while they are in place.

142 Each ofa RTTS packer, tubing hanger and pressure containing corrosion cap are designed so that

they can be installed through a BOP if that is required.

143 The WCS lists possible barriers by their functional characteristics. Accordingly references to tubing

hanger and RTTS packer in the WCS a¡e essentially interchangeable and are synonyms forpressure

containing corrosion caps in the context ofa choice as a barrier.

Temporary and long term suspension and abandonment

144 Section 5 of the WCS defines temporary suspension by reference to the MODU staying on the well

site and to four anticipated scenarios when drilling work would be temporarily suspended. Section 5

sets out the necessary barriers in each ofthose scenarios.

I45 Sections l4.l and 14.2 of the WCS address Long Term Suspension and Abandonment and set out the

barrier requirements in each of those circumstances.

146 A Long Term Suspension is "when the MODU leaves the well site". Section 14.1 of the WCS then

refers to the wells being "suspended so that they can be abandoned with rig less intervention".

ff,tf't zg

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

137 A pressure containing corrosion cap uses 0 rings to form a seal within a machined surface within a

MLS hanger.

138 The tubing hanger has a flow path through the middle which must be plugged to form a seal.

Typically the plug is a tubing hanger plug (very similar in design to a pressure containing corrosion

cap) and secured into place within the flow path of the tubing hanger.

139 The RTTS packer and the pressure containing corrosion cap both have mechanical valves that allow

for pressure testing or fluid to be pumped below the barrier and serve to form a seal that can be

removed as required.

140 The pressure containing corrosion cap is at surface and threaded onto the MLS hanger and the R TTS

packer is designed for use at points deeper into the well. The pressure containing corrosion cap also

protects the threads required for tie back from corrosion that might occur through exposure to the

elements.

141 Each of a R TTS packer, tubing hanger and pressure containing corrosion cap are designed to allow

the pressure beneath them to be checked and released while they are in place.

142 Each of a RTTS packer, tubing hanger and pressure containing corrosion cap are designed so that

they can be installed through a BOP if that is required.

143 The WCS lists possible barriers by their functional characteristics. Accordingly references to tubing

hanger and RTTS packer in the WCS are essentially interchangeable and are synonyms for pressure

containing corrosion caps in the context of a choice as a barrier.

Temporary and long term suspension and abandonment

144 Section 5 of the WCS defines temporary suspension by reference to the MODU staying on the well

site and to four anticipated scenarios when drilling work would be temporarily suspended. Section 5

sets out the necessary barriers in each of those scenarios.

145 Sections 14.l and 14.2 ofthe WCS address Long Term Suspension and Abandonment and set out the

barrier requirements in each of those circumstances.

146 A Long Term Suspension is "when the MODU leaves the well site". Section 14.1 of the WCS then

refers to the wells being "suspended so that they can be abandoned with rig less intervention".

28

WIT.1000.0001.0251

Page 29: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL ITEAD PLATFORM

UNCONTROLLED TTYDROCARBON RDLEÄSE

147 When section 5 of the WCS was prepared it was not intended to describe all eventualities involving a

temporary suspension.

148 When section 14 of the WCS was prepared, it was intended to apply to the anticipated situation

where:

(a) a sub sea well is suspended at a sea bed wellhead;

(b) the drilling rig leaves the site; and

(c) the well in that situation may be left for years waiting for a decision to completethe well or

it may be abandoned.

149 The objective in our "long term suspension" part of the WCMS was to ensure that a well suspended

for a long period on the seabed was suspended robustly such that a MODU did not have to be

mobilised to abandon the well. The alternative, if a robust suspension has been conducted, is to use a

ROV to cut the wellhead at seabed level to abandon the well permanently.

t50 The WCS were not intended to provide a prescriptive set of rules, nor to provide standards for every

scenario that may have been encountered during a well operation. The WCS are a component part of

the WCMS, the focus of which is ongoing risk management that is specific to conditions encountered

in each particular well operation, assessment of those risks and appropriate decisions being made.

Part 1.3 of the WCS allows for the WCM to risk asses any deviation in accordance with the Well

Construction Risk Management Process and approve that deviation. This is what occurred in the

case of the Hl Well.

151 The scenarios in section 5 of the WCS are, however, more applicable to the Montara well suspension

scenario than section 14 of the WCS. The Montara well suspension scenario was, in essence, a

temporary suspension. The suspension of Hl did not involve any abandonment of the well but the

MODU was leaving the site. The MODU was planned to return after Topsides installation.

152 When the DP was changed and the Hl Well was suspended the intention was to always return to the

wells, including the Hl Well, with the MODU. In other words, the wells were not suspended so that

they could be abandoned without the intervention of the MODU. So, while the MODU did leave the

well site the suspension of the wells did not meet the other criteria defining a long term suspension.

III WelI Specifics

Overview of DrillÍng Programmes - orìgìnøl pløn and revisions edP/ 2s

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

147 When section 5 of the WCS was prepared it was not intended to describe all eventualities involving a

temporary suspension.

148 When section 14 of the WCS was prepared, it was intended to apply to the anticipated situation

where:

(a) a sub sea well is suspended at a sea bed wellhead;

(b) the drilling rig leaves the site; and

(c) the well in that situation may be left for years waiting for a decision to complete the well or

it may be abandoned.

149 The objective in our "long term suspension" part of the WCMS was to ensure that a well suspended

for a long period on the seabed was suspended robustly such that a MODU did not have to be

mobilised to abandon the well. The alternative, if a robust suspension has been conducted, is to use a

ROV to cut the wellhead at seabed level to abandon the well permanently.

150 The WCS were not intended to provide a prescriptive set of rules, nor to provide standards for every

scenario that may have been encountered during a well operation. The WCS are a component part of

the WCMS, the focus of which is ongoing risk management that is specific to conditions encountered

in each particular well operation, assessment ofthose risks and appropriate decisions being made.

Part 1.3 of the WCS allows for the WCM to risk asses any deviation in accordance with the Well

Construction Risk Management Process and approve that deviation. This is what occurred in the

case of the HI Well.

151 The scenarios in section 5 of the WCS are, however, more applicable to the Montara well suspension

scenario than section 14 of the WCS. The Montara well suspension scenario was, in essence, a

temporary suspension. The suspension of HI did not involve any abandonment of the well but the

MODU was leaving the site. The MODU was planned to return after Topsides installation.

152 When the DP was changed and the HI Well was suspended the intention was to always return to the

wells, including the HI Well, with the MODU. In other words, the wells were not suspended so that

they could be abandoned without the intervention of the MODU. So, while the MODU did leave the

well site the suspension of the wells did not meet the other criteria defining a long term suspension.

HI Well Specifics

Overview of Drilling Programmes - original plan and revisions

29

WIT.1000.0001.0252

Page 30: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA \ryELL IIEAD PLATFORM

T]NCONTROLLED IIYDROCARBON RELEASE

The DP was revised 3 times:

(c)

The initial DP (Revision 0) was written to drill the wells through the WHP Topsides. The

wells were planned to be batch drilled;

Revision 1 was developed based on the WHP Topsides not being in place. The initial plan

atthat stage was to utilise the conductor deck extension to allow access to all the well slots

and drill the wells sequentially. Whilst the Revision 1 program was undergoing an internal

review additional wellhead equipment had been sourced allowing the wells to be batch

drilled per the original program. Revision I was not widely issued

Revision 2 was issued reverting back to batch drilling without the WHP Topsides in place.

The DP 1B addressed the completion of the wells after the suspension (incorporating the drilling of

the reservoir section of the horizontal wells and the running of the sand exclusion screens) and was

issued with "As Built" information after the wells had been suspended.

The cementing plønfor the 244mm (gt/s) casing

The original design of the well contemplated a well head at surface. However, it was recognised that

if there was no well head at surface the design of the Montara wells in suspension needed review.

A review of the drilling programme was conducted and on about 30 January 2009 I prepared Well

Construction Change Control Form No D650054 003 that addressed an issue that arose from that

review.

This identified that we did not have enough PCCC's to cover all the MLS's we had installed and that

if neither a PCCC or well head was in place, the top of cement for the 244mm (gt/r") casing should

be extended fuither than was originally programed. This change was to extend the cement up into

the 340mm (133/s") casing shoe so that there was an effective seal within the annulus at that point.

This change would eliminate any formation open to the annulus.

Changefrom cement plug 1o pressure contøìning conosion cap - HI tl/ell

When designing the Montara well program my preference was to design the program on the basis

that PCCCs would be used as a barrier rather than cement plugs because:

(a)

(b)

154

155

156

157

158

t59

(a) in my experience PCCCs are effective barriers; e("t 30

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

153 The DP was revised 3 times:

(a) The initial DP (Revision 0) was written to drill the wells through the WHP Topsides. The

wells were planned to be batch drilled;

(b) Revision 1 was developed based on the WHP Topsides not being in place. The initial plan

at that stage was to utilise the conductor deck extension to allow access to all the well slots

and drill the wells sequentially. Whilst the Revision 1 program was undergoing an internal

review additional wellhead equipment had been sourced allowing the wells to be batch

drilled per the original program. Revision 1 was not widely issued

(c) Revision 2 was issued reverting back to batch drilling without the WHP Topsides in place.

154 The DP IB addressed the completion of the wells after the suspension (incorporating the drilling of

the reservoir section of the horizontal wells and the running of the sand exclusion screens) and was

issued with "As Built" information after the wells had been suspended.

The cementing plan for the 244mm (95/ 8 ,') casing

155 The original design of the well contemplated a well head at surface. However, it was recognised that

if there was no well head at surface the design of the Montara wells in suspension needed review.

156 A review ofthe drilling programme was conducted and on about 30 January 2009 I prepared Well

Construction Change Control Form No D65005A 003 that addressed an issue that arose from that

review.

157 This identified that we did not have enough PCCC's to cover all the MLS's we had installed and that

if neither a PCCC or well head was in place, the top of cement for the 244mm (95/ 8,,) casing should

be extended further than was originally programed. This change was to extend the cement up into

the 340mm (13%") casing shoe so that there was an effective seal within the annulus at that point.

158 This change would eliminate any formation open to the annulus.

Change from cement plug to pressure containing corrosion cap - HI Well

159 When designing the Montara well program my preference was to design the program on the basis

that PCCCs would be used as a barrier rather than cement plugs because:

(a) in my experience PCCCs are effective barriers;

30

WIT.1000.0001.0253

Page 31: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMrvflssroN oF TNQUTRYMONTARA WELL HEAD PLATFORM

I'NCONTROLLED IIYDROCARBON RELEASE

I considered that PCCCs were barriers that would comply with sections 2 and 5 of the WCS;

corrosion caps protect the threads required to subsequently tie back the casing strings at the

end of the MLS from corrosion;

the WCS says that a corrosion cap should be used on a MLS;

PCCC's allow pressure below the PCCC to be checked prior to removal, whereas cement

plugs do not;

if cement plugs are used within un-cemented casing, a situation can arise during the drill out

of that plug where right hand torque applied to the cement can result in left hand torque

applied to the casing above. This left hand torque can result in the casing backing out and

loosing pressure integrity. Using aPCCC avoids the risk of damaging the244mm(9%")

casing when drilling out a cement plug;

if a problem was identified such as pressure below a PCCC then an alternative course of

action could be taken. In the case of the 244mm(9%") PCCC, trapped pressure below could

be managed by nippling up the BOP on the 340mm ( 13 %) casing and removing the PCCC

in conholled conditions; and

the original drilling program only contemplated one PCCC being available (which would be

used in the GI well). Also, the original drilling program did not include bringing cement up

inside the 340mm (13 %") shoe on the 244mm (9%") cement job. Bringing cement up inside

the 340mm (I3 %") shoe effectively provided a closed chamber in the 340mm (13 /2") x

244mm(9%") annulus and two PCCC's were considered to be an improvement on the

original plan.

However, because PTTEPAA did not originally have enough PCCC's in inventory and available for

all of the wells (namely Montara GI, Hl Well and Montara H4), the DP was designed to set a cement

plug from 160m to l15m in the244nm (9%") casing of the Hl and H4 wells.

On25 February 2009 | received an email from Mr O'Shea querying whether it was proposed to

change the DP so that a PCCC would be installed on the 244mm (9t / ,') casing instead of a cement

plug in the 244mm (9t /r') casing. Shortly later, a244mm (9%") PCCC became available. On 3

March 2009 | emailed Mr O'Shea advising him that a PCCC would be installed on the 244mm

(9tl*") casing instead of a cement plug in the244mm(9tl*") casing and further details would be

(c)

(d)

(e)

(e)

(h)

160

l6l

3t

given to him shortly.

Oø(,,t

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(b) I considered that PCCCs were barriers that would comply with sections 2 and 5 of the WCS;

(c) corrosion caps protect the threads required to subsequently tie back the casing strings at the

end of the MLS from corrosion;

(d) the WCS says that a corrosion cap should be used on a MLS;

(e) PCCC's allow pressure below the PCCC to be checked prior to removal, whereas cement

plugs do not;

(f) if cement plugs are used within un-cemented casing, a situation can arise during the drill out

of that plug where right hand torque applied to the cement can result in left hand torque

applied to the casing above. This left hand torque can result in the casing backing out and

loosing pressure integrity. Using a PCCC avoids the risk of damaging the 244mm (9%")

casing when drilling out a cement plug;

(g) if a problem was identified such as pressure below a PCCC then an alternative course of

action could be taken. In the case of the 244mm (9%") PCCC, trapped pressure below could

be managed by nippling up the BOP on the 340mm (13 %") casing and removing the PCCC

in controlled conditions; and

(h) the original drilling program only contemplated one PCCC being available (which would be

used in the GI well). Also, the original drilling program did not include bringing cement up

inside the 340mm (13 %") shoe on the 244mm (9%") cement job. Bringing cement up inside

the 340mm (13 %") shoe effectively provided a closed chamber in the 340mm (13 %") x

244mm (9%") annulus and two PCCC's were considered to be an improvement on the

original plan.

160 However, because PTTEPAA did not originally have enough PCCC's in inventory and available for

all of the wells (namely Montara GI, HI Well and Montara H4), the DP was designed to set a cement

plug from 160m to 115m in the 244mm (9%") casing of the HI and H4 wells.

161 On 25 February 2009 I received an email from Mr O'Shea querying whether it was proposed to

change the DP so that a PCCC would be installed on the 244mm (95/ 8,,) casing instead of a cement

plug in the 244mm (95/ 8,,) casing. Shortly later, a 244mm (9%") PCCC became available. On 3

March 2009 I emailed Mr O'Shea advising him that a PCCC would be installed on the 244mm

(95/ 8,,) casing instead of a cement plug in the 244mm (95/ 8,,) casing and further details would be

given to him shortly.

31

WIT.1000.0001.0254

Page 32: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

I]NCONTROLLED TTYDROCARBON RELEASE

162 A Change Control Form to the DP was issued to remove the planned cement plug in the Hl Well and

replace it with PCCC. We made this change because, for the reasons that I have already explained

this was a safer and more compliant design. It also replicated the design in the DP forthe GI well.

