    Downtime AnalysisMonth :June-11

    Year :2011

    Prod Cap. 210 MT

    DayBreakdown Starch Volume (MT) Raw Material

    Time (hrs) Downtime Volume Quality Peeler Washer

    1 16.69 146.00 64.00 15.67 0.00 0.00 0.00 0.00

    2 20.13 176.10 33.90 20.13 0.00 0.00 0.00 0.00

    3 17.63 154.30 55.70 17.42 0.00 0.00 0.00 0.00

    4 24.00 210.00 0.00 24.00 0.00 0.00 0.00 0.00

    5 18.14 158.70 51.30 16.00 1.92 0.00 0.00 0.00

    6 18.29 160.00 50.00 16.22 0.00 0.00 0.00 0.00

    7 22.34 195.50 14.50 21.92 0.43 0.00 0.00 0.00

    8 8.97 78.50 131.50 4.00 0.23 0.00 0.00 0.00

    9 24.00 210.00 0.00 24.00 0.00 0.00 0.00 0.0010 5.14 44.98 165.03 1.75 2.23 0.00 0.13 0.00

    11 19.52 170.83 39.18 19.52 0.00 0.00 0.00 0.00

    12 3.35 29.33 180.68 1.75 1.43 0.00 0.00 0.00

    13 15.94 139.45 70.55 14.17 1.54 0.00 0.00 0.00

    14 5.83 51.00 159.00 4.00 1.04 0.00 0.00 0.00

    15 24.00 210.00 0.00 24.00 0.00 0.00 0.00 0.00

    16 2.69 23.50 186.50 1.58 0.30 0.00 0.00 0.00

    17 21.01 183.80 26.20 21.01 0.00 0.00 0.00 0.00

    18 5.54 48.50 161.50 1.42 2.24 0.00 1.83 0.00

    19 17.14 150.00 60.00 17.09 0.00 0.00 0.00 0.00

    20 18.85 164.90 45.10 0.00 0.35 0.00 0.00 0.3321 5.20 45.50 164.50 0.00 0.00 0.00 0.00 0.00

    22 3.42 29.90 180.10 0.33 0.00 0.00 0.00 0.00

    23 16.66 145.80 64.20 15.75 0.37 0.00 0.00 0.00

    24 18.52 162.05 47.95 18.52 0.00 0.00 0.00 0.00

    25 7.09 62.05 147.95 4.08 0.00 2.13 0.00 0.00

    26 19.15 167.60 42.40 17.17 0.00 0.00 0.00 0.00

    27 18.86 165.05 44.95 17.50 1.20 0.00 0.00 0.00

    28 6.39 55.90 154.10 3.92 2.06 0.00 0.00 0.00

    29 15.83 138.50 71.50 15.75 0.00 0.00 0.00 0.00

    30 3.76 32.90 177.10 3.00 0.18 0.00 0.00 0.00

    31 0.00 0.00 210.00 0.00 0.00 0.00 0.00 0.00

    TOT 424.07 3710.63 2799.38 361.64 15.49 2.13 1.96 0.33

    ActualProductio

    n

    Hoper &Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    2/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    3/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump

    0.13 0.00 0.00 0.00 0.10 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.22 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.11 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 2.07 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 4.00 0.20 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.001.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.08 0.00 0.00 0.15 0.00 0.00 0.00 0.00 0.00

    0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.25 0.05 0.00 0.50 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00 0.00

    0.00 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.000.33 0.00 1.34 0.17 0.36 0.00 0.00 0.00 0.00

    0.33 0.00 0.00 0.00 2.17 0.00 0.00 0.00 0.00

    0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.08 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    3.22 0.05 1.84 6.88 3.16 0.00 0.00 0.22 0.00

    Extractor

    Separator

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    4/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    5/139

    Electrical UtilityLogistic

    PLN Fork Lift

    0.00 0.00 0.00 0.79 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    17.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.38 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 1.99 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    23.29 0.58 0.00 3.26 0.00 0.00 0.00 0.00 0.00

    ManPower

    Generator

    Cable,Motor &Control

    Hot OilBoiler

    WheelLoader

    DeepWell

    /Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    6/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    7/139

    Others

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.000.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.000.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    PlanedShutdown