We didn't have enough PCCCs to do it on all the Montara wells: we had allocated one for the GI

well and ended up with enough to do two, so we allocated the second of them to the second well, the

Hl Well.

March 2009

163 I was in Perth between 1 and l2March2009.

164 Mr Duncan and I shared the day to day operational responsibility for rig operations.

165 In about early March 2009,the drilling being undertaken in the Hl V/ell reflected the stages set out

in paragraphs 5.23,5.24 and 5.29 of the DP. These stages were:

5.23 Run 244mm (9 5/8") Gasing - Montara Hl

196) Hold JSA and rig-up TESCO Casing Running tool (dressed to run 244mm (9 5/8")casing) to the TDS.

197) Run 244mm (9 5/8') casing per casing tally (Appendix 3).

¡ PDC Drillable float and shoe with sharkbite installed above the float.

. After making-up the shoe track (with baker-loc) fill with mud to check for flowthrough.

o Fill each joint of casing with mud whilst running in the hole

o Monitor the trip tank closely firstly due to hydrocarbon zone being open (MontaraFormation) and secondly for surge effects on the lower Johnson and Puffininducing losses.

o Record up and down weights every 5 joints and compare against the torque anddrag modeling.

198) Make-up the244mm (9 5/8') MLS joint.

199) Run in the hole with the casing on the 244mm (9 5/8') landing string

200) Wash down the last joint of casing and land out the casing on the MLS

. Space out so that the cement head is at the rig floor level.

201) Circulate 110o/o of the casing volume

202) lnstall )UO pup joint - Vam Top pin x Buttress box

o Required to installthe surface cement head onto the 244mm (9 5/8') casing

Gu¿ lrl 32

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

162 A Change Control Form to the DP was issued to remove the planned cement plug in the Hl Well and

replace it with PCCC. We made this change because, for the reasons that I have already explained,

this was a safer and more compliant design. It also replicated the design in the DP forthe GI well.

We didn't have enough PCCCs to do it on all the Montara wells: we had allocated one for the GI

well and ended up with enough to do two, so we allocated the second of them to the second well, the

HI Well.

March 2009

163 I was in Perth between 1 and 12 March 2009.

164 Mr Duncan and I shared the day to day operational responsibility for rig operations.

165 In about early March 2009, the drilling being undertaken in the HI Well reflected the stages set out

in paragraphs 5.23, 5.24 and 5.29 of the DP. These stages were:

5.23 Run 244mm (9 5/8") Casing - Montara H1

196) Hold JSA and rig-up TESCO Casing Running tool (dressed to run 244mm (9 5/8") casing) to the TDS.

197) Run 244mm (9 5/8") casing per casing tally (Appendix 3).

• PDC Drillable float and shoe with sharkbite installed above the float.

• After making-up the shoe track (with baker-Ioc) fill with mud to check for flow through.

• Fill each joint of casing with mud whilst running in the hole

.. Monitor the trip tank closely firstly due to hydrocarbon zone being open (Montara Formation) and secondly for surge effects on the lower Johnson and Puffin inducing losses.

• Record up and down weights every 5 joints and compare against the torque and drag modeling.

198) Make-up the 244mm (9 5/8") MLS joint.

199) Run in the hole with the casing on the 244mm (9 5/8") landing string

200) Wash down the last joint of casing and land out the casing on the MLS

• Space out so that the cement head is at the rig floor level.

201) Circulate 110% of the casing volume

202) Install XlO pup joint - Vam Top pin x Buttress box

• Required to install the surface cement head onto the 244mm (9 5/8") casing

32

WIT.1000.0001.0255

Page 33: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

203) Retract the blocks to move the Tesco casing running tool out of the way (do not rig thecasing running tool down as it will be required to back out the casing from the MLS)

204) Make up the cement head.

. Take slow circulation rate (50SPM)

. Retract the blocks and lay out the Tesco Casing Running Tool offline.

205) Cement casing per program (Appendix 4)

. Monitor for returns

o Displace cement with inhibited seawater

. Ensure cement head is flushed while displacing the cement

. Estimate TOC using differential pressure prior to bumping the plug and reportsame on the DDR

o Pressure test the casing to 27.ãMPa (4000psi) for 10 minutes if plug bumps

¡ Offline: lnstallthe BOP cranes to the BOP's in preparation for nippling down theBOP's.

206) Check that the floats are holding

207) Disconnect the cement head and remove )UO joint of casing

Secure Well- Montara Hi

208) VVhilst waiting on cement use the Tesco Casing Running Tool, back-out the 244mm (95/8') MLS running tool from the MLS by rotating the casing to the right for 8-9 turns.

r The anticipated torque to back-out the running tool is 2034 - 4745 Nm (1500 -3500 ftlbs)

209) Once the running tool is released recover the landing string to surface and lay out same

210) Rig down the Tesco casing running tool

211) Run in the hole with drillpipe to 210m

212) Spot 3.97m3 (25bbls) of hi-vis

213) Pullout of the hole to 160m

214) Set cement plug from 160m to 115m

215) Pull out of the hole to 1 15m

216) Circulate hole clean with inhibited seawater

217) Pull out of the hole

218) Wait on cement (both casing cement and also the cement plug)

(4 JJ

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

203) Retract the blocks to move the Tesco casing running tool out of the way (do not rig the casing running tool down as it will be required to back out the casing from the MLS)

204) Make up the cement head.

• Take slow circulation rate (50SPM)

• Retract the blocks and layout the Tesco Casing Running Tool offline.

205) Cement casing per program (Appendix 4)

• Monitor for returns

• Displace cement with inhibited seawater

• Ensure cement head is flushed while displacing the cement

• Estimate TOC using differential pressure prior to bumping the plug and report same on the DDR

• Pressure test the casing to 27.5MPa (4000psi) for 10 minutes if plug bumps

• Offline: Install the BOP cranes to the BOP's in preparation for nippling down the BOP's.

206) Check that the floats are holding

207) Disconnect the cement head and remove XlO jOint of casing

5.24 Secure Well - Montara Hi

208) Whilst waiting on cement use the Tesco Casing Running Tool, back-out the 244mm (9 5/8") MLS running tool from the MLS by rotating the casing to the right for 8-9 turns.

• The anticipated torque to back-out the running tool is 2034 - 4745 Nm (1500 -3500 ft-Ibs)

209) Once the running tool is released recover the landing string to surface and layout same

210) Rig down the Tesco casing running tool

211) Run in the hole with drillpipe to 210m

212) Spot 3.97m3 (25bbls) of hi-vis

213) Pull out of the hole to 160m

214) Set cement plug from 160m to 115m

215) Pull out of the hole to 115m

216) Circulate hole clean with inhibited seawater

217) Pull out of the hole

218) Wait on cement (both casing cement and also the cement plug)

33

WIT.1000.0001.0256

Page 34: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF INQUTRYMONTARA WELL IIEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

5.29 Reduce the pressure in the Diverter Overchot Packer and lift the BOP's clear of thesurface wellhead. Suspend Well - Montara Hl

267) Skid to Slot 13-\tVD-003

268) Make-up a 340mm (13 3/8") casing spear and run in the hole.

269) Engage the 340mm (13 3/8') casing and apply right-hand rotation to release the MLSrunning toolfrom the hanger.

. The anticipated torque to back-out the running tool is 2034 - 4745 Nm (1500 -3500 ft-lbs)

270) Recover the casing to surface on the spear and lay out the casing and rack back thespear.

271) Run in the hole with the 508mm (20") Lynx running tool and make-up same to thelanding joint.

272) Rotate the 508mm (20") casing to the left to release the landing joint (joint torqued toless than allother joints).

273) Pull out of the hole with the 508mm (20") casing.

274) Lay out the landing joint and rack back the Lynx running tool.

275) Offline - Apply "lubriplate" lubricant to the threads on the 340mm and 508mm (13 3/8'and 20") MLS' prior to installing the corrosion cap

276) Offline - Make-up 508mm (20") corrosion cap and run in the hole with same on atugger

Figure 20 shows the suspended status of Montara H1.

166 The approval of the DP (by the Designated Authority - DA) had only been given with respect to

drilling of the wells and not for suspension. The suspension diagram in the approved DP was only

indicative of the proposed future state of suspension. Separate approval (from the DA) was required

for suspension. The suspension application was based on well data atthe time of the proposed

suspension together with a revised suspension diagram.

167 It was planned to install the244mm(9%") PCCC on Saturday, 7 March 2009. To avoid any potential

delays or inconvenience in getting approval for that change on a Saturday, a verbal request ofthe

change needed to be made to the DA on the afternoon of Friday, 6 March 2009 to make sure that

there was aural approval in place to install the PCCC before the work commenced.

168 On 6 March 2009I sent an email at approximately 1437 hours INT Time] to the DA requesting

urgent verbal approval of the Stage 1 suspension of the Hl Well. I prepared a suspension diagram

which showed the presence of a244mm (gt lr") PCCC (Suspension Diagram - Stage 1) and attached

this to the email. The Stage 1 suspension only allowed for the installation of the244mm (95/s'),/"/

e'Ú/Lr 34

COMMISSION OF INQUIRY MONTARA WELLHEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

5.29 Reduce the pressure in the Diverter Overshot Packer and lift the BOP's clear of the surface wellhead. Suspend Well - Montara H1

267) Skid to Slot 13-WD-003

268) Make-up a 340mm (13 3/8") casing spear and run in the hole.

269) Engage the 340mm (13 3/8") casing and apply right-hand rotation to release the MLS running tool from the hanger.

.. The anticipated torque to back-out the running tool is 2034 - 4745 Nm (1500 -3500 ft-Ibs)

270) Recover the casing to surface on the spear and layout the casing and rack back the spear.

271) Run in the hole with the 508mm (20") Lynx running tool and make-up same to the landing joint.

272) Rotate the 508mm (20") casing to the left to release the landing joint Uoint torqued to less than all other joints).

273) Pull out of the hole with the 508mm (20") casing.

274) Layout the landing joint and rack back the Lynx running tool.

275) Offline - Apply "Iubriplate" lubricant to the threads on the 340mm and 508mm (133/8" and 20") MLS' prior to installing the corrosion cap

276) Offline - Make-up 508mm (20") corrosion cap and run in the hole with same on a tugger

Figure 20 shows the suspended status of Montara Hi.

166 The approval of the DP (by the Designated Authority - DA) had only been given with respect to

drilling of the wells and not for suspension. The suspension diagram in the approved DP was only

indicative of the proposed future state of suspension. Separate approval (from the DA) was required

for suspension. The suspension application was based on well data at the time of the proposed

suspension together with a revised suspension diagram.

167 It was planned to install the 244mm (9%") PCCC on Saturday, 7 March 2009. To avoid any potential

delays or inconvenience in getting approval for that change on a Saturday, a verbal request of the

change needed to be made to the DA on the afternoon of Friday, 6 March 2009 to make sure that

there was aural approval in place to install the PCCC before the work commenced.

168 On 6 March 2009 I sent an email at approximately 1437 hours [NT Time] to the DA requesting

urgent verbal approval ofthe Stage 1 suspension of the HI Well. I prepared a suspension diagram

which showed the presence ofa 244mm (95/ 8,,) PCCC (Suspension Diagram - Stage 1) and attached

this to the email. The Stage I suspension only allowed for the installation of the 244mm (9%")

34

WIT.1000.0001.0257

Page 35: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

t69

coMMrssroN oF TNQUTRYMONTARA WELL IIEAD PLATFORM

UNCONTROLLED ITYDROCARBON RXLEASE

PCCC as the 340mm (133/3") casing, wellhead and BOP's would remain in place until the BOP was

removed to be installed onto another well being drilled on the WHP. The Suspension Diagram -

Stage 1 was as follows:

The Hl Well suspension was planned to be the same as the GI well that was already part of the DP.

At about 1500 hours (CST) on 6 March 2009lreceived an email from the DA granting approval for

the suspension of the H1 Well in accordance with the Suspension Diagram - Stage 1 and advising

that a formal letter confirming the approval would be issued the following week.

ã.etl7wfifãl*tÌl 8T'1

Suspension ûiãgram - Stage I

5¡gTr|l?i?[.I ¡.8 *rlq @åt*å8.-!rn

åL4l!&'â'&&ÊIgrË6

ü

*#&|;&

*s

il&.

g$älrn tfü"f CÐÊhg Eù¡e ¿[.*'1Þ9,*¡

5¿tsmm {T} sãr} cÃslng s{iroa a? * 1õ36"&tE

Stglslt? irã f i{'} Hd* TD * 3r9åx ¡¡|4üTtrll {3 Så'¡ ç¿BSq SÞJe ÈË .* 3lãä.8?t

170

&r("1 35

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

PCCC as the 340mm (133/ 8,,) casing, wellhead and BOP's would remain in place until the BOP was

removed to be installed onto another well being drilled on the WHP. The Suspension Diagram -

Stage 1 was as follows:

ACJL7 Moobra. Hl 81·1

Suspension Diagram - Stage 1

169 The HI Well suspension was planned to be the same as the GI well that was already part ofthe DP.

170 At about 1500 hours (CST) on 6 March 2009 I received an email from the DA granting approval for

the suspension of the HI Well in accordance with the Suspension Diagram - Stage 1 and advising

that a formalletler confirming the approval would be issued the following week.

35

WIT.1000.0001.0258

Page 36: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

t72

t73

t74

175

coMMrsfloN oF TNQUTRYMONTARA WELL HEAD PLATF'ORM

I]NCONTROLLED ITYDROCARBON RELEASE

I then sent that email to Mr Treasure (who was the PTETPAA Senior Drilling Supervisor on duty on

board the West Atlas).

I was on duty on the weekend of Saturday, 7 and Sunday, I March 2009.8y convention, on

weekends Mr Duncan and I would only speak about work issues if we thought that there was a

problem to solve or an opportunity to improve something. I do not recall speaking to Mr Duncan on

either Saturday, T or Sunday, 8 March 2009.

On 7 March 2009 | read the DDR dated 6 March 2009.I was aware from that report that the float

valves were functional at that time.

The244mm(gtlr") shoe float on Hl Well was cemented on TMarch 2009.

On 7 March 2009 lwas not near my computer most of the day so most of the communication with

the rig was via telephone. At approximately 1330hrs I had one or two telephone conversations with

Mr Treasure on the W'est Atlas,the substance of which was as follows:

(a) Mr Teasure informed me that:

the cement job was complete and they had pressure tested the casing;

once the casing pressure test was complete they had bled-off the pressure and when

they had nearly bled-off all the pressure they got a rush of fluid and shut the well in

at the cement unit and it appeared that the float had failed.

I asked Mr Treasure to apply or hold some pressure and wait on the cement to set.

I had a further telephone conversation with Mr Treasure later in the afternoon (I don't recall what

time) and he advised me they were keeping the pressure in the casing steady at about 1300psi and

waiting on cement.

I thought that the 1300 psi figure given by Mr Treasure was reasonable based on some rough

calculations I had done some time prior to the job to check final circulating pressure. The pressure

had to be sufficient to hold the cement in place while it set therefore the pressure had to be greater

than the hydrostatic pressure of the wet cement pumped into the casing but not excessively more

than that. I did not have any concern about the pressure being held against the float.