  • 8/6/2019 Starch Plant Downtime WB June 2011

    8/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    9/139

    Down Time Analysis for the Production Units

    Plant Code : 1 Note: plant code 1

    Plant Name : Way Bungur 2

    Factory Head : N. Minarta 3

    Production Head : Heru T. 4

    Month : June-11 5

    No. Description UOM 1-Jun-11 2-Jun-11

    I Roots

    1 Roots Shortage MT 137.08 176.10

    2 Roots Quality MT

    II Mechanical equipment

    1 Hoper and belt conveyor MT

    2 Peeler MT

    3 Washer MT

    4 Choper MT 1.17

    5 Rasper MT6 Extractor MT

    7 Separator MT

    8 DHC MT 0.87

    9 Dryer MT

    10 Shifter & bagging MT

    11 Pipe and screw conveyor MT

    12 Pump MT

    III Electrical MT

    1 PLN

    2 Generator MT

    3 Line, Motor and Control

    IV Utility MT1 Hot Oil Boiler 6.88

    2 Wheel Loader

    3 Fork Lift

    4 Deep well / Water supply

    V Logistic (spare/cons. parts, delivery) MT

    VI Man power MT

    VII Planed shutdown MT

    VIII Others

    Total Daily Downtime MT 146.00 176.10

    Daily Production (actual) MT 64.00 33.90

    Daily Production Capacity MT 210.00 210.00

  • 8/6/2019 Starch Plant Downtime WB June 2011

    10/139

    for WB

    for KB

    for BTJ

    for U2

    for SIP

    3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11 8-Jun-11 9-Jun-11

    152.40 210.00 140.00 141.88 191.77 8.75 210.00

    1.92 3.73 5.15

    52.50

    18.12 2.63

    0.96

    1.90

    9.48

    0.96

    154.30 210.00 143.84 160.00 195.50 78.50 210.00

    55.70 - 51.30 50.00 14.50 131.50 -

    210.00 210.00 195.14 210.00 210.00 210.00 210.00

  • 8/6/2019 Starch Plant Downtime WB June 2011

    11/139

    10-Jun-11 11-Jun-11 12-Jun-11 13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11

    15.31 170.83 15.31 123.96 35.00 210.00 13.85

    19.47 12.48 13.45 9.07 2.65

    1.09

    9.10 1.53 0.73 1.09 2.19

    0.48

    1.31 4.33

    5.83

    44.98 170.83 29.33 139.45 51.00 210.00 23.50

    165.03 39.18 180.68 70.55 159.00 - 186.50

    210.00 210.00 210.00 210.00 210.00 210.00 210.00

  • 8/6/2019 Starch Plant Downtime WB June 2011

    12/139

    17-Jun-11 18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11 23-Jun-11

    183.80 12.40 149.52 2.92 137.81

    19.62 3.03 3.25

    16.04

    2.92

    2.92 2.92 1.46

    4.38 25.52

    1.46

    0.44 0.48 3.15 18.96

    154.58 26.25

    5.10

    3.28

    183.80 48.50 150.00 164.90 59.30 29.90 145.80

    26.20 161.50 60.00 45.10 164.50 180.10 64.20

    210.00 210.00 210.00 210.00 223.80 210.00 210.00

  • 8/6/2019 Starch Plant Downtime WB June 2011

    13/139

    24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11 28-Jun-11 29-Jun-11 30-Jun-11

    162.05 35.73 150.21 153.13 34.27 137.81 26.25

    10.47 17.98 1.55

    18.66

    1.46 3.65

    0.36 0.69

    7.29 5.10

    17.39

    162.05 62.05 167.60 165.05 55.90 138.50 32.90

    47.95 147.95 42.40 44.95 154.10 71.50 177.10

    210.00 210.00 210.00 210.00 210.00 210.00 210.00

  • 8/6/2019 Starch Plant Downtime WB June 2011

    14/139

    1-Jul-11 mtd %

    3,138.13 84.60% from total downtime

    123.80 3.34% from total downtime

    18.66 0.50% from total downtime

    17.14 0.46% from total downtime

    2.92 0.08% from total downtime

    28.20 0.76% from total downtime

    0.48 0.01% from total downtime29.90 0.81% from total downtime

    59.60 1.61% from total downtime

    45.70 1.23% from total downtime

    0.96 0.03% from total downtime

    - 0.00% from total downtime

    208.54 5.62% from total downtime

    5.10 0.14% from total downtime

    - 0.00% from total downtime

    28.51 0.77% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 0.00% from total downtime

    - 3,709.56 56.99% from max. capacity

    -

    210.00 2,799.38 43.01% from max. capacity

    -

    210.00 6,508.94

  • 8/6/2019 Starch Plant Downtime WB June 2011

    15/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 0:00 0:00 0.00 0.00 0.00

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 0.00 0.00 0.00

    Daily Production (Capacity - Breakdown) 210.00

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    16/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    17/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    18/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    19/139

    1

    Production capacity: 210 MT/da

    Problem

    1 PLN off ### 0:00

    2 PLN on 0:00 0:30

    3 Process stop due to raw material shortage 4:00 7:00

    4 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk ### ###

    5 0:00 0:00

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    20/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.08 1.00 0.73 0.08

    0.50 1.00 4.37 0.50

    3.00 1.00 26.25 3.00 3.00

    1.77 0.10 1.55 0.18 0.18

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    5.35 32.90 3.76 3.00 0.18 0.00 0.00 0.00

    177.10 3.76

    26.25 1.55 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    21/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.08

    0.50

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.58

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.10

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    22/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    23/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 ### 15.00 1.00 131.25 15.00

    2 Start up process ### ### 0.75 1.00 6.56 0.75

    3 DHC run 2 unit due to temperature boiler drop ### ### 0.75 0.10 0.69 0.08

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 16.50 138.50 15.83

    Production 71.50

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    24/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    15.00

    0.75

    15.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    15.83

    137.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    25/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.08

    0.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    26/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    27/139

    1

    2

    3

    4

    5

    6

    7

    8

  • 8/6/2019 Starch Plant Downtime WB June 2011

    28/139

    Production capacity:

    Problem

    Start up process

    Root chopper overload

    Root chopper overload

    Root chopper overload

    Root chopper overload

    Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk and also many stone

    Process stop due to raw material shortage

    Total Breakdown Time

    Production

  • 8/6/2019 Starch Plant Downtime WB June 2011

    29/139

    1

    210 MT/day

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler

    7:00 7:45 0.75 1.00 6.56 0.75 0.75

    ### ### 0.08 1.00 0.73 0.08

    ### ### 0.17 1.00 1.46 0.17

    ### ### 0.08 1.00 0.73 0.08

    ### ### 0.08 1.00 0.73 0.08

    7:45 3:50 20.08 0.10 17.98 2.06 2.06

    3:50 7:00 3.17 1.00 27.71 3.17 3.17

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    24.42 55.90 6.39 3.92 2.06 0.00 0.00

    154.10 6.39

    34.27 17.98 0.00 0.00

    X Check 0.00 OK

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    30/139

    Mechanical Problem

    Washer Choper Rasper DHC Dryer Sifter Pump PLN

    0.08

    0.17

    0.08

    0.08

    0.00 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 3.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    31/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    32/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Root chopper no.2 overload 7:20 7:25

    2 Root chopper no.1&2 overload ### ###

    3 Root chopper no.2 overload ### ###

    4 Process stop due to raw material shortage ### 7:00

    5 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 7:00 ###

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    33/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.08 0.50 0.36 0.04

    0.08 1.00 0.73 0.08

    0.08 0.50 0.36 0.04

    17.50 1.00 153.13 17.50 17.50

    6.50 0.18 10.47 1.20 1.20

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    24.25 165.05 18.86 17.50 1.20 0.00 0.00 0.00

    44.95 18.86

    153.13 10.47 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    34/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.04

    0.08

    0.04

    0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    1.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    35/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    36/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    1 Process stop due to raw material shortage 7:00 ### 16.00 1.00 140.00

    2 Strat up process ### 0:10 1.17 1.00 10.21

    3 Boiler temparature drop due to coal difficult to burn 0:10 6:40 6.50 0.31 17.39

    4 0:00 0:00 0.00 0.00

    5 0:00 0:00 0.00 0.00

    6 0:00 0:00 0.00 0.00

    7 0:00 0:00 0.00 0.00

    8 0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.000:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    Total Breakdown Time 23.67 167.60

    Production 42.40

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    37/139

    * put number from duration column

    Raw Material Mechanical

    Time Volume Quality Peeler Washer Choper Rasper

    16.00 16.00

    1.17 1.17

    1.99

    0.00

    0.00

    0.00

    0.00

    0.00

    0.00

    0.000.00

    0.00

    0.00

    0.00

    19.15 17.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    19.15

    150.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    38/139

    roblem Electrical Util

    DHC Dryer Sifter Pump PLN

    1.99

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.99 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.39 0.00

    Separato

    r

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    39/139

    ity

    Others

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    40/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    1 Process stop due to raw material shortage 7:00 7:20 0.33 1.00