(iÐ

(b)

176

177

{r-/f436

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

171 I then sent that email to Mr Treasure (who was the PTETPAA Senior Drilling Supervisor on duty on

board the West Atlas).

172 I was on duty on the weekend of Saturday, 7 and Sunday, 8 March 2009. By convention, on

weekends Mr Duncan and I would only speak about work issues if we thought that there was a

problem to solve or an opportunity to improve something. I do not recall speaking to Mr Duncan on

either Saturday, 7 or Sunday, 8 March 2009.

173 On 7 March 2009 I read the DDR dated 6 March 2009. I was aware from that report that the float

valves were functional at that time.

174 The 244mm (9%") shoe float on HI Well was cemented on 7 March 2009.

175 On 7 March 2009 I was not near my computer most of the day so most of the communication with

the rig was via telephone. At approximately 1330hrs I had one or two telephone conversations with

Mr Treasure on the West Atlas, the substance of which was as follows:

(a) Mr Teasure informed me that:

(i) the cement job was complete and they had pressure tested the casing;

(ii) once the casing pressure test was complete they had bled-off the pressure and when

they had nearly bled-off all the pressure they got a rush of fluid and shut the well in

at the cement unit and it appeared that the float had failed.

(b) I asked Mr Treasure to apply or hold some pressure and wait on the cement to set.

176 I had a further telephone conversation with Mr Treasure later in the afternoon (I don't recall what

time) and he advised me they were keeping the pressure in the casing steady at about 1300psi and

waiting on cement.

177 I thought that the 1300 psi figure given by Mr Treasure was reasonable based on some rough

calculations I had done some time prior to the job to check final circulating pressure. The pressure

had to be sufficient to hold the cement in place while it set therefore the pressure had to be greater

than the hydrostatic pressure of the wet cement pumped into the casing but not excessively more

than that. I did not have any concern about the pressure being held against the float.

~~ 36

WIT.1000.0001.0259

Page 37: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUIRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

I had a further telephone conversation with Mr Treasure later that afternoon I eafly evening (I think

it was about 3 or 4 hours later) and I enquired how the cement was going and he said it had set and

they had bled-off the pressure with no flow from the well.

It was not my normal practice to ask for details of the amounts of fluids displacedduring any part of

the cementing process unless I was asked specifically to perform some calculation that would require

data from offshore or I wanted to perform that calculation in any event

I do not recall Mr Treasure telling me or me asking him how many barrels offluid had been initially

bled off or how many barrels he pumped back. If I hadbeen asked to perform any calculations it

would have been necessary to have relevant data sent to me or relayed to me by Mr Treasure as that

data, being the data recorded on the cement unit, is not part of the live data feed that is accessible

onshore.

In the WCS at section 9.2 it states:

"AII surface and intermediate casing strings shall be pressure tested to the design burst pressure but

not exceeding 70% of the minimum intemal yield pressure, and not less than 5600 kPa (800 psi).

The pressure shsll be held for a minimum of 20 minutes, except thøt þr casings sizes > 340mm (1 3

3/8) and strings with length ) 500m. "

That said the Schedule of Specific Requirements direction under the P(SL)A dated 18 December

1995 Section 503 fWell Casing] Paragraph 14 (c) states that pressure testing requirements include -pressure tests shall be held for as long as necessary (but not less than 10 minutes) to ascertain that

there is no continuous pressure drop, and the result recorded in the drillers log.

On the morning of Sunday I March 2009 I saw the email update dated 8 March 2009 from the

PTTEPAA personnel on West Atlas to, amongst other people, me that attached the:

(a)

(b)

PTTEPAA Daily Drilling Report dated7 March 2009; and

Advantage Drilling Mud Report datedT March 2009.

The PTTEPAA Daily Drilling Report datedT March 2009 mentions:

(a) at 1400- 1500: "switched back to Halliburton and pressure tested casing to 27.6Mpa x l0

179

180

181

r82

183

184

mins - OK BIed off test pressure to 1.37Mpa then;9+;rved pressure rapidly inæease to

U^/("t 37

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

178 I had a further telephone conversation with Mr Treasure later that afternoon I early evening (I think

it was about 3 or 4 hours later) and I enquired how the cement was going and he said it had set and

they had bled-off the pressure with no flow from the well.

179 It was not my normal practice to ask for details of the amounts of fluids displaced during any part of

the cementing process unless I was asked specifically to perform some calculation that would require

data from offshore or I wanted to perform that calculation in any event

180 I do not recall Mr Treasure telling me or me asking him how many barrels offluid had been initially

bled off or how many barrels he pumped back. If I had been asked to perform any calculations it

would have been necessary to have relevant data sent to me or relayed to me by Mr Treasure as that

data, being the data recorded on the cement unit, is not part of the live data feed that is accessible

onshore.

181 In the WCS at section 9.2 it states:

"All surface and intermediate casing strings shall be pressure tested to the design burst pressure but

not exceeding 70% of the minimum internal yield pressure, and not less than 5600 kPa (800 psi).

The pressure shall be held for a minimum of 20 minutes, except that for casings sizes> 340mm (J 3

3/8) and strings with length >500m. "

182 That said the Schedule of Specific Requirements direction under the P(SL)A dated 18 December

1995 Section 503 [Well Casing] Paragraph 14 (c) states that pressure testing requirements include­

pressure tests shall be held for as long as necessary (but not less than 10 minutes) to ascertain that

there is no continuous pressure drop, and the result recorded in the drillers log.

183 On the morning of Sunday 8 March 2009 I saw the email update dated 8 March 2009 from the

PTTEPAA personnel on West Atlas to, amongst other people, me that attached the:

(a) PTTEPAA Daily Drilling Report dated 7 March 2009; and

(b) Advantage Drilling Mud Report dated 7 March 2009.

184 The PTTEPAA Daily Drilling Report dated 7 March 2009 mentions:

(a) at 1400- 1500: "Switched back to Halliburton and pressure tested casing to 27.6Mpa x 10

mins - OK Bled off test pressure to 1. 37Mpa then observed pressure rapidly increase to

37

178

WIT.1000.0001.0260

Page 38: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL ITEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

8.9Mpa. Note: Pumped 1.47m3 and bled-off2.62m3, suspectedfloat valvefailure. Pumped

2.54m3 back into the casing at 9.3MPa";

(b) at 1500 - 1800: "ll'aited on cement."

(c) at 1800 - 1830: "Open casing annulus to atmosphere and confirm no backflow".

185 Given my discussions with Mr Treasure on 7 March 2009 there was no need for me to and I did not

scrutinize the volumes and pressures relevant to the cementing process recorded in the DDR. I

reviewed the DDR to see if there was any obvious effors or issues. There were none.

186 In the Advantage Drilling Fluids Report 7 dated 7 March 2009, drilling comments section, there is

mention of "T/'OC [úYait on CementJ Retestedfloat...".

187 On the morning of Sunday 8 March 2009Lprepared the morning update email in which I made the

commentthat:

"When bleeding off the pressure after testing the casing the float appeared to let go. Held pressure

on the casing and waited on cement. Prepared to skid and serviced top drive whilst waiting on

cement. Checkedfloøts on cøsing - OK. Released the 9 5/8" casing at the MLS and laid out the

Ianding stringl'.

188 From my discussions with Mr Treasure on 7 March 2009 and the details recorded in the morning

email and the Advantage Drilling Fluid Report, I understood that an inflow test had been done on the

244mm (f lt") casing cement and no flow had been seen.

189 The reference in the DDR report tothe "annulus" was inaccurate given what I had discussed with

Mr Treasure and what was reported in the other report and morning email.

190 I did not interpret the expression "checked cement integrity" in the morning email to mean that any

test other than the inflow test had been done. This was consistent with the discussions that I had had

with Mr Treasure on 7 March 2009.

191 It was apparent from the above reports that were available to me and my discussions with Mr

Treasure that the float valves failed in service.

I92 T-he l(est Atlas SDI Operations Procedures Manual deals with the situations of failures of float

valves and waiting on cement. &/(/ 38

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

8.9Mpa. Note: Pumped 1.47m3 and bled-off2.62m3, suspectedjloat valve failure. Pumped

2.54m3 back into the casing at 9.3MPa";

(b) at 1500 - 1800: "Waited on cement."

(c) at 1800 - 1830: "Open casing annulus to atmosphere and confirm no backjlow".

185 Given my discussions with Mr Treasure on 7 March 2009 there was no need for me to and I did not

scrutinize the volumes and pressures relevant to the cementing process recorded in the DDR. I

reviewed the DDR to see if there was any obvious errors or issues. There were none.

186 In the Advantage Drilling Fluids Report 7 dated 7 March 2009, drilling comments section, there is

mention of "WOC [Wait on Cement] Retestedjloat ... ".

187 On the morning of Sunday 8 March 2009 I prepared the morning update email in which I made the

comment that:

"When bleeding off the pressure after testing the casing the jloat appeared to let go. Held pressure

on the casing and waited on cement. Prepared to skid and serviced top drive whilst waiting on

cement. Checkedjloats on casing - OK. Released the 9 5/8" casing at the MLS and laid out the

landing string".

188 From my discussions with Mr Treasure on 7 March 2009 and the details recorded in the morning

email and the Advantage Drilling Fluid Report, I understood that an inflow test had been done on the

244mm (9%") casing cement and no flow had been seen.

189 The reference in the DDR report to the "annulus" was inaccurate given what I had discussed with

Mr Treasure and what was reported in the other report and morning email.

190 I did not interpret the expression "checked cement integrity" in the morning email to mean that any

test other than the inflow test had been done. This was consistent with the discussions that I had had

with Mr Treasure on 7 March 2009.

191 It was apparent from the above reports that were available to me and my discussions with Mr

Treasure that the float valves failed in service.

192 The West Atlas SDI Operations Procedures Manual deals with the situations of failures of float

valves and waiting on cement.

f) 38

WIT.1000.0001.0261

Page 39: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

194

195

196

r97

198

coMMrssroN oF INQTITRYMONTARA WELL IIEAD PLATFORM

I]NCONTROLLED IIYDROCARBON RELEASE

Section 1.1.31 (point 15 under procedures) of the úT'est A/øs SD1 Operations Procedures Manual

says "NOTE: If the floats fail, the valve must be closed to prevent the cement from flowing back

inside the cøsing. "

Putting together the comments made in the DDR and Advantage Mud reportand telephone

conversations with Mr Treasure, I concluded that the cementing had been completed properly and

the well integrity was not a concern.

On 1l March2009I received from Mr Treasure the completed casing and cementing report

(prepared by Mr Treasure) dated 6 March but updated following completion of the cementing on 7

March 2009. I looked very briefly at the report but did not scrutinised the figures. There was no

need for me to scrutinise the figures, given the events of 7 March 2009 as I have described above.

The report contains a pumping schedule. This schedule records fluid type, volume, pressure and

comments on the cementing operation. This schedule recorded that 16.5bbls of fluid had been

pumped back into the 244mm (gt lr") casing after the float failed and that the final pressure prior to

stopping pumping was 1350psi.

On 11 March 2009 I prepared Well Construction Change Control Form No D650054-006. This

form describes a change to the method of suspension of the Hl Well.

The revised suspension method consisted of: cemented casing shoe , a column of inhibited sea water,

244mm (gtlr') and 340mm (133/s") PCCC's and a 508mm (20") trash cap on top. A trash cap is a

non pressure containing cover to prevent debris entering the well'

The Change Control Form did not include instructions on when the 244mm (gt/r") and 340mm

(133/s") PCCC's should be installed in the Hl Well and whether the PCCC's should be pressure

tested. The manufacturer's instructions for the installation of the PCCC'S was supplied to the

PTTEP Drilling Supervisor so the caps could be installed as per the manufacturer's instructions. I

assumed that those instructions would call for an in situ pressure test after installation and I did not

note prior to sending out the manufacturers instructions that they themselves do not call for the

PCCC's to be pressure tested once installed.

The considerations for the amendment were discussed between Mr Duncan and me in the form of a

risk assessment. The following points were raised:

pressure containing corrosion caps allow pressure below the cap to be checked prior to

t99

(a)

removal, whereas cement plugs do not;

€/'jl/ 39

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

193 Section 1.1.31 (point 15 under procedures) of the West Atlas SD 1 Operations Procedures Manual

says "NOTE: If the floats fail, the valve must be closed to prevent the cement from flowing back

inside the casing. "

194 Putting together the comments made in the DDR and Advantage Mud report and telephone

conversations with Mr Treasure, I concluded that the cementing had been completed properly and

the well integrity was not a concern.

195 On 11 March 2009 I received from Mr Treasure the completed casing and cementing report

(prepared by Mr Treasure) dated 6 March but updated following completion of the cementing on 7

March 2009. I looked very briefly at the report but did not scrutinised the figures. There was no

need for me to scrutinise the figures, given the events of 7 March 2009 as I have described above.

The report contains a pumping schedule. This schedule records fluid type, volume, pressure and

comments on the cementing operation. This schedule recorded that 16.5bbls of fluid had been

pumped back into the 244mm (95/ 8,,) casing after the float failed and that the final pressure prior to

stopping pumping was 1350psi.

196 On 11 March 2009 I prepared Well Construction Change Control Form No D65005A-006. This

form describes a change to the method of suspension of the HI Well.

197 The revised suspension method consisted of: cemented casing shoe, a column of inhibited sea water,

244mm (95/ 8,,) and 340mm (133/ 8,,) PCCC's and a 508mm (20") trash cap on top. A trash cap is a

non pressure containing cover to prevent debris entering the well.

198 The Change Control Form did not include instructions on when the 244mm (95/ 8,,) and 340mm

(133/ 8,,) PCCC's should be installed in the HI Well and whether the PCCC's should be pressure

tested. The manufacturer's instructions for the installation of the PCCC's was supplied to the

PTTEP Drilling Supervisor so the caps could be installed as per the manufacturer's instructions. I

assumed that those instructions would call for an in situ pressure test after installation and I did not

note prior to sending out the manufacturers instructions that they themselves do not call for the

PCCC's to be pressure tested once installed.

199 The considerations for the amendment were discussed between Mr Duncan and me in the form of a

risk assessment. The following points were raised:

(a) pressure containing corrosion caps allow pressure below the cap to be checked prior to

removal, whereas cement plugs do not;

39

WIT.1000.0001.0262

Page 40: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF rNQrrrRYMONTAR^A. WELL HEAD PLATFORM

IJNCONTROLLED IIYDROCARBON RELEASE

(b) the risk of damaging the244mm (9t /r') casing when drilling out a cement plug;

(c) a244mm(gt/r") pressure containing corrosion cap was available; and

(d) protect the threads on the MLS.

200 I received the original signed CIrange Control Form on 12 March 2009. I scanned the Change

Control Form and attached the relevant documents and sent that to PTTEPAA's Montara

Development document controller with instructions to distribute it to the same people who had

received the DP.