    2 Start up process 7:20 8:35 1.25 1.00

    3 DHC no.2 overload ### ### 0.17 0.25

    4 PLN off and Switch on genset ### ### 0.08 0.50

    5 PLN on and switch off genset ### ### 0.42 0.50

    6 PLN off and Switch on genset ### ### 0.08 1.00

    7 PLN on and switch off genset ### ### 0.50 1.00

    8 Gearbox hopper distributor trouble ### ### 0.17 1.00

    9 Hopper distributor rasper run manual due to gearbox trouble ### 4:30 7.50 0.26

    10 Process stop due to raw material shortage 4:30 7:00 2.50 1.0011 0:00 0:00 0.00

    12 0:00 0:00 0.00

    0:00 0:00 0.00

    0:00 0:00 0.00

    Total Breakdown Time 13.00

    Production

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    41/139

    * put number from duration column

    Raw Material Me

    Time Volume Quality Peeler Washer Choper Rasper

    2.92 0.33 0.33

    10.94 1.25 1.25

    0.36 0.04

    0.36 0.04

    1.82 0.21

    0.73 0.08

    4.38 0.50

    1.46 0.17 0.17

    17.21 1.97 1.97

    21.88 2.50 2.500.00 0.00

    0.00 0.00

    0.00 0.00

    0.00 0.00

    62.05 7.09 4.08 0.00 2.13 0.00 0.00 0.00 0.00

    147.95 7.09

    35.73 0.00 18.66 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    42/139

    chanical Problem Electrical

    DHC Dryer Sifter Pump PLN

    0.04

    0.04

    0.21

    0.08

    0.50

    0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.83 0.00 0.00

    0.00 0.00 0.36 0.00 0.00 0.00 0.00 7.29 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

  • 8/6/2019 Starch Plant Downtime WB June 2011

    43/139

    Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    44/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage ### 7:00 18.52 1.00 162.05 18.52

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 18.52 162.05 18.52

    Production 47.95

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    45/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    18.52

    18.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    18.52

    162.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    46/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    47/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    48/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Process stop due to raw material shortage 8:15 ###

    2 Temperature boiler un stabil (drop) 7:00 8:15

    3 Start up process ### 0:00

    4 Root chopper overload 2:10 2:20

    5 Root chppper run 1 unit due to root chopper no.2 trouble 4:15 4:25

    6 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 0:00 3:42

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    49/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    14.92 1.00 130.52 14.92 14.92

    1.25 0.30 3.28 0.38

    0.83 1.00 7.29 0.83 0.83

    0.17 0.50 0.73 0.08

    0.17 0.50 0.73 0.08

    3.71 0.10 3.25 0.37 0.37

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    21.05 145.80 16.66 15.75 0.37 0.00 0.00 0.00

    64.20 16.66

    137.81 3.25 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    50/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.08

    0.08

    0.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    1.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    51/139

    Electrical Utility

    Others

    0.38

    0.00 0.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 3.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    52/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Automatic valve damaged milk DHC no.2 7:00 8:30 1.50 0.69 9.06 1.04

    2 DHC No 4 overload and replace cloth DHC 7:40 8:30 0.83 0.50 3.65 0.42

    (DHC run 2 unit)

    3 DHC run 3 units 8:30 ### 2.17 0.33 6.26 0.72

    4 Test 1000 KVA generator, 1000 KVA,1250 kVA ### ### 0.17 1.00 1.46 0.17

    5 Over generators to PLN ### ### 0.42 1.00 3.65 0.42

    6 8. Chopper 1, 2 trip ### ### 0.33 1.00 2.92 0.33

    7 Process stop due to raw material shortage 6:40 7:00 0.33 1.00 2.92 0.33

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 5.75 29.90 3.42

    Production 180.10

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    53/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    0.33

    0.33

    0.33 0.00 0.00 0.00 0.00 0.33 0.00 0.00 0.00

    3.42

    2.92 0.00 0.00 0.00 0.00 2.92 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    54/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    1.04

    0.42

    0.72

    0.17

    0.42

    2.17 0.00 0.00 0.00 0.00 0.00 0.58 0.00 0.00 0.00 0.00

    18.96 0.00 0.00 0.00 0.00 0.00 5.10 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    55/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    56/139