201 Also on 12INl.arch2009 an application was made to the DA to suspend the Hl Well based on

Suspension Diagram - Stage 2, including the installation of the 340mm (133/s") PCCC. Suspension

Diagram - Stage 2 was as follows:

&,J(/ 40

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(b) the risk of damaging the 244mm (95/ 8,,) casing when drilling out a cement plug;

(c) a 244mm (95/ 8,,) pressure containing corrosion cap was available; and

(d) protect the threads on the MLS.

200 I received the original signed Change Control Form on 12 March 2009. I scanned the Change

Control Form and attached the relevant documents and sent that to PTTEP AA's Montara

Development document controller with instructions to distribute it to the same people who had

received the DP.

201 Also on 12 March 2009 an application was made to the DA to suspend the HI Well based on

Suspension Diagram - Stage 2, including the installation of the 340mm (13 3/ 8,,) PCCC. Suspension

Diagram - Stage 2 was as follows:

f 40

WIT.1000.0001.0263

Page 41: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

åÊrL?mmkrlål8T-1

Ë,uspensiun ûiagram - Stagn 2

TfffßYI i2:"1õ..rHrfiçs t, *--ffi*- llffiåffiïtrffi /kd ML EffiïftËtr,r¡mr{ffi*ãr^ssæ

*#?ßãfã?ßtËå

tÍ,e*#çss\sø*ånft**t

ã0Ëñ,*Tr tø¡ tãÉFls st'm # * 15Ð.*¡

5,tgrffi l?e SE l g¡€lr!* SiÞå tr * lü¡6.&rÞ

3Sgî$ t1â lt¿l'f t{eÞ -lB * }?9.ã¡r å{4fllr!¡{gs6-}ËaE$E 910É.*- ll?ôEä'1r

coMMrssroN oF TNQUTRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

202 The application to perform the Stage 2 suspension was approved by the DA on 19 March 2009 and

the approval was then forwarded to Mr Treasure on the West Atlas.

The 340mm (13%") PCCC

203 The revised DP intended that a PCCC would be screwed into the 340mm (13 %") MLS hanger

threads at surface on the 340mm (I3 %") casing.

On 8 March 2009 the 340mm (13 %) casing above the MLS was still screwed into the MLS hanger.204

e"/(/ 4t

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

ACIl7 Mootarlll'ft ST-1

Suspension Diagram - Stage 2

0):'c -" ,2:": G;p:.;lm ~JrP J'" 340til"f' (13 _),1:";, ;:.o~~!,J":"~ C::rla nrg Cotro~o" C3¥

r\

202 The application to perform the Stage 2 suspension was approved by the DA on 19 March 2009 and

the approval was then forwarded to Mr Treasure on the West Atlas.

The 340mm (133/ 8,,) PCCC

203 The revised DP intended that a PCCC would be screwed into the 340mm (13 %") MLS hanger

threads at surface on the 340mm (13 %") casing.

204 On 8 March 2009 the 340mm (13 %") casing above the MLS was still screwed into the MLS hanger.

41

WIT.1000.0001.0264

Page 42: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA WELL IIEAD PLATX'ORM

UNCONTROLLED TTYDROCARBON RELEASE

This was left in place as a BOP parking point on the Hl \üell. The BOP could be landed on the

340mm (13 %") braden head whilst the rig drilled top hole sections in Montara If2 &,H3, wells not

originally planned for when the DP was issued. This resulted in the scheduling of the installation of

the 340mm (13 %) PCCC on the Hl Well for some time after the BOP and the MLS hanger being

removed.

The installation of a 340mm (13 %") PCCC on the Hl Well is noted in the comments section of the

DDR-14 from Montara H2 dated 16 April 2009 and reporting on the activities for 16 April 2009.

That DDR says (on page 3): "Corrosion cøpsfitted to 340mm MLS and trash capsfitted to 508mm

conductors on HI and H3-ST[ ".

The Montara H2 DDR-I4 dated 16 April 2009 anived on shore on 17 April 2009.

On l7 April 2009 I received an email from PTTEPAA staff on theúV'est Atlas saying the PCCCs

were installed. The e-mail was the morning update email that contains the morning reports that is

sent in by 0700hrs each day. Under the section "Comments/Activities" the third bullet point is

"Corrosion caps and trash caps instølled by on wells Hl qnd H3-ST-1 ".

A Trash Cap sits on the top of the 508mm (20") casing and is a non pressure containing cover to

prevent debris entering the well.

I therefore prepared the Suspension As-Built (drawing) showing the well suspended with the 340mm

(I3 %") PCCC in place.

On2l April 2009 I received by email the DDR from Montaralf2 dated 20 April 2009 that stated in

the operations section between 0600 and 0700 hrs "Note: Now all 5 wells secured and protected".

Based on those DDRs I thought that the 244mm(9%")PCCC and the 340mm (13 %") PCCC had

been installed on the Hl Well as set out in the DP (as revised by change control).

Online activities are items that are usually performed by the drilling team. They usually involve the

use of the derrick or the rig floor personnel. This is what is reported in the time breakdown on the

IADC report and also the Daily Drilling Report. Offline activities are jobs that are done at the same

time as online activities. An example of this may be the installation of atrash cap, which can be

done with an air hoist and a roustabout may be done at the same time as casing is being laid out on

an adjacent well.

Suspension status of the Hl \iletl and the plan for the completion of the n"ll" (fu

206

207

208

2t2

209

210

2lt

213

2t4

{'t 42

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

205 This was left in place as a BOP parking point on the HI Well. The BOP could be landed on the

340mm (13 %") braden head whilst the rig drilled top hole sections in Montara H2 & H3, wells not

originally planned for when the DP was issued. This resulted in the scheduling of the installation of

the 340mm (13 %") PCCC on the HI Well for some time after the BOP and the MLS hanger being

removed.

206 The installation of a 340mm (13 %") PCCC on the HI Well is noted in the comments section of the

DDR-14 from Montara H2 dated 16 April 2009 and reporting on the activities for 16 April 2009.

207 That DDR says (on page 3): "Corrosion caps fitted to 340mm MLS and trash caps fitted to 508mm

conductors on Hi and H3-STi".

208 The Montara H2 DDR-14 dated 16 April 2009 arrived on shore on 17 April 2009.

209 On 17 April 2009 I received an email from PTTEPAA staff on the West Atlas saying the PCCCs

were installed. The e-mail was the morning update e-mail that contains the morning reports that is

sent in by 0700hrs each day. Under the section "Comments/Activities" the third bullet point is

"Corrosion caps and trash caps installed by on wells Hi and H3-ST-i".

210 A Trash Cap sits on the top of the 508mm (20") casing and is a non pressure containing cover to

prevent debris entering the well.

211 I therefore prepared the Suspension As-Built (drawing) showing the well suspended with the 340mm

(13 %") PCCC in place.

212 On 21 April 2009 I received by email the DDR from Montara H2 dated 20 April 2009 that stated in

the operations section between 0600 and 0700 hrs "Note: Now all 5 wells secured and protected".

213 Based on those DDRs I thought that the 244mm (9%") PCCC and the 340mm (13 %") PCCC had

been installed on the HI Well as set out in the DP (as revised by change control).

214 Online activities are items that are usually performed by the drilling team. They usually involve the

use of the derrick or the rig floor personnel. This is what is reported in the time breakdown on the

IADC report and also the Daily Drilling Report. Offline activities are jobs that are done at the same

time as online activities. An example of this may be the installation of a trash cap, which can be

done with an air hoist and a roustabout may be done at the same time as casing is being laid out on

an adjacent well.

Suspension status of the HI Well and the plan for the completion of the wells

42

205

WIT.1000.0001.0265

Page 43: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF INQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON R.ELEASE

As at 17 April 2009 and based on the documents that I had received and on my previous telephone

discussions with Mr Treasure, I thought that the following barriers were in place and would remain

in place during the suspension of the Hl Well and prior to the commencement of work to preparethe

well for the next stage of drilling:

(a) a cemented shoe;

(b) displacement fluids within the244mm(9%") casing (which provided hydrostatic pressure

greater than the pore pressure);

24 4mm (9%") pressure containing corrosion cap ;

cement within the 340mm (13 %"\ x244mm (9%") casing annulus; and

340mm (13 %") pressure containing corrosion cap.

(c)

(d)

(e)

2t6 I also thought based on the documents that I had received that a 508mm (20") Trash Cap was in place

on the Hl Well.

The lTest Atlas returned to the Montara WHP on 19 August 2009.

After initial preparations for worko the initial work scope was to re-establish the top 20 meters of the

casing and MLS back to where the well head was going to be. This involves a tie back of casing

strings.

Next, the BOPs were to be nippled up again and pressure tested. Then the drilling assembly was to

go in and the shoe track and plug drilled out, followed by the horizontal section and then to carry on

with our program as contained in DP lB.

During the tie back we had to tie back 3 casing strings. Firstly we had to tie back the conductor. The

conductor was strong enough to support the weight of all the loads including the BOPs which were

about 90 tons. 'With the conductor installed we would cut that accurately to height and then install

the first wellhead section. The first wellhead section elevation would dictate the stack up height for

all the other items. The 340mm (l33lg") casing would have been tied back and its annular sealed off

and then the 244mm ( gtlr") casing tied back and sealed off and at that point we would have nippled

up to BOPs and started pressure testing.

The plan was to take off the trash cap, nipple up the 508mm (20") conductor with a PCCC on the

340mm (133/s") casing and a PCCC on the 244mm (9tlr") on that well.

2t7

2t8

219

220

221

(,( 43

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

215 As at 17 April 2009 and based on the documents that I had received and on my previous telephone

discussions with Mr Treasure, I thought that the following barriers were in place and would remain

in place during the suspension of the HI Well and prior to the commencement of work to prepare the

well for the next stage of drilling:

(a) a cemented shoe;

(b) displacement fluids within the 244mm (9%") casing (which provided hydrostatic pressure

greater than the pore pressure);

(c) 244mm (9%") pressure containing corrosion cap;

(d) cement within the 340mm (13 %") x 244mm (9%") casing annulus; and

(e) 340mm (13 %") pressure containing corrosion cap.

216 I also thought based on the documents that I had received that a 508mm (20") Trash Cap was in place

on the HI Well.

217 The West Atlas returned to the Montara WHP on 19 August 2009.

218 After initial preparations for work, the initial work scope was to re-establish the top 20 meters of the

casing and MLS back to where the well head was going to be. This involves a tie back of casing

strings.

219 Next, the BOPs were to be nippled up again and pressure tested. Then the drilling assembly was to

go in and the shoe track and plug drilled out, followed by the horizontal section and then to carry on

with our program as contained in DP IB.

220 During the tie back we had to tie back 3 casing strings. Firstly we had to tie back the conductor. The

conductor was strong enough to support the weight of all the loads including the BOPs which were

about 90 tons. With the conductor installed we would cut that accurately to height and then install

the first wellhead section. The first wellhead section elevation would dictate the stack up height for

all the other items. The 340mm (133/ 8,,) casing would have been tied back and its annular sealed off

and then the 244mm ( 95/ 8,,) casing tied back and sealed off and at that point we would have nippled

up to BOPs and started pressure testing.

221 The plan was to take off the trash cap, nipple up the 508mm (20") conductor with aPCCC on the

340mm (13%") casing and a PCCC on the 244mm (95/ 8,,) on that well.

43

215

WIT.1000.0001.0266

Page 44: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

222 Within the drilling program, DP lB, section 5.6 on page29 covers the removal of the trash cap,

installation of the conductor and installation of the braden head or initial wellhead section.

223 The planned steps to tie-back the 508mm (20") casing on the Hl Well were set out in paragraph 5.6.

The planned steps to remove the 340mm (13 %") PCCC and tie back the 340mm (13 %") casing on

the Hl Well were set out in paragraph 5.16 of the DP lB and the planned steps to remove the244mm

(Ç%-)PCCC and tie back the 244mm(9%) casing on the Hl Well were set out in paragraph 5.17 of

the DP.

5.6 Tie-back 508mm (20") casing- Montara Hl ST-1

15) Remove the trash cap from the well using a tugger

o Checkthethreads onthe 508mm (20") conductor

16) Rig-up to run 508mm (20") conductor

17) Make-up the landing string (Figure 28) and run in the hole

1S) Carefully makeup the Leopard connection on the MLS and engage the antirotation tabs

19) Rough cut the casing above the mezzanine deck and recover the landing sting.

20) Skidto well slot l3-WD-009 (Montara GI)

2l) Offline cut the 508mm (20") casing at 4.661m above the platform main dæk (Figure 28) with a

cold cutter and recover the cut-off.

22) Offline install the Braden Head and orient per Appendix 5 (Due North or parallel to the aft ofthe rig pointing starboard). Record wellhead serial number on the DDR

23) Offtine install Aker debris cover P^i 585776-P5

5.16 Tie-back 340mm (13 3/8") casing- Montara Hl ST-1

173\ Run in the hole with the corrosion cap running tool.

174) Make up the TDS before engaging the running tool onto the corrosion cap (this will allow for

any pressure below the corrosion cap to be observed on the standpipe and then bled-offthrough

the choke manifold)

175\ Engage the corrosion cap and check for any pressure below the corrosion cap. Note any

pressure on the IADC and the DDR. Bleed-off any pressure via the droke manifold.

176) Remove the corrosion cap by rotating clockwise for 8-9 turns with a torque of 2034 - 4745Nm

(1500-3500 ftlbs) and recover same to surface.

177) Rig-up to run 340mm (13 3i8") casing

178) Make-up the MLS tieback tool to the landing string

o Confirm all seals are intact

'ttJ 44

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

222 Within the drilling program, DP IB, section 5.6 on page 29 covers the removal of the trash cap,

installation of the conductor and installation of the braden head or initial wellhead section.

223 The planned steps to tie-back the 508mm (20") casing on the HI Well were set out in paragraph 5.6.

The planned steps to remove the 340mm (13 Ys") PCCC and tie back the 340mm (13 %") casing on

the HI Well were set out in paragraph 5.16 ofthe DP IB and the planned steps to remove the 244mm

(9%") PCCC and tie back the 244mm (9%") casing on the HI Well were set out in paragraph 5.17 of

the DP.

5.6 Tie-back 508mm (20") casing - Montara HI ST-l

15) Remove the trash cap from the well using a tugger

• Check the threads on the 508mm (20") conductor

16) Rig-up to run 508mm (20") conductor

17) Make-up the landing string (Figure 28) and run in the hole

18) Carefully make-up the Leopard connection on the MLS and engage the anti-rotation tabs

19) Rough cut the casing above the mezzanine deck and recover the landing string.

20) Skid to well slot 13-WD-009 (Montara GI)

21) Offline cut the 508mm (20") casing at 4.661m above the platform main deck (Figure 28) with a cold cutter and recover the cut-off.

22) Offline install the Braden Head and orient per Appendix 5 (Due North or parallel to the aft of the rig pointing starboard). Record wellhead serial number on the DDR

23) Offline install Aker debris cover PIN 585776-P5

5.16 Tie-back 340mm (13 3/8") casing - Montara HI ST-l

173) Run in the hole with the corrosion cap running tool.

174) Make up the TDS before engaging the running tool onto the corrosion cap (this will allow for any pressure below the corrosion cap to be observed on the standpipe and then bled-off through the choke manifold)

175) Engage the corrosion cap and check for any pressure below the corrosion cap. Note any pressure on the IADC and the DDR. Bleed-off any pressure via the choke manifold.

176) Remove the corrosion cap by rotating clockwise for 8-9 turns with a torque of 2034 - 4745Nm (1500-3500 ftlbs) and recover same to surface.

177) Rig-up to run 340mm (13 3/8") casing

178) Make-up the MLS tieback tool to the landing string

• Confirm all seals are intact

fj 44

WIT.1000.0001.0267

Page 45: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF rNQtrrRYMONTARA \ryELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

o Lubricate seals with Jet Lube AP-5 or equivalent. DO NOT use pipe dope or lubricantcontaining metal particles.

179) Run in the hole with the MLS tieback tool and space-out to ensure that no casing couplings are

in the vicinity of the swface wellhead

180) Lower the tieback tool onto the MLS and apply 0.9 to 2.2MT weight down and mark the pipe at

the rotary table

l8l) Rotate the string to the right 9.5 to 10.5 tums maintaining constant weight down on the stringwith a torque of 3390 to 5424Nm (2500 - 4000 ftlbs). The string should have moved 89mmdown.

182) Hydrotest the tieback by filling the casing with water.

183) Install the casing slips (Aker PA{ W85859-I33EA-2W). The slips are tully installed when thedistance from the top of the slips to the top of the starter head is 2l6mm (8.52")

184) Install the cold cutter and cut the 340mm (13 3/8") casing l27mm (5") [+i- 3mm (0.12")]above the top surface of the starter head ensuring the outer edge has a bevel per AkerProcedures 6l -PH20 59 -7 0 (M I 76).

185) Once the casing is cut recover the landing sÍing to surface.

186) Change from casing elevators to drillpipe elevators and make-up the pack-off running toolcomplete with the pack-off (P/1.{ W85860-1334-2Q).

187) Whilst rigging-up to run the pack-off clean out the cavity above the slips in the starter head inpreparation to run the pack-off.

188) Install the pack-off per Aker Procedures 61-PH2059-70 (M176).

189) Pressure test the pack-off to l0.9MPa (1584 psi) -70% of the collapse pressure of the casingfor l0 minutes

190) Once successfully pressure tested engage the pack-off

191) Recover the pack-offrunning tool

192) Change out the 340mm (13 3/8") pack-off running tool for the 244mm (9 5/8") pack-offrunning tool.

5.17 Tie-back 244mm (9 5/8") casing- Montara Hl ST-1

193) Run in the hole with the corrosion cap running tool.

194\ Make up the TDS before engaging the running tool onto the corrosion cap (this will allow forany pressure below the corrosion cap to be observed on the standpipe and then bled-offthroughthe choke manifold)

195) Engage the corrosion cap and check for any pressure below the corrosion cap. Note anypressure on the IADC and the DDR. Bleed-off any pressure via the choke manifold.

196) Remove the corrosion cap by rotating clockwise for 8-9 turns with a torque of 2034 - 4745Nm(1500-3500 ftlbs) and recover same to surface.

197) Rig-up torun244mm (9 5/8") casing

â*,

lJ 4s

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

• Lubricate seals with Jet Lube AP-5 or equivalent. DO NOT use pipe dope or lubricant containing metal particles.

179) Run in the hole with the MLS tieback tool and space-out to ensure that no casing couplings are in the vicinity of the surface wellhead

180) Lower the tieback tool onto the MLS and apply 0.9 to 2.2MT weight down and mark the pipe at the rotary table

181) Rotate the string to the right 9.5 to 10.5 turns maintaining constant weight down on the string with a torque of 3390 to 5424Nm (2500 - 4000 ftlbs). The string should have moved 89mm down.

182) Hydrotest the tieback by filling the casing with water.

183) Install the casing slips (Aker PIN W85859-133EA-2W). The slips are fully installed when the distance from the top of the slips to the top of the starter head is 216mm (8.52")

184) Install the cold cutter and cut the 340mm (13 3/8") casing 127mm (5") [+/- 3mm (0.12")] above the top surface of the starter head ensuring the outer edge has a bevel per Aker Procedures 61-PH2059-70 (MI76).

185) Once the casing is cut recover the landing string to surface.

186) Change from casing elevators to drillpipe elevators and make-up the pack-off running tool complete with the pack-off (PIN W85860-133A-2Q).

187) Whilst rigging-up to run the pack-off clean out the cavity above the slips in the starter head in preparation to run the pack-off.

188) Install the pack-off per Aker Procedures 61-PH2059-70 (MI76).

189) Pressure test the pack-off to 1O.9MPa (1584 psi) - 70% of the collapse pressure of the casing for 10 minutes

190) Once successfully pressure tested engage the pack-off

191) Recover the pack-off running tool

192) Change out the 340mm (l3 3/8") pack-off running tool for the 244mm (9 5/8") pack-off running tool.

5.17 Tie-back 244mm (9 5/8") casing - Montara HI ST-l

193) Run in the hole with the corrosion cap running tool.

194) Make up the TDS before engaging the running tool onto the corrosion cap (this will allow for any pressure below the corrosion cap to be observed on the standpipe and then bled-off through the choke manifold)

195) Engage the corrosion cap and check for any pressure below the corrosion cap. Note any pressure on the IADC and the DDR. Bleed-off any pressure via the choke manifold.

196) Remove the corrosion cap by rotating clockwise for 8-9 turns with a torque of 2034 - 47 45Nm (1500-3500 ftlbs) and recover same to surface.

197) Rig-up to run 244mm (9 5/8") casing

45

WIT.1000.0001.0268

Page 46: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

203)

204)

coMMrssloN oF INQUTRYMONTARA }VELL HEAD PLATFORM

IINCONTROLLED ITYDROCARBON RELEASE

198) Make-up the MLS tieback tool to the landing string.

o Confirm all seals are intact

o Lubricate seals with Jet Lube AP-5 or equivalent. DO NOT use pipe dope or lubricant

containing metal particles.

199) Run in the hole with the MLS tieback tool and space-out to ensure that no casing couplings are

in the vicinþ of the surface wellhead

o Install a 340mm x 244mm (13 3/8" x 9 5/8") casing centralizer below the surface

wellhead asthe244tnn casing will be cut without the casing slips in place.

200) Lower the tieback tool onto the MLS and apply 0.9 to 2.2MT weight down and mark the pipe at

the rotary table

201) Rotate the string to the right 9.5 to 10.5 turns maintaining constant weight down on the string

with a torque of 3390 to 5424Nm (2500 - 4000 ftlbs). The string should have moved 89mm

down.

Hydrotest the tieback by filling the casing with water.

Install a water head bushing on the casing complete with a side entry sub and a TIW.

Pressure test the casing to 27.5MPa (a000psi) for 20 minutes to check the integrity of the MLS

connection.

NOTE: This will pressure test the enttre244mm (9 5/8")casing string.

205) Nipple-down from the casing pressure test

206) Install the cold cutter and cut the 244mm (9 5/8') casing 509mm (20.04") [+/- 3mm (0.12")]

above the top surface of the starter head ensuring the outer edge has a bevel per Aker

Procedures 6l-PH2059 -70 (Ml 76).

207) Recover the landing string

20S) Change from casing elevators to drillpipe elevators (whilst installing the wellhead)

2Og) Install the unitized Aker Wellhead per the Aker procedure 6l-PH2059-70 (M176). Orient the

wellhead per the wellhead orientation procedure (Appendix 5)

2lO\ Pressure test the neck seals against the 340mm (13 3/8") casing to l0.9MPa (158a psi) - 70%

of the collapse pressure of the casing for 10 minutes.

Zll) Pressure test the cavity between the starter head and the unitized wellhead to l0.9MPa (1584

psi) -70% of the collapse pressure of the casing for 5 minutes.

212) Install the 244mm (9 5/8") slip landing guide (Figure 30)

¡ The slip landing guide will consist of a cut-off joint of 244mm (9 5/8") casing with 3

guides welded to the inside base. The guide will be lowered through the unitized

wellhead and mate-up with the already cut 244ntm (9 5/8") casing. The slip landing

guide will allow the slips to be wrapped around the casing and lowered into the wellhead

without snagging-up on the already cut casing. ,.]

ú{^/

(/ 46

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

198) Make-up the MLS tieback tool to the landing string.

• Confmn all seals are intact

• Lubricate seals with Jet Lube AP-5 or equivalent. DO NOT use pipe dope or lubricant containing metal particles.

199) Run in the hole with the MLS tieback tool and space-out to ensure that no casing couplings are in the vicinity of the surface wellhead

• Install a 340mm x 244mm (13 3/8" x 9 5/8") casing centralizer below the surface wellhead as the 244mm casing will be cut without the casing slips in place.

200) Lower the tieback tool onto the MLS and apply 0.9 to 2.2MT weight down and mark the pipe at the rotary table

201) Rotate the string to the right 9.5 to 10.5 turns maintaining constant weight down on the string with a torque of 3390 to 5424Nm (2500 - 4000 ftlbs). The string should have moved 89mm down.

202) Hydrotest the tieback by filling the casing with water.

203) Install a water head bushing on the casing complete with a side entry sub and a TIW.

204) Pressure test the casing to 27.5MPa (4000psi) for 20 minutes to check the integrity of the MLS connection.

NOTE: This will pressure test the entire 244mm (9 5/8") casing string.

205) Nipple-down from the casing pressure test

206) Install the cold cutter and cut the 244mm (9 5/8") casing 509mm (20.04") [+/- 3mm (0.12")] above the top surface of the starter head ensuring the outer edge has a bevel per Aker Procedures 61-PH2059-70 (MI76).

207) Recover the landing string

208) Change from casing elevators to drillpipe elevators (whilst installing the wellhead)

209) Install the unitized Aker Wellhead per the Aker procedure 61-PH2059-70 (MI76). Orient the wellhead per the wellhead orientation procedure (Appendix 5)

210) Pressure test the neck seals against the 340mm (13 3/8") casing to 10.9MPa (1584 psi) - 70% of the collapse pressure of the casing for 10 minutes.

211) Pressure test the cavity between the starter head and the unitized wellhead to 10.9MPa (1584 psi) -70% of the collapse pressure of the casing for 5 minutes.

212) Install the 244mm (9 5/8") slip landing guide (Figure 30)

• The slip landing guide will consist of a cut-off joint of 244mm (9 5/8") casing with 3 guides welded to the inside base. The guide will be lowered through the unitized wellhead and mate-up with the already cut 244mm (9 5/8") casing. The slip landing guide will allow the slips to be wrapped around the casing and lowered into the wellhead without snagging-up on the already cut casing.

f j 46

WIT.1000.0001.0269

Page 47: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

OF TNQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

213) Install the casing slips (Aker PN W85716-0954-3\ID. The slips are fully installed when thedistance from the top of the slips to the top of the unitized wellhead is 703mm Q7.66")

214) Once the slips are installed remove the slip landing guide.

215) Make-up the pack-off running tool to drillpipe (a minimum of 3T weight is needed to set thepack-off)

216) Install the pack-offper Aker Procedures 61-PH2059-70 (M176).

217) Pressure test the pack-off to 2296MPa (3330 psi) [70% of the collapse rating of the casing] for10 minutes

218) Once successfully pressure tested engage the pack-off

219) Take 4.5T overpull to confirm that the pack-off is engaged.

220) Recover the pack-off running tool

221) Skidto slot l3-WD-001 (MontaraH4)

222) OFFLINE: Install the tree Jig (Figure 31) to allow construction to take measurements for theflow lines. Once measurements have been taken nipple down the jig

223) OFFLINE: Remove one manual 52mm Q l/16") side outlet valve and replace with twohydraulic actuated 52mm (2 l/16") side outlet valves for the 244mm (9 5/8") annulus gas

injection manifold tie in. Confirm with Production/Construction crew on correct side ofunitized wellhead for the Gas Injection manifold tie in as well as hydraulic actuator orientationfor hydraulic control line tie in.

224) OFFLINE: Install the 4.5m high pressure riser using a double drive lock adaptor to theunitized wellhead (Figure 32).

225) OFFLINE: Install the drive-lock adaptor (loose) and cross-over spool onto the riser inpreparation for the BOP's. When the rig is tying back the last well (H3) the BOP's should be

able to skidded towards the Hl well and madeup to the drive-lock assembly

224 Paragraph 5.17 of the DP 18 shows that the 244mm(9%") casing would be exposed to atmosphere

when the 244mm(9%") PCCC was removed.

225 As the DP planned a batch drilling program the244mm(9%") casing would be exposed to

atmosphere while the 244mm(9%) casing was tied back on other wells.. This could take24 hours or

so.

226 This exposure to atmosphere is consistent with convention on surface wellhead type operations

where allowances are made for BOP removal after cement has set as contemplated in theADWCM

and commonly practised within the industry.

227 This plan meantthat:

C"J

Ll 47

COMMISSION OF INQUIRY MONTARA WELLHEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

213) Install the casing slips (Aker PIN WS5716-095A-3W). The slips are fully installed when the distance from the top of the slips to the top ofthe unitized wellhead is 703mm (27.66")

214) Once the slips are installed remove the slip landing guide.

215) Make-up the pack-off running tool to drillpipe (a minimum of 3T weight is needed to set the pack-oft)

216) Install the pack-off per Aker Procedures 61-PH2059-70 (M176).

217) Pressure test the pack-off to 22.96MPa (3330 psi) [70% of the collapse rating of the casing] for 10 minutes

21S) Once successfully pressure tested engage the pack-off

219) Take 4.5T overpull to confirm that the pack-off is engaged.

220) Recover the pack-off running tool

221) Skid to slot 13-WD-001 (Montara H4)

222) OFFLINE: Install the tree Jig (Figure 31) to allow construction to take measurements for the flow lines. Once measurements have been taken nipple down the jig

223) OFFLINE: Remove one manual 52mm (2 1/16") side outlet valve and replace with two hydraulic actuated 52mm (2 1/16") side outlet valves for the 244mm (9 5/S") annulus gas injection manifold tie in. Confirm with Production/Construction crew on correct side of unitized wellhead for the Gas Injection manifold tie in as well as hydraulic actuator orientation for hydraulic control line tie in.

224) OFFLINE: Install the 4.5m high pressure riser using a double drive lock adaptor to the unitized wellhead (Figure 32).

225) OFFLINE: Install the drive-lock adaptor (loose) and cross-over spool onto the riser in preparation for the BOP's. When the rig is tying back the last well (H3) the BOP's should be able to skidded towards the HI well and made-up to the drive-lock assembly

224 Paragraph 5.17 of the DP IB shows that the 244mm (9%") casing would be exposed to atmosphere

when the 244mm (9%") PCCC was removed.

225 As the DP planned a batch drilling program the 244mm (9%") casing would be exposed to

atmosphere while the 244mm (9%") casing was tied back on other wells .. This could take 24 hours or

so.