    1

    Production capacity: 210 MT/day

    Problem

    Bre

    1 Start up process 7:00 7:45 0.75

    2 Process stop due to impeller pump tank extractor stage 5 broken ### ### 0.50

    3 Start up process ### ### 0.84

    4 Process stop due to PLN off and genset trouble ### ### 1.50

    5 PLN on and Start up process ### ### 0.75

    6 Root chopper no.2 overload 5:00 5:05 0.08

    7 Replace v-belt root chopper no.2 5:30 5:45 0.25

    8 Separator no. 2 off due to rotation down ### ### 0.17

    9 DHC no.2 overload and washing ### ### 0.25

    10 DHC no.1 overload 4:00 4:10 0.1711 DHC no.1 overload 6:00 6:10 0.17

    12 0:00 0:00 0.00

    12 0:00 0:00 0.00

    0:00 0:00 0.00

    Total Breakdown Time 5.42

    Production

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    57/139

    * put number from duration column

    ak Down Raw Material

    Time Volume Quality Peeler Washer Choper

    1.00 6.56 0.75

    1.00 4.38 0.50

    1.00 7.35 0.84

    1.00 13.13 1.50

    1.00 6.56 0.75

    1.00 0.73 0.08 0.08

    1.00 2.19 0.25 0.25

    1.00 1.46 0.17

    1.00 2.19 0.25

    0.33 0.48 0.060.33 0.48 0.06

    0.00 0.00

    0.00 0.00

    0.00 0.00

    45.50 5.20 0.00 0.00 0.00 0.00 0.00 0.33

    164.50 5.20

    0.00 0.00 0.00 0.00 0.00 2.92

    X Check 0.00 OK

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    58/139

    Mechanical Problem Electrical

    Rasper DHC Dryer Sifter Pump PLN

    0.75

    0.50

    0.84

    1.50

    0.75

    0.17

    0.25

    0.060.06

    0.00 1.34 0.17 0.36 0.00 0.00 0.00 0.00 3.00 0.00

    0.00 11.73 1.46 3.15 0.00 0.00 0.00 0.00 26.25 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

    Generato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    59/139

    Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    60/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Coupling washer trouble ### ###

    2 Process stop due to checks voltage transformer ### 7:00

    3 Extractor tank overload 9:30 ###

    4 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 9:52 ###

    5 0:00 0:00

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    61/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.33 1.00 2.92 0.33 0.33

    17.67 1.00 154.58 17.67

    0.50 1.00 4.38 0.50

    3.46 0.10 3.03 0.35 0.35

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    21.96 164.90 18.85 0.00 0.35 0.00 0.00 0.33

    45.10 18.85

    0.00 3.03 0.00 0.00 2.92

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    62/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    63/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    64/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 ### 15.75 1.00 137.81 15.75

    2 Start up process ### 0:05 1.34 1.00 11.71 1.34

    3 DHC no.1 overload 4:40 4:50 0.17 0.33 0.48 0.05

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 17.25 150.00 17.14

    Production 60.00

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    65/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    15.75

    1.34

    17.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    17.14

    149.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    66/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.05

    0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    67/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    68/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Start up process 7:00 7:55

    2 Replacing gearbox motor peeler due to holder gearbox broken ### ###

    3 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 8:34 7:00

    4 Process stop due to raw material shortage 6:30 7:00

    5 DHC no.1 overload 1:20 1:30

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    69/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.92 1.00 8.02 0.92 0.92

    1.83 1.00 16.04 1.83 1.83

    22.43 0.10 19.62 2.24 2.24

    0.50 1.00 4.38 0.50 0.50

    0.17 0.30 0.44 0.05

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    25.85 48.50 5.54 1.42 2.24 0.00 1.83 0.00

    161.50 5.54

    12.40 19.62 0.00 16.04 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    70/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.05

    0.00 0.00 0.00 0.00 0.05 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.44 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    71/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    72/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 9:59 6:50 20.84 1.00 182.34 20.84

    2 Start up process 6:50 7:00 0.17 1.00 1.46 0.17

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 21.01 183.80 21.01

    Production 26.20

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    73/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    20.84

    0.17

    21.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    21.01

    183.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    74/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    75/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    76/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Process stop due to raw material shortage 7:00 8:00

    2 Start up process 8:00 8:35

    3 Separator run 2 unit due to separator no.1 replacing v-belt 8:15 9:45

    4 Root chopper overload ### ###

    5 Root chopper overload 6:00 6:05

    6 Root chopper overload 6:45 6:50

    7 Motor rasper no.3 trouble ### ###

    8 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk ### ###

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    77/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    1.00 1.00 8.75 1.00 1.00

    0.58 1.00 5.10 0.58 0.58

    1.50 0.33 4.33 0.50

    0.08 1.00 0.73 0.08

    0.08 1.00 0.73 0.08

    0.08 1.00 0.73 0.08

    0.17 0.33 0.48 0.05

    3.02 0.10 2.65 0.30 0.30

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    6.52 23.50 2.69 1.58 0.30 0.00 0.00 0.00