226 This exposure to atmosphere is consistent with convention on surface wellhead type operations

where allowances are made for BOP removal after cement has set as contemplated in the ADWCM

and commonly practised within the industry.

227 This plan meant that:

47

WIT.1000.0001.0270

Page 48: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

20 August 2009

228

229

(a)

(b)

(c)

(e)

(b)

coMMrssroN oF TNQUTRYMONTARÄ WELL HEAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

the 244mm (gt lr') PCCC would not have been removed until all of the 340mm (133/3")

casings had been tied back; and

had pressure been observed under 244mm (95/s") PCCC then the wellhead could have been

installed on the 340mm (133/s") casing and the BOP's installed. Having surface pressure

control equipment in place would have allowed for more options when dealing with

pressure under the PCCC.

the need to find out why the 340mm (133/s") PCCC had not been installed;

the corroded condition of the 340mm (133/s") MLS tie-back threads and the impact on the

ability to tie-back the 340mm (13318-) casing with the threads in that condition;

removing the 244mm (gtlr") PCCC to allow the BA51L Brush tool to be run to clean-up the

threads;

the 340mm (133/s) tieback threads needed to be cleaned at that time as this was the only

time the threads were going to be visible. Once the 506mm (20") conductor was tied back

the threads would not have been visible and a judgment as to the cleanliness of the threads

would have been difficult and risky;

the planned removal of the244mm (95ls") PCCC was to be conducted within a day pursuant

to the DP lB and therefore removing it now would only be a sequencing change and would

not affect the undertaking of the DCP otherwise;

making sure a check for pressure below the244mm (9tlr") PCCC be made prior to removal

Between 0745hrs and 0815hrs on 20 August 2009 I was in the PTTEPAA project office in Perth

having my normal morning telephone discussionwith Mr O'Shea on the West Atlas. Mr Duncan,

who was on the ll'est Atlas on 20 August 2009 joined that discussion and told me that when the 20"

trash cap had been removed earlier that moming it was discovered that the 340mm (133/s") pressure

containing corrosion cap had not been installed.

Mr Duncan asked me if I knew that the 340mm (133/s") PCCC had not been installed and I said I did

not know that. We then discussed the following matters:

(d)

in accordance with the DP 1B; and

( ",t

48

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(a) the 244mm (95/ 8,,) PCCC would not have been removed until all of the 340mm (13%")

casings had been tied back; and

(b) had pressure been observed under 244mm (95/ 8,,) PCCC then the wellhead could have been

installed on the 340mm (133/ 8,,) casing and the BOP's installed. Having surface pressure

control equipment in place would have allowed for more options when dealing with

pressure under the PCCC.

20 August 2009

228 Between 0745hrs and 0815hrs on 20 August 2009 I was in the PTTEPAA project office in Perth

having my normal morning telephone discussion with Mr 0' Shea on the West Atlas. Mr Duncan,

who was on the West Atlas on 20 August 2009 joined that discussion and told me that when the 20"

trash cap had been removed earlier that morning it was discovered that the 340mm (133/ S") pressure

containing corrosion cap had not been installed.

229 Mr Duncan asked me if! knew that the 340mm (133/ s") PCCC had not been installed and I said I did

not know that. We then discussed the following matters:

(a) the need to find out why the 340mm (133/ s,,) PCCC had not been installed;

(b) the corroded condition of the 340mm (133/ s") MLS tie-back threads and the impact on the

ability to tie-back the 340mm (133/ 8,,) casing with the threads in that condition;

(c) removing the 244mm (9%") PCCC to allow the BA5IL Brush tool to be run to clean-up the

threads;

(d) the 340mm (133/ s") tieback threads needed to be cleaned at that time as this was the only

time the threads were going to be visible. Once the 506mm (20") conductor was tied back

the threads would not have been visible and a judgment as to the cleanliness of the threads

would have been difficult and risky;

(e) the planned removal of the 244mm (95/ S") PCCC was to be conducted within a day pursuant

to the DP IB and therefore removing it now would only be a sequencing change and would

not affect the undertaking of the DCP otherwise;

(t) making sure a check for pressure below the 244mm (95/ S") PCCC be made prior to removal

in accordance with the DP IB; and

48

WIT.1000.0001.0271

Page 49: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

(MTCONTROLLED IIYDROCARBON RELEASE

(g) if pressure under the 244mm (gtlr") PCCC was detected further assessment would need to be

undertaken of the risks and the progrÍrm for the safe removal of the PCCC developed.

230 The procedure for the removal of the PCCC is covered in the DP 18. Section 5.17, steps 194 and

195. Below is a copy of these steps;

"Make up the TDS before engaging the running tool onto the corrosion cap (this will allow for any

pressure below the cowosion cap to be observed on the standpipe and then bled-off through the

choke manifold)

Engage the cowosion cap and checkfor any pressure below the cotosion cap. Note any pressure

on the UDC and the DDR. Bleed-offany pressure via the choke manifold."

231 After the telephone discussion with Mr O'Shea and Mr Duncan, I understand that Mr O'Shea issued

an supplementary forward plan to cover the change in plan.

232 No Change Control Form was issued for the following reasons;

(a) the244mm(f /t") PCCC was planned to be removed anyway within 24 hours and the

status of the Hl Well would have been the same. This was considered to be a re-

sequencing ofoperations not a change to design;

(b) the Hl Well was cased and cemented and to the best of our knowledge at the time satisfied

the barrier requirement for temporary suspension under Section 5 of the WCS; and

(c) the change in sequence was not considered to be a significant change for the purposes of

the change management process in the Process Manual.

233 I do not recall whether the scheduled 0900 hours meeting \ilas held on 20 August 2009.

234 On 20 August 2009 during the scheduled afternoon telephone call with Mr O'Shea he told me that

they had checked for pressure under the 244mm (gtlr") PCCC, no pressure, gas or flow had been

observed, the 244mm (gt lr") PCCC had been removed, and the cleaning of the 340mm (133/3") MLS

threads had been completed.

21 August 2009

235 At 0430 hours on 2l August 2009 | received a telephone call from Mr O'Shea who said:

(a) that there had been a release of hydrocarbon from theHl Well;

/2./, "ll-./v vPr( 4e

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(g) if pressure under the 244mm (95/ 8") PCCC was detected further assessment would need to be

undertaken of the risks and the program for the safe removal of the PCCC developed.

230 The procedure for the removal of the PCCC is covered in the DP lB. Section 5.17, steps 194 and

195. Below is a copy of these steps;

"Make up the TDS before engaging the running tool onto the corrosion cap (this will allow for any

pressure below the corrosion cap to be observed on the standpipe and then bled-off through the

choke manifold)

Engage the corrosion cap and checkfor any pressure below the corrosion cap. Note any pressure

on the lADe and the DDR. Bleed-off any pressure via the choke manifold. "

231 After the telephone discussion with Mr O'Shea and Mr Duncan, I understand that Mr O'Shea issued

an supplementary forward plan to cover the change in plan.

232 No Change Control Form was issued for the following reasons;

(a) the 244mm (95/ 8") PCCC was planned to be removed anyway within 24 hours and the

status of the HI Well would have been the same. This was considered to be a re-

sequencing of operations not a change to design;

(b) the HI Well was cased and cemented and to the best of our knowledge at the time satisfied

the barrier requirement for temporary suspension under Section 5 of the WCS; and

(c) the change in sequence was not considered to be a significant change for the purposes of

the change management process in the Process Manual.

233 I do not recall whether the scheduled 0900 hours meeting was held on 20 August 2009.

234 On 20 August 2009 during the scheduled afternoon telephone call with Mr O'Shea he told me that

they had checked for pressure under the 244mm (9%") PCCC, no pressure, gas or flow had been

observed, the 244mm (9%") PCCC had been removed, and the cleaning of the 340mm (133/ 8") MLS

threads had been completed.

21 August 2009

235 At 0430 hours on 21 August 2009 I received a telephone call from Mr O'Shea who said:

(a) that there had been a release of hydrocarbon from the HI Well;

49

WIT.1000.0001.0272

Page 50: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

UNCONTROLLED I{YDROCARBON RELEASE

(b) it appeared the Hl Well had "burped" and about 4Obbls of hydrocarbons had been released;

(c) the lV'est Atlas was currently over the H4 well slot with 2 joints of 20" casing to lay out;

and

(d) the proposal was to skid over to the Hl Well and run an RTTS packer in the Hl Well to

prevent any further flow.

236 I agreed with the proposal made by Mr O'Shea and asked if Mr Duncan was appraised of the

situation and Mr O'Shea told me he was.

237 At 0455hrs I called the NTDPIFM Oil Spill phone number that is listed in the front of the DP 18.

There was no answer so I left my name and number and the details of what had happened

Immediately after this call I proceeded to the PTTEPAA project office.

238 At 0600hrs Mr O'Shea called me again and said that the Hl Well was flowing again and all

personnel had been sent to muster. Immediately after this I called thePTTEPAA ERG leader.

Specific questions raised by the Commission

239 I have been asked by the Commissioner to provide my views about various matters.

240 I have already set out my knowledge about the situation at the time of various-events occurring.

241 Nevertheless, to address the Commissioner's questions, I have reviewed with the benefit of the

knowledge that the uncontrolled release did in fact occur on 21 August 2009,the documents that I

refer to in my statemen! including forward plans, DDRs, Advantage Drilling Fluid Reports and

IADC reports and in particular the following documents:

(a) Forward plans issued on 5 and 6 March 2009 (version 1.0 and version 2.0)

(b) PTTEPAA's DDR of 7 March 2009;

(c) PTTEPAA Hl STI 244mm(9tls") Cementing Report of 6 March 2009;

(d) Atlas Drilling's IADC report # 6695576 of 7 March 2009;

(e) Halliburton Cementer's report of 8 March 2009;

(Ð ADWCM; and

(/ 50

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(b) it appeared the HI Well had "burped" and about 40bbls of hydrocarbons had been released;

(c) the West Atlas was currently over the H4 well slot with 2 joints of 20" casing to layout;

and

(d) the proposal was to skid over to the HI Well and run an RTTS packer in the HI Well to

prevent any further flow.

236 I agreed with the proposal made by Mr O'Shea and asked ifMr Duncan was appraised of the

situation and Mr O'Shea told me he was.

237 At 0455hrs I called the NTDPIFM Oil Spill phone number that is listed in the front of the DP lB.

There was no answer so I left my name and number and the details of what had happened

Immediately after this call I proceeded to the PTTEP AA project office.

238 At 0600hrs Mr O'Shea called me again and said that the HI Well was flowing again and all

personnel had been sent to muster. Immediately after this I called the PTTEP AA ERG leader.

Specific questions raised by the Commission

239 I have been asked by the Commissioner to provide my views about various matters.

240 I have already set out my knowledge about the situation at the time of various_events occurring.

241 Nevertheless, to address the Commissioner's questions, I have reviewed with the benefit of the

knowledge that the uncontrolled release did in fact occur on 21 August 2009, the documents that I

refer to in my statement, including forward plans, DDRs, Advantage Drilling Fluid Reports and

IADC reports and in particular the following documents:

(a) Forward plans issued on 5 and 6 March 2009 (version 1.0 and version 2.0)

(b) PTTEPAA's DDR of7 March 2009;

(c) PTTEPAA HI STI 244mm (95/ 8,,) Cementing Report of 6 March 2009;

(d) Atlas Drilling's IADC report # 6695576 of7 March 2009;

(e) Halliburton Cementer's report of 8 March 2009;

(f) ADWCM; and

f.A 50

WIT.1000.0001.0273

Page 51: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQUTRYMONTARA WELL HEAD PLATFORM

T]NCONTROLLED ITYDROCARBON RELEASE

West Atlas Cementing Intermediate Casing Procedure.

Based on my interpretation of those materials, I have drawn some conclusions about what might have

occurred in relation to some of the matters that I have been asked by the Commissione4 which I set

out beloq

Possible explanation of the cementing and pressure testíng

(e)

242

243 I have already set out my knowledge about the situation as at7 and 8 March 2009. That is, I

considered that the offshore personnel had carried out the appropriate procedure (in terms ofthe

WCS and the Atlas Drilling's úV'est Atlqs SDI Operations Procedure Manual and good oilfield

practice) when confronted with an unexpected apparent in service failure of the float valve, ie they

maintained appropriate pressure to keep the cement in place while it set and advised me of the steps

that they were taking. I also considered from the materials and information that was provided to me

at that time that despite the in service failure of the valves, the cementing of the 244mm (95/s") shoe

casing had been correctly completed providing a competent barrier, to which pressure had been

applied and maintained whilst waiting for the cement to set, followed by an inflow test. Further, I

considered with the state of knowledge at that time that none of the documents sent from the West

Atlas alluded to any possible incompetence of the cemented shoe casing when reapplying pressure

and none of the telephone conversations with personnel on the lV'est Atlas indicated that this had

happened.

The Halliburton Cementer's report of SMarch 2009 (Ilaltiburton Report) notes final casing

pressure of "687psi" and "17:51 BLEED OFF CSG STNNG 3.íBBLS BACK 0P$".

I did not see the IADC report # 6695576 dated7 March 2009 until some months after the cementing

was completed.

In the IADC report # 6695576 datedT March 2009 is an entry of 1800 - 18:30 which states "Retest

Float Good. ND CMT head and CMT lines."

Those entries do not indicate anything to suggest that the shoe cement was not a competent tested

barrier.

I do not consider that the pressure test for l0 minutes duration was of any consequence on the

cement job or the float failure. Although required by the WCS, I do not consider that testing for 20

minutes would have made no difference.

5t

244

245

246

247

248

{,1

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(g) West Atlas Cementing Intermediate Casing Procedure.

242 Based on my interpretation of those materials, I have drawn some conclusions about what might have

occurred in relation to some of the matters that I have been asked by the Commissioner, which I set

out below:.

Possible explanation of the cementing and pressure testing

243 I have already set out my knowledge about the situation as at 7 and 8 March 2009. That is, I

considered that the offshore personnel had carried out the appropriate procedure (in terms of the

WCS and the Atlas Drilling's West Atlas SDI Operations Procedure Manual and good oilfield

practice) when confronted with an unexpected apparent in service failure of the float valve, ie they

maintained appropriate pressure to keep the cement in place while it set and advised me ofthe steps

that they were taking. I also considered from the materials and information that was provided to me

at that time that despite the in service failure of the valves, the cementing of the 244mm (95/ 8,,) shoe

casing had been correctly completed providing a competent barrier, to which pressure had been

applied and maintained whilst waiting for the cement to set, followed by an inflow test. Further, I

considered with the state of knowledge at that time that none of the documents sent from the West

Atlas alluded to any possible incompetence of the cemented shoe casing when reapplying pressure

and none of the telephone conversations with personnel on the West Atlas indicated that this had

happened.

244 The Halliburton Cementer's report of 8 March 2009 (Halliburton Report) notes final casing

pressure of "687psi" and "17:51 BLEED OFF CSG STRING 3.5BBLS BACK, OPSJ".

245 I did not see the IADC report # 6695576 dated 7 March 2009 until some months after the cementing

was completed.