    186.50 2.69

    13.85 2.65 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    78/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.50

    0.08

    0.08

    0.08

    0.05

    0.25 0.05 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.00

    2.19 0.48 0.00 4.33 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    79/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    80/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 7:00 24.00 1.00 210.00 24.00

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 24.00 210.00 24.00

    Production 0.00

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    81/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    24.00

    24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    24.00

    210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    82/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    83/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    84/139

    1

    Production capacity: 210 MT/da

    Problem

    1 PLN trip 7:20 7:45

    2 Root Chopper overload 0:00 0:00

    3 PLN off and direct on ### ###

    4 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 8:37 ###

    5 Process stop due to raw material shortage 3:00 7:00

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    85/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.42 1.00 3.65 0.42

    0.25 0.50 1.09 0.13

    0.25 1.00 2.19 0.25

    10.37 0.10 9.07 1.04 1.04

    4.00 1.00 35.00 4.00 4.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    15.29 51.00 5.83 4.00 1.04 0.00 0.00 0.00

    159.00 5.83

    35.00 9.07 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    86/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.42

    0.13

    0.25

    0.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.67

    1.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.83

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    87/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    88/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Chopper no.2 overload 8:00 8:05

    2 Process stop due to raw material shortage ### ###

    3 Start up process ### 0:10

    4 Separator no.1 trip due to trouble lectrical (valtage down) 5:30 6:00

    5 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 0:10 7:00

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    89/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    0.08 1.00 0.73 0.08

    13.25 1.00 115.94 13.25 13.25

    0.92 1.00 8.02 0.92 0.92

    0.50 0.30 1.31 0.15

    6.83 0.22 13.45 1.54 1.54

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    21.58 139.45 15.94 14.17 1.54 0.00 0.00 0.00

    70.55 15.94

    123.96 13.45 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    90/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.08

    0.15

    0.08 0.00 0.00 0.15 0.00 0.00 0.00 0.00 0.00 0.00

    0.73 0.00 0.00 1.31 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    91/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    92/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Process stop due to raw material shortage 7:00 8:00

    2 Start up process 8:00 8:45

    3 Root chopper no.2 overload ### ###

    4 Root chopper no.2 overload ### ###

    5 Root chopper no.1 overload ### ###

    6 Root chopper no.2 overload ### ###

    7 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 9:00 ###

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    93/139

  • 8/6/2019 Starch Plant Downtime WB June 2011

    94/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.05

    0.04

    0.04

    0.04

    0.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    1.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    95/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    96/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage ### 7:00 19.52 1.00 170.83 19.52

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 19.52 170.83 19.52

    Production 39.18

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    97/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    19.52

    19.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    19.52

    170.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    98/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    99/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    100/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Process stop due to raw material shortage 7:00 8:00

    2 Start up process 8:00 8:45

    3 Replacing motor hoper distributor rasper due to motor hopper damaged 9:10 ###

    4 Hopper peeler clogged due to water empty (automatic pump water off) ### ###

    5 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 8:45 7:00

    6 Chopper 1&2 overload 2:00 2:07

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    1

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    101/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    1.00 1.00 8.75 1.00 1.00

    0.75 1.00 6.56 0.75 0.75

    1.83 0.50 8.02 0.92

    0.25 0.50 1.09 0.13 0.13

    22.25 0.10 19.47 2.23 2.23

    0.12 1.00 1.08 0.12

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    26.21 44.98 5.14 1.75 2.23 0.00 0.13 0.00

    165.03 5.14

    15.31 19.47 0.00 1.09 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    102/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.92

    0.12

    1.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    9.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    103/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    104/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 7:00 24.00 1.00 210.00 24.00

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 24.00 210.00 24.00

    Production 0.00

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    105/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    24.00

    24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    24.00

    210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    106/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    107/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    108/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Start up process 8:00 9:00

    2 Automatic valve DHC no.3 trouble ### ###

    3 Separator run 2 unit due to separator no.1 electrical trouble (inverter) 8:00 4:00

    4 PLN off + Chopper trip ### ###

    5 PLN off ### ###

    6 Switch off genset ### ###

    7 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk 1:42 4:00

    8 Process stop due to raw material shortage 4:00 7:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    109/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    1.00 1.00 8.75 1.00 1.00