246 In the IADC report # 6695576 dated 7 March 2009 is an entry of 1800 - 18:30 which states "Retest

Float Good. RID CMT head and CMT lines. "

247 Those entries do not indicate anything to suggest that the shoe cement was not a competent tested

barrier.

248 I do not consider that the pressure test for 10 minutes duration was of any consequence on the

cement job or the float failure. Although required by the WCS, I do not consider that testing for 20

minutes would have made no difference.

51

WIT.1000.0001.0274

Page 52: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

COMMISSTON OF TNQUTRYMONTARA \ryELL HEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

In my opinion, pressure testing of the casing after waiting on cement does not necessarily provide a

clear cut test of the integrþ of the shoe casing. This is because pressure testing after waiting on

cement can be dependent upon how successful the re-pressuring was prior to waiting on cement (ie ifthe top plug was landed back in place and some overpressure applied). If a pressure test is performed

pressure should be applied to 500psi over formation leak-off pressure to ensure the cement is a

suitable barrier and integrity still exists.

Since the incident the Halliburton Report has been made available to me and my interpretation of

that report is as follows:

2s0

(a)

(b)

(c)

(d)

(e)

the pressure being bled-offafter the casing pressure test(1442 hours);

shortly after this the pressure increased - this would have been after the increase in return

flow had been observed - the cement operators shut-in the well at the cement unit. This

pressure increase corresponds to the hydrostatic pressure of the cement and drilling fluid in

the annulus;

at 1447 hours pumping operations commenced and the pressure increased from -1100psi to

-1350psi at which point the pressure stopped increasing even though the pumping continue{

at this point it appears that the fluid being pumped into the well could have been bypassing

the cement wiper plug and going into the shoe track. This fluid would have likely been a

mixture of seawater and cement. The total volume pumped since the float failure was the

equivalent to the total volume of fluid bled back after the pressure test and after the float

failed (-l6.Sbbls);

that the pumping should have been shut down once there was an indication that the pressure

was not rising within the244mm(9tlr") casing despite the continued pumping of

displacement fluid into that casing so that the cement was maintained in position;

the pressure applied when attempting to hold the cement in place while it set was likely to

have exceeded the hydrostatic pressure of the wet cement by more than an acceptable

amount;

that after pumping just a small volume of fluid the pressure stopped increasing and there is a

likelihood that the cementwiper plug was damaged and fluid was bypassing the cement

wiper plug and moving into the shoe track. This is likely to have caused a contaminated

(e)

(Á 52

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

249 In my opinion, pressure testing of the casing after waiting on cement does not necessarily provide a

clear cut test of the integrity of the shoe casing. This is because pressure testing after waiting on

cement can be dependent upon how successful the re-pressuring was prior to waiting on cement (ie if

the top plug was landed back in place and some overpressure applied). If a pressure test is performed

pressure should be applied to 500psi over formation leak-off pressure to ensure the cement is a

suitable barrier and integrity still exists.

250 Since the incident the Halliburton Report has been made available to me and my interpretation of

that report is as follows:

(a) the pressure being bled-off after the casing pressure test (1442 hours);

(b) shortly after this the pressure increased - this would have been after the increase in return

flow had been observed - the cement operators shut-in the well at the cement unit. This

pressure increase corresponds to the hydrostatic pressure of the cement and drilling fluid in

the annulus;

(c) at 1447 hours pumping operations commenced and the pressure increased from ~ 11 OOpsi to

~ 1350psi at which point the pressure stopped increasing even though the pumping continued;

(d) at this point it appears that the fluid being pumped into the well could have been bypassing

the cement wiper plug and going into the shoe track. This fluid would have likely been a

mixture of seawater and cement. The total volume pumped since the float failure was the

equivalent to the total volume of fluid bled back after the pressure test and after the float

failed (~16.5bbls);

(e) that the pumping should have been shut down once there was an indication that the pressure

was not rising within the 244mm (95/ 8,,) casing despite the continued pumping of

displacement fluid into that casing so that the cement was maintained in position;

(f) the pressure applied when attempting to hold the cement in place while it set was likely to

have exceeded the hydrostatic pressure of the wet cement by more than an acceptable

amount;

(g) that after pumping just a small volume of fluid the pressure stopped increasing and there is a

likelihood that the cement wiper plug was damaged and fluid was bypassing the cement

wiper plug and moving into the shoe track. This is likely to have caused a contaminated

52

249

WIT.1000.0001.0275

Page 53: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF INQUTRYMONTAR^A. WELL HEAD PLATFORM

I]NCONTROLLED ITYDROCARBON RELEASE

channel within the shoe track. This would then be likely to have created a conduit for the

flow (but did not cause the flow);

the final pressure after waiting on cement is recorded as 687psi. This means that the initial

pressure of 1300psi bled down by 613psi meaning there was a leak in the system (potentially

downhole). This loss of pressure was not reported verbally or in any reports submitted to

me;

the inflow test might not, in that context, have established the shoe cement was competent;

and

performing a pressure test after the cement had set might have been prudent and capable of

testing whether the barrier that was assumed to have been made by cement in the shoe track

was competent.

However, the inflow test performed after the cement had set was consistent with the Hl well being

overbalanced and pressure testing after the cement has been pumped into the shoe track generally

would not assist in determining the competence of the shoe track cement if thetop and bottom plugs

used in the cementing process re-bumped on the float collar.

I was not made aware on 7 or I March 2009 and all relevant times after that, of:

(i)

(')

251

252

(a)

(b)

the pressure bleeding off whilst waiting on cement; and

anything that indicated the possibility of fluid bypassing the top or bottom plugs.

253 If I had been aware of the above information, I would have requested thatanother pressure test of the

casing be performed. I would not normally pressure test casing once the cement is set as there is a

risk of compromising the cement integrity in the annulus.

254 The absence of another pressure test meant that, with hindsight and knowing what I now know, the

integrity of the Hl Well was not verified.

255 Although there was appropriate communications between Mr Treasure and me on 7 March2009,

there was information that I consider, with the benefit of hindsight, could have been given to me so

that I would be better able to make decisions about what needed to be done in the face of the

apparent failure of the float valve. In hindsight, the additional information required was about the

quantity of fluids that were pumped back into the casing and the variation in the pressures whilst

4¿,,\,t s3

waiting on cement to set.

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

channel within the shoe track. This would then be likely to have created a conduit for the

flow (but did not cause the flow);

(h) the final pressure after waiting on cement is recorded as 687psi. This means that the initial

pressure of 1300psi bled down by 613psi meaning there was a leak in the system (potentially

downhole). This loss of pressure was not reported verbally or in any reports submitted to

me;

(i) the inflow test might not, in that context, have established the shoe cement was competent;

and

U) performing a pressure test after the cement had set might have been prudent and capable of

testing whether the barrier that was assumed to have been made by cement in the shoe track

was competent.

251 However, the inflow test performed after the cement had set was consistent with the HI well being

overbalanced and pressure testing after the cement has been pumped into the shoe track generally

would not assist in determining the competence of the shoe track cement if the top and bottom plugs

used in the cementing process re-bumped on the float collar.

252 I was not made aware on 7 or 8 March 2009 and all relevant times after that, of:

(a) the pressure bleeding off whilst waiting on cement; and

(b) anything that indicated the possibility of fluid bypassing the top or bottom plugs.

253 IfI had been aware of the above information, I would have requested that another pressure test of the

casing be performed. I would not normally pressure test casing once the cement is set as there is a

risk of compromising the cement integrity in the annulus.

254 The absence of another pressure test meant that, with hindsight and knowing what I now know, the

integrity of the HI Well was not verified.

255 Although there was appropriate communications between Mr Treasure and me on 7 March 2009,

there was information that I consider, with the benefit of hindsight, could have been given to me so

that I would be better able to make decisions about what needed to be done in the face of the

apparent failure of the float valve. In hindsight, the additional information required was about the

quantity of fluids that were pumped back into the casing and the variation in the pressures whilst

waiting on cement to set.

53

WIT.1000.0001.0276

Page 54: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

oF TNQIJTRYMONTARA WELL HEAD PLATFORM

I]NCONTROLLED IIYDROCARBON RELEA.SE

Bøniersfor suspension in August 2009

256 I have already set out above the barriers that I thought were in place on 20 August 2009.

I consider that best practice with MLS is to suspend using a PCCC on the 244mm (gtlr") and the

340mm (133/s") casing.

The 340mm (133/s") PCCC seals the annulus space and both the 244mm (gtlr') and the 340mm

(133/s") PCCC's protect the tieback threads on the MLS. I therefore consider that the use of the

PCCC's was good practice and appropriate in the circumstances.

My post incident analysis indicates that the 244mm (gtl*") casing shoe most probably did not form an

adequate primary tested barrier however on the day with the information supplied to me, I had no

reason to suspect ttrat it was not an adequate barrier.

257

Absence of the 340mm Q33/fl PCCC

I have already set out my knowledge about the situ*ion as at2l April 2009. That is, I considered

from the materials that were provided to me at that time that a PCCC had been installed on the

340mm (133/s") MLS. The DDRs that I have referred to previously showed that the 340mm (133/s")

PCCC had been installed off line.

I considered that the absence of the 340mm (133/s") PCCC:

(a) was serious and I would have investigated the reason why it had not been installed had the

hydrocarbon release not occurred the following day; and

led to corrosion forming on the threads of the 340mm (133/s") MLS which could have lead to

an integrity issue with the installation and tie-back of the 340mm (133/s") casing.

262 However, the absence of the 340mm (133/3") PCCC did not cause the uncontrolled release. In the

context of the other barriers that I thought were in place, the Hl Well was controlled even without

the 340mm (L33ls") PCCC. Even when the244mm(9tlr") PCCC was removed the Hl Well was

stable without the 340mm (133/s") PCCC.

I do not know why the 340mm (133/s") PCCC was not installed.

Nevertheless, to address the Commissioner's questions, I have spoken with Mr Wishart, who has told

me that he had a whiteboard in his office on the West Atlas on which all programmed off line work

was listed and that other personnel could tick off the work if it was completed when he was not on

ll s4

258

259

260

261

263

264

(b)

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

Barriers for suspension in August 2009

256 I have already set out above the barriers that I thought were in place on 20 August 2009.

257 I consider that best practice with MLS is to suspend using a PCCC on the 244mm (9%") and the

340mm (13%") casing.

258 The 340mm (133/ 8,,) PCCC seals the annulus space and both the 244mm (95/ 8,,) and the 340mm

(13 3/ 8,,) PCCC's protect the tieback threads on the MLS. I therefore consider that the use of the

PCCC's was good practice and appropriate in the circumstances.

259 My post incident analysis indicates that the 244mm (95/ 8,,) casing shoe most probably did not form an

adequate primary tested barrier however on the day with the information supplied to me, I had no

reason to suspect that it was not an adequate barrier.

Absence of the 340mm (13%'~ PCCC

260 I have already set out my knowledge about the situation as at 21 April 2009. That is, I considered

from the materials that were provided to me at that time that a PCCC had been installed on the

340mm (13%") MLS. The DDRs that I have referred to previously showed that the 340mm (13%")

PCCC had been installed off line.

261 I considered that the absence of the 340mm (133/ 8,,) PCCC:

(a) was serious and I would have investigated the reason why it had not been installed had the

hydrocarbon release not occurred the following day; and

(b) led to corrosion forming on the threads of the 340mm (13%") MLS which could have lead to

an integrity issue with the installation and tie-back of the 340mm (133/ 8,,) casing.

262 However, the absence of the 340mm (133/ 8,,) PCCC did not cause the uncontrolled release. In the

context of the other barriers that I thought were in place, the HI Well was controlled even without

the 340mm (13%") PCCc. Even when the 244mm (95/ 8,,) PCCC was removed the HI Well was

stable without the 340mm (13%") PCCc.

263 I do not know why the 340mm (13%") PCCC was not installed.

264 Nevertheless, to address the Commissioner's questions, I have spoken with Mr Wishart, who has told

me that he had a whiteboard in his office on the West Atlas on which all programmed off line work

was listed and that other personnel could tick off the work if it was completed when he was not on

54

WIT.1000.0001.0277

Page 55: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA WELL HEAD PLATF'ORM

UNCONTROLLED ITYDROCARBON RELEASE

shift. Mr Wishart has told me that he used the information on the whiteboard to report offline

activities in the comments section of the DDRs.

Mr Wishart has told me that the offline activities whiteboard showed that the 340mm (133/s") PCCC

was installed some time when he was off duty and that he added that as a note to the relevant DDRs.

Based on the information from Mr Wishart and my interpretation of those materials, I have drawn the

conclusion that

(a) on the West Atlasthe following personnel should have been aware that the 340mm 1133/s")

PCCC was not installed;

PTTEPAA Senior Drilling Supervisor on the West Atlas at the time (Noel

Treasure);

Atlas Drilling Toolpusher; and

the OIM.

(b) in Perth the following personnel should have been made aware of the absence ofthe 340mm

1133/3") PCCC:

me;

Mr Duncan; and

MrMillar;

(c) as there \ilere no indications or reasons after 2l April 2009 to think that the wells were not

suspended per the DP and subsequent change control, there was no reason to conduct any

form of audit to check that all work that was thought to be performed had in fact been

completed;

what may have been expected below the244mm (9t/r") PCCC is a small amount of pressure

as a result of thermal expansion of the fluid inside the casing due to heating downhole. This

would have resulted in a small increase in pressure on the standpipe pressure gauge on the

rig floor when the running tool was stabbed into the PCCC. This pressure would have been

bled-off via the choke manifold. Once the pressure had been bled-oft no increase or return

of pressure should have been observed and no flow should have been observed. If after

bleeding off any initial pressure the pressure built back-up, the PTTEPAA offshore team

./) )(2/ tl ss

266

(iÐ

(iiÐ

(iÐ

(iii)

(d)

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

shift. Mr Wishart has told me that he used the information on the whiteboard to report offline

activities in the comments section of the DDRs.

265 Mr Wishart has told me that the offline activities whiteboard showed that the 340mm (13%") PCCC

was installed some time when he was off duty and that he added that as a note to the relevant DDRs.

266 Based on the information from Mr Wishart and my interpretation of those materials, I have drawn the

conclusion that

(a) on the West Atlas the following personnel should have been aware that the 340mm (13%")

PCCC was not installed;

(i) PTTEPAA Senior Drilling Supervisor on the West Atlas at the time (Noel

Treasure);

(ii) Atlas Drilling Toolpusher; and

(iii) the OIM.