    1.00 0.20 1.75 0.20

    20.00 0.20 35.00 4.00

    0.42 0.50 1.82 0.21

    0.33 0.50 1.46 0.17

    0.33 0.50 1.46 0.17

    2.30 0.10 2.01 0.23 0.23

    3.00 1.00 26.25 3.00 3.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    28.38 78.50 8.97 4.00 0.23 0.00 0.00 0.00

    131.50 8.97

    35.00 2.01 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    110/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.20

    4.00

    0.21

    0.17

    0.17

    0.00 0.00 0.00 4.00 0.20 0.00 0.00 0.00 0.00 0.54

    0.00 0.00 0.00 35.00 1.75 0.00 0.00 0.00 0.00 4.74

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    111/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    112/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 9:05 7:00 21.92 1.00 191.77 21.92

    2 a lot of rotten root 7:00 9:05 2.08 0.20 3.73 0.43

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 24.00 195.50 22.34

    Production 14.50

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    113/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    21.92

    0.43

    21.92 0.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    22.34

    191.77 3.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    114/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    115/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    116/139

    1

    Production capacity: 210

    Problem

    1 Process stop due to raw material shortage 7:00

    2 start production preparation ###

    3 separator number 1 suffered damage to the panel (there are sparks on the panel and inverter) ###

    (run 2 unit of separator) 0:00

    4 Too Many Rotten Root ###

    0:00

    0:00

    0:00

    0:00

    0:000:00

    0:00

    0:00

    0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    117/139

    MT/day

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    ### 15.17 1.00 132.71 15.17 15.17

    ### 0.50 0.33 1.44 0.17 0.17

    7:00 8.50 0.24 18.12 2.07

    0:00 0.00 0.00 0.00

    7:00 8.83 0.10 7.73 0.88 0.88

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.000:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    0:00 0.00 0.00 0.00

    33.00 160.00 18.29 16.22 0.00 0.00 0.00 0.00

    50.00 18.29

    141.88 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    118/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    2.07

    0.00 0.00 0.00 2.07 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 18.12 0.00 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    119/139

    Electrical Utility

    Others

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    120/139

    1

    Production capacity: 210 MT/da

    Problem

    1 Process stop due to raw material shortage 7:00 ###

    2 Start up process ### ###

    3 Temperature of boiler low ### ###

    4 DHC run 2 unit ### ###

    5 Small root (diameter bellow 2.5 cm), hard to get proper thickness of milk ### 5:20

    6 0:00 0:00

    7 0:00 0:00

    8 0:00 0:00

    0:00 0:00

    0:00 0:000:00 0:00

    0:00 0:00

    0:00 0:00

    0:00 0:00

    Total Breakdown Time

    Production

    Start

    (h:m)

    End

    (h:m)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    121/139

    * put number from duration column

    Break Down Raw Material

    Time Volume Quality Peeler Washer

    15.25 1.00 133.44 15.25 15.25

    0.75 1.00 6.56 0.75 0.75

    0.33 0.33 0.96 0.11

    0.33 0.33 0.96 0.11

    6.33 0.30 16.78 1.92 1.92

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.000.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    0.00 0.00 0.00

    23.00 158.70 18.14 16.00 1.92 0.00 0.00 0.00

    51.30 18.14

    140.00 16.78 0.00 0.00 0.00

    X Check 0.00 OK

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

    Hoper &

    Belt

  • 8/6/2019 Starch Plant Downtime WB June 2011

    122/139

    Mechanical Problem

    Choper Rasper DHC Dryer Sifter Pump PLN

    0.11

    0.00 0.00 0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.96 0.00 0.00 0.00 0.00 0.00

    Extracto

    r

    Separato

    r

    Pipe &screw

    convey

  • 8/6/2019 Starch Plant Downtime WB June 2011

    123/139

    Electrical Utility

    Others

    0.11

    0.00 0.00 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    124/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 7:00 24.00 1.00 210.00 24.00

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 24.00 210.00 24.00

    Production 0.00

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    125/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    24.00

    24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    24.00

    210.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    126/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    127/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    128/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    1 Process stop due to raw material shortage 7:00 ### 15.00 1.00 131.25

    2 Start up process ### ### 0.75 1.00 6.56

    3 Repair screw bagging for jumbo bag ### 0:00 1.00 0.22 1.90

    4 Process stop due to raw material shortage 5:20 7:00 1.67 1.00 14.58

    5 0:00 0:00 0.00 0.00

    6 0:00 0:00 0.00 0.00

    7 0:00 0:00 0.00 0.00

    8 0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.000:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    0:00 0:00 0.00 0.00