(b) in Perth the following personnel should have been made aware of the absence of the 340mm

(13%") PCCC:

(i) me;

(ii) Mr Duncan; and

(iii) Mr Millar;

( c) as there were no indications or reasons after 21 April 2009 to think that the wells were not

suspended per the DP and subsequent change control, there was no reason to conduct any

form of audit to check that all work that was thought to be performed had in fact been

completed;

(d) what may have been expected below the 244mm (95/ 8,,) PCCC is a small amount of pressure

as a result of thermal expansion of the fluid inside the casing due to heating downhole. This

would have resulted in a small increase in pressure on the standpipe pressure gauge on the

rig floor when the running tool was stabbed into the PCCC. This pressure would have been

bled-off via the choke manifold. Once the pressure had been bled-off, no increase or return

of pressure should have been observed and no flow should have been observed. If after

bleeding off any initial pressure the pressure built back-up, the PTTEP AA offshore team ew 55

265

WIT.1000.0001.0278

Page 56: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssloN oF TNQUTRYMONTARA WELL HEAD PLATFORM

TINCONTROLLED IIYDROCARBON RELEASE

would have advised the PTTEPAA Perth based team of the situation. At this stage the

340mm 1133/s") casing would have been tied back, the wellhead installed and the BOP's

nippled-up prior to attempting to remove the244mm (9t/r") PCCC;

the 244mm (9tlr") PCCC did not directly have the ability to measure leakage of the wellbore,

however the running tool has an internal probe and neck seals. The neck seals seal over the

neck of the PCCC and the internal probe pushes a poppet valve. Any pressure below the

PCCC can be recorded and bled-off at surface via the running string. Whilst the running tool

has the ability to communicate pressure and allow pressure to be bled-off, its pump through

capabilities are limited. If pressure had been detected below the244mm(9tlr") PCCC then

the 340mm (133/s") casing would have been run and the wellhead and BOP's installed. Once

the BOP's were installed, one of the elements could have been closed whilst the cap was

removed (after any pressure below the cap had been bled-off). Once the cap was off, heavy

mud could have pumped into the well at a rate significantly higher (and with less risk of a

blockage) than through the PCCC running tool;

the 244mm (f lt") PCCC was removed per the instructions in the DP lB and no pressure was

observed. No gas was detected when the PCCC was removed and no flow was observed

after the PCCC was removed. Based on all the checks at that point the Hl Well appeared to

be static;

once the rig is on location the well falls under a temporary suspension category. According

to the WCS - Section 5 only I permanent or 2 temporary barriers are required on a well

during a rig move over a well (ie moving the derrick). This was satisfied by the cemented

casing (at that time this was considered to be a competent barrier). Additionally the

ADWCM allows for the BOP's not to be installed on a cased and cemented well once the

cement has reached a specified compressive strength or after waiting on cement for 8 hours.

The casing had been cemented 6 months earlier and no pressure was found below the244mm

(9t/r-) PCCC and as such there were no indications of any cement integrity problems; and

cemented casing with a displacement fluid inside the casing with no additional barriers

within the casing is common on a well that utilises a surface wellhead system (other than a

multi-bowl system). Once the cement is in place, tested and set the BOP's are removed to

allow for the installation of the next section of the wellhead. The BOP's are then re-installed

and tested.

(e)

(e)

(h)

ÍI/ell drillÍng operøtions conducted between 19 ønd 2I August 2009 &.'l/ 56

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

would have advised the PTTEP AA Perth based team of the situation. At this stage the

340mm (133/ 8") casing would have been tied back, the wellhead installed and the BOP's

nippled-up prior to attempting to remove the 244mm (9%") PCCC;

(e) the 244mm (95/ 8") PCCC did not directly have the ability to measure leakage of the wellbore,

however the running tool has an internal probe and neck seals. The neck seals seal over the

neck of the PCCC and the internal probe pushes a poppet valve. Any pressure below the

PCCC can be recorded and bled-off at surface via the running string. Whilst the running tool

has the ability to communicate pressure and allow pressure to be bled-off, its pump through

capabilities are limited. If pressure had been detected below the 244mm (95/ 8") PCCC then

the 340mm (133/ 8") casing would have been run and the wellhead and BOP's installed. Once

the BOP's were installed, one of the elements could have been closed whilst the cap was

removed (after any pressure below the cap had been bled-off). Once the cap was off, heavy

mud could have pumped into the well at a rate significantly higher (and with less risk of a

blockage) than through the PCCC running tool;

(f) the 244mm (9%") PCCC was removed per the instructions in the DP 1B and no pressure was

observed. No gas was detected when the PCCC was removed and no flow was observed

after the PCCC was removed. Based on all the checks at that point the HI Well appeared to

be static;

(g) once the rig is on location the well falls under a temporary suspension category. According

to the WCS - Section 5 only 1 permanent or 2 temporary barriers are required on a well

during a rig move over a well (ie moving the derrick). This was satisfied by the cemented

casing (at that time this was considered to be a competent barrier). Additionally the

ADWCM allows for the BOP's not to be installed on a cased and cemented well once the

cement has reached a specified compressive strength or after waiting on cement for 8 hours.

The casing had been cemented 6 months earlier and no pressure was found below the 244mm

(95/ 8") PCCC and as such there were no indications of any cement integrity problems; and

(h) cemented casing with a displacement fluid inside the casing with no additional barriers

within the casing is common on a well that utilises a surface wellhead system (other than a

multi-bowl system). Once the cement is in place, tested and set the BOP's are removed to

allow for the installation of the next section of the wellhead. The BOP's are then re-installed

and tested.

Well drilling operations conducted between 19 and 21 August 2009

56

WIT.1000.0001.0279

Page 57: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA WELL I{EAD PLATFORM

UNCONTROLLED ITYDROCARBON RELEASE

267 I have been asked by the Commissioner to providemy views aboutthe well drilling operations

conducted in relation to the Hl Well between about 19 and 2l August 2009.

268 I have already set out my knowledge about;

(a) the barriers that were thought to have been in place as at 19 August2009;

(b) the reasons why the 340mm (133/s") threads needed to be cleaned at that point in the

operation; and

(c) the standards that were applicable at the time.

269 Based on the information above and my interpretation of the WCS, the Process Manual and

ADWCM,I set out below my views:

(a) the personnel on the llest Atlas on 20 August 2009 followed procedure by notifring me

immediately upon observing theHl Well was not per the "as builf'drawings;

(b) the way forward was discussed and risk assessed with me via telephone with Mr Duncan

and Mr O'Shea. It is my understanding Mr O'Shea then discussed the change to the DP 1B

and current forward plan with the OIM;

(c) fhe 244mm (gt lr") PCCC was removed according to procedure and the appropriate

pressure, gas and flow checks were performed. All of the checks indicated no pressure, no

flow and no gas. After 6 months of being suspended, had hydrocarbons flowed into the

well during this period the following would have been observed (but were not);

(Ð pressure under the 244mm (9t/r") PCCC;

(iÐ hydrocarbons immediately below the244mm(9tl*") PCCC (visible oil); and

(iiÐ visible flow upon removal of the244mm (95/s") PCCC;

(d) a change control was not issued because this was deemed a change of sequence not a

change of substance. That was appropriate in the circumstances. However, there was an

auditable documentary chain in place because the forward plan had been revised in

consultation with the OIM;

é¿^,

la s7

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

267 I have been asked by the Commissioner to provide my views about the well drilling operations

conducted in relation to the HI Well between about 19 and 21 August 2009.

268 I have already set out my knowledge about;

(a) the barriers that were thought to have been in place as at 19 August 2009;

(b) the reasons why the 340mm (133/ 8,,) threads needed to be cleaned at that point in the

operation; and

(c) the standards that were applicable at the time.

269 Based on the information above and my interpretation of the WCS, the Process Manual and

ADWCM, I set out below my views:

(a) the personnel on the West Atlas on 20 August 2009 followed procedure by notifying me

immediately upon observing the HI Well was not per the "as built" drawings;

(b) the way forward was discussed and risk assessed with me via telephone with Mr Duncan

and Mr O'Shea. It is my understanding Mr O'Shea then discussed the change to the DP lB

and current forward plan with the OIM;

(c) the 244mm (95/ 8,,) PCCC was removed according to procedure and the appropriate

pressure, gas and flow checks were performed. All of the checks indicated no pressure, no

flow and no gas. After 6 months of being suspended, had hydrocarbons flowed into the

well during this period the following would have been observed (but were not);

(i) pressure under the 244mm (95/ 8,,) PCCC;

(ii) hydrocarbons immediately below the 244mm (95/ 8,,) PCCC (visible oil); and

(iii) visible flow upon removal of the 244mm (95/ 8,,) PCCC;

(d) a change control was not issued because this was deemed a change of sequence not a

change of substance. That was appropriate in the circumstances. However, there was an

auditable documentary chain in place because the forward plan had been revised in

consultation with the OIM;

57

WIT.1000.0001.0280

Page 58: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

coMMrssroN oF TNQUTRYMONTARA WELL IIEAD PLATFORM

TINCONTROLLED ITYDROCARBON RELEASE

the removal of the244mm (95¡s') PCCC earlier in the drilling sequence reduced the Hl

Well to one pennanent barrier. However, with the West Atlas on location this complied

with the WCS. Again that was appropriate;

the removal of the244mm 195/;'¡ PCCC falls within the requirements of the ADWCM

where a BOP can be removed from cemented casing as long as the cement is set and meets

a 500psi compressive strengtt¡ which it did; and

based on the points outlined above it was not necessary for the 244mm(9tl*") PCCC to be

reinstalled after the 340mm (133/s") MLS threads had been cleaned. Again, in the

circumstances that was an appropriate decision.

Communication between PTTEPAA, Atlas Drillìng and Hølliburton

272

I consider that the communications between PTTEPAA staff onshore and offshore were very good.

I also consider that the communications of PTTEPAA staff onshore and offshore and the Atlas

Drilling personnel and the personnel of other contractors was also very good.

Those communications were frequent, regular and open. PTTEPAA, Atlas Drilling and each

contractor had independent and co-ordinated lines of communication.

Communication with Mr Millar were frequent (multiple times per day). This consisted of a face to

face meeting daily (Monday to Friday), frequent e-mails and telephone conversations (7 days per

week).

The communication between Halliburton Australia (Canning Vale office) and PTTEPAA Perth

based personnel involved frequent communication between Mr Geste (Halliburton Australia Cement

Engineer) and me either by telephone or e-mail. Cementing programs were discussed and distributed

frequently and Mr Geste would always seek my input before formally distributing any programs. As

required Mr Geste and I would meet face to face to discuss any specific issues. On this basis I do not

consider there was any communication failures between Halliburton Australia and myself

However, whilst I consider that communication between the various parties involved intheWest

Atlas operations was generally open and helpful and made at appropriate times, with the benefit of

hindsight there appears to be a failure in communication between PTTEPAA personnel onthe West

Atlas andAtlas Drilling personnel that either caused the 340mm (133/s") PCCC not being installed or

for its absence not to be recorded. The Change Control Form to install the 340mm (133/8") PCCC

273

274

275

(e)

270

271

(¿,',

P/ 58

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

(e) the removal of the 244mm (95/ 8,,) PCCC earlier in the drilling sequence reduced the HI

Well to one permanent barrier. However, with the West Atlas on location this complied

with the WCS. Again that was appropriate;

(t) the removal of the 244mm (95/s") PCCC falls within the requirements of the ADWCM

where a BOP can be removed from cemented casing as long as the cement is set and meets

a 500psi compressive strength, which it did; and

(g) based on the points outlined above it was not necessary for the 244mm (95/ 8,,) PCCC to be

reinstalled after the 340mm (133/ 8,,) MLS threads had been cleaned. Again, in the

circumstances that was an appropriate decision.

Communication between PTTEPAA, Atlas Drilling and Halliburton

270 I consider that the communications between PTTEPAA staff onshore and offshore were very good.

271 I also consider that the communications of PTTEPAA staff onshore and offshore and the Atlas

Drilling personnel and the personnel of other contractors was also very good.

272 Those communications were frequent, regular and open. PTTEPAA, Atlas Drilling and each

contractor had independent and co-ordinated lines of communication.

273 Communication with Mr Millar were frequent (multiple times per day). This consisted of a face to

face meeting daily (Monday to Friday), frequent e-mails and telephone conversations (7 days per

week).

274 The communication between Halliburton Australia (Canning Vale office) and PTTEPAA Perth

based personnel involved frequent communication between Mr Geste (Halliburton Australia Cement

Engineer) and me either by telephone or e-mail. Cementing programs were discussed and distributed

frequently and Mr Geste would always seek my input before formally distributing any programs. As

required Mr Geste and I would meet face to face to discuss any specific issues. On this basis I do not

consider there was any communication failures between Halliburton Australia and myself

275 However, whilst I consider that communication between the various parties involved in the West

Atlas operations was generally open and helpful and made at appropriate times, with the benefit of

hindsight there appears to be a failure in communication between PTTEPAA personnel on the West

Atlas and Atlas Drilling personnel that either caused the 340mm (13%") PCCC not being installed or

for its absence not to be recorded. The Change Control Form to install the 340mm (133/ 8,,) PCCC

58

WIT.1000.0001.0281

Page 59: State - Department of Industry, Tourism and Resources 153-t62153-162 20.20. March March 20092009 162-202 t62-202. ... Ashmore Cartier reef' The Montara Development Project involves

276

COMMISSION OF INQUIRYMONTARA \ilELL HEAD PLATFORM

UNCONTROLLED I{YDROCARBON RELEASE

was issued to the OIM. Additionally I understand that a verbal instruction was issued by a

PTTEPAA Drilling Supervisor (Mr Robinson) to an Atlas Drilling Toolpusher. These instructions

appear not to have been followed. However, the absence of the 340mm (133/s") PCCC did not cause

the uncontrolled release

It is possible that one or more people could have identified problems in the well construction

operation but none of those problems were by themselves the cause of the uncontrolled release and

the absence of identification of problems was more consistent with honest mistake rather than poor

communication.

The reason why the Hl Well became underbalanced and flowed has not been identified. I do not

believe that any communication issues caused the uncontrolled release.

I understand that a person who intentionally makes a false statement in a statutory declaration is guiþ of an

offence under section 11 of the Statutory Declarations Act 1959 (Cth), and I believe that the statements in

Declared at Perth ,n"f'âuyof March 2010

whom the declaration is made

',f?"Í,t r"fl;.tJnåf, lr,2N"r,{^*,hl-loå.4 Lr t1 'r 0 N E{

Christopher Allan Wilson

Signature ofperson

59

COMMISSION OF INQUIRY MONTARA WELL HEAD PLATFORM

UNCONTROLLED HYDROCARBON RELEASE

was issued to the OIM. Additionally I understand that a verbal instruction was issued by a

PTTEPAA Drilling Supervisor (Mr Robinson) to an Atlas Drilling Toolpusher. These instructions

appear not to have been followed. However, the absence of the 340mm (133/ 8,,) PCCC did not cause

the uncontrolled release

276 It is possible that one or more people could have identified problems in the well construction

operation but none of those problems were by themselves the cause of the uncontrolled release and

the absence of identification of problems was more consistent with honest mistake rather than poor

communication.

277 The reason why the HI Well became underbalanced and flowed has not been identified. I do not

believe that any communication issues caused the uncontrolled release.

I understand that a person who intentionally makes a false statement in a statutory declaration is guilty of an

offence under section 11 of the Statutory Declarations Act 1959 (Cth), and I believe that the statements in

this de~laration are true in every particular. /'~~~ ,7 ;::1;/

/ /c l,~,o /",/

Christopher Allan Wilson