    Total Breakdown Time 18.42 154.30

    Production 55.70

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    129/139

    * put number from duration column

    Raw Material Mechanical

    Time Volume Quality Peeler Washer Choper Rasper

    15.00 15.00

    0.75 0.75

    0.22

    1.67 1.67

    0.00

    0.00

    0.00

    0.00

    0.00

    0.000.00

    0.00

    0.00

    0.00

    17.63 17.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    17.63

    152.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    130/139

    roblem Electrical Util

    DHC Dryer Sifter Pump PLN

    0.22

    0.00 0.00 0.00 0.00 0.22 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 1.90 0.00 0.00 0.00 0.00 0.00 0.00

    Separato

    r

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    131/139

    ity

    Others

    0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    Fork

    Lift

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    132/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage ### 7:00 20.13 1.00 176.10 20.13

    2 0:00 0:00 0.00 0.00 0.00

    3 0:00 0:00 0.00 0.00 0.00

    4 0:00 0:00 0.00 0.00 0.00

    5 0:00 0:00 0.00 0.00 0.00

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.000:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 20.13 176.10 20.13

    Production 33.90

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    CapacityFactor

    (0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    133/139

    * put number from duration column

    Raw Material Mechanical Problem

    Volume Quality Peeler Washer Choper Rasper

    20.13

    20.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    20.13

    176.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    X Check 0.00 OK

    Hoper &

    Belt

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    134/139

    Electrical Utility

    DHC Dryer Sifter Pump PLN

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Pipe &screw

    convey

    Generato

    r

    Cable,Motor &

    Control

    HotOil

    Boiler

    WheelLoade

    r

    Fork

    Lift

  • 8/6/2019 Starch Plant Downtime WB June 2011

    135/139

    Others

    0.00 0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00

    Logistic

    ManPower

    PlanedShut

    down

    DeepWell /

    Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    136/139

    1

    Production capacity: 210 MT/day

    Problem

    Break Down

    Time

    1 Process stop due to raw material shortage 7:00 ### 15.25 1.00 133.44 15.25

    2 Start up process ### ### 0.42 1.00 3.65 0.42

    3 DHC run 2 unit ### ### 0.33 0.30 0.87 0.10

    4 Root choper overload 6:20 6:28 0.13 1.00 1.17 0.13

    5 Temperature of boiler low ### 1:17 2.62 0.30 6.88 0.79

    6 0:00 0:00 0.00 0.00 0.00

    7 0:00 0:00 0.00 0.00 0.00

    8 0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    0:00 0:00 0.00 0.00 0.00

    Total Breakdown Time 18.75 146.00 16.69

    Production 64.00

    Note: max. prod. capacity

    1. WB 210 MT/d N. Minarta Heru T.

    2. KB 150 MT/d N. Minarta Arif Z.

    3. BTJ 160 MT/d Suryadi Gigik R.4. U2 120 MT/d Suryadi Agus S.

    5. SIP 200 MT/d Agung Siswadi

    Start

    (h:m)

    End

    (h:m)

    Duration

    (h)

    Capacity

    Factor(0.1 - 1.0)

    Capacity

    (MT)

  • 8/6/2019 Starch Plant Downtime WB June 2011

    137/139

    * put number from duration column

    Raw Material Mechanical Problem

    Quality Peeler DHC

    15.25

    0.42

    0.10

    0.13

    15.67 0.00 0.00 0.00 0.00 0.13 0.00 0.00 0.00 0.10

    16.69

    137.08 0.00 0.00 0.00 0.00 1.17 0.00 0.00 0.00 0.87

    X Check 0.00 OK

    Volum

    e

    Hoper

    & Belt

    Washe

    r

    Chope

    r

    Raspe

    r

    Extracto

    r

    Separato

    r

  • 8/6/2019 Starch Plant Downtime WB June 2011

    138/139

    Electrical Utility

    Dryer Sifter PLN

    0.79

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.79 0.00 0.00 0.00

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.88 0.00 0.00 0.00

    Pipe &

    screwconvey

    Pum

    p

    Generato

    r

    Cable,Motor

    &Control

    Hot

    OilBoiler

    Wheel

    Loader

    Fork

    Lift

    Deep

    Well /Water

  • 8/6/2019 Starch Plant Downtime WB June 2011

    139/139

    Others

    0.00 0.00 0.00 0.00

    0.00 0.00 0.00 0.00

    Logisti

    c

    ManPowe

    r

    Planed Shut

    down